Material master --> BOM --> Resource (CRC1) --> Master Recipe (C201) --> Prod. version (C223) Process order (COR1) Confirmation - COR6N operation wise confirmation, CORKb - Order confirmation The business process 1,. When you create a process order control recipe will be created if the setting done in CORN. 2.Co60- find PI sheet by giving the order number and enter the details in PI sheet and complete 3. CO54-process message monitor-give the process order number, it will display the process messages. Choose and click send the message will be sent to the destination These are following main T codes used in PP PI For Process Industry. Configuration - Create Order Type for Process Order - T.Code CORN - Create Order Type Dependent Parameter - T.Code COR4 - Production Scheduling Profile - CORY - Specify Scheduling Parameter - OPUZ - Create Control Recipe Destination - O10C - Create Process Massage Destination - O13C (Optional) - Create Process Instruction Catagory - O12C (Optional) Master Data - Create BOM - CS01 - Create Resource - CRC1 - Create Master Recipe - C201 MRP :- MD61/MD01/MD02/MD03/MD04/MD40/MD41/MD42/MD50. Production Execution :- - COR1 - Create Process Order Manual - COR7 - Convert Plan Order to Process Order - COR6N/CORZ/CORR - Order Confirmation - CORS - Cancel Confirmation - CORT - Display Confirmation - CO53 - Control Recipe Monitor (Optional) - CO55/CO60 - Maintain PI Sheet (Optional) - CO54 - Process Massage Monitor (Optional) - MB31 - Goods Receipt For Order - COIK / MB1A / MIGO :- Goods Issue - KKS1/KKS2 - Calculate Varience - CO88 - Actual settlement - COOISPI - Order Information System Master Data 1. Maintain Material master 2. create a BOM - CS01 3.Create Resource - CRC1 4.Create Master Recipe - C201 5, Create a PV-C223 PRocess folw 1 Create a PIR In MD61 OR requirement will flow from Sale order

Upload: jnsingh12345

Post on 28-Nov-2015

1.261 views

Category:

Documents


84 download

DESCRIPTION

SAP PP-PI Process Flow Docs -Useful

TRANSCRIPT

Page 1: SAP PP-PI Process Flow Docs

Material master --> BOM --> Resource (CRC1) --> Master Recipe (C201) --> Prod. version (C223)

 

Process order (COR1)

 

Confirmation - COR6N operation wise confirmation, CORKb - Order confirmation

 

 

The business process

1,. When you create a process order control recipe will be created if the setting done in CORN.

2.Co60- find PI sheet by giving the order number and enter the details in PI sheet and complete

3. CO54-process message monitor-give the process order number,

it will display the process messages. Choose and click send

the message will be sent to the destination

These are following main T codes used in PP PI

For Process Industry.

Configuration

 

- Create Order Type for Process Order - T.Code CORN

- Create Order Type Dependent Parameter - T.Code COR4

- Production Scheduling Profile - CORY

- Specify Scheduling Parameter - OPUZ

- Create Control Recipe Destination - O10C

- Create Process Massage Destination - O13C (Optional)

- Create Process Instruction Catagory - O12C (Optional)

 

Master Data

- Create BOM - CS01

- Create Resource - CRC1

- Create Master Recipe - C201

 

MRP :- MD61/MD01/MD02/MD03/MD04/MD40/MD41/MD42/MD50.

 

Production Execution :-

- COR1 - Create Process Order Manual

- COR7 - Convert Plan Order to Process Order

- COR6N/CORZ/CORR - Order Confirmation

- CORS - Cancel Confirmation

- CORT - Display Confirmation

- CO53 - Control Recipe Monitor (Optional)

- CO55/CO60 - Maintain PI Sheet (Optional)

- CO54 - Process Massage Monitor (Optional)

- MB31 - Goods Receipt For Order

- COIK / MB1A / MIGO :- Goods Issue

- KKS1/KKS2 - Calculate Varience

- CO88 - Actual settlement

- COOISPI - Order Information System

Master Data

 

1. Maintain Material master

2. create a BOM - CS01

3.Create Resource - CRC1

4.Create Master Recipe - C201

5, Create a PV-C223

 

PRocess folw

 

1 Create a PIR In MD61 OR requirement will flow from Sale order

Page 2: SAP PP-PI Process Flow Docs

 

2. run MRP in MD02, or MD01

 

3. Convert plan order to process order in MD04 or COR7

 

4. Goods Issue to process order in MB1a or MIGO or in COR6n( if it is auto GI)

 

5. Confirm operation in COR6N

 

6. GR for order in MIGO or MB31 or COR6N

 

7. Calculate over head in KG12/CO43

 

8. Calculate variance in KKS1 or KKS2

 

9. Order settlement  in ko88 oe co88

 

Optional

 

CO53 - Control Recipe Monitor

CO55/CO60 - Maintain PI Sheet

CO54 - Process Massage Monitor

 

STD REPORT

 

COOISPI - Process order information system

The below production cycle explains the basic business flow in “Process Industry”. The flow is generally focusing only on Production and Quality Management

Simple Production Cycle:

Consider all Raw materials are available in plant and production process yet to start, the following stages are to be followed

1. Create Process Order 

Here we are creating a process order based on the capacity of the equipments and resource availability

2.   Release the Process order

Once Process order created, it has to be released for production, means system will check the scheduling, material availability, capacity planning, etc., and then release process takes place

3.      Goods issue from the Stores

Once PO got released, goods issue against the process order will takes place

4.      Start processing

Product process against the PO will start

5.      Confirmation Process

Page 3: SAP PP-PI Process Flow Docs

After production, the final out put confirmation from the process will be entered

6.      Goods Receipt Process

Goods receipt process plays a major role in any business here we have to do 101 movement type and do the postings. In goods issue process they will issue the goods against PO in 261 movement type.

7.      Quality Approval and Release

Once GR from the production was made, the material will come to Quality control for approval. Here QC person will check the material and they will do the result recording and usage decision

8.      Stock will appear in Unrestricted use for SALE /  Further Process

Once usage decision was made the material will automatically moved into unrestricted use. The FG is ready for sale

By keeping above all points in mind, the following masters and transactions are required to proceed  

S. No

Master Trans-action

T-code Description Where has to be used

1 √   MM01 Create Material Used for creating Recipe and further tracking

2 √   CRC1 Create Resource Machine / set of Machines used for making the product

3 √   C201 Create Recipe Here we are calling resource and materials required to make the finished product

4 √   QS21 Create MIC List of specifications to be checked for that concerned finished goods

5 √   QP01 Create Quality Plan Creating Quality Plan6   √ COR1 Create Process

OrderInitiating Production Process by creating Process Order

7   √ MIGO with 261 movement

Goods Issue Process Goods issue to Manufacturing unit

8   √ CORK Confirmation Process

Production Output confirmation Process

9   √ QA32 Quality Approval and Usage Decision

QC will approve and release for further process

Step by Step Execution Process:

Scenario Explanation:

REQUIREMENTS:

For a leading Process Manufacturing Company ABC, they are selling the product “FG 1”, the raw materials and resource requirements are listed below

Raw Materials required for making 50kg of Finished Product, FG 1 are

S.No Material Code / Material Type

Material Description Quantity required Unit of Measurement

Page 4: SAP PP-PI Process Flow Docs

1 RM l 1 / ROH Raw Material 1 80 Kg2 RM 2 /ROH Raw Material 2 20 Kg3 BP  1 / FERT Byproduct 60 L

Resources required for making 50kg of Finished Product FG1

S.No Resource Code Resource Description Capacity1 CRC-001 Reactor 2KL2 CRC-002 Vessel 4KL

List of MASTERS required for addressing the above scenario  

1.      Create Materials using MM01 transactions in the following way:

In this screen select “select views” button and extend the following fields

Page 5: SAP PP-PI Process Flow Docs

We have selected basic information entries field. Fill the information and finally select the General plant / storage data and give plant as 1100 and storage as 0001 in case of Raw material.

The same procedure has to be repeated for finished goods and Co-Products, in plant storage data we have to give Plant 1100 and storage 0004.

2.      Create   Resource master using CRC 1 Transactio

Here we have to mention the Person responsible and standard value type “SAP1 – Normal Production”.

Page 6: SAP PP-PI Process Flow Docs

Here we are planning to give the controlling area and cost center. Finally save the data. The same procedure has to be repeated for CRC-002

3.       Create Recipe using resource and material in T-code C201

Page 7: SAP PP-PI Process Flow Docs

In the above screen we have to enter the material we want to produce “FG 1”, and give the plant code and profile “PI01” then enter.

In the recipe header we have to enter the status as “4” and Usage as “1”  , go for Operations screen

Page 8: SAP PP-PI Process Flow Docs

Here we have to call the resource and the description details, for example in reactor CRC-001, the operations like Heating and transfer process will be carried out the same has been explained in this description field. As per standard value key we have to give the duration for the operation time and labor time. Both will be taken for scheduling.

In the material tab, we have to enter the version for the BOM and usage details, after that we have to enter the list of raw materials required for making 50 kg of the FG 1 product. Here co-product is generating so we have to give the co-product “BP 1” 60 L as “Negative” producing after the process (NOT as INPUT) and activate as Co-Product by selecting the line item and press items tab and  select co-product tab.  

In the header level line item we have the base quantity i.e Finished goods quantity, give 50 and save

Now Recipe is ready.

4.       Create MIC using QS21 transaction

Page 9: SAP PP-PI Process Flow Docs

Here give the short text, field search and int. char.desc as pH and select the Quantitative check box.

Page 10: SAP PP-PI Process Flow Docs

  

pH have some ranges so, we have to select the limits are upper and lower spec limits.

The same way we have to create temperature also

5.       Now create the Quality plan using QP01  

Page 11: SAP PP-PI Process Flow Docs

Now we are planning to create the quality plans which are to be tested before release from QC

Header data details as above

Then Go to operations and give control key as QM01, select the line item and go to inspection description tab.

Enter the MIC details here. While entering system will ask the upper spec and lower spec limits. Enter limits and save 

Masters are ready to proceed the Production Cycle  

We will start Production Cycle using transactions

1.       Create Process Order using COR1

Page 12: SAP PP-PI Process Flow Docs

Here give the total quantity as “50” and enter the start date, system will check the scheduling and capacity planning and finally finish date will come.

Now, once the process is over check the master data, in that we can find the created recipe group for that material “FG 1”

Page 13: SAP PP-PI Process Flow Docs

Now the PO stated us “Created”

Press the Flag button and ‘Release” the PO for production. After pressing flag button, actually system will checks material availability, scheduling, capacity planning etc., Once it is over the status of the PO will be changed to “Released mode”  

Save the Process order.

Page 14: SAP PP-PI Process Flow Docs

2.       Goods issue against the Process order using MIGO Transaction

Goods issue generally happens from store against the PO with the movement type 261

Once goods issue from the stores is over, the document number will be generated as below 

Page 15: SAP PP-PI Process Flow Docs

Now go to process order and check the order status “GMPS” will appear, that means Goods Movement Posted

Now Production process was started and completed. We are going to give confirmation using CORK transaction

3.       Confirmation using CORK     Transaction

Once you enter, the yield quantity you have to confirm

Page 16: SAP PP-PI Process Flow Docs

Here in MM01, Quality Management views we have to activate the inspection lot origin “04” for inspection triggering while making Goods receipt using 101 transaction. The following procedure has to be adopted. 

Select Inspection set up tab and activate  04 inspection type.

Page 17: SAP PP-PI Process Flow Docs

This activity has to be done at the time of creation of Master (MM01)

4.       Goods Receipt using MIGO with movement type 101  

If you check this screen the outputs finished product 1 and co product 1 with the quantities viz., 50 and 60 will be there. We have activated QM view only for FG 1 and not for BP 1 material. So once GRN was made the material FG 1  will be automatically moved to Quality inspection and BP 1 will be moved to “unrestricted use”.

At the time of GRN we are creating the batch for FG 1 as “FG00000001”

Page 18: SAP PP-PI Process Flow Docs

For BP 1 we are creating Batch as “CO00000001”. The batch can be created at the time of creation of Process order also.

Here we are mentioning the storage location for the final products “0004”

Once GRN made the document number will be generated for Accounting updates

Page 19: SAP PP-PI Process Flow Docs

5.       Quality Approval and Release

Now check the MMBE view, in that the material FG 1 appears in “Quality inspection”

And at the same time BP 1 in which QM was not activated, the stock appears in Unrestricted use

Page 20: SAP PP-PI Process Flow Docs

Result recording and Usage decision process for the Material FG 1 batch FG00000001

Go to QA32 and give the inspection lot origin as”04” and press enter

Check the status. The system status should be “RELEASED” 

Press “Results” button and do result recording

Page 21: SAP PP-PI Process Flow Docs

 

After entering the actual value the final screen will be like below 

Now, go to Usage decision button in the same QA32 Transaction and do accept the batch

Page 22: SAP PP-PI Process Flow Docs

Once you save the inspection stock details will come

Enter the stock quantity “50” to unrestricted and check the MMBE view now

Material will be moved to unrestricted use . Now sales process will start.  

Page 23: SAP PP-PI Process Flow Docs

The above cycle is simple production process generally carried out in “Process industries”

CRC1 - Create ResourceCR24 - Create Resource NetworkCR31 - Create HierarchyC201 - Create Master RecipeC251 - Print Master RecipeC223 - Maintain Production VersionsCOIO - Order Info System for PP-PICOPD - Print Process OrderCOPI - Print Process Order ShopFloor PapersCOR1 - Create Process OrderCOR5 - Collective Process Order ReleaseCOR6 - Single Process Order ConfirmationCOR6N - Single Screen Entry of ConfirmationsCOR7 - Convert Planned Order to Proc. OrderCOR7_PC - Part.Conv.: Plnned Ord. to Proc.Ord.COR8 - Coll.Conv.: Plnned Ord. to Proc.Ord.CORK - Process Order Confirmations (Total)CORM - Mass ProcessingCORO - Create Process Order w/o MaterialCORR - Collective Entry of ConfirmationsCORS - Cancel Process Order ConfirmationCORT - Display Process Order ConfirmationCORZ - Process Order: Time Event Confirmat.COA6 - Process Order: ArchivingCOA7 - Process Order: Retrieval - ArchiveCOA8 - Process Order: Archive ManagementCO56 - Display PI SheetCO58 - Maintain PI SheetCO59 - Delete PI SheetCO60 - Find PI SheetCOPOC - Process Manufacturing CockpitCO53 - Control Recipe Monitor

Page 24: SAP PP-PI Process Flow Docs

O10C - Assig. Ctrl Rec. Dest./Proc. Instr.O12C - Assign Charact. / Proc. Instr. Cat. 

MD61 CREATE PLANNED INDEPENDET REQUIREMENTMD11 CREATE PLAANED ORDERMD01 MRP RUN COLLECTIVEMD02 MRP SINGLE ITEM MULTI LEVELMD03 SINLE ITEM SINGLE LEVELMD04 STOCK-REQUIREMENT LIST(PLANNEC-PROCESS)MD07 STOCK-REQUIREMENT LIST COLLECTIVEMD40 MPS RUN(MRP - RUN)MD41 Single Item MultilevelMD42 Single Item Singlelevel MD50 Sales Order Planing - Make to order planingMD73 DISPLAY TOTAL REQUIREMENTMD15 CONVERT PLANNED ORDER TO PURCHASE REQ.MD16 DISPLAY PLANNED ORDERMD45 PLANNING RESULTCO24 MISSING PART INFO SYSTCM01 CAPACITY PLANINGCM02 CAPACITY PLANINGCM04 CAPACITY PLANINGMDVP COLLECTIVE AVAILABILITY CHECK(PRODUCT WISE)MF63 STAGING SITUATION STORAGE LOCATION LEVELMD15 CONVERT PLANNED ORDER TO PURCHASE REQUISTIONMD14 MS64 COPY VERSION(CHANGE VERSION FROM INACTIVE TO ACTIVE)COR7 CONVERT PLANNED ORDER TO PROCESS ORDERCOR8 CONVERT PLANNED ORDER TO PROCESS ORDERCOR1 CREATE PROCESS ORDER (MANUALY)COR2 CHANGE PROCESS ORDERCOR3 DISPLAY PROCESS ORDERCOOISPI PROCESS ORDER INFORMATION SYSTEMCOHVPI MASS PROCESSING FOR PROCESS ORDERMC01 LOGISTIC INFORMATION LIBRARYMC02 INFO-LIBRARYMC03 INFO-LIBRARYMR21 PRICE LISTCM05 CHECK FOR CAPACITY OVERLODMD48 CROSS PLANT EVALUATIONCOR1 CREATE PROCESS ORDER MANUALLYO0SC CREATE PROCESS ORDER BY SELECTING PRODUCTION VERSIONCOOISPI PROCESS ORDER INFORMATION SYSTEMCOHVPI MASS PROCESSING FOR PROCESS ORDERCOR5 COLLECTIVE ORDER RELEASECOR7 CONVERT PLANNED ORDER TO PROCESS ORDERCOIK PICIKING LISTMB26 PICK LISTMB25 RSERVATION LISTMB21 CREATE RESERVATIONMB22 CHANGE RESERVATIONMB31 GOODS RECEIPT FOR ORDERCOR6N PHASE CONFIRMATIONCORS DELETE PHASE CONFIRMATIONCORR COLLECTIVE PHASE CONFIRMATIONCO53 CONTROL RECIPE MONITORCO55 WORK LIST FOR PI SHEETCO54 PROCESS MESSAGE MONITERCO60 FIND PI SHEET

Page 25: SAP PP-PI Process Flow Docs

CO64 WORK LIST FOR PI SHEETCO67 WORK LIST FOR PI SHEET

MINING-LIME STONE CRUSHING-RAW MEAL PREPARATION-CLINKER FORMATION- FINISH CEMENT GRINDING-SLAG & CEMENT BLENDING-PACKINGMining - where u get the uncrushed limestone Crushing - where u will make the crushed limestone from uncrushed limestone Raw Meal Preparation - where additive like iron ore etc are added to crushed limestone Clinkerisation - Raw meal is heated in kiln and get the clinker, small rock or pebble like substances. Grinding - Clinker along with gypsum is grinded to make cement. Packing - Cement is either packed in 50 kg bags or in jumbo boxes or in trucks or ships as per facility in factory.