Page 1: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Neotech Institute of Technology

Neotech Institute of technologyDepartment of Civil Engineering

Students name:- Vishvjit RajputAnkit RadadiyaNitin RakholiyaAditya RamaniVidhi RanaYash Rane

Guided By:- Daivakshi B. BhattRuchi P. Barve

Page 2: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

SARDAR SAROVAR DAM

Neotech Institute of Technology

Page 3: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Glance at the project

• Estimated Cost - Rs. 392.4 billion (8 billion USD)• Main Dam - 1,210 m long, 163 m high from the

deepest foundation level.• World's Second Largest Concrete Gravity Dam (by

volume) after Grand Coulee.• World's Third Highest Spillway discharging capacity

- 87,000 m3/second• Designed Live Storage Capacity of the Reservoir

5860 MCM (4.75 million acre feet)• Hydropower - 1,450 MW installed capacity (1 billion

kWh every year)Neotech Institute of Technology

Page 4: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Glance at the project• Irrigation - 1.905 million Ha (1.8 million Ha. in

Gujarat benefitting 1 million farmers)

• Drinking Water - 9633 villages and 131 towns (29 million people)

• Canal Network - Approximately 75,000 km length within Gujarat.

• Main Canal - 458.318 km long, capacity 1,133 m3/second, 633 structures

• No. of Employees – 4673

Neotech Institute of Technology

Page 5: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Silent features of the dam

Dam Type Concrete Gravity Dam

Dam height 163m

Dam length 1210m

Estimated Cost 392.4 billion (8 billion USD)

Spillway discharge capacity 87000m3/s

Design storage capacity 5860MCM (4.75 million acre feet)

Hydropower 1450 MW

Installed capacity 1 billion kWh every year

Irrigation 1.905 million Ha.

Drinking water supply 9633 villages & 131 towns (29 million people)

Canal Network Approx. 75000 km within Gujarat

Main canal 458.318 km long

Capacity of Main Canal 1133m3/s

Number of employees 4673Neotech Institute of Technology

Page 6: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Some photos of sardar sarovar

Neotech Institute of Technology

Page 7: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Neotech Institute of Technology

Page 8: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Neotech Institute of Technology

Page 9: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Present statistic of Sardar Sarovar

• For the first time in its history, the Sardar Sarovar Dam across Narmada river started overflowing at the level of 131.05 metres.

• The highest level of water at the dam earlier was 129.5 metres July 29, 2013.

• The dam is overflowing because of the heavy rains in catchment areas of Madhya Pradesh.

• Due to the heavy rains in the catchment area of Narmada Dam as well as release of 1.5 lakh cusecs water last Friday and 2.5 lakh cusecs water last Saturday.

Neotech Institute of Technology

Page 10: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

BENEFITS OF SARDAR SAROVAR

• Irrigation :The Sardar Sarovar Project will provide irrigation facilities to 18.45 lac ha. of land, covering 3112 villages of 73 talukas in 15 districts of Gujarat.

• It will also irrigate 2,46,000 ha. of land in the strategic desert districts of Barmer and Jallore in Rajasthan and 37,500 ha. in the tribal hilly tract of Maharashtra through lift.

• About 75% of the command area in Gujarat is drought prone while entire command in Rajasthan is drought prone. Assured water supply will soon make this area drought proof.

Neotech Institute of Technology

Page 11: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

BENEFITS OF SARDAR SAROVAR• Drinking water supply : A special allocation of 0.86

MAF of water has been made to provide drinking water to 131 urban centres and 9633 villages (53% of total 18144 villages of Gujarat) within and out-side command in Gujarat for present population of 29 million and prospective population of over 40 million by the year 2021. All the villages and urban centres of arid region of Saurashtra and Kachchh and all "no source" villages and the villages affected by salinity and fluoride in North Gujarat will be benefited.

Neotech Institute of Technology

Page 12: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

BENEFITS OF SARDAR SAROVAR

• Power : There are two power houses viz. River Bed Power House and Canal Head Power House with an installed capacity of 1200 MW and 250 MW respectively. The power would be shared by three states - Madhya Pradesh - 57%, Maharashtra - 27% and Gujarat 16%. This will provide a useful peaking power to western grid of the country which has very limited hydel power production at present.

• A series of micro hydel power stations are also planned on the branch canals where convenient falls are available.

Neotech Institute of Technology

Page 13: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

BENEFITS OF SARDAR SAROVAR

• Flood Protection : It will also provide flood protection to riverine reaches measuring 30,000 ha. covering 210 villages and Bharuch city and a population of 4.0 lac in Gujarat.

• Wild Life : Wild life sanctuaries viz. "Shoolpaneshewar wild life sanctuary" on left Bank, Wild Ass Sanctuary in little Rann of Kachchh, Black Buck National Park at Velavadar, Great Indian Bustard Sanctuary in Kachchh, Nal Sarovar Bird Sanctuary and Alia Bet at the mouth of River will be benefited.

Neotech Institute of Technology

Page 14: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

BENEFITS OF SARDAR SAROVAR

• Additional Production : SSP would generate electricity. On completion, annual additional agricultural production would be Rs. 1600 crores, power generation and water supply Rs. 175 crores, aggregating about Rs. 2175 crores every year equivalent to about Rs. 6.0 crores a day.

Neotech Institute of Technology

Page 15: SARDAR SAROVAR DAM Neotech Institute of Technology Neotech Institute of technology Department of Civil Engineering Students name:- Vishvjit Rajput Ankit

Thank you

Neotech Institute of Technology