Page 1: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in
Page 2: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

Satluj Jal Vidyut Nigam Ltd.

REVIEW REPORT ON MEASURES TO AVOID SUBMERGENCE OF DEBAL SMALL HYDROPOWER STATION SITUATED IN THE UPSTREAM OF PROPOSED DEVSARI HYDROPOWER PROJECT

Prepared by:

Alternate Hydro Energy Centre

Indian Institute of Technology Roorkee

April 2018

Page 3: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

Satluj Jal Vidyut Nigam Ltd.

REVIEW REPORT ON

MEASURES TO AVOID SUBMERGENCE OF DEBAL SMALL HYDROPOWER STATION SITUATED IN THE UPSTREAM OF PROPOSED DEVSARI HYDROPOWER PROJECT

Prepared by:

Alternate Hydro Energy Centre

Indian Institute of Technology Roorkee

April 2018

Page 4: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

CONTENTS

Title Page No.

1. Introduction 1

2. The Sponsor, Background and Scope of Work 1

2.1 Sponsor 1

2.2 Background 1

3. Scope of Work 2

3.1 Alternative –I 2

3.2 Alternative –II 2

3.3 Alternative –III 2

4. Review by AHEC 3

5. Conclusions and Recommendations 4

List of Personnel Involved 6

Annexure-1 7

Annexure-2 8

Annexure-3 9

Page 5: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

1

REVIEW REPORT ON MEASURES TO AVOID SUBMERGENCE OF

DEBAL SMALL HYDROPOWER STATION SITUATED IN THE

UPSTREAM OF PROPOSED DEVSARI HYDROPOWER PROJECT

1.0 INTRODUCTION

Devsari hydropower project (252 MW) is being developed by SJVN Ltd., on river

Pinder in Chamoli district of Uttarakhand. Devsari hydropower project is a run of river project

with peaking diurnal storage to utilise the lean flows Pinder River. The full reservoir level of

this project is 1300 m. The weir site of Devsari project is located 1.75 Km in the downstream

of confluence of Kailganga with Pinder River. There is one power station named as Debal small

hydropower station (2 x 2.5 MW) on Kailganga whose machine hall floor level is 1287 m. Thus

Debal power station commissioned in the year 2007 shall be submerged in the pondage area of

Devsari project on its commissioning.

2.0 THE SPONSOR, BACKGROUND AND SCOPE OF WORK

2.1 Sponsor

SJVN Ltd. is a public sector company as a joint venture of Govt. of India and Govt. of

Himachal Pradesh. SJVNL has commissioned Nathpa Jhakri hydropower project in Himachal

Pradesh and working on several project in Himachal Pradesh and Uttarakhand. SJVN Ltd has

assigned Alternate Hydro Energy Centre, Indian Institute of Technology Roorkee (AHEC,

IITR), for the study of alternative measures to avoid submergence of Debal power station.

2.2 Background

AHEC IIT Roorkee carried out a detailed study on various possible alternatives in the

year 2011 and submitted the report to SJVNL in July 2011. The alternatives considered were

(i) Alternative – I: Purchase of the existing Debal Power House by SJVN Ltd.

(ii) Alternative – II: Construction of a protection wall around Debal power house.

(iii) Alternative – III: Shifting of Debal Power House to a higher elevation with

existing machines.

(iv) Alternative – IV: Shifting of Debal Power House at the toe of devsari dam.

(v) Alternative–V: Purchase of Debal Power House by SJVN Ltd and construction

of a new small power house at a higher location with new machines.

Page 6: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

2

In this report it was concluded that Alternative-V appears to be most appropriate

measure where SJVNL should outright purchase the Debal Power Station and construct a new

small power station at a higher elevation.

3.0 SCOPE OF WORK

SJVNL vide its letter dated Feb 06, 2018 intimated that the proposal of purchase of

Debal SHP by SJVNL did not go through due to non-willingness of Debal SHP

developer and they have prepared a report on measures to avoid submergence of Debal

SHP in January 2018 with various alternatives for protection of Debal SHP. SJVN

submitted its proposal with three alternatives to AHEC, IIT Roorkee for review. The

alternatives prepared by SJVNL are as follows:

3.1 Alternative –I

Construction of protection wall around the Debal Power Station with an underground

gallery of dia 3m to divert the water from the tail race of Debal SHP to the downstream

of Devsari HEP dam.

3.2 Alternative –II

Construction of protection wall around the Debal Power Station with combination of 3

nos. steel pipes in open (dia 1.8m) and underground gallery (dia3 m) to divert the water

from the tail race of Debal SHP to the downstream of Devsari HEP dam. Total length

of diversion arrangement shall be 2450m out of which, length of diversion arrangement

through steel pipes in open shall be 730m (approx.), whereas, length of diversion

arrangement through underground gallery shall be 1720m (approx.).

3.3 Alternative –III

Construction of protection wall around the Debal Power Station with combination of 3

nos. steel pipes in open (dia. 1.8m) and underground gallery (dia.3 m) to the

downstream of Devsari HEP dam. Total length of diversion arrangement shall be

2990m out of which, length of diversion arrangement through steel pipes in open shall

be 1990m (approx.), whereas, length of diversion arrangement through underground

gallery shall be 1000m (approx.).

Page 7: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

3

4.0 REVIEW BY AHEC

AHEC IIT Roorkee carried out detailed review study of the new proposal (January

2018) submitted by SJVNL. All the three alternatives considered by SJVNL as shown in Fig.

1 were studied. For stability of protection wall and feasibility of underground gallery (tunnel)

observations were communicated to SJVNL vide our letters dated April 11, 2018 (Annexure-

I) and April 20, 2018 (Annexure-II). These observations were discussed in detail with the

SJVNL team comprising of their design and field personal at Roorkee on April 13, 2018 and

April 25, 2018. SJVNL submitted their response to the observations vide their letter dated April

25, 2018 (Annexure-III).

Based on the detailed study of the proposals submitted by SJVNL, it is found that the

Alternative-I appears to be technical feasible among the proposed three alternatives.

According to this proposal, the following works have been provided to avoid

submergence of Debal SHP station with the estimated cost of 65.3 crores

(i) A RCC wall on the river side of Debal power house to eliminate its

submergence. The wall shall be founded one firm rock available at site as per

SJVN response and shall be about 14 metres high above its foundation level.

The top of the wall shall be at El. 1302.0 m i.e. about 1.0 metre above the

HFL/FRL of the proposed Devsari dam reservoir. The upstream and

downstream ends of the wall shall be tied to high ground levels.

(ii) A 3 m size D-shaped tunnel (gallery) of about 2,319 m length to divert the tail

water of Debal SHP to the downstream of the proposed Devsari dam so as to

keep the tail water levels of Debal SHP unaltered even after construction of

Devsari dam.

It is suggested that the following additional provisions are to be made at the time of

implementation including detailed engineering design and construction drawings of the

protection wall.

(1) The Debal power house would have been designed for normal conditions. After

the construction of retaining wall with the water around, Debal power shall

undergo excessive uplift pressure for which the same may be checked and

necessary strengthening need to be carried out.

Page 8: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

4

(2) Pull out tests under submerged conditions may be carried out to determine the

actual strength the of the rock anchors to ensure safety of retaining wall in

overturning and sliding.

(3) A grout curtain may be provided below the wall so as to minimize seepage of

water from Devsari reservoir towards Debal SHP.

(4) A drain with a sump to catch seepage may be constructed at the toe of the

retaining wall to drain and pump out any seepage towards Debal SHP.

5.0 CONCLUSIONS AND RECOMMENDATIONS

The Alternative-I where construction of protection wall around the Debal Power Station

with an underground gallery of dia 3 m to divert the water from the tail race of Debal SHP to

the downstream of Devsari HEP dam is proposed by SJVNL in their report of January 2018

appears to be technical feasible among the other alternatives. However, construction of

protection wall is not an aesthetically sound measure.

Page 9: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

5

Fig. 1: Alternative measures for Debal SHP

Page 10: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

6

LIST OF PERSONNEL INVOLVED

SJVN Limited

1. Er. N.C. Bansal, Executive Director

2. Er. Arun Dhiman, Sr. AGM (Civil)

3. Er. Rakesh Sehgal, Sr. AGM (Civil Design)

4. Er. Revti Raman, Sr. Manager (Civil Design)

ALTERNATE HYDRO ENERGY CENTRE

1. Prof S K Singal, Head & PI

2. Prof Arun Kumar, Professor & Chair Professor (RE)

3. Shri D K Agarwal, Consultant

Page 11: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

7

ANNEXURE-1

izks- ,l- ds- flaxy

v/;{k

Prof. S.K. Singal Head

Hkkjrh; izkS|ksfxdh laLFkku] #M+dh

O©dfYid ty ÅtkZ dsUnz

#M+dh&247 667 ¼mÙkjk[k.M½] Hkkjr

INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE ALTERNATE HYDRO ENERGY CENTRE

ROORKEE – 247 667 (Uttarakhand), INDIA

Phone: (01332) 285213, 274254, Fax: (01332) 273517, 273560

E-mail : [email protected], [email protected], [email protected]

No. AHEC/C-1015/852

Dated: April 11, 2018

Shri Arun Dhiman

Sr. AGM (Civil)

Satluj Jal Vidyut Nigam Ltd.,

9, Phase – II, Vasant Vihar, Dehradun – 248006

Tel: 0135 – 2760983; Fax: 0135 – 2762771, Mob: 9418053338

E-mail: [email protected]; [email protected]; [email protected]

Sub: Measures to avoid submergence of Debal small hydropower station (2 x 2.5 MW)

situated in the upstream of proposed Devsari HEP. Technical Examination /

review of the report thereof

Dear Sir,

We have gone through the technical report showing different alternatives suggested by

AHEC to avoid submergence of Debal SHP station. Our preliminary observations and details

required are given below.

1. In order to check the feasibility of underground gallery, geological details along the

route of the gallery are required.

2. For checking the design of the retaining wall around Debal power house, following

information is required

a. C & values of the foundation strata in submerged condition.

b. Silt factor if the foundation strata is not rocky.

c. Maximum and minimum tailrace levels of Debal power house tailrace.

d. Plan, transverse and longitudinal sections of Debal power house

3. Stability of the retaining wall has been checked by taking into account full passive

resistance generated through the stem. For safe design, only one third of the passive

resistance should be considered.

As discussed, a meeting with your designers may be held at AHEC, IIT Roorkee on

April 13, 2018 at 11 AM. Please make it convenient to attend the same alongwith the details given above.

Yours faithfully,

(SUNIL KUMAR SINGAL)

CC: Shri NC Bansal

Executive Director

SJVN Ltd.,

9, Phase II, Vasant Vihar, Dehradun 248006

Tel: 0135-2760983, Mob: 941 805 7575

E-mail: [email protected] (SUNIL KUMAR SINGAL)

Page 12: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

8

ANNEXURE-2

izks- ,l- ds- flaxy

v/;{k

Prof. S.K. Singal Head

Hkkjrh; izkS|ksfxdh laLFkku] #M+dh

O©dfYid ty ÅtkZ dsUnz

#M+dh&247 667 ¼mÙkjk[k.M½] Hkkjr

INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE ALTERNATE HYDRO ENERGY CENTRE

ROORKEE – 247 667 (Uttarakhand), INDIA

Phone: (01332) 285213, 274254, Fax: (01332) 273517, 273560

E-mail : [email protected], [email protected], [email protected]

No. AHEC/C-1015/928

Shri Arun Dhiman Dated: April 20, 2018

Sr. AGM (Civil)

Satluj Jal Vidyut Nigam Ltd.,9, Phase – II, Vasant Vihar, Dehradun – 248006

Tel: 0135 – 2760983; Fax: 0135 – 2762771, Mob: 9418053338

E-mail: [email protected]; [email protected]; [email protected]

Sub: Measures to avoid submergence of Debal small hydropower station (2 x 2.5 MW)

situated in the upstream of proposed Devsari HEP. Technical Examination /

review of the report thereof

Dear Sir,

We have reviewed the details submitted by you by email on April 17, 2018 and our

observations are as follows:

1. The retaining wall is unsafe in sliding, overturning and bearing pressure. It has been

justified as safe by providing anchor bolts. Anchor bolts can only be provided if there is

sound rock at foundation level.

2. The retaining wall will have to be checked for piping failure, if it is not founded on rock.

3. While designing the retaining wall, the maximum tail water level at power house side

should also be considered.

4. The water load on the heel has not been considered. Since the uplift pressure will not be

exactly equal to water load, it should be taken into consideration.

5. The ground level on the power house side should also be considered to determine the

passive resistance.

6. The angle of internal friction ɸ, which has been assumed equal to 30 degrees, will be lesser

than that because of submerged conditions.

7. Further, geotechnical / geological details below the retaining wall and along the proposed

tunnel alignment may also be provided.

8. The Debal power house would have been designed for normal conditions. After the

construction of retaining wall with the water around, Debal power shall undergo excessive

uplift pressure for which the same may be checked.

9. Cost estimate for each component may also be provided.

It is proposed that a meeting with your designers may be held at AHEC, IIT Roorkee

on April 26, 2018 at 11 AM. Please confirm and make it convenient to attend the same

alongwith the details given above.

Yours faithfully,

CC: Shri NC Bansal (SUNIL KUMAR SINGAL)

Executive Director

SJVN Ltd., 9, Phase II, Vasant Vihar, Dehradun 248006

Tel: 0135-2760983, Mob: 941 805 7575,

E-mail: [email protected] (SUNIL KUMAR SINGAL)

Page 13: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

9

ANNEXURE-3

SJVN Limited (A Joint venture of Govt.Of India &Govt. Of H.P)

Devsari Hydro Electric Porject (252MW) Therali,Distt.Chamoli,Uttarakhand:246481.

No. SJVN/DHEP/CAMP-ROORKEE/4-2018- 1 Dated:25.04.18

To,

Prof. S.K. Singal,

Head AHEC,

IIT Roorkee.

Sub: Measures to avoid submergence of Debal small hydropower station (2x2.5 MW)

situated in the upstream of proposed Devsari HEP. Technical Examination/review

of the report thereof.

Ref: i) SJVN/DHEP/PCD-DHEP/225/18-1178-1181 dated 17.03.2018.

ii) AHEC/C-1015/852 dated 11.04.2018.

iii) AHEC/C-1015/928 dated 20.04.2018.

Dear Sir,

This has reference to the communication refered above and subsequent meetings held

at IIT Roorkee on 13.04.2018 and 25.04.2018 alonwith SJVN Project and Design Team. In this

regard, the pointswise replies/details required for review of the subject cited report has been

given in the tables as under:

a) Replies w.r.t. AHEC/C-1015/852 dated 11 April 2018

Sr.

No.

Comments Reply

1 Underground gallery, geological details along

the route of the gallery are required.

The details in the vicinity attached at

Annex- A1.

2-a C & ϕ values of the foundation strata in

submerged condition.

The value of C is 6.34 Mpa and ϕ is 35°.

2-b Silt factor if the foundation strata is not rocky Silt factor is 0.661

2-c Maximum and minimum tailrace levels of Debal

power house tailrace.

Max TRT level:-1288.98m and Min. is

1287.48m

2-d Plan, transverse and longitudinal sections of

Debal power house

The details are covered in the SJVN

Report of Feb.2018.

3 Stability of the retaining wall has been checked

by taking into account full passive resistance

generated through the stem. For safe design,

only one third of the passive resistance should be

considered

The revised computations for stability

analysis have been carried out as

suggested.

Refer Annex-A2

b) Replies w.r.t. AHEC/C-1015/928 dated 20.04.18 Sr.

No.

Comments Reply

1. The retaining wall is unsafe in sliding,

overturning and bearing pressure. It has

been justified as safe by providing anchor

Sound rock is available at foundation level and

as such retaining wall has been designed and its

Page 14: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

10

bolts. Anchor bolts can only be provided

if there is sound rock at foundation level.

safety has been ensured by providing

anchorbolts.

Refer Annex-A1

2. The retaining wall will have to be checked for

piping failure, if it is not founded on rock.

As retaining wall is to be founded on rock, there

is no chance of piping failure.

3. While designing the retaining wall, the

maximum tail water level at power house

side should also be considered.

In the design , tail water level at power house

side has not been considered , as the water may

not be always available up to particular level

at power house side.

However, if considered it will enhance the

stability of retaining wall.

4. The water load on the heel has not been

considered. Since the uplift pressure will

not be exactly equal to water load, it

should be taken into consideration.

The weight of water on the heel will always be

greater than the uplift pressure. However for

safe design both have been ignored.

If , both, weight of water and uplift pressure

are considered on heel, it will further enhance

the stability of retaining wall .

5. The ground level on the power house side

should also be considered to determine the

passive resistance.

Only the passive resistance on the key of wall

has been considered in the design of wall, as the

ground level on power house side varies.

If , Ground level on power house side is

considered for passive resistance, the

stability of retaining wall will further be

enhanced.

6. The angle of internal friction ɸ, which has

been assumed equal to 30 degrees, will be

lesser than that because of submerged

conditions.

The angle of internal friction ɸ is 35 degree in

submerged condition as per field tests in the

vicinity, which is higher than assumed value

i.e. 30 degrees

7. Further, geotechnical / geological details

below the retaining wall and along the

proposed tunnel alignment may also be

provided.

For , geotechnical / geological details refer

Annex-A1

8. The Debal power house would have been

designed for normal conditions. After the

construction of retaining wall with the

water around, Debal power shall undergo

excessive uplift pressure for which the

same may be checked.

The uplift pressures will be released by

provisions of drainage holes/sump wells

around existing structures of Debal SHP.

This has also been mentioned at page no.5 of

SJVN Report of Feb.2018.

9. Cost estimate for each component may

also be provided.

Refer Annex-A3 for Detailed BoQ and

Estimate.

Keeping in view the above submissions, it is requested that the technical feasibility for the

proposed wall around the Debal HEP to avoid its submergence my kindly be provided at the

earliest, please.

Thanking you.

Yours faithfully,

Arun Dhiman (Sr. AGM),

DHEP, SJVN.

Page 15: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

11

The geological and geotechnical details of below retaining wall and along tunnel

alignment:

The rock along retaining wall is biotite gneiss with quartz veins dipping N55⁰W along foliation.

A mylonitic zone was observed at the right bank of the confluence of Kail Ganga and Pindar

River. The quartzite/phyllite sequence has an attitude of 320o-360o strike and dipping at angles

between 30⁰ to 90⁰. The dip directions are inconsistent and alternate between NE and SW.

Right bank has been explored by two holes DD-VI and DD-XIII in vicinity of confluence site.

These holes have encountered overburden of the order of 7.5 & 6m thick respectively. Number

of nil RQD zones encountered in these holes and their considerable thickness represent closely

foliated zone/sheared or shattered rock. Lugeon value in the rock zone immediately after the

overburden is of the order up to 9.52 for first 18 m. Lugeon value in general is in the range of

5 to 13.

The rock along proposed tunnel alignment of gallery is area mainly comprise of quartzite and

phyllite with intercalations of schists in the upstream part of the Reservoir between end of the

reservoir & the thrust (i.e. little upstream of confluence of Kail Ganga & Pindar rivers).

Downstream of confluence/thrust up to dam, the reservoir rock comprises of gneisses,

mylonites with alternate bands of amphibolite and biotite schists. These two rock units/zones

are separated by a Thrust.

The rock along tunnel alignment, is characterized by very strong to intensely controlled

deformation. The intense deformation makes the rock very susceptible to sliding, weathering

and rapid degradation. The quartzite is characterized by egg white to greyish, strong on

exposure it fractures into blocky and angular parts along the road section at the confluence of

the Kail Ganga and the Pinder river. The quartzite also hosts interbedded units of phyllite and

schist. The quartzite – phyllite sequence has varying attitudes due to intense deformation. These

rocks are highly folded, faulted and fractured along the right bank of Pinder River (within the

reservoir area).

The lithologies are moderately jointed, with generally rough and irregular surfaces. Thin shears

are present along the foliation. Shearing along the foliation, a result of ductile deformation is

common. High horizontal stresses from the NE direction to SW direction or top to the south as

revealed by augen structure within the gneissose rocks which indicates the movement of thrust

sheets and are as expected for this type of tectonic setting. Geological map of the reservoir area

reveals presence of number of active and dormant slides along with subsidence/creep zones at

the right bank of Pinder River and left bank of Kail ganga river. The reservoir area is dominated

by cultivated land above El. 1300 m which may represent old slide debris/ talus/colluviums.

All along the tunnel alignment (i.e. on right bank) rocks are exposed at lower level, followed

upward by river terrace material which is being used for cultivation.

The area is devoid of any lime/calcareous formations of highly pervious gravelly material.

Even if the ground in this area contains fractured and shearedquartzite/phyllite and schists,

which are relatively permeable, their base lies at analtitude of 1335 m, well above the high

water level.The proposed area is comprised of Garhwal Group of rock which is further divided

intocalcareous and arnaceouslithofacies. Garhwal group of rock consists of

quartzites,limestone, slates, schists and phyllites of low grade rocks. The thrust divided the

Page 16: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

12

Garhwal and Nandprayag-Ghat-Gwaldam Crystalline group and thrust aligned in NWSE

direction which dipping 40º-60º to the northeast. Mylonitization is also observed hundreds of

meters at the top of the Garhwal Group. In the proposed area the size of the zones of

stabilization onidentified fault and thrust, water level may fluctuate to some extent with

fluctuation reservoir levels.

An exploratory drift of 71m at right bank of river Pinder is excavated to get lithological

overview.

The drift located 5.7m downstream of dam axis & runs in N53⁰W direction and has been

excavated for 71 m length at El. 1281.86m. The rock encountered in the drift is mainly gneiss

which is dipping towards N50⁰W to N60⁰W direction (inside the hill) with the amount varying

from 50⁰-55⁰.

The brief lithological description of the drift is

given below: -

RD 0.00 to 14 m

The rock encountered in this reach is mainly

gneiss with biotite lenses on the left side at

RD+ 5 m. Initial 3 m of the drift is supported

with steel ribs.

RD 14.00 to 22 m

From RD + 14.50 to 16 m, a thick shear zone

comprising gauge and crushed rock have been

encountered. From 16 to + 22 m,

fractured/shattered gneiss has been recorded.

The drift is supported with steel ribs from 15 to

17.00 m.

RD 22 to 56 m

The rock encountered in this reach is fresh and

hard gneiss with regular shear seems 1 to 5cm

thick. A thin schist band at RD + 40 m is also

recorded.

RD 56 to 71 m

Between 56 to 57.5 m, 1.00 to 1.5 m thick

biotite schist/ schist band have been

encountered, rest of reach encountered gneiss

which is fresh & hard with regular shears.

Seepage between 58 to 70m in the crown has

been observed.

Page 17: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

13

Page 18: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

14

Page 19: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

15

Page 20: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

16

Page 21: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

17

Page 22: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

18

Page 23: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

19

Page 24: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

20

Page 25: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

21

Page 26: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

22

Page 27: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

23

Page 28: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

24

Page 29: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

25

Page 30: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

26

Page 31: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

27

Page 32: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

28

Page 33: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

29

Page 34: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

30

Page 35: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

31

Page 36: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

32

Page 37: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

33

Page 38: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

34

Page 39: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

35

Page 40: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

36

Deval SHP (5 MW)

ABSTRACT OF TENTATIVE COST FOR -Underground Gallery And Wall around Power House

1 U/G Gallery 278887241.00

2 Protection Wall around PH 373520702.79

Total Tentative Cost 652407943.78

Deval SHP (5 MW)

ABSTRACT OF TENTATIVE COST FOR -Underground Gallery And Wall around Power House

1 U/G Gallery 278887241.00

2 Protection Wall around PH 373520702.79

Total Tentative Cost 652407943.78

Page 41: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

37

Deval SHP (5 MW)

Protection wall around Deval SHP

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit

Rate

in figures

and

words

Amount

in figures and

words

INR INR

1 OPEN EXCAVATION AND BACKFILING

1.1 Open Excavation

1.1.1 Loose Excavation and ripping in open cuts and in foundations of

structures in all types of soils and depositing the excavated material

in regular layers with necessary levelling and stockpiling the useful

materials separately as and where directed with all lifts and lead upto

1 km.

m3 9,653 157 1515442.50

1.1.2 Excavation in rock in open cuts and in foundations of structures

including depositing the excavated materials in regular layers with

necessary levelling and stockpiling the useful materials separately as

and where directed with all lifts and lead up to 1 km.

m3 9,653 626 6042465.00

1.1.3 Removal of slips, bluffs and loose rock i.e. loading, handling ,

dumping of material and cleaning of surface and depositing the

excavated materials in regular layers with necessary levelling and

stockpiling the useful materials separately as and where directed with

all lifts and lead up to 1 km.

m3 50 139 6950.00

1.1.4 Hauling of excavated materials for actual distance beyond 1 km from

site of excavation.

m3x

km

19,355 37 716135.00

1.1.5 Shoring and strutting the excavated surface including labour,

materials, fabrication, erection and removal.

m2 150 2,368 355200.00

Page 42: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

38

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit

Rate

in figures

and

words

Amount

in figures and

words

INR INR

2 ANCHORS

2.1 Grouted anchor bars

2.1.1 Providing and installing grouted anchor bars of following diameters

including cutting, bending, grouting and testing complete in all

respects.

25mm dia.

a) Up to 20 m length m 66,600 577 38428200.00

3 DRILLING, GROUTING AND GROUTING MATERIAL

3.1 Drilling

3.1.1 Drilling holes for Anchor Bars vertical or inclined in all formations

of rock/concrete by percussion drilling.

a ) Up to 20 m depth

i) 25 mm dia. anchor bars m 66,600 224 14918400.00

3.1.2

Drilling holes of minimum 45 mm diameter vertical or inclined in all

formations of rock/concrete for curtain grouting by percussion

drilling.

m 3,000 575 1725000.00

3.1.3 Drilling 76 mm dia drainage holes, providing and laying PVC

perforated pipes in the holes and filling with gravel.

m 3,000 1621 4863000.00

3.2 Grouting Materials

3.2.1 Cement used for grouting including provision, delivery,

transportation, storage and complying with specified requirements.

MT 375 10,520 3945000.00

3.2.2 Sand and Bentonite used for grouting with average natural water

content as approved by the Engineer.

(i)Sand MT 281 444 124875.00

(ii)Bentonite MT 28 9,600 270000.00

Page 43: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

39

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit

Rate

in figures

and

words

Amount

in figures and

words

INR INR

3.2.3 Admixture used for grouting including supply, handling, storage and

dispersing

kg 3,750 79 296250.00

3.2.4 Standard mild steel pipes and fittings used for grouting and left

permanently in rock and/ or concrete including supply installation

and protection against blockage of pipes and fittings.

kg 9,690 97 939930.00

4 STEEL REINFORCEMENT

4.1 Providing and fixing HYSD steel reinforcement of Grade-Fe 500

( including supply ,handling, storage cutting ,bending, placing wire

clips, coupler and any other fastening devices.

MT 2,558 52,434 134151864.66

5 FORM WORK

5.1 Providing and erecting formwork for plane and curved surfaces

including maintenance, oiling, all necessary ties and fixing, access

scaffoldings, forming for chamfers upto 500mm either internal or

external and edges upto 50mm width.

a) Plane Surfaces

i) F2 m2 19,111 990 18919642.50

ii) F3 m2 19,111 1,037 19817847.75

6 CONCRETE

6.1 Concrete of grade M-25 (with 20 mm. maximum aggregate size) in

portal, frames, walls, slabs and foundation with graded crushed

aggregates including preparing surfaces, laying cement slurry before

placing concrete, mixing, placing vibrating , curing, testing and

finishing complete for all leads and lifts.

m3 21,321 5,739 122359784.25

7 ADMIXTURES

7.1 Admixtures

Page 44: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

40

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit

Rate

in figures

and

words

Amount

in figures and

words

INR INR

7.1.1 Air entraining and water reducing/set controlling or any other

approved admixtures/additives/accelerators used for different grades

of concrete, established at trial mix stages including supply, handling,

storage and dispersing.

kg 58,632 66 3869716.13

8 DEWATERI

NG

8.1 Dewatering by pumping in surface construction sites (measured in

terms of electric energy consumed by dewatering pumps) including

design of dewatering system, excavation of drainage trenches and

sumps, providing , installation and removal of all pumps, sumps,

supply, installation and removal of pipe lines and other accessories,

moving of pumps and pipes to different locations and operation and

maintenance of dewatering system. The pumps and other accessories

shall remain contractor's property after use.

a)with Electric Pumps kWh 5,000 51 255000.00

TOTAL AMOUNT - THIS BILL OF QUANTITIES 373520702.79

Page 45: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

41

Deval SHP (5 MW)

Underground Gallery And Portal (Intake and Outfall)

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit Rate

in figures and

words

Amount

in figures and

words

INR INR

1 OPEN EXCAVATION

1.1 Open Excavation

1.1.1 Chapter-5 Loose Excavation and ripping in open cuts and in foundations of

structures in all types of soils and depositing the excavated material

in regular layers with necessary levelling and stockpiling the useful

materials separately as and where directed with all lifts and lead upto

1 km.

m3 565 157 88774.08

1.1.2 Chapter-5 Excavation in rock in open cuts and in foundations of structures

including depositing the excavated materials in regular layers with

necessary levelling and stockpiling the useful materials separately

as and where directed with all lifts and lead up to 1 km.

m3 565 626 353965.44

1.1.3 Chapter-5 Removal of slips, bluffs and loose rock i.e. loading, handling ,

dumping of material and cleaning of surface and depositing the

excavated materials in regular layers with necessary levelling and

stockpiling the useful materials separately as and where directed

with all lifts and lead up to 1 km.

m3 20 139 2780.00

1.1.4 Chapter-5 Hauling of excavated materials for actual distance beyond 1 km

from site of excavation.

m3x

km

1,151 37 42582.56

1.1.5 Chapter-5 Shoring and strutting the excavated surface including labour,

materials, fabrication, erection and removal.

m2 50 2,368 118400.00

2 UNDERGROUND EXCAVATION

2.1 Chapter-6 Excavation in tunnelling by conventional method of drill and blast,

providing arrangements for lighting and ventilation, transporting the

excavated material and depositing it in regular layers with necessary

m3 17,864 1,289 23026949.12

Page 46: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

42

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit Rate

in figures and

words

Amount

in figures and

words

INR INR

levelling and stockpiling the useful material as and where directed

with all lifts and lead upto 1 km from portal in rock class I,II and III.

2.2 Chapter-6 Excavation in tunnelling by conventional method of drill and blast,

providing arrangements for lighting and ventilation, transporting the

excavated material and depositing it in regular layers with necessary

levelling and stockpiling the useful material as and where directed

with all lifts and lead upto 1 km from portal in rock class IV and V.

m3 13,114 1,505 19736328.06

2.3 Chapter-6 Removal of fallen material from approved overbreak including

loading, hauling, dumping of material and cleaning of surface with

all lifts and lead upto 1 km from portal.

m3 1,549 172 266411.11

2.4 Chapter-6 Hauling of excavated materials for actual distance beyond 1 km

from portal.

m3xkm 32,527 37 1203496.68

3 STRUCTURAL STEEL SUPPORT

3.1 Steel Ribs

3.1.1 Chapter-7 Supply, handling, fabrication, transportation to the place of

installation and installation of steel ribs, foot plates, foot blocks,

bolts, nuts etc.

MT 41 117,033 4818412.45

3.2 Lagging

3.2.1 Chapter-

7

Supply, handling, fabrication, transportation to the place of

installation and installation of steel lagging.

MT 93 117,033 10835666.64

3.2.2 Chapter-7 Supply, handling, fabrication, transportation to the place of

installation and installation of miscellaneous metal pieces including

props, tie rods, invert struts and cross bracings etc.

MT 4 69,213 284959.61

4 ROCK BOLTS AND ANCHORS

4.1 Rockbolts and Grouted anchor bars

4.1.3 Chapter-8 Providing and installing resin grouted type rockbolts of following

diameters with all accessories and fittings including filling with

Page 47: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

43

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit Rate

in figures and

words

Amount

in figures and

words

INR INR

quick set resin and slow set resin cartridges, stressing and load

testing complete in all respects.

25mm dia.

a) Up to 2 m length m 9,181 481 4416157.20

4.1.4 Chapter-8 Providing and installing grouted anchor bars of following diameters

including cutting, bending, grouting and testing complete in all

respects.

25mm dia.

a) Up to 2 m length m 3,935 534 2101183.20

4.1.7 Chapter-8 Providing and installing miscellaneous metal pieces such as small

steel beams, steel plates, steel cables used in conjunction with rock

bolts complete in all respects.

MT 5 69,213 346065.00

5 SHOTCRETE

5.1 Chapter-9 Production, supply and application of shotcrete as per mix design

including preparation and cleaning of surfaces, placing of plug

gauges for control of layer thickness and removal of rebound,

temporary protection and curing including admixtures but excluding

reinforcement with 10mm maximum aggregate size.

a) 50 mm thick m3 14,461 7,904 114298897.08

b) 100 mm thick m3 4,955 7,904 39165449.12

6 DRILLING, GROUTING AND GROUTING MATERIAL

6.1 Drilling

6.1.1 Chapter-12 Drilling holes for Rock bolts and Anchor Bars vertical or inclined in

all formations of rock/concrete by percussion drilling.

a ) Up to 2 m depth

i) 25 mm dia. rockbolts/ anchor bars m 13,116 224 2937984.00

Page 48: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

44

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit Rate

in figures and

words

Amount

in figures and

words

INR INR

6.1.2 Chapter-12 Drilling holes of minimum 38 mm diameter vertical or inclined in

all formations of rock/concrete for contact grouting.

m 1,073 247 265072.17

6.1.3 Chapter-12 Drilling holes of minimum 38 mm diameter vertical or inclined in

all formations of rock/concrete for consolidation grouting, draining

of rock and water pressure testing by percussion drilling

m 2,120 296 627372.00

6.1.4 Chapter-12 Drilling 76 mm dia drainage holes, providing and laying PVC

perforated pipes in the holes and filling with gravel.

m 2,000 1,621 3242000.00

6.2 Grout

6.2.1 Chapter - 12 Placing grout including labour, equipment, processing, mixing,

hooking up to the hole, injecting grout, hole closures and cleaning

up, excluding cost of cement.

a) Contact grouting between rock and concrete for backfilling the

voids created by approved geological over break or in any other

zones except the crown.

Per

Hole

2,507 155 388533.33

b) Consolidation grouting in holes drilled from surface or from the

underground in

i) Single stage grouting Per

Hole

942 93 87606.00

6.4 Grouting Materials

6.4.1 Chapter-12 Cement used for grouting including provision, delivery,

transportation, storage and complying with specified requirements.

MT 942 10,520 9909840.00

6.4.2 Chapter-12 Sand and Bentonite used for grouting with average natural water

content as approved by the Engineer.

(i)Sand MT 707 444 313686.00

(ii)Bentonite MT 71 9,600 678240.00

6.4.3 Chapter-12 Admixture used for grouting including supply, handling, storage and

dispersing

kg 9,420 79 744180.00

Page 49: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

45

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit Rate

in figures and

words

Amount

in figures and

words

INR INR

6.4.5 Chapter-12 Standard mild steel pipes and fittings used for grouting and left

permanently in rock and/ or concrete including supply installation

and protection against blockage of pipes and fittings.

kg 6,321 97 613183.56

7 STEEL REINFORCEMENT

7.1 Chapter-10 Providing and fixing HYSD steel reinforcement of Grade-Fe 500

(including supply, handling, storage cutting, bending, placing wire

clips, coupler and any other fastening devices.

MT 91 52,434 4792602.55

8 FORM WORK

8.1 Chapter-11 Providing and erecting formwork for plane and curved surfaces

including maintenance, oiling, all necessary ties and fixing, access

scaffoldings, forming for chamfers upto 500mm either internal or

external and edges upto 50mm width.

a) Plane Surfaces

i) F3 m2 38 1,037 39240.08

b) Curved Surfaces

i) F3C m2 9 1,075 10126.50

9 CONCRETE

9.1 Chapter-13 Concrete of grade M-25 (with 20 mm. maximum aggregate size) in

portal, frames, walls, slabs and foundation with graded crushed

aggregates including preparing surfaces, laying cement slurry before

placing concrete, mixing, placing vibrating , curing, testing and

finishing complete for all leads and lifts.

m3 12 5,739 67490.64

9.2 Chapter-13 Providing and laying backfill concrete of grade M15 (with 40 mm.

maximum aggregate size) behind steel/precast concrete lagging and

beyond pay line in approved overbreak including form works and in

additional excavation ordered by the Engineer including form work.

m3 1,175 4,614 5423469.25

9.3 Chapter-13 Providing and laying cement concrete of following grades placed

in Tunnel Concrete lining including design, furnishing,

Page 50: Satluj Jal Vidyut Nigam Ltd. - environmentclearance.nic.in

46

Item

No.

Reference to

Technical

Specifications

Description of work Unit

Quantity

Unit Rate

in figures and

words

Amount

in figures and

words

INR INR

maintenance, erection and removal of steel formwork, mixing and

placing of concrete, vibrating, curing, testing and finishing complete

for all leads and lifts, contact grouting in the crown, sealing of

cracks and cold joints etc.

i) M25 (with 40 mm maximum aggregate size) m3 2,620 5,739 15034002.21

ii) Backfill with M25 (with 40 mm maximum aggregate size) in

approved over break beyond pay line.

m3 1,223 5,739 7016266.06

10 ADMIXTURES

10.1 Chapter-13 Air entraining and water reducing/set controlling or any other

approved admixtures/additives/accelerators used for different

grades of concrete, established at trial mix stages including supply,

handling, storage and dispersing.

kg 14,498 70 1014869.29

11 DEWATERING

11.1 Chapter-14 Dewatering by pumping in underground construction sites

(measured in terms of electric energy consumed by dewatering

pumps) including design of dewatering system, excavation of

drainage trenches and sumps, providing, installation and removal of

all pumps, sumps, supply, installation and removal of pipe lines and

other accessories, moving of pumps and pipes to different locations

and operation and maintenance of dewatering system. The pumps

and other accessories shall remain contractors property after the use.

a) with Electric Pumps kWh 75,000 61 4575000.00

TOTAL AMOUNT - THIS BILL OF QUANTITIES 278887241.00