«~ I :>~' United Architects of the Philippines Center for Career Development Architectural Design & Site Planning - Refresher Module 2 If there are 2 cars in between columns, which cannot be the clear span distance between columns? Where should the excavation start, if the structure has a basement? Which ofthefollowirig should NOT be provided at the basement component of the project? What type of window is not recommended in a high rise building? ++++++++++ . ~tl~~~:::;"\~',. A Proposed low-Rise NATIONAL GOVERNMENT OFFICEProject ie. A development,,~it;~~Ba~sement, Podium (with Optional Parking) and Tower component and on a Project Site havingl'tw6';p~rcent (2.0%) slope. "';~{.~.,~~:~~~~'.'<} STATEMENT OF THE PROBLEM: J;"''h ";~ '''''':P !,;l ;fJ <"''':''' The National Government has decided to erect a building on its property~Wl(h a.; Total lot Area (TLA) of eight thousand square meters (8,000 sqm) located in Metro Manila. T~e~r4\~~'to be erected shall be a Low-Rise National Government Office Building. 4f~""'\'~~'if![~:,:# ' PROJECTSITEFEATURES: <"t;" \/,,''''''' The Project Site is a rectangular through lot with an esplanq~e atltS'(~orth ..The esplanade is relatively flat, having a 1/3 or 1% slope draining towards the east. The m~fn':~xi~)s located at the eighty meter (80m) wide "~ -e= ~ frontage facing south. The Road Right-of-Way (RROW) i~a)t:f"!:tY~meter (30m) wide street relatively flat at 1/3 or 1% slope draining east. The site is at a slope of:~~;~~~~~t (2%) towards the esplanade which has a 1.20 meter wide sidewalk, and having a 6 meter Y(j(le~tarriageway and a three meter (3m) wide promenade. ft.:/' . -"'-~-.- ..•, .•. :; The flood line is 0.5 meter lower than the e§planap.~"and at 0.0 elevation on building ground line. The thirty (30m) RROW has 2.40 meter wide siq~~~I~".~:ltl"-both Side's,but has become an arcaded street by virtue of a city ordinance. The project uses.the",:~~~eenB~irdingll concept. At the east of the lot are two (2) cp I.__ V":':':;•..•.. 'i'::., government office complexes, and(a:~~d:~,~l~flot are private low-rise office buildings. ,"~? "'';'=-~t~~:~~·~:c;/~· What is the Allowable Maximu'liJ~.,l!ildin?:l Footprint (AMBF) for the Project (in square meters)? '\c,"', t~)/::\ . For the project, zoned asirtsti!Jifional under the NBCP, how much is the maximum allowable ISA (in square meters)? .tP' rji::~::~:'<'id For the project, ftsing The~brescribed FLARdesignation/rights under the NBCP, what shall be the maximum Gross Floo,"Ar~a /GF~j&}nsquare meters) that can be generated for the Project? :\~~,;,.'''''"~~2 For th..~,PI;,~l~~!Z'basedon the maximum PSOand BHL under the NBCP,what shall be the maximum Total GfQ~SFIQ[iit/vea (TGFA, in square meters) that can be generated for the Project? '')':~:~.'l. '~~ '-::. »l~i-~-::~.(! ++++++++++ Which is not required in a Senior Manager's Area? Which is more expensive? UAP Center for Career Development - Architectural Design Refresher 2011 Prepared by: RSGabitan 6

Upload: blitzer

Post on 09-Nov-2015

7 views

Category:

Documents


0 download

DESCRIPTION

fgfdgfg

TRANSCRIPT

  • ~I:>~'United Architects of the PhilippinesCenter for Career Development

    Architectural Design & Site Planning - Refresher Module 2

    If there are 2 cars in between columns, which cannot be the clear span distance between columns?

    Where should the excavation start, if the structure has a basement?

    Which ofthefollowirig should NOT be provided at the basement component of the project?

    What type of window is not recommended in a high rise building?

    ++++++++++ . ~tl~~~:::;"\~',.A Proposed low-Rise NATIONAL GOVERNMENT OFFICEProject ie. A development,,~it;~~Ba~sement,

    Podium (with Optional Parking) and Tower component and on a Project Site havingl'tw6';p~rcent (2.0%)

    slope. "';~{.~.,~~:~~~~'.'