Saturday 6:13 – 15:00 STABLE BEAMS scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2 remarkably smooth tertiary collimators in at 5 m lifetime actually went up during second step Tunes, orbit, coupling (using IT skew quads) Scans in CMS and Atlas CMS missing initially Alice solenoid off (and back on later) LHC status 11-4-10

Upload: lucas-tyler

Post on 01-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

Saturday

6:13 – 15:00 STABLE BEAMS scans etc.

15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2

remarkably smooth tertiary collimators in at 5 m lifetime actually went up during second step

Tunes, orbit, coupling (using IT skew quads) Scans in CMS and Atlas

CMS missing initially Alice solenoid off (and back on later)

11-4-10

Page 2: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

Collimators – IR3

Settings have been evaluated for tertiary collimators in IR8 and beta* of 3 m (2010 scenario agreed in 2009). Corresponding settings, taking into account TCT calibration in IR8:

Beam 1 TCTH.4L8.B1 L = 8.16mm R = -6.86mm TCTVB.4L8 L = 8.38mm R = -9.34mm

Beam 2 TCTH.4R8.B2 L = 7.19mm R = -7.84mm TCTVB.4R8 L = 8.95mm R = -8.77mm

This corresponds to a setting of 15.3 nominal sigma. Note that the settings were adjusted on the spot to the changed squeezed IR8 optics. IR8 collimator beta values from LSA database different by up to 40m (20-30%) compared to collimation reference case.

11-4-10

Page 3: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

Sunday morning

Squeeze in IR8 Wrestling settings Eventually to 5.5 m OK had to stop here

RQTL13.L8B1 limited to 300 A, need 352 A to go to 2 m. As the lowest quench current for this magnet was 407 A, J-P Tock gives go ahead to up limit to 352 A

FGC update requires resync and reset so now further for now

MP test switch off one warm D1 magnet. Preliminary analysis while waiting for the PM: the first channel to

trigger was the FMCM in IP1 as expected. Then, we had errors from all BLM input due to the missing sanity check (not done in the last 24h due to the long store!).

Test successful!

11-4-10

Page 4: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

Sunday morning

Pre-cycle Problems, problems, problems “extremely troublesome”

Stefano wakes up half the controls group 05:43 beam back IQC/XPOC issues Too higher intensities in SPS …

11-4-10

Page 5: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

0

10

20

30

40

50

60

70

80

90

100

0

0.5

1

1.5

2

2.5

3

3.5

3:36 4:48 6:00 7:12 8:24 9:36 10:48 12:00 13:12 14:24 15:36

LHC_

BRANB_

4L8

e_no

rm

Time

B1H

B1V

B2H

B2V

Lumi_LHCb

Ra

mp

sta

rtR

am

p fi

nis

h

Bu

mp

s co

llap

sed

VE

LO

in

LH

Cb

lum

i-sc

an

CM

S lu

mi-

sca

n

AT

LA

S lu

mi-

sca

nL

HC

b 2

nd l

um

i-sc

an

Fill 1031

Mirko Pojer11-4-10

Page 6: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

Tunes – squeeze part 2

11-4-10

Page 7: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

S Part 1

11-4-10

Page 8: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

CMS

11-4-10

Page 9: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

CMS

11-4-10

Page 10: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

IP1&5 lumi vs squeeze

Raw (online) lumi plots on 10 apr 2010, during the squeeze to 2m in IP1 and IP5

Factor gained (raw numbers): ~4.5 in Pt5 (after min scan) ~4 in Pt1

Not corrected for lumi decay over the ~5h of squeeze and mini scans

atlas

Page 11: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

BRAN-P in IP1 and IP5 during squeeze

Also observe factor ~4++ increase in luminosity during the squeeze test of 10 Apr 2010

Page 12: Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators

LHC status

Program for the day

Circulating beams at 450 GeV – checks Transverse damper studies – Wolfgang Hofle 15:00 Trial ramp and squeeze

Pilot intensity All the way to 2-2-2 Async dump tests as pre-qualifier for stable beams

11-4-10