sbm(g)-phase ii mob apps€¦ · odf plus baseline survey app sbm (g) phase ii mis app use...

16
SBM(G)-Phase II Mob Apps

Upload: others

Post on 07-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

SBM(G)-Phase II Mob Apps

Page 2: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

ODF Plus Baseline Survey App SBM (G) PhaseII MIS App

Objective:- To ascertain the current status of ODF Plus in rural India, DDWS plans to conduct a baseline assessment across all villages during the current financial year

Objective:- to achieve ODF-Plus status in rural areas of the country

Version:- 2.4Size:- 5.90 MB

Version:- 1.2Size:- 7 MB

Colour Theme:- Blue Colour Theme :- Pink

OTP :- 1234 PIN:- Last 4 Digit of Registered Number

Downloadable link:-https://sbm.gov.in/odfplus/

Page 3: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered
Page 4: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered
Page 5: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

ODF Plus Baseline Survey App SBM (G) Phase II MIS App

Use following Module Number using SBM(G)-MIS :-M10:- User RegistrationM9:- Approval of registered usersM8 :- Allocation of Villages, Districts to registered users

Use following Module Number using SBM(G)-MIS :-PM01:- User RegistrationPM02:- Approval of registered usersPM03 :- Allocation of Villages, Districts to registered users

Note:- User Registration , Approval and Allocation can be done by respective State/District MIS coordinator only.

Accessible link:-https://sbm.gov.in/SBM/Secure/Login.aspx?page=advUm/rYYvQ=

Accessible link:-https://sbm.gov.in/sbmphase2/Secure/Login.aspx

Page 6: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

BLS-Village

Level

ODF

(4+1) &

CSC

BLS-

District

Level

Page 7: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

Village

Basic

Information

Community

Assets

SWM

GWM

Information

Households

Information

Page 8: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

Fecal Sludge

Management

(FSM)

Gobardhan

Plant

Plastic Waste

Management

(Block Level)

Page 9: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

ODF (4+1)

MessagesCSC Geotagging

Page 10: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered
Page 11: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

1. Same mobile number can not be registered or use in more then one role.

2. Need of Bilingual (Hindi, English) features in the app for easy understanding of questionnaires text.

3. Zero value not allowed in many cases like in Gujarat State, most of the villages had built HHs level soak pits and few villages had built the community soak pits without the drainage system. Zero (0) value in this field not accepted by app .

4. Increase the number of community assets for SLWM entry also up to 50 per village

Page 12: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

➢ Now Same mobile number can be registered or use in more then one role.

➢ Bilingual (Hindi and English) translation of labels are added throw toggle functionality.

➢ Zero (0) value allows in any component abstract value.

➢ Max value allows for the following components

▪ Community Compost Pits- 50

▪ Community Bio Gas plants - under other schemes -50

▪ Vehicles for collection & transportation of waste-99

▪ Community Soak Pits/Leach Pits/Magic Pits-50

Page 13: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

Advance Notification◦ This features is used to prompt message to the

users that new build available by adding more features/functionality , kindly update your app till <tentative date>, after that this existing version of app is no more functional.

Forcefully App Updating◦ Forcefully we insist the users that this build/version

is obsolete and no more functional now. Kindly download , install and used the latest version of app.

Page 14: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

Advance Notification Message Example

Forcefully Updating the App Message Example

Page 15: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

1• Enter Physical Progress using Module [C10]

2

•Only approved physical progress reported CSCs

are geo-tagged using ODF Plus Baseline App

3• Enter Financial Progress using Module [C 10]

In this scenario there is a gap in between physical progress and geo tagging which increase instantly day by day

Page 16: SBM(G)-Phase II Mob Apps€¦ · ODF Plus Baseline Survey App SBM (G) Phase II MIS App Use following Module Number using SBM(G)-MIS :-M10:- User Registration M9:- Approval of registered

1

• Enter Physical Progress along

with Geo tagging at one go

using MIS – Phase II App

2

• Enter Financial Progress using

Module [C 10]