DRAFT DECEMBER 2011 Southern California Association of Governments PROJECT LIST

Upload: others

Post on 24-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

DRAFT DECEMBER 2011Southern California Association of Governments

PROJECT LIST

Page 2: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

PRojECT LisT

Framework 1

FTIP Projects 2

Imperial County 2 Los Angeles County 6 Orange County 58 Riverside County 71 San Bernardino County 94 Ventura County 117 Various Counties 126

Financially-Constrained RTP Projects 128

Imperial County 128 Los Angeles County 135 Orange County 210 Riverside County 232 San Bernardino County 306 Ventura County 399 Various Counties 421

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005) 424

Strategic Projects 424

Imperial County 428 Los Angeles County 429 Orange County 435 Riverside County 442 San Bernardino County 442 Ventura County 442 Various Counties 442

Page 3: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 1

FrameworkThe project list is divided into three sections, consistent with the framework in FIGURE 1. At the center is the Federal Transportation Improvement Program (FTIP), which forms the foundation of the RTP project investment strategy and represents the first six years of already-committed funding. This RTP incorporates the adopted 2011 FTIP. The RTP con-tains an additional financially constrained set of transportation projects above and beyond the FTIP. Finally, the Strategic Plan represents an unconstrained list of potential projects that the region would pursue given additional funding and commitment.

FIGURE 1 RTP Framework

FTIP

FinanciallyConstrained

RTP

Reasonable Available Fundingfor O&M and Committed

Projects

AdditionalInvestments

NewFunding

Source ofFuture Amendments

StrategicPlan

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Page 4: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

2 Project List

FTIP ProjectsFTIP Projects

County System FTIP ID Route Description Project Cost ($1,000’s)

IMPERIAL TRANSIT IMP110902 0 3 REPLACEMENT LARGER BUSES IN 10/11 $315

IMPERIAL TRANSIT IMP090502 0 ADA PARA-TRANSIT FOR COUNTY OF IMPERIAL - 2 NEW LARGE TYPE III BUSES $130

IMPERIAL TRANSIT IMP33003 0 ADA PARATRANSIT SERVICE OPERATING ASSISTANCE $5,700

IMPERIAL TRANSIT IMP33004 0 BRAWLEY DIAL-A-RIDE - OPERATING ASSISTANCE $1,571

IMPERIAL TRANSIT IMP33021 0 CALEXICO DIAL-A-RIDE OPERATING ASSISTANCE $2,890

IMPERIAL TRANSIT IMP090504 0 CITY OF EL CENTRO DIAL-A-RIDE (ARC-IMPERIAL VALLEY) - REPLACEMENT OF PARATRANSIT BUSES WITH 2 LARGE TYPE III BUSES $130

IMPERIAL TRANSIT IMP33006 0 CITY OF IMPERIAL DIAL-A-RIDE - OPERATING ASSISTANCE $845

IMPERIAL TRANSIT IMP33000 0 COUNTY WIDE TRANSIT SYSTEM - OPERATING AND CAPITAL ASSISTANCE $50,901

IMPERIAL TRANSIT IMP990401 0 EL CENTRO DIAL-A-RIDE OPERATING ASSISTANCE $1,546

IMPERIAL TRANSIT IMP051104 0 IN EL CENTRO; REGIONAL PUBLIC BUS TRANSFER TERMINAL AND PASSENGER WAITING AREA INCLUDING A 24 FOOT HIGH CLOCK TOWER AND OTHER BEAUTIFICATION AT 7TH AND STATE STREETS, WITH MISC OTHER BUS STOP IMPROVEMENTS ON FIXED ROUTE SYSTEM

$4,906

IMPERIAL TRANSIT IMP33023 0 MED-EXPRESS SHUTTLE OPERATIONAL ASSISTANCE $1,432

IMPERIAL TRANSIT IMP100606 0 OPERATING ASSISTANCE FOR NEW NON-EMERGENCY MEDICAL TRANSPORT SERVICE $500

IMPERIAL TRANSIT IMP100603 0 REPLACE TWO LARGE BUS TYPE III FOR ARC PARATRANSIT SERVICES $143

IMPERIAL TRANSIT IMP090106 0 TRANSIT TRANSFER TERMINAL IN THE CITY OF BRAWLEY $621

IMPERIAL TRANSIT IMP100604 0 TWO NEW LARGE BUS TYPE III FOR NEW NON-EMERGENCY MEDICAL TRANSPORTATION SERVICE $143

IMPERIAL TRANSIT IMP070929 0 UPGRADES AND IMPROVEMENTS TO EXISTING BUS TRANSFER TERMINAL AT IMPERIAL VALLEY COLLEGE $2,086

IMPERIAL TRANSIT IMP090503 0 WEST SHORES DIAL-A-RIDE (ARC-IMPERIAL VALLEY) - REPLACEMENT OF GASOLINE VAN WITH 1 MEDIUM TYPE II BUS $60

IMPERIAL TRANSIT IMP43000 0 WEST SHORES DIAL-A-RIDE OPERATIONAL ASSISTANCE $1,125

IMPERIAL STATE HIGHWAY

IMPL513 8 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - SHOPP ROADWAY PRESERVATION PROGRAM (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 USC 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES))

$44,267

IMPERIAL STATE HIGHWAY

IMP00289 8 WIDEN THE OVERCROSSING BRIDGE ON SR-186 OVER I-8. IMPROVE OFF RAMPS FROM I-8 AND WIDEN SR-186 ADJACENT TO THE CASINO ENTRANCE - NON-CAPACITY ENHANCEMENT PROJECT

$9,330

IMPERIAL STATE HIGHWAY

IMP0021 78 BRAWLEY BYPASS CORRIDOR – IN AND NEAR BRAWLEY FROM 0.5 MILES SOUTH OF BAUGHMAN ROAD TO MEAD RD – 4 LANE EXPRESSWAY ON SR 86 TO 0.3 MILES NORTH OF MEAD RD. ON SR 111

$227,512

IMPERIAL STATE HIGHWAY

IMPL502 86 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS- SHOPP COLLISSION REDUCTION PROGRAM (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - INTERSECTION SIGNALIZATION PROJECTS AT INDIVIDUAL INTERSECTIONS

$1,415

IMPERIAL STATE HIGHWAY

IMP0042A 98 IN AND NEAR CALEXICO FROM 0.6 KM WEST OF SR 111 EASTERLY TO ALAMO RIVER BRIDGE WIDEN TO 4 LANE HWY (ENV. WORK & DOC. FOR SR98) ENVIRONMENTAL WORKAND DOCUMENTATION FOR SR 98

$9,000

IMPERIAL STATE HIGHWAY

8020B 98 WIDENING SR-98 FROM VV WILLIAMS AVE. TO OLLIE AVE. AND INTERSECTION IMPROVEMENTS OF SR-98 AND CESAR CHAVEZ FROM 2 TO 4 LANES(PHASE 1B).

$9,357

Page 5: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 3

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)IMPERIAL STATE

HIGHWAYIMP110901 111 CALEXICO BORDER GATEWAY AND 1ST STREET PROMENADE (IN CALEXICO, ON 1ST STREET, ADJOINING THE PEDESTRIAN AND BICYCLE

BORDER CROSSING, FROM ROUTE 111 TO HEFFERNAN AVENUE. PEDESTRIAN AND BICYCLE IMPROVEMENTS.)$2,301

IMPERIAL STATE HIGHWAY

0505 186 ANDRADE INTERNATIONAL BORDER CROSSING IN ANDRADE, AT THE ANDRADE INTERNATIONAL PORT OF ENTRY. CONSTRUCT BICYCLE AND PEDESTRIAN FACILITES

$2,520

IMPERIAL STATE HIGHWAY

IMPL501 999 GROUPED PROJECTS FOR BRIDGE REHABILIATION AND RECONSTRUCTION - SHOPP PROGRAM (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR RECONSTRUCTIONG BRIDGES (NO ADDITIONAL TRAVEL LANES))

$22,052

IMPERIAL STATE HIGHWAY

IMPL511 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM - HIGHWAY MAINTENANCE

$28,847

IMPERIAL STATE HIGHWAY

IMPL508 999 GROUPED PROJECTS FOR PLANTINGS, LANDSCAPING, ETC. (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PLANTINGS, LANDSCAPING, ETC.)

$1,969

IMPERIAL STATE HIGHWAY

IMPL512 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/OR REHABILITATION - MINOR PROGRAM

$3,654

IMPERIAL STATE HIGHWAY

IMPL505 999 GROUPED PROJECTS FOR SAFTEY IMPROVEMENTS - SHOPP PROGRAM (PROJECTS ARE CONSISTENT WITH EXEMPT TABLES 2 AND TABLE 3 CATEGORY - SHOULDER IMPROVEMENTS)

$500

IMPERIAL STATE HIGHWAY

IMPL503 999 GROUPED PROJECTS FOR SHOULDER IMPEROVEMETNS - SHOPP ROADSIDE PERSERVATION PROGRAM (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - FENCING, SAFETY ROADSIDE REST AREAS)

$19,496

IMPERIAL STATE HIGHWAY

IMP0523A 999 IN EL CENTRO ON DOGWOOD RD; RECONTRUCT AND WIDEN BRIDGE FROM 2 TO 4 LANES; WITH 2 TURN LANES $33,120

IMPERIAL STATE HIGHWAY

IMP050904 999 NEAR WESTMORLAND; AQUSITION OF 4,000 UNDEVLOPED ACRES ADJACENT TO SR-86 FOR ENVIRONMENTAL MITIGATION $445

IMPERIAL STATE HIGHWAY

IMP100101 999 PLANNING, PROGRAMMING, AND MONITORING (PPM) FUNDS TO PAY FOR ELIGIBLE STAFF AND PROGRAM EXPENSES FOR ICTC $1,361

IMPERIAL LOCAL HIGHWAY

IMP100901 0 ALAMO RIVER RECREATIONAL TRAIL, PHASE I $489

IMPERIAL LOCAL HIGHWAY

IMP070926 0 ASPHALT CONCRETE PAVING OF PITZER FROM MCCABE TO CORRELL $796

IMPERIAL LOCAL HIGHWAY

IMP090101 0 ASPHALT REHABILITATION AND RECONSTRUCTION OF WESTERN AVENUE FROM STATE HIGHWAY 86 TO NORTHERN CITY LIMITS $895

IMPERIAL LOCAL HIGHWAY

IMP080903 0 ASPHALT REHABILITATION OF RIVER DR. $226

IMPERIAL LOCAL HIGHWAY

IMP060901 0 ATEN ROAD AND OLD COUNTY ROAD 111 IMPROVEMENTS, IMPERIAL COUNTY, CA - TCSP#09CA002 $834

IMPERIAL LOCAL HIGHWAY

IMP020801 0 BAUGHMAN ROAD RECONSTRUCTION FROM STATE ROUTE 78/86 TO FORRESTER ROAD; 0.65 MILE OF COUNTY ROAD NEAR WESTMORLAND- HPP 2162

$1,503

IMPERIAL LOCAL HIGHWAY

IMP091001 0 CESAR CHAVEZ BLVD/CALEXICO - WEST PORT OF ENTRY (POE) CONGESTION IMPROVEMENTS; ROAD SURFACE REHAB, TURN LANES, LIGHTING AND SIDEWALKS

$2,850

Page 6: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

4 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)IMPERIAL LOCAL

HIGHWAYIMP070906 0 CNG FUELING STATION $23

IMPERIAL LOCAL HIGHWAY

IMP050509 0 COLE RD. CORRIDOR IMPROVEMENTS; EXPANSION OF 2 LANE ROAD INTO 4 LANE PRINCIPAL ARTERIAL (.5 MILES) FROM BOWKER RD EAST TO SR 98

$1,837

IMPERIAL LOCAL HIGHWAY

IMP050905 0 CONSTRUCT NEW SIDEWALKS IN THE CITY OF HEBER-(HPP 3548) $610

IMPERIAL LOCAL HIGHWAY

IMP050901 0 CONSTRUCT ROAD SURFACE IMPROVEMENTS AND IMPROVE ROAD SAFETY FROM BRAWLEY WATER PLANT TO HWY 86 TO 9TH STREET TO 18TH STREET, BRAWLEY - (HPP 2176)

$1,400

IMPERIAL LOCAL HIGHWAY

IMP070917 0 CONSTRUCTION OF BICYCLE/PEDESTRIAN PATH $962

IMPERIAL LOCAL HIGHWAY

IMP090701 0 DEVELOP BICYCLE PATHS AND PUBLIC PARK SPACE ADJACENT TO THE NEW RIVER, CALEXICO (HPP TEA-LU PROJECT #3092) $4,000

IMPERIAL LOCAL HIGHWAY

IMP070920 0 DIESEL EMISSION COMPLIANT 2 AXLE TRUCK TRACTOR $100

IMPERIAL LOCAL HIGHWAY

IMP070919 0 DIESEL EMISSION COMPLIANT WATER TRUCK $134

IMPERIAL LOCAL HIGHWAY

IMP050508 0 EVAN HEWES HIGHWAY RESURFACING IMPROVEMENTS FROM SILSBEE ROAD TO AUSTIN ROAD $1,519

IMPERIAL LOCAL HIGHWAY

IMP070901 0 FOUR HYBRID PASSENGER VEHICLES $158

IMPERIAL LOCAL HIGHWAY

IMP070925 0 FOUR HYBRID VEHICLES $153

IMPERIAL LOCAL HIGHWAY

IMPL507 0 GROUPED PROJECTS FOR BRIDGE REHABILIATION AND RECONSTRUCTION - HBP PROGRAM (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITONAL TRAVEL LANES)) - 5 BRIDGES; ARAZ, GENTRY, FORRESTER RD., WINTERHAVEN DRIVE AND ANZA RD.

$22,947

IMPERIAL LOCAL HIGHWAY

IMP070924 0 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION IN IMPERIAL COUNTY (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATION)

$1,520

IMPERIAL LOCAL HIGHWAY

IMP080901 0 HIGHWAY 111 EAST SIDEWALKS IMPROVEMENTS $374

IMPERIAL LOCAL HIGHWAY

IMP071203 0 I-8 ENTRANCE AND EXIT RAMPS AT SR86. LANDSCAPING BEAUTIFICATION $723

IMPERIAL LOCAL HIGHWAY

IMP080905 0 IMPERIAL AVENUE OVERLAY WITH CURB/GUTTER/SIDEWALK. $761

IMPERIAL LOCAL HIGHWAY

IMP090501 0 IMPROVE BRIDGE 58-7 ON SR115 THAT CROSSES THE ALAMO RIVER IN HOLTVILLE AND ALSO PROJECT DESIGN AND ENVIRONMENTAL ANALYSIS OF A NEW BRIDGE OVER THE SAME RIVER

$1,000

IMPERIAL LOCAL HIGHWAY

IMP050506 0 IMPROVEMENTS AT AND BETWEEN INTERSECTIONS AT: SR 115 AND 4TH, SR 115 AND PALM, 4TH AND PALM AND 4TH AND ORCHARD/CEDAR

$800

Page 7: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 5

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)IMPERIAL LOCAL

HIGHWAYIMP071202 0 IN BRAWLEY AT CATTLE CALL PARK. FROM WILLARD AVENUE, AROUND PARK, ENDING AT WILLARD AVENUE. BICYCLE AND PEDESTRIAN

IMPROVEMENTS AND LANDSCAPING$1,310

IMPERIAL LOCAL HIGHWAY

IMP050903 0 IN IMPERIAL; RECONSTRUCTION OF PASSENGER LOADING AREAS AND ROAD ACCESS IMPROVEMENTS TO THE EXPO $377

IMPERIAL LOCAL HIGHWAY

IMP051101 0 IN WESTMORLAND- SOUTH CENTER STREET; ROADWAY SURFACE IMPROVEMENTS, STREET LIGHTING AND STORM DRAIN IMPROVE-MENTS FROM BAUGHMAN RD. TO SR 78/86

$800

IMPERIAL LOCAL HIGHWAY

IMP070910 0 INSTALLATION OF BICYCLE RACKS AT VARIOUS LOCATIONS $11

IMPERIAL LOCAL HIGHWAY

IMP050902 0 KEYSTONE RD NEAR IMPERIAL, RECONSTRUCTION OF 6 MILES TO CREATE TRUCK LANE FROM SR 111 TO AUSTIN RD $2,500

IMPERIAL LOCAL HIGHWAY

IMP051201 0 NEAR EL CENTRO; DOGWOOD CORRIDOR - WIDEN & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ‘ NORTH OF MCCABE & INSTALL 2 SIGNALS ROW AND CON

$3,024

IMPERIAL LOCAL HIGHWAY

0520A 0 NEAR EL CENTRO; DOGWOOD CORRIDOR - WIDEN & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ‘ NORTH OF MCCABE & INSTALL 2 SIGNALS AB 3090 REIMBURSMENT FOR 11-IMP0520

$276

IMPERIAL LOCAL HIGHWAY

IMP070602 0 NEAR IMPERIAL - WORTHINGTON RD. INTERSECTION AT MCCONNEL RD; NEW LEFT TURN LANE AT NONSIGNALIZED INTERSECTION $732

IMPERIAL LOCAL HIGHWAY

IMP070601 0 NEAR WESTMORLAND - FORRESTER RD. INTERSECTION AT CADY RD.: NEW TURNING LANES AND TRAFFIC CHANNELIZATION AT NON-SIGNALIZED INTERSECTION

$992

IMPERIAL LOCAL HIGHWAY

IMP070913 0 NEW CNG FUELING STATION $23

IMPERIAL LOCAL HIGHWAY

IMP080907 0 NORTH CENTER STREET PAVEMENT REHABILITATION $339

IMPERIAL LOCAL HIGHWAY

IMP070928 0 PAVING OF .75 MILE SECTION OF DIRT ROAD ON P STREET $957

IMPERIAL LOCAL HIGHWAY

IMP070923 0 PAVING OF 9TH STREET BETWEEN MALAN STREET AND WILDCAT DRIVE $1,267

IMPERIAL LOCAL HIGHWAY

IMP070909 0 PAVING OF WALKING/JOGGING PATHS A BUCKLIN PARK $322

IMPERIAL LOCAL HIGHWAY

IMP020802 0 PRELIMINARY DESIGN OF TRAFFIC BRIDGE ON 8TH STREET OVER I-8 $120

IMPERIAL LOCAL HIGHWAY

IMP090403 0 REHABILITATION ALONG NORTH SIDE OF 9TH STREET BETWEEN CEDER AVENUE AND HOLT AVENUE $332

IMPERIAL LOCAL HIGHWAY

IMP050504 0 REHABILITATION AND OVERLAY OF IMPERIAL AVE. (.5 MILE) PHASE III FROM ORANGE TO ADAMS AVE. $563

IMPERIAL LOCAL HIGHWAY

IMP090105 0 REHABILITATION AND RECONSTRUCTION OF EXISTING PAVEMENT ON BARIONI ROAD FROM B STREET TO P STREET $1,156

IMPERIAL LOCAL HIGHWAY

IMP090402 0 REHABILITATION OF ADAMS AVENUE FROM IMPERIAL AVENUE TO LA BRUCHERIE AVENUE. CURB/GUTTER/SIDEWALK $700

Page 8: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

6 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)IMPERIAL LOCAL

HIGHWAYIMP050507 0 REHABILITATION OF ATEN RD. (2.25 MILES) FROM VILORE WAY TO CROSS RD AND SIGNALIZATION OF ONE INTERSECTION; PHASE ONE IN

FY2007/08 OF SIGNALIZATION AND PHASE TWO IN FY2008/09 OF REHABILITATION$1,866

IMPERIAL LOCAL HIGHWAY

IMP050502 0 REMOVAL AND RECONSTRUCTION OF EXISTING 2 LANE DOGWOOD RD (1.2 MILES) FROM I-8 BRIDGE TO STATE STREET ST - PHASE I $2,472

IMPERIAL LOCAL HIGHWAY

IMP090406 0 RESURFACING DREW ROAD FROM ROSS ROAD TO EVEN HEWES HIGHWAY IN IMPERIAL COUNTY(0.4 MILES) $328

IMPERIAL LOCAL HIGHWAY

IMP080904 0 SEISMIC BRIDGE EVALUATION STUDY $226

IMPERIAL LOCAL HIGHWAY

IMP100607 0 SIGNALIZATION OF DRIVEWAY AT IMPERIAL VALLEY COLLEGE ON ATEN ROAD $178

IMPERIAL LOCAL HIGHWAY

IMP080906 0 STATE ROUTE 115 AND 5TH STREET IMPROVEMENT $339

IMPERIAL LOCAL HIGHWAY

IMP090104 0 STREET IMPROVEMENTS OF REHABILITATION AND RECONSTRUCTION ALONG WEST SIDE OF HOLT AVENUE BETWEEN NINTH AND TENTH STREETS

$347

IMPERIAL LOCAL HIGHWAY

IMP090103 0 STREET IMPROVEMENTS OF REHABILITATION AND RECONSTRUCTION OF NORTH AND SOUTH PORTION OF MAIN STREET BETWEEN HIGHWAY 111/115 AND LYERLY ROAD

$895

IMPERIAL LOCAL HIGHWAY

IMP090102 0 STREET REHABILITATION OF EMERSON AVENUE FROM HIGHWAY 98 TO THIRD STREET. $1,200

IMPERIAL LOCAL HIGHWAY

IMP070302 0 TRAFFIC FLOW IMPROVEMENTS; TRAFFIC SIGNAL SYNCHRONIZATION $568

IMPERIAL LOCAL HIGHWAY

IMP070902 0 TWO HYBRID PASSENGER VEHICLES $58

IMPERIAL LOCAL HIGHWAY

IMP100602 0 TWO HYBRID VEHICLES $79

IMPERIAL LOCAL HIGHWAY

IMP090404 0 WALNUT AVENUE REHABILITATION BETWEEN 5TH STREET (SR 115) AND FOURTH STREET $441

LOS ANGELES TRANSIT LA0G762 0 ACCESS SERVICES - PURCHASE OF 26 REPLACEMENT MINIVAN (5 AP W/RAMP) (2 PROJECTS, 13 VEHICLES EACH). THIS PROJECT WILL USE $ 131 IN TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$1,144

LOS ANGELES TRANSIT LA0G194 0 ACQUIRE ALTERNATE FOUR (4) FUEL BUSES FOR THE CITY OF ARTESIA TO BE USED FOR NEW FIXED ROUTE SERVICE EARMARK ID #E2008-BUSP-0694

$1,029

LOS ANGELES TRANSIT LA0G196 0 ACQUIRE ALTERNATE FUEL BUSES FOR RIO HONDO COLLEGE $613

LOS ANGELES TRANSIT LA0D298 0 ACQUISITION AND INSTALLATION OF TRANSIT AMENITIES $600

LOS ANGELES TRANSIT LA0G695 0 ACQUISITION OF REPLACEMENT REVENUE VEHICLES - (PROCUREMENT OF 700 FORTY-FOOT LOW FLOOR CNG TRANSIT BUSES) (NEW BUS PROCUREMENT AND ESTIMATED TO RECEIVE THE BUSES IN THREE TO FOUR YEARS)

$330,000

LOS ANGELES TRANSIT LA0D300 0 ACQUISITION OF TELEPHONE UPGRADES FOR TRANSIT DIVISION. $60

LOS ANGELES TRANSIT LA0D79 0 ACQUISITION OF THREE, 16-FOOT, 14-PASSENGER ALTERNATIVE FUEL TRANSIT VEHICLES FOR EXISTING INTRA-CITY CIRCULATOR SYSTEM WITH CONNECTIVITY TO THE METRO GOLD LINE RAIL

$373

LOS ANGELES TRANSIT LA0D98 0 ACQUISITION OF TWO REPLACEMENT 16 OR 20 PASSENGER, CNG-FUELED VEHICLES FOR SIERRA MADRE’S ROUNDABOUT SYSTEM. $187

Page 9: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 7

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA963542 0 ACQUISTION REVENUE VEHICLES - 2,554 CLEAN FUEL BUSES: LEASED VEH, FY02 (370) FY03 (30 HC)+FY04(70 HC)+(200 ARTICS);TOTAL

OF 1000 BUSES. INCLUDES 28.5 MIL FOR ACQ OF 41 VEHICLES FOR LACRD (RTP ID 1TR08D08 & 1TR08D07A)$619,858

LOS ANGELES TRANSIT LA0G691 0 ALTERNATIVE ANALYSIS FOR THE VAN NUYS CORRIDOR $1,710

LOS ANGELES TRANSIT LA970501 0 ANNUAL EXPENDITURES INCLUDING SERVICE PROVIDER CONTRACTS & CAPITAL EXPENSES FOR COMPLEMENTARY ADA PARATRANSIT IN LOS ANGELES COUNTY

$277,737

LOS ANGELES TRANSIT LA52603 0 ANNUAL TIRE PURCHASE $275

LOS ANGELES TRANSIT LA0C8232 0 ANTELOPE VALLEY LINE CHANGES AT SANTA CLARITA-ALIGNMENT CHANGES WILL PERMIT HIGHER SPEEDS OF OPERATION AND REDUCE MAINTENANCE COST- (SCRRA). (PPNO 3202). THIS PROJECT IS A MAINTENANCE/EFFICIENCY PROJECT TO IMPROVE ON-TIME PERFORMANCE.

$3,693

LOS ANGELES TRANSIT LA0G509 0 ANTELOPE VALLEY LINE SEALED CORRIDOR. THIS PROJECT IS A CORRIDOR OF SAFETY IMPROVEMENTS AT GRADE CROSSINGS ALONG THE ANTELOPE VALLEY METROLINK LINE.

$14,000

LOS ANGELES TRANSIT LA0D299 0 AQUISITION OF (7) ALTER FUEL TRANSIT/PARATRANSIT VEHICLES FOR REPLACEMENT AND (1) FOR EXPANSION NOT TO EXCEED 35’ INCLUDING AUTOMATED ANNOUNCING SYSTEMS IN 3 FIXED-ROUTE BUSES SAFETEA-LU TRANSIT DEMO ID #251

$1,833

LOS ANGELES TRANSIT LA0G773 0 ARTS & SERVICES FOR THE DISABLED - PURCHASE OF 1 SERVICE EXPANSION SMALL BUS (8 AP, 2 WC). THIS PROJECT WILL USE $ 7 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$60

LOS ANGELES TRANSIT LA0C64 0 ASSOCIATED CAPITAL MAINTENANCE (ENGINES, TRANSMISSIONS, PARTICULATE TRAPS, KITS, ETC) (ONGOING) $25

LOS ANGELES TRANSIT LA0D345 0 ASSOCIATED CAPITAL MAINTENANCE FOR REVENUE VEHICLE FLEET (ONGOING) $38

LOS ANGELES TRANSIT LA55205 0 ASSOCIATED CAPITAL MAINTENANCE ITEMS (ONGOING). CARRYOVER FROM PRIOR FISCAL YEAR $7,361

LOS ANGELES TRANSIT LAF3434 0 AZUSA INTERMODAL TRANSIT CENTER. CONSTRUCT REGIONAL AZUSA INTERMODAL TRANSIT CENTER TO ACCOMMODATE EXISTING AND FUTURE PARKING DEMAND AND SUPPORT EFFECTIVE TRANSIT USE. PARK N RIDE, THE STRUCTURE WOULD BE LOCATED ON THE SOUTHEAST QUADRANT OF ALAMEDA AVE./SANTA FE.

$7,832

LOS ANGELES TRANSIT LAF1654 0 BALDWIN PARK METROLINK PEDESTRIAN OVERCROSSING. CONSTRUCT A PEDESTRIAN OVERCROSSING OVER BOGART AVE AND THE METROLINK LINE TO LINK THE STATION WITH VITAL BUS TRANSFER POINTS AND TO PROVIDE ACCESS TO PARKING OVERFLOW AREAS.

$1,810

LOS ANGELES TRANSIT LAFA141 0 BALDWIN PARK METROLINK TRANSPORTATION CENTER.CONSTRUCTION OF A TRANSPORTATION CENTER AND PARKING STRUCTURE AT THE BALDWIN PARK METROLINK STATION.

$8,046

LOS ANGELES TRANSIT LA0D342 0 BEAUDRY AVE TERMINAL STREETSCAPE $509

LOS ANGELES TRANSIT LAF3432 0 BEELINE CNG FUELING AND MAINTENANCE FACILITY. THE CONSTRUCTION OF CITY-OWNED MAINTENANCE, OPERATIONS, AND ADMINIS-TRATIVE FACILITY FOR THE GLENDALE BEELINE TRANSIT SYSTEM AND GLENDALE DIAL-A-RIDE..

$1,974

LOS ANGELES TRANSIT LA0D320 0 BETWEEN NORWALK AND LA MIRADA: CONSTRUCT 5.6 MILES OF NEW THIRD MAIN TRACK. PPNO# 2002 EA# R889SA TCRP# 35.2 $102,661

LOS ANGELES TRANSIT LA0G658 0 BRIDGEPORT MARKETPLACE PARK AND RIDE LOT (W/ APROX. 200 PARKING SPACES) @ THE CORNER OF NEWHALL RANCH RD AND MCBEAN PARKWAY.

$2,500

LOS ANGELES TRANSIT LA000789 0 BURBANK-GLENDALE-PASADENA AIRPORT INTERMODAL GROUND ACCESS LINK PROJECT STUDY $5,903

LOS ANGELES TRANSIT LA963546 0 BUS & RAIL CAPITAL, INCLUDES FACILITY UPGRADE, EQUIP, SPARE PARTS, NON-REV VEHICLES, MAINTENANCE SUPPORT, ITS, ETC. INCLUDES $5.3 MIL FOR LACRD IMPROVEMENTS.(INCLUDES RTP ID 1TR08D08 & 1TR08D07A & 1TR08D07B)

$992,884

LOS ANGELES TRANSIT LA0D246 0 BUS CAPITAL ITEMS-ENGINE REBUILD AND ENGINE COMPONENTS 32 BUSES AT $50K EACH. $1,600

LOS ANGELES TRANSIT LA0G649 0 BUS CHASSI WASH REPLACEMENT: REPLACE CURRENT CHASSI WASH WITH NEW EQUIPMENT. AGENCY USING $35 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY12.

$175

Page 10: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

8 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA57101 0 BUS FACILITY IMPROVEMENTS $81,124

LOS ANGELES TRANSIT LA0D207 0 BUS PROCUREMENT (ON BEHALF OF SANTA MONICA COLLEGE). $1,000

LOS ANGELES TRANSIT LA0G723 0 BUS REFURBISHMENT - REPAINTING AND BODYWORK ON FIFTEEN (15) OLDER BUSES. THIS PROJECT WILL USE $20 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE, IN FY12.

$100

LOS ANGELES TRANSIT LA01B114 0 BUS REHABILITATION - TWO (2) 40’ BUSES (FY03) - DIESEL FUEL.BUS REHAB. -- ELEVEN (11) 40’ BUSES -- DIESEL FUEL (FY04) BUS REHAB. --TEN (10) 40’ BUSES--DIESEL FUEL (FY05)

$358

LOS ANGELES TRANSIT LA0G421 0 BUS REPLACEMENT OF 13 COMMUTER OVER THE ROAD COACHES. PROJECT USING $1,514 OF TOLL CREDITS TO MATCH 5307 FUNDS IN FY12.

$7,568

LOS ANGELES TRANSIT LA0D457 0 BUS REPLACEMENT OF 20 VEHICLES $8,981

LOS ANGELES TRANSIT LA57110 0 BUS REPLACEMENT: FIVE ALTERNATIVE FUELED BUSES (20 OR 30 FT WITH ASSOCIATED INFRASTRUCTURE) AND TEN ALTERNATIVE FUELED BUSES (40 FT)

$11,500

LOS ANGELES TRANSIT LA0F022 0 BUS SHELTER PROGRAM (INSTALLATION OF BUS SHELTERS AND REAL TIME TRANSIT INFORMATION) $9,375

LOS ANGELES TRANSIT LA0G587 0 BUS STOP AMENITIES - INSPECTING, REPAIRING AND REPLACING COMPONENTS OF PASSENGER STATION BUILDINGS AND EQUIPMENT. PROJECT USING $115 OF TOLL CREDITS IN FY11 AND $100 OF TOLL CREDITS IN FY12 FOR MATCH TO 5307 FUNDS.

$2,575

LOS ANGELES TRANSIT LA0D125 0 BUS STOP AMENITIES (BENCHES AND SHELTERS) PROJECT (ONGOING) $2,871

LOS ANGELES TRANSIT LA963526 0 BUS STOP ENHANCEMENT/IMPROVEMENT $2,647

LOS ANGELES TRANSIT LA0G645 0 BUS STOP IMPROVEMENT PROJECT: REPLACE MBL BUS STOP SHELTERS AND AMENITIES WITHIN THE CITY OF MONTEBELLO. AGENCY USING $500 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY11.

$2,500

LOS ANGELES TRANSIT LA0D347 0 BUS STOP IMPROVEMENTS $32

LOS ANGELES TRANSIT LA0G428 0 BUS STOP IMPROVEMENTS $19

LOS ANGELES TRANSIT LA0C37 0 BUS STOP IMPROVEMENTS CONSTRUCTION OF PASSENGER SHELTERS AND INFORMATION KIOSKS $686

LOS ANGELES TRANSIT LA0G017 0 BUS STOP IMPROVEMENTS/ AMENITIES INCLUDES: THE PURCHASE OF BENCHES, SHELTERS, SIGNAGE, TRASH RECEPTACLES, LANDSCAPING, LIGHTING, ARTWORK AND OTHER BUS STOP RELATED AMENITIES. ADDED TOLL CREDIT IN FY10/11 IN CONSTRUCTION FOR $2.

$8,781

LOS ANGELES TRANSIT LA01B116 0 BUS SUPPORT EQUIPMENT - AIR COMPRESSOR, BRAKE LATHE, CNG DIAGNOSTIC HARDWARE & SOFTWARE EQUIPMENT AND FALL RESTRAINT SYSTEM. THIS PROJECT WILL USE $54 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE, IN FY12.

$295

LOS ANGELES TRANSIT LA01B112 0 BUS SUPPORT EQUIPMENT (ENGINES AND TRANSMISSIONS) $1,200

LOS ANGELES TRANSIT LA0G027 0 BUS SYSTEM - MAINTENANCE FACILITY EQUIPMENT (BUS WASHER AND HEAVY DUTY VACUUM) $300

LOS ANGELES TRANSIT LA0G199 0 BUS SYSTEM - MAINTENANCE FACILITY EQUIPMENT, HOIST (1). THIS PROJECT WILL USE $30 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE.

$150

LOS ANGELES TRANSIT LA01B111 0 BUS SYSTEM - PREVENTIVE MAINTENANCE. THIS PROJECT WILL USE $450 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE IN FY12.

$18,098

LOS ANGELES TRANSIT LA0B0825 0 BUS SYSTEM OPERATING EQUIPMENT - SEAT REPLACEMENT, SPRAY BOOTH, WASH RACKS & WHEEL POLISHERS. $3,750

LOS ANGELES TRANSIT LA0G430 0 CAMERA INSTALLATION ON TRANSIT FLEET. $36

LOS ANGELES TRANSIT LAE0443 0 CAPITAL IMPROVEMENTS TO SUPPORT AND ENHANCE THE CAL STATE UNIVERSITY NORTHRIDGE TRAM SYSTEM $340

LOS ANGELES TRANSIT LA0G554 0 CAPITALIZATION OF EQUIPMENT MAINTENANCE. PROJECT USING $478 OF TOLL CREDITS TO MATCH 5307 FUNDS IN FY12. $2,390

LOS ANGELES TRANSIT LA0G393 0 CAPITALIZATION OF FTA EQUIPMENT MAINTENANCE $2,480

Page 11: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 9

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA0G222 0 CAPITALIZATION OF PREVENTATIVE MAINTENANCE (EQUIPMENT MAINTENANCE EXPENSES). ADDED TOLL CREDITS IN FY10/11 IN CONS.

FOR $1,991.$41,588

LOS ANGELES TRANSIT LA0D43 0 CAPITALIZATION OF PREVENTIVE MAINTENANCE (ONGOING). $3,980

LOS ANGELES TRANSIT LA0D297 0 CAPITALIZED COST OF CONTRACTING - BUS LEASE. NON-EXPANSION $1,000

LOS ANGELES TRANSIT LA52101 0 CERTIFICATES OF PARTICIPATION (COP) HAVE BEEN ISSUED FOR THE CULVER CITY TRANSPORTATION FACILITY. PAYMENTS WILL BE MADE BI-ANNUALLY THROUGH JANUARY 2016.

$6,480

LOS ANGELES TRANSIT LA0C8380 0 CHINATOWN/COLLEGE STREET GOLD LINE STATION - INTERMODEL TRANS. CENTER ENHANCE MENT ( PEDESTRIAN WALKWAY BRIDGE, BUS STATION, AND A BIKE STATION)

$18,190

LOS ANGELES TRANSIT LA0B7041 0 CIRCULATOR BUS STUDY WITHIN CITY OF SOUTH PASADENA $181

LOS ANGELES TRANSIT LA0G698 0 CITY OF ARCADIA/ARCADIA TRANSIT, REPLACEMENT OF TEN (10) PARATRANSIT VEHICLES, WHICH EACH SEATS 16-18 AMBULATORY PASSENGERS AND 2 WHEELCHAIRS.

$900

LOS ANGELES TRANSIT LAF1408 0 CITY OF CERRITOS TRANSIT AMENITIES. IMPLEMENTATION OF THE CITYWIDE STREET FURNITURE PLAN. THIS PLAN IDENTIFIES ALL SHARED BUS STOPS LACKING TRANSIT AMENITIES.

$320

LOS ANGELES TRANSIT LAF3401 0 CITY OF SANTA CLARITA TRANSIT BUS REPLACEMENT WITH CNG. REPLACE FIVE DIESEL POWERED TRANSIT BUSES WITH 40-FOOT ALTERNATIVE FUELED COMPRESSED NATURAL GAS (CNG), LOW-FLOOR BUSES.

$2,296

LOS ANGELES TRANSIT LAFA142 0 CNG BUS REPLACEMENT. REPLACE 4 DIESEL BUSES WITH CNG FUELED BUSES. $1,280

LOS ANGELES TRANSIT LA0G669 0 CNG FUELING FACILITY $3,336

LOS ANGELES TRANSIT LA0G217 0 CNG GARAGE RETROFIT - INCLUDES MAINTENANCE OF COMPRESSED NATURAL GAS VEHICLES AND EQUIPMENT. THIS PROJECT IS A CARRY-OVER FROM PRIOR FINANCIAL YEAR.

$400

LOS ANGELES TRANSIT LA0G590 0 COMMUNICATION SYSTEM UPGRADE. PROJECT USING TOLL CREDITS; $33 IN FY11 & $10 IN FY12 FOR MATCH FOR 5307 FUNDS. $365

LOS ANGELES TRANSIT LA0G491 0 COMMUTER BUS - COSMETIC UPGRADES/REHAB. $688

LOS ANGELES TRANSIT LAF3410 0 COMMUTER EXPRESS FLEET UPGRADE TO ALTERNATIVE FUEL (CNG). PURCHASE OF FOUR 40’ CNG BUSES TO REPLACE 4 DIESEL BUSES TMC BUSES FOR THE LADOT COMMUTER EXPRESS LINE 422.

$2,324

LOS ANGELES TRANSIT LAF1442 0 COMMUTER EXPRESS FLEET UPGRADE. FUND 10 OF REQUESTED 85 CNG BUSES TO REPLACE OLD DIESEL BUSES. $4,917

LOS ANGELES TRANSIT LA0D362 0 COMPREHENSIVE OPERATIONAL ANALYSIS TRANSIT PLANNING $415

LOS ANGELES TRANSIT LA0C8221 0 COMPRESSED NATURAL GAS FUELING AND MAINTENANCE FACILITY; NEW PUMPING STATION WILL ALLOW FOR FLEET EXPANSION, AND REDUCE OPERATING COST.

$11,500

LOS ANGELES TRANSIT LA0C8223 0 COMPTON MLK TRANSIT CENTER EXPANSION AND MULTI-MODAL/WILL ALLOW THE TRANSIT SYSTEM TO REDUCE OPERATING COST. $4,934

LOS ANGELES TRANSIT LA0G216 0 COMPUTER HARDWARE AND SOFTWARE UPGRADE $126

LOS ANGELES TRANSIT LAE0076 0 CONSTRUCT ADD’L VEHICLE PARKING (200 TO 400 SPACES), BICYCLE PARKING LOT AND PEDESTRIAN REST AREA AT THE TRANSIT CENTER. SAFTEA-LU 76, E2009-BUSP-060 (PAGE 20059 IN FTA 2009 EARMARKS)

$2,085

LOS ANGELES TRANSIT LA0D127 0 CONSTRUCT CNG FUELING STATION ON EXISTING FACILITY $3,085

LOS ANGELES TRANSIT LAE0396 0 CONSTRUCTION OF EMPIRE AREA TRANSIT CENTER NEAR BURBANK AIRPORT -UPGRADE EXIST - REG,L TRANSIT & LAYOVER FACILITY ADJACENT TO THE BURBANK-GLENDALE-PASADENA AIRPORT. WILL FACILITATE TRANSFER OF PASSENGERS TO & FROM MANY GROUND TRANS. (PE ONLY)SAFTEA-LU 396, E-2009-BUSP-063.

$1,723

LOS ANGELES TRANSIT LA0D376 0 CONSTRUCTION OF GRADE SEPARATIONS ON 35 MILE FREIGHT RAIL CORRIDOR FROM LOS ANGELES TO POMONA. $959

Page 12: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

10 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA0G354 0 CONSTRUCTION OF TRANSIT CENTER AT THE COMMUNITY REC FACILITY LOCATED AT THE TAYLOR RANCH PARK AND RIDE FACILITY, 737

NORTH MONTEBELLO BOULEVARD, MONTEBELLO.$325

LOS ANGELES TRANSIT LA0G425 0 CONSTRUCTION OF VEHICLE MAINTENANCE FACILITY $7,080

LOS ANGELES TRANSIT LA0D285 0 COUNTYWIDE NON-URBANIZED AREA CAPITAL,OPERATING AND ADMINISTRATIVE ASSISTANCE $8,773

LOS ANGELES TRANSIT LA0D92 0 COUNTYWIDE UNIVERSAL FARE SYSTEM (UFS) PROJECT (ONGOING) $2,545

LOS ANGELES TRANSIT LA0D198 0 CRENSHAW/LAX TRANSIT CORRIDOR ($20 MILLION IN FY10/11 IS FOR USDOT’S TIFIA OFFICE TO SUBSIDIZE ITS COSTS FOR PROCESSING THE TIFIA LOAN OF $545.9 MILLION, THEREFORE, NOT PART OF THE TOTAL PROJECT COST.

$1,733,188

LOS ANGELES TRANSIT LAF1455 0 CROSS-TOWN TRANSIT CONNECTOR AND SERVICE EXPANSION. FUNDS TO ACQUIRE TWO (2) CNG BUSES TO IMPLEMENT NEW LOCAL TRANSIT SERVICE BETWEEN NORTH HOLLYWOOD RED LINE STATION AND DOWNTOWN BURBANK.

$811

LOS ANGELES TRANSIT LA0G080 0 CULVER CITY AERIAL STATION FOR EXPOSITION LIGHT RAIL STATION. $4,000

LOS ANGELES TRANSIT LAF1417 0 CULVER CITYBUS ARTICULATED CNG BUSES FOR OVERCROWDING, NON-EXPANSION. FUND SIX (6) OF EIGHT (8) REQUESTED SIXTY FOOT ARTICULATED BUSES TO EXPAND THE PASSENGER CAPACITY OF THE CURRENT CULVER CITYBUS LINE 6 DURING PEAK HOURS.

$5,469

LOS ANGELES TRANSIT LA52100 0 CULVER CITYBUS OPPERATION ASSISTANCE. $20,190

LOS ANGELES TRANSIT LAES757 0 CUSTOMER INFORMATION SYSTEM PROJECT: INCLUDING AUTOMATIC VEHICLE LOCATION AND REAL-TIME PASSENGER INFORMATION SYSTEMS.

$1,500

LOS ANGELES TRANSIT LAFA143 0 DASH 32-35’ CNG (OR OTHER ALT FUELED) DASH REPLACEMENT BUSES TO SAVE OVERCROWDING AND INCREASE CAPACITY IN THE DOWNTOWN AREA. 35’ BUSES WILL REPLACE 30’ BUSES.

$5,023

LOS ANGELES TRANSIT LAF3414 0 DASH CLEAN FUEL - HIGHER CAPACITY VEHICLES. PURCHASE OF ELEVEN(11)35’ REPLACEMENT CNG DASH BUSES TO EASE OVER-CROWDING AND INCREASE CAPACITY ON 6 HIGH-PERFORMING DASH ROUTES.

$4,000

LOS ANGELES TRANSIT LAE0388A 0 DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN LINKAGES BETWEEN LOS ANGELES MISSION COLLEGE AND PUBLIC TRANSIT SERVICES TO INCLUDE LIGHTING, LANDSCAPIND, AND PASSENGER AMENITIES

$263

LOS ANGELES TRANSIT LAE0195 0 DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN LINKAGES BETWEEN LOS ANGELES PIERCE COLLEGE AND MTA’S RAPID BUS TRANSIT STOPS TO INCLUDE PASSENGER AMENITIES, 2007 CFP # F1658. (DEMO ID 195, E2009-BUSP-181)

$4,049

LOS ANGELES TRANSIT LA0D281 0 DESIGN AND CONSTRUCT PARKING IMPROVEMENTS AT AND ADJACENT TO THE CITY’S EXISTING METROLINK STATION $308

LOS ANGELES TRANSIT LA0G635 0 DESIGN AND CONSTRUCTION OF PEDESTRIAN AND TRANSIT ENHANCEMENTS ALONG THE PUBLIC RIGHT-OF-WAY OF THE METRO GOLD LINE EASTSIDE EXTENSION TO SURROUNDING NEIGHBORHOOD.

$30,000

LOS ANGELES TRANSIT LA973503 0 DOWNTOWN TRANSIT MALL ENHANCEMENTS; REMODEL EXISTING SPACE TO OPEN A TRANSIT CUSTOMER SERVICE CENTER & EXTEN-SION ON THE TRANSIT CUSTOMER CENTER LEASE.

$2,261

LOS ANGELES TRANSIT LAF1415 0 EAST LA COLLEGE TRANSIT CENTER PHASE II. AMENITIES TO INCLUDE INFORMATION KIOSK AND DRIVER RESTROOMS FOR 2ND PHASE OF THE EAST LOS ANGELES COMMUNITY COLLEGE TRANSIT CENTER.

$149

LOS ANGELES TRANSIT LA0G767 0 EASTER SEALS - PURCHASE OF 2 REPLACEMENT LARGE BUS. THIS PROJECT WILL USE $ 16 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$140

LOS ANGELES TRANSIT LAF1511 0 EASTSIDE LIGHT RAIL BIKE INTERFACE PROJECT. PROJECT INCLUDES DESIGN AND CONSTRUCTION OF BIKE ROUTES WITH APPROPRI-ATE SIGNAGE AND STRIPING TO ACCESS METRO GOLD LINE STATIONS.

$1,176

LOS ANGELES TRANSIT LA0G626 0 EASTSIDE TRANSIT CORRIDOR PHASE 2 - METRO GOLD LINE EASTSIDE EXTENSION FROM ITS EXISTING TERMINUS AT ATLANTIC STATION IN EAST LOS ANGELES FARTHER EAST

$2,490,000

Page 13: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 11

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LAF1450 0 ENCINO PARK-AND-RIDE FACILITY RENOVATION. RENOVATION OF THE ENCINO PARK-AND-RIDE FACILITY IN ORDER TO ADDRESS PHYSI-

CAL AND STRUCTURAL DEFICIENCIES AND ADD CAPACITY TO THIS HEAVILY UTILIZED FACILITY. INCLUDES 50 NEW PARKING SPACES AND BIKE LOCKERS.

$1,295

LOS ANGELES TRANSIT LA973010 0 ENGINE REBUILDS FOR SERVICE FLEET $240

LOS ANGELES TRANSIT LA0G270 0 EXPANSION AND IMPROVEMENT TO EXISTING TRANSIT CENTER IN THE CITY OF PALMDALE. E2009-BUSP-137. $360

LOS ANGELES TRANSIT LA0F021 0 EXPOSITION LIGHT RAIL TRANSIT SYSTEM PHASE II - FROM CULVER CITY TO SANTA MONICA $1,317,500

LOS ANGELES TRANSIT LA0D12 0 FACILITY IMPROVEMENTS - POMONA, ARCADIA, ADMIN. OFFICE-SEISMIC RETROFIT $8,450

LOS ANGELES TRANSIT LAE0212 0 FEASIBILITY STUDY - OF DOWNTOWN STREETCAR PROJECT $1,002

LOS ANGELES TRANSIT LA0D389 0 FEDERAL GRANT WILL BE USED TO PURCHASE TWO (2) PARATRANSIT VEHICLES FOR THE CITY’S DIAL-A-RIDE SERVICE USED BY ELDERLY AND HANDICAPPED RESIDENTS

$146

LOS ANGELES TRANSIT LA0G012 0 FEDERAL OPERATING ASSISTANCE (L/P UZA. PROJECT USING $1,103 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) FOR MATCH IN FY11 IN CON AND $1,103 FOR A MATCH IN FY12.

$12,134

LOS ANGELES TRANSIT LA0G285 0 FINAL EXPANSION OF PARKING AT THE NEWHALL METROLINK STATION WHICH WILL ADD 95 PARKING SPOTS FOR PARK AND RIDE. $1,200

LOS ANGELES TRANSIT LA52600 0 FY 2010/11 ESTIMATED OPERATING ASSISTANCE - TRANSIT OPERATIONS $14,198

LOS ANGELES TRANSIT LAF3306 0 GARDENA MUNICIPAL BUS LINES LINE 1 TSP PROJECT. GARDENA MUNICIPAL BUS LINES IS PROPOSING TO IMPLEMENT TRANSIT SIGNAL PRIORITY ALONG ITS LINE 1 TO REDUCE TRANSIT TRAVEL TIMES AND ENHANCE ON-TIME PERFORMANCE. CITY OF GARDENA: MARINE AVENUE: FROM YUKON AVENUE TO WESTERN AVENUE WESTERN AVENUE: FROM MARINE AVENUE TO 166TH STREET NORMANDIE AVENUE: FROM 166TH STREET TO GARDENA BOULEVARD VERMONT AVENUE: FROM GARDENA BOULEVARD TO 153RD STREET

$844

LOS ANGELES TRANSIT LA0G670 0 GLASSELL PARK TRANSIT PAVILION, LOS ANGELES.PAVILION WILL INCLUDE MULTIPLE PERMANENT CANOPIES CONSISTING OF FIBER GLASS WITH METAL FRAMES THAT PROVIDE PASSENGERS COVERAGE FROM THE WEATHER. AMENITIES INCLUDE WANDERING PATHS, VEGETATION AND PERMANENT BENCHES FOR WAITING BETWEEN LINE TRANSFERS OF THE 5 LOCAL AND REGIONAL TRANSIT LINES WHICH USE THE PAVILION AS A STOP.

$238

LOS ANGELES TRANSIT LA0G231 0 GOLD LINE - EASTSIDE EXTENSION OPERATING ASSISTANCE $52,500

LOS ANGELES TRANSIT LA0G558 0 GOLD LINE FOOTHILL LRT EXTENSION - PASADENA TO GLENDORA $847,000

LOS ANGELES TRANSIT LAF1427 0 HAHN’S TROLLEY AND SHUTTLE TRANSIT VEHICLES; PURCHASE THREE 25 FEET-LONG ALTERNATIVELY-FUELED CUTAWAY BUSES (TWO PRIMARY SERVICE VEHICLES AND ONE SPARE VEHICLE) FOR REPLACEMENT THAT COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) AND ARE EQUIPPED WITH WHEELCHAIR LIFTS.

$375

LOS ANGELES TRANSIT LA0D380 0 HARDWARE AND SOFTWARE UPGRADE-FUEL DISPENSING/MONITORING $48

LOS ANGELES TRANSIT LA0D29 0 HEART OF THE CITY BUS TRANSFER STATION AMENITIES - CONSTRUCTION IN CITY REDEVELOPMENT AREA - (SERVICE BY 5 LACMTA LINES, 2 TORRANCE LINES & 1 LADOT COMMUTER EXPRESS LINE).

$9,378

LOS ANGELES TRANSIT LA0G671 0 HISTORIC FILIPINOTOWN BUS SECURITY LIGHTS, LOS ANGELES $79

LOS ANGELES TRANSIT LA0C53 0 HOLLYWOOD INTERMODAL TRANSPORTATION AND PUBLIC PARKING CENTER ON HAWTHORNE AVE. BETWEEN HIGHLAND AVENUE AND NORTH ORANGE DRIVE (EXIST 500 SP PARK STRUCTURE).TCRP#49.2

$41,000

LOS ANGELES TRANSIT LA0D95 0 IMPLEMENTATION OF UNIVERSAL FARE SYSTEM PROJECT AT LADOT PREVIOUSLY PART OF LAOD07. $2,893

LOS ANGELES TRANSIT LA0G113 0 INSTALL PASSENGER COUNTERS, AVL, AND STOP ANNOUCEMENT SYSTEMS ON ALL BUSES $123

LOS ANGELES TRANSIT LA0G644 0 INSTALLATION OF AN AUTOMATIC PASSENGER COUNTER (APC) SYSTEM ON MBL FLEET. AGENCY USING $60 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY12.

$300

Page 14: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

12 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA0G260 0 INSTITUTE FOR THE REDESIGN OF LEARNING DBA THE ALMANSOR CENTER PURCHASE OF SEVEN SERVICE EXPANSION SMALL BUSES 1B

AT A COST OF $58,000 EACH ($6,653 LOCAL AND $51,347 FEDERAL). IN ADDITION PURCHASE OF THREE SERVICE EXPANSION MEDIUM BUSES II AT $60,000 EACH ($6882 LOCAL AND $53,118 FEDERAL).

$586

LOS ANGELES TRANSIT LA0G783 0 INSTITUTE FOR THE REDESIGN OF LEARNING-PURCHASE 3 SERVICE EXPANSION SMALL BUSES. THIS PROJECT WILL USE $21 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$181

LOS ANGELES TRANSIT LA0G593 0 ITS REPLACEMENT. PROJECT WILL USE TOLL CREDITS; $160 IN FY11 TO MATCH 5307 FUNDS. $800

LOS ANGELES TRANSIT LA990764 0 JOB ACCESS & REVERSE COMMUTER PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123 (TOLL CREDIT WILL BE USED AS THE LOCAL MATCH TO SECTION 5316 FEDERAL FUNDS) TOLL CREDIT IN FY11/12 IN CON FOR $21,592.

$175,990

LOS ANGELES TRANSIT LA0C8114 0 LA CNTY RIDESHARE SERVICES; PROVIDE COMMUTE INFO, EMPLOYER ASSISTANCE AND INCENTIVE PROGRAMS THROUGH CORE & EMPLOYER RIDESHARE SERVICES & MTA INCENTIVE PROGRAMS. PPNO 9003

$82,560

LOS ANGELES TRANSIT LA0G142 0 LACRD - 12 BUSES FOR THE I-10 EL MONTE BUSWAY. HOT LANE. (RTP# 1TR08D08 & 1TR08D07A) $8,500

LOS ANGELES TRANSIT LA0G145 0 LACRD - 4 EXPANSION BUSES FOR THE I-110 HARBOR TRANSITWAY HOT LANE(TORRANCE TRANSIT). (RTP# 1TR204) $2,800

LOS ANGELES TRANSIT LA0G159 0 LACRD - DIVISION 13 (FORMERLY NAMED UNION DIVISION) NEW BUS OPERATIONS AND MAINTENANCE FACILITY (RTP ID 1OM08D01 & 1TR08D07A & 1HL08D03 FOR HOT LACRD PROJ). PROJECT AND SCOPE ARE FROM AMENDMENT 2008 AMENDMENT #53.

$85,500

LOS ANGELES TRANSIT LA0G154 0 LACRD - EL MONTE TRANSIT CENTER IMPROVEMENTS AND EL MONTE BUSWAY IMPROVEMENTS, INCLUDING BIKE LOCKERS, TICKET VENDING MACHINES AT EL MONTE BUSWAY STATIONS AND UP TO 30 BUS BAYS; EL MONTE BUSWAY TERMINUS (@ UNION STATION) IMPROVEMENTS INCLUDING PASSENGER STATION REHABILITATION AND UPGRADES AND IMPROVED PEDESTRIAN CONNECTION TO PATASOURAS PLAZA/UNION STATION.

$55,300

LOS ANGELES TRANSIT LA0G150 0 LACRD - I-10 AND I-110 HOT LANE OPERATIONS (O & M), INCLUDING SECURITY, NEW TRANSIT (RTP ID 1TR08D7B & 10M08D01; LA0G150, LA0G151, LA0G152,1OM08D02)

$6,700

LOS ANGELES TRANSIT LA0G149 0 LACRD - I-10 HOT LANE OPERATIONS - NEW TRANSIT SERVICES.(RTP# 1OM08D02). $3,634

LOS ANGELES TRANSIT LA0G148 0 LACRD - I-110 HOT LANE OPERATIONS - NEW TRANSIT SERVICES. (RTP# 1TR204) $1,200

LOS ANGELES TRANSIT LA0G147 0 LACRD - I-110 HOT LANE OPERATIONS - NEW TRANSIT SERVICES.(CITY OF GARDENA)(RTP# 1TR204) $600

LOS ANGELES TRANSIT LA0G153 0 LACRD - PLATFORMS AND PARKING IMPROVEMENTS AT THE METROLINK POMONA STATION. ADDITION OF 100 PARKING SPACES AND EXTENSION OF PLATFORM.(G# CA-37-X052-00)

$5,600

LOS ANGELES TRANSIT LAE0127 0 LAE0127A:PROCUREMENT OF 3 CNG REPLACEMENT TRANSIT VEHICLES AND RELATED INFRASTRCTURE EQUIPMENT FOR FIXED ROUTE PUBLIC TRANSPORTATION.

$858

LOS ANGELES TRANSIT LA0G499 0 LAE0127B: PURCHASE OF EQUIPMENT TO SUPPORT CNG VEHICLES AND MAINTAIN CNG FACILITY AND RELATED INFRASTRUCTURE IMPROVEMENTS TO FIXED ROUTE PUBLIC TRANSPORTATION

$744

LOS ANGELES TRANSIT LA0G500 0 LAE0127C: MAINTAIN CNG FACILITY AND RELATED INFRASTRUCTURE IMPROVEMENTS TO FIXED ROUTE PUBLIC TRANSPORTATION $806

LOS ANGELES TRANSIT LA0G501 0 LAE0127D: PURCHASE OF EQUIPMENT TO SUPPORT CNG VEHICLES AND MAINTAIN CNG FACILITY AND RELATED INFRASTRUCTURE IMPROVEMENTS TO FIXED ROUTE PUBLIC TRANSPORTATION

$922

LOS ANGELES TRANSIT LA0F063 0 LA-FULLERTON TRIPLE TRACK & GRADE SEP (ROSECRANS) (IN SANTA FE SPRINGS, LA ON THE BNSF LINE. CONSTRUCT TRIPLE TRACK & GRADE SEPARATION AT ROSECRANS AND MARQUARDT AVE. (PPNO 2002A) & ELIMINATE HAZARDS AT RAILROAD GRADE CROSSING.

$90,000

LOS ANGELES TRANSIT LA0D282 0 LANDSCAPE,STREETSCAPE & PASSENGER AMENITY IMPRVMENTS AT & ADJACENT LOS ANGELES CITY COLLEGE TO IMPROVE PEDESTRAN MOBILITY & ACCESSIBILITY TO EXSTG MULTIMDAL CONN. (SAFETEA-LU # 223, 2007 CFP #F1641)

$9,564

LOS ANGELES TRANSIT LA0G596 0 LAURENCE JACKSON TRANSIT CENTER CLEAN FUEL FACILITY MODIFICATION: WILL INCLUDE THE NECESSARY FACILITY MODIFICATIONS TO ACCOMMODATE AN ALTERNATIVE FUELING FACILITY SUCH AS FOR COMPRESSED NATURAL GAS FUELING.

$6,700

Page 15: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 13

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA990305 0 LIGHT RAIL TRANSIT FLEET- 50 NEW RAIL CAR (26 EXP (10 FOR METRO GOLD LINE EASTSIDE & (16) FOR EXPOSITION LRT) 24

REPLACEMENT CARS - .PPNO 3225.$162,479

LOS ANGELES TRANSIT LA0F075 0 LIGHT RAIL TRANSIT FLEET-UP TO 78 NEW CARS SYSTEMWIDE $335,400

LOS ANGELES TRANSIT LA000665 0 LINE #8 - OPERATING SUBSIDY $5,046

LOS ANGELES TRANSIT LA0G492 0 LOCAL TRANSIT BUS - COSMETIC UPGRADE/REHAB. PROJECT USING $54 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CRED-ITS) IN FY12 FOR CON

$570

LOS ANGELES TRANSIT LA0C8237 0 LONG BEACH PARK AND RIDE FACILITY AT 4TH AND PACIFIC, SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 100 DEDICATED, TRANSIT ORIENTED SPACES IN MIXED USE DEVELOPMENT

$3,902

LOS ANGELES TRANSIT LAE0332 0 LONG BEACH PARK AND RIDE FACILITY AT 3RD STREET AND PACIFIC AVE SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 300 TO 500 SPACE AND INCLUDE RESIDENTIAL AND COMMERCIAL DEVELOPMENT

$1,002

LOS ANGELES TRANSIT LAF3426 0 LONG BEACH TRANSIT’S PASSPORT REPLACEMENT PROJECT. PURCHASE OF UP TO 15 ALTERNATIVE FUEL 30-FOOT BUSES TO REPLACE A PORTION OF LBT’S DIESEL PASSPORT FLEET IN DOWNTOWN LONG BEACH.

$9,896

LOS ANGELES TRANSIT LA0G694 0 LOS ANGELES - SAN FERNANDO VALLEY BRT TRANSIT EXTENSION CANOGA $216,000

LOS ANGELES TRANSIT LAF1657 0 LOS ANGELES VALLEY COLLEGE (LAVC) BUS STATION EXTENSION. PROJECT WILL EXTEND THE ORANGE LINE STATION AT THE LA VALLEY COLLEGE BY PROVIDING A DIRECT PEDESTRIAN CONNECTION FROM THE STATION TO A NEW PEDESTRIAN ENTRANCE TO LAVC.

$2,959

LOS ANGELES TRANSIT LA974165 0 MACARTHUR PARK STATION IMPROVEMENTS INCLUDE DESIGN AND CONSTRUCTION OF A PLAZA TO ACCOMODATE PUBLIC ACCESS (PEDESTRIAN ENTRANCES, WALKWAYS, BICYCLE FACILITIES) PPNO# 3417

$1,931

LOS ANGELES TRANSIT LAF1609 0 MAIN STREET BUS STOP AND PEDESTRIAN IMPROVEMENTS. DESIGN AND CONSTRUCT BUS STOP AND PEDESTRIAN IMPROVEMENTS THAT WILL INCREASE THE USAGE AND CAPACITY OF PEDESTRIAN FACILITIES ALONG A 0.4 MILE STRETCH OF MAIN STREET.

$823

LOS ANGELES TRANSIT LA0G072 0 MAINTENANCE AND ADMINISTRATIVE EQUIPMENT. USING $100 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY12 IN CON FOR MATCH TO 5307 FUNDS.

$900

LOS ANGELES TRANSIT LA0G722 0 MAINTENANCE FACILITY RETROFIT - FOR CNG BUSES. THIS PROJECT WILL USE $187 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE.

$937

LOS ANGELES TRANSIT LA0G588 0 MAJOR BUS COMPONENTS. PROJECT USING TOLL CREDITS; $60 IN BOTH FY11 & FY12 FOR MATCH FOR 5307 FUNDS. $1,500

LOS ANGELES TRANSIT LA0G589 0 MAJOR FACILITY EQUIPMENT. PROJECT IS A CARRYOVER FROM THE 2008 FTIP AMENDMENT #44 $600

LOS ANGELES TRANSIT LAF1424 0 MCBEAN REGIONAL TRANSIT CENTER PARK AND RIDE. PURCHASE LAND, DESIGN, AND CONSTRUCT A REGIONAL PARK-AND-RIDE LOT ADJACENT TO THE MCBEAN REGIONAL TRANSIT CENTER IN THE CITY OF SANTA CLARITA.

$5,868

LOS ANGELES TRANSIT LA0D338 0 METRO GOLD LINE EASTSIDE EXTENSION ENHANCEMENTS INCLUDING ADDITIONAL TVM’S; PEDESTRIAN SAFETY, LANDSCAPING AND MULTI-MODAL INTERFACE ELEMENTS; ADDITIONAL TRACTION POWER SUBSTATION,

$14,000

LOS ANGELES TRANSIT LA0G447 0 METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION SEGMENT 1 - WILSHIRE/WESTERN TO LA CIENEGA (EXCLUDING P/E WHICH IS UNDER LA0G642)

$2,511,121

LOS ANGELES TRANSIT LA0G642 0 METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION TO WESTWOOD - P/E ONLY $107,400

LOS ANGELES TRANSIT LA29212XY 0 METRO RAIL GOLD LINE EXTENSION- PASADENA TO MONTCLAIR 24- MILE, 12- STATION LRT EXTENSION. SAFETEA-LU # 285 LEAD AGENCY WILL CHANGE TO METRO GOLD LINE

$35,530

LOS ANGELES TRANSIT LA0C8413 0 METRO RAPID BUS STATIONS-PHASE II: INCLUDES COMMUNICATIONS & EQUIPMENT - EQUIPMENT AND BUS SHELTERS ONLY. $144,900

Page 16: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

14 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LAF3712 0 METROLINK PARKING RESOURCE MANAGEMENT DEMONSTRATION PROJECT. DEMONSTRATION PROJECT PROVIDES COMMUTERS

OF METROLINK AND TRANSIT SERVICES WITH A PROACTIVE SYSTEM TO ASSIST IN LOCATING AVAILABLE PARKING WITHIN CITY’S METROLINK STATION VICINITY.

$266

LOS ANGELES TRANSIT LA0D206 0 METROLINK PEDESTRIAN BRIDGE PROJECT. THIS FACILITY WILL BE CONSTRUCTED ON THE WEST SIDE OF CITRUS AVE. THE METROLINK STATION IS ON THE EAST SIDE OF CITRUS AVE.

$469

LOS ANGELES TRANSIT LA0G456 0 METROLINK SEALED CORRIDOR GRADE CROSSING IMPROVEMENTS LOS ANGELES VENTURA SUBDIVISION $446

LOS ANGELES TRANSIT LA0C10 0 MID-CITY/EXPOSITION CORRIDOR LIGHT RAIL TRANSIT PROJECT PHASE I TO VENICE-ROBERTSON STATION. (INCLUDING E200-BUSP-095, LA CIENEGA INTERMODAL CENTER)

$930,562

LOS ANGELES TRANSIT LA0D197 0 MID-CITY/EXPOSITION CORRIDOR LRT OPERATING ASSISTANCE $114,801

LOS ANGELES TRANSIT LA0G300 0 MODIFY AND ENHANCE EXISTING INTERMODAL PASSENGER AMENITIES AT CALSTATE UNIVERSITY, NORTHRIDGE EARMARK ID # E2008-BUSP-0696

$504

LOS ANGELES TRANSIT LA0C8250 0 MONROVIA RAILROAD DEPOT MULTI-MODAL TRANSIT CENTER: STABILIZING STRUCTURE AND THEN OVERALL STRUCTURAL ELEMENTS WILL BE REPAIRED FOLLOWED BY RESTORING KEY ARCHITECTURAL . PPNO# 3415

$2,053

LOS ANGELES TRANSIT LAES187 0 MULTI-COUNTY FUNDED POSITIVE TRAIN CONTROL (PTC). SCRRA IS DEVELOPING AN ACCELERATED STRATEGY TO HAVE POSITIVE TRAIN CONTROL (PTC) OPERATIONAL ON ALL METROLINK TRAINS BY 2012 AND THE FULL PTC SYSTEM INSTALLED ON THE 216 MILES OF METROLINK-OWNED RIGHT-OF-WAY BY 2015.(5307 FUNDS FROM 5340)

$201,600

LOS ANGELES TRANSIT LA0G431 0 MULTI-MODAL TRANSIT CENTER AT CSUN TO INCLUDE PASSENGER LOADING AREAS AND BUS SHELTERS $492

LOS ANGELES TRANSIT LA0G110 0 NEW EQUIPMENT FOR BUS MAINTENANCE $120

LOS ANGELES TRANSIT LA0D471 0 NEW FREEDOM PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123. ADDED TOLL CREDITS IN FY11/12 IN CONS. FOR $9,309.

$66,347

LOS ANGELES TRANSIT LA0F096 0 NORWALK SANTA FE SPRINGS TRANSPORTATION CENTER PARKING EXPANSION AND BIKEWAY IMPROVEMENTS. PROVIDE ADDITIONAL 400 PARKING SPACES FOR TRANSIT CENTER PATRONS AND IMPROVE BICYCLES ACCESS TO THE TRANSIT CENTER

$4,057

LOS ANGELES TRANSIT LA0G073 0 NORWALK/SANTA FE SPRINGS TRANSPORTATION CENTER-METROLINK STATION IMPROVEMENTS. REHAB/IMPROVEMENT OF THE TRANSIT FACILITY, EQUIPMENT MAINTENANCE FACILITY, OPERATIONS/DISPATCH OFFICES, FUEL ISLAND, BUS WASH AND DRAINAGE, PARKING, AND PEDESTRIAN PLAZA PASSENGER AMENITIES. THIS PROJECT WILL USE $23 TOLL CREDITS TO MATCH $113 - FTA LA/LB UZA IN FY 10/11.

$649

LOS ANGELES TRANSIT LAF3402 0 NORWALK/SANTA FE SPRINGS TRANSPORTATION CTR PHASE II PARKING. CONSTRUCT A TOTAL OF APPROX. 160 PARKING SPACES ON A SITE ADJACENT TO THE METROLINK STATION.

$2,819

LOS ANGELES TRANSIT LAF1451 0 OLIVE/PICO BUS STOP IMPROVEMENT. LENGTHEN THE OLIVE/PICO BUS ZONE BY ENLARGING THE ISLAND WHERE MULTIPLE AGENCY BUS STOPS ARE LOCATED, INSTALLING LIGHTING, AND CONSTRUCTING A CONCRETE BUS PAD.

$424

LOS ANGELES TRANSIT LAES534 0 ON-BOARD CAMERA UPGRADE $500

LOS ANGELES TRANSIT LA0G108 0 ONE REPLACEMENT TRANSIT VEHICLE WOULD BE PURCHASED TO REPLACE VEHICLE # 328 $554

LOS ANGELES TRANSIT LA0G081 0 ONGOING ADMINISTATION. INCLUDES: ITS SOFTWARE IMPLEMENTATION - MAINTENANCE MANAGEMENT SOFTWARE. THE PROJECT IS USING $60 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY 11 AND $100 IN FY12 FOR MATCH TO 5307 FUNDS IN THE CON PHASE.

$1,300

LOS ANGELES TRANSIT LA0G085 0 ONGOING BUS REPLACEMENT: ALTERNATIVE FUEL BUSES - QTY 16. (PROJECT USING $689 OF TOLL CREDITS TO MATCH 5307 FUNDS IN FY11 AND $281 TOLL CREDITS FOR FY12)

$5,282

LOS ANGELES TRANSIT LA0G435 0 ON-GOING CAPITALIZATION OF TRAINING AND EDUCATION. ADDED TOLL CREDITS IN FY10/11 IN CONS. FOR $12. $220

Page 17: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 15

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA0G024 0 ON-GOING FLEET REPLACEMENT (40’ & 30’, ADA COMPLIANT, ALTERNATIVE FUEL). ADDED TOLL CREDITS IN FY10/11 IN CONS.FOR

$1,245.$45,867

LOS ANGELES TRANSIT LA50300 0 OPERATING ASSISTANCE - TRANSIT OPERATIONS AND DIAL-A -RIDE SERVICE $4,061

LOS ANGELES TRANSIT LA0G640 0 PACIFIC SURFLINER CORIDOR - RAYMER/BERNSON DOUBLE TRACK IMPROVEMENTS. THIS PROJECT WILL UPGRADE THE RAIL CORRIDOR FROM A SINGLE TRACK TO A DOUBLE TRACK, INSTALLING CONCRETE TIES ON BOTH TRACKS. IN ADDITION THIS PROJECT WILL INSTALL: FOUR NEW SPECIAL TRACKWORK TURNOUTS, NINE AT-GRADE CROSSINGS, FOUR BRIDGES, A NEW SECOND PLATFORM AT NORTHRIDGE, NEW PEDESTRIAN UNDERPASSES, NEW FENCING AND NEW PEDESTRIAN CROSSINGS AT CHATSWORTH. OTHER INHANCEMENTS INCLUDE SIGNAL RELOCATION, UTILITY RELOCATION AND DRAINAGE IMP

$1,955

LOS ANGELES TRANSIT LA0G639 0 PACIFIC SURFLINER CORRIDOR VAN NUYS NORTH PLATFORM IMPROVEMENTS. THE PROJECT WILL WIDEN A RAIL BRIDGE OVER VAN NUYS BOULEVARD, REPLACE THE SOUTH SIDE PLATFORM WITH A CENTRAL PLATFORM TO SERVE BOTH MAIN LINE TRACKS, UPGRADE ONE MILE OF MAIN LINE TRACK, UPGRADE CROSSOVERS TO HIGHER SPEED AUTOMATIC, UTILITY RELOCATION, AND RECONFIGURE THE ADJACENT UP TRACK AND YARD ENTRANCE.

$1,000

LOS ANGELES TRANSIT LA0G417 0 PAINT TRANSPORTATION DEPARTMENT BUILDING $90

LOS ANGELES TRANSIT LAF3403 0 PALMDALE TRANSPORTATION CENTER - PLATFORM EXTENSION. EXTENSION OF THE EXISTING PALMDALE TRANSPORTATION CENTER METROLINK PLATFORM FROM 510 LINEAL FEET TO 680 LINEAL FEET; 170 LINEAL FEET EXTENSION.. PROJECT IS CENTRALLY LOCATED WITHIN THE CITY LIMITS ON A 26-ACRE SITE ADJACENT TO 6TH STREET EAST AND TECHNOLOGY DRIVE (FORMERLY AVENUE P-8). THE SERVICE AREA INCLUDES PALMDALE, LANCASTER, QUARTZ HILL, PEARBLOSSOM AND LITTLEROCK. THIS SERVICE AREA IS A VERY LARGE PORTION OF THE ANTELOPE VALLEY.

$1,012

LOS ANGELES TRANSIT LA0B311 0 PARK AND RIDE FACILITIES (TRANSIT ORIENTED NEIGHBORHOOD PROGRAM). 3 PARK AND RIDES LOCATED IN THE CITIES OF AZUSA, INDUSTRY AND WEST COVINA

$42,175

LOS ANGELES TRANSIT LA0G078 0 PARTS & EQUIPMENT PURCHASE. INCLUDES: REFURBISH ENGINE - REBUILD/REPOWER. PROJECT USING $320 OF TOLL CREDITS IN FY12 IN CON TO MATCH 5307 FUNDS.

$6,612

LOS ANGELES TRANSIT LA0G198 0 PASSENGER AND PEDESTRIAN IMPROVEMENTS BY LANI $315

LOS ANGELES TRANSIT LA0G119 0 PASSENGER BENCHES AND SMALL SHELTERS - PURCHASE AND INSTALL 60 PASSENGER BENCHES AND SMALL SHELTERS THROUGHOUT THE CITY.E2009-BUSP-066

$1,207

LOS ANGELES TRANSIT LA52105 0 PAYMENTS FOR THE LEASEING OF BUS TIRES FOR THE CULVER CITYBUS FLEET. $480

LOS ANGELES TRANSIT LA0F023 0 PEAK-HOUR BUS-ONLY LANES ON LINCOLN BLVD. BETWEEN PICO BOULEVARD AND THE SOUTH CITY LIMIT (IN BOTH DIRECTIONS) $170

LOS ANGELES TRANSIT LAF1605 0 PEDESTRIAN SAFE BUS STOP LINKAGE. LINKING 11 BUS STOPS CURRENTLY INACCESSIBLE BECAUSE OF LACK OF SIDEWALKS ON BOTH THE EAST AND WEST SIDE OF HAWTHORNE BLVD. FROM CREST RD. TO PALOS VERDES DR. SOUTH (ABOUT 13,000’)

$1,544

LOS ANGELES TRANSIT LA0G493 0 PLANNING - OPERATIONAL PLANNING. PROJECT USING $120 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) LOCAL MATCH IN FY 11 FOR CON.

$600

LOS ANGELES TRANSIT LA0G764 0 POMONA VALLEY TRANSPORTATION AUTHORITY - PURCHASE OF 6 REPLACEMENT LARGE BUS (16AP, 2 WC). THIS PROJECT WILL USE $ 48 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$420

LOS ANGELES TRANSIT LA0B358 0 PREVENTATIVE MAINTENANCE FOR THE CULVER CITYBUS FLEET $12,500

LOS ANGELES TRANSIT LA0F048 0 PREVENTIVE MAINTENANCE - OPERATING $21,800

LOS ANGELES TRANSIT LA963543 0 PREVENTIVE MAINTENANCE (CAPITAL & OPERATING MAINTENANCE ITEMS ONLY) $2,972,200

LOS ANGELES TRANSIT LA50200 0 PREVENTIVE MAINTENANCE (LANCASTER/PALMDALE UZA). ADDING $1,056 OF TOLL CREDITS IN CON FOR 11/12. $34,981

LOS ANGELES TRANSIT LA0G418 0 PREVENTIVE MAINTENANCE FOR TRANSIT FLEET $400

Page 18: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

16 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA0G770 0 PRIDE INDUSTRIES, INC. - PURCHASE OF 1 OPERATING EQUIPMENT GPS UNITS (6). THIS PROJECT WILL USE $ 1 OF TOLL CREDITS TO

MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.$5

LOS ANGELES TRANSIT LA0G768 0 PRIDE INDUSTRIES, INC. - PURCHASE OF 3 SERVICE EXPANSION LARGE BUS (16 AP; 2 WC). THIS PROJECT WILL USE $ 24 OF TOLL CRED-ITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$210

LOS ANGELES TRANSIT LA0G693 0 PROCUREMENT OF FIVE (5) REPLACEMENT ALTERNATIVE FUEL TRANSIT VEHICLES NOT TO EXCEED 35-FEET, INCLUDING AUTOMATED ANNOUNCING SYSTEMS. DEMO ID 251

$2,307

LOS ANGELES TRANSIT LA0G700 0 PROCUREMENT OF THREE (3) REPLACEMENT ALTERNATIVE FUEL TRANSIT VEHICLES NOT TO EXCEED 35-FEET, INCLUDING AUTOMATED ANNUNCIATING SYSTEMS AND OTHER ASSOCIATED VEHICLE EQUIPMENT.

$1,426

LOS ANGELES TRANSIT LA0F024 0 PROP 1B SECURITY BOND PROJECTS: INCLUDING SECURITY PROJECTS SUCH AS SURVEILLANCE SYSTEM AND LIGHTING. IN ADDITION, TO PURCHASE OF SECURITY AND SAFETY EQUIPMENT.

$2,534

LOS ANGELES TRANSIT LA0D356 0 PROVIDE HARDSCAPE, LANDSCAPE AND STREETSCAPE IMPROVEMENTS AT EAST LOS ANGELES COLLEGE TO PROVIDE A OFF-STREET TRANSIT CENTER TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL

$3,856

LOS ANGELES TRANSIT LA0D357 0 PROVIDE HARDSCAPE, LANDSCAPE AND STREETSCAPE IMPROVEMENTS AT LOS ANGELES TRADE TECHNICAL COLLEGE TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS.SAFETEA-LU # 307, 2007 CFP #F1645

$5,925

LOS ANGELES TRANSIT LA0D358 0 PROVIDE HARDSCAPE, LANDSCAPE, AND STREETSCAPE IMPROVEMENTS AT LOS ANGELES VALLEY COLLEGE TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS

$4,679

LOS ANGELES TRANSIT LA0G082 0 PURCHASE & INSTALL NEW SHELTERS & BENCHES AT BUS STOPS AND TRANSFER CENTERS. ADDED $70 OF TRANSPORTATION DEVELOPMENT CREDITS IN FY11 AND $100 IN FY 12 FOR 5307 MATCH IN CON PHASE.

$1,848

LOS ANGELES TRANSIT LA0D348 0 PURCHASE (10) REPLACEMENT VANS WITH ALTERNATE FUEL VANS $1,320

LOS ANGELES TRANSIT LA0G059 0 PURCHASE (5) RELIEF VEHICLES AND (4) SERVICE VEHICLES TO REPLACE EXISTING VEHICLES THAT HAVE REACHED THE END OF THEIR USEFUL SERVICE LIFE.

$350

LOS ANGELES TRANSIT LA0G580 0 PURCHASE 1 MEDIUM BUS TYPE II CNG FOR SERVICE EXPANSION OF PARATRANSIT SERVICES. (LIFE STEPS FOUNDATION, INC. AKA CIRCLE OF FRIENDS)

$100

LOS ANGELES TRANSIT LA0D335 0 PURCHASE 1 PARATRANSIT VEHICLE $70

LOS ANGELES TRANSIT LAES430 0 PURCHASE 16 REPLACEMENT BUSES ALT-FUEL BUSES $8,023

LOS ANGELES TRANSIT LA0G677 0 PURCHASE 17 CNG REPLACEMENT BUSES $7,424

LOS ANGELES TRANSIT LA0G227 0 PURCHASE 2 BUSES FOR ROUTE 757 SERVICE EXPANSION TO NORTH HOLLYWOOD PER THE ADOPTED TRANSPORTATION DEVELOPMENT PLAN.

$1,081

LOS ANGELES TRANSIT LAES725 0 PURCHASE 2 REPLACEMENT PARATRANSIT VEHICLES 25’LONG THAT WILL CARRY 18 PASSENGERS AND ARE GASOLINE POWERED. $150

LOS ANGELES TRANSIT LA0G206 0 PURCHASE 21 REPLACEMENT ALT-FUEL BUSES. PROJECT IS A CARRYOVER FROM PRIOR FISCAL YEAR. $10,396

LOS ANGELES TRANSIT LAE0172 0 PURCHASE 21 REPLACEMENT BUSES FOR SANTA MONICA’S BIG BLUE BUS TRANSIT SERVICE. 5 BUSES PURCHASED IN FY11/12 $21,392

LOS ANGELES TRANSIT LA0D453 0 PURCHASE 5 REPLACEMENT ALTERNATIVE FUEL 40’ BUSES $3,000

LOS ANGELES TRANSIT LA0G004 0 PURCHASE 57 REPLACEMENT ALTERNATIVE FUEL 40’ BUSES $25,107

LOS ANGELES TRANSIT LA0G697 0 PURCHASE 7 REPLACEMENT ALTERNATIVE-FUEL BUSES $4,737

LOS ANGELES TRANSIT LAE0132 0 PURCHASE A NEW ALTERNATE FUEL BUS. BUS WILL REDUCE EMISSIONS & CONTINUE TO PROVIDE TRANSPORTATION $250

LOS ANGELES TRANSIT LA0G193 0 PURCHASE AND REPLACEMENT OF BRAKE LATHE. $60

LOS ANGELES TRANSIT LA0G210 0 PURCHASE AND REPLACEMENT OF MAINTENANCE EQUIPMENT: FORK LIFT AND BUS TRACTOR $80

Page 19: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 17

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA0G661 0 PURCHASE ASSOCIATED CAPITAL EQUIPMENT. THESE ITEMS WOULD INCLUDE SPARE ENGINES, TRANSMISSIONS, ETC. $324

LOS ANGELES TRANSIT LA0G268 0 PURCHASE CLEAN AIR BUSES FOR SERVICE WITHIN THE CITY OF PARAMOUNT EARMARK ID #E2009-BUSP-074 $250

LOS ANGELES TRANSIT LA0D349 0 PURCHASE EXPANSION BUSES WITH ALTERNATE FUEL (HYBRID/ELECTRIC) $600

LOS ANGELES TRANSIT LA0G672 0 PURCHASE FIVE REPLACEMENT 32’ CNG BUSES $1,980

LOS ANGELES TRANSIT LAES587 0 PURCHASE FOUR (4) 32 FOOT BUSES FOR BUS REPLACEMENT OF THE BEACH CITIES TRANSIT LINES. $610

LOS ANGELES TRANSIT LA0G662 0 PURCHASE FOUR REPLACEMENT PARATRANSIT VEHICLES. $500

LOS ANGELES TRANSIT LA0C36 0 PURCHASE FOUR REPLACEMENT PARATRANSIT VEHICLES. CARRYOVER FROM PRIOR FISCAL YEAR. $500

LOS ANGELES TRANSIT LA0G424 0 PURCHASE FOUR(4) COMMUTER 40’ ALT-FUEL BUSES TO REPLACE DIESEL BUSES. $2,100

LOS ANGELES TRANSIT LA0D109 0 PURCHASE LAND FOR VEHICLE MAINTENACE TRANSIT FACILITY $2,062

LOS ANGELES TRANSIT LAF3430 0 PURCHASE OF (17) 40-FT REPLACEMENT CNG BUSES FOR GLENDALE BEELINE FLEET. PURCHASE OF (17) 40-FOOT LOW FLOOR CNG HEAVY-DUTY VEHICLES FOR THE GLENDALE BEELINE TRANSIT SYSTEM SERVING THE GLENDALE DOWNTOWN AND GLENDALE MULTI-MODAL TRANSPORTATION CENTER.

$4,000

LOS ANGELES TRANSIT LA0G586 0 PURCHASE OF 1 LARGE BUS TYPE IIIA FOR SERVICE EXPANSION OF PARATRANSIT SERVICES. (GRANT AME CHURCH) $117

LOS ANGELES TRANSIT LA0G573 0 PURCHASE OF 13 REPLACEMENT MINIVANS FOR PARATRANSIT SERVICES. (ACCESS SERVICES, INC) $696

LOS ANGELES TRANSIT LAE0001A 0 PURCHASE OF 2 CNG BUSES FOR GLENDALE BEELINE TRANSIT SYSTEM $786

LOS ANGELES TRANSIT LA0G577 0 PURCHASE OF 2 REPLACEMENT LARGE BUSES TYPE III CNG FOR PARATRANSIT SERVICES. (LIFE STEPS FOUNDATION, INC. AKA CIRCLE OF FRIENDS).

$216

LOS ANGELES TRANSIT LA0G584 0 PURCHASE OF 2 REPLACEMENT MINIVANS AND 3 SMALL REPLACEMENT BUSES TYPE IB FOR PARATRANSIT SERVICES. (INSTITUTE FOR THE REDESIGN OF LEARNING DBA THE ALMANSOR CENTER.)

$321

LOS ANGELES TRANSIT LA0G572 0 PURCHASE OF 2 REPLACEMENT MINIVANS FOR PARATRANSIT SERVICES FOR TARZANA TREAMENT CENTER. $107

LOS ANGELES TRANSIT LA0G582 0 PURCHASE OF 2 SMALL TYPE IA BUSES AND 1 MINIVAN FOR SERVICE EXPANSION OF PARATRANSIT SERVICES. (EXCEPTIONAL CHILDREN’S FOUNDATION)

$181

LOS ANGELES TRANSIT LAF1441 0 PURCHASE OF 2-40’ REPLACEMENT CNG BUSES FOR THE GLENDALE BEELINE. $899

LOS ANGELES TRANSIT LA0G575 0 PURCHASE OF 3 REPLACEMENT MINIVANS FOR PARATRANSIT SERVICES. (VALLEY VILLAGE) $161

LOS ANGELES TRANSIT LA0G574 0 PURCHASE OF 4 MEDIUM BUS TYPE II PARATRANSIT EXPANSION VEHICLES FOR EXPANSION OF PARATRANSIT SERVICES. (LOS AMIGOS RESEARCH AND EDUCATION INSTITUTE)

$295

LOS ANGELES TRANSIT LA0G427 0 PURCHASE OF 4 PARATRANSIT REPLACEMENT TRANSIT VEHICLES (GASOLINE). $652

LOS ANGELES TRANSIT LAFA144 0 PURCHASE OF 4-40’REPLACEMENT CNG BUSES FOR THE GLENDALE BEELINE. $1,566

LOS ANGELES TRANSIT LA0B305 0 PURCHASE OF 9 BUSES FOR EXPANDED SERVICE OF WHICH TWO ARE CNG POWERED. $955

LOS ANGELES TRANSIT LA0G647 0 PURCHASE OF A MAINTENANCE SOFTWARE TO MAINTAIN TRANSIT FACILITIES & VEHICLE RECORDS,AND TO REPLACE CURRENT INVEN-TORY CONTROL SOFTWARE. AGENCY USING $106 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY12.

$527

LOS ANGELES TRANSIT LA0G281 0 PURCHASE OF A REPLACEMENT VEHICLE LIFT AT THE LA MIRADA TRANSIT FACILITY. $36

LOS ANGELES TRANSIT LA900520 0 PURCHASE OF ADD’L 13 REPLACEMENT VEHICLES FY10 TO FY11. 13 VEHICLES IN FY10 - FY 11 $624

LOS ANGELES TRANSIT LA0G429 0 PURCHASE OF BIKE RACKS FOR TRANSIT VEHICLES. $32

LOS ANGELES TRANSIT LA973018 0 PURCHASE OF DIESEL TRANSMISSION REBUILDS AND HYBRID ELECTRIC POWER TRAIN COMPONENTS FOR SERVICE FLEET $120

Page 20: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

18 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LAES133 0 PURCHASE OF EIGHT (8) HYBRID GASOLINE-ELECTRIC 40’ BUSES TO REPLACE EXISTING DIESEL BUSES WHO HAVE ACHIEVED OR

EXCEEDED TWELVE (12) YEARS/500,000+ MILES.$4,527

LOS ANGELES TRANSIT LA0G052 0 PURCHASE OF EIGHT REPLACEMENT AUTOMOBILES FOR USE BY TRANSIT STAFF AND BUS OPERATORS. $200

LOS ANGELES TRANSIT LA0G653 0 PURCHASE OF FOUR (4) ALTERNATIVE FUEL TRANSIT BUSES TO REPLACE DIESEL BUSES. USING $420 OF TRANSPORTATION DEVELOPMENT CREDITS AS MATCHING FOR CON PHASE.

$2,100

LOS ANGELES TRANSIT LA0G051 0 PURCHASE OF FOUR PARATRANSIT VANS TO REPLACE FOUR (4) 2002 MODEL YEAR VANS. $200

LOS ANGELES TRANSIT LA0C63 0 PURCHASE OF MISC OFFICE EQUIPMENT- (ONGOING) $106

LOS ANGELES TRANSIT LA0G394 0 PURCHASE OF RUNCUTTING/SCHEDULING SOFTWARE. $40

LOS ANGELES TRANSIT LAF1404 0 PURCHASE OF SIX ALTERNATIVE FUEL REPLACEMENT BUSES. PROJECT WILL PURCHASE SIX ALTERNATIVE FUEL 40 FOOT TRANSIT BUSES TO REPLACE SIX 1997 MODEL YEAR DIESEL BUSES, INCLUDING ON-BOARD RADIOS.

$3,825

LOS ANGELES TRANSIT LA0B203 0 PURCHASE OF SUPPORT EQUIPMENT - TIRES $480

LOS ANGELES TRANSIT LA0G416 0 PURCHASE OF THREE ALTERNATIVE FUEL REPLACEMENT BUSES $1,950

LOS ANGELES TRANSIT LA0G283 0 PURCHASE OF TOOLS AND EQUIPMENT FOR MAINTENANCE OF THE LA MIRADA TRANSIT FLEET. $69

LOS ANGELES TRANSIT LA0G050 0 PURCHASE OF TWO (2) ALTERNATIVE FUEL 40 FT. TRANSIT BUSES TO REPLACE TWO (2) 1997 MODEL YEAR DIESEL BUSES. $1,220

LOS ANGELES TRANSIT LA0G228 0 PURCHASE OF TWO 30 FOOT CLEAN AIR MOTOR BUSES FOR REPLACEMENT.E2008-BUSP-0671 $470

LOS ANGELES TRANSIT LA0G307 0 PURCHASE OF TWO REPLACEMENT 30 PASSENGER GASOLINE VEHICLES. $219

LOS ANGELES TRANSIT LA0G190 0 PURCHASE OF UFS FAREBOXES AND RELATED EQUIPMENT. $1,448

LOS ANGELES TRANSIT LA0G578 0 PURCHASE OF VARIOUS EQUIPMENT FOR PARATRANSIT SERVICES (7 RADIOS, 1 BASE STATION, COMPUTER W/MONITOR & PRINTER). (LIFE STEPS FOUNDATION, INC. AKA CIRCLE OF FRIENDS).

$12

LOS ANGELES TRANSIT LA0G581 0 PURCHASE OF VARIOUS EQUIPMENT FOR PARATRANSIT SERVICES. EXCEPTIONAL CHILDREN’S FOUNDATION. $13

LOS ANGELES TRANSIT LA0G660 0 PURCHASE ONE FLEET VEHICLE TO SERVE AS BACK-UP FOR EXISTING FLEET. THIS WILL HELP COMMERCE BUS LINES IMPROVE SERVICE RELIABILITY.

$554

LOS ANGELES TRANSIT LA0G689 0 PURCHASE ONE REPLACEMENT PARATRANSIT BUS. NEW CNG-POWERED PARATRANSIT VEHICLE WOULD REPLACE A GASOLINE-POW-ERED VEHICLE. VEHICLE #370 IS PROPOSED FOR REPLACEMENT. THIS VEHICLE WAS PURCHASED IN 2004, IS GASOLINE-POWERED, AND HAS EXCEEDED ITS FTA LIFESPAN.

$142

LOS ANGELES TRANSIT LAE0407 0 PURCHASE ONE TROLLEY BUS VEHICLE FOR EXISTING SERVICE ALONG CARSON ST. BETWEEN THE HARBOR TRANSIT WAY STATION AND THE CARSON CIVIC CENTER AT AVALON BLVD

$250

LOS ANGELES TRANSIT LAE0108 0 PURCHASE TWO REPLACEMENT TRIPPER BUSES. ROUTE G AND D, BLUELINE STATION AT DEL AMO BLVD/I-710 TO SOUTH BAY PAVILION MALL, DEL AMO BLVD

$502

LOS ANGELES TRANSIT LA0G015 0 PURCHASE UNIVERSAL FARE SYSTEM FAREBOXES FOR FLEET $120

LOS ANGELES TRANSIT LAF1413 0 PV TRANSIT LPG BUSES. PURCHASE OF TWELVE (12) ALTERNATIVE FUELED VEHICLES TO REPLACE EXISTING GASOLINE-POWERED VEHICLES.

$1,623

LOS ANGELES TRANSIT LA963580 0 RADIO SYSTEM; REPLACEMENT OF EXISTING RADIO/DISPATCH SYSTEM / ADVANCED BUS TECHNOLOGY $10,300

LOS ANGELES TRANSIT LA990724 0 RADIOS ON BUSES 81 VEHICLES TO INCLUDE AVL SYSTEM $3,156

Page 21: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 19

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LAF3729 0 REAL-TIME BUS ARRIVAL INFORMATION SYSTEM. DEVELOP & INSTALL ON 60 BUS STOP REAL-TIME BUS ARRIVAL INFORMATION SYSTEM

USING INTELLIGENT TRANSPORTATION SYSTEM (ITS) TECHNOLOGY TO DISSEMINATE NEXT BUS INFO TO TRAVELERS. THE PROJECT’S PHYSICAL COMPONENT IS LOCATED AT BUS STOPS AND TRANSIT CENTER WITHIN THE CITY OF CULVER CITY. THE NON-PHYSICAL COMPONENT OF THE PROJECT IS LOCATED ON A WEB SERVER.

$2,522

LOS ANGELES TRANSIT LA0G673 0 RECONSTRUCT CSULA TRANSIT CENTER BUS TURNAROUND $313

LOS ANGELES TRANSIT LA0G191 0 RED CAR TROLLEY ENGINEERING STUDY FOR DOWNTOWN LOS ANGELES STREETCAR. $1,248

LOS ANGELES TRANSIT LA0G376 0 REFURBISH 40-FOOT NABI BUSES $2,400

LOS ANGELES TRANSIT LA0G010 0 REGIONAL CONNECTOR - LIGHT RAIL IN TUNNEL ALLOWING THROUGH MOVEMENTS OF TRAINS, BLUE, GOLD, EXPO LINES. FROM ALAMEDA / 1ST STREET TO 7TH STREET/METRO CENTER

$1,366,100

LOS ANGELES TRANSIT LA0D454 0 REHAB TRANSIT ADMINISTRATIVE AND OPERATIONS OFFICES $400

LOS ANGELES TRANSIT LA0G195 0 REMODEL TRAINING ROOM AND MAINTENANCE AREA $625

LOS ANGELES TRANSIT LA0C08 0 REPLACE 10 PARATRANSIT VEHICLES $701

LOS ANGELES TRANSIT LA0F093 0 REPLACE 1997 NEW FLYER BUSES (40 FT-DIESEL WITH CNG BUSES. PURCHASE UP TO 30 BUSES) $36,692

LOS ANGELES TRANSIT LA0G220 0 REPLACE 25 ACCESSIBLE MINIVANS (@ 40K APIECE) FOR ADA PARATRANSIT SERVICE IN LOS ANGELES COUNTY $1,000

LOS ANGELES TRANSIT LA0G650 0 REPLACE BUS WASH PROJECT: REPLACEMENT OF TRANSIT FACILITY’S BUS WASH EQUIPMENT. AGENCY USING $60 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY11.

$300

LOS ANGELES TRANSIT LA0G109 0 REPLACE BUS WASHER. $284

LOS ANGELES TRANSIT LA0D13 0 REPLACE FAREBOX/UFS $1,700

LOS ANGELES TRANSIT LA0G422 0 REPLACE FOUR(4) 30’ OR 32’ ALT-FUEL BUSES $1,373

LOS ANGELES TRANSIT LA0D455 0 REPLACE RELIEF AND SUPERVISOR VEHICLES $160

LOS ANGELES TRANSIT LA0G062 0 REPLACE SIX(6)COMMUTER COACHES - THREE (3) IN FY 13/14 & THREE (3) IN 15/16. $5,000

LOS ANGELES TRANSIT LA0F094 0 REPLACE TEN (10) THOMAS BUSES (DIESEL WITH LNG BUSES) $8,061

LOS ANGELES TRANSIT LA0D349A 0 REPLACEMENT BUSES - 25FT VANS/BUSES - PURCHASE QTY OF 6 GASOLINE-22 PASSENGER CAPACITY EACH. C/O FROM 2006/2007. CARRYOVER FROM 2008 FTIP AMENDMENT 08-53.

$600

LOS ANGELES TRANSIT LA0B310 0 REPLACEMENT CNG & ELECTRIC BUSES - 20 IN FY11 AND 30 IN FY12 $63,923

LOS ANGELES TRANSIT LA0G432 0 REPLACEMENT OF 12 - 40’ CNG BUSES FROM THE 2001 BUS FLEET AND 6 - 30’ CNG BUSES FROM THE 2003 FLEET. $11,220

LOS ANGELES TRANSIT LA0G654 0 REPLACEMENT OF 16 GASOLINE FUEL TRANSIT SUPPORT VEHICLES WITH CNG AND/OR GAS-HYBRID FUEL VEHICLES. USING $111 OF TRANSPORTATION DEVELOPMENT CREDITS AS MATCHING CON PHASE.

$555

LOS ANGELES TRANSIT LA0G058 0 REPLACEMENT OF 20 - 40’ CNG BUSES FROM THE 1998 BUS FLEET. DEMO#207 $11,000

LOS ANGELES TRANSIT LA0G433 0 REPLACEMENT OF 8 - 40’ CNG BUSES FROM THE 2004 BUS FLEET. $5,280

LOS ANGELES TRANSIT LA0G132 0 REPLACEMENT OF BUSES AND PARATRANSIT VEHICLES. SAFTEA-LU 668, E2009-BUSP-174. $696

LOS ANGELES TRANSIT LA0G655 0 REPLACEMENT OF DIESEL FUEL SHOP SERVICE TRUCK WITH A NEW CNG FUEL SERVICE TRUCK. USING $26 OF TRANSPORTATION DEVELOPMENT CREDITS AS MATCHING IN CON PHASE.

$130

LOS ANGELES TRANSIT LA0D116 0 REPLACEMENT OF HVAC SYSTEM AT TORRANCE TRANSIT FACILITY $500

LOS ANGELES TRANSIT LA0F002 0 REPLACEMENT OF OMS SYSTEM (HARDWARE AND SOFTWARE) $1,200

LOS ANGELES TRANSIT LA0B204 0 REPLACEMENT OF SUPPORT EQUIPMENT - FAREBOXES FOR THE UNIVERSAL FARE SYSTEM $569

Page 22: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

20 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA996086 0 REPLACMENT - 3 ALTERNATIVE FUEL SHUTTLES $376

LOS ANGELES TRANSIT LA0G374 0 REPOWER 40-FOOT NABI BUSES $4,000

LOS ANGELES TRANSIT LA0G549 0 REPOWER 40-FOOT NABI BUSES $5,000

LOS ANGELES TRANSIT LA0G656 0 REPOWER FIVE HYBRID BUSES REHABILITATION PROJECT: REPLACEMENT OF HYBRID POWER PLANTS WITH CNG-FUEL POWER PLANTS AND REPLACEMENT OF HVAC SYSTEM OF 5 HYBRID BUSES THAT HAVE MET THEIR MIDLIFE STATUS. USING $300 OF TRANSPORTATION DEVELOPMENT CREDITS AS MATCHING FOR CON PHASE.

$1,500

LOS ANGELES TRANSIT LA0G687 0 REPOWERING OF CNG TRANSIT BUSES D20-BUSP-012 $1,600

LOS ANGELES TRANSIT LA0G592 0 SAFETY & SECURITY EMERGENCY PREPAREDNESS PLANNING. PROJECT USING TOLL CREDIT; $5 IN FY11 AS MATCH TO 5307 FUNDS. $75

LOS ANGELES TRANSIT LAE0191B 0 SAFETY IMPROVEMENTS AT BUS STOPS, INCLUDING BUS LOADING AREAS, LIGHTING, PASSENGER AMENITIES, BUS PADS & TURNOUTS, IMPROVED DRAINAGE, & APPURTENANCE WORK (SAFETEA-LU # 191 & # 321)

$2,009

LOS ANGELES TRANSIT LA29202U1 0 SAN FERNANDO VALLEY E/W BRT (FROM TERMINUS OF METRO RED LINE IN NO HOLLYWOOD TO WARNER CTR)14-MILE EXCLUSIVE BUS LANES AT FORMER RAIL RD ROW (PPNO 3333 AB3090REP ) SAFETEA-LU # 326

$21,129

LOS ANGELES TRANSIT LA29202U3 0 SAN FERNANDO VALLEY NORTH/SOUTH BRT EXTENSION PHASE I: METRO RAPID SERVICE ALONG RESEDA BLVD. AND SEPULVEDA BLVD. SAFETEA-LU # 183. THE FUNDS ARE FOR TYPICAL PASSENGER AMENITIES.

$11,702

LOS ANGELES TRANSIT LAF1601 0 SAN GABRIEL CITY-WIDE BUS SHELTER INSTALLATION. INSTALL BUS SHELTERS AT EXISTING BUS STOPS ON MTA AND MONTEBELLO BUS LINE ROUTES.

$688

LOS ANGELES TRANSIT LAF1420 0 SANTA CLARITA TRANSIT BUS STOP EXPANSION AND AMENITIES. PURCHASE AND INSTALL NEW BUS STOPS AND AMENITIES ALONG FUTURE ROUTES IDENTIFIED IN THE CITY OF SANTA CLARITA’S TRANSIT DEVELOPMENT PLAN.

$387

LOS ANGELES TRANSIT LAE0364 0 SANTA MONICA’S BIG BLUE BUS/SANTA MONICA COLLEGE TRANSIT SERVICE. BUS IMPROVEMENTS NEAR THE CAMPUS ALONG THE BUS ROUTES. CARRYOVER FROM PRIOR FISCAL YEAR

$2,000

LOS ANGELES TRANSIT LAES732 0 SECTION 5307 1% TRANSIT ENHANCEMENTS ACTIVITIES $3,750

LOS ANGELES TRANSIT LA0G591 0 SOFTWARE MODIFICATIONS. TOLL CREDITS USED FOR THIS PROJECT; $40 IN BOTH FY11 AND FY12 TO MATCH 5307 FUNDS. $1,000

LOS ANGELES TRANSIT LA0G060 0 SOFTWARE/HARDWARE REPLACEMENT & UPGRADE OF AUTOMATIC VEHICLE LOCATOR (AVL). $600

LOS ANGELES TRANSIT LA0D372 0 SOUTH ACCESS PEDESTRIAN BRIDGE TO SIERRA MADRE VILLA LIGHT RAIL STATION. THIS PEDESTRIAN BRIDGE OVER THE ROUTE 210 FREEWAY WILL PROVIDE A DIRECT AND SAFE APPROACH FOR PEDESTRIANS

$8,000

LOS ANGELES TRANSIT LA0G632 0 SOUTH BAY GREEN LINE EXTENSION-FOLLOWS HARBOR SUBDIVISION FROM METRO GREEN LINE TO THE PROPOSED REDONDO BEACH TRANSIT CENTER.FROM MARINE AVENUE STATION TO REDONDO BEACH. TRANSIT CENTER (GALLERIA)

$555,000

LOS ANGELES TRANSIT LA0G358 0 SOUTH BAY REGIONAL INTERMODAL TRANSIT CENTER PROJECT AT 465 N. CRENSHAW BLVD., TORRANCE, CA 90503. $21,500

LOS ANGELES TRANSIT LA0D272 0 SOUTH SAN FERNANDO VALLEY REGIONAL PARK AND RIDE. ADD 50 NEW PARKING SPACES TO EXISTING COMMUTER EXPRESS PARK AND RIDE LOT WITHIN EXISTING AREA.

$767

LOS ANGELES TRANSIT LA0G377 0 STEETCAR STUDY FOR CITY OF SANTA MONICA $500

LOS ANGELES TRANSIT LAF3409 0 STOCKER/MLK CRENSHAW ACCESS TO EXPO LRT STATION. BUS HUB INTERSECTIONS OF STOCKER ST AND MARTIN LUTHER KING, JR. BL AT CRENSHAW BL LOCATED IN THE 8TH AND 10TH COUNCIL DISTRICTS OF THE CITY OF LOS ANGELES.

$2,172

LOS ANGELES TRANSIT LA0G548 0 STREETCAR STUDY FOR CITY OF SANTA MONICA $1,000

Page 23: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 21

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LAF3440 0 SUNSHINE SHUTTLE TRANSIT VEHICLES. THE PROCUREMENT OF TWO COMPRESSED NATURAL GAS (CNG)-FUELED, LOW-FLOOR BUSES

FOR A FIXED-ROUTE SHUTTLE SERVICE TO REPLACE EXISTING BUSES. THE SUNSHINE SHUTTLE ROUTE SERVES THE UNINCORPORATED SOUTH WHITTIER AREA. THE SERVICE AREA IS BOUNDED BY WHITTIER BOULEVARD TO THE NORTH, BEATY AVENUE TO THE SOUTH, SANTA GERTRUDES AVENUE TO THE EAST, AND BROADWAY AVENUE TO THE WEST.

$850

LOS ANGELES TRANSIT LAES772 0 TARZANA TREATMENT CENTER HARDWARE 5 $7,124

LOS ANGELES TRANSIT LAES770 0 TARZANA TREATMENT CENTER PURCHASE OF 2 HARDWARE $2,849

LOS ANGELES TRANSIT LA0G760 0 TARZANA TREATMENT CENTERS - PURCHASE OF 1 REPLACEMENT SMALL BUS 10 AP. THIS PROJECT WILL USE $7 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$61

LOS ANGELES TRANSIT LA0G784 0 TARZANA TREATMENT CENTERS, INC-PURCHASE 1 REPLACEMENT MINI VAN. THIS PROJECT WILL USE $5 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$44

LOS ANGELES TRANSIT LA0D437 0 TEN (10) ALTERNATE FUEL 40 FT. TRANSIT BUSES TO REPLACE:THREE (3) 1995 MODEL & (7) SEVEN 1997 MODEL YEAR BUSES. $6,040

LOS ANGELES TRANSIT LA0G701 0 THE METRO GOLD LINE FOOTHILL EXTENSION TRANSIT ORIENTED DEVELOPMENT STUDY WILL ILLUSTRATE POSSIBLE TRANSIT ORI-ENTED DEVELOPMENTS INTENSITIES AROUND FUTURE METRO GOLD LINE FOOTHILL EXTENSION STATIONS.

$278

LOS ANGELES TRANSIT LA0G221 0 THE ON-GOING BUS CAPITAL PROJECT INCLUDES: BUS COMPONENTS, PROJECT ADMINISTRATION/ FACILITY IMPROVEMENTS, COM-PUTER EQUIPMENT, SAFETY/ SECURITY EQUIPMENT, SHOP EQUIPMENT, SUPPORT VEHICLES AND TIRES. ADDED TOLL CREDITS IN FY10/11 IN CONS. FOR $657.

$25,769

LOS ANGELES TRANSIT LA0G601 0 THE PROJECT INCLUDES PREVENTATIVE MAINTENANCE OF THE LA MIRADA TRANSIT FLEET. PREVENTATIVE MAINTENANCE MAY INCLUDE PURCHASES SUCH AS TIRES, LUBRICANTS, OIL AND FUEL FILTERS, AIR CONDITIONING UNIT PARTS, AND GENERAL VEHICLE AND COMPONENT HARDWARE. THE PROJECT ALSO INCLUDES THE PORTION OF THE MECHANIC’S SALARY RELATED TO PREVENTATIVE MAINTENANCE OF LA MIRADA TRANSIT VEHICLES. MOVING PRIOR FUNDS INTO FY10/11. USING TOLL CREDITS IN FY10/11 IN CONS. FOR $25. CARRYOVER FROM PRIOR FISCAL YEAR.

$245

LOS ANGELES TRANSIT LA0G719 0 THE ROSA PARKS TRANSIT STATION IMPROVEMENTS PROJECT MODERNIZES EXISTING RAIL/BUS TRANSIT STATION, RELOCATES AND EXPANDS BUS FACILITIES AND IMPROVES ACCESSIBILITY TO THE STATION AND INTEGRATION WITH SURROUNDING TRANSIT ORIENTED DISTRICT MEDICAL AND MEDICAL-EDUCATIONAL FACILITIES.

$5,500

LOS ANGELES TRANSIT LAF1414 0 THIRD STREET & LA VERNE AVENUE PARKING STRUCTURE. CONSTRUCT A PARKING STRUCTURE AT THIRD STREET AND LA VERNE AVENUE TO PROVIDE PARK AND RIDE SPACES FOR AREA TRANSIT USERS.

$19,035

LOS ANGELES TRANSIT LAF3405 0 THREE ALTERNATIVE FUEL BUSES FOR SERVICE EXPANSION. PURCHASE THREE ALTERNATIVE FUEL 40-FOOT TRANSIT BUSES FOR SERVICE EXPANSION.

$2,074

LOS ANGELES TRANSIT LA0G732 0 TORRANCE TRANSIT ALTERNATIVE FUEL/CNG REFUELING STATION $3,300

LOS ANGELES TRANSIT LAF1405 0 TORRANCE TRANSIT SYSTEM - FLEET MODERNIZATION PROJECT. FUND FORTY ONE (41) ALTERNATIVE FUEL/CNG BUSES TO REPLACE EXISTING DIESEL VEHICLES (UPDATED 7/29/11). THIS PROJECT WILL USE $2,198 OF TOLL CREDITS TO MATCH THE CMAQ & 5307 FUNDS IN THE CON PHASE IN FY 11/12.

$20,508

LOS ANGELES TRANSIT LA0G615 0 TORRANCE TRANSIT SYSTEM BUS RAPID PROJECT (REDONDO BEACH TO LONG BEACH) - FOR THE ACQUITIONS OF EIGHT (8) EXPANSION BUSES ($6,400,000), AND INCLUDES TWO (2) YEARS OF OPERATING ASSISTANCE TO OPERATE THE NEW RAPID SERVICE ($1,500,000).

$9,400

LOS ANGELES TRANSIT LAF3438 0 TORRANCE TRANSIT SYSTEM FLEET MODERNIZATION PROJECT PHASE 3. REPLACE SIX (6) DIESEL BUSES WITH HYBRID GASOLINE ELECTRIC BUSES.

$4,006

LOS ANGELES TRANSIT LA0D11 0 TRANSIT - ENHANCEMENTS (STREET FURNITURE) $327

Page 24: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

22 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA0G203 0 TRANSIT ACCESS PASS INTEGRATION - PURCHASE FARE/TICKET VENDING EQUIPMENT TO BE INTEGRATED INTO THE LOS ANGELES

COUNTY TRANSIT ACCESS PASS (TAP) SYSTEM.$4,000

LOS ANGELES TRANSIT LA0G269 0 TRANSIT CENTER AND PASSENGER AMENITIES AT LA SOUTHWEST COLLEGE EARMARK ID #E2008-BUSP-0678 AND E2009-BUSP-101 $1,381

LOS ANGELES TRANSIT LA55207 0 TRANSIT COACH TIRE (LEASE) (ONGOING). CARRYOVER FROM PRIOR FISCAL YEAR $2,000

LOS ANGELES TRANSIT LA0C61 0 TRANSIT DATA AND COMMUNICATION SYSTEMS; ITS (RADIO, AVL, DISPATCHING, AND OTHER ADVANCED TECHNOLOGY) ONGOING. $75

LOS ANGELES TRANSIT LA0D337 0 TRANSIT ENHANCEMENT ACTIVITIES: 1% FORMULA FUNDS - LOS ANGELES COUNTY $31,352

LOS ANGELES TRANSIT LA0D346 0 TRANSIT FACILITY IMPROVEMENTS (ONGOING) AT 15679 PHOEBE AVENUE, LA MIRADA $396

LOS ANGELES TRANSIT LA0G648 0 TRANSIT MAINTENANCE FACILITY ENHANCEMENT PROJECT: UPGRADE FACILITY TO ACCOMODATE THE MAINTENANCE AND REPAIR OF CNG TRANSIT BUSES. AGENCY USING $80 OF TOLL CREDITS AS A MATCH FOR 5307 FUNDS IN CONSTRUCTION PHASE IN FY11.

$400

LOS ANGELES TRANSIT LA0D137 0 TRANSIT STATION RIGHT OF WAY PROCUREMENT FOR LAND AT THE EXISTING SANTA CLARITA METROLINK STATION. CARRYOVER FROM PRIOR FISCAL YEAR

$4,517

LOS ANGELES TRANSIT LA0G595 0 TRANSIT VEHICLE REPAINT. PROJECT USING $80 OF TOLL CREDIT IN 10/11 OF THE CON PHASE IN PLACE OF A LOCAL MATCH. FUNDING FROM FY 10-11 WAS PREVIOUSLY IN FY 09-10

$400

LOS ANGELES TRANSIT LAE0039 0 TRANSIT VILLAGE - PROVIDE A TRANS. FACILITY FOR SATELLITE PARKING FOR SIERRA MADRE VILLA GOLD LINE STA, P-N-R FOR COMMUTERS, A FOOTHILL TRANSIT STORE. THE CENTER WILL HAVE THREE (3) BUS BAYS AND AT LEAST FOUR (4) SHELTERS. THE SHEL-TERS WILL ALL HAVE BENCHES WITH A SEATING CAPACITY OF AT LEAST TEN PEOPLE IN EACH SHELTER. THE AREA WILL HAVE LIGHTING FOR SAFETY AND SECURITY, TRASH RECEPTACLES, DRINKING FOUNTAINS, AND INFORMATION KIOSKS. ADDTIONAL TRAFFIC SIGNALS AND A R-HAND BUS ONLY TURN LANE.

$3,026

LOS ANGELES TRANSIT LA0G219 0 UNIVERSAL FARE COLLECTION EQUIPMENT. $226

LOS ANGELES TRANSIT LA990313 0 UNIVERSAL FARE SYSTEM (UFS) PROGRAM $3,945

LOS ANGELES TRANSIT LA0F059 0 UPGRADE SECURITY CAMERA SYSTEMS (L/P UZA. USING $80 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY12 FOR CON.

$400

LOS ANGELES TRANSIT LA0G076 0 UPGRADE TO EXISTING PHONE SYSTEM. USING $20 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY11 IN CON PHASE.

$100

LOS ANGELES TRANSIT LA0G761 0 VALLEY VILLAGE - PURCHASE OF 1 REPLACEMENT SMALL BUS 8 AP, 2 WC. THIS PROJECT WILL USE $ 7 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$60

LOS ANGELES TRANSIT LA0G772 0 VALLEY VILLAGE - PURCHASE OF 7 SERVICE EXPANSION SMALL BUS 8 AP, 2 WC. THIS PROJECT WILL USE $ 49 OF TOLL CREDITS TO MATCH THE 5310 FEDERAL FUNDS IN THE CON PHASE.

$420

LOS ANGELES TRANSIT LA0D343 0 VEHICLE MAINTENANCE FACILITY $9,627

LOS ANGELES TRANSIT LAES771 0 VILLA ESPERANZA SERVICES REPLACEMENT OF THREE MINI VANS IV AT $4,817 LOCAL AND $37,183 FEDERAL EACH. $126

LOS ANGELES TRANSIT LAF1630 0 WASHINGTON BLVD TRANSIT ENHANCEMENTS. WASHINGTON BL TRANSIT ENHANCEMENT IS A STREETSCAPE DESIGN PROJECT THAT ENCOURAGES INCREASED USE OF PUBLIC TRANSIT WHILE SUPPORTING LAND USES THAT ARE COMPATIBLE W/TOD

$2,384

LOS ANGELES TRANSIT LA0G200 0 WHEELCHAIR STRAPS FOR BUS FLEET $130

LOS ANGELES TRANSIT LAF3407 0 WHITTIER BUS STOP IMPROVEMENT PLAN. IMPLEMENTATION OF A CITYWIDE BUS STOP IMPROVEMENT PLAN. THIS PLAN IDENTIFIES THE AMENITIES TO 45 BUS STOPS IN THE CITY.

$1,656

Page 25: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 23

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES TRANSIT LA29202W 0 WILSHIRE BLVD BRTPHASE I: 12.5-MI. CORRIDOR WITH 7.7-MI. PEAK PERIOD BUS LANE ON WILSHIRE WITHIN THE CITY AND COUNTY OF

LA FROM VALENCIA ST. TO CITY OF SANTA MONICA. INCLUDES STREET WIDENING, CURB LANE REPAVING/RECONSTRUCTING, IMPROVED TRAFFIC SIGNAL TIMING & BUS SIGNAL PRIORITY. PHASE II: INCLUDES ENHANCED SHELTERS & LANDSCAPING; STREET REPAIR/RECON-STRUCTION; CONCRETE BUS PADS AND P&R FACILITIES.

$80,610

LOS ANGELES TRANSIT LAE0036 0 WILSHIRE/ VERMONT PEDESTRIAN PLAZA IMPROVEMENTS AND INTERMODAL PEDESTRIAN LINKAGES $1,960

LOS ANGELES TRANSIT LA0G299 0 ZERO EMISSION BUS DEMONSTRATION PROJECT EARMARK ID# E2009-BUSP-115 $594

LOS ANGELES TRANSIT LAF3419 1 SUNSET JUNCTION PHASE 2. CREATE A MULTI-MODAL TRANSIT PLAZA TO INTEGRATE PUBLIC TRANSPORTATION, PEDESTRIAN & BICYCLE IMPROVEMENTS THAT WOULD RESULT IN REGIONAL & LOCAL BENEFITS (CFP3844). TRIANGLE PROPERTY ON SUNSET BLVD BWT MANZANITA AND SANTA MONICA.

$5,869

LOS ANGELES STATE HIGHWAY

LA0G720 1 F46 – PACIFIC COAST HIGHWAY ARTERIAL IMPROVEMENTS FROM ANITA ST. TO PALOS VERDES BLVD. STUDY, DESIGN, OBTAIN RIGHT OF WAY AND CONSTRUCT ROADWAY IMPROVEMENTS, STRIPING/SIGNAL ENHANCEMENTS FOR TURN LANES AND OTHER INTERSECTION IMPROVEMENTS. PROJECT NO. MR312.06, FA NO. MOU.MR312.06.

$1,400

LOS ANGELES STATE HIGHWAY

LA0G714 1 F47 - INTERSECTION IMPROVEMENTS ON PACIFIC COAST HWY AT TORRANCE BLVD. DEVELOP PLANS, SPECIFICATIONS AND ESTIMATES FOR A NORTHBOUND RIGHT TURN LANE. PROJECT NO. MR312.07, FA NO. MOU.MR312.07.

$585

LOS ANGELES STATE HIGHWAY

LA0F074 1 ROUTE 1: INSTALLATION OF NEW TRAFFIC SIGNAL TO CONTROL TRAFFIC FLOW THROUGH THE INTERSECTION OF ROUTE 1 (PACIFIC COAST HIGHWAY) AND CORRAL CANYON RD;SPEED ADVISORY SIGNS ON PCH, TRAFFIC INFORMATION.

$596

LOS ANGELES STATE HIGHWAY

LA0C8080 1 ROUTE 1: MANHATTAN BEACH: ON ROUTE 1 BETWEEN 33RD STREET & ROSECRANS AV; ADD ONE THROUGH LN TO NORTH BOUND SEPULVEDA BLVD. TO WIDEN EXISTING STRUCTURE FROM 6 TO 7 THROUGH LANES PPNO 2947. PROJECT USING $288 OF TOLL CREDITS TO OBLIGATE 100% FEDERAL FUNDS IN ENG PHASE.

$13,555

LOS ANGELES STATE HIGHWAY

16606 1 ROUTE 1: NEAR MARINA REY ON LINCOLN BL FRM JEFFERSON BL TO FIJI WAY - WIDEN FROM 3 TO 4 THRU LNES IN EA. DIR. & RPLCE CULVER BL OC &CNSTRCT NEW BRDG OVR BALLONA CREK (EA 1661C, PPNO 0027P).

$3,232

LOS ANGELES STATE HIGHWAY

LA0G692 2 ROUTE 002: FROM 0.5 MILES SOUTH OF BRANDEN STREET TO I-5/SR-2 INTERCHANGE - MODIFY TERMINUS, SOUNDWALLS, LANDSCAP-ING, INSTALLING DETECTOR LOOPS AND RAMP METERS, RESTRIPING (WITH NO LANE ADDITION) AND IMPROVING ARTERIAL STREETS (RESTRIPING-NO INCREASE IN CAPACITY, AND REMOVING & WIDENING SIDEWALK. (EA 20550, PPNO 2689)(TOLL CREDITS = LOCAL MATCH)

$9,329

LOS ANGELES STATE HIGHWAY

LA000358 5 ROUTE 005: --- FROM ROUTE 134 TO ROUTE 170 HOV LANES (8 TO 10 LANES) (CFP 346)(2001 CFP 8355). (EA# 12180, 12181,12182+12183=1218W,12184, 13350 PPNO 0142F,151E,3985,3986,3987) SAFETEA LU # 570. CONSTRUCT MODIFIED IC @ I-5 EMPIRE AVE, AUX LNS NB & SB BETWEEN BURBANK BLVD & EMPIRE AVE; AND MODIFY EXISTING STRUCTURES. ADD AUXILIARY LANE BETWEEN ALAMEDA AND OLIVE FROM PM 28.43 TO PM 29.78

$712,274

LOS ANGELES STATE HIGHWAY

LA000357 5 ROUTE 005: --- FROM ROUTE 170 TO ROUTE 118 ONE HOV LANE IN EACH DIRECTION (10 TO 12 LANES) INCLUDING THE RECONSTRUCTION OF THE I-5/SR-170 MIXED FLOW CONNECTOR AND THE CONSTRUCTION OF THE I-5/SR-170 HOV TO HOV CONNECTOR (CFP 345) (2001 CFP 8339; CFP2197). (EA# 121901, PPNO 0158K) (TCRP#41.2)

$207,838

LOS ANGELES STATE HIGHWAY

LAE0465 5 ROUTE 005: PHASE 1 OF 3-- IN LA/SANTA CLARITA: FR CALGROVE TO RTE 14; CONSTRUCT TRUCK LANE (EA 2332A, PPNO 3189), (SAFTETEA-LU#465 FUNDED PAED FOR THIS PHASE INCLUDED IN LA0G440).

$130,000

LOS ANGELES STATE HIGHWAY

LA0G440 5 ROUTE 005: PHASE 2 AND 3 OF 3-- IN LA/SANTA CLARITA: PHASE 2 (N/B FR RTE 14 TO WELDON CNYN ROAD; CONSTRUCT HOV LANE )& PHASE 3 (FR SR14 TO PARKER RD OC; CONSTRUCT HOV, TRUCK & AUX LANES (EA 2332C, PPNO 3189A & EA 2332E PPNO 3189B), SAFTETEA-LU#465. PE & RW $ ARE PROGRAMMED FOR EA 2332E ONLY.

$410,000

LOS ANGELES STATE HIGHWAY

LA0D192 5 ROUTE 005: GARVEE DEBT SERVICE PAYMENTS: RT 5 FROM RT 118 TO RT 14 FROM 10 TO 12 LANES HOV LANES. EA# 122001, PPNO 0162P.

$28,895

Page 26: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

24 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES STATE

HIGHWAYLA0C8012 5 ROUTE 005: I-5 WESTERN AVENUE I/C PHASE I -REALIGNMENT OF I-5 NB OFF & ON RAMPS @ WESTERN. NB EXIT RAMP BEGINS AS 2

AND WIDENS TO 4 LANES AT FLOWER ST. (EA# 1786A, PPNO 2120)$33,615

LOS ANGELES STATE HIGHWAY

LA0D463 5 ROUTE 5: I-5 LAKE HUGHES RD- INTERSECTION IMPROVEMENTS & WIDENING TO PROVIDE ADDITIONAL LANES ON EASTBOUND AND WESTBOUND APPROACHES

$500

LOS ANGELES STATE HIGHWAY

LA0D462 5 ROUTE 5: I-5 PARKER RD INTERSECTION IMPROVEMENTS INCLUDING BRIDGE WIDENING AND LANE ADDITIONS $500

LOS ANGELES STATE HIGHWAY

LA0D74 5 ROUTE 5: IN LOS ANGELES FROM CHAMBERLAIN STREET TO LARKSPUR STREET SOUNDWALL CONSTRUCTION PART OF RTE 5 FR 118 TO 14 HOV PRJ (CFP 8925). EA# 23550 .PPNO 3236.

$41,724

LOS ANGELES STATE HIGHWAY

LA0D73B 5 ROUTE 5: IN NORWALK: FROM ORANGE COUNTY LINE TO ROUTE 605: CARMENITA INTERCHANGE IMPROVEMENT (EA 2159C0, PPNO 2808A) (TCRP 42.3, & 43)

$379,730

LOS ANGELES STATE HIGHWAY

LA0D73 5 ROUTE 5: LA MIRADA, NORWALK & SANTA FE SPRINGS-ORANGE CO LINE TO RTE 605 JUNCTION. WIDEN FOR HOV & MIXED FLOW LNS, RECONSTRUCT VALLEY VIEW (EA 2159A0 = 21591, 21592, 21593, 21594, 21595, PPNO 2808 = 4153, 2808, 4154, 4155, 4156). TCRP#42.2&42.1

$1,241,757

LOS ANGELES STATE HIGHWAY

LA996134 5 ROUTE 5: RTE. 5/14 INTERCHANGE & HOV LNS ON RTE 14 - CONSTRUCT 2 ELEVATED LANES - HOV CONNECTOR (DIRECT CONNECTORS) (EA# 16800)(2001 CFP 8343) (PPNO 0168M)

$161,100

LOS ANGELES STATE HIGHWAY

LAE2577 5 ROUTE 5: STUDY NORWALK, SANTA FE SPRINGS, DOWNEY, MONTEBELLO, & COMMERCE: ON I-5, CONDUCT PLAN’G, ENV. STUDIES FOR WIDEN’G W/HOV & MIXED FLOW LNS FROM I-605 TO I-710.(EA2159E, 2159F, PPNO 2808C, 2808D)PAED ONLY

$4,730

LOS ANGELES STATE HIGHWAY

LA0G139 10 LACRD - EXPAND CAPACITY OF THE I-10 HOT LANE (RESTRIPING AND BUFFER CHANGES). RESTRIPE TO ADD A SECOND LANE (WB - SANTA ANITA TO I-710; EB - I-710 TO BALDWIN AVE.)FOR HOT LANES ON THE I-10. (RTP# 1HL08D01)

$3,200

LOS ANGELES STATE HIGHWAY

LA0G137 10 LACRD - HOT LANES ON I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182ND ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD.(IT AND TOLL TECHNOLOGY)(RTP # 1HL08D01, HL08D03, 1OM08D01)CONVERSION OF HOV LANES TO HOT LANES ON I-10 FROM ALAMEDA ST./UNION STATION TO I-605. (RTP ID 1HL08D01 & 1HL08D03 & 1TR08D07B)

$66,679

LOS ANGELES STATE HIGHWAY

LAE3805 10 PLANNING, DESIGN AND PRELIMINARY ENGINEERING OF ON/OFF RAMP SYSTEM AT INTERSECTION OF I-10 AND ROBERTSON/NATIONAL BLVD.

$2,500

LOS ANGELES STATE HIGHWAY

LA0F098 10 ROUTE 010: L.A. COUNTY I-10 AND I-605 IC;CONSTRUCT ONE/TWO LANE BRIDGE STRUCTURE, BRANCHING OFF SB OF RTE 605 TO EB OF RTE 10 AT-GRADE CONNECTOR RAMP (EA 24540, PPNO 3529; CONSTRUCT ONE-LANE CONNECTOR FROM SB I-605 TO WB I-10.

$78,760

LOS ANGELES STATE HIGHWAY

LA01342 10 ROUTE 010: RT 10 FROM RT 605 TO PUENTE AVE HOV LANES (8+0 TO 8+2) (EA# 117070, PPNO 0306H) PPNO 3333 3382 AB 3090 REP (TCRP #40)

$200,064

LOS ANGELES STATE HIGHWAY

LA000548 10 ROUTE 10: FROM PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES & SOUNDWALLS (C-ISTEA 77720, 95 STIP-IIP) (EA# 117080,11172, 1170U, PPNO# 0309N, 0309S)

$184,522

LOS ANGELES STATE HIGHWAY

LA0B875 10 ROUTE 10: HOV LANES FROM CITRUS TO ROUTE 57/210 - (EA# 11934, PPNO# 0310B) $192,643

LOS ANGELES STATE HIGHWAY

LA0G665 14 COMPLETE PA/ED FOR AN APPROXIMATE 63-MILE WEST-EAST FREEWAY/EXPRESSWAY AND POSSIBLE TRUCK TOLL FACILITY BETWEEN SR-14 IN LA COUNTY AND SR-18 IN SB COUNTY. HIGH DESERT CORRIDOR PA/ED COMBINES THE LA COUNTY MEASURE R PROJECT FROM SR-14 TO I-15 AND SB COUNTY FEDERAL EARMARKS PROVIDED TO CITY OF VICTORVILLE FOR US-395 TO SR-18. BOTH PROJECTS AND FUNDS ARE COMBINED TO COMPLETE THE PA/ED FROM SR-14 TO SR-18.

$30,000

LOS ANGELES STATE HIGHWAY

LA0C8102 14 ROUTE 14: SR-14 FREEWAY/AVENUE I INTERCHANGE IMPROVEMENTS-WIDENING AVE I FROM 2 TO 3 LANES IN EACH DIRECTION, ADDING DUAL LEFT TURN LANES, AND WIDENING A BRIDGE STRUCTURE. PPNO 3123.

$10,581

Page 27: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 25

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES STATE

HIGHWAYLA0D336 14 ROUTE 14: SR14/AVENUE K INTERCHANGE IMPROVEMENTS. WIDEN NORTHBOUND OFFRAMP AND 15TH STREET WEST. WIDEN N/B

OFFRAMP FROM 3 TO 4 LANES AT AVE K/15TH ST-W.$4,250

LOS ANGELES STATE HIGHWAY

LAE0357 19 CONSTRUCT NEW LEFT TURN LANE AT THE STATE ROUTE 19 AND TELSTAR. THE ADDITION OF A SECONDARY LEFT TURN LANE AND TRAFFIC SIGNAL AT THE INTERSECTION OF ROSEMEAD BLVD (STATE) AND TELSTAR AVE. PROJECT USING $347 TOLL CREDIT FOR CON-STRUCTION PHASE IN FY 10/11 FOR STPL AND DEMO FUNDS.

$2,360

LOS ANGELES STATE HIGHWAY

LA0G600 47 ROUTE 047: REPLACEMENT OF SCHUYLER HEIM BRIDGE TO INCLUDE 2 THRU LANES AND 1 AUX LANE NB; AND 3 THRU LANES AND 1 AUX LANE SB (EA 13820, PPNO 0444E).

$278,993

LOS ANGELES STATE HIGHWAY

LA0D45 47 SR-47 EXPRESSWAY:REPLACEMENT OF SCHUYLER HEIM BRIDGE TO INCLUDE 2 THRU LANES AND 1 AUX LANE NB; AND 3 THRU LANES AND 1 AUX LANE SB; CONSTRUCT EXPRESSWAY AND 2-LANE FLYOVER. SAFETEA-LU #712 & #3797

$687,000

LOS ANGELES STATE HIGHWAY

LA0D391 47 VINCENT THOMAS BRIDGE STUDY - DEVELOP AND ANALYZE ALTERNATIVES TO INCREASE NEEDED CAPACITY. SAFETEA-LU HPP # 297 NON-CAPACITY

$1,400

LOS ANGELES STATE HIGHWAY

LA0D393 60 GRAND AVENUE/SR 57/60 INTERCHANGE MODIFICATION: RESTRIPE THE EXISTING GRAND AVE, ADD WB ON-RAMP AND ADD WB AUX LANE, ADD SECOND SB LFT TURN LN AT EB RAMP (09 CFP 3137)

$19,002

LOS ANGELES STATE HIGHWAY

LA0D450 60 RECONSTRUCT SR 60/GRAND AV INTERCHANGE - WIDEN GRAND AV: SB ADD 1THRU LN (2 EXSTNG); NB ADD 1 THRU LN (3 EXSTNG), REPLACE GRAND AV OC, ADD EB LOOP ON-RAMP, CONSTRUCT ADDITIONAL EB THRU LN FROM GRAND AVE TRAP LN TO SR57 ADD LN, ADD TWO BYPASS RAMP CONNECTORS, ADD AUX LNS EB AND WB FROM EAST TO WEST JUNCTION OF THE CONFLUENCE.

$257,900

LOS ANGELES STATE HIGHWAY

LA0D399 60 ROUTE 60: CONSTRUCTION OF NEW PARTIAL DIAMOND INTERCHANGE FOR STATE ROUTE 60 (SR-60) AT LEMON AVE (SAFETEA-LU # 587).

$18,627

LOS ANGELES STATE HIGHWAY

LA0B951 71 ROUTE 71: ROUTE 10 TO ROUTE 60 - EXPRESSWAY TO FREEWAY CONVERSION - ADD 1 HOV LANE AND 1 MIXED FLOW LANE . (2001 CFP 8349, TCRP #50) (EA# 210600, PPNO 2741) (TCRP #50)

$250,000

LOS ANGELES STATE HIGHWAY

LA0G317 71 STATE ROUTE 71 EXPANSION FROM SR 60 TO I-10 POMONA CA (ADD PA&ED ONLY). $878

LOS ANGELES STATE HIGHWAY

LA0G208 101 PROJECT WILL REPLACE EXISTING 2 LANE BRIDGE WITH 4 LANE BRIDGE AND ONE TURN LANE AT LOST HILLS ROAD/US 101 INTER-CHANGE. THIS WILL BRING BRIDGE TO CURRENT LANE CONFIGURATION OF LOST HILLS ROAD ON EITHER SIDE OF BRIDGE. THE INTER-CHANGE WILL ELIMINATE A CROSS-TRAFFIC MOVEMENT TO ACCESS THE NB US 101. THERE WILL BE NO ADDITIONAL LANES ON THE US 101 FREEWAY. THE REPLACEMENT BRIDGE WILL BE WIDER,4 LANES RATHER THAN 2 AND THE SPAN WILL BE APPROXIMATELY 280 FEET LONG, ACCOMMODATING THE WIDTH OF THE ROAD ON EIT

$28,080

LOS ANGELES STATE HIGHWAY

LA0D31 101 ROUTE 101: CONSTRUCT ONE ADDITIONAL LANE FOR BOTH NORTH AND SOUTH BOUND OFF-RAMPS AT VAN NUYS BLVD. (RIP 1 M, IIP 8 M) (EA # 199630) (PPNO 2789) (DEMO= NAT. CORRIDOR PLANNING AND BORDER DEV.)

$10,232

LOS ANGELES STATE HIGHWAY

LAOB416 101 ROUTE 101: IN LOS ANGELES - DOWNTOWN OVER FREEWAY 101 - PEDESTRIAN BRIDGE ENHANCEMENT $3,916

LOS ANGELES STATE HIGHWAY

LA960142 101 RTE 101/LINDERO CANYON ROAD INTERCHANGE IMPROVEMENT PROJECT. LINDERO CYN RD BTW VIA COLINAS AND AGOURA RD WID-ENED FROM 2 TO 3 LANES IN EACH DIRECTION. RAMP G-6 WIDENED TO 2 LANES TO PROVIDE FOR 2 FREE RT LANES FOR EASTBOUND VIA COLINAS TRAFFIC AT LINDERO CYN RD. THE EXISTING NORTHBOUND AUX LANE WILL BE EXTENDED SOUTHERLY FROM ITS TERMI-NUS AT RAMP G-6 TO RAMP G-3. INCLUDES BIKE PATH CONSTRUCTION.

$23,382

LOS ANGELES STATE HIGHWAY

LA0G230 101 U.S. 101 FREEWAY AND PALO COMADO CANYON ROAD BRIDGE-AT CHESEBRO ROAD (PM 33.0/34.4). WIDENING OF BRIDGE FROM 2-LANES TO 4-LANES, CONSTRUCTION OF SIDEWALKS AND BIKE LANES, MODIFICATION OF ON/OFF RAMPS, AND MODIFICATION OF VARIOUS INTERSECTIONS.

$21,500

Page 28: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

26 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES STATE

HIGHWAYLA0D344 101 WIDENING OF THE REYES ADOBE ROAD OVERCROSSING OF THE 101 FREEWAY FROM 3 LANES TO 6 LANES, ALONG WITH BIKE LANES

AND SIDEWALKS$11,072

LOS ANGELES STATE HIGHWAY

LAE1609 105 ROUTE 105: STUDY REPORT FOR INTERCHANGE IMPROVEMENTS AT LAX AIRPORT (E/P, PS/E ONLY) $400

LOS ANGELES STATE HIGHWAY

LA0G141 110 LACRD - HOT LANES ON THE I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182 ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD. INCLUDES OPERATIONAL IMPROVEMENTS AT I-110 OFF-RAMP AT ADAMS BLVD (RE-STRIPE OFF-RAMP TO ADD A RIGHT TURN LANE AND WIDEN ADAMS BLVD BRIDGE FOR AN ADDITIONAL THROUGH LANE TO FIGUEROA WAY). CONVERSION OF HOV LANES TO HOT LANES. (INFRASTRUCTURE/PAVEMENT) (1HL08D01, 1HL08D03)

$46,900

LOS ANGELES STATE HIGHWAY

LA0G138 110 LACRD - HOT LANES ON THE I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182 ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD. CONVERSION OF HOV LANES TO HOT LANES.(INFRASTRUCTURE/PAVEMENT)(1HL08D01, 1HL08D03)

$3,881

LOS ANGELES STATE HIGHWAY

LA0D328 110 ROUTE 110: IN LOS ANGELES FROM 8TH STREET ON RAMP TO I-110/I-10 CONNECTOR, CONSTRUCT NB & SB AUXILIARY LANES AND MODIFY RAMPS (EA 2411U, PPNO 3343) CONVERT EXIST’G SB AUX LANE TO OPTIONAL LANE & MODIFY RAMPS; NB HARBOR FWY, FROM NORTH END OF 12TH ST UC TO NORTH END OF THE 7TH ST UC, ADD STORAGE LANE ON THE MAINLINE & RECONSTRUCT RAMP

$54,932

LOS ANGELES STATE HIGHWAY

LA0G086 110 TO EXTEND I-110 NORTH FROM ITS CURRENT TERMINUS AT I-10 INTO DOWNTOWN LOS ANGELES VIA CENTRAL CITY WEST AREA IN LOS ANGELES, CALIFORNIA. THE ADAMS/FIGUEROA FLYOVER STUDY, PSR, WILL INVESTIGATE HOW THE CONSTRUCTION OF A NEW STRUC-TURE – CONNECTING THE I-110 NORTHBOUND HOV LANE OFF-RAMP DIRECTLY TO FIGUEROA STREET.

$7,841

LOS ANGELES STATE HIGHWAY

LAF1204 118 ROUTE 118: 118 FREEWAY WESTBOUND OFF-RAMP AT TAMPA AV. THIS PROJECT WILL EXTEND THE RIGHT-TURN ONLY FROM THE WB SR-118 OFF-RAMP AT TAMPA AV AND WILL INSTALL AN ADDITIONAL SB LEFT-TURN LANE ON TAMPA AT THE EB SR-118 ON-RAMP.

$1,055

LOS ANGELES STATE HIGHWAY

LA0D480 126 ROUTE 126: SR-126 IMPROVEMENTS - LOS ANGELES COUNTY LINE TO CASTAIC CREEK BRIDGE: IMPROVE 5 INTERSECTIONS ADD LT & RT LANES, ADD 1 SB AUX LANE FROM LONG CANYON RD TO WOLCOTT WAY

$35,500

LOS ANGELES STATE HIGHWAY

LA0C8099 126 ROUTE 126: SR-126/COMMERCE CTR DR NEW IC. CONSTRUCT A PARTIAL CLOVERLEAF, GRADE SEPARATED IC AND WIDEN ST 126 FROM .76 KM EAST OF IC TO .85 KM WEST 4-6 LANES. (2001 CFP 8099) (PPNO 3118)

$60,000

LOS ANGELES STATE HIGHWAY

18850 134 ROUTE 134: BETWEEN PASS AVE AND CALIFORNIA ST (MEDIA DISTRICT) - MODIFY RTE 134/HOLLYWOOD WAY I/C, NEW RAMPS BET. HOLLYWOOD WAY & ALAMEDA (2001 CFP, 8415). (EA 18850 PPNO 2223).

$47,031

LOS ANGELES STATE HIGHWAY

17870 134 ROUTE 134: RTE 134 BETWEEN I-5 & PACIFIC AVE MODIFY 134/SAN FERNANDO RD I/C & GRADE SEP AT UPRR SAN FERNANDO/FLOW- ER (WIDEN 1 BRIDGE & 1 OFF RAMP) NON-CAPACITY INCREASING (PPNO 9814 )

$31,375

LOS ANGELES STATE HIGHWAY

LA0G403 134 UPGRADE TRAFFIC SIGNAL AT SR-134 FREEWAY WB/OFF RAMPS AT HARVEY DR. INTERSECTION. UPGRADE TRAFFIC SIGNAL AT HARVEY DR. AND WILSON AVE. ADD THIRD LANE ON HARVEY DR. AT WILSON AVE.

$3,000

LOS ANGELES STATE HIGHWAY

LA0D180 138 ROUTE 138 WIDENING FROM 2 TO 4 LANES WITH MEDIAN TURN LANE- NEAR LIANO FROM 0.30 MILES WEST OF 165TH STREET EAST TO 0.37 MILES WEST OF 190TH STREET EAST. (SEG.12). EA# 127271, PPNO 0694Q.

$89,811

LOS ANGELES STATE HIGHWAY

LA962212 138 ROUTE 138: IN PALMDALE @ AVENUE P-8 FROM ROUTE 14 TO 100TH STREET - ACQUISITION OF ROW FOR FUTURE RTE 138 (TIER 2 ENV) (CFP 2212 $3540 2001 CFP 8021)(EA# 116720,PPNO 0393F)

$700,000

LOS ANGELES STATE HIGHWAY

LA0D451 138 ROUTE 138: ROUTE 138 FROM AVE. T TO ROUTE 18-WIDEN 2 TO 4 THRU LANES WITH MEDIAN TURN LANE. EA# 12721,12722,12723,12724,12725,12728. PPNO# 3325,3326,3327,3328,3329,3331

$48,247

LOS ANGELES STATE HIGHWAY

LA0G411 210 I-210 SOUNDWALLS BETWEEN PENNSYVANIA AVE. TO LOWELL AVE. $25,000

Page 29: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 27

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES STATE

HIGHWAYLA0G121 210 LA CANADA FLINTRIDGE, CA I-210 - DESIGN OF TWO SOUNDWALL SEGMENTS. DESIGN/ENGINEERING OF TWO SOUNDWALL

SEGMENTS:SOUNDWALL NO. S341 (SOUTH OF I-210 – FOOTHILL BOULEVARD EASTBOUND ON RAMP TO BERKSHIRE PLACE - EAST-BOUND OFF RAMP; AND PORTION OF SOUNDWALL NO. S338 (NORTH SIDE OF I-210 FREEWAY - FOOTHILL BOULEVARD - WESTBOUND OFF RAMP TO BERKSHIRE PLACE WESTBOUND ON RAMP.

$294

LOS ANGELES STATE HIGHWAY

LAE0219 210 ROUTE 210: CONSTRUCT SOUND WALLS ALONG PORTIONS OF THE I-210 FREEWAY BETWEEN ARROYO BLVD AND ORANGE GROVE $1,800

LOS ANGELES STATE HIGHWAY

LA0G124 405 RECONFIGURING THE I-405 FREEWAY INTERCHANGES, AT CHERRY AVENUE, TO INCORPORATE BOTH NORTHBOUND AND SOUTHBOUND ON/OFF RAMPS AND TO CONFORM WITH CALTRANS DESIGN CRITERIA. (NO ADDITIONAL CAPACITY, ONLY AN INTERCHANGE RECONFIGU-RATION.)ONLY FOR PSR PHASE.

$474

LOS ANGELES STATE HIGHWAY

LA0B408 405 ROUTE 405: ADD A 10-MILE HOV LANE ON THE NORTHBOUND 405 BETWEEN I-10 AND U.S. 101 IN LA FROM RTE 10 TO RTE 101 WIDEN FOR HOV LANE & MODIFY RAMPS, ADD NEW WB ON RAMP AT SUNSET & HOV INGRESS/EGRESS AT SANTA MONICA BLV(EA 12030, PPNO 0851G, SAFETLU SECTION 1302 #18, 1934 #20)

$1,034,000

LOS ANGELES STATE HIGHWAY

LA0D77 405 ROUTE 405: CITY OF L.A.-AT ROUTE 405 & US 101 INTERCHANGE. CONSTRUCT FREEWAY CONNECTOR FROM SB RTE 405 TO NB&SB US 101 & ADD AUX LANE FROM BURBANK TO NB 101 CONNECTOR (EA# 199610, PPNO 2787)

$120,144

LOS ANGELES STATE HIGHWAY

LA0D193 405 ROUTE 405: GARVEE DEBT PAYMENTS RTE. 405 - WATERFORD AV. TO RTE 10 - AUX LNE:LOS ANGELES - WATERFORD AV. TO RTE 10 - CNSTRCT S/B AUX LNE & S/B HOV LNE (2001 CFP 8354) (EA 195900 ,PPNO 2333).

$34,470

LOS ANGELES STATE HIGHWAY

LA0D194 405 ROUTE 405: GARVEE DEBT SERVICE PAYMENTS: IN LOS ANGELES ON ROUTE 405/101 CONNECTOR GAP CLOSURE (2001 CFP 7248, 2001 CFP 8347) (EA# 20120K, PPNO 2336). (BOTH RIP & IIP)

$30,787

LOS ANGELES STATE HIGHWAY

49160 405 ROUTE 405: IN INGLEWOOD AT ARBOR VITAE AVENUE-CONSTRUCT SOUTH HALF OF INTER-CHANGE. EA# 491601, PPNO 0831) $55,922

LOS ANGELES STATE HIGHWAY

1178A 405 ROUTE 405: IN LOS ANGELES AND CULVER CITY FROM ROUTE 90 TO ROUTE 10 - HOV LANES (SB 5+0 TO 5+1; NB 5+0 TO 5+1 HOV) (2206LK CFP) OBLIGATED 6207 (034)

$190,228

LOS ANGELES STATE HIGHWAY

LA0D332 405 ROUTE 405: IN LOS ANGELES: FROM LA TIJERA BLVD TO JEFFERSON BLVD; ADD AUXILIARY LANE PPNO: 3348 EA: 24130 $38,711

LOS ANGELES STATE HIGHWAY

LAF1103 405 ROUTE 405: WILMINGTON AVENUE INTERCHANGE MODIFICATION AT I-405. IMPROVE I-405/WILMINGTON AVENUE INTERCHANGE BY ADDING A NEW NORTHBOUND ON-RAMP AND WIDENING OF WILMINGTON AVENUE, 223RD, AND EXISTING ON- AND OFF-RAMPS.

$26,170

LOS ANGELES STATE HIGHWAY

LAE0574 605 ROUTE 605: STUDY - CONSTRUCT I-605 INTERCHANGE CAPACITY IMPROVEMENTS IN IRWINDALE $1,920

LOS ANGELES STATE HIGHWAY

18790 710 ROUTE 710: STUDY TO EVALUATE TECHNICAL FEASIBILITY AND IMPACTS OF AN ALTERNATIVE TO CLOSE 710 FREEWAY GAP. THIS STUDY INCLUDES ENVIRONMENTAL STUDIES (EIR/EIS) (EA# 187901, PPNO# 2215)

$87,454

LOS ANGELES STATE HIGHWAY

LA0B952 710 ROUTE 710: RECONSTRUCT I-710 INTERCHANGES AT I-5, AT I-405, AT SR 91, AND AT I-105. AS PART OF OF THE I-710 CORRIDOR PROGRAM PROPOSING 4 TRUCK LANES (PORTS-RAIL YARDS), 10 GENERAL LANES (PORT-SR-60)(ISTEA ID # 37)(SAFTEA-LU 3773)

$40,500

LOS ANGELES STATE HIGHWAY

LA996143 710 ROUTE 710: RTE 710 PCH TO DOWNTOWN L.B., PAVEMENT RECON, MEDIAN, LANDSCAPING IMPROVE (EA 2203U, 23640, PPNO: 2945,3248)

$7,496

LOS ANGELES STATE HIGHWAY

LALS02 999 ROUTE 999: GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - SHOPP ROADWAY PRESERVATION PROGRAM . PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - PAVEMENT RESURFACING AND/OR REHA-BILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

$899,264

Page 30: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

28 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES STATE

HIGHWAYLA0G441 999 ROUTE 999: GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM - HIGHWAY

MAINTENANCE. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATION.

$29,817

LOS ANGELES STATE HIGHWAY

LALS08 999 ROUTE 999: GROUPED PROJECTS FOR EMERGENCY REPAIR - SHOPP EMERGENCY RESPONSE PROGRAM. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. THIS APPLIES TO DAMAGES THAT DO NOT QUALIFY FOR FEDERAL EMERGENCY RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FEDERAL EMERGENCY RELIEF FUNDS BUT EXTEND BEYOND THE FEDERALLY DECLARED DISASTER PERIOD.

$94,523

LOS ANGELES STATE HIGHWAY

LALS01 999 ROUTE 999: GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP COLLISION REDUCTION PROGRAM. PROJECTS ARE CONSIS-TENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES.

$140,486

LOS ANGELES STATE HIGHWAY

LALS07 999 ROUTE 999: GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MANDATES PROGRAM PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES.

$127,250

LOS ANGELES STATE HIGHWAY

LALS06 999 ROUTE 999: GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MOBILITY PROGRAM. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES.

$6,378

LOS ANGELES STATE HIGHWAY

LALS09 999 ROUTE 999: GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/OR REHA-BILITATION - MINOR PROGRAM. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - RR/HWY CROSSING, SAFER NON-FED AID SYS RDS, SHLDER IMPROV, TRAFFIC CONTROL DEVICES & OPERATING ASSISTANCE OTHER THAN SIGNALIZPAVEMENT RESURFACING AND/OR REHABILITATION.

$17,765

LOS ANGELES STATE HIGHWAY

LALS03 999 ROUTE 999: IN LOS ANGELES COUNTY, LUMP SUM ROADSIDE PRESERAVATION PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$2,872

LOS ANGELES STATE HIGHWAY

LA0D479 999 ROUTE 999: LOS ANGELES COUNTY ITIP TRANSPORTATION ENHANCEMENT PROJECT LUMP SUM (PPNO 3546, 3547, 3548, 3549, 3550, ETC)

$12,947

LOS ANGELES STATE HIGHWAY

LA990921 999 ROUTE 999: ON VARIOUS HIGHWAYS. GROUPED PROJECTS FOR NOISE ATTENUATION (SOUNDWALLS) (ONLY EA00234 ON RTE 710 REMAINING. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES.

$236,700

LOS ANGELES STATE HIGHWAY

LALS04 999 ROUTE 999:IN L.A. GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - SHOPP PROGRAM. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

$116,148

LOS ANGELES LOCAL HIGHWAY

LA0D445 0 10TH STREET WEST CAPACITY IMPROVEMENTS FROM AVE L TO AVE M. CAPACITY IMPROVEMENTS ON 10TH STREET WEST BY WIDEN-ING EXISTING ROADWAY TO ROW EXTENTS, CLOSING ANY MIXED FLOW LANE GAPS, PROVIDING CONTINUOUS PEDESTRIAN WALKS, & BUS TURNOUTS.

$4,221

LOS ANGELES LOCAL HIGHWAY

LA9811099 0 20TH STREET WEST FROM AVENUE P-8 TO ELIZABETH LAKE ROAD 1 MILE STREET EXTENSION AND BRIDGE CONSTRUCTION (NEW ROAD).

$6,600

LOS ANGELES LOCAL HIGHWAY

LAE2932 0 213TH ST. PEDESTRIAN SIDEWALK BRIGE OVER DOMINGUEZ CHANNEL. CONSTRUCT 213TH ST. PEDESTRIAN BRIDGE TO PROVIDE SAFE PASSAGE FOR PEDESTRIANS & WHEELCHAIRS OVER DOMINGUEZ CHANNEL.

$2,200

LOS ANGELES LOCAL HIGHWAY

LAF1508 0 6TH STREET EAST BIKEWAY EXTENSION. THIS PROJECT WILL PROVIDE A MISSING LINK IN THE CLASS I BWY TO CONNECT THE EXISTING SIERRA HWY BIKEWAY TO THE TRANSPORTATION CENTER AND AN EXISTING BIKEWAY IN CLOCK TOWER PLAZA

$544

LOS ANGELES LOCAL HIGHWAY

LAF3703 0 A ‘NO NET NEW TRIPS’ RIDESHARE TOOLKIT. DEVELOP A TDM TOOLKIT WITH ONLINE MULTI-MODAL MOBILITY INFORMATION, BIKE ACCOMMODATIONS, 300 WALKING-ROLLING CARTS, 75 BIKE LOCKERS & INCENTIVE PROGRAMS FOR EMPLOYERS, SCHOOLS & NEIGH-BORHOODS. WITHIN THE CITY OF SANTA MONICA IN DEMAND MANAGEMENT AREAS AS DEFINED IN THE LAND USE AND CIRCULATION ELEMENT (LUCE) STRATEGY FRAMEWORK.

$849

Page 31: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 29

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0F007A 0 AC CONVERSION. GLENDALE BLVD.-HYPERION AVE. COMPLEX OF BRIDGES OVER LA RIVER, I-5 AND RIVERSIDE DR, REHABILITATION/

SEISMIC RETROFIT; UPGRADE BRIDGE RAILING; INCLUDES BRIDGES 53C-1881, 53C-1882, 53C-1883, 53C-1884 AND 53-1069. NO ADDITIONAL LANES. REALIGN I-5 NORTH BOUND OFF RAMP (FED PROJECT ID: BHLS-5006(181)

$30,725

LOS ANGELES LOCAL HIGHWAY

LA000800A 0 AC CONVERSION. HBRR LOCAL BRIDGE LUMP SUM - (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

$49,820

LOS ANGELES LOCAL HIGHWAY

LA0C8086A 0 AC CONVERSION. NORTH SPRING ST BRIDGE WIDENING & REHABILITATION. INCLUDES WIDENING THE STRUCTURE & THE WEST APPROACH FROM 4 TO 6 LANES, BIKE ROUTES WILL BE MADE PART OF THE SHOULDERS (53C0859).

$28,027

LOS ANGELES LOCAL HIGHWAY

LA0C57 0 ACE/GATEWAY CITIES-CONSTRUCT GRADE SEP. AT PASSONS BLVD IN PICO RIVERA (& MODIFY PROFILE OF SERAPIS AV,)(PART OF ALAMEDA CORR EAST PROJ.)SAFETEA-LU HPP # 1666 (TCRP #54.3)

$44,530

LOS ANGELES LOCAL HIGHWAY

LAE0084 0 ADAMS STREET REHABILITATION PROJECT $372

LOS ANGELES LOCAL HIGHWAY

LA0G739 0 AGOURA ROAD WIDENING. WIDEN AND REALIGN ROADWAY FROM WESTERLY CITY LIMITS TO CORNELL DRIVE (APROX 2 MILES). SOME AREAS ARE TWO LANES AND WILL BE WIDENED TO FOUR LANES. THE OTHER PORTIONS OF THE STREET ALREADY HAVE FOUR LANES. CONSTRUCT/MODIFY SIDEWALKS AND BIKE LANES; ADD LANDSCAPED MEDIANS

$5,500

LOS ANGELES LOCAL HIGHWAY

LA98STIP3 0 ALAMEDA ST AND N SPRING ST ARTERIAL REDESIGN -REALIGN ALAMEDA/N.SPRING ELIMINATING INEFFICENT INTERSECTN WITH MAIN ST/N. MAIN STREET. 3 NB LANES & 3 SB LANES.

$8,555

LOS ANGELES LOCAL HIGHWAY

LA0D333 0 ANAHEIM STREET PLANNING, COORDINATION AND DESIGN OF OPERATIONAL & STREETSCAPE (NON-CAPACITY IMPROVEMENTS). $566

LOS ANGELES LOCAL HIGHWAY

LAF3722 0 ANGELS WALK BOYLE HEIGHTS. PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS (HISTORIC STANCHIONS) AT STRATEGIC LOCATIONS.

$818

LOS ANGELES LOCAL HIGHWAY

LAF1844 0 ANGELS WALK CRENSHAW. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS (HISTORIC STANCHIONS) AT STRATEGIC LOCATIONS.

$764

LOS ANGELES LOCAL HIGHWAY

LAF1845 0 ANGELS WALK HIGHLAND PARK. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS AT STRATEGIC LOCATIONS.

$784

LOS ANGELES LOCAL HIGHWAY

LAF1846 0 ANGELS WALK NORTH HOLLYWOOD. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS AT STRATEGIC LOCATIONS.

$714

LOS ANGELES LOCAL HIGHWAY

LAF3721 0 ANGELS WALK SILVERLAKE. PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS (HISTORIC STANCHIONS) AT STRATEGIC LOCATIONS.

$844

LOS ANGELES LOCAL HIGHWAY

LA0D188 0 ARBOR VITAE STREET FROM LA BREA AVENUE TO PRAIRIE AVENUE BY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS, DRIVEWAYS, PEDESTRIAN RAMPS, LANDSCAPING AND STREET LIGHTING.

$3,532

LOS ANGELES LOCAL HIGHWAY

LAF3607 0 ARCADIA GOLD LINE STATION PEDESTRIAN LINKAGE PROJECT. DESIGN AND CONSTRUCTION OF PEDESTRIAN IMPROVEMENTS AROUND THE PLANNED GOLD LINE ARCADIA STATION, CONNECTING THE COMMUNITIES WITH THE REGIONAL RAIL SYSTEM.

$2,379

LOS ANGELES LOCAL HIGHWAY

LAF3714 0 ARROYO VERDUGO COMMUTE MANAGER SYSTEM. DEVELOPMENT OF A CUSTOMIZED TDM-SPECIFIC GEOGRAPHICALLY BASED WEBSITE. $800

LOS ANGELES LOCAL HIGHWAY

LA0G711 0 ARTESIA BLVD. TRAFFIC SIGNAL INTERSECTION IMPROVEMENTS AT WESTERN AVE. - WITH DUAL LEFT TURN LANES. $675

LOS ANGELES LOCAL HIGHWAY

LA0D120 0 ARTESIA TRAFFIC ENHANCEMENT PROJECT FOR ARTESIA BLVD, PIONEER BLVD AND 183RD STREET RESURFACING, STREETSCAPING, TRAFFIC CALMING, ANGLE-PARKING SIGNALS, ETC.

$1,192

Page 32: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

30 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF3646 0 ARTS DISTRICT/LITTLE TOKYO GOLD LINE STATION LINKAGES. PEDESTRIAN ENHANCEMENTS INCLUDING SIDEWALK/PATH PAVING;

PED LIGHTS; STREET TREES/PLANTING; DISTRICT SIGNAGE; ENTRY ELEMENTS; STREET FURNITURE; CROSSWALK PAVING; AND BIKE PARKING.

$1,269

LOS ANGELES LOCAL HIGHWAY

LA0D390 0 AT I-110 NB AT JOHN S GIBSON BLVD NB RAMPS & NB SR-47/I-110 CONNECTOR. WIDEN SB 47 TO NB 110 CONNECTOR FROM 1 TO 2 LNS BEGIN AT SB 47 PM 0.72 (STATION 535+00) JUST W OF FRONT ST ON-RAMP. ADDL THROUGH LN CONTINUES ON NB 110 & ENDS JUST N OF THE J S GIBSON OFF-RAMP. WIDEN NB 110/J S GIBSON ON-RAMP TO IMPROVE ACCESS TO FWY & INTERSECTION OF J S GIBSON/110 NB RAMPS W/ IMPROVED TURN RADII & RE-STRIPING

$35,051

LOS ANGELES LOCAL HIGHWAY

LA0G181 0 ATCS - CENTRAL BUSINESS DISTRICT. DEVELOP A FULLY TRAFFIC RESPONSIVE SIGNAL CONTROL SYSTEM TO APPROXIMATELY 180 INTERSECTIONS CURRENTLY OPERATIONAL WITH ATSAC CAPABILITY.

$9,215

LOS ANGELES LOCAL HIGHWAY

LAE2835 0 ATHERTON ST ENCLOSE, CONSTRUCT STORM DRAIN AND LANDSCAPE EXISTING OPEN CULVERT $1,440

LOS ANGELES LOCAL HIGHWAY

LAE2378 0 ATLANTIC BLVD STREET IMPROVEMENTS FROM 52ND DRIVE TO 58TH STREET. RESURFACING EXISTING PAVEMENT, SIGNING AND STRIPING, MINOR CONCRETE REPAIRS, LANDSCAPING, TRAFFIC LOOPS.

$809

LOS ANGELES LOCAL HIGHWAY

LA0D279 0 ATLANTIC BLVD. BRIDGE OVER THE L.A RIVER 5/8 MILE N SLAUSON AVE, WIDEN 6 LANE BRIDGE TO ADD RIGHT TURN LANE (BRIDGE #53C0252)

$14,614

LOS ANGELES LOCAL HIGHWAY

LA0G074 0 ATMS INTEGRATION BUENA PARK (ORANGE COUNTY)WITH IEN (LOS ANGELES COUNTY)FIBER OPTIC CABLE ALONG IMPERIAL HIGHWAY FROM CARMENITA RD TO VALLEY VIEW AVENUE AND ALONG VALLEY VIEW AVENUE FROM IMPERIAL HIGHWAY TO ROSECRANS AVENUE

$1,546

LOS ANGELES LOCAL HIGHWAY

LAF1342 0 ATSAC/ATCS - PLATT RANCH PROJECT. PROVIDE ATSAC/ATCS TYPE FACILITIES AND BUS PRIORITY INFRASTRUCTURE TO APPROX. 29 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A COMPUTER BASED REAL-TIME TRAFFIC SIGNALIZATION

$5,469

LOS ANGELES LOCAL HIGHWAY

LA0G729 0 AVALON BLVD IMPROVEMENT FROM I-405 TO 223RD STREET CONSIST OF REVING AND REPLACING DAMAGED SIDEWALK, CURB & GUT-TERS, AND WHEELCHAIR RAMPS, REMOVING AND REPLACING PORTIONS OF FAILED PAVEMENTS, AND GRINDING AND OVERLAY THE EXISTING PAVEMENT UTILIZING ROBBERIZED ASPHALT.

$500

LOS ANGELES LOCAL HIGHWAY

LA0G730 0 AVALON BLVD IMPROVEMENT FROM VICTORIA STREET TO I-405 FREEWAY CONSIST OF REMOVING AND REPLACING DAMAGED SIDE-WALK, CURB & GUTTER, AND WHILCHAIR RAMPS, REMOVING AND REPLACING SECTIONS OF FAILED PAVEMENTS, AND GRINDING AND OVERLAYING THE EXISTING PAVEMENT UTILIZING RUBBERIZED ASPHALT.

$550

LOS ANGELES LOCAL HIGHWAY

LAE2198 0 AVALON BLVD INTERCHANGE MODIFICATION AT I-405 IMPROVING AVALON/I-405 INTERCHANGE BY CONSTRUCTING A NEW SOUTHBOUND ON-RAMP, WIDENING NORTHBOUND OFF-RAMP AND ON-RAMP, WIDENING AVALON BLVD NORTHBOUND.

$21,800

LOS ANGELES LOCAL HIGHWAY

LA9708289 0 AVENUE G FROM RT14 TO 25TH ST WEST. WIDEN FROM 2 TO 6 LANES (0.2 MILES) (TOTAL 6 LANES IN BOTH DIRECTIONS). INCLUDES INTERCHANGE IMPROVEMENTS.

$23,400

LOS ANGELES LOCAL HIGHWAY

LA0D446 0 AVENUE K GAP CLOSURE FROM 40TH STREET WEST TO 60TH STREET WEST. WIDEN GAPS TO ADD AN ADDITIONAL LANE IN EACH DIREC-TION (4 LANES TOTAL) WITHIN THE CITY JURISDICTION.

$3,410

LOS ANGELES LOCAL HIGHWAY

LA0D447 0 AVENUE L GAP CLOSURE FROM 60TH STREET WEST TO 30TH WEST, ADDING AN ADDITIONAL LANE IN EACH DIRECTION, INCLUDING A MEDIAN (WITHIN CITY JURISDICTION)

$4,620

LOS ANGELES LOCAL HIGHWAY

LAF3129 0 AVENUE L WIDENING: 15TH TO 30TH STREET WEST. CONSTRUCT CAPACITY IMPROVEMENTS ALONG AVENUE L BY WIDENING EXIST-ING ROADWAY TO AVAILABLE ROW EXTENTS & CLOSING ANY MIXED FLOW LANE GAPS, & PROVIDE IMPROVED CIRCULATION TO SR-14. WIDENING FROM 2 TO 3 LANES.

$3,273

LOS ANGELES LOCAL HIGHWAY

LA0D449 0 AVENUE M AND SR14 OVERCROSSING IMPROVEMENTS. WIDENING AVENUE M FROM 2 TO 7 LANES FROM 10TH STREET WEST TO 15TH STREET WEST.

$13,650

Page 33: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 31

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF1507 0 AVENUE S BIKEWAY PHASE 2. CLASS I BIKEWAY IMPROVEMENTS ALONG THE GENERAL ALIGNMENT OF AVENUE S IN THE CITY OF

PALMDALE. THIS PROJECT WILL INCLUDE CLOSING GAPS IN OUR LOCAL BICYCLE PLAN.$1,733

LOS ANGELES LOCAL HIGHWAY

LA960134 0 AVENUE S HIGHWAY 14/DOWNING ST WIDENING. WIDEN AVENUE S FROM STATE HIGHWAY 14 TO DOWNING ST (FROM 4 TO 6 LANES) 3 LANES IN EA. DIR.) APPROX 1.6 MILES.

$7,200

LOS ANGELES LOCAL HIGHWAY

LA9811102 0 AVENUE S RAIROAD GRADE SEPARATION (OVERPASS/UNDERPASS) OF METROLINK RR TRACKS, WEST OF SIERRA HIGHWAY - 6 LANES. INCLUDES GRADE SEPARATION OF SIERRA HIGHWAY AND APPLICABLE RAMPING.

$56,800

LOS ANGELES LOCAL HIGHWAY

LAF3107 0 AVENUE S WIDENING PHASE II. AVENUE S WIDENING PHASE II PROJECT PROVIDES A 6 LANE ROADWAY, SIDEWALK, CURB AND GUTTER, CLASS 1 BIKEWAY, TRAFFIC SIGNALS, AND ENHANCEMENTS.. THE PROJECT IS SITUATED IN THE HEART OF THE CITY OF PALMDALE IN THE NORTHERN LOS ANGELES COUNTY. THE PROJECT SPANS ALONG AVENUE S, A MAJOR ARTERIAL THAT HAS BEEN IDENTIFIED AS A SIGNIFICANT ARTERIAL BY METRO AS PART THE LOS ANGELES COUNTYWIDE SIGNIFICANT ARTERIAL NETWORK.

$11,023

LOS ANGELES LOCAL HIGHWAY

LA000373 0 AVIATION BLVD FROM MANHATTAN BEACH BLVD TO ARBOR VITAE WIDEN FROM 4 TO 6 LANES (ISTEA, 102-240, 1991) $13,984

LOS ANGELES LOCAL HIGHWAY

LA0C8089 0 BARHAM / CAHUENGA / INTERSECTION WIDEN IMPROVEMENT, FOR LEFT/RIGHT TURN IMPROV. PPNO 3111. $1,495

LOS ANGELES LOCAL HIGHWAY

LA960018 0 BEVERLY BOULEVARD MONTEBELLO BLVD TO W/O REA DRIVE RECONSTRUCT & WIDEN FROM 4 TO 6 LANES $3,650

LOS ANGELES LOCAL HIGHWAY

LAF1530 0 BICYCLE SYSTEM GAP CLOSURES & IMPROVED LA RIVER BIKE PATH. PROJECT WILL CONSTRUCT PRIORITY CLASS I & III BICYCLE SYS-TEM GAP CLOSURES IN LONG BEACH AND IMPROVE CONNECTION TO LA RIVER.

$1,231

LOS ANGELES LOCAL HIGHWAY

LAF1535 0 BICYCLE WAYFINDING SIGNAGE PROGRAM. WAYFINDING SIGNS TO DIRECT BICYCLISTS, AND EDUCATE MOTORISTS, TO THE LOCATIONS OF DEDICATED BIKE PATHS, LANES AND ROUTES, DESTINATIONS, AND TRANSIT HUBS THROUGHOUT LOS ANGELES.

$504

LOS ANGELES LOCAL HIGHWAY

LAF1506 0 BIKE COMPATIBLE RDWY SAFETY AND LINKAGE ON PALOS VERDES DR. THE PROJECT WILL HAVE A CLASS II BIKE LANE ON BOTH SIDES OF PALOS VERDES DRIVE SOUTH, WITH AN UNPAVED SHOULDER FOR EMERGENCY USE.

$788

LOS ANGELES LOCAL HIGHWAY

LAF3505 0 BIKE NETWORK LINKAGES TO EXPOSITION LIGHT RAIL. BIKE NETWORK ENHANCEMENTS TO SUPPORT EXPOSITION LINE. INCREASED SAFETY AND CONVENIENCE WITH SIGNAL DETECTION, HIGHLY VISIBLE LANE MARKINGS AND NEW BIKE RACKS. THE PROJECT AREA IS LOCATED THROUGHOUT THE CITY OF SANTA MONICA AND NO MORE THAN TWO MILES FROM THE PROPOSED EXPOSITION LIGHT RAIL LINE STATIONS.

$3,429,147

LOS ANGELES LOCAL HIGHWAY

LAF1522 0 BIKE SAFE ROADWAY GRATES. THIS PROJECT IS TO UPGRADE EXISTING ROADWAY GRATES TO IMPROVE BIKE SAFETY AND PROMOTE CYCLING USAGE.

$539

LOS ANGELES LOCAL HIGHWAY

LAF1534 0 BIKE TECHNOLOGY DEMONSTRATION. PROJECT WILL CONSIST OF DESIGN, INSTALLATION AND EVALUATION OF SEVERAL BICYCLE TECHNOLOGIES, INCLUDING BICYCLE ACTIVATED DETECTION AT INTERSECTIONS, BIKE BOXES, AND BIKE PARKING.

$399

LOS ANGELES LOCAL HIGHWAY

LAF1503 0 BIKEWAY IMPROVEMENTS ON FOOTHILL BLVD. AT SAN DIMAS WASH. THE BWY IMPROVEMENTS ON FOOTHILL BLVD. AT SAN DIMAS WASH; WILL CLOSE THE GAP ON A BRIDGE & CONNECT THE EXISTING CLASS II BIKE LANES TO THE EAST & WEST OF SAN DIMAS WASH CROSSING.

$2,390

LOS ANGELES LOCAL HIGHWAY

LA002738 0 BIKEWAY/PEDESTRIAN BRIDGE OVER LA RIVER AT TAYLOR YARD CLASS I (CFP 738, 2077) (PPNO# 3156) $5,000

LOS ANGELES LOCAL HIGHWAY

LAF3643 0 BOYLE HEIGHTS CHAVEZ AVE STREETSCAPE/PEDESTRIAN IMPROVEMENTS. ENHANCE USE OF PUBLIC TRANSIT, PROVIDE NEW PED. AMENITIES & SAFE ACCESS TO METRO GOLD LINE STATIONS ON 1ST STREET.

$5,478

Page 34: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

32 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0F010 0 BRIDGE NO. 53C0327 AND 53C0328, THE OLD ROAD, OVER SANTA CLARA RIVER AND OVER SPTCO(ABND)FROM 550 SOUTH OF SKYVIEW

LANE TO RYE CANYON ROAD.REPLACE 4 LANE APPROACHES AND BRIDGES WITH 6 LANE APPROACHES AND BRIDGES.$47,991

LOS ANGELES LOCAL HIGHWAY

LA0G451 0 BRIDGE NO. 53C0876, HIGUERA ST, OVER BALLONA CR. BETWEEN EASTHAM DRIVE AND JEFFERSON BLVD. REPLACE 3 LANE BRIDGE WITH A NEW 4 LANE BRIDGE.

$7,594

LOS ANGELES LOCAL HIGHWAY

LA0G104 0 BRIDGE NO. 53C1880,530595, SIXTH STREET, OVER LA RIVER, E SANTA ANA FREEWAY. REPLACE SEISMICALLY/STRUCTURALLY DEFICIENT SIXTH STREET VIADUCT WITH NEW VIADUCT. NO LANES BEING ADDED. TOLL CREDITS USED FOR R/W IN LIEU OF PROP 1B SEISMIC BOND FUNDS.

$709,672

LOS ANGELES LOCAL HIGHWAY

LA0D171 0 BROADWAY IMPROVEMENTS FROM ALBERTONI TO 168TH ST. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT.

$1,540

LOS ANGELES LOCAL HIGHWAY

LA0D170 0 BROADWAY IMPROVEMENTS FROM GRIFFITH ST TO ALBERTONI. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT.

$1,980

LOS ANGELES LOCAL HIGHWAY

LA0D169 0 BROADWAY IMPROVEMENTS FROM MAIN ST TO GRIFFITH ST. CONSTRUCTION OF MISSING CURB & GUTTER AND RECONSTRUCTION OF EXISTING PAVEMENT AND UNDERGROUNDING THE OVERHEAD POWER LINES.

$1,203

LOS ANGELES LOCAL HIGHWAY

LA0D167 0 BROADWAY IMPRVMNTS FRM 168TH ST. TO NORTH CITY LIMIT (ALONDRA BLVD). CONSTRUCT RAISED CONCRETE MEDIANS W/ LANDSCAPE & HARDSCAPE, ADD CURB & GUTTER & SIDEWLK ,RECNSTRUCT EXSTNG PAVEMNT.

$1,070

LOS ANGELES LOCAL HIGHWAY

LA0G383 0 BROCKWAY BUS CONNECTOR. CONNECT BROCKWAY STREET TO EL MONTE TRANSIT STATION (BUS ACCESS ONLY). RIGHT OF WAY IS ROUGHLY THE WEST 1/3 OF FORMER GUNDERSON SITE (PARCEL 8578-019-008), LOCATED ON NORTHWEST CORNER OF SANTA ANITA AVENUE AND BROCKWAY STREET.

$4,550

LOS ANGELES LOCAL HIGHWAY

LAE1816 0 BURBANK BLVD & HAYVENHURST AVE INTERSECTION IMPROVEMENTS - REDUCE WIDTH OF MEDIAN ISLANDS ON BURBANK BLVD TO INSTALL ADDITIONAL LEFT TURN LANE FROM W/B BURBANK TO S/B HAYVENHURST, AND EXCLUSIVE RIGHT TURN LANE FROM E/B BURBANK TO S/B HAYVENHURST; MODIFY TRAFFIC SIGNAL & STREET LIGHTING.

$1,081

LOS ANGELES LOCAL HIGHWAY

LAE1181 0 BURBANK BLVD & WOODLEY AVE INTERSECTION IMPROVEMENTS. REDUCE WIDTH OF MADIAN ISLAND ON BURBANK BLVD TO CON-STRUCT ADDITIONAL LEFT TURN LANE FROM E/B BURBANK BLVD TO N/B WOODLEY AVE; MODIFY TRAFFIC SIGNAL AND STREET LIGHT-ING. PROP C FUNDING RECEIVED THROUGH CFP 2009 (F3169).

$495

LOS ANGELES LOCAL HIGHWAY

LA0C8046 0 BURBANK BLVD WIDENING-LANKERSHIM BLVD TO CLEON AVE. FROM VARYING ROADWAY WIDTH TO FULL MAJOR HIGHWAY STANDARDS. FROM 1 LN TO 2 LNS IN EACH DIRECTION. PPNO 3097.

$15,417

LOS ANGELES LOCAL HIGHWAY

LAF3317 0 BUS SIGNAL PRIORITY IN CULVER CITY. DESIGN, DEVELOP & INSTALL WIRELESS BUS SIGNAL PRIORITY SYSTEM ON CULVER CITY BUS FLEET AND AT INTERSECTIONS TO INCREASE OPERATION EFFICIENCY & TRAVEL TIME SAVINGS. THE PROJECT INCLUDES INTERSEC-TIONS WITH TRANSIT SERVICE WITHIN THE BOUNDARY OF THE CITY OF CULVER CITY.

$2,751

LOS ANGELES LOCAL HIGHWAY

LAE3793 0 CALIFORNIA AVE WIDENING: FROM WILLOW AVE AND SPRING ST WIDEN CALIFORNIA AVE TO SECONDARY MODIFIED HIGHWAY STREET STANDARDS (NON-CAPACITY).

$1,200

LOS ANGELES LOCAL HIGHWAY

LA0G616 0 CALIFORNIA STATE POLYTECHNIC UNIVERSITY ROADWAYS TO TRANSIT CENTER, CALIFORNIA; STREET IMPROVEMENTS ROADWAY REHABILITATION - SOUTH CAMPUS DRIVE, MULTIPLE PHASES.

$2,519

LOS ANGELES LOCAL HIGHWAY

LA9711031 0 CASTAIC CUTOFF FROM LAKE HUGHES RD TO SAN FRANCISQUITO CANYON RD CONTRUCT NEW ROAD 4 12-FOOT LANES AND 10-FOOT SHOULDERS

$7,600

LOS ANGELES LOCAL HIGHWAY

LA996328 0 CCTV CAMERA INSTALLATION $602

Page 35: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 33

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAE1934A 0 CENTURY BLVD PEDESTRIAN SAFETY AND TRANSPORTATION IMPROVEMENTS. $3,600

LOS ANGELES LOCAL HIGHWAY

LAF1612 0 CENTURY CITY URBAN DESIGN AND PEDESTRIAN CONNECTION PLAN. PROJECT WILL IMPLEMENT SIDEWALK IMPROVEMENTS, DECORA-TIVE CROSSWALKS, MEDIAN ISLAND, CURB RAMPS, PEDESTRIAN LIGHTING, SHELTERS, BENCHES, TRASH RECEPTACLES & STREET TREES.

$3,342

LOS ANGELES LOCAL HIGHWAY

LA0C8075 0 CESAR CHAVEZ AVE/ LORENA ST / INDIANA ST INTERSECTION IMPROVEMENTS. RECONSTRUCTION OF A FIVE-LEGGED SIGNALIZED INTERSECTION INTO A MODERN ROUNDABOUT. THE CONSTRUCTION OF THE ROUNDABOUT WILL REDUCE THE COMPLEXITY OF THE INTERSECTION AND WILL IMPROVE TRAFFIC FLOW AND SAFETY.

$10,933

LOS ANGELES LOCAL HIGHWAY

LAF1611 0 CESAR CHAVEZ TRANSIT CORRIDOR (110 FWY TO ALAMEDA). INSTALLATION OF PEDESTRIAN/TRANSIT RIDER AMENITIES INC. BUS STOP GARDENS AT THREE INTERSECTIONS, NEW PEDESTRIAN LIGHTING, STREET TREES IN A LANDSCAPED PARKWAY & WAYFINDING SIGNAGE.

$2,350

LOS ANGELES LOCAL HIGHWAY

LA0C8095 0 CHERRY AVE. WIDENING PROJECT. BET 19TH ST AND PACIFIC COAST HIGHWAY BY WIDENING THE ARTERIAL FROM ONE TO TWO LANES IN EACH DIRECTION.(PPNO 3128). SAFETEA-LU #3203

$6,721

LOS ANGELES LOCAL HIGHWAY

LAE0595 0 CHEVY CHASE RAIL ROAD IMPROVEMENTS. SAFETY IMPROVEMENTS AT THE CHEVY CHASE AND AT-GRADE CROSSING AT DORAN, BROADWAY, GRANDVIEW AND SONORA AT-GRADE CROSSING.

$919

LOS ANGELES LOCAL HIGHWAY

LAF1734 0 CITY OF BELL GARDENS SIGNAGE PROGRAM. BELL GARDENS CAPITAL IMPROVEMENT PROJECT THAT WILL PROMOTE THE CITY THROUGH NEW SIGNAGE.

$322

LOS ANGELES LOCAL HIGHWAY

LAF1836 0 CITY OF LONG BEACH ATHERTON STREET ENHANCEMENT PROJECT. REHABILITATING THE LANDSCAPED MEDIAN TO ENHANCE THE EXPERIENCE OF OVER 37,000 PEDESTRIANS, BICYCLISTS, TRANSIT USERS AND AUTOS DAILY.

$1,322

LOS ANGELES LOCAL HIGHWAY

LSTEA0044 0 CITY OF ROLLING HILLS ESTATES - DEEP VALLEY DRIVE FROM 718 DEEP VALLEY DRIVE TO ROXCOVE DRIVE. - CONSTRUCT STREETSCAPE AND PEDESTRIAN IMPROVEMENTS.

$322

LOS ANGELES LOCAL HIGHWAY

LAF1728 0 CITY OF SANTA MONICA ITS IMPROVEMENTS. SANTA MONICA REAL TIME BEACH PARKING SIGNS. THIS PROJECT WILL MAKE INFORMA-TION REGARDING BEACH PARKING AVAILABLE TO MOTORISTS DESTINED FOR SANTA MONICA BEACH PARKING LOTS.

$1,166

LOS ANGELES LOCAL HIGHWAY

LAF3312 0 CITY OF TORRANCE ITS & TRAFFIC IMPROVEMENTS. IMPLEMENT ITS COMPONENTS AT LOCATIONS NOT COVERED BY ‘95 METRO CFP SOUTH BAY SIGNAL SYNCH PROJECT, TO PROVIDE EFFECTIVE CITYWIDE AND MULTI-JURISDICTIONAL TRAFFIC MANAGEMENT. *CRENSHAW BLVD BETWEEN PCH AND THE MOST SOUTH CITY CONTROLLED SIGNALIZED INTERSECTION.

$1,364

LOS ANGELES LOCAL HIGHWAY

LAF3535 0 CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS AND BICYCLISTS. SANTA CLARITA CITYWIDE WAYFINDING PROGRAM FOR PEDES-TRIANS AND BICYCLISTS TO DIRECT THEM TO METROLINK STATIONS AND OTHER REGIONAL TRIP GENERATORS.. THE SANTA CLARITA CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS AND BICYCLISTS WILL DESIGN AND INSTALL WAYFINDING SIGNS ALONG THE CITY’S EXISTING NETWORK OF MULTI-USE PATHS, ON-STREET BIKEWAYS, PASEOS IN THE VALENCIA AND SAUGUS NEIGHBORHOODS, AND SIDEWALKS ALONG MOST MAJOR ROADWAYS.

$271

LOS ANGELES LOCAL HIGHWAY

LAF1510 0 CLAREMONT PORTION OF THE CITRUS REGIONAL BIKEWAY. THIS PROJECT PROPOSES THE IMPLEMENTATION OF THE CLAREMONT POR-TION OF THE CITRUS REGIONAL BIKEWAY UTILIZING BONITA AVENUE AND FIRST STREET AS PRIMARY CLASS II BIKE ROUTES.

$1,794

LOS ANGELES LOCAL HIGHWAY

LA0G674 0 COLDMILL AND ASPHALT OVERLAY OF EXISTING STREETS AT VARIOUS LOCATIONS. REMOVE AND REPLACE CURB, GUTTER, AND SIDE-WALK, AND RE-STRIPE SAME STREETS.

$560

LOS ANGELES LOCAL HIGHWAY

LA0D465 0 COLIMA RD- HALIBURTON RD/ CITY OF DIAMOND BAR CB ROAD WIDENING: RESTRIPE FOR 3ED THROUGH LANE ON EB APPROACH (HACIENDA BLVD- FULLERTON RD) & WB APPROACH (FULLERTON- CAMINO DEL SUR)

$600

Page 36: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

34 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAE0896 0 COLIMA ROAD AT FULLERTON ROAD INTERSECTION IMPROVEMENT $1,500

LOS ANGELES LOCAL HIGHWAY

LAF3612 0 COLORADO PEDESTRIAN PROMENADE: LRT STATION TO PIER/BEACH. A PEDESTRIAN PROMENADE ON COLORADO AVENUE TO CONNECT THE EXPO LIGHT RAIL TERMINUS STATION AT 4TH STREET WITH DOWNTOWN SANTA MONICA, THE CIVIC CENTER AREA, THE PIER AND THE BEACH. THE PROJECT IS LOCATED ON COLORADO AVENUE BETWEEN 4TH STREET AND THE SANTA MONICA PIER IN THE CITY OF SANTA MONICA, AND INCLUDES THE STREET, THE SIDEWALKS AND BOTH INTERSECTIONS. THE TOTAL PROJECT AREA IS APPROXI-MATELY 1,240 LINEAR FEET.

$6,568

LOS ANGELES LOCAL HIGHWAY

LA0G321 0 COMPLETION OF PARK PLACE EXTENSION BETWEEN ALASKA AVENUE AND SEPULVEDA BOULEVARD IN THE CITY OF EL SEGUNDO. PARK PLACE FOUR LANE ROADWAY EXTENSION BETWEEN NASH AND ALLIED WAY.

$3,783

LOS ANGELES LOCAL HIGHWAY

LAE1321 0 COMPTON ARTERIAL RECONSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY). $3,840

LOS ANGELES LOCAL HIGHWAY

LAE3768 0 COMPTON ARTERIAL REONCSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY). $3,000

LOS ANGELES LOCAL HIGHWAY

LAOB7326 0 COMPTON CREEK BIKEWAY EXTSN - PHASE III.DSIGN & CNSTRUCT .6 MI OF CLAS 1 BIKE/PED PATH FRM GREENLEAF BL TO ARTESIA FWY.WILL INC BIKE PATH, PED WALKWAY SIGNAGE, STRPNG. (PPNO 2869).

$464

LOS ANGELES LOCAL HIGHWAY

LAE1915 0 CONSTRUCT AND IMPROVE MEDIANS AND DRAINAGE ON IMPERIAL HIGHWAY FROM WEST BORDER TO EAST BORDER OF CITY OF LA MIRADA

$5,503

LOS ANGELES LOCAL HIGHWAY

LAE2333 0 CONSTRUCT AND REPAIR LINING IN FOUR TUNNELS ON KANAN, KANAN DUME, AND MALIBU ROADS BETWEEN US-1 AND US-101. (PROJECT USING $1,581 OF TOLL CREDITS IN FY 10/11 FOR MATCH FOR STPL AND DEMO FUNDS)

$12,000

LOS ANGELES LOCAL HIGHWAY

LA0G395 0 CONSTRUCT CONCRETE SIDEWALKS AND CURB RAMPS, INSTALL SPEED RADAR FEEDBACK SIGNS AND PEDESTRIAN COUNTDOWN HEADS AND RESTRIPE CROSSWALKS ON FOSTER ROAD FROM STUDEBAKER ROAD TO MCRAE STREET.

$600

LOS ANGELES LOCAL HIGHWAY

LAE2651 0 CONSTRUCT CROSSWALK BUMP-OUTS AND RELATED STREETSCAPE IMPROVEMENTS ON TEMPLE ST BETWEEN HOOVER ST & GLENDALE. PROJECT WILL PROVIDE FOR VARIOUS STREETSCAPE IMPROVEMENTS.

$500

LOS ANGELES LOCAL HIGHWAY

LA0D477 0 CONSTRUCT IMPROVEMENTS FOR SR-14 INTERCHANGE AT GOLDEN VALLEY ROAD. DIAMOND CONFIRGURATION, TWO RAMPS, IMPROVEMENTS INCLUDE WIDENING OF BRIDGE OVERCROSSING, NEW SIGNALS, RAMP MOD.

$7,370

LOS ANGELES LOCAL HIGHWAY

LAE0001B 0 CONSTRUCT SAFE ACCESS TO STREETS FOR BICYCLISTS AND PEDESTRIANS INCLUDING CROSSWALKS, SIDEWALKS, AND TRAFFIC CALMING MEASURES

$500

LOS ANGELES LOCAL HIGHWAY

LAE1138 0 CONSTRUCT VALLEY DRAINAGE AND RESURFACING IMPROVEMENTS: WEST OF SANTA ANITA AV- INCLUDING NO CAPACITY INCREASE STREET RESURFACING

$1,533

LOS ANGELES LOCAL HIGHWAY

LAE3229 0 CONSTRUCTION AND ENHANCEMENTS OF TRAILS IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA $960

LOS ANGELES LOCAL HIGHWAY

LAE1531 0 CONSTRUCTION OF A SMART CROSSWALK SYSTEM AT THE INTERSECTION OF ARMINTA ST. AND MASON AVE. $50

LOS ANGELES LOCAL HIGHWAY

LAE2634 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF HAMLIN ST. AND CORBIN AVE. $125

LOS ANGELES LOCAL HIGHWAY

LAE0388B 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF INDEPENDENCE AVE. AND SHERMAN WAY. $125

Page 37: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 35

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAE3201 0 CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF OSO AVE. AND VANOWEN ST. $125

LOS ANGELES LOCAL HIGHWAY

LAE2699 0 CONSTRUCTION OF NEW MULTI-USE PATH/TRAIL ALONG RIVER BANK BETWEEN SEPULVEDA BLVD & KESTER AVE INCLUDING ACCESS RAMPS, REATAINING WALLS, LANDSCAPING ETC.

$574

LOS ANGELES LOCAL HIGHWAY

LAE1697 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. NORTHEAST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. DEVONSHIRE STREET (LANGDON TO WOODMAN), SEPULVEDA BLV

$500

LOS ANGELES LOCAL HIGHWAY

LAE2147 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. LINDLEY AVE. (STRATHERN TO CHASE), ROSCOE BLVD

$1,000

LOS ANGELES LOCAL HIGHWAY

LAE1509 0 CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. SOUTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. VICTORY BLVD (OAKLAND TO RESEDA) TAMPA AVE

$1,000

LOS ANGELES LOCAL HIGHWAY

LAE1867 0 CONSTRUCTION OF SMART CROSSWALK AT THE INTERSECTION OF TOPANGA CANYON AND GAULT ST. $50

LOS ANGELES LOCAL HIGHWAY

LA0G212 0 CONVERT LAS VIRGENES RD. FROM 2 LANE ROAD TO 4 LANE ROAD BETWEEN AGOURA RD. AND LOST HILLS RD.; 2 LANES IN EACH DIRECTION AND PROVIDING TURNING POCKETS, TRAFFIC SIGNAL INSTALLATIONS AND MODIFICATIONS, BIKE LANES AND SIDEWALKS

$2,000

LOS ANGELES LOCAL HIGHWAY

LAF3522 0 CORDOVA STREET ROAD DIET PROJECT. CONVERT THE VEHICULAR-ORIENTED STREET TO A COMPLETE STREET BY REMOVING 2 VEHICU-LAR TRAFFIC LANES TO ACCOMMODATE BIKE AND PED FACILITIES. CITY OF PASADENA- HILL STREET TO ARROYO PARKWAY.

$3,694

LOS ANGELES LOCAL HIGHWAY

LAF1501 0 COUNTY CLUB DRIVE BIKEWAY IMPROVEMENT PROJECT. CONSTRUCTION OF A 4-FOOT WIDE CLASS II BIKE LANE IN BOTH DIRECTIONS ALONG A ONE MILE SECTION OF COUNTRY CLUB DRIVE.

$1,802

LOS ANGELES LOCAL HIGHWAY

LA0G414 0 COYOTE CREEK BIKE TRAIL: CLASS 1 BIKE PATH ALONG THE COYOTE CREEK FLOOD CHANNEL FROM HILLSBOROUGH DRIVE TO ROSECRANS AVNEUE

$709

LOS ANGELES LOCAL HIGHWAY

LAE0326 0 CREATION OF A RAISED MEDIAN ON ALONDRA BLVD.BETWEEN CLARK AND WOODRUFF TO IMPROVE TRAFFIC SAFETY AND EFFICIENCE. THE MEDIAN WILL PROVIDE LANDSCAPING, LIGHTING AND IRRIGATION

$385

LOS ANGELES LOCAL HIGHWAY

LAE2843 0 CRENSHAW BLVD REHABILITATION, MARICOPA ST TO SEPULVEDA BLVD, CITY OF TORRANCE $3,730

LOS ANGELES LOCAL HIGHWAY

LAE2157 0 CRENSHAW BLVD REHABILITATION. BETWEEN 182ND ST & 190TH. NEW RIGHT TURN LANES NEAR I-405 RAMPS - NO NEW THROUGH-TRAVEL LANES.

$3,458

LOS ANGELES LOCAL HIGHWAY

LAF3175 0 CULVER BOULEVARD REALIGNMENT PROJECT. CULVER BL. WIDENING W/ FRONTAGE ROAD NARROWING, SEPARATED BY REBUILT BIKE/PED MEDIAN, W/ RAISED MEDIAN, TURN LANES, TRAFFIC SIGNAL, COUNTDOWN PED HEADS AND OTHER IMPROVEMENTS.. THE PROJ-ECT LIMITS ARE SEPULVEDA BL. TO THE WEST AND ELENDA STREET TO THE EAST, LOCATED ENTIRELY WITHIN THE CITY OF CULVER CITY. ALL OF THE REALIGNMENT WILL BE WITHIN THE EXISTING PUBLIC RIGHT-OF-WAY. SAFTEA-LU 3069 PG 119 STAT. 1375.

$6,965

LOS ANGELES LOCAL HIGHWAY

LAF3518 0 DAISY CORRIDOR AND 6TH STREET BIKE BOULEVARD. CONSTRUCT TWO (2) BICYCLE BOULEVARDS ALONG TWO CORRIDORS KNOWN AS THE DAISY CORRIDOR AND 6TH STREET IN LONG BEACH. THE PROPOSED BIKE BOULEVARD ALONG THE DAISY CORRIDOR IS A NORTH-SOUTH ROUTE BETWEEN BROADWAY. BIKE LANE (CLASS II) IS LESS THAN 1 MILE.

$2,655

LOS ANGELES LOCAL HIGHWAY

LAF3171 0 DE SOTO AVE WIDENING: RONALD REAGAN FWY TO DEVONSHIRE ST.. WIDEN DE SOTO AVE FR SR-118 TO DEVONSHIRE ST TO PROVIDE 3 LANES IN EACH DIRECTION & UNIFORM ROADWAY WIDTH. EXISTING ASPHALT BERMS TO BE REPLACED WITH CURB, GUTTER, & 10’ SIDEWALK.

$11,600

LOS ANGELES LOCAL HIGHWAY

LAE1920 0 DEL AMO BLVD - FROM NORMANDIE AVE AND NEW HAMPSHIRE - RECONSTRUCT AND WIDEN . FROM 1 LANE EA. DIR TO 2 LANES IN EA DIR.

$29,920

Page 38: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

36 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA000389 0 DEL AMO BLVD FROM MADRONA AVE TO CRENSHAW BLVD CONSTRUCT 0 TO 4 LANES NEW GRADE SEPARATION (CFP 6361, 4314; PPNO

2371).$32,439

LOS ANGELES LOCAL HIGHWAY

LAF3115 0 DEL AMO BOULEVARD BRIDGE REPLACEMENT IMPROVEMENTS. REMOVE/REPLACE DEL AMO BRIDGE FROM 2 TO 4 LANES OVER COYOTE CREEK WITHIN CURRENT 100-FT ROW & REALIGN DEL AMO TO A STRAIGHT ROADWAY CONFIG W/LANDSC MEDIAN, CURB & GUTTER, & SIDEWK..

$12,162

LOS ANGELES LOCAL HIGHWAY

LA0F062 0 DESIGN AND CONST. OF REAL-TIME PARKING INF./GUIDANCE SYSTEM. PHASE I COVERS SANTA MONICA AREA, BOUNDED BY COLORADO AVE., OCEAN AVE., WILSHIRE BLVD AND LINCOLN BLVD.

$700

LOS ANGELES LOCAL HIGHWAY

LAF3514 0 DESIGN AND CONSTRUCT 0.28 MILES CLASS I BIKE FACILITY NORTH OF I-10 FROM MOTOR AVE. TO 500 FEET EAST OF DUNLEER DR. (CONTINUOUS BIKEWAY FROM EXPOSITION PARK TO SANTA MONICA BEACH).

$6,169

LOS ANGELES LOCAL HIGHWAY

LAF3513 0 DESIGN AND CONSTRUCT 3.85 MILE BIKEWAY ALONG FUTURE EXPOSITION LIGHT RAIL CORRIDOR BETWEEN VENICE/ROBERTSON BLVDS. AND SANTA MONICA CITY LIMITS AT CENTINELA. CLASS I AND CLASS II BIKEWAYS.

$11,886

LOS ANGELES LOCAL HIGHWAY

LA960179 0 DESIGN AND CONSTRUCT A GRADE SEPARATION IN SOUTH WILMINGTON TO SEPARATE VEHICLE/TRUCK TRAFFIC FROM AN ACTIVE RAIL LINE AND PROVIDE DIRECT ACCESS TO PORT TERMINALS, A COMMUNITY CENTER AND OTHER BUSINESSES.

$69,029

LOS ANGELES LOCAL HIGHWAY

LAE0938 0 DESIGN AND CONSTRUCT REALIGNMENT OF BRAHMA DRIVE AT WINNETKA TO ELIMINATE HAZARDOUS CONDITION $300

LOS ANGELES LOCAL HIGHWAY

LA0G727 0 DESIGN AND CONSTRUCTION TO REHABILITATE MAPLE AVENUE FROM SEPULVEDA BOULEVARD TO PARKVIEW DRIVE, NO LANE ADDITION.

$2,500

LOS ANGELES LOCAL HIGHWAY

LAE0191 0 DESIGN,RIGHT-OF-WAY, AND CONSTRUCT 2.8 MILE BIKEWAY AND PEDESTRIAN PATH FROM MILLS AVE. TO VALLEY HOME IN WHITTIER. $2,000

LOS ANGELES LOCAL HIGHWAY

LAF3501 0 DETECTION OF BICYCLES AT SIGNAL CONTROLLED INTERSECTIONS. BICYCLE DETECTION SYSTEMS AT INTERSECTIONS CONTROLLED BY TRAFFIC SIGNALS ALONG BIKE CORRIDORS..

$2,495

LOS ANGELES LOCAL HIGHWAY

LAE0701 0 DEVELOP AND IMPLEMENT TRAFFIC CALMING MEASURES FOR TRAFFIC EXITING THE I-710 INTO LONG BEACH $1,920

LOS ANGELES LOCAL HIGHWAY

LAE2978 0 DEVELOP CONCEPTUAL MASTER PLAN TO IMPROVE THE EFFICIENCY OF TRANSPORTATION FACILITIES (E/P & PS/E ONLY) $194

LOS ANGELES LOCAL HIGHWAY

LA0D473 0 DOCKWEILER DR EXTENSION FROM LYONS AV TO EXISTING DOCKWEILER DR: CONSTRUCT A 4-LANE FACILITY (2 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, AND DRAINAGE IMPROVEMENTS

$11,126

LOS ANGELES LOCAL HIGHWAY

LAF1704 0 DOWNTOWN L.A. ALTERNATIVE GREEN TRANSIT MODES TRIAL PROGRAM. OFFER SHARED RIDE-BICYCLE AND NEIGHBORHOOD ELECTRIC VEHICLE TRANSIT SERVICES TO LA CITY HALL AS AN ALTERNATIVE TO OVERCROWDED DASH SERVICE

$1,026

LOS ANGELES LOCAL HIGHWAY

LAF3731 0 DOWNTOWN LA INTER-MODAL TRANSIT INFORMATION AND WAYFINDING. INSTALL TRANSIT INFORMATION MONITORS, VARIABLE MES-SAGE SIGNS, INTERACTIVE KIOSKS & PARKING AVAILABILITY SIGNAGE ALONG BROADWAY CORRIDOR TO OLYMPIC.

$1,612

LOS ANGELES LOCAL HIGHWAY

LAF3624 0 DOWNTOWN TORRANCE PEDESTRIAN IMPROVEMENT PROJECT. INCREASE CONNECTIVITY, IMPROVE PEDESTRIAN SAFETY, REDUCE AUTOMOBILE DEPENDENCY, AND STIMULATE ECONOMIC DEVELOPMENT IN DOWNTOWN TORRANCE.. THE PROJECT AREA IS BOUND BY TORRANCE BOULEVARD TO THE NORTH, CARSON STREET TO THE SOUTH, CRAVENS AVENUE TO THE WEST, AND CABRILLO AVENUE TO THE EAST.

$1,118

LOS ANGELES LOCAL HIGHWAY

LAF1655 0 EAST COLORADO BOULEVARD PEDESTRIAN ENHANCEMENTS (PHASE I). INSTALLATION OF PEDESTRIAN-SCALE STREET LIGHTING ON REGIONALLY SIGNIFICANT STREET IN A SPECIFIC PLAN AREA OF PASADENA IN ORDER TO INCREASE LIVABILITY/ENHANCE PEDESTRIAN MOVEMENT.

$1,093

Page 39: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 37

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF3603 0 EAST COLORADO BOULEVARD PEDESTRIAN IMPROVEMENTS (PHASE 2). INSTALL PED-SCALE STREET LIGHTS, DECORATIVE CROSS-

WALKS, BUS BENCHES & TRASH RECEPTACLES ON A REGIONALLY SIGNIFICANT STREET TO INCREASE LIVABILITY, SAFETY & ENHANCE PED MOVEMENT. EAST COLORADO BOULEVARD BETWEEN HILL AVENUE AND ALLEN AVENUE IN THE CITY OF PASADENA. (0.46 MILES)

$754

LOS ANGELES LOCAL HIGHWAY

LA996393 0 EAST DOWNTOWN TRUCK ACCESS IMPROVEMENTS: WIDENINGS, IMPRVMNTS, STRIPING, AT AND NEAR ALAMEDA ST & WASHINGTON BL IN THE EAST DOWNTOWN L.A. AREA

$2,153

LOS ANGELES LOCAL HIGHWAY

LA962314 0 EAST SAN GABRIEL VALLEY SOM PILOT PROJECT TRAFFIC SIGNALS INTERCONNECT PROJECT $9,071

LOS ANGELES LOCAL HIGHWAY

LAF1615 0 EASTSIDE LIGHT RAIL PEDESTRIAN LINKAGE. IMPROVE LINKAGES WITHIN 1/4 MILE OF METRO’S GOLD LINE LRT. $2,990

LOS ANGELES LOCAL HIGHWAY

LAF3651 0 EASTSIDE LIGHT RAIL PEDESTRIAN LINKAGES, PHASE II. ENHANCE MULTI-MODAL ACCESS TO THE MARIACHI & SOTO GOLD LINE STATIONS, FOCUSING ON 1ST STREET.

$1,698

LOS ANGELES LOCAL HIGHWAY

LA0G710 0 ECHO PARK/SUNSET BL STREETSCAPE BEAUTIFICATION - PROJECT WILL PROVIDE FOR CONSTRUCTION OF PEDESTRIAN AND STREETSCAPE IMPROVEMENTS ALONG SUNSET BL IN THE ECHO PARK AREA.PROJECT ELEMENTS WILL INCLUDE SIDEWALK IMPROVE-MENTS, STREET TREES, TRANSIT AMNENITIES, AND PARKWAY LANDSCAPING.

$750

LOS ANGELES LOCAL HIGHWAY

LA0G709 0 EL DORADO & BROMWICH SIDEWALK IMPROVEMENTS - IMPROVEMENTS WILL BE ON: 1) EL DORADO AV-BROMWICH ST TO MONTAGUE ST; AND 2) BROMWICH ST-EL DORADO AV TO SAN FERNANDO RD. CONSTRUCTION ELEMENTS WILL INCLUDE CONCRETE CURB, GUTTER, SIDEWALKS, ADA-COMPLIANT ACCESS RAMPS AND ASPHALT CONCRETE PAVING.

$649

LOS ANGELES LOCAL HIGHWAY

LAF1504 0 EL MONTE: TRANSIT CYCLE FRIENDLY. EL MONTE PROPOSES TO IMPLEMENT THE 1ST PHASE OF THE EL MONTE BIKE-TRANSIT HUB COMPONENT (METRO BICYCLE TRANSPORTATION STRATEGIC PLAN) A COUNTYWIDE EFFORT TO IMPROVE BIKE FACILITIES

$167

LOS ANGELES LOCAL HIGHWAY

LAF1718 0 EL PUEBLO PEDESTRIAN IMPROVEMENTS PHASE I, II, III & IV. WAYFINDING ELEMENT OF ENHANCED PEDESTRIAN FACILITIES TO IMPROVE AND ASSIST PEDESTRIAN MOVEMENT IN THE EL PUEBLO DISTRICT & OTHER LANDMARKS IN DOWNTOWN LA. ALSO IN PED MODE (F1661)

$1,746

LOS ANGELES LOCAL HIGHWAY

LAF1634 0 EL PUEBLO PEDESTRIAN IMPROVEMENTS PHASE I, II, III, & IV. DESIGN AND CONSTRUCTION OF ENHANCED FACILITIES TO IMPROVE & ASSIST PEDESTRIAN MOVEMENT IN THE EL PUEBLO DISTRICT & OTHER LANDMARKS IN DOWNTOWN LA. WAYFINDING ELEMENT IN TDM F1718.

$12,763

LOS ANGELES LOCAL HIGHWAY

LA990358 0 EL SEGUNDO EMPLOYMENT CTR ITS PRJ (T21-1477) $5,721

LOS ANGELES LOCAL HIGHWAY

LAF1514 0 EMERALD NECKLACE BIKE TRAIL PROJECT. DESIGN AND CONSTRUCT 1.1 MILES OF CLASS I BIKE PATH TO CONNECT DUARTE ROAD TO THE SAN GABRIEL RIVER BICYCLE TRAIL.

$503

LOS ANGELES LOCAL HIGHWAY

LAE2750A 0 ENGINEERING SUPPORT TO I-5 JOINT POWERS AUTHORITY TO WIDEN I-5 FREEWAY. PAVEMENT AND INTERSECTION IMPROVEMENT AT LA MIRADA BLVD AND ALONDRA BLVD PRIOR TO I-5 IMPROVEMENTS

$1,945

LOS ANGELES LOCAL HIGHWAY

LAE1933 0 ENHANCE BYZANTINE LATINO QUARTER TRANSIT PLAZAS AT NORMANDIE AND PICO, AND HOOVER AND PICO, LOS ANGELES BY IMPROVING STREETSCAPES, INCLUDING EXPANDING CONCRETE AND PAVING

$500

LOS ANGELES LOCAL HIGHWAY

LAE2476 0 ENHANCE PEDESTRIAN ENVIRONMENT AND INCREASE SAFETY ALONG OLYMPIC BL BETWEEN VERMONT AVE AND WESTERN AVE. PROJECT WILL PROVIDE VARIOUS STREETSCAPE IMPROVEMENTS ALONG LIMITS.

$2,000

LOS ANGELES LOCAL HIGHWAY

LA0D318 0 ESPLANADE STREETSCAPE IMPROVEMENTS INCLUDES RESURFACING, RELOCATING CURB & GUTTER FOR ADDITIONAL LANDSCAPING, STREET GUTTER AND STORM DRAINS SAFETEA HPP# 1662

$3,034

Page 40: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

38 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAE3439 0 EXPAND DIESEL EMISSIONS REDUCTION PROGRAM OF GATEWAY CITIES COG $2,676

LOS ANGELES LOCAL HIGHWAY

LAF1720 0 EXPERIENCELA.COM WEB 2.0 INTERACTIVE TRANSIT MAPPING. PROVIDE INTERACTIVE MAPPING, WIFI AND MOBILE INTERFACE, AND WEB 2.0 TECHNOLOGY AS NEW SERVICES ON EXPERIENCELA.COM.

$377

LOS ANGELES LOCAL HIGHWAY

LAF1613 0 EXPO LINE STN STREETSCAPE PROJECT-EAST CRENSHAW TO JEFFERSON. DESIGN & CONSTRUCTION OF PEDESTRIAN RELATED STREETSCAPE IMPROVEMENTS WITHIN 1/4 MILE FROM EACH OF 3 LIGHT RAIL STATIONS ALONG EXPOSITION BLVD BETWEEN CRENSHAW & JEFFERSON.

$3,262

LOS ANGELES LOCAL HIGHWAY

LA0C8164 0 EXPOSITION BLVD RIGHT-OF-WAY BIKE PATH-WESTSIDE EXTENSION. DESIGN AND CONSTRUCTION OF 2.5 MILES OF CLASS 1 BIKEWAY, LIGHTING, LANDSCAPING & INTERSECTION IMPROVEMENTS. (PPNO# 3184)

$14,710

LOS ANGELES LOCAL HIGHWAY

LAF3142 0 EXPOSITION PARK TRAFFIC CIRCULATION IMPROVEMENTS. WIDEN THE INTERSECTIONS OF VERMONT AVE & MARTIN LUTHER KING, JR. BLVD & FIGUEROA ST & MARTIN LUTHER KING JR BLVD TO PROVIDE EXCLUSIVE RIGHT TURN LANES..

$4,477

LOS ANGELES LOCAL HIGHWAY

LA0G717 0 F48 - INTERSECTION IMPROVEMENTS ON PACIFIC COAST HWY AT PALOS VERDES BLVD. PLANS, SPECIFICATIONS, AND ESTIMATES FOR CONSTRUCTION OF A RIGHT TURN ONLY LANE ON WESTBOUND PALOS VERDES BLVD AT PACIFIC COAST HWY. PROJECT NO. MR318.08, FA NO. MOU.MR318.08.

$320

LOS ANGELES LOCAL HIGHWAY

LA0B702 0 FAIR OAKS AV CORRIDOR & COLUMBIA ST STREET IMPROVEMENTS -- MEDIAN, CURB BULBOUTS, PAVEMENT REHAB, AND LANDSCAPING PROJECT (ROGAN FUNDS; HR5394)

$4,382

LOS ANGELES LOCAL HIGHWAY

LAOB422 0 FAIR OAKS AV & SR-110 IMPROVEMENT PROJECT (ROGAN FUNDS, HR5394)EXPAND EXIT OFF-RAMP OF 110 NB, ADD A HOOK RAMP FOR EXISTING ON-RAMP 110 SB.

$9,418

LOS ANGELES LOCAL HIGHWAY

LA0G406 0 FAIRMONT AVE. PARK-N-RIDE FACILTY (83 PARKING SPACES) TO SERVE COMMUTERS USING SR-134, I-5. THE LOCATION OF THE PARK-N-RIDE IS FAIRMONT AVENUE AND SAN FERNANDO RD, ON THE SOUTH SIDE OF FAIRMONT AVENUE BETWEEN SAN FERNANDO ROAD AND SR-134 WESTBOUND FREEWAY RAMPS. THE WORK INCLUDES EARTHWORK, DRAINAGE, AND PLACEMENT OF AC, LIGHTING, LANDSCAPING, FENCING, AND SIGNAGE WORK. THE WORK ALSO INCLUDES INSTALLING A SIDEWALK FOR PEDESTRIAN ACCESS FROM SAN FERNANDO ROAD.

$3,000

LOS ANGELES LOCAL HIGHWAY

LAF1639 0 FASHION DISTRICT STREETSCAPE PHASE II. STREETSCAPE IMPROVEMENTS ENHANCING THE PEDESTRIAN ENVIRONMENT TO FACILITATE INCREASED PEDESTRIAN USAGE BETWEEN LA FASHION DISTRICT’S CORE AND THE 7TH ST TRANSIT CORRIDOR.

$2,034

LOS ANGELES LOCAL HIGHWAY

LA0G559 0 FIGUEROA STREET PAVEMENT RECONSTRUCTION AND REHABILITATION PROJECT FROM I-405 FREEWAY TO VICTORIA STREET INCLUDE RECONSTRUCTION OF DAMAGED CURB & GUTTER AND SIDEWALK. RECONSTRUCTION OF EXISTING PAVEMENT AND OVERLAY WITH RUBBERIZED ASPHALT.

$500

LOS ANGELES LOCAL HIGHWAY

LAF1513 0 FIJI WAY BICYCLE LANE PROJECT. WIDEN THE SOUTH SIDE OF FIJI WAY FROM WEST OF ADMIRALTY WAY FOR BIKE LANES. $1,007

LOS ANGELES LOCAL HIGHWAY

LAF1219 0 FIRESTONE BLVD BRIDGE WIDENING OVER SAN GABRIEL RIVER. PROJECT PROPOSES TO WIDEN BRIDGE TO IMPROVE PEDESTRIAN SAFETY, VEHICLE EFFICIENCY, IMPROVE ACCESS LINKS WITH OTHER MODAL NEEDS, AND ADDRESS CAPACITY ENHANCEMENTS FOR THE REGION

$4,890

LOS ANGELES LOCAL HIGHWAY

LAE0479 0 FIRESTONE BLVD. FROM RYERSON AVE AND STEWART & GRAY RD. WIDEN SECTIONS OF FIRESTONE (BOTTLENECK FOR TURN LANES; ST RECONSTRUCTION, REHAB, & RESURFACE; & UPGRADE HANDICAP RAMPS

$2,000

LOS ANGELES LOCAL HIGHWAY

LAF3124 0 FIRESTONE BOULEVARD CAPACITY IMPROVEMENTS. INCREASE THE NUMBER OF LANES FROM 4 TO 6 ON FIRESTONE BLVD WITHIN THE ROW, RAISED LS MEDIANS, SIDEWALKS, BUS SHELTERS & PULLOUTS, C&G, STREET LIGHTING, & UTILITY RELOCATION..

$14,721

Page 41: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 39

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF3726 0 FIRST AND LAST MILE TRANSIT CONNECTIVITY OPTIONS. IMPLEMENT A PILOT SHARED FLEET VEHICLE PROGRAM THAT INCLUDES,

BIKES, ALTERNATIVE GREEN VEHICLES FOR FIRST & LAST MILES FROM UNION STATION TO AND OTHER DOWNTOWN LOCATIONS.$1,641

LOS ANGELES LOCAL HIGHWAY

LAF3130 0 FLORENCE AVE REGIONAL TRANSPORTATION CORRIDOR IMPRVMT PROJ. RECONFIGURATION OF 1.2 MILE SEGMENT OF FLORENCE AV INCLUDING NEW FLORENCE AV/REDONDO BL INTERSECTION & RELATED CAPACITY PED/BIKE IMPRV TO REBALANCE STREET INTO MULTIMODAL CORRIDOR..

$5,000

LOS ANGELES LOCAL HIGHWAY

LAF1635 0 FLORENCE AVENUE PEDESTRIAN IMPROVEMENT PROJECT. PROVIDES PEDESTRIAN ORIENTED IMPROVEMENTS ON FLORENCE AVENUE INCLUDING PEDESTRIAN LIGHTING, LANDSCAPING, SIGNAGE, CROSSWALK TREATMENT, AND BUS AND STREET FURNITURE.

$7,988

LOS ANGELES LOCAL HIGHWAY

LAF1328 0 FLORENCE AVENUE TRAFFIC SIGNAL COMMUNICATION SYSTEM. INSTALL FIBER OPTIC COMMUNICATION & VIDEO-DETECTION SYSTEM ON FLORENCE AVE AND INTERCONNECT FLORENCE TO EXISTING FIBER BACKBONE TO DEVELOP AN ETHERNET BASED COMMUNICATION NETWORK.

$1,798

LOS ANGELES LOCAL HIGHWAY

LAF3702 0 FOLD-N-GO PASADENA - FOLDING BICYCLE DEMONSTRATION PROGRAM. PROVIDE INCENTIVE TO TRANSIT RIDERS TOWARD THE PUR-CHASE OF COLLAPSIBLE BIKES - APPROX. 1000 TO USE IN CONJUNCTION WITH BUS & RAIL SYSTEMS..

$325

LOS ANGELES LOCAL HIGHWAY

LAF3144 0 FOOTHILL BLVD AND SIERRA HWY INTERSECTION IMPROVEMENTS. WIDEN FOOTHILL BL TO PROVIDE AN ADDITIONAL N/B THROUGH LANE, RESTRIPE SIERRA HWY TO PROVIDE ADDITIONAL W/B RIGHT TURN LANE, & SIGNALIZE THE INTERSECTION..

$1,860

LOS ANGELES LOCAL HIGHWAY

LA0C8128 0 FOX HILLS AREA TRAF SIG SYNCH EFFORT & CITY-WIDE AUTO TRAF SIGNAL CONTROL AND MONITORING PROJECT. INCORPORATE 11 SIGNALIZED INTERSECTIONS INTO AN ATSAC / ADAPTIVE TRAF CONTROL SYS.

$2,036

LOS ANGELES LOCAL HIGHWAY

LAE2617 0 GALE AVENUE --FROM FULLERTON ROAD TO NOGALES ST, WIDEN FROM 4 TO 6 LANES AND NOGALES ST INTERSECTION WIDENING AT GALE AVE. TO ADD LEFT TURN LANE.

$600

LOS ANGELES LOCAL HIGHWAY

LA0G306 0 GARFIELD AVENUE AT SLAUSON AVENUE INTERSECTION (GARFIELD AVENUE AT FLOTILLA AVENUE) - PROJECT INVOLVES PAVEMENT RECONSTRUCTION IN CONCRETE, NEW CURB AND GUTTER, DRAINAGE, TRAFFIC SIGNAL, BUS SHELTERS, AND STRIPING OF THE INTERSECTION.

$570

LOS ANGELES LOCAL HIGHWAY

LAF3309 0 GATEWAY CITIES FORUM TRAFFIC SIGNAL CORRIDORS PROJ, PHASE VI. DESIGN AND CONSTRUCT MULTIJURISDICTIONAL TRAFFIC SIGNAL SYNCHRONIZATION, INTERSECTION OPERATIONAL IMPROVEMENTS & ITS COMPONENTS ON REGIONAL ARTERIALS IN GATEWAY CITES AREA.

$17,000

LOS ANGELES LOCAL HIGHWAY

LA0F008 0 GLENDALE BLVD. OVER L.A RIVER, REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET, UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 (53C1881) GLENDALE-HYPERION COMPLEX OF BRIDGES. (#53C-1883)

$1,680

LOS ANGELES LOCAL HIGHWAY

LA0F009 0 GLENDALE BLVD. OVER LA RIVER. REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET. UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 GLENDALE-HYPERION COMPLEX OF BRIDGES. (BRIDGE #53C1884, BHLS-5006(187))

$3,150

LOS ANGELES LOCAL HIGHWAY

LA0F007 0 GLENDALE BLVD.-HYPERION AVE. COMPLEX OF BRIDGES OVER LA RIVER, I-5 AND RIVERSIDE DR, REHABILITATION/SEISMIC RETROFIT; UPGRADE BRIDGE RAILING; INCLUDES BRIDGES 53C-1881, 53C-1882, 53C-1883, 53C-1884 AND 53-1069. NO ADDITIONAL LANES. REALIGN I-5 NORTH BOUND OFF RAMP (FED PROJECT ID: BHLS-5006(181)

$66,207

LOS ANGELES LOCAL HIGHWAY

LA0G186 0 GLENDALE PARKS, RECREATION & COMMUNITY SERVICES DEPARTMENT WILL CONSTRUCT A 1,825 FOOT ADA ACCESSIBLE RECRE-ATIONAL TRAIL (NOT FOR COMMUTING PURPOSES) ADJACENT TO THE 27-ACRE GLENDALE SPORTS COMPLEX IN THE SAN RAFAEL HILLS ABOVE THE CITY OF GLENDALE. A PORTION OF THE SPORTS COMPLEX PARKING LOT WILL BE RE-STRIPED TO INCLUDE ADDITIONAL HANDICAPPED SPACES NEAR THE TRAILHEAD. (NO ADDITIONAL PARKING SPACES WILL BE ADDED).

$197

LOS ANGELES LOCAL HIGHWAY

LA0B104 0 GOLDEN VALLEY ROAD - NEWHALL RANCH ROAD TO PLUM CANYON ROAD. 0 TO 4 LANES APPROXIMATELY 1.5 MILES. $11,000

Page 42: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

40 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA990359 0 GRADE SEP XINGS SAFETY IMPR; 35- MI FREIGHT RAIL CORR. THRGH SAN.GAB. VALLEY - EAST. L.A. TO POMONA ALONG UPRR

ALHAMBRA &L.A. SUBDIV - ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318$1,347,101

LOS ANGELES LOCAL HIGHWAY

LA0G088 0 GRADE SEPERATION FOR REEVES CROSSING AT TERMINAL ISLAND WOULD ELIMINATE TRAFFIC CONFLICTS AND ALLOW EFFICIENT MOVEMENT OF TRAINS IN TERMINAL ISLAND WITHOUT CONCERN FOR IMPACTS TO VEHICULAR TRAFFIC.

$108,760

LOS ANGELES LOCAL HIGHWAY

LA0G036 0 GRAND AVENUE REHABILITATION. BEAUTIFICATION, STREETSCAPE/HARDSCAPE, PEDESTRIAN IMPROVEMENTS, ETC. $700

LOS ANGELES LOCAL HIGHWAY

LAF1136 0 GRANDVIEW AV MODIFICATIONS WITHIN THE CITY OF GLENDALE. THE GRANDVIEW AVENUE GRADE CROSSING (NON CAPACITY) THE INTERSECTION OF AIR WAY AND GRANDVIEW AVENUE, AND THE INTERSECTION OF GRANDVIEW AVENUE AND SAN FERNANDO ROAD ALONG WITH ROADWAY WIDENING AND OTHER ASSOCIATED WORK. THE PROPOSED IMPROVEMENTS ARE AS FOLLOWS: WIDEN GRANDVIEW AVENUE BETWEEN AIR WAY AND SAN FERNANDO ROAD TO INCREASE ROADWAY CAPACITY AND TO ACCOMMODATE TRUCK TURNING MANEUVERS. THE PROJECT WILL ADD ONE EAST BOUND LEFT-TURN LANE ON GRAND

$4,535

LOS ANGELES LOCAL HIGHWAY

LAE2194 0 GREENLEAF ROW COMMUNITY ENHANCEMENT PROJECT DESIGN AND CONSTRUCTION OF BIKEWAY PED WALK WAY AND UPGRADE SIGNALIZATION

$3,840

LOS ANGELES LOCAL HIGHWAY

LA11G2T 0 GROUP PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES. PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. PROJECTS TO UPGRADE, CREATE, MAINTAIN, ENHANCE, OR ELIMINATE HAZARDS FOR PEDESTRIANS AND CYCLIST FACILITIES THROUGHOUT COUNTY.

$24,473

LOS ANGELES LOCAL HIGHWAY

LA11G2 0 GROUP PROJECTS FOR BICYLCE AND PEDESTRIAN FACILITES. PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. PROJECTS TO UPGRADE, CREATE, MAINTAIN, ENHANCE, OR ELIMINATE HAZARDS FOR PEDESTRIANS AND CYCLIST FACILITIES THROUGHOUT COUNTY.

$60,828

LOS ANGELES LOCAL HIGHWAY

LA11G5 0 GROUP PROJECTS FOR DIRECTIONAL AND INFORMATIONAL SIGNAGE ON LOCAL ROADS THROUGHOUT THE COUNTY. PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. DIRECTIONAL AND INFORMARMATIONAL SIGNS, SIGN REMOVALS, AND/OR SYSTEMS TO IMPROVE OR UPGRADE SIGNAGE MECHANISMS.

$21,222

LOS ANGELES LOCAL HIGHWAY

LA11G1 0 GROUP PROJECTS FOR PAVEMENT RESURFACING AND OR REHABILITATION ON LOCAL ROADS THROUGHOUT COUNTY. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. PAVEMENT RESURFACING, REHABILITATION, RECONSTRUCTION, AC OVERLAYS, ROAD MAINTENANCE TO PREVENT AND ELIMINATE HAZARDS, NO LANE ADDITIONS. THERE ARE PROJECTS IN THE GROUPED PROJECT LISTING THAT CONTAIN PROJECTS WITH TOLL CREDITS.

$561,030

LOS ANGELES LOCAL HIGHWAY

LA11G4 0 GROUP PROJECTS FOR PLANTING, LANDSCAPING, TRANSPORTATION SYSTEM BETTERMENTS, BEAUTIFICATION AND SCENIC EASE-MENTS THOUGHOUT THE COUNTY (NO LANE ADDITIONS). PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES.

$36,650

LOS ANGELES LOCAL HIGHWAY

LA11G4T 0 GROUP PROJECTS FOR PLANTING, LANDSCAPING, TRANSPORTATION SYSTEM BETTERMENTS, BEAUTIFICATION AND SCENIC EASE-MENTS THOUGHOUT THE COUNTY (NO LANE ADDITIONS). PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES.

$16,154

LOS ANGELES LOCAL HIGHWAY

LA11G3 0 GROUP PROJECTS FOR SAFETY AND OPERATING IMPROVEMENTS ON THE LOCAL HIGHWAY SYSTEM THROUGHOUT THE COUNTY. PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES. RAILROAD/HIGHWAY CROSSING, SAFER FEDERAL-AID SYSTEM ROADS, SHOULDER IMPROVEMENTS, PROJECTS THAT CORRECT, IMPROVE, OR ELIMINATE A HAZARDOUS LOCATION OR FEATURE, TRAFFIC CONTROL DEVICES AND OPERATING ASSISTANCE, SIGNALIZATION PROJECTS (INDIVIDUAL INTERSEC-TIONS), PAVEMENT MARKING DEMONSTRATION PROJECTS, TRUCK CLIMBING LA

$356,811

Page 43: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 41

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA000800 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM PROJECTS ARE CONSISTENT WITH 40

CFP PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTION BRIDGES (NO ADDITIONAL TRAVEL LANES)

$383,708

LOS ANGELES LOCAL HIGHWAY

LA0C8126 0 HARBOR-GATEWAY ATSAC/ATCS PROJECT; IMPROVEMENTS TO 109 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTROL SYSTEM.

$11,142

LOS ANGELES LOCAL HIGHWAY

LA960176 0 HARRY S BRIDGES BLVD RELOCATION/CONSOLIDATION OF STREETS, STREET INTERSECTIONS, TRAFFIC CHANNELIZATION AND SIGNALIZATION (TEA21-#978)

$51,813

LOS ANGELES LOCAL HIGHWAY

LAF3109 0 HAWTHORNE BOULEVARD MOBILITY IMPROVEMENT PROJECT. IMPROVE CIRCULATION, INCREASING EFFICIENCY FOR VEHICU-LAR, PEDESTRIAN, PUBLIC TRANSIT AND BICYCLE MOVEMENT ON HAWTHORNE BLVD.. THE PROJECT LIMIT IS FROM EL SEGUNDO BOULEVARD TO THE NORTH AND TO THE SOUTHERN CITY LIMIT AT ROSECRANS AVENUE. FROM I-105/120 STREET TO EL SEGUNDO BOULEVARD.

$8,200

LOS ANGELES LOCAL HIGHWAY

LAF3146 0 HIGHLAND AVENUE WIDENING-ODIN STREET TO FRANKLIN AVENUE. WIDEN THE EXISTING ROADWAY FROM 75 FT TO 87 FT TO ADD ADDITIONAL TURNING TRAFFIC LANE ALONG HIGHLAND AVE & UPGRADE THE HIGHWAY TO MAJOR HIGHWAY STANDARDS.

$5,804

LOS ANGELES LOCAL HIGHWAY

LA0G686 0 HIGHLAND PARK PEDESTRIAN IMPROVEMENTS ALONG FIGUEROA BETWEEN AVENUE 50 AND AVENUE 60 $250,000

LOS ANGELES LOCAL HIGHWAY

LAF1708 0 HOLLYWOOD INTEGRATED MODAL INFORMATION SYSTEM. INSTALLATION OF ELECTRONIC, DIRECTION AND PARKING AVAILABIL-ITY SIGNS WITH INTERNET CONNECTIVITY TO PROVIDE ADVANCE AND REAL-TIME INFORMATION INTENDED TO INCREASE TRANSIT RIDERSHIP

$3,130

LOS ANGELES LOCAL HIGHWAY

LA0C8209 0 HOLLYWOOD MEDIA DISTRICT-PED IMPRV. STREETSCAPE ELEMNTS: LANDSCAPE MEDIAN ISLANDS, PED LIGHTING,STAMPED XWALK, ON SANTA MONICA BL- VINE ST TO HIGHLAND & HIGHLAND - MELROSE TO FOUNTAIN

$810

LOS ANGELES LOCAL HIGHWAY

LAF1617 0 HOLLYWOOD PEDESTRIAN/TRANSIT CROSSROADS PHASE II. DESIGN AND INSTALL PEDESTRIAN AND TRANSIT USER ENHANCEMENTS, EXTENDING THE ORIGINAL HOLLYWOOD PEDESTRIAN/TRANSIT IMPROVEMENT PROJECT TO INCLUDE HIGHLAND AVENUE AND VINE STREET.

$860

LOS ANGELES LOCAL HIGHWAY

LAF1197 0 HUNTINGTON DR CAPACITY IMPROVEMENTS. MITIGATION COSTS EXCLUDED [PROJECT INVOLVES TRAFFIC FLOW AND CAPACITY IMPR-MENTS INCL THE ADDITION OF A THROUGH LANE, TURN LANES & RECONSTRUCTION OF MEDIAN & CHANNELIZING ISLANDS]

$2,925

LOS ANGELES LOCAL HIGHWAY

LA0C8036 0 HYPERION AV UNDR WAVERLY DR BRDGE, RE-COFIGURE SIDEWKS ALONG HYPERION. RE-ALLIGN I-5 NB OFF-RAMP AT GLENDALE BLVD. PROVIDE ALTERNATIVE BIKEWAY ACCESS TO LA RIVER. PPNO 3092.

$14,422

LOS ANGELES LOCAL HIGHWAY

LAF1326 0 I-5/SR-134 CONGESTION MANAGEMENT PROJECT. MONITOR AND CONTROL TRAFFIC USING SURFACE STREETS IN GLENDALE AND BURBANK TO TRAVEL BETWEEN I-5 AND SR-134. THE SYSTEM WILL PROVIDE SEAMLESS TRAFFIC MONITORING AND CONTROL.

$1,931

LOS ANGELES LOCAL HIGHWAY

LAF1178 0 I-710 EARLY ACTION PLAN - INTERSECTION IMPROVEMENTS AT FIRESTONE BLVD/ATLANTIC AVENUE INTERSECTION. FIRESTONE BLVD IS EXISTING 2 LANES IN EACH DIRECTION, AFTER THE PROJECT WILL BE 3 LANES IN EACH DIRECTION. THE LENGTH OF THE PROJECT IS .75 MILES. PRIMARILY IT WILL WIDEN FIRESTONE BLVD AND ATLANTIC AVENUE AND REALIGN THEIR INTERSECTION.

$50,360

LOS ANGELES LOCAL HIGHWAY

LA996347 0 I-710/FIRESTONE BLVD.IC, PHASE IV (FIRESTONE BLVD. BRIDGE WIDENING OVER L.A RIVER) PROJECT NO. HP21L-5257 (016) (HBRR: 53C1972) WIDEN OF FIRESTONE BLVD FROM RAYO AVE TO I-710 FREEWAY, ON-RAMP MOD. REHABILITATE 5-LANE BRIDGE TO 6 LANE, ADD SHOULDERS, UPGRADE BRIDGE RAILIN

$21,816

LOS ANGELES LOCAL HIGHWAY

LAF1520 0 IMPERIAL HIGHWAY BIKE LANES. THIS PROJECT INVOLVES THE MODIFICATION OF THE MEDIAN ISLAND AND THE WIDENING OF IMPERIAL HIGHWAY ALONG 1000 FT EAST OF PERSHING DRIVE TO ACCOMMODATE BIKE LANES.

$2,322

Page 44: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

42 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF3305 0 IMPERIAL HWY FIBER OPTIC TRAFFIC SIGNAL COMMUNICATIONS PROJ. INSTALL FIBER-OPTIC COMMUNICATION & VIDEO-DETECTION

SYSTEM ON IMPERIAL HWY AND INTERCONNECT IT TO EXISTING FIBER BACKBONE TO DEVELOP AN ETHERNET-BASED COMMUNICATION NETWORK.

$900

LOS ANGELES LOCAL HIGHWAY

LAE1142 0 IMPLEMENT ITS SUBREGIONAL MASTERPLAN: FOCUS INTEGRATING STATE, LOCAL, & PRIVATE SYSTEMS FOR REAL TIME TRAFFIC CONTROL & FREIGHT TRAVELER INFO, TRUCK SAFETY, SECURITY, & EMISSIONS

$2,688

LOS ANGELES LOCAL HIGHWAY

LAE2828 0 IMPLEMENT STREETSCAPE IMPROVEMENTS ALONG WILBUR AVE TO ENHANCE TRAFFIC AND PEDESTRIAN TRAFIC. ALL WORK SHALL BE COMPLETED IN CITY OF LA ROW

$100

LOS ANGELES LOCAL HIGHWAY

LAE1023 0 IMPLEMENT VAN NUYS RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN AND AROUND THE VAN NUYS AREA OF THE CITY. NO TRAFFIC CAPACITY

$500

LOS ANGELES LOCAL HIGHWAY

LA990351 0 IMPROVE GLENDALE BLVD/FWY RT 2 TERMINUS RECONFIG/REDSIGN, TRAFFIC MGMT. NEIGHBORHOOD SAFETY MEASURES (TEA21-#413) (TOLL CREDIT WILL BE USED AS THE LOCAL MATCH FOR THE DEMO FUNDS)TOLL CREDIT IN FY10/11 IN CON. FOR $375 AND FY11/12 IN CON. FOR $1,875.

$14,258

LOS ANGELES LOCAL HIGHWAY

LA0C8052 0 IMPROVE SAN FERNANDO ROAD BETWEEN ELM ST AND EAGLE ROCK BL, ADD TURN LANES. MAKE IMPROVEMENTS AT SR-2 RAMPS. PPNO 3102.

$1,991

LOS ANGELES LOCAL HIGHWAY

LAE0884 0 IMPROVEMENTS TO THE SOUTH AZUSA AVE./AMAR RD. INTERSECTION (500 FEET IN ALL DIRECTIONS FROM INTERSECTION) IMPROVEMENTS INCLUDE WIDENING, ADDING LEFT LANE, AND TRAFFIC SIGNAL MODIFICATIONS.

$1,200

LOS ANGELES LOCAL HIGHWAY

LAE0427 0 IN CITY OF LOS ANGELES, ON 103RD STREET FROM CENTRAL TO GRAHAM & CENTRAL AV. FROM 103RD STREET TO IMPERIAL HWY. PROJECT WILL PROVIDE STREETSCAPE, TRANSIT, AND PEDESTRIAN AMENITIES.

$4,000

LOS ANGELES LOCAL HIGHWAY

LSTEA0019 0 IN LOS ANGELES - ALONG THE LA RIVER FROM BARCLAY ST. TO N. SPRING ST. - CONSTRUCT BIKE PATH $1,706

LOS ANGELES LOCAL HIGHWAY

LAE0518 0 IN THE CITY OF LOS ANGELES, ON BROADWAY W/S FROM 4TH ST. TO 235 N/O 4TH ST, AND 4TH ST FROM BROADWAY TO 120 W/O BROADWAY. REMOVE AND REPLACE SIDEWALKS INCLUDING PORTIONS THAT SPAN.

$2,500

LOS ANGELES LOCAL HIGHWAY

LAF3303 0 INDUSTRY-ATMS SIGNAL UPGRADE/CCTV VIDEO SURVEILLANCE SYSTEM. DESIGN & IMPLEMENT 20 ATMS SIGNAL UPGRADE, 6 CCTV VIDEO SURVEILLANCE SYSTEM, WIRELESS COMMUNICATIONS & LOCAL CONTROL CENTER (LCC) VIDEO SCREEN SYSTEM.

$1,004

LOS ANGELES LOCAL HIGHWAY

1ITS04 0 INFORMATION EXCHANGE NETWORK PHASE III. DESIGN AND IMPLEMENTATION OF VARIOUS DESIRED FEATURE ENHANCEMENTS TO LOS ANGELES COUNTY’S INFORMATION EXCHANGE NETWORK, A MULTIJURISDICTIONAL ADVANCED TRAFFIC MANAGEMENT SYSTEM.

$4,000

LOS ANGELES LOCAL HIGHWAY

LAE2906 0 INGLEWOOD AVENUE CORRIDOR IMPROVEMENT AT MARINE AVENUE FOR ROADWAY WIDENING AT THREE INTERSECTION CORNERS TO ACCOMMODATE DEDICATED RIGHT TURN LANE POCKETS TO IMPROVE THRU TRAFFIC FLOW AND REDUCE CONGESTION. THIS PROJECT WILL INCLUDE CURB, GUTTER, SIDEWALK, ADA ACCESSIBLE RAMPS, UTILITY RELOCATION, AND SIGNAL REPLACEMENTS/MODIFICA-TIONS. RIGHT OF WAY ACQUISITION WILL BE REQUIRED IN ORDER TO ACCOMMODATE RIGHT TURN POCKETS OF SUFFICIENT STACKING LENGTH.

$4,515

LOS ANGELES LOCAL HIGHWAY

LA996425 0 INSTALL REVERSIBLE LANE ON SEPULVEDA BL THROUGH TUNNEL AT MULHOLLAND DR, INSTALL BIKE FACILITIES FROM SKIRBALL CENTER DR TO BEL AIR CREST RD, IMPLEMENT INTERSECTION IMPROVEMENTS AT SKIRBALL CENTER DR, I-405 FWY SB ON-RAMP, MORAGA DR, WILSHIRE BL

$8,301

LOS ANGELES LOCAL HIGHWAY

LAES235 0 INSTALL SAFETY IMPROVEMENTS AT THE AT-GRADE CROSSING OF BUENA VISTA STREET NEAR VANOWEN STREET, INCLUDING CROSS-ING GATES, PEDESTRIAN IMPROVEMENTS, MEDIAN ISLANDS, PAVEMENT MARKINGS AND CCTV.

$3,205

LOS ANGELES LOCAL HIGHWAY

LA0G718 0 INSTALL SAFETY LIGHTS ON COMPTON CREEK.(DEMO ID 205 PUBLIC LAW 03 APP ACT 108-72002) $496

Page 45: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 43

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAE2591 0 INSTALL TRAFFIC SIGNAL ON BALBOA BL. AT KNOLLWOOD SHOPPING CENTER $120

LOS ANGELES LOCAL HIGHWAY

LAE2883 0 INSTALLATION OF NEW AND THE REMOVE/REPLACE OF EXISTING DAMAGED OR SUBSTANDARD SIDEWALKS, DRIVE APPROACHES, AND CONFLICTING OBSTRUCTIONS AND ADA RAMPS. PROJECT AREA IS BOUNDED BY FOSTER RD TO ROSECRANS AVE AND LAKEWOOD BLVD TO CLARK AVE.

$742

LOS ANGELES LOCAL HIGHWAY

LAF3314 0 INTELLIGENT TRANSPORTATION SYSTEM (ITS) COMMUNICATION SYSTEM. UPGRADE AND REPLACE UNDER CAPACITY COMMUNICATION SYSTEM HARDWARE IN ORDER TO PROVIDE A VIABLE AND COST EFFECTIVE COMMUNICATION LINK BETWEEN TRAFFIC CORRIDORS AND THE LA COUNTY IEN.

$5,493

LOS ANGELES LOCAL HIGHWAY

LAF3302 0 INTELLIGENT TRANSPORTATION SYSTEM (ITS) PHASE III. COMPLETE THE MAIN COMMUNICATION INFRASTRUCTURE SYSTEM OF THE ITS COMMUNICATION MASTER PLAN BY CLOSING ALL GAPS IN THE EXISTING FIBER COMMUNICATION NETWORK. AS STATED IN THE PROJ-ECT DESCRIPTION, THIS PROJECT TARGETS CRITICAL EXISTING GAPS WITHIN THE CITY’S ITS FIBER MASTER PLAN.

$5,294

LOS ANGELES LOCAL HIGHWAY

LA0D439 0 INTELLIGENT TRANSPORTATION SYSTEM LOGISTICS & SYSTEMS MANAGEMENT, WILL PRODUCE AN ITS MASTERPLAN FOR THE GATEWAY CITIES SUBREGION WITH AN EMPHASIS IN GOODS MOVEMENT

$500

LOS ANGELES LOCAL HIGHWAY

LA0G734 0 INTERMODAL ACCESS AT HENRY MAYO NEWHALL MEMORIAL CENTER - IMPROVE BUS TURN-OUT ON MCBEAN PARKWAY AT AVENIDA NAVAREE AND DEVELOPMENT OF NORTHBOUND LEFT-TURN POCKETS AT MCBEAN PARKWAY AND ORCHARD VILLAGE ROAD AT HENRY MAYO NEWHALL MEMORIAL CENTER.

$251

LOS ANGELES LOCAL HIGHWAY

LAE0134 0 INTERSECTION AT BALBOA BLVD & SAN FERNANDO RD.MINOR WIDEN TO PROVIDE TURN LANES, & REALIGNMENT OF BALBOA RD.RIGHT-TURN LANE AT BALBOA BLVD.

$500

LOS ANGELES LOCAL HIGHWAY

LAF3307 0 INTERSECTION IMPROVEMENTS ON BONITA AVE. AT CATARACT AVE. INSTALLATION OF NEW TRAFFIC SIGNAL, LIGHTING ON BONITA AVE AT CATARACT AVE AND THE SYNCHRONIZATION OF EXISTING SIGNALS ALONG BONITA AVE BETWEEN EUCLA AVE AND EASTERLY CITY LIMIT. NEW TRAFFIC SIGNAL ON BONITA AVENUE AT CATARACT AVENUE, AND SYNCHRONIZATION OF THE EXISTING SIGNALS ON BONITA AVENUE AT EUCLA AVENUE, SAN DIMAS AVENUE, IGLESIA STREET, WALNUT AVENUE, SAN DIMAS CANYON ROAD WITH THE NEW SIGNAL.

$1,674

LOS ANGELES LOCAL HIGHWAY

LA0G724 0 INTERSECTION IMPROVEMENTS TO ADD NORTHBOUND, EASTBOUND AND WESTBOUND DEDICATED RIGHT TURN-LANES; ADD SECOND EASTBOUND LEFT-TURN LANE; AND TRAFFIC SIGNAL UPGRADES THROUGH WIDENING AND RECHANNELIZATION.

$19,600

LOS ANGELES LOCAL HIGHWAY

LA0G683 0 INTERSECTION MODERNICATION, SYNCHRONIZATION, AND RE-PAVEMENT. THE PROJECT CONSISTS OF THE INSTALLATION OF INTERSECTION (PORTLAND CONCRETE CEMENT) AT GAGE AVENUE AND WALKER AVENUE, AND THE REHABILITATION OF GAGE AVENUE FROM WILLCOX AVENUE TO CHANSLOR AVENUE AND TRAFFIC SIGNAL MODIFICATIONS AND APPURTENANCES. TOLL CREDIT FOR CON-STRUCTION PHASE IN FY 11/12 FOR $86.

$428

LOS ANGELES LOCAL HIGHWAY

LAE3764 0 ITS & INTERSECTION IMPROVEMENTS IN AND NEAR LAX AIRPORT, WHICH MAY INCLUDE RESTRIPING, SIGNAL PHASE CHANGES, AND THE ADDITION OF INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT.

$1,250

LOS ANGELES LOCAL HIGHWAY

LA996324 0 ITS IMPROVEMENTS: LAKE AVENUE AND DEL MAR BLVD. $963

LOS ANGELES LOCAL HIGHWAY

LAE2538 0 KOREATOWN PAVILION GARDEN-TO ENHANCE THE NORTHEAST CORNER OF NORMANDIE AND OLYMPIC BL. $250

LOS ANGELES LOCAL HIGHWAY

LA0D108 0 L.A RIVER BIKE PATH PHASE 1C- CLASS 1 BIKEWAY ALONG WEST BANK OF LA RIVER- FLETCHER DR TO BARCLAY ST INCLUDES LIGHTING, SIGNAGE, PAVEMNT MARKINGS & FENCING (LA996245) (PPNO 5006)

$2,536

LOS ANGELES LOCAL HIGHWAY

LA0D209 0 LA BREA AVENUE, FROM FLORENCE AVE TO CENTURY BLVD AND IMPERIAL HIGHWAY, FROM PRAIRIE AVE TO VAN NESS AVE BY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS.

$5,977

Page 46: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

44 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA990360 0 LA LOMA BRIDGE CONTRUCTION (TEA21-#1208) THE LENGTH OF THE PROJECT IS 379 FT. RECONSTRUCT THE ONE LANE IN EACH

DIRECTION. BRIDGE NO. 53C0759, LA LOMA RD, OVER ARROYO SECO CHANNEL, 0.8 MIS S. FOOTHHILL FREEWAY.$20,171

LOS ANGELES LOCAL HIGHWAY

LA0C8058 0 LA TIJERA BRIDGE WIDENING OVER I-405 FREEWAY; PROVIDE SIDE-BY-SIDE DUAL LEFT -TURN LANES IN EAST & WESTBOUND DIRECTION ONTO FREEWAY RAMPS.

$14,515

LOS ANGELES LOCAL HIGHWAY

LA0G155 0 LACRD - TRANSIT SIGNAL PRIORITY IN THE CITY OF LOS ANGELES. $1,000

LOS ANGELES LOCAL HIGHWAY

LAF3114 0 LAKEWOOD BOULEVARD PHASE 3 IMPROVEMENTS. WIDEN TO PROVIDE 3 LANES IN EACH DIRECTION & 50 CURB RETURNS AT INTER-SECTIONS, RECONSTRUCT INFRASTRUCTURE TO EXTEND LIFE BY 50 YEARS, REPLACE LANDSCAPING, LIGHTING, & TRAFFIC SIGNALS.

$7,778

LOS ANGELES LOCAL HIGHWAY

LAE1655 0 LANDSCAPE AND IRRIGATE EAST BOUND 91 FREEWAY ON AND OFF RAMPS AT BELLFLOWER BL. $240

LOS ANGELES LOCAL HIGHWAY

LAF3640 0 LANI - EVERGREEN PARK STREET ENHANCEMENT PROJECT. INCREASE PEDESTRIAN SAFETY AND ACCESS BY PROVIDING IMPROVED CROSSWALKS, NEW BUS SHELTERS AND STREET TREES TO ENHANCE CONNECTIVITY BETWEEN TRANSIT AND AREA LANDMARKS.. THE PROPOSED PROJECT IS LOCATED IN THE BOYLE HEIGHTS COMMUNITY OF LOS ANGELES.

$1,075

LOS ANGELES LOCAL HIGHWAY

LAE2389 0 LAS TUNAS PED ENHANCEMENTS. INSTALL AND REPLACE ADA RAMPS. UPDATE CROSSING MARKING AND SIGNALS $791

LOS ANGELES LOCAL HIGHWAY

LAE0180 0 LAUREL CANYON BLVD BETWEEN HAMLIN STREET AND VICTORY BLVD. PROJECT WILL PROVIDE FOR PEDESTRIAN SAFETY AND BEAUTIFICATION TREATMENT. ELEMENTS INCLUDE LANDSCAPED MEDIAN ISLANDS.

$1,200

LOS ANGELES LOCAL HIGHWAY

LA0C8038 0 LAUREL CANYON BLVD BRDGE OVER TUJUNGA WASH WIDENING (BRIDGE #53C-1233)- REHABILITATE 4-LANE BRIDGE AND WIDEN TO ADD SHOULDERS, UPGRADE BRIDGE RAILINGS. PPNO 3094 3379 AB 3090

$3,700

LOS ANGELES LOCAL HIGHWAY

LAES085 0 LAX HOSPITALITY ZONE STREET AND SIDEWALK REHABILITATION - PHASE 1: THIS PROJECT WILL RESURFACE STREETS AND CON-STRUCT SIDEWALK IMPROVEMENTS IN THE VICINITY OF THE LAX INTERNATIONAL AIRPORT. PROJECT LIMITS WILL BE WITHIN THE NEWLY CREATED AIRPORT HOSPITALITY ZONE.

$3,500

LOS ANGELES LOCAL HIGHWAY

LAE0346 0 LIGHTING, AND SAFETY IMPROVEMENTS ON ROAD LEADING TO HANSEN DAM RECREATION AREA. ACCESS IMPROVEMENTS INCLUD-ING HILLSIDE STABILIZATION AND PARKING LOT REHABILITATION ALONG OSBORNE STREET BETWEEN GLENOAKS BOULEVARD AND DRONFIELD AVENUE [REF P.L. 110-244, SEC 105(A)(234)] (CHANGE PER H.R.1195-6/6/08)

$6,500

LOS ANGELES LOCAL HIGHWAY

LAF1206 0 LINCOLN BL WIDENING AT VENICE BL. WIDEN BOTH SIDES OF LINCOLN BL NORTH AND SOUTH OF VENICE BL TO PROVIDE AN ADDI-TIONAL LANE IN EACH DIRECTION DURING WEEKDAY PEAK COMMUTE HOURS.

$1,050

LOS ANGELES LOCAL HIGHWAY

LAF3615 0 LONG BEACH BLVD. PEDESTRIAN IMPROVEMENT PROJECT. PROJECT PROVIDES PEDESTRIAN-ORIENTED IMPROVEMENTS TO LONG BEACH BOULEVARD INCLUDING PEDESTRIAN LIGHTING, STREET TREES, AND CROSSWALK TREATMENTS.

$2,521

LOS ANGELES LOCAL HIGHWAY

LAE1296 0 LONG BEACH INTELLIGENT TRANSPORTATION SYSTEM $2,880

LOS ANGELES LOCAL HIGHWAY

LAF3503 0 LONG BEACH SOUTH WATERFRONT BIKE PATH GAP CLOSURE. THE SOUTH WATERFRONT BIKE PATH CONNECTION PROPOSES A MAIN GAP-CLOSURE TO LONG BEACH’S PRIMARY BIKEWAY NETWORK. THIS CLASS I PATH INCLUDES A MID-BLOCK CROSSING AND WAYFIND-ING SIGNS.. THE PROPOSED SOUTH WATERFRONT BIKE PATH STARTS AT THE NORTH END OF THE QUEENSWAY BRIDGE AT THE EXISTING TERMINUS OF THE CLASS I PATH. THE PROPOSED ALIGNMENT FOLLOWS THE NORTH SIDE OF QUEENSWAY DRIVE WITHIN THE CITY RIGHT-OF-WAY AS A CLASS I BIKE PATH TO THE EXISTING CLASS I PAT

$885

LOS ANGELES LOCAL HIGHWAY

LAF1848 0 LOS ANGELES CITY COLLEGE (LACC) RED LINE STATION EXTENSION. CREATE AN EXTENSION OF THE ENTRANCE TO THE METRO RED LINE STATION AT VERMONT/WILLOW BROOK AV TO THE LACC CAMPUS

$1,471

Page 47: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 45

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF1817 0 LOS ANGELES NEIGHBORHOOD INITIATIVE WEST ADAMS ENHANCEMENTS. THIS PROJECT WILL PROVIDE VIBRANT LANDSCAPING AND

HISTORICALLY INSPIRED GATEWAY MARKERS ON A BLIGHTED TRANSPORTATION CORRIDOR, ENHANCING THE DRIVING AND TRANSIT ENVIRONMENT.

$892

LOS ANGELES LOCAL HIGHWAY

LAE1148 0 LOS ANGELES REGIONAL DIESEL EMISSIONS REDUCTION PROGRAM FOR ENGINE RETROFIT PROVIDES INCENTIVE GRANTS TO OWNER OPERATORS OLD DIESEL TRUCKS TO UPGRADE EQUIPMENT TO REDUCE EMISSIONS

$449

LOS ANGELES LOCAL HIGHWAY

LA0F003 0 LOS ANGELES STREET, OVER BIG DALTON WASH, 0.5 MI S IRWINDALE AVE. WIDEN 2-LANE BRIDGE TO 4-LANE BRIDGE, ADD SHOULDERS, UPGRADE BRIDGE RAILING (# 53C0676)

$2,319

LOS ANGELES LOCAL HIGHWAY

LA960170 0 MAGIC MOUNTAIN PARKWAY EXTENSION FROM SAN FERNANDO RD TO VIA PRINCESSA: CONSTRUCT A NEW ROAD WITH 3 LANES IN EACH DIRECTION

$21,101

LOS ANGELES LOCAL HIGHWAY

LA0C8087 0 MAGNOLIA BLVD WIDENING-CAHUENGA BLVD TO VINELAND AVE. FROM THE EXISTING ROADWY STANDARD TO SECONDARY HWY STANDARD. FROM 1 LANE TO 2 LANES IN EACH DIRECTION. (PPNO 3110).

$4,030

LOS ANGELES LOCAL HIGHWAY

LA0G218 0 MAINE AVENUE MASTER PLAN DEVELOPMENT PROJECT. DEVELOP PRELIMINARY AND PS&E DESIGN FOR MAINE AVENUE IN BALDWIN PARK THAT IMPROVES THE DOWNTOWN/CIVIC CENTER AREA FOR USE BY PEDESTRIANS, BICYCLISTS AND TRANSIT USERS.

$119

LOS ANGELES LOCAL HIGHWAY

LA0D448 0 MAJOR ARTERIAL GAP CLOSURES CITYWIDE. AVENUE J FROM 36TH ST WEST TO 32ND ST WEST, 20TH ST EAST FROM AVENUE J-4 TO AVENUE J-8

$2,902

LOS ANGELES LOCAL HIGHWAY

LAF1527 0 MANCHESTER AVENUE BIKE LANES & ISLAND REDUCTION. THE PROJECT CONSISTS OF THE INSTALLATION OF ONE MILE OF BIKE LANES AND THE REDUCTION OF THE LANDSCAPED MEDIAN ISLAND ON MANCHESTER BL BETWEEN SEPULVEDA BL AND OSAGE AV

$2,328

LOS ANGELES LOCAL HIGHWAY

LAF3105 0 MCBEAN PARKWAY WIDENING/GAP CLOSURE OVER SANTA CLARA RIVER. WIDEN MCBEAN PARKWAY BRIDGE TO 8 LANES AND CON-STRUCT CLASS I PATH CONNECTION BETWEEN MCBEAN PARKWAY AND SANTA CLARA RIVER TRAIL.. THE PROJECT IS LOCATED IN THE CITY OF SANTA CLARITA. MCBEAN PARKWAY WITHIN THE PROJECT LIMITS IS ON A ROUGHLY NORTH-SOUTH ALIGNMENT. THE NEAREST MAJOR CROSS STREETS ARE NEWHALL RANCH ROAD TO THE NORTH AND MAGIC MOUNTAIN PARKWAY TO THE SOUTH. THE TOTAL LENGTH OF THE ROADWAY GAP CLOSURE PROJECT IS APPROXIMATELY 0.25 MILES

$6,864

LOS ANGELES LOCAL HIGHWAY

LAF3647 0 MENLO AVE/MLK VERMONT EXPO STATION PEDESTRIAN IMPROVEMENTS. IMPROVE PEDESTRIAN ACCESS TO THE NEW EXPO STATION ON VERMONT AVE BY INSTALLING SIDEWALKS, LANDSCAPING, AND LIGHTING ALONG MENLO AVE. AND MLK JR. BLVD. PLUS A MEDIAN ON MLK BLVD.

$3,302

LOS ANGELES LOCAL HIGHWAY

LAF3301 0 METRO GOLD LINE AT-GRADE CROSSING MOBILITY ENHANCEMENTS. DEPLOYMENT OF ITS AT SIGNALIZED INTERSECTIONS ADJACENT TO METRO GOLD LINE AT-GRADE CROSSINGS TO PROVIDE ADAPTIVE TRAFFIC SIGNAL CONTROL TO IMPROVE MOBILITY & ENHANCE SAFETY.

$1,695

LOS ANGELES LOCAL HIGHWAY

LA996340 0 MISSION BLVD. GRADE SEPARATION AT SR. 71(FROM UPRR UNDERCROSSING TO 9TH ST. MISSION BLVD FROM WESTERN TO CURRAN PLACE (CFP 6340, 8400). PPNO 2232. SAFETEA-LU # 511 (PPNO 2232)AND SAFETEA-LU # 3771 (2232).

$51,000

LOS ANGELES LOCAL HIGHWAY

LAF3524 0 MISSION CITY TRAIL BICYCLE BRIDGE AT WORKMAN. CONSTRUCT A BICYCLE BRIDGE OVER THE RAIL CORRIDOR TO PROVIDE LINK-AGES BETWEEN THE NORTH AND SOUTH SIDES OF THE CITY AND THE MISSION CITY BICYCLE TRAIL.. THIS PROJECT PROPOSES TO CONSTRUCT A BRIDGE OVER THE METRO RAILROAD TRACK CONNECTING THE NORTHERNMOST PORTION OF SOUTH WORKMAN AVENUE (SOUTH OF THE RAIL ROAD TRACKS) WITH THE MISSION CITY BICYCLE TRAIL (IMMEDIATELY NORTH OF THE RAIL ROAD TRACKS).

$2,742

LOS ANGELES LOCAL HIGHWAY

LA0G372 0 MODIFY EXISTING SIGNALS AT INTERSECTIONS ALONG VALLEY VIEW AVE., CARMENITA RD., ALONDRA BLVD. AND ROSECRANS AVE. TO ACCOMODATE ADDITIONAL TRAFFIC DURING CONSTRUCTION OF I-5/CARMENITA & I-5/ALONDRA PROJECTS. TO BE COMPLETED IN ADVANCE OF THE I-5 WIDENING PROJECT START OF CONSTRUCTION.

$1,050

Page 48: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

46 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0C8055 0 MOORPARK ST WIDENING - WOODMAN AVE TO MURIETTA AVE.- WIDEN EXISTING ROADWAY FROM VARYING WIDTH TO 70 FTEET TO

PROVIDE ON ADDTL TRAFFIC LANE IN EA DIR & UPGRADE HIGHWAY TO SECONDARY HWY STANDARDS. THIS PROJECT IMPROVES 2080 LF OF MOORPARK AVE. PPNO 3103.

$6,788

LOS ANGELES LOCAL HIGHWAY

LA29202N 0 MTA TIP ADMINISTRATION PLANNING, PROGRAMMING AND MONITORING FOR STIP PROJECTS THROUGH OUT LA COUNTY (200 CFP 7116 STATE ONLY 3594,2001 CFP 8401, PPNO 3535, 9001A, 9001)

$65,022

LOS ANGELES LOCAL HIGHWAY

LA0G716 0 N17- AVIATION BLVD INTERSECTION IMPROVEMENTS AT ARTESIA BLVD. INSTALL AN EASTBOUND RIGHT TURN LANE VIA STRIPING ON ARTESIA BLVD AT AVIATION BLVD. PROJECT NO. MR312.13, FA NO. MOU.MR312.13.

$22

LOS ANGELES LOCAL HIGHWAY

LA0G715 0 N19 - INGLEWOOD AVE INTERSECTION IMPROVEMENTS AT MANHATTAN BEACH BLVD. INSTALL EASTBOUND RIGHT TURN OVERLAP SIGNAL PHASE. PROJECT NO. MR312.14, FA NO. MOU.MR312.14.

$30

LOS ANGELES LOCAL HIGHWAY

LA0G721 0 N58 - AVIATION BLVD. INTERSECTION IMPROVEMENTS AT ARTESIA BLVD. PLANS, SPECIFICATIONS, ESTIMATES, OBTAINING RIGHT OF WAY, AND CONSTRUCTION OF A RIGHT TURN ONLY LANE ON NORTHBOUND AVIATION BLVD AT ARTESIA BLVD. PROJECT NO. MR312.20. FA NO. MOU.MR312.20.

$847

LOS ANGELES LOCAL HIGHWAY

LA0C8056 0 NASH ST/DOUGLAS ST, & ROSECRANS AVE. INTERSECTION IMPROVEMENTS. PROVIDES A 2ND W-BOUND L- TURN LANE & SEPARATE E-BOUND R- TURN LANE ON ROSECRANS AVE AT NASH ST/PRKWAY. (PPNO 3129).

$5,382

LOS ANGELES LOCAL HIGHWAY

LAE0319 0 NEIGHBORHOOD TRAFFIC SAFETY IMPROVEMENTS, INCLUDING STREET LIGHTING AND OTHER PEDESTRIAN & TRANSIT ENHANCEMENT. ELYSIAN VALLEY NEIGHBORHOOD FROM QUEEN ST. ON THE NORTH, BARCLAY ST.

$1,400

LOS ANGELES LOCAL HIGHWAY

LAF3800 0 NEWHALL GATEWAY ROUNDABOUT. CONSTRUCT A ROUNDABOUT AND INSTALL LANDSCAPING AND ENTRY MONUMENT AT THE INTER-SECTION OF MAIN STREET AND NEWHALL AVENUE. WILL SERVE AS A SOUTHERN GATEWAY INTO DOWNTOWN NEWHALL.. THIS PROJECT IS LOCATED IN THE CITY OF SANTA CLARITA WITHIN THE DOWNTOWN NEWHALL AREA OF THE CITY. THE PROJECT PROPOSES TO CON-STRUCT A ROUNDABOUT AT THE INTERSECTION OF MAIN STREET AND NEWHALL AVENUE.

$1,003

LOS ANGELES LOCAL HIGHWAY

LA0G032 0 NORMANDIE AVE & PICO BLVD INTERSECTION IMPROV -THIS PROJECT WILL RECONSTRUCT & WIDEN THE NORTHWEST CORNER OF THE INSTERSECTION OF NORMANDIE AV & PICO BLVD. IT WILL REMOVE THE TRAFFIC ISLAND S/O THE INTERSECTION ON NORMANDIE AV. THE PROPSED ALIGNMENT AT TH

$1,744

LOS ANGELES LOCAL HIGHWAY

LA0B7237 0 NORTH ATLANTIC BLVD WIDENING AND CHANNELIZATION-INCLUDES THE ENVIRONMENTAL ANALYSIS AND PREPARATION OF PLANS, SPCIFICATIONS, AND ESTIMATES FOR THE WIDENING OF ATLANTIC. PPNO 2915

$641

LOS ANGELES LOCAL HIGHWAY

LAF3519 0 NORTH COUNTY BIKEWAYS. INSTALL FOUR CLASS II AND THREE CLASS III BIKEWAY SEGMENTS, INCLUDING SIGNAGE, STRIPING, ROAD WIDENING, & ROAD SHOULDER IMPROVEMENTS.

$1,600

LOS ANGELES LOCAL HIGHWAY

LAF1300 0 NORTH COUNTY TRAFFIC FORUM ITS EXPANSION. MULTIJURISDICTIONAL PROJECT WILL UPGRADE CENTRAL TOC SOFTWARE AND SIGNAL CONTROLLERS; CONNECT TO LA COUNTY IEN; AND ADD TRAFFIC SIGNALS/CORRIDORS TO EXISTING INTERCONNECT SYSTEM.

$11,194

LOS ANGELES LOCAL HIGHWAY

LAF3148 0 NORTH MAIN ST. GRADE SEPARATION: CONSTRUCT A NEW GRADE SEPARATION OVER UPRR AND METROLINK & LA RIVER WHILE PRE-SERVING THE EXISTING HISTORIC N. MAIN ST. BRIDGE. BIKE LANES WILL BE ADDED AT THE SHOULDERS OF THE BRIDGE. OTHER WORK COMPONENTS INCLUDE REALIGNING ALBION STREET AND MODIFYING THE INTERSECTIONS OF NORTH MAIN AND MESNAGER STREET AT THE WEST END.

$91,280

LOS ANGELES LOCAL HIGHWAY

LA0C8086 0 NORTH SPRING ST, OVER LOS ANGELES RIVER .4 MILES WEST OF I-5. REHABILITATE AND WIDEN 4 LANE BRIDGE (NO ADDED LANES) ADD SIDEWALKS UPGRADE BRIDGE RAILINGS (53C0859).

$79,546

LOS ANGELES LOCAL HIGHWAY

LAF1163 0 NORTH VENICE BL WIDENING AT LA CIENEGA BL. WIDEN THE NORTH SIDE OF VENICE BL FROM DAVID AV TO CHARITON ST TO PROVIDE AN ADDITIONAL FULL-TIME WB THROUGH LANE AT LA CIENEGA BL

$1,057

Page 49: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 47

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAE1703 0 NORTHEAST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF

VARIOUS STREETS IN THE NORTHEAST SAN FERNANDO VALLEY.$200

LOS ANGELES LOCAL HIGHWAY

LAE3269 0 NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENTS; WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE NORTHWEST SAN FERNANDO VALLEY AREA.WILL NOT INCREASE CAP

$3,056

LOS ANGELES LOCAL HIGHWAY

LA000512 0 OCEAN BOULEVARD, FROM THE LOS ANGELES RIVER OVER UPRR AND BACK CHANNEL, TO 0.1 MILE E OF STATE ROUTE 47, REPLACE 5 LANE EXISTING GERALD DESMOND BRIDGE WITH NEW 6 LANE BRIDGE (3 LANES IN EACH DIRECTION); OTHER IMPROVEMENTS INCLUDE CONSTRUCTION OF NEW APPROACH STRUCTURES AND ROADS, RECONSTRUCTION OF THE EXISTING HORSESHOE INTERCHANGE RAMP CONNECTORS, RECONSTRUCTION OF THE EXISTING CONNECTORS TO SR-710, AND RECONSTRUCTION OF TWO RAMP CONNECTIONS TO PICO AVENUE.

$960,203,000

LOS ANGELES LOCAL HIGHWAY

LAF1205 0 OLYMPIC BL AND MATEO STREET GOODS MOVEMENT IMP-PHASE II. IMPROVEMENT OF FREEWAY ACCESS BY WIDENING WB OLYMPIC BL BET MATEO ST & SANTA FE AV FOR A RIGHT-TURN LANE, AND NB MATEO ST BET OLYMPIC BL & PORTER ST FOR INCREASED CURB RETURN.

$4,421

LOS ANGELES LOCAL HIGHWAY

LA0G708 0 ON MAPLE AVENUE, ADD A DESIGNATED SOUTHBOUND RIGHT-TURN LANE AT THE INTERSECTION WITH SEPULVEDA BLVD. (MEASURE R PROJECT N47)

$600

LOS ANGELES LOCAL HIGHWAY

LA0B7234 0 OVERLAND BRIDGE -- OVER I-10 FREEWAY -WIDEN W SIDE OF OVERLAND AVE BRIDGE OVER THE I-10 FROM NATIONAL BLVD/I-10 WESTBOUND RAMPS TO NATIONAL BLVD/NATIONAL PLACE. PPNO 2863

$8,641

LOS ANGELES LOCAL HIGHWAY

LA990352 0 PALISADES BLUFF STABILIZATION PROJ. (TEA21-#453) $8,897

LOS ANGELES LOCAL HIGHWAY

LAF1700 0 PALMDALE TRANSPORTATION CENTER - WAYFINDING SIGNAGE PROGRAM. THIS PROJECT WILL PROVIDE A WAYFINDING SIGN PROGRAM TO ASSIST MOTORISTS, BICYCLISTS AND PEDESTRIANS WITH LOCATING THE PALMDALE TRANSPORTATION CENTER IN THE CITY OF PALMDALE.

$260

LOS ANGELES LOCAL HIGHWAY

LAF1529 0 PALOS VERDES DRIVE NORTH BIKE LANES. CONSTRUCTION OF CLASS II BIKELANE AND RELATED IMPROVEMENTS ON PALOS VERDES DRIVE NORTH

$2,574

LOS ANGELES LOCAL HIGHWAY

LAF1120 0 PARAMOUNT BL AT FIRESTONE BL IMPROVEMENTS. RECONSTRUCT CURB RETURNS AT EACH OF THE 4 CORNERS WITH 50’ TURNING RADII; CONSTRUCT EB RIGHT-TURN POCKET AND STRIPE 3RD EB THRU LANE, MODIFY TRAFFIC SIGNAL

$3,019

LOS ANGELES LOCAL HIGHWAY

LA0D388 0 PARAMOUNT BLVD BETWEEN COVER ST. AND CANDLEWOOD ST-PAVEMENT REHAB. RAISED MEDIAN AND LANDSCAPE SAFETEALU # 2288.

$1,350

LOS ANGELES LOCAL HIGHWAY

LAE2293 0 PARAMOUNT BLVD FROM GARDENDALE ST AND TELEGRAP RD -- ITS IMPROVEMENTS AS WELL AS MINOR WIDENING AT CRITICAL INTERSECTIONS TO ALLOW FOR SAID IMPROVEMENTS (NON-CAPACITY).

$1,904

LOS ANGELES LOCAL HIGHWAY

LAE0489 0 PASADENA AVE / MONTEREY RD PARTIAL GRADE SEPERATION - PRELIMINARY ENGINEERING - FEASABILITY. SAFTEA-LU DEMO # 489. $288

LOS ANGELES LOCAL HIGHWAY

LAF3653 0 PASADENA AVE PED CONNECTION TO GOLD LINE HERITAGE SQ STATION. PROVIDE PEDESTRIAN/BIKE CONNECTIVITY, TREES, FURNI-TURE, LIGHTING, ENHANCED CROSSWALKS AND TRAFFIC CALMING/SAFETY IMPROVEMENTS ALONG PASADENA AV.

$2,567

LOS ANGELES LOCAL HIGHWAY

LAF1659 0 PEDESTRIAN IMPROVEMENTS FOR INTERSECTIONS WITH BUS STOPS. THIS PROJECT CONSISTS OF SAFETY AND AESTHETIC-RELATED PEDESTRIAN IMPROVEMENTS AT INTERSECTIONS ALONG MAJOR ARTERIALS WITH HIGH TRANSIT AND PEDESTRIAN ACTIVITIES WITHIN THE CITY OF CULVER CITY.

$1,066

LOS ANGELES LOCAL HIGHWAY

LA0D106 0 PEDESTRIAN/BICYCLE FACILITIES, LANDSCAPE AND ARTWORK ENHANCEMENTS ADJACENT TO THE I-5/SR 10 AND THE LOS ANGELES RIVER.

$5,038

Page 50: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

48 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0C8094 0 PIER B ST INTERMODAL RAILYARD EXPANSION. PROJECT WILL EXPAND PIER B ST INTERMODAL RAILYARD TO FACILITATE ADDITIONAL

RAIL SHIPMENTS AND REALIGN AND WIDEN PIER B STREET.$81,800

LOS ANGELES LOCAL HIGHWAY

LAE1407 0 PLAZA DRIVE FROM VINCENT AVE. TO CALIFORNIA AVE. INCLUDING INSTALLATION OF TRAFFIC SIGNAL SYS AT INTERSECTION OF PLAZA DR. & CALIF. THE SYNC. OF TWO TRAFFIC SY, & ADD TURN LANES.

$721

LOS ANGELES LOCAL HIGHWAY

LAF3170 0 PORT TRUCK TRAFFIC REDUCTION PROGRAM: WEST BASIN RAILYARD. INTERMODAL RAILYARD CONNECTING PORT OF LA WITH ALAMEDA CORRIDOR TO ACCOMMODATE INCREASED LOADING OF TRAINS AT THE PORT, THEREBY REDUCING TRUCK TRIPS TO OFF-DOCK RAILYARDS..

$110,511

LOS ANGELES LOCAL HIGHWAY

LA0C8129 0 PORTS OF LONG BEACH AND LOS ANGELES ATMS/ATIS PROJECT TO IMPROVE TRAFFIC OPERATIONS ON THE: I-710, I-110, SR47/103. $11,410

LOS ANGELES LOCAL HIGHWAY

LA0F076 0 PRIME DESSERT WOODLAND PRESERVE TRAILS PROJECT, PHASE II, WILL AUGMENT THE 57-ACRE RECREATIONAL TRAIL SYSTEM AT THE PRIME DESERT WOODLAND PRESERVE IN LANCASTER.

$604

LOS ANGELES LOCAL HIGHWAY

LA0F030 0 PROJECT WILL IMPROVE FLOW OF TRAFFIC FROM I-110 FWY ON/OFF-RAMPS AT C STREET BY CONSOLIDATING TWO CLOSELY SPACED INTERSECTIONS INTO ONE.

$23,980

LOS ANGELES LOCAL HIGHWAY

LA0F073 0 PROJECTS WITHIN AND NEAR LOS ANGELES INTERNATIONAL AIRPORT TO ELIMINATE TRAFFIC BOTTLENECKS. (LOS ANGELES WORLD AIRPORTS) SEC. 336 FUNDING

$5,067

LOS ANGELES LOCAL HIGHWAY

LA0F019 0 PURCHASE OF BUS BENCHES, TRASH CANS, AND SMALL SHELTERS FOR VARIOUS TRANIST STOPS THROUGHOUT CITY OF LAKEWOOD. $480

LOS ANGELES LOCAL HIGHWAY

LA0F016 0 PURCHASE, INSTALL, AND INTEGRATE OPTICOM PRIORITY CONTROL SYSTEM TO EXISTING TRAFFIC CONTROLLERS AT VARIOUS LOCATIONS WITHIN CITY LIMITS. (SAFETEA-LU#2345)

$216

LOS ANGELES LOCAL HIGHWAY

LAF3125 0 RAMONA CORRIDOR TRANSIT CENTER ACCESS PROJECT. CONSTRUCT A NEW UNDERPASS STRUCTURE (APPROXIMATELY ONE MILE) ON RAMONA BLVD UNDER SANTA ANITA AVE TO PROVIDE DIRECT ACCESS TO LOWER LEVEL OF NEW EL MONTE TRANSIT CENTER. THE PROPOSED BUS TUNNEL RAMPS WILL BEGIN EAST OF THE SANTA ANITA AVENUE AND RAMONA BOULEVARD INTERSECTION ON RAMONA BOULEVARD AND THE TUNNEL WILL CONTINUE UNDER SANTA ANITA AVENUE (ALONG ROMONA BOULEVARD) TO THE LOWER LEVEL OF THE EL MONTE TRANSIT CENTER. THE TUNNEL WILL HAVE TWO BUS ONLY L

$16,000

LOS ANGELES LOCAL HIGHWAY

LAF1104 0 RANCHO VISTA BL (RVB) GRADE SEPARATION AT SIERRA HWY/UPRR/METROLINK RR CROSSING AND APPLICABLE CONNECTOR RAMPS/ROADS AND AUXILIARY ROADS IMPROVEMENTS: RVB/AVE P WIDEN FROM 4 TO 6 LANES FROM FAIRWAY DR TO 10TH ST EAST, SIERRA HWY WIDEN FROM 4 TO 6 LANES FROM APPROX 400FT NORTH OF AVE O-8 TO AVE P-8, AVE P-8 WIDEN FROM 4-6 LANES FROM APPROX 400FT WEST OF DIVISION ST TO SIERRA HWY, AND 4TH STREET EAST CONSTRUCT NEW 2 LANE ROAD FROM 3RD ST EAST TO AVE P-8. IMPROVEMENTS ALSO INCLUDE INTERSECTIONS ON THE PRIMARY

$64,172

LOS ANGELES LOCAL HIGHWAY

LAE2246 0 RANCHO VISTA BLVD - WIDEN INTERSECTION AT 3RD ST EAST AND INTERSECTION AT 8TH ST. EAST/LOCKHEED WAY - 6 LANES; MODIFY TRAFFIC SIGNALS, DRAINAGE, SIDEWALKS, MEDIANS, UTILITY RELOCATIONS

$9,550

LOS ANGELES LOCAL HIGHWAY

LAE1903 0 RANDOLPH STREET IMPROVEMENTS BETWEEN WILMINGTON AVENUE AND FISHBURN. PROJECT WILL USE $359 OF TOLL CREDITS TO MATCH DEMO AND STPL FUNDS IN FY11.

$2,260

LOS ANGELES LOCAL HIGHWAY

LAE2024 0 REALIGNMENT LA BREA AV TO REDUCE CONGESTION: IMPROVEMENTS AT INTERSECTION WITH HILLCREST BLVD (6-LEG TO 4-LEG/SIGNALIZED) & WITH TAMARACK AV (ADD SIGNAL) - 2007 METRO CALL FUNDS (PC25) ONLY APPLY TO REALIGNMENT OF THE LA BREA AVENUE BETWEEN HILLCREST BL AND SPRUCE AVE/MARKET STREET INTERSECTIONS.

$9,970

LOS ANGELES LOCAL HIGHWAY

LAF1717 0 REAL-TIME MOTORIST PARKING INFORMATION SYSTEM DEMONSTRATION. THIS PROJECT WILL PROVIDE A REAL-TIME INFORMATION SYSTEM TO COMMUNICATE AND GUIDE MOTORISTS TO AVAILABLE PARKING SPACES IN SELECTED PARKING STRUCTURES IN THE CITY OF CULVER CITY.

$1,072

Page 51: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 49

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0G173 0 RECONFIGURATION OF CONTROL POINT (CP) MOLE - THE NEW CONTROL POINT AT THE MOLE WILL ENABLE INCREASED TRAIN SPEEDS

AND REDUCED TRAIN DELAYS CAUSED BY MANUAL SWITCH OPERATIONS.$26,460

LOS ANGELES LOCAL HIGHWAY

LA0D441 0 RECONFIGURATION OF VALLEY BLVD ON-AND-OFF-RAMPS TO THE 605 FREEWAY TO IMPROVE MOBILITY, CIRCULATION, AND RELIEVE THE CURRENT CONGESTION AT VALLEY BLVD.

$28,012

LOS ANGELES LOCAL HIGHWAY

LAE1440 0 RECONFIGURE SAN FERNANDO RD. FROM FLETCHER DR. TO I-5 FWY. $6,450

LOS ANGELES LOCAL HIGHWAY

LA0G122 0 RECONSTRUCT AND RESURFACE LA BREA AVE FROM 64TH STREET TO 104TH AND IMPERIAL HIGHWAY FROM PRAIRIE AND VAN NESS AVENUES.

$4,121

LOS ANGELES LOCAL HIGHWAY

LAE3239 0 RECONSTRUCT ATLANTIC AVE AND IMPROVE DRAINAGE FROM FIRESTONE BLVD TO ABBOTT RD PAVEMENT REHABILITATION, RAISED MEDIANS, DRAINAGE, SIGNAL, PARKWAY, AND MISC. IMPROVEMENTS.

$5,944

LOS ANGELES LOCAL HIGHWAY

LAE0266 0 RECONSTRUCT I-710 SOUTHERN TERMINUS OFF RAMP.CURRENT FUNDING APPLIED ONLY TOWARDS THE P/E & PRELIMINARY DESIGN PHASE.CONSTRUCTION FUNDING TO BE SOUGHT LATER (E/P,PS/E ONLY)

$158,849

LOS ANGELES LOCAL HIGHWAY

LAE1401 0 RECONSTRUCT LONG BEACH BLVD WITH MEDIANS AND IMPROVED DRAINAGE PHASE II FROM IMPERIAL HWY TO TWEEDY BLVD. PHASE III LIMITS ARE MAGNOLIA AVE. TO IMPERIAL HWY.

$3,500

LOS ANGELES LOCAL HIGHWAY

LA0D478 0 RECONSTRUCT OF WASHINGTON BLVD FROM I-5 FWY TO THE WEST; UPGRADE TRAFFIC SIGNALS AND IMPROVE THE EXISTING PAVEMENT

$592

LOS ANGELES LOCAL HIGHWAY

LAE1390 0 RECONSTRUCT PARAMOUNT BLVD WITH MEDIANS AND IMPROVE DRAINAGE FROM ARTESIA BLVD TO CANDLEWOOD STREET $575

LOS ANGELES LOCAL HIGHWAY

LA0D461 0 RECONSTRUCT- THE OLD ROAD FROM HILLCREST PARKWAY TO LAKE HUGHES RD & WIDEN FROM 40’ TO 68’, 2 VEH. LANES AND A 5’ CLASS II BIKELANE IN EA DIR & STRIPPED MEDIAN (FROM 2 TO 4 LNS 2 EA DIR)

$10,700

LOS ANGELES LOCAL HIGHWAY

LAE1610 0 RECONSTRUCT WHITTIER BLVD AND IMPROVE PARKWAY DRAINAGE FROM PHILADELPHIA STREET TO FIVE POINTS (WASHINGTON BOULEVARD) IN WHITTIER

$1,632

LOS ANGELES LOCAL HIGHWAY

LAE1696 0 RECONSTRUCTION OF THE STRAND STAIRWAYS IN THE CITY OF MANHATTAN BEACH TO IMPROVE BEACH ACCESS AND ACCOMMODATE INCREASED PEDESTRIAN TRAFFIC. PROJECT USING TOLL CREDITS AS A LOCAL MATCH: $320 IN CON PHASE IN FY12 FOR DEMO FUNDS.

$1,920

LOS ANGELES LOCAL HIGHWAY

LAF3502 0 REDONDO BEACH BICYCLE TRANSPORTATION PLAN IMPLEMENTATION. IMPLEMENT CLASS II AND III BIKE FACILITIES IDENTIFIED IN THE CITY OF REDONDO BEACH’S ADOPTED BICYCLE TRANSPORTATION PLAN. APPROXIMATELY 2.1 CENTERLINE MILES OF BIKE LANES AND 15.8 CENTERLINE MILES OF BIKE ROUTES THROUGHOUT THE CITY OF REDONDO BEACH.

$1,949

LOS ANGELES LOCAL HIGHWAY

LA996205 0 REHAB LANKERSHIM SP STATION REFURBISH HISTORIC DEPOT, LNDSCPE. PRKING FACILITIES, BUS SHLTRS, BIKE LOCKERS $3,600

LOS ANGELES LOCAL HIGHWAY

LAE3157 0 REHABILITATE ADDISON ST BETWEEN KESTER AVE AND LEMONA AVE: PROVIDE ASHALT CONCRETE RESURFACING ON THE PROPOSED PROJECT LIMITS. WILL NOT ENHANCE TRAFFIC CAPACITY.

$47

LOS ANGELES LOCAL HIGHWAY

LA0G369 0 REHABILITATE ALONDRA AVENUE FROM CARMENITA ROAD TO SHOEMAKER AVENUE, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION.

$420

LOS ANGELES LOCAL HIGHWAY

LA0G368 0 REHABILITATE ALONDRA BOULEVARD FROM COYOTE CREEK TO VALLEY VIEW STREET, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION.

$205

LOS ANGELES LOCAL HIGHWAY

LA0G367 0 REHABILITATE CARMENITA ROAD FROM ALONDRA BOULEVARD TO THE SOUTH LIMIT OF THE I-5/CARMENITA PROJECT ON CARMENITA ROAD, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION.

$415

Page 52: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

50 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0G364 0 REHABILITATE EXCELSIOR DRIVE FROM SHOEMAKER AVENUE TO BLOOMFIELD AVENUE, IN ADVANCE OF THE I-5/CARMENITA

CONSTRUCTION.$320

LOS ANGELES LOCAL HIGHWAY

LA0G363 0 REHABILITATE FIRESTONE BOULEVARD FROM SHOEMAKER AVENUE TO BLOOMFIELD AVENUE, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION.

$205

LOS ANGELES LOCAL HIGHWAY

LA0G365 0 REHABILITATE FREEWAY DRIVE FROM MARQUARDT AVENUE TO SPRING AVENUE, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION. $80

LOS ANGELES LOCAL HIGHWAY

LAE1285 0 REHABILITATE PAVEMENT ON AZUSA AVE AND SAN GABRIEL AVE $480

LOS ANGELES LOCAL HIGHWAY

LA0G378 0 REHABILITATE PUMICE STREET FROM SPRING AVENUE TO CARMENITA ROAD. $300

LOS ANGELES LOCAL HIGHWAY

LA0G370 0 REHABILITATE ROSECRANS AVENUE FROM CARMENITA ROAD TO VALLEY VIEW STREET, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION.

$880

LOS ANGELES LOCAL HIGHWAY

LA0G362 0 REHABILITATE SHOEMAKER AVE. FROM EXCELSIOR DRIVE TO FIRESTONE BLVD, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION. $135

LOS ANGELES LOCAL HIGHWAY

LA0G366 0 REHABILITATE SPRING AVENUE FROM PUMICE STREET TO FREEWAY DRIVE, IN ADVANCE OF THE I-5/CARMENITA CONSTRUCTION. $250

LOS ANGELES LOCAL HIGHWAY

LAE0550 0 REHABILITATE STREET SURFACE OF CEDROS AVE BETWEEN BURBANK BLVD AND MAGNOLIA BLVD. WILL PROVIDE FOR ASPHALT CONCRETE RESURFACING. NON CAPACITY ENHANCING AND ALL ON LA ROW

$43

LOS ANGELES LOCAL HIGHWAY

LAE0937 0 REHABILITATE STREET SURFACES IN SHERMAN OAKS; PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE SHERMAN OAKS AREA. PROJECT WILL NOT ENHANCE TRAFFIC CAP.

$123

LOS ANGELES LOCAL HIGHWAY

LA0D443 0 REHABILITATING THE EXISTING AZUSA AVE. BRIDGE OVER THE UPRR TRACKS AND VALLEY BLVD, APPLY NEW PAINT TO THE EXISTING STEEL BRIDGE TO AVOID FURTHER WEATHER CORROSION.

$1,600

LOS ANGELES LOCAL HIGHWAY

LA0D128 0 REHABILITATION OF INTERSECTIONS, PARKWAY IMPROVEMENTS, LANDSCAPING, AND SIGNALIZATION AT VARIOUS LOCATIONS ALONG ROSEMEAD BLVD WITHIN CITY LIMITS OF PICO RIVERA (FROM TELEGRAPH RD TO WASHINGTON BLVD). PROJECT WILL BE USING TOLL CREDIT FOR THE FEDERAL FUNDS; $99 IN FY11 TO MATCH DEM0 AND STPL FUNDS.

$1,395

LOS ANGELES LOCAL HIGHWAY

LA0B876 0 REMOVAL OF FLOOD DEBRIS & RECONSTRUCTION OF EXISTING RDWY & DRAINAGE SYSTEM (CHANTRY FLATS RD RECONSTRUCTION PROJECT)

$640

LOS ANGELES LOCAL HIGHWAY

LAE1228 0 REPAIR ROSECRANS AND ALONDRA BRIDGES PER THE COUNTY OF LOS ANGELES TRIENNIAL INSPECTION REPORT. $49

LOS ANGELES LOCAL HIGHWAY

LA0C8133 0 RESEDA ATSAC/ATCS PROJ.PROVIDE ATSAC/ATCS TYPE IMPROVEMENTS TO 107 SIGNALIZED INTERSECTIONS THRU IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTRL SYS

$15,045

LOS ANGELES LOCAL HIGHWAY

LA0F040 0 RESTORATION, OPERATION AND/OR MAINTENANCE COSTS ASSOCIATED WITH THE HISTORIC ANGELS FLIGHT RAILWAY ON BUNKER HILL IN DOWNTOWN LOS ANGELES

$224

LOS ANGELES LOCAL HIGHWAY

LA0G745 0 RESTRIPE BOUQUET CANYON ROAD FROM SECO CANYON ROAD TO PLUM CANYON ROAD FROM 4 TO 6 LANES; APPROXIMATELY 2.2 MILES

$1,500

LOS ANGELES LOCAL HIGHWAY

LA0G748 0 RESTRIPE GOLDEN VALLEY ROAD FROM SOLEDAD CANYON ROAD TO SIERRA HIGHWAY FROM 4 TO 6 LANES; APPROXIMATELY 2.5 MILES $1,500

Page 53: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 51

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0G740 0 RESTRIPE LYONS AVENUE FROM WILEY CANYON ROAD TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G750 0 RESTRIPE MAGIC MOUNTAIN PARKWAY FROM AUTO CENTER DRIVE TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1 MILE $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G743 0 RESTRIPE NEWHALL AVENUE FROM RAILROAD AVENUE TO CARL COURT FROM 4 TO 6 LANES; APPROXIMATELY 0.4 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G742 0 RESTRIPE ORCHARD VILLAGE ROAD FROM MCBEAN PARKWAY TO LYONS AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.3 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G746 0 RESTRIPE PLUM CANYON ROAD FROM BOUQUET CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 0.5 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G744 0 RESTRIPE RAILROAD AVENUE FROM NEWHALL AVENUE TO BOUQUET CANYON ROAD FROM 4 TO 6 LANES; APPROXIMATELY 3 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G752 0 RESTRIPE SIERRA HIGHWAY FROM SOLEDAD CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 2 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G751 0 RESTRIPE SIERRA HIGHWAY FROM VIA PRINCESSA TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 5.5 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G747 0 RESTRIPE WHITES CANYON ROAD FROM SOLEDAD CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 2 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G741 0 RESTRIPE WILEY CANYON ROAD FROM LYONS AVENUE TO RAILROAD AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILES $1,500

LOS ANGELES LOCAL HIGHWAY

LA0G187 0 RESURFACING AND RECONSTRUCTION OF PACIFIC BOULEVARD. REMOVE AND REPLACE PORTIONS OF THE CURB, GUTTER, SIDEWALK, CROSS GUTTER AND RESURFACE THE STREET, INCLUDING REMOVAL OF PORTIONS OF THE RAILROAD UNDER THE EXISTING PAVING FROM SLAUSON AVENUE TO THE NORTHERLY CITY LIMIT. (2008 AABILL - HR.2764- SEC 129 PUBLIC LAW 110-161, PG 279)

$880

LOS ANGELES LOCAL HIGHWAY

LA0D442 0 RETROFITING THE EXISTING TWO-LANE WIDE PECK ROAD BRIDGE OVER THE SAN GABRIEL RIVER FWY (ROUTE 605) & WIDEN IT TO ACCOMODATE 4 LANES (2 EACH DIRECTION) TO ELIMINATE BOTTLENECK

$12,000

LOS ANGELES LOCAL HIGHWAY

LA0C8063 0 RIVERSIDE DR. VIADUCT REPLACEMENT. REPLACEMENT OF EXISTING 2-LANE BRIDGE WITH 2 THROUGH LANES BRIDGE FLARING 4 LANES AT SAN FERNANDO ROAD WITH NEW ROUNDABOUT. BIKE LANE ADDED COMBINED WITH 53C-1932 - WILL RESULT IN INCR. CIRCULATION. PPNO 3105 (53C-0160)

$55,092

LOS ANGELES LOCAL HIGHWAY

LAE0732 0 RIVERSIDE DRIVE NON-CAPACITY IMPROVEMENTS BETWEEN VAN NUYS BLVD AND TILDEN AVE. $400

LOS ANGELES LOCAL HIGHWAY

LAE2819 0 ROSECRANS AVE OVERHEAD AND ARTERIAL RECONSTRUCTION PROJECT(NON-CAPACITY).SAFTEA-LU 1321. ISTEA 36. $15,000

LOS ANGELES LOCAL HIGHWAY

LA0G713 0 ROSECRANS AVE. ARTERIAL IMPROVEMENTS FROM VERMONT AVE. TO CRENSHAW BLVD. INCLUDES RAISED LANDSCAPED MEDIAN ISLANDS, TRAFFIC SIGNAL UPGRADES, PAVEMENT UPGRADES, AND TRAFFIC CHANNELIZATION.

$5,140

LOS ANGELES LOCAL HIGHWAY

LA0G685 0 ROSECRANS AVENUE/405 FREEWAY RAMP WIDENING PROJECT, HAWTHORNE, CA. ON ROSECRANS AVENUE FROM INGLEWOOD AVENUE TO 250’ WEST OF I-405 SOUTH BOUND OFF RAMP, WIDEN ROSECRANS AVENUE AND BASE OF RAMP TO ALLOW FOR RIGHT TURN ONLY LANE ON WEST BOUND ROSECRANS, UPGRADE AND CONSTRUCT RAISED MEDIANS, IMPROVE SHOULDERS, AND UPGRADE PAVEMENT MARKINGS.

$4,126

Page 54: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

52 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAE2663 0 ROSEMEAD BLVD SAFETY ENHANCEMENT AND BEAUTIFICATION: ACTIVITIES BETWEEN LOWER AZUSA RD AND ROSEMEAD/ CALLITA RD.

NO ADDITIONAL LANES, OR ROAD WIDTH.$20,000

LOS ANGELES LOCAL HIGHWAY

LA0G668 0 ROSEMEAD BLVD SAFETY ENHANCEMENTS & BEAUTIFICATION PROJECT: INSTALLATION OF BICYCLE LANES, SIDEWALK IMPROVE-MENTS, LANDSCAPING, WAYFINDING SIGNAGE FROM PENTLAND TO CALLITA (1.7 MI).

$4,500

LOS ANGELES LOCAL HIGHWAY

LAF1502 0 SAN FERNANDO BIKEWAY. IMPLEMENT A CLASS I BIKEWAY ALONG SAN FERNANDO BLVD, VICTORY PLACE AND BURBANK WESTERN CHANNEL TO COMPLETE THE BURBANK LEG OF A 12 MILE BIKEWAY.

$8,239

LOS ANGELES LOCAL HIGHWAY

LAF1640 0 SAN FERNANDO DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT. DESIGN AND CONSTRUCTION OF THE DOWNTOWN PORTION OF THE SAN FERNANDO CORRIDORS PLAN. THE PROJECT WILL INCREASE PEDESTRIAN ACTIVITY, PROMOTE PUBLIC TRANSIT AND ENHANCE SAFETY.

$3,782

LOS ANGELES LOCAL HIGHWAY

LA0G704 0 SAN FERNANDO HIGH SCHOOL STREET IMPROVEMENTS NEAR LAUREL CANYON AT FOX, NO LANE ADDITION. $250

LOS ANGELES LOCAL HIGHWAY

LA0C8064 0 SAN FERNANDO MISSION BLVD WIDENING, WHERE NECESSARY, BET SEPULVEDA BLVD & I-5 FWY. FROM 1 LANE TO 2 LANES IN EACH DIRECTION.PPNO 3106.

$2,469

LOS ANGELES LOCAL HIGHWAY

LAF1505 0 SAN FERNANDO PACOIMA WASH BIKE PATH. THE SAN FERNANDO PACOIMA WASH BIKE PATH WILL BE A 1.6-MILE LONG CLASS I FACIL-ITY ALONG THE PACOIMA WASH IN SAN FERNANDO. IT INCLUDES 3 BRIDGES, 5 OVERPASSES AND 8 ACCESS POINTS.

$2,495

LOS ANGELES LOCAL HIGHWAY

LAE1093 0 SAN FERNANDO RD NORTH - FROM ASTORIA ST TO SAYRE ST. WIDEN ROADWAY AND CONSTRUCT CONCRETE SIDEWALK, CURB, GUTTER, ACCESS RAMPS, AND BULKHEAD.

$1,060

LOS ANGELES LOCAL HIGHWAY

LA0B7330 0 SAN FERNANDO RD ROW BIKE PATH PHSE II-CONSTRUCT 2.75 MILES CLAS I FRM FIRST ST TO BRANFORD ST,ON MTA-OWND ROW PARLEL TO SAN FERNANDO RD. LINK CYCLSTS TO NUMROUS BUS LNE. PPNO 2868.

$10,198

LOS ANGELES LOCAL HIGHWAY

LA0G400 0 SAN FERNANDO RD. /GRANDVIEW AVE. AT GRADE CROSSING INTERSECTION IMPROVEMENTS. $3,500

LOS ANGELES LOCAL HIGHWAY

LAF1524 0 SAN FERNANDO RD. BIKE PATH PH. IIIA/IIIB - CONSTRUCTION. RECOMMEND PHASE IIIA-CONSTRUCTION OF A CLASS I BIKE PATH WITHIN METRO OWNED RAIL RIGHT-OF-WAY ALONG SAN FERNANDO RD. BETWEEN BRANFORD ST. AND TUXFORD ST INCL BRIDGE.

$10,463

LOS ANGELES LOCAL HIGHWAY

LAF3515 0 SAN FERNANDO RD. BIKE PATH PH. IIIB CONSTRUCTION. CONSTRUCT 2.75 MILE CLASS I BIKE PATH WITHIN METRO RIGHT-OF-WAY ALONG SAN FERNANDO RD. BETWEEN TUXFORD ST. AND COHASSET ST. TO COMPLETE 12-MILE BIKEWAY.. THE PROJECT IS LOCATED WITHIN THE CITY OF LOS ANGELES, IN THE COMMUNITY OF SUN VALLEY. THE PROJECT CONSISTS OF A CLASS I FACILITY 12 FEET IN WIDTH AND 2.75 MILES IN LENGTH BETWEEN TUXFORD ST. AND COHASSET ST. (BURBANK CITY LIMIT).

$10,714

LOS ANGELES LOCAL HIGHWAY

LAF1130 0 SAN FERNANDO RD-FLETCHER DR TO SR-2, ELM ST TO I-5 FWY. WIDEN SAN FERNANDO RD AT FLETCHER DR & SR-2 SB ON-RAMP TO ADD RIGHT-TURN LANES. WIDEN SAN FERNANDO RD AT ELM ST TO I-5 TO ADD NB THRU LANE, LEFT-TURN LANE, PED AND TRANSIT FEATURES

$9,211

LOS ANGELES LOCAL HIGHWAY

LAF3621 0 SAN FERNANDO ROAD DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT. THE SAN FERNANDO ROAD DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT INCLUDES THE DESIGN AND CONSTRUCTION OF IMPROVEMENTS TO PROMOTE WALKING, PUBLIC TRANSIT USE AND SAFETY.. THIS PROJECT IS LOCATED ON SAN FERNANDO ROAD BETWEEN SAN FERNANDO MISSION BOULEVARD AND WEST CITY LIMIT AT HUBBARD STREET.

$4,390

LOS ANGELES LOCAL HIGHWAY

LA0D129 0 SAN GABRIEL BLVD REHAB - FROM BROADWAY TO LAS TUNAS: PVEMNT RECONSTRCT & OVERLAY, CONCRT REPRS., DRAINAGE IMPS. $2,000

LOS ANGELES LOCAL HIGHWAY

LA9910012 0 SAN GABRIEL BLVD REHAB - FROM MISSION TO BROADWAY: PVMT RECONSTRCT & OVERLAY, CONCRT REPRS, DRAINAGE IMPROVEMENTS. SAFETEA-LU HPP #471 (REVISED BY PUBLIC LAW 110-244 TO INCLUDE FUNDING FROM HPP #1579, #2690, & 2811).

$2,000

Page 55: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 53

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF1528 0 SAN GABRIEL RIVER BIKE PATH GAP CLOSURE AT WILLOW STREET. CREATION OF OFF-STREET BICYCLE PATH TO ACHIEVE BICYCLE

ROUTE GAP CLOSURE ON WILLOW STREET FROM THE SAN GABRIEL RIVER BIKE PATH WEST TO STUDEBAKER ROAD$970

LOS ANGELES LOCAL HIGHWAY

LAF3308 0 SAN GABRIEL VALLEY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT. DESIGN AND CONSTRUCTION OF MULTIJURISDICTIONAL TRAF-FIC SIGNAL SYNCH, INTERSECTION OPERATIONAL IMPROVEMENTS, AND INTELLIGENT TRANSPORTATION SYSTEM COMPONENTS ON REGIONAL ARTERIALS.

$25,000

LOS ANGELES LOCAL HIGHWAY

LAE0340 0 SANTA ANITA AVE CORRIDOR IMPROVEMENTS PRJ. INSTALL NEW RIGHT AND LEFT TURN POCKETS, NEW TRAFFIC SIGNALS, INTERSECTION WIDEN AND NEW STRIPING AT FOOTHILL BLVD, LIVE OAK AVE, DUARTE

$3,000

LOS ANGELES LOCAL HIGHWAY

LA0B7335 0 SANTA CLARA RIV. REGIONAL COMMUTER TRAIL-DESIGNING FINAL SEGMENT (5) OF THE TOTAL 7 MILES OF CLASS I BIKE/PED PATH ALONG THE NORTH SIDE OF THE RIVER FROM THE KEYSTONE DEVELOPMENT

$700

LOS ANGELES LOCAL HIGHWAY

LA9708004 0 SANTA CLARITA PARKWAY FROM BOUQUET CYN RD/SOLEDAD CYN INSTALL NEW ROADWAY (0 TO 4 LANES) (2.5 MILE) $17,550

LOS ANGELES LOCAL HIGHWAY

LA9910016 0 SANTA CLARITA PKWY FROM SOLEDAD CYN RD TO VIA PRINCESSA (1.6 MILES); FROM 0 TO 6 LANES. $4,000

LOS ANGELES LOCAL HIGHWAY

LA9910017 0 SANTA CLARITA PKWY FROM VIA PRINCESSA TO STATE HWY 14 (1 MILE) FROM 0 TO 6 LANES. $3,100

LOS ANGELES LOCAL HIGHWAY

LAE0509 0 SCENIC PRESERVATION AND RUN-OFF MITIGATION IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA NEAR PCH AND US101

$1,440

LOS ANGELES LOCAL HIGHWAY

LAF1532 0 SCHOOL BASED BICYCLE TRAINING, SANTA MONICA. PROVIDE TRAINING FOR STUDENTS AT 2 MIDDLE SCHOOLS ON HOW TO SAFELY RIDE BICYCLE ON CITY STREETS TO ACCESS SCHOOL.

$130

LOS ANGELES LOCAL HIGHWAY

LA0D173 0 SEPULVEDA BLVD, ALAMEDA ST. TO EAST CITY LIMIT. STREET WIDENING, MEDIAN ISLANDS, REHAB. 4-LANE BRIDGE, & WIDEN TO 6 LANES, UPGRADE BRIDGE RAILINGS.(53C0652)

$1,375

LOS ANGELES LOCAL HIGHWAY

LAE3069 0 SEPULVEDA BOULEVARD WIDENING PROJECT TO ADD A THIRD SOUTHBOUND LANE ON SEPULVEDA BOULEVARD WITHIN THE EXISTING RIGHT OF WAY BETWEEN JEFFERSON BL/PLAYA STREET TO GREEN VALLEY CIRCLE.SEPULVEDA BL FROM SAWTELL AVE TO JEFFERSON/PLAYA ST WILL BE RE-STRIPED.

$8,132

LOS ANGELES LOCAL HIGHWAY

LA0C8054 0 SKIRBALL CENTER DR WIDENING - I-405 FWY TO MULHOLLAND DR, WIDEN AND RESTRIPE SKIRBALL CENTER DR TO PROVIDE AN ADDITIONAL S/B LANE. (PPNO 3132).

$2,200

LOS ANGELES LOCAL HIGHWAY

LAF1662 0 SOLANO CANYON-ZANJA MADRE-CHINATOWN-BROADWAY BUS STOP IMPROV. IMPROVE 8 BUS STOPS ALONG BROADWAY-BERNARD ST TO SOLANO AV WITH STREET FURNITURE & LANDSCAPING, INCREASING ACCESSIBILITY, TRANSFERS & TRANSIT USE

$1,115

LOS ANGELES LOCAL HIGHWAY

LA0G401 0 SONORA AVE. AT GRADE CROSSING SAFETY IMPROVEMENTS, SONORA AND AIR WAY - AT GRADE CROSSING NON CAPACITY NO LANE ADDITION.

$3,700

LOS ANGELES LOCAL HIGHWAY

LA0C8037 0 SOTO ST BRIDGE OVER MISSION RD & HUNTINGTON DR WILL DEMOLISH EXISTING BRIDGE AND REALIGN THE STREET TO INCREASE TRAFFIC FLOW ADDING A BIKE LANE. PPNO 3093 3380 (BRIDGE #53C0013)

$22,852

LOS ANGELES LOCAL HIGHWAY

LAF3507 0 SOUTH BALDWIN PARK COMMUTER BIKEWAY PROJECT. CONSTRUCT 3-MILE COMMUTER CLASS I BIKE PATH ALONG SAN GABRIEL RIVER AND WALNUT CREEK CONNECTING TO MAJOR EMPLOYMENT CENTERS ON BALDWIN PARK BLVD.

$820

LOS ANGELES LOCAL HIGHWAY

LAF3310 0 SOUTH BAY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT. DESIGN AND CONSTRUCTION OF MULTIJURISDICTIONAL TRAFFIC SIGNAL SYNCHRONIZATION, OPERATIONAL IMPROVEMENTS & ITS COMPONENTS ON ARTERIALS IN THE SOUTH BAY AREA OF LA COUNTY.

$13,000

Page 56: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

54 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF1607 0 SOUTH STREET PEDESTRIAN, BIKEWAY AND TRANSIT IMPROVEMENT. IMPROVE PEDESTRIAN ENVIRONMENT AND TRANSIT STOP LOCA-

TIONS WITH LANDSCAPED MEDIANS, TRANSIT SHELTERS, BENCHES, SIDEWALK ENHANCEMENTS AND LIGHTING. CLOSE EXISTING BIKE LANE GAP.

$1,457

LOS ANGELES LOCAL HIGHWAY

LAE0284 0 SOUTHWEST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS. PROJECT WILL NOT ENHANCE TRAFFIC CAPACITY.

$2,300

LOS ANGELES LOCAL HIGHWAY

LA0G313 0 SPRING STREET AND LAKEWOOD BLVD. TUNNEL IMPROVEMENTS; MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS. ON SPRING ST. BETWEEN LAKEWOOD BLVD. & KILROY AIRPORT WAY. ON LAKEWOOD BLVD. BETWEEN SPRING ST. AND 405 FREEWAY. ISTEA #51 LONG BEACH AIRPORT ACCESS

$1,723

LOS ANGELES LOCAL HIGHWAY

LA0D47 0 SR 710 MITIGATION PROJECT-TRAFFIC CONTROL AND MONITORING SYSTEM-INTELLIGENT TRANSPORTATION SYSTEMS (ITS). CONSTRUCT AND INSTALL ITS TECHNOLOGY AND VARIOUS DEGREES OF SMART SIGNALS

$9,575

LOS ANGELES LOCAL HIGHWAY

LA0G409 0 SR-134/I-5 TSM PROJECT INCL. RAMP METERS,CCTV,CMS $350

LOS ANGELES LOCAL HIGHWAY

LA0G408 0 SR-2 / VERDUGO BLVD. INTERCHANGE SIGNALIZATION. $350

LOS ANGELES LOCAL HIGHWAY

LA0G397 0 SR-2 SB CONNECTOR TO WB SR-134 METERING. SR-2 NB TO WB SR-134 METERING. SR-2 NB CONNECTOR TO WB SR-134 METERING. SR-2 NB TO WB SR-134 METERING.

$3,500

LOS ANGELES LOCAL HIGHWAY

LA0G404 0 SR-2/HOLLY DR. INTERCHANGE RAMP SIGNALIZATION $600

LOS ANGELES LOCAL HIGHWAY

LA0D260 0 STATE ROUTE 90 CONNECTOR ROAD TO ADMIRALTY WAY. THIS PROJECT WILL IMPROVE THE SR-90/SR-1 INTERSECTION INCLUDING THE ADDITION OF A LANE IN EACH DIRECTION AND CONSTRUCTION OF A DIRECT ROAD BETWEEN ADMIRALTY WAY AND SR-90

$6,000

LOS ANGELES LOCAL HIGHWAY

LA0G349 0 STREET AND DRAINAGE RECONSTRUCTION AT SHEILA STREET AND COMMERCE WAY. $600

LOS ANGELES LOCAL HIGHWAY

LAE2279 0 STREETSCAPE IMPROVMENTS ALONG CENTRAL AVE FROM WASHINGTON BLVD TO VERNON AVE INCLUDING PED LIGHTING, NEW BUS STOPS AND STREET FURNITURE, SIDEWALK WIDENING, CROSSWALK ENHANCEMENTS, TREES ETC.

$4,000

LOS ANGELES LOCAL HIGHWAY

LAE1883 0 STUDY - ORANGELINE CORRIDOR DEVELOPMENT PROJ - HIGH SPEED MAGLEV & STATION AREA DEVLOPMENT FROM NORTH LA TO SOUTH OC FOLLOWING SR14 AND FORMER PACIFIC RAILRD CORRIDOR

$336

LOS ANGELES LOCAL HIGHWAY

LAE1633 0 STUDY REPORT FOR THE INTER. OF OLD RIVER SCHOOL RD, FIRESTONE BLVD & UNION PACIFIC RAILROAD. REVIEW/ANALYZE OPERATIONS & SAFETY ASPECTS, DESIGN OPTIONS ETC. (E/P & PS/E ONLY)

$500

LOS ANGELES LOCAL HIGHWAY

LAE0881 0 STUDY, ENVIRONMENTAL REVIEW, PERMITS AND PRELIMINARY ENGINEERING FOR A PEDESTRIAN BRIDGE OVER ATLANTIC BLVD IN THE CITY OF MONTEREY PARK (E/P,PS/E ONLY)

$600

LOS ANGELES LOCAL HIGHWAY

LAF1663 0 SUNSET JUNCTION TRANSIT PLAZA. CONVERT AN UNUSED ROADWAY SECTION INTO A TRANSIT PLAZA WITH NEW CONCRETE PLAT-FORM, STREET FURNITURE, PED LIGHTS, & LANDSCAPING, INCREASING ACCESSIBILITY, TRANSFERS & TRANSIT USE.

$1,671

LOS ANGELES LOCAL HIGHWAY

LA0D420 0 SUNSET OVERLOOK TRAILHEAD AREA IN HAHAMONGNA WATERSHED PARK NEAR THE DEVIL’S GATE DAM (GRANT FROM RECREATIONAL TRAILS PROGRAM)

$264

LOS ANGELES LOCAL HIGHWAY

LA0G006 0 SYCAMORE, CANYON PARK TRAIL PHASE IV - RECOMMENDED FOR FUNDING UNDER THE NON-MOTORIZED ELEMENT OF THE RECREATIONAL TRAILS PROGRAM (GRANT AWARD: $304,920). DECOMPOSED GRANITE 2/3 MI

$347

LOS ANGELES LOCAL HIGHWAY

LAF1316 0 SYNCHRONIZATION OF TRAFFIC SIGNALS ON REGIONAL ARTERIALS IN THE SANTA CLARITA AREA OF LOS ANGELES COUNTY AND INSTALLATION OF FIBER OPTIC INTERCONNECT GAP CLOSURE.

$3,355

Page 57: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 55

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0C8031 0 TAMPA AVE BRDGE WIDENING. WIDEN RIVER CROSSING FROM 4 LNS TO 6 LNS ON TAMPA AVE BRDGE, CONSTRUCT BIKE UNDERPASS

PPNO 3090 3376 REP (BRIDGE # 53C1335)$10,800

LOS ANGELES LOCAL HIGHWAY

LA0G182 0 THE CENTRAL CITY EAST PROJECT WILL PROVIDE A FULLY TRAFFIC RESPONSIVE SIGNAL CONTROL SYSTEM TO APPROXIMATELY 150 INTERSECTIONS CURRENTLY OPERATIONAL WITH ATSAC CAPABILITY.

$4,885

LOS ANGELES LOCAL HIGHWAY

LA0G007 0 THE MOUNTAIN AVE./DUARTE ROAD REALIGNMENT/RECONSTRUCTION. INLCUDING RE-ALIGNMENT AND RECONSTRUCTION OF A POR-TION OF MOUNTAIN AVE AND DUARTE ROAD STREET PAVEMENT, RELOCATION OF STORM DRAIN STRUCTURES, REMOVAL AND REPLACE-MENT OF CURB/GUTTER/SIDEWALK.

$568

LOS ANGELES LOCAL HIGHWAY

LAF3136 0 THE OLD ROAD FROM MAGIC MOUNTAIN PARKWAY TO TURNBERRY LANE. WIDEN THE OLD ROAD FROM NORTH OF MAGIC MOUNTAIN PKWY TO TURNBERRY LN & HENRY MAYO DR TO 1200 FEET WEST OF THE OLD ROAD. THE PROPOSED PROJECT IS LOCATED ON THE OLD ROAD FROM APPROXIMATELY 700 FEET NORTH OF MAGIC MOUNTAIN PARKWAY TO TURNBERRY LANE, HENRY MAYO DRIVE FROM THE OLD ROAD TO THE STATE ROUTE 126 HOOK RAMPS, AND RYE CANYON ROAD BETWEEN THE OLD ROAD AND AVENUE STANFORD.

$47,453

LOS ANGELES LOCAL HIGHWAY

LAE3790 0 THE PASADENA ITS INTEGRATES 2 COMPONENTS; TRAFFIC SIGNAL COMMUNICATION AND CONTRL, AND PUBLIC PARKING AVAILABILITY INFO. SAFETEA-LU PRJ #3790

$3,545

LOS ANGELES LOCAL HIGHWAY

LA0G171 0 THE PROPOSED PROJECT INCLUDES THREE NEW TRACKS ALONG THE WEST SIDE OF PIER T. THIS PROJECT WILL ALSO INVOLVE RELO-CATING THE EXISTING UTILITIES.

$32,960

LOS ANGELES LOCAL HIGHWAY

LA0G169 0 THIS PROJECT PROVIDES STORAGE TRACKS ON THE PIER F ROAD CUL-DE-SAC,WHICH ARE USEFUL FOR SUPPORT FUNCTIONS SUCH AS SET OUT OF BAD ORDER RAIL CARS AND POSSIBLY ENGINE TIE-UP.

$24,140

LOS ANGELES LOCAL HIGHWAY

LA0G170 0 THIS PROJECT WILL CREATE IMPROVED LEAD TRACKS TO THE METROPOLITAN STEVEDORING CO. (METRO) RAIL YARD AND TO PIER F ON-DOCK RAIL YARD.

$65,840

LOS ANGELES LOCAL HIGHWAY

LA0G371 0 THIS PROJECT WILL MODIFY EXISTING RAISED MEDIANS AT INTERSECTIONS ALONG VALLEY VIEW ST., CARMENITA RD. ALONDRA BLVD. AND ROSECRANS AVE. TO ACCOMMODATE LONGER LEFT TURN POCKETS NECESSARY TO HANDLE ADDITIONAL TRAFFIC DUE TO THE I-5/CARMENITA AND THE I-5 ALONDRA PROJECTS CONSTRUCTION.

$710,000

LOS ANGELES LOCAL HIGHWAY

LA0G172 0 THIS PROJECT WILL PROVIDE FOR DOUBLE TRACKING THE SOUTH LEG OF THE WYE TO ACCOMMODATE SIMULTANEOUS TRAIN SWITCH-ING MOVES FROM THESE VARIOUS ACTIVITIES ON TERMINAL ISLAND.

$12,850

LOS ANGELES LOCAL HIGHWAY

LA0G168 0 THIS PROJECT WILL PROVIDE FOR STREETSCAPE IMPROVEMENTS IN THE WESTCHESTER AREA OF THE CITY OF LOS ANGELES ON SEPULVEDA BL BETWEEN 80TH AND 83RD STS.

$980

LOS ANGELES LOCAL HIGHWAY

LA0D145B 0 TIERRA SUBIDA WIDENING FROM AVENUE S TO AVENUE RAYBURN RD. - FROM 2 TO 4 LANES; WITH TRAFFIC SIGNALS, STREETLIGHTS, RAISED MEDIANS, DRAINAGE IMPROVEMENTS AND PEDESTRIAN IMPROVEMENTS. SPLIT FROM LA0D145.

$6,900

LOS ANGELES LOCAL HIGHWAY

LA996297 0 TMOC & RETROFIT OF CITY TRAFFIC SIGNAL SYSTEM (TEA21-#940) $6,478

LOS ANGELES LOCAL HIGHWAY

LA0G202 0 TRAFFIC LIGHT SYNCHRONIZATION ALONG THREE MAJOR ARTERIIALS , GLENDALE AVE, BRAND BLVD.,SAN FERNANDO RD., AND COLORADO ST.

$5,000

LOS ANGELES LOCAL HIGHWAY

LAF3318 0 TRAFFIC MONITORING AND SURVEILLANCE SYSTEM GAP CLOSURE. DESIGN AND IMPLEMENTATION OF 14 CCTV CAMERA TRAFFIC MONITORING AND SURVEILLANCE SYSTEM, HUB SWITCHING EQUIPMENT AND APPROX. 4 MI OF FIBER OPTIC COMMUNICATION CABLES, AND EOC VIDEO.

$3,048

LOS ANGELES LOCAL HIGHWAY

LA0G351 0 TRAFFIC SIGNAL MODIFICATIONS ON ARTERIAL STREETS CITYWIDE $600

Page 58: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

56 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAE1955 0 TRAFFIC SIGNAL UPGRADES ALONG THE US-101 FREEWAY RAMPS BETWEEN WINNETKA AVE AND VAN NUYS BLVD. $400

LOS ANGELES LOCAL HIGHWAY

LAE1601 0 TRANSPORTATION ENHANCEMENT TO CHILDREN’S MUSEUM OF LOS ANGELES. $1,200

LOS ANGELES LOCAL HIGHWAY

LA996343 0 U.S. 101 FWY/KANAN RD. INTERCHANGE IMPROVEMENTS - ADD 1 LANE TO NB OFF RAMP (1 TO 2). SAFETEA-LU # 3099 $24,460

LOS ANGELES LOCAL HIGHWAY

LAE1274 0 UPGRADE INTERSECTION ON BELLFLOWER @ ALONDRA AND ROSECRANS TO INSTALL LEFT-TURN PHASING (NORTH AND SOUTH BOUND) $387

LOS ANGELES LOCAL HIGHWAY

LAE3018 0 VALLEY BLVD IMPROVEMENTS BETWEEN 710 AND MARGUERITA. INVOLVES TRAFFIC FLOW IMPROVEMENTS INCLUDING RAISED MEDIANS AND TURN LANES.

$3,724

LOS ANGELES LOCAL HIGHWAY

LA996427 0 VALLEY BLVD. GRADE SEPARATION $54,285

LOS ANGELES LOCAL HIGHWAY

LA0G350 0 VALLEY BLVD: ADD 1 THROUGH EB LANE, INSTALLATION OF STREET LIGHTING, CURB & GUTTER, 7 BUS TURNOUTS AND MODIFICATIONS TO 2 TRAFFIC SIGNALS. NO ROW IMPACTS.

$3,300

LOS ANGELES LOCAL HIGHWAY

LAE2750B 0 VALLEY VIEW AVE AND ALONDRA BLVD INTERSECTION IMPROVEMENTS IN ADVANCE OF I-5 FREEWAY IMPROVEMENTS $2,235

LOS ANGELES LOCAL HIGHWAY

LA0C8092 0 VALLEY VIEW AVE GRADE SPARATN AT BNSF RAILWAY SOUTH OF STAGE RD. CONSTRUCT A GRADE SPARATN FOR VALLEY VIEW AVE FROM EXSTNG BNSF TRACKS BY CONSTRCTNG A HWY UNDERPASS PPNO 3117 (3022)

$79,084

LOS ANGELES LOCAL HIGHWAY

LA0G361 0 VALLEY VIEW STREET REHABILITATION FROM ROSECRANS AVENUE TO STAGE ROAD AT THE NORTH LIMIT OF VALLEY VIEW GRADE SEPARATION

$145

LOS ANGELES LOCAL HIGHWAY

LA0G360 0 VALLEY VIEW STREET REHABILITATION FROM SOUTH LIMIT OF VALLEY VIEW GRADE SEPARATION AT STAGE ROAD TO FIRESTONE BOULEVARD (SOUTH), IN ADVANCE OF I-5 FREEWAY IMPROVEMENTS.

$660

LOS ANGELES LOCAL HIGHWAY

LA0C8042 0 VANOWEN ST BRDGE WIDENING & REHAB. PRJCT WILL WIDEN EXISTING BRIDGE TO MATCH THE STREET IT WILL ALLOW INC TRAFFIC FLOW AND SAFETY. CONSTRUCT BIKE PATH UNDER. PPNO 3095 3378 AB 3090

$14,917

LOS ANGELES LOCAL HIGHWAY

LAE0726 0 VANOWEN/EMPIRE/CLYBOURN RAILROAD CROSSING GRADE SEPARATION STUDY PROJECT $1,000

LOS ANGELES LOCAL HIGHWAY

LA0G712 0 VERMONT AVE. ARTERIAL IMPROVEMENTS FROM ROSECRANS AVE. TO 182ND STREET. INCLUDES ADDITION OF TURN POCKETS WHERE GEOMETRICALLY POSSIBLE, CHANNELIZATION, TRAFFIC SIGNAL IMPROVEMENTS, PAVEMENT UPGRADES AND SOME CONCRETE WORK.

$2,350

LOS ANGELES LOCAL HIGHWAY

LA9910013 0 VIA PRINCESSA EXTENSION FROM GOLDEN VALLEY ROAD TO APPROXIMATELY 350M WEST OF RAINBOW GLEN DRIVE, EAST OF ISABELLA PKWY

$46,935

LOS ANGELES LOCAL HIGHWAY

LA0D476 0 VIA PRINCESSA EXTENSION FROM MAGIC MOUNTAIN PKWY TO GOLDEN VALLEY RD: CONSTRUCT APPROXMTLY A 1-MILE FACILITY (3 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, & DRAINAGE IMPRVMT

$22,602

LOS ANGELES LOCAL HIGHWAY

LA9910014 0 VIA PRINCESSA FROM OAKRIDGE DRIVE TO MAGIC MTN PRKWAY. FROM 0 - 6 LANES; LESS THAN ONE MILE. $11,650

LOS ANGELES LOCAL HIGHWAY

LAF1141 0 VICTORY BL WIDENING FROM TOPANGA CYN BL TO DE SOTO AV. WIDEN THE SOUTH SIDE OF VICTORY BL FROM TOPANGA CYN BL TO DE SOTO AV TO PROVIDE AN ADDITIONAL EB TRAVEL LANE

$11,655

LOS ANGELES LOCAL HIGHWAY

LAE3308 0 WALNUT GROVE AT BROADWAY INTERSECTION IMPROVEMENT. REHAB INTERSECTION; ACQUIRE CORNER CUT OFF TO INCREASE CURB RETURN RADII TO ADD LEFT TURN LANE IMPROVE PED SAFETY

$1,675

Page 59: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 57

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLAF1736 0 WAYFINDING PROGRAM. DEVELOP A SIGNAGE PROGRAM AS PART OF THE MIXED-USE AND PEDESTRIAN LINKAGES PLAN TO IMPROVE

PEDESTRIAN ACCESS IN DOWNTOWN$165

LOS ANGELES LOCAL HIGHWAY

LAE3284 0 WEST ADAMS BLVD STREETSCAPE-INSTALL STREETSCAPE AND COMMUNITY GATEWAY IMPROVEMENTS ALONG WEST ADAMS BLVD. $250

LOS ANGELES LOCAL HIGHWAY

LAF3632 0 WESTERN AV BUS STOP & PEDESTRIAN IMPROVEMENT PROJECT. INSTALL PEDESTRIAN AND TRANSIT AMENITIES TO ENHANCE THE PEDESTRIAN ENVIRONMENT ALONG WESTERN AV BTW EXPOSITION BL & I-10 FREEWAY.

$1,472

LOS ANGELES LOCAL HIGHWAY

LAF3650 0 WESTERN AVE EXPO LINE STATION LINKAGE PROJECT (SOUTH). TO DESIGN & CONSTRUCT PEDESTRIAN & SAFETY ENHANCEMENTS INTENDED TO INCREASE THE USAGE OF PUBLIC TRANSPORTATION AND CREATE A LINK TO METRO EXPO LR STATION AT WESTERN & EXPOSITION..

$858

LOS ANGELES LOCAL HIGHWAY

LAF3631 0 WESTLAKE MACARTHUR PARK PEDESTRIAN IMPROVEMENT PROJECT. INSTALL PEDESTRIAN IMPROVEMENTS INCL PEDESTRIAN LIGHT-ING, SIDEWALK ENHANCEMENTS, STREET FURNITURE & TREES, ENHANCED CROSSWALKS, & BUS STOP AMENITIES.

$1,674

LOS ANGELES LOCAL HIGHWAY

LA0G257 0 WHITTIER GREENWAY TRAILHEAD PARK. EXTENSION OF WHITTIER GREENWAY TRAIL FROM MILLS AVENUE TO 300 FEET EAST OF MILLS AVENUE IN CONJUNCTION WITH CONSTRUCTION OF NEW TRAILHEAD PARK AND 20 SPACE PARKING LOT FOR BICYCLE COMMUNTERS.

$650

LOS ANGELES LOCAL HIGHWAY

LAE3085 0 WIDEN AND RECONSTRUCT WASHINGTON BOULEVARD FROM WESTERN CITY BOUNDARY AT VERNON [350’ WEST OF INDIANA STREET] TO I-5 FREEWAY AT TELEGRAPH RD., WIDEN FROM 2 LANES TO 3 LANES IN EACH DIRECTION, INCREASE TURN RADIUS AND MEDIANS, UPGRADE TRAFFIC SIGNALS AND STREET LIGHTING AND IMPROVE SIDEWALKS.

$32,000

LOS ANGELES LOCAL HIGHWAY

LAE2515 0 WIDEN BUNDY DR. BETWEEN WILSHIRE AND SANTA MONICA BLVD - WIDEN FROM 2 LANES TO 4 LANES. $4,250

LOS ANGELES LOCAL HIGHWAY

LAE2517 0 WIDEN MAINE AVE. IN BALDWIN PARK ADD 1 THRU LN & 1 RIGHT TURN AND 1 LEFT TURN ONLY LANE (SAFETEA-LU DEMO ID #2517. PROJECT USING $60 OF TOLL CREDIT IN FY12 FOR ENG PHASE TO MATCH DEMO FUNDS.

$360

LOS ANGELES LOCAL HIGHWAY

LA0G166 0 WIDENING OF 30TH ST WEST FROM AVENUE M TO AVENUE L (APPROX. 1 MILE) FROM 2 VEHICULAR TRAVEL LANES TO 4 LANES. 8 FOOT CLASS II BIKE LANES WILL BE STRIPPED ON BOTH SIDES OF THE STREET.

$1,140

LOS ANGELES LOCAL HIGHWAY

LAF1129 0 WIDENING SAN FERNANDO RD AT BALBOA RD. INSTALL A RIGHT-TURN LANE ON WEST SIDE OF SAN FERNANDO RD AT BALBOA RD TO PROVIDE ADD’L CAPACITY; WILL REQUIRE ROW ACQUISITION, RETAINING WALLS AND RE-STRIPING

$1,632

LOS ANGELES LOCAL HIGHWAY

LA996419 0 WIDN NATIONAL BLVD. & ALLO FOR A 2ND W/B LEFT-TRN LNE & ADDTNL E/B RGHT-TURN ONLY LNE FOR THE I-405 S/B ON RAMP. 2ND LFT-TRN LNE ON NATIONAL AT SEPULVEDA AND A 2ND (SEE COMMENTS)

$603

LOS ANGELES LOCAL HIGHWAY

LAF1725 0 WIFI ON THE GOLD LINE. WIFI INTERNET INSTALLED ON GOLD LINE TRAINS, POLES & STATIONS, EASTSIDE EXTENSION, CHINATOWN & LITTLE TOKYO/ARTS DISTRICTS.

$1,213

LOS ANGELES LOCAL HIGHWAY

LA0F041 0 WILL ADD STREETLIGNTS ON LEMON GROVE RECREATION CENTER ON THE EAST HOLLYWOOD COMMUNITY, MAKING PROPERTY OWNERS, COMMUNITY MEMBERS, PEDESTRIANS AND MOTORISTS FEEL SAFER

$293

LOS ANGELES LOCAL HIGHWAY

LAF1649 0 WILLOW STREET PEDESTRIAN IMPROVEMENT PROJECT. THIS PROJECT PROVIDES PEDESTRIAN-ORIENTED IMPROVEMENTS TO WILLOW ST INCLUDING MEDIANS, PEDESTRIAN LIGHTING, LANDSCAPING, SIGNAGE AND CROSSWALK TREATMENTS.

$3,097

LOS ANGELES LOCAL HIGHWAY

LAF3716 0 WILLOWBROOK AREA ACCESS IMPROVEMENTS TO MLK MACC. IMPLEMENT WAYFINDING SYSTEM INCLUDING TRANSIT INFORMATION AS PART OF A LARGER PROJECT, INCLUDING PEDESTRIAN IMPROVEMENTS, BIKEWAY & STREETSCAPING.. THE PROJECT IS LOCATED IN THE COUNTY OF LOS ANGELES, IN THE UNINCORPORATED COMMUNITY OF WILLOWBROOK NEAR THE IMPERIAL/WILMINGTON ROSA PARKS METRO RAIL STATION AND THE MARTIN LUTHER KING JR. MULTI-SERVICE AMBULATORY CARE CENTER (MACC).

$4,000

LOS ANGELES LOCAL HIGHWAY

LAF3521 0 WILLOWBROOK AREA BIKEWAY IMPROVEMENTS. INSTALL A BIKE PATH AND TWO BIKE ROUTES IN THE WILLOWBROOK AREA TO IMPROVE MOBILITY.

$600

Page 60: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

58 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)LOS ANGELES LOCAL

HIGHWAYLA0C8124 0 WILMINGTON ATSAC/ATCS PROJECT; IMPROVEMENTS TO 70 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF COMPUTER

BASED REAL TIME TRAFFIC SIGNAL MONITORING AND CONTROL SYSTEM.$12,467

LOS ANGELES LOCAL HIGHWAY

LA0C8050 0 WILSHIRE BL CORRDR IMPRVMNTS-SELBY AV TO COMSTOCK AV WIDEN WILSHIRE BL TO RELIEF CONGESTION AT KEY INTERSECT AND PROVIDE PEAK HOUR BUS LANES & INSTALL RAISED LANDSCAPE MEDIAN. PPNO 3101.

$7,479

LOS ANGELES LOCAL HIGHWAY

LA0C8084 0 WINNETKA AVE BRDGE WIDEN & REHAB. - WIDEN THE RIVER CROSSING FROM 4 TO 6 LANES, CONSTRUCT BIKE UNDERPASS. PPNO 3108 3377 AB 3090 REP (53C1388)

$10,519

LOS ANGELES LOCAL HIGHWAY

LAF3304 0 WOODRUFF AV FIBER-OPTIC TRAFFIC SIGNAL COMMUNICATIONS PROJ. INSTALL FIBER-OPTIC COMMUNICATION & VIDEO DETECTION SYSTEM ON WOODRUFF AV & INTERCONNECT IT TO EXISTING FIBER BACKBONE TO DEVELOP AN ETHERNET-BASED COMMUNICATION NETWORK.

$923

LOS ANGELES LOCAL HIGHWAY

LAF3709 0 ZERO EMISSION VEHICLE CHARGING STATIONS. INSTALL 43 ELECTRIC VEHICLE CHARGING STATIONS FOR USE BY ELECTRIC VEHICLES USING AVAILABLE TECHNOLOGY.. THE CHARGERS WILL BE INSTALLED AT EXISTING AND NEW LOCATIONS TO CREATE A CITY-WIDE CHARGING NETWORK. THE NETWORK WILL REDUCE VEHICLE MILES TRAVELLED BY PROVIDING CHARGING AT LIGHT RAIL STATIONS AND EMPLOYMENT DESTINATION POINTS.

$717

ORANGE TRANSIT ORA110632 0 1% TRANSIT ENHANCEMENTS - BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (MISSION VIEJO) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED)

$890

ORANGE TRANSIT ORA110634 0 1% TRANSIT ENHANCEMENTS - BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (OCTA) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED)

$4,227

ORANGE TRANSIT ORA080917 0 1% TRANSIT SECURITY PROJECTS (MISSION VIEJO). TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $21 & FY10/11 FOR $21, FY11/12 $19,650

$736

ORANGE TRANSIT ORA080907 0 1% TRANSIT SECURITY PROJECTS (OCTA). TRANSIT DEVELOPMENT CREDITS IN FY10/11 $96,747, IN FY11/12 $94,245 $3,491

ORANGE TRANSIT ORA080909 0 A PROJECT STUDY FOR THE CITY OF SANTA ANA - FIXED GUIDEWAY SYSTEM LINKING THE SANTA ANA REGIONAL TRANSPORTATION INTERMODAL CENTER TO HARBOR BLVD IN THE CITY OF GARDEN GROVE. PE AND ENV

$5,541

ORANGE TRANSIT ORA080908 0 A TRANSIT CORRIDOR FOR THE CITY OF ANAHEIM - ANAHEIM RAPID CONNECTION (ARC) FIXED GUIDEWAY SYSTEM LINKING THE ANAHEIM REGIONAL TRANSPORTATION INTERMODAL CENTER (ARTIC) TO THE PLATINUM TRIANGLE TO THE ANAHEIM RESORT. ALTERNATIVES ANALYSIS, EIR/EIS, LPA AND CONCEPTUAL AND ADVANCED ENGINEERING, PROJECT DEVELOPMENT ACTIVITIES AND PRELIMINARY ENGINEERING.

$18,536

ORANGE TRANSIT ORA111220 0 ABRAZAR - 2 SMALL BUSES, 3 MEDIUM BUSES, 4 MINIVANS FOR REPLACEMENT, 5 COMPUTERS, 2 SERVERS, 10 RESTRAINTS, 12 RADIOS, 1 BASE STATION. (UTILIZING $60,378 IN TOLL CREDIT FOR FY10/11)

$526

ORANGE TRANSIT ORA080904 0 ABRAZAR - THREE (R) SMALL BUSES TYPE1A ,THREE SE SMALL BUSES TYPE1A, EIGHT MRS $299

ORANGE TRANSIT ORA111231 0 AGE WELL - 12 RADIOS, 1 BASE STATION, 3 COMPUTERS. (UTILIZING $2,283 IN TOLL CREDIT FOR FY10/11) $20

ORANGE TRANSIT ORA111225 0 AGE WELL, INC - 12 MINIVANS FOR EXPANSION SERVICE (UTILIZING $60,562 IN TOLL CREDIT FOR FY10/11) $528

ORANGE TRANSIT ORA085004 0 ANAHEIM CANYON STATION PROJECT WILL ADD DOUBLE TRACK AND ANOTHER PLATFORM AS WELL AS EXTEND THE EXISTING PLAT-FORM TO BE IN CONFORMANCE WITH THE METROLINK STANDARDS FOR PASSENGER PLATFORM LENGTH. (MAY USE TOLL CREDIT IF CMAQ REQUIRES A MATCH)

$22,000

ORANGE TRANSIT ORA120318 0 ANAHEIM REGIONAL TRANS INTERMODAL CENTER (ARTIC) PHASE I - INCLUDE EXPAND OF EXIST AMTRAK/METROLINK STATION AT ANA STAD TO PROVIDE ACCESS W/ TRANS SVC

$187,509

Page 61: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 59

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE TRANSIT ORA021202 0 BUS OPERATING ASSISTANCE FTA9 - FOR PARATRANSIT - MISSION VIEJO - UZA $8,908

ORANGE TRANSIT ORA174 0 BUS OPERATING ASSISTANCE FTA9 - FOR PARATRANSIT (OCTA) $41,736

ORANGE TRANSIT ORA110616 0 BUS RAPID TRANSIT (BRT) - PURCHASE (3) 40’ EXPANSION VEHICLES FOR SERVICE IN ORANGE COUNTY $1,005

ORANGE TRANSIT ORA080803 0 CAPITAL COST OF CONTRACTING (COSTS ASSOCIATED WITH CONTRACTING FOR SERVICES SUCH AS PARATRANSIT) $178,379

ORANGE TRANSIT ORA990920 0 CAPITAL COST OF CONTRACTING (COSTS ASSOCIATED WITH CONTRACTING FOR SERVICES SUCH AS PARATRANSIT)(MISSION VIEJO) $16,253

ORANGE TRANSIT ORA110614 0 CAPITAL LEASE COSTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT ANAHEIM MAINTENANCE BASE

$4,845

ORANGE TRANSIT ORA110615 0 CAPITAL LEASE COSTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT GARDEN GROVE MAINTENANCE BASE

$4,935

ORANGE TRANSIT ORA37111 0 CAPITAL MAINTENANCE ON METROLINK SYSTEM. (REHAB OF TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES, FACILITIES, MAINTENANCE OF WAY RAIL SPURS, AND ROLLING STOCK) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - REHABILITATION OR RECONSTRUCTION OF TRACK STRUCTURES, TRACK, AND TRACKBED IN EXISTING RIGHTS-OF-WAY.( NON-CAPACITY INCREASING)

$67,024

ORANGE TRANSIT ORA111222 0 CITY OF BUENA PARK SENIOR CENTER - 2 LARGE BUSES FOR REPLACEMENT (UTILIZING $16,000 IN TOLL CREDIT FOR FY10/11) $140

ORANGE TRANSIT ORA111226 0 CITY OF HUNTINGTON BEACH SENIORS - 4 MINIVANS FOR REPLACEMENT SERVICE. (UTILIZING $20,187 IN TOLL CREDIT FOR FY10/11) $176

ORANGE TRANSIT ORA111227 0 CITY OF IRVINE TRIPS - 1 LARGE BUS, 2 MINIVANS FOR REPLACEMENT SERVICE. (UTILIZING $21,220 IN TOLL CREDIT FOR FY10/11) $185

ORANGE TRANSIT ORA081501 0 CITY OF LAGUNA BEACH - TROLLEYS (3 REPLACEMENT) OCTA CO-LEAD $700

ORANGE TRANSIT ORA080901 0 CITY SHUTTLE SYSTEM CAPITAL AND OPERATIONS & MAINTENANCE PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$7,552

ORANGE TRANSIT ORA020812 0 COMMUTER RAIL CROSSING MONITORS UPGRADE AND OR INSTALL MONITORING EQUIPMENT AT RAIL CROSSINGS IN ORANGE COUNTY TO PROVIDE NOTIFICATION IN THE EVENT OF DAMAGE OR MALFUNCTION

$273

ORANGE TRANSIT ORA020815 0 COMMUTER RAIL RIGHT-OF-WAY FENCING REPLACE DESTROYED OR DAMAGED FENCING ALONG THE RAIL CORRIDORS WITHIN ORANGE COUNTY TO DETER UNAUTHORIZED ACCESS

$818

ORANGE TRANSIT ORA990930 0 CONTROL POINT STADIUM CROSSOVER (ANAHEIM) LOCATED NEAR THE ANAHEIM STADIUM METROLINK STATION, FROM THE KATELLA AVENUE OVERPASS TO THE STATE COLLEGE BOULEVARD GRADE CROSSING. THE PROJECT WILL CONSTRUCT UNIVERSAL POWER CROSSOVERS, POWER TURNOUT AND POWER DERAIL

$6,490

ORANGE TRANSIT ORA080903 0 ENVIRONMENTAL CLEARANCE AND ADVANCED CONCEPTUAL DESIGN OF THE CALIFORNIA HIGH SPEED RAIL AUTHORITY, HIGH SPEED RAIL PROJECT FROM SAN FRANCISCO TO LOS ANGELES

$7,000

ORANGE TRANSIT ORA55134 0 FACILITY MODIFICATIONS FOR BUS TRANSIT (ELEVATOR UPGRADES, JOINT SEALANT, FALL PROTECTION, VEHICLE LIFTS AND OTHER FACILITY MODIFICATIONS) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES

$1,084

ORANGE TRANSIT ORA020120 0 FIXED ROUTE OPERATING COSTS $1,537,414

ORANGE TRANSIT ORA020113 0 FULLERTON TRAIN STATION - PARKING STRUCTURE, PHASE I AND II. TOTAL OF 800 SPACES (PPNO 2026) $33,385

ORANGE TRANSIT ORA081623 0 FULLERTON TRANSPORTATION CENTER - INITIAL PLANNING AND CONCEPTUAL ENGINEERING OF THE EXPANSION FOR THE FULLERTON TRANSPORTATION CENTER.

$875

ORANGE TRANSIT ORA111240 0 GOLDEN RAIN FOUNDATION LAGUNA WOODS - 4 LARGER BUSES FOR REPLACEMENT SERVICE. (UTILIZING $48,174 IN TOLL CREDIT FOR FY10/11)

$420

Page 62: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

60 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE TRANSIT ORA110304 0 GOLDENWEST TRANSPORTATION CENTER PARKING STRUCTURE EXPANSION. CONSTRUCT A SURFACE PARKING LOT AND A FOUR LEVEL

PARKING GARAGE STRUCTURE OF APPROXIMATELY 300 SPACES AT THE SURFACE PARKING AREA FOR THE EXISTING TRANSPORTATION CENTER.

$8,600

ORANGE TRANSIT ORA020818 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVI-RONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT

$2,896

ORANGE TRANSIT ORA110618 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVI-RONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT

$18,708

ORANGE TRANSIT ORA110619 0 GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CONSTRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVI-RONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT

$43,820

ORANGE TRANSIT ORA990909 0 GROUPED PROJECTS FOR GRANTS FOR TRAINING AND RESEARCH PROGRAMS SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - GRANTS FOR TRAINING AND RESEARCH PROGRAMS

$3,602

ORANGE TRANSIT ORA020819 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES - SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$3,126

ORANGE TRANSIT ORA990910 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES - SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$5,880

ORANGE TRANSIT ORA110621 0 INTERMODAL PARK AND RIDE FACILITY AT DISCOVERY SCIENCE CENTER IN SANTA ANA $372

ORANGE TRANSIT ORA081622 0 IRVINE TRANSIT STATION - EXPANSION OF THE IRVINE TRANSIT CENTER (ITC). INITIAL PLANNING AND CONCEPTUAL ENGINEERING PHASE

$2,660

ORANGE TRANSIT ORA020817 0 KEY CARD ACCESS SYSTEM FOR BASE FACILITIES - INSTALL KEY CARD ACCESS SYSTEM AT FIVE OCTA BASE FACILITIES IN ANAHEIM, GARDEN GROVE, IRVINE (SAND CANYON AND CONSTRUCTION CIRCLE) AND SANTA ANA.

$754

ORANGE TRANSIT ORA120537 0 LAGUNA NIGUEL RAIL STATION PARKING EXPANSION - CONSTRUCTION OF 562 NEW SPACES (281 EXISTING + 562 NEW = 843 SPACES) $63,000

ORANGE TRANSIT ORA111209 0 LAGUNA NIGUEL TO SAN JUAN CAPISTRANO PASSING SIDING - ADD 1.8 MILES OF NEW RAILROAD TRACK ADJACENT TO THE EXISTING MAIN TRACK. MP 193.9 - MP 195.7

$26,806

ORANGE TRANSIT ORA081618 0 METROLINK COMMUTER RAIL PROGRAM - HIGH FREQUENCY METROLINK SERVICE OPERATIONS BETWEEN FULLERTON AND LAGUNA NIGUEL/MISSION VIEJO.

$15,000

ORANGE TRANSIT ORA020820 0 METROLINK SERVICE TRACK EXPANSION AND GRADE CROSSING IMPROVEMENTS. PART OF A PLAN TO IMPLEMENT 30 MINUTE HEADWAYS COULD INCLUDE TURNBACK FACILITIES, LAYOVER FACILITIES, AND OR RELIABILITY IMPROVEMENTS. PROJECTS ARE CON-SISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - RAILROAD/HIGHWAY CROSSING

$178,971

ORANGE TRANSIT ORA110101 0 OCTA MAINTENANCE OF WAY (MOW) SPURS. 1,000 FT MOW SPUR TRACKS AT 2 LOCATIONS ON THE ORANGE SUBDIVISION IN ANAHEIM AND LAGUNA NIGUEL

$2,100

Page 63: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 61

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE TRANSIT ORA020505 0 OCTA SHARE OF DEMOLITION OF EXISTING MAIL DOCK AND CONSTRUCTION OF NEW, EXPANDED PASSENGER PLATFORM AT LA UNION

STATION.$3,000

ORANGE TRANSIT ORA090302 0 OCTA SHARE OF THE METROLINK ROLLING STOCK AQUISITION. CARS & LOCOS, UP TO 87 CARS/CABS ORDERED IN FY 09 & IN FUTURE YRS, UP TO 22 CARS/CABS, UP TO 11 LOCOS ORDERED BY FY09, & UP TO 4 LOCOS IN FUTURE

$158,110

ORANGE TRANSIT ORA199 0 OPERATING ASSISTANCE $10,156

ORANGE TRANSIT ORA37115 0 OPERATING ASSISTANCE FOR COMMUTER RAIL $194,122

ORANGE TRANSIT ORA111229 0 ORANGE COUNTY ARC - 10 LARGE BUSES FOR EXPANSION SERVICE. (UTILIZING $80,290 IN TOLL CREDIT FOR FY10/11) $700

ORANGE TRANSIT ORA080906 0 ORANGE COUNTY ARC - TEN (SE) LARGE BUSES TYPE III, CAMERAS $669

ORANGE TRANSIT ORA082605 0 ORANGE COUNTY METROLINK FIBER OPTICS INSTALLATION PROJECT. (REPLACE AND UPGRADE COMMUNICATIONS SYSTEM THROUGH-OUT METROLINK) PROVIDE A FIBER OPTIC BACKBONE AND SUE MICROWAVE HOPS TO TRANSMIT DATA TO THE MOC IN POMONA. CTOS THAT WILL FILL CONDUIT GAPS ARE BEING PROCESSED. VERIZON (FORMERLY MCI) CONDUIT WILL BE USED BETWEEN RITCHEY ST. AND SOUTHERN TERMINUS. METROLINK RAIL REHAB ORA37111 CONTAINS THE 5309 FUNDS

$12,300

ORANGE TRANSIT ORA120357 0 ORANGE COUNTY. TRAFFIC SIGNAL SYNCHRONIZATION FOR BUS RAPID TRANSIT CORRIDORS $14,673

ORANGE TRANSIT ORA085001 0 ORANGE TRANSPORTATION CENTER PARKING EXPANSION - PROJECT WILL PROVIDE APPROXIMATLY 1,100 ADDITIONAL TRANSIT PARK-ING SPACES AT THE ORANGE STATION PARKING CENTER.

$23,701

ORANGE TRANSIT ORA030612 0 PLACENTIA TRANSIT STATION - E OF SR-57 AND MELROSE ST AND N OF CROWTHER AVE. CONSTRUCT NEW METROLINK STATION AND RAIL SIDEING PPNO 9514

$23,420

ORANGE TRANSIT ORA080801 0 POSTIVE TRAIN CONTROL FOR METROLINK WILL HELP TO PREVENT TRAIN-TO-TRAIN COLLISIONS, SPEEDING AND OVER-SPEED DERAILMENTS, AND MOVEMENT OF A TRAIN THROUGH A WRONG RAIL SEGMENT OR INTO TRACK WORK ZONES. THE IMPLEMENTATION OF THE PROJECT WILL ENHANCE THE SAFETY AND SECURITY OF COMMUTER RAIL SERVICE, WHILE HELPING TO MEET 2015 FEDERAL MANDATE ENACTED IN THE RSIA OF 2008.

$250,000

ORANGE TRANSIT ORA021203 0 PREVENTATIVE MAINTENANCE (MISSION VIEJO) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES. TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $1,826 & FY10/11 FOR $1,874.

$42,633

ORANGE TRANSIT ORA020106 0 PREVENTATIVE MAINTENANCE (OCTA) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT-EGORIES - PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $3,830 & FY10/11 FOR $1,543.)

$170,234

ORANGE TRANSIT ORA020810 0 PURCHASE (1) 40’ REPLACEMENT VEHICLE FOR EXPRESS SERVICE IN ORANGE COUNTY FTA# E-2008-BUSP-677 $590

ORANGE TRANSIT ORA55241 0 PURCHASE (1) STANDARD 40 FT REPLACEMENT ALT FUEL BUSES - (1) IN FY15/16 $700

ORANGE TRANSIT ORA110303 0 PURCHASE (11) MID-SIZE 32’ ALTERNATIVE FUEL REPLACEMENT BUSES $4,498

ORANGE TRANSIT ORA020811 0 PURCHASE (202) 40’ REPLACEMENT VEHICLE IN ORANGE COUNTY - (90) IN FY11/12, (89) IN FY12/13, AND (23) IN FY15/16. INCLUDES TOLL CREDITS IN FY11-12 $7,776,200

$102,213

ORANGE TRANSIT ORA000817 0 PURCHASE (50) STANDARD 60FT REPLACEMENT - ALTERNATIVE FUEL - IN FY15/16 $44,395

ORANGE TRANSIT ORA041501 0 PURCHASE (71) STANDARD 30FT EXPANSION BUSES - ALTERNATIVE FUEL - (31) IN FY08-09, (9) IN FY09-10, (7) IN FY11-12, (6) IN FY12-13 AND (18) IN FY13-14

$8,998

ORANGE TRANSIT ORA0826016 0 PURCHASE (72) PARATRANSIT EXPANSION VANS - (21) IN FY09/10, (51) IN FY10/11. $7,641

ORANGE TRANSIT ORA080918 0 PURCHASE MISCELLANEOUS SUPPORT EQUIPMENT. SUCH AS CEA VEHICLES, SHERIFF VEHICLES, FORKLIFTS AND OTHER MISCELLA-NEOUS SUPPORT EQUIPMENT

$1,000

Page 64: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

62 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE TRANSIT ORA080919 0 PURCHASE MISCELLANEOUS SUPPORT VEHICLES $625

ORANGE TRANSIT ORA082618 0 PURCHASE PARATRANSIT VEHICLES EXPANSION (MISSION VIEJO) (11) IN FY10/11. $3,384

ORANGE TRANSIT ORA020118 0 PURCHASE REPLACEMENT PARATRANSIT VANS (230) - (32) IN FY11/12, (58) IN FY12/13, (140) IN FY15/16 PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF NEW BUSES AND RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET

$13,507

ORANGE TRANSIT ORA110301 0 PURCHASE TWENTY (20) 32-35’ REPLACEMENT ALTERNATIVE FUEL BUSES AND AUXILIARY EQUIPMENT SUCH AS TICKET VENDING MACHINES AND ASSET MANAGEMENT SOFTWARE FOR ANAHEIM TRANSPORTATION NETWORK

$4,620

ORANGE TRANSIT ORA080804 0 RADIO COMMUNICATION SYSTEM UPGRADE $28,895

ORANGE TRANSIT ORA55022 0 REPLACEMENT CLEAN AIR AND FESTIVAL TROLLIES $2,370

ORANGE TRANSIT ORA65002 0 RIDESHARE SERVICES RIDEGUIDE, DATABASE, CUSTOMER INFO, AND MARKETING (ORANGE COUNTY PORTION). $5,223

ORANGE TRANSIT ORA110633 0 RIDESHARE VANPOOL PROGRAM - CAPITAL LEASE COSTS $2,197

ORANGE TRANSIT ORA100099 0 ROUTE 792/A RIVERSIDE/CORONA TO ANAHEIM RESORT AREA EXPRESS BUS SERVICE $780

ORANGE TRANSIT ORA081621 0 SANTA ANA TRANSIT STATION - EXPANSION OF THE SANTA ANA REGIONAL TRANSPORTATION CENTER. INITIAL PLANNING AND CON-CEPTUAL ENGINEERING PHASE

$3,400

ORANGE TRANSIT ORA110624 0 SANTA ANA TRANSIT TERMINAL FACILITY IMPROVEMENTS, INC. INCREASE VENTILATION / SAFETY $282

ORANGE TRANSIT ORA110613 0 SECURITY SURVEILLANCE AND MONITORING EQUIPMENT FOR TRANSIT $5,528

ORANGE TRANSIT ORA111230 0 ST. ANSELM’S CROSS CULTURAL CENTER - 2 SMALL BUSES FOR REPLACEMENT SERVICE. (UTILIZING $13,764 IN TOLL CREDIT FOR FY10/11)

$120

ORANGE TRANSIT ORA081619 0 STATION IMPROVMENTS - SUPPORT CONTINUED AND EXPANDED METROLINK OPERATIONS, AND STATION IMPROVEMENT $250

ORANGE TRANSIT ORA110305 0 THE LAGUNA NIGUEL/MISSION VIEJO STATION ENHANCEMENTS. IMPROVEMENTS INCLUDE PARKING, PEDESTRIAN ACCESSIBILITY, TICKETING MACHINES, RESTROOMS, ELEVATORS, BENCHES, SHADE STRUCTURES, AND OTHER STRUCTURES OR AMENTITIES.

$8,524

ORANGE TRANSIT ORA120536 0 TUSTIN RAIL STATION PARKING EXPANSION - CONSTRUCTION OF 191 NEW SPACES (281 EXISTING SPACES + 191 NEW SPACES = 472 TOTAL SPACES) PPNO 9510

$17,600

ORANGE TRANSIT ORA110625 0 VARIOUS PLANNING & TRANSPORTATION PROJECTS DETERMINED BY THE ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) TO REDUCE CONGESTION IN OC, INCLUDING SMARTH GROWTH AND INCREASED TRANSIT

$2,395

ORANGE TRANSIT ORA37122 0 VEHICLE MODIFICATIONS/MISC, REPLACE SUPP VEHICLES AND SUPPORT EQUIP, BUS AND FACILITY EQUIPMENT PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF SUPPORT VEHICLES. TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $250

$9,011

ORANGE TRANSIT ORA020814 0 VIDEO SURVEILLANCE SYSTEM FOR BASE FACILITIES - INSTALL VIDEO SURVEILLANCE EQUIPMENT AT FOUR OCTA BASE FACILITIES IN ANAHEIM, GARDEN GROVE, IRVINE (SAND CANYON AND CONSTRUCTION CIRCLE)

$803

ORANGE STATE HIGHWAY

ORA000100 5 GENE AUTRY WAY WEST @ I-5 (I-5 HOV TRANSITWAY TO HASTER) ADD OVERCROSSING ON I-5 (S)/MANCHESTER AND EXTEND GENE AUTRY WAY WEST FROM I-5 TO HASTER (3 LANES IN EA DIR.)

$70,984

ORANGE STATE HIGHWAY

ORA55063 5 I-5 @ AVERY PARKWAY (MARGUERITE TO CAMINO CAPISTRANO) INTERCHANGE IMPROVEMENTS. WIDEN FROM 4 TO 5 LANES (FOR TURN LANE) UNDER FREEWAY BRIDGE.

$840

ORANGE STATE HIGHWAY

ORA120359 5 I-5 @ JAMBOREE - CONSTRUCT AUX LN ON I-5 SB; WIDEN SB OFF-RAMP FROM 1 TO 2 LANES; AND WIDENING JAMBOREE RD EB UNDERCROSSING TO CREATE A TURN LANE TO NB ON-RAMP PPNO 2806B

$8,485

Page 65: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 63

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE STATE

HIGHWAYORA000122 5 I-5 @ LA PAZ INTERCHANGE IMPROVEMENTS. EXPAND LA PAZ RD. FROM 4 TO 6 LANES TOTAL. (99-LHILL-GMA-1125) $8,943

ORANGE STATE HIGHWAY

ORA020109 5 I-5 AT CAMINO CAPISTRANO INTERSECTION IMPROVEMENT. WIDEN S/B OFFRAMP FROM 2 TO 3 LANES. PPNO 2615. DUAL LEAD. OCTA PA&ED. CALTRANS PS&E ROW AND CON

$19,207

ORANGE STATE HIGHWAY

ORA111210 5 I-5 FROM SR 55 TO SR 57 - ADD 1 HOV LANE EACH DIRECTION; RECONSTRUCT THE FIRST ST/FOURTH ST IC ON SB I-5 TO INCREASE WEAVING LENGTH TO STANDARD (EXTEND MERGE LANES BY 100 FEET)

$45,669

ORANGE STATE HIGHWAY

ORA081601 5 I-5/SR-55 INTERIM IMPROVEMENTS INCLUDE RECONSTRUCTING THE I-5 S/B ON-RAMP AT FIRST ST TO A LOOP RAMP, PROVIDING MORE MERGING ROOM FOR TRAFFIC BETWEEN THE I-5 S/B CONNECTION AND SR-55 S/B MCFADDEN AVE OFF-RAMP. FURTHER PLANNING STUDIES WILL BE UNDERTAKEN TO ADDRESS THE LONG-TERM I-5/SR-55 TRAFFIC DEFICIENCIES (I-5 BEGIN PM 29.1, END PM 31.1; SR-55 BEGIN PM 9.2, END PM 11.2)

$1,250

ORANGE STATE HIGHWAY

ORA110607 5 IN ORANGE COUNTY, ON ROUTE 5 FROM CALLE JUANITA TO 4TH STREET. PROVIDE ENHANCED PAVING AND LANDSCAPING PPNO #2592 $1,873

ORANGE STATE HIGHWAY

ORA030602 5 IN SAN CLEMENTE - SB CAMINO DE ESTRELLA - WIDEN OFF RAMP FROM 1 TO 2 LANES AND WIDEN OVERCROSSING FROM 5 TO 7 LANES (1 W/B LEFT TURN LANE AND 1 E/B LANE), EA 0F0600, SHOPP, MOBILITY

$13,493

ORANGE STATE HIGHWAY

ORA120402 5 IN SAN CLEMENTE NORTHBOUND INTERSTATE 5 AT AVENIDA VAQUERO - SOUNDWALL DESIGN AND CONSTRUCTION PPNO 2580A. DUAL LEAD AGENCY. OCTA FOR PA&ED AND PS&E CALTRAN LEAD FOR ROW CON

$2,760

ORANGE STATE HIGHWAY

ORA030604 5 IN THE CITY OF MISSION VIEJO SB OFFRAMP AT CROWN VALLEY PARKWAY - WIDEN OFF RAMP FROM 4 TO 5 LANES SHOPP PROJECT EA 12-0F8201

$3,249

ORANGE STATE HIGHWAY

ORA990929 5 INTERSTATE 5 ADD 1 HOV IN EACH DIRECTION FROM SOUTH OF AVENIDA PICO TO SOUTH OF AVENIDA VISTA HERMOSA AND RECONFIGURE AVENIDA PICO INTERCHANGE. PPNO:2531D

$106,289

ORANGE STATE HIGHWAY

ORA111002 5 INTERSTATE 5 ADD 1 HOV IN EACH DIRECTION FROM SOUTH OF AVENIDA VISTA HERMOSA TO SOUTH OF PACIFIC COAST HIGHWAY. PPNO 2531E

$74,705

ORANGE STATE HIGHWAY

ORA111001 5 INTERSTATE 5 ADD 1 HOV IN EACH DIRECTION FROM SOUTH OF PACIFIC COAST HIGHWAY TO SAN JUAN CREEK ROAD. PPNO:2531F $63,093

ORANGE STATE HIGHWAY

ORA120326 5 RECONSTRUCT I-5/SR-74 INTERCHANGE (IN SAN JUAN CAPISTRANO, ON ROUTE 74 FROM ROUTE 5 TO EAST OF THE CITY LIMIT. RECONSTRUCT THE ROUTE 74 AND ROUTE 5 INTERCHANGE) PPNO 4102 DUAL LEAD SJC CALTRANS

$84,514

ORANGE STATE HIGHWAY

ORA120401 5 SOUTHBOUND INTERSTATE 5 FROM EL CAMINO REAL TO AVENIDA RAMONA - SOUNDWALL DESIGN AND CONSTRUCTION PPNO 2544B. DUAL LEAD AGENCY OCTA FOR PA&ED AND PS&E CALTRAN LEAD FOR ROW CON

$4,995

ORANGE STATE HIGHWAY

ORA000193 22 HOV CONNECTORS FROM SR-22 TO I-405, BETWEEN SEAL BEACH BLVD. (I-405 PM 022.558) AND VALLEY VIEW ST. (SR-22 PM R000.917), WITH A SECOND HOV LANE IN EACH DIRECTION ON I-405 BETWEEN THE TWO DIRECT CONNECTORS.

$119,625

ORANGE STATE HIGHWAY

ORA000195 22 ON SR-22 (I-405 TO SR55) ADD 2 HOV LANES/1 EA DIR (FRM 0 - 2) & 2 AUX LANES/1 EA DIR (FRM 0- 2) (I-5 TO BEACH) & OPERATING IMPROVMENTS (SEE COMMENTS) TCRP PAYBACK WHEN AVAILABLE

$546,587

ORANGE STATE HIGHWAY

ORA084902 22 SR-22/I-405 HOV CONNECTOR REPLACEMENT PLANTING $2,040

ORANGE STATE HIGHWAY

ORA030610 55 ADD SOUTHBOUND AUXILIARY LANE FROM DYER TO MACARTHUR. PPNO 3473 $2,619

ORANGE STATE HIGHWAY

ORA015 55 BAKER STREET AND SR-55; N/B & S/B FRONTAGE ROAD IMPROVEMENTS. S/B FREE RIGHT TURN, N/B LEFT-TURN AND 2ND E/B LEFT. $900

Page 66: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

64 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE STATE

HIGHWAYORA030603 55 CONSTRUCT 1 AUX LANE ON S/B SR-55 BETWEEN E EDINGER AVE ON RAMP AND E DYER RD OFF RAMP EA0G9600 (SHOPP MOBILITY) $34,064

ORANGE STATE HIGHWAY

ORA084401 55 IN COSTA MESA, SANTA ANA, TUSTIN ON SR-55 BETWEEN PAULARINO AVE AND .2 MILES NORTH OF 17TH STREET - CONVERT EXISTING LIMITED ACCESS HOV STRIPING TO FULL TIME CONTINUOUS ACCESS HOV STRIPING

$1,490

ORANGE STATE HIGHWAY

ORA016 55 PAULARINO AVE (SR-55 NB FRONTAGE ROAD @ PAULARINO AVE) IN COSTA MESA INTERSECTION IMPROVEMENT. ADDING A N/B RAMP AND W/B RIGHT-TURN-LANE.

$505

ORANGE STATE HIGHWAY

ORA017 55 PAULARINO AVE IN SR-55 SB FRONTAGE ROAD COSTA MESA. INTERSECTION IMPROVEMENT ADD S/B RIGHT-TURN LANE. $270

ORANGE STATE HIGHWAY

ORA100511 55 SR-55 WIDENING BETWEEN I-405 AND I-5. ADD ONE LANE IN BOTH DIRECTION. $297,000

ORANGE STATE HIGHWAY

ORA120332 57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) EA 0F0311 (SR91/ORANGETHORPE TO YORBA LINDA SEGMENT) SPLIT PROJECT WITH ORA081901

$72,208

ORANGE STATE HIGHWAY

ORA081901 57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) EA 0F0321 (YORBA LINDA TO LAMBERT SEGMENT) SPLIT PROJECT WITH ORA120332

$73,243

ORANGE STATE HIGHWAY

ORA120333 57 EXIST 4 MF N/B; WIDEN TO 5 MF LANES N/B FROM 0.3 MI S/O KATELLA TO 0.3 MI N/O LINCOLN (2.92 MILES) -- 0F0400 $41,086

ORANGE STATE HIGHWAY

ORA000820 57 SR-57 TRUCK CLIMBING AUX LANE FROM LAMBERT TO LA CO. LINE PPNO 3847A EA 0C120 $124,600

ORANGE STATE HIGHWAY

ORA120320 57 SR-57/LAMBERT RD INTERCHANGE IMPROVEMENTS - RECONFIG EXISTING DIAMOND INTERCHANGE TO LOOP RAMP, ADD SB LN ON OFFRAMP

$38,150

ORANGE STATE HIGHWAY

10254 73 SJHC, 15 MI TOLL RD BETWEEN I-5 IN SAN JUAN CAPISTRANO & RTE 73 IN IRVINE, EXISTING 3/M/F EA.DIR.1 ADD’L M/F EA DIR, PLUS CLIMBING & AUX LNS AS REQ, BY 2020 PER SCAG/TCA MOU 4/5/01

$351,111

ORANGE STATE HIGHWAY

ORA000152 74 ORTEGA HWY (RANCHO VIEJO RD TO JUST EAST OF I-5/SR-74 INTERCHAGE) RDWAY WIDEN ADD RT TRN LNE TO CAPAC & REDUCE QUE ON WB SR-74 TO NB I-5 TRN. N/B FRM 2TO3 & S/B 2TO3 .

$2,550

ORANGE STATE HIGHWAY

ORA120507 74 WIDEN ORTEGA HIGHWAY FROM COUNTY/CITY OF SAN JUAN CAPISTRANO TO APPROXIMATELY 1,900 FEET EAST OF THE INTERSECTION OF THE LA PATA/ORTEGA HIGHWAY INTERSECTION (APPROXIMATELY 1.2 MILES). WIDEN FROM 2 TO 4. INCLUDING WIDENING OF THE BRIDGE OVER SAN JUAN CREEK.

$42,694

ORANGE STATE HIGHWAY

ORA120506 74 WIDEN ROUTE 74 FROM 2 TO 4 LANES - COUNTY SEGMENT (ON ROUTE 74 FROM CITY/COUNTY LINE TO ANTONIO PARKWAY / LA PATA AVE. WIDEN FROM 2 LANES TO 4 LANES) PPNO 4110A EA 08691 SPLIT FROM ORA120507

$40,905

ORANGE STATE HIGHWAY

ORA000115 90 IMPERIAL HWY SMART ST (LAC TO HARBOR) RESTRIPE 4 TO 6 LNS (LAC LINE TO IDAHO ST. ADD RAISED MEDIAN. MODFY MEDIANS AT 4 INTSECS. ADD BUS PADS, TURNOUTS.(COMBINES ORA028 AND ORA029)

$16,244

ORANGE STATE HIGHWAY

ORA082309 90 IMPERIAL HWY SMART ST (SR-57 TO ROSE) WIDEN INTERSECTION OF IMPERIAL HIGHWAY AND ASSOCIATED ROAD TO PROVIDE 2ND DUAL LEFT TURN LANE FOR THE NORTH AND SOUTH LEGS OF ASSOCIATED ROAD AND MODIFICATIONS ON EXISTING AUXILARY LANE (NON CAPACITY IMPROVEMENT) WHICH JOINS THE NB SR-57 ONRAMPS.

$2,300

ORANGE STATE HIGHWAY

ORA020808 90 IN ORANGE COUNTY, ON RTE 90 IMPERIAL HIGHWAY, IN THE CITIES OF YORBA LINDA AND ANAHEIM ON ROUTE 90 FROM EAST OF KELLOGG DRIVE UNDERCROSSING TO LA PALMA AVENUE. THE PROJECT IS TO PROVIDE ENHANCEMENT AND MITIGATION PLANTING. PPNO 4434B EA 12-056221

$1,669

Page 67: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 65

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE STATE

HIGHWAYORA040601 91 ACQUIRE AND INSTALL VALUE PRICING PILOT SYSTEM ON THE 91 EXPRESS LANES TO TEST VIABILITY OF DYNAMIC PRICING OF TOLL

LANES$1,089

ORANGE STATE HIGHWAY

ORA000822 91 CONNECT EXISTING AUXILIARY LANE THROUGH INTERCHANGES ON WB SR-91 BETWEEN SR-57 AND I-5 WITH ITS ELEMENTS PPNO 4516A EA 0C5700

$73,400

ORANGE STATE HIGHWAY

ORA110502 91 EASTBOUND RTE 91 FROM RTE 91/55 CONNECTOR TO EAST OF WEIR CANYON ROAD INTERCHANGE; WESTBOUND RTE 91 FROM EAST OF WEIR CANYON RD INTERCHANGE TO IMPERIAL HWY INTERCHANGE. WIDENING. REPLACEMENT PLANTING/LANDSCAPING. SPLIT FROM ORA030601

$2,498

ORANGE STATE HIGHWAY

ORA111207 91 HOV/HOT CONNECTOR: NB SR-241 TO EB SR-91, WB SR-91 TO SB SR-241 (1 LANE EACH DIR) $3,000

ORANGE STATE HIGHWAY

ORA020807 91 IN ORANGE COUNTY, AT THE COAL CANYON ROAD INTERCHANGE. THE PROJECT IS TO INSTALL VEGETATION ENHANCEMENTS $802

ORANGE STATE HIGHWAY

ORA120336 91 SR-91 EASTBOUND LANE ADDITION BETWEEN SR-241 & SR-71, & IMPROVE NB SR-71 CONNECTOR FROM SR-91 TO STD ONE LANE AND SHOULDER WIDTH. 0G0400

$77,575

ORANGE STATE HIGHWAY

ORA000821 91 SR-91 WB (SR-55 THROUGH TUSTIN INTERCHANGE) EXTEND LANE AND RECONSTRUCT AUX. LANE. PPNO 4587A EA 0C560) $41,930

ORANGE STATE HIGHWAY

ORA030601 91 SR-91: ADD 1 MF LANE E/B BTWN 91/55 CONNECTOR & SR-241 -- W/B BTWN SR-241 & IMPERIAL HWY; MODIFY W/B ON RAMPS FROM LAKEVIEW AVE TO IMPRV MERGE (ADD AUX LANE BETWEEN NB 55 - TO - EB 91 ON-RAMP AND LAKEVIEW OFF RAMP). PROJECT SPLIT LANDSCAPING

$85,986

ORANGE STATE HIGHWAY

ORA990911 142 IN ORANGE COUNTY, ON RTE. 142, TO PROVIDE NATIVE LANDSCAPING. $525

ORANGE STATE HIGHWAY

ORA051 241 (FTC-N) (OSO PKWY TO ETC) (13MI) EXISTING 2 MF IN EA. DIR, 2 ADDITIONAL M/F LANES, PLS CLMBNG & AUX LANS AS REQ BY 2020 PER SCAG/TCA MOU 4/05/01.

$143,517

ORANGE STATE HIGHWAY

ORA052 241 (FTC-S) (I-5 TO OSO PKWY) (15MI) 2 MF EA. DIR BY 2013; AND 1 ADDITIONAL M/F EA. DIR. PLS CLMBNG & AUX LANES AS REQ BY 2030 PER SCAG/TCA MOU 4/05/01. #1988

$1,509,133

ORANGE STATE HIGHWAY

ORA050 241 ETC (RTE 241/261/133) (RTE 91 TO I-5/JAMBOREE) EXISTING 2 M/F EA.DIR, 2 ADD’L M/F IN EA. DIR, PLUS CLIMB AND AUX LNS AS REQ, BY 2020 PER SCAG/TCA MOU 4/05/01.

$1,156,097

ORANGE STATE HIGHWAY

ORA082601 241 HIGHWAY MAINTENANCE (SHOPP) PROJECT, EA 12-0K5900, RTE.241, PM 27.9/39.0, IN ORANGE COUNTY, IN IRVINE AND IN AND NEAR ANAHEIM AND YORBA LINDA. THE PROJECT IS TO PROVIDE TYPE O OVERLAY.

$7,803

ORANGE STATE HIGHWAY

ORA100507 405 CONSTRUCT FOURTH NB THROUGH LANE ON BEACH BLVD AT THE I-405 INTERCHANGE AND REMOVE OFF-RAMP ON I-405 AT BEACH (NORTH-EAST CORNER OF BEACH/EDINGER). CO LEAD WITH WESTMINSTER

$1,500

ORANGE STATE HIGHWAY

ORA082602 405 HIGHWAY MAINTENANCE PROJECT (SHOPP), EA 12-0L0601, IN ORANGE COUNTY, ON RTE 405. IN THE CITIES OF IRVINE AND COSTA MESA FROM RTE. 5 TO HARBOR BLVD. THE PROJECT IS TO PROVIDE PCC PROFILE GRINDING.

$8,750

ORANGE STATE HIGHWAY

ORA000194 405 HOV CONNECTORS FROM I-405 TO I-605, BETWEEN KATELLA AVE. (I-605 PM R001.104) AND SEAL BEACH BLVD. (I-405 PM 022.643), WITH A SECOND HOV LANE IN EACH DIRECTION ON I-405 BETWEEN THE TWO DIRECT CONNECTORS

$159,630

ORANGE STATE HIGHWAY

ORA030605 405 I-405 FROM SR-73 TO I-605 ADD 1 MF LANE EACH DIR AND PROVIDE ADDITIONAL CAPITAL IMPROVEMENTS. #317. COMBINED WITH ORA045, ORA151 AND ORA120310

$1,694,000

ORANGE STATE HIGHWAY

ORA084901 405 I-405/I-605 HOV CONNECTOR REPLACEMENT PLANTING $3,840

Page 68: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

66 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE STATE

HIGHWAYORA080916 405 IN ORANGE COUNTY, I-405 FROM BEAR STREET TO FAIRVIEW ROAD. PROVIDE ROADWAY REHABILITATION INCLUDING PAVEMENT

REPAIR.$1,365

ORANGE STATE HIGHWAY

ORA001109 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - SHOPP PROGRAM. SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

$5,902

ORANGE STATE HIGHWAY

ORA082603 999 GROUPED PROJECTS FOR EMERGENCY REPAIR - SHOPP EMERGENCY RESPONSE PROGRAM. SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. THIS APPLIES TO DAMAGES THAT DO NOT QUALIFY FOR FEDERAL EMERGENCY RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FEDERAL EMERGENCY RELIEF FUNDS BUT EXTEND BEYOND THE FEDERALLY DECLARED DISASTER PERIOD

$34,988

ORANGE STATE HIGHWAY

ORA001103 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - SHOPP ROADWAY PRESERVATION PROGRAM. SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILI-TATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

$124,984

ORANGE STATE HIGHWAY

ORA084402 999 GROUPED PROJECTS FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES. SCOPE - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES

$580

ORANGE STATE HIGHWAY

ORA001102 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP COLLISION REDUCTION PROGRAM SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - RAILROAD/HIGHWAY CROSSING,SHOULDER IMP, TRAFFIC CONTROL DEVICES,OPS ASSISTANCE INTERSECTION SIGNALIZATION PROJECTS PAVEMENT MARKING, LIGHTING IMPROVEMENTS

$32,565

ORANGE STATE HIGHWAY

ORA001108 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MANDATES PROGRAM. SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - RAILROAD/HIGHWAY CROSSING, SAFER NON-FEDERAL-AID SYSTEM ROADS, SHOULDER IMP, TRAFFIC CONTROL DEVICES AND OPS ASSISTANCE OTHER THAN SIGNALIZATION PROJECTS, LIGHTING IMP

$62,457

ORANGE STATE HIGHWAY

ORA001105 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MOBILITY PROGRAM. SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - RAILROAD/HIGHWAY CROSSING, SAFER NON-FEDERAL-AID SYSTEM ROADS, SHOULDER IMP, TRAFFIC CONTROL DEVICES OPS ASSISTANCE.INTERSECTION SIGNALIZATION PROJECTS, PAVEMENT MARKING DEMO,LIGHTING

$10,032

ORANGE STATE HIGHWAY

ORA001104 999 GROUPED PROJECTS FOR SHOULDER IMPROVEMENTS - SHOPP ROADSIDE PRESERVATION PROGRAM. SCOPE: PROJECTS ARE CONSIS-TENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - FENCING,SAFETY ROADSIDE REST AREAS

$7,409

ORANGE STATE HIGHWAY

ORA040607 999 ORANGE COUNTY - COUNTYWIDE ACTIVITIES: PLANNING, PROGRAMMING AND MONITORING (PPM) $20,257

ORANGE LOCAL HIGHWAY

550 0 ALTON AVE IN SANTA ANA CONSTRUCT A NEW 4-LANE (2E/B AND 2W/B) OVERCROSSING & HOV ACCESS RAMPS @ SR-55 $76,988

ORANGE LOCAL HIGHWAY

ORA990919 0 ALTON PARKWAY IMPROVEMENTS - CONSTRUCT NEW 4 LANE ROADWAY FROM COMMERCENTRE DRIVE TO TOWNE CENTRE DRIVE, A LENGTH OF APPROXIMATELY 4,800 FEET.

$6,400

ORANGE LOCAL HIGHWAY

ORA990932 0 ANTONIO PARKWAY PAVEMENT REHABILITATION - THE PROJECT WILL REHABILITATE ANTONIO PARKWAY BY COLD-PLANING AND OVER-LAYING THE EXISTING ROADWAY FROM VIA HONESTO TO COTO DE CAZA/LA PROMESA. INCLUDED IN THIS REHABILITATION WILL BE ISOLATED AREAS OF FULL RECONSTRUCTION, CURB RAMPS.

$445

Page 69: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 67

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE LOCAL

HIGHWAYORA110603 0 BIKEWAY WAYFINDING SIGNAGE - ASSESS EXISTING BIKEWAY WAYFINDING SIGNAGE CITYWIDE WITH FOCUS ON SIGNAGE IN AND

AROUND CLASS I BIKEWAYS, MAJOR INSTITUTIONS, CITY PARKS, RECREATIONAL FACILITIES, SCHOOLS, AND OTHER PUBLICLY-OWNED ASSETS. PRODUCE DETAILED RECOMMENDATIONS ON PLACEMENT AND/OR REPLACEMENT OF SIGNAGE TO DETERMINE THE 60 LOCA-TIONS FOR SIGNAGE INSTALLATION AND/OR REPLACEMENT.

$50

ORANGE LOCAL HIGHWAY

ORA02926 0 BNSF RAILWAY LINE (KRAEMER BLVD TO KELLOGG DR) ALONG SS OF ORANGETHORPE. INSTALL SUPPLEMENTAL SAFETY MEASURES AT 8 AT-GRADE CROSSINGS (4.4 MILES).

$7,518

ORANGE LOCAL HIGHWAY

ORA02925 0 BNSF RAILWAY LINE (PLACENTIA) ALONG SS OF ORANGETHORPE. GRADE SEPARATION/ CORRIDOR IMPROVEMENTS $78,230

ORANGE LOCAL HIGHWAY

ORA125 0 BRISTOL ST (WARNER TO MEMORY LANE) WIDEN FROM 4 TO 6 LANES (IMPV AT BRISTOL/WARNER (ADD NB/EB/SB THRU LNS; WB RT TRN LN) AND BRISTOL/FIRST (ADD NB/SB THRU LNS; SB LFT/RT/TRN LNS

$166,286

ORANGE LOCAL HIGHWAY

ORA120501 0 BROOKHURST STREET WIDENING FROM S/O BALL ROAD TO N/O KATELLA AVENUE (4-6 LANES) $26,480

ORANGE LOCAL HIGHWAY

ORA100601 0 BUD TURNER REC TRAIL AT LAGUNA LAKE. TRAIL RECONSTRUCTION, LANDSCAPE AND IRRIGATION IMPROVEMENT $1,070

ORANGE LOCAL HIGHWAY

ORA020115 0 CABOT ROAD BRIDGE TO CAMINO CAPISTRANO -PROVIDE ALT ACCESS TO METROLINK STATION & RELIEF TO INTERCHANGE AT I-5 & AVERY (LANES IN EACH DIRECTION ON PASEO DE LA COLLINAS FROM CABOT TO CAMINO CAPISTRANO)

$2,678

ORANGE LOCAL HIGHWAY

ORA000162 0 CHAPMAN AVE (TUSTIN TO SR-55) WIDEN FROM 4 TO 6 LANES. ADD 2 DEDIC. RT TURN LANES (1@ WB CHAPMAN & 1@NB TUSTIN) PLUS, 2 BUS TURNOUTS (1@NB TUSTIN AND 1@WB CHAPMAN INTERSECTION.)

$5,870

ORANGE LOCAL HIGHWAY

ORA020506 0 CITY OF ORANGE - SANTA FE DEPOT SPECIFIC PLAN UPDATE $232

ORANGE LOCAL HIGHWAY

ORA020804 0 CONSTRUCT MULTI USE TRAIL STAGING FACILITY ON THE WEST OF THE SANTA ANA RIVER SOUTH OF LINCOLN AVE. IN THE CITY OF ANAHEIM, WHICH WILL INCLUDE: 14 PARKING STALS, RESTROOM BUILDING, 1 DRINKING FOUNTAIN, A HORSE D-RAIL, BICYCLE RACKS, BENCHES, NATIVE LANDSCAPING, SECURITY LIGHTING AND SECURITY FENCING

$472

ORANGE LOCAL HIGHWAY

ORA100606 0 CONSTRUCT REGIONAL CLASS 1 BIKEWAY ALONG COYOTE CREEK FLOOD CONTROL CHANNEL FROM IMPERIAL HWY IN LA HABRA TO LA COUNTY BORDER

$609

ORANGE LOCAL HIGHWAY

ORA082401 0 COW CAMP ROAD (4 LANES) FROM ANTONIO TO FOOTHILL TRANSPORTATION CORRIDOR (FTC)IS A MAJOR ARTERIAL HIGHWAY AND FROM FTC TO ORTEGA PRIMARY ARTERIAL HIGHWAY.

$193,434

ORANGE LOCAL HIGHWAY

ORA000163 0 CROWN VALLEY PARKWAY (PUERTA REAL TO CITY LIMITS, NEAR JARDINES) WIDENING FROM 6 LANE DIVIDED TO 8 LANE DIVIDED. $5,443

ORANGE LOCAL HIGHWAY

ORA100509 0 DESIGN AND IMPLEMENT HARBOR BOULEVARD ITS IN GARDEN GROVE. $3,179

ORANGE LOCAL HIGHWAY

ORA100508 0 DEVELOP AND IMPLEMENT AN ITS MASTER PLAN IN ANAHEIM $1,000

ORANGE LOCAL HIGHWAY

ORA170602 0 FLAMINGO ROAD RECONSTRUCTION $1,980

ORANGE LOCAL HIGHWAY

ORA085003 0 FLOWER STREET BIKE TRAIL GAP CLOSURE- CONSTRUCTION OF A 10-FOOT WIDE BY ONE-HALF MILE LONG ASPHALT BICYCLE TRAIL, INCLUDING LANDSCAPING, IRRIGATION, AND TRAILHEAD PLAZA

$625

Page 70: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

68 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE LOCAL

HIGHWAYORA990906 0 GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES FUNDED WITH TE - SCOPE: PROJECTS ARE CONSISTENT WITH 40

CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED)

$35,834

ORANGE LOCAL HIGHWAY

ORA020501 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - HBP PROGRAM - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

$23,155

ORANGE LOCAL HIGHWAY

ORA55013 0 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - SHOPP ROADWAY PRESERVATION PROGRAM - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

$79,771

ORANGE LOCAL HIGHWAY

ORA990907 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERA-TION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES)

$16,337

ORANGE LOCAL HIGHWAY

ORA082001 0 HARBOR BLVD - ADAMS AVE: ADD A SECOND SOUTHBOUND RIGHT-TURN LANE, ADD A THIRD EASTBOUND LEFT-TURN LANE. $6,964

ORANGE LOCAL HIGHWAY

ORA120522 0 HUNTINGTON BEACH - ATLANTA AVE WIDENING (FRM HUNTINGTON TO DELEWARE; FRM 2 TO 4 LNS) $4,423

ORANGE LOCAL HIGHWAY

ORA102904 0 IMAGE BASED TOLL COLLECTION SYSTEM - DEMONSTRATION PROJECT (ITS) $745

ORANGE LOCAL HIGHWAY

ORA110302 0 IN PLACENTIA AND FULLERTON, N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES). REPLACEMENT PLANTING AS THE RESULT OF THE SR-57 NORTHBOUND WIDENING. REPLACEMENT PLANTING RELATED TO ORA081901 AND ORA120332

$2,688

ORANGE LOCAL HIGHWAY

ORA120510 0 IRVINE - BARANCA & RED HILL INT IMPV (ADD 4TH WB, SB, EB, NB THRU LNS & EB/WB LFT TRN LNS & WB DEDICATED RT TRN LN) $15,475

ORANGE LOCAL HIGHWAY

ORA120511 0 IRVINE - JAMBOREE RD @ I-5/MICHELLE (ADD 4TH SB AND NB THRU LANES) $15,545

ORANGE LOCAL HIGHWAY

ORA120315 0 IRVINE - SAND CANYON @ I-5 (ADD 3RD AND 4TH NB AND SB THRU LNS ON SND CYN; IMP EB APPROACH ADD 2 LFT TRN LNS,1 THRU LN, & 1 RT TRN LN)

$8,441

ORANGE LOCAL HIGHWAY

ORA120514 0 IRVINE - TRABUCO RD @ SR-133 (ADD NEW ON-RAMPS AND OFF RAMPS AT TRABUCO & SR-133) $71,875

ORANGE LOCAL HIGHWAY

ORA48 0 JEFFERY RD (IRVINE CENTER DR TO WALNUT) RAILROAD GRADE SEPARATION. FROM 4 TO 6 LANES. DUAL LEAD OCTA IRVINE $46,449

ORANGE LOCAL HIGHWAY

ORA020823 0 KRAEMER BLVD GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON KRAEMER BLVD AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT.

$100,413

ORANGE LOCAL HIGHWAY

ORA120305 0 LA PALMA - LA PALMA AVE/DEL AMO BLVD OVER COYOTE CRK - REALIGN EXISTING RDWY TO STRAIGHT; DEMO & RECONSTRUCTION $800

ORANGE LOCAL HIGHWAY

ORA000173 0 LA PAZ RD (MURILANDS/I-5 TO CHRISANTA DR) WIDENING FROM 4 TO 6 LANES BRIDGE # 55C0215 $12,250

ORANGE LOCAL HIGHWAY

ORA120316 0 LAGUNA NIGUEL - CROWN VALLEY PKWY WIDENING (WIDEN EB FROM CABOT TO I-5 ON RAMP, FROM 4 TO 5 LANES; ADD DED RT TRN LN FOR SB I-5 ON RAMP AND DED RT TRN LN FOR NB ON RAMP)

$10,109

Page 71: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 69

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE LOCAL

HIGHWAYORA020825 0 LAKEVIEW AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON LAKEVIEW AVE AT THE BNSF RR TRACKS. ORANGE COUNTY

GATEWAY PROJECT. PROJECT UTILIZING $3,032 IN TOLL CREDITS FOR ROW PHASE IN FY10/11$73,956

ORANGE LOCAL HIGHWAY

ORA000146 0 MEATS AVE @ SR55 INTERCHANGE. CONSTRUCT ON-RAMP/OFF-RAMPS. PART OF SR-55 ENHANCEMENT PROJECTS.(0 TO 2 LANES) $60,000

ORANGE LOCAL HIGHWAY

ORA000125 0 MOULTON PKWY (SANTA MARIA TO EL PACIFICO) WIDEN FRM 7 TO 9 LANES (N/B 3 TO 4 AND S/B 4 TO 5), WIDEN INTERSECTIONS, ADD SIDEWALK AND LANDSCAPING.

$7,685

ORANGE LOCAL HIGHWAY

ORA000813 0 NEWPORT AVENUE EXTENSION PROJECT, PHASE II (FROM N/O EDINGER AVE. TO MYRTLE AVE.) GRADE SEPARATION AT OCTA/SCRRA RAILWAY PAED ONLY

$2,316

ORANGE LOCAL HIGHWAY

ORA040605 0 NEWPORT BEACH - JAMBOREE RD WIDENING (BETWEEN BAYVIEW WAY & MACARTHUR BLVD) FROM 6 TO 8 LANES $1,631

ORANGE LOCAL HIGHWAY

ORA120527 0 ORANGE - MAIN ST (WIDEN FRM CULVER TO 260’ N/O PALMYRA; FRM 4 TO 6 LNS) $4,043

ORANGE LOCAL HIGHWAY

ORA120505 0 ORANGE COUNTY - ALTON PARKWAY EXTENSION (IRVINE) (IRVINE BLVD TO CMMERCENTER DR; FRM 0 TO 6 LNS) $40,000

ORANGE LOCAL HIGHWAY

ORA120504 0 ORANGE COUNTY - LA PATA AVENUE WIDENING & GAP CLOSURE (WIDEN FROM 3 TO 5 LNS (2,700 FT S/O ORTEGA HWY TO RD TERMINUS); GAP CLOSURE - ADD 4 LNS (EXISTING LA PATA TERMINUS TO CALLE SALUDA); EXTENSION - ADD 4 LANES (EXISTING CAMINO DEL RIO TERMINUS TO LA PATA)

$38,560

ORANGE LOCAL HIGHWAY

ORA020507 0 ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) - REDUCE ORANGE COUNTY CONGESTION (ROCC) PROGRAM (INCLUDES STUDIES AND PLANNING)CO-LEAD OCTA

$1,500

ORANGE LOCAL HIGHWAY

ORA020805 0 ORANGE COUNTY SIGNAL IMPROVEMENT PROGRAM. THIS PROJECT WILL TARGET 158 MILES AND 533 SIGNALIZED INTERSECTIONS ALONG TEN HIGH-VOLUME REGIONAL TRAFFIC CORRIDORS ACROSS THE COUNTY OF ORANGE FOR COORDINATED SIGNAL SYNCHRONIZATION.

$8,000

ORANGE LOCAL HIGHWAY

ORA020824 0 ORANGETHORPE AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON ORANGETHORPE AVE AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT. PROJECT UTILIZING $1,922 IN TOLL CREDITS FOR ROW PHASE

$117,383

ORANGE LOCAL HIGHWAY

ORA100605 0 OSO CREEK TRAIL - COMPREHENSIVE SIGNAGE INCLUDING 4 KIOSKS AND WAYFINDING SIGNS ALONG 5.5 MILES OF TRAIL $324

ORANGE LOCAL HIGHWAY

ORA111601 0 PCH DEL PRADO STREETSCAPE IMPROVEMENT PROJECT PHASE 1 STUDY- BETWEEN BLUE LANTERN AND COPPER LANTERN, CONVERT FROM 1-WAY TO 2-WAY STREETS, INTERSECTION IMPROVEMENTS, TRAFFIC CALMING, TRAFFIC SIGNAL MODIFICATION, BICYCLE AND TRANSPORTATION ENHANCEMENTS, STREET REPAIR AND OTHER STREET MODIFICATION.

$2,338

ORANGE LOCAL HIGHWAY

ORA120524 0 PLACENTIA - ORANGETHORPE AVE WIDENING (FRM MELROSE AVE TO ECL; FRM 4 TO 6 LNS) $1,188

ORANGE LOCAL HIGHWAY

ORA120523 0 PLACENTIA - RICHFIELD AVE - ATWOOD CHANNEL BRIDGE WIDENING FROM 3 TO 4 LANES $347

ORANGE LOCAL HIGHWAY

ORA080604 0 PLANNING FOR TRANSIT IN STANTON: CITYWIDE POLICIES AND SITE SPECIFIC DEVELOPMENT STANDARDS FOR TRANSIT-ORIENTED PROJECTS. (OCCOG ROCC)

$264

ORANGE LOCAL HIGHWAY

ORA190601 0 PLANNING STUDIES AND PSR’S (SR-55 STUDY 19TH STREET TO INDUSTRIAL WAY IN COSTA MESA) $1,130

Page 72: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

70 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE LOCAL

HIGHWAYORA080602 0 PLANNING STUDY TO EVALUATE THE LAND USE IN THE GATEWAY SPECIFIC PLAN (GSP) INCLUDING TRANSIT ORIENTED DEVELOPMENT

AND MIXED USE DEVELOPMENT (OCCOG ROCC)$203

ORANGE LOCAL HIGHWAY

ORA080902 0 PROJECT FEASIBILITY STUDY OF SIX MILES OF NEW ROADWAYS INCLUDING TRABUCO RD, O STREET AND MARINE WAY $500

ORANGE LOCAL HIGHWAY

ORA082406 0 PROJECT WILL BUILD OUT ANTONIO PARKWAY TO ITS MASTER PLAN OF ARTERIAL HIGHWAYS DESIGNATION WIDTH BETWEEN LADERA PLANNED COMMUNITY AND ORTEGA HIGHWAY BY WIDENING THE ROAD FROM FOUR TO SIX LANES. THE PROJECT WILL INCLUDE WIDEN-ING ANTONIO PARKWAY BRIDGE BY ONE LANE IN EACH DIRECTLY.

$47,499

ORANGE LOCAL HIGHWAY

ORA990918 0 RANCHO PARKWAY EXTENSION: HERMANA CIRCLE TO PORTOLA PARKWAY APPROX 1700 FEET. RANCHO PARKWAY WILL BE A 4-LANE DIVIDED ROADWAY

$2,056

ORANGE LOCAL HIGHWAY

ORA000809 0 RAYMOND AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON RAYMOND AVE AT THE BNSF RR TRACKS $76,792

ORANGE LOCAL HIGHWAY

ORA020801 0 RECONSTRUCT OR REHABILITATE RECREATIONAL TRAIL ALONG LEMON ST. FROM SANTIAGO TO VALLEY DR. $733

ORANGE LOCAL HIGHWAY

ORA000177 0 RED HILL @ EDINGER AVE/RR TRACKS. GRADE SEPARATION THE PE STUDY WILL ADDRESS VARIOUS ALTERNATIVES $2,097

ORANGE LOCAL HIGHWAY

ORA020802 0 SALT CREEK TRAIL ENHANCEMENT PROJECT $637

ORANGE LOCAL HIGHWAY

ORA120525 0 SAN JUAN CAPISTRANO - DEL OBISPO WIDENING (WIDEN FRM ALIPAZ TO CAMINO CAPISTRANO; TO ACCOMMODATE BIKE LANES AND SIDEWALK IN EACH DIRECTION)

$7,480

ORANGE LOCAL HIGHWAY

ORA000118 0 SAND CYN RD @ SCRRA TRACKS (BURT RD TO LAGUNA CANYON/OAK CANYON) - RAILROAD GRADE SEPARATION. WIDENS FROM 4 TO 6 LANES. CO LEAD WITH OCTA

$55,590

ORANGE LOCAL HIGHWAY

ORA120521 0 SANTA ANA - FIRST STREET WIDENING (FRM SUSAN TO FAIRVIEW; FRM 4 TO 6 LNS) BRIDGE 55C0022 $16,171

ORANGE LOCAL HIGHWAY

ORA120520 0 SANTA ANA - GRAND AVENUE WIDENING (FRM 1ST TO 4TH; FRM 2 TO 3 LNS ) $12,437

ORANGE LOCAL HIGHWAY

ORA120519 0 SANTA ANA - MACARTHUR BLVD WIDENING (WIDEN SB ONRAMP (FRM EB MACARTHUR) TO SR-55 BY ADDING 1LN) WIDEN FROM 3 TO 4 LANES.

$1,499

ORANGE LOCAL HIGHWAY

ORA082610 0 SANTA ANA BLVD GRADE SEPARATION - NEAR THE EXPANSION OF THE SANTA ANA REGIONAL TRANSPORTATION CENTER. (SARTIC) INITIAL PLANNING AND CONCEPTUAL ENGINEERING PHASE. RELATED TO ORA81621

$1,671

ORANGE LOCAL HIGHWAY

ORA020809 0 SANTA ANA GOLDEN LOOP TRAIL REHABILITATION - REHAB 19,000 LINEAR FEET OF TRAIL $293

ORANGE LOCAL HIGHWAY

ORA100603 0 SANTA ANA RIVER TRAIL FAIRVIEW TRIANGLE HABITAT RESTORATION PROJECT IMPROVEMENTS FOR AND ALONG THE SANTA ANA RIVER TRAIL

$150

ORANGE LOCAL HIGHWAY

ORA120518 0 SANTA ANTA - MAC ARTHUR BLVD WIDENING (WIDEN NB ONRAMP (FROM EB MACARTHUR) TO SR-55 BY ADDING 1 LN). $1,841

ORANGE LOCAL HIGHWAY

ORA120330 0 SEAL BEACH - SEAL BEACH BLVD, OVERPASS BRIDGE LENGTHENING TURN LANES AND RAMPS REALIGNMENT (FROM BEVERLY MANOR RD TO OLD RANCH PKWY)

$9,926

Page 73: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 71

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)ORANGE LOCAL

HIGHWAYORA990928 0 SEAL BEACH BLVD AT 405 FWY SOUTHBOUND OFF RAMP. TO WIDEN THE EASTSIDE AND ADD AN ADDITIONAL THRU LANE (FROM 6 TO

7).$1,443

ORANGE LOCAL HIGHWAY

ORA990912 0 SEAL BEACH BLVD FROM OLD RANCH PKWY TO ST. CLOUD. WIDEN STREET TO MATCH NEW BRIDGE OVER 405 FWY. 2 EXISTING LANES IN EACH DIRECTION. 3 LANES IN EACH DIRECTION WHEN CONSTRUCTED

$1,443

ORANGE LOCAL HIGHWAY

ORA100506 0 SIGNAL UPGRADES ON AVENIDA DE LAS FLORES, MELINDA ROAD, AVENIDA DE LAS BANDERAS, AND ALMA ALDEA, IN RSM. $145

ORANGE LOCAL HIGHWAY

ORA000815 0 SR-91/GYPSUM CANYON ROAD INTERCHANGE. WIDEN GYPSUM CANYON ROAD FROM 2 TO 4 LANES. ADD CLASS II ON-ROAD BIKE LANES, ADD MULTI USE TRAIL AND SIDEWALK ON WEST SIDE OF ROADWAY. THIS WILL REQUIRE MODIFICATION OF EXISTING ENTRANCE RAMP TO GYPSUM. SR-91 CONNECTIONS ARE UNCHANGED, THE EASTBOUND SR-91 EXIT RAMP INTERSECTION WILL BE RECONSTRUCTED AND SIGNALIZED.

$5,000

ORANGE LOCAL HIGHWAY

ORA040602 0 STATE COLLEGE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON STATE COLLEGE BLVD AT THE BNSF RR TRACKS (SANTA FE AVE TO 700 FT SOUTH OF VALENCIA)

$73,648

ORANGE LOCAL HIGHWAY

ORA080603 0 THE CITY’S CONSULTANT WILL PREPARE A PROGRAM ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE SANTA FE SPECIFIC PLAN UPDATE (OCCOG ROCC)

$223

ORANGE LOCAL HIGHWAY

ORA020826 0 TUSTIN AVE / ROSE DRIVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON TUSTIN AVE / ROSE DRIVE AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT

$99,210

ORANGE LOCAL HIGHWAY

ORA990452 0 TUSTIN BRANCH RAIL TRAIL ALONG THE SANTIAGO CREEK FROM TUSTIN ST. TO WALNUT AVE. AND CITY OWNED RW FROM WALNUT AVE. TO COLLINS AVE. FILLS 2 MILE GAP IN A REGIONAL TRAIL.

$2,436

ORANGE LOCAL HIGHWAY

ORA55244 0 TUSTIN RANCH ROAD EXTENSION FROM WALNUT AVENUE TO VALENCIA AVENUE INCLUDING CONSTRUCTION OF A BRIDGE OVER THE OCTA/SCRRA RAILWAY LINE AND EDINGER AVENUE. 3 NEW LANES IN EACH DIRECTION FOR A TOTAL OF 6.

$13,995

ORANGE LOCAL HIGHWAY

ORA080920 0 WIDEN AND RECONSTRUCT FIRESTONE BLVD FROM ARTESIA BLVD TO APPROXIMATELY 900 FEET NORTH OF ARTESIA. ADD A DUAL LEFT TURN LANE AND THIRD THROUGH LANE ALONG ARTESIA BLVD AT THE EASTBOUND APPROACH OF THE INTERSECTION

$6,723

ORANGE LOCAL HIGHWAY

ORA082405 0 WIDEN OSO PARKWAY FROM BLASCO TO INTERSTATE 5 - PROJECT WILL WIDEN BOTH THE EAST BOUND AND WEST BOUND DIRECTIONS FROM THE CURRENT THREE LANES IN EACH DIRECTION TO FOUR LANES IN EACH DIRECTION.

$11,408

ORANGE LOCAL HIGHWAY

ORA110602 0 WIDENING OF LAGUNA CANYON / I-405 OVERCROSSING FROM 2 LANES TO 4 LANES $11,950

ORANGE LOCAL HIGHWAY

ORA120322 0 YORBA LINDA - CONSTRUCT PEDESTRIAN BRIDGE OVER IMPERIAL HWY NEAR MAIN ST $4,215

RIVERSIDE TRANSIT RIV080927 0 AT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: MAINTENANCE FACILITY UPGRADES (UNLEADED FUEL DISPENSERS, FIRE DOOR, ENERGY EFFICIENT LIGHTING, ROOF REPAIRS, EASEMENT RESTORATION (RIVERSIDE YARD PROPERTY), AND RE-KEY AND INSTALL FUEL FORCE SYSTEM TO STANDARIZE AND UPDATE MAINTENANCE AND SECURITY PROCEDURES)) (FY 09 5307).

$430

RIVERSIDE TRANSIT RIV041021 0 BUS RAPID TRANSIT (BRT) ENHANCEMENTS: ADVERTISING, MARKETING, PLACEMENT/LOGISTICS OF BRT INFRASTRUCTURE, STUDIES, ETC. FOR BRT DEVELOPMENT & IMPLEMENTATION (FY 05 5307)

$262

RIVERSIDE TRANSIT RIV050556 0 BUS RAPID TRANSIT (BRT) ENHANCEMENTS: DEVELOP BRT ENHANCEMENT PLAN (E.G. PROMOTIONAL STRATEGIES, BRAND AWARENESS & RIDERSHIP SCENARIOS, ETC.) (FY 06 5307 UZA: TEM/MURR) (TE)

$400

RIVERSIDE TRANSIT RIV061138 0 FACILITIES IMPROVEMENTS AT EXISTING RTA RIVERSIDE & HEMET FACILITIES (E.G. CONCRETE REPLACEMENT, FLOOR RECOATING, FACILITY PAINTING, ROOF REPAIRS, ETC.) (FY 08 5307) (UZA: RIV-SAN)

$138

Page 74: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

72 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV050524 0 FOR RIV SS - CONSTRUCT EXPANDED SERVICE BAY FOR VEHICLE MAINTENANCE AT EXISTING RIVERSIDE MAINT. FACILITY OPS AREA

SUPPORTING EXISTING VEHICLE FLEET (FY 07 5307) (UZA: RIV-SAN)$1,000

RIVERSIDE TRANSIT RIV080926 0 FOR RIVERSIDE SPECIAL SERVICES - CONSTRUCT FLEET BAY FOR PARARANSIT VEHICLES, PER APPROVED 2008/2009 SRTP, TABLE 4 - CAPITAL PROJECT NO. FY 09-3 (FY 09 5307) (UZA: RIV-SAN)

$1,030

RIVERSIDE TRANSIT RIV071263 0 IN COACHELLA VALLEY - FRED WARING CORRIDOR EXPRESS SERVICE DEMONSTRATION PROJECT: PROVIDE LIMITED EXPRESS SERVICE FROM THE INDIO TRANSFER LOCATION TO THE TRANSFER LOCATION ON TOWN CENTER WAY WITH SERVICE TO COLLEGE OF THE DESERT AND LIMITED STOPS ALONG THE CORRIDOR.

$350

RIVERSIDE TRANSIT RIV070708 0 IN COACHELLA VALLEY - PURCHASE 16 REPLACEMENT BUSES (ALT-FUEL 30-40 FT, 30-43 PASSENGER) W/ LIFTS, RACKS, FARE BOXES, RADIOS & ACCESSORIES (FY 08 5307) (UZA: INCCPS) (E-BUSP-0101)

$5,226

RIVERSIDE TRANSIT RIV110408 0 IN COACHELLA VALLEY - RIDESHARE PROGRAM (FTA 5316, FY’S 09 AND 10). $165

RIVERSIDE TRANSIT RIV090109 0 IN COACHELLA VALLEY - RIDESHARE PROGRAM (FY 07 & 08 - 5316). $50

RIVERSIDE TRANSIT RIV090403 0 IN COACHELLA VALLEY AREA - CNG FUELING STATION IMPROVEMENTS (2008/2009 SRTP - REV TABLE 4 - SL09-09). $439

RIVERSIDE TRANSIT RIV090912 0 IN COACHELLA VALLEY AREA - PURCHASE FIVE (5) REPLACEMENT ALT FUEL PARATRANSIT VEHICLES (2008/2009 SRTP - TABLE 4 - SL 09-13, UPDATED 9/16/2009) (FTA 5307 - FY 09).

$515

RIVERSIDE TRANSIT RIV110805 0 IN COACHELLA VALLEY AREA - PURCHASE SEVEN (7) REPLACEMENT CNG PARATRANSIT BUSES (FTA 5307 - FY 12)(UZA: INCCPS). $665

RIVERSIDE TRANSIT RIV090113 0 IN COACHELLA VALLEY AREA FOR DESERT ARC: PURCHASE ONE REPLACEMENT LARGE BUS - VII (FY 08 - 5310). $95

RIVERSIDE TRANSIT RIV110106 0 IN COACHELLA VALLEY AREA FOR SUNLINE TRANSIT AGENCY - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 - 5307 CARRY OVER) (UZA: INCCPS).

$1,875

RIVERSIDE TRANSIT RIV090615 0 IN COACHELLA VALLEY AREA FOR SUNLINE TRANSIT AGENCY - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 5307) (UZA: INCCPS). $1,745

RIVERSIDE TRANSIT RIV110110 0 IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITIES - TRANSIT SECURITY ENHANCEMENT PROJECT (E.G., FENCING AROUND PERIMETERS OF THOUSAND PALMS AND INDIO FACILITIES).

$810

RIVERSIDE TRANSIT RIV110809 0 IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITIES - TRANSIT SECURITY ENHANCEMENT PROJECT, INCLUDING REPLACEMENT VEHICLES FOR STAFF IN THE SAFETY/SECURITY DEPARTMENT AND TO ENHANCE BUS STOPS THROUGHOUT THE VALLEY (PROP 1B FUNDED PROJECT).

$395

RIVERSIDE TRANSIT RIV071232 0 IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITIES/MAINTENACE BUILDING: MAINTENANCE BUILDING CAPABILITY EXPANSION AND REHABILITATION/ENHANCEMENTS OF THE EXISTING MAINTENANCE BUILDING. (FY 09 - ARRA 5307).

$3,250

RIVERSIDE TRANSIT RIV110111 0 IN COACHELLA VALLEY AT EXISTING SUNLINE FACILITY - FACILITY IMPROVEMENTS: IMPROVE EXISTING FACILITIES, INCLUDING ROOF REPAIR, CARPET REPLACEMENT, BLIND REPLACEMENT, PARKING LOT REPAIRS, ETC., AT THE THOUSAND PALMS AND INDIO FACILITIES (FY 11 - 5307) (UZA: INDCCPS).

$451

RIVERSIDE TRANSIT RIV071266 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT - CONSTRUCTION OF NEW ADMINISTRATIVE OFFICE AND TRANSIT HUB AT 32-505 HARRY OLIVER TR., IN THOUSAND PALMS, CA. THE NEW ADMINISTRATIVE OFFICE WILL REPLACE THE 24-YR. OLD TEMPORARY TRAILER FACILITIES THAT HAVE EXCEEDED THEIR USEFUL LIFE BY 4 YEARS (FTA 5309C - E-2009-BUSP-171; 2009 HR 1105, PUBLIC LAW 11-8).

$16,980

RIVERSIDE TRANSIT RIV110801 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - CAPITALIZED PREVENTIVE MAINTENANCE (FY 12 - 5307 & CARRY OVER) (UZA: INCCPS).

$1,967

RIVERSIDE TRANSIT RIV110808 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FACILITY IMPROVEMENTS: IMPROVE THE THOUSAND PALMS AND INDIO FACILITIES, INCLUDING ROOF REPAIR, BUILDING ROOF, REPLACEMENT OF CARPETING AND BLINDS, AND REPAIR OF PARKING FACILITIES FOR STAFF USE (FTA 5307 - FY 12) (UZA: INCCPS).

$550

Page 75: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 73

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV090614 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR

2009/2010 (FY 10 - 5307) (UZA: INCCPS).$20,960

RIVERSIDE TRANSIT RIV110105 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2010/2011 (FTA 5307 - FY 11 AND C/O FY 10) (UZA: INCCPS).

$19,449

RIVERSIDE TRANSIT RIV110803 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2011/2012 (FTA 5307 - FY 12 AND C/O FY 11) (UZA: INCCPS).

$20,077

RIVERSIDE TRANSIT RIV110103 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FURNITURE REPLACEMENT: PURCHASE NEW FURNITURE TO REPLACE EXISTING FURNITURE FOR STAFF IN VARIOUS DEPARTMENTS (FY 11 - 5307) (UZA: INDCCPS).

$300

RIVERSIDE TRANSIT RIV110827 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - FURNITURE REPLACEMENT: PURCHASE OF OFFICE FURNITURE TO REPLACE AND ADD FURNITURE AS THE FURNITURE REACHES THE END OF ITS CYCLE LIFE (FY 12 - 5307) (UZA: INCCPS).

$120

RIVERSIDE TRANSIT RIV090107 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - JOB ACCESS & REVERSE COMMUTER PROGRAM & NEW FREEDOM PROJECTS LUMP SUM FOR NON-PROFIT ORGANIZATIONS (CONSISTENT W/40 CFR PART 93 EXEMPT TABLES 2 AND 3 ) ( FY 07 & 08 - 5316 & 5317).

$207

RIVERSIDE TRANSIT RIV090620 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - JOINT PARTNERSHIP WITH CALSTART/WESTSTART FOR FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP AND OPERATE A ZERO EMISSION BUS (E-2008-BUSP-0102).

$282

RIVERSIDE TRANSIT RIV071228 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE 4 EXPANSION PARATRANSIT DAR BUSES (CNG, 30 FT., APPROX. 12 PASSENGER), WITH LIFTS, RADIOS, FARE BOXES, AND ACCESSORIES (PER SUNLINE’S REV. 2008/2009 SRTP T-4 - SL09-08).

$412

RIVERSIDE TRANSIT RIV090617 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE FIVE REPLACEMENT NON-REVENUE SUPPORT VEHICLES (FY 10 5307) (UZA: INCCPS).

$231

RIVERSIDE TRANSIT RIV090619 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE FOUR EXPANSION PARATRANSIT DAR BUSES (CNG, 30’ TO 35’ - APPROX. 12 PASSENGER), WITH LIFTS, RADIOS, FARE BOXES, AND ACCESSORIES (FY 10 5307) (FTA 5309 - E-2009-BUSP-135)(UZA: INCCPS).

$400

RIVERSIDE TRANSIT RIV090618 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE FOUR EXPANSION, NON-REVENUE SUPPORT VEHICLES (FY 10 5307) (UZA: INCCPS).

$112

RIVERSIDE TRANSIT RIV110810 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE OF TICKET VENDING MACHINE (TVM) FOR INSTALLATION AT A SELECTED BUS TRANSFER LOCATION (FY 12 - 5307) (UZA: INCCPS).

$75

RIVERSIDE TRANSIT RIV110102 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE ONE EXPANSION PARATRANSIT VEHICLE (CNG, 30’ TO 35’ - APPROX. 12 PASSENGER), WITH LIFT, RADIO, FARE BOX, AND ACCESSORIES TO EXPAND DEMAND RESPONSE SERVICE AND ONE COMMUTER BUS TO PROVIDE COMMUTER SERVICE FROM THE COACHELLA VALLEY TO THE PASS AREA (FY 11 - 5309).

$938

RIVERSIDE TRANSIT RIV110108 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE SEVEN EXPANSION PARATRANSIT DAR BUSES (CNG - 25’ TO 35’ BUSES), WITH LIFTS, RADIOS, FARE BOXES, AND ACCESSORIES FOR SERVICE EXPANSION THROUGHOUT THE SERVICE AREA, BASED ON RECOMMENDATIONS IN THE 2006 COA AND 2009 COA UPDATE. THE BUSES WILL BE USED TO EXPAND DAR, SPECIALIZED TRANSIT SERVICES AND FOR SENIORS AND PERSONS W/DISABILITIES.

$748

RIVERSIDE TRANSIT RIV110109 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES (E.G., BUS SHELTERS, KIOSK LEXANS, LEXAN SCHEDULES, SOLAR BATTERIES, AND MISC. SUPPLIES) FOR VARIOUS BUS STOPS (FY 11 - 5307) (UZA: INCCPS).

$300

RIVERSIDE TRANSIT RIV090621 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES (E.G., KIOSK LEXANS, LEXAN SCHEDULES, SOLAR BATTERIES, AND MISC. SUPPLIES), FOR VARIOUS BUS STOPS (FY 10 5307) (UZA: INDCCPS).

$80

Page 76: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

74 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV110806 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES FOR CONTINUED

IMPROVEMENTS TO BUS STOPS FOR THE SAFETY AND COMFORT OF PASSENGERS AS RECOMMENDED IN THE COMPREHENSIVE OPERATIONAL ANALYSIS (FY 12 - 5307) (UZA: INCCPS).

$66

RIVERSIDE TRANSIT RIV090622 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES ON BUS STOP IMPROVEMENT PROJECTS (FY 10 5307) (UZA: INDCCPS).

$650

RIVERSIDE TRANSIT RIV080921 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES ON BUS STOP IMPROVEMENT PROJECTS. ITS EQUIPMENT TO BE PURCHASED INCLUDES: AUTOMATED VEHICLE LOCATORS (AVL), GEOGRAPHIC POSITIONING SYSTEM (GPS), AND MOBILE DATA TERMINALS (MDT) (FY 09 - ARRA 5307).

$1,417

RIVERSIDE TRANSIT RIV110812 0 IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - TECHNICAL TRANSIT PLANNING AND FACILITY FEASIBILITY STUDIES (FY 12 - 5307) (UZA: INCCPS).

$450

RIVERSIDE TRANSIT RIV090120 0 IN CORONA – BUS STOP SHELTERS AND BUS STOP AMENITIES AND REPLACEMENT EQUIPMENT (FY 10 – ARRA FTA 5307). $240

RIVERSIDE TRANSIT RIV090610 0 IN CORONA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 - 5307) (UZA: RIV-SB). $606

RIVERSIDE TRANSIT RIV051201 0 IN CORONA - CONTINUE THE IMPLEMENTATION OF A 60 SPACE PARK-AND-RIDE LOT (VIA ANNUAL LEASE AGREEMENT) AT LIVING TRUTH CHRISTIAN FELLOWSHIP AT 1114 W. ONTARIO AVE.

$40

RIVERSIDE TRANSIT RIV090119 0 IN CORONA – PURCHASE 4 REPLACEMENT TYPE II CNG PARATRANSIT DIAL-A-RIDE BUSES W/LIFTS, FAREBOXES, SECURITY CAMERAS, COMMUNICATION EQUIPMENT & ACCESSORIES (FY 10 – ARRA FTA 5307).

$360

RIVERSIDE TRANSIT RIV091210 0 IN CORONA - PURCHASE THREE REPLACEMENT TYPE II CNG PARATRANSIT DIAL-A-RIDE BUSES W/LIFTS, FAREBOXES, SECURITY CAMERAS, COMMUNICATION EQUIPMENT & ACCESSORIES (FEDERAL APPROPRIATION THROUGH HR 3288, FFY 2009/2010 - FTA 5309).

$260

RIVERSIDE TRANSIT RIV110802 0 IN EASTERN RIVERSIDE COUNTY FOR PALO VERDE TRANSIT AGENCY - OPERATING ASSISTANCE: FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEAR 2011/2012 (UZA: PALO VERDE).

$960

RIVERSIDE TRANSIT RIV110112 0 IN EASTERN RIVERSIDE COUNTY FOR PALO VERDE VALLEY TRANSIT AGENCY - FIXED ROUTE AND DIAL-A-RIDE: OPERATING ASSISTANCE FOR FISCAL YEAR 2010/2011 (FY 11 - 5307) (UZA: PALO VERDE).

$828

RIVERSIDE TRANSIT RIV041029 0 IN RIVERSIDE - CONSTRUCT NEW RIVERSIDE TRANSIT CENTER AT 4141 VINE ST., IN THE VICINITY OF DOWNTOWN METROLINK STATION (5309C FY 03+04+06+08, E-2006-BUSP-156 & E-2008-BUSP-0688 EARMARKS) (FY 09 5309) (UZA: RIV-SAN) (TE)

$7,510

RIVERSIDE TRANSIT RIV110914 0 IN RIVERSIDE AND SAN BERNARDINO COUNTY – FOR RIVERSIDE – SAN BERNARDINO COUNTY INDIAN HEALTH, INC.: PURCHASE OF FIVE MINI-VANS FOR SERVICE EXPANSION (FTA 5310 - FFYS 10 & 11) ($25 TDC USED TO MATCH FTA 5310 IN CONS).

$220

RIVERSIDE TRANSIT RIV110828 0 IN RIVERSIDE CO - GROUPED PROJECTS FOR PURCHASE OF NEW BUSES & RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF NEW AND RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET (FTA 5310 - FFYS 10 & 11) ($27 TDC USED TO MATCH FTA 5310 IN CONS).

$234

RIVERSIDE TRANSIT RIV110915 0 IN RIVERSIDE CO - GROUPED PROJECTS FOR PURCHASE OF NEW BUSES & RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF NEW AND RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPANSIONS OF THE FLEET (FTA 5310 - FFYS 10 & 11) ($72 TDC USED TO MATCH FTA 5310 IN CONS).

$630

Page 77: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 75

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV100604 0 IN RIVERSIDE COUNTY - GROUPED PROJECTS FOR PURCHASE OF NEW BUSES AND REPLACEMENT OF EXISTING VEHICLES OR FOR

MINOR EXPANSION OF THE FLEET: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND 3 CATEGORIES - PURCHASE OF NEW BUSES AND REPLACEMENT OF EXISTING VEHICLES OR FOR MINOR EXPANSION OF THE FLEET (FTA 5310 - FY 2009).

$1,364

RIVERSIDE TRANSIT RIV110829 0 IN RIVERSIDE COUNTY - GROUPED PROJECTS FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (FTA 5310 - FFY’S 10 AND 11) (.27K TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FTA 5310 IN CONS).

$2

RIVERSIDE TRANSIT RIV090611 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 - 5307) (UZA: RIV-SB). $300

RIVERSIDE TRANSIT RIV110101 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 11 - 5307) (UZA: RIV-SB). $300

RIVERSIDE TRANSIT RIV110807 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 12 - 5307) (UZA: RIV-SB). $350

RIVERSIDE TRANSIT RIV090121 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES – PURCHASE FAREBOX SYSTEM (FY 10 –ARRA FTA 5307). $530

RIVERSIDE TRANSIT RIV110826 0 IN RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - REPLACEMENT VEHICLES: PURCHASE OF FOUR (4) REPLACEMENT ALT-FUEL (CNG) DIAL-A-RIDE PARATRANSIT VEHICLES W/LIFTS, TIEDOWNS, FAREBOXES, RADIOS, CAMERAS, AND ACCESSORIES (FY 12 - 5307) (UZA: RIV-SAN).

$475

RIVERSIDE TRANSIT RIV090122 0 IN RIVERSIDE, FOR RIVERSIDE SPECIAL SERVICES – PURCHASE EQUIPMENT TO SUPPORT THE CNG MAINTENANCE FACILITY OPERATION (FY 10 – ARRA FTA 5307).

$170

RIVERSIDE TRANSIT RIV050553 0 IN TEMECULA - CONSTRUCT NEW TEMECULA TRANSIT CENTER AT 27199 JEFFERSON AVE. (SW OF JEFFERSON AVE & SE OF CHERRY ST) (04, 05, 06, 07, E-2006-091, E-2007-0131, & 2008-BUSP-0131, SAFETEA-LU).

$8,000

RIVERSIDE TRANSIT RIV041030 0 IN THE CITY OF HEMET - CONSTRUCT NEW HEMET TRANSIT CENTER (WITH APPROXIMATELY 4 BUS BAYS) AT 700 SCARAMELLA CR., HEMET, CA (5309C FY 04 + 05 EARMARKS).

$1,442

RIVERSIDE TRANSIT RIV090115 0 IN THE COACHELLA VALLEY FOR ANGEL VIEW CRIPPLED CHILDREN’S FOUNDATION: PURCHASE COMPUTER HARDWARE FOR GPS SYSTEM (TPC IS $1K - .885 IS FTA-5310 & .115 IS AGENCY SHARE) (FY 08 - 5310).

$2

RIVERSIDE TRANSIT RIV110406 0 IN THE COACHELLA VALLEY FOR CVAG – JOB ACCESS & REVERSE COMMUTE PROGRAM: PROVIDE SHUTTLE SERVICE FOR THE HOMELESS SEEKING EMPLOYMENT - SHUTTLE SERVICE WILL PROVIDE CONNECTIONS TO SUNLINE BUS HUBS AND TO AREAS WHERE SUNLINE DOES NOT CURRENTLY SERVE. PROGRAM ALSO INCLUDES MOBILITY MANAGER (FTA 5316, FY’S 09 AND 10).

$199

RIVERSIDE TRANSIT RIV090103 0 IN THE COACHELLA VALLEY FOR SUNLINE - JOB ACCESS & REVERSE COMMUTE PROGRAM: OPERATING ASSISTANCE TO PROVIDE EXTENDED NIGHT/GUARANTEED SERVICE PROGRAM (FY 07 & 08 - 5316).

$506

RIVERSIDE TRANSIT RIV090108 0 IN THE COACHELLA VALLEY FOR SUNLINE - NEW FREEDOM PROGRAM: OPERATING ASSISTANCE TO FUND TRIP PROGRAM (FY 07 & 08 -5317).

$208

RIVERSIDE TRANSIT RIV071283 0 IN THE COACHELLA VALLEY FOR SUNLINE - OPERATING ASSISTANCE TO PROVIDE COMMUNITY BASED FLEX ROUTE IN THE CITY OF DESERT HOT SPRINGS (FY 06 5316 AND 5317) .

$477

RIVERSIDE TRANSIT RIV110813 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT - PURCHASE MISCELLANEOUS MAINTENANCE TOOLS AND EQUIPMENT: PURCHASE OF MAJOR REPLACEMENT TOOLS, EQUIPMENT AND PARTS USED IN ROUTINE VEHICLE MAINTENANCE (FY 12 - 5307) (UZA: INCCPS).

$100

RIVERSIDE TRANSIT RIV110104 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT - PURCHASE OF MAJOR REPLACEMENT TOOLS, EQUIPMENT AND PARTS USED IN ROUTINE VEHICLE MAINTENANCE (E.G., MULTI-METERS, TORQUE WRENCHES, IMPACT SOCKETS, SOFTWARE UPDATES, SERVICE JACKS, MISC. AIR AND HAND TOOLS AND DRILL BITS) (FY 11 - 5307) (UZA: INCCPS).

$200

Page 78: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

76 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV110811 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY - IMPLEMENT INTELLIGENT TRANSPORTATION SYSTEM (ITS) PROJECT:

PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR SERVICE PLANNING AND DEVELOPMENT FOR NEW AND EXISTING ROUTES, IN ADDITION TO SCHEDULE ADHERENCE (FY 12 - 5307) (UZA: INCCPS).

$500

RIVERSIDE TRANSIT RIV110407 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – JOB ACCESS & REVERSE COMMUTE AND NEW FREEDOM PROJECT: EXPRESS SERVICE TO THE PASS AREA WITH SERVICE TO BANNING AND BEAUMONT, CONNECTING COACHELLA VALLEY COMMUTERS TO WESTERN RIVERSIDE COUNTY (FTA 5316 AND FTA 5317, FY’S 09 AND 10).

$535

RIVERSIDE TRANSIT RIV110409 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY –TAXI VOUCHER PROGRAM FOR COACHELLA VALLEY RESIDENTS AGE 60 AND OVER AND /OR DISABLED. PROGRAM OFFERS A FIFTY PERCENT DISCOUNT FOR INTER CITY AND INTRA CITY TRAVEL, WITHIN THE COACHELA VALLEY (FTA 5317, FY’S 09 AND 10).

$332

RIVERSIDE TRANSIT RIV090616 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE’S FLEET OLDER BUSES, INCLUDING RESTORATION OF COLORS ON BOTH THE INTERIOR AND EXTERIOR, AND PURCHASE OF EQUIPMENT NEEDED TO REPAIR/ REHAB BUSES (FY 10 5307) (UZA: INCCPS).

$743

RIVERSIDE TRANSIT RIV110107 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE’S FLEET OLDER BUSES, INCLUDING RESTORATION OF COLORS ON BOTH THE INTERIOR AND EXTERIOR, AND PURCHASE OF EQUIPMENT NEEDED TO REPAIR/REHAB BUSES (FY 11 - 5307) (UZA: INCCPS).

$300

RIVERSIDE TRANSIT RIV110804 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE’S FLEET OLDER BUSES, INCLUDING RESTORATION OF COLORS ON BOTH THE INTERIOR AND EXTERIOR, AND PURCHASE OF EQUIPMENT NEEDED TO REPAIR/REHAB BUSES (FY 12 -5307) (UZA: INCCPS).

$160

RIVERSIDE TRANSIT RIV090404 0 IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY: REHABILITATION OF SUNLINE’S FLEET OLDER BUSES, INCLUDING RESTORATION OF COLORS ON BOTH THE INTERIOR AND EXTERIOR.

$418

RIVERSIDE TRANSIT RIV100602 0 IN WESTERN RIVERSIDE COUNTY - GROUPED PROJECT LISTING FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND 3 CATEGORIES - PURCHASE OF OFFICE, SHOP AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (FTA 5310 - FY 2009).

$4

RIVERSIDE TRANSIT RIV110121 0 IN WESTERN RIVERSIDE COUNTY - RTA FACILITY IMPROVEMENTS: CARPET REPLACEMENT AT THE RIVERSIDE FACILITY (FTA 11 - 5307) (UZA: HEM/SJ).

$5

RIVERSIDE TRANSIT RIV110824 0 IN WESTERN RIVERSIDE COUNTY AT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: FACILITY MAINTENANCE AND IMPROVEMENTS - PURCHASE OF ERGONOMICALLY DESIGNED OFFICE FURNITURE, CARPET REPLACEMENT AT RIVERSIDE FACILITY, LIGHTING RETROFIT, RESURFACING OF MAINTENANCE SHOP FLOORS, PAINTING OF INTERIOR AND EXTERIOR RIVERSIDE AND HEMET BUILDINGS, CONCRETE REPAIR AND REPLACEMENT (FY 12 - FTA 5307) (UZA: RIV-SB).

$897

RIVERSIDE TRANSIT RIV090607 0 IN WESTERN RIVERSIDE COUNTY AT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: FACILITY MAINTENANCE AND IMPROVEMENTS - ROOF REPLACEMENT AND UPGRADE OF SHOP VENTILATION IN THE REPAIR GARAGE AREA, PER CFC 2211.7 AND THE CALIFORNIA MECHANICAL CODE (FY 10 5307) (UZA: RIV/SAN).

$376

RIVERSIDE TRANSIT RIV090116 0 IN WESTERN RIVERSIDE COUNTY FOR CARE CONNEXXUS, INC: PURCHASE ONE REPLACEMENT LARGE BUS (APPROX. 16 PASSENGERS, GAS/DIESEL) W/LIFT AND TIEDOWNS (FY 08 - 5310).

$95

RIVERSIDE TRANSIT RIV090114 0 IN WESTERN RIVERSIDE COUNTY FOR CARE-A-VAN TRANSIT, INC.: PURCHASE ONE REPLACEMENT MINI VAN (GAS/DIESEL) (FY 08 - 5310).

$55

RIVERSIDE TRANSIT RIV090112 0 IN WESTERN RIVERSIDE COUNTY FOR MOUNTAIN SHADOWS SUPPORT GROUP - RIVERSIDE: PURCHASE TWO EXPANSION VEHICLES (MED. BUSES - II) (FY 08 - 5310).

$126

Page 79: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 77

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV090111 0 IN WESTERN RIVERSIDE COUNTY FOR PEPPERMINT RIDGE: PURCHASE ONE REPLACEMENT MODIFIED VAN (TYPE V - APPROX. 8

PASSENGER, GAS/DIESEL) WITH MOBILE RADIO (FY 08 -5310).$51

RIVERSIDE TRANSIT RIV090613 0 IN WESTERN RIVERSIDE COUNTY FOR RIVERSIDE SPECIAL SERVICES -INSTALLATION OF ADDITIONAL CNG SLOW FILL STATIONS, ACCOMMODATING FUTURE FLEET EXPANSION (FROM 20 TO 29 FILL STATIONS), PER APPROVED 2009/2010 SRTP - TABLE 4A PROJECT NO. 10-4 (FY 10 5307) (UZA: RIV-SAN).

$500

RIVERSIDE TRANSIT RIV090612 0 IN WESTERN RIVERSIDE COUNTY FOR RIVERSIDE SPECIAL SERVICES -PURCHASE OFFICE EQUIPMENT FOR ADMINISTRATIVE OFFICES, CONFERENCE ROOM, TRAINING ROOM AND FOR THE CNG VEHICLE MAINTENANCE FACILITY, PER APPROVED 2009/2010 SRTP - TABLE 4A - PROJECT NO. 10-1 (FY 10 5307) (UZA:RIV-SAN).

$20

RIVERSIDE TRANSIT RIV041028 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - BUS RAPID TRANSIT (BRT) AMENITIES (E.G. SIGNS, ATIS KIOSKS, SHELTER MATERIALS, ETC.) FOR VARIOUS BRT STOPS.

$1,582

RIVERSIDE TRANSIT RIV090127 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – BUS STOP AMENITIES: PURCHASE BENCHES, POLES/EXTENSIONS, SIGNS, TRASH RECEPTACLES, I-STOPS, ETC., TO REHAB & EXPAND EXISTING STOP/SHELTERS (FY 10 – ARRA-FTA 5307 & ARRA-FTA 5311).

$225

RIVERSIDE TRANSIT RIV110115 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITAL COST OF CONTRACTING (FY 11 - FTA 5307) (UZA: RIV-SB, TEM/MURR, & ARRA FTA 5307 CARRY OVER).

$6,713

RIVERSIDE TRANSIT RIV110816 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITAL COST OF CONTRACTING (FY 12 – FTA 5307) (UZA: RIV-SB, TEM/MURR). $5,313

RIVERSIDE TRANSIT RIV110120 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITAL MAINTENANCE EQUIPMENT: PURCHASE OF VARIOUS MAINTENANCE EQUIPMENT (E.G., LIFT REBUILD, POINJAR, AIR COMPRESSOR/GENERATORS) (FY 11 - 5307) (UZA: HEM/SJ).

$64

RIVERSIDE TRANSIT RIV110822 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITAL MAINTENANCE SPARES: PURCHASE OF SPARE PARTS FOR ROLLING STOCK UNDER THE BUS MAINTENANCE PROGRAM (FY 12 - 5307) (UZA: RIV-SB).

$1,679

RIVERSIDE TRANSIT RIV110118 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITAL MAINTENANCE SPARES: PURCHASE OF SPARE PARTS FOR ROLLING STOCK UNDER THE MAINTENANCE PROGRAM (FY 11 - 5307) (UZA: TEM/MURR).

$1,666

RIVERSIDE TRANSIT RIV090604 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITAL MAINTENANCE SPARES: PURCHASE ROLLING STOCK CAPITAL PARTS (E.G., ALTERNATOR, MANIFOLDS, PUMPS, CONTROLLER, TRANSMISSIONS, COMPRESSOR, ETC.) (FY 10 - 5307)(UZA: TEM/MURR).

$2,484

RIVERSIDE TRANSIT RIV110119 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED COST OF TIRE LEASE (FY 11 - 5307) (UZA: HEM/SJ). $261

RIVERSIDE TRANSIT RIV110823 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED COST OF TIRE LEASE (FY 12 - 5307) (UZA: RIV-SB). $243

RIVERSIDE TRANSIT RIV090123 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 10 – ARRA FTA 5307 & ARRA-FTA 5311 + $58 FROM FY 10 - FTA 5307 UZA:TEM/MURR + $104 FROM FY’S 07, 08 & 09 UZA: LA/LB/STA ANA).

$9,448

RIVERSIDE TRANSIT RIV110114 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 11 - 5307) (UZA: RIV/SB, TEM/MUUR & ARRA FTA 5307 CARRY OVER).

$8,714

RIVERSIDE TRANSIT RIV110815 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – CAPITALIZED PREVENTATIVE MAINTENANCE (FY 12 – FTA 5307) (UZA: RIV-SB, TEM/MURR). $9,188

RIVERSIDE TRANSIT RIV071219 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - DEBT FINANCING (FY 08/09 PORTION) FOR 55 CNG REPLACEMENT 40-FT BUSES PURCHASED IN 2001 THROUGH THE CTFC (FY 09 5307).

$2,032

RIVERSIDE TRANSIT RIV090126 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – DEBT FINANCING (FY 09/10) FOR 55 CNG REPLACEMENT 40-FT BUSES PURCHASED IN 2001 THROUGH THE CTFC (FY 10 – ARRA-FTA 5307 + FY 10 - FTA 5307 UZA: RIV/SB + TEM/MURR).

$4,810

RIVERSIDE TRANSIT RIV090105 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES (FY 07 & 08 5316 & 5317).

$2,174

Page 80: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

78 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV090608 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - INFORMATION SYSTEMS: REPLACEMENT AND UPGRADES OF TELEPHONE SYSTEM AND

MICROSOFT EXCHANGE SERVER IN THE RIVERSIDE AND HEMET FACILITIES(FY 10 5307) (UZA: RIV/SAN).$170

RIVERSIDE TRANSIT RIV090104 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - JOB ACCESS & REVERSE COMMUTE PROGRAM OPERATING ASSISTANCE: COMMUTER LINK SERVICES - ROUTES 212 AND 217 (FY 07 & 08 - 5316) (UZAS: HEM/SAN JAC + TEM/MURR).

$1,541

RIVERSIDE TRANSIT RIV110402 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - JOB ACCESS & REVERSE COMMUTE PROGRAM: EXTENDED SERVICE PROGRAM (FTA 5316, FY’S 09 AND 10).

$1,264

RIVERSIDE TRANSIT RIV110403 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - JOB ACCESS AND REVERSE COMMUTE PROGRAM OPERATING ASSISTANCE: COMMUTER LINK SERVICES - ROUTES 212 AND 217 (UZAS: HEM/SAN JAC + TEM/MURR) (FTA 5316, FY’S 09 AND 10).

$1,399

RIVERSIDE TRANSIT RIV051007 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - NEAR MORENO VALLEY - REGIONAL TRANSIT CENTER FOR MASS TRANSIT SERVICE IN WESTERN RIVERSIDE COUNTY SOUTH OF SR60 ALONG THE I-215 CORRIDOR(PA&ED ONLY).

$6,000

RIVERSIDE TRANSIT RIV071286 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - OPERATING ASSISTANCE FOR THE HEMET OPPORTUNITY PROJECT EXPRESS (HOPE) BUS TO PROVIDE SPECIALIZED TRANSPORTATION SERVICES TO DPSS CLIENTS IN THE HEMET AREA (SEC 5316 - 2006 FUNDS).

$730

RIVERSIDE TRANSIT RIV071206 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - PURCHASE REPLACEMENT SUPPORT VEHICLES: 1 RELIEF SUPPORT VEHICLE, AND 1 VEHICLE FOR STOPS AND ZONE OPERATIONS (FY 09 5307)

$54

RIVERSIDE TRANSIT RIV110830 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - REPLACEMENT OF REVENUE VEHICLES: PURCHASE OF 45 REPLACEMENT REVENUE VEHICLES (GASOLINE), 21 TYPE VII COMMUTERLINK VEHICLES AND 24 TYPE VII FIXED ROUTE VEHICLES.

$6,263

RIVERSIDE TRANSIT RIV110817 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT REVENUE VEHICLES (HEAVY DUTY): PURCHASE OF 33 HEAVY DUTY REPLACEMENT BUSES TO BE USED FOR DIRECTLY OPERATED ROUTES. THE NEW BUSES WILL REPLACE THE OLD NABI MODEL THAT REACHED THE END OF THE SERVICE LIFE/FTA GUIDELINES. NEW HEAVY DUTY BUSES HAVE AN ESTIMATED SERVICE LIFE OF 12 YEARS OR 500,000 MILES.

$18,659

RIVERSIDE TRANSIT RIV110818 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT REVENUE VEHICLES FOR CONTRACTED OPERATIONS: PURCHASE OF NINE (9) E-LO BUSES - THREE (3) COMMUTERLINK SERVICE AND SIX (6) FOR CONTRACTED FIXED ROUTES. THE 3-LO BUSES ARE MED-SIZE, MED-DUTY, APPROX. 30-FT IN LENGTH AND HAVE ESTIMATED SERVICE LIFE OF SEVEN YEARS OR 200,000 MILES (FY 12 – 5307) (UZA: RIV-SB).

$1,577

RIVERSIDE TRANSIT RIV110819 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT REVENUE VEHICLES FOR DIAL-A-RIDE OPERATIONS: PURCHASE OF 17 TYPE II VEHICLES FOR DIAL-A-RIDE OPERATIONS. (FY 12 – 5307) (UZA: RIV-SB).

$1,318

RIVERSIDE TRANSIT RIV110820 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT SUPPORT VEHICLES: PURCHASE OF NINE (9) RELIEF CARS FOR OPERATIONS (FY 12 – 5307) (UZA: RIV-SB).

$136

RIVERSIDE TRANSIT RIV110821 0 IN WESTERN RIVERSIDE COUNTY FOR RTA – REPLACEMENT TRUCKS FOR STOP AND ZONE OPERATIONS: PURCHASE OF THREE (3) TRUCKS FOR STOP AND ZONE OPERATIONS (FY 12 – 5307) (UZA: RIV-SB).

$161

RIVERSIDE TRANSIT RIV090606 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - REVENUE VEHICLE SYSTEMS: PURCHASE GFI FAREBOX UPGRADE (BV-8) (FY 10 5307) (UZA: RIV/SAN).

$65

RIVERSIDE TRANSIT RIV091211 0 IN WESTERN RIVERSIDE COUNTY FOR RTA - VEHICLE REPLACEMENT: PURCHASE SEVENTEEN (17) REPLACEMENT HEAVY DUTY CNG REVENUE VEHICLE ROLLING STOCK (FEDERAL APPROPRIATION THROUGH HR 3288, FFY 2009/2010 - FTA 5309).

$9,577

RIVERSIDE TRANSIT RIV110113 0 IN WESTERN RIVERSIDE COUNTY FOR RTA IN FY 2010/2011 - OPERATING ASSISTANCE: FIXED ROUTE AND DIAL-A-RIDE (FY 11 - 5307) (UZA: HEM/SJ).

$34,540

RIVERSIDE TRANSIT RIV110814 0 IN WESTERN RIVERSIDE COUNTY FOR RTA IN FY 2011/2012 - OPERATING ASSISTANCE: FIXED ROUTE AND DIAL-A-RIDE (FY 12 - 5307) (UZA: HEM/SJ).

$37,812

Page 81: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 79

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV110410 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: DRIVER SENSITIVITY TRAINING FOR CARE CONNEXXUS, INC. (FTA 5317, FY’S 09 AND 10). $30

RIVERSIDE TRANSIT RIV090609 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: INSTALL ADVANCE TRAVELER INFORMATION SYSTEMS (ATIS) ON VARIOUS FIXED ROUTE VEHICLES AND INSTALLATION OF ELECTRONIC MESSAGE SIGNS AT APPROX. 60 BUS STOPS (FY ‘S 05, 07, 08, 09, AND 10 - 5309).

$612

RIVERSIDE TRANSIT RIV110405 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: MOBILITY MANAGEMENT AND TRAVEL TRAINING PROGRAM (FTA 5316 AND 5317, FY’S 09 AND 10).

$616

RIVERSIDE TRANSIT RIV061142 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE DIRECT TV & WIFI ON COMMUTER LINK FOR ENHANCED COMMUTER TRAVEL (FY 08 5307) (UZA: RIV-SAN)

$290

RIVERSIDE TRANSIT RIV061136 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE IT OFFICE EQUIPMENT (E.G. PC & NOTEBOOK COMPUTERS AND REPLACE NETWORK EQUIPMENT & COPIERS, ETC.) (FY 08 5307) (UZA: RIV-SAN)

$186

RIVERSIDE TRANSIT RIV080928 0 IN WESTERN RIVERSIDE COUNTY FOR RTA: UPGRADE AND REPLACE ORACLE SERVERS AND IMPLEMENT A DATA CENTER SERVER VIRTUALIZATION SYSTEM IN RIVERSIDE CONNECTED WITH A LIVE REPLICATED DISASTER RECOVERY SITE IN HEMET (FY 09 5307).

$379

RIVERSIDE TRANSIT RIV110404 0 IN WESTERN RIVERSIDE COUNTY OPERATING ASSISTANCE FOR RIVERSIDE COUNTY REGIONAL MEDICAL CENTER FOR DIRECTLY OPERATED TRANSPORTATION SERVICES - SPECIALIZED NON-EMERGENCY MEDICAL TRANSPORTATION PROGRAM (FTA 5317, FY’S 09 AND 10).

$820

RIVERSIDE TRANSIT RIV070712 0 JOINT PARTNERSHIP W/ CALSTART/WESTSTART FOR FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP & OPERATE A ZERO EMISSION BUS (E-2006-BUSP-149 + E-2007-BUSP-0102)

$489

RIVERSIDE TRANSIT RIV080919 0 JOINT PARTNERSHIP W/CALSTAR/WESTSTART FOR FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP AND OPERATE A ZERO EMISSION BUS (E-2008-BUSP-0102).

$271

RIVERSIDE TRANSIT RIV090301 0 METROLINK POSITIVE TRAIN CONTROL (PTC): SYSTEM WIDE IMPLEMENTATION OF PTC - JOINT PROJECT FUNDED BY LACMT, OCTA, SANBAG, AND VCTC (RCTC PROGRAMMING ONLY ITS SHARE OF THE PROJECT COST) (FY 09 - ARRA FTA 5307).

$4,786

RIVERSIDE TRANSIT RIV011242 0 PURCHASE EXPANSION ROLLING STOCK (2 CAB CARS AND 3 LOCOMOTIVES) FOR METROLINK IEOC AND RIVERSIDE/FULLERTON/LA LINES (EA: RIVFUL, PPNO: 0079E)

$19,693

RIVERSIDE TRANSIT RIV061137 0 PURCHASE NEW SHOP EQUIPMENT: (E.G. CUT-OFF SAW, BRAKE DRUM DOLLY, TRANSMISSION JACK, IMPACT WRENCHES, LAP TOP COMPUTERS & SOFTWARE, ETC.) (FY 08 5307) (UZA: RIV-SAN)

$26

RIVERSIDE TRANSIT RIV061113 0 PURCHASE REPLACE. SHOP EQUIP. (E.G. PARALLELOGRAM & SEFEC LIFTS, STAR BRAKE LATHE, PRESSURE WASHER, BUS WASH BRUSH, TIRE/VACUUM MACHINES, SWEEPERS, ETC.) (FY 07 5307)(UZA: RIV-SAN)

$155

RIVERSIDE TRANSIT RIV061153 0 PURCHASE REPLACEMENT MAINTENANCE TOOLS, EQUIPMENT, & PARTS (E.G. MULTI-METERS, TORQUE WRENCHES, IMPACT SOCKETS, SERVICE JACKS, AIR & HAND TOOLS, ETC.) (FY 07 5307) (UZA: INCCPS)

$200

RIVERSIDE TRANSIT RIV071218 0 PURCHASE SCHEDULING AND RUNCUTTING SOFTWARE FOR IMPROVED OPERATIONS COST/BENEFIT ANALYSIS OF TRIP TIMES, REVENUE HOURS, HEADWAYS, OPERATOR PAY SHEETS, ETC. (FY 07 5307 & FY 09 5307 ).

$350

RIVERSIDE TRANSIT RIV061157 0 PURCHASE TRANSIT ENHANCE. BUS STOP AMENITIES (E.G. BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 08 5307) (UZA: INDCCPS) (TE)

$799

RIVERSIDE TRANSIT RIV071229 0 PURCHASE TRANSIT ENHANCEMENT BUS STOP AMENITIES (E.G., BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 09 5307 + FY 09 - ARRA-FTA 5307) (UZA: INDCCPS) (TE)

$1,250

RIVERSIDE TRANSIT RIV010214 0 RCTC SHARE OF PURCHASE OF METROLINK CARS & LOCOMOTIVES - UP TO 47 CARS/CABS & 8 LOCOS TO BE ORDERED BY 6/30/06 (FY 03 & 04 5307) (SHARES AMONG LAOC8231, SBD20020801, & ORA090302)

$15,448

RIVERSIDE TRANSIT RIV061143 0 RCTC’S SHARE OF OCTA’S FY 07 REHAB AND RENOVATION (FY 07 5307) (UZA: RIV-SAN) $75

Page 82: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

80 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE TRANSIT RIV520109 0 RECONSTRUCT & UPGRADE SAN JACINTO BRANCH LINE FOR RAIL PASSENGER SERVICE (RIVERSIDE TO PERRIS) (PERRIS VALLEY LINE)

(FY 07 5307) (UZA: RIV-SAN)$232,000

RIVERSIDE TRANSIT RIV520111 0 REGIONAL RIDESHARE - CONTINUING PROGRAM. $10,157

RIVERSIDE TRANSIT RIV090601 0 REHABILITATION/RENOVATION OF METROLINK TRACK, SIGNALS, COMMUNICATIONS, STRUCTURES, FACILITIES, SYSTEMS, AND ROLLING STOCK ($251 TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FY 11/12 FTA 5309 IN CONSTRUCTION) (FY’S 2012/2013 AND 2013/2014 LOCAL 20% MATCH IS MTA’S PROP C).

$9,001

RIVERSIDE TRANSIT RIV050530 0 SCRAA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC’S FY 07 5307 PORTION TO SCRA PROJECT) (FY 07 5307) (UZA: RIV-SAN) (PARENT: LA963505)

$406

RIVERSIDE TRANSIT RIV090303 0 SCRRA CENTRAL MAINTENANCE FACILITY AND KELLER STREET YARD MAINTENANCE FACILITY: INSTALLATION OF A GUARD GATE AND MODIFICATION OF AN EXISTING LOCKING DOCK FOR BETTER ACCESS AND ADDITIONAL STORAGE FOR NEW EQUIPMENT (FY 09 - ARRA FTA 5307).

$760

RIVERSIDE TRANSIT RIV090302 0 SCRRA REHAB & RENOVATION OF METROLINK RAIL: REHABILITATION OF METROLINK TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES AND EQUIPMENT (FY 09 - ARRA FTA 5307).

$1,670

RIVERSIDE TRANSIT RIV061145 0 SCRRA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC’S FY 08 PORTION) TO SCRRA PROJECT) (FY 08 5307) (UZA: RIV-SAN)

$509

RIVERSIDE TRANSIT RIV071235 0 SCRRA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC’S FY 09 PORTION TO SCRRA PROJECT) (FY 09 5307)

$2,782

RIVERSIDE STATE HIGHWAY

47520 10 AT I-10/JEFFERSON ST IC: RECONSTRUCT, REALIGN, & WIDEN IC 2 TO 6 LANES (SOUTHERLY OF VARNER RD TO UPRR), WIDEN RAMPS, ADD NEW ENTRY RAMPS, INCLUDING RAMP METERING (NO HOV PREFERENTIAL LANE INCLUDED), ADD ACCEL/DECEL LANES AT WB ENTRY AND EB EXIT (<1/4 MILE), AND ADD DEDICATED RIGHT-TURN LANES. (EA: 47520)

$81,117

RIVERSIDE STATE HIGHWAY

RIV031208 10 AT I-10/MONTEREY AVE IC - RECONFIGURE IC: CONSTRUCT NEW WB ENTRY RAMP AND REALIGN/RELOCATE WB EXIT RAMP (EA: 0F050) $12,321

RIVERSIDE STATE HIGHWAY

RIV060115 10 AT I-10/OAK VALLEY PKWY IC: RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES FROM APPROX 500’ W/O DESERT LAWN DR TO GOLF CLUB DR, WIDEN RAMPS - EB ENTRY 1 TO 2 LANES, EB & WB EXIT 1 TO 4 LANES, WB ENTRY 1 TO 3 LANES, , ADD NEW EB/WB ENTRY LOOP RAMPS (2 LANES) , ENTRY RAMPS INCLUDE HOV PREFERENTIAL LANE, AND RAMPS INCLUDE EXTENDED ACCELERATION/DECELERATION LANE (EA: 0G280)

$25,425

RIVERSIDE STATE HIGHWAY

RIV031209 10 AT I-10/PORTOLA AVE (B/W MONTEREY IC & COOK IC): CONSTRUCT NEW 6 THRU LANE PORTOLA AVE IC FROM DINAH SHORE DR TO VARNER RD & RAMPS (EB & WB EXIT 3 LNS, EB & WB ENTRY 2 LNS, EB ENTRY LOOP RAMP 2 LNS, ENTRY INCL HOV LN, WIDENING INCLUDES BRIDGE OVER UPRR & RELOCATE/WIDEN VARNER 2 TO 4 LNS, ADD EB/WB AUX LNS (MONTEREY TO PORTOLA AND PORTOLA TO COOK), EXTEND 4TH WB LANE COOK TO PORTOLA (EA: 0F120K)

$71,993

RIVERSIDE STATE HIGHWAY

RIV060116 10 I-10/CHERRY VALLEY BLVD IC: RECON/WIDEN 2 TO 5 & 6 THRU LNS (3 NB+2&3 SB) FROM E/O CALIMESA BLVD TO APPROX W/O ROBERTS RD, RECON/WIDEN RAMPS – EB ENTRY 1 TO 2 LNS W/ HOV LN, RECONFIGURE/WIDEN AS HOOK RAMPS WB ENTRY 1 TO 3 LNS W/ HOV LN & WB EXIT 1 TO 2 LNS, WIDEN EB EXIT RAMP 1 TO 2 LNS, RELOCATE/WIDEN CALIMESA/CHERRY VALLEY BLVD 2 TO 4 LNS, & INCLUDE EXTENDED RAMP ACCEL/DECEL LNS (EA: 0G170)

$51,500

RIVERSIDE STATE HIGHWAY

RIV62036 10 I-10/INDIAN CYN DR IC - WIDEN 2 TO 6 LNS BTWN GARNET AVE & 20TH AVE, RELOCATE EB EXIT RAMP (1-3 LNS) AS HOOK RAMP TO GARNET, ADD EB ENTRY HOOK RAMP (1 LN), RELOCATE WB EXIT RAMP (2-3 LNS) AS HOOK RAMP TO 20TH AVE, ADD ADJOINING WB ENTRY HOOK RAMP (2 LNS) & LOOP RAMP (2 LNS), RECON EXISTING EB & WB ENTRY RAMPS (1 LN), WIDEN GARNET 2 TO 4 LNS, WIDEN 20TH AVE 2 TO 3 LNS (2 WB & 1 EB) (EA: 45570)

$35,099

Page 83: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 81

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE STATE

HIGHWAYRIV060124 10 IN BANNING ON SUNSET AVE AT I-10 FROM S/O RAMSEY ST TO S/O LINCOLN ST: LOWER SUNSET AVE TO CONSTRUCT NEW 4-LANE

UC AT UPRR CROSSING (NON-CAPACITY) AND RECONSTRUCT THE I-10 IC RAMPS TO MEET THE NEW STREET GRADE (SAFETEA CA438, #1261+ HR4818+HR3058) (EA:33471)

$26,200

RIVERSIDE STATE HIGHWAY

RIV100605 10 IN RIVERSIDE COUNTY FROM SAN BERNARDINO COUNTY LINE TO ARIZONA STATE LINE - DEVELOP CORRIDOR MASTER PLAN FOR I-10 (EA 0N440, PPNO 0013H)

$279

RIVERSIDE STATE HIGHWAY

45580 10 NEAR PALM SPRINGS ON I-10 AT GENE AUTRY TR/PALM DR IC FROM I-10 IC SOUTH TO SALVIA ROAD - WIDEN 2 TO 6 THROUGH LANES, I-10 IC IMPROVEMENTS, WIDEN/MODIFY RAMPS FROM 1 TO 2 LNS (SAFETEA LU CA451 #1369) (EA: 45580)

$35,393

RIVERSIDE STATE HIGHWAY

RIV071251 10 ON I-10 AT APPROX PM 41.17: CONSTRUCT NEW DA VALL DR IC (6 LNS) & RAMPS (2 LNS) FROM VARNER RD TO RAMON RD INCLUDING BRIDGE OVER UPRR AND LONG CYN CREEK CHANNEL, ADD EB/WB AUX LANES ( DATE PALM DR IC TO DA VALL & DA VALL TO RAMON RD)

$132,986

RIVERSIDE STATE HIGHWAY

45590 10 ON I-10 IN CATHEDRAL CITY AT DATE PALM DR IC: MODIFY IC/WIDEN OC & ARTERIAL INCLUDING UPRR BRIDGE 2 TO 6 LNS FROM N. RAMPS SOUTH TO VISTA CHINO & RAMPS FROM 1 TO 2 LNS (EA: 45590K) ($955 TOLL CREDIT FOR STPL MATCH IN CONS)

$31,476

RIVERSIDE STATE HIGHWAY

RIV030901 10 ON I-10 IN EASTERN COACHELLA (AT 5.5 KM E/O DILLON RD & 14.6 KM W/O CACTUS CITY SRRA): CONSTRUCT NEW 6 THROUGH LANE MCNAUGHTON PKWY IC (3 LANES EACH DIR. APPROX 1/2 MILE N/O AND S/O I-10), EB EXIT RAMP (3 LANES), WB EXIT RAMP (2 LANES), EB & WB ENTRY RAMPS (1 LANE), EB & WB LOOP ENTRY RAMPS (1 LANE) WITH EXTENDED RAMP ACCELERATION/DECELERATION LANES (EA: 45210)

$45,164

RIVERSIDE STATE HIGHWAY

RIV071253 10 ON I-10 IN INDIO AT GOLF CENTER PKWY IC: RECONSTRUCT/WIDEN IC FROM 4 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL BETWEEN AVENUE 44 TO S/O WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, AND EXTEND RAMPS WITH ACCELERATION/DECELERATION LANES

$27,000

RIVERSIDE STATE HIGHWAY

RIV071252 10 ON I-10 IN INDIO AT JACKSON ST IC (AT PM 55.575): RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL FROM SHOWCASE PKWY TO SOUTH OF WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, MODIFY TRAFFIC SIGNALS

$56,000

RIVERSIDE STATE HIGHWAY

RIV071254 10 ON I-10 IN INDIO AT MONROE ST IC: RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL FROM AVENUE 42 TO S/O WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, AND EXTEND RAMPS WITH ACCELERATION/DECELERATION LANES (EA: 0K730K)

$47,000

RIVERSIDE STATE HIGHWAY

RIV110302 10 ON I-10 IN THE CITY OF BLYTHE - PROVIDE NEW W/B ON AND W/B OFF RAMPS TO HOBSON WAY APPROX 1,800’ W/O EXISTING RAMPS TO RIVIERA DR/INSPECTION STATION. THE NEW RAMPS WILL REPLACE EXISTING CONNECTION TO RIVIERA DR.

$3,635

RIVERSIDE STATE HIGHWAY

RIV070310 10 ON I-10 NEAR BEAUMONT: ADD/CONSTRUCT NEW EASTBOUND TRUCK CLIMBING LANE FROM SAN BERNARDINO COUNTY LINE TO I-10/SR60 JCT (EA: 35300)

$26,000

RIVERSIDE STATE HIGHWAY

45600 10 ON I-10 NEAR RANCHO MIRAGE FROM 3.3 KM WEST TO 2.0 KM EAST OF RAMON RD IC - CONSTRUCT BOB HOPE DR EXTENSION (6 LANES) W/ A NEW DIAMOND IC & MODIFY RAMON RD IC & RAMPS (PPNO: 0007D, EA: 45600)

$52,269

RIVERSIDE STATE HIGHWAY

RIV060117 10 ON I-10/SINGLETON RD IC: RECONSTRUCT/WIDEN 2 TO 4 THROUGH LANES (WOODHOUSE TO CALIMESA BLVD), RECONSTRUCT/WIDEN RAMPS – EB ENTRY 1 TO 2 LNS W/ HOV PREFERENTIAL LN, WB EXIT 1 TO 3 LNS, ADD EB EXIT RAMP (3 LNS), WB ENTRY RAMP (2 LNS W/ HOV PREFERENTIAL LN), INCLUDE EXTENDED RAMP ACCEL/DECEL LNS, RELOCATE CALIMESA BLVD/SINGLETON RD INTERSECTION, ADD SB EXTENDED DEDICATED RIGHT-TURN LN (EA: 0F980)

$38,400

RIVERSIDE STATE HIGHWAY

RIV010208 15 AT I-15/CAJALCO RD IC NEAR CORONA: DESIGN, RECONST/REALIGN & WIDEN CAJALCO RD FROM 2 TO 6 THRU LNS FROM TEMESCAL CYN RD TO BEDFORD CYN RD, RECONST/WIDEN SB ENTRY FROM 1-2 LNS, SB EXIT FROM 2-5 LNS, NB ENTRY FROM 1-2 LNS, NB EXIT FROM 2-4 LNS, ADD AUX LNS BTWN NB ENTRY AND NB EXIT TO EL CERRITO RD AND BTWN SB ENTRY FROM EL CERRITO RD AND SB EXIT. ($840/$600 TOLL CREDITS IN ENG/ROW TO MATCH DEMO)

$58,199

Page 84: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

82 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE STATE

HIGHWAYRIV010204 15 AT I-15/CALIFORNIA OAKS RD/KALMIA ST IC - RECONFIGURE RAMPS (CONSTRUCT NB/SB LOOP ON RAMPS, RELOCATE SB/NB OFF

RAMP), WIDEN CAL OAKS 4 TO 6 LNS FROM UC TO CAL OAKS PLAZA (EA: 0A490)$36,208

RIVERSIDE STATE HIGHWAY

RIV011233 15 AT I-15/LIMONITE AVE IC - WIDEN IC 4 TO 6 LNS, WIDEN NB AND SB EXIT RAMPS 1 TO 2 LNS, ADD 2 LANE LOOP RAMPS IN THE NB AND SB DIRECTIONS & WIDEN LIMONITE AVE FROM HAMNER TO WINEVILLE 4 TO 6 LNS (APPROX 1 MI) (EA: 0E150K)

$29,211

RIVERSIDE STATE HIGHWAY

RIV080901 15 AT I-15/MURRIETA HOT SPRINGS RD IC - CONSTRUCT NEW NB LOOP ON RAMP AND REALIGN EXISTING NB OFF RAMP (EA: 0J650K) $8,100

RIVERSIDE STATE HIGHWAY

RIV010206 15 AT I-15/RAILROAD CYN RD IC & I-15/FRANKLIN ST: CONSTRUCT NEW FULL IC AT FRANKLIN ST, RECONSTRUCT/WIDEN FRANKLIN ST OC 2 TO 4 LNS, RECONSTRUCT/WIDEN RR CYN UC 4 TO 6 LNS (SUMMERHILL DR TO CASINO RD), ADD AUX LNS FROM NEW FRANKLIN ST IC TO RR CYN RD, ADD RAMP ACCEL/DECEL LNS AT RR CYN RD AND FRANKLIN ST, REALIGN MAIN ST SB ENTRY RAMP, REPLACE NB ENTRY/SB EXIT RAMPS AT RR CYN W/ HOOK RAMPS(EA: 0A440)

$71,838

RIVERSIDE STATE HIGHWAY

991202 15 FRENCH VALLEY PKWY (FVP) - PHASE 1: DESIGN & CONSTRUCT FVP 2 THROUGH LANES ARTERIAL WESTBOUND FROM I-15 TO JEFFERSON AVE, CONSTRUCT FVP SB EXIT RAMP (1 LANE), SB AUX LANE (FROM FVP IC TO WINCHESTER RD IC) & WIDEN WINCHESTER RD IC SB EXIT RAMP (1 TO 3 LNS) (EA: 43270)

$29,273

RIVERSIDE STATE HIGHWAY

RIV031215 15 FRENCH VALLEY PKWY IC/ARTERIAL PHASES: CONSTRUCT 6 LN IC (JEFFERSON TO YNEZ) & RAMPS, NB/SB AUX LN, CD LNS (3 LNS NB&SB) & MODIFY WINCHESTER RD IC (I-215 PM: 8.43-9.75) (EA:43270)

$156,171

RIVERSIDE STATE HIGHWAY

RIV071267 15 I-15 - SBD CO LINE TO JCT I-15/I-215: CONSTRUCT 4 HOT LNS (2 HOT LNS EA DIR) FROM SBD CO LINE TO HIDDEN VALLEY PKWY AND FROM CAJALCO RD TO SR-74; CONS 2 MF LNS (1 LN EA DIR FROM SBD CO LINE TO SR-74); CONS 2 HOT LNS ( 1 HOT LN EA DIR) FROM HIDDEN VALLEY PKWY TO CAJALCO RD; CONS 2 HOV LNS (1 LN EA DIR) FROM SR74 TO JCT I-15/I-215 (PA&ED ONLY).

$1,706,347

RIVERSIDE STATE HIGHWAY

RIV62034 15 I-15/CLINTON KEITH RD IC: RECONSTRUCT/WIDEN OC 2 TO 6 LNS & RAMPS 1 & 2 LNS TO 3 & 4 LNS, ADD NB/SB AUX LNS PRIOR TO & AFTER EXIT/ENTRY RAMPS & LEFT-TURN LNS (EA: 0F580K)

$25,180

RIVERSIDE STATE HIGHWAY

RIV060109 15 I15/SR74 (CENTRAL AV) IC JCT MOD B/W 1000’ W/O COLLIER TO CONARD: ADD NB LOOP ENTRY RAMP W/ACCEL LANE, REALIGN NB ENTRY/EXIT RAMPS, WIDEN SB ENTRY/EXIT RAMPS, ADD SB ACCEL/DECEL LANES, ADD NB DECEL LANE, WIDEN SR74 RIVERSIDE TO CENTRAL 2 TO 4 THRU LNS & COLLIER TO CAMBERN 4 TO 6 THRU LNS, CONSTRUCT RIVERSIDE OC & WIDEN RIVERSIDE COLLIER TO CAMBERN 2 TO 4 THRU LNS. SR74 PM 15.5-18.5. EA: 0F3100

$85,000

RIVERSIDE STATE HIGHWAY

RIV62031 15 I-15/SR79 SO. IC: REMOVE SB EXIT RAMP, ADD NEW SB EXIT LOOP RAMP, REALIGN SB EXIT RAMP (2 LNS) W/AUX LN. WIDEN SB ENTRY 1 TO 3, NB EXIT 1 TO 4, NB ENTRY 1 TO 3 & RECON SR79S.

$35,978

RIVERSIDE STATE HIGHWAY

RIV100106 15 IN SW RIVERSIDE COUNTY - I-15/LOS ALAMOS RD. BRIDGE REPLACEMENT & WIDENING: REPLACEMENT OF EXISTING TWO LANE OVERCROSSING AT LOS ALAMOS RD. AND INTERSTATE 15 WITH A FOUR LANE OVERCROSSING (GAP CLOSURE), BRINGING THE BRIDGE VERTICAL CLEARANCE TO CALTRANS STANDARDS.

$11,440

RIVERSIDE STATE HIGHWAY

RIV100105 15 IN WESTERN RIVERSIDE COUNTY - I-15 AT INDIAN TRUCK TRAIL IC: WIDEN INDIAN TRUCK TRAIL FROM 2 TO 4 LANES, INCLUDING DEDICATED LEFT-TURN LANES TO NB AND SB ON RAMP; WIDENING OF THE SB EXIT RAMP FROM 1 TO 3 LANES; AND WIDENING OF THE NB EXIT RAMP AND ENTRY RAMP FROM 1 TO 3 LANES PLUS INTERSECTION IMPROVEMENTS AT TEMESCAL CYN RD.

$8,900

RIVERSIDE STATE HIGHWAY

RIV050532 15 ON I-15 NEAR THE CITY OF NORCO - CONSTRUCT NEW SCHLEISMAN RD IC (6 THROUGH LANES) AND RAMPS (2 LANES) AND NB/SB AUX LANE BETWEEN SCHLEISMAN RD IC AND LIMONITE RD IC (EA: 0E140K)

$62,750

RIVERSIDE STATE HIGHWAY

RIV050531 15 ON I-15 S/O TEMECULA - CONSTRUCT NEW EASTERN BYPASS/I-15 IC (4 LANES) & RAMPS (1 LANE) AND 4 LANE (2 LNS EACH DIR) EASTERLY CONNECTING ROAD (APPROX 2 MILES)

$30,000

Page 85: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 83

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE STATE

HIGHWAYRIV080903 60 AT SR-60/GILMAN SPRINGS RD IC - REALIGN GILMAN SPRINGS RD/REMOVE EXISTING EB/WB RAMPS; WIDEN OC FROM 2 TO 6 THRU

LANES; WB EXIT IS 1 LANE WIDENING TO 2 LANES THEN TO 3 LANES AT ARTERIAL, WB LOOP & EB ENTRY RAMPS FROM 1 LANE TO 2 LANES W/ HOV; WIDEN EB EXIT RAMPS FROM 1 LANE TO 2 LANES AT EXIT AND 3 LANES AT ARTERIAL; ADD AUX LANES TO WEST OF IC 1200’ EB AND 2200’ WB

$70,000

RIVERSIDE STATE HIGHWAY

32300 60 AT SR60/NASON ST IC - MODIFY/RECONSTRUCT IC & NASON ST FROM ELDER AVE TO FIR AVE: REALIGN EB, WB EXIT RAMPS PLUS EB & WB ENTRY RAMPS, ADD EB & WB ENTRY RAMP HOV LANES, & ADD EB AND WB AUX LANES (EA: 32300) ($845/$1,225 TOLL CREDITS USED TO MATCH DEMO/STPL IN CONST)

$19,946

RIVERSIDE STATE HIGHWAY

RIV080902 60 AT SR-60/REDLANDS BLVD - WIDEN OC FROM 2 TO 6 THRU LANES; WIDEN WB EXIT & ENTRY RAMPS FROM 1 LANE TO 2 LANES AT EXIT/ENTRY, 3 LANES AT ARTERIAL AND HOV AT ENTRY; WIDEN EB EXIT & ENTRY RAMPS FROM 1 LANE TO 2 LANES AT EXIT/ENTRY AND HOV AT ENTRY; ADD AUX LANES 1000’ EACH DIRECTION WEST OF IC AND 1700’ EACH DIRECTION EAST OF IC

$52,000

RIVERSIDE STATE HIGHWAY

RIV080904 60 AT SR-60/THEODORE ST IC: WIDEN OC FROM 2 TO 6 THRU LANES; WIDEN WB EXIT/ENTRY RAMPS FROM 1 LN TO 2 LNS AT EXIT/ENTRY, 3 LNS AT ART. W/ HOV AT ENTRY; WIDEN EB EXIT RAMP FROM 1 LN TO 2 LNS AT EXIT AND 3 LNS AT ART.; WIDEN EB ENTRY RAMP FROM 1 LN TO 2 LNS W/HOV; ADD EB LOOP ENTRY WITH 2 LNS AT ART. AND 1 LN AT ENTRY; ADD AUX LNS 1700’ EACH DIR WEST OF IC & 1200’ EB AND 2200’ WB EAST OF IC -RTP 3M0801

$52,000

RIVERSIDE STATE HIGHWAY

RIV110401 60 IN MORENO VALLEY AT SR-60/MORENO BEACH DR IC: MODIFY MORENO BEACH DR IC - REALIGN/WIDEN RAMPS (EB EXIT 1 TO 3 LANES, EB ENTRY 1 TO 2 LANES) AND ADD EB AUX LANE (EA: 32301)

$10,410

RIVERSIDE STATE HIGHWAY

RIV041052 60 IN MORENO VALLEY AT SR-60/MORENO BEACH DR IC: MODIFY MORENO BEACH DR IC - WIDEN OC FROM 2 TO 6 THROUGH LANES, REALIGN/WIDEN RAMPS (WB EXIT 1 TO 2 LANES), ADD NEW WB ENTRY RAMP (2 LANES), AND ADD WB AUX LANE (EA: 32303)

$38,700

RIVERSIDE STATE HIGHWAY

RIV090117 60 IN MORENO VALLEY AT SR60/NASON ST IC: WIDEN NASON ST OC FROM 2 TO 4 THROUGH LANES FROM ELDER AVE TO FIR AVE (EA: 32302)

$19,980

RIVERSIDE STATE HIGHWAY

RIV071241 60 IN MORENO VALLEY ON GRAHAM ST: CONSTRUCT 4 THROUGH LANE OC (2 LANES EACH DIR) OVER SR60 BETWEEN SUNNYMEAD BLVD AND HEMLOCK AVE, ADD SIGNALS AT HEMLOCK, LEFT-TURN POCKET LANES AT BOTH INTERSECTIONS, AND ADD PEDESTRIAN SIDEWALK (APPROX ¼ MILE) ON OC BOTH SIDES

$20,350

RIVERSIDE STATE HIGHWAY

RIV071242 60 IN THE CITY OF MORENO VALLEY - RECONSTRUCT INDIAN ST X-ING SR 60 FROM 150’ S/O SUNNYMEAD BLVD., TO HEMLOCK AVE: COMPLETE RECONSTRUCT. OF THE BRIDGE TO PROVIDE 16’6” CLEARANCE & 4 THROUGH LANES (2 LNS IN EA DIR) & ASSOC. ST IMP. WITHIN THE PROJECT LIMITS (LEFT TURN POCKETS AT SUNNYMEAD AND HEMLOCK INTERSECT., RIGHT-TURN ONLY SB AT SUNNYMEAD, NEW TS AT HEMLOCK/INDIAN ST., & INTERCONNECT MOD) (PA&ED)

$15,000

RIVERSIDE STATE HIGHWAY

RIV050535 60 ON SR60 BETWEEN JACK RABBIT TR & SR60/I-10 JCT: PH1-CONSTRUCT NEW POTRERO 6 LN OC (3 LNS EACH DIR) W/TEMP CONNECT TO WESTERN KNOLLS (EA34141). PH2: NEW IC ON/OFF RAMPS. CONSTRUCT WB/EB EXIT & ENTRY RAMPS (2 LNS) & WB/EB LOOP ENTRY RAMPS (2 LNS) (ENTRY RAMPS INCL HOV LANE), INCL EB/WB AUX LNS AT EXIT RAMPS, REALIGN WESTERN KNOLLS AVE, AND REMOVE WESTERN KNOLLS AVE CONNECTION TO SR60 (EA34142)

$78,500

RIVERSIDE STATE HIGHWAY

RIV070307 60 ON SR60 IN MORENO VALLEY: CONTINUE THE IMPLEMENTATION OF SR60 FREEWAY SERVICE PATROL (FSP) (BEAT #8, 2 TRUCKS) BETWEEN DAY ST AND REDLANDS BLVD (SR60 HOV LANE CHANGE TCM SUBSTITUTION PROJECT)

$791

RIVERSIDE STATE HIGHWAY

RIV070303 60 ON SR60 IN NW RIV CO: CONTINUE THE IMPLEMENTATION OF THE EXPANDED SR60 FREEWAY SERVICE PATROL (FSP) (BEAT #7 PATROL , 2 TRUCKS) BETWEEN MILIKEN AVE & MAIN ST (SR60 HOV LN CHANGE TCM SUBSTITUTION PROJECT)

$751

RIVERSIDE STATE HIGHWAY

RIV091007 74 IN MID-WESTERN RIVERSIDE COUNTY IN THE CITY OF LAKE ELSINORE: WIDENING OF SR-74 FROM 2 TO 4 THROUGH LANES (2 LANES IN EACH DIRECTION), WEST OF I-15 TO THE ORTEGA MOUNTAINS. OTHER IMPROVEMENTS INCLUDE TURN POCKETS AND ONE TRAFFIC SIGNAL .

$5,200

Page 86: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

84 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE STATE

HIGHWAYRIV050517 74 ON SR74 IN/NEAR HEMET FROM CALVERT AVE TO CALIFORNIA AVE: CURVE, MEDIAN, & PAVEMENT WIDENING (NON CAPACITY) (EA

0N3600)$4,872

RIVERSIDE STATE HIGHWAY

RIV62029 79 AT HWY 79 SO AND LA PAZ ST: ACQUIRE LAND, DESIGN AND CONSTRUCT PARK-AND-RIDE LOT - 157 SPACES. $2,374

RIVERSIDE STATE HIGHWAY

46460 79 IN WESTERN RIVERSIDE COUNTY ON STATE ROUTE 79 - WIDEN FROM 2 TO 4 THROUGH LANES FROM THOMPSON RD TO DOMENIGONI PKWY

$58,333

RIVERSIDE STATE HIGHWAY

RIV62024 79 ON SR79 IN SOUTHWESTERN RIVERSIDE COUNTY BETWEEN 2.0 KILOMETERS SOUTH OF DOMENIGONI PKWY TO GILMAN SPRINGS ROAD: REALIGN AND WIDEN SR79 FROM 2 TO 4 THROUGH LANES.

$1,400,000

RIVERSIDE STATE HIGHWAY

RIV061159 86 AT SR86/AVENUE 50: WIDEN AND CONSTRUCT NEW 6THROUGH LANE IC FROM E/O COACHELLA STORMWATER CHANNEL BRIDGE TO E/O TYLER ST. IMPROVEMENTS INCLUDE: EXTENDED RAMP ACCELERATION/DECELERATION LANES, RELOCATE/REALIGN AVE 50 AND TYLER ST, BIKE LANES, SIDEWALKS, AND RECONSTRUCT TRAFFIC SIGNALS (SAFETEA LU 1702, CA583, #2543) (EA: 0C970)

$26,640

RIVERSIDE STATE HIGHWAY

RIV060101 86 AT SR86S/AIRPORT BLVD (AVE 56): CONSTRUCT NEW IC (3 LANE OC - 2 LNS (1 LN IN EA DIR) + 1 MEDIAN LN)) AND RAMPS (1 LANE) FROM APPROX DESERT CACTUS DR TO 57TH AVE (EA: 47860, PPNO: 0078L)

$35,610

RIVERSIDE STATE HIGHWAY

RIV071274 86 AT SR86S/AVENUE 52 (FROM APPROX 1.57 KM S/O AVE 52 TO 0.52 KM S/O AVE 50): CONSTRUCT 6 LANE IC AND RAMPS (2 LANES), REALIGN/RELOCATE POLK ST (APPROX 1 MILE E/O AVE 52/POLK ST INTERSECTION) AND AVE 52 (APPROX ½ MILE E/O POLK ST), INCLUDE EXTENDED RAMP ACCELERATION/DECELERATION LANES (EA: 0C960)

$17,328

RIVERSIDE STATE HIGHWAY

RIV070308 91 AT SR91/71 JCT: REPLACE EB 91 TO NB 71 CONNECTOR W/ DIRECT FLY-OVER CONNECTOR, AND RECONSTRUCT THE GREEN RIVER ROAD EB ON-RAMP (EA: 0F541) ($1,501/$639/$200 TOLL CREDITS WILL BE USED IN PS&E TO MATCH DEMO-SAFETEALU/DEMO-TEA21/STP, RESPECTIVELY. $159 TOLL CREDITS WILL BE USED IN R/W TO MATCH DEMO-SAFETEALU.)

$122,658

RIVERSIDE STATE HIGHWAY

RIV050102 91 GREEN RIVER RD LANDSCAPE ENHANCEMENTS: NEAR CORONA FROM 1.0 KM E/O ORANGE/RIVERSIDE CNTY LINE TO 1.35 KM W/O SR 71/91 SEP - INSTALL LANDSCAPE ENHANCEMENTS (EA: 45662, PPNO: 0072G)

$1,832

RIVERSIDE STATE HIGHWAY

RIV031225 91 NEAR CORONA ON SR71 & SR91 (R0.0 TO R3.25): CONDUCT WILDLIFE MOVEMENT STUDY FOR MITIGATION COMMITMENT FOR SR71 WIDENING & TO AID ENV PROCESS FOR SR71/91 CONNECTORS CONS (PPNO 0048W) (EA44655)

$808

RIVERSIDE STATE HIGHWAY

RIV010212 91 ON SR91 - ADAMS TO 60/215 IC: ADD ONE HOV LN IN EACH DIRECTION, RESTRIPE TO EXTEND 4TH WB MIXED FLOW LANE FROM 60/215 IC TO CENTRAL OFF-RAMP, RESTRIPE TO EXTEND 5TH WB MIXED FLOW LANE FROM 60/215 IC TO 14TH ST OFF-RAMP, AUX LNS (MADISON-CENTRAL), BRIDGE WIDENING & REPLACEMENTS, EB/WB BRAIDED RAMPS, IC MOD/RECONSTRUCT + SOUND/RETAINING WALLS

$278,456

RIVERSIDE STATE HIGHWAY

RIV071250 91 PH1:SR91-ADD 1 MFL(SR71-I15)/1 AUX LN VAR LOCS(SR241-PIERCE), CD SYSTEM(2/3/4 LN MAIN-I15), 1 TEL & CONVERT HOV TO TEL EA DIR(OC-I15); I15-ADD TEL MED DIR CONNCT NB15 TO WB91/EB91 TO SB15, 1 TEL EA DIR SR91 DIR CONNCT-ONTARIO IC. PH2:SR91-ADD 1 MFL EA DIR(SR241-SR71)(I15-PIERCE); I15-ADD TEL MED DIR CONNCT SB15 TO WB91/EB91 TO NB15, 1 TEL EA DIR HIDDEN VALLEY-SR91 DIR CONNCT, ONTARIO IC-CAJALCO RD

$1,490,400

RIVERSIDE STATE HIGHWAY

RIV091008 111 IN PALM SPRINGS HWY 111 (VISTA CHINO) WIDENING: HWY 111 FROM 5 TO 6 THRU LNS (ADD A 3RD WB LN) BTWN VOLTURNO RD AND SUNRISE WY, INC. INT IMP @ SUNRISE WY/HWY 111 & FARRELL DR/HWY 111; AND WID. FROM 4 TO 6 THRU LNS (ADD A 3RD WB & EB LN) BTWN VOLTURNO RD & EAST CITY LIMITS, INC. INT IMP AT GENE AUTRY TR/HWY 111. OTHER IMP INC. INT IMP @ HWY 111/ INDIAN CYN DR & PALM CYN DR/HWY 111.

$17,000

RIVERSIDE STATE HIGHWAY

RIV071246 111 IN THE CITY OF COACHELLA – CONSTRUCT A NEW 6-LN AVE 52 GRADE SEPARATION OVERHEAD STRUCTURE SPANNING OVER UPRR MAINLINE TRACKS AND GRAPEFRUIT BLVD/HWY 111, FROM SHADY LN TO APPROX 600’ E/O INDUSTRIAL WAY/TYLER ST. IMPROVEMENTS INCL: RECONFIG CONNECTION FROM AVE 52 TO GRAPEFRUIT BLVD/HWY 111, BIKE LANES, SIDEWALKS, RETAINING WALLS, RECONST TRAFFIC SIGNALS/DRIVEWAYS, REMOVE EXISTING AT-GRADE CROSSING

$22,290

Page 87: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 85

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE STATE

HIGHWAYRIV050533 215 AT I-215/CACTUS AVE IC: WIDEN IC FROM 3 TO 6 THRU LNS (EB FROM 2 TO 3 BTWN W/O BNSF RR TO 1300’ E/O VETERANS WAY, ADD

4TH EB LANE FROM NB EXIT RAMP TO E/O ELSWORTH ST, WIDEN WB FROM 1&2 TO 3 THRU LNS FROM COMMERCE CENTER DR TO BNSF RR), WIDEN RAMPS 1 TO 2&3 LNS (ENTRY RAMPS INCL HOV), EXTEND NB AUX LN BTWN ALESSANDRO BLVD SOUTH TO CACTUS AVE NB ENTRY LOOP RAMP & ADD DEDICATED RT-TURN LNS (EA0E760)

$65,370

RIVERSIDE STATE HIGHWAY

RIV010203 215 AT I-215/CLINTON KEITH RD IC - CONSTRUCT PARTIAL CLOVERLEAF: WIDEN OC 2 TO 6 THROUGH LANES, RECONSTRUCT RAMPS (WIDENING TO EXISTING NB/SB DIAMOND RAMPS) & CONSTRUCT NEW NB/SB LOOP ENTRY RAMPS (EA: 32780)

$35,668

RIVERSIDE STATE HIGHWAY

RIV050534 215 AT I-215/NEWPORT RD IC: RECONSTRUCT/WIDEN FROM 4 TO 6 THROUGH LANES BETWEEN HAUN RD AND ANTELOPE RD, RELOCATE NB AND SB EXIT RAMPS (3 LANES), RECONFIGURE NB & SB ENTRY RAMPS TO INCLUDE HOV LANE, ADD NEW NB AND SB LOOP ENTRY RAMPS (2 LANES), INCLUDE EXTENDED RAMP ACCELERATION/DECELERATION LANES, ADD EXTENDED DEDICATED RIGHT-TURN LANES (EA: 0J440)

$47,700

RIVERSIDE STATE HIGHWAY

RIV011232 215 AT I-215/SCOTT RD IC: RECONSTRUCT/WIDEN FROM 2 TO 6 THROUGH LANES BTWN E/O ANTELOPE RD & HAUN RD, RECONSTRUCT/WIDEN RAMPS – NB EXIT 1 TO 3 LNS, NB ENTRY 2 TO 3 LNS, SB EXIT 1 TO 4 LNS, SB ENTRY 1 TO 2 LNS, ADD NB EXIT LOOP RAMP (2 LNS) & SB ENTRY RAMP (3 LNS), ENTRY RAMPS INCLUDE HOV LN, RAMPS INCLUDE EXTENDED ACCELERATION/DECELERATION LNS, ADD EXTENDED RIGHT-TURN LNS (EA: 0A020)

$76,000

RIVERSIDE STATE HIGHWAY

RIV060120 215 AT I-215/VAN BUREN BLVD IC: RECONSTRUCT/WIDEN IC FROM 2 TO 4 THROUGH LANES FROM MUSEUM ENTRANCE ST TO OPPORTUNITY WAY, ADD NEW NB ENTRY RAMP (3 LANES), & WIDEN RAMPS - NB ENTRY 1 TO 2 LANES, NB EXIT 2 TO 3 LANES, SB EXIT 2 TO 3 LANES, SB ENTRY 1 TO 3 LANES, ENTRY RAMPS INCLUDE HOV LANE, ADD NB/SB AUX LANE BETWEEN VAN BUREN BLVD IC AND CACTUS AVE IC (EA 0E520)

$68,403

RIVERSIDE STATE HIGHWAY

RIV050501 215 I-215 AT SR74/G ST IC: REPLACE 2 THROUGH LANE OC WITH A 4 THROUGH LANE OC & WIDEN REDLANDS AVE (4TH TO SAN JACINTO), WIDEN/REALIGN RAMPS, MODIFY 4TH ST (G ST TO EASTERLY TERMINUS) & RECONSTRUCT INTERSECTIONS (EA: 46420)

$25,034

RIVERSIDE STATE HIGHWAY

RIV060111 215 IN MID WESTERN-RIVERSIDE CO IN THE CITY OF PERRIS - I-215/ETHANAC RD IC IMP.: IC OPERATIONAL IMP. OF THE NB & SB OFF RAMPS @ I-215/ETHANAC RD AND ON ETHANAC ON EITHER SIDE OF I-215 FOR UP TO 1,200 FT. IMPROVEMENTS CONSIST OF THE WIDENING OF THE ON AND OFF RAMPS TO PROVIDE LEFT AND RIGHT TURN POCKETS, T.S. UPGRADE AT THE RAMP TERMINI & RE-STRIPING OF THE OC TO HAVE MORE LANE OF TRAFFIC (PA&ED).

$500

RIVERSIDE STATE HIGHWAY

RIV091012 215 IN MID-WESTERN RIVERSIDE COUNTY IN THE CITY OF PERRIS - CASE ROAD/MATTHEWS RD. (SR-74) AT I-215 INTERCHANGE: RECONFIGURATION OF THE EXISTING CASE RD/MATTHEWS RD. (SR-74) AT I-215 IC, IMPROVING THE INTERSECTION OPERATIONS AND ELIMINATING CROSS TRAFFIC CONFLICTS ON THE SB RAMPS (PA&ED ONLY - EA: 0P420 ).

$21,000

RIVERSIDE STATE HIGHWAY

RIV100606 215 IN RIVERSIDE COUNTY FROM I-15/I-215 IN/NEAR MURRIETA TO SAN BERNARDINO COUNTY LINE - DEVELOP CORRIDOR MASTER PLAN FOR I-215 (EA 0N450, PPNO 0247R)

$279

RIVERSIDE STATE HIGHWAY

RIV100107 215 IN SW RIVERSIDE COUNTY - I-215/KELLER RD. IC: REPLACEMENT OF EXISTING 2-LN I-215/KELLER RD. UNDERPASS WITH A NEW 4-LN (2 LNS IN EA DIR) IC, INCLUDING LEFT TURN LANES IN EACH DIRECTION, AUXILIARY LANES AT THE NB ON-RAMP AND THE SB OFF-RAMP (LENGTH OF THE INDIVIDUAL AUX. LANES IS APPROX. 1/4 MILE), 1-LN NB OFF RAMP, 2-LN NB ON-RAMP W/HOV, 1-LN SB OFF RAMP, AND 2-LN SB ON-RAMP W/HOV (PA&ED ONLY).

$15,432

RIVERSIDE STATE HIGHWAY

RIV090902 215 IN THE CITY OF RIVERSIDE ON SB ROUTE 215, FROM BLAINE ST OFF RAMP TO THE BLAINE ST ON RAMP, EXTEND THE EXISTING LANE NUMBER 4 (LANE DROP) TO MERGE WITH THE EXISTING LANE NUMBER 4 AT THE BLAINE ST ON RAMP (EA 0N890)

$1,580

RIVERSIDE STATE HIGHWAY

RIV050555 215 ON I-215 (N/O EUCALYPTUS AVE TO N/O BOX SPRINGS RD) & SR60 (E/O DAY ST TO SR60/I-215 JCT): RECONSTRUCT JCT TO PROVIDE 2 HOV DIRECT CONNECTOR LNS (SR60 PM: 12.21 TO 13.6) AND MINOR WIDENING TO BOX SPRINGS RD FROM 2 TO 4 THROUGH LANES BETWEEN MORTON RD AND BOX SPRINGS RD/FAIR ISLE DR IC (EA: 449311)

$47,414

Page 88: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

86 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE STATE

HIGHWAYRIV071277 215 ON I-215 AT LOS ALAMOS RD IC - INSTALL LANDSCAPING AND IRRIGATION IMPROVEMENTS TO THE I-215/LOS ALAMOS ROAD

INTERCHANGE (SAFETEA-LU 2005 SEC. 1702. HPP #3140).$2,488

RIVERSIDE STATE HIGHWAY

RIV071275 215 ON I-215 AT RAMONA EXPWY IC: WIDEN/RECONSTRUCT SB AND NB EXIT RAMPS 1 TO 2 LANES AND WIDEN/MODIFY OC BRIDGE STRUCTURE (NON CAPACITY IMPROVEMENTS TO STRUCTURE) (EA: OG980)

$8,546

RIVERSIDE STATE HIGHWAY

RIV071276 215 ON I-215 FROM NUEVO RD TO BOX SPRINGS RD: CONSTRUCT 2 HOV LANES (1 LANE IN EACH DIRECTION) - PA&ED. $212,500

RIVERSIDE STATE HIGHWAY

RIV070309 215 ON I-215 IN SOUTHWEST RIVERSIDE COUNTY FROM SCOTT RD TO NUEVO RD IC: CONSTRUCT A MIXED FLOW LANE IN EACH DIRECTION AND RECONSTRUCT AUX LANES BETWEEN D ST IC AND NUEVO RD IC (EA: 0F162)

$190,947

RIVERSIDE STATE HIGHWAY

RIV070304 215 ON I-215 IN SW RIV CO: CONTINUE THE IMPLEMENTATION OF I-215 FREEWAY SERVICE PATROL (FSP) (BEAT #19, 2 TRUCKS) BETWEEN SR74/4TH ST AND ALESSANDRO BLVD (SR60 HOV LANE CHANGE TCM SUBSTITUTION PROJECT)

$791

RIVERSIDE STATE HIGHWAY

RIV070305 215 ON I-215 IN SW RIVERSIDE CO. FROM MURRIETA HOT SPRINGS RD TO SCOTT RD: CONSTRUCT A 3RD MIXED FLOW LANE IN EA DIR (WIDENS I-215 FROM 4 TO 6 LANES - 3 IN EA. DIR). THE PROJECT INCLUDES THE CONSTRUCTION OF A NEW INSIDE SHOULDER IN BOTH DIRECTIONS, A NEW MEDIAN BARRIER, OVERLAY OF EXISTING LANES, AND WIDENS THE EXISTING KELLER UC BRIDGES (NON-CAPACITY ENHANCING) TO SUPPORT THE NEW LANES (EA: 0F161).

$29,228

RIVERSIDE STATE HIGHWAY

RIV110122 215 ON I-215 IN SW RIVERSIDE COUNTY FROM MURRIETA HOT SPRINGS RD TO I-215/I-15 JUNCTION, CONSTRUCT A THIRD MIXED FLOW LANE SOUTHBOUND (WIDENS I-215/I-15 CONNECTOR FROM 2 TO 3 LANES)

$13,000

RIVERSIDE STATE HIGHWAY

0121D 215 ON I-215/SR91/SR60, RIV I215 COR IMPROV PROJ - FROM 60/91/215 JCT TO 60/215 SPLIT - WIDEN 6 TO 8 LNS, INCLUDING MAINLINE/IC IMPROVS, ADD HOV, AUX, & SB TRUCK CLIMB LN, AND LANDSCAPING (EA: 3348U1, 33486, 33487, AND 33488)

$782,720

RIVERSIDE STATE HIGHWAY

RIVLS06 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - SHOPP PROGRAM: PROJECTS ARE CONSISTENT W/40 CFR 93.126 EXEMPT TABLE 2 - WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

$23,922

RIVERSIDE STATE HIGHWAY

RIVLS12 999 GROUPED PROJECTS FOR EMERGENCY REPAIR - SHOPP EMERGENCY RESPONSE PROGRAM: PROJECTS ARE CONSISTENT W/40 CFR PART 93.126 EXEMPT TABLE 2 - REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. APPLIES TO DAMAGES THAT DO NOT QUALIFY FOR FED EMERGENCY RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FED EMERGENCY RELIEF FUNDS BUT EXTEND BEYOND THE FEDERALLY DECLARED DISASTER PERIOD.

$3,790

RIVERSIDE STATE HIGHWAY

RIVLS02 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - SHOPP ROADWAY PRESERVATION PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLE 2 - PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 USC 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

$119,017

RIVERSIDE STATE HIGHWAY

RIVLS13 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM - HIGHWAY MAINTENANCE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3 - PAVEMENT RESURFACING AND/OR REHABILITATION

$4,010

RIVERSIDE STATE HIGHWAY

RIVLS01 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP COLLISION REDUCTION PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 - RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS

$32,641

RIVERSIDE STATE HIGHWAY

RIVLS09 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MANDATES PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 - RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS

$1,740

Page 89: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 87

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE STATE

HIGHWAYRIVLS10 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MOBILITY PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126

EXEMPT TABLES 2&3 - RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS

$28,834

RIVERSIDE STATE HIGHWAY

RIVLS08 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/OR REHABILITATION - MINOR PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 - RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CONTROL DEVICES/OPERATING ASSISTANCE OTHER THAN SIGNALS, INTERSCTN SIGNAL PROJECTS AT INDVL INTERSCTN, (DESCRIPTION CONT. IN COMMENTS)

$14,903

RIVERSIDE LOCAL HIGHWAY

991206 0 BUTTERFIELD STAGE RD EXTENSIONS: EXTEND MURRIETA HOT SPRINGS RD (4 LNS) FROM BUTTERFIELD STAGE RD TO SERAPHINA RD; BUTTERFIELD STAGE RD (4 LNS) FROM RANCHO CALIFORNIA RD TO MURRIETA HOT SPRINGS RD; & NICHOLAS RD (4 LNS) FROM BUTTERFIELD STAGE RD. TO CALLE GIRASOL

$40,265

RIVERSIDE LOCAL HIGHWAY

RIV060113 0 CONSTRUCT NEW 4 LANE BRIDGE OVER MURRIETA CREEK (PART OF WESTERN BYPASS CORRIDOR) INCLUDING APPROACHES, CURB & GUTTER, SIDEWALKS, & STORM DRAIN FACILITIES

$12,411

RIVERSIDE LOCAL HIGHWAY

RIV010227 0 CORONA ADVANCED TRAFFIC MANAGEMENT SYSTEM (ATMS) - AND REGIONAL ITS INTEGRATION PHASE 2. $6,011

RIVERSIDE LOCAL HIGHWAY

RIV061161 0 ESSENTIAL ROAD IMPROVEMENTS-PHASE III: CITY SECTION 31 INCLUDING PAVEMENT REHAB, SIDEWALKS, CURB/GUTTERS, CROSS GUTTERS, ADA RAMPS & DRAINAGE IMPROVENTS ON RAMONA DR., CACTUS DR., EL CAJON DR., LA MESA DR., CALIENTE DR. (BUNCH PALMS TR TO HACIENDA AVE); AND HACIENDA AVE & IRONWOOD DR (PALM DR TO RAMONA DR).

$1,040

RIVERSIDE LOCAL HIGHWAY

991203 0 EXTEND OVERLAND DRIVE (4 LANES) FROM COMMERCE CENTER DRIVE TO AVENIDA ALVARADO/DIAZ ROAD INTERSECTION INCLUDING CONSTRUCTION OF 4 LANE BRIDGE OVER MURRIETA CREEK

$13,281

RIVERSIDE LOCAL HIGHWAY

RIV031202 0 I-10 BYPASS SOUTH: CONSTRUCT TWO LANES OF ROADWAY TO PROVIDE A BY-PASS/NETWORK FACILITY FOR THE I-10, APPROX. 1/2 MILE S/O I-10 BETWEEN THE EASTERN END OF THE CITY OF BANNING AND APACHE TRAIL IN CABAZON. OTHER IMPROVEMENTS INCLUDE THE CONSTRUCTION OF SEVERAL LOW-WATER CROSSINGS AT SMITH CREEK AND SAN GORGONIO RIVER (PA&ED).

$17,970

RIVERSIDE LOCAL HIGHWAY

RIV060102 0 IN CALIMESA - WIDEN COUNTY LN RD FROM 1 TO 2 LNS (I-10 TO CALIMESA BLVD), ADD EB DEDICATED RIGHT-TURN LN, WIDEN SB CALIMESA BLVD FROM 2 TO 3 LNS FOR APPROX. 150’ S/O COUNTY LN RD SOUTH R-O-W, ADD CURB AND GUTTER AS REQUIRED. ADDITIONAL IMPROVEMENTS INCLUDE THE LENGTHENING OF BOX CULVERT AND/OR ADD CONCRETE RETAINING WINGWALL SYSTEM (TOLL CR UTILIZATION: $101/$187 FOR ENG/R/W – DEMO-SAFETEA-LU).

$2,366

RIVERSIDE LOCAL HIGHWAY

RIV071247 0 IN CATHEDRAL CITY - SIGNAL SYNCHRONIZATION ALONG EAST PALM CANYON FROM EAST BUDDY ROGERS TO ALLEN AVE: SYNCHRONIZE LIGHTS AT FOUR INTERSECTIONS WHERE ROADWAY LANES VARY FROM A 6 LN ARTERIAL TO A 4 LN ARTERIAL AT INTERVALS ($28 TOLL CREDITS USED TO MATCH CMAQ IN CONST).

$283

RIVERSIDE LOCAL HIGHWAY

RIV011212 0 IN CATHEDRAL CITY ON RAMON RD - DATE PALM DR TO DA VALL - WIDEN 4 TO 6 LNS & PAVEMENT REHAB, SIDEWALKS, SIGNAL INTERCONNECT, RETAINING WALLS, DRAIN IMP.

$2,750

RIVERSIDE LOCAL HIGHWAY

RIV091202 0 IN COACHELLA VALLEY IN CATHEDRAL CITY – DATE PALM DR. SIGNAL SYNCHRONIZATION EQUIPMENT: INSTALLATION OF SIGNAL SYNCHRONIZATION EQUIPMENT AT TEN INTERSECTIONS ON DATE PALM DR FROM RAMON RD TO EAST PALM CANYON DR., UTILIZING THE ALREADY INSTALLED HARD-WIRE INTERCONNECT ALONG THE DATE PALM DR CORRIDOR ($47 TOLL CREDITS USED TO MATCH CMAQ IN CONS).

$445

RIVERSIDE LOCAL HIGHWAY

RIV091205 0 IN COACHELLA VALLEY IN CITY OF PALM SPRINGS – FARRELL DR RIGHT TURN LANE AT VISTA CHINO: CONSTRUCTION OF A SEPARATE RIGHT TURN LANE FOR NB TRAFFIC AT THE INTERSECTION OF FARRELL DR AND VISTA CHINO, INCLUDING RELOCATION AND UPGRADE OF THE TRAFFIC SIGNAL.

$482

Page 90: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

88 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE LOCAL

HIGHWAYRIV110130 0 IN COACHELLA VALLEY IN RANCHO MIRAGE - WIDENING OF SOUTH BOUND MONTEREY AVE. FROM 2 TO 3 LANES FROM DINAH SHORE

DR TO GERALD FORD DR. (APPROX. 3,480 L.F.). OTHER IMPROVEMENTS INCLUDE INSTALLATION OF CURB AND GUTTER, DRAINAGE IMPROVEMENTS (RETENTION BASINS), SIGNING AND STRIPING, AND TRAFFIC SIGNAL MODIFICATION AT GINGER ROGERS RD.

$1,045

RIVERSIDE LOCAL HIGHWAY

RIV091208 0 IN COACHELLA VALLEY IN THE CITY OF INDIO - JACKSON ST TRAFFIC SIGNAL INTERCONNECT AND TRAFFIC SIGNAL INSTALL: INSTALL A NEW TS AT JACKSON ST & MARKET ST/DILLON AVE., & INSTALL. OF A WIRELESS INTERCONNECT SYSTEM ON JACKSON ST BTWN AVE. 44 TO THE NO. & AVE. 45 TO THE SO., A DISTANCE OF APROX. 1 MILE. INTERCONNECT SYSTEM INCLUDES 2 EXIST. TS & 1 NEW TS ($38 TOLL CREDITS USED FOR CMAQ MATCH IN CONS).

$367

RIVERSIDE LOCAL HIGHWAY

RIV011241 0 IN CORONA ON AUTO CENTER DRIVE - CONSTRUCT 4 LANE OVERCROSSING (GRADE SEPARATION) OVER EXISTING BNSF TRACKS ($1,835/$1,240 TOLL CREDITS IN CONST TO MATCH CMAQ/PNRS).

$32,675

RIVERSIDE LOCAL HIGHWAY

RIV011240 0 IN CORONA ON EXISTING MCKINLEY ST - CONSTRUCT GRADE SEPARATION AT BNSF RAILROAD CROSSING (PROJECT STUDY REPORT & PRELIMINARY ENVIRONMENTAL ANALYSIS REPORT ACTIVITIES)

$4,023

RIVERSIDE LOCAL HIGHWAY

RIV060108 0 IN CORONA ON N. MAIN ST: ADD NB DEDICATED RIGHT-TURN LANE (APPROX 300’) FROM SR91 EXIT RAMP TO N. GRAND BLVD, ADD 3RD WB SR-91 ON RAMP LANE, SIGNAL MODS & CONSTRUCT RETAINING WALL AT PARK-N-RIDE LOT

$3,702

RIVERSIDE LOCAL HIGHWAY

RIV071259 0 IN EASTERN COACHELLA VALLEY – MECCA COMMUNITY ROUNDABOUT: CONSTRUCT A ROUNDABOUT ENTRY TO THE UNINCORPORATED MECCA COMM. ON HAMMOND RD & 4TH ST BTWN 5TH & 3RD STREETS, CONSISTING OF A SINGLE LN. TRAFFIC CIRCLE W/ONE BYPASS RT LN FOR THE SE TRAFFIC; MOUNTABLE MEDIAN APRONS; LANDSCAPED CENTER; S/W & PED. X-ING; LANDSCAPE BUFFER; REALIGNMENT OF HAMMOND RD.; AND AN ENTRY MONUMENT.

$2,599

RIVERSIDE LOCAL HIGHWAY

RIV091006 0 IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY - HWY 111 WIDENING W/IN INDIAN WELLS CITY LIMITS: WID FROM 4 TO 6 THRU LNS (3 LNS IN EA DIR) BTWN THE WCL (570’ W/O VILLAGE CTR DR) & EL DORADO DR (RTP ID’S 3A07316 & 3A07257) INCLUDING THE INSTAL OF A RAISED, LANDSCAPE MEDIAN, LEFT TURN PH @ EL DORADO DR, DUAL LEFT TURN PH @ THE SB AND EB COOK ST, RT TURN ONLY LNS AT THE EAST, WEST, AND SB COOK ST.

$27,788

RIVERSIDE LOCAL HIGHWAY

RIV091209 0 IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY - HWY 111 WIDENING WITHIN INDIAN WELLS CITY LIMITS: WIDENING FROM 4 TO 6 THRU LNS (3 LNS IN EA DIR) BTWN EL DORADO & EAST CITY LIMITS (W/O WASHINGTON), INCLUDING THE INSTALL OF A RAISED, LANDSCAPE MEDIAN AND RIGHT TURN ONLY LANE AT INDIAN WELLS LN (RTP ID’S 3A07258 & 3A07259).

$32,779

RIVERSIDE LOCAL HIGHWAY

RIV070302 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY - DATE PALM DR BRIDGE REPLACEMENT/WIDENING: REPLACEMENT OF A TW0 LANE (1 LN IN EA DIR) LOW WATER CROSSING BRIDGE OVER LONG CANYON CREEK (BRIDGE NO. 00L0043) WITH A SIX LANE (3 LNS IN EA DIR), FOR APPROXIMATELY 350 FT. (FROM VARNER RD. TO 350’ S/O VARNER RD).

$10,424

RIVERSIDE LOCAL HIGHWAY

RIV091011 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY - DATE PALM DR OVER THE WHITEWATER RIVER: WIDENING OF DATE PALM DR FROM 4 TO 6 LNS (3 LNS IN EA DIR), FROM APPROX. 350’ S/O THE BRIDGE TO 250’ N/O THE BRIDGE (VIA ESTRADA TO THE NORTH AND PEREZ RD. TO THE SOUTH), INCLUDING THE CONSTRUCTION OF A RAISED MEDIAN AND SIDEWALK ALONG THE EAST SIDE OF THE PROJECT (BRIDGE NO. 56C0189).

$18,703

RIVERSIDE LOCAL HIGHWAY

RIV110501 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY - DATE PALM DR WIDENING FROM I-10 TO 350’ S/O VARNER RD.: WIDENING OF DATE PALM DR. FROM 2 TO 6 LNS (3 LNS IN EA DIR) FROM I-10 TO 350’ S/O VARNER RD . OTHER IMPROVEMENTS INCLUDE ADDITIONAL TURNING LANES AT INTERSECTION OF DATE PALM DR. & VARNER RD., TRAFFIC SIGNALIZATION, SIDEWALKS, MEDIANS AND BIKE LANES.

$8,576

RIVERSIDE LOCAL HIGHWAY

RIV091010 0 IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY - MONTEREY AVE WIDENING FROM 4 TO 6 THROUGH LANES (ADDING A 3RD NB & SB THROUGH LANE) FROM HOVLEY LANE WEST TO PARK VIEW DR IN THE CITIES OF RANCHO MIRAGE AND PALM DESERT, INCLUDING TS MODIFICATION, AND SIGNING AND STRIPING IMPROVEMENTS (RTP ID 3A07116 & 3A07128).

$5,345

Page 91: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 89

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE LOCAL

HIGHWAYRIV090118 0 IN JOSHUA TREE NATIONAL PARK ON PARK ROUTE 11 FROM GOLD POINT TO SAND HILL - WIDEN AND REALIGN ROADWAY TO IMPROVE

SIGHT DISTANCE AND TO PROVIDE CAR PULLOUTS EVERY .25 MILES AND REDESIGN PARKING AREAS FOR SAFETY.$10,298

RIVERSIDE LOCAL HIGHWAY

RIV091005 0 IN MID WESTERN RIVERSIDE COUNTY IN THE CITY OF LAKE ELSINORE - CONSTRUCTION OF A 6-PHASE TRAFFIC SIGNAL AT THE INTERSECTION OF SR-74 AND GUNNERSON AVENUE AND WIDENING OF THE ROUTE TO PROVIDE FOR TWO LEFT TURN LANES.

$470

RIVERSIDE LOCAL HIGHWAY

RIV110125 0 IN MORENO VALLEY ON COTTONWOOD AVE. FROM INDIAN ST. TO KITCHING ST: PAVEMEMENT RESURFACING, ADJUSTMENT OF UTILITY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS.

$600

RIVERSIDE LOCAL HIGHWAY

RIV110126 0 IN MORENO VALLEY ON FREDERICK ST FROM SUNNYMEAD BLVD TO ALESSANDRO BLVD.: PAVEMENT RESURFACING, ADJUSTMENT OF UTILITY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS.

$650

RIVERSIDE LOCAL HIGHWAY

RIV110127 0 IN MORENO VALLEY ON GILMAN SPRINGS RD. FROM EUCALYPTUS AVE TO 2,225 FT. S/O VIRGINIA ST.: PAVEMENT RESURFACING, ADJUSTMENT OF UTILITY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS.

$800

RIVERSIDE LOCAL HIGHWAY

RIV110128 0 IN MORENO VALLEY ON HEACOCK ST FROM ALESSANDRO BLVD TO COTTONWOOD AVE.: PAVEMENT RESURFACING, ADJUSTMENT OF UTILITY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS.

$600

RIVERSIDE LOCAL HIGHWAY

RIV060122 0 IN MORENO VALLEY ON HEACOCK ST OVER PERRIS VALLEY STORM DRAIN LATERAL A (APROX. 2.7 MILES N/O RAMONA EXPWY): REPLACE EXISTING 2 LANE BRIDGE WITH A 4 LANE BRIDGE (BRIDGE #: 56C0233)

$2,970

RIVERSIDE LOCAL HIGHWAY

RIV110129 0 IN MORENO VALLEY ON IRIS AVE. FROM LASSELLE ST TO VIA DELLAGO: PAVEMENT RESURFACING, ADJUSTMENT OF UTILITY MANHOLE COVERS, RESETTING SURVEYING MONUMENTS, RECONSTRUCTION OF ACCESS RAMPS TO MEET ADA REQUIREMENTS, AND INSTALLING PAVEMENT STRIPING AND MARKERS.

$1,350

RIVERSIDE LOCAL HIGHWAY

RIV090911 0 IN MORENO VALLEY, WIDEN KITCHING ST FROM 2 TO 4 LANES FROM GENTIAN AVE TO CACTUS AVE , INCLUDING SIDEWALK INSTALLATION WITHIN PROJECT LIMITS.

$4,555

RIVERSIDE LOCAL HIGHWAY

RIV090909 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES + 2 AUX LANES FROM EUCALYPTUS AVE TO SR-60 EB RAMPS, INCLUDING MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

$4,791

RIVERSIDE LOCAL HIGHWAY

RIV090908 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES FROM ALESSANDRO BLVD TO EUCALYPTUS AVE, INCLUDING TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

$15,456

RIVERSIDE LOCAL HIGHWAY

RIV090910 0 IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES FROM SR-60 WB RAMPS TO IRONWOOD AVE, INCLUDING TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

$4,791

RIVERSIDE LOCAL HIGHWAY

RIV011210 0 IN MORENO VALLEY/COUNTY - REALIGN RECHE VISTA DR (PERRIS BLVD TO NORTH CITY LIMITS - APPROX 2,450’) & INSTALL SIGNAL (PERRIS/HEACOCK/RECHE VISTA DR)

$6,150

RIVERSIDE LOCAL HIGHWAY

RIV041044 0 IN MORENO VALLEY: WIDEN PERRIS BLVD 2 TO 6 LNS (PERRIS VALLEY STORM DRAIN LATERAL B TO CACTUS AVE.), INCLUDING CURB, GUTTER, SIDEWALKS, SIGNALS, & MEDIANS

$14,669

RIVERSIDE LOCAL HIGHWAY

RIV031204 0 IN MURRIETA - CONSTRUCT NEW 2 LANE GUAVA ST. BRIDGE (400’) OVER MURRIETA CREEK FROM WASHINGTON AVE TO ADAMS AVE W/ SHOULDERS & ALL REQUIRED APPROACHES (BR#: 56C0162) ($48/$1,339 TOLL CREDITS UTILIZED FOR R/W & CONS).

$7,575

Page 92: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

90 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE LOCAL

HIGHWAYRIV060123 0 IN NORTHWEST RIVERSIDE COUNTY ON CLAY ST FROM APPROX 100’ SW OF GENERAL DR TO APPROX 500’ N/O LINARES AVE: REPLACE

EXISTING 4-LANE (2 LNS IN EACH DIRECTION) AT GRADE R/R X-ING WITH A 4-LN (2 LNS IN EACH DIRECTION - NON-CAPACITY) UNDERCROSSING (UPRR).

$37,350

RIVERSIDE LOCAL HIGHWAY

RIV071278 0 IN NORTHWEST RIVERSIDE COUNTY ON MAGNOLIA AVE: REPLACE EXISTING 4 LANE (2 LNS IN EA. DIR) R/R X-ING WITH A 4-LN (2 LNS IN EA DIR - NON-CAPACITY) O.C. GRADE SEPARATION ON MAGNOLIA AVE BTWN BUCHANAN AVE. (ON THE EAST) AND LINCOLN STREET (ON THE WEST).

$60,205

RIVERSIDE LOCAL HIGHWAY

RIV090402 0 IN PALM SPRINGS – RDWAY, DRAIN., VEH. PARKING & APPURTENANT STRUCTURES & FAC. FOR THE AGUA CALIENTE MUSEUM (SE CORNER OF TAHQUITZ CNYN WY & HERMOSA DR). IMP INC: WIDEN HERMOSA DR. (TAHQUITZ CYN WY-ARENAS RD (NON-CAP)) TO PROVIDE OFFSITE BAY PARK. STALLS); EXT. HERMOSA DR (ARENAS RD-BARISTO RD, CAP ENH 2 LNS, 1 LN IN EA DIR); & CONS PALM SPRINGS SD L-9 (BARISTO CHANNEL - ARENAS RD).

$1,193

RIVERSIDE LOCAL HIGHWAY

RIV011203 0 IN PALM SPRINGS - WIDEN INDIAN CANYON DRIVE FROM 2 TO 4 LANES (2 IN EACH DIRECTION) “AT GRADE” FROM UPRR OVERCROSSING (BRIDGE 56C0025) TO TRAMVIEW ROAD.

$4,961

RIVERSIDE LOCAL HIGHWAY

RIV990727 0 IN PALM SPRINGS: WIDEN INDIAN CANYON DR FROM 2 TO 6 LANES (3 IN EACH DIRECTION), FROM UPRR OVERCROSSING (BRIDGE 56C0025) TO GARNET AVE (HBRR#:56C0025)

$18,709

RIVERSIDE LOCAL HIGHWAY

RIV011205 0 IN PERRIS - WIDEN PERRIS BLVD 2 TO 6 LANES FROM RAMONA EXPRESSWAY TO PERRIS VALLEY STORM DRAIN - LATERAL ‘B’ (APPROX. 1 MILE), INCLUDING CURB, GUTTER, SIDEWALK, RAISED MEDIAN, SIGNAL WORK, UTILITY RELOCATIONS, AND MINOR DRAINAGE IMPROVEMENTS.

$5,226

RIVERSIDE LOCAL HIGHWAY

RIV011236 0 IN RIV COUNTY & MURRIETA - EXTEND/CONSTRUCT CLINTON KEITH ROAD (6 LANES TOTAL - APPROX 3.4 MILES) WITH 2 BRIDGES FROM ANTELOPE ROAD TO WINCHESTER ROAD (SR79)

$61,597

RIVERSIDE LOCAL HIGHWAY

RIV110116 0 IN RIVERSIDE - QUIET ZONE X-ING IMPROVEMENTS: UPGRADE OF 14 AT-GRADE HWY-RAIL X-INGS & ONE PEDESTRIAN ONLY AT-GRADE X-ING ALONG THE BNSF SAN BERNARDINO SUBD. & ONE AT-GRADE HWY-RAIL X-ING ALONG THE UPRR LOS ANGELES SUBD W/IN THE CITY OF RIVERSIDE. THE IMPROVEMENTS ARE NEEDED TO OPTIMIZE SAFETY AT THE X-INGS AND ALLOW FOR QUIET ZONE TO MITIGATE EXISTING AND PROJECTED TRAIN HORN NOISE IMPACTS.

$8,000

RIVERSIDE LOCAL HIGHWAY

RIV031223 0 IN RIVERSIDE CNTY GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE LOCAL ROADS SYSTEM - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND 3 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATION.

$348

RIVERSIDE LOCAL HIGHWAY

RIV050201 0 IN RIVERSIDE COUNTY GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - HBP PROGRAM; PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLE 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

$142,238

RIVERSIDE LOCAL HIGHWAY

RIV52001 0 IN RIVERSIDE COUNTY GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE LOCAL ROADS SYSTEM - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND 3 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATION.

$565

RIVERSIDE LOCAL HIGHWAY

RIV090903 0 IN RIVERSIDE COUNTY ON CAJALCO RD – CAJALCO RD. WIDENING FROM 2 TO 4 THRU LNS (2 IN EA DIR) FROM TEMESCAL CANYON RD. TO I-215, INCL A CONTINUOUS MEDIAN LEFT TURN LN W/IN PROJECT LIMITS, SHOULDER ROAD, TURN POCKETS, & AND A BRIDGE RECONSTRUCTION OVER A WATER CROSSING (RTP IDS: 3A04WT137A, 3A04WT137B, 3A04WT138A, 3A04WT138B, 3A04WT138C) (PA&ED ONLY) ($803 TOLL CREDITS USED FOR STPL MATCH IN PA&ED).

$173,185

RIVERSIDE LOCAL HIGHWAY

RIV070703 0 IN RIVERSIDE ON IOWA AVE: REPLACE EXISTING 4 LANE (2-LNS IN EA DIR) R/R X-ING WITH A 4 LANE (2-LNS IN EA DIR - NON-CAPACITY) O.C. GRADE SEPARATION ON IOWA AVE BTWN SPRING ST & PALMYRITA AVE W/PEDESTRIAN IMPROVEMENTS & RECONSTRUCT CITRUS ST INTERSECTION (NON-CAPACITY ENHANCING).

$32,168

Page 93: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 91

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE LOCAL

HIGHWAYRIV071281 0 IN RIVERSIDE ON MAGNOLIA AVE: REPLACE EXISTING 4-LN (2 LNS IN EA DIR) R/R X-ING WITH A 4-LN (2 LNS IN EA DIR - NON-CAPACITY)

U.C. GRADE SEPARATION ON MAGNOLIA AVE BTWN SUNNYSIDE DR AND ELIZABETH ST. ADD. NON-CAPACITY IMP. INCLUDE: INSTAL. OF A TRAFFIC SIGNAL AT BEATTY DR AND MAGNOLIA; AND CONVERTING THE INTERSECTION OF MAGNOLIA AND MERRILL AVES TO ALLOW ONLY RIGHT-IN AND RIGHT-OUT MOVEMENTS.

$52,960

RIVERSIDE LOCAL HIGHWAY

RIV071280 0 IN RIVERSIDE ON MARY STREET: REPLACE EXISTING 4 LN (2 LNS IN EA DIR) R/R X-ING WITH A 4 LN (2 LNS IN EA DIR - NON-CAPACITY) U.C. GRADE SEPARATION ON MARY ST BETWEEN MARGUERITE AVE AND INDIANA AVE.

$38,000

RIVERSIDE LOCAL HIGHWAY

RIV071272 0 IN RIVERSIDE ON RIVERSIDE AVENUE: REPLACE EXISTING 4-LANE (2 LNS IN EA DIR) R/R/ X-ING WITH A 4 LN (2 LNS IN EA DIR - NON-CAPACITY) U.C. GRADE SEPARATION ALONG RIVERSIDE AVE BTWN MERRILL AVE AND 400’ N/O ELIZABETH ST. ADDITIONAL IMPROVEMENTS INCLUDE INSTALLATION OF APPROX 1,100 FT OF PCC S/W ON EACH SIDE OF RIVERSIDE AVENUE WITHIN THE PROJECT LIMITS ($791 TOLL CREDITS USED TO MATCH STPL IN R/W).

$29,512

RIVERSIDE LOCAL HIGHWAY

RIV071271 0 IN RIVERSIDE ON STREETER AVENUE: REPLACE EXISTING 4 LANE (2 LNS IN EA DIR) R/R X-ING WITH A 4 LN (2 LNS IN EA DIR - NON-CAPACITY) U.C. GRADE SEPARATION ON STREETER AVE BETWEEN LANTANA ST AND BEATTY DR., AND INSTALL APPROX. 1,000 FT OF PCC S/W ON EACH SIDE OF STREETER AVENUE WITHIN THE PROJECT LIMITS.

$36,800

RIVERSIDE LOCAL HIGHWAY

RIV060114 0 IN SOUTHWEST TEMECULA: DESIGN AND CONSTRUCT 4 LANE WESTERN BYPASS CORRIDOR (PHASE 1) FROM SR79 SOUTH TO RANCHO CALIFORNIA RD

$13,500

RIVERSIDE LOCAL HIGHWAY

RIV110825 0 IN THE CITY OF COACHELLA - WIDEN AND CONSTRUCT A NEW 6-LN BRIDGE OVER COACHELLA STORMWATER CHANNEL, FROM 300-FEET WEST OF APACHE TRAIL TO SR-86S INTERSECTION. IMPROVEMENTS INCLUDE: BIKE LANES/TRAILS, SIDEWALKS, RECONSTRUCT TRAFFIC SIGNAL/DRIVEWAYS, CHANNEL SCOUR PROTECTION, REMOVE EXISTING LOW WATER CROSSING AND CULVERTS.

$29,916

RIVERSIDE LOCAL HIGHWAY

RIV010209 0 IN THE CITY OF CORONA - CONSTRUCT FOOTHILL PARKWAY WESTERLY EXTENSION 4 LANE ROAD FROM LINCOLN AVE TO PASEO GRANDE (APPROX 2.5 MILES)

$49,311

RIVERSIDE LOCAL HIGHWAY

RIV071236 0 IN THE CITY OF DESERT HOT SPRINGS - WESTERN AVE-SCENIC DR. PAVING PROJECT: CONSTRUCT 30’ OF ASPHALT PAVING FROM PIERSON BLVD TO 600’ N/O SCENIC DR., AND FROM 200’ W/O WESTERN AVE. TO 600’ E/O WESTERN AVE. ON SCENIC DR. ($36 TOLL CREDITS USED TO MATCH CMAQ IN CONST).

$350

RIVERSIDE LOCAL HIGHWAY

RIV110831 0 IN THE CITY OF INDIO - WIDEN JEFFERSON ST FROM VARNER RD TO SUN CITY BLVD FROM 4 TO 6 LANES AND WIDEN VARNER RD FROM 2 TO 4 LANES FROM JEFFERSON ST TO APPROX 500’ EAST OF JEFFERSON ST AND THEN TAPERING BACK TO 2 LANES. INCL MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT-TURN POCKETS, DED RT TURN LANES ON SB JEFFERSON AND EB VARNER, DRAINAGE IMPROVEMENTS, SIDEWALKS, AND BIKE LANES.

$5,300

RIVERSIDE LOCAL HIGHWAY

RIV071240 0 IN THE CITY OF MORENO VALLEY - EAST BOUND CACTUS AVE WIDENING BETWEEN VETERANS WAY & HEACOCK: WIDENING OF EAST BOUND CACTUS AVE FROM 2 TO 3 LANES, INCLUDING TRAFFIC SIGNAL MODIFICATIONS WITHIN THE PROJECT REACH, CHANNELIZATION, AND SIGNAL INTERCONNECT SYSTEM.

$6,243

RIVERSIDE LOCAL HIGHWAY

RIV080905 0 IN THE CITY OF MORENO VALLEY - WIDEN ALESSANDRO BLVD BETWEEN I-215 AND FREDERICK ST FROM 4 TO 6 LANES. $12,401

RIVERSIDE LOCAL HIGHWAY

RIV080907 0 IN THE CITY OF MORENO VALLEY - WIDEN ALESSANDRO BLVD BETWEEN NASON ST AND GILMAN SPRINGS RD FROM 2 TO 4 LANES; REALIGN ALESSANDRO BLVD WITHIN PROJECT LIMITS BETWEEN THEODORE ST AND GILMAN SPRINGS RD. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, LANDSCAPING, SIDEWALKS, BIKE LANES, AND TRAILS.

$62,000

RIVERSIDE LOCAL HIGHWAY

RIV080912 0 IN THE CITY OF MORENO VALLEY - WIDEN BOX SPRINGS RD BETWEEN 500’ WEST OF CLARK ST AND DAY ST FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, GRADING, DRAINAGE, CURB, GUTTER, RETAINING WALLS, SIGNAGE, AND STRIPING.

$3,178

Page 94: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

92 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE LOCAL

HIGHWAYRIV080909 0 IN THE CITY OF MORENO VALLEY - WIDEN GILMAN SPRINGS RD BETWEEN ALESSANDRO BLVD AND BRIDGE ST FROM 2 TO 6 LANES.

IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, ACCESS ROADS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

$51,000

RIVERSIDE LOCAL HIGHWAY

RIV080908 0 IN THE CITY OF MORENO VALLEY - WIDEN GILMAN SPRINGS RD BETWEEN SR-60 AND ALESSANDRO BLVD FROM 2 TO 6 LANES. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, ACCESS ROADS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

$41,500

RIVERSIDE LOCAL HIGHWAY

RIV080910 0 IN THE CITY OF MORENO VALLEY - WIDEN HEACOCK ST BETWEEN CACTUS AVE AND SAN MICHELE RD FROM 2 TO 4 LANES INCLUDING CURB, GUTTER, SIDEWALK, AND SIGNAL.

$10,103

RIVERSIDE LOCAL HIGHWAY

RIV080911 0 IN THE CITY OF MORENO VALLEY - WIDEN HEACOCK ST BETWEEN SAN MICHELE RD AND HARLEY KNOX RD (PERRIS CITY LIMITS), FROM 2 TO 4 LANES; REALIGN HEACOCK ST WITHIN PROJECT LIMITS BETWEEN NANDINA AND OLEANDER; REPLACE BRIDGE OVER PVSD LATERAL B.

$6,100

RIVERSIDE LOCAL HIGHWAY

RIV080913 0 IN THE CITY OF MORENO VALLEY - WIDEN IRONWOOD AVE BETWEEN DAY ST AND BARCLAY DR FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, GRADING, DRAINAGE, CURB, GUTTER, RETAINING WALLS, SIGNAGE, AND STRIPING.

$3,237

RIVERSIDE LOCAL HIGHWAY

RIV080914 0 IN THE CITY OF MORENO VALLEY - WIDEN IRONWOOD AVE BETWEEN HEACOCK ST AND PERRIS BLVD FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, DRAINAGE, CURB, GUTTER, AND SIDEWALK.

$8,011

RIVERSIDE LOCAL HIGHWAY

RIV080915 0 IN THE CITY OF MORENO VALLEY - WIDEN IRONWOOD AVE BETWEEN PERRIS BLVD AND VISTA DE CERROS DR. FROM 2 TO 5 LANES (2 LANES IN EACH DIRECTION AND 1 CENTER TURNING LANE) . ADDITIONAL IMPROVEMENTS INCLUDE SIGNAL MODIFICATIONS, LIGHTING, DRAINAGE, CURB, GUTTER, STRIPING, AND SIDEWALK.

$13,397

RIVERSIDE LOCAL HIGHWAY

RIV080917 0 IN THE CITY OF MORENO VALLEY - WIDEN MORENO BEACH DR BETWEEN CACTUS AVE AND AUTO MALL DR FROM 2 TO 6 LANES. INCLUDES SIGNALS AT COTTONWOOD AVE, ALESSANDRO BLVD, AND CACTUS AVE.

$23,000

RIVERSIDE LOCAL HIGHWAY

RIV080918 0 IN THE CITY OF MORENO VALLEY - WIDEN REDLANDS BLVD BETWEEN SR-60 AND CACTUS AVE FROM 2 TO 4 LANES. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, LANDSCAPING, SIDEWALKS, BIKE LANES, AND TRAILS.

$18,300

RIVERSIDE LOCAL HIGHWAY

RIV071243 0 IN THE CITY OF PALM DESERT – FREE RIGHT TURN LANE-WB FRED WARING DR TO NB HWY 111: RECONFIGURATION OF A FREE RIGHT TURN LANE AT THE INTERSECTION FROM WEST BOUND FRED WARING DR TO NORTH BOUND HWY 111 ($61 TOLL CREDITS USED TO MATCH CMAQ IN CONST). .

$706

RIVERSIDE LOCAL HIGHWAY

RIV071262 0 IN THE CITY OF PALM DESERT – HWY 111 IMP BTWN THE NO. CITY LIMITS AND LARKSPUR LN: EXT OF & PROVIDE DUAL LEFT TURN POCKET AT THE INT OF NB HWY 111 & PLAZA WAY & RECONSTRUCTION OF CROSS GUTTER (ELIMINATE ABRUPT DIP); CONSTRUCT BUS TURNOUT ON SB HWY 111 AT THE FAR SIDE OF SAN PABLO AVE; AND INSTALL APPROX. 12,000 S.F. OF S/W AND 14 ADA COMPLIANT CURB RAMPS ($71 TOLL CR USED TO MATCH CMAQ IN CONST).

$691

RIVERSIDE LOCAL HIGHWAY

RIV071257 0 IN THE CITY OF PALM DESERT - INSTALL INTERCONNECT CONDUIT AND FIBER-OPTIC CABLE IN THE AREA SURROUNDED BY MONTEREY AVE., COUNTRY CLUB DR., COOK ST., AND HWY 111, ESTABLISHING COMM LINKS TO THE TS MAINT OFFICE; RELOCATE THE TS CENTRAL COMPUTER SYSTEM HDWE TO THE SIGNAL MAINT FAC; & IMPROVE COMM. ON TO LOCAL INTERSECTION CONTROLLERS THROUGHOUT THE CITY ($86 TOLL CR USED TO MATCH CMAQ IN CONST).

$773

RIVERSIDE LOCAL HIGHWAY

RIV071255 0 IN THE CITY OF PALM DESERT – MID VALLEY BIKE PATH: CONSTRUCT A 6.5 MILE CLASS 1 BIKE PATH ALONG THE NORTHERN CITY LIMITS BETWEEN S/O WASHINGTON ST. AND N/O MONTEREY AVE.

$5,800

RIVERSIDE LOCAL HIGHWAY

RIV000103 0 IN THE CITY OF PALM SPRINGS - CONSTRUCT BELARDO RD (2 LNS, 1 EA DIR), FROM RAMON RD TO S. PALM CANYON DR., INCLUDING NEW BRIDGE OVER TAHQUITZ CREEK, & INTERSECTION. IMPROVEMENTS. AT SUNNY DUNES RD, MESQUITE AVE., & MORONGO RD., & CONSTRUCT TRIBAL ACCESS RD TO INTERPRETIVE CENTER.

$5,500

Page 95: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 93

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE LOCAL

HIGHWAYRIV071258 0 IN THE CITY OF PALM SPRINGS – TRAFFIC MANAGEMENT CENTER: ADVANCE THE INTERCONNECTED SIGNAL TIMING TO BE UNIFIED

CITYWIDE, COORDINATE THE COMM. EQUIP., BRINGING THEM ALL ONTO THE SAME COMM. PLATFORM FOR THE TRANSMISSION OF COMPLETE DATA & DISSEMINATION OF INFO. TO THE PUBLIC.

$2,082

RIVERSIDE LOCAL HIGHWAY

RIV031205 0 IN THE CITY OF PALM SPRINGS - WIDEN RAMON RD FROM 4 TO 6 LNS (3 IN EA DIR), FROM EL CIELO RD TO SUNRISE WY., WITH INTERSECTION WIDENING AT EL CIELO RD (ADD WB RT TURN LANE), AT FARRELL DR (ADD SB LEFT TURN LANE), & AT SUNRISE WY (ADD SB LEFT, NB LEFT, AND WB LEFT).

$4,750

RIVERSIDE LOCAL HIGHWAY

RIV090405 0 IN THE CITY OF PALM SPRINGS: REPLACE EXISTING 4-LANE LOW WATER CROSSING ON VISTA CHINO AT WHITEWATER RIVER WITH A NEW 4-LANE BRIDGE - BRIDGE NO. 00L0052.

$95,000

RIVERSIDE LOCAL HIGHWAY

RIV090406 0 IN THE CITY OF PALM SPRINGS: WIDENING OF RAMON RD. FROM 4 TO 6 LANES (LANDAU BLVD. TO SAN LUIS REY DR) - ADDING A 3RD WB LANE FROM LANDAU BLVD. TO SAN LUIS REY DR., AND A 3RD EB LANE FROM CROSSLEY TO LANDAU BLVD., INCLUDING THE WIDENING OF THE EXISTING FOUR-LANE BRIDGE OVER THE WHITEWATER RIVER TO SIX-LANES.

$29,500

RIVERSIDE LOCAL HIGHWAY

RIV091001 0 IN THE COACHELLA VALLEY IN THE CITY OF DESERT HOT SPRINGS - INDIAN AVE WIDENING: WIDENING OF INDIAN AVE FROM 2 TO 6 THROUGH LANES (3 IN EA DIR), BETWEEN HWY 62 AND MISSION LAKES BLVD., INCLUDING THE CONSTRUCTION OF AN ALL WEATHER BRIDGE OVER MISSION CREEK (PA&ED).

$44,000

RIVERSIDE LOCAL HIGHWAY

RIV091201 0 IN THE COACHELLA VALLEY IN THE CITY OF DESERT HOT SPRINGS - INDIAN AVE. WIDENING: WIDENING OF INDIAN AVE. FROM 2 TO 6 THROUGH LANES (3 IN EA DIR) BETWEEN MISSION LAKES BLVD., AND PIERSON BLVD. (PA&ED ONLY).

$20,000

RIVERSIDE LOCAL HIGHWAY

RIV110124 0 IN THE COACHELLA VALLEY IN THE CITY OF PALM SPRINGS - RAMON RD. WIDENING BETWEEN SAN LUIS REY DR & LANDAU BLVD.: WIDENING OF RAMON RD. FROM A 4-LN ARTERIAL TO A 6-LN ARTERIAL (3-LNS IN EA DIR) BETWEEN SAN LUIS REY DR & LANDAU BLVD., INCLUDING THE WIDENING/REPLACEMENT OF THE WHITEWATER RIVER BRIDGE (BRIDGE NO. 56C0287), INCLUDING SEISMIC RETROFIT AND SCOUR COUNTERMEASURES AS NECESSARY.

$35,998

RIVERSIDE LOCAL HIGHWAY

RIV090102 0 IN THE COACHELLA VALLEY PM-10 PROGRAM - CLEAN VEHICLE ACQUISITION PROGRAM: FLEET ACQUISITION OF ALTERNATIVE FUEL SWEEPERS FOR REGIONAL STREET SWEEPING PROGRAM OF MAJOR ARTERIALS, FOR THE REDUCTION OF PM10 FUGITIVE DUST THROUGHOUT THE COACHELLA VALLEY ($229 TOLL CREDITS USED TO MATCH CMAQ IN CONST).

$2,000

RIVERSIDE LOCAL HIGHWAY

RIV071285 0 IN THE SOUTHEAST COACHELLA VALLEY IN EASTERN RIVERSIDE COUNTY, JUST SOUTH OF THE CITY OF COACHELLA ON AVE. 56 (AIRPORT BLVD) - FROM POLK ST TO THE WEST TO ORANGE ST. TO THE EAST OF THE R/R X-ING: REPLACE EXISTING 2 LN (1 LN IN EA DIR) AT GRADE R/R X-ING WITH A 2 LN OC (1 LN IN EA DIR - NON-CAPACITY) ACROSS THE UPRR TRACKS.

$22,300

RIVERSIDE LOCAL HIGHWAY

RIV031218 0 IN WESTERN RIV CO - NEW MID CO PKWY: CONS 6 THRU LN (3 LNS IN EA DIR) APPROX 16 MI. BTWN I-215 IN PERRIS EAST TO SR79 IN SAN JACINTO, INC. CONS/RECONS OF APPROX 10 ICS, ADD OF AUX LN REDLANDS-EVANS & EB TRUCK CLIMB LN EVANS-ANTELOPE. I-215 IMP: ADD 1 MF LN IN EA DIR NUEVO RD -VAN BUREN BLVD, & 1 AUX LN IN EA DIR MID CO PKWY-CAJALCO/RAMONA EXP & FROM MID CO PKWY-NUEVO.

$1,700,000

RIVERSIDE LOCAL HIGHWAY

RIV100102 0 IN WESTERN RIVERSIDE CO IN BEAUMONT: SR79 BYPASS EXT NO. PH II – INSTAL OF A 3-LN PRE-FAB BRIDGES ON THE EASTSIDE OF THE PH I POTRERO BRIDGE SR79 BYPASS EXT. NO., EXTENDING THE POTRERO BLVD 0.675 MI. NO. FROM THE FUTURE SR60/POTRERO FWY IC (RIV050535), TO CONNECT TO THE OAK VALLEY PKWY IN BEAUMONT, INCLUDING THE INSTAL OF A CLASS I MULTI-PURPOSES TRAIL, FLARED INTERSECTION AND TURNING POCKETS.

$21,846

RIVERSIDE LOCAL HIGHWAY

RIV091004 0 IN WESTERN RIVERSIDE CO. IN THE CITY OF MORENO VALLEY - CACTUS AVE WIDENING: WIDEN CACTUS AVE FROM 2 TO 4 THROUGH LANES (2 IN EA DIR), FROM LASSELLE ST TO NASON ST. OTHER IMPROVEMENTS INCLUDE THE INSTALLATION OF A DEDICATED RIGHT TURN LANE, A 2-WAY LEFT TURN LANE, BUS TURN-OUTS, LANDSCAPING & SIDEWALKS.

$6,350

Page 96: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

94 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)RIVERSIDE LOCAL

HIGHWAYRIV091002 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF MORENO VALLEY - EUCALYPTUS AVE. EXTENSION: CONSTRUCTION OF 3 THROUGH

LANES (2 LANES WB & 1 LANE EB) BETWEEN REDLANDS BLVD. AND THEODORE STREET, INCLUDING THE INSTALLATION OF MEDIANS, LEFT TURN POCKETS, DEDICATED RIGHT TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND A CLASS I BIKE PATH.

$6,266

RIVERSIDE LOCAL HIGHWAY

RIV091003 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF MORENO VALLEY - EUCALYPTUS AVE. WIDENING/EXTENSION: CONSTRUCTION OF A 4TH THROUGH LANE IN THE EASTERN DIRECTION FROM REDLANDS BLVD. TO THEODORE ST & EXTENSION OF EUCALYPTUS AVE. TO REDLANDS BLVD., WITH A SIGNALIZED INTERSECTION.

$3,550

RIVERSIDE LOCAL HIGHWAY

RIV090101 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF RIVERSIDE - UNDERGROUNDING OF EXISTING OVERHEAD UTILITIES ON VICTORIA AVENUE BETWEEN WASHINGTON AVE AND MAUDE ST (DEMO-STL HPP#3336; CA DEMO ID 668).

$1,804

RIVERSIDE LOCAL HIGHWAY

RIV100103 0 IN WESTERN RIVERSIDE COUNTY IN THE UNINCORPORATED AREA OF THE COUNTY OF RIVERSIDE - PIGEON PASS RD CORRIDOR: CONSTRUCT A NEW 4-LANE PIGEON PASS RD CORRIDOR FACILITY BETWEEN MT. VERNON AVE. AND HIDDEN SPRINGS RD, INCLUDING SIGNALS AND MEDIANS (PA&ED ONLY).

$33,327

RIVERSIDE LOCAL HIGHWAY

RIV011237 0 NEAR CORONA - WIDEN GREEN RIVER ROAD FROM 3 TO 6 LANES FROM SR91 SOUTHSIDE OFF/ON RAMPS TO PALISADES DRIVE. $7,583

RIVERSIDE LOCAL HIGHWAY

RIV070702 0 NEAR SR60 AND BEAUMONT W/O JCT SR60/I-10: CONSTRUCT NEW 4 LANE (2 LNS EACH DIR) POTRERO BLVD FROM SR 60 SOUTH & EAST TO SR79 (PA&ED/PRE-DESIGN)

$2,800

RIVERSIDE LOCAL HIGHWAY

RIV031206 0 ON S. PALM CANYON DR OVER ARENAS CANYON SOUTH DRAINAGE CHANNEL: REPLACE EXISTING 4 LANE LOW-WATER CROSSING WITH A NEW 4-LANE BRIDGE, INCLUDING DRAINAGE IMPROVEMENTS CONSISTING OF LEVEE CHANNELIZATION (HBRR #: 00L0027).

$4,875

RIVERSIDE LOCAL HIGHWAY

RIV060121 0 ON VAN BUREN BLVD NEAR MARCH AIR RESERVE BASE: WIDEN FROM 4 TO 6 LANES FROM APPROXIMATELY 0.5 MILES WEST OF I-215 TO BARTON ST

$6,700

RIVERSIDE LOCAL HIGHWAY

RIV041047 0 THROUGHOUT RIVERSIDE COUNTY - GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES). $270 IN TOLL CREDITS WILL BE UTILIZED FOR STPL MATCH FOR CONS IN FY 2011/2012.

$3,616

RIVERSIDE LOCAL HIGHWAY

RIV010213 0 WIDEN GENE AUTRY TRAIL FROM 2 TO 6 LANES (3 IN EACH DIRECTION), INCLUDING WIDENING OF EXISTING UPRR OVERCROSSING (BRIDGE 56C0082) FROM 1700’ S/O UPRR BRIDGE TO SALVIA ROAD.

$4,893

RIVERSIDE LOCAL HIGHWAY

RIV041045 0 WIDEN PERRIS BLVD FROM 2 TO 4 LANES FROM IRONWOOD AVE TO MANZANITA AVE INCLUDING CURB, GUTTER, SIDEWALKS, SIGNAL MODS, STREET LIGHTS & MEDIANS IMPROVEMENTS

$6,670

RIVERSIDE LOCAL HIGHWAY

RIV041043 0 WIDEN RECHE VISTA DR 2 TO 4 LNS (HEACOCK ST/PERRIS BLVD-RECHE CYN RD); WIDEN RECHE CYN RD 2 TO 4 LNS (RECHE VISTA-BARTON/HUNTS) PLUS REALIGN, SIGNALS, MEDIANS (PA&ED).

$3,386

SAN BERNARDINO

TRANSIT 20080902 0 29 PALMS TRANSIT CENTER $500

SAN BERNARDINO

TRANSIT 20111204 0 5310 PROGRAM - REPLACE 5 SMALL BUSES FOR VOCATIONAL IMPROVEMENT PROGRAM, INC. (TOLL CREDITS TO BE USED IN THE AMOUNT OF $34 IN FY2010/11)

$300

SAN BERNARDINO

TRANSIT 20111203 0 5310 PROGRAM-REPLACEMENT BUSES - 16 LARGE BUSES (TOLL CREDITS TO BE USED IN THE AMOUNT OF $128 IN FY2010/11) $1,120

SAN BERNARDINO

TRANSIT 20040815 0 ADMINISTRATION EQUIPMENT - COMPUTER HARDWARE AND OFFICE FURNISHINGS $30

Page 97: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 95

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOTRANSIT 20060606 0 BARSTOW -OPERATING EXPENSES $16,763

SAN BERNARDINO

TRANSIT 200089 0 BUS REHABILITATION AND REPAIR $6,570

SAN BERNARDINO

TRANSIT 20020811 0 BUS STOP AMENITIES - BARSTOW CITY HALL - FOR CENTRAL TRANSFER POINT AND OTHER AMENITIES $345

SAN BERNARDINO

TRANSIT SBD41064 0 BUS SYSTEM - BUS SHELTERS ON VARIOUS ROUTES-REPLACING MISSING AND/OR DAMAGED BUS STOPS, PURCHASE AND REPAIR SHELTERS, BENCHES, ETC.

$158

SAN BERNARDINO

TRANSIT SBD41084 0 BUS SYSTEM - BUSES REPLACEMENT - ALT FUEL, 2008/09-2 $5,830

SAN BERNARDINO

TRANSIT SBD31037 0 BUS SYSTEM - OPERATING ASSISTANCE $13,530

SAN BERNARDINO

TRANSIT SBD31581 0 BUS SYSTEM - OPERATING ASSISTANCE $75,503

SAN BERNARDINO

TRANSIT SBD31612 0 BUS SYSTEM - OPERATING ASSISTANCE $2,271

SAN BERNARDINO

TRANSIT SBD41055 0 BUS SYSTEM - OPERATING ASSISTANCE $14,086

SAN BERNARDINO

TRANSIT 200086 0 BUS SYSTEM - PASSENGER FACILITIES. FY10-3 BUS SHELTERS INCLUDING UPGRADES FOR ACCESSIBILITY AND AMENITIES FOR THESE AND OTHER BUS STOPS FY11-3 BUS SHELTERS INCLUDING UPGRADES FOR ACCESS;FY12-3 BUS SHELTERS; FY14-3 BUS SHELTERS INCLUDES BUS STOP LIGHTING EVERY YEAR.

$406

SAN BERNARDINO

TRANSIT 981118 0 BUS SYSTEM - PASSENGER FACILITIES: DESIGN AND BUILDING OF ONTARIO TRANSCENTER $1,244

SAN BERNARDINO

TRANSIT 200101 0 BUS SYSTEM - PASSENGER FACILITIES: DEVELOPMENT OF SAN BERNARDINO TERMINAL LOCATED ON RIALTO AND E STREET. TRANSFER POINT CENTER

$10,000

SAN BERNARDINO

TRANSIT SBD41117 0 BUS SYSTEM - PURCHASE SERVICE VEHICLES 2012-7;1-2013 $582

SAN BERNARDINO

TRANSIT SBD20030 0 BUS SYSTEM OPERATING ASSISTANCE (NOTE: ‘OTHER’ FUNDS ARE FOR JOB ACCESS REVERSE COMMUTE FUNDS. $106,170

SAN BERNARDINO

TRANSIT 20041303 0 BUS SYSTEM REPLACEMENT 35’ GAS FUEL $1,290

SAN BERNARDINO

TRANSIT SBD90105 0 BUS SYSTEM-BUSES BUS REPLACEMENTS ALT. FUEL, 2010-15 AND 15 COACHES PER YEAR AFTER 2010 $34,003

SAN BERNARDINO

TRANSIT 20111301 0 BUS SYSTEM-OPERATING ASSISTANCE-LIFELINE CONNECTIVITY BUS SERVICE BETWEEN VICTOR VALLEY AND SAN BERNARDINO VALLEY (SPLIT PROJECT FROM SBD31581)

$1,000

SAN BERNARDINO

TRANSIT SBD31084 0 BUS SYSTEM-SERVICE VEHICLES, PURCHASE SEVERAL EXPANSION SERVICE VEHICLES $2,000

Page 98: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

96 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOTRANSIT 20110302 0 CAPITAL - BUS FACILITY - CAPITAL LEASE PAYMENTS $30,177

SAN BERNARDINO

TRANSIT SBD41073 0 CAPITAL - PURCHASE OF LAND AND ARCHITECTURAL SERVICES & CONSTRUCT FOR ADMINISTRATIVE, MAINTENANCE, & OPERATIONS FACILITY (PH I & II)

$25,500

SAN BERNARDINO

TRANSIT 20080807 0 CAPITAL COST OF CONTRACTING $53

SAN BERNARDINO

TRANSIT 200427 0 CAPITAL COST OF CONTRACTING FOR OPERATIONS $7,803

SAN BERNARDINO

TRANSIT 20060601 0 CAPITALIZATION OF LEASES - FOR CONTRACTORS, RADIO SITES, APC, TIRE LEASES $6,000

SAN BERNARDINO

TRANSIT 20080804 0 CAPITALIZATION OF PREVENTATIVE MAINTENANCE $428

SAN BERNARDINO

TRANSIT 20080805 0 CAPITALIZATION OF PREVENTATIVE MAINTENANCE $193

SAN BERNARDINO

TRANSIT 20080806 0 CAPITALIZATION OF PREVENTATIVE MAINTENANCE $180

SAN BERNARDINO

TRANSIT 981122 0 CAPITALIZATION OF PREVENTIVE MAINT $57,717

SAN BERNARDINO

TRANSIT 20080206 0 CHINO TRANSIT CENTER PHASE II - PHASE II WILL CONSIST OF BUILDING ADDITIONAL BUS BAYS FOR FUTURE INTER-COUNTY ROUTES $2,527

SAN BERNARDINO

TRANSIT 20041302 0 COMPUTER HARDWARE AND SOFTWARE $138

SAN BERNARDINO

TRANSIT 20110104 0 DISPATCH & MAINTENANCE. OFFICE EQUIPMENT $50

SAN BERNARDINO

TRANSIT 200625 0 E STREET TRANSIT CORRIDOR- FROM SAN BERNARDINO TO LOMA LINDA (INCLUDES 14 ARTIC BUSES AND PARK AND RIDES) $192,236

SAN BERNARDINO

TRANSIT SBD31073 0 FACILITIES IMPROVEMENTS - EQUIPMENT AND FURNISHINGS - EAST/WEST VALLEY FACILITY PURCHASE OFFICE EQUIPMENT $3,106

SAN BERNARDINO

TRANSIT 200441 0 FACILITIES: EASTERN AREA MAINTENANCE: THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA & RCTC $17,714

SAN BERNARDINO

TRANSIT 20111202 0 FAREBOX REPLACEMENTS, REPLACE FAREBOXES ON THE 40 FOOT REVENUE VEHICLES. THIS PHASE WILL COMPLETE ALL THE VEHICLES.

$1,700

SAN BERNARDINO

TRANSIT 20061704 0 FTA5316 JOBS ACCESS REVERSE COMMUTE (JARC) VARIOUS PROJECTS TO INCREASE TRANSPORTATION ACCESS TO JOBS FOR LOW INCOME INDIVIDUALS, INCLUDING VOUCHER PROGRAMS AND VANPOOLS

$1,670

SAN BERNARDINO

TRANSIT 20040829 0 FUELING FACILITIES - TO SERVE OMNITRANS SERVICE AREA - REHABILITATION AND MAINTENANCE OF ALTERNATIVE FUELING FACILITIES

$3,000

SAN BERNARDINO

TRANSIT R589TA 0 INTERSTATE - LOS ANGELES/CHICAGO AT EL GARCES STATION MULTIMODAL - STATION - FACILITY $8,090

Page 99: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 97

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOTRANSIT 20110604 0 ITS SOFTWARE/HARDWARE $712

SAN BERNARDINO

TRANSIT 20061701 0 JOBS ACCESS AND REVERSE COMMUTE ADMINISTRATION OPERATIONS AND CAPITAL SECTION 5316 JOB ACCESS REVERSE COMMUTE (JARC) VARIOUS PROJECTS (C/O PROJECT FROM PRIOR YEAR)

$2,826

SAN BERNARDINO

TRANSIT 20080803 0 METROLINK - CMF AND KELLER STREET YARD - JOINT PROJECT FUNDED BY LAMTA, OCTA, RCTC, & VCTC (SANBAG ONLY PROGRAMMING THEIR PORTION OF PROJECT)

$6,600

SAN BERNARDINO

TRANSIT 20020802 0 METROLINK ADD’L PARKING STRUCTURE - CONSTRUCT 5 LEVEL PARKING STRUCTURE TO SERVE EXISTING METROLINK STATION AT SANTA FE DEPOT LOCATION

$11,064

SAN BERNARDINO

TRANSIT 990602 0 METROLINK CAPITAL MAINTENANCE (REHABILITATION/RENOVATION OF METROLINK TRACK, SIGNALS, COMMUNICATIONS, STRUCTURES, FACILITIES, SYSTEMS, AND ROLLING STOCK)($496 TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FY 2011/12 FTA 5309 IN CONSTRUCTION)

$18,156

SAN BERNARDINO

TRANSIT SBD41109 0 METROLINK OPERATING ASSISTANCE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK) $40,000

SAN BERNARDINO

TRANSIT 20080802 0 METROLINK POSITIVE TRAIN CONTROL - SYSTEM WIDE. IMPLEMENTATION OF PTC, JOINT PROJECT FUNDED BY LACMT, OCTA, RCTC, & VCTC (SANBAG PROGRAMMING ONLY THEIR PORTION OF THE PROJECT)

$34,000

SAN BERNARDINO

TRANSIT 20020801 0 METROLINK ROLLING STOCK - SANBAG’S SHARE OF PURCHASE OF METROLINK CARS & LOCOM UP TO 47 CARS/CABS AND IN FUTURE YEARS UP TO 22 CARS/CABS & UP TO 8 LOCOM (CO-OP LA0C8231, RIV010214)

$22,584

SAN BERNARDINO

TRANSIT 20061009 0 METROLINK-SEALED CORRIDOR-SAN GABRIEL SUB-THIS PROJECTS CONSISTS OF A COMPREHENSIVE CORRIDOR SAFETY ENHANCEMENT PROGRAM ALONG SANBAG OWNED ROW

$2,000

SAN BERNARDINO

TRANSIT 2002172 0 MID VALLEY FACILITY - NEW MAINTENANCE & ADMINISTRATION FACILITY LOCATED IN RANCHO CUCAMONGA (ETIWANDA & ARROW) $5,144

SAN BERNARDINO

TRANSIT 20061703 0 NEW FREEDOM - 5317 - VARIOUS PROJECTS AND TRANSPORTATION SERVICES BEYOND THOSE REQUIRED BY ADA, INCLUDING VOUCHER PROGRAMS-COORDINATED MOBILITY PROGRAM FOR VICTOR VALLEY (CARRYOVER FROM PRIOR FTIP 2007 DOLLARS)

$658

SAN BERNARDINO

TRANSIT 20061901 0 NEW FREEDOM PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL $1,399

SAN BERNARDINO

TRANSIT 20040808 0 OFFICE EQUIPMENT $907

SAN BERNARDINO

TRANSIT 20080203 0 OLDTIMERS FOUNDATION - PURCHASE 1 TYPE II AND 1 TYPE III VEHICLES (16 PASSENGER) FOR ELDERLY AND HANDICAPPED-5310 PROGRAM

$125

SAN BERNARDINO

TRANSIT 20080205 0 ONTARIO YMCA - PURCHASE 2 TYPE III BUSES - 16 PASSENGER FOR ELDERLY AND HANDICAPPED - 5310 PROGRAM $66

SAN BERNARDINO

TRANSIT 20080208 0 OPARC - PURCHASE 4 TYPE VANS - 8 PASSENGER FOR ELDERLY AND HANDICAPPED PROGRAM - 5310 PROGRAM $200

SAN BERNARDINO

TRANSIT 20111201 0 OPERATIONS OF THE ACCESS SERVICE. (OMNITRANS WILL UTILIZE PART OF ITS ALLOCATED FTA5307 FORMULA FUNDS TO HELP PAY FOR THESE OPERATIONS)

$11,600

SAN BERNARDINO

TRANSIT SBD41114 0 PARATRANSIT - VEHICLE REPLACEMENT ALT. FUEL, 2011-8; 2012-5; 2013-5 $2,831

Page 100: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

98 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOTRANSIT 20020140 0 PARATRANSIT - VEHICLES 17 PASSENGER REPLACEMENT - ALT. FUEL; 05-01 - REPLACEMENT YEAR 2005-FY 2001 VEHICLE $663

SAN BERNARDINO

TRANSIT 20040701 0 PARATRANSIT - VEHICLES 22 PASSENGER REPLACEMENT - GAS 08-1;5-2010;2-2011; $533

SAN BERNARDINO

TRANSIT 20040811 0 PARATRANSIT VEHICLE REPLACEMENT - 16 PASSENGER - GAS-07-6;08-4 $709

SAN BERNARDINO

TRANSIT SBD44003 0 PARATRANSIT VEHICLE REPLACEMENT (10/11-1-18 PAX AND 11/12 1-18 PAX $225

SAN BERNARDINO

TRANSIT 200423 0 PARATRANSIT VEHICLES - REPLACEMENT - GAS/DIESEL; 04-3;05-2;06-4;08-3,09-3 $1,198

SAN BERNARDINO

TRANSIT 200426 0 PARATRANSIT VEHICLES - REPLACING 7 PASSENGER GAS BUS 06-1;08-2;09-1 $190

SAN BERNARDINO

TRANSIT 20060603 0 PASSENGER FACILITIES - STOPS AND ZONES - SAN BERNARDINO VALLEY -PURCHASE EQUIPMENT FOR STOP AND ZONE IMPROVEMENTS $1,000

SAN BERNARDINO

TRANSIT 20081602 0 PRUCHASE 1 BUS FOR BIG BEAR TO SAN BERNARDINO ROUTE $300

SAN BERNARDINO

TRANSIT 20081601 0 PRUCHASE 2 30’ GAS BUSES $300

SAN BERNARDINO

TRANSIT 20040816 0 PRUCHASE SHELTERS AND BENCHES AND I-STOPS $249

SAN BERNARDINO

TRANSIT 200424 0 PURCHASE REPLACEMENT DIESEL BUSES - 06-1;07-4 $1,416

SAN BERNARDINO

TRANSIT 20061012 0 REDLANDS RAIL PROJECT-REDLANDS SUBDIVISION FROM APPROX.SAN BERNARDINO METROLINK STATION TO APPROX. WABASH/COLTON AVE.-THE TERMINUS REDLANDS-PSE& ANALYSIS OF ALT. FOR FTA NEW START (FULL FUNDING WILL BE PROGRAMMED AS SOON AS SANBAG BOARD APPROVES CMAQ ALLOCATION TO PROJECT)

$72,480

SAN BERNARDINO

TRANSIT 20081103 0 REHAB./REPAIR/RETROFIT TRANSIT FACILITIES $278

SAN BERNARDINO

TRANSIT 20110105 0 REPLACE CUMMINS ENGINES AT MIDLIFE TO ENSURE THEY ARE KEPT IN TOP PERFORMING ORDER. THE ENGINE OVERHAULS ARE FOR 28-33 PASSENGER VEHICLES ONLY.

$125

SAN BERNARDINO

TRANSIT 20040813 0 REPLACEMENT - ALT. FUEL 37 PASSENGER VEHICLES; 3-2011 $1,275

SAN BERNARDINO

TRANSIT 20040208 0 REPLACEMENT BUS - PURCHASE 1 40’ 40 PASSENGER LNG/CNG BUS $464

SAN BERNARDINO

TRANSIT 20040211 0 REPLACEMENT PARATRANSIT VEHICLES REPLACING PARATRANSIT VEHICLES ON OMNITRANS ACCESS FLEET;08-50;2011-50 $6,000

SAN BERNARDINO

TRANSIT 20020810 0 REPLACEMENT-PARATRANSIT - 9 PASSENGER VEHICLES - GAS - 1-2010/11 $205

Page 101: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 99

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOTRANSIT 200809 0 RIALTO AVE. & E STREET PLATFORM AND TRACK $7,600

SAN BERNARDINO

TRANSIT 200450 0 RIALTO METROLINK STATION - INCREASE PARKING SPACES FROM 225-775 $3,356

SAN BERNARDINO

TRANSIT 200416 0 SCLA RAIL SERVICE FROM AIR EXPRESSWAY APPROX. 5 MILES N0 TO COLUSA RD. BETWEEN PHANTOM EAST & MOJAVE RIVER-PUT IN NEW RAIL LINE FROM BNSF TO SCLA.(FOR FREIGHT)PROJECT IN CONNECTION WITH NEW INTERMODAL/MULTIMODAL FACILITY ON SCLA PROPERTY

$250,000

SAN BERNARDINO

TRANSIT SBD200436 0 SERVICE EQUIPMENT: PURCHASE & INSTALL GPS EQUIPMENT AT STATIONS. THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA, RCTC & VCTC

$305

SAN BERNARDINO

TRANSIT SBD200437 0 SERVICE EQUIPMENT: PURCHASE AND INSTALL UPGRADED TICKET VENDING MACHINES AT VARIOUS STATIONS SYSTEM WIDE. THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA, RCTC, & VCTC

$400

SAN BERNARDINO

TRANSIT 981111 0 TRANSIT - ENHANCEMENTS: 1% TRANSIT ENHANCEMENTS TO INCREASE ACCESSIBILITY TO BUS STOPS $1,500

SAN BERNARDINO

TRANSIT 20020806 0 TRANSIT - FACILITIES - IMPROVEMENT/UPKEEP OF EXISTING FACILITIES $6,000

SAN BERNARDINO

TRANSIT 981104 0 TRANSIT - SECURITY $994

SAN BERNARDINO

TRANSIT 981114 0 TRANSIT - SECURITY CAPITALIZATION OF SECURITY COSTS $1,500

SAN BERNARDINO

TRANSIT SBD31055 0 TRANSIT ADMINISTRATION EQUIPMENT PURCHASE COMPUTER HARDWARE & SOFTWARE FOR MIS $30,623

SAN BERNARDINO

TRANSIT SBD44006 0 TRANSIT ADMINISTRATION EQUIPMENT OFFICE EQUIPMENT $128

SAN BERNARDINO

TRANSIT 20110301 0 TRANSIT OPERATING EQUIPMENT - ITS SOFTWARE/HARDWARE $75

SAN BERNARDINO

TRANSIT 200088 0 TRANSIT SERVICE EQUIPMENT - PURCHASE MAINTENANCE EQUIPMENT FOR EAST AND WEST VALLEY FACILITIES. (BONDLS LOCAL ARE PROP 1 B)

$3,028

SAN BERNARDINO

TRANSIT 20010120 0 TRANSIT SERVICE EQUIPMENT - PURCHASE OF VARIOUS MAINTENANCE EQUIPMENT (ON-GOING PROJECT) $31

SAN BERNARDINO

TRANSIT 20110103 0 TRANSTRACK SOFTWARE MAINTENANCE CONTRACT PLUS DISPATCHING MODULE $70

SAN BERNARDINO

TRANSIT 20040825 0 UPLAND METROLINK STATION - ADDITIONAL PARKING $5,810

SAN BERNARDINO

TRANSIT 20040817 0 VEHICLE OVERHAULS - TO REBUILD ENGINES, TRANSMISSIONS, ETC. ON AGING FLEET $90

SAN BERNARDINO

TRANSIT 20040812 0 VEHICLE REPLACEMENT - 28 PASSENGER DEVIATED FIXED ROUTE; 07-2 $376

Page 102: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

100 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOTRANSIT 200425 0 VEHICLE REPLACEMENT - PARATRANSIT VEHICLES - 2 -18 PASSENGER ACCESSIBLE SMALL BUSES $147

SAN BERNARDINO

STATE HIGHWAY

200455 0 PLANNING, PROGRAMMING AND MONITORING AB3090 PAYBACK PROJECTS $632

SAN BERNARDINO

STATE HIGHWAY

SBD41147 10 AIRPORT GROUND ACCESS -I-10 AT ARCHIBALD AVE - INSTALL IRRIGATION SYSTEM AND LANDSCAPE PLANTING $3,085

SAN BERNARDINO

STATE HIGHWAY

200432 10 AT I-10 AND FORD ST. ON RAMP TO THE FREEWAY - SIGNAL AND INTERSECTIONS IMPROVEMENTS $700

SAN BERNARDINO

STATE HIGHWAY

0H930 10 FROM WATERMAN AVE UC TO ALABAMA ST OC - RESTRIPE ROADBED TO ADD A WESTBOUND AUXILIARY LANE (MINOR A) $1,600

SAN BERNARDINO

STATE HIGHWAY

SBD31808 10 I-10 AT RIVERISDE AVE - 2.1 KM W/O RIVERSIDE AVE TO 1.3 KM E/O RIVERSIDE AVE. MODIFY IC 4 TO 9 LNS (INCL TURN LNS) FROM SLOVER TO VALLEY & ADD AUX LANES & OPER IMPRV

$40,000

SAN BERNARDINO

STATE HIGHWAY

1830 10 I-10 AT CEDAR AVE. BETWEEN SLOVER AND VALLEY- RECONSTRUCT I/C-WIDEN FROM 4-6 LANES WITH LEFT AND RIGHT TURN LANES. ADD AUX LANE ON E/B ON AND OFF RAMPS

$56,948

SAN BERNARDINO

STATE HIGHWAY

2002160 10 I-10 AT GROVE INTERCHANGE AND GROVE AVE. CORRIDOR - RELOCATE I/10 & 4TH ST. I/C TO GROVE AVE. AND WIDEN GROVE AVE BETWEEN I-10 TO HOLT (WIDEN 4-6 LANES)

$156,000

SAN BERNARDINO

STATE HIGHWAY

200803 10 I-10 AT VINEYARD AVE. INTERCHANGE. INTERCHANGE WIDENING FROM 4-6 LANES AND WIDEN ON AND OFF RAMPS TO TWO LANES, INTERSECTION IMPROVEMENTS AND ENHANCE EXISTING LANDSCAPING

$83,550

SAN BERNARDINO

STATE HIGHWAY

44810 10 I-10 TIPPECANOE RECONFIGURE INTERCHANGE& ADD EASTBOUND OFF-RAMP AUXILIARY LN FROM WATERMAN ON-RAMP TO TIPPECANOE OFF-RAMP , WIDEN BRIDGE (NON-CAPACITY), & LOCAL RD IMP/MOD (HP1366)

$78,770

SAN BERNARDINO

STATE HIGHWAY

20020812 10 I-10/CHERRY AVENUE INTERCHANGE - INTERCHANGE RECONSTRUCT - REPLACE O/C, WIDEN O/H AND WIDEN I/C FROM SLOVER TO VALLEY FROM 4-6 LANES WITH DOUBLE LEFT TURNS TO RAMPS(PROJECT COST INCREASED TO $84,090 DUE TO LOCAL A/C - TRUE PROJECT COSTS REMAIN AT $76,113)

$84,090

SAN BERNARDINO

STATE HIGHWAY

200845 10 I-10/WABASH AVENUE INTERCHANGE - PSR IN CONJUNCTION WITH CALTRANS $40,000

SAN BERNARDINO

STATE HIGHWAY

0C2500 10 I-1O HOV LANE ADDITION - FROM HAVEN (ONTARIO TO FORD ST (REDLANDS)-WIDENING FROM 8-10 LANES, AUX LANES WIDENING UNDERCROSSINGS AND OVERCROSSINGS AND RECONSTRUCTION OF RAMPS WHERE NEEDED

$1,090,014

SAN BERNARDINO

STATE HIGHWAY

150D 10 IN COLTON FROM 0.2 MIL (0.3 KM) W/O RANCHO AVE TO 0.9 MI (1.5 KM) E/O LA CADENA DRIVE - CONSTRUCT RR TO RR GRADE SEPARATION

$201,994

SAN BERNARDINO

STATE HIGHWAY

34090 10 IN FONTANA AT ALDER AVENUE CONSTRUCT 4 LANE INTERCHANGE (2 LANES IN EACH DIRECTION.) $99,105

SAN BERNARDINO

STATE HIGHWAY

SBD031269 10 IN FONTANA AT BEECH AVENUE CONSTRUCT 4 LANE INTERCHANGE ( 2 LANES IN EACH DIRECTION. $113,023

SAN BERNARDINO

STATE HIGHWAY

49750 10 IN FONTANA, FROM 0.8KM E/OF ETIWANDA AVE OVC TO 1.5 KM W/O RIVERSIDE AVE. O/C-WIDEN EXIT RAMPS AND CONSTRUCT AUX. LANES(CT TOOK OUT SHOPP FUNDING)

$26,707

SAN BERNARDINO

STATE HIGHWAY

SBD45000 10 IN FONTANA: I-10 AT CITRUS AVE IC RECONSTRUCT IC WITH 6 THRU LANES; & REPLACE BRIDGE OVERCROSSING(O/C WIDEN FROM 2-6 LNS) AND WIDEN CITRUS FROM SLOVER TO VALLEY 4-6 LNS.

$56,392

Page 103: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 101

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOSTATE

HIGHWAY47440 10 IN REDLANDS FROM ORANGE ST. TO FORD ST. - ADD ONE MIXED FLOW LANE IN EACH DIRECTION AND FULL WIDENING OF 11 BRIDGES

ONE LANE IN EA DIRECTION$34,067

SAN BERNARDINO

STATE HIGHWAY

43320 10 IN YUCAIPA @ LIVE OAK CANYON ROAD INTERCHANGE RECONFIGURE INTERCHANGE AND WIDEN LIVE OAK CANYON ROAD FROM 2 TO 6 THRU LANES (I-10/LIVE OAK CANYON) (TCRP #59)

$18,634

SAN BERNARDINO

STATE HIGHWAY

38420 10 ON I-10 FROM 0.1 KM W/O I-10/I-215 TO 0.2 KM W/O WABASH O/C & I-215 FROM 0.0-4.3 FROM RIVERSIDE CO TO I-10/215 JCT. INSTALL FOC BACKBONE SYSTEM, MODIFY COMMUNIC HUB; WIDEN RAMPS (PROJECT COMPLETED 9/2009)

$16,855

SAN BERNARDINO

STATE HIGHWAY

200434 10 ON I-10 IN REDLANDS AND YUCAIPA FROM FORD ST. O/C TO LIVE OAK CANYON RD. CONSTRUCT 1 W/B MIXED-FLOW LANE $43,186

SAN BERNARDINO

STATE HIGHWAY

SBD41339 10 PEPPER AVE. AT I-10 MODIFICATION OF PEPPER AVE. INTERCHANGE WIDEN BRIDGE FROM 3-7 LANES (2 THRU LANES, 2 TURN LANES SOUTH, 1 TURN LANE NORTH) AND ADD AUXILIARY LANES TO FREEWAY (POST MILES KILOMETERS -32.5-34.4) (T21-#499)

$39,815

SAN BERNARDINO

STATE HIGHWAY

0L340 10 VARIOUS AGENCIES/CITIES AESTHETIC CORRIDOR MASTER PLAN (ON URBAN CORRIDOR IN A COUNTY - DEVELOP MASTER PLAN) $440

SAN BERNARDINO

STATE HIGHWAY

0G841 15 C. V. KANE SCRRA INTERPRETIVE DISPLAYS (NEAR THE CITY OF BARSTOW, AT THE C.V. KANE SAFETY ROADSIDE REST AREA (SCRRA) INSTALL INTERPRETIVE DISPLAYS

$260

SAN BERNARDINO

STATE HIGHWAY

200626 15 CONSTRUCT NEW INLAND EMPIRE TRANSPORTATION MANAGEMENT CENTER - INSTALL TMC-IN THE S/E QUADRANT OF I-15 AND SR 210 I/C ON N/S VICTORIA AVE (I/T CITY OF FONTANA EA37704

$44,345

SAN BERNARDINO

STATE HIGHWAY

SBD41446 15 EUCALYPTUS AT I-15 CONSTRUCT INTERCHANGE 3 LANES IN EA DIR STANDARD I/C CONFIG.(JOINT PROJECT BETWEEN VICTORVILLE AND HESPERIA)

$61,100

SAN BERNARDINO

STATE HIGHWAY

SBD55026 15 EUCALYPTUS STREET FROM I-15 TO PEACH AVENUE - RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES AND CONSTRUCT RAILROAD CROSSING

$8,546

SAN BERNARDINO

STATE HIGHWAY

200613 15 I-15 & MUSCATEL STREET CONSTRUCT 6 LANE INTERCHANGE WITH LEFT AND RIGHT TURN LANES, INCLUDING 1700 FT AUX LANE UPSTREAM TO SB EXIT RAMP”

$71,100

SAN BERNARDINO

STATE HIGHWAY

200048 15 I-15 AT BASELINE INTERCHANGE - FROM 1,800 N/O BASELINE TO 2,400’ S/O; 1800’ W/O TO EAST AVE. TO 1500’ E/O EAST AVE-WIDEN RAMPS (INCLUDING BRIDGES), WIDEN BASELINE RD. FROM 4-6 LANES, WIDEN EAST AVE. FROM 2-4 LANES, REALIGN AND WIDEN S/B AND N/B DIAMOND RAMPS FROM 1-2 LNS (INCLUDG BRIDGES, AD S.B LOOP ON-RAMP (INCL BRIDGES) ADD I-15 ACCEL/DECEL LANES, AND OPERATIONAL IMPROVEMENTS (EA497100)(CA435)

$42,709

SAN BERNARDINO

STATE HIGHWAY

0H1300 15 I-15/DUNCAN CANYON INTERCHANGE - CONVERT EXIST 2 LN OVERCROSSING TO DIAMOND IC, WIDEN TO 4 LANES PLUS DBL LEFT TURNS TO SB RAMP ACCEL/DECEL LANES & SINGLE LEFT TO NORTHBOUND RAMP

$35,834

SAN BERNARDINO

STATE HIGHWAY

20061201 15 I-15/I-215 I/C IMPROVEMTS-DEVORE I/C S/O GLEN HELEN PARKWY TO N/O KENWOOD & ON I-215 FROM S/O DEVORE RD. I/C TO I-15 (16.0-17.8) ADD 1 M/F LN IN EA DIR TO EXISTG 3 M/F LNS FROM 3800’ S/O GLEN HELEN PARKWY TO 3100’ N/O I-215 I/C (CONSTRUCT TRUCK BYPASS LNS S/O I-15/I-215 I/C TO N/O KENWOOD I/C RECONFIG OF I-15/I-215 I/C DEVORE ROAD, I/C, & KENWOOD AVE I/C RECONNECT OF CAJON BETWN DEVORE RD.&KENWOOD

$480,254

SAN BERNARDINO

STATE HIGHWAY

SBD031279 15 IN HESPERIA AT I-15 AND RANCHERO ROAD - CONSTRUCT 6 LANE INTERCHANGE WITH LEFT AND RIGHT TURN LANES, INCLUDING 1300 FT. AUX LANE PRIOR TO N/B OFF RAMP AND 3200 FT. AUX LANE FROM TO S/B LOOP ON RAMP

$80,625

SAN BERNARDINO

STATE HIGHWAY

35558 15 IN SAN BERNARDINO CO. - GATEWAY ENHANCEMENTS ON I-15 FROM MOJAVE DR. IN VICTORVILLE TO STODDARD WELLS RD. IN BARSTOW-RETENTION WALL ENHANCMENTS AND LANDSCAPING(PPNO0175N)

$2,446

SAN BERNARDINO

STATE HIGHWAY

34170 15 IN VICTORVILLE AT LA MESA ROAD/NISQUALLI ROAD CONSTRUCT I/C NEW 6 LANE INTERCHANGE $90,009

Page 104: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

102 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOSTATE

HIGHWAY35556 15 IN VICTORVILLE BETWEEN MOJAVE DRIVE AND 1.6 KM N/O STODDARD WELLS RD. O/C PHASE 2 RECONSTRUCT D ST. AND E ST. I/C AND

STODDARD WELLS I/C (REFER TO MODELING DETAILS)(CA061)$146,676

SAN BERNARDINO

STATE HIGHWAY

200152 15 ON I-15 FROM 3,500 FT. S OF ARROW RTE. TO 3,500 ‘ N/O FOOTHILL BLVD AND AND ON ARROW RT. FROM 1000 FT.W/TO 100 FT. E/ OF I- 15-CONSTRUCT NEW I/C AR ARROW RTE, CONSTRUCT S/B DOUBLE DECEL LANES TO FOOTHILL BLVD OFFRAMP AND MODIFY RAMPS AT FOOTHILL.

$91,370

SAN BERNARDINO

STATE HIGHWAY

47221 15 ON I-15, NEAR ONTARIO/RANCHO CUCAMONGA FROM RIVERSIDE COUNTY LINE TO 7TH STREET, ALSO IN RIVERSIDE COUNTY (PM51.4-52.3) REHABILITATION ROADWAY - SHOPP PROJECT

$98,862

SAN BERNARDINO

STATE HIGHWAY

200078 15 PARK-N-RIDE LOT EXPANSION AND FACILITIES AT BEAR VALLEY RD & I-15 (70 EXISTING SPACES TO 300 SPACES) $755

SAN BERNARDINO

STATE HIGHWAY

20061702 18 E-220 HIGH DESERT CORRIDOR-WEST TO EAST SR-14 TO US 395 CONNECTING AT SB COUNTY, . CONSTRUCT NEW 4-6 LANE FACILITY (PART OF 20020144) JPA PROJECT. SR. 138 PM 43.4 TO SR18T 17.0 S.B. COUNTY LINE 0.0.

$4,000,000

SAN BERNARDINO

STATE HIGHWAY

20020144 18 HI- DESERT CORR. PHASE 1, SR-18 REALIGNMENT FROM US 395 IN ADELANTO TO SR-18 E/O APPLE VALLEY. COONSTRUCT 4-6 LANE FREEWAY/EXPRESSWAY. CONSTRUCT NEW IC @I-15 W/AUX LANES NORTH AND SOUTH OF NEW IC. CONSTRUCT INTERSECTION @US 395 W/TURN POCKETS TO NORTH AND SOUTH

$1,156,000

SAN BERNARDINO

STATE HIGHWAY

0A7910 18 IN RUNNING SPRINGS FROM RTE. 18 FROM N/O NOB HILL DR. TO S/O R.S. SCHOOL RD. AND RTE 330 FROM S/O RTE. 18 TO RTE. 18-RURAL GATEWAY BEAUTIFICATION-AESTHETIC IMPROVEMTNS

$2,265

SAN BERNARDINO

STATE HIGHWAY

200612 18 SR 18 FROM APPLE VALLEY RD. TO CORWIN RD. - WIDEN FROM 4-6 LANES (APPROX. 3 MI) $14,400

SAN BERNARDINO

STATE HIGHWAY

20110602 18 SR18 AT APPLEY VALLEY ROAD INTERSECTION REALIGNMENT WITH TURN AND APPROACH LANES $4,650

SAN BERNARDINO

STATE HIGHWAY

34770 58 0.4 MILES WEST OF KERN CO LINE TO 7.5 MI EAST OF JCT RTE 395 - CONSTRUCT 4 LANE EXPRESS WAY ON NEW ALIGNMENT, NEW INTERCHANGE AT US 395 AND SR 58

$148,067

SAN BERNARDINO

STATE HIGHWAY

4351 58 SR58 EXPRESSWAY-REALIGN AND WIDEN FROM 2-4 LANE EXPRESSWAY. NEW INTERCHANGES AT LENWOOD RD AND HINKLEY RD. 2.8 MILES WEST OF HIDDEN RIVER RD. TO 0.7 MILES EAST OF LENWOOD ROAD -- REALIGN AND WIDEN TO 4 LANE EXPRESSWAY (2-4 LANES) (PHASE 2)

$298,326

SAN BERNARDINO

STATE HIGHWAY

200602 60 SR 60 AND VINEYARD AVE. INTERCHANGE RECONSTRUCTION-LENGTHEN BRIDGE TO ACOMMODATE VINEYARD AVE WIDENING AND RAMP WIDENING 4-6 LANES

$50,810

SAN BERNARDINO

STATE HIGHWAY

201133 60 SR 60 AT EUCLID WIDEN W/B EXIT RAMP FROM 2-3 LANES $1,620

SAN BERNARDINO

STATE HIGHWAY

201132 60 SR-60 AT ARCHIBALD AVENUE WIDEN ON AND OFF RAMPS (2-3 LANES EACH WAY) $7,900

SAN BERNARDINO

STATE HIGHWAY

200604 60 SR60 AT GROVE AVENUE INTERCHANGE RECONSTRUCTION AND GROVE AVE. +/-300 FT. N/S OF SR 60-WIDEN FROM 4-6 LANES $50,810

SAN BERNARDINO

STATE HIGHWAY

201114 60 WIDENING OF CENTRAL AVENUE BRIDGE CROSSING SR-60 TO ACCOMODATE WIDENING OF RAMPS AND THE DESIGNATED FREEWAY LANES.

$27,779

SAN BERNARDINO

STATE HIGHWAY

200435 62 ON SH62 IN YUCCA VALLEY FROM APACHE TRAIL EAST TO APPROX 0.5 MILES TO PALM AVE. INSTALL NEW RAISED MEDIAN, CONSTRUCT CURB & GUTTER & NEW STREET LIGHTS, AND NEW SIGNAL AT CHURCH ST.(CA543)

$2,740

Page 105: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 103

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOSTATE

HIGHWAY20080901 62 ON SR 62 FROM ENCELIA RD. TO CIENEGA RD. ROAD REHABILITATION $4,650

SAN BERNARDINO

STATE HIGHWAY

0L350 62 ON VARIOUS ROUTES - RURAL ROADSIDE -ARCHAEOLOGICAL INVENTORY - DIST. 8 (PPNO 0227J)-ARRA STATE TE FUNDING $1,405

SAN BERNARDINO

STATE HIGHWAY

200851 62 SR 62 FROM FAIRWAY TO CAMINO DEL CIELO; AND PALM TO AIRWAY WIDENING FROM 4-6 LANES, INSTALL MEDIANS, SIGNALS, SIDEWALKS, AND CURB AND GUTTER

$11,000

SAN BERNARDINO

STATE HIGHWAY

0G930 62 SR 62 REALIGNMENT FROM APPROX. 445’ W/O CAMINO DEL CIELO TO TROJAN LANE-WIDEN 4-6 LANES. REALIGNING KICKAPOO TO ACOMA, RAISED MEDIAN ISLAND, TRAFFIC SIGNALS, SIDEWALKS AND STREET LIGHTS

$50,544

SAN BERNARDINO

STATE HIGHWAY

20060203 62 SR 62 SAFETY & UTILITY IMPROVMNTS-TCRP 129 ON SR 62 FROM LA HONDA WY EAST APPROX. 0.2 MILES TO DOMOSA - INSTALL RAISED LANDSCAPED MEDIANS, SIDEWALKS, UTIL U/GROUND/DRAINAGE

$320

SAN BERNARDINO

STATE HIGHWAY

20084103 62 SR62 -TRAFFIC CONTROL SYCNRONIZATION OF 4 TRAFFIC SIGNALS FROM CAMINO DEL CIELO/SR62 TRAFFIC SIGNAL THROUGH ACOMA TRAIL SR 62 TRAFFIC SIGNAL PROGRAM

$226

SAN BERNARDINO

STATE HIGHWAY

2011185 66 WIDEN FOOTHILL BOULEVARD (OLD STATE ROUTE 66) BETWEEN GROVE AVENUE AND SAN BERNARDINO RDWIDEN FROM 4-6 LANES INCLUDES RAISED MEDIANS, SIDEWALKS, STREET LIGHTING, LANDSCAPING AND AN ARCH SPANNING FOOTHILL BOULEVARD AS A MONUMENT TO THE HISTORIC ROUTE 66.

$6,006

SAN BERNARDINO

STATE HIGHWAY

20010133 66 WIDEN FOOTHILL BOULEVARD (OLD STATE ROUTE 66) BETWEEN SAN BERNARDINO RD AVENUE AND VINEYARD AVE. REMOVES THE EAST UPLAN UNDERPASS BRIDGE ALSO KNOWN AS THE PACIFIC ELECTRIC RR BRIDGE, CONSTRUCTS A NEW PUBLIC TRAIL BRIDGE ALONG THE RR ALIGNMENT AND ADDES, RAISED MEDIANS, SIDEWALKS, STREET LIGHTING, LANDSCAPING AND AN ARCH SPANNING FOOTHILL BOULEVARD AS A MONUMENT TO THE HISTORIC ROUTE 66.

$10,632

SAN BERNARDINO

STATE HIGHWAY

0F100 71 ON RTE. 71 FROM SOQUEL CYN PARKWY TO RIVERSIDE CO. LINE AND RIV. CO FROM S.B. CO LINE TO SANTA ANA RIVER BRIDGE -PHASE 1- TREE PLANTING AND AESTHETICS-

$1,974

SAN BERNARDINO

STATE HIGHWAY

0P240 138 CONSTRUCT A NEW VISTA POINT AT ROUTE 138 WITH PAVED AREA FOR 10 PARKING SPACES INCLUDING 2 SPACES FOR ADA DRIVERS WITH DECORATIVE FENCE AND INTERPRETIVE SIGNS.

$570

SAN BERNARDINO

STATE HIGHWAY

34011 138 NEAR WRIGHTWOOD FROM PHELAN RD TO I-15 WIDEN FROM 2 TO 4 LANES $87,181

SAN BERNARDINO

STATE HIGHWAY

20110110 210 CONSTRUCT NEW FULL-SERVICE INTERCHANGE WITH DIAMOND CONFIGURATION AT SR-210 AND PEPPER AVENUE IN THE CITY OF RIALTO. ADD WB AND EB ACCEL AND DECEL LANES AND LOCAL STREET IMPROVEMENTS (CONSTRUCT 4 LANES ON PEPPER AVE FROM HIGHLAND AVE TO 160 FT SOUTH OF SR-210).

$18,965

SAN BERNARDINO

STATE HIGHWAY

20432 210 ON RTE 210 FROM ETIWANDA AVE.- 2.0 MI. NORTH TO 0.5 MI SOUTH OF RTE 210 - MITIGATION PLANTING 2,200 1-GAL. EUCALYPTUS TREES

$1,802

SAN BERNARDINO

STATE HIGHWAY

20084106 210 ON SR 210 LANDSCAPING SEGMENTS 8-11 - PROVIDE PLANTING, IRRIGATION AND INERT GROUNDCOVER ALONG SR210 FROM WEST OF SIERRA AVE IN THE CITY OF FONTANA TO SR210/I-215 I.C IN SAN BERNARDINO (TOLL CREDITS TO BE USED IN CON PHASE. STPLS ADDED FOR $210,000 IN FY2010/11).

$9,574

SAN BERNARDINO

STATE HIGHWAY

2011154 210 SR 210 AT 5TH ST/GREENSPOT RD; ON AND OFF RAMPS WIDENING; ADD LANES (.45) ORIGINALLY PORTION OF PROJECT 200429 PROJECT ADDS 1 LANE N/B TO EXISTING 2 LANES AND ADDING 2 LANES TO EXISTING TO LANES TO N/B OFF RAMP AND ADDING 1 LANE TO EXISTING 2 LANE S/B OFF RAMP

$2,000

SAN BERNARDINO

STATE HIGHWAY

201153 210 SR 210 S/B ON-RAMP AT 5TH ST - ADD 1 LANE-ORIGINALLY PART OF 200429 - EXISTING S/B ON RAMP HAS 2 MERGING LANES INTO 1 LANE PRIOR TO ENTERING MAIN LINE. PROPOSED ADDING 1 ADDITIONAL LANE ON S/B ON RAMP THAT EXTENDS TO MAINLINE

$2,000

Page 106: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

104 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOSTATE

HIGHWAY20620 210 UPLAND TO SAN BERNARDINO FROM LA CO LINE TO RTE 215 - 8 LN FREEWAY INCLUDING 2 HOV LNS (6+2)-210 CORR. W/AUX LNS

THRUOUT SEGS. 9-11(SEG.11 INCL CONNECTOR BETWEEN 210 & 215 (MORE)$482,339

SAN BERNARDINO

STATE HIGHWAY

SBD59204 215 I-215 AT UNIVERSITY PARKWAY INTERCHANGE - CONSTRUCT SOUTHBOUND UNIVERSITY PARKWAY -INTERCHANGE RECONFIGURATION AND AUX. LANE ON EACH SIDE, NEW RAMP

$22,513

SAN BERNARDINO

STATE HIGHWAY

200614 215 I-215 BI-COUNTY HOV LANE GAP CLOSURE PROJECT- ADD 1 HOV LANE IN EACH DIRECTION FROM SPRUCE ST. ON RIV 91 TO ORANGE SHOW RD;(ALSO INCLUDES RTP 4M0803 (STIP 2010 $24881 RCTC AND $45089 SANBAG)

$212,545

SAN BERNARDINO

STATE HIGHWAY

713 215 I-215 CORRIDOR NORTH - IN SAN BERNARDINO, ON I-215 FROM RTE 10 TO RTE 210 - ADD 2 HOV & 2 MIXED FLOW LNS (1 IN EA. DIR.) AND OPERATIONAL IMP INCLUDING AUX LANES AND BRAIDED RAMP

$718,586

SAN BERNARDINO

STATE HIGHWAY

OM630 215 I-215 MT. VERNON/WASHINGTON ST. INTERCHANGE-RECONSTRUCT I/C-(PROJECT IS IN REPLACE O/C STRUCTURE; RECONFIGURE ON/OFF RAMPS; ADD SB ACCEL AND NB DECEL LANE-IMPROVEMENTS TO LOCAL STREETS (PA & ED ONLY)

$152,821

SAN BERNARDINO

STATE HIGHWAY

SBD31850 215 IN GRAND TERRACE AT I-215 BARTON ROAD INTERCHANGE RECONSTRUCT OC AND RAMPS WITH PARTIAL CLOVERLEAF CONFIGURATION NW OF I-215 WORK INCL ADD OF NB AUX LN.LOCAL STREET WORK TO INCL WIDENING OF BARTON RD, REMOVAL OF LA CROSSE AVE. BETWEEN VIVENDA AVE & BARTON RD, REPLACEMENT W/ NEW LOCAL ROAD, IMPROVEMENTS TO THE BARTON RD AND MICHIGAN WAY/VIVENDA AVE INTERSECTION AND REALIGNMENT OF COMMERCE WAY

$141,407

SAN BERNARDINO

STATE HIGHWAY

34041 395 SR395 UCT, NEW ALIGNMENT - FROM JCT I-15 TO JCT SR-18 - 6-LANE FREEWAY & FROM JCT SR-18 TO PURPLE SAGE - 4-LANE FREEWAY (SPLIT PROJECT FROM 34040)

$4,000

SAN BERNARDINO

STATE HIGHWAY

34042 395 US 395 - NWE ALIGNMENT 4 LANE EXPRESSWAY FROM PURPLE SAGE RD. TO 0.5 MILES S/O FARMINGTON RD. (PROJECT NEW SPLIT FROM 34040)

$7,000

SAN BERNARDINO

STATE HIGHWAY

200451 395 US-395 (HESPERIA, VICTORVILLE, & ADELANTO) FROM I-15 TO 1.8 MI. S/O DESERT FLOWER RD.-INTERIM WIDENING-WIDEN FROM 2-4 LANES AND ADD LEFT TURN CHANNELIZATION AT INTERSECTIONS

$2,000

SAN BERNARDINO

STATE HIGHWAY

SBD59303 999 ___SET ASIDES/RESERVATIONS FOR FUTURE SB45 -PLANNING, PROGRAMMING, & MONITORING $7,440

SAN BERNARDINO

STATE HIGHWAY

SBDLS07 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - SHOPP PROGRAM-PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.123 EXEMPT TABLES 2 CATEGORY WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

$132,148

SAN BERNARDINO

STATE HIGHWAY

SBDLS09 999 GROUPED PROJECTS FOR EMERGENCY RESPONSE PROJECTS AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128 EXEMPT)

$36,086

SAN BERNARDINO

STATE HIGHWAY

SBDLS13 999 GROUPED PROJECTS FOR IIP TE STATE PROJECTS - VARIOUS LOCATIONS WITHIN SAN BERNARDINO COUNTY (PROJECTS ARE EXEMPT UNDER CFR 40 PARTS 51 AND 93

$1,620

SAN BERNARDINO

STATE HIGHWAY

SBDLS02 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - SHOPP ROADWAY PRESERVATION PROGRAM-PROJECTS ARE CONSISTENT W/40 CFR PART 93.126 EXEMPT TABLES 2-PAVEMENT RESURFACING AND/OR REHAB. EMERGENCY RELIEF (23 U.S.C.125) WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDL TRAVEL LANES)

$374,322

SAN BERNARDINO

STATE HIGHWAY

SBDLS14 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM - HIGHWAY MAINTENANCE-PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 TABLES 2 AND 3 CATEGORIES -PAVEMENT RESURFACING OR REHABILITATION

$17,586

Page 107: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 105

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOSTATE

HIGHWAYSBDLS011 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MANDATES PROGRAM-PROJECTS ARE CONSISTENT WITH 40 CFR PART

93.126 EXEMPT TABLES 2 AND 3 CATEGORIES-RAILROAD/HIGHWAY CROSSING, SAFER NON-FEDERAL AID SYSTEM ROADS. SHOULDER IMPROVEMENTS, TRAFFIC CONTROL DEVICES AND OPERATING ASSISTANCE OTHER THAN SIGNALIZATION PROJECTS. INTERSECTION SIGNALIZATION PROJECTS AT INDIVIDUAL INTERSECTIONS, PAVEMENT MARKING

$7,334

SAN BERNARDINO

STATE HIGHWAY

SBDLS04 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SHOPP MOBILITY PROGRAM-PROJECTS ARE CONSISTENT W/40 CFR PART 93.126 EXEMPT TABLES 2 & 3-RAILROAD/HIWAY XING, SAFER NON-FED AID SYSTEM ROADS, SHOULDER IMPRVMTS,TRAFFIC CONTROL DEV., &OPERATING ASSIST OTHER THAN SIGNALIZATION PROJECTS, INTERSECT SIGNALIZATION PROJS AT INDIVIDUAL INTERSECTS, PAVEMENT MARKING DEMOS,TRUCK CLIMBING LNS OUTSIDE URBAN AREA, LIGHT

$233,045

SAN BERNARDINO

STATE HIGHWAY

SBDLS05 999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURF AND/OR OTHER REHAB - (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3) R/R/HIWAY XING, SAFER NON FED-AD SYSTEM ROADS, SHOULDER IMPROVMENTS, TRAFFIC CONTROL DEVICES&OPERATING ASSIST OTHER THAN SIGNALIZATION PROJECTS OR PROJECTS AT INDIVIDUAL SIGNALS, PAVEMT. MARK DEMOS, TRUCK CLIMBING LNS OUTSIDE UR

$12,110

SAN BERNARDINO

STATE HIGHWAY

SBDLS01 999 GROUPED PROJECTS FOR SAFETY IMPROVMNTS - SHOPP COLLISION REDUCTION PROGRAM-PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3 CATEGORIES -RAILROAD/HIWAY XING, SAFER NON-FED AID SYSTEM ROADS, SHOULDER IMPROVMTS, TRAFFIC CONTRL DEVICES & OPER ASSIST OTHER THAN SIGNALIZATION PROJECTS @ INDIVIDUAL INTERSECTIONS, PAVEMT MARKING DEMOS, TRUCK CLIMBING LNS O/S THE URBANIZED AREA

$226,478

SAN BERNARDINO

STATE HIGHWAY

SBDLS03 999 GROUPED PROJECTS FOR SHOULDER IMPROVEMENTS - SHOPP ROADSIDE PRESERVATION PROGRAM-PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORY -PAVEMENT RESURFACING AND OR REJABILITATION. EMMERGENCY RELIEF (23U.S.C. 125) WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDLT TRAVEL LANES

$16,960

SAN BERNARDINO

LOCAL HIGHWAY

201157 0 .WASHINGTON ST. FROM .90 MILES WEST OF WASHINGTON ST. TO LA CADENA MT. VERNON CONSTRUCT NEW 4 LANE ROADWAY (FOR PA & ED ONLY)

$28,000

SAN BERNARDINO

LOCAL HIGHWAY

SBD031421 0 3RD AVENUE BEAR VALLEY TO NISQUALLI ROAD WIDEN FROM 2 LANES TO 4 LANES, EXTEND ROAD WITH 4 LANES $750

SAN BERNARDINO

LOCAL HIGHWAY

SBD031422 0 3RD AVENUE NISQUALLI ROAD TO GREEN TREE BOULEVARD WIDEN FROM 2 LANES TO 4 LANES $750

SAN BERNARDINO

LOCAL HIGHWAY

201181 0 3RD STREET FROM TIPPECANOE AVENUE TO LELAND/NORTON WAY AND FROM LELAND/NORTON WAY TO VICTORIA AVENUE SHOULDER WIDENING AND MEDIANS- 1.25 MILES)(NO THROUGH LANE WIDENING) TOTAL LENGTH 1.95 MILES FORMERLY PART OF PROJECT ID 200852

$3,200

SAN BERNARDINO

LOCAL HIGHWAY

201185 0 3RD STREET FROM VICTORIA AVENUE TO PALM AVENUE - SHOULDER IMPROVEMENTS (REMAINS 4 LANES) (1 MILE) FORMERLY PART OF PROJECT ID 200430

$1,592

SAN BERNARDINO

LOCAL HIGHWAY

SBD59019 0 40TH ST. FROM ACRE LANE TO ELECTRIC AVENUE; ACQUIRE ROW AND WIDEN ROAD FROM 2 TO 4 LANES (1,200 FT.) $3,264

SAN BERNARDINO

LOCAL HIGHWAY

201183 0 5TH ST FROM TIPPECANOE AVENUE TO VICTORIA AVE.-WIDEN FROM 2-4 LANES $5,255

SAN BERNARDINO

LOCAL HIGHWAY

201170 0 5TH STREET FROM STERLING AVE TO VICTORIA AVE WIDEN FROM 2-4 LANES. $5,800

SAN BERNARDINO

LOCAL HIGHWAY

201158 0 AGUA MANSA FROM RIALTO CHANNEL TO RANCHO AVE. 2-4 LANE WIDENING.(PROGRAMMED FUNDING FOR PA & ED ONLY) $6,652

Page 108: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

106 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAYSBD55031 0 ALABAMA STREET FROM 3RD STREET TO SOUTH CITY LIMITS - WIDEN FROM 2 TO 3 S/B LANES (0.25 MILES) $82

SAN BERNARDINO

LOCAL HIGHWAY

200419 0 ALABAMA STREET WIDENING - WIDEN FROM 2-4 LANES FROM NORTH CITY LIMITS TO 3,000 FT. NORTH PALMETTO $7,200

SAN BERNARDINO

LOCAL HIGHWAY

20080801 0 AMBOY RD: OVERLAY PAVEMENT SAN BERNARDINO COUNTY - LUMP SUM MAINTENANCE AND REHAB. PROJECTS FOR LOCAL PROJECTS WITH SAN BERNARDINO COUNTY. ALL PROJECTS FALL UNDER THE 23 CFR 450.324 (F) AND ARE UNDER THE EXEMPT PROJECT LISTING 40 CFR PART 93

$2,165

SAN BERNARDINO

LOCAL HIGHWAY

SBD41427 0 AMBOY ROAD - LEAR AVE TO ADOBE RD. (5.5 MILES) CONSTRUCT NEW 2 LANE ROAD (ONE LANE IN EACH DIRECTION) $550

SAN BERNARDINO

LOCAL HIGHWAY

SBD031418 0 AMETHYST ROAD PALMDALE ROAD TO HOPLAND STREET WIDEN EXISTING ROAD FROM 2 LANES TO 4 LANES $4,000

SAN BERNARDINO

LOCAL HIGHWAY

SBD031233 0 ARROW BOULEVARD ALDER TO MAPLE AVENUE WIDEN 2 LANES TO 4 LANES $2,008

SAN BERNARDINO

LOCAL HIGHWAY

201101 0 ARROW ROUTE WIDENING FROM 2 TO 4 LANES. BRIDGE AND STREET WIDENING FOR ARROW ROUTE, FROM MONTE VISTA AVENUE TO BENSON AVENUE (PROJECT WAS 200630 IN 2008 RTIP)

$3,420

SAN BERNARDINO

LOCAL HIGHWAY

200157 0 AT MAIN STREET AND IOWA AVENUE AND APPROX. 300’ NORTH AND 300’ EAST OF EACH SIDE OF STREET-INTERSECTION IMPROVEMENTS, CURB & GUTTER, REMOVE BILLBOARD AND TRAFFIC SIGNAL

$369

SAN BERNARDINO

LOCAL HIGHWAY

2011157 0 AVENUE E IMPROVEMENTS FROM BRYANT ST. TO 5TH STREET, WIDEN 2-4 LANES $2,200

SAN BERNARDINO

LOCAL HIGHWAY

SBD031361 0 AYALA DRIVE BASELINE ROAD TO SR210 WIDEN FROM 2 LANES TO 4 LANES $2,703

SAN BERNARDINO

LOCAL HIGHWAY

200810 0 BAKER BLVD. BRIDGE - OVER MOJAVE RIVER, 0.2 MI SW OF DEATH VALLEY RD REPLACE 2 LANE BRIDGE W 4 LANE BRIDGE (BRIDGE NO 54C0127)

$2,910

SAN BERNARDINO

LOCAL HIGHWAY

SBD031295 0 BARTON ROAD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES SPOT WIDENINGS $690

SAN BERNARDINO

LOCAL HIGHWAY

201187 0 BASE LINE BETWEEN SR-210 RAMPS - WIDEN FROM 4 LANES TO 6 LANES (0.1 MILES) WIDEN SR-210 BRIDGE ON BASE LINE FROM 4 LANES TO 6 LANES

$3,972

SAN BERNARDINO

LOCAL HIGHWAY

201191 0 BASE LINE FROM SEINE AVENUE TO STONEY CREEK DRIVE - WIDEN FROM 4-6 LANES (0.2 MILES) $583

SAN BERNARDINO

LOCAL HIGHWAY

200019 0 BASELINE ACROSS CITY CREEK - FROM 600’ W TO 600’ EAST OF CITY CREEK RECONSTRUCT EXISTING BRIDGE TO INCREASE HYDRAULIC CAPACITY (NO ADDTL LANES - STILL 4) REPLACING LOW WATER XING(00L0028)

$22,810

SAN BERNARDINO

LOCAL HIGHWAY

SBD031217 0 BEECH AVENUE FOOTHILL TO MILLER AVE WIDEN FROM 2 LANES TO 4 LANES $4,630

SAN BERNARDINO

LOCAL HIGHWAY

200018 0 BOULDER AV ACROSS CITY CREEK S/O BASELINE - RECONSTRUCT EXISTING BRIDGE FROM 2 TO 4 LANES; ALSO WIDEN BOULDER AVE FROM 190’ NORTH TO 1,430’ SOUTH OF BRIDGE FROM 2-4 LANES (54C0648)

$20,718

SAN BERNARDINO

LOCAL HIGHWAY

SBD55033 0 BOULDER AVE. FROM GREENSPOT TO SOUTH CITY LIMITS - WIDEN FROM 2-4 LANES (0.70 MILES) $330

Page 109: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 107

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAY200866 0 BRIDGE NO 54C0547, BEAR VALLEY RD. OVER BNSF RAILWAY, AMTRAK & UP RR, 3.8 MILES E. OF I-15. PRELIMINARY ENGINEERING,

REHAB. AND WIDEN 6-7 LANES ON BRIDGE (PROJECT IS FUNDED FOR PSE/ENVIRONMENTAL STUDIES ONLY)$5,427

SAN BERNARDINO

LOCAL HIGHWAY

2011158 0 BRYANT STREET IMPROVEMENTS, OAK GLEN RD. TO DATE AVE. EMBANKMENT/SLOPE PROTECTION $720

SAN BERNARDINO

LOCAL HIGHWAY

2011121 0 CACTUS WIDENING - WIDEN CACTUS FROM VALLEY TO WALNUT AVENUES FROM 2-4 LANES $2,235

SAN BERNARDINO

LOCAL HIGHWAY

SBD31876 0 CALIFORNIA STREET BARTON ROAD TO REDLANDS BOULEVARD WIDEN FROM 2 TO 4 LANES $1,090

SAN BERNARDINO

LOCAL HIGHWAY

SBD59023 0 CAMPUS PKWY-PEPPER/LINDEN DRIVE EXTENSION FROM KENDALL TO I-215 FWY - CONSTRUCT (4) LANE ROADWAY - BETWEEN KENDALL DRIVE AND I-215, PARTIAL DIAMOND INTERCHANGE FOR N/B (2,000 FT)

$22,000

SAN BERNARDINO

LOCAL HIGHWAY

201139 0 CASA GRANDE AVENUE FROM LYTLE CREEK ROAD TO MANGO AVENUE CONSTRUCT 4 LANES $10,500

SAN BERNARDINO

LOCAL HIGHWAY

200608 0 CENTRAL AVENUE WIDENING PROJECT BETWEEN WATERMAN AND MT.VIEW AVE.(2 MI) -WIDEN FROM 2-4 LANES BETWEEN TIPPECANOE AND MT.VIEW, ADDING CURBS, SIDEWALKS AND LIGHTING

$5,600

SAN BERNARDINO

LOCAL HIGHWAY

200409 0 CHERRY AVE. AT SCRRA RR CROSSING - WIDEN BRIDGE FROM 4-6 LANES ON CHERRY OVER RR CROSSING (FROM MERRILL TO WHITTRAM)

$8,829

SAN BERNARDINO

LOCAL HIGHWAY

200410 0 CHERRY AVE. WIDENING FROM WHITTRAM TO FOOTHILL BLVD. -WIDEN 4-6 LANES $7,291

SAN BERNARDINO

LOCAL HIGHWAY

SBD031190 0 CHERRY AVENUE BASELINE AVENUE TO HIGHLAND AVENUE WIDENING STREET FROM 2 LANES TO 6 LANES $4,180

SAN BERNARDINO

LOCAL HIGHWAY

201107 0 CHERRY AVENUE FROM SOUTH HIGHLAND TO I-15 WIDEN (2-6 LANES) $2,625

SAN BERNARDINO

LOCAL HIGHWAY

SBD58044 0 CITRUS AVENUE AUBURN CT. TO WABASH AVENUE WIDEN FROM 2 TO 4 LANES $525

SAN BERNARDINO

LOCAL HIGHWAY

200006 0 CITRUS AVENUE FROM JURUPA TO SLOVER - WIDEN FROM 2-4 LANES W/LEFT TURN LANES AT INTERSECTIONS (SLOVER, SANTA ANA AVE. & JURUPA-3 INTERSECTIONS)

$5,830

SAN BERNARDINO

LOCAL HIGHWAY

201140 0 CITRUS AVENUE FROM SUMMIT AVENUE TO I-15 WIDEN FROM 2 TO 4 LANES $2,625

SAN BERNARDINO

LOCAL HIGHWAY

201106 0 COMMERCE WAY FROM MICHIGAN AVENUE TO BARTON ROAD AT VIVIENDA AVENUE. NEW ROAD - 4 LANE ROAD EXTENSION $1,066

SAN BERNARDINO

LOCAL HIGHWAY

20110109 0 CONSTRUCT NEW RAILROAD GRADE-SEPARATED CROSSING BETWEEN LAUREL STREET AND THE BNSF RAILROAD IN THE CITY OF COLTON. WORK ALONG LAUREL STREET BEGINS APPROXIMATELY 420 FT EAST OF PENNSYLVANIA AVE AND 195FT WEST OF 9TH ST. NO ADDITIONAL LANES ARE PROPOSED.

$53,995

SAN BERNARDINO

LOCAL HIGHWAY

2011159 0 COUNTY LINE ROAD IMPROVEMENTS FROM I-10 TO CALIMESA - INSTALL LEFT TURN LANE AND SIGNAL AT CALIMESA AND COUNTY LINE RD.

$480

SAN BERNARDINO

LOCAL HIGHWAY

200408 0 CUMBERLAND DRIVE EXTENSION - SH 18 NORTH TO CUMBERLAND DRIVE -PAVE NEW ROAD - 1 LANE IN EACH DIRECTION $3,000

Page 110: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

108 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAY201142 0 CYPRESS AVENUE FROM DUNCAN CANYON ROAD TO FRONTAGE ROAD (I-15)-CONSTRUCT NEW 2 LANE ROAD $3,200

SAN BERNARDINO

LOCAL HIGHWAY

201141 0 CYPRESS AVENUE FROM SLOVER TO JURUPA AVENUE WIDEN FROM 2-4 LANES $2,498

SAN BERNARDINO

LOCAL HIGHWAY

201180 0 DEL ROSA DRIVE FROM 3RD STREET TO 6TH STREET-WIDEN FROM 2 TO 4 LANES (0.4 MILES) FORMERLY PART OF PROJECT ID 200852 $1,400

SAN BERNARDINO

LOCAL HIGHWAY

201143 0 DUNCAN CANYON ROAD FROM CITRUS AVENUE TO SIERRA AVENUE CONSTRUCT 4 LANES. $5,251

SAN BERNARDINO

LOCAL HIGHWAY

201166 0 DUNCAN CANYON ROAD FROM I-15 TO CITRUS AVENUE-WIDEN FROM 2-4 LANES $1,312

SAN BERNARDINO

LOCAL HIGHWAY

SBD031118 0 EDISON AVENUE RAMONA TO CENTRAL WIDEN FROM 4 LANES TO 6 LANES & REHABILITATION (SPOT WIDENING) $2,000

SAN BERNARDINO

LOCAL HIGHWAY

SBD031419 0 EL EVADO ROAD, PALMDALE RD TO AIR BASE ROAD PALMDALE TO HOPLAND (12/98) HOPLAND TO AIR BASE (12/96), WIDEN FROM 2 TO 4 WITH LEFT TURN LANES

$4,000

SAN BERNARDINO

LOCAL HIGHWAY

200151 0 EL MIRAGE RD. FROM RICHARDSON RD. (CITY LIMITS) TO SR 395 - PAVE EXISTING 2 LANE DIRT ROAD AND RESURFACE $5,295

SAN BERNARDINO

LOCAL HIGHWAY

201134 0 ETIWANDA AVE. GRADE SEPARATION PROJECT REPLACES AN AT-GRADE RAILROAD CROSSING AT THE INTERSECTION OF ETIWANDA AVENUE AND THE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (SCRRA) RAILROAD TRACKS WITH AN OVERHEAD ROADWAY/AT GRADE RAILRAOD TRACK GRADE SEPARATION

$54,050

SAN BERNARDINO

LOCAL HIGHWAY

SBD031228 0 ETIWANDA AVENUE RIVERSIDE COUNTY LINE TO INTERSTATE 10 WIDEN FROM 4 TO 6 LANES $2,635

SAN BERNARDINO

LOCAL HIGHWAY

SBD31785 0 EUCALYPTUS FROM PEYTON DR. TO CHINO HILLS COMMUNITY PARK ENTRANCE - CONSTRUCT 2 LANE RD. (PHASE 1 FROM PEYTON DRIVE TO GALLOPING HILLS RD. COMPLETED IN 2/2007)

$3,542

SAN BERNARDINO

LOCAL HIGHWAY

SBD88086 0 EUCLID AVENUE FROM D ST TO FOOTHILL BOULEVARD - STORM DRAIN EXTENSION $1,414

SAN BERNARDINO

LOCAL HIGHWAY

200403 0 EVANS/WEST STREET FROM REDLANDS BLVD TO BARTON -CONSTRUCT 4 NEW LANES, A N/S ARTERIAL ROADWAY FROM REDLANS BLVD TO BARTON, WEST OF ANDERSON ST.

$9,153

SAN BERNARDINO

LOCAL HIGHWAY

200401 0 FAIRFIELD RANCH EXT.-EXTEND FAIRFIELD RANCH RD. FROM 950 FT. S/O INTERSECTION OF FFRANCH RD TO 5000 FT. PARALLEL TO SR71 TO PINE INTERSECTION-CONSTRUCT NEW 2 LANE RD. W/BIKE LANES

$6,990

SAN BERNARDINO

LOCAL HIGHWAY

200407 0 FLAMINGO HEIGHTS LANDERS ROAD IMPROVEMTS-SH 247 PIPES WASH TO JOHNSON VALLEY-WIDEN TO ACCOMMODATE PASSING LANES WITH TURN POCKETS (SAME AS 20061705)

$2,826

SAN BERNARDINO

LOCAL HIGHWAY

201137 0 FOOTHILL BLVD AT ARCHIBALD AVE. INTERSECTION IMPROVEMENTS AND ADD DESIGNATED RIGHT TURN LANE $640

SAN BERNARDINO

LOCAL HIGHWAY

2011123 0 FOOTHILL BLVD FROM EAST CITY LIMITS TO WEST CITY LIMITS -WIDEN FROM 4 TO 6 LANES $8,706

SAN BERNARDINO

LOCAL HIGHWAY

201102 0 FOOTHILL BLVD. FROM 500’ W/O MONTE VISTA TO CENTRAL AVE. -WIDEN TO ULTIMATE WIDTH TO PROVIDE DUAL LEFT TURN LANES . $2,270

Page 111: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 109

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAYSBD31903 0 FOOTHILL BOULEVARD (STATE ROUTE 66) AT FOURTH MODIFY SIGNALS, CHANNELIZE TRAFFIC SIGNAL, INTERSECTION

IMPROVEMENTS/REALIGN INTERSECTION (0.11 MILE)$1,137

SAN BERNARDINO

LOCAL HIGHWAY

SBD031335 0 FOOTHILL BOULEVARD AT ARCHIBALD AVENUE INTERSECTION IMPROVEMENTS (ADD RIGHT TURN LANE) $640

SAN BERNARDINO

LOCAL HIGHWAY

201103 0 FOOTHILL BOULEVARD BOTTLENECK AND SAFETY IMPROVEMENTS- FROM CENTRAL TO GROVE AVE.INSTALL RIGHT TURN LANES AT MAJOR INTERSECTIONS, ELONGATE LEFT TURNS FOR SAFE TURNING, CURB, GUTTER DRAINAGE, ROADWAY REHAB.

$5,300

SAN BERNARDINO

LOCAL HIGHWAY

SBD031246 0 FOOTHILL BOULEVARD CITRUS AVENUE TO MAPLE AVENUE WIDEN TO STATE STANDARDS FROM 4 TO 6 LANES $7,218

SAN BERNARDINO

LOCAL HIGHWAY

SBD59004 0 FRANCIS ST. FROM BON VIEW AVE TO GROVE WIDENING 2 TO 4 LANES (STORM DRAIN FROM BON VIEW TO PARCO) $12,300

SAN BERNARDINO

LOCAL HIGHWAY

200619 0 GLEN HELEN PARKWAY - FROM 0.2 MILES WEST OF CAJON CREEK TO 0.2 MILES EAST OF CAJON CREEK-REPLACE 36’ WIDE 48’ LONG 2 LN BRIDGE OVER CAJON CREEK W/ 102’, 526’LONG 4 LN BRIDGE (54C0025)

$35,682

SAN BERNARDINO

LOCAL HIGHWAY

20040826 0 GLEN HELEN PARKWAY AT UPRR AND BNSF- GRADE SEPARATION $29,000

SAN BERNARDINO

LOCAL HIGHWAY

SBD97147 0 GREEN TREE BLVD AT AT&SF RAILROAD CONSTRUCT 4-LANE BR & CONNECT TO HESPERIA & RIDGECREST RD $30,850

SAN BERNARDINO

LOCAL HIGHWAY

200853 0 GREENSPOT FROM BOULDER AVE. TO SR210 - WIDEN FROM 4-6 LANES (0.80) $15,700

SAN BERNARDINO

LOCAL HIGHWAY

2011152 0 GREENSPOT RD BETWEEN SR 210 RAMPS - WIDEN FROM 4-5 LANES (.10) $3,000

SAN BERNARDINO

LOCAL HIGHWAY

201156 0 GREENSPOT RD. FROM SANTA PAULA ST. TO 2,600’ S/O SANTA ANA RIVER - WIDEN FROM 2-4 LANES WITH MEDIAN (2.2 MILES) $22,530

SAN BERNARDINO

LOCAL HIGHWAY

20061015 0 GREENSPOT ROAD BRIDGE AT SANTA ANA RIVER - GREENSPOT RD.CONSTRUCT NEW 4 LANE BRIDGE (STRIPING FOR 2 LANES) AT SAR W/ CHANNEL IMPROVMENTS-REALIGN APPROX 2400’ OF 2 LANE RD.(54C0368)

$11,046

SAN BERNARDINO

LOCAL HIGHWAY

200074 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS FOR SAN BERNARDINO COUNTY-BIKE/PED PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126,127,128, EXEMPT TABLE 2 & 3).

$4,071

SAN BERNARDINO

LOCAL HIGHWAY

SBDLS08 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - HBP PROGRAM -PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127, 128 EXEMPT TABLES 2 & 3

$40,834

SAN BERNARDINO

LOCAL HIGHWAY

SBD031505 0 GROUPED PROJECTS FOR LTF ARTICLE 3 PROJECTS LTF, ARTICLE 3 BICYCLE/PEDESTRIAN PROJECTS AT VARIOUS LOCATIONS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128, EXEMPT TABLES 2 & 3)

$7,900

SAN BERNARDINO

LOCAL HIGHWAY

20040830 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES - PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERA-TION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES)

$14,668

SAN BERNARDINO

LOCAL HIGHWAY

200075 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS - LANDSCAPE, ETC. FOR SAN BERNARDINO CNTY - PROJECTS CONSISTENT WITH 40 CFR PART93.126,127,128, EXEMPT TABLES 2 & 3)

$3,271

SAN BERNARDINO

LOCAL HIGHWAY

20081104 0 GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES -PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERA-TION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES)

$700

Page 112: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

110 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAYSBD59006 0 GROVE AVENUE FROM STATE ST. TO 350’ NORTH OF HOLT BLVD. WIDENING FROM 4 TO 6 LANES WIDENING RAILROAD BRIDGE ALSO

(1,450’),LANDSCAPE RESTORATION, LEFT TURN LANES AT HOLT$8,400

SAN BERNARDINO

LOCAL HIGHWAY

201169 0 H STREET FROM KENDALL DRIVE TO 40TH STREET WIDENING FROM 2-4 LANES $918

SAN BERNARDINO

LOCAL HIGHWAY

200404 0 HOLT BLVD CORRIDOR WIDENING FROM BENSON AVE. TO VINEYARD AVE. WIDEN ROAD FROM 4-6 LANES INCLUDING TRAFFIC SIGNAL MODIFICATIONS AND RESTRIPING

$42,320

SAN BERNARDINO

LOCAL HIGHWAY

20010137 0 HUNTS LANE @ UNION PACIFIC RAILROAD CROSSING - GRADE SEPARATION -PART OF ALAMEDA CORRIDOR STUDY (TCRP #55.3)(TOLL CREDITS TO BE USED FOR FY10/11 CONST PHASE IN THE AMOUNT OF $4371)

$37,176

SAN BERNARDINO

LOCAL HIGHWAY

SBD031284 0 I AVENUE FROM RANCHERO RD TO MAIN ST. WIDEN FROM 2 LANES TO 4 LANES $6,870

SAN BERNARDINO

LOCAL HIGHWAY

20081704 0 I-10/ALABAMA AND REDLANDS BLVD AND ALABAMA COLTON INTERSECTION IMPROVEMENTS - WIDEN INTERSECTION APPROACHES ON ALL FOUR LEGS OF REDLANDS/ALABAMA BLVD ST. INTERSECTION ADD DUAL LEFT TURN LANES. REALIGN ALABAMA ST ON NORTH SIDE OF INTERSECTION TO ELIMINATE THE 23’ HORIZONTAL OFFSET AT INTERSECTION

$13,527

SAN BERNARDINO

LOCAL HIGHWAY

20040804 0 I-40/AZ95 CONNECTOR- J ST. FROM I-40 OFFRAMPS TO W. BROADWY;NEEDLES HGWY FROM W. BROADWY TO N.K ST; N.K ST FROM NEEDLES TO AZ 95-WIDEN 2-4 LNS-INTERSCTN& CORRIDOR IMPRVT.

$24,817

SAN BERNARDINO

LOCAL HIGHWAY

200201 0 IN ADELANTO, EL MIRAGE RD. FROM SR. 395 TO 1 MILE EAST TO ADELANTO RD. AND ON ADELANTO RD. FROM EL MIRAGE RD. TO 1 MILE SOUTH-AUBURN AVE. PAVE EXISTING 2 LANE RD.

$560

SAN BERNARDINO

LOCAL HIGHWAY

200202 0 IN CHINO - ON CHINO AVENUE FROM MONTE VISTA TO SIXTH STREET-WIDEN EXISTING 2 LANES TO 4 LANES AND INSTALL SIGNAL AT INTERSECTION OF CHINO AVE. AND MONTE VISTA

$584

SAN BERNARDINO

LOCAL HIGHWAY

200207 0 IN CHINO - ON PINE AVE EXTENSION FROM SR 71 TO EUCLID IN THE CITY OF CHINO - WIDEN BRIDGE FROM 2-4 LANES $25,000

SAN BERNARDINO

LOCAL HIGHWAY

200209 0 IN HESPERIA - PAVE ESCONDIDO ROAD FROM RANCHERO TO CEDAR (2.0 MILES). PAVE 4 LANES OF ROADWAY 2 IN EACH DIRECTION. $5,900

SAN BERNARDINO

LOCAL HIGHWAY

200211 0 IN HESPERIA ON I STREET FROM MAIN ST. TO BEAR VALLEY RD. APPROX. 4.4 MILES - WIDEN FROM 2-4 LANES $7,700

SAN BERNARDINO

LOCAL HIGHWAY

20010139 0 IN ONTARIO: ON MILLIKEN AT UNION PACIFIC RAILROAD - GRADE SEPARATION - PART OF ALAMEDA CORRIDOR STUDY - TCRP #55.2 $73,983

SAN BERNARDINO

LOCAL HIGHWAY

20020134 0 IN RANCHO CUCAMONGA - ON ARROW RTE. FROM ETIWANDA AVENUE TO EAST STREET - WIDEN FROM 2-4 LANES (3,200 FEET) $1,100

SAN BERNARDINO

LOCAL HIGHWAY

200431 0 INLAND PACIFIC ELECTRIC TRAIL - ON OLD SP ABANDONED RR BETWEEN I-15 TO MAPLE AVE.-CONSTRUCT CLASS 1 BIKE LANE (APPROX. 7 MILES LONG)

$3,054

SAN BERNARDINO

LOCAL HIGHWAY

201110 0 INSTALLATION OF VARIOUS TRAFFIC SIGNALS ALONG LA MESA ROAD $1,200

SAN BERNARDINO

LOCAL HIGHWAY

20084104 0 JOSHUA STREET PARK & RIDE EXPANSION - ON JOSHUA STREET WEST OF US 395,C ITY OF HESPERIA, EXISTING PNR HAS 188 SPACES AND NEEDS TO ADD 150 SPACES, TO INCLUDE LANDSCAPING, LIGHTING AND VARIOUS NON-CAPACITY STREET IMPROVEMENTS TO FACILITATE ADDITIONAL SPACES (TOLL CREDITS TO BE USED IN ENG & CON PHASES.CMAQ ADDED $5 IN 10/11 AND $67 2011/12 )

$638

SAN BERNARDINO

LOCAL HIGHWAY

SBD031227 0 JURUPA AVENUE ETIWANDA TO SIERRA AVENUE CONSTRUCT 6 LANE ROAD $24,463

Page 113: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 111

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAY201144 0 JURUPA AVENUE FROM TAMARIND AVENUE TO ALDER AVENUE WIDEN FROM 2 TO 4 LANES $958

SAN BERNARDINO

LOCAL HIGHWAY

20110601 0 LA CADENA DR OVER SANTA ANA RIVER, 1.5 MI SOUTH OF I-10 - REPLACE EXISTING 4 LANE BRIDGE WITH 6 LANE BRIDGE (54C0077) $27,535

SAN BERNARDINO

LOCAL HIGHWAY

201190 0 LANZIT DITCH BRIDGE: REPLACE 2 LANE BRIDGE WITH 2 LANE BRIDGE 2008 RTIP PROJECT NUMBER: 20083303 $2,476

SAN BERNARDINO

LOCAL HIGHWAY

201104 0 LEMON STREET/MAUNA LOA STREET-NEW RR UNDERCROSSING THAT INCLUDES CONSTRUCTION OF A NEW OVERCROSSING BRIDGE AND REALIGNMENT AND RECONSTRUCTION OF LEMON AND MAUNA LOA STREETS FROM 3RD AVE. TO JUST WEST OF E AVE.

$47,900

SAN BERNARDINO

LOCAL HIGHWAY

200607 0 LENA ROAD EXENSION PROJECT - EXTENSION OF LENA RD. FROM MILL ST. TO ORANGE SHOW RD.-NEW 4 LANE ROAD (CO-OP PROJECT WITH IVDA)SAFETEA-LU -#1701

$6,300

SAN BERNARDINO

LOCAL HIGHWAY

200622 0 LENWOOD GRADE SEPARATION - NORTH OF WEST MAIN ST; APPROX.400 FT. N/O TO 600 FT. S/O BNSF AND SANTA FE RR RIGHT-OF-WAY-4 TRAVEL LANE GRADE SEPARATION (CA627)

$30,385

SAN BERNARDINO

LOCAL HIGHWAY

SBD55025 0 MAIN STREET FROM I-15 TO MAPLE (PHASE 1) FROM MAPLE TO 11TH (PHASE 2) - I-15 TO SR 395 (PHASE 3); WIDEN AND RECONSTRUCT FROM 4 - 6 LANES, INCLUDING WIDENING OF BRIDGE OVER CALIFORNIA AQUEDUCT (2.75 MILES)

$14,500

SAN BERNARDINO

LOCAL HIGHWAY

200807 0 MAIN STREET WIDENING - BNSF TO WEST CITY LIMITS-WIDENING FROM 1-2 LANES IN THE E/B & W/B DIRECTION-(BRIDGE WIDENING AND APPROACHES OF ABOUT 100’ IN EACH DIRECTION”

$384

SAN BERNARDINO

LOCAL HIGHWAY

200013 0 MAPLE AVENUE FROM MAIN ST. TO 650’ SOUTH OF CROMDALE STREET - REHABILITATION - RESURFACE 2 LANE RD. (NO NEW LANES) $1,975

SAN BERNARDINO

LOCAL HIGHWAY

200012 0 MAPLE AVENUE FROM MARIPOSA TD. TO MAIN STREET - ROAD REHAB. - RESURFACING 2 EXISTING LANES (NO NEW LANES) $2,310

SAN BERNARDINO

LOCAL HIGHWAY

SBD031254 0 MERRILL AVENUE ALDER TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES $2,065

SAN BERNARDINO

LOCAL HIGHWAY

201105 0 MICHIGAN AVENUE WIDENING (2-4 LANES) FROM COMMERCE WAY TO MAIN STREET $1,205

SAN BERNARDINO

LOCAL HIGHWAY

SBD55034 0 MISSION BLVD. FROM LA COUNTY LINE TO BENSON AVE (2.2 MILES) RECONSTRUCT RDWAY, LANDSCAPE MEDIAN ISLANDS, STORM DRAINS, UPGRADED SIGNALS (NO ADDTL LANES) (T21-#60)

$8,560

SAN BERNARDINO

LOCAL HIGHWAY

SBD031315 0 MISSION BOULEVARD GROVE TO HAVEN WIDEN FROM 4 LANES TO 6 LANES ,LANDSCAPED MEDIAN AND STORM DRAIN(3.3 MI) (T21-#60) SEG.1 ARCHIBALD TO HAVEN AND SEG.2- GROVE TO ARCHIBALD

$50,000

SAN BERNARDINO

LOCAL HIGHWAY

2011151 0 MOJAVE DESERT AIR BASIN RIDESHARE PROGRAM $1,293

SAN BERNARDINO

LOCAL HIGHWAY

200049 0 MOJAVE RIVER BRIDGE CROSSING FROM TERMINUS OF YUCCA LOMA RD TO TERMINUS OF GREEN TREE BLVD - PRE. ENVIRONMENTAL REVIEW FOR CONSTRUCTION OF NEW 4 LANE BRIDGE-INCLUDES A BRIDGE OVER THE BNSF RR TO HESPERIA ROAD (PROJECT 97147 ENVIRONMENTAL DOC IS BEING INCLUDED IN THIS PROJECT. THE PROJECTS CONNECT AND ENVIRON. DOC IS REQUIRING THAT THE WHOLE PROJECT BE INCLUDED ON BOTH SBD97147 AND 200049)

$32,550

SAN BERNARDINO

LOCAL HIGHWAY

200857 0 MONTE VISTA AVE. FROM PHILLIPS BLVD. TO MISSION BLVD (0.5 MILES)-WIDENING FROM 2-4 LANES $5,450

SAN BERNARDINO

LOCAL HIGHWAY

20010135 0 MONTE VISTA AVENUE @ UNION PACIFIC RAILROAD CROSSING - GRADE SEPARATION PART OF ALAMEDA CORRIDOR GRADE SEPARATION PROJECTS FUNDED WITH TCRP #55.1(CA505)

$18,100

Page 114: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

112 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAY200808 0 MT. VERNON AVEN. WIDENING - WIDEN FROM 1-2 LANES NORTHBOUND FROM RAVEN WAY TO PICO ST.. $543

SAN BERNARDINO

LOCAL HIGHWAY

SBD31905 0 MT. VERNON AVENUE BRIDGE (OVERHEAD) AT BNSF REPLACE GRADE SEPARATION, REPLACE 4 LANE BRIDGE WITH 4 LANE BRIDGE FROM 2ND TO 5TH STREETS (0.2 MILES SOUTH OF RTE. 66)(BRIDGE NO 54C0066)

$73,032

SAN BERNARDINO

LOCAL HIGHWAY

200856 0 MT. VERNON BRIDGE OVER UPRR -ON MT. VERNON AVE. FROM “M” ST. TO I-10 ON RAMP. WIDENING BRIDGE FROM 2-4 LANES (CA338) $50,000

SAN BERNARDINO

LOCAL HIGHWAY

SBD41317 0 MT. VIEW AVE. BRIDGE AT MISSION CREEK CHANNEL WIDEN ROADWAY & SHOULDER WORK AND EXISTING BRIDGE AT MT. VIEW -1 LN. NO. & SO. TO 2 LNS N/S & LFT_TURNS TO MAKE A TOTAL OF 4 LANES ( 2 IN EACH DIRECTION)

$1,655

SAN BERNARDINO

LOCAL HIGHWAY

2011160 0 MT. VIEW AVE. BRIDGE OVER SANTA ANA RIVER. CONSTRUCT NEW 4 LANE BRIDGE. MT. VIEW CURRENTLY TERMINATES AT SOUTH EDGE OF SANTA ANA RIVER. PROJECT WOULD EXTEND BY MEANS OF BRIDGE ACROSS RIVER.

$12,500

SAN BERNARDINO

LOCAL HIGHWAY

SBD41316 0 MT. VIEW AVE. RAILWAY GRADE CROSSING, 1500 FT. NORTH OF I-10 WIDEN RAILWAY GRADE CROSSING FROM 1 LANE NORTH & SOUTH TO 2 LANES NORTH & SOUTH & UPGRADE GATES (0.75 MILES)

$1,724

SAN BERNARDINO

LOCAL HIGHWAY

200609 0 MT.VIEW WIDENING/EXTENSION PROJECT- WIDEN S/B FROM 2-4LNS- FROM COULSTON TO RIVERVIEW (SOUTH OF SANTA ANA RIVER) (PROJECT IS SPLIT INTO 2 SEPARATE PROJECTS AS OF THE 2011 ENTRY)

$7,500

SAN BERNARDINO

LOCAL HIGHWAY

20083303 0 NATIONAL TRAILS HGWY OVER LANZIT DITCH, 2.8 MILES E. OF KELBAKER RD. - REPLACE 2 LANE BRIDGE WITH NEW 2 LANE BRIDGE (54C0286)

$2,476

SAN BERNARDINO

LOCAL HIGHWAY

201111 0 NATIONAL TRAILS HIGHWAY AND MOJAVE RIVER - BRIDGE REHAB. REPLACE EXISTING RAILING TO MEET CURRENT STANDARDS $1,375

SAN BERNARDINO

LOCAL HIGHWAY

20083302 0 NATIONAL TRAILS HIGHWAY, OVER DOLA DITCH, 2.1 MI EAST OF KELBAKER RD. REPLACE 2 LANE BRIDGE WITH NEW 2 LANE BRIDGE (54C0285

$2,124

SAN BERNARDINO

LOCAL HIGHWAY

SBD88140 0 NATIONAL TRAILS ROAD BETWEEN INTERSTATE 15 & AIRBASE RD. WIDEN FROM 2 LANES TO 4 LANES $2,600

SAN BERNARDINO

LOCAL HIGHWAY

201179 0 NATIONAL TRIALS HIGHWAY BETWEEN INTERSTATE 15 & AIR EXPRESSWAY WIDEN FROM 2-4 LANES (1.9 MILES) $12,225

SAN BERNARDINO

LOCAL HIGHWAY

20040209 0 NATL TRAILS HIWAY FROM BRYMAN RD S/O MORNING GLORY ST. TO BRYMAN TO N O MARIGOLD- WIDEN EXISTG 2 LN RD FOR PASSING LNS - 1 IN EA DIRECT., INCL TRANSITIONS Y (CO W/#200106)

$2,154

SAN BERNARDINO

LOCAL HIGHWAY

SBD031426 0 NEEDLES HIGHWAY FROM ‘N’ STREET TO NEVADA STATE LINE-REALIGN, REHABILITATE, WIDEN SHOULDERS, TURN LANES, PASSING LANES, AND ACCELERATION LANES (1 LANE IN EACH DIR.) RELOCATE UTIL. (CURRENTLY PROGRAMMED FOR PSE ONLY)

$65,500

SAN BERNARDINO

LOCAL HIGHWAY

SBD031412 0 NISQUALLI RD FROM BALSAM RD TO HESPERIA RD - WIDEN FROM 2 LANES TO 4 LANES, DRAINAGE IMPROVEMENTS, AND VERTICAL REALIGNMENT

$3,750

SAN BERNARDINO

LOCAL HIGHWAY

200805 0 NORTH VINEYARD AVE. GRADE SEPARATION - BETWEEN HOLT BLVD AND AIRPORT DR. BUILDING RR BRIDGE FLYOVER-NO LANES ADDED TO ARTERIALS. THE GRADE SEP. IS AT THE UP RR ALHAMBRA LINE

$56,088

SAN BERNARDINO

LOCAL HIGHWAY

200846 0 OLD WATERMAN CANYON BRIDGE REPLACMENT-APPROX 1 MILE NORTH OF SR18. REMOVE AND RECONSTRUCT BRIDGE ON OLD WATERMAN CANYON ROAD. EXISTING 2- LANE TO 2 LANE BRIDGE (0.02 MILES)

$2,603

SAN BERNARDINO

LOCAL HIGHWAY

200213 0 ON 3RD ST. FROM PALM AVE. TO 5TH ST. WIDEN 3RD ST. E/O PALM AVE. FROM 2 TO 3 LANES AND EXTEND 3RD ST. EASTERLY TO CONNECT 5TH ST.

$1,571

SAN BERNARDINO

LOCAL HIGHWAY

200414 0 ON DUNCAN ROAD FROM OASIS EAST TO BALDY MESA PAVE DIRT ROADS 1 LANE IN EACH DIRECTION INCLUDING STOP SIGNS AT RR CROSSING

$22,000

Page 115: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 113

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAY200212 0 ON GREENSPOT RD. - REALIGNMENT (S CURVE) FROM ST PAULA- 3700’ EASTERLY, (REMAINS 2 LANES) $1,705

SAN BERNARDINO

LOCAL HIGHWAY

201113 0 ORANGE STREET FROM LUGONIA TO SAN BERNARDINO AVE. -WIDEN THE EAST SIDE OF THE STREET TO REMOVE A RESTRICTION IN THE ROADWAY TRAVEL AREA. PROJECT INCLUDES ROAD PAVING, CURB AND GUTTER, SIDEWALK, STREET LIGHTING, STRIPING AND MARKING, AND LANDSCAPE IMPROVEMENTS. THE PROJECT WILL IMPROVE PEDESTRIAN AND VEHICULAR SAFE TRAVEL AND CIRCULATION.

$540

SAN BERNARDINO

LOCAL HIGHWAY

200420 0 ORANGE STREET WIDENING - FROM NORTH CITY LIMITS TO RIVERVIEW DRIVE - WIDEN STREET FROM 2-4 LANES $540

SAN BERNARDINO

LOCAL HIGHWAY

2011105 0 PALM AVE. FROM 3RD ST. TO 5TH ST. - SHOULDER IMPROVEMENTS (NO WIDENING) $818

SAN BERNARDINO

LOCAL HIGHWAY

200850 0 PALM AVE. GRADE SEPARATION , PALM AVE. APPROX. 530’ S/O I-215 PALM AVE. INTERCHANGE TO APPROX. 1450’ S/O CAJON BLVD.-CONSTRUCT AT GRADE RR SEPARATION - BUILD BRIDGE OVERCROSSING SEPARATING TRAFFIC FROM RR CROSSING (NO ADDITIONAL LANES) 2-2 LANES (CA615)

$30,077

SAN BERNARDINO

LOCAL HIGHWAY

201159 0 PEPPER AVE. (SEGMENT SOUTH OF I-10) FROM SLOVER TO AGUA MANSA - NEW 2 LANE CONNECTION. TRAFFIC SIGNAL AT PEPPER AND AGUA MANSA.

$4,646

SAN BERNARDINO

LOCAL HIGHWAY

2002170 0 PEPPER AVE: FOOTHILL BLVD TO SR 210 -- WIDEN EXISTING 2 LANES TO 4 LANES (2 EACH DIR) $15,000

SAN BERNARDINO

LOCAL HIGHWAY

20083401 0 PEYTON DRIVE FROM ENGLISH RD. TO EUCALYPTUS; WIDEN PEYTON FROM 4-6 LANES WITH MARKED BIKE LANES IN EACH DIRECTION (PHASE 2) OF SBD41242

$3,951

SAN BERNARDINO

LOCAL HIGHWAY

20083402 0 PEYTON DRIVE FROM EUCALYPTUS TO SR 142; WIDEN PEYTON TO 2-4 LANES WITH MARKED BIKE LANES IN EACH DIRECTION $7,119

SAN BERNARDINO

LOCAL HIGHWAY

200021 0 RAMONA AV AT STATE ST - RAILROAD CROSSING GRADE SEPARATION-FUNDED WITH TCRP (PART OF ALAMEDA CORRIDOR STUDY) (CA505)

$22,408

SAN BERNARDINO

LOCAL HIGHWAY

SBD55028 0 RANCHERO RD. FROM DANBURY TO ARROWHEAD LAKE RD. - WIDEN FROM 2 TO 4 LANES (3 MILES) $11,000

SAN BERNARDINO

LOCAL HIGHWAY

SBD55030 0 RANCHERO RD. FROM I-15 TO 7TH ST. - WIDEN FROM 2 TO 4 LANES (5.50 MILES) $11,000

SAN BERNARDINO

LOCAL HIGHWAY

SBD031276 0 RANCHERO ROAD 7TH AVENUE TO DANBURY REALIGN ROAD AND WIDEN FROM 2-4 LANES AND CONSTRUCT RAILROAD UNDERCROSSING

$30,058

SAN BERNARDINO

LOCAL HIGHWAY

200815 0 RANCHERO ST. FROM .3 M E/O MARIPOSA TO HESPERIA CL (3 MILES)-WIDEN 2-4 LANES $11,025

SAN BERNARDINO

LOCAL HIGHWAY

SBD41289 0 RANCHO LAS FLORES PARKWAY -NO LANES CURRENTLY EXIST. DEVELOPER TO CONST RUCT HIGHWY 138 TO RANCHERO RD. 2 LANES IN EACH DIRECTION.

$10,000

SAN BERNARDINO

LOCAL HIGHWAY

SBD031259 0 RANDALL AVENUE ALDER AVENUE TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES $1,715

SAN BERNARDINO

LOCAL HIGHWAY

200843 0 RECHE CANYON RD. FROM 1.20 MILES OF S. BARTON ROAD TO 0.42 MILES SOUTH OF BARTON RD (.078 MILES)-WIDEN FROM 2-4 LANES $5,650

Page 116: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

114 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAYSBD031294 0 REDLANDS BOULEVARD AT CALIFORNIA STREET WIDEN INTERSECTION AND INSTALL TRAFFIC SIGNALS AND DRAINAGE AND CURB AND

GUTTERS$1,090

SAN BERNARDINO

LOCAL HIGHWAY

SBD031296 0 REDLANDS BOULEVARD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES $6,850

SAN BERNARDINO

LOCAL HIGHWAY

20020202 0 REDLANDS PARK ONCE PROGRAM - NEW PARKING STRUCTURE BETWEEN EUREKA AND 3RD ST. S/O STUART AND N/O RR APPROX. 200 SPACES (NOT PNR) (THIS PROJECT REPLACES 200421)

$6,290

SAN BERNARDINO

LOCAL HIGHWAY

20061707 0 RIDESHARE ACTIVITIES FOR SOUTHCOAST AIR BASIN $4,486

SAN BERNARDINO

LOCAL HIGHWAY

200603 0 RIVERSIDE AVE. OVER METROLINK AND BNSF RY, 0.1 MI S OF I-10 REMOVE AND REPLACE EXISTING 5 LANE BRIDGE WITH 7 LANE BRIDGE (PA&ED ONLY) SCOPING FOR PORJECT. HIGH COST PROJECT AGREEMENT REQUIRED PRIOR TO PE AUTHORIZATION.

$37,575

SAN BERNARDINO

LOCAL HIGHWAY

SBD031360 0 RIVERSIDE AVENUE SANTA ANA TO AGUA MANSA CONTINUOUS LEFT TURN LANE;WIDEN WEST SIDE(FOR LEFT TURN LANE AND ADDING CURB AND GUTTER

$2,200

SAN BERNARDINO

LOCAL HIGHWAY

SBD031152 0 RIVERSIDE DRIVE AT SAN ANTONIO FLOOD CONTROL CHANNEL WIDEN BRIDGE FROM 4 LANES TO 6 LANES $1,120

SAN BERNARDINO

LOCAL HIGHWAY

200816 0 ROCK SPRINGS RD. FROM 0.25 MI. E/O GLENDALE AVE. TO KIOWA (1.86 MILES) WIDEN FROM 2-4 LANES $20,000

SAN BERNARDINO

LOCAL HIGHWAY

20110603 0 ROCK SPRINGS ROAD OVER MOJAVE RIVER, .9 MILES E ARROWHEAD LK RD. REPLACE TWO LANE LOW WATER CROSSING WITH NEW 4 LANE BRIDGE

$18,533

SAN BERNARDINO

LOCAL HIGHWAY

200405 0 S. MILLIKEN AVE. GRADE SEPARATION - ON MILLIKEN FROM UPR TO NORTH OF MISSION BLVD. RR GRADE SEP-CONSTRUCT O/C/U/C AT RR-REALIGNMENT OF STS TO MEET O/CROSSING & INTERSTN IMPROVMTS

$80,468

SAN BERNARDINO

LOCAL HIGHWAY

200835 0 SAN BERNARDINO AVE. FROM CHERRY AVE. TO FONTANA CITY LIMITS (LIME AVE.) (1.25 MILES)-WIDEN 2-4 LANES $3,665

SAN BERNARDINO

LOCAL HIGHWAY

20110801 0 SAN BERNARDINO VALLEY COORDINATED TRAFFIC SIGNAL MAINTENANCE/MONITORING $1,450

SAN BERNARDINO

LOCAL HIGHWAY

20061502 0 SAN BERNARDINO VALLEY COORDINATED TRAFFIC SIGNAL SYSTEM - TIERS 3 & 4 - UPGRADE AND SYNCHRONIZE APPROX. 500 SIGNALS LOCATED ALONG ARTERIAL ROADEWAYS IN SAN BERNARDINO VALLEY

$7,948

SAN BERNARDINO

LOCAL HIGHWAY

SBD031266 0 SIERRA AVENUE FOOTHILL BOULEVARD TO BASELINE AVENUE- WIDEN FROM 4 TO 6 LANES $8,129

SAN BERNARDINO

LOCAL HIGHWAY

201145 0 SIERRA AVENUE FROM VALLEY BOULEVARD TO SAN BERNARDINO AVENUE WIDEN FROM 4 TO 6 LANES $2,823

SAN BERNARDINO

LOCAL HIGHWAY

201146 0 SIERRA LAKES PARKWAY FROM BEECH AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES. $4,290

SAN BERNARDINO

LOCAL HIGHWAY

201161 0 SLOVER AVE: FROM ALDER AVE EAST TO LINDEN AVENUE WIDEN 2-4 LANES $3,218

SAN BERNARDINO

LOCAL HIGHWAY

201150 0 SLOVER AVENUE FROM CEDAR AVE. EAST TO LARCH AVE. WIDEN FROM 2-4 LANES $650

SAN BERNARDINO

LOCAL HIGHWAY

201147 0 SLOVER AVENUE FROM ETIWANDA AVENUE TO 800 FEET EAST OF ETIWANDA AVENUE WIDEN FROM 2-4 LANES $2,095

Page 117: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 115

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAYSBD41241 0 SOQUEL CANYON PARKWAY EXTENSNION CONSTRUCT NEW 2 LANE_ROAD W BIKE LANES FROM EXISTING TERMINUS OF SOQUEL

CANYON PARKWAY AT PIPELINE AVE. TO WOODVIEW ROAD AT MEDLARINCLUDED ARE BICYCLE LANES MARKED IN EACH DIRECTION$4,000

SAN BERNARDINO

LOCAL HIGHWAY

200804 0 SOUTH ARCHIBALD AVE. GRADE SEPARATION (AT MISSION BLVD) CONSTRUCT A HIGHWAY AND RR GRADE SEPARTION AT EXISTING AT-GRADE CROSSING SOUTH OF ARCHIBALD AND THE UPPR LA LINE-PROJECT TO BUILD NEW FLY-OVER BRIDGE FOR RR - WIDENING FROM 2-6 LANES 3 LANES IN EACH DIRECTION AND LEFT AND RIGHT TURN LANES;DRAINAGE IMPROVMENTS

$57,932

SAN BERNARDINO

LOCAL HIGHWAY

2011150 0 SOUTH COAST AIR BASIN RIDESHARE PROGRAM $2,400

SAN BERNARDINO

LOCAL HIGHWAY

201148 0 SOUTH HIGHLAND AVENUE FROM CHERRY AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES $5,250

SAN BERNARDINO

LOCAL HIGHWAY

201186 0 SR 210 RAMPS AT BASE LINE-RAMP WIDENING - ADD LANES WIDEN ON AND OFF RAMPS AT SOUTHBOUND SR-210/BASE LINE I/C $750

SAN BERNARDINO

LOCAL HIGHWAY

SBD94177 0 STATE ROUTE 62 AT LARREA AVENUE & HATCH ROAD RECONFIGURE AND SIGNALIZATION (NO SYNCHRONIZATION) $196

SAN BERNARDINO

LOCAL HIGHWAY

SBD94174 0 STATE ROUTE 62 CANYON TO SUNRISE WIDEN FROM 4 TO 5 LANES FOR CONINUOUS LEFT TURN LANE $323

SAN BERNARDINO

LOCAL HIGHWAY

SBD94173 0 STATE ROUTE 62 LEE DRIVE TO LUPINE DRIVE WIDEN FROM 4 TO 5 LANES FOR CONTINUOUS LEFT TURN LANE $300

SAN BERNARDINO

LOCAL HIGHWAY

SBD59021 0 STATE STREET FROM 16TH STREET TO FOOTHILL BLVD.; EXTEND AND CONSTRUCT (4) LANES OF ROADWAY (1.5 MILES) TO CONNECT STATE STREET TO RANCHO AVENUE (NEW ROAD)4 PHASES TOTAL IN PROJECT

$22,290

SAN BERNARDINO

LOCAL HIGHWAY

200824 0 STATE STREET FROM ADAMS NORTH TO NOLAN/SHORT ST. (1.44 MILES) WIDEN FROM 2-4 LANES - GRADE SEPARATION $6,300

SAN BERNARDINO

LOCAL HIGHWAY

201184 0 STERLING AVE FROM 3RD STREET TO 5TH STREET - WIDEN FROM 2-4 LANES (0.13 MILES) FORMERLY PART OF PROJECT ID 200852 $400

SAN BERNARDINO

LOCAL HIGHWAY

200801 0 STEWART STREET WIDENING WIDEN FROM 2-4 LANES FROM ANDERSON TO CAMPUS ST. $650

SAN BERNARDINO

LOCAL HIGHWAY

20040210 0 SUMMIT VALLEY ROAD - FROM SH138 TO RANCHERO ROAD-WIDEN FROM 2-4 LANES $21,000

SAN BERNARDINO

LOCAL HIGHWAY

201115 0 THE CHINO-CORONA ROAD IMPROVEMENTS PROJECT IS LOCATED IN THE NEWLY ANNEXED AREA OF THE CITY OF CHINO. IMPROVEMENTS INCLUDE CONSTRUCTION OF A NEW BRIDGE CROSSING OVER MILL CREEK (BOX CULVERT WITH ROAD OVER DRAINAGE) , A NATURAL DRAINAGE SYSTEM OWNED AND MAINTAINED BY UNITED STATES ARMY CORPS OF ENGINEERS ALONG CHINO-CORONA ROAD.

$6,659

SAN BERNARDINO

LOCAL HIGHWAY

201182 0 TIPPECANOE AVENUE FROM 3RD STREET TO 5TH STREET - WIDEN FROM 2-4 LANES (0.3 MILES) FORMERLY PART OF PROJECT ID 200852

$798

SAN BERNARDINO

LOCAL HIGHWAY

200610 0 TIPPECANOE WIDENING PROJECT - BETWEEN MILL AND SANTA ANA RIVER BRIDGE ST. (1.4 MI)-WIDEN FROM 4-6 LANES INCLUD.MEDIAN LANDSCAPE

$2,978

SAN BERNARDINO

LOCAL HIGHWAY

201162 0 VALLEY BOULEVARD FROM BEECH AVENUE TO CITRUS AVENUE WIDEN FROM 4-6 LANES $2,418

Page 118: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

116 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAY201149 0 VALLEY BOULEVARD FROM CHERRY AVENUE TO BEECH AVENUE WIDEN FROM 4-6 LANES $2,418

SAN BERNARDINO

LOCAL HIGHWAY

201163 0 VALLEY BOULEVARD FROM CITRUS AVENUE TO SIERRA AVENUE WIDEN FROM 4-6 LANES $2,418

SAN BERNARDINO

LOCAL HIGHWAY

201165 0 VALLEY BOULEVARD FROM HEMLOCK AVENUE TO BEECH AVENUE WIDEN FROM 4-6 LANES $604

SAN BERNARDINO

LOCAL HIGHWAY

201164 0 VALLEY BOULEVARD FROM SIERRA AVENUE TO ALDER AVENUE WIDEN FROM 4-6 LANES $724

SAN BERNARDINO

LOCAL HIGHWAY

200111 0 VICTOR VALLEY COLLEGE TRANSFER POINT FACILITY - LOCATED 18422 BEAR VALLEY RD. IN VICTORVILLE $823

SAN BERNARDINO

LOCAL HIGHWAY

2011104 0 VICTORIA AVE FROM 3RD ST. TO 6TH ST. - SHOULDER IMPROVEMENTS (NO WIDENING) $3,195

SAN BERNARDINO

LOCAL HIGHWAY

200837 0 VISTA ROAD GRADE SEPARATION-WIDEN 2-4 LANES AND CONSTRUCT GRADE SEPARATION $23,000

SAN BERNARDINO

LOCAL HIGHWAY

200035 0 WABASH AV FROM 5TH ST TO I-10 - CONSTRUCT NEW 2 LANE STREET TO I-10 TO MATCH ON AND OFF RAMPS-CONSTRUCT MISSING LINK (2 LANE IN EACH DIRECTION)-1 MILE

$950

SAN BERNARDINO

LOCAL HIGHWAY

200064 0 WASHINGTON ST FROM RECHE CANYON TO HUNTS LN - ELIMINATE BOTTLENECK ADD NB TURN POCKET;WIDEN 2- 4 LNS ON WASHINGTON FROM RECHE CYN. TO HUNTS LN. USING EXISTING WIDTH;MODIFY SIGNALS

$570

SAN BERNARDINO

LOCAL HIGHWAY

2011103 0 WIDEN 5TH STREET FROM 2 TO 4 LANES BETWEEN DEL ROSA DR AND PALM AVENUE; CONSTRUCT NEW TRAFFIC SIGNAL AT 5TH/CENTRAL INTERSECTION; WIDEN 5TH ST AT SR210 FREEWAY UNDERCROSSING FROM 4 TO 5 LANES; ADD TURN LANE, MODIFY RAMP TERMINI; SHOULDER IMPROVEMENTS ON DEL ROSA DR BETWEEN 3RD ST AND 5TH ST (NO ADDITIONAL LANES);

$14,587

SAN BERNARDINO

LOCAL HIGHWAY

20082402 0 WIDEN BASE LINE BETWEEN CHURCH AVE. AND SEINE AVE. FROM 4-6 LANES (EXCLUDING FREEWAY BRIDGE OVER SR210) $1,200

SAN BERNARDINO

LOCAL HIGHWAY

201136 0 WIDEN FOOTHILL BOULEVARD (OLD STATE ROUTE 66) BETWEEN SAN BERNARDINO ROAD AND VINEYARD AVENUE. REMOVE THE EAST UPLAND UNDERPASS BRIDGE ALSO KNOWN AS THE PACIFIC ELECTRIC RAILROAD BRIDGE, CONSTRCT A NEW PUBLIC TRAIL BRIDGE ALONG THE RAILROAD ALIGNMENT AND ADD A RAISED MEDIAN, STREET LIGHTING, SIDEWALKS AND LANDSCAPING.

$10,632

SAN BERNARDINO

LOCAL HIGHWAY

2011156 0 WILDWOOD CANYON ROAD IMPROVEMENTS - HOLMES TO MESA GRANDE INSTALL LEFT TURN LANE AND CURB AND GUTTER. $120

SAN BERNARDINO

LOCAL HIGHWAY

201135 0 WILSON AVE FROM EAST AVE. TO WARDMAN BULLOCK RD. CONSTRUCTION OF A 2 LANE ROAD (ONE LANE EACH DIRECTION) WITH A RAISED MEDIAN, CURB AND GUTTER, AND STREET LIGHTS.

$4,010

SAN BERNARDINO

LOCAL HIGHWAY

200836 0 YATES RD. FROM .24 MILE NORTH OF CHINQUAPIN TO .02 MILES SOUTH OF FORTUNA (1.5 MILES) -WIDEN 2-4 LANES $4,325

SAN BERNARDINO

LOCAL HIGHWAY

201138 0 YOUNGS CANYON RD. FROM SAN SEVAINE TO CHERRY AVE. CONSTRUCT NEW 4 LANE DIVIDED STREET $3,400

SAN BERNARDINO

LOCAL HIGHWAY

200042 0 YUCAIPA BLVD. FROM 5TH TO 14TH STREET - WIDENING FROM 4-6 LANES $2,200

SAN BERNARDINO

LOCAL HIGHWAY

2011155 0 YUCAIPA BLVD. IMPROVEMENTS - YUCAIPA BLVD FRIN 14TH ST. TO I-10 FREEWAY- WIDEN FROM 4-6 LANES $8,300

Page 119: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 117

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)SAN

BERNARDINOLOCAL

HIGHWAYSBD55012 0 YUCCA LOMA RD. AT SR 18 CONNECTION NEW CONNECTION - CONNECTING YUCCA LOMA RD. AND SR 18 - NEW INTER- SECTION $2,772

SAN BERNARDINO

LOCAL HIGHWAY

SBD55011 0 YUCCA LOMA RD. FROM APPLE VALLEY RD. TO NAVAJO RD. WIDEN EXISTING 2 LANE RD. TO 4 LANE RD. (2 LANES IN EACH DIRECTION) (3 MILES)

$6,500

VENTURA TRANSIT VEN090703 0 ADA PARATRANSIT SERVICE- OPERATING ASSISTANCE $52

VENTURA TRANSIT VEN030612 0 ADA SERVICE - CAPITAL LEASE & OPERATING COST $1,303

VENTURA TRANSIT VEN061006 0 BUS BENCH REPLACEMENT $10

VENTURA TRANSIT VEN090705 0 BUS SHELTER AT CENTRAL AVENUE AND DEL NORTE TRANSFER LOCATION $24

VENTURA TRANSIT VEN101101 0 BUS STOP ENHANCEMENTS FOR THOUSAND OAKS TRANSIT. $50

VENTURA TRANSIT VEN011219 0 BUS WASHER REPLACEMENT $484

VENTURA TRANSIT VEN070203 0 CAMARILLO METROLINK STATION IMPROVEMENTS INCLUDING PLATFORM AND PEDESTRIAN CIRCULATION, PASSENGER STATION BUILDING/RESTROOMS, PLUS RELATED CONSTRUCTION OF NEW SIDING BETWEEN CAMARILLO AND OXNARD.

$4,424

VENTURA TRANSIT VEN090109 0 CAMERA SYSTEM FOR SUPERVISORY AND SUPPORT VEHICLES $30

VENTURA TRANSIT VEN110102 0 CONSTRUCT BUS SHELTER AT ROUTE 33/150 JUNCTION AND ASSOCIATED PEDESTRIAN IMPROVEMENTS; INSTALL PRE-FABRICATED SHELTERS AT VARIOUS OTHER LOCATIONS IN OJAI

$113

VENTURA TRANSIT VEN090501 0 CONSTRUCT NEW TRANSIT MAINTENANCE AND OPERATIONS FACILITY (EARMARK NUMBER E2009-BUS091) $50,000

VENTURA TRANSIT VEN011214 0 DBE GOAL EVALUATION/SETTING CONSULTING SERVICE $58

VENTURA TRANSIT VEN101104 0 DIAL-A-RIDE VEHICLE CAPITAL LEASE $124

VENTURA TRANSIT VEN090107 0 EIGHT (8) CNG-FUELED 25-FOOT TO 40-FOOT BUSES FOR EXPANSION. BUSES WILL BE USED ON ALL GOLD COAST LINES TO REDUCE SPARE RATIO AND INCREASE FREQUENCY WHERE WARRANTED BY DEMAND.

$3,608

VENTURA TRANSIT VEN081001 0 ELDERLY/DISABLED PLANNING INCLUDING PATRON DISABILITY EVALUATION $1,440

VENTURA TRANSIT VEN055401 0 EXPAND TRANSIT MAINTENANCE FACILITY TO ACCOMMODATE SYSTEM EXPANSION $1,907

VENTURA TRANSIT VEN056402 0 EXPANSION OF CNG TIME FILL AND GAS STORAGE $253

VENTURA TRANSIT VEN110111 0 EXTEND OPERATING HOURS FOR THOUSAND OAKS FIXED ROUTE AND DIAL A RIDE SYSTEMS $330

VENTURA TRANSIT VEN090108 0 FAREBOX SYSTEM UPGRADE $600

VENTURA TRANSIT VEN050301 0 FARM RAILROAD CROSSING IMPROVEMENTS IN VENTURA COUNTY $500

VENTURA TRANSIT VEN020902 0 FINANCIAL MANAGEMENT SYSTEM $64

VENTURA TRANSIT VEN090105 0 FIVE LARGE 12 PASSENGER CUTAWAY VEHICLES FOR PARATRANSIT FOR REPLACEMENT $425

VENTURA TRANSIT VEN055406 0 FIVE REPLACEMENT PARATRANSIT VANS $523

VENTURA TRANSIT VEN090115 0 FIVE REPLACEMENT PARATRANSIT VEHICLES FOR CAMARILLO HEALTH CARE DISTRICT $259

VENTURA TRANSIT VEN090202 0 FOUR (4) REPLACEMENT MINIVANS FOR ARC VENTURA COUNTY $180

VENTURA TRANSIT VEN090106 0 FOUR (4) TRANSIT SUPERVISORY VEHICLES AND RELATED EQUIPMENT FOR REPLACEMENT $185

VENTURA TRANSIT SCAG5317 0 FTA SECTION 5317 NEW FREEDOM SCAG ADMINISTRATIVE ASSISTANCE FOR FY 2009-2011. $167

VENTURA TRANSIT VEN020901 0 FUEL TANK REMEDIATION - MTBE PROJECT $96

VENTURA TRANSIT VEN031246 0 GFI FAREBOX REPLACEMENT $288

Page 120: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

118 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA TRANSIT VEN110902 0 GPS UNITS FOR CAMARILLO HEALTH CARE DISTRICT PARATRANSIT VEHICLES IN FISCAL YEAR 2010/11 (5310 INCLUDES $321 TOLL

CREDITS)$3

VENTURA TRANSIT VEN030608 0 GROUPED PROJ FOR RECONSTR OR RENOVATION TRANSIT BUILDNGS/STRUCTURES & REHAB TRANSIT VEH - MOORPARK BUSES & TRANSIT CENTER SCOPE: PROJ ARE CONSISTENT W/H 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT - TRANS VEH REHAB & RECONST OR RENOV TRANSIT BUILDNGS/STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINT FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON-CAPACITY INCREASING)

$1,264

VENTURA TRANSIT VEN090502 0 GROUPED PROJECTS FOR CONSTRUCTION OF SMALL PASSENGER SHELTERS AND INFORMATION KIOSKS - TRANSIT ENHANCEMENTS PROGRAM SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - CONSTRUCTION OF SMALL PASSENGER SHELTERS AND INFORMATION KIOSKS

$151

VENTURA TRANSIT VEN051005 0 GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP - ELDERLY & DISABLED NEW FREEDOMS INITIATIVE (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128,EXEMPT TABLES 2&3- PURCHASE OF NEW BUSES TO REPLACE EXIST VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS 23&49 USC)

$2,434

VENTURA TRANSIT VEN070202 0 GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP - JOBS ACCESS REVERSE COMMUTE PROJECTS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128,EXEMPT TABLES 2&3- PURCHASE OF NEW BUSES TO REPLACE EXIST VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS 23&49 USC)

$4,302

VENTURA TRANSIT VEN54095 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO PARATRANSIT AGENCIES - ADA PARATRANSIT CAPITAL SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$7,633

VENTURA TRANSIT VEN050401 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES - CAMARILLO AREA TRANSIT SCOPE: PROJECTS ARE CON-SISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$5,300

VENTURA TRANSIT VEN010409 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES - EAST COUNTY ADA PARATRANSIT SERVICE SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$1,169

VENTURA TRANSIT VEN34206 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES - FIXED ROUTE SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$14,046

VENTURA TRANSIT VEN34253 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES - OJAI TROLLEY SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$4,118

VENTURA TRANSIT VEN981107 0 GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES ADA SERVICE - PARATRANSIT CAPITAL SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - OPERATING ASSISTANCE TO TRANSIT AGENCIES

$5,103

VENTURA TRANSIT VEN057404 0 GROUPED PROJECTS FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES - REPLACE MAINTENANCE EQUIPMENT SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGO-RIES - PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES

$505

VENTURA TRANSIT VEN091118 0 GROUPED PROJECTS FOR RECON/RENOV O TRANSIT BUILDINGS & STRUCT - CENTRAL MAINTENANCE FACILITY & KELLER STREET YARD SCOPE: PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - RECON/RENOV OF TRANSIT BUILDINGS AND STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE AND MAINTENANCE FACILITIES, STATIONS, TERMINALS, AND ANCILLARY STRUCTURES).(NON-CAPACITY INCREASING)

$960

Page 121: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 119

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA TRANSIT VEN061000 0 GROUPED PROJECTS FOR RECONSTRUCTION OR RENOVATION OF TRANSIT BUILDINGS AND STRUCTURES - CAMARILLO RAIL STATION

MAINT SCOPE: PROJECTS CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 & TABLE 3 CATEGORIES - RECONSTR OR RENOVA-TION OF TRANSIT BUILDINGS & STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINTENANCE FACILITIES, STATIONS, TERMI-NALS, & ANCILLARY STRUCTURES).( NON-CAPACITY INCREASING)

$600

VENTURA TRANSIT VEN030611 0 GROUPED PROJECTS FOR RECONSTRUCTION OR RENOVATION OF TRANSIT BUILDINGS/STRUCTURES & REHABILIATION OF TRANSIT VEHICLES SCOPE: PROJECTS ARE CONSISTENT W/H 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT - TRANS VEH REHAB & RECONST OR RENOV TRANSIT BUILDNGS/STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINT FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON-CAPACITY INCREASING)

$2,378

VENTURA TRANSIT VEN64003 0 GROUPED PROJECTS FOR REHABILITATION OF TRANSIT VEHICLES - FIXED ROUTE & ADA SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - REHABILITATION OF TRANSIT VEHICLES (IN PM10AND PM2.5NONATTAINMENT OR MAINTENANCE AREAS, SUCH PROJECTS ARE EXEMPT ONLY IF THEY ARE IN COMPLIANCE WITH CONTROL MEASURES IN THE APPLICABLE IMPLEMENTATION PLAN)

$14,609

VENTURA TRANSIT VEN981118 0 GROUPED PROJECTS FOR REHABILITATION OF TRANSIT VEHICLES SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - REHABILITATION OF TRANSIT VEHICLES (IN PM10AND PM2.5NONATTAINMENT OR MAIN-TENANCE AREAS, SUCH PROJECTS ARE EXEMPT ONLY IF THEY ARE IN COMPLIANCE WITH CONTROL MEASURES IN THE APPLICABLE IMPLEMENTATION PLAN)

$3,077

VENTURA TRANSIT VEN059401 0 GROUPED PROJECTS LISTING FOR PURCHASE/REHAB OF OPERATING EQUIP - VENTURA COUNTY SMARTCARD SYSTEM MAINTENANCE, REHABILITATION & UPGRADE INCLUDING BUS FLEET CHANGES (DEINSTALLS AND INSTALLS) SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PURCHASE/REHAB OF OPERATING EQUIPMENT FOR VEHICLES (E.G., RADIOS, FAREBOXES, LIFTS, ETC.)

$3,542

VENTURA TRANSIT VEN990609 0 GRPD PROJ REHAB/RECON TRACK STRUCT, TRACK, TRACKBED IN EXT ROW; RECON/RENOV TRANS BLGS/STRUCT;VEH;POWER/SIGNAL COMM EQ SCOPE: PROJ CONS W 40 CFR PART 93.126 EXMPT TABLES 2&3 CAT- RECON/RENOV TRANS BLDINGS/STRUCT;VEH;PWR/SGIN/COMM SYS;REHAB/RENOV TRK STRUC,TRK,TRKBED IN EXT ROW (EG, RAIL/BUS BLDNGS,STORE/MAIN FAC, STATIONS, TERMINALS, & ANCILL STRUCT).NON-CAP INCR.TDCRED=$1,991 10/11, $1,384 11/12

$47,947

VENTURA TRANSIT VEN54036 0 IN VENTURA COUNTY VENTURA INTERCITY SERVICE TRANSIT AUTHORITY (VISTA) CAPITAL LEASE (INCLUDES PURCHASE OF 40 PARTICULATE TRAPS)

$29,551

VENTURA TRANSIT VEN991203 0 INSTALLATION OF ABOVE GROUND HOIST SYSTEM $175

VENTURA TRANSIT VEN110607 0 MAINTENANCE DIAGNOSTIC TOOL $6

VENTURA TRANSIT VEN090201 0 MARKET/VALENTINE INDUSTRIAL PARK SHUTTLE SERVICE ON MARKET STREET, VALENTINE ROAD, AND TELEPHONE ROAD $866

VENTURA TRANSIT VEN54057 0 MARKETING & PASSENGER AWARENESS ACTIVITIES (PLANNING: PROGRAM SUPPORT & ADM) $2,041

VENTURA TRANSIT VEN030609 0 METROLINK STATION SECURITY WALL (TRANSIT ENHANCEMENT) $79

VENTURA TRANSIT VEN030610 0 MILLS RD AT MAPLE ST - TWO BUS TURNOUTS WITH BUS SHELTERS, BIKE RACKS, BENCHES, & OTHER BUS STOP AMENITIES $450

VENTURA TRANSIT VEN061007 0 MILLS ROAD AT MAPLE ADJACENT TO PACIFIC VIEW MALL - BUS TURNOUTS WITH BUS SHELTERS, AND OTHER BUS STOP AMENITIES $359

VENTURA TRANSIT VEN057414 0 MIS EQUIPMENT REPLACE/UPGRADE $114

VENTURA TRANSIT VEN090708 0 MODERNIZE TRANSIT OPERATIONS FACILITY $2,091

VENTURA TRANSIT VEN090111 0 MODERNIZE, UPGRADE, AND REHABILITATE SIMI VALLEY TRANSIT OPERATIONS CENTER AND GARAGE (INCLUDES TRANSPORTATION DEVEL CREDITS OF $25).

$781

Page 122: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

120 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA TRANSIT VEN110605 0 MOORPARK RAIL STATION UPGRADES INCLUDING PLANTING/IRRIGATION UPGRADE, TICKET MACHINES RELOCATION, STRIPING AND

PAINTING, LIGHTING IMPROVEMENTS$59

VENTURA TRANSIT VEN051202 0 MULTI-AGENCY TRANSPORTATION / VEHICLE FACILITY (INCLUDING OJAI TROLLEY MAINTENANCE FACILITY) $312

VENTURA TRANSIT VEN040405 0 NEXT BUS UPGRADE FOR REAL-TIME BUS STOP SIGNAGE (TRANSIT ENHANCEMENTS) $868

VENTURA TRANSIT VEN031203 0 ONE (1) CNG PARATRANSIT VAN FOR EXPANSION $100

VENTURA TRANSIT VEN081003 0 ONE (1) FIXED-ROUTE BUS FOR REPLACEMENT $112

VENTURA TRANSIT VEN091202 0 ONE (1) REPLACEMENT COLOR LASER JET PRINTER $4

VENTURA TRANSIT VEN110901 0 ONE EXPANSION MINIVAN IN FISCAL YEAR 10/11 FOR HELP OF OJAI (5310 INCLUDES $5,047 OF TOLL CREDITS) $44

VENTURA TRANSIT VEN055410 0 ONE EXPANSION PARATRANSIT VAN $121

VENTURA TRANSIT VEN055413 0 ONE EXPANSION PARATRANSIT VAN $128

VENTURA TRANSIT VEN090709 0 OPERATING ASSISTANCE - METROLINK $582

VENTURA TRANSIT VEN110108 0 OPERATING ASSISTANCE - VINEYARD AVENUE LINE THREE YEAR DEMONSTRATION (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDIT OF $195.)

$1,701

VENTURA TRANSIT VEN011221 0 PAINT 4 CNG BUSES $35

VENTURA TRANSIT VEN54056 0 PLANNING/IMPLEMENTATION OF COORDINATED PARATRANSIT $786

VENTURA TRANSIT VEN090117 0 POSITIVE TRAIN CONTROL SYSTEM - VENTURA COUNTY FUNDING SHARE OF FIVE-COUNTY PROJECT ALSO IN L.A., ORANGE, RIVERSIDE AND SAN BERNARDINO COUNTIES

$2,480

VENTURA TRANSIT VEN090104 0 PURCHASE 3 REPLACEMENT BUSES. $1,260

VENTURA TRANSIT VEN081004 0 PURCHASE ONE (1) EXPANSION DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE $100

VENTURA TRANSIT VEN090701 0 PURCHASE ONE (1) EXPANSION DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE. $100

VENTURA TRANSIT VEN110606 0 PURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS $130

VENTURA TRANSIT VEN090702 0 PURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT $100

VENTURA TRANSIT VEN081005 0 PURCHASE ONE (1) REPLACEMENT DIAL-A-RIDE BUS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE $100

VENTURA TRANSIT VEN090707 0 PURCHASE TWO (2) WHEELCHAIR-SIZE SCALES FOR USE IN ADA CERTIFICATION $10

VENTURA TRANSIT VEN110110 0 PURCHASE TWO CNG TRANSIT BUSES FOR REPLACEMENT AND TWO TRANSIT SERVICE VEHICLES FOR EXPANSION PLUS ADDITIONAL FARE EQUIPMENT (CMAQ INCLUDES TRANSIT DEVELOPMENT CREDITS OF $53 IN FY 2011/12)

$1,139

VENTURA TRANSIT VEN031218 0 REALIGN MOORPARK RAIL STATION SOUTH PARKING LOT ENTRANCE $932

VENTURA TRANSIT VEN110604 0 REPLACE FAREBOXES AND INSTALL AUTOMATIC STOP ANNUNCIATORS $127

VENTURA TRANSIT VEN031242 0 REPLACE GARAGE CNG BUS HOISTS (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDITS OF $13.) $113

VENTURA TRANSIT VEN061008 0 REPLACE MAINTENANCE MIS EQUIPMENT $500

VENTURA TRANSIT VEN110603 0 REPLACE PHONE SYSTEM FOR DIAL-A-RIDE CALL-IN CENTER $69

VENTURA TRANSIT VEN051207 0 REPLACE TWENTY-EIGHT (28) COMPUTERS $63

VENTURA TRANSIT VEN090110 0 REPLACE/UPGRADE TRANSIT SHELTERS AND ADD NEW SHELTERS $484

VENTURA TRANSIT VEN091204 0 REPLACEMENT ENGINE FOR CNG BUS $20

VENTURA TRANSIT VEN091203 0 REPLACEMENT ENGINE FOR CNG PARATRANSIT VAN $8

VENTURA TRANSIT VEN031241 0 SAFETY AND SECURITY PLANNING AND TRAINING $10

Page 123: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 121

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA TRANSIT VEN057416 0 SCHEDULING / RUN CUTTING SYSTEM $150

VENTURA TRANSIT VEN100101 0 SIMI VALLEY / MOORPARK METROLINK GRADE CROSSING IMPROVEMENTS (FY 10 TRANSPORATION APPROPRIATION HIGH SPEED RAIL GRADE CROSSING DEMO FUND)

$750

VENTURA TRANSIT VEN010406 0 SMART CARD DATA MANAGEMENT $1,666

VENTURA TRANSIT VEN070204 0 SMARTCARD UPGRADE $420

VENTURA TRANSIT VEN110109 0 THOUSAND OAKS TRANSIT CENTER PARKING LOT EXPANSION AND OTHER IMPROVEMENTS - EXPAND PARKING LOT BY APPROXIMATELY 77 SPACES, INSTALL ASSOCIATED LANDSCAPING, AND UPGRADE TRANSIT CENTER LIGHTING

$231

VENTURA TRANSIT VEN090114 0 THREE (3) FIXED-ROUTE CNG BUSES FOR REPLACEMENT (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDITS OF $17.) $1,530

VENTURA TRANSIT VEN101103 0 THREE (3) MINIVANS FOR CAMARILLO AREA TRANSIT DIAL-A-RIDE SYSTEM EXPANSION $150

VENTURA TRANSIT VEN055412 0 THREE (3) REPLACEMENT PARATRANSIT VANS (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDIT OF $36 IN FY 10/11.) $317

VENTURA TRANSIT VEN011223 0 THREE (3) REPLACEMENT UTILITY VANS $105

VENTURA TRANSIT VEN090116 0 THREE FIXED-ROUTE BUSES FOR REPLACEMENT - OJAI TROLLEY $466

VENTURA TRANSIT VEN055409 0 THREE REPLACEMENT PARATRANSIT VANS - CARRYOVER FROM PRIOR YEAR $302

VENTURA TRANSIT VEN051203 0 TITLE VI SURVEYS $50

VENTURA TRANSIT VEN54069 0 TRANSIT INFORMATION CENTER $1,581

VENTURA TRANSIT VEN031244 0 TRANSIT MARKETING $30

VENTURA TRANSIT VEN101102 0 TRANSIT MARKETING $50

VENTURA TRANSIT VEN54070 0 TRANSIT MARKETING (CMAQ INCLUDES TRANSP DEVEL CREDITS OF $57 IN 10/11.) $2,509

VENTURA TRANSIT VEN110601 0 TRANSIT MARKETING FOR THOUSAND OAKS TRANSIT $38

VENTURA TRANSIT VEN081002 0 TRANSIT OPERATIONS FACILITY EXPANSION FOR THOUSAND OAKS TRANSIT $1,000

VENTURA TRANSIT VEN990602 0 TRANSIT PLANNING & PROGRAMMING (PLANNING: PROGRAM SUPPORT & ADM) $1,935

VENTURA TRANSIT VEN110602 0 TRANSIT PLANNING FOR THOUSAND OAKS TRANSIT $25

VENTURA TRANSIT VEN34348 0 TRANSIT PROGRAMMING & PLANNING $2,241

VENTURA TRANSIT VEN54149 0 TWO-WAY RADIO SYSTEM REPLACEMENT $125

VENTURA TRANSIT VEN54115 0 VISTA BUS SYSTEM PLANNING $1,679

VENTURA STATE HIGHWAY

VEN051213 23 IN MOORPARK RTE 23 MOORPARK AVE FROM THIRD ST TO CASEY RD WIDEN FROM 1 LANE IN EACH DIRECTION TO 1 LANE NB AND 2 LANES SB. REALIGN FIRST ST/POINDEXTER INTERSECTION AND UPGRADE RAIL CROSSING.

$2,095

VENTURA STATE HIGHWAY

VEN110114 34 IN CAMARILLO LEWIS ROAD FROM PLEASANT VALLEY ROAD TO DAWSON DRIVE LANDSCAPING ENHANCEMENT $1,300

VENTURA STATE HIGHWAY

VEN040401 34 IN OXNARD AT RICE AVE. RAILROAD GRADE SEPARATION $12,327

VENTURA STATE HIGHWAY

VEN050404 101 AT CENTRAL AVENUE - LANDSCAPING ENHANCEMENTS $600

VENTURA STATE HIGHWAY

VEN54020 101 IN CAMARILLO CONSTRUCT AIRPORT NORTH (SPRINGVILLE) INTERCHANGE (CONNECTING FUTURE EXTENSIONS OF VERDULERA ST & PONDEROSA DR) INTERSECTING US 101

$40,000

Page 124: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

122 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA STATE

HIGHWAYVEN051210 101 IN CAMARILLO RECONFIGURE CENTRAL AVENUE / ROUTE 101 INTERCHANGE (INCLUDES CENTRAL AVE BRIDGE WIDENING FROM 1 TO 2

LANES EACH DIRECTION)$37,861

VENTURA STATE HIGHWAY

VEN031226 101 IN CAMARILLO ROUTE 101 AT PLEASANT VALLEY ROAD IMPROVE INTERSECTION WITH SOUTHBOUND RAMPS - WIDEN ONRAMP ENTRANCE FROM 1 TO 2 LANES AND ADD TURN LANES

$1,053

VENTURA STATE HIGHWAY

VEN051006 101 IN OXNARD AT DEL NORTE BOULEVARD - IMPROVE INTERCHANGE, WIDEN DEL NORTE BRIDGE OVER 101 (FROM VENTURA BLVD TO RTE 101 SB RAMPS) FROM 2 TO 4 LANES PLUS LEFT-TURN LANE. ADD NB LOOP ONRAMPS AND REALIGN AND IMPROVE OTHER RAMPS.

$56,706

VENTURA STATE HIGHWAY

343 101 IN OXNARD AT RICE AVE (SANTA CLARA) RECONSTRUCT INTERCHANGE (T21-#664) (SAFETEA-LU #1565) (SAFETEA-LU #2639 AND ‘TIP’) (TCSP - 2010 APPROP EARMARK)

$83,977

VENTURA STATE HIGHWAY

VEN053402 101 IN OXNARD LANDSCAPING/IRRIGATION ENHANCEMENTS SOUTH SIDE OF ROUTE 101 AT DEL NORTE - REGIONAL STP INCLUDES $9 OF TOLL CREDITS FOR FY 10/11 PE

$694

VENTURA STATE HIGHWAY

VEN011205 101 IN THOUSAND OAKS - IMPROVEMENTS AT VAR LOCATIONS LA CNTY LINE-MOORPARK RD: CONV AUX LANES TO MF LANES, ADD 1 LANE EACH DIRECTION BY SHIFTING CL NORTHWARDS & WIDENING ON NB SIDE, REALIGN & WIDEN RAMPS, CONSTR SOUNDWALLS (EA 19521, 19522), WIDEN 3 BRIDGES ON NORTHSIDE (HAMPSHIRE UC, CONEJO SCHOOL UC, & MOORPARK UC); IMPROVE 101/23 CONNECTORS.(STP=FY 2010 APPROPS EARMARK)(INCL RT 23 PM 3.3/3.8)

$60,342

VENTURA STATE HIGHWAY

VEN070201 101 NEAR MUSSEL SHOALS ADD 1 HOV LANE EACH DIR FROM MOBIL PIER ROAD UC TO S/O CASITAS PASS RD IN SANTA BARBARA CO. (PM R 39.8 TO 2.2). HOV LANES ARE PROPOSED TO BE PART-TIME (AM & PM PEAK PERIODS) ONLY. EXTEND ON/OFF-LANES AT MUSSEL SHOALS & LA CONCHITA FOR BETTER ACCEL AND DECEL; KEEP AS SINGLE LANES. CLOSE EXISTING 3 MEDIAN OPENINGS LOCATED NEAR LA CONCHITA AND MUSSEL SHOALS AND TANK FARM.

$87,760

VENTURA STATE HIGHWAY

VEN010202 101 RECONFIGURE N/B CALIFORNIA ST OFFRAMP (RECONFIGURE RAMP TO TERMINATE AT OAKS ST INSTEAD OF THE CURRENT CALIFORNIA ST LOCATION)

$24,720

VENTURA STATE HIGHWAY

VEN110301 101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PH 2 INCLUDING WENDY DRIVE BRIDGE SOUTHBOUND WIDENING ACROSS ROUTE 101; SB OFF-RAMP IMPROVEMENT TO WIDEN FROM 1 TO 2 LANES AT WENDY DRIVE INTERSECTION TO PROVIDE TURN LANE (RAMP TO REMAIN 1 LANE EXITING FREEWAY) TOLL CREDIT = $88 FOR CON SPLIT FROM VEN056406

$6,300

VENTURA STATE HIGHWAY

VEN110302 101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PH 3 IMPROVE SB ONRAMP (SPLIT FROM VEN056406) $3,587

VENTURA STATE HIGHWAY

VEN056406 101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PHASE I INCLUDING WENDY DRIV BRIDGE NB WIDENING ACROSS ROUTE 101; NB RAMP IMPROVEMENTS; INTERSECTION IMPROVEMENTS; SIGNAL MOD (OTHER PHASES SPLIT TO VEN110301 & VEN110302.) TOLL CREDIT = $77 FOR CON

$6,271

VENTURA STATE HIGHWAY

VEN34089 118 IN MOORPARK L.A. AVE FROM ROUTE 23 (MOORPARK AVE) TO E/O SPRING CONSTRUCT SIDEWALKS, REALIGN ROADWAY AND WIDEN FROM 4 TO 6 LANES

$1,158

VENTURA STATE HIGHWAY

12020 118 IN MOORPARK LOS ANGELES AVE WIDEN FROM 4 TO 6 LANES BETWEEN MAUREEN AND LETA YANCY $950

VENTURA STATE HIGHWAY

VEN071106 118 IN SIM VLY WIDEN RTE 118 WB LA CONTY LN TO TAPO CYN FR 3 TO 4 LANES (TAPO CYN TO KUEHNER) AND FR 4 TO 5 LANES (KUEHNER TO COUNTY LN); WIDEN EB TAPO CYN TO TAPO FR 3 TO 4 LANES; WIDEN EB KUEHNER TO LA CNTY LINE FR 4 TO 5 LAN

$29,717

VENTURA STATE HIGHWAY

VEN070804 118 IN SIMI VALLEY LANDSCAPE ENHANCEMENTS AT FIRST STREET. $1,500

VENTURA STATE HIGHWAY

VEN051003 118 IN SIMI VALLEY LANDSCAPE ENHANCEMENTS FROM WESTERN CITY LIMIT TO EASTERN CITY LIMIT. $1,400

Page 125: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 123

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA STATE

HIGHWAY6566 118 NEAR SIMI VALLEY AT ALAMOS CYN RD ADD RAMPS $2,560

VENTURA STATE HIGHWAY

VEN080401 118 ROUTE 118 FROM ROUTE 126 IN VENTURA TO ROUTE 23 IN MOORPARK - PLANNING/FEASIBILITY STUDY OF POTENTIAL IMPROVEMENTS. TCSP EARMARK 08CA005 EA 28750 PPNO 4407

$271

VENTURA STATE HIGHWAY

VEN110113 150 IN SANTA PAULA TEN STREET FROM SANTA PAULA STREET TO ROUTE 126 - LANDSCAPING/AESTHETIC ENHANCEMENTS, PEDESTRIAN & BICYCLE AMENITIES AND IMPROVEMENTS (RIP-TE INCLUDES TOLL CREDITS OF $6 FOR 11/12 PE, $63 FOR 12/13 CON, TOTAL OF $69.)

$600

VENTURA STATE HIGHWAY

VEN54187 999 2% FOR PLANNING, PROGRAMMING, & MONITORING $2,395

VENTURA STATE HIGHWAY

VENLS01 999 GROUPED PROJ FOR SAFETY IMPROV - SHOPP COLLISION REDUCT PROJ CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 & TABLE 3 CAT - RR/HWY XING, SAFER NON-FED-AID SYS RDS, SHOULDER IMPROV, TRAFF CONTROL DEV & OPER ASSIST OTH THAN SIGNALIZATION PROJ, INTRSCTION SIGNALIZATION PROJ @ INDIVI INTERSECTIONS, PAVEMNT MARKING DEMO, TRUCK CLIMB LANES OUTSIDE URB AREAS, LIGHTNG IMPROV, EMERGENCY TRUCK PULLOVERS

$2,625

VENTURA STATE HIGHWAY

VENLS05 999 GROUPED PROJ FOR SAFETY IMPROV-SHOPP MOBILITY PROG PROJ CONSISTENT W/ 40 CFR PT 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT - RR/HWY XING, SAFER NON-FED-AID SYS RDS, SHOULDER IMPROV, TRAFF CONTRL DEVS & OPERATING ASSIST OTHER THAN SIG-NALIZATION PROJ, INTERSECTION SIGNALIZATION PROJ @ INDIV INTERSECTIONS, PAVEMENT MARKING DEMO, TRUCK CLIMBING LANES OUTSIDE URB AREA, LIGHTING IMPROV, EMER TRUCK PULLOVERS

$3,899

VENTURA STATE HIGHWAY

VENLS08 999 GROUPED PROJ LISTING MANDATES (SCOPE: PROJ CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 &3 CAT - RR/HWY XING, SAFER NON-FED-AID SYSTEM RDS, SHOULDER IMPR, TRAFFIC CONTROL DEVICES & OPER ASSISTANCE OTH THAN SIGNALIZATION PROJ, INTERSECTION SIGNALIZATION PROJ AT INDIVID INTERSECTIONS, PAVEMENT MARKING DEMO, TRUCK CLIMBING LANES OUTSIDE URBANIZED AREA, LIGHTING IMPROV, EMER TRUCK PULLOVERS)

$984

VENTURA STATE HIGHWAY

VENLS03 999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - SHOPP PROGRAM COPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

$16,521

VENTURA STATE HIGHWAY

VENLS10 999 GROUPED PROJECTS FOR EMERGENCY REPAIR - SHOPP EMERGENCY RESPONSE PROGRAM SCOPE: PROJ CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - REPAIR DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS. THIS APPLIES TO DAMAGES THAT DON’T QUALIFY FOR FED EMER RELIEF FUNDS OR TO DAMAGES THAT QUALIFY FOR FED EMER RELIEF FUNDS BUT EXTEND BEYOND THE FED-DECLARED DISASTER PERIOD

$23,197

VENTURA STATE HIGHWAY

VENLS06 999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION - CALTRANS MINOR PROGRAM SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATION

$3,341

VENTURA STATE HIGHWAY

VENLS02 999 GROUPED PROJECTS LISTING FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM - ROADWAY PRESERVATION PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126 EXEMPT TABLES 2 & 3 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATON)

$145,562

VENTURA LOCAL HIGHWAY

VEN090504 0 1000’ E. OF ROUTE 126/CTR ST TO 0.75 MILE WEST OF RANCHO CAMULOS CONSTRUCT BIKE/PED PATH FOR 1.2 MILES IN SANTA PAULA BRANCH ROW (PHASE III OF PIRU/CAMULUS PROJECT, SPLIT FROM VEN990310)

$1,018

VENTURA LOCAL HIGHWAY

VEN990310 0 1000’ E. OF RTE 126/CTR ST/RANCHO CAMULOS PIRU CRK BRIDGE (PHASE I & IV) FENCING RE-LAY TRK, INSTALL PLATFRM @ RANCHO CAMULOS (VEN070101) , BIKE/PED PATH FROM 0.75 MILE WEST OF RANCHO CAMULOS TO RANCHO CAMULOS. (BIKE/PED PATH ALSO IN VEN090504.)

$6,000

Page 126: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

124 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA LOCAL

HIGHWAYVEN050402 0 ADOLFO ROAD EASTBOUND AT SANTA ROSA ROAD - ADD DUAL LEFT AND RIGHT TURN LANES (TOLL CREDITS = $135 FOR FY 10/11 CON) $1,177

VENTURA LOCAL HIGHWAY

VEN54164 0 BICYCLE & PEDESTRIAN TRAIL EXTENSION: FOX CYN BARRANCA FROM RT 150 TO OJAI VALLEY TRAIL $148

VENTURA LOCAL HIGHWAY

VEN990319 0 CALIFORNIA ST BRIDGE OVER RT 101 PEDESTRIAN ENHANCEMENTS $1,671

VENTURA LOCAL HIGHWAY

VEN050403 0 CALLEGUAS BIKE PATH - CONSTRUCT CLASS I BIKE PATH FOR 0.7 MILES FROM ADOLFO ROAD TO THE ROUTE 101 FREEWAY, WITH CONNECTION TO NEW TRAIL AT VILLAGE AT THE PARK (PHASE II). (CMAQ INCLUDES $191 IN TOLL CREDITS FOR 11/12 CONSTRUCTION.)

$2,083

VENTURA LOCAL HIGHWAY

VEN110106 0 CALLEGUAS CREEK BIKE PATH PHASE 4 - SOUTH SIDE OF ROUTE 101 FROM PETIT STREET TO CALLEGUAS CREEK / VILLAGE AT THE PARK DRIVE - CONSTRUCT APPROXIMATELY 3500 FOOT CLASS I BIKE PATH

$400

VENTURA LOCAL HIGHWAY

VEN110105 0 CALLEGUAS CREEK BIKE TRAIL PHASE 3 - CONSTRUCT 3800 FOOT BIKE PATH ALONG WEST SIDE OF CALLEGUAS CREEK FROM ROUTE 101 TO PLEASANT VALLEY ROAD

$700

VENTURA LOCAL HIGHWAY

VEN054605 0 CONEJO CREEK PARK BIKE PATH - CLASS I BIKE PATH FOR 1.4 MILES IN CONEJO CREEK PARK FROM ROUTE 23 TO JANSS ROAD AND PAIGE LANE

$1,601

VENTURA LOCAL HIGHWAY

VEN110304 0 CONSTRUCT 300-FOOT CLASS I BIKE PATH FROM SHERIDAN WAY TO VENTURA RIVER BIKE TRAIL - CMAQ INCLUDES TOLL CREDIT OF $6 FOR PE AND $23 FOR CON

$250

VENTURA LOCAL HIGHWAY

VEN071104 0 CONSTRUCT PONDEROSA EXTENSION FROM EARL JOSEPH TO VENTURA BLVD INCLUDING BIKE LANES (SPLIT FROM PROJECT 07-VEN990305)

$5,114

VENTURA LOCAL HIGHWAY

VEN053403 0 EAST VENTURA BOULEVARD FROM NYLAND AVENUE TO EAST OF ALMOND DRIVE - LANDSCAPE ENHANCEMENT, PEDESTRIAN AND BICYCLE FACILITIES, DRAINAGE IMPROVEMENT AND PAVEMENT REHABILITATION

$3,100

VENTURA LOCAL HIGHWAY

VEN110308 0 ERBES ROAD FROM FALMOUTH TO THOUSAND OAKS BLVD (3900’) CONSTRUCT CLASS II BIKE LANES, SIDEWALK/DRAINAGE IMPROVEMENTS, EXTEND TURN LANES AT INTERSECTION OF ERBES/HILLCREST

$5,600

VENTURA LOCAL HIGHWAY

VEN031212 0 EXPAND TRAFFIC SIGNAL COORDINATION SYSTEM $450

VENTURA LOCAL HIGHWAY

VEN54168 0 FACILITY INCL BIKEWAY/WALKWAY FROM SANTA PAULA CREEK TO PECK RD FENCING, LANDSCAPING, BRIDGE & DRAINAGE, PUBLIC ACCESS POINTS/ SAFETY ITEMS

$4,094

VENTURA LOCAL HIGHWAY

VENLS07 0 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION - HBP PROGRAM SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

$9,358

VENTURA LOCAL HIGHWAY

VEN54032 0 GROUPED PROJECTS FOR PAVEMNT RESURFACING AND/OR REHABILITATION - LOCAL STREETS & ROADS SCOPE: PROJECTS ARE CON-SISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES - PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADD TRAV LANES) TOLL CRED FOR CON FY11=160, FY12=87, FY13=148, FY14=217.

$29,867

VENTURA LOCAL HIGHWAY

VEN056407 0 HILLCREST DRIVE FROM TELLER ROAD TO CONEJO BLVD - CLASS II BIKE LANES $284

VENTURA LOCAL HIGHWAY

VEN011202 0 HUENEME RD FROM OXNARD CITY LIMITS TO RICE RD - WIDEN FROM 2 TO 4 LANES $6,953

Page 127: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 125

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA LOCAL

HIGHWAYVEN54019 0 IN CAMARILLO ADOLFO RD EXTENSION EXTEND ROAD EASTERLY TO CAMARILLO SPRINGS RD/US 101 (TWO-LANE UNDIVIDED ROAD) $11,358

VENTURA LOCAL HIGHWAY

VEN110306 0 IN MEINERS OAKS ON LOMITA AVENUE FROM RICE RD TO S LOMITA AVE CONSTRUCT 1.5 MILE CLASS III BIKE ROUTE $309

VENTURA LOCAL HIGHWAY

VEN34095 0 IN OXNARD COLONIA RD/CAMINO DEL SOL RT 1 TO ENTRADA DR CONSTRUCT 4 LANES $10,269

VENTURA LOCAL HIGHWAY

VEN34094 0 IN OXNARD HUENEME RD SAVIERS TO ARCTURUS WIDEN AND CONSTRUCT FROM 2 TO 4 LANES (SAFETEA-LU PROJECT #2639 & ‘TIP’) $3,616

VENTURA LOCAL HIGHWAY

VEN053401 0 INSTALL INTERCONNECT CABLE TO CONNECT SIGNALIZED INTERSECTIONS AT VARIOUS LOCATIONS THROUGHOUT THE CITY $500

VENTURA LOCAL HIGHWAY

VEN031216 0 INSTALL NEW SIGNALS AT INTERSECTION OF PALM AVENUE AND ROUTE 126 EB OFF-RAMP, AND TENTH STREET AND ROUTE 126 EB OFF-RAMP

$558

VENTURA LOCAL HIGHWAY

VEN051211 0 LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES $4,417

VENTURA LOCAL HIGHWAY

VEN090503 0 LYNN ROAD FROM HILLCREST DRIVE TO AVENIDA DE LOS ARBOLES CONSTRUCT CLASS II BIKE LANES FOR 3 MILES (TEA21#221). $1,251

VENTURA LOCAL HIGHWAY

VEN056403 0 LYNN ROAD FROM ROUTE 101 TO AVENIDA DE LAS FLORES SIGNAL SYNCHRONIZATION IMPROVEMENT (PHASE III) $460

VENTURA LOCAL HIGHWAY

VEN040501 0 NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS - CON PHASE (PE & ROW IN 07-VEN54122) - INCL FINANCE COST

$50,265

VENTURA LOCAL HIGHWAY

VEN54122 0 NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS - PE AND ROW PHASES (CON IN 07-VEN040501) -- PHASE I

$3,362

VENTURA LOCAL HIGHWAY

VEN110303 0 NEAR DEL NORTE ON SANTA CLARA AVENUE FROM CENTRAL TO ROUTE 118 CONSTRUCT 2.98 MILES OF CLASS II BIKE LANES $1,100

VENTURA LOCAL HIGHWAY

VEN090102 0 NEW SIGNAL AT KIMBALL ROAD AND FOOTHILL ROAD $500

VENTURA LOCAL HIGHWAY

VEN010203 0 OJAI VALLEY BIKE TRAIL EXTENSION/FULTON ST EXTENSION (STP INCLUDES TOLL CREDITS OF $54 FOR FY 2010/11 CON.) $611

VENTURA LOCAL HIGHWAY

VEN110104 0 OJAI VALLEY BIKE TRAIL NEAR CASITAS SPRINGS - REPLACE DRY-WEATHER CROSSING WITH 790-FOOT BRIDGE OVER SAN ANTONIO CREEK

$1,820

VENTURA LOCAL HIGHWAY

VEN051002 0 OLSON ROAD WIDENING FROM FOUR TO SIX LANES FROM PRESIDENTIAL DRIVE TO SIMI VALLEY CITY LIMIT, 2700 FEET $2,984

VENTURA LOCAL HIGHWAY

VEN990317 0 OXNARD BLVD 5TH/VINEYARD & ON 5TH ST (RT 34) OXNARD BLVD/ROSE AVE CONSTRUCT NEW BICYCLE & PEDESTRIAN FACILITIES 1.5 MILES IN LENGTH

$4,589

VENTURA LOCAL HIGHWAY

VEN110305 0 PONDEROSA DRIVE FROM ARNEILL TO LAS POSAS REPLACE AND UPGRADE SIDEWALK, CURB AND GUTTER, MEDIAN, LANDSCAPING, TREES AND IRRIGATION

$717

VENTURA LOCAL HIGHWAY

VEN110307 0 PONDEROSA DRIVE FROM LANTANA TO 200’ E OF CARMEN CONSTRUCT ENHANCED HARDSCAPE, LANDSCAPE, AND IRRIGATION - RIP-TE INCLUDES TOLL CREDIT OF $46 FOR CON

$460

Page 128: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

126 Project List

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VENTURA LOCAL

HIGHWAYVEN051004 0 RECONSTRUCT AND DEEP LIFT ASPHALT ON VARIOUS ROADS IN VENTURA COUNTY WITHIN CONGRESSIONAL DISTRICT 24 $6,000

VENTURA LOCAL HIGHWAY

VEN93017 0 REGIONAL RIDESHARE PROGRAM FOR 10/11, 11/12, 12/13, 13/14, 14/15, & 15/16 $4,465

VENTURA LOCAL HIGHWAY

VEN071105 0 REIMBURSEMENT OF LEWIS ROAD WIDENING ADVANCE CONSTRUCTION FUNDS PAID WITH LOCAL BONDS (PROJECT 07-VEN040501) $23,000

VENTURA LOCAL HIGHWAY

VEN051401 0 ROUTE 126 AND SANTA PAULA BRANCH RAILROAD AT POLE CREEK - CLASS I BIKE PATH UNDERCROSSING 0.2 MILES IN LENGTH (CMAQ INCLUDES $8 TOLL CREDITS FOR PE.)

$1,395

VENTURA LOCAL HIGHWAY

VEN031229 0 ROUTE 126 BIKE PATH - PHASE II BIKE PATH (CLASS I) CROSSING THE HARMON BARRANCA -(INCLUDES $221 OF CMAQ PROVIDING MATCH THROUGH TOLL CREDITS)

$1,930

VENTURA LOCAL HIGHWAY

VEN031230 0 ROUTE 126 BIKE PATH PHASE III BIKE PATH (CLASS I) PARALLEL AND SOUTH OF ROUTE 126 0.3 MILES FROM PARRISH TO BACH (ADJACENT TO IMPERIAL MOBILE HOME PARK) - CMAQ INCLUDES TOLL CREDITS OF $11 FOR PE, $7 FOR ROW, AND $96 FOR CON

$1,000

VENTURA LOCAL HIGHWAY

VEN040502 0 SANTA ROSA ROAD FROM UPLAND ROAD TO WOODCREEK ROAD WIDEN FROM TWO TO FOUR LANES AND ADD BIKE LANES $2,113

VENTURA LOCAL HIGHWAY

VEN031205 0 SIMI VALLEY BIKE PATH CLASS I 1400-FOOT CONNECTION FROM METROLINK STATION TO STEARNS STREET. (CMAQ INCLUDES TOLL CREDITS OF $23 FOR 2010/11 CON.)

$254

VENTURA LOCAL HIGHWAY

VEN990341 0 SURFERS’ POINT BIKE PATH RESTORATION RESTORE 0.8 KM BIKEWAY SEGMENT DESTROYED BY STORMS ENVIRONMENTAL $1,964

VENTURA LOCAL HIGHWAY

VEN110107 0 THOUSAND OAKS COMMUNITY TRANSPORTATON CENTER PARK & RIDE LOT - LANDSCAPING EHANCEMENTS & BIKE RACKS $180

VENTURA LOCAL HIGHWAY

VEN090101 0 TRAFFIC SIGNAL IMPROVEMENTS AT VARIOUS LOCATIONS $740

VENTURA LOCAL HIGHWAY

VEN110112 0 VICTORIA AVENUE FROM GUM TREE ST TO GONZALES RD SIDEWALK AND DRAINAGE IMPROVEMENTS, RESTRIPING TO PROVIDE THREE NB THROUGH LANES AND BIKE LANE

$1,100

VENTURA LOCAL HIGHWAY

VEN051201 0 WEST LOS ANGELES AVENUE FROM WEST CITY LIMIT TO EASY STREET 0.4 MILE CLASS II BIKE LANES - CMAQ INCLUDES $228 OF TOLL CREDITS FOR 11/12 CON.

$1,986

VARIOUS TRANSIT SCAG5316 0 FTA SECTION 5316 JOB ACCESS AND REVERSE COMMUTE ADMINISTRATIVE ASSISTANCE FOR FY 2009, 2010 AND 2011. $200

VARIOUS STATE HIGHWAY

SCAG206 999 GROUPED PROJECTS FOR EMERGENCY REPAIR PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 1 & 3 CATEGORIES - REPAIR OF DAMAGE CAUSED BY NATURAL DISASTERS, CIVIL UNREST, OR TERRORIST ACTS, EXCEPT PROJECTS INVOLVING SUBSTANTIAL FUNCTIONAL, LOCATIONAL OR CAPACITY CHANGES.

$4,500

VARIOUS LOCAL HIGHWAY

SCAG205 0 GROUPED PROJECTS FOR RAILROAD/HIGHWAY CROSSING -- PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGOIRES - RAILROAD/HIGHWAY CROSSING.

$4,241

VARIOUS LOCAL HIGHWAY

SCAG015 0 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - HSIP PROGRAM PROJECTS CONSISTENT WITH 40 CFR PART 93.126.TABLES 2 & 3 CATEGORIES - RAILROAD/HIGHWAY CROSSING, SAFER ONO-FEDERAL-AID SYSTEM ROADS, SHOULDER IMPROVEMENTS, TRAFFIC CONTROL DEVICES & OPERATING ASSISTANCE OTHER THAN SIGNALIZATION PROJECTS, INTERSECTION SIGNALIZATION PROJECTS AT INDIVIDUAL INTERSECNS, PAVEMENT MARKING DEMO

$120,000

Page 129: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 127

FTIP ProjectsCounty System FTIP ID Route Description Project Cost

($1,000’s)VARIOUS LOCAL

HIGHWAYSCAG016 0 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS - SAFE ROUTES TO SCHOOL PROGRAM (SRTS) PROJECTS CONSISTENT WITH 40

CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEOGRIES - RAILROAD/HWY CROSSING, SAFER NON-FEDERAL-AID SYSTEM RDS, SHOULDER IMP, TRAFFIC CONTROL DEVICES , INTERSECTIPN SIGNALIZATION & INDIVIDUAL INTERSECTIONS, PAVEMT MARKING DEMO.

$26,170

VARIOUS LOCAL HIGHWAY

SCAG014 0 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS ON HIGH RISK RURAL ROAD - HRRR PROGRAM - (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3 CATEGORIES - SAFER NON-FEDERAL-AID SYSTEM ROADS.

$3,708

VARIOUS LOCAL HIGHWAY

ORA3711 0 IMPROVE AND EXPAND THE SANTA ANA RIVER TRAIL ALONG THE AREA IMMEDIATELY BOARDING THE EASTSIDE OF THE ANAHEIM REGIONAL TRANSPORTATION INTERMODAL CENTER (ARTIC) (THE CITY OF ANAHEIM IS THE LEAD AGENCY)

$736,700

VARIOUS LOCAL HIGHWAY

SC3711 0 IMPROVE BUS TURN-OUT ON MCBEAN PARKWAY AT AVENIDA NAVARRE AND DEVELOPMENT OF NORTHBOUND LEFT-TURN POCKET AT MCBEAN PARKWAY AND ORCHARD VILLAGE ROAD AT HENRY MAYO NEWHALL MEMORIAL CENTER (THE CITY OF SANTA CLARITA IS THE LEAD AGENCY)

$250

VARIOUS LOCAL HIGHWAY

SCAG 3711 0 STUDY – EXPRESS TRAVEL CHOICES (PHASE II) – (CALTRANS IS THE LEAD AGENCY) $4,000,000

Page 130: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

128 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

IMPERIAL IMP33003 TRANSIT ADA PARATRANSIT SERVICE OPERATING ASSISTANCE 2012 $5,700

IMPERIAL IMP33004 TRANSIT BRAWLEY DIAL-A-RIDE – OPERATING ASSISTANCE 2012 $1,571

IMPERIAL IMP33021 TRANSIT CALEXICO DIAL-A-RIDE OPERATING ASSISTANCE 2012 $2,890

IMPERIAL IMP33006 TRANSIT CITY OF IMPERIAL DIAL-A-RIDE – OPERATING ASSISTANCE

2012 $845

IMPERIAL IMP33000 TRANSIT COUNTY WIDE TRANSIT SYSTEM – OPERATING AND CAPITAL ASSISTANCE

2012 $50,901

IMPERIAL IMP990401 TRANSIT EL CENTRO DIAL-A-RIDE OPERATING ASSISTANCE 2012 $1,546

IMPERIAL IMP33023 TRANSIT MED-EXPRESS SHUTTLE OPERATIONAL ASSISTANCE 2012 $1,432

IMPERIAL 6OM0701-IMP100606

TRANSIT OPERATING ASSISTANCE FOR NEW NON-EMERGENCY MEDICAL TRANSPORT SERVICE

2012 $500

IMPERIAL 6OM0701-IMP100603

TRANSIT REPLACE TWO LARGE BUS TYPE III FOR ARC PARATRANSIT SERVICES

2011 $143

IMPERIAL 6OM0701-IMP100604

TRANSIT TWO NEW LARGE BUS TYPE III FOR NEW NON-EMER-GENCY MEDICAL TRANSPORTATION SERVICE

2011 $143

IMPERIAL IMP43000 TRANSIT WEST SHORES DIAL-A-RIDE OPERATIONAL ASSISTANCE

2012 $1,125

IMPERIAL 6OM0701-IMP110902

TRANSIT 3 REPLACEMENT LARGER BUSES IN 10/11 2012 $315

IMPERIAL 6OM0701-IMP090502

TRANSIT ADA PARA-TRANSIT FOR COUNTY OF IMPERIAL – 2 NEW LARGE TYPE III BUSES

2010 $130

IMPERIAL 6OM0701-IMP090504

TRANSIT CITY OF EL CENTRO DIAL-A-RIDE (ARC-IMPERIAL VALLEY) – REPLACEMENT OF PARATRANSIT BUSES WITH 2 LARGE TYPE III BUSES

2010 $130

IMPERIAL IMP051104 TRANSIT IN EL CENTRO; REGIONAL PUBLIC BUS TRANSFER TERMINAL AND PASSENGER WAITING AREA INCLUD-ING A 24 FOOT HIGH CLOCK TOWER AND OTHER BEAUTIFICATION AT 7TH AND STATE STREETS, WITH MISC OTHER BUS STOP IMPROVEMENTS ON FIXED ROUTE SYSTEM

2011 $4,906

Page 131: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 129

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

IMPERIAL 6TDL04-IMP090106

TRANSIT TRANSIT TRANSFER TERMINAL IN THE CITY OF BRAWLEY

2013 $1,432

IMPERIAL 6TDL04-IMP111101

TRANSIT TRANSIT TRANSFER TERMINAL IN THE CITY OF IMPERIAL

2013 $1,217

IMPERIAL 6OM0701-IMP070929

TRANSIT UPGRADES AND IMPROVEMENTS TO EXISTING BUS TRANSFER TERMINAL AT IMPERIAL VALLEY COLLEGE

2010 $2,086

IMPERIAL 6OM0701-IMP090503

TRANSIT WEST SHORES DIAL-A-RIDE (ARC-IMPERIAL VALLEY) – REPLACEMENT OF GASOLINE VAN WITH 1 MEDIUM TYPE II BUS

2010 $60

IMPERIAL 6120008 STATE HIGHWAY

TBD, STATE ROUTE 98 OR JASPER

ROAD

SR-111 SR-7 FROM SR-111 TO SR-7. WIDEN AND IMPROVE TO 4/6 LANES. ON EITHER JASPER ROAD OR SR-98

2035 $1,170,483

IMPERIAL 6OM0701-IMP00289

STATE HIGHWAY

8 WIDEN THE OVERCROSSING BRIDGE ON SR-186 OVER I-8. IMPROVE OFF RAMPS FROM I-8 AND WIDEN SR-186 ADJACENT TO THE CASINO ENTRANCE – NON-CAPACITY ENHANCEMENT PROJECT

2011 $9,330

IMPERIAL 6120002 STATE HIGHWAY

8 I-8 IMPERIAL AVE IMPERIAL AVE RECONSTRUCT INTERCHANGE AT IMPERIAL AVE. 2014 $58,472

IMPERIAL 6120009 STATE HIGHWAY

8 I-8 SR-186 SR-186 AT I-8/SR-186, IMPROVE INTERCHANGE – WIDEN AND IMPROVE RAMPS

2030 $78,577

IMPERIAL IMP0021 STATE HIGHWAY

78 BRAWLEY BYPASS CORRIDOR -- IN AND NEAR BRAWLEY FROM 0.5 MILES SOUTH OF BAUGHMAN ROAD TO MEAD RD – 4 LANE EXPRESSWAY ON SR 86 TO 0.3 MILES NORTH OF MEAD RD. ON SR 111

2012 $227,512

IMPERIAL IMP0042A STATE HIGHWAY

98 IN AND NEAR CALEXICO FROM 0.6 KM WEST OF SR 111 EASTERLY TO ALAMO RIVER BRIDGE WIDEN TO 4 LANE HWY (ENV. WORK & DOC. FOR SR98) ENVIRONMENTAL WORKAND DOCUMENTATION FOR SR 98

2012 $9,000

IMPERIAL 8020B STATE HIGHWAY

98 WIDENING SR-98 FROM VV WILLIAMS AVE. TO OLLIE AVE. AND INTERSECTION IMPROVEMENTS OF SR-98 AND CESAR CHAVEZ FROM 2 TO 4 LANES(PHASE 1B).

2014 $9,357

IMPERIAL 6120004 STATE HIGHWAY

98 SR-98 ALL AMERICAN CANAL

VV WILLIAMS PHASE 1C – FROM 30.9 TO 32.2 WIDEN FROM 2 TO 4 LANES

2020 $58,850

Page 132: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

130 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

IMPERIAL 6120005 STATE HIGHWAY

98 SR-98 DOGWOOD ALL AMERICAN CANAL

PHASE 2 – FROM 30.0 TO 30.9 WIDEN FROM 2 TO 4 LANES

2023 $34,656

IMPERIAL 6120003 STATE HIGHWAY

98 SR-98 OLLIE AVE. ROCKWOOD IN CALEXICO – WIDEN CONVENTIONAL HIGHWAY PHASE 1A – FROM 32.4 TO 32.6 WIDEN FROM 4 TO 6 LANES

2018 $9,781

IMPERIAL 6TDL04-IMP110901

STATE HIGHWAY

111 CALEXICO BORDER GATEWAY AND 1ST ST PROMENADE (IN CALEXICO, ON 1ST ST, ADJOINING THE PEDESTRIAN AND BICYCLE BORDER CROSSING, FROM ROUTE 111 TO HEFFERNAN AVE. PEDESTRIAN AND BICYCLE IMPROVEMENTS.)

2018 $2,301

IMPERIAL 6120010 STATE HIGHWAY

111 SR-111 SR-98 I-8 WIDEN AND IMPROVE TO 6 LANE FREEWAY WITH INTERCHANGES AT HEBER, MCCABE, AND JASPER AND OVERPASS AT CHICK RD.

2030 $997,259

IMPERIAL 6120007 STATE HIGHWAY

115 SR-115 SR-115 EVAN HEWES HIGHWAY

FROM SR-115 TO EVAN HEWES HIGHWAY CONSTRUCT 4-LANE EXPRESSWAY

2030 $231,816

IMPERIAL 0505 STATE HIGHWAY

186 ANDRADE INTERNATIONAL BORDER CROSSING IN ANDRADE, AT THE ANDRADE INTERNATIONAL PORT OF ENTRY. CONSTRUCT BICYCLE AND PEDESTRIAN FACILITES

2013 $2,520

IMPERIAL 6OM0701-IMPL508

STATE HIGHWAY

999 GROUPED PROJECTS FOR PLANTINGS, LANDSCAPING, ETC. (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PLANTINGS, LANDSCAPING, ETC.)

2015 $1,969

IMPERIAL 6M04018 STATE HIGHWAY

999 IN EL CENTRO ON DOGWOOD RD; RECONTRUCT AND WIDEN BRIDGE FROM 2 TO 4 LANES; WITH 2 TURN LANES

2012 $33,120

IMPERIAL 6OM0701-IMP050904

STATE HIGHWAY

999 NEAR WESTMORLAND; AQUSITION OF 4,000 UNDEV-LOPED ACRES ADJACENT TO SR-86 FOR ENVIRON-MENTAL MITIGATION

2011 $445

IMPERIAL 6OM0701-IMP100101

STATE HIGHWAY

999 PLANNING, PROGRAMMING, AND MONITORING (PPM) FUNDS TO PAY FOR ELIGIBLE STAFF AND PROGRAM EXPENSES FOR ICTC

2015 $1,361

IMPERIAL IMP080903 LOCAL HIGHWAY

ASPHALT REHABILITATION OF RIVER DR. 2012 $226

Page 133: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 131

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

IMPERIAL 6OM0701-IMP091001

LOCAL HIGHWAY

CESAR CHAVEZ BLVD/CALEXICO – WEST PORT OF ENTRY (POE) CONGESTION IMPROVEMENTS; ROAD SURFACE REHAB, TURN LANES, LIGHTING AND SIDEWALKS

2012 $2,850

IMPERIAL 6TDL04-IMP090701

LOCAL HIGHWAY

DEVELOP BICYCLE PATHS AND PUBLIC PARK SPACE ADJACENT TO THE NEW RIVER, CALEXICO (HPP TEA-LU PROJECT #3092)

2011 $4,000

IMPERIAL IMP050508 LOCAL HIGHWAY

EVAN HEWES HIGHWAY RESURFACING IMPROVEMENTS FROM SILSBEE ROAD TO AUSTIN ROAD

2011 $1,519

IMPERIAL 6OM0701-IMP070924

LOCAL HIGHWAY

GROUPED PROJECTS FOR PAVEMENT RESURFAC-ING AND/OR REHABILITATION IN IMPERIAL COUNTY (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION)

2011 $1,520

IMPERIAL IMP080901 LOCAL HIGHWAY

HIGHWAY 111 EAST SIDEWALKS IMPROVEMENTS 2011 $374

IMPERIAL 6OM0701-IMP071203

LOCAL HIGHWAY

I-8 ENTRANCE AND EXIT RAMPS AT SR86. LANDSCAPING BEAUTIFICATION

2011 $723

IMPERIAL IMP080905 LOCAL HIGHWAY

IMPERIAL AVE OVERLAY WITH CURB/GUTTER/SIDEWALK.

2012 $761

IMPERIAL 6OM0701-IMP090501

LOCAL HIGHWAY

IMPROVE BRIDGE 58-7 ON SR115 THAT CROSSES THE ALAMO RIVER IN HOLTVILLE AND ALSO PROJECT DESIGN AND ENVIRONMENTAL ANALYSIS OF A NEW BRIDGE OVER THE SAME RIVER

2013 $1,000

IMPERIAL 6TDL04-IMP071202

LOCAL HIGHWAY

IN BRAWLEY AT CATTLE CALL PARK. FROM WILLARD AVE, AROUND PARK, ENDING AT WILLARD AVE. BICYCLE AND PEDESTRIAN IMPROVEMENTS AND LANDSCAPING

2013 $1,310

IMPERIAL 6OM0701-IMP050903

LOCAL HIGHWAY

IN IMPERIAL; RECONSTRUCTION OF PASSENGER LOADING AREAS AND ROAD ACCESS IMPROVEMENTS TO THE EXPO

2010 $377

IMPERIAL IMP051101 LOCAL HIGHWAY

IN WESTMORLAND- SOUTH CENTER ST; ROADWAY SURFACE IMPROVEMENTS, STREET LIGHTING AND STORM DRAIN IMPROVEMENTS FROM BAUGHMAN RD. TO SR 78/86

2011 $800

Page 134: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

132 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

IMPERIAL 6OM0701-IMP080907

LOCAL HIGHWAY

NORTH CENTER ST PAVEMENT REHABILITATION 2012 $339

IMPERIAL 6OM0701-IMP070928

LOCAL HIGHWAY

PAVING OF .75 MILE SECTION OF DIRT ROAD ON P ST 2012 $957

IMPERIAL 6OM0701-IMP070923

LOCAL HIGHWAY

PAVING OF 9TH ST BETWEEN MALAN ST AND WILDCAT DRIVE

2011 $1,267

IMPERIAL 6OM0701-IMP090105

LOCAL HIGHWAY

REHABILITATION AND RECONSTRUCTION OF EXISTING PAVEMENT ON BARIONI ROAD FROM B ST TO P ST

2011 $1,156

IMPERIAL IMP050507 LOCAL HIGHWAY

REHABILITATION OF ATEN RD. (2.25 MILES) FROM VILORE WAY TO CROSS RD AND SIGNALIZATION OF ONE INTERSECTION; PHASE ONE IN FY2007/08 OF SIGNALIZATION AND PHASE TWO IN FY2008/09 OF REHABILITATION

2011 $1,866

IMPERIAL IMP080904 LOCAL HIGHWAY

SEISMIC BRIDGE EVALUATION STUDY 2012 $226

IMPERIAL IMP080906 LOCAL HIGHWAY

STATE ROUTE 115 AND 5TH ST IMPROVEMENT 2012 $339

IMPERIAL 6OM0701-IMP100602

LOCAL HIGHWAY

TWO HYBRID VEHICLES 2011 $79

IMPERIAL 6TDL04-IMP100901

LOCAL HIGHWAY

ALAMO RIVER RECREATIONAL TRAIL, PHASE I 2012 $489

IMPERIAL 6OM0701-IMP070926

LOCAL HIGHWAY

ASPHALT CONCRETE PAVING OF PITZER FROM MCCABE TO CORRELL

2010 $796

IMPERIAL 6OM0701-IMP090101

LOCAL HIGHWAY

ASPHALT REHABILITATION AND RECONSTRUCTION OF WESTERN AVE FROM STATE HIGHWAY 86 TO NORTHERN CITY LIMITS

2011 $895

IMPERIAL 6OM0701-IMP060901

LOCAL HIGHWAY

ATEN ROAD AND OLD COUNTY ROAD 111 IMPROVEMENTS, IMPERIAL COUNTY, CA – TCSP#09CA002

2011 $834

IMPERIAL IMP020801 LOCAL HIGHWAY

BAUGHMAN ROAD RECONSTRUCTION FROM STATE ROUTE 78/86 TO FORRESTER ROAD; 0.65 MILE OF COUNTY ROAD NEAR WESTMORLAND- HPP 2162

2011 $1,503

IMPERIAL 6TDL04-IMP070906

LOCAL HIGHWAY

CNG FUELING STATION 2011 $23

Page 135: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 133

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

IMPERIAL IMP050509 LOCAL HIGHWAY

COLE RD. CORRIDOR IMPROVEMENTS; EXPANSION OF 2 LANE ROAD INTO 4 LANE PRINCIPAL ARTERIAL (.5 MILES) FROM BOWKER RD EAST TO SR 98

2012 $1,837

IMPERIAL IMP050905 LOCAL HIGHWAY

CONSTRUCT NEW SIDEWALKS IN THE CITY OF HEBER-(HPP 3548)

2011 $610

IMPERIAL IMP050901 LOCAL HIGHWAY

CONSTRUCT ROAD SURFACE IMPROVEMENTS AND IMPROVE ROAD SAFETY FROM BRAWLEY WATER PLANT TO HWY 86 TO 9TH ST TO 18TH ST, BRAWLEY – (HPP 2176)

2011 $1,400

IMPERIAL 6TDL04-IMP070917

LOCAL HIGHWAY

CONSTRUCTION OF BICYCLE/PEDESTRIAN PATH 2011 $962

IMPERIAL 6OM0701-IMP070920

LOCAL HIGHWAY

DIESEL EMISSION COMPLIANT 2 AXLE TRUCK TRACTOR

2011 $100

IMPERIAL 6OM0701-IMP070919

LOCAL HIGHWAY

DIESEL EMISSION COMPLIANT WATER TRUCK 2011 $134

IMPERIAL IMP070901 LOCAL HIGHWAY

FOUR HYBRID PASSENGER VEHICLES 2010 $158

IMPERIAL 6TDL04-IMP070925

LOCAL HIGHWAY

FOUR HYBRID VEHICLES 2011 $153

IMPERIAL IMP050506 LOCAL HIGHWAY

IMPROVEMENTS AT AND BETWEEN INTERSECTIONS AT: SR 115 AND 4TH, SR 115 AND PALM, 4TH AND PALM AND 4TH AND ORCHARD/CEDAR

2011 $800

IMPERIAL 6TDL04-IMP070910

LOCAL HIGHWAY

INSTALLATION OF BICYCLE RACKS AT VARIOUS LOCATIONS

2010 $11

IMPERIAL IMP050902 LOCAL HIGHWAY

KEYSTONE RD NEAR IMPERIAL, RECONSTRUCTION OF 6 MILES TO CREATE TRUCK LANE FROM SR 111 TO AUSTIN RD

2011 $2,500

IMPERIAL IMP051201 LOCAL HIGHWAY

NEAR EL CENTRO; DOGWOOD CORRIDOR – WIDEN & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ‘ NORTH OF MCCABE & INSTALL 2 SIGNALS ROW AND CON

2012 $3,024

Page 136: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

134 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

IMPERIAL 0520A LOCAL HIGHWAY

NEAR EL CENTRO; DOGWOOD CORRIDOR – WIDEN & IMPROVE DOGWOOD RD. (2 TO 4 LANES) FROM CORRELL NORTH TO 2600 ‘ NORTH OF MCCABE & INSTALL 2 SIGNALS AB 3090 REIMBURSMENT FOR 11-IMP0520

2012 $276

IMPERIAL 6OM0701-IMP070602

LOCAL HIGHWAY

NEAR IMPERIAL – WORTHINGTON RD. INTERSECTION AT MCCONNEL RD; NEW LEFT TURN LANE AT NONSIG-NALIZED INTERSECTION

2011 $732

IMPERIAL 6OM0701-IMP070601

LOCAL HIGHWAY

NEAR WESTMORLAND – FORRESTER RD. INTERSECTION AT CADY RD.: NEW TURNING LANES AND TRAFFIC CHANNELIZATION AT NONSIGNALIZED INTERSECTION

2011 $992

IMPERIAL 6TDL04-IMP070913

LOCAL HIGHWAY

NEW CNG FUELING STATION 2011 $23

IMPERIAL 6OM0701-IMP070909

LOCAL HIGHWAY

PAVING OF WALKING/JOGGING PATHS A BUCKLIN PARK 2010 $322

IMPERIAL 6OM0701-IMP020802

LOCAL HIGHWAY

PRELIMINARY DESIGN OF TRAFFIC BRIDGE ON 8TH ST OVER I-8

2010 $120

IMPERIAL 6OM0701-IMP090403

LOCAL HIGHWAY

REHABILITATION ALONG NORTH SIDE OF 9TH ST BETWEEN CEDER AVE AND HOLT AVE

2010 $332

IMPERIAL IMP050504 LOCAL HIGHWAY

REHABILITATION AND OVERLAY OF IMPERIAL AVE. (.5 MILE) PHASE III FROM ORANGE TO ADAMS AVE.

2011 $563

IMPERIAL 6OM0701-IMP090402

LOCAL HIGHWAY

REHABILITATION OF ADAMS AVE FROM IMPERIAL AVE TO LA BRUCHERIE AVE. CURB/GUTTER/SIDEWALK

2010 $700

IMPERIAL IMP050502 LOCAL HIGHWAY

REMOVAL AND RECONSTRUCTION OF EXISTING 2 LANE DOGWOOD RD (1.2 MILES) FROM I-8 BRIDGE TO STATE ST – PHASE I

2011 $2,472

IMPERIAL 6OM0701-IMP090406

LOCAL HIGHWAY

RESURFACING DREW ROAD FROM ROSS ROAD TO EVEN HEWES HIGHWAY IN IMPERIAL COUNTY(0.4 MILES)

2011 $328

IMPERIAL 6TDL04-IMP100607

LOCAL HIGHWAY

SIGNALIZATION OF DRIVEWAY AT IMPERIAL VALLEY COLLEGE ON ATEN ROAD

2011 $178

IMPERIAL 6OM0701-IMP090104

LOCAL HIGHWAY

STREET IMPROVEMENTS OF REHABILITATION AND RECONSTRUCTION ALONG WEST SIDE OF HOLT AVE BETWEEN NINTH AND TENTH STREETS

2011 $347

Page 137: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 135

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

IMPERIAL 6OM0701-IMP090103

LOCAL HIGHWAY

STREET IMPROVEMENTS OF REHABILITATION AND RECONSTRUCTION OF NORTH AND SOUTH PORTION OF MAIN ST BETWEEN HIGHWAY 111/115 AND LYERLY ROAD

2011 $895

IMPERIAL 6OM0701-IMP090102

LOCAL HIGHWAY

STREET REHABILITATION OF EMERSON AVE FROM HIGHWAY 98 TO THIRD ST.

2011 $1,200

IMPERIAL 6OM0701-IMP070302

LOCAL HIGHWAY

TRAFFIC FLOW IMPROVEMENTS; TRAFFIC SIGNAL SYNCHRONIZATION

2011 $568

IMPERIAL 6TDL04-IMP070902

LOCAL HIGHWAY

TWO HYBRID PASSENGER VEHICLES 2010 $58

IMPERIAL 6OM0701-IMP090404

LOCAL HIGHWAY

WALNUT AVE REHABILITATION BETWEEN 5TH ST (SR 115) AND FOURTH ST

2010 $441

IMPERIAL 6120006 LOCAL HIGHWAY

CALEXICO INTERMODAL

TRANSPORTATION CENTER

CONSTRUCT CALEXICO INTERMODAL TRANSPORTATION CENTER

2018 $9,315

IMPERIAL 6120011 LOCAL HIGHWAY

CESAR CHAVEZ 2ND ST SR-98 WIDEN AND IMPROVE 2018 $13,196

IMPERIAL 6120001 LOCAL HIGHWAY

FORRESTER ROAD I-8 SR-78 WIDEN AND IMPROVE TO FOUR-LANE ARTERIAL 2018 $250,578

LOS ANGELES 1TR1014 TRANSIT ACCESS SERVICES INCORPORATED (PARATRANSIT) – METRO SUBSIDY

2035 $4,210,300

LOS ANGELES 1OM0702-LA0D298

TRANSIT ACQUISITION AND INSTALLATION OF TRANSIT AMENITIES

2010 $600

LOS ANGELES LA0D300 TRANSIT ACQUISITION OF TELEPHONE UPGRADES FOR TRANSIT DIVISION.

2011 $60

LOS ANGELES LA970501 TRANSIT ANNUAL EXPENDITURES INCLUDING SERVICE PROVIDER CONTRACTS & CAPITAL EXPENSES FOR COMPLEMENTARY ADA PARATRANSIT IN LOS ANGELES COUNTY

2015 $277,737

LOS ANGELES LA52603 TRANSIT ANNUAL TIRE PURCHASE 2012 $275

Page 138: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

136 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0C8232 TRANSIT ANTELOPE VALLEY LINE CHANGES AT SANTA CLARITA-ALIGNMENT CHANGES WILL PERMIT HIGHER SPEEDS OF OPERATION AND REDUCE MAINTENANCE COST- (SCRRA). (PPNO 3202). THIS PROJECT IS A MAINTENANCE/EFFICIENCY PROJECT TO IMPROVE ON-TIME PERFORMANCE.

2018 $3,693

LOS ANGELES LA0D299 TRANSIT AQUISITION OF (7) ALTER FUEL TRANSIT/PARA-TRANSIT VEHICLES FOR REPLACEMENT AND (1) FOR EXPANSION NOT TO EXCEED 35’ INCLUDING AUTO-MATED ANNOUNCING SYSTEMS IN 3 FIXED-ROUTE BUSES SAFETEA-LU TRANSIT DEMO ID #251

2012 $1,833

LOS ANGELES LA0D345 TRANSIT ASSOCIATED CAPITAL MAINTENANCE FOR REVENUE VEHICLE FLEET (ONGOING)

2014 $38

LOS ANGELES LA55205 TRANSIT ASSOCIATED CAPITAL MAINTENANCE ITEMS (ONGOING). CARRYOVER FROM PRIOR FISCAL YEAR

2011 $7,361

LOS ANGELES 1NL04-LAF1654 TRANSIT BALDWIN PARK METROLINK PEDESTRIAN OVERCROSSING. CONSTRUCT A PEDESTRIAN OVER-CROSSING OVER BOGART AVE AND THE METROLINK LINE TO LINK THE STATION WITH VITAL BUS TRANS-FER POINTS AND TO PROVIDE ACCESS TO PARKING OVERFLOW AREAS.

2015 $1,810

LOS ANGELES 1TR08D08- LA963546

TRANSIT BUS & RAIL CAPITAL, INCLUDES FACILITY UPGRADE, EQUIP, SPARE PARTS, NON-REV VEHICLES, MAINTENANCE SUPPORT, ITS, ETC. INCLUDES $5.3 MIL FOR LACRD IMPROVEMENTS.(INCLUDES RTP ID 1TR08D08 & 1TR08D07A & 1TR08D07B)

2016 $992,884

LOS ANGELES LA0D125 TRANSIT BUS STOP AMENITIES (BENCHES AND SHELTERS) PROJECT (ONGOING)

2011 $2,871

LOS ANGELES LA963526 TRANSIT BUS STOP ENHANCEMENT/IMPROVEMENT 2011 $2,647

LOS ANGELES 1NL04-LA0G428 TRANSIT BUS STOP IMPROVEMENTS 2011 $19

LOS ANGELES LA01B111 TRANSIT BUS SYSTEM – PREVENTIVE MAINTENANCE. THIS PROJECT WILL USE $450 OF TOLL CREDITS TO MATCH THE 5307 FEDERAL FUNDS IN THE CON PHASE IN FY12.

2012 $18,098

Page 139: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 137

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1OM0702-LA0B0825

TRANSIT BUS SYSTEM OPERATING EQUIPMENT – SEAT REPLACEMENT, SPRAY BOOTH, WASH RACKS & WHEEL POLISHERS.

2011 $3,750

LOS ANGELES 1TR1022 TRANSIT CALL FOR PROJECTS TRANSIT CAPITAL MODE 2030 $394,900

LOS ANGELES LAE0443 TRANSIT CAPITAL IMPROVEMENTS TO SUPPORT AND ENHANCE THE CAL STATE UNIVERSITY NORTHRIDGE TRAM SYSTEM

2010 $340

LOS ANGELES LA0D43 TRANSIT CAPITALIZATION OF PREVENTIVE MAINTENANCE (ONGOING).

2013 $3,980

LOS ANGELES LA0D297 TRANSIT CAPITALIZED COST OF CONTRACTING – BUS LEASE. NON-EXPANSION

2011 $1,000

LOS ANGELES LA52101 TRANSIT CERTIFICATES OF PARTICIPATION (COP) HAVE BEEN ISSUED FOR THE CULVER CITY TRANSPORTATION FACILITY. PAYMENTS WILL BE MADE BI-ANNUALLY THROUGH JANUARY 2016.

2016 $6,480

LOS ANGELES LAF1442 TRANSIT COMMUTER EXPRESS FLEET UPGRADE. FUND 10 OF REQUESTED 85 CNG BUSES TO REPLACE OLD DIESEL BUSES.

2014 $4,917

LOS ANGELES LA0D362 TRANSIT COMPREHENSIVE OPERATIONAL ANALYSIS TRANSIT PLANNING

2013 $415

LOS ANGELES LAE0076 TRANSIT CONSTRUCT ADD’L VEHICLE PARKING (200 TO 400 SPACES), BICYCLE PARKING LOT AND PEDESTRIAN REST AREA AT THE TRANSIT CENTER. SAFTEA-LU 76, E2009-BUSP-060 (PAGE 20059 IN FTA 2009 EARMARKS)

2014 $2,085

LOS ANGELES LAE0396 TRANSIT CONSTRUCTION OF EMPIRE AREA TRANSIT CENTER NEAR BURBANK AIRPORT -UPGRADE EXIST – REG,L TRANSIT & LAYOVER FACILITY ADJACENT TO THE BURBANK-GLENDALE-PASADENA AIRPORT. WILL FACILITATE TRANSFER OF PASSENGERS TO & FROM MANY GROUND TRANS. (PE ONLY)SAFTEA-LU 396, E-2009-BUSP-063.

2011 $1,723

Page 140: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

138 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D198 TRANSIT CRENSHAW/LAX TRANSIT CORRIDOR ($20 MILLION IN FY10/11 IS FOR USDOT’S TIFIA OFFICE TO SUBSI-DIZE ITS COSTS FOR PROCESSING THE TIFIA LOAN OF $545.9 MILLION, THEREFORE, NOT PART OF THE TOTAL PROJECT COST.

2018 $1,733,188

LOS ANGELES LAF1455 TRANSIT CROSS-TOWN TRANSIT CONNECTOR AND SERVICE EXPANSION. FUNDS TO ACQUIRE TWO (2) CNG BUSES TO IMPLEMENT NEW LOCAL TRANSIT SERVICE BETWEEN NORTH HOLLYWOOD RED LINE STATION AND DOWNTOWN BURBANK.

2014 $811

LOS ANGELES LA52100 TRANSIT CULVER CITYBUS OPPERATION ASSISTANCE. 2012 $20,190

LOS ANGELES LAE0388A TRANSIT DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN LINKAGES BETWEEN LOS ANGELES MISSION COLLEGE AND PUBLIC TRANSIT SERVICES TO INCLUDE LIGHTING, LANDSCAPIND, AND PASSENGER AMENITIES

2010 $263

LOS ANGELES LAE0195 TRANSIT DESIGN AND CONSTRUCT IMPROVED PEDESTRIAN LINKAGES BETWEEN LOS ANGELES PIERCE COLLEGE AND MTA’S RAPID BUS TRANSIT STOPS TO INCLUDE PASSENGER AMENITIES, 2007 CFP # F1658. (DEMO ID 195, E2009-BUSP-181)

2014 $4,049

LOS ANGELES LA973503 TRANSIT DOWNTOWN TRANSIT MALL ENHANCEMENTS; REMODEL EXISTING SPACE TO OPEN A TRANSIT CUSTOMER SERVICE CENTER & EXTENSION ON THE TRANSIT CUSTOMER CENTER LEASE.

2015 $2,261

LOS ANGELES 1NL04-LAF1511 TRANSIT EASTSIDE LIGHT RAIL BIKE INTERFACE PROJECT. PROJECT INCLUDES DESIGN AND CONSTRUCTION OF BIKE ROUTES WITH APPROPRIATE SIGNAGE AND STRIPING TO ACCESS METRO GOLD LINE STATIONS.

2014 $1,176

LOS ANGELES 1TR0704-LA0G626

TRANSIT EASTSIDE TRANSIT CORRIDOR PHASE 2 – METRO GOLD LINE EASTSIDE EXTENSION FROM ITS EXIST-ING TERMINUS AT ATLANTIC STATION IN EAST LOS ANGELES FARTHER EAST

2035 $1,530,600

LOS ANGELES LA973010 TRANSIT ENGINE REBUILDS FOR SERVICE FLEET 2011 $240

Page 141: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 139

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1TDL04-LA0G270

TRANSIT EXPANSION AND IMPROVEMENT TO EXISTING TRANSIT CENTER IN THE CITY OF PALMDALE. E2009-BUSP-137.

2012 $360

LOS ANGELES LA0F021 TRANSIT EXPOSITION LIGHT RAIL TRANSIT SYSTEM PHASE II – FROM CULVER CITY TO SANTA MONICA

2018 $1,317,500

LOS ANGELES 1OM0702- LA0D12

TRANSIT FACILITY IMPROVEMENTS – POMONA, ARCADIA, ADMIN. OFFICE-SEISMIC RETROFIT

2011 $8,450

LOS ANGELES LAE0212 TRANSIT FEASIBILITY STUDY – OF DOWNTOWN STREETCAR PROJECT

2011 $1,002

LOS ANGELES 1OM0702- LA0G012

TRANSIT FEDERAL OPERATING ASSISTANCE (L/P UZA. PROJECT USING $1,103 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) FOR MATCH IN FY11 IN CON AND $1,103 FOR A MATCH IN FY12.

2012 $12,134

LOS ANGELES LA52600 TRANSIT FY 2010/11 ESTIMATED OPERATING ASSISTANCE – TRANSIT OPERATIONS

2011 $14,198

LOS ANGELES LA29212XY- LA0G558

TRANSIT GOLD LINE FOOTHILL LRT EXTENSION – PASADENA TO GLENDORA

2018 $623,000

LOS ANGELES LA0D29 TRANSIT HEART OF THE CITY BUS TRANSFER STATION AMENITIES – CONSTRUCTION IN CITY REDEVELOPMENT AREA – (SERVICE BY 5 LACMTA LINES, 2 TORRANCE LINES & 1 LADOT COMMUTER EXPRESS LINE).

2014 $9,378

LOS ANGELES 1NL04- LA0G671

TRANSIT HISTORIC FILIPINOTOWN BUS SECURITY LIGHTS, LOS ANGELES

2011 $79

LOS ANGELES LA990764 TRANSIT JOB ACCESS & REVERSE COMMUTER PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123 (TOLL CREDIT WILL BE USED AS THE LOCAL MATCH TO SECTION 5316 FEDERAL FUNDS) TOLL CREDIT IN FY11/12 IN CON FOR $21,592.

2016 $175,990

LOS ANGELES LA0C8114 TRANSIT LA CNTY RIDESHARE SERVICES; PROVIDE COMMUTE INFO, EMPLOYER ASSISTANCE AND INCENTIVE PROGRAMS THROUGH CORE & EMPLOYER RIDESHARE SERVICES & MTA INCENTIVE PROGRAMS. PPNO 9003

2016 $82,560

LOS ANGELES 1TR08D08-LA0G142

TRANSIT LACRD – 12 BUSES FOR THE I-10 EL MONTE BUSWAY. HOT LANE. (RTP# 1TR08D08 & 1TR08D07A)

2012 $8,500

Page 142: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

140 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1OM08D01 TRANSIT LACRD – DIVISION 13 (FORMERLY NAMED UNION DIVISION) NEW BUS OPERATIONS AND MAINTENANCE FACILITY (RTP ID 1OM08D01 & 1TR08D07A & 1HL08D03 FOR HOT LACRD PROJ). PROJECT AND SCOPE ARE FROM AMENDMENT 2008 AMENDMENT #53.

2014 $85,500

LOS ANGELES 1TR08D7A TRANSIT LACRD – EL MONTE TRANSIT CENTER IMPROVE-MENTS AND EL MONTE BUSWAY IMPROVEMENTS, INCLUDING BIKE LOCKERS, TICKET VENDING MACHINES AT EL MONTE BUSWAY STATIONS AND UP TO 30 BUS BAYS; EL MONTE BUSWAY TERMINUS (@ UNION STATION) IMPROVEMENTS INCLUDING PAS-SENGER STATION REHABILITATION AND UPGRADES AND IMPROVED PEDESTRIAN CONNECTION TO PATASOURAS PLAZA/UNION STATION.

2012 $55,300

LOS ANGELES 1TR08D7B-LA0G150

TRANSIT LACRD – I-10 AND I-110 EXPRESS LANES FORMA-TION OF NEW VANPOOLS AND ENHANCED TRANSIT SERVICE INCLUDING SECURITY, MARKETING AND MAINTENANCE.(RTP ID 1TR08D7B & 10M08D01; LA0G150, LA0G151, LA0G152,1OM08D02). (SPLIT WITH LA0G819)

2011 $6,700

LOS ANGELES 1OM08D02 TRANSIT LACRD – I-10 HOT LANE OPERATIONS – NEW TRANSIT SERVICES.(RTP# 1OM08D02).

2011 $3,634

LOS ANGELES 1TR204-LA0G148

TRANSIT LACRD – I-110 HOT LANE OPERATIONS – NEW TRAN-SIT SERVICES. (RTP# 1TR204)

2011 $1,200

LOS ANGELES 1TR204-LA0G147

TRANSIT LACRD – I-110 HOT LANE OPERATIONS – NEW TRAN-SIT SERVICES.(CITY OF GARDENA)(RTP# 1TR204)

2012 $600

LOS ANGELES 1TR08D07A- LA0G153

TRANSIT LACRD – PLATFORMS AND PARKING IMPROVEMENTS AT THE METROLINK POMONA STATION. ADDITION OF 100 PARKING SPACES AND EXTENSION OF PLATFORM.(G# CA-37-X052-00)

2010 $5,600

LOS ANGELES LAE0127 TRANSIT LAE0127B: PURCHASE OF EQUIPMENT TO SUPPORT CNG VEHICLES AND MAINTAIN CNG FACILITY AND RELATED INFRASTRUCTURE IMPROVEMENTS TO FIXED ROUTE PUBLIC TRANSPORTATION

2013 $744

Page 143: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 141

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0F063 TRANSIT LA-FULLERTON TRIPLE TRACK & GRADE SEP (ROSECRANS) (IN SANTA FE SPRINGS, LA ON THE BNSF LINE. CONSTRUCT TRIPLE TRACK & GRADE SEPARATION AT ROSECRANS AND MARQUARDT AVE. (PPNO 2002A) & ELIMINATE HAZARDS AT RAILROAD GRADE CROSSING.

2015 $90,000

LOS ANGELES LA0D282 TRANSIT LANDSCAPE,STREETSCAPE & PASSENGER AMENITY IMPRVMENTS AT & ADJACENT LOS ANGELES CITY COLLEGE TO IMPROVE PEDESTRAN MOBILITY & ACCESSIBILITY TO EXSTG MULTIMDAL CONN. (SAFETEA-LU # 223, 2007 CFP #F1641)

2012 $9,564

LOS ANGELES LA0C8237 TRANSIT LONG BEACH PARK AND RIDE FACILITY AT 4TH AND PACIFIC, SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 100 DEDICATED, TRANSIT ORIENTED SPACES IN MIXED USE DEVELOPMENT

2014 $3,902

LOS ANGELES LAE0332 TRANSIT LONG BEACH PARK AND RIDE FACILITY AT 3RD ST AND PACIFIC AVE SOUTH OF THE MTA BLUE LINE PACIFIC STATION. 300 TO 500 SPACE AND INCLUDE RESIDENTIAL AND COMMERCIAL DEVELOPMENT

2012 $1,002

LOS ANGELES 1NL04-LAF1657 TRANSIT LOS ANGELES VALLEY COLLEGE (LAVC) BUS STATION EXTENSION. PROJECT WILL EXTEND THE ORANGE LINE STATION AT THE LA VALLEY COLLEGE BY PRO-VIDING A DIRECT PEDESTRIAN CONNECTION FROM THE STATION TO A NEW PEDESTRIAN ENTRANCE TO LAVC.

2013 $2,959

LOS ANGELES LA974165 TRANSIT MACARTHUR PARK STATION IMPROVEMENTS INCLUDE DESIGN AND CONSTRUCTION OF A PLAZA TO ACCOMODATE PUBLIC ACCESS (PEDESTRIAN ENTRANCES, WALKWAYS, BICYCLE FACILITIES) PPNO# 3417

2011 $1,931

LOS ANGELES 1NL04-LAF1609 TRANSIT MAIN ST BUS STOP AND PEDESTRIAN IMPROVEMENTS. DESIGN AND CONSTRUCT BUS STOP AND PEDESTRIAN IMPROVEMENTS THAT WILL INCREASE THE USAGE AND CAPACITY OF PEDESTRIAN FACILITIES ALONG A 0.4 MILE STRETCH OF MAIN ST.

2015 $823

Page 144: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

142 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1TR1021 TRANSIT METRO AND MUNICIPAL REGIONAL CLEAN FUEL BUS CAPITAL--FACILITIES AND ROLLING STOCK (METRO’S SHARE TO BE USED FOR CLEAN FUEL BUSES) (CAPITAL COSTS ONLY)

2035 $150,000

LOS ANGELES UT101-LA0G447 TRANSIT METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION SEGMENT 1 – WILSHIRE/WESTERN TO LA CIENEGA (EXCLUDING P/E WHICH IS UNDER LA0G642)

2023 $1,950,100

LOS ANGELES UT101-LA0G642 TRANSIT METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION TO WESTWOOD – P/E ONLY

2012 $107,400

LOS ANGELES LA29212XY TRANSIT METRO RAIL GOLD LINE EXTENSION- PASADENA TO MONTCLAIR 24- MILE, 12- STATION LRT EXTENSION. SAFETEA-LU # 285 LEAD AGENCY WILL CHANGE TO METRO GOLD LINE

2014 $35,530

LOS ANGELES LA0C8413 TRANSIT METRO RAPID BUS STATIONS-PHASE II: INCLUDES COMMUNICATIONS & EQUIPMENT – EQUIPMENT AND BUS SHELTERS ONLY.

2012 $144,900

LOS ANGELES 1TDL04-LAF3712 TRANSIT METROLINK PARKING RESOURCE MANAGEMENT DEMONSTRATION PROJECT. DEMONSTRATION PROJECT PROVIDES COMMUTERS OF METROLINK AND TRANSIT SERVICES WITH A PROACTIVE SYSTEM TO ASSIST IN LOCATING AVAILABLE PARKING WITHIN CITY’S METROLINK STATION VICINITY.

2014 $266

LOS ANGELES LA0C10 TRANSIT MID-CITY/EXPOSITION CORRIDOR LIGHT RAIL TRANSIT PROJECT PHASE I TO VENICE-ROBERTSON STATION. (INCLUDING E200-BUSP-095, LA CIENEGA INTERMODAL CENTER)

2012 $930,562

LOS ANGELES LA0D197 TRANSIT MID-CITY/EXPOSITION CORRIDOR LRT OPERATING ASSISTANCE

2015 $114,801

LOS ANGELES 1TDL04-LA0G300

TRANSIT MODIFY AND ENHANCE EXISTING INTERMODAL PASSENGER AMENITIES AT CALSTATE UNIVERSITY, NORTHRIDGE EARMARK ID # E2008-BUSP-0696

2012 $504

LOS ANGELES 1TR1020 TRANSIT NEW AIRPORT BUS DIVISION (CAPITAL COSTS ONLY) 2022 $155,500

LOS ANGELES LA0D471 TRANSIT NEW FREEDOM PROGRAM ADMINISTRATION, OPERATIONS AND CAPITAL FOR UZA 2 AND UZA 123. ADDED TOLL CREDITS IN FY11/12 IN CONS. FOR $9,309.

2016 $66,347

Page 145: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 143

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LA0F096 TRANSIT NORWALK SANTA FE SPRINGS TRANSPORTATION CENTER PARKING EXPANSION AND BIKEWAY IMPROVEMENTS. PROVIDE ADDITIONAL 400 PARKING SPACES FOR TRANSIT CENTER PATRONS AND IMPROVE BICYCLES ACCESS TO THE TRANSIT CENTER

2011 $4,057

LOS ANGELES 1OM0702-LA0G435

TRANSIT ON-GOING CAPITALIZATION OF TRAINING AND EDUCATION. ADDED TOLL CREDITS IN FY10/11 IN CONS. FOR $12.

2013 $220

LOS ANGELES LA50300 TRANSIT OPERATING ASSISTANCE – TRANSIT OPERATIONS AND DIAL-A -RIDE SERVICE

2012 $4,061

LOS ANGELES LA0B311 TRANSIT PARK AND RIDE FACILITIES (TRANSIT ORIENTED NEIGHBORHOOD PROGRAM). 3 PARK AND RIDES LOCATED IN THE CITIES OF AZUSA, INDUSTRY AND WEST COVINA

2014 $11,402

LOS ANGELES LA52105 TRANSIT PAYMENTS FOR THE LEASEING OF BUS TIRES FOR THE CULVER CITYBUS FLEET.

2014 $480

LOS ANGELES 1NL04-LAF1605 TRANSIT PEDESTRIAN SAFE BUS STOP LINKAGE. LINKING 11 BUS STOPS CURRENTLY INACCESSIBLE BECAUSE OF LACK OF SIDEWALKS ON BOTH THE EAST AND WEST SIDE OF HAWTHORNE BLVD. FROM CREST RD. TO PALOS VERDES DR. SOUTH (ABOUT 13,000’)

2013 $1,544

LOS ANGELES 1TR1017 TRANSIT PLANNING FOR TRANSIT PROJECTS 2028 $25,500

LOS ANGELES LA0B358 TRANSIT PREVENTATIVE MAINTENANCE FOR THE CULVER CITYBUS FLEET

2015 $12,500

LOS ANGELES LA0F048 TRANSIT PREVENTIVE MAINTENANCE – OPERATING 2011 $21,800

LOS ANGELES LA963543 TRANSIT PREVENTIVE MAINTENANCE (CAPITAL & OPERATING MAINTENANCE ITEMS ONLY)

2016 $2,878,025

LOS ANGELES LA50200 TRANSIT PREVENTIVE MAINTENANCE (LANCASTER/PALMDALE UZA). ADDING $1,056 OF TOLL CREDITS IN CON FOR 11/12.

2015 $34,981

LOS ANGELES LA0F024 TRANSIT PROP 1B SECURITY BOND PROJECTS: INCLUDING SECURITY PROJECTS SUCH AS SURVEILLANCE SYS-TEM AND LIGHTING. IN ADDITION, TO PURCHASE OF SECURITY AND SAFETY EQUIPMENT.

2013 $2,534

Page 146: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

144 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D356 TRANSIT PROVIDE HARDSCAPE, LANDSCAPE AND STREETSCAPE IMPROVEMENTS AT EAST LOS ANGELES COLLEGE TO PROVIDE A OFF-STREET TRANSIT CENTER TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL

2013 $3,856

LOS ANGELES LA0D357 TRANSIT PROVIDE HARDSCAPE, LANDSCAPE AND STREETSCAPE IMPROVEMENTS AT LOS ANGELES TRADE TECHNICAL COLLEGE TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS.SAFETEA-LU # 307, 2007 CFP #F1645

2013 $5,925

LOS ANGELES LA0D358 TRANSIT PROVIDE HARDSCAPE, LANDSCAPE, AND STREETSCAPE IMPROVEMENTS AT LOS ANGELES VALLEY COLLEGE TO IMPROVE PEDESTRIAN MOBILITY AND MULTI-MODAL TRANSIT CONNECTIONS

2011 $4,679

LOS ANGELES LA0D348 TRANSIT PURCHASE (10) REPLACEMENT VANS WITH ALTERNATE FUEL VANS

2011 $1,320

LOS ANGELES LA0G227 TRANSIT PURCHASE 2 BUSES FOR ROUTE 757 SERVICE EXPAN-SION TO NORTH HOLLYWOOD PER THE ADOPTED TRANSPORTATION DEVELOPMENT PLAN.

2012 $1,081

LOS ANGELES LAE0132 TRANSIT PURCHASE A NEW ALTERNATE FUEL BUS. BUS WILL REDUCE EMISSIONS & CONTINUE TO PROVIDE TRANSPORTATION

2011 $250

LOS ANGELES LAE0001A TRANSIT PURCHASE OF 2 CNG BUSES FOR GLENDALE BEELINE TRANSIT SYSTEM

2011 $786

LOS ANGELES LA900520 TRANSIT PURCHASE OF ADD’L 13 REPLACEMENT VEHICLES FY10 TO FY11. 13 VEHICLES IN FY10 – FY 11

2016 $624

LOS ANGELES 1NL04-LA0G429 TRANSIT PURCHASE OF BIKE RACKS FOR TRANSIT VEHICLES. 2012 $32

LOS ANGELES LA973018 TRANSIT PURCHASE OF DIESEL TRANSMISSION REBUILDS AND HYBRID ELECTRIC POWER TRAIN COMPONENTS FOR SERVICE FLEET

2011 $120

LOS ANGELES 1OM0702-LA0G394

TRANSIT PURCHASE OF RUNCUTTING/SCHEDULING SOFTWARE. 2011 $40

LOS ANGELES LA0B203 TRANSIT PURCHASE OF SUPPORT EQUIPMENT – TIRES 2011 $480

Page 147: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 145

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE0407 TRANSIT PURCHASE ONE TROLLEY BUS VEHICLE FOR EXISTING SERVICE ALONG CARSON ST. BETWEEN THE HARBOR TRANSIT WAY STATION AND THE CARSON CIVIC CENTER AT AVALON BLVD

2010 $250

LOS ANGELES LAE0108 TRANSIT PURCHASE TWO REPLACEMENT TRIPPER BUSES. ROUTE G AND D, BLUELINE STATION AT DEL AMO BLVD/I-710 TO SOUTH BAY PAVILION MALL, DEL AMO BLVD

2012 $502

LOS ANGELES 1O1003 TRANSIT RAIL REHABILITATION AND REPLACEMENT (CAPITAL COSTS ONLY)

2035 $6,538,500

LOS ANGELES 1TR0404 TRANSIT REGIONAL CONNECTOR – LIGHT RAIL IN TUNNEL ALLOWING THROUGH MOVEMENTS OF TRAINS, BLUE, GOLD, EXPO LINES. FROM ALAMEDA / 1ST ST TO 7TH ST/METRO CENTER

2020 $1,366,100

LOS ANGELES LA0D349A TRANSIT REPLACEMENT BUSES – 25FT VANS/BUSES – PURCHASE QTY OF 6 GASOLINE-22 PASSENGER CAPACITY EACH. C/O FROM 2006/2007. CARRYOVER FROM 2008 FTIP AMENDMENT 08-53.

2011 $600

LOS ANGELES LA0B310 TRANSIT REPLACEMENT CNG & ELECTRIC BUSES – 20 IN FY11 AND 30 IN FY12

2013 $63,923

LOS ANGELES LAE0191B TRANSIT SAFETY IMPROVEMENTS AT BUS STOPS, INCLUDING BUS LOADING AREAS, LIGHTING, PASSENGER AMENITIES, BUS PADS & TURNOUTS, IMPROVED DRAINAGE, & APPURTENANCE WORK (SAFETEA-LU # 191 & # 321)

2010 $2,009

LOS ANGELES LA29202U3 TRANSIT SAN FERNANDO VALLEY NORTH/SOUTH BRT EXTENSION PHASE I: METRO RAPID SERVICE ALONG RESEDA BLVD. AND SEPULVEDA BLVD. SAFETEA-LU # 183. THE FUNDS ARE FOR TYPICAL PASSENGER AMENITIES.

2014 $11,702

LOS ANGELES 1TDL04-LAF1601 TRANSIT SAN GABRIEL CITY-WIDE BUS SHELTER INSTALLATION. INSTALL BUS SHELTERS AT EXIST-ING BUS STOPS ON MTA AND MONTEBELLO BUS LINE ROUTES.

2013 $688

Page 148: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

146 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE0364 TRANSIT SANTA MONICA’S BIG BLUE BUS/SANTA MONICA COLLEGE TRANSIT SERVICE. BUS IMPROVEMENTS NEAR THE CAMPUS ALONG THE BUS ROUTES. CARRYOVER FROM PRIOR FISCAL YEAR

2014 $2,000

LOS ANGELES LA0D372 TRANSIT SOUTH ACCESS PEDESTRIAN BRIDGE TO SIERRA MADRE VILLA LIGHT RAIL STATION. THIS PEDESTRIAN BRIDGE OVER THE ROUTE 210 FREEWAY WILL PROVIDE A DIRECT AND SAFE APPROACH FOR PEDESTRIANS

2012 $8,000

LOS ANGELES LA0D437 TRANSIT TEN (10) ALTERNATE FUEL 40 FT. TRANSIT BUSES TO REPLACE:THREE (3) 1995 MODEL & (7) SEVEN 1997 MODEL YEAR BUSES.

2011 $6,040

LOS ANGELES 1TR0704-LA0G701

TRANSIT THE METRO GOLD LINE FOOTHILL EXTENSION TRAN-SIT ORIENTED DEVELOPMENT STUDY WILL ILLUS-TRATE POSSIBLE TRANSIT ORIENTED DEVELOPMENTS INTENSITIES AROUND FUTURE METRO GOLD LINE FOOTHILL EXTENSION STATIONS.

2013 $278

LOS ANGELES LA0D11 TRANSIT TRANSIT – ENHANCEMENTS (STREET FURNITURE) 2011 $327

LOS ANGELES 1TR08D07A-LA0G269

TRANSIT TRANSIT CENTER AND PASSENGER AMENITIES AT LA SOUTHWEST COLLEGE EARMARK ID #E2008-BUSP-0678 AND E2009-BUSP-101

2012 $1,381

LOS ANGELES LA55207 TRANSIT TRANSIT COACH TIRE (LEASE) (ONGOING). CARRYOVER FROM PRIOR FISCAL YEAR

2011 $2,000

LOS ANGELES LA0C61 TRANSIT TRANSIT DATA AND COMMUNICATION SYSTEMS; ITS (RADIO, AVL, DISPATCHING, AND OTHER ADVANCED TECHNOLOGY) ONGOING.

2013 $75

LOS ANGELES LA0D337 TRANSIT TRANSIT ENHANCEMENT ACTIVITIES: 1% FORMULA FUNDS – LOS ANGELES COUNTY

2016 $31,352

LOS ANGELES 1OM0702-LA0D346

TRANSIT TRANSIT FACILITY IMPROVEMENTS (ONGOING) AT 15679 PHOEBE AVE, LA MIRADA

2011 $396

LOS ANGELES LA0D137 TRANSIT TRANSIT STATION RIGHT OF WAY PROCUREMENT FOR LAND AT THE EXISTING SANTA CLARITA METROLINK STATION. CARRYOVER FROM PRIOR FISCAL YEAR

2011 $4,517

Page 149: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 147

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE0039 TRANSIT TRANSIT VILLAGE – PROVIDE A TRANS. FACILITY FOR SATELLITE PARKING FOR SIERRA MADRE VILLA GOLD LINE STA, P-N-R FOR COMMUTERS, A FOOTHILL TRANSIT STORE. THE CENTER WILL HAVE THREE (3) BUS BAYS AND AT LEAST FOUR (4) SHELTERS. THE SHELTERS WILL ALL HAVE BENCHES WITH A SEATING CAPACITY OF AT LEAST TEN PEOPLE IN EACH SHEL-TER. THE AREA WILL HAVE LIGHTING FOR SAFETY AND SECURITY, TRASH RECEPTACLES, DRINKING FOUNTAINS, AND INFORMATION KIOSKS. ADDTIONAL TRAFFIC SIGNALS AND A R-HAND BUS ONLY TURN LANE.

2012 $3,026

LOS ANGELES 1TR1016 TRANSIT UNION BUS DIVISION (CAPITAL COSTS ONLY) 2012 $90,100

LOS ANGELES LA0F059 TRANSIT UPGRADE SECURITY CAMERA SYSTEMS (L/P UZA. USING $80 OF TRANSPORTATION DEVELOPMENT CREDITS (TOLL CREDITS) IN FY12 FOR CON.

2012 $400

LOS ANGELES LA29202W TRANSIT WILSHIRE BLVD BRTPHASE I: 12.5-MI. CORRIDOR WITH 7.7-MI. PEAK PERIOD BUS LANE ON WILSHIRE WITHIN THE CITY AND COUNTY OF LA FROM VALENCIA ST. TO CITY OF SANTA MONICA. INCLUDES STREET WIDENING, CURB LANE REPAVING/RECONSTRUCTING, IMPROVED TRAFFIC SIGNAL TIMING & BUS SIGNAL PRIORITY. PHASE II: INCLUDES ENHANCED SHELTERS & LANDSCAPING; STREET REPAIR/RECONSTRUCTION; CONCRETE BUS PADS AND P&R FACILITIES.

2014 $80,610

LOS ANGELES LA0C64 TRANSIT ASSOCIATED CAPITAL MAINTENANCE (ENGINES, TRANSMISSIONS, PARTICULATE TRAPS, KITS, ETC) (ONGOING)

2012 $25

LOS ANGELES LA0D342 TRANSIT BEAUDRY AVE TERMINAL STREETSCAPE 2008 $509

LOS ANGELES LA0D320 TRANSIT BETWEEN NORWALK AND LA MIRADA: CONSTRUCT 5.6 MILES OF NEW THIRD MAIN TRACK. PPNO# 2002 EA# R889SA TCRP# 35.2

2010 $102,661

LOS ANGELES LA0G658 TRANSIT BRIDGEPORT MARKETPLACE PARK AND RIDE LOT (W/ APROX. 200 PARKING SPACES) @ THE CORNER OF NEWHALL RANCH RD AND MCBEAN PARKWAY.

2018 $2,500

LOS ANGELES LA57101 TRANSIT BUS FACILITY IMPROVEMENTS 2010 $81,124

Page 150: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

148 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA57110 TRANSIT BUS REPLACEMENT: FIVE ALTERNATIVE FUELED BUSES (20 OR 30 FT WITH ASSOCIATED INFRASTRUCTURE) AND TEN ALTERNATIVE FUELED BUSES (40 FT)

2010 $11,500

LOS ANGELES LA0C37 TRANSIT BUS STOP IMPROVEMENTS CONSTRUCTION OF PASSENGER SHELTERS AND INFORMATION KIOSKS

2010 $686

LOS ANGELES LA01B112 TRANSIT BUS SUPPORT EQUIPMENT (ENGINES AND TRANSMISSIONS)

2011 $1,200

LOS ANGELES LA0C8380 TRANSIT CHINATOWN/COLLEGE STREET GOLD LINE STATION – INTERMODEL TRANS. CENTER ENHANCE MENT ( PEDESTRIAN WALKWAY BRIDGE, BUS STATION, AND A BIKE STATION)

2012 $18,190

LOS ANGELES LA0C8223 TRANSIT COMPTON MLK TRANSIT CENTER EXPANSION AND MULTI-MODAL/WILL ALLOW THE TRANSIT SYSTEM TO REDUCE OPERATING COST.

2011 $4,934

LOS ANGELES LA0D127 TRANSIT CONSTRUCT CNG FUELING STATION ON EXISTING FACILITY

2010 $3,085

LOS ANGELES 1TDL04-LA0G354

TRANSIT CONSTRUCTION OF TRANSIT CENTER AT THE COMMUNITY REC FACILITY LOCATED AT THE TAYLOR RANCH PARK AND RIDE FACILITY, 737 NORTH MONTEBELLO BLVD, MONTEBELLO.

2012 $325

LOS ANGELES 1TR0704-LA0G635

TRANSIT DESIGN AND CONSTRUCTION OF PEDESTRIAN AND TRANSIT ENHANCEMENTS ALONG THE PUBLIC RIGHT-OF-WAY OF THE METRO GOLD LINE EASTSIDE EXTENSION TO SURROUNDING NEIGHBORHOOD.

2020 $30,000

LOS ANGELES LA0D389 TRANSIT FEDERAL GRANT WILL BE USED TO PURCHASE TWO (2) PARATRANSIT VEHICLES FOR THE CITY’S DIAL-A-RIDE SERVICE USED BY ELDERLY AND HANDICAPPED RESIDENTS

2008 $146

LOS ANGELES 1OM0701 TRANSIT GOLD LINE – EASTSIDE EXTENSION OPERATING ASSISTANCE

2014 $52,500

LOS ANGELES LA0D95 TRANSIT IMPLEMENTATION OF UNIVERSAL FARE SYSTEM PROJECT AT LADOT PREVIOUSLY PART OF LAOD07.

2008 $2,893

Page 151: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 149

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1TR204-LA0G145

TRANSIT LACRD – 4 EXPANSION BUSES FOR THE I-110 HARBOR TRANSITWAY HOT LANE(TORRANCE TRANSIT). (RTP# 1TR204)

2010 $2,800

LOS ANGELES LA990305 TRANSIT LIGHT RAIL TRANSIT FLEET- 50 NEW RAIL CAR (26 EXP (10 FOR METRO GOLD LINE EASTSIDE & (16) FOR EXPOSITION LRT) 24 REPLACEMENT CARS – .PPNO 3225.

2012 $162,479

LOS ANGELES LA000665 TRANSIT LINE #8 – OPERATING SUBSIDY 2009 $5,046

LOS ANGELES LAF1424 TRANSIT MCBEAN REGIONAL TRANSIT CENTER PARK AND RIDE. PURCHASE LAND, DESIGN, AND CONSTRUCT A REGIONAL PARK-AND-RIDE LOT ADJACENT TO THE MCBEAN REGIONAL TRANSIT CENTER IN THE CITY OF SANTA CLARITA.

2014 $5,868

LOS ANGELES LA0D338 TRANSIT METRO GOLD LINE EASTSIDE EXTENSION ENHANCEMENTS INCLUDING ADDITIONAL TVM’S; PEDESTRIAN SAFETY, LANDSCAPING AND MULTI-MODAL INTERFACE ELEMENTS; ADDITIONAL TRACTION POWER SUBSTATION,

2010 $14,000

LOS ANGELES LA0C8250 TRANSIT MONROVIA RAILROAD DEPOT MULTI-MODAL TRANSIT CENTER: STABILIZING STRUCTURE AND THEN OVERALL STRUCTURAL ELEMENTS WILL BE REPAIRED FOLLOWED BY RESTORING KEY ARCHITECTURAL . PPNO# 3415

2008 $2,053

LOS ANGELES 1NL04-LA0G198 TRANSIT PASSENGER AND PEDESTRIAN IMPROVEMENTS BY LANI

2012 $315

LOS ANGELES LA0F023 TRANSIT PEAK-HOUR BUS-ONLY LANES ON LINCOLN BLVD. BETWEEN PICO BLVD AND THE SOUTH CITY LIMIT (IN BOTH DIRECTIONS)

2011 $170

LOS ANGELES LA0335 TRANSIT PURCHASE 1 PARATRANSIT VEHICLE 2008 $70

LOS ANGELES LAE0172 TRANSIT PURCHASE 21 REPLACEMENT BUSES FOR SANTA MONICA’S BIG BLUE BUS TRANSIT SERVICE. 5 BUSES PURCHASED IN FY11/12

2012 $21,392

LOS ANGELES LA0D453 TRANSIT PURCHASE 5 REPLACEMENT ALTERNATIVE FUEL 40’ BUSES

2010 $3,000

Page 152: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

150 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D109 TRANSIT PURCHASE LAND FOR VEHICLE MAINTENACE TRANSIT FACILITY

2008 $2,062

LOS ANGELES LA0C63 TRANSIT PURCHASE OF MISC OFFICE EQUIPMENT- (ONGOING) 2013 $106

LOS ANGELES 1OM0702-LA0G283

TRANSIT PURCHASE OF TOOLS AND EQUIPMENT FOR MAINTE-NANCE OF THE LA MIRADA TRANSIT FLEET.

2013 $69

LOS ANGELES LA963580 TRANSIT RADIO SYSTEM; REPLACEMENT OF EXISTING RADIO/DISPATCH SYSTEM / ADVANCED BUS TECHNOLOGY

2010 $10,300

LOS ANGELES LA990724 TRANSIT RADIOS ON BUSES 81 VEHICLES TO INCLUDE AVL SYSTEM

2009 $3,156

LOS ANGELES 1TR204-LA0G191

TRANSIT RED CAR TROLLEY ENGINEERING STUDY FOR DOWNTOWN LOS ANGELES STREETCAR.

2014 $1,248

LOS ANGELES LA0D454 TRANSIT REHAB TRANSIT ADMINISTRATIVE AND OPERATIONS OFFICES

2012 $400

LOS ANGELES LA0C08 TRANSIT REPLACE 10 PARATRANSIT VEHICLES 2008 $701

LOS ANGELES 1TDL04-LA0G220

TRANSIT REPLACE 25 ACCESSIBLE MINIVANS (@ 40K APIECE) FOR ADA PARATRANSIT SERVICE IN LOS ANGELES COUNTY

2010 $1,000

LOS ANGELES LA0D455 TRANSIT REPLACE RELIEF AND SUPERVISOR VEHICLES 2008 $160

LOS ANGELES LA0D116 TRANSIT REPLACEMENT OF HVAC SYSTEM AT TORRANCE TRANSIT FACILITY

2008 $500

LOS ANGELES LA0F002 TRANSIT REPLACEMENT OF OMS SYSTEM (HARDWARE AND SOFTWARE)

2010 $1,200

LOS ANGELES LA996086 TRANSIT REPLACMENT – 3 ALTERNATIVE FUEL SHUTTLES 2010 $376

LOS ANGELES LA29202U1 TRANSIT SAN FERNANDO VALLEY E/W BRT (FROM TERMINUS OF METRO RED LINE IN NO HOLLYWOOD TO WARNER CTR)14-MILE EXCLUSIVE BUS LANES AT FORMER RAIL RD ROW (PPNO 3333 AB3090REP ) SAFETEA-LU # 326

2010 $21,129

LOS ANGELES LA0D272 TRANSIT SOUTH SAN FERNANDO VALLEY REGIONAL PARK AND RIDE. ADD 50 NEW PARKING SPACES TO EXISTING COMMUTER EXPRESS PARK AND RIDE LOT WITHIN EXISTING AREA.

2008 $767

Page 153: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 151

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LA0G719 TRANSIT THE ROSA PARKS TRANSIT STATION IMPROVEMENTS PROJECT MODERNIZES EXISTING RAIL/BUS TRANSIT STATION, RELOCATES AND EXPANDS BUS FACILI-TIES AND IMPROVES ACCESSIBILITY TO THE STATION AND INTEGRATION WITH SURROUNDING TRANSIT ORIENTED DISTRICT MEDICAL AND MEDICAL-EDUCA-TIONAL FACILITIES.

2014 $5,500

LOS ANGELES 1TDL04-LA0G203

TRANSIT TRANSIT ACCESS PASS INTEGRATION – PURCHASE FARE/TICKET VENDING EQUIPMENT TO BE INTE-GRATED INTO THE LOS ANGELES COUNTY TRANSIT ACCESS PASS (TAP) SYSTEM.

2011 $4,000

LOS ANGELES LA0D343 TRANSIT VEHICLE MAINTENANCE FACILITY 2008 $9,627

LOS ANGELES 1TDL04-LAES771

TRANSIT VILLA ESPERANZA SERVICES REPLACEMENT OF THREE MINI VANS IV AT $4,817 LOCAL AND $37,183 FEDERAL EACH.

2010 $126

LOS ANGELES LAE0036 TRANSIT WILSHIRE/ VERMONT PEDESTRIAN PLAZA IMPROVEMENTS AND INTERMODAL PEDESTRIAN LINKAGES

2011 $1,960

LOS ANGELES 1TL104 TRANSIT BUS CAPITAL COUNTYWIDE COUNTYWIDE BUS SYSTEM IMPROVEMENT--METRO FLEET

2035 $8,433,800

LOS ANGELES 1TR1010 TRANSIT BUS CAPITAL COUNTYWIDE COUNTYWIDE BUS SYSTEM IMPROVEMENT--MUNI FLEET

2035 $6,683,200

LOS ANGELES 1TR1001 TRANSIT GREEN LINE SOUTH BAY EXTENSION

MARINE AVE STATION

PROPOSED REDONDO

BEACH TRANSIT CENTER

GREEN LINE EXTENSION ALONG HARBOR SUBDIVISION TO THE PROPOSED REDONDO BEACH TRANSIT CENTER

2035 $555,000

LOS ANGELES LA0C53 TRANSIT HAWTHORNE AVE HOLLYWOOD INTERMODAL TRANSPORTATION AND PUBLIC PARKING CENTER ON HAWTHORNE AVE. BETWEEN HIGHLAND AVE AND NORTH ORANGE DRIVE (EXIST 500 SP PARK STRUCTURE).TCRP#49.2

2020 $41,000

LOS ANGELES 1TR1009 TRANSIT LAKEWOOD STATION TRANSIT

CENTER AND PARK-AND-RIDE

METRO GREEN LINE LAKEWOOD STATION

METRO GREEN LINE LAKEWOOD

STATION

CONSTRUCT TRANSIT CENTER AND PARK-AND-RIDE LOT FOR CONNECTION TO THE METRO GREEN LINE AT LAKEWOOD STATION. A TOTAL OF 230 PARKING SPACES ARE PROPOSED.

2018 $5,100

Page 154: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

152 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1TR0101 TRANSIT METRO RAIL GREEN LINE EXTENSION

MARIPOSA & NASH CENTURY & SEPULVEDA-LAX

TERMINAL

PEOPLE MOVER OR LIGHT RAIL 2030 $330,000

LOS ANGELES 1TL0703 TRANSIT METRO RAIL TRANSIT CAPITAL

COUNTYWIDE RAIL CAPITAL PROJECTS 2035 $19,151,000

LOS ANGELES 1TR1019 TRANSIT METRO RAIL TRANSIT CAPITAL

COUNTYWIDE RAIL SYSTEM IMPROVEMENTS (CAPITAL COSTS ONLY) 2035 $2,365,700

LOS ANGELES 1TL204 TRANSIT METRO RAIL TRANSIT CAPITAL

COUNTYWIDE TRANSIT CONTINGENCY/NEW RAIL YARDS/ADDI-TIONAL RAIL CARS (CAPITAL COSTS ONLY)

2030 $592,700

LOS ANGELES 1TR1015 TRANSIT METROLINK COMMUTER RAIL

COUNTYWIDE METROLINK CAPITAL SUBSIDY (DOES NOT INCLUDE METROLINK FARES AND OTHER NON-METRO FUNDS)

2035 $991,600

LOS ANGELES 1CR04 TRANSIT METROLINK COMMUTER RAIL

COUNTYWIDE METROLINK OPERATIONS SUBSIDY (DOES NOT INCLUDE METROLINK FARES AND OTHER NON-METRO FUNDS)

2035 $1,916,700

LOS ANGELES 1TR1008 TRANSIT NORWALK/SANTA FE SPRINGS

TRANSPORTATION CTR PARKING

12800 IMPERIAL HWY, SANTA FE

SPRINGS

12800 IMPERIAL HWY, SANTA FE

SPRINGS

NORWALK/SANTA FE SPRINGS TRANSPORTATION CTR PHASE II PARKING. CONSTRUCT A TOTAL OF APPROX. 160 PARKING SPACES ON A SITE ADJACENT TO THE METROLINK STATION.

2014 $2,819

LOS ANGELES 1TR1003 TRANSIT PURPLE/RED LINE CENTURY CITY WESTWOOD METRO WESTSIDE SUBWAY EXTENSION SEGMENT 3 (CENTURY CITY TO WESTWOOD)

2035 $1,615,000

LOS ANGELES 1TR1002 TRANSIT PURPLE/RED LINE FAIRFAX CENTURY CITY METRO WESTSIDE SUBWAY EXTENSION SEGMENT 2 (FAIRFAX TO CENTURY CITY)

2030 $2,450,000

LOS ANGELES 1TR0705 TRANSIT SAN FERNANDO VALLEY NORTH-SOUTH METRO ORANGE LINE

CANOGA STATION (ORANGE LINE)

CHATSWORTH METROLINK

STATION

SAN FERNANDO VALLEY NORTH-SOUTH METRO ORANGE LINE CANOGA EXTENSION

2014 $221,000

LOS ANGELES 1TR0706 TRANSIT SFV N/S BRT PHASE II

SAN FERNANDO VALLEY NORTH/SOUTH BRT PHASE II &#40;METRO RAPID SERVICE IMPROVEMENTS ON MAJOR NORTH/SOUTH ARTERIALS IN SFV&#41;

2018 $157,464

LOS ANGELES LA0D13 TRANSIT TEST REPLACE FAREBOX/UFS 2011 $1,700

LOS ANGELES 1TR1011 TRANSIT WEST SANTA ANA BRANCH ROW

CORRIDOR

LA/OC COUNTY LINE TOWARD DOWNTOWN LA

WEST SANTA ANA BRANCH ROW CORRIDOR – PROVIDES FOR THE DEVELOPMENT OF A GRADE-SEPARATED TRANSIT CORRIDOR – PHASE FROM LA COUNTY LINE TOWARD DOWNTOWN LA

2030 $649,000

Page 155: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 153

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1TR1012 TRANSIT CALIFORNIA HIGH SPEED RAIL

CALIFORNIA HIGH SPEED RAIL PHASE 1 – ENV/PE 2011 $80,000

LOS ANGELES 1120005 TRANSIT EXPAND RAIL METRO GREEN LINE NORWALK

STATION

METRO GREEN LINE EXTENSION: METRO GREEN LINE NORWALK STATION TO NORWALK METROLINK STATION

2035 $480,000

LOS ANGELES 1120006 TRANSIT EXPAND RAIL AZUSA COUNTY LINE METRO GOLD LINE FOOTHILL EXTENSION: AZUSA TO COUNTY LINE

2035 $998,000

LOS ANGELES 1120003 TRANSIT EXPAND RAIL CRENSHAW CORRIDOR

METRO BLUE LINE SLAUSON

STATION

SLAUSON LIGHT RAIL: CRENSHAW CORRIDOR TO METRO BLUE LINE SLAUSON STATION

2035 $554,000

LOS ANGELES 1120004 TRANSIT EXPAND RAIL METRO RED LINE STATION NORTH

HOLLYWOOD

BURBANK BOB HOPE AIRPORT

METRO RED LINE EXTENSION: METRO RED LINE STATION NORTH HOLLYWOOD TO BURBANK BOB HOPE AIRPORT

2035 $933,000

LOS ANGELES 1120002 TRANSIT EXPAND RAIL WILSHIRE/VERMONT EXPOSITION/VERMONT

VERMONT SHORT CORRIDOR: WILSHIRE/VERMONT TO EXPOSITION/VERMONT

2035 $1,178,000

LOS ANGELES 1O1005 STATE HIGHWAY

CALL FOR PROJECTS GOODS MOVEMENT MODE 2030 $682,100

LOS ANGELES 1O1004 STATE HIGHWAY

CALL FOR PROJECTS RSTI MODE 2030 $753,900

LOS ANGELES 1O1002 STATE HIGHWAY

SAFETY NET (IMMEDIATE NEEDS) PROGRAM 2035 $253,700

LOS ANGELES 1M1005 STATE HIGHWAY

HIGH DESERT CORRIDOR

HIGH DESERT CORRIDOR (ENVIRONMENTAL) 2014 $33,000

LOS ANGELES LA0C8080 STATE HIGHWAY

1 ROUTE 1: MANHATTAN BEACH: ON ROUTE 1 BETWEEN 33RD ST & ROSECRANS AV; ADD ONE THROUGH LN TO NORTH BOUND SEPULVEDA BLVD. TO WIDEN EXISTING STRUCTURE FROM 6 TO 7 THROUGH LANES PPNO 2947. PROJECT USING $288 OF TOLL CREDITS TO OBLIGATE 100% FEDERAL FUNDS IN ENG PHASE.

2014 $13,555

LOS ANGELES 16606 STATE HIGHWAY

1 ROUTE 1: NEAR MARINA REY ON LINCOLN BLVD FRM JEFFERSON BLVD TO FIJI WAY – WIDEN FROM 3 TO 4 THRU LNES IN EA. DIR. & RPLCE CULVER BLVD OC &CNSTRCT NEW BRDG OVR BALLONA CREK (EA 1661C, PPNO 0027P).

2018 $3,232

Page 156: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

154 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA990351-LA0G692

STATE HIGHWAY

2 ROUTE 002: FROM 0.5 MILES SOUTH OF BRANDEN ST TO I-5/SR-2 INTERCHANGE – MODIFY TERMINUS, SOUNDWALLS, LANDSCAPING, INSTALLING DETECTOR LOOPS AND RAMP METERS, RESTRIPING (WITH NO LANE ADDITION) AND IMPROVING ARTERIAL STREETS (RESTRIPING-NO INCREASE IN CAPACITY, AND REMOVING & WIDENING SIDEWALK. (EA 20550, PPNO 2689)(TOLL CREDITS = LOCAL MATCH)

2016 $9,329

LOS ANGELES LA000358 STATE HIGHWAY

5 ROUTE 005: --- FROM ROUTE 134 TO ROUTE 170 HOV LANES (8 TO 10 LANES) (CFP 346)(2001 CFP 8355). (EA# 12180, 12181,12182+12183=1218W,12184, 13350 PPNO 0142F,151E,3985,3986,3987) SAFETEA LU # 570. CONSTRUCT MODIFIED IC @ I-5 EMPIRE AVE, AUX LNS NB & SB BETWEEN BURBANK BLVD & EMPIRE AVE; AND MODIFY EXISTING STRUCTURES. ADD AUXILIARY LANE BETWEEN ALAMEDA AND OLIVE FROM PM 28.43 TO PM 29.78

2014 $712,274

LOS ANGELES LAE0465 STATE HIGHWAY

5 ROUTE 005: PHASE 1 OF 3 – IN SANTA CLARITA FROM ROUTE 14 TO PICO CANYON/LYONS AVE IN THE SOUTHBOUND DIRECTION AND FROM ROUTE 14 TO GAVIN CANYON ROAD IN THE NORTHBOUND DIREC-TION. CONST TRUCK CLIMBING LANES. (EA 2332A, PPNO 3189), (SAFTETEA-LU#465 FUNDED PAED FOR THIS PHASE INCLUDED IN LA0G440).

2016 $130,000

LOS ANGELES LA0D192 STATE HIGHWAY

5 ROUTE 005: GARVEE DEBT SERVICE PAYMENTS: RT 5 FROM RT 118 TO RT 14 FROM 10 TO 12 LANES HOV LANES. EA# 122001, PPNO 0162P.

2015 $28,895

LOS ANGELES LA0C8012 STATE HIGHWAY

5 ROUTE 005: I-5 WESTERN AVE I/C PHASE I -REALIGNMENT OF I-5 NB OFF & ON RAMPS @ WESTERN. NB EXIT RAMP BEGINS AS 2 AND WIDENS TO 4 LANES AT FLOWER ST. (EA# 1786A, PPNO 2120)

2014 $33,615

LOS ANGELES LA0D463 STATE HIGHWAY

5 ROUTE 5: I-5 LAKE HUGHES RD- INTERSECTION IMPROVEMENTS & WIDENING TO PROVIDE ADDITIONAL LANES ON EASTBOUND AND WESTBOUND APPROACHES

2018 $500

Page 157: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 155

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D462 STATE HIGHWAY

5 ROUTE 5: I-5 PARKER RD INTERSECTION IMPROVEMENTS INCLUDING BRIDGE WIDENING AND LANE ADDITIONS

2018 $500

LOS ANGELES LA0D73B STATE HIGHWAY

5 ROUTE 5: IN NORWALK: FROM ORANGE COUNTY LINE TO ROUTE 605: CARMENITA INTERCHANGE IMPROVEMENT (EA 2159C0, PPNO 2808A) (TCRP 42.3, & 43)

2014 $379,730

LOS ANGELES LA0D73 STATE HIGHWAY

5 ROUTE 5: LA MIRADA, NORWALK & SANTA FE SPRINGS-ORANGE CO LINE TO RTE 605 JUNCTION. WIDEN FOR HOV & MIXED FLOW LNS, RECONSTRUCT VALLEY VIEW (EA 2159A0 = 21591, 21592, 21593, 21594, 21595, PPNO 2808 = 4153, 2808, 4154, 4155, 4156). TCRP#42.2&42.1

2018 $1,241,757

LOS ANGELES LAE2577 STATE HIGHWAY

5 ROUTE 5: STUDY NORWALK, SANTA FE SPRINGS, DOWNEY, MONTEBELLO, & COMMERCE: ON I-5, CONDUCT PLAN’G, ENV. STUDIES FOR WIDEN’G W/HOV & MIXED FLOW LNS FROM I-605 TO I-710.(EA2159E, 2159F, PPNO 2808C, 2808D)PAED ONLY

2023 $4,730

LOS ANGELES LA000357 STATE HIGHWAY

5 ROUTE 005: --- FROM ROUTE 170 TO ROUTE 118 ONE HOV LANE IN EACH DIRECTION (10 TO 12 LANES) INCLUDING THE RECONSTRUCTION OF THE I-5/SR-170 MIXED FLOW CONNECTOR AND THE CONSTRUCTION OF THE I-5/SR-170 HOV TO HOV CONNECTOR (CFP 345) (2001 CFP 8339; CFP2197). (EA# 121901, PPNO 0158K) (TCRP#41.2)

2012 $207,838

LOS ANGELES LAE0465-LA0G440

STATE HIGHWAY

5 ROUTE 005: PHASE 2 AND 3 OF 3-- IN LA/SANTA CLARITA: PHASE 2 (N/B FR RTE 14 TO WELDON CNYN ROAD; CONSTRUCT HOV LANE )& PHASE 3 (FR SR14 TO PARKER RD OC; CONSTRUCT HOV, TRUCK & AUX LANES (EA 2332C, PPNO 3189A & EA 2332E PPNO 3189B), SAFTETEA-LU#465. PE & RW $ ARE PROGRAMMED FOR EA 2332E ONLY.

2017 $410,000

LOS ANGELES LA0D74 STATE HIGHWAY

5 ROUTE 5: IN LOS ANGELES FROM CHAMBERLAIN ST TO LARKSPUR ST SOUNDWALL CONSTRUCTION PART OF RTE 5 FR 118 TO 14 HOV PRJ (CFP 8925). EA# 23550 .PPNO 3236.

2016 $41,724

Page 158: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

156 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA996134 STATE HIGHWAY

5 ROUTE 5: RTE. 5/14 INTERCHANGE & HOV LNS ON RTE 14 – CONSTRUCT 2 ELEVATED LANES – HOV CONNECTOR (DIRECT CONNECTORS) (EA# 16800)(2001 CFP 8343) (PPNO 0168M)

2014 $161,100

LOS ANGELES 1H0103 STATE HIGHWAY

5 I-5/I-405 SOUTH NORTH I-5/I-405 CARPOOL LANE PARTIAL CONNECTOR (SOUTH TO NORTH)

2030 $330,000

LOS ANGELES 1TL1001 STATE HIGHWAY

5 I-5 PICO CANYON PARKER ROAD IN L.A./SANTA CLARITA ON RTE 5 FROM PICO CANYON TO PARKER RD, HOV AND AUXILIARY LANE IMPROVEMENTS

2030 $390,000

LOS ANGELES 1HL08D01-LA0G139

STATE HIGHWAY

10 LACRD – EXPAND CAPACITY OF THE I-10 HOT LANE (RESTRIPING AND BUFFER CHANGES). RESTRIPE TO ADD A SECOND LANE (WB – SANTA ANITA TO I-710; EB – I-710 TO BALDWIN AVE.)FOR HOT LANES ON THE I-10. (RTP# 1HL08D01)

2014 $3,200

LOS ANGELES 1HL08D01-LA0G137

STATE HIGHWAY

10 LACRD – HOT LANES ON I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182ND ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD.(IT AND TOLL TECHNOLOGY)(RTP # 1HL08D01, HL08D03, 1OM08D01)CONVERSION OF HOV LANES TO HOT LANES ON I-10 FROM ALAMEDA ST./UNION STATION TO I-605. (RTP ID 1HL08D01 & 1HL08D03 & 1TR08D07B)

2012 $66,679

LOS ANGELES LAE3805 STATE HIGHWAY

10 PLANNING, DESIGN AND PRELIMINARY ENGINEERING OF ON/OFF RAMP SYSTEM AT INTERSECTION OF I-10 AND ROBERTSON/NATIONAL BLVD.

2013 $200

LOS ANGELES LA0F098 STATE HIGHWAY

10 ROUTE 010: L.A. COUNTY I-10 AND I-605 IC;CONSTRUCT ONE/TWO LANE BRIDGE STRUCTURE, BRANCHING OFF SB OF RTE 605 TO EB OF RTE 10 AT-GRADE CONNECTOR RAMP (EA 24540, PPNO 3529; CONSTRUCT ONE-LANE CONNECTOR FROM SB I-605 TO WB I-10.

2014 $78,760

LOS ANGELES LA000548 STATE HIGHWAY

10 ROUTE 10: FROM PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES & SOUNDWALLS (C-ISTEA 77720, 95 STIP-IIP) (EA# 117080,11172, 1170U, PPNO# 0309N, 0309S)

2018 $184,522

Page 159: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 157

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0B875 STATE HIGHWAY

10 ROUTE 10: HOV LANES FROM CITRUS TO ROUTE 57/210 – (EA# 11934, PPNO# 0310B)

2018 $192,643

LOS ANGELES 1OM0702-LA0G819

STATE HIGHWAY

10 LACRD – I-10 AND I-110 EXPRESSLANES TOLL SYS-TEM OPERATIONS, MAINTENANCE, MARKETING AND DATA COLLECTION (RTP ID 1TR08D7B & 10M08D01; LA0G150, LA0G151, LA0G152,1OM08D02)

2013 $2,499

LOS ANGELES LA01342 STATE HIGHWAY

10 ROUTE 010: RT 10 FROM RT 605 TO PUENTE AVE HOV LANES (8+0 TO 8+2) (EA# 117070, PPNO 0306H) PPNO 3333 3382 AB 3090 REP (TCRP #40)

2014 $200,064

LOS ANGELES LA0D336 STATE HIGHWAY

14 ROUTE 14: SR14/AVE K INTERCHANGE IMPROVEMENTS. WIDEN NORTHBOUND OFFRAMP AND 15TH ST WEST. WIDEN N/B OFFRAMP FROM 3 TO 4 LANES AT AVE K/15TH ST-W.

2023 $4,250

LOS ANGELES LA0C8102 STATE HIGHWAY

14 ROUTE 14: SR-14 FREEWAY/AVE I INTERCHANGE IMPROVEMENTS-WIDENING AVE I FROM 2 TO 3 LANES IN EACH DIRECTION, ADDING DUAL LEFT TURN LANES, AND WIDENING A BRIDGE STRUCTURE. PPNO 3123.

2012 $10,581

LOS ANGELES 1H0101 STATE HIGHWAY

14 SR-14 AVE. P-8 AVE. L ADD 1 HOV LANE EACH DIRECTION ON THE SR-14 FROM AVE. P-8 TO AVE. L

2030 $120,000

LOS ANGELES 1OM0702-LAE0357

STATE HIGHWAY

19 CONSTRUCT NEW LEFT TURN LANE AT THE STATE ROUTE 19 AND TELSTAR. THE ADDITION OF A SECONDARY LEFT TURN LANE AND TRAFFIC SIGNAL AT THE INTERSECTION OF ROSEMEAD BLVD (STATE) AND TELSTAR AVE. PROJECT USING $347 TOLL CREDIT FOR CONSTRUCTION PHASE IN FY 10/11 FOR STPL AND DEMO FUNDS.

2012 $2,360

LOS ANGELES LA0D45-LA0G600

STATE HIGHWAY

47 ROUTE 047: REPLACEMENT OF SCHUYLER HEIM BRIDGE TO INCLUDE 2 THRU LANES AND 1 AUX LANE NB; AND 3 THRU LANES AND 1 AUX LANE SB (EA 13820, PPNO 0444E).

2014 $278,993

LOS ANGELES LA0D45 STATE HIGHWAY

47 SR-47 EXPRESSWAY:REPLACEMENT OF SCHUYLER HEIM BRIDGE TO INCLUDE 2 THRU LANES AND 1 AUX LANE NB; AND 3 THRU LANES AND 1 AUX LANE SB; CONSTRUCT EXPRESSWAY AND 2-LANE FLYOVER. SAFETEA-LU #712 & #3797

2018 $687,000

Page 160: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

158 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1M0430 STATE HIGHWAY

47 SR-47 AT NAVY WAY CONSTRUCTION OF INTERCHANGE AT SR-47 / NAVY WAY

2014 $47,800

LOS ANGELES 1M0104 STATE HIGHWAY

57 SR-57/SR-60 SR-57/SR-60 INTERCHANGE IMPROVEMENT 2030 $475,000

LOS ANGELES LA0D399 STATE HIGHWAY

60 ROUTE 60: CONSTRUCTION OF NEW PARTIAL DIAMOND INTERCHANGE FOR STATE ROUTE 60 (SR-60) AT LEMON AVE (SAFETEA-LU # 587).

2018 $19,000

LOS ANGELES LA0B951 STATE HIGHWAY

71 ROUTE 71: ROUTE 10 TO ROUTE 60 – EXPRESSWAY TO FREEWAY CONVERSION – ADD 1 HOV LANE AND 1 MIXED FLOW LANE . (2001 CFP 8349, TCRP #50) (EA# 210600, PPNO 2741) (TCRP #50)

2023 $250,000

LOS ANGELES 1M1001 STATE HIGHWAY

71 SR-71 MISSION BLVD RIO RANCHO RD EXPRESSWAY TO FREEWAY CONVERSION – ADD 1 HOV LANE AND 1 MIXED FLOW LANE

2030 $330,000

LOS ANGELES 1M1003 STATE HIGHWAY

91 91/105/110/405 I-405, I-110, I-105 AND SR-91 RAMP AND INTERCHANGE IMPROVEMENTS (SOUTH BAY)

2014 $1,265,200

LOS ANGELES 1OM0702-LA0G208

STATE HIGHWAY

101 PROJECT WILL REPLACE EXISTING 2 LANE BRIDGE WITH 4 LANE BRIDGE AND ONE TURN LANE AT LOST HILLS ROAD/US 101 INTERCHANGE. THIS WILL BRING BRIDGE TO CURRENT LANE CONFIGURATION OF LOST HILLS ROAD ON EITHER SIDE OF BRIDGE. THE INTERCHANGE WILL ELIMINATE A CROSS-TRAFFIC MOVEMENT TO ACCESS THE NB US 101. THERE WILL BE NO ADDITIONAL LANES ON THE US 101 FREEWAY. THE REPLACEMENT BRIDGE WILL BE WIDER,4 LANES RATHER THAN 2 AND THE SPAN WILL BE APPROXI-MATELY 280 FEET LONG, ACCOMMODATING THE WIDTH OF THE ROAD ON EIT

2014 $28,080

LOS ANGELES LA0D31 STATE HIGHWAY

101 ROUTE 101: CONSTRUCT ONE ADDITIONAL LANE FOR BOTH NORTH AND SOUTH BOUND OFF-RAMPS AT VAN NUYS BLVD. (RIP 1 M, IIP 8 M) (EA # 199630) (PPNO 2789) (DEMO= NAT. CORRIDOR PLANNING AND BORDER DEV.)

2018 $10,232

Page 161: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 159

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA960142 STATE HIGHWAY

101 LINDERO CANYON ROAD

RTE 101/LINDERO CANYON ROAD INTERCHANGE IMPROVEMENT PROJECT. LINDERO CYN RD BTW VIA COLINAS AND AGOURA RD WIDENED FROM 2 TO 3 LANES IN EACH DIRECTION. RAMP G-6 WIDENED TO 2 LANES TO PROVIDE FOR 2 FREE RT LANES FOR EASTBOUND VIA COLINAS TRAFFIC AT LINDERO CYN RD. THE EXISTING NORTHBOUND AUX LANE WILL BE EXTENDED SOUTHERLY FROM ITS TERMINUS AT RAMP G-6 TO RAMP G-3. INCLUDES BIKE PATH CONSTRUCTION.

2014 $23,382

LOS ANGELES LA0D344 STATE HIGHWAY

101 REYES ADOBE ROAD

WIDENING OF THE REYES ADOBE ROAD OVERCROSSING OF THE 101 FREEWAY FROM 3 LANES TO 6 LANES, ALONG WITH BIKE LANES AND SIDEWALKS

2012 $11,072

LOS ANGELES 1M0802 STATE HIGHWAY

101 US-101 AT UNIVERSAL TERRACE PARKWAY

US-101/UNIVERSAL TERRACE PARKWAY (CAMPO DE CAHUENGA WAY) INTERCHANGE IMPROVEMENTS

2014 $21,516

LOS ANGELES 1M0132 STATE HIGHWAY

103 PIER B ST/TERMINAL ISLAND

FWY

INTERCHANGE IMPROVEMENT – NEW NB ON-RAMP TO SR-103

2012 $1,000

LOS ANGELES LAE1609 STATE HIGHWAY

105 ROUTE 105: STUDY REPORT FOR INTERCHANGE IMPROVEMENTS AT LAX AIRPORT (E/P, PS/E ONLY)

2011 $400

LOS ANGELES 1HL08D03 STATE HIGHWAY

110 LACRD – HOT LANES ON THE I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182 ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD. INCLUDES OPERATIONAL IMPROVEMENTS AT I-110 OFF-RAMP AT ADAMS BLVD (RE-STRIPE OFF-RAMP TO ADD A RIGHT TURN LANE AND WIDEN ADAMS BLVD BRIDGE FOR AN ADDITIONAL THROUGH LANE TO FIGUEROA WAY). CONVERSION OF HOV LANES TO HOT LANES. (INFRASTRUCTURE/PAVEMENT) (1HL08D01, 1HL08D03)

2012 $46,900

LOS ANGELES 1HL08D01-LA0G138

STATE HIGHWAY

110 LACRD – HOT LANES ON THE I-10 FROM ALAMEDA ST./UNION STATION TO I-605, AND ON I-110 FROM 182 ST./ARTESIA TRANSIT CENTER TO ADAMS BLVD. CONVERSION OF HOV LANES TO HOT LANES.(INFRASTRUCTURE/PAVEMENT)(1HL08D01, 1HL08D03)

2012 $3,881

Page 162: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

160 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D328 STATE HIGHWAY

110 ROUTE 110: IN LOS ANGELES FROM 8TH ST ON RAMP TO I-110/I-10 CONNECTOR, CONSTRUCT NB & SB AUXILIARY LANES AND MODIFY RAMPS (EA 2411U, PPNO 3343) CONVERT EXIST’G SB AUX LANE TO OPTIONAL LANE & MODIFY RAMPS; NB HARBOR FWY, FROM NORTH END OF 12TH ST UC TO NORTH END OF THE 7TH ST UC, ADD STORAGE LANE ON THE MAINLINE & RECONSTRUCT RAMP

2012 $54,932

LOS ANGELES LAF1204 STATE HIGHWAY

118 ROUTE 118: 118 FREEWAY WESTBOUND OFF-RAMP AT TAMPA AV. THIS PROJECT WILL EXTEND THE RIGHT-TURN ONLY FROM THE WB SR-118 OFF-RAMP AT TAMPA AV AND WILL INSTALL AN ADDITIONAL SB LEFT-TURN LANE ON TAMPA AT THE EB SR-118 ON-RAMP.

2018 $1,055

LOS ANGELES LA0C8099 STATE HIGHWAY

126 ROUTE 126: SR-126/COMMERCE CTR DR NEW IC. CONSTRUCT A PARTIAL CLOVERLEAF, GRADE SEPARATED IC AND WIDEN ST 126 FROM .76 KM EAST OF IC TO .85 KM WEST 4-6 LANES. (2001 CFP 8099) (PPNO 3118)

2014 $60,000

LOS ANGELES LA0D480 STATE HIGHWAY

126 ROUTE 126: SR-126 IMPROVEMENTS – LOS ANGELES COUNTY LINE TO CASTAIC CREEK BRIDGE: IMPROVE 5 INTERSECTIONS ADD LT & RT LANES, ADD 1 SB AUX LANE FROM LONG CANYON RD TO WOLCOTT WAY

2012 $35,500

LOS ANGELES 17870 STATE HIGHWAY

134 ROUTE 134: RTE 134 BETWEEN I-5 & PACIFIC AVE MODIFY 134/SAN FERNANDO RD I/C & GRADE SEP AT UPRR SAN FERNANDO/FLOW- ER (WIDEN 1 BRIDGE & 1 OFF RAMP) NON-CAPACITY INCREASING (PPNO 9814 )

2011 $31,375

LOS ANGELES 1OM0702-LA0G403

STATE HIGHWAY

134 SR-134 FREEWAY WB/OFF RAMPS AT

HARVEY DR

UPGRADE TRAFFIC SIGNAL AT SR-134 FREEWAY WB/OFF RAMPS AT HARVEY DR. INTERSECTION. UPGRADE TRAFFIC SIGNAL AT HARVEY DR. AND WILSON AVE. ADD THIRD LANE ON HARVEY DR. AT WILSON AVE.

2012 $3,000

LOS ANGELES LA0D180 STATE HIGHWAY

138 ROUTE 138 WIDENING FROM 2 TO 4 LANES WITH MEDIAN TURN LANE- NEAR LIANO FROM 0.30 MILES WEST OF 165TH ST EAST TO 0.37 MILES WEST OF 190TH ST EAST. (SEG.12). EA# 127271, PPNO 0694Q.

2012 $89,811

Page 163: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 161

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D451 STATE HIGHWAY

138 ROUTE 138: ROUTE 138 FROM AVE. T TO ROUTE 18-WIDEN 2 TO 4 THRU LANES WITH MEDIAN TURN LANE. EA# 12721,12722,12723,12724,12725,12728. PPNO# 3325,3326,3327,3328,3329,3331

2014 $48,247

LOS ANGELES LA962212 STATE HIGHWAY

138 ROUTE 138: IN PALMDALE @ AVE P-8 FROM ROUTE 14 TO 100TH ST – ACQUISITION OF ROW FOR FUTURE RTE 138 (TIER 2 ENV) (CFP 2212 $3540 2001 CFP 8021)(EA# 116720,PPNO 0393F)

2019 $700,000

LOS ANGELES LAE0219 STATE HIGHWAY

210 ROUTE 210: CONSTRUCT SOUND WALLS ALONG PORTIONS OF THE I-210 FREEWAY BETWEEN ARROYO BLVD AND ORANGE GROVE (SAFETEA-LU #219 HIGH PRIORITY PROJECTS)

2013 $1,800

LOS ANGELES 1OM0702-LA0G124

STATE HIGHWAY

405 RECONFIGURING THE I-405 FREEWAY INTERCHANGES, AT CHERRY AVE, TO INCORPORATE BOTH NORTH-BOUND AND SOUTHBOUND ON/OFF RAMPS AND TO CONFORM WITH CALTRANS DESIGN CRITERIA. (NO ADDITIONAL CAPACITY, ONLY AN INTERCHANGE RECONFIGURATION.)ONLY FOR PSR PHASE.

2020 $474

LOS ANGELES LA0B408 STATE HIGHWAY

405 ROUTE 405: ADD A 10-MILE HOV LANE ON THE NORTHBOUND 405 BETWEEN I-10 AND U.S. 101 IN LA FROM RTE 10 TO RTE 101 WIDEN FOR HOV LANE & MODIFY RAMPS, ADD NEW WB ON RAMP AT SUNSET & HOV INGRESS/EGRESS AT SANTA MONICA BLV(EA 12030, PPNO 0851G, SAFETLU SECTION 1302 #18, 1934 #20)

2018 $1,034,000

LOS ANGELES LA0D193 STATE HIGHWAY

405 ROUTE 405: GARVEE DEBT PAYMENTS RTE. 405 – WATERFORD AV. TO RTE 10 – AUX LNE:LOS ANGELES – WATERFORD AV. TO RTE 10 – CNSTRCT S/B AUX LNE & S/B HOV LNE (2001 CFP 8354) (EA 195900 ,PPNO 2333).

2015 $34,470

LOS ANGELES LA0D194 STATE HIGHWAY

405 ROUTE 405: GARVEE DEBT SERVICE PAYMENTS: IN LOS ANGELES ON ROUTE 405/101 CONNECTOR GAP CLOSURE (2001 CFP 7248, 2001 CFP 8347) (EA# 20120K, PPNO 2336). (BOTH RIP & IIP)

2015 $30,787

LOS ANGELES 49160 STATE HIGHWAY

405 ROUTE 405: IN INGLEWOOD AT ARBOR VITAE AVE-CONSTRUCT SOUTH HALF OF INTER-CHANGE. EA# 491601, PPNO 0831)

2018 $55,922

Page 164: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

162 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1178A STATE HIGHWAY

405 ROUTE 405: IN LOS ANGELES AND CULVER CITY FROM ROUTE 90 TO ROUTE 10 – HOV LANES (SB 5+0 TO 5+1; NB 5+0 TO 5+1 HOV) (2206LK CFP) OBLIGATED 6207 (034)

2012 $23,000

LOS ANGELES LA0D332 STATE HIGHWAY

405 ROUTE 405: IN LOS ANGELES: FROM LA TIJERA BLVD TO JEFFERSON BLVD; ADD AUXILIARY LANE PPNO: 3348 EA: 24130

2014 $38,711

LOS ANGELES LAE0574 STATE HIGHWAY

605 ROUTE 605: STUDY – CONSTRUCT I-605 INTERCHANGE CAPACITY IMPROVEMENTS IN IRWINDALE

2013 $1,920

LOS ANGELES 1M1004 STATE HIGHWAY

605 I-605 I-605 CORRIDOR “HOT SPOT” INTERCHANGES IN GATEWAY CITIES

2025 $3,200,000

LOS ANGELES 18790 STATE HIGHWAY

710 ROUTE 710: STUDY TO EVALUATE TECHNICAL FEASIBILITY AND IMPACTS OF AN ALTERNATIVE TO CLOSE 710 FREEWAY GAP. THIS STUDY INCLUDES ENVIRONMENTAL STUDIES (EIR/EIS) (EA# 187901, PPNO# 2215)

2025 $87,454

LOS ANGELES LA996143 STATE HIGHWAY

710 ROUTE 710: RTE 710 PCH TO DOWNTOWN L.B., PAVEMENT RECON, MEDIAN, LANDSCAPING IMPROVE (EA 2203U, 23640, PPNO: 2945,3248)

2013 $7,496

LOS ANGELES LA0B952 STATE HIGHWAY

710 ROUTE 710: RECONSTRUCT I-710 INTERCHANGES AT I-5, AT I-405, AT SR 91, AND AT I-105. AS PART OF OF THE I-710 CORRIDOR PROGRAM PROPOSING 4 TRUCK LANES (PORTS-RAIL YARDS), 10 GENERAL LANES (PORT-SR-60)(ISTEA ID # 37)(SAFTEA-LU 3773)

2015 $40,500

LOS ANGELES 1M1002 STATE HIGHWAY

710 I-710 I-710 EARLY ACTION PROJECTS 2022 $687,000

LOS ANGELES 1C0401 STATE HIGHWAY

710 I-710 OCEAN BLVD IN LONG BEACH

INTERMODAL RAILROAD YARDS IN

COMMERCE/VERNON

I-710 CORRIDOR USER-FEE BACKED CAPACITY ENHANCEMENT – WIDEN TO 5 MIXED FLOW + 2 DEDICATED LANES FOR CLEAN TECHNOLOGY TRUCKS (EACH DIRECTION) AND INTERCHANGE IMPROVEMENTS, FROM OCEAN BLVD IN LONG BEACH TO THE INTERMODAL RAILROAD YARDS IN COMMERCE/VERNON

2030 $5,580,000

Page 165: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 163

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1M0101 STATE HIGHWAY

710 SR-710 (GAP CLOSURE)

VALLEY BLVD CALIFORNIA BLVD &

PASADENA AVE

CONSTRUCT 4 TOLL LANES IN EACH DIRECTION IN TUNNEL TO COMPLETE THE 710 FREEWAY

2030 $5,636,000

LOS ANGELES LA0D479 STATE HIGHWAY

999 ROUTE 999: LOS ANGELES COUNTY ITIP TRANSPORTATION ENHANCEMENT PROJECT LUMP SUM (PPNO 3546, 3547, 3548, 3549, 3550, ETC)

2016 $12,947

LOS ANGELES LA990921 STATE HIGHWAY

999 ROUTE 999: ON VARIOUS HIGHWAYS. GROUPED PROJECTS FOR NOISE ATTENUATION (SOUNDWALLS) (ONLY EA00234 ON RTE 710 REMAINING. PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES.

2012 $236,700

LOS ANGELES 1O1010 LOCAL HIGHWAY

CALL FOR PROJECTS RESERVE 2030 $93,300

LOS ANGELES 1NL04-LA11G2T LOCAL HIGHWAY

GROUP PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES. PROJECTS ARE CONSISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGO-RIES. PROJECTS TO UPGRADE, CREATE, MAINTAIN, ENHANCE, OR ELIMINATE HAZARDS FOR PEDESTRI-ANS AND CYCLIST FACILITIES THROUGHOUT COUNTY.

2014 $24,473

LOS ANGELES 1NL04-LA11G4T LOCAL HIGHWAY

GROUP PROJECTS FOR PLANTING, LANDSCAPING, TRANSPORTATION SYSTEM BETTERMENTS, BEAUTI-FICATION AND SCENIC EASEMENTS THOUGHOUT THE COUNTY (NO LANE ADDITIONS). PROJECTS ARE CON-SISTENT WITH 40CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3 CATEGORIES.

2014 $16,154

LOS ANGELES 1O1012 LOCAL HIGHWAY

HIGHWAY OPERATIONAL IMPROVEMENTS IN ARROYO VERDUGO SUBREGION

2014 $260,000

LOS ANGELES 1O1013 LOCAL HIGHWAY

HIGHWAY OPERATIONAL IMPROVEMENTS IN LAS VIRGENES/MALIBU SUBREGION

2014 $253,000

LOS ANGELES 6OM0701- SC3711

LOCAL HIGHWAY

IMPROVE BUS TURN-OUT ON MCBEAN PARKWAY AT AVENIDA NAVARRE AND DEVELOPMENT OF NORTHBOUND LEFT-TURN POCKET AT MCBEAN PARKWAY AND ORCHARD VILLAGE ROAD AT HENRY MAYO NEWHALL MEMORIAL CENTER (THE CITY OF SANTA CLARITA IS THE LEAD AGENCY)

2012 $250

Page 166: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

164 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA996343 LOCAL HIGHWAY

101/KANAN U.S. 101 FWY/KANAN RD. INTERCHANGE IMPROVEMENTS – ADD 1 LANE TO NB OFF RAMP (1 TO 2). SAFETEA-LU # 3099

2012 $24,460

LOS ANGELES LA0D445 LOCAL HIGHWAY

10TH ST WEST 10TH ST WEST CAPACITY IMPROVEMENTS FROM AVE L TO AVE M. CAPACITY IMPROVEMENTS ON 10TH ST WEST BY WIDENING EXISTING ROADWAY TO ROW EXTENTS, CLOSING ANY MIXED FLOW LANE GAPS, PROVIDING CONTINUOUS PEDESTRIAN WALKS, & BUS TURNOUTS.

2014 $5,417

LOS ANGELES 1NL04-LAF1615 LOCAL HIGHWAY

1ST ST EASTSIDE LIGHT RAIL PEDESTRIAN LINKAGE. IMPROVE LINKAGES WITHIN 1/4 MILE OF METRO’S GOLD LINE LRT.

2012 $2,990

LOS ANGELES 1NL04-LAF3640 LOCAL HIGHWAY

1ST ST LANI – EVERGREEN PARK STREET ENHANCEMENT PROJECT. INCREASE PEDESTRIAN SAFETY AND ACCESS BY PROVIDING IMPROVED CROSSWALKS, NEW BUS SHELTERS AND STREET TREES TO ENHANCE CONNECTIVITY BETWEEN TRANSIT AND AREA LAND-MARKS.. THE PROPOSED PROJECT IS LOCATED IN THE BOYLE HEIGHTS COMMUNITY OF LOS ANGELES.

2016 $1,075

LOS ANGELES LA0D448 LOCAL HIGHWAY

20TH ST WEST MAJOR ARTERIAL GAP CLOSURES CITYWIDE. AVE J FROM 36TH ST WEST TO 32ND ST WEST, 20TH ST EAST FROM AVE J-4 TO AVE J-8

2018 $2,902

LOS ANGELES LA9811099 LOCAL HIGHWAY

20TH ST WEST 20TH ST WEST FROM AVE P-8 TO ELIZABETH LAKE ROAD 1 MILE STREET EXTENSION AND BRIDGE CONSTRUCTION (NEW ROAD).

2014 $6,600

LOS ANGELES LAE2932 LOCAL HIGHWAY

213TH ST 213TH ST. PEDESTRIAN SIDEWALK BRIGE OVER DOMINGUEZ CHANNEL. CONSTRUCT 213TH ST. PEDESTRIAN BRIDGE TO PROVIDE SAFE PASSAGE FOR PEDESTRIANS & WHEELCHAIRS OVER DOMINGUEZ CHANNEL.

2012 $2,000

LOS ANGELES 1NL04-LA0G166 LOCAL HIGHWAY

30TH ST WEST WIDENING OF 30TH ST WEST FROM AVE M TO AVE L (APPROX. 1 MILE) FROM 2 VEHICULAR TRAVEL LANES TO 4 LANES. 8 FOOT CLASS II BIKE LANES WILL BE STRIPPED ON BOTH SIDES OF THE STREET.

2014 $1,142

Page 167: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 165

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF3631 LOCAL HIGHWAY

3RD ST WESTLAKE MACARTHUR PARK PEDESTRIAN IMPROVEMENT PROJECT. INSTALL PEDESTRIAN IMPROVEMENTS INCL PEDESTRIAN LIGHTING, SIDE-WALK ENHANCEMENTS, STREET FURNITURE & TREES, ENHANCED CROSSWALKS, & BUS STOP AMENITIES.

2015 $1,674

LOS ANGELES 1NL04-LAF3518 LOCAL HIGHWAY

6TH ST DAISY CORRIDOR AND 6TH ST BIKE BLVD. CONSTRUCT TWO (2) BICYCLE BLVDS ALONG TWO CORRIDORS KNOWN AS THE DAISY CORRIDOR AND 6TH ST IN LONG BEACH. THE PROPOSED BIKE BLVD ALONG THE DAISY CORRIDOR IS A NORTH-SOUTH ROUTE BETWEEN BROADWAY. BIKE LANE (CLASS II) IS LESS THAN 1 MILE.

2015 $2,655

LOS ANGELES 1NL04-LAF1508 LOCAL HIGHWAY

6TH ST EAST 6TH ST EAST BIKEWAY EXTENSION. THIS PROJECT WILL PROVIDE A MISSING LINK IN THE CLASS I BWY TO CONNECT THE EXISTING SIERRA HWY BIKEWAY TO THE TRANSPORTATION CENTER AND AN EXISTING BIKEWAY IN CLOCK TOWER PLAZA

2015 $544

LOS ANGELES LA000800-LA000800A

LOCAL HIGHWAY

A AC CONVERSION. HBRR LOCAL BRIDGE LUMP SUM – (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126,127,128, EXEMPT TABLES 2 & 3)

2016 $49,820

LOS ANGELES LA000800 LOCAL HIGHWAY

A GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM PROJECTS ARE CONSISTENT WITH 40 CFP PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVE-MENTS OR RECONSTRUCTION BRIDGES (NO ADDI-TIONAL TRAVEL LANES)

2016 $383,708

LOS ANGELES LAE0084 LOCAL HIGHWAY

ADAMS ST ADAMS ST REHABILITATION PROJECT 2011 $372

LOS ANGELES LAE3157 LOCAL HIGHWAY

ADDISON REHABILITATE ADDISON ST BETWEEN KESTER AVE AND LEMONA AVE: PROVIDE ASHALT CONCRETE RESURFACING ON THE PROPOSED PROJECT LIMITS. WILL NOT ENHANCE TRAFFIC CAPACITY.

2010 $47

Page 168: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

166 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0G739 LOCAL HIGHWAY

AGOURA ROAD AGOURA ROAD WIDENING. WIDEN AND REALIGN ROADWAY FROM WESTERLY CITY LIMITS TO CORNELL DRIVE (APROX 2 MILES). SOME AREAS ARE TWO LANES AND WILL BE WIDENED TO FOUR LANES. THE OTHER PORTIONS OF THE STREET ALREADY HAVE FOUR LANES. CONSTRUCT/MODIFY SIDEWALKS AND BIKE LANES; ADD LANDSCAPED MEDIANS

2014 $5,500

LOS ANGELES 1TDL04-LAF3726 LOCAL HIGHWAY

ALAMEDA FIRST AND LAST MILE TRANSIT CONNECTIVITY OPTIONS. IMPLEMENT A PILOT SHARED FLEET VEHICLE PROGRAM THAT INCLUDES, BIKES, ALTER-NATIVE GREEN VEHICLES FOR FIRST & LAST MILES FROM UNION STATION TO AND OTHER DOWNTOWN LOCATIONS.

2014 $1,641

LOS ANGELES LA996393 LOCAL HIGHWAY

ALAMEDA ST EAST DOWNTOWN TRUCK ACCESS IMPROVEMENTS: WIDENINGS, IMPRVMNTS, STRIPING, AT AND NEAR ALAMEDA ST & WASHINGTON BLVD IN THE EAST DOWNTOWN L.A. AREA

2011 $2,153

LOS ANGELES LA98STIP3 LOCAL HIGHWAY

ALAMEDA ST AND SPRING ST

ALAMEDA ST AND N SPRING ST ARTERIAL REDESIGN -REALIGN ALAMEDA/N.SPRING ELIMINATING INEFFICENT INTERSECTN WITH MAIN ST/N. MAIN ST. 3 NB LANES & 3 SB LANES.

2013 $8,555

LOS ANGELES LAE1296 LOCAL HIGHWAY

ALL STREETS LONG BEACH INTELLIGENT TRANSPORTATION SYSTEM 2012 $2,880

LOS ANGELES LAE0326 LOCAL HIGHWAY

ALONDRA BLVD. CREATION OF A RAISED MEDIAN ON ALONDRA BLVD.BETWEEN CLARK AND WOODRUFF TO IMPROVE TRAFFIC SAFETY AND EFFICIENCE. THE MEDIAN WILL PROVIDE LANDSCAPING, LIGHTING AND IRRIGATION

2012 $385

LOS ANGELES LAE2750B LOCAL HIGHWAY

ALONDRA BLVD VALLEY VIEW AVE AND ALONDRA BLVD INTERSECTION IMPROVEMENTS IN ADVANCE OF I-5 FREEWAY IMPROVEMENTS

2010 $2,235

LOS ANGELES LAE2699 LOCAL HIGHWAY

ALONG LA RIVER BANK

CONSTRUCTION OF NEW MULTI-USE PATH/TRAIL ALONG RIVER BANK BETWEEN SEPULVEDA BLVD & KESTER AVE INCLUDING ACCESS RAMPS, REATAINING WALLS, LANDSCAPING ETC.

2012 $574

Page 169: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 167

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D333 LOCAL HIGHWAY

ANAHEIM ST ANAHEIM ST PLANNING, COORDINATION AND DESIGN OF OPERATIONAL & STREETSCAPE (NON-CAPACITY IMPROVEMENTS).

2011 $566

LOS ANGELES LAE1531 LOCAL HIGHWAY

ARMINTA ST / MASON AVE

CONSTRUCTION OF A SMART CROSSWALK SYSTEM AT THE INTERSECTION OF ARMINTA ST. AND MASON AVE.

2012 $50

LOS ANGELES 1AL04 LOCAL HIGHWAY

ARTERIAL IMPROVEMENTS

COUNTYWIDE REGIONAL SURFACE TRANSPORTATION IMPROVEMENTS, INCLUDING GOODS MOVEMENT GRADE CROSSINGS

2021 $563,750

LOS ANGELES 1NL04-LAF1836 LOCAL HIGHWAY

ATHERTON ST CITY OF LONG BEACH ATHERTON ST ENHANCEMENT PROJECT. REHABILITATING THE LANDSCAPED MEDIAN TO ENHANCE THE EXPERIENCE OF OVER 37,000 PEDESTRIANS, BICYCLISTS, TRANSIT USERS AND AUTOS DAILY.

2012 $1,322

LOS ANGELES LAE2835 LOCAL HIGHWAY

ATHERTON ST ATHERTON ST ENCLOSE, CONSTRUCT STORM DRAIN AND LANDSCAPE EXISTING OPEN CULVERT

2012 $1,440

LOS ANGELES LAE2378 LOCAL HIGHWAY

ATLANTIC ATLANTIC BLVD STREET IMPROVEMENTS FROM 52ND DRIVE TO 58TH ST. RESURFACING EXISTING PAVEMENT, SIGNING AND STRIPING, MINOR CONCRETE REPAIRS, LANDSCAPING, TRAFFIC LOOPS.

2013 $809

LOS ANGELES LAE3239 LOCAL HIGHWAY

ATLANTIC AVE RECONSTRUCT ATLANTIC AVE AND IMPROVE DRAINAGE FROM FIRESTONE BLVD TO ABBOTT RD PAVEMENT REHABILITATION, RAISED MEDIANS, DRAINAGE, SIGNAL, PARKWAY, AND MISC. IMPROVEMENTS.

2009 $5,944

LOS ANGELES LA0D279 LOCAL HIGHWAY

ATLANTIC BLVD. ATLANTIC BLVD. BRIDGE OVER THE L.A RIVER 5/8 MILE N SLAUSON AVE, WIDEN 6 LANE BRIDGE TO ADD RIGHT TURN LANE (BRIDGE #53C0252)

2016 $14,614

LOS ANGELES LAE0881 LOCAL HIGHWAY

ATLANTIC BLVD. STUDY, ENVIRONMENTAL REVIEW, PERMITS AND PRELIMINARY ENGINEERING FOR A PEDESTRIAN BRIDGE OVER ATLANTIC BLVD IN THE CITY OF MONTEREY PARK (E/P,PS/E ONLY)

2013 $600

LOS ANGELES LAE2198 LOCAL HIGHWAY

AVALON BLVD AVALON BLVD INTERCHANGE MODIFICATION AT I-405 IMPROVING AVALON/I-405 INTERCHANGE BY CONSTRUCTING A NEW SOUTHBOUND ON-RAMP, WIDENING NORTHBOUND OFF-RAMP AND ON-RAMP, WIDENING AVALON BLVD NORTHBOUND.

2014 $21,800

Page 170: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

168 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA9708289 LOCAL HIGHWAY

AVE G AVE G FROM RT14 TO 25TH ST WEST. WIDEN FROM 2 TO 6 LANES (0.2 MILES) (TOTAL 6 LANES IN BOTH DIRECTIONS). INCLUDES INTERCHANGE IMPROVEMENTS.

2023 $23,400

LOS ANGELES LA0D446 LOCAL HIGHWAY

AVE K AVE K GAP CLOSURE FROM 40TH ST WEST TO 60TH ST WEST. WIDEN GAPS TO ADD AN ADDITIONAL LANE IN EACH DIRECTION (4 LANES TOTAL) WITHIN THE CITY JURISDICTION.

2030 $3,410

LOS ANGELES 1NL04-LA0F076 LOCAL HIGHWAY

AVE K-8 PRIME DESSERT WOODLAND PRESERVE TRAILS PROJECT, PHASE II, WILL AUGMENT THE 57-ACRE RECREATIONAL TRAIL SYSTEM AT THE PRIME DESERT WOODLAND PRESERVE IN LANCASTER.

2008 $604

LOS ANGELES LA0D447 LOCAL HIGHWAY

AVE L AVE L GAP CLOSURE FROM 60TH ST WEST TO 30TH WEST, ADDING AN ADDITIONAL LANE IN EACH DIRECTION, INCLUDING A MEDIAN (WITHIN CITY JURISDICTION)

2020 $4,620

LOS ANGELES 1A1003 LOCAL HIGHWAY

AVE L AVE L WIDENING: 15TH TO 30TH ST WEST. CONSTRUCT CAPACITY IMPROVEMENTS ALONG AVE L BY WIDENING EXISTING ROADWAY TO AVAILABLE ROW EXTENTS & CLOSING ANY MIXED FLOW LANE GAPS, & PROVIDE IMPROVED CIRCULATION TO SR-14. WIDENING FROM 2 TO 3 LANES.

2014 $3,273

LOS ANGELES LA0D449 LOCAL HIGHWAY

AVE M AVE M AND SR14 OVERCROSSING IMPROVEMENTS. WIDENING AVE M FROM 2 TO 7 LANES FROM 10TH ST WEST TO 15TH ST WEST.

2023 $13,650

LOS ANGELES 1NL04-LAF1507 LOCAL HIGHWAY

AVE S AVE S BIKEWAY PHASE 2. CLASS I BIKEWAY IMPROVE-MENTS ALONG THE GENERAL ALIGNMENT OF AVE S IN THE CITY OF PALMDALE. THIS PROJECT WILL INCLUDE CLOSING GAPS IN OUR LOCAL BICYCLE PLAN.

2014 $1,733

LOS ANGELES LA960134 LOCAL HIGHWAY

AVE S AVE S HIGHWAY 14/DOWNING ST WIDENING. WIDEN AVE S FROM STATE HIGHWAY 14 TO DOWNING ST (FROM 4 TO 6 LANES) 3 LANES IN EA. DIR.) APPROX 1.6 MILES.

2018 $7,200

Page 171: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 169

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA9811102 LOCAL HIGHWAY

AVE S AVE S RAIROAD GRADE SEPARATION (OVERPASS/UNDERPASS) OF METROLINK RR TRACKS, WEST OF SIERRA HIGHWAY – 6 LANES. INCLUDES GRADE SEPARATION OF SIERRA HIGHWAY AND APPLICABLE RAMPING.

2018 $56,800

LOS ANGELES LA000373 LOCAL HIGHWAY

AVIATION BLVD AVIATION BLVD FROM MANHATTAN BEACH BLVD TO ARBOR VITAE WIDEN FROM 4 TO 6 LANES (ISTEA, 102-240, 1991)

2014 $4,280

LOS ANGELES LA0D443 LOCAL HIGHWAY

AZUSA AVE REHABILITATING THE EXISTING AZUSA AVE. BRIDGE OVER THE UPRR TRACKS AND VALLEY BLVD, APPLY NEW PAINT TO THE EXISTING STEEL BRIDGE TO AVOID FURTHER WEATHER CORROSION.

2012 $1,600

LOS ANGELES LAE1285 LOCAL HIGHWAY

AZUSA AVE. & SAN GABRIEL AVE.

REHABILITATE PAVEMENT ON AZUSA AVE AND SAN GABRIEL AVE

2010 $480

LOS ANGELES LAE0884 LOCAL HIGHWAY

AZUSA AVE IMPROVEMENTS TO THE SOUTH AZUSA AVE./AMAR RD. INTERSECTION (500 FEET IN ALL DIRECTIONS FROM INTERSECTION) IMPROVEMENTS INCLUDE WIDENING, ADDING LEFT LANE, AND TRAFFIC SIGNAL MODIFICATIONS.

2010 $1,200

LOS ANGELES LAE2591 LOCAL HIGHWAY

BALBOA INSTALL TRAFFIC SIGNAL ON BALBOA BL. AT KNOLLWOOD SHOPPING CENTER

2010 $120

LOS ANGELES LAE0134 LOCAL HIGHWAY

BALBOA BLVD INTERSECTION AT BALBOA BLVD & SAN FERNANDO RD.MINOR WIDEN TO PROVIDE TURN LANES, & REALIGNMENT OF BALBOA RD.RIGHT-TURN LANE AT BALBOA BLVD.

2011 $500

LOS ANGELES 1NL04-LAF3507 LOCAL HIGHWAY

BALDWIN PARK BLVD

SOUTH BALDWIN PARK COMMUTER BIKEWAY PROJECT. CONSTRUCT 3-MILE COMMUTER CLASS I BIKE PATH ALONG SAN GABRIEL RIVER AND WALNUT CREEK CONNECTING TO MAJOR EMPLOYMENT CEN-TERS ON BALDWIN PARK BLVD.

2015 $820

LOS ANGELES LA0C8089 LOCAL HIGHWAY

BARHAM / CAHUENGA

BARHAM / CAHUENGA / INTERSECTION WIDEN IMPROVEMENT, FOR LEFT/RIGHT TURN IMPROV. PPNO 3111.

2014 $1,495

LOS ANGELES LAE1274 LOCAL HIGHWAY

BELLFLOWER BLVD. UPGRADE INTERSECTION ON BELLFLOWER @ ALONDRA AND ROSECRANS TO INSTALL LEFT-TURN PHASING (NORTH AND SOUTH BOUND)

2011 $387

Page 172: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

170 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA960018 LOCAL HIGHWAY

BEVERLY BLVD BEVERLY BLVD MONTEBELLO BLVD TO W/O REA DRIVE RECONSTRUCT & WIDEN FROM 4 TO 6 LANES

2014 $3,650

LOS ANGELES 1NL04-LAF1510 LOCAL HIGHWAY

BONITA AVE & FIRST ST

CLAREMONT PORTION OF THE CITRUS REGIONAL BIKEWAY. THIS PROJECT PROPOSES THE IMPLEMEN-TATION OF THE CLAREMONT PORTION OF THE CITRUS REGIONAL BIKEWAY UTILIZING BONITA AVE AND FIRST ST AS PRIMARY CLASS II BIKE ROUTES.

2012 $1,794

LOS ANGELES LA0G745 LOCAL HIGHWAY

BOUQUET CANYON ROAD

RESTRIPE BOUQUET CANYON ROAD FROM SECO CANYON ROAD TO PLUM CANYON ROAD FROM 4 TO 6 LANES; APPROXIMATELY 2.2 MILES

2018 $1,500

LOS ANGELES LA0D169 LOCAL HIGHWAY

BROADWAY BROADWAY IMPROVEMENTS FROM MAIN ST TO GRIFFITH ST. CONSTRUCTION OF MISSING CURB & GUTTER AND RECONSTRUCTION OF EXISTING PAVEMENT AND UNDERGROUNDING THE OVERHEAD POWER LINES.

2013 $1,203

LOS ANGELES 1TDL04-LAF3731 LOCAL HIGHWAY

BROADWAY DOWNTOWN LA INTER-MODAL TRANSIT INFORMATION AND WAYFINDING. INSTALL TRANSIT INFORMATION MONITORS, VARIABLE MESSAGE SIGNS, INTERACTIVE KIOSKS & PARKING AVAILABILITY SIGNAGE ALONG BROADWAY CORRIDOR TO OLYMPIC.

2014 $1,612

LOS ANGELES LA0D171 LOCAL HIGHWAY

BROADWAY BROADWAY IMPROVEMENTS FROM ALBERTONI TO 168TH ST. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT.

2010 $1,540

LOS ANGELES LA0D170 LOCAL HIGHWAY

BROADWAY BROADWAY IMPROVEMENTS FROM GRIFFITH ST TO ALBERTONI. CONSTRUCT RAISED CONCRETE MEDIANS WITH LANDSCAPE AND HARDSCAPE, ADD CURB & GUTTER AND SIDEWALK. RECONSTRUCT EXSTING PAVEMNT.

2011 $1,980

LOS ANGELES LA0D167 LOCAL HIGHWAY

BROADWAY BROADWAY IMPRVMNTS FRM 168TH ST. TO NORTH CITY LIMIT (ALONDRA BLVD). CONSTRUCT RAISED CONCRETE MEDIANS W/ LANDSCAPE & HARDSCAPE, ADD CURB & GUTTER & SIDEWLK ,RECNSTRUCT EXSTNG PAVEMNT.

2010 $1,070

Page 173: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 171

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE0518 LOCAL HIGHWAY

BROADWAY IN THE CITY OF LOS ANGELES, ON BROADWAY W/S FROM 4TH ST. TO 235 N/O 4TH ST, AND 4TH ST FROM BROADWAY TO 120 W/O BROADWAY. REMOVE AND REPLACE SIDEWALKS INCLUDING PORTIONS THAT SPAN.

2010 $2,500

LOS ANGELES 1NL04-LAES235 LOCAL HIGHWAY

BUENA VISTA ST INSTALL SAFETY IMPROVEMENTS AT THE AT-GRADE CROSSING OF BUENA VISTA ST NEAR VANOWEN ST, INCLUDING CROSSING GATES, PEDESTRIAN IMPROVE-MENTS, MEDIAN ISLANDS, PAVEMENT MARKINGS AND CCTV.

2012 $3,205

LOS ANGELES LAE2515 LOCAL HIGHWAY

BUNDY DR WIDEN BUNDY DR. BETWEEN WILSHIRE AND SANTA MONICA BLVD – WIDEN FROM 2 LANES TO 4 LANES.

2014 $4,250

LOS ANGELES LAE1816 LOCAL HIGHWAY

BURBANK BLVD BURBANK BLVD & HAYVENHURST AVE INTERSECTION IMPROVEMENTS – REDUCE WIDTH OF MEDIAN ISLANDS ON BURBANK BLVD TO INSTALL ADDITIONAL LEFT TURN LANE FROM W/B BURBANK TO S/B HAYVENHURST, AND EXCLUSIVE RIGHT TURN LANE FROM E/B BURBANK TO S/B HAYVENHURST; MODIFY TRAFFIC SIGNAL & STREET LIGHTING.

2014 $1,081

LOS ANGELES LAE1181 LOCAL HIGHWAY

BURBANK BLVD BURBANK BLVD & WOODLEY AVE INTERSECTION IMPROVEMENTS. REDUCE WIDTH OF MADIAN ISLAND ON BURBANK BLVD TO CONSTRUCT ADDITIONAL LEFT TURN LANE FROM E/B BURBANK BLVD TO N/B WOODLEY AVE; MODIFY TRAFFIC SIGNAL AND STREET LIGHTING. PROP C FUNDING RECEIVED THROUGH CFP 2009 (F3169).

2013 $495

LOS ANGELES LA0C8046 LOCAL HIGHWAY

BURBANK BLVD BURBANK BLVD WIDENING-LANKERSHIM BLVD TO CLEON AVE. FROM VARYING ROADWAY WIDTH TO FULL MAJOR HIGHWAY STANDARDS. FROM 1 LN TO 2 LNS IN EACH DIRECTION. PPNO 3097.

2014 $15,417

LOS ANGELES LA0F030 LOCAL HIGHWAY

C ST PROJECT WILL IMPROVE FLOW OF TRAFFIC FROM I-110 FWY ON/OFF-RAMPS AT C ST BY CONSOLIDAT-ING TWO CLOSELY SPACED INTERSECTIONS INTO ONE.

2014 $23,980

LOS ANGELES LAE3793 LOCAL HIGHWAY

CALIFORNIA AVE, CALIFORNIA AVE WIDENING: FROM WILLOW AVE AND SPRING ST WIDEN CALIFORNIA AVE TO SECONDARY MODIFIED HIGHWAY STREET STANDARDS (NON-CAPACITY).

2013 $1,200

Page 174: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

172 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA9711031 LOCAL HIGHWAY

CASTAIC CUT OFF CASTAIC CUTOFF FROM LAKE HUGHES RD TO SAN FRANCISQUITO CANYON RD CONTRUCT NEW ROAD 4 12-FOOT LANES AND 10-FOOT SHOULDERS

2018 $7,600

LOS ANGELES LAE0550 LOCAL HIGHWAY

CEDROS REHABILITATE STREET SURFACE OF CEDROS AVE BETWEEN BURBANK BLVD AND MAGNOLIA BLVD. WILL PROVIDE FOR ASPHALT CONCRETE RESURFACING. NON CAPACITY ENHANCING AND ALL ON LA ROW

2010 $43

LOS ANGELES 1OM0702-LAE0427

LOCAL HIGHWAY

CENTRAL AVE IN CITY OF LOS ANGELES, ON 103RD ST FROM CENTRAL TO GRAHAM & CENTRAL AV. FROM 103RD ST TO IMPERIAL HWY. PROJECT WILL PROVIDE STREETSCAPE, TRANSIT, AND PEDESTRIAN AMENITIES.

2011 $4,000

LOS ANGELES LAE2279 LOCAL HIGHWAY

CENTRAL AVE STREETSCAPE IMPROVMENTS ALONG CENTRAL AVE FROM WASHINGTON BLVD TO VERNON AVE INCLUDING PED LIGHTING, NEW BUS STOPS AND STREET FURNITURE, SIDEWALK WIDENING, CROSSWALK ENHANCEMENTS, TREES ETC.

2014 $4,000

LOS ANGELES LAE1934A LOCAL HIGHWAY

CENTURY BLVD CENTURY BLVD PEDESTRIAN SAFETY AND TRANSPORTATION IMPROVEMENTS.

2012 $3,600

LOS ANGELES 1NL04-LAF1611 LOCAL HIGHWAY

CESAR CHAVEZ CESAR CHAVEZ TRANSIT CORRIDOR (110 FWY TO ALAMEDA). INSTALLATION OF PEDESTRIAN/TRAN-SIT RIDER AMENITIES INC. BUS STOP GARDENS AT THREE INTERSECTIONS, NEW PEDESTRIAN LIGHT-ING, STREET TREES IN A LANDSCAPED PARKWAY & WAYFINDING SIGNAGE.

2015 $2,350

LOS ANGELES LA0C8075 LOCAL HIGHWAY

CESAR CHAVEZ AV CESAR CHAVEZ AVE/ LORENA ST / INDIANA ST INTERSECTION IMPROVEMENTS. RECONSTRUCTION OF A FIVE-LEGGED SIGNALIZED INTERSECTION INTO A MODERN ROUNDABOUT. THE CONSTRUCTION OF THE ROUNDABOUT WILL REDUCE THE COMPLEXITY OF THE INTERSECTION AND WILL IMPROVE TRAFFIC FLOW AND SAFETY.

2014 $10,933

LOS ANGELES LA0C8095 LOCAL HIGHWAY

CHERRY AVE CHERRY AVE. WIDENING PROJECT. BET 19TH ST AND PACIFIC COAST HIGHWAY BY WIDENING THE ARTERIAL FROM ONE TO TWO LANES IN EACH DIRECTION.(PPNO 3128). SAFETEA-LU #3203

2012 $6,471

Page 175: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 173

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE0595 LOCAL HIGHWAY

CHEVY CHASE DRIVE

CHEVY CHASE RAIL ROAD IMPROVEMENTS. SAFETY IMPROVEMENTS AT THE CHEVY CHASE AND AT-GRADE CROSSING AT DORAN, BROADWAY, GRANDVIEW AND SONORA AT-GRADE CROSSING.

2013 $919

LOS ANGELES LAE0001B LOCAL HIGHWAY

CITRUS AVE CONSTRUCT SAFE ACCESS TO STREETS FOR BICYCLISTS AND PEDESTRIANS INCLUDING CROSSWALKS, SIDEWALKS, AND TRAFFIC CALMING MEASURES

2011 $500

LOS ANGELES LAE2978 LOCAL HIGHWAY

CITRUS AVE DEVELOP CONCEPTUAL MASTER PLAN TO IMPROVE THE EFFICIENCY OF TRANSPORTATION FACILITIES (E/P & PS/E ONLY)

2010 $194

LOS ANGELES LAE1321 LOCAL HIGHWAY

CITY OF COMPTON VARIOUS LOCATION

COMPTON ARTERIAL RECONSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY).

2011 $3,840

LOS ANGELES 1NL04-LAF3505 LOCAL HIGHWAY

CITYWIDE BIKE NETWORK LINKAGES TO EXPOSITION LIGHT RAIL. BIKE NETWORK ENHANCEMENTS TO SUP-PORT EXPOSITION LINE. INCREASED SAFETY AND CONVENIENCE WITH SIGNAL DETECTION, HIGHLY VISIBLE LANE MARKINGS AND NEW BIKE RACKS. THE PROJECT AREA IS LOCATED THROUGHOUT THE CITY OF SANTA MONICA AND NO MORE THAN TWO MILES FROM THE PROPOSED EXPOSITION LIGHT RAIL LINE STATIONS.

2015 $3,428

LOS ANGELES 1NL04-LAF3535 LOCAL HIGHWAY

CITYWIDE CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS AND BICYCLISTS. SANTA CLARITA CITYWIDE WAY-FINDING PROGRAM FOR PEDESTRIANS AND BICY-CLISTS TO DIRECT THEM TO METROLINK STATIONS AND OTHER REGIONAL TRIP GENERATORS.. THE SANTA CLARITA CITYWIDE WAYFINDING PROGRAM FOR PEDESTRIANS AND BICYCLISTS WILL DESIGN AND INSTALL WAYFINDING SIGNS ALONG THE CITY’S EXISTING NETWORK OF MULTI-USE PATHS, ON-STREET BIKEWAYS, PASEOS IN THE VALENCIA AND SAUGUS NEIGHBORHOODS, AND SIDEWALKS ALONG MOST MAJOR ROADWAYS.

2016 $271

Page 176: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

174 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF1535 LOCAL HIGHWAY

CITYWIDE – VARIOUS LOCATIONS

BICYCLE WAYFINDING SIGNAGE PROGRAM. WAYFINDING SIGNS TO DIRECT BICYCLISTS, AND EDU-CATE MOTORISTS, TO THE LOCATIONS OF DEDICATED BIKE PATHS, LANES AND ROUTES, DESTINATIONS, AND TRANSIT HUBS THROUGHOUT LOS ANGELES.

2012 $504

LOS ANGELES 1NL04-LAF1522 LOCAL HIGHWAY

CITYWIDE – VARIOUS LOCATIONS

BIKE SAFE ROADWAY GRATES. THIS PROJECT IS TO UPGRADE EXISTING ROADWAY GRATES TO IMPROVE BIKE SAFETY AND PROMOTE CYCLING USAGE.

2012 $539

LOS ANGELES LA0D465 LOCAL HIGHWAY

COLIMA COLIMA RD- HALIBURTON RD/ CITY OF DIAMOND BAR CB ROAD WIDENING: RESTRIPE FOR 3ED THROUGH LANE ON EB APPROACH (HACIENDA BLVD- FULLERTON RD) & WB APPROACH (FULLERTON- CAMINO DEL SUR)

2018 $600

LOS ANGELES LAE0896 LOCAL HIGHWAY

COLIMA COLIMA ROAD AT FULLERTON ROAD INTERSECTION IMPROVEMENT

2012 $1,500

LOS ANGELES 1NL04-LAF3612 LOCAL HIGHWAY

COLORADO AVE. COLORADO PEDESTRIAN PROMENADE: LRT STATION TO PIER/BEACH. A PEDESTRIAN PROMENADE ON COLORADO AVE TO CONNECT THE EXPO LIGHT RAIL TERMINUS STATION AT 4TH ST WITH DOWNTOWN SANTA MONICA, THE CIVIC CENTER AREA, THE PIER AND THE BEACH. THE PROJECT IS LOCATED ON COLORADO AVE BETWEEN 4TH ST AND THE SANTA MONICA PIER IN THE CITY OF SANTA MONICA, AND INCLUDES THE STREET, THE SIDEWALKS AND BOTH INTERSECTIONS. THE TOTAL PROJECT AREA IS APPROXIMATELY 1,240 LINEAR FEET.

2015 $6,568

LOS ANGELES 1NL04-LAF1655 LOCAL HIGHWAY

COLORADO BLVD EAST COLORADO BLVD PEDESTRIAN ENHANCEMENTS (PHASE I). INSTALLATION OF PEDESTRIAN-SCALE STREET LIGHTING ON REGIONALLY SIGNIFICANT STREET IN A SPECIFIC PLAN AREA OF PASADENA IN ORDER TO INCREASE LIVABILITY/ENHANCE PEDES-TRIAN MOVEMENT.

2014 $1,093

Page 177: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 175

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF3603 LOCAL HIGHWAY

COLORADO BLVD EAST COLORADO BLVD PEDESTRIAN IMPROVEMENTS (PHASE 2). INSTALL PED-SCALE STREET LIGHTS, DECORATIVE CROSSWALKS, BUS BENCHES & TRASH RECEPTACLES ON A REGIONALLY SIGNIFICANT STREET TO INCREASE LIVABILITY, SAFETY & ENHANCE PED MOVEMENT. EAST COLORADO BLVD BETWEEN HILL AVE AND ALLEN AVE IN THE CITY OF PASADENA. (0.46 MILES)

2014 $754

LOS ANGELES LAOB7326 LOCAL HIGHWAY

COMPTON CREEK COMPTON CREEK BIKEWAY EXTSN – PHASE III.DSIGN & CNSTRUCT .6 MI OF CLAS 1 BIKE/PED PATH FRM GREENLEAF BLVD TO ARTESIA FWY.WILL INC BIKE PATH, PED WALKWAY SIGNAGE, STRPNG. (PPNO 2869).

2010 $464

LOS ANGELES 1NL04-LAF1501 LOCAL HIGHWAY

COUNTY CLUB DR COUNTY CLUB DRIVE BIKEWAY IMPROVEMENT PROJECT. CONSTRUCTION OF A 4-FOOT WIDE CLASS II BIKE LANE IN BOTH DIRECTIONS ALONG A ONE MILE SECTION OF COUNTRY CLUB DRIVE.

2013 $1,802

LOS ANGELES 1NL04-LA0G414 LOCAL HIGHWAY

COYOTE CREEK FLOOD CHANNEL

COYOTE CREEK BIKE TRAIL: CLASS 1 BIKE PATH ALONG THE COYOTE CREEK FLOOD CHANNEL FROM HILLSBOROUGH DRIVE TO ROSECRANS AVNEUE

2011 $709

LOS ANGELES 1NL04-LAF3624 LOCAL HIGHWAY

CRAVENS AVE DOWNTOWN TORRANCE PEDESTRIAN IMPROVEMENT PROJECT. INCREASE CONNECTIVITY, IMPROVE PEDESTRIAN SAFETY, REDUCE AUTOMOBILE DEPEN-DENCY, AND STIMULATE ECONOMIC DEVELOPMENT IN DOWNTOWN TORRANCE.. THE PROJECT AREA IS BOUND BY TORRANCE BLVD TO THE NORTH, CARSON ST TO THE SOUTH, CRAVENS AVE TO THE WEST, AND CABRILLO AVE TO THE EAST.

2015 $1,118

LOS ANGELES 1NL04-LAF1844 LOCAL HIGHWAY

CRENSHAW BL ANGELS WALK CRENSHAW. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDE-BOOK AND 15 ON-STREET INFORMATION MARKERS (HISTORIC STANCHIONS) AT STRATEGIC LOCATIONS.

2014 $764

LOS ANGELES LAE2157 LOCAL HIGHWAY

CRENSHAW BLVD CRENSHAW BLVD REHABILITATION. BETWEEN 182ND ST & 190TH. NEW RIGHT TURN LANES NEAR I-405 RAMPS – NO NEW THROUGH-TRAVEL LANES.

2012 $3,458

LOS ANGELES LAE2843 LOCAL HIGHWAY

CRENSHAW BLVD CRENSHAW BLVD REHABILITATION, MARICOPA ST TO SEPULVEDA BLVD, CITY OF TORRANCE

2011 $3,730

Page 178: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

176 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LSTEA0044

LOCAL HIGHWAY

DEEP VALLEY DRIVE

CITY OF ROLLING HILLS ESTATES – DEEP VALLEY DRIVE FROM 718 DEEP VALLEY DRIVE TO ROXCOVE DRIVE. – CONSTRUCT STREETSCAPE AND PEDES-TRIAN IMPROVEMENTS.

2012 $322

LOS ANGELES LAE1920 LOCAL HIGHWAY

DEL AMO DEL AMO BLVD – FROM NORMANDIE AVE AND NEW HAMPSHIRE – RECONSTRUCT AND WIDEN . FROM 1 LANE EA. DIR TO 2 LANES IN EA DIR.

2018 $3,000

LOS ANGELES LA000389 LOCAL HIGHWAY

DEL AMO BLVD DEL AMO BLVD FROM MADRONA AVE TO CRENSHAW BLVD CONSTRUCT 0 TO 4 LANES NEW GRADE SEPARATION (CFP 6361, 4314; PPNO 2371).

2012 $32,439

LOS ANGELES LAE1697 LOCAL HIGHWAY

DEVONSHIRE ST CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. NORTHEAST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. DEVONSHIRE ST (LANGDON TO WOODMAN), SEPULVEDA BLV

2010 $500

LOS ANGELES LAE2147 LOCAL HIGHWAY

DEVONSHIRE ST CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. LINDLEY AVE. (STRATHERN TO CHASE), ROSCOE BLVD

2010 $1,000

LOS ANGELES LA0D473 LOCAL HIGHWAY

DOCKWEILER DRIVE DOCKWEILER DR EXTENSION FROM LYONS AV TO EXISTING DOCKWEILER DR: CONSTRUCT A 4-LANE FACILITY (2 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, AND DRAINAGE IMPROVEMENTS

2014 $11,126

LOS ANGELES 1NL04-LAF1514 LOCAL HIGHWAY

DUARTE ROAD EMERALD NECKLACE BIKE TRAIL PROJECT. DESIGN AND CONSTRUCT 1.1 MILES OF CLASS I BIKE PATH TO CONNECT DUARTE ROAD TO THE SAN GABRIEL RIVER BICYCLE TRAIL.

2011 $503

LOS ANGELES LA962314 LOCAL HIGHWAY

EAST SAN GABRIEL EAST SAN GABRIEL VALLEY SOM PILOT PROJECT TRAFFIC SIGNALS INTERCONNECT PROJECT

2011 $9,071

LOS ANGELES 1NL04-LA0G710 LOCAL HIGHWAY

ECHO PARK AREA ECHO PARK/SUNSET BLVD STREETSCAPE BEAUTIFICATION – PROJECT WILL PROVIDE FOR CONSTRUCTION OF PEDESTRIAN AND STREETSCAPE IMPROVEMENTS ALONG SUNSET BLVD IN THE ECHO PARK AREA.PROJECT ELEMENTS WILL INCLUDE SIDEWALK IMPROVEMENTS, STREET TREES, TRANSIT AMNENITIES, AND PARKWAY LANDSCAPING.

2013 $750

Page 179: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 177

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LA0G709 LOCAL HIGHWAY

EL DORADO AV EL DORADO & BROMWICH SIDEWALK IMPROVEMENTS – IMPROVEMENTS WILL BE ON: 1) EL DORADO AV-BROMWICH ST TO MONTAGUE ST; AND 2) BROMWICH ST-EL DORADO AV TO SAN FERNANDO RD. CONSTRUCTION ELEMENTS WILL INCLUDE CON-CRETE CURB, GUTTER, SIDEWALKS, ADA-COMPLIANT ACCESS RAMPS AND ASPHALT CONCRETE PAVING.

2012 $649

LOS ANGELES 1NL04-LAF1718 LOCAL HIGHWAY

EL PUEBLO DOWNTOWN LOS

ANGELES

EL PUEBLO PEDESTRIAN IMPROVEMENTS PHASE I, II, III & IV. WAYFINDING ELEMENT OF ENHANCED PEDESTRIAN FACILITIES TO IMPROVE AND ASSIST PEDESTRIAN MOVEMENT IN THE EL PUEBLO DISTRICT & OTHER LANDMARKS IN DOWNTOWN LA. ALSO IN PED MODE (F1661)

2014 $1,746

LOS ANGELES 1NL04-LAF1634 LOCAL HIGHWAY

EL PUEBLO LOS ANGELES DOWNTOWN

EL PUEBLO PEDESTRIAN IMPROVEMENTS PHASE I, II, III, & IV. DESIGN AND CONSTRUCTION OF ENHANCED FACILITIES TO IMPROVE & ASSIST PEDESTRIAN MOVEMENT IN THE EL PUEBLO DISTRICT & OTHER LANDMARKS IN DOWNTOWN LA. WAYFINDING ELE-MENT IN TDM F1718.

2014 $12,763

LOS ANGELES LA990358 LOCAL HIGHWAY

EL SEGUNDO EL SEGUNDO EMPLOYMENT CTR ITS PRJ (T21-1477) 2011 $5,721

LOS ANGELES LAE0319 LOCAL HIGHWAY

ELYSIAN VALLEY NEIGHBORHOOD TRAFFIC SAFETY IMPROVEMENTS, INCLUDING STREET LIGHTING AND OTHER PEDESTRIAN & TRANSIT ENHANCEMENT. ELYSIAN VALLEY NEIGHBORHOOD FROM QUEEN ST. ON THE NORTH, BARCLAY ST.

2010 $1,400

LOS ANGELES LA0D318 LOCAL HIGHWAY

ESPLANADE ESPLANADE STREETSCAPE IMPROVEMENTS INCLUDES RESURFACING, RELOCATING CURB & GUTTER FOR ADDITIONAL LANDSCAPING, STREET GUTTER AND STORM DRAINS SAFETEA HPP# 1662

2013 $1,416

LOS ANGELES 1NL04-LAF1613 LOCAL HIGHWAY

EXPOSITION BL EXPO LINE STN STREETSCAPE PROJECT-EAST CRENSHAW TO JEFFERSON. DESIGN & CONSTRUC-TION OF PEDESTRIAN RELATED STREETSCAPE IMPROVEMENTS WITHIN 1/4 MILE FROM EACH OF 3 LIGHT RAIL STATIONS ALONG EXPOSITION BLVD BETWEEN CRENSHAW & JEFFERSON.

2012 $3,262

Page 180: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

178 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0C8164 LOCAL HIGHWAY

EXPOSITION BLVD. EXPOSITION BLVD RIGHT-OF-WAY BIKE PATH-WESTSIDE EXTENSION. DESIGN AND CONSTRUCTION OF 2.5 MILES OF CLASS 1 BIKEWAY, LIGHTING, LANDSCAPING & INTERSECTION IMPROVEMENTS. (PPNO# 3184)

2012 $14,710

LOS ANGELES LAOB422 LOCAL HIGHWAY

FAIR OAKS FAIR OAKS AV & SR-110 IMPROVEMENT PROJECT (ROGAN FUNDS, HR5394)EXPAND EXIT OFF-RAMP OF 110 NB, ADD A HOOK RAMP FOR EXISTING ON-RAMP 110 SB.

2018 $9,418

LOS ANGELES 1OM0702-LA0G686

LOCAL HIGHWAY

FIGUEROA BLVD HIGHLAND PARK PEDESTRIAN IMPROVEMENTS ALONG FIGUEROA BETWEEN AVE 50 AND AVE 60

2014 $250

LOS ANGELES 1NL04-LAF1845 LOCAL HIGHWAY

FIGUEROA ST ANGELS WALK HIGHLAND PARK. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS AT STRATEGIC LOCATIONS.

2012 $784

LOS ANGELES 1NL04-LAF1513 LOCAL HIGHWAY

FIJI WAY BIKE LANE FIJI WAY BICYCLE LANE PROJECT. WIDEN THE SOUTH SIDE OF FIJI WAY FROM WEST OF ADMIRALTY WAY FOR BIKE LANES.

2014 $1,007

LOS ANGELES LAE0479 LOCAL HIGHWAY

FIRESTONE BLVD. FIRESTONE BLVD. FROM RYERSON AVE AND STEWART & GRAY RD. WIDEN SECTIONS OF FIRESTONE (BOTTLENECK FOR TURN LANES; ST RECONSTRUCTION, REHAB, & RESURFACE; & UPGRADE HANDICAP RAMPS

2011 $2,000

LOS ANGELES LA996347 LOCAL HIGHWAY

FIRESTONE BLVD. I-710/FIRESTONE BLVD.IC, PHASE IV (FIRESTONE BLVD. BRIDGE WIDENING OVER L.A RIVER) PROJECT NO. HP21L-5257 (016) (HBRR: 53C1972) WIDEN OF FIRESTONE BLVD FROM RAYO AVE TO I-710 FREEWAY, ON-RAMP MOD. REHABILITATE 5-LANE BRIDGE TO 6 LANE, ADD SHOULDERS, UPGRADE BRIDGE RAILIN

2018 $28,658

LOS ANGELES LAE1633 LOCAL HIGHWAY

FIRESTONE BLVD. STUDY REPORT FOR THE INTER. OF OLD RIVER SCHOOL RD, FIRESTONE BLVD & UNION PACIFIC RAILROAD. REVIEW/ANALYZE OPERATIONS & SAFETY ASPECTS, DESIGN OPTIONS ETC. (E/P & PS/E ONLY)

2011 $500

Page 181: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 179

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAF1178 LOCAL HIGHWAY

FIRESTONE BLVD I-710 EARLY ACTION PLAN – INTERSECTION IMPROVEMENTS AT FIRESTONE BLVD/ATLANTIC AVE INTERSECTION. FIRESTONE BLVD IS EXISTING 2 LANES IN EACH DIRECTION, AFTER THE PROJECT WILL BE 3 LANES IN EACH DIRECTION. THE LENGTH OF THE PROJECT IS .75 MILES. PRIMARILY IT WILL WIDEN FIRESTONE BLVD AND ATLANTIC AVE AND REALIGN THEIR INTERSECTION.

2014 $50,360

LOS ANGELES 1NL04-LAF3651 LOCAL HIGHWAY

FIRST ST. EASTSIDE LIGHT RAIL PEDESTRIAN LINKAGES, PHASE II. ENHANCE MULTI-MODAL ACCESS TO THE MARIACHI & SOTO GOLD LINE STATIONS, FOCUSING ON 1ST ST.

2015 $1,698

LOS ANGELES 1NL04-LAF3130 LOCAL HIGHWAY

FLORENCE AVE FLORENCE AVE REGIONAL TRANSPORTATION CORRIDOR IMPRVMT PROJ. RECONFIGURATION OF 1.2 MILE SEGMENT OF FLORENCE AV INCLUDING NEW FLORENCE AV/REDONDO BLVD INTERSECTION & RELATED CAPACITY PED/BIKE IMPRV TO REBALANCE STREET INTO MULTIMODAL CORRIDOR..

2014 $5,000

LOS ANGELES 1NL04-LAF1635 LOCAL HIGHWAY

FLORENCE AVE FLORENCE AVE PEDESTRIAN IMPROVEMENT PROJECT. PROVIDES PEDESTRIAN ORIENTED IMPROVEMENTS ON FLORENCE AVE INCLUDING PEDESTRIAN LIGHTING, LANDSCAPING, SIGNAGE, CROSSWALK TREATMENT, AND BUS AND STREET FURNITURE.

2014 $7,988

LOS ANGELES 1NL04-LAF1503 LOCAL HIGHWAY

FOOTHILL BLVD BIKEWAY IMPROVEMENTS ON FOOTHILL BLVD. AT SAN DIMAS WASH. THE BWY IMPROVEMENTS ON FOOTHILL BLVD. AT SAN DIMAS WASH; WILL CLOSE THE GAP ON A BRIDGE & CONNECT THE EXISTING CLASS II BIKE LANES TO THE EAST & WEST OF SAN DIMAS WASH CROSSING.

2013 $2,390

LOS ANGELES LAE2883 LOCAL HIGHWAY

FOSTER RD INSTALLATION OF NEW AND THE REMOVE/REPLACE OF EXISTING DAMAGED OR SUBSTANDARD SIDEWALKS, DRIVE APPROACHES, AND CONFLICTING OBSTRUCTIONS AND ADA RAMPS. PROJECT AREA IS BOUNDED BY FOSTER RD TO ROSECRANS AVE AND LAKEWOOD BLVD TO CLARK AVE.

2011 $742

Page 182: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

180 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LA0G395 LOCAL HIGHWAY

FOSTER ROAD CONSTRUCT CONCRETE SIDEWALKS AND CURB RAMPS, INSTALL SPEED RADAR FEEDBACK SIGNS AND PEDESTRIAN COUNTDOWN HEADS AND RESTRIPE CROSSWALKS ON FOSTER ROAD FROM STUDEBAKER ROAD TO MCRAE ST.

2011 $600

LOS ANGELES 1O0703 LOCAL HIGHWAY

FREEWAY SERVICE PATROL

COUNTYWIDE FREEWAY SERVICE PATROL 2035 $795,200

LOS ANGELES LAE2617 LOCAL HIGHWAY

GALE AVE GALE AVE --FROM FULLERTON ROAD TO NOGALES ST, WIDEN FROM 4 TO 6 LANES AND NOGALES ST INTERSECTION WIDENING AT GALE AVE. TO ADD LEFT TURN LANE.

2014 $600

LOS ANGELES 1OM0702-LA0G306

LOCAL HIGHWAY

GARFIELD AVE GARFIELD AVE AT SLAUSON AVE INTERSECTION (GARFIELD AVE AT FLOTILLA AVE) – PROJECT INVOLVES PAVEMENT RECONSTRUCTION IN CON-CRETE, NEW CURB AND GUTTER, DRAINAGE, TRAFFIC SIGNAL, BUS SHELTERS, AND STRIPING OF THE INTERSECTION.

2011 $570

LOS ANGELES 1NL04-LAF1736 LOCAL HIGHWAY

GARVEY, ATLANTIC, GARFIELD

WAYFINDING PROGRAM. DEVELOP A SIGNAGE PRO-GRAM AS PART OF THE MIXED-USE AND PEDESTRIAN LINKAGES PLAN TO IMPROVE PEDESTRIAN ACCESS IN DOWNTOWN

2011 $165

LOS ANGELES LA0F008 LOCAL HIGHWAY

GLENDALE BLVD GLENDALE BLVD. OVER L.A RIVER, REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET, UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 (53C1881) GLENDALE-HYPERION COMPLEX OF BRIDGES. (#53C-1883)

2013 $1,880

LOS ANGELES LA0F009 LOCAL HIGHWAY

GLENDALE BLVD GLENDALE BLVD. OVER LA RIVER. REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET. UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 GLENDALE-HYPERION COMPLEX OF BRIDGES. (BRIDGE #53C1884, BHLS-5006(187))

2013 $2,350

Page 183: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 181

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA990351 LOCAL HIGHWAY

GLENDALE BLVD./FWY RT 2

IMPROVE GLENDALE BLVD/FWY RT 2 TERMINUS RECONFIG/REDSIGN, TRAFFIC MGMT. NEIGHBORHOOD SAFETY MEASURES (TEA21-#413) (TOLL CREDIT WILL BE USED AS THE LOCAL MATCH FOR THE DEMO FUNDS)TOLL CREDIT IN FY10/11 IN CON. FOR $375 AND FY11/12 IN CON. FOR $1,875.

2014 $14,258

LOS ANGELES LA0D477 LOCAL HIGHWAY

GOLDEN VALLEY ROAD

CONSTRUCT IMPROVEMENTS FOR SR-14 INTERCHANGE AT GOLDEN VALLEY ROAD. DIAMOND CONFIRGURATION, TWO RAMPS, IMPROVEMENTS INCLUDE WIDENING OF BRIDGE OVERCROSSING, NEW SIGNALS, RAMP MOD.

2014 $7,370

LOS ANGELES LA0B104 LOCAL HIGHWAY

GOLDEN VALLEY ROAD

GOLDEN VALLEY ROAD – NEWHALL RANCH ROAD TO PLUM CANYON ROAD. 0 TO 4 LANES APPROXIMATELY 1.5 MILES.

2018 $11,000

LOS ANGELES LA0G748 LOCAL HIGHWAY

GOLDEN VALLEY ROAD

RESTRIPE GOLDEN VALLEY ROAD FROM SOLEDAD CANYON ROAD TO SIERRA HIGHWAY FROM 4 TO 6 LANES; APPROXIMATELY 2.5 MILES

2014 $1,500

LOS ANGELES LAF1136 LOCAL HIGHWAY

GRANDVIEW GRANDVIEW AV MODIFICATIONS WITHIN THE CITY OF GLENDALE.THE PROJECT WILL ADD ONE EAST BOUND LEFT-TURN LANE ON GRANDVIEW WEST OF AIR WAY, ONE EASTBOUND THROUGH-LANE ON GRANDVIEW BETWEEN AIR WAY AND SAN FERNANDO RD. ONE NORTHBOUND LEFT-TURN LANE ON SAN FERNANDO RD. SOUTH OF GRANDVIEW, AND ONE SOUTHBOUND RIGHT-TURN LANE ON SAN FERNANDO RD. NORTH OF GRANDVIEW

2012 $4,535

LOS ANGELES LAE2194 LOCAL HIGHWAY

GREENLEAF BLVD GREENLEAF ROW COMMUNITY ENHANCEMENT PROJECT DESIGN AND CONSTRUCTION OF BIKEWAY PED WALK WAY AND UPGRADE SIGNALIZATION

2011 $3,840

LOS ANGELES LAE2634 LOCAL HIGHWAY

HAMLIN ST CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF HAMLIN ST. AND CORBIN AVE.

2012 $125

LOS ANGELES LAE1601 LOCAL HIGHWAY

HANSEN DAM REC AREA

TRANSPORTATION ENHANCEMENT TO CHILDREN’S MUSEUM OF LOS ANGELES.

2012 $1,200

Page 184: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

182 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA960176 LOCAL HIGHWAY

HARRY BRIDGES BLVD

HARRY S BRIDGES BLVD RELOCATION/CONSOLIDATION OF STREETS, STREET INTERSECTIONS, TRAFFIC CHANNELIZATION AND SIGNALIZATION (TEA21-#978)

2014 $51,813

LOS ANGELES 1A1010 LOCAL HIGHWAY

HIGUERA ST BRIDGE NO. 53C0876, HIGUERA ST, OVER BALLONA CR. BETWEEN EASTHAM DRIVE AND JEFFERSON BLVD. REPLACE 3 LANE BRIDGE WITH A NEW 4 LANE BRIDGE.

2014 $7,594

LOS ANGELES LA0F040 LOCAL HIGHWAY

HILL RESTORATION, OPERATION AND/OR MAINTENANCE COSTS ASSOCIATED WITH THE HISTORIC ANGELS FLIGHT RAILWAY ON BUNKER HILL IN DOWNTOWN LOS ANGELES

2012 $224

LOS ANGELES 1NL04-LAF1617 LOCAL HIGHWAY

HOLLYWOOD BLVD HOLLYWOOD PEDESTRIAN/TRANSIT CROSSROADS PHASE II. DESIGN AND INSTALL PEDESTRIAN AND TRANSIT USER ENHANCEMENTS, EXTENDING THE ORIGINAL HOLLYWOOD PEDESTRIAN/TRANSIT IMPROVEMENT PROJECT TO INCLUDE HIGHLAND AVE AND VINE ST.

2013 $860

LOS ANGELES LA0F007 LOCAL HIGHWAY

HYPERION AVE GLENDALE BLVD.-HYPERION AVE. COMPLEX OF BRIDGES OVER LA RIVER, I-5 AND RIVERSIDE DR, REHABILITATION/SEISMIC RETROFIT; UPGRADE BRIDGE RAILING; INCLUDES BRIDGES 53C-1881, 53C-1882, 53C-1883, 53C-1884 AND 53-1069. NO ADDITIONAL LANES. REALIGN I-5 NORTH BOUND OFF RAMP (FED PROJECT ID: BHLS-5006(181)

2016 $66,207

LOS ANGELES LA0C8036 LOCAL HIGHWAY

HYPERION AVE HYPERION AV UNDR WAVERLY DR BRDGE, RE-COFIGURE SIDEWKS ALONG HYPERION. RE-ALLIGN I-5 NB OFF-RAMP AT GLENDALE BLVD. PROVIDE ALTERNATIVE BIKEWAY ACCESS TO LA RIVER. PPNO 3092.

2013 $14,422

LOS ANGELES LAE1915 LOCAL HIGHWAY

IMPERIAL CONSTRUCT AND IMPROVE MEDIANS AND DRAINAGE ON IMPERIAL HIGHWAY FROM WEST BORDER TO EAST BORDER OF CITY OF LA MIRADA

2012 $5,503

Page 185: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 183

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF1520 LOCAL HIGHWAY

IMPERIAL HWY. IMPERIAL HIGHWAY BIKE LANES. THIS PROJECT INVOLVES THE MODIFICATION OF THE MEDIAN ISLAND AND THE WIDENING OF IMPERIAL HIGHWAY ALONG 1000 FT EAST OF PERSHING DRIVE TO ACCOMMODATE BIKE LANES.

2014 $2,322

LOS ANGELES LAE2906 LOCAL HIGHWAY

INGLEWOOD AVE INGLEWOOD AVE CORRIDOR IMPROVEMENT AT MARINE AVE FOR ROADWAY WIDENING AT THREE INTERSECTION CORNERS TO ACCOMMODATE DEDI-CATED RIGHT TURN LANE POCKETS TO IMPROVE THRU TRAFFIC FLOW AND REDUCE CONGESTION. THIS PROJECT WILL INCLUDE CURB, GUTTER, SIDEWALK, ADA ACCESSIBLE RAMPS, UTILITY RELOCATION, AND SIGNAL REPLACEMENTS/MODIFICATIONS. RIGHT OF WAY ACQUISITION WILL BE REQUIRED IN ORDER TO ACCOMMODATE RIGHT TURN POCKETS OF SUFFICIENT STACKING LENGTH.

2014 $4,515

LOS ANGELES 1ITS04 LOCAL HIGHWAY

ITS COUNTYWIDE CALL FOR PROJECTS SIGNAL SYNCHRONIZATION MODE

2030 $1,023,700

LOS ANGELES LAE3764 LOCAL HIGHWAY

JENNY ST ITS & INTERSECTION IMPROVEMENTS IN AND NEAR LAX AIRPORT, WHICH MAY INCLUDE RESTRIPING, SIGNAL PHASE CHANGES, AND THE ADDITION OF INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT.

2011 $1,250

LOS ANGELES LA0D390 LOCAL HIGHWAY

JOHN S. GIBSON AT I-110 NB AT JOHN S GIBSON BLVD NB RAMPS & NB SR-47/I-110 CONNECTOR. WIDEN SB 47 TO NB 110 CONNECTOR FROM 1 TO 2 LNS BEGIN AT SB 47 PM 0.72 (STATION 535+00) JUST W OF FRONT ST ON-RAMP. ADDL THROUGH LN CONTINUES ON NB 110 & ENDS JUST N OF THE J S GIBSON OFF-RAMP. WIDEN NB 110/J S GIBSON ON-RAMP TO IMPROVE ACCESS TO FWY & INTERSECTION OF J S GIBSON/110 NB RAMPS W/ IMPROVED TURN RADII & RE-STRIPING

2014 $35,051

LOS ANGELES LAE2333 LOCAL HIGHWAY

KANAN DUME CONSTRUCT AND REPAIR LINING IN FOUR TUNNELS ON KANAN, KANAN DUME, AND MALIBU ROADS BETWEEN US-1 AND US-101. (PROJECT USING $1,581 OF TOLL CREDITS IN FY 10/11 FOR MATCH FOR STPL AND DEMO FUNDS)

2011 $12,000

Page 186: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

184 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D209 LOCAL HIGHWAY

LA BREA AVE LA BREA AVE, FROM FLORENCE AVE TO CENTURY BLVD AND IMPERIAL HIGHWAY, FROM PRAIRIE AVE TO VAN NESS AVE BY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS.

2011 $5,977

LOS ANGELES LAE2024 LOCAL HIGHWAY

LA BREA AVE REALIGNMENT LA BREA AV TO REDUCE CONGESTION: IMPROVEMENTS AT INTERSECTION WITH HILLCREST BLVD (6-LEG TO 4-LEG/SIGNALIZED) & WITH TAMARACK AV (ADD SIGNAL) – 2007 METRO CALL FUNDS (PC25) ONLY APPLY TO REALIGNMENT OF THE LA BREA AVE BETWEEN HILLCREST BLVD AND SPRUCE AVE/MARKET STREET INTERSECTIONS.

2014 $9,970

LOS ANGELES 1OM0702-LA0G122

LOCAL HIGHWAY

LA BREA AVE AND IMPERIAL HIGHWAY

RECONSTRUCT AND RESURFACE LA BREA AVE FROM 64TH ST TO 104TH AND IMPERIAL HIGHWAY FROM PRAIRIE AND VAN NESS AVENUES.

2012 $4,121

LOS ANGELES LA990360 LOCAL HIGHWAY

LA LOMA ROAD LA LOMA BRIDGE CONTRUCTION (TEA21-#1208) THE LENGTH OF THE PROJECT IS 379 FT. RECONSTRUCT THE ONE LANE IN EACH DIRECTION. BRIDGE NO. 53C0759, LA LOMA RD, OVER ARROYO SECO CHANNEL, 0.8 MIS S. FOOTHHILL FREEWAY.

2016 $20,171

LOS ANGELES LAE2750A LOCAL HIGHWAY

LA MIRADA BLVD ENGINEERING SUPPORT TO I-5 JOINT POWERS AUTHORITY TO WIDEN I-5 FREEWAY. PAVEMENT AND INTERSECTION IMPROVEMENT AT LA MIRADA BLVD AND ALONDRA BLVD PRIOR TO I-5 IMPROVEMENTS

2011 $1,945

LOS ANGELES LA0C8058 LOCAL HIGHWAY

LA TIJERA BLVD LA TIJERA BRIDGE WIDENING OVER I-405 FREEWAY; PROVIDE SIDE-BY-SIDE DUAL LEFT -TURN LANES IN EAST & WESTBOUND DIRECTION ONTO FREEWAY RAMPS.

2012 $14,515

LOS ANGELES LA996324 LOCAL HIGHWAY

LAKE AVE ITS IMPROVEMENTS: LAKE AVE AND DEL MAR BLVD. 2010 $963

LOS ANGELES 1NL04-LAF1846 LOCAL HIGHWAY

LANKERSHIM BLVD ANGELS WALK NORTH HOLLYWOOD. TO PROMOTE PEDESTRIAN ACTIVITY WITHIN THE PROJECT LIMITS WITH A GUIDEBOOK AND 15 ON-STREET INFORMATION MARKERS AT STRATEGIC LOCATIONS.

2012 $714

LOS ANGELES LAE2389 LOCAL HIGHWAY

LAS TUNAS DR LAS TUNAS PED ENHANCEMENTS. INSTALL AND REPLACE ADA RAMPS. UPDATE CROSSING MARKING AND SIGNALS

2013 $791

Page 187: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 185

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1A1009 LOCAL HIGHWAY

LAS VIRGENES (RURAL ARTERIAL)

CONVERT LAS VIRGENES RD. FROM 2 LANE ROAD TO 4 LANE ROAD BETWEEN AGOURA RD. AND LOST HILLS RD.; 2 LANES IN EACH DIRECTION AND PROVIDING TURNING POCKETS, TRAFFIC SIGNAL INSTALLATIONS AND MODIFICATIONS, BIKE LANES AND SIDEWALKS

2012 $25

LOS ANGELES LAE0180 LOCAL HIGHWAY

LAUREL CANYON BLVD

LAUREL CANYON BLVD BETWEEN HAMLIN ST AND VICTORY BLVD. PROJECT WILL PROVIDE FOR PEDESTRIAN SAFETY AND BEAUTIFICATION TREATMENT. ELEMENTS INCLUDE LANDSCAPED MEDIAN ISLANDS.

2011 $1,200

LOS ANGELES LA0C8038 LOCAL HIGHWAY

LAUREL CYN BLVD LAUREL CANYON BLVD BRDGE OVER TUJUNGA WASH WIDENING (BRIDGE #53C-1233)- REHABILITATE 4-LANE BRIDGE AND WIDEN TO ADD SHOULDERS, UPGRADE BRIDGE RAILINGS. PPNO 3094 3379 AB 3090

2018 $3,700

LOS ANGELES LA0F041 LOCAL HIGHWAY

LEMON GROVE WILL ADD STREETLIGNTS ON LEMON GROVE RECREATION CENTER ON THE EAST HOLLYWOOD COMMUNITY, MAKING PROPERTY OWNERS, COMMUNITY MEMBERS, PEDESTRIANS AND MOTORISTS FEEL SAFER

2010 $293

LOS ANGELES 1NL04-LAF3615 LOCAL HIGHWAY

LONG BEACH BLVD. LONG BEACH BLVD. PEDESTRIAN IMPROVEMENT PROJECT. PROJECT PROVIDES PEDESTRIAN-ORIENTED IMPROVEMENTS TO LONG BEACH BLVD INCLUDING PEDESTRIAN LIGHTING, STREET TREES, AND CROSSWALK TREATMENTS.

2015 $2,521

LOS ANGELES LA002738 LOCAL HIGHWAY

LOS ANGELES RIVER

BIKEWAY/PEDESTRIAN BRIDGE OVER LA RIVER AT TAYLOR YARD CLASS I (CFP 738, 2077) (PPNO# 3156)

2015 $5,000

LOS ANGELES 1NL04-LSTEA0019

LOCAL HIGHWAY

LOS ANGELES RIVER

IN LOS ANGELES – ALONG THE LA RIVER FROM BARCLAY ST. TO N. SPRING ST. – CONSTRUCT BIKE PATH

2013 $1,542

LOS ANGELES LA0D108 LOCAL HIGHWAY

LOS ANGELES RIVER

L.A RIVER BIKE PATH PHASE 1C- CLASS 1 BIKEWAY ALONG WEST BANK OF LA RIVER- FLETCHER DR TO BARCLAY ST INCLUDES LIGHTING, SIGNAGE, PAVEMNT MARKINGS & FENCING (LA996245) (PPNO 5006)

2010 $2,536

Page 188: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

186 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF1639 LOCAL HIGHWAY

LOS ANGELES ST FASHION DISTRICT STREETSCAPE PHASE II. STREETSCAPE IMPROVEMENTS ENHANCING THE PEDESTRIAN ENVIRONMENT TO FACILITATE INCREASED PEDESTRIAN USAGE BETWEEN LA FASHION DISTRICT’S CORE AND THE 7TH ST TRANSIT CORRIDOR.

2013 $2,034

LOS ANGELES LA0F003 LOCAL HIGHWAY

LOS ANGELES ST LOS ANGELES ST, OVER BIG DALTON WASH, 0.5 MI S IRWINDALE AVE. WIDEN 2-LANE BRIDGE TO 4-LANE BRIDGE, ADD SHOULDERS, UPGRADE BRIDGE RAILING (# 53C0676)

2014 $2,319

LOS ANGELES LA0G740 LOCAL HIGHWAY

LYONS AVE RESTRIPE LYONS AVE FROM WILEY CANYON ROAD TO RAILROAD AVE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILES

2018 $1,500

LOS ANGELES LA0G750 LOCAL HIGHWAY

MAGIC MOUNTAIN PKWY

RESTRIPE MAGIC MOUNTAIN PARKWAY FROM AUTO CENTER DRIVE TO RAILROAD AVE FROM 4 TO 6 LANES; APPROXIMATELY 1 MILE

2018 $1,500

LOS ANGELES LA960170 LOCAL HIGHWAY

MAGIC MOUNTAIN PKWY

MAGIC MOUNTAIN PARKWAY EXTENSION FROM SAN FERNANDO RD TO VIA PRINCESSA: CONSTRUCT A NEW ROAD WITH 3 LANES IN EACH DIRECTION

2014 $21,101

LOS ANGELES LA0C8087 LOCAL HIGHWAY

MAGNOLIA BLVD MAGNOLIA BLVD WIDENING-CAHUENGA BLVD TO VINELAND AVE. FROM THE EXISTING ROADWY STANDARD TO SECONDARY HWY STANDARD. FROM 1 LANE TO 2 LANES IN EACH DIRECTION. (PPNO 3110).

2012 $4,030

LOS ANGELES LAE2517 LOCAL HIGHWAY

MAINE AVE WIDEN MAINE AVE. IN BALDWIN PARK ADD 1 THRU LN & 1 RIGHT TURN AND 1 LEFT TURN ONLY LANE (SAFETEA-LU DEMO ID #2517. PROJECT USING $60 OF TOLL CREDIT IN FY12 FOR ENG PHASE TO MATCH DEMO FUNDS.

2014 $300

LOS ANGELES 1NL04-LA0G218 LOCAL HIGHWAY

MAINE AVE MAINE AVE MASTER PLAN DEVELOPMENT PROJECT. DEVELOP PRELIMINARY AND PS&E DESIGN FOR MAINE AVE IN BALDWIN PARK THAT IMPROVES THE DOWN-TOWN/CIVIC CENTER AREA FOR USE BY PEDESTRI-ANS, BICYCLISTS AND TRANSIT USERS.

2011 $119

Page 189: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 187

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF1527 LOCAL HIGHWAY

MANCHESTER AVE. MANCHESTER AVE BIKE LANES & ISLAND REDUCTION. THE PROJECT CONSISTS OF THE INSTALLATION OF ONE MILE OF BIKE LANES AND THE REDUCTION OF THE LANDSCAPED MEDIAN ISLAND ON MANCHESTER BLVD BETWEEN SEPULVEDA BLVD AND OSAGE AV

2015 $2,328

LOS ANGELES 1A1007 LOCAL HIGHWAY

MCBEAN PKWY MCBEAN PARKWAY WIDENING/GAP CLOSURE OVER SANTA CLARA RIVER. WIDEN MCBEAN PARKWAY BRIDGE TO 8 LANES AND CONSTRUCT CLASS I PATH CONNECTION BETWEEN MCBEAN PARKWAY AND SANTA CLARA RIVER TRAIL.. THE PROJECT IS LOCATED IN THE CITY OF SANTA CLARITA. MCBEAN PARKWAY WITHIN THE PROJECT LIMITS IS ON A ROUGHLY NORTH-SOUTH ALIGNMENT. THE NEAREST MAJOR CROSS STREETS ARE NEWHALL RANCH ROAD TO THE NORTH AND MAGIC MOUNTAIN PARKWAY TO THE SOUTH. THE TOTAL LENGTH OF THE ROADWAY GAP CLOSURE PROJECT IS APPROXIMATELY 0.25 MILES

2018 $6,864

LOS ANGELES 1NL04-LA0G257 LOCAL HIGHWAY

MILLS AVE WHITTIER GREENWAY TRAILHEAD PARK. EXTENSION OF WHITTIER GREENWAY TRAIL FROM MILLS AVE TO 300 FEET EAST OF MILLS AVE IN CONJUNCTION WITH CONSTRUCTION OF NEW TRAILHEAD PARK AND 20 SPACE PARKING LOT FOR BICYCLE COMMUNTERS.

2014 $650

LOS ANGELES LA996340 LOCAL HIGHWAY

MISSION MISSION BLVD. GRADE SEPARATION AT SR. 71(FROM UPRR UNDERCROSSING TO 9TH ST. MISSION BLVD FROM WESTERN TO CURRAN PLACE (CFP 6340, 8400). PPNO 2232. SAFETEA-LU # 511 (PPNO 2232)AND SAFETEA-LU # 3771 (2232).

2012 $51,000

LOS ANGELES LA0C8055 LOCAL HIGHWAY

MOORPARK ST MOORPARK ST WIDENING – WOODMAN AVE TO MURIETTA AVE.- WIDEN EXISTING ROADWAY FROM VARYING WIDTH TO 70 FTEET TO PROVIDE ON ADDTL TRAFFIC LANE IN EA DIR & UPGRADE HIGHWAY TO SECONDARY HWY STANDARDS. THIS PROJECT IMPROVES 2080 LF OF MOORPARK AVE. PPNO 3103.

2012 $6,788

LOS ANGELES LA0C8086 LOCAL HIGHWAY

N SPRING ST NORTH SPRING ST, OVER LOS ANGELES RIVER .4 MILES WEST OF I-5. REHABILITATE AND WIDEN 4 LANE BRIDGE (NO ADDED LANES) ADD SIDEWALKS UPGRADE BRIDGE RAILINGS (53C0859).

2018 $79,546

Page 190: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

188 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF1534 LOCAL HIGHWAY

N/A BIKE TECHNOLOGY DEMONSTRATION. PROJECT WILL CONSIST OF DESIGN, INSTALLATION AND EVALUATION OF SEVERAL BICYCLE TECHNOLOGIES, INCLUDING BICYCLE ACTIVATED DETECTION AT INTERSECTIONS, BIKE BOXES, AND BIKE PARKING.

2015 $399

LOS ANGELES 1NL04-LAF1612 LOCAL HIGHWAY

N/A CENTURY CITY URBAN DESIGN AND PEDESTRIAN CONNECTION PLAN. PROJECT WILL IMPLEMENT SIDE-WALK IMPROVEMENTS, DECORATIVE CROSSWALKS, MEDIAN ISLAND, CURB RAMPS, PEDESTRIAN LIGHT-ING, SHELTERS, BENCHES, TRASH RECEPTACLES & STREET TREES.

2015 $3,342

LOS ANGELES 1NL04-LAF1728 LOCAL HIGHWAY

N/A CITY OF SANTA MONICA ITS IMPROVEMENTS. SANTA MONICA REAL TIME BEACH PARKING SIGNS. THIS PROJECT WILL MAKE INFORMATION REGARDING BEACH PARKING AVAILABLE TO MOTORISTS DESTINED FOR SANTA MONICA BEACH PARKING LOTS.

2012 $1,166

LOS ANGELES LAE0388B LOCAL HIGHWAY

N/A CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF INDEPENDENCE AVE. AND SHERMAN WAY.

2012 $125

LOS ANGELES 1TR08D7B-LA0G155

LOCAL HIGHWAY

N/A LACRD – TRANSIT SIGNAL PRIORITY IN THE CITY OF LOS ANGELES.

2011 $1,000

LOS ANGELES LAE0346 LOCAL HIGHWAY

N/A LIGHTING, AND SAFETY IMPROVEMENTS ON ROAD LEADING TO HANSEN DAM RECREATION AREA. ACCESS IMPROVEMENTS INCLUDING HILLSIDE STABILIZATION AND PARKING LOT REHABILITATION ALONG OSBORNE ST BETWEEN GLENOAKS BLVD AND DRONFIELD AVE [REF P.L. 110-244, SEC 105(A)(234)] (CHANGE PER H.R.1195-6/6/08)

2012 $6,500

LOS ANGELES LAE1148 LOCAL HIGHWAY

N/A LOS ANGELES REGIONAL DIESEL EMISSIONS REDUCTION PROGRAM FOR ENGINE RETROFIT PROVIDES INCENTIVE GRANTS TO OWNER OPERATORS OLD DIESEL TRUCKS TO UPGRADE EQUIPMENT TO REDUCE EMISSIONS

2014 $449

LOS ANGELES 1OM0702- LA990352

LOCAL HIGHWAY

N/A PALISADES BLUFF STABILIZATION PROJ. (TEA21-#453)

2011 $8,897

Page 191: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 189

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF1532 LOCAL HIGHWAY

N/A SCHOOL BASED BICYCLE TRAINING, SANTA MONICA. PROVIDE TRAINING FOR STUDENTS AT 2 MIDDLE SCHOOLS ON HOW TO SAFELY RIDE BICYCLE ON CITY STREETS TO ACCESS SCHOOL.

2013 $130

LOS ANGELES LAF1342 LOCAL HIGHWAY

N/A ATSAC/ATCS – PLATT RANCH PROJECT. PROVIDE ATSAC/ATCS TYPE FACILITIES AND BUS PRIORITY INFRASTRUCTURE TO APPROX. 29 SIGNALIZED INTER-SECTIONS THROUGH IMPLEMENTATION OF A COM-PUTER BASED REAL-TIME TRAFFIC SIGNALIZATION

2012 $5,469

LOS ANGELES LA0F062 LOCAL HIGHWAY

N/A DESIGN AND CONST. OF REAL-TIME PARKING INF./GUIDANCE SYSTEM. PHASE I COVERS SANTA MONICA AREA, BOUNDED BY COLORADO AVE., OCEAN AVE., WILSHIRE BLVD AND LINCOLN BLVD.

2010 $700

LOS ANGELES 1NL04-LA0G186 LOCAL HIGHWAY

N/A GLENDALE PARKS, RECREATION & COMMUNITY SERVICES DEPARTMENT WILL CONSTRUCT A 1,825 FOOT ADA ACCESSIBLE RECREATIONAL TRAIL (NOT FOR COMMUTING PURPOSES) ADJACENT TO THE 27-ACRE GLENDALE SPORTS COMPLEX IN THE SAN RAFAEL HILLS ABOVE THE CITY OF GLENDALE. A POR-TION OF THE SPORTS COMPLEX PARKING LOT WILL BE RE-STRIPED TO INCLUDE ADDITIONAL HANDICAPPED SPACES NEAR THE TRAILHEAD. (NO ADDITIONAL PARKING SPACES WILL BE ADDED).

2010 $197

LOS ANGELES LAE1401 LOCAL HIGHWAY

N/A RECONSTRUCT LONG BEACH BLVD WITH MEDIANS AND IMPROVED DRAINAGE PHASE II FROM IMPERIAL HWY TO TWEEDY BLVD. PHASE III LIMITS ARE MAGNOLIA AVE. TO IMPERIAL HWY.

2012 $3,500

LOS ANGELES LAE3439 LOCAL HIGHWAY

NA EXPAND DIESEL EMISSIONS REDUCTION PROGRAM OF GATEWAY CITIES COG

2011 $2,676

LOS ANGELES LA990359 LOCAL HIGHWAY

NA GRADE SEP XINGS SAFETY IMPR; 35- MI FREIGHT RAIL CORR. THRGH SAN.GAB. VALLEY – EAST. L.A. TO POMONA ALONG UPRR ALHAMBRA &L.A. SUBDIV – ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318

2018 $1,347,101

Page 192: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

190 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE1142 LOCAL HIGHWAY

NA IMPLEMENT ITS SUBREGIONAL MASTERPLAN: FOCUS INTEGRATING STATE, LOCAL, & PRIVATE SYSTEMS FOR REAL TIME TRAFFIC CONTROL & FREIGHT TRAVELER INFO, TRUCK SAFETY, SECURITY, & EMISSIONS

2011 $2,688

LOS ANGELES LA29202N LOCAL HIGHWAY

NA MTA TIP ADMINISTRATION PLANNING, PROGRAMMING AND MONITORING FOR STIP PROJECTS THROUGH OUT LA COUNTY (200 CFP 7116 STATE ONLY 3594,2001 CFP 8401, PPNO 3535, 9001A, 9001)

2016 $65,022

LOS ANGELES LAE1883 LOCAL HIGHWAY

NA STUDY – ORANGELINE CORRIDOR DEVELOPMENT PROJ – HIGH SPEED MAGLEV & STATION AREA DEVLOPMENT FROM NORTH LA TO SOUTH OC FOLLOWING SR14 AND FORMER PACIFIC RAILRD CORRIDOR

2010 $336

LOS ANGELES LA0D188 LOCAL HIGHWAY

NA ARBOR VITAE ST FROM LA BREA AVE TO PRAIRIE AVE BY RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS, DRIVEWAYS, PEDESTRIAN RAMPS, LANDSCAPING AND STREET LIGHTING.

2011 $3,532

LOS ANGELES LAE0938 LOCAL HIGHWAY

NA DESIGN AND CONSTRUCT REALIGNMENT OF BRAHMA DRIVE AT WINNETKA TO ELIMINATE HAZARDOUS CONDITION

2010 $300

LOS ANGELES LA0C8126 LOCAL HIGHWAY

NA HARBOR-GATEWAY ATSAC/ATCS PROJECT; IMPROVEMENTS TO 109 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTROL SYSTEM.

2011 $11,142

LOS ANGELES LA0D439 LOCAL HIGHWAY

NA INTELLIGENT TRANSPORTATION SYSTEM LOGISTICS & SYSTEMS MANAGEMENT, WILL PRODUCE AN ITS MASTERPLAN FOR THE GATEWAY CITIES SUBREGION WITH AN EMPHASIS IN GOODS MOVEMENT

2011 $500

LOS ANGELES LA0C8133 LOCAL HIGHWAY

NA RESEDA ATSAC/ATCS PROJ.PROVIDE ATSAC/ATCS TYPE IMPROVEMENTS TO 107 SIGNALIZED INTERSECTIONS THRU IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTRL SYS

2012 $15,045

Page 193: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 191

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0B7335 LOCAL HIGHWAY

NA SANTA CLARA RIV. REGIONAL COMMUTER TRAIL-DESIGNING FINAL SEGMENT (5) OF THE TOTAL 7 MILES OF CLASS I BIKE/PED PATH ALONG THE NORTH SIDE OF THE RIVER FROM THE KEYSTONE DEVELOPMENT

2008 $700

LOS ANGELES 1NL04-LA0G006 LOCAL HIGHWAY

NA SYCAMORE, CANYON PARK TRAIL PHASE IV – RECOMMENDED FOR FUNDING UNDER THE NON-MOTORIZED ELEMENT OF THE RECREATIONAL TRAILS PROGRAM (GRANT AWARD: $304,920). DECOMPOSED GRANITE 2/3 MI

2010 $347

LOS ANGELES LA996419 LOCAL HIGHWAY

NATIONAL BLVD WIDN NATIONAL BLVD. & ALLO FOR A 2ND W/B LEFT-TRN LNE & ADDTNL E/B RGHT-TURN ONLY LNE FOR THE I-405 S/B ON RAMP. 2ND LFT-TRN LNE ON NATIONAL AT SEPULVEDA AND A 2ND (SEE COMMENTS)

2011 $603

LOS ANGELES LAE1703 LOCAL HIGHWAY

NE SAN FERNANDO VALLEY

NORTHEAST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE NORTHEAST SAN FERNANDO VALLEY.

2011 $200

LOS ANGELES LA0G743 LOCAL HIGHWAY

NEWHALL AVE RESTRIPE NEWHALL AVE FROM RAILROAD AVE TO CARL COURT FROM 4 TO 6 LANES; APPROXIMATELY 0.4 MILES

2018 $1,500

LOS ANGELES 1120001 LOCAL HIGHWAY

NEWHALL RANCH ROAD

.25M WEST OF NEWHALL RANCH

ROAD/MCBEAN PKWY

.14 MILES EAST OF NEWHALL RANCH ROAD/AVE TIBBITTS

WIDEN BRIDGE 53C2164 TO ACCOMMODATE EIGHT 12 FT LANES, 4 FT SHOULDERS, A CLASS 1 BIKE TRAIL, AND AN ADDITIONAL 6 FT SIDEWALK. MINOR SIDEWALK AND ROADWAY APPROACH WORK.

2014 $15,710

LOS ANGELES 1O1007 LOCAL HIGHWAY

NON-MOTORIZED COUNTYWIDE CALL FOR PROJECTS BICYCLE MODE 2030 $260,800

LOS ANGELES 1O1008 LOCAL HIGHWAY

NON-MOTORIZED COUNTYWIDE CALL FOR PROJECTS PEDESTRIAN MODE 2030 $260,800

LOS ANGELES 1O1009 LOCAL HIGHWAY

NON-MOTORIZED COUNTYWIDE CALL FOR PROJECTS TRANSPORTATION ENHANCEMENT ACTIVITIES (TEA MODE)

2030 $159,300

LOS ANGELES LAE2538 LOCAL HIGHWAY

NORMANDIE KOREATOWN PAVILION GARDEN-TO ENHANCE THE NORTHEAST CORNER OF NORMANDIE AND OLYMPIC BL.

2012 $250

Page 194: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

192 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA450022 LOCAL HIGHWAY

NORMANDIE AVE NORMANDIE AVE & PICO BLVD INTERSECTION IMPROV -THIS PROJECT WILL RECONSTRUCT & WIDEN THE NORTHWEST CORNER OF THE INSTERSECTION OF NORMANDIE AV & PICO BLVD. IT WILL REMOVE THE TRAFFIC ISLAND S/O THE INTERSECTION ON NORMANDIE AV. THE PROPSED ALIGNMENT AT TH

2008 $1,744

LOS ANGELES 0 LOCAL HIGHWAY

NORTH MAIN ST NORTH MAIN ST. GRADE SEPARATION: CONSTRUCT A NEW GRADE SEPARATION OVER UPRR AND METROLINK & LA RIVER WHILE PRESERVING THE EXISTING HISTORIC N. MAIN ST. BRIDGE. BIKE LANES WILL BE ADDED AT THE SHOULDERS OF THE BRIDGE. OTHER WORK COMPONENTS INCLUDE REALIGNING ALBION ST AND MODIFYING THE INTERSECTIONS OF NORTH MAIN AND MESNAGER ST AT THE WEST END.

2018 $91,280

LOS ANGELES 1NL04-LAF3514 LOCAL HIGHWAY

NORTHVALE RD. DESIGN AND CONSTRUCT 0.28 MILES CLASS I BIKE FACILITY NORTH OF I-10 FROM MOTOR AVE. TO 500 FEET EAST OF DUNLEER DR. (CONTINUOUS BIKEWAY FROM EXPOSITION PARK TO SANTA MONICA BEACH).

2015 $6,169

LOS ANGELES LA000512 LOCAL HIGHWAY

OCEAN BLVD OCEAN BLVD, FROM THE LOS ANGELES RIVER OVER UPRR AND BACK CHANNEL, TO 0.1 MILE E OF STATE ROUTE 47, REPLACE 5 LANE EXISTING GERALD DESMOND BRIDGE WITH NEW 6 LANE BRIDGE (3 LANES IN EACH DIRECTION); OTHER IMPROVEMENTS INCLUDE CONSTRUCTION OF NEW APPROACH STRUC-TURES AND ROADS, RECONSTRUCTION OF THE EXIST-ING HORSESHOE INTERCHANGE RAMP CONNECTORS, RECONSTRUCTION OF THE EXISTING CONNECTORS TO SR-710, AND RECONSTRUCTION OF TWO RAMP CON-NECTIONS TO PICO AVE.

2018 $1,162,003

LOS ANGELES LA0F010 LOCAL HIGHWAY

OLD ROAD BRIDGE NO. 53C0327 AND 53C0328, THE OLD ROAD, OVER SANTA CLARA RIVER AND OVER SPTCO(ABND)FROM 550 SOUTH OF SKYVIEW LANE TO RYE CANYON ROAD.REPLACE 4 LANE APPROACHES AND BRIDGES WITH 6 LANE APPROACHES AND BRIDGES.

2014 $47,991

LOS ANGELES LA0D461 LOCAL HIGHWAY

OLD ROAD RECONSTRUCT- THE OLD ROAD FROM HILLCREST PARKWAY TO LAKE HUGHES RD & WIDEN FROM 40’ TO 68’, 2 VEH. LANES AND A 5’ CLASS II BIKELANE IN EA DIR & STRIPPED MEDIAN (FROM 2 TO 4 LNS 2 EA DIR)

2014 $10,700

Page 195: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 193

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE2476 LOCAL HIGHWAY

OLYMPIC BL ENHANCE PEDESTRIAN ENVIRONMENT AND INCREASE SAFETY ALONG OLYMPIC BLVD BETWEEN VERMONT AVE AND WESTERN AVE. PROJECT WILL PROVIDE VARIOUS STREETSCAPE IMPROVEMENTS ALONG LIMITS.

2012 $2,000

LOS ANGELES LAF1205 LOCAL HIGHWAY

OLYMPIC BLVD. OLYMPIC BLVD AND MATEO STREET GOODS MOVEMENT IMP-PHASE II. IMPROVEMENT OF FREE-WAY ACCESS BY WIDENING WB OLYMPIC BLVD BET MATEO ST & SANTA FE AV FOR A RIGHT-TURN LANE, AND NB MATEO ST BET OLYMPIC BLVD & PORTER ST FOR INCREASED CURB RETURN.

2013 $4,421

LOS ANGELES LA0D441 LOCAL HIGHWAY

ON-OFF RAMP 605 RECONFIGURATION OF VALLEY BLVD ON-AND-OFF-RAMPS TO THE 605 FREEWAY TO IMPROVE MOBILITY, CIRCULATION, AND RELIEVE THE CURRENT CONGESTION AT VALLEY BLVD.

2018 $28,012

LOS ANGELES LA0G742 LOCAL HIGHWAY

ORCHARD VILLAGE ROAD

RESTRIPE ORCHARD VILLAGE ROAD FROM MCBEAN PARKWAY TO LYONS AVE FROM 4 TO 6 LANES; APPROXIMATELY 1.3 MILES

2018 $1,500

LOS ANGELES LAE3201 LOCAL HIGHWAY

OSO AVE CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF OSO AVE. AND VANOWEN ST.

2012 $125

LOS ANGELES LA0B7234 LOCAL HIGHWAY

OVERLAND AVE OVERLAND BRIDGE -- OVER I-10 FREEWAY -WIDEN W SIDE OF OVERLAND AVE BRIDGE OVER THE I-10 FROM NATIONAL BLVD/I-10 WESTBOUND RAMPS TO NATIONAL BLVD/NATIONAL PLACE. PPNO 2863

2012 $8,641

LOS ANGELES 1NL04-LAF1505 LOCAL HIGHWAY

PACOIMA WASH ACCESS ROAD

SAN FERNANDO PACOIMA WASH BIKE PATH. THE SAN FERNANDO PACOIMA WASH BIKE PATH WILL BE A 1.6-MILE LONG CLASS I FACILITY ALONG THE PACOIMA WASH IN SAN FERNANDO. IT INCLUDES 3 BRIDGES, 5 OVERPASSES AND 8 ACCESS POINTS.

2015 $2,495

LOS ANGELES 1NL04-LAF1529 LOCAL HIGHWAY

PALOS VERDES DRIVE NORTH

PALOS VERDES DRIVE NORTH BIKE LANES. CONSTRUCTION OF CLASS II BIKELANE AND RELATED IMPROVEMENTS ON PALOS VERDES DRIVE NORTH

2012 $2,574

Page 196: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

194 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF1506 LOCAL HIGHWAY

PALOS VERDES DRIVE SOUTH

BIKE COMPATIBLE RDWY SAFETY AND LINKAGE ON PALOS VERDES DR. THE PROJECT WILL HAVE A CLASS II BIKE LANE ON BOTH SIDES OF PALOS VERDES DRIVE SOUTH, WITH AN UNPAVED SHOULDER FOR EMER-GENCY USE.

2014 $788

LOS ANGELES LAE1390 LOCAL HIGHWAY

PARAMOUNT BLVD. RECONSTRUCT PARAMOUNT BLVD WITH MEDIANS AND IMPROVE DRAINAGE FROM ARTESIA BLVD TO CANDLEWOOD ST

2011 $575

LOS ANGELES LAE2293 LOCAL HIGHWAY

PARAMOUNT BLVD PARAMOUNT BLVD FROM GARDENDALE ST AND TELEGRAP RD -- ITS IMPROVEMENTS AS WELL AS MINOR WIDENING AT CRITICAL INTERSECTIONS TO ALLOW FOR SAID IMPROVEMENTS (NON-CAPACITY).

2012 $1,904

LOS ANGELES 1NL04-LAF3653 LOCAL HIGHWAY

PASADENA AVE PASADENA AVE PED CONNECTION TO GOLD LINE HERITAGE SQ STATION. PROVIDE PEDESTRIAN/BIKE CONNECTIVITY, TREES, FURNITURE, LIGHTING, ENHANCED CROSSWALKS AND TRAFFIC CALMING/SAFETY IMPROVEMENTS ALONG PASADENA AV.

2017 $2,567

LOS ANGELES LA0C57 LOCAL HIGHWAY

PASSONS BLVD ACE/GATEWAY CITIES-CONSTRUCT GRADE SEP. AT PASSONS BLVD IN PICO RIVERA (& MODIFY PROFILE OF SERAPIS AV,)(PART OF ALAMEDA CORR EAST PROJ.)SAFETEA-LU HPP # 1666 (TCRP #54.3)

2010 $44,530

LOS ANGELES LA0D442 LOCAL HIGHWAY

PECK RD RETROFITING THE EXISTING TWO-LANE WIDE PECK ROAD BRIDGE OVER THE SAN GABRIEL RIVER FWY (ROUTE 605) & WIDEN IT TO ACCOMODATE 4 LANES (2 EACH DIRECTION) TO ELIMINATE BOTTLENECK

2018 $12,000

LOS ANGELES LAE1933 LOCAL HIGHWAY

PICO ENHANCE BYZANTINE LATINO QUARTER TRANSIT PLAZAS AT NORMANDIE AND PICO, AND HOOVER AND PICO, LOS ANGELES BY IMPROVING STREETSCAPES, INCLUDING EXPANDING CONCRETE AND PAVING

2014 $500

LOS ANGELES LA0C8094 LOCAL HIGHWAY

PIER B ST PIER B ST INTERMODAL RAILYARD EXPANSION. PROJECT WILL EXPAND PIER B ST INTERMODAL RAILYARD TO FACILITATE ADDITIONAL RAIL SHIPMENTS AND REALIGN AND WIDEN PIER B ST.

2016 $81,800

Page 197: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 195

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D120 LOCAL HIGHWAY

PIONEER BLVD ARTESIA TRAFFIC ENHANCEMENT PROJECT FOR ARTESIA BLVD, PIONEER BLVD AND 183RD ST RESURFACING, STREETSCAPING, TRAFFIC CALMING, ANGLE-PARKING SIGNALS, ETC.

2012 $1,192

LOS ANGELES LAE1407 LOCAL HIGHWAY

PLAZA DRIVE PLAZA DRIVE FROM VINCENT AVE. TO CALIFORNIA AVE. INCLUDING INSTALLATION OF TRAFFIC SIGNAL SYS AT INTERSECTION OF PLAZA DR. & CALIF. THE SYNC. OF TWO TRAFFIC SY, & ADD TURN LANES.

2010 $721

LOS ANGELES LA0G746 LOCAL HIGHWAY

PLUM CANYON ROAD

RESTRIPE PLUM CANYON ROAD FROM BOUQUET CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 0.5 MILES

2018 $1,500

LOS ANGELES 1O0701 LOCAL HIGHWAY

PORTS OF LOS ANGELES/LONG

BEACH

EXPANSION OF PIER B ST INTERMODAL RAILYARD (FOR PIER B ST REALIGNMENT PHASE OF PROJECT SEE LA0C8094)

2015 $245,300

LOS ANGELES LA0G744 LOCAL HIGHWAY

RAILROAD AVE RESTRIPE RAILROAD AVE FROM NEWHALL AVE TO BOUQUET CANYON ROAD FROM 4 TO 6 LANES; APPROXIMATELY 3 MILES

2018 $1,500

LOS ANGELES 1NL04-LAF1504 LOCAL HIGHWAY

RAMONA EL MONTE: TRANSIT CYCLE FRIENDLY. EL MONTE PROPOSES TO IMPLEMENT THE 1ST PHASE OF THE EL MONTE BIKE-TRANSIT HUB COMPONENT (METRO BICYCLE TRANSPORTATION STRATEGIC PLAN) A COUNTYWIDE EFFORT TO IMPROVE BIKE FACILITIES

2013 $167

LOS ANGELES LAE2246 LOCAL HIGHWAY

RANCHO VISTA BLVD

RANCHO VISTA BLVD – WIDEN INTERSECTION AT 3RD ST EAST AND INTERSECTION AT 8TH ST. EAST/LOCKHEED WAY – 6 LANES; MODIFY TRAFFIC SIGNALS, DRAINAGE, SIDEWALKS, MEDIANS, UTILITY RELOCATIONS

2015 $9,550

LOS ANGELES LAE1903 LOCAL HIGHWAY

RANDOLPH RANDOLPH ST IMPROVEMENTS BETWEEN WILMINGTON AVE AND FISHBURN. PROJECT WILL USE $359 OF TOLL CREDITS TO MATCH DEMO AND STPL FUNDS IN FY11.

2012 $2,260

LOS ANGELES 1O0702 LOCAL HIGHWAY

RETROFIT SOUNDWALL

PROGRAM

COUNTYWIDE COUNTYWIDE SOUNDWALLS (METRO REGIONAL LINES AND MONTEREY PARK/SR-60)

2035 $2,149,900

LOS ANGELES 1RL04 LOCAL HIGHWAY

RIDESHARE COUNTYWIDE RIDESHARE SERVICES 2035 $528,400

Page 198: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

196 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0C8063 LOCAL HIGHWAY

RIVERSIDE DR RIVERSIDE DR. VIADUCT REPLACEMENT. REPLACEMENT OF EXISTING 2-LANE BRIDGE WITH 2 THROUGH LANES BRIDGE FLARING 4 LANES AT SAN FERNANDO ROAD WITH NEW ROUNDABOUT. BIKE LANE ADDED COMBINED WITH 53C-1932 – WILL RESULT IN INCR. CIRCULATION. PPNO 3105 (53C-0160)

2018 $55,092

LOS ANGELES LAE0732 LOCAL HIGHWAY

RIVERSIDE DR RIVERSIDE DRIVE NON-CAPACITY IMPROVEMENTS BETWEEN VAN NUYS BLVD AND TILDEN AVE.

2012 $400

LOS ANGELES LAE2819 LOCAL HIGHWAY

ROSECRANS ROSECRANS AVE OVERHEAD AND ARTERIAL RECONSTRUCTION PROJECT(NON-CAPACITY).SAFTEA-LU 1321. ISTEA 36.

2014 $15,000

LOS ANGELES LAE1228 LOCAL HIGHWAY

ROSECRANS AVE AND ALONDRA

BLVD.

REPAIR ROSECRANS AND ALONDRA BRIDGES PER THE COUNTY OF LOS ANGELES TRIENNIAL INSPECTION REPORT.

2012 $49

LOS ANGELES LA0C8056 LOCAL HIGHWAY

ROSECRANS AVE. NASH ST/DOUGLAS ST, & ROSECRANS AVE. INTERSECTION IMPROVEMENTS. PROVIDES A 2ND W-BOUND L- TURN LANE & SEPARATE E-BOUND R- TURN LANE ON ROSECRANS AVE AT NASH ST/PRKWAY. (PPNO 3129).

2011 $5,382

LOS ANGELES 1OM0702-LA0D128

LOCAL HIGHWAY

ROSEMEAD BLVD REHABILITATION OF INTERSECTIONS, PARKWAY IMPROVEMENTS, LANDSCAPING, AND SIGNALIZATION AT VARIOUS LOCATIONS ALONG ROSEMEAD BLVD WITHIN CITY LIMITS OF PICO RIVERA (FROM TELEGRAPH RD TO WASHINGTON BLVD). PROJECT WILL BE USING TOLL CREDIT FOR THE FEDERAL FUNDS; $99 IN FY11 TO MATCH DEM0 AND STPL FUNDS.

2012 $1,395

LOS ANGELES LAE2663 LOCAL HIGHWAY

ROSEMEAD BLVD ROSEMEAD BLVD SAFETY ENHANCEMENT AND BEAUTIFICATION: ACTIVITIES BETWEEN PENTLAND ST/ RAILROAD TRACKS AND ROSEMEAD/ CALLITA RD. NO ADDITIONAL LANES, OR ROAD WIDTH. PROJECT CONNECTED TO LA0G668.

2013 $20,000

Page 199: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 197

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LA0G668 LOCAL HIGHWAY

ROSEMEAD BLVD ROSEMEAD BLVD SAFETY ENHANCEMENTS & BEAUTIFICATION PROJECT: INSTALLATION OF BICYCLE LANES, SIDEWALK IMPROVEMENTS, LANDSCAPING, WAYFINDING SIGNAGE FROM PENTLAND TO CALLITA (1.7 MI).

2013 $4,500

LOS ANGELES 1NL04-LAF3646 LOCAL HIGHWAY

S. LOS ANGELES ST. TO N. ALAMEDA

ST.

ARTS DISTRICT/LITTLE TOKYO GOLD LINE STATION LINKAGES. PEDESTRIAN ENHANCEMENTS INCLUD-ING SIDEWALK/PATH PAVING; PED LIGHTS; STREET TREES/PLANTING; DISTRICT SIGNAGE; ENTRY ELE-MENTS; STREET FURNITURE; CROSSWALK PAVING; AND BIKE PARKING.

2015 $1,269

LOS ANGELES 1O0704 LOCAL HIGHWAY

SAFE COUNTYWIDE SAFE 2035 $253,700

LOS ANGELES 1NL04-LAF1502 LOCAL HIGHWAY

SAN FERNANDO SAN FERNANDO BIKEWAY. IMPLEMENT A CLASS I BIKEWAY ALONG SAN FERNANDO BLVD, VICTORY PLACE AND BURBANK WESTERN CHANNEL TO COM-PLETE THE BURBANK LEG OF A 12 MILE BIKEWAY.

2014 $8,239

LOS ANGELES 1NL04-LA0D106 LOCAL HIGHWAY

SAN FERNANDO PEDESTRIAN/BICYCLE FACILITIES, LANDSCAPE AND ARTWORK ENHANCEMENTS ADJACENT TO THE I-5/SR 10 AND THE LOS ANGELES RIVER.

2008 $5,038

LOS ANGELES LA0C8064 LOCAL HIGHWAY

SAN FERNANDO MISSION BLVD

SAN FERNANDO MISSION BLVD WIDENING, WHERE NECESSARY, BET SEPULVEDA BLVD & I-5 FWY. FROM 1 LANE TO 2 LANES IN EACH DIRECTION.PPNO 3106.

2012 $2,469

LOS ANGELES 1NL04-LAF1524 LOCAL HIGHWAY

SAN FERNANDO RD.

SAN FERNANDO RD. BIKE PATH PH. IIIA/IIIB – CONSTRUCTION. RECOMMEND PHASE IIIA-CONSTRUCTION OF A CLASS I BIKE PATH WITHIN METRO OWNED RAIL RIGHT-OF-WAY ALONG SAN FERNANDO RD. BETWEEN BRANFORD ST. AND TUXFORD ST INCL BRIDGE.

2015 $10,463

Page 200: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

198 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF3515 LOCAL HIGHWAY

SAN FERNANDO RD SAN FERNANDO RD. BIKE PATH PH. IIIB CONSTRUCTION. CONSTRUCT 2.75 MILE CLASS I BIKE PATH WITHIN METRO RIGHT-OF-WAY ALONG SAN FERNANDO RD. BETWEEN TUXFORD ST. AND COHASSET ST. TO COMPLETE 12-MILE BIKEWAY.. THE PROJECT IS LOCATED WITHIN THE CITY OF LOS ANGELES, IN THE COMMUNITY OF SUN VALLEY. THE PROJECT CONSISTS OF A CLASS I FACILITY 12 FEET IN WIDTH AND 2.75 MILES IN LENGTH BETWEEN TUXFORD ST. AND COHASSET ST. (BURBANK CITY LIMIT).

2016 $10,714

LOS ANGELES 1NL04-LA0B7330

LOCAL HIGHWAY

SAN FERNANDO RD SAN FERNANDO RD ROW BIKE PATH PHSE II-CONSTRUCT 2.75 MILES CLAS I FRM FIRST ST TO BRANFORD ST,ON MTA-OWND ROW PARLEL TO SAN FERNANDO RD. LINK CYCLSTS TO NUMROUS BUS LNE. PPNO 2868.

2011 $10,198

LOS ANGELES LAE1440 LOCAL HIGHWAY

SAN FERNANDO RD RECONFIGURE SAN FERNANDO RD. FROM FLETCHER DR. TO I-5 FWY.

2013 $6,450

LOS ANGELES 1NL04-LAF3621 LOCAL HIGHWAY

SAN FERNANDO RD SAN FERNANDO RD DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT. THE SAN FERNANDO ROAD DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT INCLUDES THE DESIGN AND CONSTRUC-TION OF IMPROVEMENTS TO PROMOTE WALKING, PUBLIC TRANSIT USE AND SAFETY.. THIS PROJECT IS LOCATED ON SAN FERNANDO ROAD BETWEEN SAN FERNANDO MISSION BLVD AND WEST CITY LIMIT AT HUBBARD ST.

2015 $4,390

LOS ANGELES LAOC8052 LOCAL HIGHWAY

SAN FERNANDO RD IMPROVE SAN FERNANDO ROAD BETWEEN ELM ST AND EAGLE ROCK BL, ADD TURN LANES. MAKE IMPROVEMENTS AT SR-2 RAMPS. PPNO 3102.

2012 $1,991

LOS ANGELES LAE1093 LOCAL HIGHWAY

SAN FERNANDO RD NORTH

SAN FERNANDO RD NORTH – FROM ASTORIA ST TO SAYRE ST. WIDEN ROADWAY AND CONSTRUCT CONCRETE SIDEWALK, CURB, GUTTER, ACCESS RAMPS, AND BULKHEAD.

2010 $1,060

Page 201: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 199

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA9910012 LOCAL HIGHWAY

SAN GABRIEL BLVD. SAN GABRIEL BLVD REHAB – FROM MISSION TO BROADWAY: PVMT RECONSTRCT & OVERLAY, CONCRT REPRS, DRAINAGE IMPROVEMENTS. SAFETEA-LU HPP #471 (REVISED BY PUBLIC LAW 110-244 TO INCLUDE FUNDING FROM HPP #1579, #2690, & 2811).

2011 $2,000

LOS ANGELES LA0D129 LOCAL HIGHWAY

SAN GABRIEL BLVD. SAN GABRIEL BLVD REHAB – FROM BROADWAY TO LAS TUNAS: PVEMNT RECONSTRCT & OVERLAY, CONCRT REPRS., DRAINAGE IMPS.

2010 $2,000

LOS ANGELES LAE0340 LOCAL HIGHWAY

SANTA ANITA AVE SANTA ANITA AVE CORRIDOR IMPROVEMENTS PRJ. INSTALL NEW RIGHT AND LEFT TURN POCKETS, NEW TRAFFIC SIGNALS, INTERSECTION WIDEN AND NEW STRIPING AT FOOTHILL BLVD, LIVE OAK AVE, DUARTE

2012 $3,000

LOS ANGELES 1NL04-LAF3607 LOCAL HIGHWAY

SANTA CLARA ST ARCADIA GOLD LINE STATION PEDESTRIAN LINKAGE PROJECT. DESIGN AND CONSTRUCTION OF PEDES-TRIAN IMPROVEMENTS AROUND THE PLANNED GOLD LINE ARCADIA STATION, CONNECTING THE COMMUNI-TIES WITH THE REGIONAL RAIL SYSTEM.

2015 $2,379

LOS ANGELES LA9708004 LOCAL HIGHWAY

SANTA CLARITA PKWY

SANTA CLARITA PKWY FROM BOUQUET CYN RD/SOLEDAD CYN INSTALL NEW ROADWAY (0 TO 4 LANES) (2.5 MILE)

2018 $17,550

LOS ANGELES LA9910016 LOCAL HIGHWAY

SANTA CLARITA PKWY

SANTA CLARITA PKWY FROM SOLEDAD CYN RD TO VIA PRINCESSA (1.6 MILES); FROM 0 TO 6 LANES.

2018 $4,000

LOS ANGELES LA9910017 LOCAL HIGHWAY

SANTA CLARITA PKWY

SANTA CLARITA PKWY FROM VIA PRINCESSA TO STATE HWY 14 (1 MILE) FROM 0 TO 6 LANES.

2018 $3,100

LOS ANGELES LA0C8209 LOCAL HIGHWAY

SANTA MONICA BLVD

HOLLYWOOD MEDIA DISTRICT-PED IMPRV. STREETSCAPE ELEMNTS: LANDSCAPE MEDIAN ISLANDS, PED LIGHTING,STAMPED XWALK, ON SANTA MONICA BL- VINE ST TO HIGHLAND & HIGHLAND – MELROSE TO FOUNTAIN

2009 $810

LOS ANGELES 1OM0702-LA0G168

LOCAL HIGHWAY

SEPULVEDA BLVD THIS PROJECT WILL PROVIDE FOR SIDEWALK AND LANDSCAPING IMPROVEMENTS IN THE WESTCHESTER AREA OF THE CITY OF LOS ANGELES ON THE WEST SIDE OF SEPULVEDA BLVD BETWEEN 80TH ST. AND 84TH PL.

2012 $980

Page 202: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

200 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA996425 LOCAL HIGHWAY

SEPULVEDA BLVD INSTALL REVERSIBLE LANE ON SEPULVEDA BLVD THROUGH TUNNEL AT MULHOLLAND DR, INSTALL BIKE FACILITIES FROM SKIRBALL CENTER DR TO BEL AIR CREST RD, IMPLEMENT INTERSECTION IMPROVEMENTS AT SKIRBALL CENTER DR, I-405 FWY SB ON-RAMP, MORAGA DR, WILSHIRE BLVD

2012 $8,301

LOS ANGELES LA0D173 LOCAL HIGHWAY

SEPULVEDA BLVD SEPULVEDA BLVD, ALAMEDA ST. TO EAST CITY LIMIT. STREET WIDENING, MEDIAN ISLANDS, REHAB. 4-LANE BRIDGE, & WIDEN TO 6 LANES, UPGRADE BRIDGE RAILINGS.(53C0652)

2018 $1,375

LOS ANGELES LAE3069 LOCAL HIGHWAY

SEPULVEDA BLVD SEPULVEDA BLVD WIDENING PROJECT TO ADD A THIRD SOUTHBOUND LANE ON SEPULVEDA BLVD WITHIN THE EXISTING RIGHT OF WAY BETWEEN JEFFERSON BLVD/PLAYA ST TO GREEN VALLEY CIRCLE.SEPULVEDA BLVD FROM SAWTELL AVE TO JEFFERSON/PLAYA ST WILL BE RE-STRIPED.

2012 $1,621

LOS ANGELES LAE3790 LOCAL HIGHWAY

SEVERAL MAJOR STREET

CORRIDORS

THE PASADENA ITS INTEGRATES 2 COMPONENTS; TRAFFIC SIGNAL COMMUNICATION AND CONTRL, AND PUBLIC PARKING AVAILABILITY INFO. SAFETEA-LU PRJ #3790

2011 $3,545

LOS ANGELES LAE0701 LOCAL HIGHWAY

SHOEMAKER BRIDGE

DEVELOP AND IMPLEMENT TRAFFIC CALMING MEASURES FOR TRAFFIC EXITING THE I-710 INTO LONG BEACH

2013 $1,856

LOS ANGELES LAE0266 LOCAL HIGHWAY

SHOEMAKER BRIDGE

RECONSTRUCT I-710 SOUTHERN TERMINUS OFF RAMP.CURRENT FUNDING APPLIED ONLY TOWARDS THE P/E & PRELIMINARY DESIGN PHASE.CONSTRUCTION FUNDING TO BE SOUGHT LATER (E/P,PS/E ONLY)

2011 $2,880

LOS ANGELES LA0G752 LOCAL HIGHWAY

SIERRA HIGHWAY RESTRIPE SIERRA HWY FROM SOLEDAD CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 2 MILES

2018 $1,500

LOS ANGELES LA0G751 LOCAL HIGHWAY

SIERRA HIGHWAY RESTRIPE SIERRA HIGHWAY FROM VIA PRINCESSA TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 5.5 MILES

2018 $1,500

Page 203: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 201

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0C8054 LOCAL HIGHWAY

SKIRBALL CENTER DR

SKIRBALL CENTER DR WIDENING – I-405 FWY TO MULHOLLAND DR, WIDEN AND RESTRIPE SKIRBALL CENTER DR TO PROVIDE AN ADDITIONAL S/B LANE. (PPNO 3132).

2012 $2,200

LOS ANGELES LAE3229 LOCAL HIGHWAY

SMMNRA CONSTRUCTION AND ENHANCEMENTS OF TRAILS IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA

2010 $960

LOS ANGELES LAE0509 LOCAL HIGHWAY

SMMNRA SCENIC PRESERVATION AND RUN-OFF MITIGATION IN THE SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA NEAR PCH AND US101

2010 $1,440

LOS ANGELES LA0C8037 LOCAL HIGHWAY

SOTO ST SOTO ST BRIDGE OVER MISSION RD & HUNTINGTON DR WILL DEMOLISH EXISTING BRIDGE AND REALIGN THE STREET TO INCREASE TRAFFIC FLOW ADDING A BIKE LANE. PPNO 3093 3380 (BRIDGE #53C0013)

2014 $22,852

LOS ANGELES 1NL04- LAF1607

LOCAL HIGHWAY

SOUTH ST SOUTH ST PEDESTRIAN, BIKEWAY AND TRANSIT IMPROVEMENT. IMPROVE PEDESTRIAN ENVIRONMENT AND TRANSIT STOP LOCATIONS WITH LANDSCAPED MEDIANS, TRANSIT SHELTERS, BENCHES, SIDEWALK ENHANCEMENTS AND LIGHTING. CLOSE EXISTING BIKE LANE GAP.

2014 $1,213

LOS ANGELES 1NL04-LAF3503 LOCAL HIGHWAY

SOUTH WATERFRONT BIKE

PATH

LONG BEACH SOUTH WATERFRONT BIKE PATH GAP CLOSURE. THE SOUTH WATERFRONT BIKE PATH CON-NECTION PROPOSES A MAIN GAP-CLOSURE TO LONG BEACH’S PRIMARY BIKEWAY NETWORK. THIS CLASS I PATH INCLUDES A MID-BLOCK CROSSING AND WAY-FINDING SIGNS.. THE PROPOSED SOUTH WATERFRONT BIKE PATH STARTS AT THE NORTH END OF THE QUEENSWAY BRIDGE AT THE EXISTING TERMINUS OF THE CLASS I PATH. THE PROPOSED ALIGNMENT FOL-LOWS THE NORTH SIDE OF QUEENSWAY DRIVE WITHIN THE CITY RIGHT-OF-WAY AS A CLASS I BIKE PATH TO THE EXISTING CLASS I PAT

2016 $885

LOS ANGELES LAE1655 LOCAL HIGHWAY

SR 91 AT BELLFLOWER BLVD.

LANDSCAPE AND IRRIGATE EAST BOUND 91 FREEWAY ON AND OFF RAMPS AT BELLFLOWER BLVD

2011 $240

Page 204: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

202 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0D260 LOCAL HIGHWAY

STATE ROUTE 90 STATE ROUTE 90 CONNECTOR ROAD TO ADMIRALTY WAY. THIS PROJECT WILL IMPROVE THE SR-90/SR-1 INTERSECTION INCLUDING THE ADDITION OF A LANE IN EACH DIRECTION AND CONSTRUCTION OF A DIRECT ROAD BETWEEN ADMIRALTY WAY AND SR-90

2018 $6,000

LOS ANGELES LA0D420 LOCAL HIGHWAY

SUNSET OVERLOOK TRAILHEAD

SUNSET OVERLOOK TRAILHEAD AREA IN HAHAMONGNA WATERSHED PARK NEAR THE DEVIL’S GATE DAM (GRANT FROM RECREATIONAL TRAILS PROGRAM)

2010 $264

LOS ANGELES LA0C8031 LOCAL HIGHWAY

TAMPA AVE TAMPA AVE BRDGE WIDENING. WIDEN RIVER CROSSING FROM 4 LNS TO 6 LNS ON TAMPA AVE BRDGE, CONSTRUCT BIKE UNDERPASS PPNO 3090 3376 REP (BRIDGE # 53C1335)

2012 $10,800

LOS ANGELES 1TR1023 LOCAL HIGHWAY

TDM COUNTYWIDE CALL FOR PROJECTS TDM MODE 2030 $157,700

LOS ANGELES LAE2651 LOCAL HIGHWAY

TEMPLE ST CONSTRUCT CROSSWALK BUMP-OUTS AND RELATED STREETSCAPE IMPROVEMENTS ON TEMPLE ST BETWEEN HOOVER ST & GLENDALE. PROJECT WILL PROVIDE FOR VARIOUS STREETSCAPE IMPROVEMENTS.

2010 $500

LOS ANGELES 1A1005 LOCAL HIGHWAY

THE OLD ROAD THE OLD ROAD FROM MAGIC MOUNTAIN PARKWAY TO TURNBERRY LANE. WIDEN THE OLD ROAD FROM NORTH OF MAGIC MOUNTAIN PKWY TO TURNBERRY LN & HENRY MAYO DR TO 1200 FEET WEST OF THE OLD ROAD. THE PROPOSED PROJECT IS LOCATED ON THE OLD ROAD FROM APPROXIMATELY 700 FEET NORTH OF MAGIC MOUNTAIN PARKWAY TO TURNBERRY LANE, HENRY MAYO DRIVE FROM THE OLD ROAD TO THE STATE ROUTE 126 HOOK RAMPS, AND RYE CANYON ROAD BETWEEN THE OLD ROAD AND AVE STANFORD.

2018 $47,453

LOS ANGELES LAE1696 LOCAL HIGHWAY

THE STRAND RECONSTRUCTION OF THE STRAND STAIRWAYS IN THE CITY OF MANHATTAN BEACH TO IMPROVE BEACH ACCESS AND ACCOMMODATE INCREASED PEDESTRIAN TRAFFIC. PROJECT USING TOLL CREDITS AS A LOCAL MATCH: $320 IN CON PHASE IN FY12 FOR DEMO FUNDS.

2012 $1,920

Page 205: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 203

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0F019 LOCAL HIGHWAY

THROUGHOUT THE CITY OF LAKEWOOD

PURCHASE OF BUS BENCHES, TRASH CANS, AND SMALL SHELTERS FOR VARIOUS TRANIST STOPS THROUGHOUT CITY OF LAKEWOOD.

2009 $480

LOS ANGELES LA0D145 LOCAL HIGHWAY

TIERRA SUBIDA AVE TIERRA SUBIDA WIDENING FROM AVE S TO AVE RAYBURN RD. – FROM 2 TO 4 LANES; WITH TRAFFIC SIGNALS, STREETLIGHTS, RAISED MEDIANS, DRAINAGE IMPROVEMENTS AND PEDESTRIAN IMPROVEMENTS. SPLIT FROM LA0D145.

2018 $6,900

LOS ANGELES LAE1867 LOCAL HIGHWAY

TOPANGA CANYON / GAULT ST.

CONSTRUCTION OF SMART CROSSWALK AT THE INTERSECTION OF TOPANGA CANYON AND GAULT ST.

2012 $50

LOS ANGELES 1NL04-LAF1640 LOCAL HIGHWAY

TRUMANST SAN FERNANDO DOWNTOWN PEDESTRIAN IMPROVEMENT PROJECT. DESIGN AND CONSTRUC-TION OF THE DOWNTOWN PORTION OF THE SAN FERNANDO CORRIDORS PLAN. THE PROJECT WILL INCREASE PEDESTRIAN ACTIVITY, PROMOTE PUBLIC TRANSIT AND ENHANCE SAFETY.

2014 $3,782

LOS ANGELES 1NL04-LAF3519 LOCAL HIGHWAY

VAIOUS LOCATIONS IN NORTH COUTNY

NORTH COUNTY BIKEWAYS. INSTALL FOUR CLASS II AND THREE CLASS III BIKEWAY SEGMENTS, INCLUD-ING SIGNAGE, STRIPING, ROAD WIDENING, & ROAD SHOULDER IMPROVEMENTS.

2016 $1,600

LOS ANGELES LAE1138 LOCAL HIGHWAY

VALLEY CONSTRUCT VALLEY DRAINAGE AND RESURFACING IMPROVEMENTS: WEST OF SANTA ANITA AV- INCLUDING NO CAPACITY INCREASE STREET RESURFACING

2011 $1,533

LOS ANGELES LAE3018 LOCAL HIGHWAY

VALLEY BLVD VALLEY BLVD IMPROVEMENTS BETWEEN 710 AND MARGUERITA. INVOLVES TRAFFIC FLOW IMPROVEMENTS INCLUDING RAISED MEDIANS AND TURN LANES.

2012 $3,724

LOS ANGELES LA0G350 LOCAL HIGHWAY

VALLEY BLVD VALLEY BLVD: ADD 1 THROUGH EB LANE, INSTAL-LATION OF STREET LIGHTING, CURB & GUTTER, 7 BUS TURNOUTS AND MODIFICATIONS TO 2 TRAFFIC SIGNALS. NO ROW IMPACTS.

2014 $3,300

LOS ANGELES LA996427 LOCAL HIGHWAY

VALLEY BLVD VALLEY BLVD. GRADE SEPARATION 2011 $54,285

Page 206: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

204 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0C8092 LOCAL HIGHWAY

VALLEY VIEW AVE VALLEY VIEW AVE GRADE SPARATN AT BNSF RAILWAY SOUTH OF STAGE RD. CONSTRUCT A GRADE SPARATN FOR VALLEY VIEW AVE FROM EXSTNG BNSF TRACKS BY CONSTRCTNG A HWY UNDERPASS PPNO 3117 (3022). PROJECT USING $175 IN TOLL CREDITS TO MATCH TEA21 AND SAFETEA-LU FUNDS IN THE CON PHASE IN FY 11/12.

2014 $79,084

LOS ANGELES 1NL04-LA0G361 LOCAL HIGHWAY

VALLEY VIEW AVE VALLEY VIEWST REHABILITATION FROM ROSECRANS AVE TO STAGE ROAD AT THE NORTH LIMIT OF VALLEY VIEW GRADE SEPARATION

2011 $145

LOS ANGELES LA0C8042 LOCAL HIGHWAY

VANOWEN ST VANOWEN ST BRDGE WIDENING & REHAB. PRJCT WILL WIDEN EXISTING BRIDGE TO MATCH THEST IT WILL ALLOW INC TRAFFIC FLOW AND SAFETY. CONSTRUCT BIKE PATH UNDER. PPNO 3095 3378 AB 3090

2012 $14,917

LOS ANGELES LAE0726 LOCAL HIGHWAY

VANOWEN/CLYBOURN

VANOWEN/EMPIRE/CLYBOURN RAILROAD CROSSING GRADE SEPARATION STUDY PROJECT

2012 $1,000

LOS ANGELES 1NL04-LAF1734 LOCAL HIGHWAY

VARIOUS CITY OF BELL GARDENS SIGNAGE PROGRAM. BELL GARDENS CAPITAL IMPROVEMENT PROJECT THAT WILL PROMOTE THE CITY THROUGH NEW SIGNAGE.

2011 $322

LOS ANGELES 1OM0702-LA0G674

LOCAL HIGHWAY

VARIOUS COLDMILL AND ASPHALT OVERLAY OF EXISTING STREETS AT VARIOUS LOCATIONS. REMOVE AND REPLACE CURB, GUTTER, AND SIDEWALK, AND RE-STRIPE SAME STREETS.

2012 $560

LOS ANGELES 1NL04-LAF3501 LOCAL HIGHWAY

VARIOUS DETECTION OF BICYCLES AT SIGNAL CONTROLLED INTERSECTIONS. BICYCLE DETECTION SYSTEMS AT INTERSECTIONS CONTROLLED BY TRAFFIC SIGNALS ALONG BIKE CORRIDORS..

2015 $2,495

LOS ANGELES LAE3269 LOCAL HIGHWAY

VARIOUS NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENTS; WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE NORTHWEST SAN FERNANDO VALLEY AREA.WILL NOT INCREASE CAP

2013 $1,056

LOS ANGELES LA0C8129 LOCAL HIGHWAY

VARIOUS PORTS OF LONG BEACH AND LOS ANGELES ATMS/ATIS PROJECT TO IMPROVE TRAFFIC OPERATIONS ON THE: I-710, I-110, SR47/103.

2010 $11,410

Page 207: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 205

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF3502 LOCAL HIGHWAY

VARIOUS REDONDO BEACH BICYCLE TRANSPORTATION PLAN IMPLEMENTATION. IMPLEMENT CLASS II AND III BIKE FACILITIES IDENTIFIED IN THE CITY OF REDONDO BEACH’S ADOPTED BICYCLE TRANSPORTATION PLAN. APPROXIMATELY 2.1 CENTERLINE MILES OF BIKE LANES AND 15.8 CENTERLINE MILES OF BIKE ROUTES THROUGHOUT THE CITY OF REDONDO BEACH.

2014 $1,949

LOS ANGELES LA996328 LOCAL HIGHWAY

VARIOUS CCTV CAMERA INSTALLATION 2010 $602

LOS ANGELES LAE1023 LOCAL HIGHWAY

VARIOUS IMPLEMENT VAN NUYS RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN AND AROUND THE VAN NUYS AREA OF THE CITY. NO TRAFFIC CAPACITY

2010 $500

LOS ANGELES LAE0937 LOCAL HIGHWAY

VARIOUS REHABILITATE STREET SURFACES IN SHERMAN OAKS; PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE SHERMAN OAKS AREA. PROJECT WILL NOT ENHANCE TRAFFIC CAP.

2010 $123

LOS ANGELES LAE0284 LOCAL HIGHWAY

VARIOUS SOUTHWEST SAN FERNANDO VALLEY RD AND SAFETY IMPROVEMENTS. PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS. PROJECT WILL NOT ENHANCE TRAFFIC CAPACITY.

2009 $2,300

LOS ANGELES LA0F016 LOCAL HIGHWAY

VARIOUS INTERSECTIONS

PURCHASE, INSTALL, AND INTEGRATE OPTICOM PRIORITY CONTROL SYSTEM TO EXISTING TRAFFIC CONTROLLERS AT VARIOUS LOCATIONS WITHIN CITY LIMITS. (SAFETEA-LU#2345)

2011 $216

LOS ANGELES LA0C8128 LOCAL HIGHWAY

VARIOUS INTERSECTIONS

FOX HILLS AREA TRAF SIG SYNCH EFFORT & CITY-WIDE AUTO TRAF SIGNAL CONTROL AND MONITORING PROJECT. INCORPORATE 11 SIGNALIZED INTERSECTIONS INTO AN ATSAC / ADAPTIVE TRAF CONTROL SYS.

2010 $2,036

LOS ANGELES LAE3768 LOCAL HIGHWAY

VARIOUS LOCATION COMPTON ARTERIAL REONCSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY).

2012 $3,000

Page 208: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

206 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES 1NL04-LAF1530 LOCAL HIGHWAY

VARIOUS STREETS AND ACCES

IMPROVEMENTS TO LAR BIKE PATH

BICYCLE SYSTEM GAP CLOSURES & IMPROVED LA RIVER BIKE PATH. PROJECT WILL CONSTRUCT PRIOR-ITY CLASS I & III BICYCLE SYSTEM GAP CLOSURES IN LONG BEACH AND IMPROVE CONNECTION TO LA RIVER.

2014 $1,231

LOS ANGELES LA9910013 LOCAL HIGHWAY

VIA PRINCESSA VIA PRINCESSA EXTENSION FROM GOLDEN VALLEY ROAD TO APPROXIMATELY 350M WEST OF RAINBOW GLEN DRIVE, EAST OF ISABELLA PKWY

2018 $46,935

LOS ANGELES LA0D476 LOCAL HIGHWAY

VIA PRINCESSA VIA PRINCESSA EXTENSION FROM MAGIC MOUNTAIN PKWY TO GOLDEN VALLEY RD: CONSTRUCT APPROXMTLY A 1-MILE FACILITY (3 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, & DRAINAGE IMPRVMT

2018 $22,602

LOS ANGELES LA9910014 LOCAL HIGHWAY

VIA PRINCESSA PKWY

VIA PRINCESSA FROM OAKRIDGE DRIVE TO MAGIC MTN PRKWAY. FROM 0 – 6 LANES; LESS THAN ONE MILE.

2018 $11,650

LOS ANGELES LAE1509 LOCAL HIGHWAY

VICTORY BLVD CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS. SOUTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. VICTORY BLVD (OAKLAND TO RESEDA) TAMPA AVE

2010 $1,000

LOS ANGELES 1NL04-LAF3647 LOCAL HIGHWAY

W. MLK JR. BLVD. AND MENLO AVE.

MENLO AVE/MLK VERMONT EXPO STATION PEDESTRIAN IMPROVEMENTS. IMPROVE PEDESTRIAN ACCESS TO THE NEW EXPO STATION ON VERMONT AVE BY INSTALLING SIDEWALKS, LANDSCAPING, AND LIGHTING ALONG MENLO AVE. AND MLK JR. BLVD. PLUS A MEDIAN ON MLK BLVD.

2015 $3,302

LOS ANGELES LAE3308 LOCAL HIGHWAY

WALNUT GROVE WALNUT GROVE AT BROADWAY INTERSECTION IMPROVEMENT. REHAB INTERSECTION; ACQUIRE CORNER CUT OFF TO INCREASE CURB RETURN RADII TO ADD LEFT TURN LANE IMPROVE PED SAFETY

2011 $1,675

LOS ANGELES 1NL04-LAF1659 LOCAL HIGHWAY

WASHINGTON BLVD PEDESTRIAN IMPROVEMENTS FOR INTERSECTIONS WITH BUS STOPS. THIS PROJECT CONSISTS OF SAFETY AND AESTHETIC-RELATED PEDESTRIAN IMPROVEMENTS AT INTERSECTIONS ALONG MAJOR ARTERIALS WITH HIGH TRANSIT AND PEDESTRIAN ACTIVITIES WITHIN THE CITY OF CULVER CITY.

2013 $1,066

Page 209: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 207

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE3085 LOCAL HIGHWAY

WASHINGTON BLVD WIDEN AND RECONSTRUCT WASHINGTON BLVD FROM WESTERN CITY BOUNDARY AT VERNON [350’ WEST OF INDIANA ST] TO I-5 FREEWAY AT TELEGRAPH RD., WIDEN FROM 2 LANES TO 3 LANES IN EACH DIRECTION, INCREASE TURN RADIUS AND MEDIANS, UPGRADE TRAFFIC SIGNALS AND STREET LIGHTING AND IMPROVE SIDEWALKS.

2014 $32,000

LOS ANGELES LA0D478 LOCAL HIGHWAY

WASHINGTON BLVD RECONSTRUCT OF WASHINGTON BLVD FROM I-5 FWY TO THE WEST; UPGRADE TRAFFIC SIGNALS AND IMPROVE THE EXISTING PAVEMENT

2011 $592

LOS ANGELES 1NL04-LAF1817 LOCAL HIGHWAY

WEST ADAMS LOS ANGELES NEIGHBORHOOD INITIATIVE WEST ADAMS ENHANCEMENTS. THIS PROJECT WILL PROVIDE VIBRANT LANDSCAPING AND HISTORI-CALLY INSPIRED GATEWAY MARKERS ON A BLIGHTED TRANSPORTATION CORRIDOR, ENHANCING THE DRIV-ING AND TRANSIT ENVIRONMENT.

2013 $892

LOS ANGELES LAE3284 LOCAL HIGHWAY

WEST ADAMS WEST ADAMS BLVD STREETSCAPE-INSTALL STREETSCAPE AND COMMUNITY GATEWAY IMPROVEMENTS ALONG WEST ADAMS BLVD.

2012 $250

LOS ANGELES 1O1001 LOCAL HIGHWAY

WEST BASIN RAILYARD

PORT TRUCK TRAFFIC REDUCTION PROGRAM: WEST BASIN RAILYARD. INTERMODAL RAILYARD CON-NECTING PORT OF LA WITH ALAMEDA CORRIDOR TO ACCOMMODATE INCREASED LOADING OF TRAINS AT THE PORT, THEREBY REDUCING TRUCK TRIPS TO OFF-DOCK RAILYARDS..

2014 $110,511

LOS ANGELES 1NL04-LAF3650 LOCAL HIGHWAY

WESTERN AVE WESTERN AVE EXPO LINE STATION LINKAGE PROJECT (SOUTH). TO DESIGN & CONSTRUCT PEDESTRIAN & SAFETY ENHANCEMENTS INTENDED TO INCREASE THE USAGE OF PUBLIC TRANSPORTATION AND CRE-ATE A LINK TO METRO EXPO LR STATION AT WESTERN & EXPOSITION..

2017 $858

LOS ANGELES 1NL04-LAF3632 LOCAL HIGHWAY

WESTERN AVE WESTERN AV BUS STOP & PEDESTRIAN IMPROVEMENT PROJECT. INSTALL PEDESTRIAN AND TRANSIT AMENI-TIES TO ENHANCE THE PEDESTRIAN ENVIRONMENT ALONG WESTERN AV BTW EXPOSITION BLVD & I-10 FREEWAY.

2015 $1,472

Page 210: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

208 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LA0G747 LOCAL HIGHWAY

WHITES CANYON ROAD

RESTRIPE WHITES CANYON ROAD FROM SOLEDAD CANYON ROAD TO CITY LIMIT FROM 4 TO 6 LANES; APPROXIMATELY 2 MILES

2018 $1,500

LOS ANGELES LAE1610 LOCAL HIGHWAY

WHITTIER BLVD RECONSTRUCT WHITTIER BLVD AND IMPROVE PARKWAY DRAINAGE FROM PHILADELPHIA ST TO FIVE POINTS (WASHINGTON BLVD) IN WHITTIER

2011 $1,632

LOS ANGELES LAE0191 LOCAL HIGHWAY

WHITTIER GREENWAY TRAIL

DESIGN,RIGHT-OF-WAY, AND CONSTRUCT 2.8 MILE BIKEWAY AND PEDESTRIAN PATH FROM MILLS AVE. TO VALLEY HOME IN WHITTIER.

2012 $2,000

LOS ANGELES LAE2828 LOCAL HIGHWAY

WILBUR AVE IMPLEMENT STREETSCAPE IMPROVEMENTS ALONG WILBUR AVE TO ENHANCE TRAFFIC AND PEDESTRIAN TRAFIC. ALL WORK SHALL BE COMPLETED IN CITY OF LA ROW

2012 $100

LOS ANGELES LA0G741 LOCAL HIGHWAY

WILEY CANYON ROAD

RESTRIPE WILEY CANYON ROAD FROM LYONS AVE TO RAILROAD AVE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILES

2018 $1,500

LOS ANGELES 1NL04-LAF1528 LOCAL HIGHWAY

WILLOW ST SAN GABRIEL RIVER BIKE PATH GAP CLOSURE AT WILLOW ST. CREATION OF OFF-STREET BICYCLE PATH TO ACHIEVE BICYCLE ROUTE GAP CLOSURE ON WILLOW ST FROM THE SAN GABRIEL RIVER BIKE PATH WEST TO STUDEBAKER ROAD

2014 $970

LOS ANGELES 1NL04-LAF1649 LOCAL HIGHWAY

WILLOW ST WILLOW ST PEDESTRIAN IMPROVEMENT PROJECT. THIS PROJECT PROVIDES PEDESTRIAN-ORIENTED IMPROVEMENTS TO WILLOW ST INCLUDING MEDIANS, PEDESTRIAN LIGHTING, LANDSCAPING, SIGNAGE AND CROSSWALK TREATMENTS.

2014 $3,097

LOS ANGELES LA0C8050 LOCAL HIGHWAY

WILSHIRE BLVD WILSHIRE BLVD CORRDR IMPRVMNTS-SELBY AV TO COMSTOCK AV WIDEN WILSHIRE BLVD TO RELIEF CONGESTION AT KEY INTERSECT AND PROVIDE PEAK HOUR BUS LANES & INSTALL RAISED LANDSCAPE MEDIAN. PPNO 3101.

2012 $7,479

LOS ANGELES LA0C8084 LOCAL HIGHWAY

WINNETKA AVE BRIDGE

WINNETKA AVE BRDGE WIDEN & REHAB. – WIDEN THE RIVER CROSSING FROM 4 TO 6 LANES, CONSTRUCT BIKE UNDERPASS. PPNO 3108 3377 AB 3090 REP (53C1388)

2012 $10,519

Page 211: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 209

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s)

LOS ANGELES LAE1955 LOCAL HIGHWAY

WINNETKA/VAN NUYS BLVD

TRAFFIC SIGNAL UPGRADES ALONG THE US-101 FREEWAY RAMPS BETWEEN WINNETKA AVE AND VAN NUYS BLVD.

2012 $400

LOS ANGELES 1NL04- LAF3524

LOCAL HIGHWAY

WORKMAN ST MISSION CITY TRAIL BICYCLE BRIDGE AT WORKMAN. CONSTRUCT A BICYCLE BRIDGE OVER THE RAIL COR-RIDOR TO PROVIDE LINKAGES BETWEEN THE NORTH AND SOUTH SIDES OF THE CITY AND THE MISSION CITY BICYCLE TRAIL. THIS PROJECT PROPOSES TO CONSTRUCT A BRIDGE OVER THE METRO RAILROAD TRACK CONNECTING THE NORTHERNMOST PORTION OF SOUTH WORKMAN AVE (SOUTH OF THE RAIL ROAD TRACKS) WITH THE MISSION CITY BICYCLE TRAIL (IMMEDIATELY NORTH OF THE RAIL ROAD TRACKS).

2015 $2,742

LOS ANGELES LA0F073 LOCAL HIGHWAY

WORLD WAY PROJECTS WITHIN AND NEAR LOS ANGELES INTERNATIONAL AIRPORT TO ELIMINATE TRAFFIC BOTTLENECKS. (LOS ANGELES WORLD AIRPORTS) SEC. 336 FUNDING

2011 $5,067

LOS ANGELES 1O0707 OTHER PORTS OF LOS ANGELES/LONG

BEACH

NEW CERRITOS CHANNEL RAIL BRIDGE $91,000

LOS ANGELES 1O0710 OTHER PORTS OF LOS ANGELES/LONG

BEACH

OTHER IN-PORT MAINLINE $204,700

LOS ANGELES 1O0706 OTHER PORTS OF LOS ANGELES/LONG

BEACH

PORTS RAIL SYSTEM 2018 $257,900

LOS ANGELES 1O0709 OTHER PORTS OF LOS ANGELES/LONG

BEACH

REEVES GRADE SEPARATION 2014 $61,000

LOS ANGELES 1O0708 OTHER PORTS OF LOS ANGELES/LONG

BEACH

TRIPLE TRACK S/O THENARD 2020 $16,500

Page 212: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

210 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA110632 TRANSIT 1% TRANSIT ENHANCEMENTS – BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (MISSION VIEJO) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED)

2016 $890

ORANGE ORA110634 TRANSIT 1% TRANSIT ENHANCEMENTS – BICYCLE AND PEDESTRIAN FACILITIES COUNTYWIDE (OCTA) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGO-RIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED)

2016 $4,227

ORANGE ORA120318 TRANSIT ANAHEIM REGIONAL TRANS INTERMODAL CENTER (ARTIC) PHASE I – INCLUDE EXPAND OF EXIST AMTRAK/METROLINK STATION AT ANA STAD TO PROVIDE ACCESS W/ TRANS SVC

2018 $187,509

ORANGE ORA021202 TRANSIT BUS OPERATING ASSISTANCE FTA9 – FOR PARATRANSIT – MISSION VIEJO – UZA

2016 $8,908

ORANGE ORA174 TRANSIT BUS OPERATING ASSISTANCE FTA9 – FOR PARATRANSIT (OCTA)

2020 $41,736

ORANGE 2OM0701-ORA080803

TRANSIT CAPITAL COST OF CONTRACTING (COSTS ASSOCIATED WITH CONTRACTING FOR SERVICES SUCH AS PARATRANSIT)

2020 $178,379

ORANGE ORA110614 TRANSIT CAPITAL LEASE COSTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT ANAHEIM MAINTENANCE BASE

2016 $4,845

ORANGE ORA110615 TRANSIT CAPITAL LEASE COSTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATIONS OF CNG FUELING STATION AT GARDEN GROVE MAINTENANCE BASE

2012 $4,935

Page 213: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 211

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA37111 TRANSIT CAPITAL MAINTENANCE ON METROLINK SYSTEM. (REHAB OF TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES, FACILITIES, MAINTENANCE OF WAY RAIL SPURS, AND ROLLING STOCK) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OR RECONSTRUCTION OF TRACK STRUCTURES, TRACK, AND TRACKBED IN EXISTING RIGHTS-OF-WAY.( NON-CAPACITY INCREASING)

2020 $67,024

ORANGE ORA55134 TRANSIT FACILITY MODIFICATIONS FOR BUS TRANSIT (ELEVATOR UPGRADES, JOINT SEALANT, FALL PROTECTION, VEHICLE LIFTS AND OTHER FACILITY MODIFICATIONS) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES

2016 $1,084

ORANGE ORA110619-ORA110618

TRANSIT GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSIS-TENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CON-STRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT

2030 $2,896

Page 214: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

212 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA110618-ORA110619

TRANSIT GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSIS-TENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CON-STRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT

2016 $18,708

ORANGE ORA110619-ORA020818

TRANSIT GROUPED PROJECTS FOR ACTIVITIES THAT DO NOT LEAD TO CONSTRUCTION. PROJECTS ARE CONSIS-TENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – SPECIFIC ACTIVITIES WHICH DO NOT INVOLVE OR LEAD DIRECTLY TO CON-STRUCTION, SUCH AS: PLANNING AND TECHNICAL STUDIES, GRANTS FOR TRAINING AND RESEARCH PROGRAMS, PLANNING ACTIVITIES CONDUCTED PURSUANT TO TITLES 23 AND 49 U.S.C, FEDERAL-AID SYSTEMS REVISIONS, ENGINEERING TO ASSESS SOCIAL, ECONOMIC, AND ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION OR ALTERNAT

2030 $43,820

ORANGE ORA110618-ORA020819

TRANSIT GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

2030 $3,126

ORANGE ORA090302 TRANSIT OCTA SHARE OF THE METROLINK ROLLING STOCK AQUISITION. CARS & LOCOS, UP TO 87 CARS/CABS ORDERED IN FY 09 & IN FUTURE YRS, UP TO 22 CARS/CABS, UP TO 11 LOCOS ORDERED BY FY09, & UP TO 4 LOCOS IN FUTURE

2020 $158,110

ORANGE ORA37115 TRANSIT OPERATING ASSISTANCE FOR COMMUTER RAIL 2016 $194,122

ORANGE ORA120357 TRANSIT ORANGE COUNTY. TRAFFIC SIGNAL SYNCHRONIZATION FOR BUS RAPID TRANSIT CORRIDORS

2012 $14,673

Page 215: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 213

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA030612 TRANSIT PLACENTIA TRANSIT STATION – E OF SR-57 AND MELROSE ST AND N OF CROWTHER AVE. CONSTRUCT NEW METROLINK STATION AND RAIL SIDEING PPNO 9514

2014 $23,420

ORANGE ORA021203 TRANSIT PREVENTATIVE MAINTENANCE (MISSION VIEJO) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGO-RIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES. TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $1,826 & FY10/11 FOR $1,874.

2016 $42,633

ORANGE ORA020106 TRANSIT PREVENTATIVE MAINTENANCE (OCTA) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (TRANSIT DEVELOPMENT CREDITS IN FY10/11 FOR $5,425, FY11/12 FOR $23,561, FY12/13 $759,582, FY13/14 $6,933,620, FY14/15 $7,086,190, FY15/16 $7,335,639)

2016 $170,234

ORANGE ORA55241 TRANSIT PURCHASE (1) STANDARD 40 FT REPLACEMENT ALT FUEL BUSES – (1) IN FY15/16

2018 $700

ORANGE ORA041501 TRANSIT PURCHASE (71) STANDARD 30FT EXPANSION BUSES – ALTERNATIVE FUEL – (31) IN FY08-09, (9) IN FY09-10, (7) IN FY11-12, (6) IN FY12-13 AND (18) IN FY13-14

2018 $8,998

ORANGE 2OM0701-ORA080918

TRANSIT PURCHASE MISCELLANEOUS SUPPORT EQUIPMENT. SUCH AS CEA VEHICLES, SHERIFF VEHICLES, FORKLIFTS AND OTHER MISCELLANEOUS SUPPORT EQUIPMENT

2020 $1,000

ORANGE ORA020118 TRANSIT PURCHASE REPLACEMENT PARATRANSIT VANS (230) – (32) IN FY11/12, (58) IN FY12/13, (140) IN FY15/16 PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGO-RIES – PURCHASE OF NEW BUSES AND RAIL CARS TO REPLACE EXISTING VEHICLES OR FOR MINOR EXPAN-SIONS OF THE FLEET

2016 $13,507

Page 216: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

214 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA65002 TRANSIT RIDESHARE SERVICES RIDEGUIDE, DATABASE, CUSTOMER INFO, AND MARKETING (ORANGE COUNTY PORTION).

2016 $5,223

ORANGE ORA110624 TRANSIT SANTA ANA TRANSIT TERMINAL FACILITY IMPROVEMENTS, INC. INCREASE VENTILATION / SAFETY

2015 $282

ORANGE ORA110625 TRANSIT VARIOUS PLANNING & TRANSPORTATION PROJECTS DETERMINED BY THE ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) TO REDUCE CONGESTION IN OC, INCLUDING SMARTH GROWTH AND INCREASED TRANSIT

2016 $2,395

ORANGE ORA37122 TRANSIT VEHICLE MODIFICATIONS/MISC, REPLACE SUPP VEHICLES AND SUPPORT EQUIP, BUS AND FACILITY EQUIPMENT PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF SUPPORT VEHICLES. TRANSIT DEVELOPMENT CREDITS IN FY09/10 FOR $250

2016 $7,873

ORANGE ORA110616 TRANSIT BUS RAPID TRANSIT (BRT) – PURCHASE (3) 40’ EXPANSION VEHICLES FOR SERVICE IN ORANGE COUNTY

2012 $1,005

ORANGE HSRT0701 TRANSIT ENVIRONMENTAL CLEARANCE AND ADVANCED CONCEPTUAL DESIGN OF THE CALIFORNIA HIGH SPEED RAIL AUTHORITY, HIGH SPEED RAIL PROJECT FROM SAN FRANCISCO TO LOS ANGELES

2015 $7,000

ORANGE ORA020113 TRANSIT FULLERTON TRAIN STATION – PARKING STRUCTURE, PHASE I AND II. TOTAL OF 800 SPACES (PPNO 2026)

2012 $33,385

ORANGE ORA110619-ORA990909

TRANSIT GROUPED PROJECTS FOR GRANTS FOR TRAINING AND RESEARCH PROGRAMS SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – GRANTS FOR TRAINING AND RESEARCH PROGRAMS

2016 $3,602

Page 217: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 215

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA110619-ORA020819

TRANSIT GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

2016 $5,880

ORANGE ORA110621 TRANSIT INTERMODAL PARK AND RIDE FACILITY AT DISCOVERY SCIENCE CENTER IN SANTA ANA

2016 $372

ORANGE 2TR0712 TRANSIT IRVINE TRANSIT STATION – EXPANSION OF THE IRVINE TRANSIT CENTER (ITC). INITIAL PLANNING AND CONCEPTUAL ENGINEERING PHASE

2015 $2,660

ORANGE ORA120537 TRANSIT LAGUNA NIGUEL RAIL STATION PARKING EXPANSION – CONSTRUCTION OF 562 NEW SPACES (281 EXISTING + 562 NEW = 843 SPACES)

2013 $63,000

ORANGE ORA199 TRANSIT OPERATING ASSISTANCE 2010 $10,156

ORANGE ORA37111-ORA082605

TRANSIT ORANGE COUNTY METROLINK FIBER OPTICS INSTALLATION PROJECT. (REPLACE AND UPGRADE COMMUNICATIONS SYSTEM THROUGHOUT METROLINK) PROVIDE A FIBER OPTIC BACKBONE AND SUE MICROWAVE HOPS TO TRANSMIT DATA TO THE MOC IN POMONA. CTOS THAT WILL FILL CONDUIT GAPS ARE BEING PROCESSED. VERIZON (FORMERLY MCI) CONDUIT WILL BE USED BETWEEN RITCHEY ST. AND SOUTHERN TERMINUS. METROLINK RAIL REHAB ORA37111 CONTAINS THE 5309 FUNDS

2011 $12,300

ORANGE ORA020106-ORA111211

TRANSIT PREVENTATIVE MAINTENANCE (ATN) PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES

2017 $1,668

ORANGE 2OM0701-ORA080919

TRANSIT PURCHASE MISCELLANEOUS SUPPORT VEHICLES 2020 $625

ORANGE ORA110633 TRANSIT RIDESHARE VANPOOL PROGRAM – CAPITAL LEASE COSTS

2012 $2,197

ORANGE 2L207 TRANSIT ROUTE 792/A RIVERSIDE/CORONA TO ANAHEIM RESORT AREA EXPRESS BUS SERVICE

2012 $780

Page 218: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

216 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA110613 TRANSIT SECURITY SURVEILLANCE AND MONITORING EQUIPMENT FOR TRANSIT

2016 $5,528

ORANGE ORA120536 TRANSIT TUSTIN RAIL STATION PARKING EXPANSION – CONSTRUCTION OF 191 NEW SPACES (281 EXISTING SPACES + 191 NEW SPACES = 472 TOTAL SPACES) PPNO 9510

2012 $17,600

ORANGE ORA110613-ORA020814

TRANSIT VIDEO SURVEILLANCE SYSTEM FOR BASE FACILITIES – INSTALL VIDEO SURVEILLANCE EQUIPMENT AT FOUR OCTA BASE FACILITIES IN ANAHEIM, GARDEN GROVE, IRVINE (SAND CANYON AND CONSTRUCTION CIRCLE)

2016 $803

ORANGE 2TR0701 TRANSIT ANAHEIM RAPID CONNECTION

ARTIC ANAHEIM RESORT ANAHEIM RAPID CONNECTION: ELEVATED FIXED-GUIDEWAY SYSTEM CONNECTING THE ANAHEIM REGIONAL TRANSPORTATION INTERMODAL CENTER, THE PLATINUM TRIANGLE, AND THE ANAHEIM RESORT

2020 $839,768

ORANGE 2120009 TRANSIT BRISTOL/STATE COLLEGE

BREA MALL IRVINE STATION 28-MILE FIXED-ROUTE BRT AND STRUCTURES BETWEEN BREA MALL AND IRVINE STATION

2030 $4,040

ORANGE 2TR0702 TRANSIT COMMUNITY-BASED SHUTTLES PROGRAM

COUNTYWIDE DEPLOY CITY-INITIATED COMMUNITY-BASED SHUTTLES

2035 $264,500

ORANGE 2TR0703 TRANSIT ELDERLY & HANDICAPPED ASSISTANCE

COUNTYWIDE EXPAND TRANSPORTATION CHOICES FOR SENIORS AND THE DISABLED

2035 $396,900

ORANGE 2L206 TRANSIT FIXED ROUTE BUS COUNTYWIDE COUNTYWIDE FIXED ROUTE, EXPRESS, AND PARATRANSIT CAPITAL.

2035 $1,810,653

ORANGE 2TR0708 TRANSIT GO LOCAL RAIL FEEDER PROGRAM

COUNTYWIDE PROGRAM TO DEVELOP CITY-INITIATED PROJECTS TO IMPROVE ACCESS TO METROLINK STATIONS

2035 $1,168,000

ORANGE 2120007 TRANSIT HARBOR CSU, FULLERTON BALBOA 19-MILE FIXED-ROUTE BRT AND STRUCTURES BETWEEN FULLERTON AND NEWPORT BEACH

2030 $3,490

ORANGE 2TR0704 TRANSIT METROLINK SERVICE EXPANSION

PROGRAM

COUNTYWIDE HIGH-FREQUENCY SERVICE FROM LAGUNA NIGUEL TO LA AND PROVIDE CORRIDOR IMPROVEMENTS AND RAIL FEEDER SERVICE WITHIN THE COUNTY.

2035 $1,184,400

ORANGE 2TR0705 TRANSIT REGIONAL GATEWAY PROGRAM

COUNTYWIDE STATION IMPROVEMENTS TO SUPPORT HIGH-SPEED RAIL SYSTEMS

2035 $264,700

ORANGE 2TR0709 TRANSIT SAFE TRANSIT STOPS COUNTYWIDE IMPROVE SAFETY AND AMENITIES AT TRANSIT STOPS 2035 $29,200

Page 219: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 217

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE 2TR1001 TRANSIT SANTA ANA AND GARDEN GROVE FIXED GUIDEWAY

SANTA ANA REGIONAL

TRANSPORTATION CENTER (SARTC)

HARBOR BLVD/WESTMINSTER AVE

SANTA ANA AND GARDEN GROVE FIXED GUIDEWAY BETWEEN SARTC AND A NEW TRANSIT CENTER IN GARDEN GROVE, NEAR THE INTERSECTION OF HARBOR BLVD AND WESTMINSTER AVE

2020 $155,283

ORANGE 2120001 TRANSIT VANPOOL AND PARK&RIDE PROGRAM

IDENTIFY OPPORTUNITIES AND EXPAND RIDESHARE SERVICES FOR ORANGE COUNTY.

2035 $161,540

ORANGE 2120008 TRANSIT WESTMINSTER / 17TH

LONG BEACH TRANSIT MALL

SANTA ANA REGIONAL

TRANSPORTATION CENTER

22-MILE FIXED-ROUTE BRT AND STRUCTURES BETWEEN SANTA ANA AND LONG BEACH

2030 $2,080

ORANGE 2120010 STATE HIGHWAY

CONTINUOUS ACCESS HOV

COMPLETE CONTINUOUS ACCESS CONVERSION OF THE ORANGE COUNTY HOV SYSTEM WHERE FEASIBLE.

2014 $19,400

ORANGE 2L149 STATE HIGHWAY

MOTORIST SERVICES COUNTYWIDE FREEWAY SERVICE PATROL AND CALLBOX PROGRAM 2035 $241,200

ORANGE 2L150 STATE HIGHWAY

SOUNDWALLS COUNTYWIDE RETROFIT SOUNDWALL PROGRAM 2035 $28,366

ORANGE ORA120359 STATE HIGHWAY

5 I-5 @ JAMBOREE – CONSTRUCT AUX LN ON I-5 SB; WIDEN SB OFF-RAMP FROM 1 TO 2 LANES; AND WIDENING JAMBOREE RD EB UNDERCROSSING TO CREATE A TURN LANE TO NB ON-RAMP PPNO 2806B

2012 $8,485

ORANGE ORA030602 STATE HIGHWAY

5 IN SAN CLEMENTE – SB CAMINO DE ESTRELLA – WIDEN OFF RAMP FROM 1 TO 2 LANES AND WIDEN OVERCROSSING FROM 5 TO 7 LANES (1 W/B LEFT TURN LANE AND 1 E/B LANE), EA 0F0600, SHOPP, MOBILITY

2012 $13,493

ORANGE ORA120402 STATE HIGHWAY

5 IN SAN CLEMENTE NORTHBOUND INTERSTATE 5 AT AVENIDA VAQUERO – SOUNDWALL DESIGN AND CONSTRUCTION PPNO 2580A. DUAL LEAD AGENCY. OCTA FOR PA&ED AND PS&E CALTRAN LEAD FOR ROW CON

2011 $2,760

Page 220: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

218 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA120326 STATE HIGHWAY

5 RECONSTRUCT I-5/SR-74 INTERCHANGE (IN SAN JUAN CAPISTRANO, ON ROUTE 74 FROM ROUTE 5 TO EAST OF THE CITY LIMIT. RECONSTRUCT THE ROUTE 74 AND ROUTE 5 INTERCHANGE) PPNO 4102 DUAL LEAD SJC CALTRANS

2014 $84,514

ORANGE ORA120401 STATE HIGHWAY

5 SOUTHBOUND INTERSTATE 5 FROM EL CAMINO REAL TO AVENIDA RAMONA – SOUNDWALL DESIGN AND CONSTRUCTION PPNO 2544B. DUAL LEAD AGENCY OCTA FOR PA&ED AND PS&E CALTRAN LEAD FOR ROW CON

2011 $4,995

ORANGE ORA000100 STATE HIGHWAY

5 GENE AUTRY WAY WEST @ I-5 (I-5 HOV TRANSITWAY TO HASTER) ADD OVERCROSSING ON I-5 (S)/MANCHESTER AND EXTEND GENE AUTRY WAY WEST FROM I-5 TO HASTER (3 LANES IN EA DIR.)

2012 $70,984

ORANGE ORA55063 STATE HIGHWAY

5 I-5 @ AVERY PARKWAY (MARGUERITE TO CAMINO CAPISTRANO) INTERCHANGE IMPROVEMENTS. WIDEN FROM 4 TO 5 LANES (FOR TURN LANE) UNDER FREEWAY BRIDGE.

2010 $840

ORANGE ORA000122 STATE HIGHWAY

5 I-5 @ LA PAZ INTERCHANGE IMPROVEMENTS. EXPAND LA PAZ RD. FROM 4 TO 6 LANES TOTAL. (99-LHILL-GMA-1125)

2012 $8,943

ORANGE ORA020109 STATE HIGHWAY

5 I-5 AT CAMINO CAPISTRANO INTERSECTION IMPROVEMENT. WIDEN S/B OFFRAMP FROM 2 TO 3 LANES. PPNO 2615. DUAL LEAD. OCTA PA&ED. CALTRANS PS&E ROW AND CON

2012 $19,207

ORANGE ORA110607 STATE HIGHWAY

5 IN ORANGE COUNTY, ON ROUTE 5 FROM CALLE JUANITA TO 4TH ST. PROVIDE ENHANCED PAVING AND LANDSCAPING PPNO #2592

2013 $1,873

ORANGE ORA030604 STATE HIGHWAY

5 IN THE CITY OF MISSION VIEJO SB OFFRAMP AT CROWN VALLEY PARKWAY – WIDEN OFF RAMP FROM 4 TO 5 LANES SHOPP PROJECT EA 12-0F8201

2012 $3,249

ORANGE 2H01143 STATE HIGHWAY

5 I-5 AVENIDA PICO SAN JUAN CREEK ROAD

ADD 1 HOV LANE EACH DIRECTION FROM AVENIDA PICO TO SAN JUAN CREEK ROAD AND RECONFIGURE AVENIDA PICO INTERCHANGE

2020 $261,576

Page 221: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 219

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE 2M0730 STATE HIGHWAY

5 I-5 AVERY PKWY ALICIA PKWY ADD 1 MF LANE EACH DIRECTION (AVERY TO ALICIA) AND RECONFIGURE INTERCHANGES AT AVERY AND LA PAZ

2020 $584,240

ORANGE 2H0702 STATE HIGHWAY

5 I-5 BARRANCA PARKWAY

BARRANCA PARKWAY HOV INTERCHANGE IMPROVE-MENT – ADD SB HOV ON-RAMP AND NB HOV OFF-RAMP

2023 $13,600

ORANGE 2M0731 STATE HIGHWAY

5 I-5 EL TORO Y TRUCK BYPASS

SR-55 ADD 1 MF LANE EACH DIRECTION AND MERGING IMPROVEMENTS.

2023 $298,025

ORANGE 2M0717 STATE HIGHWAY

5 I-5 LOS ALISOS ADD RAMPS AT LOS ALISOS 2023 $57,954

ORANGE 2M0718 STATE HIGHWAY

5 I-5 MARGUERITE PARKWAY

ADD NEW INTERCHANGE AT MARGUERITE PARKWAY (SADDLEBACK CC CONNECTION)

2020 $133,723

ORANGE 2H0703 STATE HIGHWAY

5 I-5 SR-55 SR-57 ADD 1 HOV LANE EACH DIRECTION; RECONSTRUCT THE FIRST ST/FOURTH ST IC ON SB I-5 TO INCREASE WEAVING LENGTH TO STANDARD; EXTEND MERGE LANES BY 100 FEET

2035 $118,874

ORANGE 2M0732 STATE HIGHWAY

5 I-5 SR-57 SR-91 ADD 1 LANE EACH DIRECTION (57 TO 91) 2030 $336,904

ORANGE 2M04109A STATE HIGHWAY

5 I-5 STONEHILL DR ADD SOUTHBOUND I-5 OFF-RAMP AT STONEHILL 2020 $84,700

ORANGE ORA000193-ORA084902

STATE HIGHWAY

22 SR-22/I-405 HOV CONNECTOR REPLACEMENT PLANTING

2014 $2,040

ORANGE ORA000193 STATE HIGHWAY

22 HOV CONNECTORS FROM SR-22 TO I-405, BETWEEN SEAL BEACH BLVD. (I-405 PM 022.558) AND VALLEY VIEW ST. (SR-22 PM R000.917), WITH A SECOND HOV LANE IN EACH DIRECTION ON I-405 BETWEEN THE TWO DIRECT CONNECTORS.

2014 $119,625

ORANGE ORA000195 STATE HIGHWAY

22 ON SR-22 (I-405 TO SR55) ADD 2 HOV LANES/1 EA DIR (FRM 0 – 2) & 2 AUX LANES/1 EA DIR (FRM 0- 2) (I-5 TO BEACH) & OPERATING IMPROVMENTS (SEE COMMENTS) TCRP PAYBACK WHEN AVAILABLE

2012 $546,587

ORANGE ORA015 STATE HIGHWAY

55 BAKER ST AND SR-55; N/B & S/B FRONTAGE ROAD IMPROVEMENTS. S/B FREE RIGHT TURN, N/B LEFT-TURN AND 2ND E/B LEFT.

2014 $900

Page 222: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

220 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA030603 STATE HIGHWAY

55 CONSTRUCT 1 AUX LANE ON S/B SR-55 BETWEEN E EDINGER AVE ON RAMP AND E DYER RD OFF RAMP EA0G9600 (SHOPP MOBILITY)

2012 $34,064

ORANGE 2OM0701-ORA084401

STATE HIGHWAY

55 IN COSTA MESA, SANTA ANA, TUSTIN ON SR-55 BETWEEN PAULARINO AVE AND .2 MILES NORTH OF 17TH ST – CONVERT EXISTING LIMITED ACCESS HOV STRIPING TO FULL TIME CONTINUOUS ACCESS HOV STRIPING

2012 $1,490

ORANGE ORA016 STATE HIGHWAY

55 PAULARINO AVE (SR-55 NB FRONTAGE ROAD @ PAULARINO AVE) IN COSTA MESA INTERSECTION IMPROVEMENT. ADDING A N/B RAMP AND W/B RIGHT-TURN-LANE.

2018 $505

ORANGE ORA017 STATE HIGHWAY

55 PAULARINO AVE IN SR-55 SB FRONTAGE ROAD COSTA MESA. INTERSECTION IMPROVEMENT ADD S/B RIGHT-TURN LANE.

2014 $270

ORANGE ORA030610 STATE HIGHWAY

55 ADD SOUTHBOUND AUXILIARY LANE FROM DYER TO MACARTHUR. PPNO 3473

2012 $2,619

ORANGE 2M0733 STATE HIGHWAY

55 SR-55 I-405 SR-22 ADD 1 MF LANE EACH DIRECTION AND FIX CHOKEPOINTS FROM I-405 TO SR-22; ADD 1 AUX LANE EA DIR BTWN SELECT ON/OFF RAMP THROUGH PROJECT LIMITS

2023 $343,055

ORANGE ORA120333 STATE HIGHWAY

57 EXIST 4 MF N/B; WIDEN TO 5 MF LANES N/B FROM 0.3 MI S/O KATELLA TO 0.3 MI N/O LINCOLN (2.92 MILES) -- 0F0400

2018 $41,086

ORANGE 2TK01116 STATE HIGHWAY

57 SR-57 TRUCK CLIMBING AUX LANE FROM LAMBERT TO LA CO. LINE PPNO 3847A EA 0C120

2030 $124,600

ORANGE ORA120320 STATE HIGHWAY

57 SR-57/LAMBERT RD INTERCHANGE IMPROVEMENTS – RECONFIG EXISTING DIAMOND INTERCHANGE TO LOOP RAMP, ADD SB LN ON OFFRAMP

2018 $38,150

ORANGE ORA120332 STATE HIGHWAY

57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) EA 0F0311 (SR91/ORANGETHORPE TO YORBA LINDA SEGMENT) SPLIT PROJECT WITH ORA081901

2014 $72,208

Page 223: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 221

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA120332-ORA081901

STATE HIGHWAY

57 ADD ONE MF LANE ON N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES) EA 0F0321 (YORBA LINDA TO LAMBERT SEGMENT) SPLIT PROJECT WITH ORA120332

2014 $73,243

ORANGE 2H0705 STATE HIGHWAY

57 SR-57 CERRITOS HOV DROP RAMP 2035 $166,904

ORANGE 2M0724 STATE HIGHWAY

57 SR-57 LAMBERT ST LAMBERT INTERCHANGE IMPROVEMENT 2035 $12,477

ORANGE 2M0735A STATE HIGHWAY

57 SR-57 NB ORANGEWOOD KATELLA ADD 1 MF LANE NB BETWEEN ORANGEWOOD AND KATELLA

2020 $20,875

ORANGE 10254 STATE HIGHWAY

73 SJHC, 15 MI TOLL RD BETWEEN I-5 IN SAN JUAN CAPISTRANO & RTE 73 IN IRVINE, EXISTING 3/M/F EA.DIR.1 ADD’L M/F EA DIR, PLUS CLIMBING & AUX LNS AS REQ, BY 2020 PER SCAG/TCA MOU 4/5/01

2020 $351,111

ORANGE 2M0726 STATE HIGHWAY

73 SR-73 GLENWOOD DR/PACIFIC PARK DR

COMPLETE SOUTHBOUND RAMP AT INTERCHANGE WITH GLENWOOD DR/PACIFIC PARK DR

2035 $42,727

ORANGE 2H0706 STATE HIGHWAY

73 SR-73 I-405 I-405 HOV CONNECTOR BETWEEN I405 AND SR73. INCLUDES MERGING LANES AND RECONSTRUCTION OF FAIRVIEW BRIDGE.

2035 $174,242

ORANGE 2H0707 STATE HIGHWAY

73 SR-73 I-405 MACARTHUR ADD 1 HOV LANE EACH DIRECTION FROM MACARTHUR TO 405

2035 $249,424

ORANGE ORA120507 STATE HIGHWAY

74 WIDEN ORTEGA HIGHWAY FROM COUNTY/CITY OF SAN JUAN CAPISTRANO TO APPROXIMATELY 1,900 FEET EAST OF THE INTERSECTION OF THE LA PATA/ORTEGA HIGHWAY INTERSECTION (APPROXIMATELY 1.2 MILES). WIDEN FROM 2 TO 4. INCLUDING WIDEN-ING OF THE BRIDGE OVER SAN JUAN CREEK.

2012 $42,694

ORANGE ORA120507-ORA120506

STATE HIGHWAY

74 WIDEN ROUTE 74 FROM 2 TO 4 LANES – COUNTY SEGMENT (ON ROUTE 74 FROM CITY/COUNTY LINE TO ANTONIO PARKWAY / LA PATA AVE. WIDEN FROM 2 LANES TO 4 LANES) PPNO 4110A EA 08691 SPLIT FROM ORA120507

2012 $40,905

ORANGE ORA000152 STATE HIGHWAY

74 ORTEGA HIGHWAY ORTEGA HWY (RANCHO VIEJO RD TO JUST EAST OF I-5/SR-74 INTERCHAGE) RDWAY WIDEN ADD RT TRN LNE TO CAPAC & REDUCE QUE ON WB SR-74 TO NB I-5 TRN. N/B FRM 2TO3 & S/B 2TO3 .

2014 $2,550

Page 224: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

222 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE 2L224-ORA020808

STATE HIGHWAY

90 IN ORANGE COUNTY, ON RTE 90 IMPERIAL HIGHWAY, IN THE CITIES OF YORBA LINDA AND ANAHEIM ON ROUTE 90 FROM EAST OF KELLOGG DR UNDERCROSSING TO LA PALMA AVE. THE PROJECT IS TO PROVIDE ENHANCEMENT AND MITIGATION PLANTING. PPNO 4434B EA 12-056221

2012 $1,669

ORANGE ORA000115 STATE HIGHWAY

90 IMPERIAL HWY SMART ST (LAC TO HARBOR) RESTRIPE 4 TO 6 LNS (LAC LINE TO IDAHO ST. ADD RAISED MEDIAN. MODFY MEDIANS AT 4 INTSECS. ADD BUS PADS, TURNOUTS.(COMBINES ORA028 AND ORA029)

2012 $16,244

ORANGE 2M01126 STATE HIGHWAY

91 CONNECT EXISTING AUXILIARY LANE THROUGH INTERCHANGES ON WB SR-91 BETWEEN SR-57 AND I-5 WITH ITS ELEMENTS PPNO 4516A EA 0C5700

2018 $73,400

ORANGE ORA030601-ORA110502

STATE HIGHWAY

91 EASTBOUND RTE 91 FROM RTE 91/55 CONNECTOR TO EAST OF WEIR CANYON ROAD INTERCHANGE; WESTBOUND RTE 91 FROM EAST OF WEIR CANYON RD INTERCHANGE TO IMPERIAL HWY INTERCHANGE. WIDENING. REPLACEMENT PLANTING/LANDSCAPING. SPLIT FROM ORA030601

2018 $2,498

ORANGE 2L224-ORA020807

STATE HIGHWAY

91 IN ORANGE COUNTY, AT THE COAL CANYON ROAD INTERCHANGE. THE PROJECT IS TO INSTALL VEGETATION ENHANCEMENTS

2013 $802

ORANGE 2M01125 STATE HIGHWAY

91 SR-91 WB (SR-55 THROUGH TUSTIN INTERCHANGE) EXTEND LANE AND RECONSTRUCT AUX. LANE. PPNO 4587A EA 0C560)

2018 $41,930

ORANGE ORA030601 STATE HIGHWAY

91 SR-91: ADD 1 MF LANE E/B BTWN 91/55 CONNECTOR & SR-241 -- W/B BTWN SR-241 & IMPERIAL HWY; MODIFY W/B ON RAMPS FROM LAKEVIEW AVE TO IMPRV MERGE (ADD AUX LANE BETWEEN NB 55 – TO – EB 91 ON-RAMP AND LAKEVIEW OFF RAMP). PROJECT SPLIT LANDSCAPING

2014 $85,986

ORANGE ORA120336 STATE HIGHWAY

91 SR-91 EASTBOUND LANE ADDITION BETWEEN SR-241 & SR-71, & IMPROVE NB SR-71 CONNECTOR FROM SR-91 TO STD ONE LANE AND SHOULDER WIDTH. 0G0400

2012 $77,575

Page 225: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 223

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE 2T04128 STATE HIGHWAY

91 SR-91 FAIRMONT DR CONSTRUCT OVERCROSSING AND SR-91 INTERCHANGE AT FAIRMONT BLVD

2030 $123,943

ORANGE 2120004 STATE HIGHWAY

91 SR-91 GYPSUM CANYON IMPROVE INTERCHANGE AT GYPSUM CANYON. 2025 $40,000

ORANGE 2T01135 STATE HIGHWAY

91 SR-91 SR-241 HOV/HOT CONNECTOR NB 241 TO EB 91, WB 91 TO SB 241

2018 $473,191

ORANGE 2M0737 STATE HIGHWAY

91 SR-91 SR-241 I-15 IN ORANGE COUNTY, ADD A WB MF LANE FROM 241 OFF RAMP TO GYPSUM CANYON AND AUX LANES EACH DIRECTION BETWEEN 241 AND COUNTY LINE. SEE RIVERSIDE COUNTY FOR ADDITIONAL IMPROVEMENTS.

2018 $173,728

ORANGE 2M0736 STATE HIGHWAY

91 SR-91 EB SR-57 SR-55 ADD 1 MF LANE EASTBOUND; IMPROVE INTERCHANGE AT SR-91/SR-55 AND LAKEVIEW AVE; OPERATIONAL, NO INCREASE IN CAPACITY

2023 $355,764

ORANGE ORA051 STATE HIGHWAY

241 (FTC-N) (OSO PKWY TO ETC) (13MI) EXISTING 2 MF IN EA. DIR, 2 ADDITIONAL M/F LANES, PLS CLMBNG & AUX LANS AS REQ BY 2020 PER SCAG/TCA MOU 4/05/01.

2020 $143,517

ORANGE ORA052 STATE HIGHWAY

241 (FTC-S) (I-5 TO OSO PKWY) (15MI) 2 MF EA. DIR BY 2013; AND 1 ADDITIONAL M/F EA. DIR. PLS CLMBNG & AUX LANES AS REQ BY 2030 PER SCAG/TCA MOU 4/05/01. #1988

2030 $1,509,133

ORANGE ORA050 STATE HIGHWAY

241 ETC (RTE 241/261/133) (RTE 91 TO I-5/JAMBOREE) EXISTING 2 M/F EA.DIR, 2 ADD’L M/F IN EA. DIR, PLUS CLIMB AND AUX LNS AS REQ, BY 2020 PER SCAG/TCA MOU 4/05/01.

2020 $1,156,097

ORANGE 2120003 STATE HIGHWAY

241 SR-241 JEFFREY NEW INTERCHANGE AT JEFFREY AND 241. 2030 $70,000

ORANGE ORA030605 STATE HIGHWAY

405 I-405 FROM SR-73 TO I-605 ADD 1 MF LANE EACH DIR AND PROVIDE ADDITIONAL CAPITAL IMPROVEMENTS. #317. COMBINED WITH ORA045, ORA151 AND ORA120310

2023 $1,694,000

ORANGE ORA000193-ORA084901

STATE HIGHWAY

405 I-405/I-605 HOV CONNECTOR REPLACEMENT PLANTING

2013 $3,840

Page 226: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

224 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA100507 STATE HIGHWAY

405 CONSTRUCT FOURTH NB THROUGH LANE ON BEACH BLVD AT THE I-405 INTERCHANGE AND REMOVE OFF-RAMP ON I-405 AT BEACH (NORTH-EAST CORNER OF BEACH/EDINGER). CO LEAD WITH WESTMINSTER

2012 $1,500

ORANGE ORA000193-ORA000194

STATE HIGHWAY

405 HOV CONNECTORS FROM I-405 TO I-605, BETWEEN KATELLA AVE. (I-605 PM R001.104) AND SEAL BEACH BLVD. (I-405 PM 022.643), WITH A SECOND HOV LANE IN EACH DIRECTION ON I-405 BETWEEN THE TWO DIRECT CONNECTORS

2014 $159,630

ORANGE 2M0728 STATE HIGHWAY

405 I-405 I-5 SR-55 ADD 1 MF LANE EACH DIRECTION FROM I-5 TO SR-55 AND IMPROVE MERGING

2023 $374,540

ORANGE 2M04131 STATE HIGHWAY

405 I-405 NB JEFFREY CULVER ADD AUXILIARY LANE 2020 $15,618

ORANGE 2M0719 STATE HIGHWAY

605 I-605 KATELLA ON-RAMP IMPROVE INTERCHANGE 2020 $20,789

ORANGE ORA040607 STATE HIGHWAY

999 ORANGE COUNTY – COUNTYWIDE ACTIVITIES: PLANNING, PROGRAMMING AND MONITORING (PPM)

2020 $20,257

ORANGE 2GL04-ORA02925

LOCAL HIGHWAY

BNSF RAILWAY LINE (PLACENTIA) ALONG SS OF ORANGETHORPE. GRADE SEPARATION/ CORRIDOR IMPROVEMENTS

2015 $78,230

ORANGE ORA990906 LOCAL HIGHWAY

GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES FUNDED WITH TE – SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON-MOTORIZED)

2014 $35,834

ORANGE ORA990907 LOCAL HIGHWAY

GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES – PROJECTS ARE CON-SISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES)

2020 $16,337

Page 227: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 225

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA120332-ORA110302

LOCAL HIGHWAY

IN PLACENTIA AND FULLERTON, N/B SR-57 FROM 0.4 MI N/O SR-91 TO 0.1 MI N/O LAMBERT RD (5.1 MILES). REPLACEMENT PLANTING AS THE RESULT OF THE SR-57 NORTHBOUND WIDENING. REPLACEMENT PLANTING RELATED TO ORA081901 AND ORA120332

2018 $2,688

ORANGE ORA120534-ORA020823

LOCAL HIGHWAY

KRAEMER BLVD GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON KRAEMER BLVD AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT.

2015 $100,431

ORANGE ORA120534-ORA020825

LOCAL HIGHWAY

LAKEVIEW AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON LAKEVIEW AVE AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT. PROJECT UTILIZING $3,032 IN TOLL CREDITS FOR ROW PHASE IN FY10/11

2015 $73,956

ORANGE ORA020507 LOCAL HIGHWAY

ORANGE COUNTY COUNCIL OF GOVERNMENTS (OCCOG) – REDUCE ORANGE COUNTY CONGESTION (ROCC) PROGRAM (INCLUDES STUDIES AND PLANNING)CO-LEAD OCTA

2012 $1,500

ORANGE 2GL04-ORA000809

LOCAL HIGHWAY

RAYMOND AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON RAYMOND AVE AT THE BNSF RR TRACKS

2016 $63,740

ORANGE ORA040602 LOCAL HIGHWAY

STATE COLLEGE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON STATE COLLEGE BLVD AT THE BNSF RR TRACKS (SANTA FE AVE TO 700 FT SOUTH OF VALENCIA)

2016 $73,648

ORANGE ORA120534-ORA020826

LOCAL HIGHWAY

TUSTIN AVE / ROSE DR GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON TUSTIN AVE / ROSE DR AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT

2015 $99,210

ORANGE 2GL04-ORA02926

LOCAL HIGHWAY

BNSF RAILWAY LINE (KRAEMER BLVD TO KELLOGG DR) ALONG SS OF ORANGETHORPE. INSTALL SUPPLEMENTAL SAFETY MEASURES AT 8 AT-GRADE CROSSINGS (4.4 MILES).

2010 $7,518

ORANGE ORA020506 LOCAL HIGHWAY

CITY OF ORANGE – SANTA FE DEPOT SPECIFIC PLAN UPDATE

2010 $232

ORANGE ORA100509 LOCAL HIGHWAY

DESIGN AND IMPLEMENT HARBOR BLVD ITS IN GARDEN GROVE.

2011 $3,179

Page 228: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

226 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA100508 LOCAL HIGHWAY

DEVELOP AND IMPLEMENT AN ITS MASTER PLAN IN ANAHEIM

2012 $1,000

ORANGE ORA55013 LOCAL HIGHWAY

GROUPED PROJECTS FOR PAVEMENT RESURFAC-ING AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM – PROJECTS ARE CON-SISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCT-ING BRIDGES (NO ADDITIONAL TRAVEL LANES)

2010 $79,771

ORANGE ORA120315 LOCAL HIGHWAY

IRVINE – SAND CANYON @ I-5 (ADD 3RD AND 4TH NB AND SB THRU LNS ON SND CYN; IMP EB APPROACH ADD 2 LFT TRN LNS,1 THRU LN, & 1 RT TRN LN)

2012 $8,441

ORANGE ORA080604 LOCAL HIGHWAY

PLANNING FOR TRANSIT IN STANTON: CITYWIDE POLICIES AND SITE SPECIFIC DEVELOPMENT STANDARDS FOR TRANSIT-ORIENTED PROJECTS. (OCCOG ROCC)

2010 $264

ORANGE 2SL04 LOCAL HIGHWAY

PLANNING STUDIES AND PSR’S (SR-55 STUDY 19TH ST TO INDUSTRIAL WAY IN COSTA MESA)

2015 $1,130

ORANGE ORA080602 LOCAL HIGHWAY

PLANNING STUDY TO EVALUATE THE LAND USE IN THE GATEWAY SPECIFIC PLAN (GSP) INCLUDING TRANSIT ORIENTED DEVELOPMENT AND MIXED USE DEVELOPMENT (OCCOG ROCC)

2011 $203

ORANGE ORA000177 LOCAL HIGHWAY

RED HILL @ EDINGER AVE/RR TRACKS. GRADE SEPARATION THE PE STUDY WILL ADDRESS VARIOUS ALTERNATIVES

2016 $2,097

ORANGE ORA120330 LOCAL HIGHWAY

SEAL BEACH – SEAL BEACH BLVD, OVERPASS BRIDGE LENGTHENING TURN LANES AND RAMPS REALIGNMENT (FROM BEVERLY MANOR RD TO OLD RANCH PKWY)

2010 $9,926

ORANGE ORA100506 LOCAL HIGHWAY

SIGNAL UPGRADES ON AVENIDA DE LAS FLORES, MELINDA ROAD, AVENIDA DE LAS BANDERAS, AND ALMA ALDEA, IN RSM.

2010 $145

ORANGE ORA080603 LOCAL HIGHWAY

THE CITY’S CONSULTANT WILL PREPARE A PROGRAM ENVIRONMENTAL IMPACT REPORT (EIR) FOR THE SANTA FE SPECIFIC PLAN UPDATE (OCCOG ROCC)

2012 $223

Page 229: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 227

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA990452 LOCAL HIGHWAY

TUSTIN BRANCH RAIL TRAIL ALONG THE SANTIAGO CREEK FROM TUSTIN ST. TO WALNUT AVE. AND CITY OWNED RW FROM WALNUT AVE. TO COLLINS AVE. FILLS 2 MILE GAP IN A REGIONAL TRAIL.

2011 $2,436

ORANGE 550 LOCAL HIGHWAY

ALTON ALTON AVE IN SANTA ANA CONSTRUCT A NEW 4-LANE (2E/B AND 2W/B) OVERCROSSING & HOV ACCESS RAMPS @ SR-55

2012 $76,988

ORANGE 2A1001-ORA990919

LOCAL HIGHWAY

ALTON PARKWAY ALTON PARKWAY IMPROVEMENTS – CONSTRUCT NEW 4 LANE ROADWAY FROM COMMERCENTRE DR TO TOWNE CENTRE DR, A LENGTH OF APPROXIMATELY 4,800 FEET.

2014 $6,400

ORANGE ORA120505 LOCAL HIGHWAY

ALTON PARKWAY ORANGE COUNTY – ALTON PARKWAY EXTENSION (IRVINE) (IRVINE BLVD TO CMMERCENTER DR; FRM 0 TO 6 LNS)

2012 $40,000

ORANGE 2OM0701-ORA990932

LOCAL HIGHWAY

ANTONIO PARKWAY ANTONIO PARKWAY PAVEMENT REHABILITATION – THE PROJECT WILL REHABILITATE ANTONIO PARKWAY BY COLD-PLANING AND OVERLAYING THE EXISTING ROADWAY FROM VIA HONESTO TO COTO DE CAZA/LA PROMESA. INCLUDED IN THIS REHABILITA-TION WILL BE ISOLATED AREAS OF FULL RECON-STRUCTION, CURB RAMPS.

2012 $445

ORANGE 2A0803 LOCAL HIGHWAY

ANTONIO PARKWAY PROJECT WILL BUILD OUT ANTONIO PARKWAY TO ITS MASTER PLAN OF ARTERIAL HIGHWAYS DESIGNATION WIDTH BETWEEN LADERA PLANNED COMMUNITY AND ORTEGA HIGHWAY BY WIDENING THE ROAD FROM FOUR TO SIX LANES. THE PROJECT WILL INCLUDE WIDENING ANTONIO PARKWAY BRIDGE BY ONE LANE IN EACH DIRECTLY.

2018 $47,499

ORANGE ORA120522 LOCAL HIGHWAY

ATLANTA AVE HUNTINGTON BEACH – ATLANTA AVE WIDENING (FRM HUNTINGTON TO DELEWARE; FRM 2 TO 4 LNS)

2012 $4,423

ORANGE ORA120510 LOCAL HIGHWAY

BARRANCA IRVINE – BARANCA & RED HILL INT IMPV (ADD 4TH WB, SB, EB, NB THRU LNS & EB/WB LFT TRN LNS & WB DEDICATED RT TRN LN)

2011 $15,475

Page 230: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

228 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA020501 LOCAL HIGHWAY

BRIDGE GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

2030 $23,155

ORANGE ORA125 LOCAL HIGHWAY

BRISTOL ST BRISTOL ST (WARNER TO MEMORY LANE) WIDEN FROM 4 TO 6 LANES (IMPV AT BRISTOL/WARNER (ADD NB/EB/SB THRU LNS; WB RT TRN LN) AND BRISTOL/FIRST (ADD NB/SB THRU LNS; SB LFT/RT/TRN LNS

2012 $160,046

ORANGE ORA120501 LOCAL HIGHWAY

BROOKHURST ST BROOKHURST ST WIDENING FROM S/O BALL ROAD TO N/O KATELLA AVE (4-6 LANES)

2014 $30,508

ORANGE ORA000162 LOCAL HIGHWAY

CHAPMAN CHAPMAN AVE (TUSTIN TO SR-55) WIDEN FROM 4 TO 6 LANES. ADD 2 DEDIC. RT TURN LANES (1@ WB CHAPMAN & 1@NB TUSTIN) PLUS, 2 BUS TURNOUTS (1@NB TUSTIN AND 1@WB CHAPMAN INTERSECTION.)

2011 $5,870

ORANGE 2A0804 LOCAL HIGHWAY

COW CAMP ROAD COW CAMP ROAD (4 LANES) FROM ANTONIO TO FOOTHILL TRANSPORTATION CORRIDOR (FTC)IS A MAJOR ARTERIAL HIGHWAY AND FROM FTC TO ORTEGA PRIMARY ARTERIAL HIGHWAY.

2018 $193,434

ORANGE ORA000163 LOCAL HIGHWAY

CROWN VALLEY PARKWAY

CROWN VALLEY PARKWAY (PUERTA REAL TO CITY LIMITS, NEAR JARDINES) WIDENING FROM 6 LANE DIVIDED TO 8 LANE DIVIDED.

2012 $5,443

ORANGE ORA120316 LOCAL HIGHWAY

CROWN VALLEY PARKWAY

LAGUNA NIGUEL – CROWN VALLEY PKWY WIDENING (WIDEN EB FROM CABOT TO I-5 ON RAMP, FROM 4 TO 5 LANES; ADD DED RT TRN LN FOR SB I-5 ON RAMP AND DED RT TRN LN FOR NB ON RAMP)

2012 $10,109

ORANGE ORA120525 LOCAL HIGHWAY

DEL OBISPO SAN JUAN CAPISTRANO – DEL OBISPO WIDENING (WIDEN FRM ALIPAZ TO CAMINO CAPISTRANO; TO ACCOMMODATE BIKE LANES AND SIDEWALK IN EACH DIRECTION)

2012 $7,480

ORANGE ORA120521 LOCAL HIGHWAY

FIRST ST SANTA ANA – FIRST ST WIDENING (FRM SUSAN TO FAIRVIEW; FRM 4 TO 6 LNS) BRIDGE 55C0022

2014 $16,171

Page 231: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 229

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA120520 LOCAL HIGHWAY

GRAND AVE SANTA ANA – GRAND AVE WIDENING (FRM 1ST TO 4TH; FRM 2 TO 3 LNS )

2012 $12,437

ORANGE ORA000815 LOCAL HIGHWAY

GYPSUM CANYON SR-91/GYPSUM CANYON ROAD INTERCHANGE. WIDEN GYPSUM CANYON ROAD FROM 2 TO 4 LANES. ADD CLASS II ON-ROAD BIKE LANES, ADD MULTI USE TRAIL AND SIDEWALK ON WEST SIDE OF ROADWAY. THIS WILL REQUIRE MODIFICATION OF EXISTING ENTRANCE RAMP TO GYPSUM. SR-91 CONNECTIONS ARE UNCHANGED, THE EASTBOUND SR-91 EXIT RAMP INTERSECTION WILL BE RECONSTRUCTED AND SIGNALIZED.

2018 $5,000

ORANGE ORA120511 LOCAL HIGHWAY

JAMBOREE RD IRVINE – JAMBOREE RD @ I-5/MICHELLE (ADD 4TH SB AND NB THRU LANES)

2012 $15,545

ORANGE ORA040605 LOCAL HIGHWAY

JAMBOREE ROAD NEWPORT BEACH – JAMBOREE RD WIDENING (BETWEEN BAYVIEW WAY & MACARTHUR BLVD) FROM 6 TO 8 LANES

2012 $1,631

ORANGE ORA48 LOCAL HIGHWAY

JEFFERY RD JEFFERY RD (IRVINE CENTER DR TO WALNUT) RAILROAD GRADE SEPARATION. FROM 4 TO 6 LANES. DUAL LEAD OCTA IRVINE

2012 $46,449

ORANGE ORA120504 LOCAL HIGHWAY

LA PATA AVE ORANGE COUNTY – LA PATA AVE WIDENING & GAP CLOSURE (WIDEN FROM 3 TO 5 LNS (2,700 FT S/O ORTEGA HWY TO RD TERMINUS); GAP CLOSURE – ADD 4 LNS (EXISTING LA PATA TERMINUS TO CALLE SALUDA); EXTENSION – ADD 4 LANES (EXISTING CAMINO DEL RIO TERMINUS TO LA PATA)

2014 $38,560

ORANGE ORA000173 LOCAL HIGHWAY

LA PAZ RD LA PAZ RD (MURILANDS/I-5 TO CHRISANTA DR) WIDENING FROM 4 TO 6 LANES BRIDGE # 55C0215

2014 $9,700

ORANGE ORA110602 LOCAL HIGHWAY

LAGUNA CANYON WIDENING OF LAGUNA CANYON / I-405 OVERCROSSING FROM 2 LANES TO 4 LANES

2014 $11,950

ORANGE 2120005 LOCAL HIGHWAY

LOCAL FAIR SHARE PROGRAM

ROADWAY MAINTENANCE AND IMPROVEMENT PROJECTS.

2035 $2,381,600

ORANGE ORA120519 LOCAL HIGHWAY

MAC ARTHUR BLVD SANTA ANA – MACARTHUR BLVD WIDENING (WIDEN SB ONRAMP (FRM EB MACARTHUR) TO SR-55 BY ADDING 1LN) WIDEN FROM 3 TO 4 LANES.

2012 $1,499

Page 232: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

230 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE ORA120518 LOCAL HIGHWAY

MAC ARTHUR BLVD SANTA ANTA – MAC ARTHUR BLVD WIDENING (WIDEN NB ONRAMP (FROM EB MACARTHUR) TO SR-55 BY ADDING 1 LN).

2012 $1,841

ORANGE ORA120527 LOCAL HIGHWAY

MAIN ST ORANGE – MAIN ST (WIDEN FRM CULVER TO 260’ N/O PALMYRA; FRM 4 TO 6 LNS)

2012 $4,043

ORANGE ORA000146 LOCAL HIGHWAY

MEATS MEATS AVE @ SR55 INTERCHANGE. CONSTRUCT ON-RAMP/OFF-RAMPS. PART OF SR-55 ENHANCEMENT PROJECTS.(0 TO 2 LANES)

2018 $60,000

ORANGE ORA000125 LOCAL HIGHWAY

MOULTON MOULTON PKWY (SANTA MARIA TO EL PACIFICO) WIDEN FRM 7 TO 9 LANES (N/B 3 TO 4 AND S/B 4 TO 5), WIDEN INTERSECTIONS, ADD SIDEWALK AND LANDSCAPING.

2012 $7,685

ORANGE 2L220 LOCAL HIGHWAY

NON-MOTORIZED COUNTYWIDE IMPLEMENT THE COMMUTER BIKEWAYS STRATEGIC PLAN

2035 $469,034

ORANGE ORA120534-ORA020824

LOCAL HIGHWAY

ORANGETHORPE ORANGETHORPE AVE GRADE SEPARATION: CONSTRUCT A GRADE SEPARATION ON ORANGETHORPE AVE AT THE BNSF RR TRACKS. ORANGE COUNTY GATEWAY PROJECT. PROJECT UTI-LIZING $1,922 IN TOLL CREDITS FOR ROW PHASE

2015 $117,383

ORANGE ORA120524 LOCAL HIGHWAY

ORANGETHORPE AVE PLACENTIA – ORANGETHORPE AVE WIDENING (FRM MELROSE AVE TO ECL; FRM 4 TO 6 LNS)

2014 $1,188

ORANGE 2A0801 LOCAL HIGHWAY

OSO PARKWAY WIDEN OSO PARKWAY FROM BLASCO TO INTERSTATE 5 – PROJECT WILL WIDEN BOTH THE EAST BOUND AND WEST BOUND DIRECTIONS FROM THE CURRENT THREE LANES IN EACH DIRECTION TO FOUR LANES IN EACH DIRECTION.

2018 $9,000

ORANGE ORA020115 LOCAL HIGHWAY

PASEO DE LA COLLINAS

CABOT ROAD BRIDGE TO CAMINO CAPISTRANO -PROVIDE ALT ACCESS TO METROLINK STATION & RELIEF TO INTERCHANGE AT I-5 & AVERY (LANES IN EACH DIRECTION ON PASEO DE LA COLLINAS FROM CABOT TO CAMINO CAPISTRANO)

2012 $2,678

Page 233: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 231

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE 2120011 LOCAL HIGHWAY

PCH/DEL PRADO BLUE LANTERN COPPER LANTERN BETWEEN BLUE LANTERN AND COPPER LANTERN, RECONFIG PCH FROM 3 NB LANES TO 2 NB; 2 SB, AND RECONFIG DEL PRADO FROM 3 SB LANES TO 1 NB; 1 SB. ALSO INCLUDES INTERSECTION IMPROVE-MENTS, TRAFFIC CALMING, TRAFFIC SIGNAL MODIFICATION, BICYCLE AND TRANSPORTATION ENHANCEMENTS, STREET REPAIR, AND OTHER STREET MODIFICATIONS.

2014 $22,000

ORANGE 2A1001-ORA990918

LOCAL HIGHWAY

RANCHO PARKWAY RANCHO PARKWAY EXTENSION: HERMANA CIRCLE TO PORTOLA PARKWAY APPROX 1700 FEET. RANCHO PARKWAY WILL BE A 4-LANE DIVIDED ROADWAY

2014 $2,056

ORANGE 2A0704 LOCAL HIGHWAY

REGIONAL CAPACITY PROGRAM

COUNTYWIDE COMPLETE MPAH, IMPROVE ARTERIAL CAPACITY 2035 $1,984,650

ORANGE ORA120523 LOCAL HIGHWAY

RICHFIELD AVE PLACENTIA – RICHFIELD AVE – ATWOOD CHANNEL BRIDGE WIDENING FROM 3 TO 4 LANES

2012 $347

ORANGE ORA000118 LOCAL HIGHWAY

SAND CANYON SAND CYN RD @ SCRRA TRACKS (BURT RD TO LAGUNA CANYON/OAK CANYON) – RAILROAD GRADE SEPARATION. WIDENS FROM 4 TO 6 LANES. CO LEAD WITH OCTA

2014 $55,590

ORANGE 2M1001 LOCAL HIGHWAY

SEAL BEACH BLVD SEAL BEACH BLVD AT 405 FWY SOUTHBOUND OFF RAMP. TO WIDEN THE EASTSIDE AND ADD AN ADDI-TIONAL THRU LANE (FROM 6 TO 7).

2012 $1,443

ORANGE 2A1003 LOCAL HIGHWAY

SEAL BEACH BLVD SEAL BEACH BLVD FROM OLD RANCH PKWY TO ST. CLOUD. WIDEN STREET TO MATCH NEW BRIDGE OVER 405 FWY. 2 EXISTING LANES IN EACH DIRECTION. 3 LANES IN EACH DIRECTION WHEN CONSTRUCTED

2012 $1,443

ORANGE 2A0705 LOCAL HIGHWAY

SIGNAL SYNCHRONIZATION

PROGRAM

COUNTYWIDE SYNCHRONIZE SIGNALS ACROSS JURISDICTIONS AND SMART STREETS

2035 $877,855

ORANGE ORA120514 LOCAL HIGHWAY

TRABUCO ROAD IRVINE – TRABUCO RD @ SR-133 (ADD NEW ON-RAMPS AND OFF RAMPS AT TRABUCO & SR-133)

2020 $71,875

ORANGE ORA55244 LOCAL HIGHWAY

TUSTIN RANCH ROAD TUSTIN RANCH ROAD EXTENSION FROM WALNUT AVE TO VALENCIA AVE INCLUDING CONSTRUCTION OF A BRIDGE OVER THE OCTA/SCRRA RAILWAY LINE AND EDINGER AVE. 3 NEW LANES IN EACH DIRECTION FOR A TOTAL OF 6.

2012 $13,995

Page 234: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

232 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

ORANGE 2120002 OTHER ENVIRONMENTAL CLEANUP AND

FREEWAY MITIGATION PROGR

TRANSPORTATION-RELATED WATER QUALITY PRO-GRAM AND ACQUISITION/RESTORATION OF HABITAT.

2035 $368,410

ORANGE 2120006 OTHER PPM AND OTHER STUDIES

PLANNING, PROGRAMMING, AND MONITORING STUD-IES, AND OTHER STUDIES INCLUDING TDM/TSM

2035 $87,430

RIVERSIDE RIV051201 TRANSIT IN CORONA – CONTINUE THE IMPLEMENTATION OF A 60 SPACE PARK-AND-RIDE LOT (VIA ANNUAL LEASE AGREEMENT) AT LIVING TRUTH CHRISTIAN FELLOWSHIP AT 1114 W. ONTARIO AVE.

2014 $40

RIVERSIDE RIV071286 TRANSIT IN WESTERN RIVERSIDE COUNTY FOR RTA – OPERATING ASSISTANCE FOR THE HEMET OPPORTUNITY PROJECT EXPRESS (HOPE) BUS TO PROVIDE SPECIALIZED TRANSPORTATION SERVICES TO DPSS CLIENTS IN THE HEMET AREA (SEC 5316 – 2006 FUNDS).

2012 $730

RIVERSIDE RIV520109 TRANSIT RECONSTRUCT & UPGRADE SAN JACINTO BRANCH LINE FOR RAIL PASSENGER SERVICE (RIVERSIDE TO PERRIS) (PERRIS VALLEY LINE) (FY 07 5307) (UZA: RIV-SAN)

2012 $232,000

RIVERSIDE RIV520111 TRANSIT REGIONAL RIDESHARE – CONTINUING PROGRAM. 2011 $10,157

RIVERSIDE RIV080927 TRANSIT AT RTA EXISTING HEMET AND RIVERSIDE FACILITIES: MAINTENANCE FACILITY UPGRADES (UNLEADED FUEL DISPENSERS, FIRE DOOR, ENERGY EFFICIENT LIGHTING, ROOF REPAIRS, EASEMENT RESTORATION (RIVERSIDE YARD PROPERTY), AND RE-KEY AND INSTALL FUEL FORCE SYSTEM TO STANDARIZE AND UPDATE MAINTENANCE AND SECURITY PROCEDURES)) (FY 09 5307).

2012 $430

RIVERSIDE 3TR04A TRANSIT BUS RAPID TRANSIT (BRT) ENHANCEMENTS: ADVERTISING, MARKETING, PLACEMENT/LOGISTICS OF BRT INFRASTRUCTURE, STUDIES, ETC. FOR BRT DEVELOPMENT & IMPLEMENTATION (FY 05 5307)

2010 $262

Page 235: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 233

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV050556 TRANSIT BUS RAPID TRANSIT (BRT) ENHANCEMENTS: DEVELOP BRT ENHANCEMENT PLAN (E.G. PROMOTIONAL STRATEGIES, BRAND AWARENESS & RIDERSHIP SCENARIOS, ETC.) (FY 06 5307 UZA: TEM/MURR) (TE)

2011 $400

RIVERSIDE RIV061138 TRANSIT FACILITIES IMPROVEMENTS AT EXISTING RTA RIVERSIDE & HEMET FACILITIES (E.G. CONCRETE REPLACEMENT, FLOOR RECOATING, FACILITY PAINTING, ROOF REPAIRS, ETC.) (FY 08 5307) (UZA: RIV-SAN)

2012 $138

RIVERSIDE RIV050524 TRANSIT FOR RIV SS – CONSTRUCT EXPANDED SERVICE BAY FOR VEHICLE MAINTENANCE AT EXISTING RIVERSIDE MAINT. FACILITY OPS AREA SUPPORTING EXISTING VEHICLE FLEET (FY 07 5307) (UZA: RIV-SAN)

2010 $1,000

RIVERSIDE RIV080926 TRANSIT FOR RIVERSIDE SPECIAL SERVICES – CONSTRUCT FLEET BAY FOR PARARANSIT VEHICLES, PER APPROVED 2008/2009 SRTP, TABLE 4 – CAPITAL PROJECT NO. FY 09-3 (FY 09 5307) (UZA: RIV-SAN)

2010 $1,030

RIVERSIDE 30M0701-RIV071263

TRANSIT IN COACHELLA VALLEY – FRED WARING CORRIDOR EXPRESS SERVICE DEMONSTRATION PROJECT: PROVIDE LIMITED EXPRESS SERVICE FROM THE INDIO TRANSFER LOCATION TO THE TRANSFER LOCATION ON TOWN CENTER WAY WITH SERVICE TO COLLEGE OF THE DESERT AND LIMITED STOPS ALONG THE CORRIDOR.

2011 $350

RIVERSIDE 3ITS0701-RIV090622

TRANSIT IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES ON BUS STOP IMPROVEMENT PROJECTS (FY 10 5307) (UZA: INDCCPS).

2012 $650

Page 236: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

234 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV080921 TRANSIT IN COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR PLANNING RELATED ACTIVITIES ON BUS STOP IMPROVEMENT PROJECTS. ITS EQUIPMENT TO BE PURCHASED INCLUDES: AUTOMATED VEHICLE LOCATORS (AVL), GEOGRAPHIC POSITIONING SYSTEM (GPS), AND MOBILE DATA TERMINALS (MDT) (FY 09 – ARRA 5307).

2010 $1,417

RIVERSIDE RIV041029 TRANSIT IN RIVERSIDE – CONSTRUCT NEW RIVERSIDE TRANSIT CENTER AT 4141 VINE ST., IN THE VICINITY OF DOWNTOWN METROLINK STATION (5309C FY 03+04+06+08, E-2006-BUSP-156 & E-2008-BUSP-0688 EARMARKS) (FY 09 5309) (UZA: RIV-SAN) (TE)

2012 $7,510

RIVERSIDE HSRT0702 TRANSIT IN RIVERSIDE COUNTY – GROUPED PROJECTS FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES (FTA 5310 – FFY’S 10 AND 11) (.27K TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FTA 5310 IN CONS).

2014 $2

RIVERSIDE RIV050553 TRANSIT IN TEMECULA – CONSTRUCT NEW TEMECULA TRANSIT CENTER AT 27199 JEFFERSON AVE. (SW OF JEFFERSON AVE & SE OF CHERRY ST) (04, 05, 06, 07, E-2006-091, E-2007-0131, & 2008-BUSP-0131, SAFETEA-LU).

2013 $8,000

Page 237: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 235

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3ITS0701-RIV110811

TRANSIT IN THE COACHELLA VALLEY FOR SUNLINE TRANSIT AGENCY – IMPLEMENT INTELLIGENT TRANSPORTATION SYSTEM (ITS) PROJECT: PURCHASE VARIOUS ITS EQUIPMENT, SOFTWARE AND HARDWARE FOR EXISTING AND EXPANSION SERVICE, AS WELL AS FOR SERVICE PLANNING AND DEVELOPMENT FOR NEW AND EXISTING ROUTES, IN ADDITION TO SCHEDULE ADHERENCE (FY 12 – 5307) (UZA: INCCPS).

2011 $500

RIVERSIDE RIV051007 TRANSIT IN WESTERN RIVERSIDE COUNTY FOR RTA – NEAR MORENO VALLEY – REGIONAL TRANSIT CENTER FOR MASS TRANSIT SERVICE IN WESTERN RIVERSIDE COUNTY SOUTH OF SR60 ALONG THE I-215 CORRIDOR(PA&ED ONLY).

2018 $6,000

RIVERSIDE RIV061142 TRANSIT IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE DIRECT TV & WIFI ON COMMUTER LINK FOR ENHANCED COMMUTER TRAVEL (FY 08 5307) (UZA: RIV-SAN)

2012 $290

RIVERSIDE RIV061136 TRANSIT IN WESTERN RIVERSIDE COUNTY FOR RTA: PURCHASE IT OFFICE EQUIPMENT (E.G. PC & NOTEBOOK COMPUTERS AND REPLACE NETWORK EQUIPMENT & COPIERS, ETC.) (FY 08 5307) (UZA: RIV-SAN)

2012 $186

RIVERSIDE RIV080928 TRANSIT IN WESTERN RIVERSIDE COUNTY FOR RTA: UPGRADE AND REPLACE ORACLE SERVERS AND IMPLEMENT A DATA CENTER SERVER VIRTUALIZATION SYSTEM IN RIVERSIDE CONNECTED WITH A LIVE REPLICATED DISASTER RECOVERY SITE IN HEMET (FY 09 5307).

2012 $379

RIVERSIDE RIV080919 TRANSIT JOINT PARTNERSHIP W/CALSTAR/WESTSTART FOR FUEL CELL BUS RESEARCH & DEMONSTRATION PROJECT TO DEVELOP AND OPERATE A ZERO EMISSION BUS (E-2008-BUSP-0102).

2010 $271

RIVERSIDE RIV011242 TRANSIT PURCHASE EXPANSION ROLLING STOCK (2 CAB CARS AND 3 LOCOMOTIVES) FOR METROLINK IEOC AND RIVERSIDE/FULLERTON/LA LINES (EA: RIVFUL, PPNO: 0079E)

2012 $19,693

Page 238: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

236 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV061137 TRANSIT PURCHASE NEW SHOP EQUIPMENT: (E.G. CUT-OFF SAW, BRAKE DRUM DOLLY, TRANSMISSION JACK, IMPACT WRENCHES, LAP TOP COMPUTERS & SOFTWARE, ETC.) (FY 08 5307) (UZA: RIV-SAN)

2012 $26

RIVERSIDE RIV061113 TRANSIT PURCHASE REPLACE. SHOP EQUIP. (E.G. PARALLELOGRAM & SEFEC LIFTS, STAR BRAKE LATHE, PRESSURE WASHER, BUS WASH BRUSH, TIRE/VACUUM MACHINES, SWEEPERS, ETC.) (FY 07 5307)(UZA: RIV-SAN)

2012 $155

RIVERSIDE RIV061153 TRANSIT PURCHASE REPLACEMENT MAINTENANCE TOOLS, EQUIPMENT, & PARTS (E.G. MULTI-METERS, TORQUE WRENCHES, IMPACT SOCKETS, SERVICE JACKS, AIR & HAND TOOLS, ETC.) (FY 07 5307) (UZA: INCCPS)

2010 $200

RIVERSIDE RIV061157 TRANSIT PURCHASE TRANSIT ENHANCE. BUS STOP AMENITIES (E.G. BENCHES, TRASH CONTAINERS, KIOSK LEXANS & SCHEDULES, SHELTERS, SUPPLIES, ETC.) FOR VARIOUS STOPS (FY 08 5307) (UZA: INDCCPS) (TE)

2011 $799

RIVERSIDE RIV061143 TRANSIT RCTC’S SHARE OF OCTA’S FY 07 REHAB AND RENOVATION (FY 07 5307) (UZA: RIV-SAN)

2013 $75

RIVERSIDE RIV050530 TRANSIT SCRAA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC’S FY 07 5307 PORTION TO SCRA PROJECT) (FY 07 5307) (UZA: RIV-SAN) (PARENT: LA963505)

2013 $406

RIVERSIDE RIV061145 TRANSIT SCRRA REHABILITATION AND RENOVATION OF TRACK AND ROLLING STOCK SIGNAL STRUCTURE (RCTC’S FY 08 PORTION) TO SCRRA PROJECT) (FY 08 5307) (UZA: RIV-SAN)

2012 $509

RIVERSIDE 3TL807 TRANSIT ATIS MAINTENANCE N/A N/A SYSTEM MAINTENANCE 2027 $4,000

RIVERSIDE 3TL504 TRANSIT BUS PURCHASES COACHELLA VALLEY

PURCHASE 15 ADDITIONAL EXPANSION BUSES, ROUTES TBD. THEY WILL INCLUDE 60FT, 45FT, 40FT, 32FT, AND 30FT BUSES.

2012 $6,026

RIVERSIDE 3TL507 TRANSIT BUS PURCHASES COACHELLA VALLEY

PURCHASE ADDITIONAL REPLACEMENT BUSES FOR FIXED ROUTE AND PARATRANSIT SERVICES. THE ADDITIONAL VEHICLES WILL CONSIST OF 60FT, 45FT, 40FT, 32 FT, AND 30FT BUSES.

2020 $11,518

Page 239: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 237

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3TR04C TRANSIT BUS RAPID TRANSIT COACHELLA VALLEY

IMPLEMENT BUS RAPID SERVICE/BRT ON HIGHWAY 111 BASED ON RECOMMENDATIONS IN THE COMPREHENSIVE OPERATIONAL ANALYSIS CON-DUCTED IN 2005/06. PROJECT WILL ENTAIL COM-PLETING FEASIBILITY STUDY AND WORKING WITH THE LOCAL JURISDICTION ON VARIOUS ACTIVITIES PRIOR TO IMPLEMENTING PROJECT.

2018 $11,743

RIVERSIDE 3TR04A, 3TR04B

TRANSIT BUS RAPID TRANSIT MAGNOLIA CORRIDOR

PHASE 1 (CITY OF RIVERSIDE)

MORENO VALLEY CORRIDOR PHASE 2 (CITY OF MORENO

VALLEY)

BUS RAPID TRANSIT (BRT): 65 INTERSECTIONS RETROFITTED FOR SIGNAL PRIORITY FOR TRANSIT AND AUTOMATED TRAVEL INFORMATION AT 15 BUS STOPS

2018 $1,364

RIVERSIDE 3ITS09 TRANSIT COUNTYWIDE FULLY INTEGRATED TRANSIT OPS, MANAGEMENT, AND TRAVELER INFORMATION SYSTEM/BRT/BUS SIGNAL PRIORITY

2035 $94,427

RIVERSIDE 3TL104 TRANSIT ELDERLY &AMP;AMP; DISABLED

ASSISTANCE

COACHELLA VALLEY

IMPROVE PARATRANSIT SERVICES FOR THE ELDERLY &AMP;AMP; PERSONS WITH DISABILITIES

2015 $19,500

RIVERSIDE 3TL1507 TRANSIT ENHANCED COMMUTER LINK –

EAST CORRIDOR

WESTERN RIVERSIDE COUNTY

SAN DIEGO, ORANGE, AND LOS

ANGELES COUNTIES

PROPOSED COMMUTER LINK SERVICE AT THE EASTERN SIDE OF I-215 CORRIDOR TO SAN DIEGO AND NEIGHBORING COUNTIES OF ORANGE AND LOS ANGELES THROUGH METROLINK SERVICE CONNEC-TIONS. THE RESIDENTS OF CALIMESA, BEAUMONT, BANNING , HEMET/SAN JACINTO WILL BE ABLE TO GO TO NEIGHBORING NORTHERN AND EASTERN COUN-TIES WITH THE COMFORT AND CONVENIENCE OF AN EXPRESS BUS SERVICE.

2012 $16,901

RIVERSIDE 3TL1607 TRANSIT ENHANCED COMMUTER LINK – WEST CORRIDOR

WESTERN RIVERSIDE COUNTY

SAN DIEGO, ORANGE, AND LOS

ANGELES COUNTIES

PROPOSED COMMUTER LINK SERVICE AT THE WESTERN SIDE OF I-15 CORRIDOR TO SAN DIEGO AND NEIGHBORING COUNTIES OF ORANGE AND LOS ANGELES THROUGH METROLINK CONNECTIONS. A PROPOSED EXPANSION AN IMPROVEMENT OF THE EXISTING COMMUTER SERVICE FROM MURRIETA/TEMECULA INCLUDING THE CITIES OF PERRIS, MORENO VALLEY, NORCO, AND CORONA.

2012 $7,717

Page 240: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

238 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3TL907 TRANSIT EXPRESS/COMMUTER BUS SERVICE

COACHELLA VALLEY

RIVERSIDE IMPLEMENT EXPRESS BUS SERVICE TO CONNECT COMMUTERS TO METROLINK SERVICE IN RIVERSIDE, AS WELL AS EXPRESS BUS SERVICE ALONG I-10. SUNLINE WILL PURCHASE DIFFERENT SIZE BUSES, INCLUDING 45FT &AMP;#40;MCI BUSES&AMP;#41; FOR COMMUTER SERVICE.

2018 $3,149

RIVERSIDE 3TL707 TRANSIT GFI FAREBOXES, SMARTCARDS,

&AMP; SECURITY SYSTEMS

COACHELLA VALLEY

INSTALL SECURITY SYSTEMS IN SUNLINE BUSES AND ACQUIRE NEW FAREBOXES WITH SMARTCARD TECHNOLOGY AND CAPABILITIES.

2013 $2,429

RIVERSIDE 3CR104 TRANSIT METROLINK COMMUTER RAIL

COUNTYWIDE METROLINK IMPROVEMENTS&#40;TRACK AND ROLL-ING STOCK&#41;

2030 $206,184

RIVERSIDE 3TL1707 TRANSIT METROLINK COMMUTER RAIL

IEOC AND 91 LINES METROLINK CONSTRUCT NEW STATION AT 3360 VAN BUREN BLVD IN RIVERSIDE &AMP;#40;PARKING 550 SPACES&AMP;#41;

2035 $24,746

RIVERSIDE 3TL1207 TRANSIT MISCELLANEOUS MAINTENANCE

EQUIPMENT

COACHELLA VALLEY

PURCHASE VARIOUS MAINTENANCE EQUIPMENT FOR THE MAINTENANCE DEPARTMENT.

2020 $200

RIVERSIDE 3TC0703 TRANSIT PARK &AMP;AMP; RIDE LOTS

COACHELLA VALLEY

ACQUIRE PROPERTY AND CONSTRUCT 3 PARK AND RIDE LOTS

2014 $13,496

RIVERSIDE 3CR0702 TRANSIT PERRIS VALLEY LINE CITY OF PERRIS CITY OF SAN JACINTO

METROLINK PERRIS VALLEY LINE COMMUTER RAIL EXTENSION FROM PERRIS TO SAN JACINTO &#40;~16.5 MILES&#41;, STATIONS AT WINCHESTER RD &#40;SR-79 @ ASBURY ST&#41;, HEMET AIRPORT &#40;SANDERSON AVE @ STETSON RD&#41;, SAN JACINTO &#40;STATE ST @ 7TH ST&#41;

2035 $201,716

RIVERSIDE 3CR0703 TRANSIT PERRIS VALLEY LINE CITY OF PERRIS CITY OF TEMECULA METROLINK PERRIS VALLEY LINE COMMUTER RAIL EXTENSION FROM PERRIS TO TEMECULA &#40;~16.5 MILES&#41;, STATIONS AT NEWPORT RD &#40;@ I-215&#41;, CLINTON KEITH RD &#40;@ I-215&#41;, AND WINCHESTER RD &#40;SR-79 @ I-215&#41;

2035 $450,258

RIVERSIDE 3TL1007 TRANSIT PREVENTIVE MAINTENANCE

COACHELLA VALLEY

PURCHASE VEHICLE PARTS AND PAY FOR LABOR COST ASSOCIATED WITH ONGOING MAINTENANCE OF REVENUE VEHICLES

2020 $1,500

Page 241: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 239

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3TL1107 TRANSIT PREVENTIVE MAINTENANCE

COACHELLA VALLEY

PURCHASE VEHICLE PARTS AND PAY FOR LABOR COST ASSOCIATED WITH ONGOING MAINTENANCE OF REVENUE VEHICLES

2020 $1,000

RIVERSIDE 3TL607 TRANSIT PURCHASE AMENITIES

COACHELLA VALLEY

PURCHASE MORE AMENITIES FOR INSTALLATION AT BUS STOPS THROUGHOUT THE SERVICE AREA BASED ON RECOMMENDATIONS FROM THE COA.

2020 $5,068

RIVERSIDE 3CR0701 TRANSIT RIVERSIDE LINE, 91 LINE, &AMP; IEOC

LINE

THROUGHOUT RIVERSIDE,

ORANGE COUNTY, &AMP; LOS

ANGELES COUNTY

METROLINK COMMUTER RAIL EXISTING LINES SERVICES EXPANSION – RIVERSIDE, 91, AND IEOC LINES

2035 $690,021

RIVERSIDE 3TL1307 TRANSIT SUPPORT VEHICLES COACHELLA VALLEY

PURCHASE VEHICLES THAT WILL BE USED AS RELIEF VEHICLES FOR SUNLINE DRIVERS AT THE BEGINNING OR ENDING OF THEIR SHIFTS IN MID-ROUTE.

2013 $150

RIVERSIDE 3TL0407 TRANSIT TRANSFER LOCATION IMPROVEMENT

COACHELLA VALLEY

FACILITY IMPROVEMENT TO ACCOMMODATE ADDITIONAL SERVICE ROUTES BASED ON RECOM-MENDATION FROM COMPREHENSIVE OPERATIONAL ANALYSIS

2025 $6,178

RIVERSIDE 3TC04TR1 TRANSIT TRANSIT CENTER BANNING/ BEAUMONT/

CALIMESA AREA

TRANSIT CENTER 2020 $5,084

RIVERSIDE 3TC04TR3 TRANSIT TRANSIT CENTER COACHELLA VALLEY

CONSTRUCT 4 TRANSIT CENTERS IN THE COACHELLA VALLEY, LOCATIONS TBD

2013 $11,166

RIVERSIDE 3TC04TR10 TRANSIT TRANSIT CENTER LAKE ELSINORE TRANSIT CENTER 2025 $5,753

RIVERSIDE 3TC04TR6 TRANSIT TRANSIT CENTER MENIFEE &#40;SOUTH-

WESTERN RIVERSIDE

COUNTY&#41;

TRANSIT CENTER 2027 $5,926

RIVERSIDE 3TC04TR8 TRANSIT TRANSIT CENTER NORTHWEST RIVERSIDE COUNTY

ZONE – EAST VALE/ NORCO

TRANSIT CENTER 2035 $6,998

Page 242: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

240 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3TC0702 TRANSIT TRANSIT CENTER ENHANCEMENTS

RIVERSIDE, CORONA,

TEMECULA, HEMET,MORENO

VALLEY, BANNING / BEUMONT,

TRANSIT CENTER ENHANCEMENT – LANDSCAPING, STREET SCRAPING, BUS SHELTERS

2035 $14,705

RIVERSIDE 3TL307 TRANSIT TRANSIT CENTER MAINTENANCE

N/A N/A MAINTENANCE OF NINE TRANSIT CENTERS 2030 $20,000

RIVERSIDE 3C01MA03 STATE HIGHWAY

CETAP – RIVERSIDE COUNTY TO ORANGE

COUNTY

WESTERN RIVERSIDE COUNTY

ORANGE COUNTY CETAP – RIVERSIDE COUNTY TO ORANGE COUNTY: – CONSTRUCT NEW INTERCOUNTY TRANSPORTATION CORRIDOR A – 2 TOLL EACH DIR ON NEW FACILITY PARALLEL TO SR-91, FROM SR-241 TO I-15, WITH IC AT SR-241, SR-71, I-15; – PRELIMINARY ENGINEERING AND ENVIRONMENTAL IMPACT REPORT/STATEMENT ONLY ON CORRIDOR B – 2 TOLL EACH DIR ON NEW FACILITY FROM I-15/MID-COUNTY PKWY TO SR-241/SR-133

2035 $11,496,032

RIVERSIDE 3C01MA01 STATE HIGHWAY

CETAP EAST-WEST CORRIDOR

I-15 I-215 CETAP: PROVIDE NEW EAST-WEST TRANSPORTATION CORRIDOR BETWEEN I-15 IN THE WEST, I-215 IN THE EAST, SOUTH OF LAKE MATHEWS IN THE NORTH, AND SR 74 IN THE SOUTH.

2035 $2,367,661

RIVERSIDE 3ITS0717 STATE HIGHWAY

FREEWAY SERVICE PATROL

FREEWAY SERVICE PATROL FROM ORANGE COUNTY LINE TO RIVERSIDE COUNTY.

2016 $21,702

RIVERSIDE 3ITS07 STATE HIGHWAY

ITS COUNTYWIDE ITS CALTRANS D8 LUMP SUM 2035 $91,864

RIVERSIDE 3M0722 STATE HIGHWAY

NEW INTERCHANGE LANDAU AND I-10

VISTA CHINO VARNER ROAD CONSTRUCT NEW 6-LANE MIXED FLOW, PARTIAL CLOVERLEAF IC WITH AUXILIARY LANES AND 4 TWO LANE RAMPS PLUS 6 LANE GRADE SEPARATION BRIDGE OVER UPRR BETWEEN PALM DR IC AND DATE PALM DR IC

2035 $111,664

RIVERSIDE 30M0701-RIV110302

STATE HIGHWAY

10 ON I-10 IN THE CITY OF BLYTHE – PROVIDE NEW W/B ON AND W/B OFF RAMPS TO HOBSON WAY APPROX 1,800’ W/O EXISTING RAMPS TO RIVIERA DR/INSPECTION STATION. THE NEW RAMPS WILL REPLACE EXISTING CONNECTION TO RIVIERA DR.

2015 $3,635

Page 243: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 241

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 45600 STATE HIGHWAY

10 BOB HOPE DR ON I-10 NEAR RANCHO MIRAGE FROM 3.3 KM WEST TO 2.0 KM EAST OF RAMON RD IC – CONSTRUCT BOB HOPE DR EXTENSION (6 LANES) W/ A NEW DIAMOND IC & MODIFY RAMON RD IC & RAMPS (PPNO: 0007D, EA: 45600)

2012 $52,269

RIVERSIDE RIV060116 STATE HIGHWAY

10 CHERRY VALLEY BLVD

I-10/CHERRY VALLEY BLVD IC: RECON/WIDEN 2 TO 5 & 6 THRU LNS (3 NB+2&3 SB) FROM E/O CALIMESA BLVD TO APPROX W/O ROBERTS RD, RECON/WIDEN RAMPS – EB ENTRY 1 TO 2 LNS W/ HOV LN, RECONFIGURE/WIDEN AS HOOK RAMPS WB ENTRY 1 TO 3 LNS W/ HOV LN & WB EXIT 1 TO 2 LNS, WIDEN EB EXIT RAMP 1 TO 2 LNS, RELOCATE/WIDEN CALIMESA/CHERRY VALLEY BLVD 2 TO 4 LNS, & INCLUDE EXTENDED RAMP ACCEL/DECEL LNS (EA: 0G170)

2018 $51,500

RIVERSIDE 3M0720 STATE HIGHWAY

10 DA VALL DR ON I-10 AT APPROX PM 41.17: CONSTRUCT NEW DA VALL DR IC (6 LNS) & RAMPS (2 LNS) FROM VARNER RD TO RAMON RD INCLUDING BRIDGE OVER UPRR AND LONG CYN CREEK CHANNEL, ADD EB/WB AUX LANES ( DATE PALM DR IC TO DA VALL & DA VALL TO RAMON RD)

2023 $132,986

RIVERSIDE 45590 STATE HIGHWAY

10 DATE PALM DR ON I-10 IN CATHEDRAL CITY AT DATE PALM DR IC: MODIFY IC/WIDEN OC & ARTERIAL INCLUDING UPRR BRIDGE 2 TO 6 LNS FROM N. RAMPS SOUTH TO VISTA CHINO & RAMPS FROM 1 TO 2 LNS (EA: 45590K) ($955 TOLL CREDIT FOR STPL MATCH IN CONS)

2012 $31,476

RIVERSIDE 45580 STATE HIGHWAY

10 GENE AUTRY TR NEAR PALM SPRINGS ON I-10 AT GENE AUTRY TR/PALM DR IC FROM I-10 IC SOUTH TO SALVIA ROAD – WIDEN 2 TO 6 THROUGH LANES, I-10 IC IMPROVEMENTS, WIDEN/MODIFY RAMPS FROM 1 TO 2 LNS (SAFETEA LU CA451 #1369) (EA: 45580)

2012 $35,393

RIVERSIDE 3A07021 STATE HIGHWAY

10 GOLF CENTER PKWY ON I-10 IN INDIO AT GOLF CENTER PKWY IC: RECONSTRUCT/WIDEN IC FROM 4 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL BETWEEN AVE 44 TO S/O WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, AND EXTEND RAMPS WITH ACCELERATION/DECELERATION LANES

2020 $27,000

Page 244: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

242 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3TK04MA12 STATE HIGHWAY

10 I-10 ON I-10 NEAR BEAUMONT: ADD/CONSTRUCT NEW EASTBOUND TRUCK CLIMBING LANE FROM SAN BERNARDINO COUNTY LINE TO I-10/SR60 JCT (EA: 35300)

2020 $26,000

RIVERSIDE 3M01CV01 STATE HIGHWAY

10 I-10 AT AVE 50 I-10 CONSTRUCT NEW 4 LANE IC AND RAMPS 2014 $23,371

RIVERSIDE 3M04SH05 STATE HIGHWAY

10 I-10 CALIMESA @ COUNTY LINE RD &AMP;#40;R4.0

&AMP;#41;

500 METERS E/O SANDLWOOD DR

I/C &AMP;#40;R4.3 &AMP;#41;

REPLACE BRIDGE, RAMPS, CONSTRUCT AUXILIARY LANES, AND REALIGN CALIMESA RD &AMP;#40;EA 0A710K&AMP;#41;

2020 $73,396

RIVERSIDE 3M01SH06 STATE HIGHWAY

10 I-10 MONTEREY AVE &#40;44.5&#41;

DILLON RD &#40;58.9 &#41;

ADD 1 MF LANE EACH DIRECTION &#40;EA 0A030K&#41;

2030 $127,317

RIVERSIDE 3M04WT003 STATE HIGHWAY

10 I-10 &#40;PM 0.0 TO 2.8&#41;

AT CALIMESA BLVD/

SANDALWOOD DR

BTWN 7TH ST &AMP;

SANDALWOOD DR

RECONSTRUCT IC AND RECONSTRUCT/WIDEN RAMPS 2020 $31,740

RIVERSIDE 3A04WT007 STATE HIGHWAY

10 I-10 &#40;PM 11.1 TO 11.6&#41;

AT SUNSET AVE BTWN RAMPS RECONSTRUCT/WIDEN IC RAMPS, ADD TURN LANES TO EB RAMPS, AND ADD WB AUX LANE ON I-10 FROM 22ND ST TO SUNSET AVE

2023 $27,659

RIVERSIDE 3M0715 STATE HIGHWAY

10 I-10 &#40;PM 58.39 TO 59.39&#41;

AT DILLON RD BTWN VISTA DEL NORTE AND VISTA

DEL SUR

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2020 $22,022

RIVERSIDE 3M04WT001 STATE HIGHWAY

10 I-10 &#40;PM 7.07 TO 8.07&#41;

AT SR-79/ BEAUMONT AVE

BTWN 6TH ST AND 1ST ST

RECONSTRUCT/WIDEN SR-79/BEAUMONT AVE IC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2020 $20,665

RIVERSIDE 3M04WT004 STATE HIGHWAY

10 I-10 &#40;PM 7.71 TO 8.71&#41;

AT PENNSYLVANIA AVE

BTWN 6TH ST AND 3RD ST

RECONSTRUCT PENNSYLVANIA AVE IC AND RECON-STRUCT/WIDEN RAMPS

2020 $20,665

RIVERSIDE 3A04WT003 STATE HIGHWAY

10 I-10 &#40;PM 8.81 TO 9.81&#41;

AT HIGHLAND SPRINGS AVE

BTWN 5TH ST AND SOUTH RAMPS

RECONSTRUCT/WIDEN HIGHLAND SPRINGS AVE IC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2030 $37,394

RIVERSIDE 3M0705 STATE HIGHWAY

10 I-10 &#40;PM SBD 38.66 TO RIV

0.52&#41;

AT COUNTY LINE RD

BTWN 7TH ST &AMP; I-10 EAST

RAMPS

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2020 $20,665

RIVERSIDE 3M04WT002 STATE HIGHWAY

10 I-10 &#40;PM12.35 TO 13.35&#41;

AT 8TH ST BTWN RAMSEY ST AND LINCOLN ST

RECONSTRUCT/WIDEN 8TH ST IC UC 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2023 $8,879

Page 245: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 243

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3M04MA05 STATE HIGHWAY

10 I-10/SR-60 JCT/SPLIT SR60/I-10 JCT/SPLIT

CONSTRUCT NEW INTERCHANGE 2030 $184,464

RIVERSIDE RIV62036 STATE HIGHWAY

10 INDIAN CANYON DR I-10/INDIAN CYN DR IC – WIDEN 2 TO 6 LNS BTWN GARNET AVE & 20TH AVE, RELOCATE EB EXIT RAMP (1-3 LNS) AS HOOK RAMP TO GARNET, ADD EB ENTRY HOOK RAMP (1 LN), RELOCATE WB EXIT RAMP (2-3 LNS) AS HOOK RAMP TO 20TH AVE, ADD ADJOINING WB ENTRY HOOK RAMP (2 LNS) & LOOP RAMP (2 LNS), RECON EXISTING EB & WB ENTRY RAMPS (1 LN), WIDEN GARNET 2 TO 4 LNS, WIDEN 20TH AVE 2 TO 3 LNS (2 WB & 1 EB) (EA: 45570)

2014 $35,099

RIVERSIDE 3A07020 STATE HIGHWAY

10 JACKSON ST ON I-10 IN INDIO AT JACKSON ST IC (AT PM 55.575): RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL FROM SHOWCASE PKWY TO SOUTH OF WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, MODIFY TRAFFIC SIGNALS

2020 $56,000

RIVERSIDE 0 STATE HIGHWAY

10 JEFFERSON ST AT I-10/JEFFERSON ST IC: RECONSTRUCT, REALIGN, & WIDEN IC 2 TO 6 LANES (SOUTHERLY OF VARNER RD TO UPRR), WIDEN RAMPS, ADD NEW ENTRY RAMPS, INCLUDING RAMP METERING (NO HOV PREFERENTIAL LANE INCLUDED), ADD ACCEL/DECEL LANES AT WB ENTRY AND EB EXIT (<1/4 MILE), AND ADD DEDICATED RIGHT-TURN LANES. (EA: 47520)

2018 $81,117

RIVERSIDE RIV030901 STATE HIGHWAY

10 MCNAUGHTON PKWY ON I-10 IN EASTERN COACHELLA (AT 5.5 KM E/O DILLON RD & 14.6 KM W/O CACTUS CITY SRRA): CONSTRUCT NEW 6 THROUGH LANE MCNAUGHTON PKWY IC (3 LANES EACH DIR. APPROX 1/2 MILE N/O AND S/O I-10), EB EXIT RAMP (3 LANES), WB EXIT RAMP (2 LANES), EB & WB ENTRY RAMPS (1 LANE), EB & WB LOOP ENTRY RAMPS (1 LANE) WITH EXTENDED RAMP ACCELERATION/DECELERATION LANES (EA: 45210)

2018 $45,164

Page 246: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

244 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07022 STATE HIGHWAY

10 MONROE ST ON I-10 IN INDIO AT MONROE ST IC: RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES INCLUDING BRIDGE OVER WHITEWATER RIVER CHANNEL FROM AVE 42 TO S/O WHITEWATER RIVER CHANNEL, RECONSTRUCT/WIDEN RAMPS 1 TO 2 LANES, AND EXTEND RAMPS WITH ACCELERATION/DECELERATION LANES (EA: 0K730K)

2020 $47,000

RIVERSIDE RIV031208 STATE HIGHWAY

10 MONTEREY AVE AT I-10/MONTEREY AVE IC – RECONFIGURE IC: CONSTRUCT NEW WB ENTRY RAMP AND REALIGN/RELOCATE WB EXIT RAMP (EA: 0F050)

2014 $12,699

RIVERSIDE RIV060115 STATE HIGHWAY

10 OAK VALLEY PKWY/SAN TIMOTEO CYN

RD

AT I-10/OAK VALLEY PKWY IC: RECONSTRUCT/WIDEN IC FROM 2 TO 6 THROUGH LANES FROM APPROX 500’ W/O DESERT LAWN DR TO GOLF CLUB DR, WIDEN RAMPS – EB ENTRY 1 TO 2 LANES, EB & WB EXIT 1 TO 4 LANES, WB ENTRY 1 TO 3 LANES, , ADD NEW EB/WB ENTRY LOOP RAMPS (2 LANES) , ENTRY RAMPS INCLUDE HOV PREFERENTIAL LANE, AND RAMPS INCLUDE EXTENDED ACCELERATION/DECELERATION LANE (EA: 0G280)

2018 $25,425

RIVERSIDE RIV031209 STATE HIGHWAY

10 PORTOLA AVE AT I-10/PORTOLA AVE (B/W MONTEREY IC & COOK IC): CONSTRUCT NEW 6 THRU LANE PORTOLA AVE IC FROM DINAH SHORE DR TO VARNER RD & RAMPS (EB & WB EXIT 3 LNS, EB & WB ENTRY 2 LNS, EB ENTRY LOOP RAMP 2 LNS, ENTRY INCL HOV LN, WIDENING INCLUDES BRIDGE OVER UPRR & RELOCATE/WIDEN VARNER 2 TO 4 LNS, ADD EB/WB AUX LNS (MONTEREY TO PORTOLA AND PORTOLA TO COOK), EXTEND 4TH WB LANE COOK TO PORTOLA (EA: 0F120K)

2018 $71,993

RIVERSIDE RIV060117 STATE HIGHWAY

10 SINGLETON RD ON I-10/SINGLETON RD IC: RECONSTRUCT/WIDEN 2 TO 4 THROUGH LANES (WOODHOUSE TO CALIMESA BLVD), RECONSTRUCT/WIDEN RAMPS – EB ENTRY 1 TO 2 LNS W/ HOV PREFERENTIAL LN, WB EXIT 1 TO 3 LNS, ADD EB EXIT RAMP (3 LNS), WB ENTRY RAMP (2 LNS W/ HOV PREFERENTIAL LN), INCLUDE EXTENDED RAMP ACCEL/DECEL LNS, RELOCATE CALIMESA BLVD/SINGLETON RD INTERSECTION, ADD SB EXTENDED DEDICATED RIGHT-TURN LN (EA: 0F980)

2018 $38,400

Page 247: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 245

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV060124 STATE HIGHWAY

10 SUNSET AVE IN BANNING ON SUNSET AVE AT I-10 FROM S/O RAMSEY ST TO S/O LINCOLN ST: LOWER SUNSET AVE TO CONSTRUCT NEW 4-LANE UC AT UPRR CROSSING (NON-CAPACITY) AND RECONSTRUCT THE I-10 IC RAMPS TO MEET THE NEW STREET GRADE (SAFETEA CA438, #1261+ HR4818+HR3058) (EA:33471)

2015 $26,200

RIVERSIDE 3A10WT07 STATE HIGHWAY

15 IN SW RIVERSIDE COUNTY – I-15/LOS ALAMOS RD. BRIDGE REPLACEMENT & WIDENING: REPLACEMENT OF EXISTING TWO LANE OVERCROSSING AT LOS ALAMOS RD. AND INTERSTATE 15 WITH A FOUR LANE OVERCROSSING (GAP CLOSURE), BRINGING THE BRIDGE VERTICAL CLEARANCE TO CALTRANS STANDARDS.

2012 $11,440

RIVERSIDE 3M10WT02 STATE HIGHWAY

15 IN WESTERN RIVERSIDE COUNTY – I-15 AT INDIAN TRUCK TRAIL IC: WIDEN INDIAN TRUCK TRAIL FROM 2 TO 4 LANES, INCLUDING DEDICATED LEFT-TURN LANES TO NB AND SB ON RAMP; WIDENING OF THE SB EXIT RAMP FROM 1 TO 3 LANES; AND WIDENING OF THE NB EXIT RAMP AND ENTRY RAMP FROM 1 TO 3 LANES PLUS INTERSECTION IMPROVEMENTS AT TEMESCAL CYN RD.

2012 $8,900

RIVERSIDE RIV010208 STATE HIGHWAY

15 CAJALCO RD AT I-15/CAJALCO RD IC NEAR CORONA: DESIGN, RECONST/REALIGN & WIDEN CAJALCO RD FROM 2 TO 6 THRU LNS FROM TEMESCAL CYN RD TO BEDFORD CYN RD, RECONST/WIDEN SB ENTRY FROM 1-2 LNS, SB EXIT FROM 2-5 LNS, NB ENTRY FROM 1-2 LNS, NB EXIT FROM 2-4 LNS, ADD AUX LNS BTWN NB ENTRY AND NB EXIT TO EL CERRITO RD AND BTWN SB ENTRY FROM EL CERRITO RD AND SB EXIT. ($840/$600 TOLL CREDITS IN ENG/ROW TO MATCH DEMO)

2018 $58,199

RIVERSIDE RIV010204 STATE HIGHWAY

15 CALIFORNIA OAKS RD/KALMIA ST IC

AT I-15/CALIFORNIA OAKS RD/KALMIA ST IC – RECONFIGURE RAMPS (CONSTRUCT NB/SB LOOP ON RAMPS, RELOCATE SB/NB OFF RAMP), WIDEN CAL OAKS 4 TO 6 LNS FROM UC TO CAL OAKS PLAZA (EA: 0A490)

2012 $36,208

Page 248: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

246 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV62034 STATE HIGHWAY

15 CLINTON KEITH RD I-15/CLINTON KEITH RD IC: RECONSTRUCT/WIDEN OC 2 TO 6 LNS & RAMPS 1 & 2 LNS TO 3 & 4 LNS, ADD NB/SB AUX LNS PRIOR TO & AFTER EXIT/ENTRY RAMPS & LEFT-TURN LNS (EA: 0F580K)

2014 $25,180

RIVERSIDE RIV050531 STATE HIGHWAY

15 EASTERN BYPASS ON I-15 S/O TEMECULA – CONSTRUCT NEW EASTERN BYPASS/I-15 IC (4 LANES) & RAMPS (1 LANE) AND 4 LANE (2 LNS EACH DIR) EASTERLY CONNECTING ROAD (APPROX 2 MILES)

2023 $30,000

RIVERSIDE 991202 STATE HIGHWAY

15 FRENCH VALLEY PKWY

FRENCH VALLEY PKWY (FVP) – PHASE 1: DESIGN & CONSTRUCT FVP 2 THROUGH LANES ARTERIAL WESTBOUND FROM I-15 TO JEFFERSON AVE, CONSTRUCT FVP SB EXIT RAMP (1 LANE), SB AUX LANE (FROM FVP IC TO WINCHESTER RD IC) & WIDEN WINCHESTER RD IC SB EXIT RAMP (1 TO 3 LNS) (EA: 43270)

2012 $29,273

RIVERSIDE RIV031215 STATE HIGHWAY

15 FRENCH VALLEY PKWY

FRENCH VALLEY PKWY IC/ARTERIAL PHASES: CONSTRUCT 6 LN IC (JEFFERSON TO YNEZ) & RAMPS, NB/SB AUX LN, CD LNS (3 LNS NB&SB) & MODIFY WINCHESTER RD IC (I-215 PM: 8.43-9.75) (EA:43270)

2018 $156,171

RIVERSIDE 3M0730 STATE HIGHWAY

15 I-15 AT I-15/MURRIETA HOT SPRINGS RD IC – CONSTRUCT NEW NB LOOP ON RAMP AND REALIGN EXISTING NB OFF RAMP (EA: 0J650K)

2014 $8,100

RIVERSIDE RIV071267 STATE HIGHWAY

15 I-15 I-15 – SBD CO LINE TO JCT I-15/I-215: CONSTRUCT 4 HOT LNS (2 HOT LNS EA DIR) FROM SBD CO LINE TO HIDDEN VALLEY PKWY AND FROM CAJALCO RD TO SR-74; CONS 2 MF LNS (1 LN EA DIR FROM SBD CO LINE TO SR-74); CONS 2 HOT LNS ( 1 HOT LN EA DIR) FROM HIDDEN VALLEY PKWY TO CAJALCO RD; CONS 2 HOV LNS (1 LN EA DIR) FROM SR74 TO JCT I-15/I-215 (PA&ED ONLY).

2020 $1,706,347

RIVERSIDE 3A04A26 STATE HIGHWAY

15 I-15 AT BELLEGRAVE AVE

BTWN HAMNER AVE &AMP; WINEVILLE

RD

ADD SIGNALS AND RAMPS. 0.1 MI. 2030 $4,407

RIVERSIDE 3M0737 STATE HIGHWAY

15 I-15 AT LAKE ST BTWN WALKER CYN RD TEMESCAL

CYN RD

RECONSTRUCT/WIDEN IC FROM 2 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2023 $20,275

Page 249: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 247

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3M0734 STATE HIGHWAY

15 I-15 AT MALAGA RD BTWN CASINO DR LAKEVIEW TERRACE

AND GRAPE ST

CONSTRUCT NEW 4 LANE OC OVER I-15 2030 $30,686

RIVERSIDE 3A04A17 STATE HIGHWAY

15 I-15 AT RIVERSIDE DR BTWN COLLIER AVE AND DEXTER AVE

CONSTRUCT NEW 4 LANE OC OVER I-15 2023 $30,604

RIVERSIDE 3A04A16 STATE HIGHWAY

15 I-15 AT SECOND ST &#40;CHANEY

AVE&#41;

BTWN COLLIER AVE AND CAMINO DEL

NORTE

CONSTRUCT NEW 4 LANE ARTERIAL CONNECTING OVERCROSS OVER I-15

2035 $42,640

RIVERSIDE 3M0702 STATE HIGHWAY

15 I-15 SR-60 &#40;51.5&#41;

SAN BERNARDINO COUNTY LINE

&#40;52.8&#41;

ALSO SBD-15-0.0/2.39 ROUTE 60 TO I-10 ADD &AMP; EXTEND AUX LANES &#40;EA:0C350&#41; &#40;ALSO SEE 3M01MA06&#41;

2030 $22,779

RIVERSIDE 3M0729 STATE HIGHWAY

15 I-15 &#40;28.36 TO 29.36&#41;

AT HORSETHIEF CANYON RD

JUST BEYOND AND BTWN RAMPS

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT RAMPS

2030 $5,206

RIVERSIDE 3M0727 STATE HIGHWAY

15 I-15 &#40;PM 15.8 TO 16.8&#41;

AT BUNDY CANYON RD

BTWN ORANGE ST AND CHERRY ST

RECONSTRUCT/WIDEN BUNDY CANYON RD IC FROM 2 TO 4 LANES AND RECONSTRUCT RAMPS

2030 $22,635

RIVERSIDE 3M0735 STATE HIGHWAY

15 I-15 &#40;PM 17.01 TO 18.01&#41;

AT OLIVE ST BTWN ORCHARD ST AND GRAPE ST

CONSTRUCT NEW 4 LANE IC AND RAMPS 2018 $39,151

RIVERSIDE 3M0736 STATE HIGHWAY

15 I-15 &#40;PM 23.35 TO 24.35&#41;

AT NICHOLS RD BTWN RAMPS RECONSTRUCT/WIDEN IC FROM 2 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2030 $44,947

RIVERSIDE 3M0728 STATE HIGHWAY

15 I-15 &#40;PM 32.60 TO 33.60&#41;

AT TEMESCAL CANYON

NORTH OF GLENN IVY JUST BEYOND AND BTWN RAMPS

RECONSTRUCT/WIDEN TEMESCAL CANYON IC FROM 2 TO 4 LANES AND RECONSTRUCT RAMPS

2030 $19,989

RIVERSIDE 3M0721 STATE HIGHWAY

15 I-15 &#40;PM 4.48 TO 5.48&#41;

AT I-15/RANCHO CALIFORNIA

BTWN YNEZ RD AND JEFFERSON AVE

RECONFIGURE 4 TO 6 LANE IC AND RAMPS AT I-15 AND RANCHO CALIFORNIA. TYPE OF LANES FOR ARTERIAL WIDENING WILL BE THROUGH LANES.

2035 $33,008

RIVERSIDE 3M04WT007 STATE HIGHWAY

15 I-15 &#40;PM 42.37 TO 43.37&#41;

AT HIDDEN VALLEY PKWY

BTWN HAMNER AVE &AMP; BEYOND NB

EXIT RAMP

RECONSTRUCT INTERCHANGE/RAMPS/CHANNELIZA-TION IMPROVEMENTS

2018 $2,544

RIVERSIDE 3M0733 STATE HIGHWAY

15 I-15 &#40;PM 43.13 TO 44.13&#41;

AT 2ND ST BTWN HAMNER AVE &AMP; VALLEY VIEW

AVE

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND WIDEN RAMPS

2018 $2,859

RIVERSIDE 3M04WT005 STATE HIGHWAY

15 I-15 &#40;PM 45.1 TO 46.1&#41;

AT 6TH ST BTWN HAMNER AVE &AMP; SIERRA AVE

RECONSTRUCT INTERCHANGE/RAMPS/CHANNELIZA-TION IMPROVEMENTS

2018 $12,719

Page 250: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

248 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV011233 STATE HIGHWAY

15 LIMONITE AVE AT I-15/LIMONITE AVE IC – WIDEN IC 4 TO 6 LNS, WIDEN NB AND SB EXIT RAMPS 1 TO 2 LNS, ADD 2 LANE LOOP RAMPS IN THE NB AND SB DIRECTIONS & WIDEN LIMONITE AVE FROM HAMNER TO WINEVILLE 4 TO 6 LNS (APPROX 1 MI) (EA: 0E150K)

2018 $29,211

RIVERSIDE RIV010206 STATE HIGHWAY

15 RAILROAD CYN RD AND FRANKLIN ST

AT I-15/RAILROAD CYN RD IC & I-15/FRANKLIN ST: CONSTRUCT NEW FULL IC AT FRANKLIN ST, RECONSTRUCT/WIDEN FRANKLIN ST OC 2 TO 4 LNS, RECONSTRUCT/WIDEN RR CYN UC 4 TO 6 LNS (SUMMERHILL DR TO CASINO RD), ADD AUX LNS FROM NEW FRANKLIN ST IC TO RR CYN RD, ADD RAMP ACCEL/DECEL LNS AT RR CYN RD AND FRANKLIN ST, REALIGN MAIN ST SB ENTRY RAMP, REPLACE NB ENTRY/SB EXIT RAMPS AT RR CYN W/ HOOK RAMPS(EA: 0A440)

2018 $71,838

RIVERSIDE RIV050532 STATE HIGHWAY

15 SCHLEISMAN RD ON I-15 NEAR THE CITY OF NORCO – CONSTRUCT NEW SCHLEISMAN RD IC (6 THROUGH LANES) AND RAMPS (2 LANES) AND NB/SB AUX LANE BETWEEN SCHLEISMAN RD IC AND LIMONITE RD IC (EA: 0E140K)

2018 $62,750

RIVERSIDE RIV060109 STATE HIGHWAY

15 SR74/CENTRAL AVE I15/SR74 (CENTRAL AV) IC JCT MOD B/W 1000’ W/O COLLIER TO CONARD: ADD NB LOOP ENTRY RAMP W/ACCEL LANE, REALIGN NB ENTRY/EXIT RAMPS, WIDEN SB ENTRY/EXIT RAMPS, ADD SB ACCEL/DECEL LANES, ADD NB DECEL LANE, WIDEN SR74 RIVERSIDE TO CENTRAL 2 TO 4 THRU LNS & COLLIER TO CAMBERN 4 TO 6 THRU LNS, CONSTRUCT RIVERSIDE OC & WIDEN RIVERSIDE COLLIER TO CAMBERN 2 TO 4 THRU LNS. SR74 PM 15.5-18.5. EA: 0F3100

2018 $85,000

RIVERSIDE RIV62031 STATE HIGHWAY

15 SR79 SOUTH I-15/SR79 SO. IC: REMOVE SB EXIT RAMP, ADD NEW SB EXIT LOOP RAMP, REALIGN SB EXIT RAMP (2 LNS) W/AUX LN. WIDEN SB ENTRY 1 TO 3, NB EXIT 1 TO 4, NB ENTRY 1 TO 3 & RECON SR79S.

2012 $35,978

RIVERSIDE 30M0701-RIV070303

STATE HIGHWAY

60 ON SR60 IN NW RIV CO: CONTINUE THE IMPLEMENTATION OF THE EXPANDED SR60 FREEWAY SERVICE PATROL (FSP) (BEAT #7 PATROL , 2 TRUCKS) BETWEEN MILIKEN AVE & MAIN ST (SR60 HOV LN CHANGE TCM SUBSTITUTION PROJECT)

2010 $751

Page 251: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 249

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3M0714 STATE HIGHWAY

60 GILMAN SPRINGS RD AT SR-60/GILMAN SPRINGS RD IC – REALIGN GILMAN SPRINGS RD/REMOVE EXISTING EB/WB RAMPS; WIDEN OC FROM 2 TO 6 THRU LANES; WB EXIT IS 1 LANE WIDENING TO 2 LANES THEN TO 3 LANES AT ARTERIAL, WB LOOP & EB ENTRY RAMPS FROM 1 LANE TO 2 LANES W/ HOV; WIDEN EB EXIT RAMPS FROM 1 LANE TO 2 LANES AT EXIT AND 3 LANES AT ARTERIAL; ADD AUX LANES TO WEST OF IC 1200’ EB AND 2200’ WB

2018 $70,000

RIVERSIDE RIV041052-RIV110401

STATE HIGHWAY

60 MORENO BEACH DR IN MORENO VALLEY AT SR-60/MORENO BEACH DR IC: MODIFY MORENO BEACH DR IC – REALIGN/WIDEN RAMPS (EB EXIT 1 TO 3 LANES, EB ENTRY 1 TO 2 LANES) AND ADD EB AUX LANE (EA: 32301)

2014 $10,410

RIVERSIDE RIV041052 STATE HIGHWAY

60 MORENO BEACH DR IN MORENO VALLEY AT SR-60/MORENO BEACH DR IC: MODIFY MORENO BEACH DR IC – WIDEN OC FROM 2 TO 6 THROUGH LANES, REALIGN/WIDEN RAMPS (WB EXIT 1 TO 2 LANES), ADD NEW WB ENTRY RAMP (2 LANES), AND ADD WB AUX LANE (EA: 32303)

2014 $38,700

RIVERSIDE RIV041052-RIV090117

STATE HIGHWAY

60 NASON ST IN MORENO VALLEY AT SR60/NASON ST IC: WIDEN NASON ST OC FROM 2 TO 4 THROUGH LANES FROM ELDER AVE TO FIR AVE (EA: 32302)

2014 $19,980

RIVERSIDE 32300 STATE HIGHWAY

60 NASON ST AT SR60/NASON ST IC – MODIFY/RECONSTRUCT IC & NASON ST FROM ELDER AVE TO FIR AVE: REALIGN EB, WB EXIT RAMPS PLUS EB & WB ENTRY RAMPS, ADD EB & WB ENTRY RAMP HOV LANES, & ADD EB AND WB AUX LANES (EA: 32300) ($845/$1,225 TOLL CREDITS USED TO MATCH DEMO/STPL IN CONST)

2012 $19,946

RIVERSIDE RIV050535 STATE HIGHWAY

60 POTRERO BLVD ON SR60 BETWEEN JACK RABBIT TR & SR60/I-10 JCT: PH1-CONSTRUCT NEW POTRERO 6 LN OC (3 LNS EACH DIR) W/TEMP CONNECT TO WESTERN KNOLLS (EA34141). PH2: NEW IC ON/OFF RAMPS. CONSTRUCT WB/EB EXIT & ENTRY RAMPS (2 LNS) & WB/EB LOOP ENTRY RAMPS (2 LNS) (ENTRY RAMPS INCL HOV LANE), INCL EB/WB AUX LNS AT EXIT RAMPS, REALIGN WESTERN KNOLLS AVE, AND REMOVE WESTERN KNOLLS AVE CONNECTION TO SR60 (EA34142)

2014 $78,500

Page 252: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

250 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3M0712 STATE HIGHWAY

60 REDLANDS BLVD AT SR-60/REDLANDS BLVD – WIDEN OC FROM 2 TO 6 THRU LANES; WIDEN WB EXIT & ENTRY RAMPS FROM 1 LANE TO 2 LANES AT EXIT/ENTRY, 3 LANES AT ARTERIAL AND HOV AT ENTRY; WIDEN EB EXIT & ENTRY RAMPS FROM 1 LANE TO 2 LANES AT EXIT/ENTRY AND HOV AT ENTRY; ADD AUX LANES 1000’ EACH DIRECTION WEST OF IC AND 1700’ EACH DIRECTION EAST OF IC

2018 $52,000

RIVERSIDE 30M0701-RIV070307

STATE HIGHWAY

60 SR60 ON SR60 IN MORENO VALLEY: CONTINUE THE IMPLEMENTATION OF SR60 FREEWAY SERVICE PATROL (FSP) (BEAT #8, 2 TRUCKS) BETWEEN DAY ST AND REDLANDS BLVD (SR60 HOV LANE CHANGE TCM SUBSTITUTION PROJECT)

2010 $791

RIVERSIDE 3TK04MA13 STATE HIGHWAY

60 SR-60 BADLANDS AREA EAST OF

MORENO VALLEY &#40;NEAR

GILMAN SPRINGS RD&

BADLANDS AREA – WEST OF SR-60/I-10

JCT

ADD EASTBOUND TRUCK CLIMBING LANE 2018 $43,442

RIVERSIDE 3M04WT017 STATE HIGHWAY

60 SR-60 &#40;PM 14.84 TO 15.84&#41;

AT HEACOCK ST BTWN HEMLOCK AVE &AMP;

SUNNYMEAD BLVD

WIDEN/RECONSTRUCT HEACOCK IC, RAMPS, AND CHANNELIZATION IMPROVEMENTS. NO ADDITIONAL LANES PLANNED.

2020 $23,873

RIVERSIDE 3M0713 STATE HIGHWAY

60 SR-60 &#40;PM 15.85 TO 16.85&#41;

AT PERRIS BLVD BTWN SUNNYMEAD BLVD &AMP; IRONWOOD

RECONSTRUCT/WIDEN ARTERIAL FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS &#40;NO ADDI-TIONAL LANES PLANNED&#41;

2018 $37,379

RIVERSIDE 3M01WT020 STATE HIGHWAY

60 SR-60 &#40;PM 2.53 TO 3.53&#41;

AT MISSION BLVD BTWN GRANITE HILL DR &AMP; SEVAINE

WAY

RECONSTRUCT INTERCHANGE/RAMPS 2030 $3,822

RIVERSIDE 3A04A29 STATE HIGHWAY

60 SR-60 &#40;PM 9.06 TO 10.06&#41;

AT RUBIDOUX BLVD BTWN 30TH &AMP; 34TH STS

RECONSTRUCT/WIDEN IC, RAMPS AND CHANNELIZA-TION IMPROVEMENTS

2030 $22,875

RIVERSIDE 3A04A30 STATE HIGHWAY

60 SR-60 &#40;PM SBD 9.46 TO 10.46&#41;

AT MILLIKEN AVE BTWN HARREL AVE &AMP; IBERIA

RECONSTRUCT/WIDEN IC, RAMPS, AND CHANNELIZA-TION IMPROVEMENTS

2020 $4,133

RIVERSIDE 3M04WT018 STATE HIGHWAY

60 SR-60 &AMP;#40;PM 11.23 TO

12.23&AMP;#41;

AT MAIN ST BTWN RUSSELL ST &AMP;AMP; STODDARD AVE

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS, CHANNELIZATION IMPROVEMENTS

2020 $4,133

Page 253: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 251

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3M0801 STATE HIGHWAY

60 THEODORE ST AT SR-60/THEODORE ST IC: WIDEN OC FROM 2 TO 6 THRU LANES; WIDEN WB EXIT/ENTRY RAMPS FROM 1 LN TO 2 LNS AT EXIT/ENTRY, 3 LNS AT ART. W/ HOV AT ENTRY; WIDEN EB EXIT RAMP FROM 1 LN TO 2 LNS AT EXIT AND 3 LNS AT ART.; WIDEN EB ENTRY RAMP FROM 1 LN TO 2 LNS W/HOV; ADD EB LOOP ENTRY WITH 2 LNS AT ART. AND 1 LN AT ENTRY; ADD AUX LNS 1700’ EACH DIR WEST OF IC & 1200’ EB AND 2200’ WB EAST OF IC -RTP 3M0801

2018 $52,000

RIVERSIDE 3M01MA09 STATE HIGHWAY

71 SR-71 SR-91 SAN BERNARDINO COUNTY LINE

WIDEN TO 3 MF LANES EACH DIRECTION 2035 $177,132

RIVERSIDE RIV050517 STATE HIGHWAY

74 SR74 ON SR74 IN/NEAR HEMET FROM CALVERT AVE TO CALIFORNIA AVE: CURVE, MEDIAN, & PAVEMENT WIDENING (NON CAPACITY) (EA 0N3600)

2011 $4,872

RIVERSIDE 46460 STATE HIGHWAY

79 IN WESTERN RIVERSIDE COUNTY ON STATE ROUTE 79 – WIDEN FROM 2 TO 4 THROUGH LANES FROM THOMPSON RD TO DOMENIGONI PKWY

2014 $58,333

RIVERSIDE RIV62029 STATE HIGHWAY

79 SR 79 SOUTH AT HWY 79 SO AND LA PAZ ST: ACQUIRE LAND, DESIGN AND CONSTRUCT PARK-AND-RIDE LOT – 157 SPACES.

2018 $1,797

RIVERSIDE RIV62024 STATE HIGHWAY

79 SR79 ON SR79 IN SOUTHWESTERN RIVERSIDE COUNTY BETWEEN 2.0 KILOMETERS SOUTH OF DOMENIGONI PKWY TO GILMAN SPRINGS ROAD: REALIGN AND WIDEN SR79 FROM 2 TO 4 THROUGH LANES.

2018 $1,400,000

RIVERSIDE 3A04SH12 STATE HIGHWAY

79 SR-79 HUNTER RD DOMENIGONI PKWY WIDEN FROM 4 TO 6 LANES 2030 $100,147

RIVERSIDE RIV060101 STATE HIGHWAY

86 AT SR86S/AIRPORT BLVD (AVE 56): CONSTRUCT NEW IC (3 LANE OC – 2 LNS (1 LN IN EA DIR) + 1 MEDIAN LN)) AND RAMPS (1 LANE) FROM APPROX DESERT CACTUS DR TO 57TH AVE (EA: 47860, PPNO: 0078L)

2012 $35,610

Page 254: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

252 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV061159 STATE HIGHWAY

86 AVE 50 AT SR86/AVE 50: WIDEN AND CONSTRUCT NEW 6THROUGH LANE IC FROM E/O COACHELLA STORMWATER CHANNEL BRIDGE TO E/O TYLER ST. IMPROVEMENTS INCLUDE: EXTENDED RAMP ACCELERATION/DECELERATION LANES, RELOCATE/REALIGN AVE 50 AND TYLER ST, BIKE LANES, SIDEWALKS, AND RECONSTRUCT TRAFFIC SIGNALS (SAFETEA LU 1702, CA583, #2543) (EA: 0C970)

2018 $26,640

RIVERSIDE 3M0717 STATE HIGHWAY

86 AVE 52 AT SR86S/AVE 52 (FROM APPROX 1.57 KM S/O AVE 52 TO 0.52 KM S/O AVE 50): CONSTRUCT 6 LANE IC AND RAMPS (2 LANES), REALIGN/RELOCATE POLK ST (APPROX 1 MILE E/O AVE 52/POLK ST INTERSECTION) AND AVE 52 (APPROX ½ MILE E/O POLK ST), INCLUDE EXTENDED RAMP ACCELERATION/DECELERATION LANES (EA: 0C960)

2018 $17,328

RIVERSIDE 3M01CV03 STATE HIGHWAY

86 SR-86 &#40;PM 17.81 TO 18.81&#41;

AT AVE 54 BTWN SR-111 &AMP; FILLMORE

CONSTRUCT 4 LANE BRIDGE/INTERCHANGE AND RAMPS ACROSS SR-86

2030 $64,710

RIVERSIDE 3M0716 STATE HIGHWAY

86 SR86S &#40;PM 21.02 TO 22.9&#41;

AT DILLON RD BTWN WEST OF COACHELLA STORM

WATER CHANNEL AND AVE 47

RECONSTRUCT/WIDEN IC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2020 $26,851

RIVERSIDE RIV050102 STATE HIGHWAY

91 GREEN RIVER RD LANDSCAPE ENHANCEMENTS: NEAR CORONA FROM 1.0 KM E/O ORANGE/RIVERSIDE CNTY LINE TO 1.35 KM W/O SR 71/91 SEP – INSTALL LANDSCAPE ENHANCEMENTS (EA: 45662, PPNO: 0072G)

2015 $1,832

RIVERSIDE RIV010212 STATE HIGHWAY

91 ON SR91 – ADAMS TO 60/215 IC: ADD ONE HOV LN IN EACH DIRECTION, RESTRIPE TO EXTEND 4TH WB MIXED FLOW LANE FROM 60/215 IC TO CENTRAL OFF-RAMP, RESTRIPE TO EXTEND 5TH WB MIXED FLOW LANE FROM 60/215 IC TO 14TH ST OFF-RAMP, AUX LNS (MADISON-CENTRAL), BRIDGE WIDENING & REPLACEMENTS, EB/WB BRAIDED RAMPS, IC MOD/RECONSTRUCT + SOUND/RETAINING WALLS

2018 $278,456

Page 255: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 253

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 30M0701-RIV071250

STATE HIGHWAY

91 SR91 PH1:SR91-ADD 1 MFL(SR71-I15)/1 AUX LN VAR LOCS(SR241-PIERCE), CD SYSTEM(2/3/4 LN MAIN-I15), 1 TEL & CONVERT HOV TO TEL EA DIR(OC-I15); I15-ADD TEL MED DIR CONNCT NB15 TO WB91/EB91 TO SB15, 1 TEL EA DIR SR91 DIR CONNCT-ONTARIO IC. PH2:SR91-ADD 1 MFL EA DIR(SR241-SR71)(I15-PIERCE); I15-ADD TEL MED DIR CONNCT SB15 TO WB91/EB91 TO NB15, 1 TEL EA DIR HIDDEN VALLEY-SR91 DIR CONNCT, ONTARIO IC-CAJALCO RD

2018 $1,490,400

RIVERSIDE 3M01WT024 STATE HIGHWAY

91 SR-91 &#40;PM 10.6 TO 11.6&#41;

AT MAGNOLIA AVE BTWN MERCED DR AND FILLMORE ST

RECONSTRUCT/WIDEN IC UC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2020 $23,164

RIVERSIDE 3M01WT026 STATE HIGHWAY

91 SR-91 &#40;PM 12.9 TO 13.1&#41;

AT TYLER ST BTWN DIANA AVE &AMP; INDIANA AVE

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2030 $48,311

RIVERSIDE 3M01WT022 STATE HIGHWAY

91 SR-91 &#40;PM 15.50 TO 15.70&#41;

AT ADAMS ST BTWN DIANA AVE &AMP; INDIANA AVE

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2020 $23,164

RIVERSIDE 3M01WT023 STATE HIGHWAY

91 SR-91 &#40;PM 16.15 TO 17.15&#41;

AT MADISON ST BTWN GARDEN ST &AMP; INDIANA AVE

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2020 $23,164

RIVERSIDE 3M01WT021 STATE HIGHWAY

91 SR-91 &#40;PM 19.50 TO 20.50&#41;

AT 14TH ST BTWN OLIVEWOOD AVE AND

COMMERCE ST

RECONSTRUCT/WIDEN IC AND RECONSTRUCT/WIDEN RAMPS

2018 $11,747

RIVERSIDE RIV070308 STATE HIGHWAY

91 SR91/71 JCT AT SR91/71 JCT: REPLACE EB 91 TO NB 71 CONNECTOR W/ DIRECT FLY-OVER CONNECTOR, AND RECONSTRUCT THE GREEN RIVER ROAD EB ON-RAMP (EA: 0F541) ($1,501/$639/$200 TOLL CREDITS WILL BE USED IN PS&E TO MATCH DEMO-SAFETEALU/DEMO-TEA21/STP, RESPECTIVELY. $159 TOLL CREDITS WILL BE USED IN R/W TO MATCH DEMO-SAFETEALU.)

2018 $122,658

Page 256: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

254 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07131 STATE HIGHWAY

111 IN PALM SPRINGS HWY 111 (VISTA CHINO) WIDENING: HWY 111 FROM 5 TO 6 THRU LNS (ADD A 3RD WB LN) BTWN VOLTURNO RD AND SUNRISE WY, INC. INT IMP @ SUNRISE WY/HWY 111 & FARRELL DR/HWY 111; AND WID. FROM 4 TO 6 THRU LNS (ADD A 3RD WB & EB LN) BTWN VOLTURNO RD & EAST CITY LIMITS, INC. INT IMP AT GENE AUTRY TR/HWY 111. OTHER IMP INC. INT IMP @ HWY 111/ INDIAN CYN DR & PALM CYN DR/HWY 111.

2018 $17,000

RIVERSIDE RIV060111 STATE HIGHWAY

215 IN MID WESTERN-RIVERSIDE CO IN THE CITY OF PERRIS – I-215/ETHANAC RD IC IMP.: IC OPERATIONAL IMP. OF THE NB & SB OFF RAMPS @ I-215/ETHANAC RD AND ON ETHANAC ON EITHER SIDE OF I-215 FOR UP TO 1,200 FT. IMPROVEMENTS CONSIST OF THE WIDENING OF THE ON AND OFF RAMPS TO PROVIDE LEFT AND RIGHT TURN POCKETS, T.S. UPGRADE AT THE RAMP TERMINI & RE-STRIPING OF THE OC TO HAVE MORE LANE OF TRAFFIC (PA&ED).

2014 $500

RIVERSIDE 3M10WT03 STATE HIGHWAY

215 IN SW RIVERSIDE COUNTY – I-215/KELLER RD. IC: REPLACEMENT OF EXISTING 2-LN I-215/KELLER RD. UNDERPASS WITH A NEW 4-LN (2 LNS IN EA DIR) IC, INCLUDING LEFT TURN LANES IN EACH DIRECTION, AUXILIARY LANES AT THE NB ON-RAMP AND THE SB OFF-RAMP (LENGTH OF THE INDIVIDUAL AUX. LANES IS APPROX. 1/4 MILE), 1-LN NB OFF RAMP, 2-LN NB ON-RAMP W/HOV, 1-LN SB OFF RAMP, AND 2-LN SB ON-RAMP W/HOV (PA&ED ONLY).

2020 $15,432

RIVERSIDE RIV62040 STATE HIGHWAY

215 ON I-215 AT LOS ALAMOS RD IC – INSTALL LANDSCAPING AND IRRIGATION IMPROVEMENTS TO THE I-215/LOS ALAMOS ROAD INTERCHANGE (SAFETEA-LU 2005 SEC. 1702. HPP #3140).

2011 $2,488

RIVERSIDE 0121D STATE HIGHWAY

215 ON I-215/SR91/SR60, RIV I215 COR IMPROV PROJ – FROM 60/91/215 JCT TO 60/215 SPLIT – WIDEN 6 TO 8 LNS, INCLUDING MAINLINE/IC IMPROVS, ADD HOV, AUX, & SB TRUCK CLIMB LN, AND LANDSCAPING (EA: 3348U1, 33486, 33487, AND 33488)

2012 $782,720

Page 257: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 255

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 30M0701-RIV070304

STATE HIGHWAY

215 ON I-215 IN SW RIV CO: CONTINUE THE IMPLEMENTATION OF I-215 FREEWAY SERVICE PATROL (FSP) (BEAT #19, 2 TRUCKS) BETWEEN SR74/4TH ST AND ALESSANDRO BLVD (SR60 HOV LANE CHANGE TCM SUBSTITUTION PROJECT)

2010 $791

RIVERSIDE RIV050533 STATE HIGHWAY

215 CACTUS AVE AT I-215/CACTUS AVE IC: WIDEN IC FROM 3 TO 6 THRU LNS (EB FROM 2 TO 3 BTWN W/O BNSF RR TO 1300’ E/O VETERANS WAY, ADD 4TH EB LANE FROM NB EXIT RAMP TO E/O ELSWORTH ST, WIDEN WB FROM 1&2 TO 3 THRU LNS FROM COMMERCE CENTER DR TO BNSF RR), WIDEN RAMPS 1 TO 2&3 LNS (ENTRY RAMPS INCL HOV), EXTEND NB AUX LN BTWN ALESSANDRO BLVD SOUTH TO CACTUS AVE NB ENTRY LOOP RAMP & ADD DEDICATED RT-TURN LNS (EA0E760)

2018 $65,370

RIVERSIDE RIV010203 STATE HIGHWAY

215 CLINTON KEITH RD AT I-215/CLINTON KEITH RD IC – CONSTRUCT PARTIAL CLOVERLEAF: WIDEN OC 2 TO 6 THROUGH LANES, RECONSTRUCT RAMPS (WIDENING TO EXISTING NB/SB DIAMOND RAMPS) & CONSTRUCT NEW NB/SB LOOP ENTRY RAMPS (EA: 32780)

2012 $35,668

RIVERSIDE 3M0738 STATE HIGHWAY

215 I215 ON I-215 IN SW RIVERSIDE COUNTY FROM MURRIETA HOT SPRINGS RD TO I-215/I-15 JUNCTION, CONSTRUCT A THIRD MIXED FLOW LANE SOUTHBOUND (WIDENS I-215/I-15 CONNECTOR FROM 2 TO 3 LANES)

2018 $13,000

RIVERSIDE RIV070309 STATE HIGHWAY

215 I-215 ON I-215 IN SOUTHWEST RIVERSIDE COUNTY FROM SCOTT RD TO NUEVO RD IC: CONSTRUCT A MIXED FLOW LANE IN EACH DIRECTION AND RECONSTRUCT AUX LANES BETWEEN D ST IC AND NUEVO RD IC (EA: 0F162)

2018 $190,947

Page 258: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

256 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV070305 STATE HIGHWAY

215 I-215 ON I-215 IN SW RIVERSIDE CO. FROM MURRIETA HOT SPRINGS RD TO SCOTT RD: CONSTRUCT A 3RD MIXED FLOW LANE IN EA DIR (WIDENS I-215 FROM 4 TO 6 LANES – 3 IN EA. DIR). THE PROJECT INCLUDES THE CONSTRUCTION OF A NEW INSIDE SHOULDER IN BOTH DIRECTIONS, A NEW MEDIAN BARRIER, OVERLAY OF EXISTING LANES, AND WIDENS THE EXISTING KELLER UC BRIDGES (NON-CAPACITY ENHANCING) TO SUPPORT THE NEW LANES (EA: 0F161).

2014 $29,228

RIVERSIDE 3M0803 STATE HIGHWAY

215 I-215 ON INTERSTATE 215, FROM BLAINE ST SB OFF-RAMP TO 0.3 MILES EAST OF UNIVERSITY AVE UNDERCROSSING (PM 41.2 TO PM 42.2), EXTEND THE EXISTING SB LANE #4 (LANE DROP) TO 0.3 MILES EAST OF UNIVERSITY AVE UNDERCROSSING (EA 0N890)

2012 $1,580

RIVERSIDE 3H07A STATE HIGHWAY

215 I-215 ON I-215 FROM NUEVO RD TO BOX SPRINGS RD: CONSTRUCT 2 HOV LANES (1 LANE IN EACH DIRECTION) – PA&ED.

2030 $212,500

RIVERSIDE RIV050555 STATE HIGHWAY

215 I-215 & SR60 ON I-215 (N/O EUCALYPTUS AVE TO N/O BOX SPRINGS RD) & SR60 (E/O DAY ST TO SR60/I-215 JCT): RECONSTRUCT JCT TO PROVIDE 2 HOV DIRECT CONNECTOR LNS (SR60 PM: 12.21 TO 13.6) AND MINOR WIDENING TO BOX SPRINGS RD FROM 2 TO 4 THROUGH LANES BETWEEN MORTON RD AND BOX SPRINGS RD/FAIR ISLE DR IC (EA: 449311)

2014 $47,414

RIVERSIDE 3A04A27 STATE HIGHWAY

215 I-215 &#40;PM 15.95 TO 16.95&#41;

AT GARBANI RD BTWN HAUN RD &AMP;AMP; ANTELOPE RD

CONSTRUCT NEW 4 LANE &#40;2 LNS EAC DIR&#41; AND RAMPS

2030 $44,813

RIVERSIDE 3M0719 STATE HIGHWAY

215 I-215 &#40;PM 20.34 TO 21.34&#41;

AT MCCALL BLVD BTWN BRADLEY RD &AMP; ENCANTO DR

RECONSTRUCT/WIDEN IC FROM 4 TO 6 LANES AND RECONSTRUCT RAMPS

2030 $22,265

RIVERSIDE 3M04WT009 STATE HIGHWAY

215 I-215 &#40;PM 23.04 TO 24.04&#41;

AT SR-74 &#40;MATTHEWS

RD&#41;

BTWN CASE RD &AMP; TRUMBLE RD

RECONSTRUCT INTERCHANGE/RAMPS 2014 $16,495

Page 259: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 257

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3M0731 STATE HIGHWAY

215 I-215 &#40;PM 24.7 TO 26.1&#41;

AT ELLIS AVE BTWN PERRIS VALLEY STORM

DRAIN W/O I-215 TO DUNLAP DR E/O

I-215

CONSTRUCT NEW 2 LANE IC AND RAMPS &#40;1 LANE&#41;

2030 $92,443

RIVERSIDE 3M04WT014 STATE HIGHWAY

215 I-215 &#40;PM 27.38 TO 28.38&#41;

AT NUEVO RD BTWN A ST &AMP; E. FRONTAGE RD

RECONSTRUCT INTERCHANGE, ADD CHANNELIZATION LANES ON RAMPS, MODIFY TRAFFIC SIGNALS

2030 $35,749

RIVERSIDE 3M0725 STATE HIGHWAY

215 I-215 &#40;PM 29.5 – 30.0&#41;

AT PLACENTIA BTWN RAMPS CONSTRUCT NEW 6 LANE IC AND RAMPS AT PLACENTIA OC

2020 $59,216

RIVERSIDE 3M0708 STATE HIGHWAY

215 I-215 &#40;PM 30.9&#41;

AT RAMONA EXPWY

BTWN RAMPS RECONSTRUCT/WIDEN FROM 4 TO 8 LANES, WIDEN SB AND NB EXIT RAMPS AT I-215/RAMONA EXPWY IC AND OC, CONSTRUCT DUAL LEFT-TURN LANES AT THE EXIT RAMPS TEMINI

2030 $56,473

RIVERSIDE 3A04WT059 STATE HIGHWAY

215 I-215 &#40;PM 31.83 TO 32.83&#41;

AT HARLEY KNOX BLVD

BTWN HARVILL AVE AND WESTERN WAY

RECONSTRUCT AND WIDEN HARLEY KNOX BLVD OC FROM 2 TO 4 LANES AND RECONSTRUCT/WIDEN RAMPS

2018 $28,525

RIVERSIDE 3M0724 STATE HIGHWAY

215 I-215 &#40;PM 35.92 TO 36.92&#41;

AT ALESSANDRO BLVD

BTWN BNSF &AMP; OLD 215 FRONTAGE

ROAD

WIDEN/RECONSTRUCT IC FROM 4 TO 6 LANES AND RECONSTRUCT/WIDEN RAMPS

2030 $4,985

RIVERSIDE 3M04WT012 STATE HIGHWAY

215 I-215 &#40;PM 43.40 TO 44.40&#41;

AT COLUMBIA AVE BTWN PRIMER ST &AMP;

BRANDYWINE AVE

RECONSTRUCT INTERCHANGE/RAMPS 2035 $25,414

RIVERSIDE 3M04WT011 STATE HIGHWAY

215 I-215 &#40;PM 44.51 TO 45.51&#41;

AT CENTER ST BTWN STEPHENS AVE &AMP; IOWA

AVE

RECONSTRUCT INTERCHANGE/RAMPS 2035 $40,727

RIVERSIDE RIV050534 STATE HIGHWAY

215 NEWPORT RD AT I-215/NEWPORT RD IC: RECONSTRUCT/WIDEN FROM 4 TO 6 THROUGH LANES BETWEEN HAUN RD AND ANTELOPE RD, RELOCATE NB AND SB EXIT RAMPS (3 LANES), RECONFIGURE NB & SB ENTRY RAMPS TO INCLUDE HOV LANE, ADD NEW NB AND SB LOOP ENTRY RAMPS (2 LANES), INCLUDE EXTENDED RAMP ACCELERATION/DECELERATION LANES, ADD EXTENDED DEDICATED RIGHT-TURN LANES (EA: 0J440)

2018 $47,700

Page 260: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

258 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV011232 STATE HIGHWAY

215 SCOTT RD AT I-215/SCOTT RD IC: RECONSTRUCT/WIDEN FROM 2 TO 6 THROUGH LANES BTWN E/O ANTELOPE RD & HAUN RD, RECONSTRUCT/WIDEN RAMPS – NB EXIT 1 TO 3 LNS, NB ENTRY 2 TO 3 LNS, SB EXIT 1 TO 4 LNS, SB ENTRY 1 TO 2 LNS, ADD NB EXIT LOOP RAMP (2 LNS) & SB ENTRY RAMP (3 LNS), ENTRY RAMPS INCLUDE HOV LN, RAMPS INCLUDE EXTENDED ACCELERATION/DECELERATION LNS, ADD EXTENDED RIGHT-TURN LNS (EA: 0A020)

2018 $76,000

RIVERSIDE RIV050501 STATE HIGHWAY

215 SR74/G ST I-215 AT SR74/G ST IC: REPLACE 2 THROUGH LANE OC WITH A 4 THROUGH LANE OC & WIDEN REDLANDS AVE (4TH TO SAN JACINTO), WIDEN/REALIGN RAMPS, MODIFY 4TH ST (G ST TO EASTERLY TERMINUS) & RECONSTRUCT INTERSECTIONS (EA: 46420)

2012 $25,034

RIVERSIDE RIV060120 STATE HIGHWAY

215 VAN BUREN BLVD AT I-215/VAN BUREN BLVD IC: RECONSTRUCT/WIDEN IC FROM 2 TO 4 THROUGH LANES FROM MUSEUM ENTRANCE ST TO OPPORTUNITY WAY, ADD NEW NB ENTRY RAMP (3 LANES), & WIDEN RAMPS – NB ENTRY 1 TO 2 LANES, NB EXIT 2 TO 3 LANES, SB EXIT 2 TO 3 LANES, SB ENTRY 1 TO 3 LANES, ENTRY RAMPS INCLUDE HOV LANE, ADD NB/SB AUX LANE BETWEEN VAN BUREN BLVD IC AND CACTUS AVE IC (EA 0E520)

2014 $68,403

RIVERSIDE 30M0701-RIVLS06

STATE HIGHWAY

999 GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – SHOPP PROGRAM: PROJECTS ARE CONSISTENT W/40 CFR 93.126 EXEMPT TABLE 2 – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

2013 $23,922

RIVERSIDE 30M0701-RIVLS02

STATE HIGHWAY

999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION – SHOPP ROADWAY PRESERVATION PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLE 2 – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 USC 125), WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES)

2016 $153,514

Page 261: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 259

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 30M0701-RIVLS13

STATE HIGHWAY

999 GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE STATE HIGHWAY SYSTEM – HIGHWAY MAINTENANCE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 & 3 – PAVEMENT RESURFACING AND/OR REHABILITATION

2011 $5,676,520

RIVERSIDE 3GR104 STATE HIGHWAY

999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS – SHOPP MOBILITY PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 – RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CNTRL DEVICES/OPERATING ASSIST OTHER THAN SIGNALS, INTERSCTN SIGNAL PRJCTS AT INDVL INTERSCTNS, PVMNT MARKING DEMO, TCL OUTSIDE THE UA, LIGHTING IMPRVMNTS, EMERGENCY TRUCK PULLOVERS

2014 $28,834

RIVERSIDE RIVLS08 STATE HIGHWAY

999 GROUPED PROJECTS FOR SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/OR REHABILITATION – MINOR PROGRAM: PROJECTS ARE CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2&3 – RR/HWY CROSSING, SAFER NON-FED-AID SYSTEM RDS, SHOULDR IMPRVMNTS, TRAFFIC CONTROL DEVICES/OPERATING ASSISTANCE OTHER THAN SIGNALS, INTERSCTN SIGNAL PROJECTS AT INDVL INTERSCTN, (DESCRIPTION CONT. IN COMMENTS)

2012

RIVERSIDE 991206 LOCAL HIGHWAY

BUTTERFIELD STAGE RD EXTENSIONS: EXTEND MURRIETA HOT SPRINGS RD (4 LNS) FROM BUTTERFIELD STAGE RD TO SERAPHINA RD; BUTTERFIELD STAGE RD (4 LNS) FROM RANCHO CALIFORNIA RD TO MURRIETA HOT SPRINGS RD; & NICHOLAS RD (4 LNS) FROM BUTTERFIELD STAGE RD. TO CALLE GIRASOL

2014 $40,265

RIVERSIDE RIV060113 LOCAL HIGHWAY

CONSTRUCT NEW 4 LANE BRIDGE OVER MURRIETA CREEK (PART OF WESTERN BYPASS CORRIDOR) INCLUDING APPROACHES, CURB & GUTTER, SIDEWALKS, & STORM DRAIN FACILITIES

2018 $12,411

Page 262: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

260 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV031202 LOCAL HIGHWAY

I-10 BYPASS SOUTH: CONSTRUCT TWO LANES OF ROADWAY TO PROVIDE A BY-PASS/NETWORK FACILITY FOR THE I-10, APPROX. 1/2 MILE S/O I-10 BETWEEN THE EASTERN END OF THE CITY OF BANNING AND APACHE TRAIL IN CABAZON. OTHER IMPROVEMENTS INCLUDE THE CONSTRUCTION OF SEVERAL LOW-WATER CROSSINGS AT SMITH CREEK AND SAN GORGONIO RIVER (PA&ED).

2018 $17,970

RIVERSIDE RIV011241 LOCAL HIGHWAY

IN CORONA ON AUTO CENTER DR – CONSTRUCT 4 LANE OVERCROSSING (GRADE SEPARATION) OVER EXISTING BNSF TRACKS ($1,835/$1,240 TOLL CREDITS IN CONST TO MATCH CMAQ/PNRS).

2014 $32,675

RIVERSIDE RIV011240 LOCAL HIGHWAY

IN CORONA ON EXISTING MCKINLEY ST – CONSTRUCT GRADE SEPARATION AT BNSF RAILROAD CROSSING (PROJECT STUDY REPORT & PRELIMINARY ENVIRONMENTAL ANALYSIS REPORT ACTIVITIES)

2019 $4,023

RIVERSIDE RIV060108 LOCAL HIGHWAY

IN CORONA ON N. MAIN ST: ADD NB DEDICATED RIGHT-TURN LANE (APPROX 300’) FROM SR91 EXIT RAMP TO N. GRAND BLVD, ADD 3RD WB SR-91 ON RAMP LANE, SIGNAL MODS & CONSTRUCT RETAINING WALL AT PARK-N-RIDE LOT

2013 $3,702

RIVERSIDE RIV011210 LOCAL HIGHWAY

IN MORENO VALLEY/COUNTY – REALIGN RECHE VISTA DR (PERRIS BLVD TO NORTH CITY LIMITS – APPROX 2,450’) & INSTALL SIGNAL (PERRIS/HEACOCK/RECHE VISTA DR)

2012 $6,150

RIVERSIDE RIV050201 LOCAL HIGHWAY

IN RIVERSIDE COUNTY GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM; PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLE 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDITIONAL TRAVEL LANES).

2016 $142,238

Page 263: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 261

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV52001 LOCAL HIGHWAY

IN RIVERSIDE COUNTY GROUPED PROJECTS FOR PAVEMENT RESURFACING AND/OR REHABILITATION ON THE LOCAL ROADS SYSTEM – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND 3 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION.

2012 $565

RIVERSIDE 30M0701-RIV071272

LOCAL HIGHWAY

IN RIVERSIDE ON RIVERSIDE AVE: REPLACE EXISTING 4-LANE (2 LNS IN EA DIR) R/R/ X-ING WITH A 4 LN (2 LNS IN EA DIR – NON-CAPACITY) U.C. GRADE SEPARATION ALONG RIVERSIDE AVE BTWN MERRILL AVE AND 400’ N/O ELIZABETH ST. ADDITIONAL IMPROVEMENTS INCLUDE INSTALLATION OF APPROX 1,100 FT OF PCC S/W ON EACH SIDE OF RIVERSIDE AVE WITHIN THE PROJECT LIMITS ($791 TOLL CREDITS USED TO MATCH STPL IN R/W).

2013 $29,512

RIVERSIDE 30M0701-RIV071271

LOCAL HIGHWAY

IN RIVERSIDE ON STREETER AVE: REPLACE EXISTING 4 LANE (2 LNS IN EA DIR) R/R X-ING WITH A 4 LN (2 LNS IN EA DIR – NON-CAPACITY) U.C. GRADE SEPARATION ON STREETER AVE BETWEEN LANTANA ST AND BEATTY DR., AND INSTALL APPROX. 1,000 FT OF PCC S/W ON EACH SIDE OF STREETER AVE WITHIN THE PROJECT LIMITS.

2013 $36,800

RIVERSIDE RIV060114 LOCAL HIGHWAY

IN SOUTHWEST TEMECULA: DESIGN AND CONSTRUCT 4 LANE WESTERN BYPASS CORRIDOR (PHASE 1) FROM SR79 SOUTH TO RANCHO CALIFORNIA RD

2018 $13,500

RIVERSIDE 30M0701-RIV071236

LOCAL HIGHWAY

IN THE CITY OF DESERT HOT SPRINGS – WESTERN AVE-SCENIC DR. PAVING PROJECT: CONSTRUCT 30’ OF ASPHALT PAVING FROM PIERSON BLVD TO 600’ N/O SCENIC DR., AND FROM 200’ W/O WESTERN AVE. TO 600’ E/O WESTERN AVE. ON SCENIC DR. ($36 TOLL CREDITS USED TO MATCH CMAQ IN CONST).

2012 $350

RIVERSIDE 30M0701-RIV090405

LOCAL HIGHWAY

IN THE CITY OF PALM SPRINGS: REPLACE EXISTING 4-LANE LOW WATER CROSSING ON VISTA CHINO AT WHITEWATER RIVER WITH A NEW 4-LANE BRIDGE – BRIDGE NO. 00L0052.

2017 $95,000

Page 264: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

262 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07100 LOCAL HIGHWAY

IN THE COACHELLA VALLEY IN THE CITY OF PALM SPRINGS – RAMON RD. WIDENING BETWEEN SAN LUIS REY DR & LANDAU BLVD.: WIDENING OF RAMON RD. FROM A 4-LN ARTERIAL TO A 6-LN ARTERIAL (3-LNS IN EA DIR) BETWEEN SAN LUIS REY DR & LANDAU BLVD., INCLUDING THE WIDENING/REPLACEMENT OF THE WHITEWATER RIVER BRIDGE (BRIDGE NO. 56C0287), INCLUDING SEISMIC RETROFIT AND SCOUR COUNTERMEASURES AS NECESSARY.

2023 $35,998

RIVERSIDE 3OM0701 LOCAL HIGHWAY

IN THE COACHELLA VALLEY PM-10 PROGRAM – CLEAN VEHICLE ACQUISITION PROGRAM: FLEET ACQUISITION OF ALTERNATIVE FUEL SWEEPERS FOR REGIONAL STREET SWEEPING PROGRAM OF MAJOR ARTERIALS, FOR THE REDUCTION OF PM10 FUGITIVE DUST THROUGHOUT THE COACHELLA VALLEY ($229 TOLL CREDITS USED TO MATCH CMAQ IN CONST).

2014 $2,000

RIVERSIDE RIV031206 LOCAL HIGHWAY

ON S. PALM CANYON DR OVER ARENAS CANYON SOUTH DRAINAGE CHANNEL: REPLACE EXISTING 4 LANE LOW-WATER CROSSING WITH A NEW 4-LANE BRIDGE, INCLUDING DRAINAGE IMPROVEMENTS CONSISTING OF LEVEE CHANNELIZATION (HBRR #: 00L0027).

2018 $4,875

RIVERSIDE RIV060121 LOCAL HIGHWAY

ON VAN BUREN BLVD NEAR MARCH AIR RESERVE BASE: WIDEN FROM 4 TO 6 LANES FROM APPROXIMATELY 0.5 MILES WEST OF I-215 TO BARTON ST

2014 $6,700

RIVERSIDE RIV041047 LOCAL HIGHWAY

THROUGHOUT RIVERSIDE COUNTY – GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES – PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANSPORTATION BUILDINGS, STRUCTURES, OR FACILITIES). $270 IN TOLL CREDITS WILL BE UTILIZED FOR STPL MATCH FOR CONS IN FY 2011/2012.

2014 $3,616

Page 265: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 263

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV041043 LOCAL HIGHWAY

WIDEN RECHE VISTA DR 2 TO 4 LNS (HEACOCK ST/PERRIS BLVD-RECHE CYN RD); WIDEN RECHE CYN RD 2 TO 4 LNS (RECHE VISTA-BARTON/HUNTS) PLUS REALIGN, SIGNALS, MEDIANS (PA&ED).

2023 $3,386

RIVERSIDE RIV010227 LOCAL HIGHWAY

CORONA ADVANCED TRAFFIC MANAGEMENT SYSTEM (ATMS) – AND REGIONAL ITS INTEGRATION PHASE 2.

2010 $6,011

RIVERSIDE RIV061161 LOCAL HIGHWAY

ESSENTIAL ROAD IMPROVEMENTS-PHASE III: CITY SECTION 31 INCLUDING PAVEMENT REHAB, SIDEWALKS, CURB/GUTTERS, CROSS GUTTERS, ADA RAMPS & DRAINAGE IMPROVEMENTS ON RAMONA DR., CACTUS DR., EL CAJON DR., LA MESA DR., CALIENTE DR. (BUNCH PALMS TR TO HACIENDA AVE); AND HACIENDA AVE & IRONWOOD DR (PALM DR TO RAMONA DR).

2014 $1,040

RIVERSIDE 3G0705 LOCAL HIGHWAY

IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY – 66TH AVE GRADE SEPARATION: CONSTRUCT A TWO-LN (1-LN IN EA DIR) 66TH AVE ELEVATED STRUCTURE OVER THE UPRR, HAMMOND RD., AND SH-111., FROM WESTERLY OF LINCOLN ST TO JOHNSON ST ON THE EAST IN THE COMMUNITY OF MECCA. ADD. IMPROVEMENTS WILL BE CONSTRUCTED TO TIE BACK INTO THE EXISTING ALIGNMENT.

2016 $25,250

RIVERSIDE RIV110825 LOCAL HIGHWAY

IN THE CITY OF COACHELLA – WIDEN AND CONSTRUCT A NEW 6-LN BRIDGE OVER COACHELLA STORMWATER CHANNEL, FROM 300-FEET WEST OF APACHE TRAIL TO SR-86S INTERSECTION. IMPROVEMENTS INCLUDE: BIKE LANES/TRAILS, SIDEWALKS, RECONSTRUCT TRAFFIC SIGNAL/DRIVEWAYS, CHANNEL SCOUR PROTECTION, REMOVE EXISTING LOW WATER CROSSING AND CULVERTS.

2018 $29,916

RIVERSIDE 3A04A23 LOCAL HIGHWAY

&AMP;QUOT;A &AMP;QUOT; STREET

NUEVO RD 4TH ST WIDEN FROM 2 TO 4 LANES 2020 $7,500

RIVERSIDE 3A04WT092 LOCAL HIGHWAY

11TH ST/CASE RD PERRIS BLVD GOETZ RD WIDEN FROM 2 TO 4 LANES 2018 $2,000

RIVERSIDE 3A04A05 LOCAL HIGHWAY

14TH AVE RIVER VALLEY RD 7TH ST WIDEN EXISTING BRIDGE AT D-CANAL FROM 2 TO 4 LANES

2023 $1,780

Page 266: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

264 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT086 LOCAL HIGHWAY

1ST ST PARKRIDGE AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2018 $1,616

RIVERSIDE 3A04WT087 LOCAL HIGHWAY

2ND ST RIVER RD HAMNER AVE WIDEN FROM 2 TO 4 LANES 2018 $4,641

RIVERSIDE 3A04A08 LOCAL HIGHWAY

7TH ST HOBSONWAY RICE ST WIDEN FROM 2 TO 4 LANES 2023 $750

RIVERSIDE 3A07062 LOCAL HIGHWAY

ADAMS ST BEFORE AND AFTER BRIDGE

AT WHITEWATER CHANNEL

CONSTRUCT NEW 4 LANE BRIDGE 2014 $11,900

RIVERSIDE 3A01WT049A LOCAL HIGHWAY

ALESSANDRO BLVD IN THE CITY OF MORENO VALLEY – WIDEN ALESSANDRO BLVD BETWEEN I-215 AND FREDERICK ST FROM 4 TO 6 LANES.

2014 $12,401

RIVERSIDE 3A01WT051 LOCAL HIGHWAY

ALESSANDRO BLVD IN THE CITY OF MORENO VALLEY – WIDEN ALESSANDRO BLVD BETWEEN NASON ST AND GILMAN SPRINGS RD FROM 2 TO 4 LANES; REALIGN ALESSANDRO BLVD WITHIN PROJECT LIMITS BETWEEN THEODORE ST AND GILMAN SPRINGS RD. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, LANDSCAPING, SIDEWALKS, BIKE LANES, AND TRAILS.

2014 $62,000

RIVERSIDE 3A01WT050C LOCAL HIGHWAY

ALESSANDRO BLVD 500&AMP;#39; E/O KITCHING ST

NASON ST WIDEN ALESSANDRO BLVD FROM 500&AMP;#39; E/O KITCHING ST TO NASON ST FROM 2 TO 6 LANES

2018 $12,200

RIVERSIDE 3A01WT049B LOCAL HIGHWAY

ALESSANDRO BLVD FREDERICK ST PERRIS BLVD WIDEN FROM 4 TO 6 LANES 2018 $5,300

RIVERSIDE 3A01WT123 LOCAL HIGHWAY

ALESSANDRO BLVD TRAUTWEIN RD I-215 WIDEN FROM 4 TO 6 LANES 2030 $6,118

RIVERSIDE 3120007 LOCAL HIGHWAY

ANTELOPE ROAD CLINTON KEITH ROAD

SCOTT ROAD CONSTRUCT – REALIGN ANTELOPE RD FROM CLINTON KEITH RD. TO SCOTT ROAD – 4 THROUGH LANES, 2 LANE IN EACH DIRECTION.

2020 $20,000

RIVERSIDE 3A04A20 LOCAL HIGHWAY

ARABY DR ANZA TR STAGECOACH RD CONSTRUCT NEW BRIDGE CROSSING OVER PALM CANYON WASH

2020 $25,000

RIVERSIDE 3A01WT124 LOCAL HIGHWAY

ARCHIBALD AVE SAN BERNARDINO COUNTY LINE

RIVER RD WIDEN FROM 2 TO 4 LANES, INCLUDING WIDENING OF BRIDGE OVER SANTA ANA RIVER.

2030 $23,310

Page 267: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 265

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01WT112 LOCAL HIGHWAY

ARLINGTON AVE MAGNOLIA AVE ALESSANDRO BLVD WIDEN FROM 4 TO 6 LANES 2018 $13,494

RIVERSIDE 3A04WT125 LOCAL HIGHWAY

ARMSTRONG RD SAN BERNARDINO COUNTY LINE

VALLEY WAY WIDEN FROM 2 TO 4 LANES 2035 $6,132

RIVERSIDE 3AL104 LOCAL HIGHWAY

ARTERIAL IMPROVEMENTS

COACHELLA VALLEY

EASTERN COUNTY WIDEN/RECONSTRUCT/REHABILITATE REGIONAL ARTERIALS

2035 $501,280

RIVERSIDE 3AL204 LOCAL HIGHWAY

ARTERIAL IMPROVEMENTS

COUNTYWIDE WIDEN/CONSTRUCT REGIONAL ARTERIALS 2035 $728,586

RIVERSIDE 3AL304 LOCAL HIGHWAY

ARTERIAL IMPROVEMENTS

WESTERN COUNTY WESTERN COUNTY WIDEN/REHABILITATE ARTERIAL IMPROVEMENTS

2035 $652,709

RIVERSIDE 3A04A13 LOCAL HIGHWAY

AUTO CENTER DR &AMP;AMP;#40;

CASINO DR&AMP; AMP;#41;

FRANKLIN ST DIAMOND DR &AMP;AMP;#40; RAILROAD CYN

RD&AMP; AMP;#41;

WIDEN BRIDGE OVER SAN JACINTO RIVER FROM 2 TO 4 LANES

2018 $9,000

RIVERSIDE 3A07092 LOCAL HIGHWAY

AVE 48 GRADE SEPARATION AT HWY 111/SPRR

WIDEN FROM 4 TO 6 LANES 2023 $4,936

RIVERSIDE 3A07167 LOCAL HIGHWAY

AVE 48 INTERSECTION OF AVE 48 AND

HWY 86

WIDEN FROM 4 TO 6 LANES 2014 $113

RIVERSIDE 3A07057 LOCAL HIGHWAY

AVE 48 JACKSON ST VAN BUREN ST &#40;CENTER

LINE&#41;

WIDEN FROM 2 TO 6 LANES 2020 $7,886

RIVERSIDE 3A07108 LOCAL HIGHWAY

AVE 48 VAN BUREN ST W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2020 $4,010

RIVERSIDE 3A07172 LOCAL HIGHWAY

AVE 48 VAN BUREN ST TO W

W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2030 $3,918

RIVERSIDE 3A01CV002 LOCAL HIGHWAY

AVE 50 BRIDGE. AT ALL AMER.CANAL

CONSTRUCT 4-LANE BRIDGE 2023 $3,603

RIVERSIDE 3A04CV113 LOCAL HIGHWAY

AVE 50 HWY 111 TO SR-86S

SR-86S WIDEN FROM 2 TO 4 LANES 2014 $85,037

RIVERSIDE 3A07039 LOCAL HIGHWAY

AVE 50 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 4 LANES 2020 $10,588

Page 268: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

266 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07070 LOCAL HIGHWAY

AVE 50 JEFFERSON ST MADISON ST WIDEN FROM 2 TO 4 LANES. SHARED PROJECT BETWEEN THE CITY OF LA QUINTA AND INDIO. THE SOUTH SIDE OF AVE 50 WIDENING FROM 1 TO 2 LANES, WHERE SECTIONS ARE MISSING, IS CITY OF LA QUINTA PROJECT. THE NORTH SIDE WITHIN THE SAME LIMITS ON AVE 50 IS THE CITY OF INDIO PROJECT.

2018 $1,383

RIVERSIDE 3A01CV004 LOCAL HIGHWAY

AVE 50 SR-86S TO I-10 I-10 WIDEN FROM 2 TO 4 LANES 2020 $24,830

RIVERSIDE 3A01CV005 LOCAL HIGHWAY

AVE 50 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 4 LANES 2020 $7,174

RIVERSIDE 3A01CV014 LOCAL HIGHWAY

AVE 52 CALHOUN ST FREDRICK ST WIDEN FROM 2 TO 6 LANES 2023 $8,532

RIVERSIDE 3A07174 LOCAL HIGHWAY

AVE 52 CALHOUN ST FREDRICK ST WIDEN FROM 2 TO 6 LANES 2035 $4,095

RIVERSIDE 3A01CV015A LOCAL HIGHWAY

AVE 52 FREDRICK ST HARRISON ST WIDEN FROM 2 TO 6 LANES 2020 $2,305

RIVERSIDE 3A07094 LOCAL HIGHWAY

AVE 52 GRADE SEPARATION AT HWY 111/SPRR

WIDEN FROM 2 TO 6 LANES 2018 $4,853

RIVERSIDE 3A01CV015B LOCAL HIGHWAY

AVE 52 HARRISON ST HWY 111 WIDEN FROM 2 TO 6 LANES 2020 $1,375

RIVERSIDE 3A01CV015C LOCAL HIGHWAY

AVE 52 HWY 111 SR-86S WIDEN FROM 2 TO 6 LANES 2020 $115,056

RIVERSIDE 3A07164 LOCAL HIGHWAY

AVE 52 INTERSECTION OF AVE 52 AND HWY

111

WIDEN FROM 2 TO 6 LANES 2018 $139

RIVERSIDE 3A07165 LOCAL HIGHWAY

AVE 52 INTERSECTION OF AVE 52 AND SR-86

WIDEN FROM 2 TO 6 LANES 2018 $122

RIVERSIDE 3A07098 LOCAL HIGHWAY

AVE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2014 $4,630

RIVERSIDE 3A07173 LOCAL HIGHWAY

AVE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2035 $2,086

RIVERSIDE 3A01CV010 LOCAL HIGHWAY

AVE 52 JEFFERSON ST MADISON ST WIDEN FROM 2 TO 4 LANES IN AREAS WITH MISSING SECTIONS ON THE NORTH SIDE OF AVE 52.

2014 $780

Page 269: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 267

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01CV017 LOCAL HIGHWAY

AVE 54 HARRISON ST TYLER ST WIDEN FROM 2 TO 4 LANES 2018 $9,024

RIVERSIDE 3A07011 LOCAL HIGHWAY

AVE 54 HWY 111 FILLMORE CONSTRUCT 4-LANE BRIDGE 2018 $34,937

RIVERSIDE 3A01CV018 LOCAL HIGHWAY

AVE 54 TYLER ST HWY 111 WIDEN FROM 2 TO 4 LANES 2018 $3,640

RIVERSIDE 3A01CV016 LOCAL HIGHWAY

AVE 54 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 4 LANES 2018 $7,984

RIVERSIDE 3A01CV023 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

0.25 MI. W OF VAN BUREN ST

HARRISON ST WIDEN FROM 2 TO 4 LANES 2023 $11,009

RIVERSIDE 3A07181 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

0.25 MI. W OF VAN BUREN ST

HARRISON ST WIDEN FROM 2 TO 6 LANES 2035 $5,853

RIVERSIDE 3A07180 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

GRADE SEPARATION OVER

HWY 111 AND SPRR

BTWN PALM ST AND EAST SIDE OF

COACHELLA STORM CHNL

WIDEN FROM 2 TO 6 LANES INCLUDING GRADE SEPA-RATION OVER UPRR

2023 $22,439

RIVERSIDE 3A07177 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

HARRISON ST TYLER ST WIDEN FROM 2 TO 6 LANES 2030 $4,759

RIVERSIDE 3A07176 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

JACKSON ST 0.25 MILES W OF VAN BUREN ST

WIDEN FROM 2 TO 6 LANES 2035 $2,645

RIVERSIDE 3A07175 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2035 $3,894

RIVERSIDE 3A07179 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

POLK ST HWY 111 WIDEN FROM 2 TO 6 LANES 2030 $1,414

RIVERSIDE 3A04CV027 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

SPRR E SIDE OF BR. AT COACHELLA VLLY

STORM CHNL

WIDEN FROM 2 TO 4 LANES 2023 $1,644

RIVERSIDE 3A07182 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

SPRR TO E SIDE OF BR. AT COACHELLA VLLY STORM CHNL

SR86S WIDEN FROM 2 TO 6 LANES 2030 $11,548

RIVERSIDE 3A07178 LOCAL HIGHWAY

AVE 56 / AIRPORT BLVD

TYLER ST POLK ST WIDEN FROM 2 TO 6 LANES 2030 $3,883

RIVERSIDE 3A07185 LOCAL HIGHWAY

AVE 58 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 4 LANES 2030 $4,371

Page 270: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

268 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07102 LOCAL HIGHWAY

AVE 58 JEFFERSON ST MADISON ST WIDEN SOUTH SIDE FROM 1 TO 2 LANES 2018 $3,442

RIVERSIDE 3A07106 LOCAL HIGHWAY

AVE 58 MADISON ST MONROE ST WIDEN SOUTH SIDE FROM 1 TO 2 LANES IN AREAS WITH MISSING SECTIONS.

2018 $690

RIVERSIDE 3A07184 LOCAL HIGHWAY

AVE 58 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2035 $3,618

RIVERSIDE 3A07078 LOCAL HIGHWAY

AVE 58 VAN BUREN ST HARRISON ST &#40;SR-86&#41;

WIDEN FROM 2 TO 4 LANES 2023 $6,267

RIVERSIDE 3A07186 LOCAL HIGHWAY

AVE 62 AVE 62 SR-86S IC BTWN W/O SR111 TO BUCHANAN ST

WIDEN FROM 0 TO 6 LANES 2035 $46,550

RIVERSIDE 3A07193 LOCAL HIGHWAY

AVE 62 FILLMORE ST PIERCE ST WIDEN FROM 2 TO 6 LANES 2035 $25,959

RIVERSIDE 3A07190 LOCAL HIGHWAY

AVE 62 HARRISON ST TYLER ST WIDEN FROM 2 TO 6 LANES 2035 $5,628

RIVERSIDE 3A07188 LOCAL HIGHWAY

AVE 62 JACKSON ST VAN BUREN ST WIDEN FROM 2 TO 6 LANES 2035 $8,105

RIVERSIDE 3A07187 LOCAL HIGHWAY

AVE 62 MONROE ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2035 $6,772

RIVERSIDE 3A07194 LOCAL HIGHWAY

AVE 62 PIERCE ST SR86S WIDEN FROM 2 TO 6 LANES 2030 $7,714

RIVERSIDE 3A07192 LOCAL HIGHWAY

AVE 62 POLK ST FILLMORE ST WIDEN FROM 2 TO 6 LANES 2035 $10,148

RIVERSIDE 3A07191 LOCAL HIGHWAY

AVE 62 TYLER ST POLK ST WIDEN FROM 2 TO 6 LANES 2035 $5,628

RIVERSIDE 3A07189 LOCAL HIGHWAY

AVE 62 VAN BUREN ST HARRISON ST WIDEN FROM 2 TO 6 LANES 2035 $8,041

RIVERSIDE 3A07196 LOCAL HIGHWAY

AVE 66 AVE 66 BR./LOW WATER XING

BTWN W/O COACHELLA VALLEY

STORM WATER CHNL AND PERCE ST

WIDEN FROM 2 TO 6 LANES 2030 $3,334

RIVERSIDE 3A07195 LOCAL HIGHWAY

AVE 66 AVE 66 SR-86S IC BTWN W/O BUCHANAN ST AND

E/O SR86S

WIDEN FROM 0 TO 6 LANES 2030 $46,934

Page 271: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 269

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV071285 LOCAL HIGHWAY

AVE. 56 (AIRPORT BLVD)

IN THE SOUTHEAST COACHELLA VALLEY IN EASTERN RIVERSIDE COUNTY, JUST SOUTH OF THE CITY OF COACHELLA ON AVE. 56 (AIRPORT BLVD) – FROM POLK ST TO THE WEST TO ORANGE ST. TO THE EAST OF THE R/R X-ING: REPLACE EXISTING 2 LN (1 LN IN EA DIR) AT GRADE R/R X-ING WITH A 2 LN OC (1 LN IN EA DIR – NON-CAPACITY) ACROSS THE UPRR TRACKS.

2014 $22,300

RIVERSIDE 3A07137 LOCAL HIGHWAY

AVE 44 AVE. 44 BR. / LOW WATER XING

WIDEN FROM 2 TO 4 LANES, INCLUDING NEW BRIDGE. 2018 $12,216

RIVERSIDE 3A07017 LOCAL HIGHWAY

AVE 44 LOW WATER XING DILLON RD WIDEN FROM 2 TO 4 LANES, INCLUDING REPLACE-MENT OF A 2 LANE LOW WATER CROSSING WITH A 4 LANE BRIDGE.

2018 $11,145

RIVERSIDE 3A07029 LOCAL HIGHWAY

AVE 44 MONROE ST LOW WATER XING WIDEN FROM 2 TO 4 LANES, INCLUDING BRIDGE OVER WHITEWATER RIVER.

2020 $14,504

RIVERSIDE 3A07043 LOCAL HIGHWAY

AVE 48 HJORTH ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2018 $9,898

RIVERSIDE 3A07166 LOCAL HIGHWAY

AVE 48 INTERSECTION OF AVE 48 AND

HWY 86

INTERSECTION IMPROVEMENTS 2018 $973

RIVERSIDE 3A07076 LOCAL HIGHWAY

AVE 48 JACKSON ST VAN BUREN ST &AMP;#40;CENTER

LINE&AMP;#41;

WIDEN FROM 2 TO 6 LANES 2018 $4,542

RIVERSIDE 3A07025 LOCAL HIGHWAY

AVE 48 JEFFERSON ST ALL AMERICAN CANAL

WIDEN FROM 4 TO 6 LANES 2018 $7,531

RIVERSIDE 3A07117 LOCAL HIGHWAY

AVE 48 VAN BUREN ST W OF HWY 86 WIDEN FROM 2 TO 6 LANES 2018 $3,918

RIVERSIDE 3A07065 LOCAL HIGHWAY

AVE 50 JACKSON ST VAN BUREN ST &AMP;#40; CENTER

LINE &AMP;#41;

WIDEN FROM 2 TO 4 LANES 2018 $3,762

RIVERSIDE 3A01CV003 LOCAL HIGHWAY

AVE 50 JEFFERSON ST MADISON ST (EXCL BR. AT

ALLAMERICAN CANAL)

WIDEN FROM 2 TO 4 LANES 2018 $4,185

Page 272: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

270 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07056 LOCAL HIGHWAY

AVE 50 MADISON ST MONROE ST WIDEN FROM 2 TO 4 LANES 2018 $4,089

RIVERSIDE 3A07052 LOCAL HIGHWAY

AVE 50 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2018 $3,679

RIVERSIDE 3A07115 LOCAL HIGHWAY

AVE 52 JACKSON ST CALHOUN ST WIDEN FROM 2 TO 6 LANES 2018 $2,086

RIVERSIDE 3A01CV011 LOCAL HIGHWAY

AVE 52 MADISON ST MONROE ST WIDEN FROM 2 TO 4 LANES 2018 $3,973

RIVERSIDE 3A01CV012 LOCAL HIGHWAY

AVE 52 MONROE ST JACKSON ST WIDEN FROM 2 TO 4 LANES 2018 $7,945

RIVERSIDE 3A04A10 LOCAL HIGHWAY

BARNARD ST DATE ST INTAKE BLVD CONSTRUCT/EXTEND 2 LANE ARTERIAL 2020 $1,675

RIVERSIDE 3A04WT126 LOCAL HIGHWAY

BAXTER RD I-15 CENTRAL ST WIDEN FROM 2 TO 4 LANES 2030 $17,929

RIVERSIDE RIV000103 LOCAL HIGHWAY

BELARDO RD. IN THE CITY OF PALM SPRINGS – CONSTRUCT BELARDO RD (2 LNS, 1 EA DIR), FROM RAMON RD TO S. PALM CANYON DR., INCLUDING NEW BRIDGE OVER TAHQUITZ CREEK, & INTERSECTION. IMPROVEMENTS. AT SUNNY DUNES RD, MESQUITE AVE., & MORONGO RD., & CONSTRUCT TRIBAL ACCESS RD TO INTERPRETIVE CENTER.

2012 $5,500

RIVERSIDE 3A01WT127 LOCAL HIGHWAY

BELLGRAVE AVE CANTU-GALLEANO RANCH RD

VAN BUREN BLVD WIDEN FROM 2 TO 4 LANES 2035 $4,745

RIVERSIDE 3A01WT128 LOCAL HIGHWAY

BENTON RD SR-79 EASTERN BYPASS WIDEN FROM 2 TO 4 LANES 2030 $7,145

RIVERSIDE 3A07109 LOCAL HIGHWAY

BOB HOPE DR DINAH SHORE RAMON RD WIDEN FROM 4 TO 6 LANES 2012 $3,953

RIVERSIDE 3A07197 LOCAL HIGHWAY

BOB HOPE DR DINAH SHORE RAMON RD WIDENING OF THE SOUTH BOUND LANE FROM 2 TO 3 LANES.

2018 $3,123

RIVERSIDE 3A07138 LOCAL HIGHWAY

BOB HOPE DR FRANK SINATRA DR

GERALD FORD DR WIDEN FROM 4 TO 6 LANES 2018 $5,820

RIVERSIDE 3A07082 LOCAL HIGHWAY

BOB HOPE DR GERALD FORD DINAH SHORE DR WIDEN FROM 4 TO 6 LANES 2018 $5,861

Page 273: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 271

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT056B LOCAL HIGHWAY

BOX SPRINGS RD IN THE CITY OF MORENO VALLEY – WIDEN BOX SPRINGS RD BETWEEN 500’ WEST OF CLARK ST AND DAY ST FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, GRADING, DRAINAGE, CURB, GUTTER, RETAINING WALLS, SIGNAGE, AND STRIPING.

2012 $3,178

RIVERSIDE 3A04WT056A LOCAL HIGHWAY

BOX SPRINGS RD &#40; IRONWOOD

AVE &#41;

MORTON RD 500&#39; W/O CLARK ST

WIDEN FROM 2 TO 4 LANES 2018 $2,500

RIVERSIDE 3A04WT131 LOCAL HIGHWAY

BRIGGS RD NEWPORT RD SCOTT RD WIDEN FROM 2 TO 4 LANES 2035 $9,048

RIVERSIDE 3A04WT132 LOCAL HIGHWAY

BRIGGS RD SCOTT RD SR-79 &AMP;#40; WINCHESTER RD

&AMP;#41;

CONSTRUCT 4 LANE ARTERIAL 2035 $19,153

RIVERSIDE 3A04WT130 LOCAL HIGHWAY

BRIGGS RD SIMPSON RD NEWPORT RD CONSTRUCT 4 LANE ARTERIAL 2035 $17,370

RIVERSIDE 3A04WT129 LOCAL HIGHWAY

BRIGGS RD SR-74 &AMP;#40; PINACATE

RD&AMP;#41;

SIMPSON RD CONSTRUCT 4 LANE ARTERIAL 2035 $14,863

RIVERSIDE 3A01WT133 LOCAL HIGHWAY

BUNDY CANYON RD I-15 MURRIETA RD WIDEN FROM 2 TO 4 LANES 2020 $30,279

RIVERSIDE 3A01WT134 LOCAL HIGHWAY

BUNDY CANYON RD MISSION TRAIL I-15 WIDEN FROM 2 TO 4 LANES 2030 $3,635

RIVERSIDE 3A01WT136 LOCAL HIGHWAY

BUTTERFIELD STAGE RD+ POURROY RD

MURRIETA HOT SPRINGS RD

SR-79 &AMP;#40; WINCHESTER &AMP;#41;

CONSTRUCT 4 LANE ARTERIAL 2030 $40,674

RIVERSIDE RIV071240 LOCAL HIGHWAY

CACTUS AVE. IN THE CITY OF MORENO VALLEY – EAST BOUND CACTUS AVE WIDENING BETWEEN VETERANS WAY & HEACOCK: WIDENING OF EAST BOUND CACTUS AVE FROM 2 TO 3 LANES, INCLUDING TRAFFIC SIGNAL MODIFICATIONS WITHIN THE PROJECT REACH, CHANNELIZATION, AND SIGNAL INTERCONNECT SYSTEM.

2012 $6,243

Page 274: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

272 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A10WT01 LOCAL HIGHWAY

CACTUS AVE. IN WESTERN RIVERSIDE CO. IN THE CITY OF MORENO VALLEY – CACTUS AVE WIDENING: WIDEN CACTUS AVE FROM 2 TO 4 THROUGH LANES (2 IN EA DIR), FROM LASSELLE ST TO NASON ST. OTHER IMPROVEMENTS INCLUDE THE INSTALLATION OF A DEDICATED RIGHT TURN LANE, A 2-WAY LEFT TURN LANE, BUS TURN-OUTS, LANDSCAPING & SIDEWALKS.

2014 $6,350

RIVERSIDE 3120004 LOCAL HIGHWAY

CACTUS AVE. LASSELLE ST. NASON ST. WIDEN FROM 2 TO 4 LANES 2014 $9,900

RIVERSIDE 3A04WT137A LOCAL HIGHWAY

CAJALCO RD. IN RIVERSIDE COUNTY ON CAJALCO RD – CAJALCO RD. WIDENING FROM 2 TO 4 THRU LNS (2 IN EA DIR) FROM TEMESCAL CANYON RD. TO I-215, INCL A CONTINUOUS MEDIAN LEFT TURN LN W/IN PROJECT LIMITS, SHOULDER ROAD, TURN POCKETS, & AND A BRIDGE RECONSTRUCTION OVER A WATER CROSSING (RTP IDS: 3A04WT137A, 3A04WT137B, 3A04WT138A, 3A04WT138B, 3A04WT138C) (PA&ED ONLY) ($803 TOLL CREDITS USED FOR STPL MATCH IN PA&ED).

2020 $173,185

RIVERSIDE 3A04WT140 LOCAL HIGHWAY

CANTU-GALLEANO RANCH RD

&AMP;#40;AKA GALENA ST&AMP

WINEVILLE RD BELLGRAVE AVE CONSTRUCT 4 LANE ARTERIAL 2030 $12,281

RIVERSIDE 3A07107 LOCAL HIGHWAY

CANYON CREST DR COUNTRY CLUB CENTURY WIDEN 2 TO 4 LANES 2018 $4,034

RIVERSIDE 3A07262 LOCAL HIGHWAY

CASE RD GOETZ RD I-215 WIDEN FROM 2 TO 4 LANES, INCLUDING 2 BRIDGES OVER SAN JACINTO RIER AND INTERCHANGE AT I-215

2020 $124,353

RIVERSIDE 3A07099 LOCAL HIGHWAY

CATHEDRAL CYN DR TERRACE RD E PALM CYN WIDEN FROM 2 TO 4 LANES 2018 $2,525

RIVERSIDE 3A07287 LOCAL HIGHWAY

CAWSTON AVE ESPLANADE AVE RAMONA EXPWAY CONSTRUCT 4 LANES 2018 $12,000

RIVERSIDE 3A04WT141 LOCAL HIGHWAY

CENTER ST MT VERNON AVE RECHE CANYON RD CONSTRUCT 4 LANE ARTERIAL 2035 $15,639

RIVERSIDE 3A01WT114 LOCAL HIGHWAY

CENTRAL AVE MAGNOLIA AVE SR91 WIDEN FROM 4 TO 6 LANES BTWN SR-91 AND MAGNOLIA

2018 $2,730

Page 275: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 273

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT142 LOCAL HIGHWAY

CENTRAL ST BAXTER RD PALOMAR ST WIDEN FROM 2 TO 4 LANES 2030 $2,801

RIVERSIDE 3A04WT143 LOCAL HIGHWAY

CENTRAL ST GRAND AVE PALOMAR ST WIDEN FROM 2 TO 4 LANES 2030 $1,937

RIVERSIDE 3A07199 LOCAL HIGHWAY

CHASE SCHOOL RD I-10 RAMON RD WIDEN FROM 0 TO 4 LANES 2030 $21,183

RIVERSIDE 3A04WT144 LOCAL HIGHWAY

CHERRY VALLEY BLVD

DESERT LAWN DR NOBLE ST WIDEN FROM 2 TO 4 LANES 2035 $9,608

RIVERSIDE 3A04WT145 LOCAL HIGHWAY

CHERRY VALLEY BLVD

NOBLE ST HIGHLAND SPRINGS AVE

CONSTRUCT 4 LANE ARTERIAL 2035 $10,519

RIVERSIDE RIV060123 LOCAL HIGHWAY

CLAY ST. IN NORTHWEST RIVERSIDE COUNTY ON CLAY ST FROM APPROX 100’ SW OF GENERAL DR TO APPROX 500’ N/O LINARES AVE: REPLACE EXISTING 4-LANE (2 LNS IN EACH DIRECTION) AT GRADE R/R X-ING WITH A 4-LN (2 LNS IN EACH DIRECTION – NON-CAPACITY) UNDERCROSSING (UPRR).

2013 $37,350

RIVERSIDE 3A01WT072 LOCAL HIGHWAY

CLINTON KEITH RD COPPERCRAFT TOULON DR WIDEN FROM 4 TO 6 LANES 2020 $1,645

RIVERSIDE 3A01WT071 LOCAL HIGHWAY

CLINTON KEITH RD I-15 COPPERCRAFT WIDEN FROM 2 TO 6 LANES 2018 $18,700

RIVERSIDE 3A01WT073 LOCAL HIGHWAY

CLINTON KEITH RD I-215 MEADOWLARK LN WIDEN FROM 4 TO 6 LANES 2020 $2,041

RIVERSIDE 3A04WT146 LOCAL HIGHWAY

CLINTON KEITH RD MEADOWLARK LN SR-79 CONSTRUCT 6 LANE ARTERIAL 2020 $47,592

RIVERSIDE 3A01WT083 LOCAL HIGHWAY

CLINTON KEITH RD TOULON DR I-215 WIDEN FROM 4 TO 6 LANES 2014 $35,501

RIVERSIDE RIV011236 LOCAL HIGHWAY

CLINTON KEITH RD. IN RIV COUNTY & MURRIETA – EXTEND/CONSTRUCT CLINTON KEITH ROAD (6 LANES TOTAL – APPROX 3.4 MILES) WITH 2 BRIDGES FROM ANTELOPE ROAD TO WINCHESTER ROAD (SR79)

2018 $61,597

RIVERSIDE 3A04WT147 LOCAL HIGHWAY

CLOVERDALE RD ARCHIBALD AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2035 $4,126

RIVERSIDE 3A07299 LOCAL HIGHWAY

COOK ST BR. AT WHITEWATER CHNL

WIDEN FROM 4 TO 6 LANES 2023 $8,823

Page 276: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

274 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07301 LOCAL HIGHWAY

COOK ST COUNTRY CLUB WHITEWATER BRG. WIDEN FROM 4 TO 6 LANES 2023 $8,791

RIVERSIDE 3A07311 LOCAL HIGHWAY

COOK ST WHITEWATER BR. FRED WARING DR WIDEN FROM 4 TO 6 LANES 2023 $2,331

RIVERSIDE 3A07136 LOCAL HIGHWAY

COOK ST FRANK SINATRA COUNTRY CLUB DR. WIDEN FROM 4 TO 6 LANES 2023 $2,500

RIVERSIDE 3A04WT088 LOCAL HIGHWAY

CORYDON AVE RIVER RD NORCO DR WIDEN FROM 2 TO 4 LANES 2030 $5,743

RIVERSIDE 3A07288 LOCAL HIGHWAY

COTTONWOOD AVE WARREN RD STATE ST WIDEN FROM 2 TO 4 LANES 2020 $20,000

RIVERSIDE 3A07147 LOCAL HIGHWAY

COUNTRY CLUB DR INTERSECTION OF COUNTRY CLUB

DR. AND BOB HOPE DR.

INTERSECTION IMPROVEMENTS AT COUNTRY CLUB DR AND BOB HOPE DR.

2016 $1,550

RIVERSIDE 3A07200 LOCAL HIGHWAY

COUNTRY CLUB DR MONTEREY AVE PORTOLA AVE WIDEN FROM 4 TO 6 LANES 2030 $7,559

RIVERSIDE 3A07123 LOCAL HIGHWAY

COUNTRY CLUB DR COOK ST ELDORADO DR WIDEN FROM 4 TO 6 LANES 2030 $3,250

RIVERSIDE 3A01CV030 LOCAL HIGHWAY

COUNTRY CLUB DR EL DORADO DR OASIS CLUB DR WIDEN FROM 4 TO 6 LANES 2030 $3,135

RIVERSIDE 3A01CV031 LOCAL HIGHWAY

COUNTRY CLUB DR OASIS CLUB DR WASHINGTON ST WIDEN FROM 4 TO 6 LANES 2030 $3,203

RIVERSIDE 3A01CV033 LOCAL HIGHWAY

COUNTRY CLUB DR PORTOLA AVE COOK ST WIDEN FROM 4 TO 6 LANES 2030 $3,049

RIVERSIDE RIV060102 LOCAL HIGHWAY

COUNTY LINE RD IN CALIMESA – WIDEN COUNTY LN RD FROM 1 TO 2 LNS (I-10 TO CALIMESA BLVD), ADD EB DEDICATED RIGHT-TURN LN, WIDEN SB CALIMESA BLVD FROM 2 TO 3 LNS FOR APPROX. 150’ S/O COUNTY LN RD SOUTH R-O-W, ADD CURB AND GUTTER AS REQUIRED. ADDITIONAL IMPROVEMENTS INCLUDE THE LENGTHENING OF BOX CULVERT AND/OR ADD CONCRETE RETAINING WINGWALL SYSTEM (TOLL CR UTILIZATION: $101/$187 FOR ENG/R/W – DEMO-SAFETEA-LU).

2014 $2,366

Page 277: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 275

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07095 LOCAL HIGHWAY

CROSSLEY RD / GOLF CLUB DR

DINAH SHORE DR. AVE 34 WIDEN FROM 2 TO 4 LANES 2030 $4,714

RIVERSIDE 3A07009 LOCAL HIGHWAY

CROSSLEY RD / GOLF CLUB DR

N. BANK OF WASH S. BANK OF WASH NEW BRIDGE OVER PALM CANYON WASH. 2030 $72,418

RIVERSIDE 3A07112 LOCAL HIGHWAY

CROSSLEY RD / GOLF CLUB DR

RAMON RD DINAH SHORE DR. WIDEN FROM 2 TO 4 LANES 2018 $3,765

RIVERSIDE 3A07120 LOCAL HIGHWAY

DA VALL RD AVE 30 I-10 CONSTRUCT NEW 6-LANE ROAD 2030 $3,263

RIVERSIDE 3A07055 LOCAL HIGHWAY

DA VALL RD DINAH SHORE RAMON RD WIDEN FROM 2 TO 6 LANES 2018 $8,100

RIVERSIDE 3A07042 LOCAL HIGHWAY

DA VALL RD I-10 VARNER RD CONSTRUCT NEW 6-LANE ROAD, INCLUDING BRIDGE AT LONG CANYON

2030 $21,480

RIVERSIDE 3A07201 LOCAL HIGHWAY

DA VALL RD MCCALLUM WAY AVE 30 WIDEN FROM 2 TO 4 LANES 2030 $2,681

RIVERSIDE 3A07127 LOCAL HIGHWAY

DA VALL RD MCCALLUM WAY AVE 30 WIDEN FROM 2 TO 6 LANES 2023 $2,977

RIVERSIDE 3A07125 LOCAL HIGHWAY

DA VALL RD RAMON RD MCCALLUM WAY WIDEN FROM 2 TO 6 LANES 2020 $3,075

RIVERSIDE 3A07028-RIV070302

LOCAL HIGHWAY

DATE PALM DR IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY – DATE PALM DR BRIDGE REPLACEMENT/WIDENING: REPLACEMENT OF A TW0 LANE (1 LN IN EA DIR) LOW WATER CROSSING BRIDGE OVER LONG CANYON CREEK (BRIDGE NO. 00L0043) WITH A SIX LANE (3 LNS IN EA DIR), FOR APPROXIMATELY 350 FT. (FROM VARNER RD. TO 350’ S/O VARNER RD).

2018 $10,424

RIVERSIDE 3A07032 LOCAL HIGHWAY

DATE PALM DR DINAH SHORE DR RAMON RD WIDEN FROM 4 TO 6 LANES 2020 $4,003

RIVERSIDE 3A07060 LOCAL HIGHWAY

DATE PALM DR EAST PALM CYN GERALD FORD DR WIDEN FROM 4 TO 6 LANES, INCLUDING BRIDGE AT N. CATHERAL CHANNEL

2018 $13,015

RIVERSIDE 3A07048 LOCAL HIGHWAY

DATE PALM DR GERALD FORD DR DINAH SHORE DR WIDEN FROM 4 TO 6 LANES 2020 $3,333

Page 278: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

276 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07028-RIV110501

LOCAL HIGHWAY

DATE PALM DR. IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY – DATE PALM DR WIDENING FROM I-10 TO 350’ S/O VARNER RD.: WIDENING OF DATE PALM DR. FROM 2 TO 6 LNS (3 LNS IN EA DIR) FROM I-10 TO 350’ S/O VARNER RD . OTHER IMPROVEMENTS INCLUDE ADDITIONAL TURNING LANES AT INTERSECTION OF DATE PALM DR. & VARNER RD., TRAFFIC SIGNALIZATION, SIDEWALKS, MEDIANS AND BIKE LANES.

2018 $8,576

RIVERSIDE 3A07027 LOCAL HIGHWAY

DATE PALM DR. OVER WHITEWATER RIVER

BRIDGE

IN EASTERN RIVERSIDE COUNTY IN THE COACHELLA VALLEY – DATE PALM DR OVER THE WHITEWATER RIVER: WIDENING OF DATE PALM DR FROM 4 TO 6 LNS (3 LNS IN EA DIR), FROM APPROX. 350’ S/O THE BRIDGE TO 250’ N/O THE BRIDGE (VIA ESTRADA TO THE NORTH AND PEREZ RD. TO THE SOUTH), INCLUDING THE CONSTRUCTION OF A RAISED MEDIAN AND SIDEWALK ALONG THE EAST SIDE OF THE PROJECT (BRIDGE NO. 56C0189).

2018 $18,703

RIVERSIDE 3A07129 LOCAL HIGHWAY

DIAZ ROAD DENDY PARKWAY NORTH CITY LIMITS CONSTRUCT 4 LANE ARTERIAL 2020 $2,880

RIVERSIDE 3A07051 LOCAL HIGHWAY

DILLON RD AVE 44 I-10 WIDEN FROM 2 TO 4 LANES 2020 $8,895

RIVERSIDE 3A07212 LOCAL HIGHWAY

DILLON RD BR. AT WHITEWATER CHNL

EASTERLY WIDEN FROM 2 TO 4 LANES 2030 $1,265

RIVERSIDE 3A07091 LOCAL HIGHWAY

DILLON RD GRADE SEPARATION AT HWY 111 / SPRR

WIDEN FROM 2 TO 4 LANES 2018 $5,030

RIVERSIDE 3A07096 LOCAL HIGHWAY

DILLON RD I-10 WHITEWATER BR. WIDEN FROM 2 TO 4 LANES 2014 $4,669

RIVERSIDE 3A07205 LOCAL HIGHWAY

DILLON RD INDIAN AVE PALM DR WIDEN FROM 2 TO 4 LANES 2030 $11,699

RIVERSIDE 3A07204 LOCAL HIGHWAY

DILLON RD INTERSECTION OF DILLON RD &AMP;AMP; INDIAN AVE

EASTERLY WIDEN FROM 2 TO 6 LANES 2030 $956

Page 279: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 277

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07206 LOCAL HIGHWAY

DILLON RD INTERSECTION OF DILLON RD

&AMP;AMP; PALM DR

EASTERLY WIDEN FROM 4 TO 6 LANES 2030 $956

RIVERSIDE 3A07207 LOCAL HIGHWAY

DILLON RD PALM DR MOUNTAIN VIEW WIDEN FROM 2 TO 4 LANES 2030 $5,037

RIVERSIDE 3A07026 LOCAL HIGHWAY

DILLON RD SR-62 INDIAN AVE WIDEN FROM 2 TO 4 LANES 2030 $14,850

RIVERSIDE 3A07213 LOCAL HIGHWAY

DILLON RD WHITEWATER BR. HWY 111 WIDEN FROM 2 TO 4 LANES 2030 $3,285

RIVERSIDE 3A04WT148 LOCAL HIGHWAY

DOMENIGONI PKWY SR-79 &AMP;#40; WINCHESTER RD

&AMP;#41;

WARREN RD WIDEN FROM 4 TO 6 LANES 2035 $15,110

RIVERSIDE 3A04WT034 LOCAL HIGHWAY

DOMENIGONI PKWY WARREN RD SANDERSON AVE WIDEN FROM 4 TO 6 LANES 2018 $5,601

RIVERSIDE 3A07061 LOCAL HIGHWAY

DUNE PALMS RD BR. AT WHITEWATER CHNL

CONSTRUCT 4-LANE BRIDGE 2018 $11,900

RIVERSIDE 3A07264 LOCAL HIGHWAY

DUNLAP ORANGE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2018 $4,000

RIVERSIDE 3ITS0701-RIV071247

LOCAL HIGHWAY

EAST PALM CANYON IN CATHEDRAL CITY – SIGNAL SYNCHRONIZATION ALONG EAST PALM CANYON FROM EAST BUDDY ROGERS TO ALLEN AVE: SYNCHRONIZE LIGHTS AT FOUR INTERSECTIONS WHERE ROADWAY LANES VARY FROM A 6 LN ARTERIAL TO A 4 LN ARTERIAL AT INTERVALS ($28 TOLL CREDITS USED TO MATCH CMAQ IN CONST).

2012 $283

RIVERSIDE 3EL04 LOCAL HIGHWAY

ECONOMIC DEVELOPMENT

WESTERN COUNTY INFRASTRUCTURE AND FACILITY IMPROVEMENTS INCENTIVES

2035 $40,477

RIVERSIDE 3A04WT149 LOCAL HIGHWAY

EL CERRITO RD I-15 ONTARIO AVE WIDEN FROM 2 TO 4 LANES 2030 $1,763

RIVERSIDE 3A04WT150 LOCAL HIGHWAY

ELLIS AVE POST RD SR-74 WIDEN FROM 2 TO 4 LANES 2035 $7,830

RIVERSIDE 3A04WT093 LOCAL HIGHWAY

ELLIS AVE SR-74 I-215 CONSTRUCT 2 LANE ARTERIAL AND 2 LANE GRADE SEPARATION OVER BNSF RR &#40;KEEP GRADE SEPARATION IN ARTERIAL SECTION&#41;

2030 $15,407

Page 280: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

278 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3120005 LOCAL HIGHWAY

ELM ST ADAMS AVE JACKSON AVE WIDEN FROM 2 TO 4 LANES WITH I-15 OVERCROSSING

2020 $10,000

RIVERSIDE 3A04WT208 LOCAL HIGHWAY

ESPLANADE AVE WARREN RD STATE ST WIDEN FROM 2 TO 4 LANES 2014 $10,553

RIVERSIDE 3A01WT152 LOCAL HIGHWAY

ETHANAC RD SHERMAN RD MATTHEWS RD WIDEN FROM 2 TO 4 LANES INCL. GRADE SEPARA-TION OVER BNSF RR &#40;GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE&#41;

2030 $43,027

RIVERSIDE 3A01WT151 LOCAL HIGHWAY

ETHANAC RD SR-74 KEYSTONE DR CONSTRUCT 4 LANE ARTERIAL 2030 $6,393

RIVERSIDE 3A04WT052 LOCAL HIGHWAY

EUCALYPTUS AVE I-215 TOWNGATE BLV WIDEN FROM 4 TO 6 LANES 2014 $3,848

RIVERSIDE 3A07162 LOCAL HIGHWAY

EUCALYPTUS AVE TOWNGATE BLV ELSWORTH ST STREET IMPROVEMENT / WIDENING 2014 $183

RIVERSIDE 3A10WT02 LOCAL HIGHWAY

EUCALYPTUS AVE. IN WESTERN RIVERSIDE COUNTY IN THE CITY OF MORENO VALLEY – EUCALYPTUS AVE. EXTENSION: CONSTRUCTION OF 3 THROUGH LANES (2 LANES WB & 1 LANE EB) BETWEEN REDLANDS BLVD. AND THEODORE ST, INCLUDING THE INSTALLATION OF MEDIANS, LEFT TURN POCKETS, DEDICATED RIGHT TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND A CLASS I BIKE PATH.

2012 $6,266

RIVERSIDE 3A10WT03 LOCAL HIGHWAY

EUCALYPTUS AVE. IN WESTERN RIVERSIDE COUNTY IN THE CITY OF MORENO VALLEY – EUCALYPTUS AVE. WIDENING/EXTENSION: CONSTRUCTION OF A 4TH THROUGH LANE IN THE EASTERN DIRECTION FROM REDLANDS BLVD. TO THEODORE ST & EXTENSION OF EUCALYPTUS AVE. TO REDLANDS BLVD., WITH A SIGNALIZED INTERSECTION.

2014 $3,550

RIVERSIDE 3A01WT100 LOCAL HIGHWAY

EVANS RD NUEVO RD I-215 CONSTRUCT 4 LANE ARTERIAL 2018 $17,494

RIVERSIDE 3A04WT099 LOCAL HIGHWAY

EVANS RD PLACENTIA AVE NUEVO RD CONSTRUCT 4 LANE ARTERIAL 2018 $7,000

Page 281: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 279

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV010209 LOCAL HIGHWAY

FOOTHILL PARKWAY IN THE CITY OF CORONA – CONSTRUCT FOOTHILL PARKWAY WESTERLY EXTENSION 4 LANE ROAD FROM LINCOLN AVE TO PASEO GRANDE (APPROX 2.5 MILES)

2014 $49,311

RIVERSIDE 3A01CV040B LOCAL HIGHWAY

FRANK SINATRA DR COOK ST ELDORADO DR WIDEN FROM 4 TO 6 LANES 2023 $5,450

RIVERSIDE 3A01CV040A LOCAL HIGHWAY

FRANK SINATRA DR ELDORADO DR TAMARISK ROW DR WIDEN FROM 4 TO 6 LANES 2023 $1,301

RIVERSIDE 3A07149 LOCAL HIGHWAY

FRANK SINATRA DR INTERSECTION OF FRANK SINATRA

DR. AND BOB HOPE DR.

INTERSECTION IMPROVEMENTS AT FRANK SINATRA DR. AND BOB HOPE DR.

2013 $1,500

RIVERSIDE 3A07304 LOCAL HIGHWAY

FRANK SINATRA DR MONTEREY AVE PORTOLA AVE WIDEN FROM 4 TO 6 LANES 2023 $6,858

RIVERSIDE 3A07306 LOCAL HIGHWAY

FRANK SINATRA DR PORTOLA AVE COOK ST WIDEN FROM 4 TO 6 LANES 2023 $5,034

RIVERSIDE 3A07024 LOCAL HIGHWAY

FRANK SINATRA DR WHITEWATER RIVER BRIDGE

AT FRANK SINATRA DR

REPLACE A 4 LANE AT GRADE LOW-WATER CROSSING WITH A NEW 4 LANE BRIDGE

2018 $38,158

RIVERSIDE 3A04A14 LOCAL HIGHWAY

FRANKLIN ST AVE 6 CANYON ESTATES DR

WIDEN STREET AND BRIDGE OVER I-15 FROM 2 TO 4 LANES

2018 $1,222

RIVERSIDE 3A07217 LOCAL HIGHWAY

FRED WARING DR ADAMS ST. DUNE PALMS RD WIDEN FROM 2 TO 3 LANES ON THE NORTH SIDE OF FRED WARING DR FROM ADAMS ST TO DUNE PALMS RD.

2014 $5,012

RIVERSIDE 3A07111 LOCAL HIGHWAY

FRED WARING DR DUNE PALMS RD JEFFERSON ST WIDEN FROM 3 TO 6 LANES 2012 $3,775

RIVERSIDE 3A07218 LOCAL HIGHWAY

FRED WARING DR DUNE PALMS RD JEFFERSON ST WIDEN NORTH SIDE OF FRED WARING DR FROM 2 TO 3 LANES

2020 $1,144

RIVERSIDE 3A07063 LOCAL HIGHWAY

FRED WARING DR WASHINGTON ST DUNE PALMS RD WIDEN FROM 4 TO 6 LANES 2012 $7,813

RIVERSIDE 3A01WT221 LOCAL HIGHWAY

FRENCH VALLEY &AMP;#40;WESTERN BYPASS&AMP;#41;

MARGARITA RD MURRIETA CREEK CONSTRUCT 0 TO 6 LANE ARTERIAL 2020 $19,384

RIVERSIDE 3A01WT222A LOCAL HIGHWAY

FRENCH VALLEY &AMP;#40;WESTERN BYPASS&AMP;#41;

MURRIETA CREEK RANCHO CALIFORNIA RD

CONSTRUCT 0 TO 4 LANE ARTERIAL 2030 $24,977

Page 282: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

280 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04A32 LOCAL HIGHWAY

GARBANI RD BRADLEY RD I-215 CONSTRUCT 4-LANE ARTERIAL 2030 $2,558

RIVERSIDE 3A04A31 LOCAL HIGHWAY

GARBANI RD I-215 MENIFEE RD RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES 2030 $2,251

RIVERSIDE RIV010213 LOCAL HIGHWAY

GENE AUTRY TR. WIDEN GENE AUTRY TRAIL FROM 2 TO 6 LANES (3 IN EACH DIRECTION), INCLUDING WIDENING OF EXISTING UPRR OVERCROSSING (BRIDGE 56C0082) FROM 1700’ S/O UPRR BRIDGE TO SALVIA ROAD.

2012 $4,893

RIVERSIDE 3A07004 LOCAL HIGHWAY

GENE AUTRY TRAIL N. BANK OF WHITEWATER

RIVER

S. BANK OF WHITEWATER RIVER

NEW BRIDGE TO REPLACE EXISTING LOW WATER CROSSING AT WHITEWATER RIVER.

2023 $141,190

RIVERSIDE 3A07312 LOCAL HIGHWAY

GERALD FORD DR COOK ST FRANK SINATRA DR WIDEN FROM 3 TO 4 LANES 2030 $1,250

RIVERSIDE 3A01WT192 LOCAL HIGHWAY

GILMAN SPRINGS SANDERSON AVE STATE ST WIDEN FROM 2 TO 4 LANES 2035 $8,208

RIVERSIDE 3A01WT153 LOCAL HIGHWAY

GILMAN SPRINGS RD IN THE CITY OF MORENO VALLEY – WIDEN GILMAN SPRINGS RD BETWEEN ALESSANDRO BLVD AND BRIDGE ST FROM 2 TO 6 LANES. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, ACCESS ROADS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

2014 $51,000

RIVERSIDE 3A01WT053 LOCAL HIGHWAY

GILMAN SPRINGS RD IN THE CITY OF MORENO VALLEY – WIDEN GILMAN SPRINGS RD BETWEEN SR-60 AND ALESSANDRO BLVD FROM 2 TO 6 LANES. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, ACCESS ROADS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

2018 $41,500

RIVERSIDE 3A01WT154 LOCAL HIGHWAY

GILMAN SPRINGS RD BRIDGE ST SANDERSON AVE WIDEN FROM 2 TO 4 LANES 2030 $8,752

RIVERSIDE 3A01WT101 LOCAL HIGHWAY

GOETZ RD CASE RD ETHANAC RD WIDEN FROM 2 TO 4 LANES 2018 $18,000

RIVERSIDE 3A04WT156 LOCAL HIGHWAY

GOETZ RD JUANITA DR LESSER LN WIDEN FROM 2 TO 4 LANES 2030 $7,513

Page 283: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 281

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT102 LOCAL HIGHWAY

GOETZ RD LESSER LN ETHANAC RD WIDEN FROM 2 TO 4 LANES 2020 $7,000

RIVERSIDE 3A04WT155 LOCAL HIGHWAY

GOETZ RD NORMANDY RD JUANITA DR WIDEN FROM 2 TO 4 LANES 2030 $2,000

RIVERSIDE 3GL04 LOCAL HIGHWAY

GRADE SEPARATION COUNTYWIDE GRADE SEPARATION IMPROVEMENTS 2035 $1,217,800

RIVERSIDE 3A04WT157 LOCAL HIGHWAY

GRAND AVE ORTEGA HWY &AMP; AMP;#40;

SR-74&AMP; AMP;#41;

CENTRAL ST WIDEN FROM 2 TO 4 LANES 2030 $22,400

RIVERSIDE 3A04WT042 LOCAL HIGHWAY

GRAND AVE TOFT DR SR-74 WIDEN FROM 2 TO 4 LANES 2023 $2,658

RIVERSIDE 3A07040 LOCAL HIGHWAY

GRAPEFRUIT BLVD AVE 48/DILLON RD AVE 50 WIDEN FROM 4 TO 6 LANES 2018 $10,326

RIVERSIDE 3A07071 LOCAL HIGHWAY

GRAPEFRUIT BLVD AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2020 $6,955

RIVERSIDE 3A07069 LOCAL HIGHWAY

GRAPEFRUIT BLVD AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2018 $7,074

RIVERSIDE 3A07088 LOCAL HIGHWAY

GRAPEFRUIT BLVD AVE 54 AVE 56 WIDEN FROM 2 TO 4 LANES 2030 $5,152

RIVERSIDE RIV011237 LOCAL HIGHWAY

GREEN RIVER RD. NEAR CORONA – WIDEN GREEN RIVER ROAD FROM 3 TO 6 LANES FROM SR91 SOUTHSIDE OFF/ON RAMPS TO PALISADES DR.

2014 $7,583

RIVERSIDE 3120008 LOCAL HIGHWAY

GUAVA AVE WASHINGTON AVE MONROE AVE WIDEN FROM 2 TO 4 LANES 2020 $10,000

RIVERSIDE RIV031204 LOCAL HIGHWAY

GUAVA ST. BRIDGE OVER MURRIETA

CREEK

IN MURRIETA – CONSTRUCT NEW 2 LANE GUAVA ST. BRIDGE (400’) OVER MURRIETA CREEK FROM WASHINGTON AVE TO ADAMS AVE W/ SHOULDERS & ALL REQUIRED APPROACHES (BR#: 56C0162) ($48/$1,339 TOLL CREDITS UTILIZED FOR R/W & CONS).

2018 $7,575

RIVERSIDE 3A01CV047A LOCAL HIGHWAY

HACIENDA AVE CHOLLA DR PALM DR WIDEN FROM 2 TO 6 LANES 2014 $5,184

RIVERSIDE 3A01CV047B LOCAL HIGHWAY

HACIENDA AVE LITTLE MORONGO RD

CHOLLA DR&#40; MISSINGLINK &#41;

CONSTRUCT NEW 6-LANE ROAD 2014 $4,922

Page 284: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

282 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01CV049 LOCAL HIGHWAY

HACIENDA AVE MOUNTAIN VIEW RD

DILLON RD&AMP; #40; LONGCYNRD

&AMP;#41;

WIDEN FROM 2 TO 4 LANES 2014 $14,801

RIVERSIDE 3A01CV048 LOCAL HIGHWAY

HACIENDA AVE PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 6 LANES 2014 $8,886

RIVERSIDE 30M0701-RIV071259

LOCAL HIGHWAY

HAMMOND RD. IN EASTERN COACHELLA VALLEY – MECCA COMMUNITY ROUNDABOUT: CONSTRUCT A ROUNDABOUT ENTRY TO THE UNINCORPORATED MECCA COMM. ON HAMMOND RD & 4TH ST BTWN 5TH & 3RD STREETS, CONSISTING OF A SINGLE LN. TRAFFIC CIRCLE W/ONE BYPASS RT LN FOR THE SE TRAFFIC; MOUNTABLE MEDIAN APRONS; LANDSCAPED CENTER; S/W & PED. X-ING; LANDSCAPE BUFFER; REALIGNMENT OF HAMMOND RD.; AND AN ENTRY MONUMENT.

2012 $2,599

RIVERSIDE 3A04WT089 LOCAL HIGHWAY

HAMNER COTA ST HAMNER AVE WIDEN FROM 4 TO 6 LANES 2018 $1,111

RIVERSIDE 3A01WT159 LOCAL HIGHWAY

HAMNER AVE BELLEGRAVE AVE SANTA ANA RIVER WIDEN FROM 2 TO 6 LANES, INCLUDING BRIDGE OVER SANTA ANA RIVER

2030 $30,269

RIVERSIDE 3A01WT158 LOCAL HIGHWAY

HAMNER AVE MISSION BLVD BELLEGRAVE AVE WIDEN FROM 2 TO 6 LANES 2030 $9,051

RIVERSIDE 3A04WT160 LOCAL HIGHWAY

HARLEY JOHN RD WASHINGTON ST CAJALCO RD WIDEN FROM 2 TO 4 LANES 2030 $3,779

RIVERSIDE 3A04WT060 LOCAL HIGHWAY

HARLEY KNOX BLVD. WESTERN WAY INDIAN AVE WIDEN FROM 2 TO 4 LANES 2018 $7,000

RIVERSIDE 3A07074 LOCAL HIGHWAY

HARRISON ST AVE 54 AVE 56 WIDEN FROM 2 TO 4 LANES 2018 $6,648

RIVERSIDE 3A04WT054 LOCAL HIGHWAY

HEACOCK ST IN THE CITY OF MORENO VALLEY – WIDEN HEACOCK ST BETWEEN CACTUS AVE AND SAN MICHELE RD FROM 2 TO 4 LANES INCLUDING CURB, GUTTER, SIDEWALK, AND SIGNAL.

2012 $10,103

Page 285: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 283

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A0801 LOCAL HIGHWAY

HEACOCK ST IN THE CITY OF MORENO VALLEY – WIDEN HEACOCK ST BETWEEN SAN MICHELE RD AND HARLEY KNOX RD (PERRIS CITY LIMITS), FROM 2 TO 4 LANES; REALIGN HEACOCK ST WITHIN PROJECT LIMITS BETWEEN NANDINA AND OLEANDER; REPLACE BRIDGE OVER PVSD LATERAL B.

2014 $6,100

RIVERSIDE RIV060122 LOCAL HIGHWAY

HEACOCK ST. IN MORENO VALLEY ON HEACOCK ST OVER PERRIS VALLEY STORM DRAIN LATERAL A (APROX. 2.7 MILES N/O RAMONA EXPWY): REPLACE EXISTING 2 LANE BRIDGE WITH A 4 LANE BRIDGE (BRIDGE #: 56C0233)

2012 $2,970

RIVERSIDE 3A07168 LOCAL HIGHWAY

HEACOCK ST-SI DRACAEA EUCALYPTUS STREET IMPROVEMENT / WIDENING 2020 $105

RIVERSIDE 3A07160 LOCAL HIGHWAY

HEACOCK ST-SI EUCALYPTUS FIR STREET IMPROVEMENT / WIDENING 2020 $275

RIVERSIDE 3A07169 LOCAL HIGHWAY

HEACOCK ST-SI IRONWOOD AVE MANZANITA AVE STREET IMPROVEMENT / WIDENING 2020 $57

RIVERSIDE 3A07289 LOCAL HIGHWAY

HEWITT ST MAIN ST SOUTH CITY LIMIT WIDEN FROM 2 TO 4 LANES 2030 $15,000

RIVERSIDE 30M0701-RIV071262

LOCAL HIGHWAY

HIGHWAY 111 IN THE CITY OF PALM DESERT – HWY 111 IMP BTWN THE NO. CITY LIMITS AND LARKSPUR LN: EXT OF & PROVIDE DUAL LEFT TURN POCKET AT THE INT OF NB HWY 111 & PLAZA WAY & RECONSTRUCTION OF CROSS GUTTER (ELIMINATE ABRUPT DIP); CONSTRUCT BUS TURNOUT ON SB HWY 111 AT THE FAR SIDE OF SAN PABLO AVE; AND INSTALL APPROX. 12,000 S.F. OF S/W AND 14 ADA COMPLIANT CURB RAMPS ($71 TOLL CR USED TO MATCH CMAQ IN CONST).

2011 $691

RIVERSIDE 3A07087 LOCAL HIGHWAY

HIGHWAY 111 JACKSON ST INDIO BLVD WIDEN FROM 4 TO 6 LANES 2018 $5,185

RIVERSIDE 3A07031 LOCAL HIGHWAY

HIGHWAY 111 MADISON ST RUBIDOUX ST. WIDEN FROM 4 TO 6 LANES 2014 $7,826

RIVERSIDE 3A07049 LOCAL HIGHWAY

HIGHWAY 111 MONROE ST JACKSON ST WIDEN FROM 4 TO 6 LANES 2018 $9,248

RIVERSIDE 3A07053 LOCAL HIGHWAY

HIGHWAY 111 SHIELDS RD. MADISON ST WIDEN FROM 4 TO 6 LANES 2014 $1,879

Page 286: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

284 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT090 LOCAL HIGHWAY

HILLSIDE AVE 1ST ST HIDDEN VALLEY PKWY

CONSTRUCT 2 LANE ARTERIAL 2030 $1,602

RIVERSIDE 3A04A03 LOCAL HIGHWAY

HOBSONWAY ARROWHEAD BLVD CARLTON AVE WIDEN FROM 2 TO 4 LANES 2020 $3,075

RIVERSIDE 3A04A06 LOCAL HIGHWAY

HOBSONWAY OLIVE LAKE BLVD INTAKE BLVD WIDEN EXISTING BRIDGE AT C-CANAL FROM 2 TO 4 LANES

2035 $2,255

RIVERSIDE 3A04WT161 LOCAL HIGHWAY

HORSETHIEF CANYON RD

TEMESCAL CANYON RD

I-15 WIDEN FROM 2 TO 4 LANES 2030 $3,692

RIVERSIDE 3A07258 LOCAL HIGHWAY

HWY 111 IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY – HWY 111 WIDENING WITHIN INDIAN WELLS CITY LIMITS: WIDENING FROM 4 TO 6 THRU LNS (3 LNS IN EA DIR) BTWN EL DORADO & EAST CITY LIMITS (W/O WASHINGTON), INCLUDING THE INSTALL OF A RAISED, LANDSCAPE MEDIAN AND RIGHT TURN ONLY LANE AT INDIAN WELLS LN (RTP ID’S 3A07258 & 3A07259).

2014 $32,779

RIVERSIDE 3A07316 LOCAL HIGHWAY

HWY 111 IN EASTERN RIVERSIDE CO. IN THE COACHELLA VALLEY – HWY 111 WIDENING W/IN INDIAN WELLS CITY LIMITS: WID FROM 4 TO 6 THRU LNS (3 LNS IN EA DIR) BTWN THE WCL (570’ W/O VILLAGE CTR DR) & EL DORADO DR (RTP ID’S 3A07316 & 3A07257) INCLUDING THE INSTAL OF A RAISED, LANDSCAPE MEDIAN, LEFT TURN PH @ EL DORADO DR, DUAL LEFT TURN PH @ THE SB AND EB COOK ST, RT TURN ONLY LNS AT THE EAST, WEST, AND SB COOK ST.

2014 $27,788

RIVERSIDE 3A07220 LOCAL HIGHWAY

INDIAN AVE 14TH AVE PIERSON BLVD WIDEN FROM 2 TO 6 LANES 2030 $4,715

RIVERSIDE 3A07054 LOCAL HIGHWAY

INDIAN AVE 19TH AVE 300 FT. SOUTH OF 18TH AVE.

WIDEN FROM 2 TO 4 LANES 2030 $8,267

RIVERSIDE 3A07223 LOCAL HIGHWAY

INDIAN AVE 19TH AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2030 $9,071

RIVERSIDE 3A07222 LOCAL HIGHWAY

INDIAN AVE 20TH AVE 19TH AVE WIDEN FROM 2 TO 4 LANES 2023 $2,422

RIVERSIDE 3A07219 LOCAL HIGHWAY

INDIAN AVE DILLON RD 14TH AVE WIDEN FROM 2 TO 6 LANES 2030 $5,344

Page 287: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 285

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07221 LOCAL HIGHWAY

INDIAN AVE INTERSECTION OF INDIAN AVE AND

20TH AVE

NORTHERLY WIDEN FROM 2 TO 6 LANES 2018 $956

RIVERSIDE 3A07265 LOCAL HIGHWAY

INDIAN AVE NORTH CITY LIMIT ORANGE WIDEN FROM 2 TO 4 LANES 2018 $9,000

RIVERSIDE 3A07023 LOCAL HIGHWAY

INDIAN AVE. IN THE COACHELLA VALLEY IN THE CITY OF DESERT HOT SPRINGS – INDIAN AVE WIDENING: WIDENING OF INDIAN AVE FROM 2 TO 6 THROUGH LANES (3 IN EA DIR), BETWEEN HWY 62 AND MISSION LAKES BLVD., INCLUDING THE CONSTRUCTION OF AN ALL WEATHER BRIDGE OVER MISSION CREEK (PA&ED).

2020 $44,000

RIVERSIDE 3A01CV053 LOCAL HIGHWAY

INDIAN AVE. IN THE COACHELLA VALLEY IN THE CITY OF DESERT HOT SPRINGS – INDIAN AVE. WIDENING: WIDENING OF INDIAN AVE. FROM 2 TO 6 THROUGH LANES (3 IN EA DIR) BETWEEN MISSION LAKES BLVD., AND PIERSON BLVD. (PA&ED ONLY).

2020 $20,000

RIVERSIDE RIV011203 LOCAL HIGHWAY

INDIAN CANYON DR. IN PALM SPRINGS – WIDEN INDIAN CANYON DR FROM 2 TO 4 LANES (2 IN EACH DIRECTION) “AT GRADE” FROM UPRR OVERCROSSING (BRIDGE 56C0025) TO TRAMVIEW ROAD.

2012 $4,961

RIVERSIDE RIV990727 LOCAL HIGHWAY

INDIAN CANYON DR. IN PALM SPRINGS: WIDEN INDIAN CANYON DR FROM 2 TO 6 LANES (3 IN EACH DIRECTION), FROM UPRR OVERCROSSING (BRIDGE 56C0025) TO GARNET AVE (HBRR#:56C0025)

2018 $18,709

RIVERSIDE 3A07045 LOCAL HIGHWAY

INDIAN ST HEMLOCK ST SUNNYMEAD BLD WIDEN OC FROM 2 TO 4 LANES 2030 $9,750

RIVERSIDE 3A04WT055 LOCAL HIGHWAY

INDIAN ST SAN MICHELE RD OLEANDER AVE WIDEN FROM 2 TO 4 LANES 2020 $2,674

RIVERSIDE 3A04WT162 LOCAL HIGHWAY

INDIAN TRUCK TRAIL TEMESCAL CANYON RD

I-15 WIDEN FROM 2 TO 4 LANES 2030 $3,569

RIVERSIDE 3A04WT115 LOCAL HIGHWAY

IOWA AVE CENTER ST 3RD ST WIDEN FROM 4 TO 6 LANES 2020 $8,559

Page 288: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

286 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT056C LOCAL HIGHWAY

IRONWOOD AVE IN THE CITY OF MORENO VALLEY – WIDEN IRONWOOD AVE BETWEEN DAY ST AND BARCLAY DR FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, GRADING, DRAINAGE, CURB, GUTTER, RETAINING WALLS, SIGNAGE, AND STRIPING.

2012 $3,237

RIVERSIDE 3A04WT056E LOCAL HIGHWAY

IRONWOOD AVE IN THE CITY OF MORENO VALLEY – WIDEN IRONWOOD AVE BETWEEN HEACOCK ST AND PERRIS BLVD FROM 2 TO 4 LANES. INCLUDES UTILITY RELOCATION, DRAINAGE, CURB, GUTTER, AND SIDEWALK.

2012 $8,011

RIVERSIDE 3A04WT056F LOCAL HIGHWAY

IRONWOOD AVE IN THE CITY OF MORENO VALLEY – WIDEN IRONWOOD AVE BETWEEN PERRIS BLVD AND VISTA DE CERROS DR. FROM 2 TO 5 LANES (2 LANES IN EACH DIRECTION AND 1 CENTER TURNING LANE) . ADDITIONAL IMPROVEMENTS INCLUDE SIGNAL MODIFICATIONS, LIGHTING, DRAINAGE, CURB, GUTTER, STRIPING, AND SIDEWALK.

2018 $13,397

RIVERSIDE 3A04WT056G LOCAL HIGHWAY

IRONWOOD AVE NASON ST REDLANDS BLVD WIDEN FROM 2 TO 4 LANES 2023 $8,063

RIVERSIDE 3ITS08 LOCAL HIGHWAY

ITS ITS INLAND EMPIRE LUMP SUM &#40;GRADE CROSSING IMPROVEMENTS, IE 511, REGIONAL MOBILITY MANAGER, ETC.&#41;

2035 $24,539

RIVERSIDE 3120006 LOCAL HIGHWAY

IVY ST JEFFERSON AVE WASHINGTON AVE WIDEN FROM 2 TO 4 LANES 2020 $2,000

RIVERSIDE 3120009 LOCAL HIGHWAY

JACKSON AVE MURRIETA HOT SPRINGS ROAD

INEZ RD. WIDEN FROM 2 TO 4 LANES WITH BRIDGE OVER WARM SPRINGS CREEK

2020 $10,000

RIVERSIDE 3A01CV123 LOCAL HIGHWAY

JACKSON ST AVE 40 I-10 IC WIDEN FROM 2 TO 6 LANES 2018 $9,558

RIVERSIDE 3A01CV110A LOCAL HIGHWAY

JACKSON ST AVE 44 AVE 46 WIDEN FROM 4 TO 6 LANES 2018 $6,460

RIVERSIDE 3A01CV111 LOCAL HIGHWAY

JACKSON ST AVE 46 AVE 48 WIDEN FROM 3 TO 6 LANES 2018 $8,403

RIVERSIDE 3A01CV054 LOCAL HIGHWAY

JACKSON ST AVE 48 AVE 50 WIDEN FROM 2 TO 4 LANES 2018 $3,907

RIVERSIDE 3A07086 LOCAL HIGHWAY

JACKSON ST AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2018 $3,134

Page 289: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 287

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07224 LOCAL HIGHWAY

JACKSON ST AVE 50 AVE 52 WIDEN FROM 2 TO 4 LANES 2030 $3,133

RIVERSIDE 3A01CV110B LOCAL HIGHWAY

JACKSON ST I-10 IC AVE 44 WIDEN FROM 4 TO 6 LANES 2020 $1,268

RIVERSIDE 3A01WT076 LOCAL HIGHWAY

JEFFERSON AVE NUTMEG ST MURRIETA HOT SPRINGS RD

WIDEN FROM 2 TO 4 LANES 2020 $9,555

RIVERSIDE 3A01WT075 LOCAL HIGHWAY

JEFFERSON AVE PALOMAR ST NUTMEG ST CONSTRUCT 6 LANE ARTERIAL 2020 $5,221

RIVERSIDE 47520-RIV110831

LOCAL HIGHWAY

JEFFERSON ST IN THE CITY OF INDIO – WIDEN JEFFERSON ST FROM VARNER RD TO SUN CITY BLVD FROM 4 TO 6 LANES AND WIDEN VARNER RD FROM 2 TO 4 LANES FROM JEFFERSON ST TO APPROX 500’ EAST OF JEFFERSON ST AND THEN TAPERING BACK TO 2 LANES. INCL MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT-TURN POCKETS, DED RT TURN LANES ON SB JEFFERSON AND EB VARNER, DRAINAGE IMPROVEMENTS, SIDEWALKS, AND BIKE LANES.

2014 $5,300

RIVERSIDE 3A01CV116 LOCAL HIGHWAY

JEFFERSON ST AVE 40 AVE 38 WIDEN FROM 2 TO 4 LANES 2018 $3,237

RIVERSIDE 3A07171 LOCAL HIGHWAY

JEFFERSON ST I-10 AVE 40 WIDEN FROM 2 TO 6 LANES 2018 $2,824

RIVERSIDE 3A07019 LOCAL HIGHWAY

JEFFERSON ST I-10 IC AND BR. OVER RR

WIDEN FROM 2 TO 6 LANES 2018 $18,734

RIVERSIDE 3A0805 LOCAL HIGHWAY

KITCHING ST IN MORENO VALLEY, WIDEN KITCHING ST FROM 2 TO 4 LANES FROM GENTIAN AVE TO CACTUS AVE , INCLUDING SIDEWALK INSTALLATION WITHIN PROJECT LIMITS.

2012 $4,555

RIVERSIDE 3A04WT043 LOCAL HIGHWAY

LAKE ST I-15 LINCOLN ST WIDEN FROM 2 TO 6 LANES 2018 $32,000

RIVERSIDE 3A07018B LOCAL HIGHWAY

LANDAU I-10 VALLEY CENTER BLVD

CONSTRUCT NEW 6-LANE ROAD 2030 $1,688

RIVERSIDE 3A07018C LOCAL HIGHWAY

LANDAU VALLEY CENTER BLVD

VARNER RD CONSTRUCT NEW 4-LANE ROAD 2030 $4,185

RIVERSIDE 3A07018A LOCAL HIGHWAY

LANDAU VISTA CHINO I-10 CONSTRUCT NEW 6-LANE ROAD 2030 $16,100

Page 290: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

288 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01WT057B LOCAL HIGHWAY

LASSELLE ST EUCALYPTUS ALESSANDRO WIDEN FROM 2 TO 4 LANES 2018 $2,300

RIVERSIDE 3A04A18 LOCAL HIGHWAY

LEMON ST MISSION TR GRAPE ST WIDEN FROM 2 TO 4 LANES 2018 $8,000

RIVERSIDE 3A01WT163 LOCAL HIGHWAY

LIMONITE AVE ETIWANDA AVE VAN BUREN BLVD WIDEN FROM 2 TO 4 LANES 2030 $8,129

RIVERSIDE 3A01WT164 LOCAL HIGHWAY

LIMONITE AVE VAN BUREN BLVD CLAY ST WIDEN FROM 4 TO 6 LANES 2030 $2,353

RIVERSIDE 3A07016 LOCAL HIGHWAY

LIMONITE AVE WINEVILLE AVE. ETIWANDA AVE WIDEN EB LANE FROM 1 LANE TO 2 LANES. 2020 $7,000

RIVERSIDE 3120002 LOCAL HIGHWAY

LIMONITE AVE. ARCHIBALD HAMNER WIDENING OF LIMONITE AVE FROM 4 TO 6 LANES 2030 $5,000

RIVERSIDE 3A01CV104 LOCAL HIGHWAY

LITTLE MORONGO RD MISSION LAKES BLVD

PIERSON BLVD WIDEN FROM 2 TO 4 LANES 2018 $4,182

RIVERSIDE 3A01CV105 LOCAL HIGHWAY

LITTLE MORONGO RD PIERSON BLVD TWO BUNCH PALMS TR

WIDEN FROM 2 TO 4 LANES 2014 $4,646

RIVERSIDE 3A01CV103 LOCAL HIGHWAY

LITTLE MORONGO RD TWO BUNCH PALMS TR

DILLON RD WIDEN FROM 2 TO 6 LANES 2018 $10,366

RIVERSIDE 3120013 LOCAL HIGHWAY

LOS ALAMOS RD. – NORTH SIDE

HANCOCK AVE. WHITEWOOD AVE. WIDENING FROM 4 TO 6 LANES. 2020 $1,195

RIVERSIDE 3120010 LOCAL HIGHWAY

MADISON AVE. MURRIETA HOT SPRINGS RD.

DATE ST. WIDEN FROM 2 TO 4 LANES 2020 $15,000

RIVERSIDE 3A01CV060 LOCAL HIGHWAY

MADISON ST AVE 50 AVE 49 &#40;MISSING

LINK&#41;

CONSTRUCT NEW 4 – LANE ROAD 2018 $9,208

RIVERSIDE 3A01CV059A LOCAL HIGHWAY

MADISON ST AVE 52 AVE 50 WIDEN FROM 3 TO 6 LANES 2014 $8,626

RIVERSIDE 3A01CV059B LOCAL HIGHWAY

MADISON ST AVE 52 AVE 50 WIDEN WEST SIDE OF MADISON FROM 1 TO 2 LANES. JOINT PROJECT WITH CITY OF INDIO WHO IS RESPON-SIBLE FOR THE EAST SIDE OF MADISON.

2014 $3,590

RIVERSIDE 3A01CV064 LOCAL HIGHWAY

MADISON ST FRED WARING DR INDIO BLVD WIDEN FROM 2 TO 4 LANES 2018 $4,631

RIVERSIDE 3A01CV062 LOCAL HIGHWAY

MADISON ST HWY 111 .25 MILES NORTH OF HWY 111

WIDEN FROM 2 TO 4 LANES 2014 $1,251

Page 291: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 289

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01CV061 LOCAL HIGHWAY

MADISON ST HWY 111 AVE. 49 CONSTRUCT NEW 4 – LANE ROAD 2014 $5,662

RIVERSIDE 3A07225 LOCAL HIGHWAY

MADISON ST MILES AVE FRED WARING DR CONSTRUCT NEW 4-LANE ROAD 2030 $15,745

RIVERSIDE 3A01CV063 LOCAL HIGHWAY

MADISON ST MILES AVE FRED WARING DR &AMP;#40;MISSING

LINK&AMP;#41;

CONSTRUCT NEW 4 – LANE ROAD, INCLUDING BRIDGE AT ALL AMERICAN CANAL AND WHITEWATER RIVER.

2018 $17,870

RIVERSIDE 3A04T027 LOCAL HIGHWAY

MAGNOLIA AVE ONTARIO AVE KELLOGG AVE. INTERSECTION UPGRADES ON MAGNOLIA AVE. BETWEEN ONTARIO AVE. AND KELLOGG AVE.TO ACCOMMODATE RESTRIPING FROM 4 TO 6 LANES.

2035 $150

RIVERSIDE 3G01G04 LOCAL HIGHWAY

MAGNOLIA AVE. IN NORTHWEST RIVERSIDE COUNTY ON MAGNOLIA AVE: REPLACE EXISTING 4 LANE (2 LNS IN EA. DIR) R/R X-ING WITH A 4-LN (2 LNS IN EA DIR – NON-CAPACITY) O.C. GRADE SEPARATION ON MAGNOLIA AVE BTWN BUCHANAN AVE. (ON THE EAST) AND LINCOLN ST (ON THE WEST).

2015 $60,205

RIVERSIDE RIV071281 LOCAL HIGHWAY

MAGNOLIA AVE. IN RIVERSIDE ON MAGNOLIA AVE: REPLACE EXISTING 4-LN (2 LNS IN EA DIR) R/R X-ING WITH A 4-LN (2 LNS IN EA DIR – NON-CAPACITY) U.C. GRADE SEPARATION ON MAGNOLIA AVE BTWN SUNNYSIDE DR AND ELIZABETH ST. ADD. NON-CAPACITY IMP. INCLUDE: INSTAL. OF A TRAFFIC SIGNAL AT BEATTY DR AND MAGNOLIA; AND CONVERTING THE INTERSECTION OF MAGNOLIA AND MERRILL AVES TO ALLOW ONLY RIGHT-IN AND RIGHT-OUT MOVEMENTS.

2011 $52,960

RIVERSIDE 3A04A25 LOCAL HIGHWAY

MAIN ST OLD TOWN FRONT ST

PUJOL ST CONSTRUCT 2 LANE BRIDGE ACROSS MURRIETA CREEK

2012 $2,562

RIVERSIDE 3A04WT030 LOCAL HIGHWAY

MAIN ST SOUTH GRAND BLVD.

ONTARIO AVE. WIDEN FROM 2 TO 4 LANES. 2035 $2,473

RIVERSIDE 3A04A15 LOCAL HIGHWAY

MALAGA RD MISSION TR CASINO DR/LAKEVIEW TERRACE

WIDEN FROM 2 TO 4 LANES 2023 $9,700

RIVERSIDE 3A07266 LOCAL HIGHWAY

MAPES AVE GOETZ RD WEST CITY LIMIT CONSTRUCT 4 LANES 2020 $7,000

RIVERSIDE 3A04WT165 LOCAL HIGHWAY

MARKET ST RUBIDOUX BLVD SANTA ANA RIVER WIDEN FROM 2 TO 4 LANES INCL. BRIDGE OVER SANTA ANA RIVER

2030 $9,854

Page 292: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

290 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07268 LOCAL HIGHWAY

MARKHAM ST WADE REDLANDS AVE WIDEN FROM 2 TO 4 LANES 2020 $6,000

RIVERSIDE 3G01G10 LOCAL HIGHWAY

MARY ST IN RIVERSIDE ON MARY ST: REPLACE EXISTING 4 LN (2 LNS IN EA DIR) R/R X-ING WITH A 4 LN (2 LNS IN EA DIR – NON-CAPACITY) U.C. GRADE SEPARATION ON MARY ST BETWEEN MARGUERITE AVE AND INDIANA AVE.

2016 $38,000

RIVERSIDE 3A01WT167 LOCAL HIGHWAY

MCCALL BLVD ASPEL RD MENIFEE RD WIDEN FROM 2 TO 4 LANES 2030 $2,924

RIVERSIDE 3A01WT166 LOCAL HIGHWAY

MCCALL BLVD I-215 ASPEL RD WIDEN FROM 4 TO 6 LANES 2030 $3,645

RIVERSIDE 3A04WT168 LOCAL HIGHWAY

MCCALL BLVD MENIFEE RD SR-79 &AMP;#40; WINCHESTER &AMP;#41;

CONSTRUCT 2 LANE ARTERIAL INCL. GRADE SEPARA-TION OVER BNSF RR &AMP;#40;GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE&AMP;#41;

2035 $28,841

RIVERSIDE 3A04WT169 LOCAL HIGHWAY

MCCALL BLVD SR-79&AMP;#40 ;WINCHESTER RD

&AMP;#41;

WARREN RD CONSTRUCT 2 LANE ARTERIAL INCL. GRADE SEPARA-TION OVER BNSF RR – GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN IN THE ARTERIAL SECTION.

2035 $23,249

RIVERSIDE 3A07267 LOCAL HIGHWAY

MCPHERSON RD ETHANAC RD MAPES AVE CONSTRUCT 2 LANES 2030 $3,100

RIVERSIDE 3A04WT080 LOCAL HIGHWAY

MENIFEE RD GARBANI RD SCOTT RD WIDEN FROM 2 TO 4 LANES 2020 $2,957

RIVERSIDE 3A04WT079 LOCAL HIGHWAY

MENIFEE RD HOLLAND RD GARBANI RD CONSTRUCT 4 LANE ARTERIAL 2020 $6,794

RIVERSIDE 3A01WT170 LOCAL HIGHWAY

MENIFEE RD RAMONA EXPWY SR-74 &#40;PINACATE

RD&#41;

WIDEN FROM 2 TO 4 LANES 2030 $19,552

RIVERSIDE 3A01WT172 LOCAL HIGHWAY

MENIFEE RD SIMPSON RD ALDERGATE DR CONSTRUCT 4 LANE ARTERIAL 2030 $6,069

RIVERSIDE 3A01WT171 LOCAL HIGHWAY

MENIFEE RD SR-74 &#40; PINACATE RD

&#41;

SIMPSON RD WIDEN FROM 2 TO 4 LANES INCL. GRADE SEPARA-TION OVER RR &#40;GRADE SEP PORTION IS NOT PART OF GRADE SEP LIST AND SHOULD REMAIN HERE&#41;

2030 $39,176

Page 293: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 291

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV031218 LOCAL HIGHWAY

MID COUNTY PKWY IN WESTERN RIV CO – NEW MID CO PKWY: CONS 6 THRU LN (3 LNS IN EA DIR) APPROX 16 MI. BTWN I-215 IN PERRIS EAST TO SR79 IN SAN JACINTO, INC. CONS/RECONS OF APPROX 10 ICS, ADD OF AUX LN REDLANDS-EVANS & EB TRUCK CLIMB LN EVANS-ANTELOPE. I-215 IMP: ADD 1 MF LN IN EA DIR NUEVO RD -VAN BUREN BLVD, & 1 AUX LN IN EA DIR MID CO PKWY-CAJALCO/RAMONA EXP & FROM MID CO PKWY-NUEVO.

2020 $2,285,800

RIVERSIDE 3A01CV121A LOCAL HIGHWAY

MILES AVE MONROE ST INDIO BLVD WIDEN FROM 2 TO 4 LANES 2018 $4,029

RIVERSIDE 3A01CV067 LOCAL HIGHWAY

MISSION LAKES BLVD INDIAN AVE LITTLE MORONGO RD

WIDEN FROM 2 TO 6 LANES 2018 $6,938

RIVERSIDE 3A07226 LOCAL HIGHWAY

MISSION LAKES BLVD INDIAN AVE LITTLE MORONGO RD

WIDEN FROM 2 TO 6 LANES 2030 $8,851

RIVERSIDE 3A01CV068 LOCAL HIGHWAY

MISSION LAKES BLVD LITTLE MORONGO RD

PALM DR WIDEN FROM 2 TO 6 LANES 2018 $8,102

RIVERSIDE 3A07227 LOCAL HIGHWAY

MISSION LAKES BLVD LITTLE MORONGO RD

PALM DR WIDEN FROM 2 TO 6 LANES 2023 $8,102

RIVERSIDE 3A07001 LOCAL HIGHWAY

MISSION LAKES BLVD PALM DR EASTERN TERMINUS AT VERBENA DR

WIDEN FROM 2 TO 6 LANES 2035 $2,545

RIVERSIDE 3A01WT044 LOCAL HIGHWAY

MISSION TR RAILROAD CANYON RD

BUNDY CANYON RD WIDEN FROM 4 TO 6 LANES 2023 $7,243

RIVERSIDE 3120014 LOCAL HIGHWAY

MONROE AVE. MURRIETA HOT SPRINGS RD.

LOS ALAMOS AVE. CONSTRUCT A 4 LANE FACILITY – MONROE AVE. FROM MURRIETA HOT SPRINGS RD. TO LOS ALAMOS RD.

2020 $8,000

RIVERSIDE 3A07030 LOCAL HIGHWAY

MONROE ST AVE 40 I-10 IC WIDEN FROM 2 TO 6 LANES 2018 $5,716

RIVERSIDE 3120011 LOCAL HIGHWAY

MONROE ST. AVE. 49 AVE. 52 WIDENING FROM 2 TO 4 LANES – 2 LANES IN EACH DIRECTION

2014 $4,419

RIVERSIDE 3A07116 LOCAL HIGHWAY

MONTEREY AVE CLANCY LANE HOVLEY LANE WEST WIDEN FROM 4 TO 6 LANES 2018 $3,591

RIVERSIDE 3A07228 LOCAL HIGHWAY

MONTEREY AVE I-10 RAMON RD WIDEN FROM 2 TO 6 LANES 2030 $3,625

Page 294: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

292 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07128 LOCAL HIGHWAY

MONTEREY AVE PARKVIEW DR. CLANCY LANE WIDEN FROM 4 TO 6 LANES 2018 $2,967

RIVERSIDE 3A07067 LOCAL HIGHWAY

MONTEREY AVE. IN COACHELLA VALLEY IN RANCHO MIRAGE – WIDENING OF SOUTH BOUND MONTEREY AVE. FROM 2 TO 3 LANES FROM DINAH SHORE DR TO GERALD FORD DR. (APPROX. 3,480 L.F.). OTHER IMPROVEMENTS INCLUDE INSTALLATION OF CURB AND GUTTER, DRAINAGE IMPROVEMENTS (RETENTION BASINS), SIGNING AND STRIPING, AND TRAFFIC SIGNAL MODIFICATION AT GINGER ROGERS RD.

2014 $1,045

RIVERSIDE 3A07155 LOCAL HIGHWAY

MORENO BEACH DR IN THE CITY OF MORENO VALLEY – WIDEN MORENO BEACH DR BETWEEN CACTUS AVE AND AUTO MALL DR FROM 2 TO 6 LANES. INCLUDES SIGNALS AT COTTONWOOD AVE, ALESSANDRO BLVD, AND CACTUS AVE.

2014 $12,001

RIVERSIDE 3A07105 LOCAL HIGHWAY

MORENO BEACH DR RECHE CANYON RD SR-60 WIDEN FROM 2 TO 4 LANES 2020 $4,284

RIVERSIDE 3A07135 LOCAL HIGHWAY

MORENO BEACH DR. AUTO MALL DR. CACTUS AVE CONSTRUCT 6 LANES 2018 $23,000

RIVERSIDE 3A07270 LOCAL HIGHWAY

MORGAN ST INDIAN AVE BRADLEY RD CONSTRUCT 4 LANES 2030 $15,000

RIVERSIDE 3A07269 LOCAL HIGHWAY

MORGAN ST NEVADA INDIAN AVE WIDEN FROM 2 TO 4 LANES 2018 $1,000

RIVERSIDE 3A07271 LOCAL HIGHWAY

MOUNTAIN AVE MCPHERSON A ST WIDEN FROM 2 TO 4 LANES 2030 $2,000

RIVERSIDE 3A01CV073 LOCAL HIGHWAY

MOUNTAIN VIEW 20TH AVE VARNER RD WIDEN FROM 2 TO 6 LANES 2030 $5,226

RIVERSIDE 3A07231 LOCAL HIGHWAY

MOUNTAIN VIEW 20TH AVE VARNER RD WIDEN FROM 2 TO 6 LANES 2030 $6,100

RIVERSIDE 3A07230 LOCAL HIGHWAY

MOUNTAIN VIEW DILLON RD 20TH AVE WIDEN FROM 2 TO 4 LANES 2030 $5,125

RIVERSIDE 3A01CV071 LOCAL HIGHWAY

MOUNTAIN VIEW HACIENDA AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2018 $9,293

Page 295: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 293

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07232 LOCAL HIGHWAY

MOUNTAIN VIEW HACIENDA AVE DILLON RD WIDEN FROM 2 TO 4 LANES 2030 $7,829

RIVERSIDE 3A01WT174 LOCAL HIGHWAY

MURRIETA HOT SPRINGS RD

MARGARITA RD SR-79 &AMP;#40; WINCHESTER &AMP;#41;

WIDEN FROM 4 TO 6 LANES 2020 $5,050

RIVERSIDE 3A01WT173 LOCAL HIGHWAY

MURRIETA HOT SPRINGS RD

POURROY RD SR-79 &AMP;#40; EASTERN BYPASS

&AMP;#41;

CONSTRUCT 4 LANE ARTERIAL 2030 $9,755

RIVERSIDE 3A07272 LOCAL HIGHWAY

MURRIETA RD CASE RD ETHANAC RD WIDEN FROM 2 TO 4 LANES 2020 $7,000

RIVERSIDE 3A04WT175 LOCAL HIGHWAY

MURRIETA RD ETHANAC RD MCCALL BLVD WIDEN FROM 2 TO 4 LANES 2030 $5,921

RIVERSIDE 3A07002 LOCAL HIGHWAY

N. INDIAN CANYON DR.

TRAMVIEW RD. RR XING &#40;INCL. BR. AT WHITEWATER

RVR&#41;

WIDEN FROM 4 TO 6 LANES 2030 $304,044

RIVERSIDE 3A04A04 LOCAL HIGHWAY

N. LOVEKIN BLVD 10TH AVE 8TH AVE WIDEN EXISTING BRIDGE AT C-CANAL FROM 2 TO 4 LANES

2023 $2,000

RIVERSIDE 3A04A09 LOCAL HIGHWAY

N. LOVEKIN BLVD HOBSONWAY 10TH AVE WIDEN FROM 2 TO 4 LANES 2020 $4,160

RIVERSIDE 3A07118 LOCAL HIGHWAY

N. PALM CYN DR ALEJO RD TAHQUITZ CYN RD WIDEN FROM 3 TO 4 LANES 2030 $3,460

RIVERSIDE 3A07119 LOCAL HIGHWAY

NASON ST CACTUS AVE IRIS AVE. WIDEN 4 TO 6 LANES / STREET IMPROVEMENT 2014 $13,400

RIVERSIDE 3A07154 LOCAL HIGHWAY

NASON ST ELDER AVE IRONWOOD AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $624

RIVERSIDE 3A07101 LOCAL HIGHWAY

NASON ST EUCALYPTUS AVE. CACTUS AVE CONSTRUCT 4 LANES 2018 $9,750

RIVERSIDE 3A04WT070 LOCAL HIGHWAY

NASON ST FIR AVE. EUCALYPTUS AVE. WIDEN FROM 2 TO 4 LANES 2014 $375

RIVERSIDE 3A01WT176 LOCAL HIGHWAY

NEWPORT RD GOETZ RD MURRIETA RD CONSTRUCT 6 LANE ARTERIAL 2030 $16,228

RIVERSIDE 3A04WT178 LOCAL HIGHWAY

NEWPORT RD I-215 MENIFEE RD WIDEN FROM 4 TO 6 LANES 2030 $3,085

Page 296: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

294 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT177 LOCAL HIGHWAY

NEWPORT RD MURRIETA RD I-215 WIDEN FROM 4 TO 6 LANES 2030 $22,944

RIVERSIDE 3A04A11 LOCAL HIGHWAY

NICHOLS RD COLLIER AVE DEXTER AVE WIDEN FROM 2 TO 6 LANES 2023 $8,480

RIVERSIDE 3NL04 LOCAL HIGHWAY

NON-MOTORIZED COUNTYWIDE VARIOUS PEDESTRIAN AND BIKEWAY NON-MOTOR-IZED IMPROVEMENT PROJECTS

2030 $43,308

RIVERSIDE 3A04WT091 LOCAL HIGHWAY

NORCO DR CORYDON AVE HAMNER AVE WIDEN FROM 2 TO 4 LANES 2020 $4,549

RIVERSIDE 3A04WT179 LOCAL HIGHWAY

NUEVO RD DUNLAP DR MENIFEE RD WIDEN FROM 2 TO 4 LANES 2030 $8,604

RIVERSIDE 3A07273 LOCAL HIGHWAY

ORANGE AVE INDIAN AVE DUNLAP DR WIDEN FROM 2 TO 4 LANES 2030 $23,000

RIVERSIDE 991203 LOCAL HIGHWAY

OVERLAND DR. EXTEND OVERLAND DR (4 LANES) FROM COMMERCE CENTER DR TO AVENIDA ALVARADO/DIAZ ROAD INTERSECTION INCLUDING CONSTRUCTION OF 4 LANE BRIDGE OVER MURRIETA CREEK

2018 $13,281

RIVERSIDE 3A04WT117 LOCAL HIGHWAY

OVERLOOK PKWY CHATEAU RIDGE LN SANDTRACK RD CONSTRUCT NEW 4 LANE ARTERIAL 2020 $19,368

RIVERSIDE 3A07291 LOCAL HIGHWAY

PALM AVE ESPLANADE AVE SEVENTH ST CONSTRUCT 4 LANES 2018 $1,900

RIVERSIDE 3A07292 LOCAL HIGHWAY

PALM AVE SEVENTH ST RAMONA BLVD WIDEN FROM 2 TO 4 LANES 2018 $3,100

RIVERSIDE 3A01WT180 LOCAL HIGHWAY

PALOMAR ST MISSION TRAIL JEFFERSON WIDEN FROM 2 TO 4 LANES 2030 $28,000

RIVERSIDE 3A07170 LOCAL HIGHWAY

PERRIS BLVD DRACAEA FIR WIDEN FROM 4 TO 6 LANES / STREET IMPROVEMENT 2020 $36

RIVERSIDE 3A07140 LOCAL HIGHWAY

PERRIS BLVD IRONWOOD AVE SUNNYMEAD BLD WIDEN FROM 4 TO 6 LANES 2020 $1,930

RIVERSIDE 3A01WT106 LOCAL HIGHWAY

PERRIS BLVD NUEVO RD 11TH ST WIDEN FROM 2 TO 4 LANES 2020 $40,000

RIVERSIDE 3A01WT105 LOCAL HIGHWAY

PERRIS BLVD RAMONA EXPWY NUEVO RD WIDEN FROM 4 TO 6 LANES 2020 $20,000

Page 297: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 295

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01WT062 LOCAL HIGHWAY

PERRIS BLVD RECHE VISTA DR IRONWOOD AVE WIDEN FROM 2 TO 4 LANES 2014 $8,854

RIVERSIDE RIV041044 LOCAL HIGHWAY

PERRIS BLVD. IN MORENO VALLEY: WIDEN PERRIS BLVD 2 TO 6 LNS (PERRIS VALLEY STORM DRAIN LATERAL B TO CACTUS AVE.), INCLUDING CURB, GUTTER, SIDEWALKS, SIGNALS, & MEDIANS

2012 $14,669

RIVERSIDE RIV011205 LOCAL HIGHWAY

PERRIS BLVD. IN PERRIS – WIDEN PERRIS BLVD 2 TO 6 LANES FROM RAMONA EXPRESSWAY TO PERRIS VALLEY STORM DRAIN – LATERAL ‘B’ (APPROX. 1 MILE), INCLUDING CURB, GUTTER, SIDEWALK, RAISED MEDIAN, SIGNAL WORK, UTILITY RELOCATIONS, AND MINOR DRAINAGE IMPROVEMENTS.

2014 $5,226

RIVERSIDE RIV041045 LOCAL HIGHWAY

PERRIS BLVD. WIDEN PERRIS BLVD FROM 2 TO 4 LANES FROM IRONWOOD AVE TO MANZANITA AVE INCLUDING CURB, GUTTER, SIDEWALKS, SIGNAL MODS, STREET LIGHTS & MEDIANS IMPROVEMENTS

2012 $6,670

RIVERSIDE 3A04A34 LOCAL HIGHWAY

PHILADELPHIA AVE MILLIKEN AVE I-15 WIDEN FROM 1 EB EXISTING TO 2 LANES 2035 $938

RIVERSIDE 3A04A33 LOCAL HIGHWAY

PHILADELPHIA AVE WINEVILLE RD ETIWANDA AVE WIDEN FROM 1 EB EXISTING TO 2 LANES 2035 $1,018

RIVERSIDE 3A01CV076 LOCAL HIGHWAY

PIERSON BLVD INDIAN AVE LITTLE MORONGO RD

WIDEN FROM 2 TO 6 LANES 2014 $5,401

RIVERSIDE 3A07234 LOCAL HIGHWAY

PIERSON BLVD INDIAN AVE LITTLE MORONGO RD

WIDEN FROM 2 TO 6 LANES 2030 $6,839

RIVERSIDE 3A01CV075 LOCAL HIGHWAY

PIERSON BLVD SR-62 INDIAN AVE WIDEN FROM 2 TO 6 LANES 2014 $13,504

RIVERSIDE 3A07233 LOCAL HIGHWAY

PIERSON BLVD SR-62 INDIAN AVE WIDEN FROM 2 TO 6 LANES 2030 $10,813

RIVERSIDE 3A04WT064 LOCAL HIGHWAY

PIGEON PASS RD CANTARINI N HIDDEN SPRINGS WIDEN FROM 2 TO 4 LANES 2018 $6,000

Page 298: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

296 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT139 LOCAL HIGHWAY

PIGEON PASS RD. CORRIDOR

IN WESTERN RIVERSIDE COUNTY IN THE UNINCORPORATED AREA OF THE COUNTY OF RIVERSIDE – PIGEON PASS RD CORRIDOR: CONSTRUCT A NEW 4-LANE PIGEON PASS RD CORRIDOR FACILITY BETWEEN MT. VERNON AVE. AND HIDDEN SPRINGS RD, INCLUDING SIGNALS AND MEDIANS (PA&ED ONLY).

2020 $33,327

RIVERSIDE 3A01WT107 LOCAL HIGHWAY

PLACENTIA AVE INDIAN AVE EVANS RD WIDEN FROM 2 TO 4 LANES 2030 $25,000

RIVERSIDE 3A07305 LOCAL HIGHWAY

PORTOLA AVE COUNTRY CLUB DR FRANK SINATRA DR WIDEN FROM 4 TO 6 LANES 2030 $6,154

RIVERSIDE 3A07309 LOCAL HIGHWAY

PORTOLA AVE GERALD FORD DR I-10 WIDEN FROM 4 TO 6 LANES 2030 $2,678

RIVERSIDE 3A07314 LOCAL HIGHWAY

PORTOLA AVE HWY 111 MAGNESIA FALLS DR

WIDEN FROM 4 TO 6 LANES 2030 $898

RIVERSIDE 3A07298 LOCAL HIGHWAY

PORTOLA AVE MAGNESIA FALLS DR

COUNTRY CLUB DR WIDEN FROM 4 TO 6 LANES 2030 $9,084

RIVERSIDE 3A07122 LOCAL HIGHWAY

PORTOLA AVE FRANK SINATRA DR

GERALD FORD DR WIDEN FROM 4 TO 6 LANES 2030 $3,250

RIVERSIDE 3120003 LOCAL HIGHWAY

POTRERO BLVD. EXTENSION

CALIFORNIA MICHIGAN AVE. CONSTRUCT NEW 4 LANE ARTERIAL HIGHWAY EXTENSION AND OVERPASS FACILITY AT SR79

2018 $30,000

RIVERSIDE 3A10WT06 LOCAL HIGHWAY

POTRERO BRIDGE PROJECT (SR 79

BYPASS EXTENSION NORTH)

IN WESTERN RIVERSIDE CO IN BEAUMONT: SR79 BYPASS EXT NO. PH II – INSTAL OF A 3-LN PRE-FAB BRIDGES ON THE EASTSIDE OF THE PH I POTRERO BRIDGE SR79 BYPASS EXT. NO., EXTENDING THE POTRERO BLVD 0.675 MI. NO. FROM THE FUTURE SR60/POTRERO FWY IC (RIV050535), TO CONNECT TO THE OAK VALLEY PKWY IN BEAUMONT, INCLUDING THE INSTAL OF A CLASS I MULTI-PURPOSES TRAIL, FLARED INTERSECTION AND TURNING POCKETS.

2020 $21,846

RIVERSIDE 3A04WT032 LOCAL HIGHWAY

RAILROAD ST SHERMAN AVE MAIN ST &AMP;AMP;#40; AT GRAND &AMP;

AMP;#41;

WIDEN FROM 2 TO 4 LANES 2035 $5,090

Page 299: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 297

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE RIV011212 LOCAL HIGHWAY

RAMON RD IN CATHEDRAL CITY ON RAMON RD – DATE PALM DR TO DA VALL – WIDEN 4 TO 6 LNS & PAVEMENT REHAB, SIDEWALKS, SIGNAL INTERCONNECT, RETAINING WALLS, DRAIN IMP.

2012 $2,750

RIVERSIDE 3A07068 LOCAL HIGHWAY

RAMON RD GENE AUTRY TRAIL SAN LUIS REY DR. WIDEN FROM 4 TO 6 LANES 2023 $2,450

RIVERSIDE 3A01CV078 LOCAL HIGHWAY

RAMON RD GENE AUTRY TRAIL W BANK OF THE WHITEWATER RVR

WIDEN FROM 4 TO 6 LANES 2018 $3,157

RIVERSIDE 3A07235 LOCAL HIGHWAY

RAMON RD INTERSECTION OF RAMON RD &AMP;AMP; VARNER RD

DATE GARDEN DR. WIDEN FROM 4 TO 6 LANES 2030 $188

RIVERSIDE 3A07238 LOCAL HIGHWAY

RAMON RD MONTEREY AVE THOUSAND PALMS CYN RD

WIDEN FROM 2 TO 4 LANES 2030 $14,428

RIVERSIDE 3A07005 LOCAL HIGHWAY

RAMON RD S. INDIAN CYN SUNRISE WAY &#40;INCL.

BARISTO STORM CHNL XING&#41;

WIDEN FROM 4 TO 6 LANES 2020 $119,966

RIVERSIDE 3A07145 LOCAL HIGHWAY

RAMON RD S. PALM CYN DR S. INDIAN CYN DR WIDEN FROM 4 TO 6 LANES 2018 $1,099

RIVERSIDE RIV031205 LOCAL HIGHWAY

RAMON RD. IN THE CITY OF PALM SPRINGS – WIDEN RAMON RD FROM 4 TO 6 LNS (3 IN EA DIR), FROM EL CIELO RD TO SUNRISE WY., WITH INTERSECTION WIDENING AT EL CIELO RD (ADD WB RT TURN LANE), AT FARRELL DR (ADD SB LEFT TURN LANE), & AT SUNRISE WY (ADD SB LEFT, NB LEFT, AND WB LEFT).

2020 $4,750

RIVERSIDE 3A07089 LOCAL HIGHWAY

RAMON RD. IN THE CITY OF PALM SPRINGS: WIDENING OF RAMON RD. FROM 4 TO 6 LANES (LANDAU BLVD. TO SAN LUIS REY DR) – ADDING A 3RD WB LANE FROM LANDAU BLVD. TO SAN LUIS REY DR., AND A 3RD EB LANE FROM CROSSLEY TO LANDAU BLVD., INCLUDING THE WIDENING OF THE EXISTING FOUR-LANE BRIDGE OVER THE WHITEWATER RIVER TO SIX-LANES.

2018 $29,500

RIVERSIDE 3A01WT110B LOCAL HIGHWAY

RAMONA EXPWY EVANS RD RIDER ST WIDEN FROM 2 TO 6 LANES 2018 $10,500

Page 300: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

298 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01WT183 LOCAL HIGHWAY

RAMONA EXPWY PICO AVE BRIDGE ST WIDEN FROM 2 TO 6 LANES 2035 $43,065

RIVERSIDE 3A01WT182 LOCAL HIGHWAY

RAMONA EXPWY RIDER ST PICO AVE WIDEN FROM 4 TO 6 LANES 2035 $3,012

RIVERSIDE 3A01WT210 LOCAL HIGHWAY

RAMONA EXPWY SANDERSON AVE STATE ST WIDEN FROM 2 TO 6 LANES 2012 $18,352

RIVERSIDE 3A01WT217 LOCAL HIGHWAY

RANCHO CALIFORNIA RD

JEFFERSON AVE MARGARITA RD WIDEN FROM 4 TO 6 LANES 2035 $9,883

RIVERSIDE 3120001 LOCAL HIGHWAY

RANCHO WAY DIAZ RD. MARGARITA RD. CONSTRUCT RANCHO WAY – 4 LANE LOCAL ARTE-RIAL FROM DIAZ RD. TO MARGARITA RD.

2035 $36,000

RIVERSIDE 3A04WT065 LOCAL HIGHWAY

RECHE CANYON RD RECHE VISTA DR MORENO BEACH DR CONSTRUCT 4 LANE ARTERIAL 2018 $15,680

RIVERSIDE 3A04WT184 LOCAL HIGHWAY

RECHE CANYON RD SAN BERNARDINO CO LINE

RECHE VISTA DR WIDEN FROM 2 TO 4 LANES 2030 $17,429

RIVERSIDE 3A07274 LOCAL HIGHWAY

REDLANDS AVE HARLEY KNOX BLVD.

PLACENTIA AVE CONSTRUCT 4 LANES 2020 $15,000

RIVERSIDE 3A07275 LOCAL HIGHWAY

REDLANDS AVE PLACENTIA AVE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2030 $5,000

RIVERSIDE 3A07156 LOCAL HIGHWAY

REDLANDS BLVD IN THE CITY OF MORENO VALLEY – WIDEN REDLANDS BLVD BETWEEN SR-60 AND CACTUS AVE FROM 2 TO 4 LANES. IMPROVEMENTS INCLUDE MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION, LEFT TURN POCKETS, DEDICATED RIGHT TURN, DRAINAGE, LANDSCAPING, SIDEWALKS, BIKE LANES, AND TRAILS.

2014 $18,300

RIVERSIDE 3A07148 LOCAL HIGHWAY

REDLANDS BLVD IRONWOOD AVE KALMIA AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $884

RIVERSIDE 3A07159 LOCAL HIGHWAY

REDLANDS BLVD KALMIA AVE LOCUST AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $372

RIVERSIDE 3A01WT067 LOCAL HIGHWAY

REDLANDS BLVD LOCUST AVE ALESSANDRO BLVD WIDEN FROM 2 TO 4 LANES 2014 $7,428

RIVERSIDE 3A07161 LOCAL HIGHWAY

REDLANDS BLVD SPRUCE AVE IRONWOOD AVE WIDEN 2 TO 4 LANES / STREET IMPROVEMENT 2020 $208

Page 301: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 299

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07276 LOCAL HIGHWAY

RIDER ST NEVADA RAMONA EXPWY WIDEN FROM 2 TO 4 LANES 2030 $15,000

RIVERSIDE 3RL04 LOCAL HIGHWAY

RIDESHARE COUNTYWIDE RCTC COMMUTER ASSISTANCE PROGRAM: RIDE-SHARE AND OTHER INCENTIVE PROGRAMS, TDM &#40;TELECOMMUTE, PARK AND RIDE, ETC.&#41;

2035 $94,175

RIVERSIDE 3A04A35 LOCAL HIGHWAY

RIVERSIDE DR HAMNER AVE ETIWANDA AVE WIDEN FROM 2 TO 4 LANES 2030 $2,455

RIVERSIDE 3A04A36 LOCAL HIGHWAY

RIVERSIDE DR AT DAY CREEK

WINEVILLE RD ETIWANDA AVE WIDEN BRIDGE FROM 2 TO 4 LANES 2035 $389

RIVERSIDE 3A04A07 LOCAL HIGHWAY

RIVIERA DR 18TH AVE 20TH AVE CONSTRUCT 2 LANE OVERCROSSING AT THE LOWER OUTFALL DRAIN

2023 $1,796

RIVERSIDE 3A07114 LOCAL HIGHWAY

S. PALM CYN DR TAHQUITZ CYN RD RAMON RD WIDEN FROM 3 TO 4 LANES 2030 $3,626

RIVERSIDE 3A04A21 LOCAL HIGHWAY

SALVIA RD. GARNETT HILL GENE AUTRY TR. CONSTRUCT 4 LANE ARTERIAL CONNECTOR 2030 $9,600

RIVERSIDE 3A07279 LOCAL HIGHWAY

SAN JACINTO AVE A ST REDLANDS AVE WIDEN FROM 2 TO 4 LANES, INCLUDING BRIDGE OVER I-215.

2030 $25,000

RIVERSIDE 3A07278 LOCAL HIGHWAY

SAN JACINTO AVE NAVAJO A ST CONSTRUCT 4 LANES 2030 $4,500

RIVERSIDE 3A07280 LOCAL HIGHWAY

SAN JACINTO AVE REDLANDS AVE DUNLAP DR WIDEN FROM 2 TO 6 LANES, INCLUDING BRIDGE OVER PERRIS VALLEY STORN DRAIN.

2030 $15,000

RIVERSIDE 3A07277 LOCAL HIGHWAY

SAN JACINTO AVE WEST CITY LIMIT NAVAJO WIDEN FROM 2 TO 6 LANES 2030 $4,500

RIVERSIDE 3A04WT068 LOCAL HIGHWAY

SAN MICHELE RD HEACOCK ST INDIAN AVE WIDEN FROM 2 TO 4 LANES 2018 $1,580

RIVERSIDE 3A01WT036 LOCAL HIGHWAY

SANDERSON AVE BNSF RR CROSSING

&AMP;#40;NEAR STETSON

AVE&AMP;#41;

ACACIA AVE WIDEN FROM 2 TO 4 LANES 2008 $2,210

RIVERSIDE 3A01WT035 LOCAL HIGHWAY

SANDERSON AVE DOMENIGONI PKWY STETSON AVE WIDEN FROM 2 TO 4 LANES 2008 $5,233

Page 302: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

300 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01WT185 LOCAL HIGHWAY

SANDERSON AVE &AMP;AMP;#40;SR-79&AMP;AMP;#41;

GILLMAN SPRINGS RD

&AMP;AMP;#40; AT SR-79&AMP;

AMP;#41;

RAMONA EXPWY WIDEN FROM 4 TO 6 LANES 2030 $22,965

RIVERSIDE 3A04WT188 LOCAL HIGHWAY

SCHLEISMAN RD CLEVELAND AVE 68TH ST WIDEN FROM 2 TO 4 LANES 2030 $6,088

RIVERSIDE 3A04WT187 LOCAL HIGHWAY

SCHLEISMAN RD HARRISON AVE CLEVELAND AVE CONSTRUCT 4 LANE ARTERIAL 2030 $11,574

RIVERSIDE 3A07014 LOCAL HIGHWAY

SCHLEISMAN RD I-15 ARLINGTON AVE CONSTRUCT 4 LANE ARTERIAL 2035 $25,735

RIVERSIDE 3A04WT186 LOCAL HIGHWAY

SCHLEISMAN RD SAN BERNARDINO COUNTY LINE

HARRISON AVE WIDEN FROM 2 TO 4 LANES 2030 $14,093

RIVERSIDE RIV010205C LOCAL HIGHWAY

SCOTT RD EL CENTRO SR-79 (WINCHESTER RD)

IN RIVERSIDE COUNTY NEAR MURRIETA RECONSTRUCT AND WIDEN SCOTT ROAD FROM 2 TO 6 LANES BETWEEN EL CENTRO AND SR79 &AMP;AMP;#40;WINCHESTER RD&AMP;AMP;#41;

2030 $16,500

RIVERSIDE RIV010205B LOCAL HIGHWAY

SCOTT RD I-215 EL CENTRO WIDEN SCOTT RD FROM 4 TO 6 LANES BETWEEN I-215 AND EL CENTRO

2030 $8,500

RIVERSIDE 3A01WT207 LOCAL HIGHWAY

SCOTT RD MURRIETA RD I-215 WIDEN FROM 2 TO 4 LANES 2018 $6,094

RIVERSIDE 3A07295 LOCAL HIGHWAY

SEVENTH ST CAWSTON AVE RAMONA EXPWAY &AMP;#40; CUR-

RENTLY MOUNTAIN AVE. &AMP;#41;

WIDEN FROM 2 TO 4 LANES 2030 $9,200

RIVERSIDE 3A07294 LOCAL HIGHWAY

SEVENTH ST WARREN RD CAWSTON AVE CONSTRUCT 4 LANES 2030 $14,000

RIVERSIDE 3A07296 LOCAL HIGHWAY

SOBOBA RD CHABELA DR CITY LIMIT WIDEN FROM 2 TO 4 LANES 2018 $4,000

RIVERSIDE 3A04WT191 LOCAL HIGHWAY

SR-74 I-15 ETHANAC RD WIDEN FROM 4 TO 6 LANES 2035 $20,440

RIVERSIDE 3A04WT037 LOCAL HIGHWAY

SR-74 WINCHESTER RD &#40;SR-79&#41;

WARREN RD WIDEN FROM 4 TO 6 LANES 2018 $9,535

Page 303: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 301

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT190 LOCAL HIGHWAY

SR-74 &#40;ETHANAC&#41;

MATTHEWS RD SR-79 &#40; WINCHESTER &#41;

WIDEN FROM 2 TO 4 LANES &#40;MATTHEWS TO BRIGGS&#41;. WIDEN FROM 4 TO 6 LANES&#40;BRIGGS TO SR-79&#41;.

2035 $16,537

RIVERSIDE 3A01WT045 LOCAL HIGHWAY

SR-74 &#40;GRAND AVE&#41;

RIVERSIDE DR &#40;SR-74&#41;

ORTEGA HWY &#40;SR-74&#41;

WIDEN FROM 4 TO 6 LANES 2023 $11,000

RIVERSIDE 3A04WT047 LOCAL HIGHWAY

SR-74 &#40;RIVERSIDE DR/COLLIER AVE&#41;

I-15 LAKESHORE DR WIDEN FROM 4 TO 6 LANES 2018 $3,500

RIVERSIDE 3A04WT046 LOCAL HIGHWAY

SR-74 &AMP;#40; RIVERSIDE

DR&AMP;#41;

LAKESHORE DR GRAND AVE WIDEN FROM 4 TO 6 LANES 2020 $12,000

RIVERSIDE 3A01WT213 LOCAL HIGHWAY

SR79 – SAN JACINTO AVE.

NORTH RAMONA BLVD

7TH ST WIDEN FROM 2 TO 4 LANES 2018 $6,870

RIVERSIDE 3A01WT196 LOCAL HIGHWAY

SR-79 &#40;EASTERN BYPASS&#41;

SR79 &#40;WINCHESTER

RD NEAR SCOTT RD&#41;

I-15 CONSTRUCT 4 LANE ARTERIAL 2030 $260,167

RIVERSIDE 3A01WT218 LOCAL HIGHWAY

SR-79 SOUTH &#40; CONSTANCE&#41;

I-15 PECHANGA PKWY WIDEN FROM 6 TO 8 LANES 2020 $2,060

RIVERSIDE 3A01WT214 LOCAL HIGHWAY

STATE ST GILLMAN SPRINGS RD

QUANDT RANCH RD WIDEN FROM 2 TO 4 LANES 2018 $5,718

RIVERSIDE 3A01WT039 LOCAL HIGHWAY

STATE ST JOHNSTON AVE FLORIDA AVE &AMP;AMP;#40;SR-74&AMP;AMP;#41;

WIDEN FROM 2 TO 4 LANES 2018 $1,481

RIVERSIDE 3A01WT040 LOCAL HIGHWAY

STETSON AVE WARREN RD CAWSTON AVE RELOCATE AND CONSTRUCT 4 LANE ARTERIAL 2018 $4,366

RIVERSIDE 3A07126 LOCAL HIGHWAY

SUNRISE PARKWAY N. INDIAN CANYON DR

NORTH PALM CANYON DR

&AMP;#40;SR 111&AMP;#41;

CONSTRUCT/EXTEND 4 LANE ARTERIAL CONNECTOR 2030 $15,800

RIVERSIDE 3A04A22 LOCAL HIGHWAY

SUNRISE PARKWAY SUNRISE WAY NORTH OF SAN

RAFAEL DR

N. INDIAN CANYON DR.

CONSTRUCT/EXTEND 4 LANE ARTERIAL CONNECTOR 2030 $3,000

Page 304: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

302 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A04WT197 LOCAL HIGHWAY

TEMESCAL CANYON RD

EL CERRITO RD. INDIAN TRUCK TRAIL

WIDEN FROM 2 TO 4 LANES 2030 $22,665

RIVERSIDE 3A04WT198 LOCAL HIGHWAY

TEMESCAL CANYON RD

INDIAN TRUCK TRAIL

LAKE ST WIDEN FROM 2 TO 4 LANES 2035 $15,962

RIVERSIDE 3A0807 LOCAL HIGHWAY

THEODORE ST IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES + 2 AUX LANES FROM EUCALYPTUS AVE TO SR-60 EB RAMPS, INCLUDING MEDIANS, TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

2018 $4,791

RIVERSIDE 3A0808 LOCAL HIGHWAY

THEODORE ST IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES FROM ALESSANDRO BLVD TO EUCALYPTUS AVE, INCLUDING TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

2018 $15,456

RIVERSIDE 3A0806 LOCAL HIGHWAY

THEODORE ST IN MORENO VALLEY, WIDEN THEODORE ST FROM 2 TO 4 LANES FROM SR-60 WB RAMPS TO IRONWOOD AVE, INCLUDING TRAFFIC SIGNALS, CHANNELIZATION IMPROVEMENTS, LEFT-TURN POCKETS, DEDICATED RIGHT-TURN LANES, DRAINAGE IMPROVEMENTS, LANDSCAPING, SIDEWALKS, AND BIKE LANES.

2018 $4,791

RIVERSIDE 3A07281 LOCAL HIGHWAY

TRUMBLE RD MAPES AVE ELLIS AVE WIDEN FROM 2 TO 4 LANES 2018 $4,000

RIVERSIDE 3A07240 LOCAL HIGHWAY

TWO BUNCH PALMS TR

INDIAN AVE LITTLE MORONGO RD

WIDEN FROM 0 TO 6 LANES 2030 $10,727

RIVERSIDE 3A01CV085 LOCAL HIGHWAY

TWO BUNCH PALMS TR

LITTLE MORONGO RD

PALM DR WIDEN FROM 2 TO 6 LANES 2018 $7,754

RIVERSIDE 3A01CV086 LOCAL HIGHWAY

TWO BUNCH PALMS TR

PALM DR MIRACLE HILL RD WIDEN FROM 2 TO 6 LANES 2018 $5,678

RIVERSIDE 3A04WT118 LOCAL HIGHWAY

TYLER ST WELLS AVE ARLINGTON AVE WIDEN FROM 2 TO 4 LANES 2020 $5,650

Page 305: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 303

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A0803 LOCAL HIGHWAY

VALLEY CENTER BLVD

DATE PALM DR DA VALL DR &#40;FUTURE

EXTENSION&#41;

IN THE CITY OF CATHEDRAL CITY, CONSTRUCT VALLEY CENTER BLVD NORTH OF I-10 AND SOUTH OF VARNER RD AS A 4 LANE ARTERIAL FROM DATE PALM DR TO FUTURE DA VALL RD EXTENSION

2020 $26,225

RIVERSIDE 3A0802 LOCAL HIGHWAY

VALLEY CENTER BLVD

PALM DR DATE PALM DR IN THE CITY OF CATHEDRAL CITY, CONSTRUCT VALLEY CENTER BLVD NORTH OF I-10 AND SOUTH OF VARNER RD AS A 4 LANES ARTERIAL FROM PALM DR TO DATE PALM DR

2023 $28,204

RIVERSIDE 3A07315 LOCAL HIGHWAY

VAN BUREN BLVD JACKSON ST GARFIELD WIDEN FROM 4 TO 6 LANES 2018 $20,000

RIVERSIDE 3A01WT199 LOCAL HIGHWAY

VAN BUREN BLVD MOCKINGBIRD CANYON RD

WOOD RD WIDEN FROM 4 TO 6 LANES 2018 $12,928

RIVERSIDE 3A07007 LOCAL HIGHWAY

VAN BUREN BLVD ORANGE TERRACE PKWY

OPPORTUNITY WAY WIDEN FROM 4 TO 6 LANES 2030 $2,900

RIVERSIDE 3A07036 LOCAL HIGHWAY

VAN BUREN ST AVE 48 AVE 50 WIDEN FROM 2 TO 6 LANES 2020 $10,669

RIVERSIDE 3A07037 LOCAL HIGHWAY

VAN BUREN ST AVE 50 AVE 52 WIDEN FROM 2 TO 6 LANES 2020 $10,669

RIVERSIDE 3A07241 LOCAL HIGHWAY

VAN BUREN ST AVE 50 AVE 52 WIDEN FROM 2 TO 6 LANES 2030 $3,818

RIVERSIDE 3A01CV087 LOCAL HIGHWAY

VAN BUREN ST AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2023 $475

RIVERSIDE 3A07242 LOCAL HIGHWAY

VAN BUREN ST AVE 52 AVE 54 WIDEN FROM 2 TO 4 LANES 2030 $4,170

RIVERSIDE 3A07243 LOCAL HIGHWAY

VAN BUREN ST AVE 54 AVE 56/AIRPORT WIDEN FROM 2 TO 4 LANES 2030 $3,964

RIVERSIDE 3A01CV088 LOCAL HIGHWAY

VAN BUREN ST AVE 54 AVE 56/AIRPORT BLVD

WIDEN FROM 2 TO 4 LANES 2023 $478

RIVERSIDE 3A07097 LOCAL HIGHWAY

VAN BUREN ST INDIO BLVD AVE 48 WIDEN FROM 3 TO 6 LANES 2018 $4,662

RIVERSIDE 3A07244 LOCAL HIGHWAY

VAN BUREN ST INDIO BLVD AVE 48 WIDEN FROM 3 TO 6 LANES 2030 $4,054

Page 306: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

304 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A01CV091 LOCAL HIGHWAY

VARNER RD DATE PALM DR RAMON RD WIDEN FROM 2 TO 4 LANES 2030 $42,356

RIVERSIDE 3A07251 LOCAL HIGHWAY

VARNER RD DATE PALM DR RAMON RD WIDEN FROM 2 TO 4 LANES 2030 $42,055

RIVERSIDE 3A01CV090 LOCAL HIGHWAY

VARNER RD MOUNTAIN VIEW RD

DATE PALM DR WIDEN FROM 2 TO 4 LANES 2018 $11,431

RIVERSIDE 3A07250 LOCAL HIGHWAY

VARNER RD MOUNTAIN VIEW RD

DATE PALM DR WIDEN FROM 2 TO 4 LANES 2030 $11,281

RIVERSIDE 3A01CV089 LOCAL HIGHWAY

VARNER RD PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 4 LANES 2018 $5,566

RIVERSIDE 3A07249 LOCAL HIGHWAY

VARNER RD PALM DR MOUNTAIN VIEW RD WIDEN FROM 2 TO 4 LANES 2030 $5,566

RIVERSIDE 3A07252 LOCAL HIGHWAY

VARNER RD WASHINGTON ST ADAMS ST WIDEN FROM 3 TO 4 LANES 2035 $898

RIVERSIDE 3A07075 LOCAL HIGHWAY

VARNER RD / AVE 42 JACKSON ST GOLF CTR PKWY WIDEN FROM 2 TO 6 LANES 2018 $6,552

RIVERSIDE 3A07079 LOCAL HIGHWAY

VARNER RD / AVE 42 JEFFERSON ST MADISON ST WIDEN FROM 2 TO 6 LANES, INCLUDING BRIDGE OVER ALL AMERICAN CANAL.

2018 $5,963

RIVERSIDE 3A07050 LOCAL HIGHWAY

VARNER RD / AVE 42 MADISON ST MONROE ST WIDEN FROM 2 TO 6 LANES 2018 $9,905

RIVERSIDE 3A07064 LOCAL HIGHWAY

VARNER RD / AVE 42 MONROE ST JACKSON ST WIDEN FROM 2 TO 6 LANES 2018 $5,365

RIVERSIDE 3A01CV097 LOCAL HIGHWAY

VISTA CHINO DATE PALM DA VALL DR CONSTRUCT NEW 4-LANE ROAD 2023 $16,236

RIVERSIDE 3A01CF096 LOCAL HIGHWAY

VISTA CHINO E BANK OF WHITEWATER BR.

LANDAU BLVD WIDEN FROM 4 TO 6 LANES 2018 $3,726

RIVERSIDE 3A01WT041 LOCAL HIGHWAY

WARREN RD ESPLANADE AVE DOMENIGONI PKWY WIDEN FROM 2 TO 4 LANES 2030 $16,783

RIVERSIDE 3A01WT215 LOCAL HIGHWAY

WARREN RD RAMONA EXPWY ESPLANADE AVE WIDEN FROM 2 TO 4 LANES 2018 $13,155

RIVERSIDE 3A04WT202 LOCAL HIGHWAY

WASHINGTON ST HERMOSA DR HARLEY JOHN RD WIDEN FROM 2 TO 4 LANES 2030 $12,112

Page 307: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 305

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID System Route # Route Name From To Description Project Completion

By*

Project Cost ($1,000’s

RIVERSIDE 3A07253 LOCAL HIGHWAY

WASHINGTON ST I-10 AVE 38 WIDEN FROM 4 TO 6 LANES 2030 $3,192

RIVERSIDE 3A04WT120 LOCAL HIGHWAY

WASHINGTON ST VICTORIA AVE HERMOSA DR WIDEN FROM 2 TO 4 LANES 2020 $7,732

RIVERSIDE 3A07282 LOCAL HIGHWAY

WATSON A ST MCPHERSON RD CONSTRUCT 4 LANES 2030 $8,000

RIVERSIDE 3A07283 LOCAL HIGHWAY

WEBSTER AVE HARLEY KNOX BLVD.

MARKHAM CONSTRUCT 6 LANES 2030 $8,000

RIVERSIDE 3A07284 LOCAL HIGHWAY

WEBSTER AVE MARKHAM RAMONA EXPWY WIDEN FROM 2 TO 6 LANES 2018 $4,000

RIVERSIDE 3A07285 LOCAL HIGHWAY

WEBSTER AVE RAMONA EXPWY RIDER ST WIDEN FROM 2 TO 4 LANES 2020 $6,000

RIVERSIDE 3120012 LOCAL HIGHWAY

WHITEWOOD AVE. MURRIETA HOT SPRINGS RD.

JACKSON AVE. WIDEN FROM 2 TO 4 LANES 2020 $6,000

RIVERSIDE 3A04WT078 LOCAL HIGHWAY

WHITEWOOD RD. KELLER RD CLINTON KEITH RD CONSTRUCT 4 LANE ARTERIAL 2020 $12,032

RIVERSIDE 3A04WT121 LOCAL HIGHWAY

WOOD RD JOHN F KENNEDY DR

VAN BUREN WIDEN FROM 2 TO 4 LANES 2020 $4,445

RIVERSIDE 3A04WT203 LOCAL HIGHWAY

WOOD RD KRAMERIA AVE CAJALCO RD WIDEN FROM 2 TO 4 LANES 2030 $8,799

RIVERSIDE 3A01CV098 LOCAL HIGHWAY

111 VISTA CHINO N. PALM CANYON DR

SUNRISE WAY WIDEN FROM 4 TO 6 LANES 2030 $6,970

Page 308: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

306 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

SBD31037 TRANSIT BUS SYSTEM – OPERATING ASSISTANCE 2010 $13,530

SAN BERNARDINO

SBD41055 TRANSIT BUS SYSTEM – OPERATING ASSISTANCE 2011 $14,086

SAN BERNARDINO

SBD31612 TRANSIT BUS SYSTEM – OPERATING ASSISTANCE 2012 $2,271

SAN BERNARDINO

SBD31581 TRANSIT BUS SYSTEM – OPERATING ASSISTANCE 2016 $75,503

SAN BERNARDINO

200086 TRANSIT BUS SYSTEM – PASSENGER FACILITIES. FY12-10 BUS SHELTERS INCLUDING UPGRADES FOR ACCESSIBILITY AND AMENITIES FOR THESE AND OTHER BUS STOPS; FY13-3 BUS SHELTERS AND AMENITIES;FY14-3 BUS SHELTERS AND AMENITIES; BUS SHELTERS INCLUDES BUS STOP LIGHTING EVERY YEAR.

2016 $406

SAN BERNARDINO

SBD90105 TRANSIT BUS SYSTEM-BUSES BUS REPLACEMENTS ALT. FUEL, 2010-15 AND 15 COACHES PER YEAR AFTER 2010

2015 $34,003

SAN BERNARDINO

SBD31084 TRANSIT BUS SYSTEM-SERVICE VEHICLES, PURCHASE SEVERAL EXPANSION SERVICE VEHICLES

2013 $2,000

SAN BERNARDINO

SBD41073 TRANSIT CAPITAL – PURCHASE OF LAND AND ARCHITECTURAL SERVICES & CONSTRUCT FOR ADMINISTRATIVE, MAINTENANCE, & OPERATIONS FACILITY (PH I & II)

2012 $25,500

SAN BERNARDINO

4OM0701-20060601

TRANSIT CAPITALIZATION OF LEASES – FOR CONTRACTORS, RADIO SITES, APC, TIRE LEASES

2014 $6,000

SAN BERNARDINO

200625 TRANSIT E STREET TRANSIT CORRIDOR- FROM SAN BERNARDINO TO LOMA LINDA (INCLUDES 14 ARTIC BUSES AND PARK AND RIDES)

2014 $192,236

Page 309: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 307

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

990602 TRANSIT METROLINK CAPITAL MAINTENANCE (REHABILITATION/RENOVATION OF METROLINK TRACK, SIGNALS, COMMUNICATIONS, STRUCTURES, FACILITIES, SYSTEMS, AND ROLLING STOCK)($496 TRANSPORTATION DEVELOPMENT CREDITS USED TO MATCH FY 2011/12 FTA 5309 IN CONSTRUCTION)

2012 $20,826

SAN BERNARDINO

SBD41109 TRANSIT METROLINK OPERATING ASSISTANCE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK)

2012 $40,000

SAN BERNARDINO

4OM0701-20061009

TRANSIT METROLINK-SEALED CORRIDOR-SAN GABRIEL SUB-THIS PROJECTS CONSISTS OF A COMPREHENSIVE CORRIDOR SAFETY ENHANCEMENT PROGRAM ALONG SANBAG OWNED ROW

2012 $2,000

SAN BERNARDINO

SBD41114 TRANSIT PARATRANSIT – VEHICLE REPLACEMENT ALT. FUEL, 2012-3;

2013 $2,831

SAN BERNARDINO

SBD44003 TRANSIT PARATRANSIT VEHICLE REPLACEMENT (10/11-1-18 PAX AND 11/12 1-18 PAX

2011 $225

SAN BERNARDINO

200427 TRANSIT PREVENTATIVE MAINTENANCE OPERATING ASSISTANCE

2014 $7,803

SAN BERNARDINO

20040211 TRANSIT REPLACEMENT PARATRANSIT VEHICLES REPLACING PARATRANSIT VEHICLES ON OMNITRANS ACCESS FLEET;08-50;2011-50

2011 $6,000

SAN BERNARDINO

20020810 TRANSIT REPLACEMENT-PARATRANSIT – 9 PASSENGER VEHICLES – GAS – 1-2010/11

2009 $205

SAN BERNARDINO

200450 TRANSIT RIALTO METROLINK STATION – INCREASE PARKING SPACES FROM 225-775

2011 $3,356

Page 310: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

308 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200416 TRANSIT SCLA RAIL SERVICE FROM AIR EXPRESSWAY APPROX. 5 MILES N0 TO COLUSA RD. BETWEEN PHANTOM EAST & MOJAVE RIVER-PUT IN NEW RAIL LINE FROM BNSF TO SCLA.(FOR FREIGHT)PROJECT IN CONNECTION WITH NEW INTERMODAL/MULTIMODAL FACILITY ON SCLA PROPERTY

2014 $250,000

SAN BERNARDINO

981111 TRANSIT TRANSIT – ENHANCEMENTS: 1% TRANSIT ENHANCEMENTS TO INCREASE ACCESSIBILITY TO BUS STOPS

2014 $1,500

SAN BERNARDINO

981104 TRANSIT TRANSIT – SECURITY 2014 $994

SAN BERNARDINO

981114 TRANSIT TRANSIT – SECURITY CAPITALIZATION OF SECURITY COSTS

2014 $1,500

SAN BERNARDINO

SBD31055 TRANSIT TRANSIT ADMINISTRATION EQUIPMENT PURCHASE COMPUTER HARDWARE & SOFTWARE FOR MIS

2014 $30,623

SAN BERNARDINO

SBD41064 TRANSIT BUS SYSTEM – BUS SHELTERS ON VARIOUS ROUTES-REPLACING MISSING AND/OR DAMAGED BUS STOPS, PURCHASE AND REPAIR SHELTERS, BENCHES, ETC.

2010 $158

SAN BERNARDINO

981118 TRANSIT BUS SYSTEM – PASSENGER FACILITIES: DESIGN AND BUILDING OF ONTARIO TRANSCENTER

2010 $1,244

SAN BERNARDINO

200101 TRANSIT BUS SYSTEM – PASSENGER FACILITIES: DEVELOPMENT OF SAN BERNARDINO TERMINAL LOCATED ON RIALTO AND E STREET. TRANSFER POINT CENTER

2014 $10,000

SAN BERNARDINO

20041303 TRANSIT BUS SYSTEM REPLACEMENT 35’ GAS FUEL

2009 $1,290

SAN BERNARDINO

981122 TRANSIT CAPITALIZATION OF PREVENTIVE MAINT 2012 $69,467

Page 311: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 309

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

SBD31073 TRANSIT FACILITIES IMPROVEMENTS – EQUIPMENT AND FURNISHINGS – EAST/WEST VALLEY FACILITY PURCHASE OFFICE EQUIPMENT

2007 $3,106

SAN BERNARDINO

200441 TRANSIT FACILITIES: EASTERN AREA MAINTENANCE: THIS IS PART OF PROJECT FUNDED BY LACMTA, OCTA & RCTC

2009 $17,714

SAN BERNARDINO

R589TA TRANSIT INTERSTATE – LOS ANGELES/CHICAGO AT EL GARCES STATION MULTIMODAL – STATION – FACILITY

2012 $8,090

SAN BERNARDINO

20020801 TRANSIT METROLINK ROLLING STOCK – SANBAG’S SHARE OF PURCHASE OF METROLINK CARS & LOCOM UP TO 47 CARS/CABS AND IN FUTURE YEARS UP TO 22 CARS/CABS & UP TO 8 LOCOM (CO-OP LA0C8231, RIV010214)

2012 $22,584

SAN BERNARDINO

20040811 TRANSIT PARATRANSIT VEHICLE REPLACEMENT – 16 PASSENGER – GAS-07-6;08-4

2010 $709

SAN BERNARDINO

200423 TRANSIT PARATRANSIT VEHICLES – REPLACEMENT – GAS/DIESEL; 04-3;05-2;06-4;08-3,09-3

2010 $1,198

SAN BERNARDINO

200426 TRANSIT PARATRANSIT VEHICLES – REPLACING 7 PASSENGER GAS BUS 06-1;08-2;09-1

2009 $190

SAN BERNARDINO

200424 TRANSIT PURCHASE REPLACEMENT DIESEL BUSES – 06-1;07-4

2009 $1,416

SAN BERNARDINO

SBD44006 TRANSIT TRANSIT ADMINISTRATION EQUIPMENT OFFICE EQUIPMENT

2010 $128

SAN BERNARDINO

20010120 TRANSIT TRANSIT SERVICE EQUIPMENT – PURCHASE OF VARIOUS MAINTENANCE EQUIPMENT (ON-GOING PROJECT)

2010 $31

SAN BERNARDINO

20040817 TRANSIT VEHICLE OVERHAULS – TO REBUILD ENGINES, TRANSMISSIONS, ETC. ON AGING FLEET

2010 $90

Page 312: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

310 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200425 TRANSIT VEHICLE REPLACEMENT – PARATRANSIT VEHICLES – 2 -18 PASSENGER ACCESSIBLE SMALL BUSES

2008 $147

SAN BERNARDINO

4120217 TRANSIT E STREET BRT CAL STATE SAN BERNARDINO

LOMA LINDA FULL BRT – 15-MIN. HEADWAYS ALL DAY 2014 $163,338

SAN BERNARDINO

4120215 TRANSIT EUCLID FOOHILL BLVD POMONA RINCON FULL BRT – 15-MIN. HEADWAYS PEAK, 30-MIN OFF PEAK

2030 $128,695

SAN BERNARDINO

4120219 TRANSIT FOOTHILL/5TH MONTE VISTA AVE BOULDER RD FULL BRT – 15-MIN. HEADWAYS PEAK, 30-MIN OFF PEAK

2020 $415,911

SAN BERNARDINO

4120222 TRANSIT GOLD LINE PHASE 2B TO MONTCLAIR

COUNTY LINE MONTCLAIR LIGHT RAIL EXTENDED FROM COUNTY LINE TO MONTCLAIR &#40;PHASE 2B&#41;

2020 $97,861

SAN BERNARDINO

4120211 TRANSIT GRAND/EDISON AVE

CHINO HILLS PKWAY MILLIKEN AVE &#40;HAMNER AVE&#41;

EXPRESS BUS 2030 $30,088

SAN BERNARDINO

4120206 TRANSIT HAVEN AVE. BANYAN ST EDISON AVE EXPRESS BUS 2030 $18,387

SAN BERNARDINO

4120213 TRANSIT HOLT AVE/4TH ST. GAREY AVE SIERRA AVE EXPRESS BUS 2030 $30,029

SAN BERNARDINO

4TL104 TRANSIT LOCAL TRANSIT SERVICE

COUNTYWIDE COUNTYWIDE COUNTYWIDE LOCAL TRANSIT SERVICE 2030 $364,000

SAN BERNARDINO

4CR04 TRANSIT METROLINK COMMUTER RAIL

COUNTYWIDE COUNTYWIDE SERVICE EXPANSION; SB LINE 72 DAILY TRAINS, RIVERSIDE LINE 46 DAILY TRAINS, IEOC LINE 28 DAILY TRAINS

2030 $188,708

SAN BERNARDINO

4TR0101 TRANSIT REDLANDS RAIL PHASE I

RIALTO/E ST. UNIVERSITY OF REDLANDS EXTEND RAIL SERVICE TO REDLANDS (9 MILES); COMMUTER RAIL TECHNOLOGY

2018 $148,876

SAN BERNARDINO

4120194 TRANSIT REDLANDS RAIL PHASE II

RIALTO/E ST. UNIVERSITY OF REDLANDS ADD A SECOND TRACK/ADDITIONAL PASSING TRACK THROUGHOUT THE COR-RIDOR OF PHASE 1 PROJECT

2020 $183,490

SAN BERNARDINO

4120209 TRANSIT RIVERSIDE AVE. SIERRA AVE UNIVERSITY AVE EXPRESS BUS 2030 $28,416

SAN BERNARDINO

4120205 TRANSIT SAN BERNARDINO AVE

SIERRA AVE E STREET EXPRESS BUS 2030 $15,729

SAN BERNARDINO

4120204 TRANSIT SIERRA AVE. RIVERSIDE AVE MARYGOLD AVE EXPRESS BUS 2030 $13,372

Page 313: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 311

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200455 STATE HIGHWAY

PLANNING, PROGRAMMING AND MONITORING AB3090 PAYBACK PROJECTS

2008 $632

SAN BERNARDINO

4A07226 STATE HIGHWAY

AGUA MANSA 0080M W, RANCHO AVE

E0073 RANCHO AVE WIDEN AGUA MANSA RD FROM 0080M W, RANCHO AVE E0073 FROM 2 TO 4 LANES

2030 $749

SAN BERNARDINO

4120234 STATE HIGHWAY

ALDER AVE BASELINE FOOTHILL BLVD WIDEN ALDER AVE FROM BASELINE AVE TO FOOTHILL BLVD FROM 2 TO 4 LANES

2020 $2,625

SAN BERNARDINO

4120235 STATE HIGHWAY

AMETHYST RD SYCAMORE RD EUCALYPTUS RD WIDEN AMETHYST RD FROM SYCAMORE RD TO EUCALYPTUS RD FROM 0 TO 4 LANES

2020 $1,609

SAN BERNARDINO

4120109 STATE HIGHWAY

CHINO AVE MONTE VISTA RD NORTH, SOUTH AND WEST LEG 600’ EACH DIRECTION

WIDEN CHINO AVE AT MONTE VISTA RD; NORTH, SOUTH AND WEST LEG 600’ EACH DIRECTION

2035 $1,172

SAN BERNARDINO

4A07002 STATE HIGHWAY

EVANS ST. PHASE II UPRR BARTON RD. NEW ROAD, 2 LANES EACH DIR 2014 $32,150

SAN BERNARDINO

4120236 STATE HIGHWAY

FONTANA AVE VALLEY BLVD MERILL WIDEN FONTANA AVE FROM VALLEY BLVD TO MERILL AVE FROM 2 TO 4 LANES

2030 $5,251

SAN BERNARDINO

4A07020 STATE HIGHWAY

NATIONAL TRAILS HIGHWAY

IN SAN BERNARDINO COUNTY

SAFETY UPGRADE 2020 $12,000

SAN BERNARDINO

4120233 STATE HIGHWAY

PIPE LINE AVE 0.04 M S/O PHILADELPHIA AVE

PHILLIPS BLVD WIDEN PIPELINE AVE FROM .04M S/O PHILADELPHIA AVE TO PHILLIPS BLVD FROM 2 TO 4 LANES

2030 $3,260

SAN BERNARDINO

4PD04 STATE HIGHWAY

PROJECT DEVELOPMENT

& TRAFFIC MITIGATION

COUNTYWIDE COUNTYWIDE PROJECT DEVELOPMENT & TRAFFIC MITIGATION

2025 $143,313

SAN BERNARDINO

4120231 STATE HIGHWAY

RANDALL AVE MAPLE AVE RIVERSIDE AVE WIDEN RANDALL AVE FROM MAPLE AVE TO RIVERSIDE AVE FROM 2 TO 4 LANES

2030 $1,380

SAN BERNARDINO

4A07218 STATE HIGHWAY

VALLEY BLVD COMMERCE DR ALMOND AV WIDEN VALLEY BLVD FROM COMMERCE DR TO ALMOND AVE FROM 5 TO 6 LANES

2020 $1,316

SAN BERNARDINO

4120232 STATE HIGHWAY

VALLEY BLVD POPLAR AVE CATAWABA AVE WIDEN VALLEY BLVD FROM POPLAR AVE TO CATAWBA AVE FROM 4 TO 6 LANES

2035 $604

Page 314: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

312 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07363 STATE HIGHWAY

WALNUT AVE 0.10 M S/O ROSWELL AVE

ROSWELL AVE WIDEN WALNUT AVE FROM .10 M S/O ROSWELL AVE TO ROSWELL AVE FROM 2 TO 4 LANES

2035 $357

SAN BERNARDINO

4120230 STATE HIGHWAY

WILSON AVE ETIWANDA AVE WARDMAN BULLOCK WIDEN WILSON AVE FROM ETIWANDA AVE FROM 0 TO 2 LANES

2030 $2,083

SAN BERNARDINO

SBD41147 STATE HIGHWAY

10 AIRPORT GROUND ACCESS -I-10 AT ARCHIBALD AVE – INSTALL IRRIGATION SYSTEM AND LANDSCAPE PLANTING

2011 $3,085

SAN BERNARDINO

200432 STATE HIGHWAY

10 AT I-10 AND FORD ST. ON RAMP TO THE FREEWAY – SIGNAL AND INTERSECTIONS IMPROVEMENTS

2014 $700

SAN BERNARDINO

1830 STATE HIGHWAY

10 I-10 AT CEDAR AVE. BETWEEN SLOVER AND VALLEY- RECONSTRUCT I/C-WIDEN FROM 4-6 LANES WITH LEFT AND RIGHT TURN LANES. ADD AUX LANE ON E/B ON AND OFF RAMPS

2014 $56,948

SAN BERNARDINO

2002160 STATE HIGHWAY

10 I-10 AT GROVE INTERCHANGE AND GROVE AVE. CORRIDOR – RELOCATE I/10 & 4TH ST. I/C TO GROVE AVE. AND WIDEN GROVE AVE BETWEEN I-10 TO HOLT (WIDEN 4-6 LANES)

2018 $156,000

SAN BERNARDINO

44810 STATE HIGHWAY

10 I-10 TIPPECANOE RECONFIGURE INTERCHANGE& ADD EASTBOUND OFF-RAMP AUXILIARY LN FROM WATERMAN ON-RAMP TO TIPPECANOE OFF-RAMP , WIDEN BRIDGE (NON-CAPACITY), & LOCAL RD IMP/MOD (HP1366)

2014 $78,770

SAN BERNARDINO

20020812 STATE HIGHWAY

10 I-10/CHERRY AVE INTERCHANGE – INTERCHANGE RECONSTRUCT – REPLACE O/C, WIDEN O/H AND WIDEN I/C FROM SLOVER TO VALLEY FROM 4-6 LANES WITH DOUBLE LEFT TURNS TO RAMPS(PROJECT COST INCREASED TO $84,090 DUE TO LOCAL A/C – TRUE PROJECT COSTS REMAIN AT $76,113)

2014 $84,090

Page 315: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 313

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

150D STATE HIGHWAY

10 IN COLTON FROM 0.2 MIL (0.3 KM) W/O RANCHO AVE TO 0.9 MI (1.5 KM) E/O LA CADENA DRIVE – CONSTRUCT RR TO RR GRADE SEPARATION

2014 $201,994

SAN BERNARDINO

SBD031269 STATE HIGHWAY

10 IN FONTANA AT BEECH AVE CONSTRUCT 4 LANE INTERCHANGE ( 2 LANES IN EACH DIRECTION.

2018 $113,023

SAN BERNARDINO

49750 STATE HIGHWAY

10 IN FONTANA, FROM 0.8KM E/OF ETIWANDA AVE OVC TO 1.5 KM W/O RIVERSIDE AVE. O/C-WIDEN EXIT RAMPS AND CONSTRUCT AUX. LANES(CT TOOK OUT SHOPP FUNDING)

2012 $26,707

SAN BERNARDINO

SBD45000 STATE HIGHWAY

10 IN FONTANA: I-10 AT CITRUS AVE IC RECONSTRUCT IC WITH 6 THRU LANES; & REPLACE BRIDGE OVERCROSSING(O/C WIDEN FROM 2-6 LNS) AND WIDEN CITRUS FROM SLOVER TO VALLEY 4-6 LNS.

2014 $56,392

SAN BERNARDINO

SBD41339 STATE HIGHWAY

10 PEPPER AVE. AT I-10 MODIFICATION OF PEPPER AVE. INTERCHANGE WIDEN BRIDGE FROM 3-7 LANES (2 THRU LANES, 2 TURN LANES SOUTH, 1 TURN LANE NORTH) AND ADD AUXILIARY LANES TO FREEWAY (POST MILES KILOMETERS -32.5-34.4) (T21-#499)

2014 $39,815

SAN BERNARDINO

0H930 STATE HIGHWAY

10 FROM WATERMAN AVE UC TO ALABAMA ST OC – RESTRIPE ROADBED TO ADD A WESTBOUND AUXILIARY LANE (MINOR A)

2010 $1,600

SAN BERNARDINO

SBD31808 STATE HIGHWAY

10 I-10 AT RIVERISDE AVE – 2.1 KM W/O RIVERSIDE AVE TO 1.3 KM E/O RIVERSIDE AVE. MODIFY IC 4 TO 9 LNS (INCL TURN LNS) FROM SLOVER TO VALLEY & ADD AUX LANES & OPER IMPRV

2012 $40,000

SAN BERNARDINO

34090 STATE HIGHWAY

10 IN FONTANA AT ALDER AVE CONSTRUCT 4 LANE INTERCHANGE (2 LANES IN EACH DIRECTION.)

2030 $99,105

Page 316: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

314 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

43320 STATE HIGHWAY

10 IN YUCAIPA @ LIVE OAK CANYON ROAD INTERCHANGE RECONFIGURE INTERCHANGE AND WIDEN LIVE OAK CANYON ROAD FROM 2 TO 6 THRU LANES (I-10/LIVE OAK CANYON) (TCRP #59)

2012 $18,634

SAN BERNARDINO

38420 STATE HIGHWAY

10 ON I-10 FROM 0.1 KM W/O I-10/I-215 TO 0.2 KM W/O WABASH O/C & I-215 FROM 0.0-4.3 FROM RIVERSIDE CO TO I-10/215 JCT. INSTALL FOC BACKBONE SYSTEM, MODIFY COMMUNIC HUB; WIDEN RAMPS (PROJECT COMPLETED 9/2009)

2012 $16,855

SAN BERNARDINO

200434 STATE HIGHWAY

10 ON I-10 IN REDLANDS AND YUCAIPA FROM FORD ST. O/C TO LIVE OAK CANYON RD. CONSTRUCT 1 W/B MIXED-FLOW LANE

2012 $43,186

SAN BERNARDINO

4H01001 STATE HIGHWAY

10 I-10 I-1O HOV LANE ADDITION – FROM HAVEN (ONTARIO TO FORD ST (REDLANDS)-WIDENING FROM 8-10 LANES, AUX LANES WIDENING UNDERCROSSINGS AND OVERCROSSINGS AND RECONSTRUCTION OF RAMPS WHERE NEEDED

2020 $1,090,014

SAN BERNARDINO

4M04023 STATE HIGHWAY

10 I-10 0.1 KM E/O I-15 (PM 9.9)

0.4 KM E/O I-215 (PM R24.5) INSTALL RMS, CCTV ESU; WIDEN ENTRANCE RAMPS FROM 1 TO 2 LANES AT: EB & WB AT CHERRY AVE, CITRUS AVE, CEDAR AVE, RIVERSIDE AVE AND MT VERNON AVE; WB AT RANCHO AVE; EB AT 9TH ST (EA:38430)

2014 $21,527

SAN BERNARDINO

4M01025 STATE HIGHWAY

10 I-10 ALABAMA ST INTERCHANGE INTERCHANGE (PM 28.0-29.5) 2020 $22,000

SAN BERNARDINO

4M1001 STATE HIGHWAY

10 I-10 AT YUCAIPA BLVD YUCAIPA BLVD @ I-10 FWY – IMPROVE THE WB ON-RAMP FROM 1-2 LANES AND MODIFY TRAFFIC SIGNAL

2012 $1,700

SAN BERNARDINO

4M07021 STATE HIGHWAY

10 I-10 FORD ST. RIVERSIDE COUNTY LINE ADD 1 AUX LANE EACH DIRECTION (PM33.0-0.0)

2030 $43,200

Page 317: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 315

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4H01003 STATE HIGHWAY

10 I-10 FORD ST. RIVERSIDE COUNTY LINE ADD 1 HOV LANE EACH DIRECTION (PM 33.0-0.0)

2030 $106,800

SAN BERNARDINO

4M07013 STATE HIGHWAY

10 I-10 HAVEN FORD ST ADD 1 AUX LANE EACH DIRECTION 2020 $242,700

SAN BERNARDINO

4M07002 STATE HIGHWAY

10 I-10 MONTE VISTA AT I-10 FREEWAY IN MONTCLAIR ON I-10 AT MONTE VISTA – INTERCHANGE IMPROVEMENTS &#40;PM.25-1.1&#41;

2020 $26,500

SAN BERNARDINO

4M01030 STATE HIGHWAY

10 I-10 MOUNTAIN VIEW AV AT INTERCHANGE INTERCHANGE (PM 26.5-27.5) 2020 $40,300

SAN BERNARDINO

4M01031 STATE HIGHWAY

10 I-10 MT VERNON AV IN COLTON INTERCHANGE (23.0-24.0) 2020 $28,788

SAN BERNARDINO

4M01032 STATE HIGHWAY

10 I-10 WABASH AV INTERCHANGE INTERCHANGE (PM 23.6-34.2) 2030 $24,710

SAN BERNARDINO

4120197 STATE HIGHWAY

10 I-10 @ ALABAMA INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2030 $37,821

SAN BERNARDINO

4120200 STATE HIGHWAY

10 I-10 @ ALDER NEW INTERCHANGE I-10 @ ALDER 2030 $138,676

SAN BERNARDINO

4M01027 STATE HIGHWAY

10 I-10 @ CALIFORNIA INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2030 $63,035

SAN BERNARDINO

4M07001 STATE HIGHWAY

10 I-10 @ EUCLID EUCLID AV IN ONTARIO ON I-10 AT EUCLID AVE – WIDEN THE EXIT RAMP FROM 2-3 LANES

2030 $12,607

SAN BERNARDINO

4120196 STATE HIGHWAY

10 I-10 @ MONTE VISTA

RECONSTRUCT INTERCHANGE I-10 @ MONTE VISTA

2030 $35,019

SAN BERNARDINO

4120198 STATE HIGHWAY

10 I-10 @ MT. VERNON INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2030 $44,825

SAN BERNARDINO

4120199 STATE HIGHWAY

10 I-10 @ MTN. VIEW INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2030 $71,439

SAN BERNARDINO

4M07003 STATE HIGHWAY

10 I-10 @ UNIVERSITY INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2030 $8,405

SAN BERNARDINO

4M04033 STATE HIGHWAY

10 I-10 @ WILDWOOD INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2030 $49,027

Page 318: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

316 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200803 STATE HIGHWAY

10 I-10 AT VINEYARD AVE

I-10 AT VINEYARD AVE. INTERCHANGE. INTERCHANGE WIDENING FROM 4-6 LANES AND WIDEN ON AND OFF RAMPS TO TWO LANES, INTERSECTION IMPROVEMENTS AND ENHANCE EXISTING LANDSCAPING

2018 $83,550

SAN BERNARDINO

4H01011 STATE HIGHWAY

10 I-10/I-15 NORTH TO WEST WEST TO NORTH HOV CONNECTOR 2030 $16,802

SAN BERNARDINO

4H01010 STATE HIGHWAY

10 I-10/I-15 SOUTH TO WEST/WEST TO SOUTH

HOV CONNECTOR 2030 $16,802

SAN BERNARDINO

4H01009 STATE HIGHWAY

10 I-10/I-215 SOUTH TO EAST/EAST TO SOUTH

HOV CONNECTOR 2030 $17,846

SAN BERNARDINO

4ITS04- 0G841

STATE HIGHWAY

15 C. V. KANE SCRRA INTERPRETIVE DISPLAYS (NEAR THE CITY OF BARSTOW, AT THE C.V. KANE SAFETY ROADSIDE REST AREA (SCRRA) INSTALL INTERPRETIVE DISPLAYS

2015 $260

SAN BERNARDINO

SBD41446 STATE HIGHWAY

15 EUCALYPTUS AT I-15 CONSTRUCT INTERCHANGE 3 LANES IN EA DIR STANDARD I/C CONFIG.(JOINT PROJECT BETWEEN VICTORVILLE AND HESPERIA)

2020 $61,100

SAN BERNARDINO

SBD55026 STATE HIGHWAY

15 EUCALYPTUS STREET FROM I-15 TO PEACH AVE – RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES AND CONSTRUCT RAILROAD CROSSING

2012 $8,546

SAN BERNARDINO

200613 STATE HIGHWAY

15 I-15 & MUSCATEL STREET CONSTRUCT 6 LANE INTERCHANGE WITH LEFT AND RIGHT TURN LANES, INCLUDING 1700 FT AUX LANE UPSTREAM TO SB EXIT RAMP”

2018 $71,100

Page 319: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 317

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200048 STATE HIGHWAY

15 I-15 AT BASELINE INTERCHANGE – FROM 1,800 N/O BASELINE TO 2,400’ S/O; 1800’ W/O TO EAST AVE. TO 1500’ E/O EAST AVE-WIDEN RAMPS (INCLUDING BRIDGES), WIDEN BASELINE RD. FROM 4-6 LANES, WIDEN EAST AVE. FROM 2-4 LANES, REALIGN AND WIDEN S/B AND N/B DIAMOND RAMPS FROM 1-2 LNS (INCLUDG BRIDGES, AD S.B LOOP ON-RAMP (INCL BRIDGES) ADD I-15 ACCEL/DECEL LANES, AND OPERATIONAL IMPROVEMENTS (EA497100)(CA435)

2014 $42,709

SAN BERNARDINO

0H1300 STATE HIGHWAY

15 I-15/DUNCAN CANYON INTERCHANGE – CONVERT EXIST 2 LN OVERCROSSING TO DIAMOND IC, WIDEN TO 4 LANES PLUS DBL LEFT TURNS TO SB RAMP ACCEL/DECEL LANES & SINGLE LEFT TO NORTHBOUND RAMP

2012 $35,834

SAN BERNARDINO

20061201 STATE HIGHWAY

15 I-15/I-215 I/C IMPROVEMTS-DEVORE I/C S/O GLEN HELEN PARKWY TO N/O KENWOOD & ON I-215 FROM S/O DEVORE RD. I/C TO I-15 (16.0-17.8) ADD 1 M/F LN IN EA DIR TO EXISTG 3 M/F LNS FROM 3800’ S/O GLEN HELEN PARKWY TO 3100’ N/O I-215 I/C (CONSTRUCT TRUCK BYPASS LNS S/O I-15/I-215 I/C TO N/O KENWOOD I/C RECONFIG OF I-15/I-215 I/C DEVORE ROAD, I/C, & KENWOOD AVE I/C RECONNECT OF CAJON BETWN DEVORE RD.&KENWOOD

2018 $480,254

SAN BERNARDINO

SBD031279 STATE HIGHWAY

15 IN HESPERIA AT I-15 AND RANCHERO ROAD – CONSTRUCT 6 LANE INTERCHANGE WITH LEFT AND RIGHT TURN LANES, INCLUDING 1300 FT. AUX LANE PRIOR TO N/B OFF RAMP AND 3200 FT. AUX LANE FROM TO S/B LOOP ON RAMP

2014 $80,625

Page 320: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

318 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

35558 STATE HIGHWAY

15 IN SAN BERNARDINO CO. – GATEWAY ENHANCEMENTS ON I-15 FROM MOJAVE DR. IN VICTORVILLE TO STODDARD WELLS RD. IN BARSTOW-RETENTION WALL ENHANCMENTS AND LANDSCAPING(PPNO0175N)

2020 $2,446

SAN BERNARDINO

34170 STATE HIGHWAY

15 IN VICTORVILLE AT LA MESA ROAD/NISQUALLI ROAD CONSTRUCT I/C NEW 6 LANE INTERCHANGE

2012 $90,009

SAN BERNARDINO

35556 STATE HIGHWAY

15 IN VICTORVILLE BETWEEN MOJAVE DRIVE AND 1.6 KM N/O STODDARD WELLS RD. O/C PHASE 2 RECONSTRUCT D ST. AND E ST. I/C AND STODDARD WELLS I/C (REFER TO MODELING DETAILS)(CA061)

2018 $146,676

SAN BERNARDINO

200152 STATE HIGHWAY

15 ON I-15 FROM 3,500 FT. S OF ARROW RTE. TO 3,500 ‘ N/O FOOTHILL BLVD AND AND ON ARROW RT. FROM 1000 FT.W/TO 100 FT. E/ OF I- 15-CONSTRUCT NEW I/C AR ARROW RTE, CONSTRUCT S/B DOUBLE DECEL LANES TO FOOTHILL BLVD OFFRAMP AND MODIFY RAMPS AT FOOTHILL.

2020 $91,370

SAN BERNARDINO

200626 STATE HIGHWAY

15 CONSTRUCT NEW INLAND EMPIRE TRANSPORTATION MANAGEMENT CENTER – INSTALL TMC-IN THE S/E QUADRANT OF I-15 AND SR 210 I/C ON N/S VICTORIA AVE (I/T CITY OF FONTANA EA37704

2011 $44,345

SAN BERNARDINO

200078 STATE HIGHWAY

15 PARK-N-RIDE LOT EXPANSION AND FACILITIES AT BEAR VALLEY RD & I-15 (70 EXISTING SPACES TO 300 SPACES)

2012 $755

SAN BERNARDINO

4M07034 STATE HIGHWAY

15 I-15 AT FOOTHILL BLVD WIDEN-NB-ON-RAMP TO 2 LANES FROM RAMP ENTRANCE TO THE METERING POINT AND TRANSITION TO 1 LANE AT THE GORE POINT & INSTALL RAMP METERING. (EA 0H791)

2018 $1,050

Page 321: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 319

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4M07004 STATE HIGHWAY

15 I-15 BEAR VALLEY RD AT INTERCHANGE INTERCHANGE MODIFICATION (PM 36.5-38.5)

2020 $31,521

SAN BERNARDINO

4M1006 STATE HIGHWAY

15 I-15 BOULDER ROAD/ DALE EVANS PKWY

AT INTERCHANGE I-15 AT BOULDER ROAD/ DALE EVANS PKWY RECONSTRUCT INTERCHANGE-L-1 DIAMOND-PSR ONLY

2011 $500

SAN BERNARDINO

4M01037 STATE HIGHWAY

15 I-15 CAJON JN/SR-138 INTERCHANGE (PM 16.0-21.7) 2020 $28,308

SAN BERNARDINO

4T01003 STATE HIGHWAY

15 I-15 DEVORE SUMMIT TRUCK CLIMBING LANE (PM 15.9-27.0) 2012 $10,000

SAN BERNARDINO

4M07010 STATE HIGHWAY

15 I-15 HIGH DESERT CORRIDOR

IN VICTORVILLE/APPLE VALLEY ON I-15 AT EAST/WEST HIGH DESERT CORRIDOR – CONSTRUCT INTERCHANGE &AMP;#40;PM 15.1-35.9&AMP;#41;

2018 $94,564

SAN BERNARDINO

4H01005 STATE HIGHWAY

15 I-15 I-215 US-395 ADD 1 HOV LANE EACH DIRECTION (PM 16.0-33.2)

2020 $269,833

SAN BERNARDINO

4M07014 STATE HIGHWAY

15 I-15 MOJAVE ST. NEW INTERCHANGE &#40;PM 41.0-43.0&#41;

2020 $63,043

SAN BERNARDINO

4M01040 STATE HIGHWAY

15 I-15 OAK HILL RD REPLACE OVERCROSSING (R28.4-29.8) 2020 $1,827

SAN BERNARDINO

4H01004 STATE HIGHWAY

15 I-15 RIVERSIDE COUNTY LINE

I-215 ADD 1 HOV LANE EACH DIRECTION (PM 0.0- 16.0)

2020 $479,798

SAN BERNARDINO

4PL07015 STATE HIGHWAY

15 I-15 SIERRA AVE UC (12.8) 1/93 MILES S/O GLEN HELEN PKWY U/C

SIGNALIZE SB AND NB I-15 RAMP INTERSECTIONS (EA:0G290) (4M045054) (12.8-13.2)

2014 $2,760

SAN BERNARDINO

4M1004 STATE HIGHWAY

15 I-15 STODDARED WELLS NORTH

AT INTERCHANGE I-15 AT STODDARED WELLS NORTH RECONSTRUCT INTERCHANGE L-8 PSR ONLY

2011 $500

SAN BERNARDINO

4M1005 STATE HIGHWAY

15 I-15 STODDARED WELLS NORTH

BOULDER RD I-15 BETWEEN STODDARD WELLS NORTH AND BOULDER RD NEW INTERCHANGE -L-1 DIAMOND PSR ONLY

2011 $500

SAN BERNARDINO

4H01006 STATE HIGHWAY

15 I-15 US-395 SR-18/MOJAVE RIVER ADD 1 HOV LANE EACH DIRECTION (PM 31.0-40.6)

2020 $398,169

SAN BERNARDINO

4120201 STATE HIGHWAY

15 I-15 @ BEAR VALLEY RD.

INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2020 $29,958

Page 322: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

320 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4M01041 STATE HIGHWAY

15 I-15 @ SIERRA INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2030 $21,287

SAN BERNARDINO

20020144 STATE HIGHWAY

18 HI- DESERT CORR. PHASE 1, SR-18 REALIGNMENT FROM US 395 IN ADELANTO TO SR-18 E/O APPLE VALLEY. COONSTRUCT 4-6 LANE FREEWAY/EXPRESSWAY. CONSTRUCT NEW IC @I-15 W/AUX LANES NORTH AND SOUTH OF NEW IC. CONSTRUCT INTERSECTION @US 395 W/TURN POCKETS TO NORTH AND SOUTH

2020 $1,156,000

SAN BERNARDINO

200612 STATE HIGHWAY

18 SR 18 FROM APPLE VALLEY RD. TO CORWIN RD. – WIDEN FROM 4-6 LANES (APPROX. 3 MI)

2012 $14,400

SAN BERNARDINO

0A7910 STATE HIGHWAY

18 IN RUNNING SPRINGS FROM RTE. 18 FROM N/O NOB HILL DR. TO S/O R.S. SCHOOL RD. AND RTE 330 FROM S/O RTE. 18 TO RTE. 18-RURAL GATEWAY BEAUTIFICATION-AESTHETIC IMPROVEMTNS

2013 $2,265

SAN BERNARDINO

4A04902 STATE HIGHWAY

18 SR-18 0.8 MI WEST OF ORCHARD DR (PM

79.9)

2.1 MI WEST OF ORCHARD DR (PM 81.2)

CONSTRUCT PASSING LANES (PM 79.9/81.2) AND TURN LANES (PM 73.76/84.33)

2018 $16,459

SAN BERNARDINO

4PL07026 STATE HIGHWAY

18 SR-18 ALSO SBD-189-0.0/0.37: NR RIM

FOREST FROM JCT RTE 18/189

0.5 KM EAST RECONSTRUCT SLOPES, STACK WALL WIDEN LAND & SHOULDER ON RTE 189 AND EXTEND RETAINING WALL ON RTE 18 (EA:1A900)

2012 $7,346

SAN BERNARDINO

4A01900 STATE HIGHWAY

18 SR-18 LOS ANGELES COUNTY LINE

US 395 WIDEN FROM 1 TO 2 LANES EACH DIR (PM 116-100.9)

2020 $47,770

SAN BERNARDINO

4M07016 STATE HIGHWAY

38 MENTONE BLVD (SR-38)

WABASH AVE E/GARNET ST WIDEN MENTONE BLVD (SR-38) FROM WABASH AVE TO E/GARNET ST FROM 2 TO 4 LANES (PM 3.0-5.5)

2020 $7,763

Page 323: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 321

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

34770 STATE HIGHWAY

58 0.4 MILES WEST OF KERN CO LINE TO 7.5 MI EAST OF JCT RTE 395 – CONSTRUCT 4 LANE EXPRESS WAY ON NEW ALIGNMENT, NEW INTERCHANGE AT US 395 AND SR 58

2020 $148,067

SAN BERNARDINO

4351 STATE HIGHWAY

58 SR58 EXPRESSWAY-REALIGN AND WIDEN FROM 2-4 LANE EXPRESSWAY. NEW INTERCHANGES AT LENWOOD RD AND HINKLEY RD. 2.8 MILES WEST OF HIDDEN RIVER RD. TO 0.7 MILES EAST OF LENWOOD ROAD -- REALIGN AND WIDEN TO 4 LANE EXPRESSWAY (2-4 LANES) (PHASE 2)

2018 $298,326

SAN BERNARDINO

200602 STATE HIGHWAY

60 SR 60 AND VINEYARD AVE. INTERCHANGE RECONSTRUCTION-LENGTHEN BRIDGE TO ACOMMODATE VINEYARD AVE WIDENING AND RAMP WIDENING 4-6 LANES

2018 $7,621

SAN BERNARDINO

4M07017-201133

STATE HIGHWAY

60 SR 60 AT EUCLID WIDEN W/B EXIT RAMP FROM 2-3 LANES

2012 $1,620

SAN BERNARDINO

4M07017-201132

STATE HIGHWAY

60 SR-60 AT ARCHIBALD AVE WIDEN ON AND OFF RAMPS (2-3 LANES EACH WAY)

2018 $7,900

SAN BERNARDINO

200604 STATE HIGHWAY

60 SR60 AT GROVE AVE INTERCHANGE RECONSTRUCTION AND GROVE AVE. +/-300 FT. N/S OF SR 60-WIDEN FROM 4-6 LANES

2018 $7,621

SAN BERNARDINO

4M07008 STATE HIGHWAY

60 SR-60 RAMONA AVE IC (R1.5)

SB I-15 CONNECTOR (R10.0) WIDEN AUX LANES IN EACH DIRECTION, WIDEN CONNECTOR FROM SB-15 TO WB-60 AND EB-60 TO NB/SB-15, WIDEN RAMPS FROM ONE TO TWO LANES (EA:OE330)

2018 $71,000

SAN BERNARDINO

4M04050 STATE HIGHWAY

60 SR-60 SR-60 AT CENTRAL AVE (3.8)

INTERCHANGE ADD AUX LANES AND WIDEN RAMPS, CONST ENTRANCE LOOP RAMP (EA:0C870) PM R2.1-3.0)

2014 $13,754

SAN BERNARDINO

4PL07019 STATE HIGHWAY

60 SR-60 @ MOUNTAIN

RECONSTRUCT INTERCHANGE SR-60 @ MOUNTAIN

2020 $31,156

Page 324: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

322 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120202 STATE HIGHWAY

60 SR-60 @ RAMONA RECONSTRUCT INTERCHANGE SR-60 @ RAMONA

2020 $35,949

SAN BERNARDINO

200435 STATE HIGHWAY

62 ON SH62 IN YUCCA VALLEY FROM APACHE TRAIL EAST TO APPROX 0.5 MILES TO PALM AVE. INSTALL NEW RAISED MEDIAN, CONSTRUCT CURB & GUTTER & NEW STREET LIGHTS, AND NEW SIGNAL AT CHURCH ST.(CA543)

2011 $2,740

SAN BERNARDINO

4OM0701-20084103

STATE HIGHWAY

62 SR62 -TRAFFIC CONTROL SYCNRONIZATION OF 4 TRAFFIC SIGNALS FROM CAMINO DEL CIELO/SR62 TRAFFIC SIGNAL THROUGH ACOMA TRAIL SR 62 TRAFFIC SIGNAL PROGRAM

2011 $226

SAN BERNARDINO

20060203 STATE HIGHWAY

62 SR 62 SAFETY & UTILITY IMPROVMNTS-TCRP 129 ON SR 62 FROM LA HONDA WY EAST APPROX. 0.2 MILES TO DOMOSA – INSTALL RAISED LANDSCAPED MEDIANS, SIDEWALKS, UTIL U/GROUND/DRAINAGE

2013 $320

SAN BERNARDINO

4A01383 STATE HIGHWAY

62 SR-62 (TWENTY-NINE PALMS HWY)

FAIRWAY DR SR-247 WIDEN FROM 2 TO 3 LANES EACH DIR (PM 8.75-12.5)

2020 $38,114

SAN BERNARDINO

20010133-2011185

STATE HIGHWAY

66 WIDEN FOOTHILL BLVD (OLD STATE ROUTE 66) BETWEEN GROVE AVE AND SAN BERNARDINO RDWIDEN FROM 4-6 LANES INCLUDES RAISED MEDIANS, SIDEWALKS, STREET LIGHTING, LANDSCAPING AND AN ARCH SPANNING FOOTHILL BLVD AS A MONUMENT TO THE HISTORIC ROUTE 66.

2012 $6,006

Page 325: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 323

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

20010133 STATE HIGHWAY

66 WIDEN FOOTHILL BLVD (OLD STATE ROUTE 66) BETWEEN SAN BERNARDINO RD AVE AND VINEYARD AVE. REMOVES THE EAST UPLAN UNDERPASS BRIDGE ALSO KNOWN AS THE PACIFIC ELECTRIC RR BRIDGE, CONSTRUCTS A NEW PUBLIC TRAIL BRIDGE ALONG THE RR ALIGNMENT AND ADDES, RAISED MEDIANS, SIDEWALKS, STREET LIGHTING, LANDSCAPING AND AN ARCH SPANNING FOOTHILL BLVD AS A MONUMENT TO THE HISTORIC ROUTE 66.

2010 $10,632

SAN BERNARDINO

0F100 STATE HIGHWAY

71 ON RTE. 71 FROM SOQUEL CYN PARKWY TO RIVERSIDE CO. LINE AND RIV. CO FROM S.B. CO LINE TO SANTA ANA RIVER BRIDGE -PHASE 1- TREE PLANTING AND AESTHETICS-

2015 $1,974

SAN BERNARDINO

4A01384 STATE HIGHWAY

83 SR-83 &#40;EUCLID &#41;

MERRIL AV KIMBALL AV WIDEN FROM 2 TO 4 LANES EACH DIR &#40;3.9-2.8&#41;

2020 $1,530

SAN BERNARDINO

4ITS04-0P240 STATE HIGHWAY

138 CONSTRUCT A NEW VISTA POINT AT ROUTE 138 WITH PAVED AREA FOR 10 PARKING SPACES INCLUDING 2 SPACES FOR ADA DRIVERS WITH DECORATIVE FENCE AND INTERPRETIVE SIGNS.

2015 $570

SAN BERNARDINO

34011 STATE HIGHWAY

138 NEAR WRIGHTWOOD FROM PHELAN RD TO I-15 WIDEN FROM 2 TO 4 LANES

2018 $87,181

SAN BERNARDINO

4M07035 STATE HIGHWAY

138 SR-138 SR-18 PHELAN RD PHASE II: WIDEN 2 TO 4 LANES FROM SR-18 TO PHELAN RD (PHASE I PHELAN RD TO I-15 IN RTIP#34011)

2023 $75,615

SAN BERNARDINO

4A01385 STATE HIGHWAY

142 SR-142 (CHINO HILLS PKWY)

CARBON CANYON RD PIPELINE DR WIDEN FROM 2 TO 3 LANES EACH DIR (PM 2.0-5.5)

2020 $7,158

Page 326: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

324 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4M1007 STATE HIGHWAY

210 CONSTRUCT NEW FULL-SERVICE INTERCHANGE WITH DIAMOND CONFIGURATION AT SR-210 AND PEPPER AVE IN THE CITY OF RIALTO. ADD WB AND EB ACCEL AND DECEL LANES AND LOCAL STREET IMPROVEMENTS (CONSTRUCT 4 LANES ON PEPPER AVE FROM HIGHLAND AVE TO 160 FT SOUTH OF SR-210).

2018 $18,965

SAN BERNARDINO

4OM0701-20084106

STATE HIGHWAY

210 ON SR 210 LANDSCAPING SEGMENTS 8-11 – PROVIDE PLANTING, IRRIGATION AND INERT GROUNDCOVER ALONG SR210 FROM WEST OF SIERRA AVE IN THE CITY OF FONTANA TO SR210/I-215 I.C IN SAN BERNARDINO (TOLL CREDITS TO BE USED IN CON PHASE. STPLS ADDED FOR $210,000 IN FY2010/11).

2014 $9,574

SAN BERNARDINO

20432 STATE HIGHWAY

210 ON RTE 210 FROM ETIWANDA AVE.- 2.0 MI. NORTH TO 0.5 MI SOUTH OF RTE 210 – MITIGATION PLANTING 2,200 1-GAL. EUCALYPTUS TREES

2012 $1,802

SAN BERNARDINO

20620 STATE HIGHWAY

210 UPLAND TO SAN BERNARDINO FROM LA CO LINE TO RTE 215 – 8 LN FREEWAY INCLUDING 2 HOV LNS (6+2)-210 CORR. W/AUX LNS THRUOUT SEGS. 9-11(SEG.11 INCL CONNECTOR BETWEEN 210 & 215 (MORE)

2012 $482,339

SAN BERNARDINO

4M07007 STATE HIGHWAY

210 I-210 @ BASELINE INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2020 $10,785

SAN BERNARDINO

4M01047 STATE HIGHWAY

210 I-210 @ DEL ROSA INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2020 $43,139

SAN BERNARDINO

4M01049 STATE HIGHWAY

210 I-210 @ WATERMAN

INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2020 $61,113

SAN BERNARDINO

4M01005 STATE HIGHWAY

210 SR-210 I-215 I-10 ADD 1 MF LANE AND 1 HOV LANE EACH DIRECTION AND WIDEN UC’S (PM 22.0-33.2)

2020 $138,033

Page 327: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 325

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4M0801 STATE HIGHWAY

210 SR-210 VICTORIA AVE VICTORIA AVE. CONSTRUCT NEW DIAMOND IC AT VICTORIA AVE WITH 2 LANES EACH RAMP AND MODIFICATIONS TO ARDEN AVE IC

2030 $57,183

SAN BERNARDINO

SBD59204 STATE HIGHWAY

215 I-215 AT UNIVERSITY PARKWAY INTERCHANGE – CONSTRUCT SOUTHBOUND UNIVERSITY PARKWAY -INTERCHANGE RECONFIGURATION AND AUX. LANE ON EACH SIDE, NEW RAMP

2018 $22,513

SAN BERNARDINO

200614 STATE HIGHWAY

215 I-215 BI-COUNTY HOV LANE GAP CLOSURE PROJECT- ADD 1 HOV LANE IN EACH DIRECTION FROM SPRUCE ST. ON RIV 91 TO ORANGE SHOW RD;(ALSO INCLUDES RTP 4M0803 (STIP 2010 $24881 RCTC AND $45089 SANBAG)

2014 $212,545

SAN BERNARDINO

SBD31850 STATE HIGHWAY

215 IN GRAND TERRACE AT I-215 BARTON ROAD INTERCHANGE RECONSTRUCT OC AND RAMPS WITH PARTIAL CLOVERLEAF CONFIGURATION NW OF I-215 WORK INCL ADD OF NB AUX LN.LOCAL STREET WORK TO INCL WIDENING OF BARTON RD, REMOVAL OF LA CROSSE AVE. BETWEEN VIVENDA AVE & BARTON RD, REPLACEMENT W/ NEW LOCAL ROAD, IMPROVEMENTS TO THE BARTON RD AND MICHIGAN WAY/VIVENDA AVE INTERSECTION AND REALIGNMENT OF COMMERCE WAY

2018 $141,407

SAN BERNARDINO

713 STATE HIGHWAY

215 I-215 CORRIDOR NORTH – IN SAN BERNARDINO, ON I-215 FROM RTE 10 TO RTE 210 – ADD 2 HOV & 2 MIXED FLOW LNS (1 IN EA. DIR.) AND OPERATIONAL IMP INCLUDING AUX LANES AND BRAIDED RAMP

2012 $718,586

Page 328: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

326 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4M0803 STATE HIGHWAY

215 I-215 60/91/215 JUNCTION ORANGE SHOW RD I-215 BI-COUNTY IMPROVMT PROJECT – ADD 1 MF LN EACH DIR ; RECONSTRUCT OVERCROSSINGS & UNDERPASSES; CONSTRUCT/MODIFY FWY ACCESS RAMPS; MODIFY FWY CONNECTORS; ADD DECEL AND ACCEL LNS; WIDEN/REALIGN LOCAL RDS; ADD/MODIFY SIGNALS (PE FUNDING ONLY)

2018 $52,280

SAN BERNARDINO

4M07005 STATE HIGHWAY

215 I-215 BARTON ROAD IC (0.58)

TO (1.95) RECONSTRUCT INTERCHANGE 2016 $68,858

SAN BERNARDINO

4M01043 STATE HIGHWAY

215 I-215 MT VERNON/WASHINGTON

INTERCHANGE RECONSTRUCT WASHINGTON STREET IC IN SB COUNTY – REPLACE OVERCROSSING STRUCTURE; RECONFIGURE ON/OFF RAMPS; ADD SB ACCELERATION LANE AND NB DECELERATION LANE; IMPROVEMENTS TO LOCAL STREETS. &#40;PE FUNDING ONLY&#41;

2016 $117,000

SAN BERNARDINO

4H01008 STATE HIGHWAY

215 I-215 SR-210 I-15 ADD 1 HOV LANE EACH DIRECTION (PM 9.5-18.0)

2030 $179,335

SAN BERNARDINO

4M01003 STATE HIGHWAY

215 I-215 SR-30 I-15 ADD 1 MF LANE EACH DIRECTION (10.0-18.0)

2030 $104,146

SAN BERNARDINO

4M01044 STATE HIGHWAY

215 I-215 @ PALM INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2035 $21,055

SAN BERNARDINO

4M01045 STATE HIGHWAY

215 I-215 @ PEPPER/LINDEN

INTERCHANGE RECONFIGURATION/NEW INTERCHANGE

2035 $109,104

SAN BERNARDINO

4A01386 STATE HIGHWAY

247 SR-247 (OLD WOMAN SPRINGS

RD)

NORTH OF SR-62 GRIFFITH RD WIDEN FROM 1 TO 2 LANES EACH DIR (EA:34430) (PM

2020 $7,158

SAN BERNARDINO

34040 STATE HIGHWAY

395 SR395 JCT.NEW ALIGNMENT 4 LANE FREEWAY FROM SR18 TO PURPLE SAGE

2030 $14,000

SAN BERNARDINO

34041 STATE HIGHWAY

395 SR395 UCT, NEW ALIGNMENT – FROM JCT I-15 TO JCT SR-18 – 6-LANE FREEWAY & FROM JCT SR-18 TO PURPLE SAGE – 4-LANE FREEWAY (SPLIT PROJECT FROM 34040)

2030 $4,000

Page 329: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 327

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

34042 STATE HIGHWAY

395 US 395 – NEW ALIGNMENT 4 LANE EXPRESSWAY FROM PURPLE SAGE RD. TO 0.5 MILES S/O FARMINGTON RD. (PROJECT NEW SPLIT FROM 34040)

2020 $10,000

SAN BERNARDINO

4A07141 STATE HIGHWAY

395 US 395 AQUEDUCT WIDEN US 395 AT AQUEDUCT FROM 4 TO 6 LANES

2020 $2,798

SAN BERNARDINO

4A07004 STATE HIGHWAY

395 US 395 AQUEDUCT HOLLY ST. WIDEN US 395 FROM AQUEDUCT TO HOLLY ST. FROM 2 TO 6 LANES OR 4 TO 6 LANES, VARIOUS SEGMENTS. 22.25 LANE MILES

2020 $26,806

SAN BERNARDINO

4120229 STATE HIGHWAY

395 US 395 AQUEDUCT MOJAVE DR WIDEN US 395 FROM AQUEDUCT TO MOJAVE DR FROM 2 TO 6 LANES

2020 $598

SAN BERNARDINO

4PL07027 STATE HIGHWAY

395 US-395 15.02 KM N/O SHADOW MTN RD

(36.2)

1.0 KM S/O KRAMER JCT (45.3) CORRECT CURVE (EA: 0C130) (PM 36.2-45.3)

2013 $18,729

SAN BERNARDINO

4A07392 STATE HIGHWAY

395 US-395 CALLEJA RD DESERT FLOWER RD WIDEN US-395 FROM CALLEJA TO DESERT FLOWER RD FROM 2 TO 4 LANES

2018 $2,599

SAN BERNARDINO

4M0802 STATE HIGHWAY

395 US-395 I-15 1.8 MI S/O DESERT FLOWER RD WIDEN FROM 2 TO 4 LANES EACH DIR AND INSTALL LEFT TURN CHANNELIZATION

2014 $136,870

SAN BERNARDINO

4M04009 STATE HIGHWAY

395 US-395 NB FROM 0.84MI S/O DESERT FLOWER RD TO 2.84MI N/O PURPLE SAGE ST,

AND FROM 4MI N/O SHADOW MOUNTAIN

A

SB FROM 2.72MI N/O PURPLE SAGE ST TO 0.95MI S/O DESERT

FLOWER RD, AND FROM 5.95MI N/O SHADOW MOUNTAI

ADD PASSING LANES IN BOTH DIREC-TIONS AND ADJUST VERTICAL AND HORIZONTAL ALIGNMENTS (EA: 0E840)

2020 $44,536

SAN BERNARDINO

SBD59303 STATE HIGHWAY

999 ___SET ASIDES/RESERVATIONS FOR FUTURE SB45 -PLANNING, PROGRAMMING, & MONITORING

2012 $7,440

SAN BERNARDINO

4A07106 LOCAL HIGHWAY

.WASHINGTON ST. FROM .90 MILES WEST OF WASHINGTON ST. TO LA CADENA MT. VERNON CONSTRUCT NEW 4 LANE ROADWAY (FOR PA & ED ONLY)

2018 $28,000

Page 330: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

328 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

SBD031421 LOCAL HIGHWAY

3RD AVE BEAR VALLEY TO NISQUALLI ROAD WIDEN FROM 2 LANES TO 4 LANES, EXTEND ROAD WITH 4 LANES

2012 $750

SAN BERNARDINO

SBD031422 LOCAL HIGHWAY

3RD AVE NISQUALLI ROAD TO GREEN TREE BLVD WIDEN FROM 2 LANES TO 4 LANES

2014 $750

SAN BERNARDINO

4OM0701-201181

LOCAL HIGHWAY

3RD STREET FROM TIPPECANOE AVE TO LELAND/NORTON WAY AND FROM LELAND/NORTON WAY TO VICTORIA AVE SHOULDER WIDENING AND MEDIANS- 1.25 MILES) (NO THROUGH LANE WIDENING) TOTAL LENGTH 1.95 MILES FORMERLY PART OF PROJECT ID 200852

2015 $3,200

SAN BERNARDINO

SBD59019 LOCAL HIGHWAY

40TH ST. FROM ACRE LANE TO ELECTRIC AVE; ACQUIRE ROW AND WIDEN ROAD FROM 2 TO 4 LANES (1,200 FT.)

2018 $3,264

SAN BERNARDINO

4OM0701-201183

LOCAL HIGHWAY

5TH ST FROM TIPPECANOE AVE TO VICTORIA AVE.-WIDEN FROM 2-4 LANES

2018 $5,255

SAN BERNARDINO

4A07119 LOCAL HIGHWAY

5TH STREET FROM STERLING AVE TO VICTORIA AVE WIDEN FROM 2-4 LANES.

2018 $5,800

SAN BERNARDINO

SBD55031 LOCAL HIGHWAY

ALABAMA STREET FROM 3RD STREET TO SOUTH CITY LIMITS – WIDEN FROM 2 TO 3 S/B LANES (0.25 MILES)

2018 $82

SAN BERNARDINO

200419 LOCAL HIGHWAY

ALABAMA STREET WIDENING – WIDEN FROM 2-4 LANES FROM NORTH CITY LIMITS TO 3,000 FT. NORTH PALMETTO

2014 $7,200

SAN BERNARDINO

SBD41427 LOCAL HIGHWAY

AMBOY ROAD – LEAR AVE TO ADOBE RD. (5.5 MILES) CONSTRUCT NEW 2 LANE ROAD (ONE LANE IN EACH DIRECTION)

2014 $550

SAN BERNARDINO

SBD031418 LOCAL HIGHWAY

AMETHYST ROAD PALMDALE ROAD TO HOPLAND STREET WIDEN EXISTING ROAD FROM 2 LANES TO 4 LANES

2012 $4,000

SAN BERNARDINO

SBD031233 LOCAL HIGHWAY

ARROW BLVD ALDER TO MAPLE AVE WIDEN 2 LANES TO 4 LANES

2014 $2,008

Page 331: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 329

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200630 LOCAL HIGHWAY

ARROW ROUTE WIDENING FROM 2 TO 4 LANES. BRIDGE AND STREET WIDENING FOR ARROW ROUTE, FROM MONTE VISTA AVE TO BENSON AVE (PROJECT WAS 200630 IN 2008 RTIP)

2012 $3,420

SAN BERNARDINO

200157 LOCAL HIGHWAY

AT MAIN STREET AND IOWA AVE AND APPROX. 300’ NORTH AND 300’ EAST OF EACH SIDE OF STREET-INTERSECTION IMPROVEMENTS, CURB & GUTTER, REMOVE BILLBOARD AND TRAFFIC SIGNAL

2010 $369

SAN BERNARDINO

SBD031361 LOCAL HIGHWAY

AYALA DRIVE BASELINE ROAD TO SR210 WIDEN FROM 2 LANES TO 4 LANES

2012 $2,703

SAN BERNARDINO

SBD031295 LOCAL HIGHWAY

BARTON ROAD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES SPOT WIDENINGS

2014 $690

SAN BERNARDINO

4OM0701-201191

LOCAL HIGHWAY

BASE LINE FROM SEINE AVE TO STONEY CREEK DRIVE – WIDEN FROM 4-6 LANES (0.2 MILES)

2018 $583

SAN BERNARDINO

200019 LOCAL HIGHWAY

BASELINE ACROSS CITY CREEK – FROM 600’ W TO 600’ EAST OF CITY CREEK RECONSTRUCT EXISTING BRIDGE TO INCREASE HYDRAULIC CAPACITY (NO ADDTL LANES – STILL 4) REPLACING LOW WATER XING(00L0028)

2015 $22,810

SAN BERNARDINO

SBD031217 LOCAL HIGHWAY

BEECH AVE FOOTHILL TO MILLER AVE WIDEN FROM 2 LANES TO 4 LANES

2014 $4,630

SAN BERNARDINO

200018 LOCAL HIGHWAY

BOULDERAVE ACROSS CITY CREEK S/O BASELINE – RECONSTRUCT EXISTING BRIDGE FROM 2 TO 4 LANES; ALSO WIDEN BOULDER AVE FROM 190’ NORTH TO 1,430’ SOUTH OF BRIDGE FROM 2-4 LANES (54C0648)

2012 $20,718

SAN BERNARDINO

SBD55033 LOCAL HIGHWAY

BOULDER AVE. FROM GREENSPOT TO SOUTH CITY LIMITS – WIDEN FROM 2-4 LANES (0.70 MILES)

2018 $330

Page 332: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

330 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A01256 LOCAL HIGHWAY

CACTUS WIDENING – WIDEN CACTUS FROM VALLEY TO WALNUT AVENUES FROM 2-4 LANES

2014 $2,235

SAN BERNARDINO

SBD31876 LOCAL HIGHWAY

CALIFORNIA STREET BARTON ROAD TO REDLANDS BLVD WIDEN FROM 2 TO 4 LANES

2018 $1,090

SAN BERNARDINO

SBD59023 LOCAL HIGHWAY

CAMPUS PKWY-PEPPER/LINDEN DRIVE EXTENSION FROM KENDALL TO I-215 FWY – CONSTRUCT (4) LANE ROADWAY – BETWEEN KENDALL DRIVE AND I-215, PARTIAL DIAMOND INTERCHANGE FOR N/B (2,000 FT)

2020 $22,000

SAN BERNARDINO

4A04084 LOCAL HIGHWAY

CASA GRANDE AVE FROM LYTLE CREEK ROAD TO MANGO AVE CONSTRUCT 4 LANES

2018 $10,500

SAN BERNARDINO

200608 LOCAL HIGHWAY

CENTRAL AVE WIDENING PROJECT BETWEEN WATERMAN AND MT.VIEW AVE.(2 MI) -WIDEN FROM 2-4 LANES BETWEEN TIPPECANOE AND MT.VIEW, ADDING CURBS, SIDEWALKS AND LIGHTING

2012 $5,600

SAN BERNARDINO

200409 LOCAL HIGHWAY

CHERRY AVE. AT SCRRA RR CROSSING – WIDEN BRIDGE FROM 4-6 LANES ON CHERRY OVER RR CROSSING (FROM MERRILL TO WHITTRAM)

2018 $8,829

SAN BERNARDINO

4A04087 LOCAL HIGHWAY

CHERRY AVE FROM SOUTH HIGHLAND TO I-15 WIDEN (2-6 LANES)

2014 $2,625

SAN BERNARDINO

SBD58044 LOCAL HIGHWAY

CITRUS AVE AUBURN CT. TO WABASH AVE WIDEN FROM 2 TO 4 LANES

2014 $525

SAN BERNARDINO

200006 LOCAL HIGHWAY

CITRUS AVE FROM JURUPA TO SLOVER – WIDEN FROM 2-4 LANES W/LEFT TURN LANES AT INTERSECTIONS (SLOVER, SANTA ANA AVE. & JURUPA-3 INTERSECTIONS)

2012 $5,830

SAN BERNARDINO

4A01093 LOCAL HIGHWAY

CITRUS AVE FROM SUMMIT AVE TO I-15 WIDEN FROM 2 TO 4 LANES

2018 $2,625

Page 333: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 331

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4G0154 LOCAL HIGHWAY

CONSTRUCT NEW RAILROAD GRADE-SEPARATED CROSSING BETWEEN LAUREL STREET AND THE BNSF RAILROAD IN THE CITY OF COLTON. WORK ALONG LAUREL STREET BEGINS APPROXIMATELY 420 FT EAST OF PENNSYLVANIA AVE AND 195FT WEST OF 9TH ST. NO ADDITIONAL LANES ARE PROPOSED.

2014 $53,995

SAN BERNARDINO

200408 LOCAL HIGHWAY

CUMBERLAND DRIVE EXTENSION – SH 18 NORTH TO CUMBERLAND DRIVE -PAVE NEW ROAD – 1 LANE IN EACH DIRECTION

2018 $3,000

SAN BERNARDINO

4A1005 LOCAL HIGHWAY

CYPRESS AVE FROM DUNCAN CANYON ROAD TO FRONTAGE ROAD (I-15)-CONSTRUCT NEW 2 LANE ROAD

2018 $3,200

SAN BERNARDINO

4A07214 LOCAL HIGHWAY

DEL ROSA DRIVE FROM 3RD STREET TO 6TH STREET-WIDEN FROM 2 TO 4 LANES (0.4 MILES) FORMERLY PART OF PROJECT ID 200852

2018 $1,400

SAN BERNARDINO

4A01099 LOCAL HIGHWAY

DUNCAN CANYON ROAD FROM CITRUS AVE TO SIERRA AVE CONSTRUCT 4 LANES.

2014 $5,251

SAN BERNARDINO

4A1006 LOCAL HIGHWAY

DUNCAN CANYON ROAD FROM I-15 TO CITRUS AVE-WIDEN FROM 2-4 LANES

2014 $1,312

SAN BERNARDINO

SBD031118 LOCAL HIGHWAY

EDISON AVE RAMONA TO CENTRAL WIDEN FROM 4 LANES TO 6 LANES & REHABILITATION (SPOT WIDENING)

2014 $2,000

SAN BERNARDINO

SBD031419 LOCAL HIGHWAY

EL EVADO ROAD, PALMDALE RD TO AIR BASE ROAD PALMDALE TO HOPLAND (12/98) HOPLAND TO AIR BASE (12/96), WIDEN FROM 2 TO 4 WITH LEFT TURN LANES

2012 $4,000

SAN BERNARDINO

200151 LOCAL HIGHWAY

EL MIRAGE RD. FROM RICHARDSON RD. (CITY LIMITS) TO SR 395 – PAVE EXISTING 2 LANE DIRT ROAD AND RESURFACE

2014 $5,295

Page 334: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

332 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

SBD031228 LOCAL HIGHWAY

ETIWANDA AVE RIVERSIDE COUNTY LINE TO INTERSTATE 10 WIDEN FROM 4 TO 6 LANES

2014 $2,635

SAN BERNARDINO

4A1003 LOCAL HIGHWAY

EUCALYPTUS FROM PEYTON DR. TO CHINO HILLS COMMUNITY PARK ENTRANCE – CONSTRUCT 2 LANE RD. (PHASE 1 FROM PEYTON DRIVE TO GALLOPING HILLS RD. COMPLETED IN 2/2007)

2014 $3,542

SAN BERNARDINO

SBD88086 LOCAL HIGHWAY

EUCLID AVE FROM D ST TO FOOTHILL BLVD – STORM DRAIN EXTENSION

2013 $1,414

SAN BERNARDINO

200401 LOCAL HIGHWAY

FAIRFIELD RANCH EXT.-EXTEND FAIRFIELD RANCH RD. FROM 950 FT. S/O INTERSECTION OF FFRANCH RD TO 5000 FT. PARALLEL TO SR71 TO PINE INTERSECTION-CONSTRUCT NEW 2 LANE RD. W/BIKE LANES

2014 $6,990

SAN BERNARDINO

200407 LOCAL HIGHWAY

FLAMINGO HEIGHTS LANDERS ROAD IMPROVEMTS-SH 247 PIPES WASH TO JOHNSON VALLEY-WIDEN TO ACCOMMODATE PASSING LANES WITH TURN POCKETS (SAME AS 20061705)

2012 $2,826

SAN BERNARDINO

4A07098 LOCAL HIGHWAY

FOOTHILL BLVD. FROM 500’ W/O MONTE VISTA TO CENTRAL AVE. -WIDEN TO ULTIMATE WIDTH TO PROVIDE DUAL LEFT TURN LANES .

2018 $2,270

SAN BERNARDINO

SBD31903 LOCAL HIGHWAY

FOOTHILL BLVD (STATE ROUTE 66) AT FOURTH MODIFY SIGNALS, CHANNELIZE TRAFFIC SIGNAL, INTERSECTION IMPROVEMENTS/REALIGN INTERSECTION (0.11 MILE)

2011 $1,137

SAN BERNARDINO

SBD031335 LOCAL HIGHWAY

FOOTHILL BLVD AT ARCHIBALD AVE INTERSECTION IMPROVEMENTS (ADD RIGHT TURN LANE)

2012 $640

Page 335: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 333

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4OM0701-201103

LOCAL HIGHWAY

FOOTHILL BLVD BOTTLENECK AND SAFETY IMPROVEMENTS- FROM CENTRAL TO GROVE AVE.INSTALL RIGHT TURN LANES AT MAJOR INTERSECTIONS, ELONGATE LEFT TURNS FOR SAFE TURNING, CURB, GUTTER DRAINAGE, ROADWAY REHAB.

2015 $5,300

SAN BERNARDINO

SBD031246 LOCAL HIGHWAY

FOOTHILL BLVD CITRUS AVE TO MAPLE AVE WIDEN TO STATE STANDARDS FROM 4 TO 6 LANES

2018 $7,218

SAN BERNARDINO

SBD59004 LOCAL HIGHWAY

FRANCIS ST. FROM BON VIEW AVE TO GROVE WIDENING 2 TO 4 LANES (STORM DRAIN FROM BON VIEW TO PARCO)

2018 $12,300

SAN BERNARDINO

200619 LOCAL HIGHWAY

GLEN HELEN PARKWAY – FROM 0.2 MILES WEST OF CAJON CREEK TO 0.2 MILES EAST OF CAJON CREEK-REPLACE 36’ WIDE 48’ LONG 2 LN BRIDGE OVER CAJON CREEK W/ 102’, 526’LONG 4 LN BRIDGE (54C0025)

2014 $35,682

SAN BERNARDINO

20040826 LOCAL HIGHWAY

GLEN HELEN PARKWAY AT UPRR AND BNSF- GRADE SEPARATION

2012 $29,000

SAN BERNARDINO

SBD97147 LOCAL HIGHWAY

GREEN TREE BLVD AT AT&SF RAILROAD CONSTRUCT 4-LANE BR & CONNECT TO HESPERIA & RIDGECREST RD

2014 $30,850

SAN BERNARDINO

200853 LOCAL HIGHWAY

GREENSPOT FROM BOULDER AVE. TO SR210 – WIDEN FROM 4-6 LANES (0.80)

2012 $15,700

SAN BERNARDINO

4A1009 LOCAL HIGHWAY

GREENSPOT RD BETWEEN SR 210 RAMPS – WIDEN FROM 4-5 LANES (.10)

2014 $3,000

SAN BERNARDINO

20061014 LOCAL HIGHWAY

GREENSPOT RD. FROM SANTA PAULA ST. TO 2,600’ S/O SANTA ANA RIVER – WIDEN FROM 2-4 LANES WITH MEDIAN (2.2 MILES)

2018 $22,530

Page 336: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

334 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

20061015 LOCAL HIGHWAY

GREENSPOT ROAD BRIDGE AT SANTA ANA RIVER – GREENSPOT RD.CONSTRUCT NEW 4 LANE BRIDGE (STRIPING FOR 2 LANES) AT SAR W/ CHANNEL IMPROVMENTS-REALIGN APPROX 2400’ OF 2 LANE RD.(54C0368)

2012 $11,046

SAN BERNARDINO

SBDLS08 LOCAL HIGHWAY

GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM -PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127, 128 EXEMPT TABLES 2 & 3

2015 $40,834

SAN BERNARDINO

20040830 LOCAL HIGHWAY

GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES – PROJECTS ARE CONSIS-TENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCEPT REHABILITATION AND OPERATION OF HISTORIC TRANS-PORTATION BUILDINGS, STRUCTURES, OR FACILITIES)

2016 $14,668

SAN BERNARDINO

SBD59006 LOCAL HIGHWAY

GROVE AVE FROM STATE ST. TO 350’ NORTH OF HOLT BLVD. WIDENING FROM 4 TO 6 LANES WIDENING RAILROAD BRIDGE ALSO (1,450’),LANDSCAPE RESTORATION, LEFT TURN LANES AT HOLT

2018 $8,400

SAN BERNARDINO

4A07263 LOCAL HIGHWAY

H STREET FROM KENDALL DRIVE TO 40TH STREET WIDENING FROM 2-4 LANES

2018 $918

SAN BERNARDINO

4A01210 LOCAL HIGHWAY

HOLT BLVD CORRIDOR WIDENING FROM BENSON AVE. TO VINEYARD AVE. WIDEN ROAD FROM 4-6 LANES INCLUDING TRAFFIC SIGNAL MODIFICATIONS AND RESTRIPING

2018 $42,320

SAN BERNARDINO

SBD031284 LOCAL HIGHWAY

I AVE FROM RANCHERO RD TO MAIN ST. WIDEN FROM 2 LANES TO 4 LANES

2014 $6,870

Page 337: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 335

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A0801 LOCAL HIGHWAY

I-40/AZ95 CONNECTOR- J ST. FROM I-40 OFFRAMPS TO W. BROADWY;NEEDLES HGWY FROM W. BROADWY TO N.K ST; N.K ST FROM NEEDLES TO AZ 95-WIDEN 2-4 LNS-INTERSCTN& CORRIDOR IMPRVT.

2018 $24,817

SAN BERNARDINO

200201 LOCAL HIGHWAY

IN ADELANTO, EL MIRAGE RD. FROM SR. 395 TO 1 MILE EAST TO ADELANTO RD. AND ON ADELANTO RD. FROM EL MIRAGE RD. TO 1 MILE SOUTH-AUBURN AVE. PAVE EXISTING 2 LANE RD.

2012 $560

SAN BERNARDINO

200202 LOCAL HIGHWAY

IN CHINO – ON CHINO AVE FROM MONTE VISTA TO SIXTH STREET-WIDEN EXISTING 2 LANES TO 4 LANES AND INSTALL SIGNAL AT INTERSECTION OF CHINO AVE. AND MONTE VISTA

2014 $584

SAN BERNARDINO

200207 LOCAL HIGHWAY

IN CHINO – ON PINE AVE EXTENSION FROM SR 71 TO EUCLID IN THE CITY OF CHINO – WIDEN BRIDGE FROM 2-4 LANES

2018 $25,000

SAN BERNARDINO

200209 LOCAL HIGHWAY

IN HESPERIA – PAVE ESCONDIDO ROAD FROM RANCHERO TO CEDAR (2.0 MILES). PAVE 4 LANES OF ROADWAY 2 IN EACH DIRECTION.

2012 $5,900

SAN BERNARDINO

200211 LOCAL HIGHWAY

IN HESPERIA ON I STREET FROM MAIN ST. TO BEAR VALLEY RD. APPROX. 4.4 MILES – WIDEN FROM 2-4 LANES

2014 $7,700

SAN BERNARDINO

20020134 LOCAL HIGHWAY

IN RANCHO CUCAMONGA – ON ARROW RTE. FROM ETIWANDA AVE TO EAST STREET – WIDEN FROM 2-4 LANES (3,200 FEET)

2014 $1,100

SAN BERNARDINO

4OM0701-201110

LOCAL HIGHWAY

INSTALLATION OF VARIOUS TRAFFIC SIGNALS ALONG LA MESA ROAD

2012 $1,200

SAN BERNARDINO

SBD031227 LOCAL HIGHWAY

JURUPA AVE ETIWANDA TO SIERRA AVE CONSTRUCT 6 LANE ROAD

2014 $24,463

Page 338: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

336 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A04108 LOCAL HIGHWAY

JURUPA AVE FROM TAMARIND AVE TO ALDER AVE WIDEN FROM 2 TO 4 LANES

2018 $958

SAN BERNARDINO

200622 LOCAL HIGHWAY

LENWOOD GRADE SEPARATION – NORTH OF WEST MAIN ST; APPROX.400 FT. N/O TO 600 FT. S/O BNSF AND SANTA FE RR RIGHT-OF-WAY-4 TRAVEL LANE GRADE SEPARATION (CA627)

2014 $30,385

SAN BERNARDINO

SBD55025 LOCAL HIGHWAY

MAIN STREET FROM I-15 TO MAPLE (PHASE 1) FROM MAPLE TO 11TH (PHASE 2) – I-15 TO SR 395 (PHASE 3); WIDEN AND RECONSTRUCT FROM 4 – 6 LANES, INCLUDING WIDENING OF BRIDGE OVER CALIFORNIA AQUEDUCT (2.75 MILES)

2012 $14,500

SAN BERNARDINO

200013 LOCAL HIGHWAY

MAPLE AVE FROM MAIN ST. TO 650’ SOUTH OF CROMDALE STREET – REHABILITATION – RESURFACE 2 LANE RD. (NO NEW LANES)

2010 $1,975

SAN BERNARDINO

200012 LOCAL HIGHWAY

MAPLE AVE FROM MARIPOSA TD. TO MAIN STREET – ROAD REHAB. – RESURFACING 2 EXISTING LANES (NO NEW LANES)

2011 $2,310

SAN BERNARDINO

SBD031254 LOCAL HIGHWAY

MERRILL AVE ALDER TO MAPLE AVE WIDEN FROM 2 TO 4 LANES

2018 $2,065

SAN BERNARDINO

4A07268 LOCAL HIGHWAY

MICHIGAN AVE WIDENING (2-4 LANES) FROM COMMERCE WAY TO MAIN STREET

2018 $1,205

SAN BERNARDINO

SBD031315 LOCAL HIGHWAY

MISSION BLVD GROVE TO HAVEN WIDEN FROM 4 LANES TO 6 LANES ,LANDSCAPED MEDIAN AND STORM DRAIN(3.3 MI) (T21-#60) SEG.1 ARCHIBALD TO HAVEN AND SEG.2- GROVE TO ARCHIBALD

2018 $50,000

Page 339: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 337

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200049 LOCAL HIGHWAY

MOJAVE RIVER BRIDGE CROSSING FROM TERMINUS OF YUCCA LOMA RD TO TERMINUS OF GREEN TREE BLVD – PRE. ENVIRONMENTAL REVIEW FOR CONSTRUCTION OF NEW 4 LANE BRIDGE-INCLUDES A BRIDGE OVER THE BNSF RR TO HESPERIA ROAD (PROJECT 97147 ENVIRONMENTAL DOC IS BEING INCLUDED IN THIS PROJECT. THE PROJ-ECTS CONNECT AND ENVIRON. DOC IS REQUIRING THAT THE WHOLE PROJECT BE INCLUDED ON BOTH SBD97147 AND 200049)

2014 $32,550

SAN BERNARDINO

200857 LOCAL HIGHWAY

MONTE VISTA AVE. FROM PHILLIPS BLVD. TO MISSION BLVD (0.5 MILES)-WIDENING FROM 2-4 LANES

2018 $5,450

SAN BERNARDINO

SBD31905 LOCAL HIGHWAY

MT. VERNON AVE BRIDGE (OVERHEAD) AT BNSF REPLACE GRADE SEPARATION, REPLACE 4 LANE BRIDGE WITH 4 LANE BRIDGE FROM 2ND TO 5TH STREETS (0.2 MILES SOUTH OF RTE. 66)(BRIDGE NO 54C0066)

2015 $73,032

SAN BERNARDINO

SBD41317 LOCAL HIGHWAY

MT. VIEW AVE. BRIDGE AT MISSION CREEK CHANNEL WIDEN ROADWAY & SHOULDER WORK AND EXISTING BRIDGE AT MT. VIEW -1 LN. NO. & SO. TO 2 LNS N/S & LFT_TURNS TO MAKE A TOTAL OF 4 LANES ( 2 IN EACH DIRECTION)

2018 $1,655

SAN BERNARDINO

4OM0701-2011160

LOCAL HIGHWAY

MT. VIEW AVE. BRIDGE OVER SANTA ANA RIVER. CONSTRUCT NEW 4 LANE BRIDGE. MT. VIEW CURRENTLY TERMINATES AT SOUTH EDGE OF SANTA ANA RIVER. PROJECT WOULD EXTEND BY MEANS OF BRIDGE ACROSS RIVER.

2014 $12,500

Page 340: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

338 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200609 LOCAL HIGHWAY

MT.VIEW WIDENING/EXTENSION PROJECT – WIDEN S/B FROM 2-4LNS- FROM COULSTON TO RIVERVIEW (SOUTH OF SANTA ANA RIVER) (PROJECT IS SPLIT INTO 2 SEPARATE PROJECTS AS OF THE 2011 ENTRY)

2014 $7,500

SAN BERNARDINO

4OM0701-201111

LOCAL HIGHWAY

NATIONAL TRAILS HIGHWAY AND MOJAVE RIVER – BRIDGE REHAB. REPLACE EXISTING RAILING TO MEET CURRENT STANDARDS

2012 $1,375

SAN BERNARDINO

20040209 LOCAL HIGHWAY

NATL TRAILS HIWAY FROM BRYMAN RD S/O MORNING GLORY ST TO BRYMAN TO N O MARIGOLD- WIDEN EXISTG 2 LN RD FOR PASSING LNS – 1 IN EA DIRECT., INCL TRANSITIONS Y (CO W/#200106)

2014 $2,154

SAN BERNARDINO

SBD031426 LOCAL HIGHWAY

NEEDLES HIGHWAY FROM ‘N’ STREET TO NEVADA STATE LINE-REALIGN, REHABILITATE, WIDEN SHOULDERS, TURN LANES, PASSING LANES, AND ACCELERATION LANES (1 LANE IN EACH DIR.) RELOCATE UTIL. (CURRENTLY PROGRAMMED FOR PSE ONLY)

2012 $65,500

SAN BERNARDINO

200213 LOCAL HIGHWAY

ON 3RD ST. FROM PALM AVE. TO 5TH ST. WIDEN 3RD ST. E/O PALM AVE. FROM 2 TO 3 LANES AND EXTEND 3RD ST. EASTERLY TO CONNECT 5TH ST.

2014 $1,571

SAN BERNARDINO

200212 LOCAL HIGHWAY

ON GREENSPOT RD. – REALIGNMENT (S CURVE) FROM ST PAULA- 3700’ EASTERLY, (REMAINS 2 LANES)

2010 $1,701

SAN BERNARDINO

200420 LOCAL HIGHWAY

ORANGE STREET WIDENING – FROM NORTH CITY LIMITS TO RIVERVIEW DRIVE – WIDEN STREET FROM 2-4 LANES

2018 $540

SAN BERNARDINO

4OM0701-2011105

LOCAL HIGHWAY

PALM AVE. FROM 3RD ST. TO 5TH ST. – SHOULDER IMPROVEMENTS (NO WIDENING)

2012 $818

Page 341: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 339

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

2002170 LOCAL HIGHWAY

PEPPER AVE: FOOTHILL BLVD TO SR 210 -- WIDEN EXISTING 2 LANES TO 4 LANES (2 EACH DIR)

2012 $15,000

SAN BERNARDINO

4A1001 LOCAL HIGHWAY

PEYTON DRIVE FROM ENGLISH RD. TO EUCALYPTUS; WIDEN PEYTON FROM 4-6 LANES WITH MARKED BIKE LANES IN EACH DIRECTION (PHASE 2) OF SBD41242

2012 $3,951

SAN BERNARDINO

4A1002 LOCAL HIGHWAY

PEYTON DRIVE FROM EUCALYPTUS TO SR 142; WIDEN PEYTON TO 2-4 LANES WITH MARKED BIKE LANES IN EACH DIRECTION

2014 $8,708

SAN BERNARDINO

SBD55028 LOCAL HIGHWAY

RANCHERO RD. FROM DANBURY TO ARROWHEAD LAKE RD. – WIDEN FROM 2 TO 4 LANES (3 MILES)

2014 $11,000

SAN BERNARDINO

SBD55030 LOCAL HIGHWAY

RANCHERO RD. FROM I-15 TO 7TH ST. – WIDEN FROM 2 TO 4 LANES (5.50 MILES)

2012 $11,000

SAN BERNARDINO

SBD031276 LOCAL HIGHWAY

RANCHERO ROAD 7TH AVE TO DANBURY REALIGN ROAD AND WIDEN FROM 2-4 LANES AND CONSTRUCT RAILROAD UNDERCROSSING

2012 $30,058

SAN BERNARDINO

4A07225 LOCAL HIGHWAY

RANDALL AVE ALDER AVE TO MAPLE AVE WIDEN FROM 2 TO 4 LANES

2014 $1,715

SAN BERNARDINO

SBD031294 LOCAL HIGHWAY

REDLANDS BLVD AT CALIFORNIA STREET WIDEN INTERSECTION AND INSTALL TRAFFIC SIGNALS AND DRAINAGE AND CURB AND GUTTERS

2015 $1,090

SAN BERNARDINO

SBD031296 LOCAL HIGHWAY

REDLANDS BLVD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES

2014 $6,850

SAN BERNARDINO

20020202 LOCAL HIGHWAY

REDLANDS PARK ONCE PROGRAM – NEW PARKING STRUCTURE BETWEEN EUREKA AND 3RD ST. S/O STUART AND N/O RR APPROX. 200 SPACES (NOT PNR) (THIS PROJECT REPLACES 200421)

2014 $6,290

Page 342: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

340 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200603 LOCAL HIGHWAY

RIVERSIDE AVE. OVER METROLINK AND BNSF RY, 0.1 MI S OF I-10 REMOVE AND REPLACE EXISTING 5 LANE BRIDGE WITH 7 LANE BRIDGE (PA&ED ONLY) SCOPING FOR PORJECT. HIGH COST PROJECT AGREEMENT REQUIRED PRIOR TO PE AUTHORIZATION.

2014 $37,575

SAN BERNARDINO

SBD031360 LOCAL HIGHWAY

RIVERSIDE AVE SANTA ANA TO AGUA MANSA CONTINUOUS LEFT TURN LANE;WIDEN WEST SIDE(FOR LEFT TURN LANE AND ADDING CURB AND GUTTER

2014 $2,200

SAN BERNARDINO

200816-20110603

LOCAL HIGHWAY

ROCK SPRINGS ROAD OVER MOJAVE RIVER, .9 MILES E ARROWHEAD LK RD. REPLACE TWO LANE LOW WATER CROSSING WITH NEW 4 LANE BRIDGE

2015 $18,533

SAN BERNARDINO

200405 LOCAL HIGHWAY

S. MILLIKEN AVE. GRADE SEPARATION – ON MILLIKEN FROM UPR TO NORTH OF MISSION BLVD. RR GRADE SEP-CONSTRUCT O/C/U/C AT RR-REALIGNMENT OF STS TO MEET O/CROSSING & INTERSTN IMPROVMTS

2014 $80,468

SAN BERNARDINO

SBD031266 LOCAL HIGHWAY

SIERRA AVE FOOTHILL BLVD TO BASELINE AVE- WIDEN FROM 4 TO 6 LANES

2018 $8,129

SAN BERNARDINO

4A04126 LOCAL HIGHWAY

SIERRA AVE FROM VALLEY BLVD TO SAN BERNARDINO AVE WIDEN FROM 4 TO 6 LANES

2012 $2,823

SAN BERNARDINO

4A04127 LOCAL HIGHWAY

SIERRA LAKES PARKWAY FROM BEECH AVE TO CITRUS AVE WIDEN FROM 2 TO 4 LANES.

2014 $4,290

SAN BERNARDINO

4A01132 LOCAL HIGHWAY

SLOVER AVE FROM ETIWANDA AVE TO 800 FEET EAST OF ETIWANDA AVE WIDEN FROM 2-4 LANES

2014 $2,095

Page 343: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 341

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

SBD41241 LOCAL HIGHWAY

SOQUEL CANYON PARKWAY EXTENSNION CONSTRUCT NEW 2 LANE_ROAD W BIKE LANES FROM EXISTING TERMINUS OF SOQUEL CANYON PARKWAY AT PIPELINE AVE. TO WOODVIEW ROAD AT MEDLARINCLUDED ARE BICYCLE LANES MARKED IN EACH DIRECTION

2018 $4,000

SAN BERNARDINO

4A07056 LOCAL HIGHWAY

SOUTH HIGHLAND AVE FROM CHERRY AVE TO CITRUS AVE WIDEN FROM 2 TO 4 LANES

2014 $5,250

SAN BERNARDINO

SBD94177 LOCAL HIGHWAY

STATE ROUTE 62 AT LARREA AVE & HATCH ROAD RECONFIGURE AND SIGNALIZATION (NO SYNCHRONIZATION)

2014 $196

SAN BERNARDINO

SBD59021 LOCAL HIGHWAY

STATE STREET FROM 16TH STREET TO FOOTHILL BLVD.; EXTEND AND CONSTRUCT (4) LANES OF ROADWAY (1.5 MILES) TO CONNECT STATE STREET TO RANCHO AVE (NEW ROAD)4 PHASES TOTAL IN PROJECT

2018 $22,290

SAN BERNARDINO

4OM0701-201184

LOCAL HIGHWAY

STERLING AVE FROM 3RD STREET TO 5TH STREET – WIDEN FROM 2-4 LANES (0.13 MILES) FORMERLY PART OF PROJECT ID 200852

2018 $400

SAN BERNARDINO

4A0802 LOCAL HIGHWAY

THE CHINO-CORONA ROAD IMPROVEMENTS PROJECT IS LOCATED IN THE NEWLY ANNEXED AREA OF THE CITY OF CHINO. IMPROVEMENTS INCLUDE CONSTRUCTION OF A NEW BRIDGE CROSSING OVER MILL CREEK (BOX CULVERT WITH ROAD OVER DRAINAGE) , A NATURAL DRAINAGE SYSTEM OWNED AND MAINTAINED BY UNITED STATES ARMY CORPS OF ENGINEERS ALONG CHINO-CORONA ROAD.

2014 $6,659

Page 344: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

342 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07142 LOCAL HIGHWAY

TIPPECANOE AVE FROM 3RD STREET TO 5TH STREET – WIDEN FROM 2-4 LANES (0.3 MILES) FORMERLY PART OF PROJECT ID 200852

2018 $798

SAN BERNARDINO

4A07274 LOCAL HIGHWAY

VALLEY BLVD FROM BEECH AVE TO CITRUS AVE WIDEN FROM 4-6 LANES

2018 $2,418

SAN BERNARDINO

4A07273-201149

LOCAL HIGHWAY

VALLEY BLVD FROM CHERRY AVE TO BEECH AVE WIDEN FROM 4-6 LANES

2018 $2,418

SAN BERNARDINO

4A1007 LOCAL HIGHWAY

VALLEY BLVD FROM CITRUS AVE TO SIERRA AVE WIDEN FROM 4-6 LANES

2018 $2,418

SAN BERNARDINO

4A07273-201165

LOCAL HIGHWAY

VALLEY BLVD FROM HEMLOCK AVE TO BEECH AVE WIDEN FROM 4-6 LANES

2014 $604

SAN BERNARDINO

4A07140 LOCAL HIGHWAY

VALLEY BLVD FROM SIERRA AVE TO ALDER AVE WIDEN FROM 4-6 LANES

2018 $724

SAN BERNARDINO

200111 LOCAL HIGHWAY

VICTOR VALLEY COLLEGE TRANSFER POINT FACILITY – LOCATED 18422 BEAR VALLEY RD. IN VICTORVILLE

2010 $823

SAN BERNARDINO

4OM0701-2011104

LOCAL HIGHWAY

VICTORIA AVE FROM 3RD ST. TO 6TH ST. – SHOULDER IMPROVEMENTS (NO WIDENING)

2015 $3,195

SAN BERNARDINO

200064 LOCAL HIGHWAY

WASHINGTON ST FROM RECHE CANYON TO HUNTS LN – ELIMINATE BOTTLENECK ADD NB TURN POCKET;WIDEN 2- 4 LNS ON WASHINGTON FROM RECHE CYN. TO HUNTS LN. USING EXISTING WIDTH;MODIFY SIGNALS

2012 $570

SAN BERNARDINO

4A01387 LOCAL HIGHWAY

WIDEN 5TH STREET FROM 2 TO 4 LANES BETWEEN DEL ROSA DR AND PALM AVE; CONSTRUCT NEW TRAFFIC SIGNAL AT 5TH/CENTRAL INTERSECTION; WIDEN 5TH ST AT SR210 FREEWAY UNDERCROSSING FROM 4 TO 5 LANES; ADD TURN LANE, MODIFY RAMP TERMINI; SHOULDER IMPROVEMENTS ON DEL ROSA DR BETWEEN 3RD ST AND 5TH ST (NO ADDITIONAL LANES);

2014 $14,587

Page 345: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 343

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

SBD55012 LOCAL HIGHWAY

YUCCA LOMA RD. AT SR 18 CONNECTION NEW CONNECTION – CONNECTING YUCCA LOMA RD. AND SR 18 – NEW INTER- SECTION

2018 $2,772

SAN BERNARDINO

SBD55011 LOCAL HIGHWAY

YUCCA LOMA RD. FROM APPLE VALLEY RD. TO NAVAJO RD. WIDEN EXISTING 2 LANE RD. TO 4 LANE RD. (2 LANES IN EACH DIRECTION) (3 MILES)

2014 $6,500

SAN BERNARDINO

4OM0701-2011158

LOCAL HIGHWAY

BRYANT STREET IMPROVEMENTS, OAK GLEN RD. TO DATE AVE. EMBANKMENT/SLOPE PROTECTION

2010 $720

SAN BERNARDINO

200410 LOCAL HIGHWAY

CHERRY AVE. WIDENING FROM WHITTRAM TO FOOTHILL BLVD. -WIDEN 4-6 LANES

2012 $7,291

SAN BERNARDINO

SBD031190 LOCAL HIGHWAY

CHERRY AVE BASELINE AVE TO HIGHLAND AVE WIDENING STREET FROM 2 LANES TO 6 LANES

2018 $4,180

SAN BERNARDINO

4OM0701-2011159

LOCAL HIGHWAY

COUNTY LINE ROAD IMPROVEMENTS FROM I-10 TO CALIMESA – INSTALL LEFT TURN LANE AND SIGNAL AT CALIMESA AND COUNTY LINE RD.

2012 $480

SAN BERNARDINO

200421 LOCAL HIGHWAY

DOWNTOWN REDLAND CORE AREA PARKING GARAGE-NEW PARKING STRUCTURE BETWEEN EUREKA AND 3RD STREET SOUTH OF STUART AND N/OR RR-APPOX. 200 SPACES (NOT A PNR) (PROJECT COMBINED WITH 20020202)

2015 $6,000

SAN BERNARDINO

200403 LOCAL HIGHWAY

EVANS/WEST STREET FROM REDLANDS BLVD TO BARTON -CONSTRUCT 4 NEW LANES, A N/S ARTERIAL ROADWAY FROM REDLANS BLVD TO BARTON, WEST OF ANDERSON ST.

2018 $9,153

Page 346: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

344 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200074 LOCAL HIGHWAY

GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS FOR SAN BERNARDINO COUNTY-BIKE/PED PROJECTS (PROJECTS CONSISTENT W/40CFR PART 93.126,127,128, EXEMPT TABLE 2 & 3).

2011 $4,071

SAN BERNARDINO

SBD031505 LOCAL HIGHWAY

GROUPED PROJECTS FOR LTF ARTICLE 3 PROJECTS LTF, ARTICLE 3 BICYCLE/PEDESTRIAN PROJECTS AT VARIOUS LOCATIONS (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128, EXEMPT TABLES 2 & 3)

2010 $7,900

SAN BERNARDINO

4OM0701-200075

LOCAL HIGHWAY

GROUPED PROJECTS FOR TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS – LANDSCAPE, ETC. FOR SAN BERNARDINO CNTY – PROJECTS CONSISTENT WITH 40 CFR PART93.126,127,128, EXEMPT TABLES 2 & 3)

2011 $3,271

SAN BERNARDINO

4G0106 LOCAL HIGHWAY

IN ONTARIO: ON MILLIKEN AT UNION PACIFIC RAILROAD – GRADE SEPARATION – PART OF ALAMEDA CORRIDOR STUDY – TCRP #55.2

2012 $73,983

SAN BERNARDINO

200431 LOCAL HIGHWAY

INLAND PACIFIC ELECTRIC TRAIL – ON OLD SP ABANDONED RR BETWEEN I-15 TO MAPLE AVE.-CONSTRUCT CLASS 1 BIKE LANE (APPROX. 7 MILES LONG)

2011 $3,054

SAN BERNARDINO

200607 LOCAL HIGHWAY

LENA ROAD EXENSION PROJECT – EXTENSION OF LENA RD. FROM MILL ST. TO ORANGE SHOW RD.-NEW 4 LANE ROAD (CO-OP PROJECT WITH IVDA)SAFETEA-LU -#1701

2012 $6,300

Page 347: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 345

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

SBD55034 LOCAL HIGHWAY

MISSION BLVD. FROM LA COUNTY LINE TO BENSON AVE (2.2 MILES) RECONSTRUCT RDWAY, LANDSCAPE MEDIAN ISLANDS, STORM DRAINS, UPGRADED SIGNALS (NO ADDTL LANES) (T21-#60)

2010 $8,560

SAN BERNARDINO

SBD41316 LOCAL HIGHWAY

MT. VIEW AVE. RAILWAY GRADE CROSSING, 1500 FT. NORTH OF I-10 WIDEN RAILWAY GRADE CROSSING FROM 1 LANE NORTH & SOUTH TO 2 LANES NORTH & SOUTH & UPGRADE GATES (0.75 MILES)

2014 $1,724

SAN BERNARDINO

0A6410 LOCAL HIGHWAY

NATIONAL TRAILS HIGHWAY REPAVING – OVERLAY BETWEEN VICTORVILLE CITY LIMITS AND BARSTOW CITY LIMITS

2013 $10,000

SAN BERNARDINO

SBD88140 LOCAL HIGHWAY

NATIONAL TRAILS ROAD BETWEEN INTERSTATE 15 & AIRBASE RD. WIDEN FROM 2 LANES TO 4 LANES

2012 $2,600

SAN BERNARDINO

SBD031412 LOCAL HIGHWAY

NISQUALLI RD FROM BALSAM RD TO HESPERIA RD – WIDEN FROM 2 LANES TO 4 LANES, DRAINAGE IMPROVEMENTS, AND VERTICAL REALIGNMENT

2012 $3,750

SAN BERNARDINO

200414 LOCAL HIGHWAY

ON DUNCAN ROAD FROM OASIS EAST TO BALDY MESA PAVE DIRT ROADS 1 LANE IN EACH DIRECTION INCLUDING STOP SIGNS AT RR CROSSING

2012 $22,000

SAN BERNARDINO

200021 LOCAL HIGHWAY

RAMONA AVE AT STATE ST – RAILROAD CROSSING GRADE SEPARATION-FUNDED WITH TCRP (PART OF ALAMEDA CORRIDOR STUDY) (CA505)

2010 $22,408

SAN BERNARDINO

SBD41289 LOCAL HIGHWAY

RANCHO LAS FLORES PARKWAY -NO LANES CURRENTLY EXIST. DEVELOPER TO CONST RUCT HIGHWY 138 TO RANCHERO RD. 2 LANES IN EACH DIRECTION.

2014 $10,000

Page 348: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

346 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

SBD031152 LOCAL HIGHWAY

RIVERSIDE DRIVE AT SAN ANTONIO FLOOD CONTROL CHANNEL WIDEN BRIDGE FROM 4 LANES TO 6 LANES

2012 $1,120

SAN BERNARDINO

4ITS04-20061502

LOCAL HIGHWAY

SAN BERNARDINO VALLEY COORDINATED TRAFFIC SIGNAL SYSTEM – TIERS 3 & 4 – UPGRADE AND SYNCHRONIZE APPROX. 500 SIGNALS LOCATED ALONG ARTERIAL ROADEWAYS IN SAN BERNARDINO VALLEY

2010 $7,948

SAN BERNARDINO

SBD94174 LOCAL HIGHWAY

STATE ROUTE 62 CANYON TO SUNRISE WIDEN FROM 4 TO 5 LANES FOR CONINUOUS LEFT TURN LANE

2012 $323

SAN BERNARDINO

SBD94173 LOCAL HIGHWAY

STATE ROUTE 62 LEE DRIVE TO LUPINE DRIVE WIDEN FROM 4 TO 5 LANES FOR CONTINUOUS LEFT TURN LANE

2012 $300

SAN BERNARDINO

20040210 LOCAL HIGHWAY

SUMMIT VALLEY ROAD – FROM SH138 TO RANCHERO ROAD-WIDEN FROM 2-4 LANES

2018 $21,000

SAN BERNARDINO

200610 LOCAL HIGHWAY

TIPPECANOE WIDENING PROJECT – BETWEEN MILL AND SANTA ANA RIVER BRIDGE ST. (1.4 MI)-WIDEN FROM 4-6 LANES INCLUD.MEDIAN LANDSCAPE

2012 $2,978

SAN BERNARDINO

200035 LOCAL HIGHWAY

WABASH AVE FROM 5TH ST TO I-10 – CONSTRUCT NEW 2 LANE STREET TO I-10 TO MATCH ON AND OFF RAMPS-CONSTRUCT MISSING LINK (2 LANE IN EACH DIRECTION)-1 MILE

2014 $950

SAN BERNARDINO

20010133-201136

LOCAL HIGHWAY

WIDEN FOOTHILL BLVD (OLD STATE ROUTE 66) BETWEEN SAN BERNARDINO ROAD AND VINEYARD AVE. REMOVE THE EAST UPLAND UNDERPASS BRIDGE ALSO KNOWN AS THE PACIFIC ELECTRIC RAILROAD BRIDGE, CONSTRCT A NEW PUBLIC TRAIL BRIDGE ALONG THE RAILROAD ALIGNMENT AND ADD A RAISED MEDIAN, STREET LIGHTING, SIDEWALKS AND LANDSCAPING.

2012 $10,632

Page 349: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 347

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A04415 LOCAL HIGHWAY

14TH ST YUCAIPA BL OAK GLEN RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,405

SAN BERNARDINO

4A07302 LOCAL HIGHWAY

4TH ST PALMETTO SAN ANTONIO WIDEN 4TH ST FROM PALMETTO TO SAN ANTONIO FROM 2 TO 4 LANES

2030 $659

SAN BERNARDINO

4A01185 LOCAL HIGHWAY

4TH ST VINEYARD AV CUCAMONGA CREEK WIDEN 4TH ST FROM VINEYARD AVE TO CUCAMONGA CREEK FROM 4 TO 6 LANES

2030 $1,300

SAN BERNARDINO

4A07311 LOCAL HIGHWAY

4TH ST FROM CAMPUS AVE TO

GROVE AVE FROM 2 TO 4 LA

CAMPUS AV GROVE AVE WIDEN 4TH ST FROM CAMPUS AVE TO GROVE AVE FROM 2 TO 4 LANES

2030 $1,163

SAN BERNARDINO

4A01262B LOCAL HIGHWAY

5TH AV CRAFTON AV WABASH AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,426

SAN BERNARDINO

4A07292 LOCAL HIGHWAY

5TH ST WARM CREEK PEDLEY WIDEN 5TH ST FROM WARM CREEK TO PEDLEY FROM 2 TO 4 LANES

2020 $690

SAN BERNARDINO

4A01366 LOCAL HIGHWAY

5TH ST YUCAIPA BLVD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $5,215

SAN BERNARDINO

4120141 LOCAL HIGHWAY

5TH STREET CITY CREEK BRIDGE SR 210 WIDEN 5TH ST FROM CITY CREEK TO SR 210; RE-STRIPE 5TH ST FROM 4 TO 6 LANES BTWN CHURCH AVE AND SR 210; RE-STRIPE 5TH ST FROM 4 TO 5 LANES WITH ADDITIONAL TURN LANE AT FREEWAY UNDERCROSSING; CONSTRUCT TRUCK ACCELLERATION LANE ON SOUTHBOUND SR 210 ON-RAMP AND FREEWAY MAINLINE INCLUDING WIDENING EXISTING FREEWAY BRIDGE

2018 $5,070

SAN BERNARDINO

4120153 LOCAL HIGHWAY

6TH ST CUCAMONGA CREEK WIDEN 6TH ST AT CUCAMONGA CREEK CHANNEL (50% RC, 50% ONTARIO)

2030 $359

SAN BERNARDINO

4A01147 LOCAL HIGHWAY

7TH AVE RANCHERO RD BEAR VALLEY RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $10,265

SAN BERNARDINO

4120143 LOCAL HIGHWAY

9TH ST DEL ROSA DR PALM AVE STRIPING MODIFICATION ADDING CONTINUOUS CENTER 2-WAY LEFT TURN LANE AND BIKE LANES

2014 $540

SAN BERNARDINO

4A07062 LOCAL HIGHWAY

9TH ST DEL ROSA DR VICTORIA AV WIDEN 9TH ST FROM DEL ROSA DR TO VICTORIA AVE FROM 2 TO 4 LANES

2018 $2,860

Page 350: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

348 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120154 LOCAL HIGHWAY

9TH ST CUCAMONGA CREEK WIDEN 9TH ST AT CUCAMONGA CREEK CHANNEL

2030 $359

SAN BERNARDINO

4A04406 LOCAL HIGHWAY

ADELANTO RD AUBURN AVE COLUSA RD NEW ROAD, 2 LANES EACH DIR 2018 $9,000

SAN BERNARDINO

4120004 LOCAL HIGHWAY

ADELANTO ROAD AIR EXPRESSWAY EL MIRAGE RD WIDEN ADELANTO ROAD FROM AIR EXPRESSWAY TO EL MIRAGE

2030 $2,399

SAN BERNARDINO

4120002 LOCAL HIGHWAY

ADELANTO ROAD COLUSA OLEANDER WIDEN ADELANTO ROAD FROM COLUSA TO OLEANDER

2030 $4,592

SAN BERNARDINO

4120003 LOCAL HIGHWAY

ADELANTO ROAD EL MIRAGE RD COLUSA RD WIDEN ADELANTO ROAD FROM EL MIRAGE TO COLUSA

2030 $4,203

SAN BERNARDINO

4120001 LOCAL HIGHWAY

ADELANTO ROAD HOLLY RD AIR EXPRESSWAY WIDEN ADELANTO ROAD FROM HOLLY TO AIR EXPRESSWAY

2030 $861

SAN BERNARDINO

4120110 LOCAL HIGHWAY

AGUA MANSA RD RANCHO AV RIVERSIDE AVE WIDEN AGUA MANSA RD FROM RANCHO AVE TO RIVERSIDE AVE FROM 2 TO 4 LANES

2020 $3,322

SAN BERNARDINO

4120008 LOCAL HIGHWAY

AIR EXPRESSWAY ADELANTO RD US-395 WIDEN AIR EXPRESSWAY FROM ADELANTO RD TO US-395

2030 $2,294

SAN BERNARDINO

4120006 LOCAL HIGHWAY

AIR EXPRESSWAY ASTER RICHARDSON WIDEN AIR EXPRESSWAY FROM ASTER TO RICHARDSON

2030 $5,064

SAN BERNARDINO

4120005 LOCAL HIGHWAY

AIR EXPRESSWAY RICHARDSON RD LESSING WIDEN AIR EXPRESSWAY FROM RICHARDSON TO LESSING

2030 $5,596

SAN BERNARDINO

4120007 LOCAL HIGHWAY

AIR EXPRESSWAY US-395 ASTER WIDEN AIR EXPRESSWAY FROM US-395 TO ASTER

2030 $3,282

SAN BERNARDINO

4A01188 LOCAL HIGHWAY

AIRPORT DR ROCHESTER AVE KETTERING DR WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,843

SAN BERNARDINO

4120145 LOCAL HIGHWAY

AIRPORT DR FROM KETTERING DR TO ETIWANDA

AVE FROM 2 TO 4 LANES

KETTERING DR ETIWANDA AVE WIDEN AIRPORT DR FROM KETTERING DR TO ETIWANDA AVE FROM 2 TO 4 LANES

2030 $476

SAN BERNARDINO

4A01237 LOCAL HIGHWAY

ALABAMA 3RD ST SAN BERNARDINO AV WIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: RTIP#SBD31719 WIDENS BRIDGE AT SANTA ANA RIVER)

2020 $7,150

Page 351: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 349

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07017 LOCAL HIGHWAY

ALABAMA LUGONIA AV BARTON RD WIDEN ALABAMA FROM LUGONIA AVE TO BARTON RD FROM 4 TO 6 LANES

2018 $12,750

SAN BERNARDINO

4A07042 LOCAL HIGHWAY

ALABAMA N CITY LIMITS PALMETTO WIDEN ALABAMA FROM N CITY LIMITS TO PALMETTO FROM 2 TO 4 LANES

2020 $7,700

SAN BERNARDINO

4A07175 LOCAL HIGHWAY

ALABAMA ST 3RD ST CITY LIMITS WIDEN ALABAMA ST FROM 3RD ST TO CITY LIMITS FROM 2 TO 4 LANES

2030 $2,299

SAN BERNARDINO

4A07073 LOCAL HIGHWAY

ALABAMA ST LUGONIA PALMETTO WIDEN ALABAMA ST FROM LUGONIA AVE TO PALMETTO AVE FROM 4 TO 6 LANES

2020 $4,658

SAN BERNARDINO

4A07349 LOCAL HIGHWAY

ALDER AV TAYLOR ST VALLEY BLVD WIDEN ALDER AVE FROM TAYLOR ST TO VALLEY BLVD FROM 2 LANES TO 4

2020 $304

SAN BERNARDINO

4A07251 LOCAL HIGHWAY

ALDER AV VALLEY SAN BERNARDINO WIDEN ALDER AVE FROM VALLEY BLVD TO SAN BERNARDINO AVE FROM 2 LANES TO 4

2020 $844

SAN BERNARDINO

4120181 LOCAL HIGHWAY

ALDER AVE BASELINE RD SR-30 WIDEN ALDER AVE FROM BASELINE RD TO SR-30 FROM 2 TO 6 LANES

2020 $4,197

SAN BERNARDINO

4A07126 LOCAL HIGHWAY

ALDER AVE JURUPA N/ SLOVER WIDEN ALDER AVE FROM JURUPA TO N/O SLOVER AVE FROM 2 TO 4 LANES

2020 $3,038

SAN BERNARDINO

4A07322 LOCAL HIGHWAY

ALDER AVE JURUPA AVE N .12M WIDEN ALDER AVE FROM JURUPA AVE TO .12M NORTH FROM 2 TO 4 LANES

2020 $405

SAN BERNARDINO

4A07262 LOCAL HIGHWAY

ALDER AVE SLOVER N 0023M WIDEN ALDER AVE FROM SLOVER AVE TO .23M NORTH FROM 2 TO 4 LANES

2020 $776

SAN BERNARDINO

4A07319 LOCAL HIGHWAY

AMARGOSA RD 1780’ N/O VILLAGE DRIVE

AT POWER LINE EASEMENT WIDEN AMARGOSA RD FROM 1780’ N/O VILLAGE DR TO CENTER OF LADWP POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $414

SAN BERNARDINO

4A07318 LOCAL HIGHWAY

AMARGOSA RD 2050’ S/O AIR BASE RD

AT POWER LINE EASEMENT WIDEN AMARGOSA RD FROM 2050’ S/O AIR BASE DR TO POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $414

SAN BERNARDINO

4A07276 LOCAL HIGHWAY

AMARGOSA RD CLOVIS RD RANCHO RD WIDEN AMARGOSA RD FROM CLOVIS RD TO RANCHO ROAD FROM 2 TO 4 LANES

2020 $683

SAN BERNARDINO

4A07281 LOCAL HIGHWAY

AMARGOSA RD JUST S/O AIR BASE RD

AT POWER LINE EASEMENT WIDEN AMARGOSA RD FROM JUST S/O AIR BASE RD TO POWER LINE EASEMENT FROM 1 TO 4 LANES

2020 $648

Page 352: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

350 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07149 LOCAL HIGHWAY

AMARGOSA RD RANCHO RD VILLAGE DR WIDEN AMARGOSA RD FROM RANCHO RD TO VILLAGE DR FROM 0 TO 4 LANES (INCLUDES WASH CROSSING)

2012 $2,665

SAN BERNARDINO

4120010 LOCAL HIGHWAY

AMETHST DESERT FLOWER OLEANDER WIDEN AMETHST FROM DESERT FLOWER TO OLEANDER

2035 $2,298

SAN BERNARDINO

4120009 LOCAL HIGHWAY

AMETHST HOLLY RD RANCHO WIDEN AMETHST FROM HOLLY TO RANCHO

2035 $2,298

SAN BERNARDINO

4A07210 LOCAL HIGHWAY

AMETHYST PALMDALE RD SENECA RD WIDEN AMETHYST RD FROM PALMDALE RD TO SENECA RD FROM 2 TO 4 LANES

2020 $1,451

SAN BERNARDINO

4A07296 LOCAL HIGHWAY

AMETHYST RD JUST N/O HOPLAND POWER LINE EASEMENT WIDEN AMETHYST RD FROM JUST N/O HOPLAND TO POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $562

SAN BERNARDINO

4A07223 LOCAL HIGHWAY

AMETHYST RD RANCHO RD HOPLAND WIDEN AMETHYST RD FROM RANCHO RD TO HOPLAND FROM 0 TO 4 LANES

2012 $1,265

SAN BERNARDINO

4A01008 LOCAL HIGHWAY

APPLE VALLEY RD SR-18 YUCCA LOMA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $26,500

SAN BERNARDINO

4120095 LOCAL HIGHWAY

APPLE VALLEY RD OHNA FALCHION WIDEN APPLE VALLEY RD FROM OHNA TO FALCHION FROM 0 TO 2 LANES

2020 $5,856

SAN BERNARDINO

4G0116 LOCAL HIGHWAY

ARCHIBALD AV IN ONTARIO (LOS ANGELES) ROADWAY WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) – WIDEN 2-6 LANES

2020 $42,299

SAN BERNARDINO

4A04189 LOCAL HIGHWAY

ARCHIBALD AVE FROM EDISON AVE

TO SOUTH CITY LIMITS FROM 2 TO

6 LANES

EDISON AVE SOUTH CITY LIMITS WIDEN ARCHIBALD AVE FROM EDISON AVE TO SOUTH CITY LIMITS FROM 2 TO 6 LANES

2030 $7,187

SAN BERNARDINO

4A04190 LOCAL HIGHWAY

ARCHIBALD AVE FROM RIVERSIDE AVE TO EDISON

AVE FROM 2 TO 6 LANES

RIVERSIDE AVE EDISON AVE WIDEN ARCHIBALD AVE FROM RIVERSIDE AVE TO EDISON AVE FROM 2 TO 6 LANES

2030 $6,686

SAN BERNARDINO

4A07066 LOCAL HIGHWAY

ARROW BLVD ALDER AVE MAPLE AVE WIDEN FROM 2 TO 4 LANES 2018 $5,000

SAN BERNARDINO

4120125 LOCAL HIGHWAY

ARROW HIGHWAY ALMERIA CITRUS WIDEN ARROW HIGHWAY FROM ALMERIA AVE TO CITRUS AVE FROM 2 TO 4 LANES

2020 $1,265

Page 353: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 351

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07179 LOCAL HIGHWAY

ARROW ROUTE CLAIRMONT CENTRAL AVE WIDEN ARROW ROUTE FROM CLAIRMONT AVE TO CENTRAL AVE FROM 2 TO 4 LANES

2020 $1,890

SAN BERNARDINO

4A07076 LOCAL HIGHWAY

ARROW ROUTE COUNTY LINE CENTRAL AVE WIDEN ARROW ROUTE FROM COUNTY LINE TO CENTRAL AVE FROM 2 TO 4 LANES

2030 $4,000

SAN BERNARDINO

4A07024 LOCAL HIGHWAY

ARROW ROUTE HICKORY AVE TOKAY AVE WIDEN ARROW ROUTE FROM HICKORY AVE TO TOKAY AVE FROM 2 TO 4 LANES

2020 $5,969

SAN BERNARDINO

4120157 LOCAL HIGHWAY

ARROW ROUTE ETIWANDA DITCH WIDEN ARROW ROUTE AT ETIWANDA DITCH

2014 $718

SAN BERNARDINO

4120163 LOCAL HIGHWAY

ARROW ROUTE GROVE ST TO BA BAKER ST WIDEN ARROW ROUTE FROM GROVE ST TO BAKER ST FROM 2 TO 4 LANES

2030 $1,260

SAN BERNARDINO

4120161 LOCAL HIGHWAY

ARROW ROUTE SOUTH SIDE 500 FT EAST OF I-15

1300 FT EAST WIDEN ARROW ROUTE FROM SOUTH SIDE 500 FT EAST OF I-15 TO 1300 FT EAST FROM 2 TO 4 LANES

2018 $987

SAN BERNARDINO

4AL04 LOCAL HIGHWAY

ARTERIAL IMPROVEMENTS

COUNTYWIDE VARIOUS COUNTYWIDE ARTERIAL IMPROVEMENTS 2035 $1,340,714

SAN BERNARDINO

4120011 LOCAL HIGHWAY

ASTER AIR EXPRESSWAY EL MIRAGE RD WIDEN ASTER FROM AIR EXPRESSWAY TO EL MIRAGE

2030 $3,602

SAN BERNARDINO

4120014 LOCAL HIGHWAY

ASTER COLUSA OLEANDER WIDEN ASTER FROM COLUSA TO OLEANDER

2030 $4,593

SAN BERNARDINO

4120013 LOCAL HIGHWAY

ASTER EL MIRAGE RD COLUSA RD WIDEN ASTER FROM EL MIRAGE TO COLUSA

2030 $4,861

SAN BERNARDINO

4120012 LOCAL HIGHWAY

ASTER PALMDALE RD AIR EXPRESSWAY WIDEN ASTER FROM PALMDALE TO AIR EXPRESSWAY

2030 $5,359

SAN BERNARDINO

4A07348 LOCAL HIGHWAY

ASTER RD OLVINE RD DEL ROSA RD WIDEN ASTER RD FROM OLVINE RD TO DEL ROSA RD FROM 0 TO 4 LANES

2020 $318

SAN BERNARDINO

4A07221 LOCAL HIGHWAY

ASTER RD PALMDALE RD OLVINE RD WIDEN ASTER RD FROM PALMDALE RD TO OLVINE RD FROM 0 TO 4 LANES

2020 $1,274

SAN BERNARDINO

4A04405 LOCAL HIGHWAY

ASTER RD RANCHO RD AIR EXPRESSWAY NEW ROAD, 1 LANE EACH DIR 2012 $1,850

SAN BERNARDINO

4A07170 LOCAL HIGHWAY

ASTER ROAD MOJAVE DR CACTUS ROAD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,025

Page 354: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

352 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A04400 LOCAL HIGHWAY

AUBURN/ADELANTO

CHAMBERLAIN WAY (CRIPPEN RD)

JONATHAN ST WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $1,700

SAN BERNARDINO

4A07248 LOCAL HIGHWAY

AVE E 14TH ST BRYANT ST WIDEN AVE E FROM 14TH ST TO BRYANT ST FROM 2 LANES TO 4 LANES

2020 $894

SAN BERNARDINO

4A04416 LOCAL HIGHWAY

AVE E 8TH ST BRYANT ST WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $17,800

SAN BERNARDINO

200810 LOCAL HIGHWAY

BAKER BAKER BLVD. BRIDGE – OVER MOJAVE RIVER, 0.2 MI SW OF DEATH VALLEY RD REPLACE 2 LANE BRIDGE W 4 LANE BRIDGE (BRIDGE NO 54C0127)

2018 $2,910

SAN BERNARDINO

4A07285 LOCAL HIGHWAY

BALDY MESA RD LA MESA RD OLIVINE RD WIDEN BALDY MESA RD FROM LA MESA RD TO OLIVINE RD FROM 0 TO 4 LANES

2020 $632

SAN BERNARDINO

4A01310 LOCAL HIGHWAY

BALDY MESA RD PALMDALE RD LA MESA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $950

SAN BERNARDINO

4A07145 LOCAL HIGHWAY

BANANA AVE JURUPA N/SLOVER WIDEN BANANA AVE FROM JURUPA AVE TO N/SLOVER AVE FROM 2 TO 4 LANES

2020 $2,734

SAN BERNARDINO

4120159 LOCAL HIGHWAY

BANYAN ST ETIWANDA EAST AVE WIDEN BANYAN ST FROM ETIWANDA TO EAST AVE, NORTH SIDE ONLY 1-2 LANES

2014 $817

SAN BERNARDINO

4120018 LOCAL HIGHWAY

BARTLETT ADELANTO RD US-395 WIDEN BARTLETT FROM ADELANTO TO US-395

2020 $1,652

SAN BERNARDINO

4120016 LOCAL HIGHWAY

BARTLETT ASTER RICHARDSON WIDEN BARTLETT FROM ASTER TO RICHARDSON

2020 $5,300

SAN BERNARDINO

4120017 LOCAL HIGHWAY

BARTLETT RICHARDSON RD CAUGLIN WIDEN BARTLETT FROM RICHARDSON TO CAUGLIN

2020 $3,524

SAN BERNARDINO

4120015 LOCAL HIGHWAY

BARTLETT US-395 ASTER WIDEN BARTLETT FROM US-395 TO ASTER

2020 $2,552

SAN BERNARDINO

4A01139 LOCAL HIGHWAY

BARTON RD HONEY HILLS N.E. CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,534

SAN BERNARDINO

4A01141 LOCAL HIGHWAY

BARTON RD I-215 WEST CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,798

SAN BERNARDINO

4A07245 LOCAL HIGHWAY

BARTON RD LOMA LINDA CITY LIMITS

CALIFORNIA ST WIDEN BARTON RD FROM LOMA LINDA CITY LIMITS TO CALIFORNIA ST FROM 4 TO 6 LANES

2020 $945

Page 355: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 353

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A01066 LOCAL HIGHWAY

BARTON RD S. CITY LIMITS WATERMAN AV WIDEN FROM 2 TO 3 LANES EACH DIR (NOTE: OVERLAPS RTIP#200064 AND SBD78022, RECHE CYN TO WATERMAN)

2012 $1,043

SAN BERNARDINO

4120139 LOCAL HIGHWAY

BARTON RD WEST SIDE OF I-215 OVERCROSSING

EAST SIDE OF I-215 OVERCROSSING WIDEN BARTON RD AT I-215 OVERCROSSING FROM 2 TO 4 LANES

2030 $5,747

SAN BERNARDINO

4A07121 LOCAL HIGHWAY

BASELINE WEST CITY LIMITS AYALA/CEDAR WIDEN AND RECONSTRUCT BASELINE FROM WEST CITY LIMITS TO AYALA DR FROM 2 TO 4 LANES

2035 $3,186

SAN BERNARDINO

4A07083 LOCAL HIGHWAY

BASELINE AV MANGO MAPLE BASELINE AVE FROM MANGO AVE TO MAPLE AVE WIDEN FROM 2 TO 6 LANES

2012 $4,200

SAN BERNARDINO

4A07212 LOCAL HIGHWAY

BASELINE AVE CITRUS SIERRA WIDEN BASELINE AVE FROM CITRUS AVE TO SIERRA AVE FROM 2 TO 6 LANES

2020 $7,445

SAN BERNARDINO

4120182 LOCAL HIGHWAY

BASELINE RD WEST TO EAST CITY LIMITS

EAST CITY LIMITS WIDEN AND RECONSTRUCT BASELINE RD FROM WEST TO EAST CITY LIMITS FROM 4 TO 6 LANES

2020 $10,304

SAN BERNARDINO

4120155 LOCAL HIGHWAY

BASELINE RD ETIWANDA AVE I-15 WIDEN BASELINE RD FROM ETIWANDA AVE TO I-15 FROM 3 LANES TO 4 LANES

2030 $475

SAN BERNARDINO

4A07074 LOCAL HIGHWAY

BEAR VALLEY CUTOFF

JOSHUA RD SR-18 WIDEN BEAR VALLEY CUOFF FROM JOSHUA RD TO SR-18 FROM 2 TO 6 LANES

2020 $4,617

SAN BERNARDINO

4A07391 LOCAL HIGHWAY

BEAR VALLEY RD 1270’ W/O TOPAZ RD AT POWER LINE EASEMENT WIDEN BEAR VALLEY RD FROM 1270’ W/O TOPAZ RD TO POWER LINE EASEMENT FROM 2 TO 4 LANES

2020 $26

SAN BERNARDINO

4A07355 LOCAL HIGHWAY

BEAR VALLEY RD 1920’ E/O TOPAZ RD AT POWER LINE EASEMENT WIDEN BEAR VALLEY RD FROM 1920’ E/O TOPAZ RD TO POWER LINE EASEMENT

2020 $229

SAN BERNARDINO

4A01011 LOCAL HIGHWAY

BEAR VALLEY RD APPLE VALLEY RD NAVAJO RD WIDEN FROM 2 TO 3 LANES EACH DIR 2023 $6,900

SAN BERNARDINO

4A07156 LOCAL HIGHWAY

BEAR VALLEY RD US HWY 395 ASTER RD (MONTE VISTA RD) WIDEN BEAR VALLEY FROM US HWY 395 TO ASTER RD FROM 2 LANES TO 6 LANES.

2020 $2,532

SAN BERNARDINO

4120096 LOCAL HIGHWAY

BEAR VALLEY RD KIOWA NAVAJO RD WIDEN BEAR VALLEY RD FROM KIOWA RD TO NAVAJO RD FROM 4 TO 6 LANES

2030 $2,252

SAN BERNARDINO

4A07080 LOCAL HIGHWAY

BEAR VALLEY RD NAVAJO RD JOSHUA RD WIDEN BEAR VALLEY RD FROM NAVAJO RD TO JOSHUA RD FROM 2 TO 4 LANES

2030 $4,505

Page 356: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

354 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120022 LOCAL HIGHWAY

BEAVER AIR EXPRESSWAY EL MIRAGE RD WIDEN BEAVER FROM AIR EXPRESSWAY TO EL MIRAGE

2030 $2,182

SAN BERNARDINO

4120019 LOCAL HIGHWAY

BEAVER COLUSA OLEANDER WIDEN BEAVER FROM COLUSA TO OLEANDER

2030 $2,488

SAN BERNARDINO

4120020 LOCAL HIGHWAY

BEAVER EL MIRAGE RD COLUSA RD WIDEN BEAVER FROM EL MIRAGE TO COLUSA

2030 $2,488

SAN BERNARDINO

4120023 LOCAL HIGHWAY

BEAVER PALMDALE RD AIR EXPRESSWAY WIDEN BEAVER FROM PALMDALE TO AIR EXPRESSWAY

2030 $3,607

SAN BERNARDINO

4120021 LOCAL HIGHWAY

BEAVER VILLA VICTOR WIDEN BEAVER FROM VILLA TO VICTOR 2030 $311

SAN BERNARDINO

4A07185 LOCAL HIGHWAY

BEECH ARROW ROUTE SH-66 WIDEN BEECH AVE FROM ARROW ROUTE TO SH-66 FROM 2 TO 4 LANES

2020 $1,721

SAN BERNARDINO

4A07104 LOCAL HIGHWAY

BEECH RANDALL AVE ARROW ROUTE WIDEN BEECH AVE FROM RANDALL AVE TO ARROW ROUTE FROM 2 TO 4 LANES

2020 $3,476

SAN BERNARDINO

4A07157 LOCAL HIGHWAY

BEECH VALLEY RANDALL WIDEN BEECH AVE FROM VALLEY TO RANDALL AVE FROM 2 TO 4 LANES

2020 $2,531

SAN BERNARDINO

4120124 LOCAL HIGHWAY

BEECH AVE MILLER FOOTHILL WIDEN BEECH AVE FROM MILLER AVE TO FOOTHILL BLVD FROM 2 TO 4 LANES

2020 $4,631

SAN BERNARDINO

4A04192 LOCAL HIGHWAY

BELLEGRAVE AVE FROM MERRILL

AVE TO MILLIKEN AVE (HAMNER

AVE) FROM 2 TO 4 LANES

MERRILL AVE MILLIKEN AVE WIDEN BELLEGRAVE AVE FROM MERRILL AVE TO MILLIKEN AVE (HAMNER AVE) FROM 2 TO 4 LANES

2020 $11,867

SAN BERNARDINO

4120024 LOCAL HIGHWAY

BELLFLOWER AIR EXPRESSWAY EL MIRAGE RD WIDEN BELLFLOWER FROM AIR EXPRESSWAY TO EL MIRAGE

2030 $3,261

SAN BERNARDINO

4120026 LOCAL HIGHWAY

BELLFLOWER CACTUS AIR EXPRESSWAY WIDEN BELLFLOWER FROM CACTUS TO AIR EXPRESSWAY

2030 $2,943

SAN BERNARDINO

4120027 LOCAL HIGHWAY

BELLFLOWER EL MIRAGE RD CALLEJA WIDEN BELLFLOWER FROM EL MIRAGE TO CALLEJA

2030 $3,896

SAN BERNARDINO

4120025 LOCAL HIGHWAY

BELLFLOWER PALMDALE RD MOJAVE WIDEN BELLFLOWER FROM PALMDALE TO MOJAVE

2030 $813

Page 357: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 355

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07096 LOCAL HIGHWAY

BELLFLOWER ST BEAR VALLEY RD GOODWIN DR WIDEN BELLFLOWER RD FROM BEAR VALLEY RD TO .5 MI. S/O GOODWIN DR FROM 0 LANES TO 4 LANES.

2020 $3,798

SAN BERNARDINO

4A04407 LOCAL HIGHWAY

BELLFLOWER ST MOJAVE DR BARTLETT RD WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $6,300

SAN BERNARDINO

4A07298 LOCAL HIGHWAY

BENSON AVE PHILLIPS BLVD N/ HOWARD WIDEN BENSON AVE FROM PHILLIPS BLVD TO HOWARD ST FROM 2 TO 4 LANES

2020 $540

SAN BERNARDINO

4A07294 LOCAL HIGHWAY

BENSON AVE FROM HOWARD ST TO

STATE ST FROM 2 TO 4 LANES

HOWARD ST STATE ST WIDEN BENSON AVE FROM HOWARD ST TO STATE ST FROM 2 TO 4 LANES

2030 $1,087

SAN BERNARDINO

4A07195 LOCAL HIGHWAY

BIG BEAR BL WEST CITY LIMITS EAST CITY LIMITS INTERSECTION SIGNALIZATION AND SYNCHRONIZATION

2013 $1,600

SAN BERNARDINO

4A01025 LOCAL HIGHWAY

BIG BEAR BL WEST CITY LIMITS EAST CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $18,634

SAN BERNARDINO

4A07241 LOCAL HIGHWAY

BLOOMINGTON AVE CEDAR LARCH WIDEN BLOOMINGTON AVE FROM CEDAR TO LARCH FROM 2 TO 4 LANES

2020 $1,013

SAN BERNARDINO

4A07009 LOCAL HIGHWAY

BOULDER AVE BASE LINE 5TH ST WIDEN BOULDER AVE FROM 2 LANES TO 4 LANES &#40;INCLUDING BRIDGE&#41;.

2012 $17,006

SAN BERNARDINO

4A07304 LOCAL HIGHWAY

BRYANT ST JUNIPER AVE SR-38 WIDEN BRYANT ST FROM JUNIPER AVE TO SR-38 FROM 2 TO 4 LANES

2020 $506

SAN BERNARDINO

4A04417 LOCAL HIGHWAY

BRYANT ST NORTH CITY LIMITS COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $7,796

SAN BERNARDINO

4120113 LOCAL HIGHWAY

C ST CITY LIMITS W/O RANCHO AVE

PENNSYLVANIA AVE WIDEN C ST FROM CITY LIMITS W/O RANCHO AVE TO PENNSYLVANIA AVE FROM 2 TO 4 LANES

2030 $1,296

SAN BERNARDINO

4A07192 LOCAL HIGHWAY

C STREET 0007M W, JACKSON E/0007M E, TEJON AVE WIDEN C STREET FROM 0007M W, JACKSON E/0007M E, TEJON AVE FROM 2 TO 4 LANES

2030 $1,758

SAN BERNARDINO

4A07143 LOCAL HIGHWAY

CALABASH AVE WHITTRAM AVE N/FOOTHILL BLVD WIDEN CALABASH AVE FROM WHITTRAM AVE TO N/FOOTHILL BLVD FROM 2 TO 4 LANES

2020 $2,768

Page 358: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

356 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07291 LOCAL HIGHWAY

CALIFORNIA ST ALMOND AVE SAN BERNARDINO AVE WIDEN CALIFORNIA ST FROM ALMOND AVE TO SAN BERNARDINO AVE FROM 3 TO 6 LANES

2020 $608

SAN BERNARDINO

4A07190 LOCAL HIGHWAY

CALIFORNIA ST SAN BERNARDINO PALMETTO WIDEN CALIFORNIA ST FROM SAN BERNARDINO AVE TO PALMETTO AVE FROM 2 TO 6 LANES

2020 $1,688

SAN BERNARDINO

4A01367 LOCAL HIGHWAY

CALIFORNIA ST WILDWOOD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,535

SAN BERNARDINO

4A04238 LOCAL HIGHWAY

CALIFORNIA ST LUGONIA AVE SAN BERNARDINO AVE WIDEN CALIFORNIA ST FROM LUGONIA AVE TO SAN BERNARDINO AVE FROM 2 TO 6 LANES

2020 $916

SAN BERNARDINO

4A07184 LOCAL HIGHWAY

CALIFORNIA ST REDLANDS BLVD I-10 WIDEN CALIFORNIA ST FROM REDLANDS BLVD TO I-10 FROM 5 TO 6 LANES

2020 $754

SAN BERNARDINO

4A01368 LOCAL HIGHWAY

CALIMESA BL OAK GLEN RD COUNTY LINE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,820

SAN BERNARDINO

4A07139 LOCAL HIGHWAY

CAMPUS AV FRANCIS HOLT WIDEN CAMPUS FROM FRANCIS TO HOLT FROM 2 TO 4 LANES

2018 $3,591

SAN BERNARDINO

4G0104/ 4G0112

LOCAL HIGHWAY

CAMPUS AV IN ONTARIO (ALHAMBRA)/ (LOS ANGELES) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) WIDEN 2-4 LANES

2035 $21,677

SAN BERNARDINO

4A04193 LOCAL HIGHWAY

CAMPUS AVE FROM RIVERSIDE DR TO

MERRILL AVE FROM 2 TO 4 LANES

RIVERSIDE DR MERRILL AVE WIDEN CAMPUS AVE FROM RIVERSIDE DR TO MERRILL AVE FROM 2 TO 4 LANES

2030 $5,016

SAN BERNARDINO

4A07181 LOCAL HIGHWAY

CAMPUS PKWY KENDALL I-215 CAMPUS PKWY (PEPPER-LINDEN) EXTENSION FROM KENDALL TO I-215. CONSTRUCT 4 LANES AND A PARTIAL DIAMOND INTERCHANGE

2020 $1,800

SAN BERNARDINO

4120183 LOCAL HIGHWAY

CASMALIA AVE WEST CITY LIMITS AYALA WIDEN CASMALIA AVE FROM WEST CITY LIMITS TO AYALA DR FROM 2 TO 4 LANES

2020 $5,423

SAN BERNARDINO

4A01086 LOCAL HIGHWAY

CASMALIA AVE (CARTER AVE)

SIERRA AV MANGO AV NEW WIDEN ROAD, 2 LANES EACH DIR 2012 $1,400

SAN BERNARDINO

4120028 LOCAL HIGHWAY

CASSIA ADELANTO RD HWY 395 WIDEN CASSIA FROM ADELANTO ROAD TO HWY 395

2035 $539

Page 359: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 357

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120030 LOCAL HIGHWAY

CAUGHLIN AIR EXPRESSWAY BARTLETT RD WIDEN CAUGHLIN FROM AIR EXPRESSWAY TO BARTLETT

2020 $1,507

SAN BERNARDINO

4120029 LOCAL HIGHWAY

CAUGHLIN COLUSA OLEANDER WIDEN CAUGHLIN FROM COLUSA TO OLEANDER

2020 $5,022

SAN BERNARDINO

4120031 LOCAL HIGHWAY

CAUGHLIN SENECA AIR EXPRESSWAY WIDEN CAUGHLIN FROM SENECA TO AIR EXPRESSWAY

2020 $9,581

SAN BERNARDINO

4A01027 LOCAL HIGHWAY

CENTRAL AVE CHINO AVE EL PRADO WIDEN FROM 2 TO 3 LANES EACH DIR (NOTE: OVERLAPS RTIP#SBD41236 SBD31933 FROM SR-71 TO EL PRADO)

2020 $2,000

SAN BERNARDINO

4A01296 LOCAL HIGHWAY

CENTRAL AVE FOOTHILL BL BENSON AVE NEW ROAD, 2 LANES EACH DIR 2020 $10,700

SAN BERNARDINO

4A01026 LOCAL HIGHWAY

CENTRAL AVE FRANCIS AV RIVERSIDE DR WIDEN FROM 3 TO 4 LANES EACH DIR 2020 $2,642

SAN BERNARDINO

4G07421 LOCAL HIGHWAY

CENTRAL AVE IN MONTCLAIR ON THE ALHAMBRA AND LOS ANGELES LINES

HOLT BLVD TO MISSION BLVD WIDEN CENTRAL AVE GRADE SEPARA-TION IN MONTCLAIR ON THE ALHAMBRA AND LOS ANGELES LINES

2030 $5,930

SAN BERNARDINO

4A01267 LOCAL HIGHWAY

CENTRAL AVE MONTCLAIR CITY LIMIT

CHINO CITY LIMIT WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $1,407

SAN BERNARDINO

4A01297 LOCAL HIGHWAY

CENTRAL AVE SOUTH CITY LIMITS ARROW ROUTE WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $3,270

SAN BERNARDINO

4A01266 LOCAL HIGHWAY

CENTRAL AVE PHILLIPS BLVD STATE ST WIDEN CENTRAL AVE FROM PHILLIPS BLVD TO STATE ST FROM 4 TO 6 LANES

2020 $2,093

SAN BERNARDINO

4120104 LOCAL HIGHWAY

CENTRAL AVE RIVERSIDE DR SR-71 WIDEN CENTRAL AVE FROM RIVERSIDE DR TO SR-71 FROM 4 TO 6 LANES

2020 $7,796

SAN BERNARDINO

4A07015 LOCAL HIGHWAY

CENTRAL RD BEAR VALLEY WAALEW WIDEN CENTRAL RD FROM BEAR VALLEY RD TO WAALEW RD FROM 2 TO 4 LANES

2020 $14,400

SAN BERNARDINO

4A07091 LOCAL HIGHWAY

CENTRAL RD ROUNDUP WY N/ POPPY WIDEN CENTRAL RD FROM ROUNDUP WY TO N/ POPPY RD FROM 2 TO 4 LANES

2020 $4,050

SAN BERNARDINO

4A07048 LOCAL HIGHWAY

CERES AVE MERRIL CATAWBA WIDEN CERES AVE FROM MERRILL AVE TO CATAWBA AVE FROM 2 TO 4 LANES

2020 $6,143

SAN BERNARDINO

4120035 LOCAL HIGHWAY

CHAMBERLAINE ASTER RICHARDSON WIDEN CHAMBERLAINE FROM ASTER TO RICHARDSON

2030 $4,317

SAN BERNARDINO

4120033 LOCAL HIGHWAY

CHAMBERLAINE JONATHAN US-395 WIDEN CHAMBERLAINE FROM JONATHAN TO US-395

2030 $2,165

Page 360: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

358 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120034 LOCAL HIGHWAY

CHAMBERLAINE RICHARDSON RD CAUGHLIN RD WIDEN CHAMBERLAINE FROM RICHARDSON TO CAUGLIN

2030 $2,597

SAN BERNARDINO

4120032 LOCAL HIGHWAY

CHAMBERLAINE US-395 ASTER WIDEN CHAMBERLAINE FROM US-395 TO ASTER

2030 $2,718

SAN BERNARDINO

4A07040 LOCAL HIGHWAY

CHERRY VALLEY FOOTHILL WIDEN CHERRY AVE FROM VALLEY TO FOOTHILL BLVD FROM 4 TO 6 LANES

2020 $7,796

SAN BERNARDINO

4A01089 LOCAL HIGHWAY

CHERRY AV JURUPA AV SLOVER AV WIDEN FROM 1 TO 3 LANES EACH DIR 2012 $4,354

SAN BERNARDINO

4A04091 LOCAL HIGHWAY

CHERRY AV VALLEY BL SAN BERNARDINO AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $2,800

SAN BERNARDINO

4120126 LOCAL HIGHWAY

CHERRY AVE BRIDGE

MERRILL AVE WHITTRAM AVE WIDEN CHERRY AVE BRIDGE FROM MERRILL AVE TO WHITTRAM FROM 4 TO 6 LANES

2020 $11,100

SAN BERNARDINO

4A04194 LOCAL HIGHWAY

CHINO AV EUCLID AV MILLIKEN BL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $15,211

SAN BERNARDINO

4120105 LOCAL HIGHWAY

CHINO AVE 600’ E/O MONTE VISTA RD

SIXTH ST WIDEN CHINO AVE FROM 600’ E/O MONTE VISTA RD TO SIXTH ST FROM 2 TO 4 LANES

2030 $761

SAN BERNARDINO

4A01029 LOCAL HIGHWAY

CHINO AVE CENTRAL AVE 600’ EAST OF MONTE VISTA WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,713

SAN BERNARDINO

4A01028 LOCAL HIGHWAY

CHINO AVE CENTRAL AVE MOUNTAIN AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $6,100

SAN BERNARDINO

4A01030 LOCAL HIGHWAY

CHINO AVE FERN AV EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $4,043

SAN BERNARDINO

4A07205 LOCAL HIGHWAY

CHINO AVE MOUNTAIN FERN WIDEN CHINO FROM MOUNTAIN TO FERN FROM 2 TO 4 LANES

2018 $1,500

SAN BERNARDINO

4A01031 LOCAL HIGHWAY

CHINO AVE SR-71 EAST END AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2035 $989

SAN BERNARDINO

4A01062 LOCAL HIGHWAY

CHINO HILLS PKWY RAMONA CHINO CREEK BRIDGE WIDEN CHINO HILLS PKWY FROM RAMONA AVE TO CHINO CREEK BRIDGE FROM 4 TO 6 LANES

2020 $203

SAN BERNARDINO

4120165 LOCAL HIGHWAY

CHURCH AVE ARCHIBALD HAVEN WIDEN CHURCH AVE FROM ARCHIBALD TO HAVEN FROM 2 TO 4 LANES

2030 $1,465

Page 361: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 359

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A01239 LOCAL HIGHWAY

CHURCH ST COLTON AV REDLANDS BLVD WIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: RTIP#SBD59012 WIDENS FROM COLTON TO CLARK)

2012 $4,150

SAN BERNARDINO

4A04095 LOCAL HIGHWAY

CITRUS AVE SAN BERNARDINO AVE

FOOTHILL BLVD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,820

SAN BERNARDINO

4A01094 LOCAL HIGHWAY

CITRUS AVE SAN BERNARDINO AVE

VALLEY BLVD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,400

SAN BERNARDINO

4A01096 LOCAL HIGHWAY

CITRUS AVE SLOVER AVE JURUPA AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,200

SAN BERNARDINO

4120127 LOCAL HIGHWAY

CITRUS AVE BASELINE AVE SO. HIGHLAND AVE WIDEN CITRUS AVE FROM BASELINE AVE TO SO. HIGHLAND AVE FROM 2 TO 4 LANES

2020 $5,680

SAN BERNARDINO

4A04240 LOCAL HIGHWAY

CITRUS AVE DEARBORN ST WABASH AVE WIDEN CITRUS AVE FROM DEARBORN ST TO WABASH AVE FROM 2 TO 4 LANES

2030 $1,149

SAN BERNARDINO

4A07331 LOCAL HIGHWAY

CIVIC DR MOJAVE DR ROY RODGERS DR WIDEN CIVIC DR FROM MOJAVE DR. TO ROY ROGERS DR. FROM 0 TO 4 LANES

2020 $332

SAN BERNARDINO

4120036 LOCAL HIGHWAY

COLBALT ROAD HOLLY RD RANCHO WIDEN COLBALT ROAD FROM HOLLY TO RANCHO

2030 $1,865

SAN BERNARDINO

4120173 LOCAL HIGHWAY

COLTON AVE WABASH AV CRAFTON AVE WIDEN COLTON AVE FROM WABASH AVE TO CRAFTON AVE FROM 2 TO 4 LANES

2030 $2,358

SAN BERNARDINO

4120111 LOCAL HIGHWAY

COLTON AVE MT. VERNON AVE. CITY LIMITS WIDEN COLTON AVE FROM MT. VERNON AVE.AV TO CITY LIMIT FROM 2 TO 4 LANES

2020 $3,409

SAN BERNARDINO

4120038 LOCAL HIGHWAY

COLUSA ASTER RICHARDSON WIDEN COLUSA FROM ASTER TO RICHARDSON

2035 $6,619

SAN BERNARDINO

4120039 LOCAL HIGHWAY

COLUSA MESA ADELANTO RD WIDEN COLUSA FROM MESA TO ADELANTO

2035 $1,768

SAN BERNARDINO

4120037 LOCAL HIGHWAY

COLUSA RICHARDSON RD CAUGHLIN RD WIDEN COLUSA FROM RICHARDSON TO CAUGHLIN

2035 $2,597

SAN BERNARDINO

4A07085 LOCAL HIGHWAY

COMMERCE WAY 900 FT. NORTH OF DE BERRY

PICO WIDEN COMMERCE WY FROM 900’ N/O DEBERRY RD TO PICO AVE FROM 2 TO 4 LANES

2014 $4,200

SAN BERNARDINO

4A07027 LOCAL HIGHWAY

COMMERCE WY 900’ N/O PICO MAIN ST EXTEND COMMERCE WY FROM 900’ N/O PICO TO MAIN ST FROM 0 TO 4 LANES

2020 $14,388

Page 362: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

360 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07150 LOCAL HIGHWAY

CONE CAMP RD GREENSPOT RD SOUTH CITY LIMIT CONSTRUCT NEW STREET FROM 0 TO 2 LANES

2030 $2,635

SAN BERNARDINO

4A07326 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

ARCHIBALD AVE OVER LOWER DEER

CREEK

CONSTRUCT A BRIDGE ON ARCHIBALD AVE OVER LOWER DEER CREEK-WIDEN 2-6 LANES

2030 $473

SAN BERNARDINO

4A07277 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

ARCHIBALD AVE OVER UPPER DEER

CREEK

CONSTRUCT A BRIDGE ON ARCHIBALD AVE OVER UPPER DEER CREEK-WIDEN 4-6 LANES

2030 $868

SAN BERNARDINO

4A07278 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

ARCHIBALD AVE OVER UPPER DEER CREEK SPILLWAY

CONSTRUCT A BRIDGE ON ARCHIBALD AVE OVER UPPER DEER CREEK SPILLWAY-WIDEN4-6 LANES

2030 $868

SAN BERNARDINO

4A07174 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

EIGHT ST OVER CUCAMONGA

CREEK

CONSTRUCT A BRIDGE ON EIGHT ST OVER CUCAMONGA CREEK=WIDEN 2-4 LANES

2035 $710

SAN BERNARDINO

4A07208 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

FRANCIS ST OVER CUCAMONGA

CREEK

CONSTRUCT A BRIDGE ON FRANCIS ST OVER CUCAMONGA CREEK-SIDEWALK ONLY

2030 $2,189

SAN BERNARDINO

4A07325 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON HOLD BLVD OVER WEST

CUCAMONGA CREEK

CONSTRUCT A BRIDGE ON HOLD BLVD OVER WEST CUCAMONGA CREEK--WIDEN 4-6 LANES

2030 $710

SAN BERNARDINO

4A07327 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

HOLT BLVD OVER CUCAMONGA

CREEK

CONSTRUCT A BRIDGE ON HOLT BLVD OVER CUCAMONGA CREEK-WIDEN-4-6 LANES

2030 $476

Page 363: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 361

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07317 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

MISSION BLVD OVER CUCAMONGA

CREEK

CONSTRUCT A BRIDGE ON MISSION BLVD OVER CUCAMONGA CREEK-WIDEN 4-6 LANES

2030 $1,736

SAN BERNARDINO

4A07215 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

MISSION BLVD OVER WEST

CUCAMONGA CREEK

CONSTRUCT A BRIDGE ON MISSION BLVD OVER WEST CUCAMONGA CREEK-WIDEN 4-6 LANES

2030 $552

SAN BERNARDINO

4A07267 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON RIVERSIDE DR

OVER CUCAMONGA CREEK

CONSTRUCT A BRIDGE ON RIVERSIDE DR OVER CUCAMONGA CREEK-WIDEN 4-6 LANES

2035 $947

SAN BERNARDINO

4A07260 LOCAL HIGHWAY

CONSTRUCT A BRIDGE ON

SIXTH ST OVER CUCAMONGA

CREEK

CONSTRUCT A BRIDGE ON SIXTH ST OVER CUCAMONGA CREEK-SIDEWALK ONLY

2020 $1,026

SAN BERNARDINO

4120172 LOCAL HIGHWAY

CONSTRUCT NEW BRIDGE AT WILSON

AND DAY CREEK CHANNEL

CONSTRUCT NEW BRIDGE AT WILSON AND DAY CREEK CHANNEL

2030 $1,436

SAN BERNARDINO

4A01013 LOCAL HIGHWAY

CORWIN RD SR-18 DALE EVANS PKWY WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $14,400

SAN BERNARDINO

4A07081 LOCAL HIGHWAY

COULSTON TIPPECANOE MT. VIEW WIDEN COULSTON AVE FROM TIPPECANOE TO MT. VIEW FROM 2 TO 4 LANES

2030 $4,224

SAN BERNARDINO

4A01370 LOCAL HIGHWAY

COUNTY LINE RD CALIMESA BLVD BRYANT ST WIDEN COUNTY LINE RD FROM CALIMESA BLVD TO BRYANT ST FROM 2 TO 4 LANES

2030 $2,499

SAN BERNARDINO

4A07114 LOCAL HIGHWAY

COYOTE CNYN SADDLEBACK I-15 COYOTE CANYON RD FROM SADDLEBACK RD TO I-15 WIDEN FROM 0 TO 4 LANES

2018 $3,360

Page 364: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

362 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120237 LOCAL HIGHWAY

CRAFTON HILLS PARKWAY

WABASH TENNESSEE WIDEN CRAFTON HILLS PARKWAY FROM WABASH TO TENNESSEE FROM 0 TO 2 LANES

2030 $6,875

SAN BERNARDINO

4A07028 LOCAL HIGHWAY

CRAFTON HILLS PKWY

WABASH AVE OVERCREST/TENNESSEE PAVE DIRT ROAD, 1 LANE EACH DIR 2020 $10,125

SAN BERNARDINO

4A07238 LOCAL HIGHWAY

CRAFTON HILLS PKWY

WABASH AVE E/CRAFTON PUD WIDEN CRAFTON HILLS PKWY FROM WABASH AVE TO E/CRAFTON PUD FROM 0 TO 2 LANES

2035 $1,020

SAN BERNARDINO

4120128 LOCAL HIGHWAY

CYPRESS AVE DUNCAN CANYON RD FRONTAGE RD (I-15) WIDEN CYPRESS AVE FROM DUNCAN CANYON RD TO FRONTAGE RD (I-15) FROM 2 TO 4 LANES

2030 $3,200

SAN BERNARDINO

4A04098 LOCAL HIGHWAY

CYPRESS AVE SO. HIGHLAND AVE SIERRA LAKES PKWY WIDEN CYPRESS AVE FROM SO. HIGHLAND AVE TO SIERRA LAKES PKWY FROM 0 TO 4 LANES

2030 $10,000

SAN BERNARDINO

4A01241 LOCAL HIGHWAY

CYPRESS AVE I-10 CITRUS AV WIDEN CYPRESS AVE FROM I-10 TO CITRUS AVE FROM 2 LANES TO 4 LANES

2030 $620

SAN BERNARDINO

4A07007 LOCAL HIGHWAY

DALE EVANS PKWY THUNDERBIRD RD I-15 WIDEN DALE EVANS PKWY FROM THUNDERBIRD RD TO I-15 FROM 2 LANES TO 4 LANES.

2020 $19,200

SAN BERNARDINO

4A07130 LOCAL HIGHWAY

DALEY CANYON AT SH 18

IN SAN BERNARDINO COUNTY

INTERSECTION IMPROVEMENTS 2020 $3,000

SAN BERNARDINO

4A07063 LOCAL HIGHWAY

DEEP CREEK RD BEAR VALLEY RD SITTING BULL RD WIDEN DEEP CREEK RD FROM BEAR VALLEY RD TO SITTING BULL RD FROM 0 TO 4 LANES

2023 $5,200

SAN BERNARDINO

4A07069 LOCAL HIGHWAY

DEEP CREEK RD TUSSING RANCH RD BEAR VALLEY RD WIDEN DEEP CREEK RD FROM TUSSING RACH RD TO BEAR VALLEY RD FROM 2 TO 4 LANES

2018 $4,800

SAN BERNARDINO

4A07010 LOCAL HIGHWAY

DEL ORO RD APPLE VALLEY RD CENTRAL RD WIDEN DEL ORO RD FROM APPLEY VALLEY RD TO CENTRAL RD FROM 0 LANES TO 2 LANES

2018 $16,800

SAN BERNARDINO

4A07232 LOCAL HIGHWAY

DEL ROSA AVE 6TH ST 9TH ST WIDEN DEL ROSA AVE FROM 6TH ST TO 9TH ST FROM 2 TO 4 LANES

2020 $2,299

SAN BERNARDINO

4A07380 LOCAL HIGHWAY

DEL ROSA AVE DEL ROSA DR SAN BERNARDINO CITY LIMITS WIDEN DEL ROSA AVE FROM DEL ROSA DR TO SAN BERNARDINO CITY LIMITS FROM 2 TO 4 LANES

2020 $135

Page 365: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 363

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120041 LOCAL HIGHWAY

DESERT FLOWER ASTER CAUGHLIN RD WIDEN DESERT FLOWER FROM ASTER TO CAUGHLIN

2020 $6,746

SAN BERNARDINO

4120040 LOCAL HIGHWAY

DESERT FLOWER CITY LIMITS ADELANTO RD WIDEN DESERT FLOWER FROM CITY LIMITS TO ADELANTO

2020 $6,281

SAN BERNARDINO

4120045 LOCAL HIGHWAY

DESOTO AGUADERA US-395 WIDEN DESOTO FROM AGUADERA TO US-395

2030 $5,843

SAN BERNARDINO

4120044 LOCAL HIGHWAY

DESOTO ASTER RICHARDSON WIDEN DESOTO FROM ASTER TO RICHARDSON

2030 $6,617

SAN BERNARDINO

4120043 LOCAL HIGHWAY

DESOTO RICHARDSON RD VINTON WIDEN DESOTO FROM RICHARDSON TO VINTON

2030 $2,295

SAN BERNARDINO

4120042 LOCAL HIGHWAY

DESOTO US-395 ASTER WIDEN DESOTO FROM US-395 TO ASTER 2030 $1,995

SAN BERNARDINO

4A07270 LOCAL HIGHWAY

DEVORE RD CAJON BLVD N/O I-215 OFF RAMPS WIDEN DEVORE RD FROM CAJON BLVD TO N/O I-215 OFF RAMPS FROM 2 TO 4 LANES

2020 $709

SAN BERNARDINO

4A07125 LOCAL HIGHWAY

DEVORE RD I-215 KENWOOD DR WIDEN DEVORE RD FROM I-215 TO KENWOOD DR FROM 2 TO 4 LANES

2020 $3,752

SAN BERNARDINO

4A07300 LOCAL HIGHWAY

DEVORE RD KENWOOD DR FOOTHILL DR WIDEN DEVORE RD FROM KENWOOD DR TO FOOTHILL DR FROM 2 TO 4 LANES

2020 $679

SAN BERNARDINO

4A07088 LOCAL HIGHWAY

DOS PALMAS PACOIMA RD BOREGO RD WIDEN DOS PALMAS RD FROM PACOIMA RD TO BOREGO RD FROM 2 TO 4 LANES

2020 $4,185

SAN BERNARDINO

4A07220 LOCAL HIGHWAY

DOS PALMAS SAN MATEO RD PACOIMA WIDEN DOS PALMAS RD FROM SAN MATEO RD TO PACOIMA RD FROM 2 TO 4 LANES

2020 $1,316

SAN BERNARDINO

4A07297 LOCAL HIGHWAY

DUNCAN CANYON RD

.33 M W/O I-15 E/O I-15 WIDEN DUNCAN CANYON RD FROM .33 M W/O I-15 TO E/O I-15

2020 $540

SAN BERNARDINO

4120129 LOCAL HIGHWAY

DUNCAN CANYON RD

CITRUS SIERRA WIDEN DUNCAN CANYON RD FROM CITRUS AVE TO SIERRA AVE FROM 0 TO 4 LANES

2030 $5,251

SAN BERNARDINO

4120130 LOCAL HIGHWAY

DUNCAN CANYON RD

I-15 CITRUS WIDEN DUNCAN CANYON RD FROM I-15 TO CITRUS AVE FROM 0 TO 4 LANES

2030 $1,312

SAN BERNARDINO

4A07037 LOCAL HIGHWAY

E AVE MAIN ST I AVE WIDEN E AVE FROM MAIN ST TO I ST FROM 2 TO 4 LANES

2023 $8,052

Page 366: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

364 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4G0156 LOCAL HIGHWAY

E ST IN COLTON BNSF CROSSING SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION)

2014 $236

SAN BERNARDINO

4120162 LOCAL HIGHWAY

EAST AVE FIRE STATION WILSON AVE WIDEN EAST AVE FROM FIRE STATION TO WILSON AVE

2030 $1,145

SAN BERNARDINO

4A07133 LOCAL HIGHWAY

EAST END AVE CHINO AVE WALNUT AVE WIDEN EAST END AVE FROM CHINO AVE TO WALNUT AVE FROM 2 TO 4 LANES

2020 $2,903

SAN BERNARDINO

4A07146 LOCAL HIGHWAY

EAST END AVE PHILADELPHIA AV PHILLIPS BLVD WIDEN EAST END AVE FROM PHILADELPHIA AVE TO PHILLIPS BLVD FROM 2 TO 4 LANES

2020 $2,700

SAN BERNARDINO

4A07333 LOCAL HIGHWAY

EAST END AVE FROM PHILLIPS BLVD TO GRAND AVE FROM 2 TO 4

LANES

PHILLIPS BLVD GRAND AVE WIDEN EAST END AVE FROM PHILLIPS BLVD TO GRAND AVE FROM 2 TO 4 LANES

2030 $537

SAN BERNARDINO

4120156 LOCAL HIGHWAY

EAST ST I-15 VICTORIA AVE WIDEN EAST ST FROM I-15 TO VICTORIA AVE FROM 2 TO 4 LANES

2030 $510

SAN BERNARDINO

4120148 LOCAL HIGHWAY

EAST ST WISON NORTH RIM WAY (NEW) WIDEN EAST ST FROM WISON TO NORTH RIM WAY (NEW)

2030 $200

SAN BERNARDINO

4A01032 LOCAL HIGHWAY

EDISON AV CENTRAL AV EUCLID AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $3,989

SAN BERNARDINO

4A01033 LOCAL HIGHWAY

EDISON AVE PIPELINE RAMONA WIDEN EDISON AVE FROM PIPELINE AVE TO RAMONA AVE FROM 4 TO 6 LANES

2020 $2,907

SAN BERNARDINO

4A04197 LOCAL HIGHWAY

EDISON AVE FROM EUCLID AVE TO

WALKER AVE FROM 2 TO 6 LANES

EUCLID AVE WALKER AVE WIDEN EDISON AVE FROM EUCLID AVE TO WALKER AVE FROM 2 TO 6 LANES

2030 $9,247

SAN BERNARDINO

4A04196 LOCAL HIGHWAY

EDISON AVE FROM MILL CREEK TO MILLIKEN AVE FROM 2 TO 8

LANES

MILL CREEK MILLIKEN AVE WIDEN EDISON AVE FROM MILL CREEK TO MILLIKEN AVE FROM 2 TO 8 LANES

2030 $5,517

SAN BERNARDINO

4A04198 LOCAL HIGHWAY

EDISON AVE FROM VINEYARD AVE TO MILL CREEK FROM

2 TO 8 LANES

VINEYARD AVE MILL CREEK WIDEN EDISON AVE FROM VINEYARD AVE TO MILL CREEK FROM 2 TO 8 LANES

2030 $20,727

Page 367: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 365

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A04199 LOCAL HIGHWAY

EDISON AVE FROM WALKER AVE TO VINEYARD AVE FROM 2 TO 8

LANES

WALKER AVE VINEYARD AVE WIDEN EDISON AVE FROM WALKER AVE TO VINEYARD AVE FROM 2 TO 8 LANES

2030 $3,042

SAN BERNARDINO

4A07099 LOCAL HIGHWAY

EL EVADO LA BRISA RD ANACAPA RD WIDEN EL EVADO RD FROM LAS BRISA RD TO ANACAPA RD FROM 2 TO 4 LANES

2020 $3,645

SAN BERNARDINO

4A07307 LOCAL HIGHWAY

EL EVADO RD 1260’ N/O HOOK BL AT POWER LINE EASEMENT WIDEN EL EVADO RD FROM 1260’ N/O HOOK BL TO POWER LINE EASEMENT

2020 $500

SAN BERNARDINO

4A07330 LOCAL HIGHWAY

EL EVADO RD 510’ S/O RANCHO RD AT POWER LINE EASEMENT WIDEN EL EVADO RD FROM 510’ S/O RANCHO RD TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES

2020 $337

SAN BERNARDINO

4A01270 LOCAL HIGHWAY

EL MIRAGE RD KOALA RD LA COUNTY LINE WIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: #4A01004 IN ADELANTO WIDENS FROM RICHARDSON TO US-395 TO 4 LANES EACH DIR IN 2015)

2020 $24,042

SAN BERNARDINO

4A01004 LOCAL HIGHWAY

EL MIRAGE RD RICHARDSON RD US-395 WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $7,400

SAN BERNARDINO

4A04408 LOCAL HIGHWAY

EL MIRAGE RD US-395 ADELANTO RD NEW ROAD, 2 LANES EACH DIR 2012 $3,600

SAN BERNARDINO

4120047 LOCAL HIGHWAY

EL MIRAGE ROAD AGUADERA US-395 WIDEN EL MIRAGE ROAD FROM AGUADERA TO US-395

2020 $6,191

SAN BERNARDINO

4120046 LOCAL HIGHWAY

EL MIRAGE ROAD US-395 ASTER WIDEN EL MIRAGE ROAD FROM US-395 TO ASTER

2020 $5,069

SAN BERNARDINO

4A01063 LOCAL HIGHWAY

EL PRADO RD CENTRAL AV PINE AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,473

SAN BERNARDINO

4A07087 LOCAL HIGHWAY

EL RIVINO RD CEDAR AV AGUA MANSA RD WIDEN EL RIVINO RD FROM CEDAR AVE TO AGUA MANSA RD FROM 2 TO 4 LANES

2020 $4,185

SAN BERNARDINO

4TL204 LOCAL HIGHWAY

ELDERLY & HANDICAPPED ASSISTANCE

COUNTYWIDE COUNTYWIDE ELDERLY & HANDICAPPED ASSISTANCE 2025 $137,000

SAN BERNARDINO

4A07094 LOCAL HIGHWAY

ELECTRIC AVE MT. VIEW NORTHPARK BLVD WIDEN ELECTRIC AVE FROM MT VIEW AVE TO NORTHPARK BLVD FROM 2 TO 4 LANES

2030 $3,840

Page 368: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

366 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120048 LOCAL HIGHWAY

EMERALD HOLLY RD AIR EXPRESSWAY WIDEN EMERALD FROM HOLLY TO AIR EXPRESSWAY

2030 $4,671

SAN BERNARDINO

4A07209 LOCAL HIGHWAY

EMERALD RD PALMDALE RD SENECA RD WIDEN EMERALD RD FROM PALMDALE RD TO SENECA RD FROM 2 TO 4 LANES

2020 $1,485

SAN BERNARDINO

4A01149 LOCAL HIGHWAY

ESCONDIDO AVE MAIN ST SULTANA ST WIDEN FROM 1 TO 3 LANES EACH DIR 2018 $1,500

SAN BERNARDINO

4120152 LOCAL HIGHWAY

ETIWANDA AVE MILLER 850’ N/O MILLER WIDEN ETIWANDA AVE FROM MILLER TO 850’ N/O MILLER, EAST SIDE ONLY

2030 $295

SAN BERNARDINO

4120169 LOCAL HIGHWAY

ETIWANDA AVE 6TH ARROW ROUTE WIDEN ETIWANDA AVE FROM 6TH TO ARROW ROUTE FROM 2 TO 4 LANES

2018 $4,114

SAN BERNARDINO

4120164 LOCAL HIGHWAY

ETIWANDA AVE BANYAN WILSON AVE WIDEN ETIWANDA AVE FROM BANYAN TO WILSON

2030 $1,363

SAN BERNARDINO

4120149 LOCAL HIGHWAY

ETIWANDA AVE EXISTING TERMINUS NORTH RIM WAY (NEW) WIDEN ETIWANDA AVE FROM EXISTING TERMINUS TO NORTH RIM WY (NEW)

2030 $271

SAN BERNARDINO

4A04200 LOCAL HIGHWAY

EUCALYPTUS AVE FROM EUCLID AVE TO WALKER FROM

2 TO 4 LANES

EUCLID AVE WALKER WIDEN EUCALYPTUS AVE FROM EUCLID AVE TO WALKER FROM 2 TO 4 LANES

2035 $2,675

SAN BERNARDINO

4A07249 LOCAL HIGHWAY

EUCALYPTUS ST AMARGOSA RD AMETHYST RD WIDEN EUCALYPTUS ST FROM AMARGOSA RD TO AMETHYST RD FROM 0 TO 6 LANES

2020 $886

SAN BERNARDINO

4A01151 LOCAL HIGHWAY

EUCALYPTUS ST I-15 PEACH AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $20,386

SAN BERNARDINO

4A07286 LOCAL HIGHWAY

EUCALYPTUS ST MESA VIEW DR BELLFLOWER RD WIDEN EUCALYPTUS ST FROM MESA VIEW DR. TO BELLFLOWER RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY)

2020 $632

SAN BERNARDINO

4A07287 LOCAL HIGHWAY

EUCALYPTUS ST US-395 MESA VIEW DR. WIDEN EUCALYPTUS ST FROM US 395 TO MESA VIEW DR. FROM 0 TO 4 LANES

2020 $632

SAN BERNARDINO

4120224 LOCAL HIGHWAY

EUCALYPTUS ST AMETHYST 0.15 MI W/O COBALT RD WIDEN EUCALYPTUS ST FROM AMETHYST RD TO 0.15 MI W/O COBALT RD FROM 0 TO 4 LANES (INCLUDES WASH CROSSING)

2020 $7,460

Page 369: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 367

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120106 LOCAL HIGHWAY

EUCILD AVE (SR-83) MERRIL AVE KIMBALL AV WIDEN EUCILD AVE (SR-83) FROM MERRIL AVE TO KIMBALL AVE FROM 2 TO 4 LANES

2030 $1,227

SAN BERNARDINO

4A04035 LOCAL HIGHWAY

EUCLID AV KIMBALL PINE WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $2,430

SAN BERNARDINO

4A04036 LOCAL HIGHWAY

EUCLID AV PINE SR71 WIDEN FROM 1 TO 4 LANES EACH DIR 2035 $11,500

SAN BERNARDINO

4A04201 LOCAL HIGHWAY

EUCLID AVE FROM RIVERSIDE DR TO

MERRILL AVE (EAST HALF) FROM 2 TO 4

LANES

RIVERSIDE DR MERRILL AVE WIDEN EUCLID AVE FROM RIVERSIDE DR TO MERRILL AVE (EAST HALF) FROM 2 TO 4 LANES

2035 $8,191

SAN BERNARDINO

4120144 LOCAL HIGHWAY

EVANS ST. I-10 BARTON RD. WIDEN EVANS ST FROM I-10 TO BARTON RD FROM 0 TO 4 LANES

2030 $77,647

SAN BERNARDINO

4A04067 LOCAL HIGHWAY

FAIRWAY DR SPERRY DR CITY LIMITS WIDEN FROM 2 TO 4 LANES EACH DIR 2018 $1,405

SAN BERNARDINO

4A07161 LOCAL HIGHWAY

FALCHION RD DALE EVANS NAVAJO WIDEN FALCHION RD FROM DALE EVANS PKWY TO NAVAJO RD FROM 0 TO 6 LANES

2018 $2,400

SAN BERNARDINO

4A07006 LOCAL HIGHWAY

FALCHION RD I-15 DALE EVANS PKWY WIDEN FALCHION RD FROM I-15 TO DALE EVANS PKWY FROM 0 TO 4 LANES

2018 $20,000

SAN BERNARDINO

4A01262A LOCAL HIGHWAY

FIFTH AVE WABASH AV CRAFTON AV WIDEN FIFTH AVE FROM WABASH AVE TO CRAFTON AVE FROM 2 TO 4 LANES

2030 $3,387

SAN BERNARDINO

4A07230 LOCAL HIGHWAY

FIFTH ST PEDLEY RD TIPPECANOE AV WIDEN FIFTH ST FROM PEDLEY RD TO TIPPECANOE AVE FROM 2 TO 4 LANES

2020 $1,181

SAN BERNARDINO

4A07234 LOCAL HIGHWAY

FIFTH ST WATERMAN AVE PEDLEY RD WIDEN FIFTH ST FROM WATERMAN AVE TO PEDLEY RD FROM 2 TO 4 LANES

2020 $1,148

SAN BERNARDINO

4A07162 LOCAL HIGHWAY

FLORIDA ST GREENSPOT RD GARNET ST WIDEN FLORIDA ST FROM GREENSPOT RD TO GARNET ST FROM 2 TO 4 LANES

2030 $3,522

SAN BERNARDINO

4A04101 LOCAL HIGHWAY

FONTANA AV VALLEY BL POPLAR MERRILL WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,800

SAN BERNARDINO

4120131 LOCAL HIGHWAY

FONTANA AVE RIVERSIDE COUNTY LINE

LIME AVE WIDEN FONTANA AVE FROM VALLEY BLVD TO LIME AVE FROM 2 TO 4 LANES

2030 $1,136

Page 370: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

368 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07014 LOCAL HIGHWAY

FONTANA AVE VALLEY POPLAR WIDEN FONTANA AVE FROM VALLEY BLVD TO POPLAR AVE FROM 2 TO 4 LANES

2020 $14,850

SAN BERNARDINO

4A04102 LOCAL HIGHWAY

FOOTHILL BLVD HEMLOCK ALMERIA WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $7,560

SAN BERNARDINO

4120168 LOCAL HIGHWAY

FOOTHILL BLVD VINEYARD ARCHIBALD AVE WIDEN FOOTHILL BL FROM VINEYARD TO ARCHIBALD AVE FROM 4 TO 6 LANES

2030 $2,873

SAN BERNARDINO

4120132 LOCAL HIGHWAY

FOOTHILL BLVD EAST AVE CHERRY AVE WIDEN FOOTHILL BLVD FROM EAST AVE TO CHERRY AVD FROM 2 TO 3 LANES ON EASTBOUND SIDE

2030 $7,847

SAN BERNARDINO

4120166 LOCAL HIGHWAY

FOOTHILL BLVD ARCHIBALD TO HERM HERMOSA WIDEN FOOTHILL BLVD FROM ARCHIBALD TO HERMOSA FROM 4 TO 6 LANES

2030 $1,819

SAN BERNARDINO

4A01243 LOCAL HIGHWAY

FORD ST 5TH AVE I-10 WIDEN FORD ST FROM 5TH AVE TO I-10 FROM 2 LANES TO 4 LANES

2030 $1,999

SAN BERNARDINO

4A01273 LOCAL HIGHWAY

FRANCIS AVE LA COUNTY LINE CHINO CITY LIMIT WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,683

SAN BERNARDINO

4120100 LOCAL HIGHWAY

FRANCIS AVE 600’ E/O SNYDER BENSON AV WIDEN FRANCIS AVE FROM 600’ E/O SNYDER TO BENSON AVE FROM 2 TO 4 LANES

2020 $507

SAN BERNARDINO

4120099 LOCAL HIGHWAY

FRANCIS AVE WCL 600’ E/O CONCORD CT WIDEN FRANCIS AVE FROM WCL TO 600’ E/O CONCORD CT FROM 2 TO 4 LANES (S. SIDE ONLY)

2020 $1,087

SAN BERNARDINO

4A01272 LOCAL HIGHWAY

FRANCIS AVE 0.11 M W/O EAST END

0.13 E/O TELEPHONE AVE WIDEN FRANCIS AVE FROM .11 M W/O EAST END TO .13 M E/O TELEPHONE AVE FROM 2 TO 4 LANES

2020 $5,255

SAN BERNARDINO

4A07227 LOCAL HIGHWAY

FRANCIS ST CONSTRUCT A BRIDGE ON FRANCIS ST OVER WEST CUCAMONGA CREEK

2018 $1,217

SAN BERNARDINO

4A01203 LOCAL HIGHWAY

FRANCIS ST BENSON AV CAMPUS AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,108

SAN BERNARDINO

4A01104 LOCAL HIGHWAY

FRONTAGE RD (I-15) DUNCAN CANYON RD RIVERSIDE AV NEW ROAD, 2 LANES EACH DIR 2018 $4,900

SAN BERNARDINO

4A07176 LOCAL HIGHWAY

G ST MILL ST RIALTO AVE WIDEN “G” ST FROM MILL ST TO RIALTO AVE FROM 2 TO 4 LANES

2020 $2,299

Page 371: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 369

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07352 LOCAL HIGHWAY

GARNET ST .08 M S/O MENTONE AV

MENTONE AV WIDEN GARNET ST FROM .08 M S/O MENTONE AVE TO MENTONE AVE FROM 2 TO 4 LANES

2035 $274

SAN BERNARDINO

4A07320 LOCAL HIGHWAY

GARNET ST MENTONE AV SR 38 WIDEN GARNET ST FROM MENTONE AVE TO SR 38 FROM 2 TO 4 LANES

2035 $446

SAN BERNARDINO

4A07169 LOCAL HIGHWAY

GARNET ST NEWPORT AV FLORIDA ST WIDEN GARNET ST FROM NEWPORT AVE TO FLORIDA ST FROM 2 TO 4 LANES

2035 $1,914

SAN BERNARDINO

4A07314 LOCAL HIGHWAY

GARNET ST SR-38 NEWPORT AVE WIDEN GARNET ST FROM SR-38 TO NEWPORT AVE FROM 2 TO 4 LANES

2035 $399

SAN BERNARDINO

4A07127 LOCAL HIGHWAY

GLEN HELEN PKWY GLEN HELEN PKWY NW/END WIDEN GLEN HELEN RD FROM GLEN HELEN PKWY TO NW/END FROM 2 TO 4 LANES

2030 $1,999

SAN BERNARDINO

4G0161 LOCAL HIGHWAY

GLEN HELEN PKWY IN SAN BERNARDINO COUNTY

(CAJON) ROADWAY WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION)

2018 $18,196

SAN BERNARDINO

4A07036 LOCAL HIGHWAY

GLEN HELEN PKWY LYTLE CREED RD I-15 WIDEN GLEN HELEN PKWY FROM LYTLE CREED RD TO I-15 FROM 2 TO 4 LANES

2020 $2,283

SAN BERNARDINO

4A07018 LOCAL HIGHWAY

GLEN HELEN PKWY LYTLE CREEK RD NELY/CAJON WIDEN GLEN HELEN PKWY FROM LYTLE CREEK TO NELY/CAJON BLVD FROM 2 TO 4 LANES

2030 $11,756

SAN BERNARDINO

4GL04 LOCAL HIGHWAY

GRADE SEPARATION

COUNTYWIDE VARIOUS GRADE SEPARATION IMPROVEMENTS 2035 $355,688

SAN BERNARDINO

4A07144 LOCAL HIGHWAY

GRAND AVE EAST END RD RAMONA AVE WIDEN GRAND AVE FROM EAST END RD TO RAMONA AVE FROM 2 TO 4 LANES

2020 $2,768

SAN BERNARDINO

4A07011 LOCAL HIGHWAY

GREEN TREE BVD HESPERIA RD RIDGECREST RD AT ATS&AMP;F RAILROAD CONSTRUCT 4-LANE BRIDGE; WIDEN GREEN TREE 0 TO 4 LANES

2020 $15,699

SAN BERNARDINO

4A01173 LOCAL HIGHWAY

GREENSPOT RD GOLD BUCKLE SANTA ANA RIVER WIDEN FROM 2 TO 4 LANES (EXCLUDING BRIDGE)

2020 $9,603

SAN BERNARDINO

4A07044 LOCAL HIGHWAY

GREENSPOT RD ORANGE ST BOULDER WIDEN FROM 4 TO 6 LANES 2020 $684

SAN BERNARDINO

4A07295 LOCAL HIGHWAY

GREENSPOT RD .19 M N/O FLORIDA ST

FLORIDA ST WIDEN GREENSPOT RD FROM .19 M N/O FLORIDA ST TO FLORIDA ST FROM 2 TO 4 LANES

2035 $431

Page 372: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

370 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07019 LOCAL HIGHWAY

GREENSPOT RD BRANCH

SANTA ANA RIVER BRYANT CONSTRUCT NEW STREET, GREENSPOT RD TO CONNECT TO BRYANT FROM 0 TO 2 LANES WITHIN CITY LIMIT

2020 $12,292

SAN BERNARDINO

4A04207 LOCAL HIGHWAY

GROVE AV AIRPORT DR HOLT BLVD WIDEN EXISTING GRADE SEPARATION FROM 2 TO 3 LANES EACH DIR

2018 $10,489

SAN BERNARDINO

4120160 LOCAL HIGHWAY

GROVE AVE 8TH TAPIA VIA WIDEN GROVE AVE FROM 8TH TO TAPIA VIA (EAST SIDE) FROM 1 TO 2 LANES

2030 $925

SAN BERNARDINO

4A04206 LOCAL HIGHWAY

GROVE AVE FROM RIVERSIDE DR TO

MERRILL AVE FROM 2 TO 4 LANES

RIVERSIDE DR MERRILL AVE WIDEN GROVE AVE FROM RIVERSIDE DR TO MERRILL AVE FROM 2 TO 4 LANES

2035 $8,191

SAN BERNARDINO

4120146 LOCAL HIGHWAY

GROVE AVE FROM S/O 4TH ST TO 350’ N/O HOLT

BLVD FROM 4 TO 6 LANES

S/O 4TH ST 350’ N/O HOLT BLVD WIDEN GROVE AVE FROM S/O 4TH ST TO 350’ N/O HOLT BLVD FROM 4 TO 6 LANES

2035 $23,702

SAN BERNARDINO

4G0157 LOCAL HIGHWAY

H ST IN COLTON BNSF CROSSING SAFETY UPGRADE (LOW OPTION), SAFETY UPGRADE (HIGH OPTION)

2014 $236

SAN BERNARDINO

4A04208 LOCAL HIGHWAY

HAVEN AVE FROM RIVERSIDE DR

TO BELLEGRAVE AVE FROM 2 TO 4

LANES

RIVERSIDE DR BELLEGRAVE AVE WIDEN HAVEN AVE FROM RIVERSIDE DR TO BELLEGRAVE AVE FROM 2 TO 4 LANES

2035 $3,512

SAN BERNARDINO

4120049 LOCAL HIGHWAY

HELENDALE DESERT FLOWER OLEANDER WIDEN HELENDALE FROM DESERT FLOWER TO OLEANDER

2030 $2,805

SAN BERNARDINO

4A04038 LOCAL HIGHWAY

HELLMAN AVE KIMBALL CHINO CORONA RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $4,300

SAN BERNARDINO

4120158 LOCAL HIGHWAY

HELMAN CUCAMONGA CREEK CHANNEL

WIDEN HELMAN AT CUCAMONGA CREEK CHANNEL (50%RC, 50% ONTARIO)

2030 $718

SAN BERNARDINO

4A01152 LOCAL HIGHWAY

HESPERIA RD BEAR VALLEY YUCCA ST WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $7,131

SAN BERNARDINO

4A07206 LOCAL HIGHWAY

HESPERIA RD WALNUT SULTANA WIDEN HESPERIA RD FROM WALNUT TO SULTANA FROM 2 TO 4 LANES

2030 $2,500

SAN BERNARDINO

4A07129 LOCAL HIGHWAY

HESPERIA RD YUCCA ST WALNUT AVE WIDEN HESPERIA RD FROM YUCCA TO WALNUT FROM 2 TO 4 LANES

2030 $3,000

Page 373: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 371

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07261 LOCAL HIGHWAY

HIGHLAND AV CAJON ST REDLANDS BL WIDEN HIGHLAND FROM CAJON TO REDLANDS BL FROM 3 TO 4 LANES

2035 $800

SAN BERNARDINO

4A01244 LOCAL HIGHWAY

HIGHLAND AV REDLANDS BL FORD ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $1,646

SAN BERNARDINO

4A07136 LOCAL HIGHWAY

HIGHLAND AVE CHURCH ST BOULDER AVE WIDEN HIGHLAND AVE FROM CHURCH ST TO BOULDER AVE FROM 2 TO 4 LANES

2018 $3,131

SAN BERNARDINO

4120051 LOCAL HIGHWAY

HOLLY ROAD AMETHYST US-395 WIDEN HOLLY ROAD FROM AMETHYST TO US-395

2020 $4,419

SAN BERNARDINO

4120050 LOCAL HIGHWAY

HOLLY ROAD ASTER RICHARDSON WIDEN HOLLY ROAD FROM ASTER TO RICHARDSON

2020 $4,882

SAN BERNARDINO

4120052 LOCAL HIGHWAY

HOLLY ROAD RICHARDSON RD LESSING WIDEN HOLLY ROAD FROM RICHARDSON TO LESSING

2020 $4,911

SAN BERNARDINO

4120053 LOCAL HIGHWAY

HOLLY ROAD US-395 ASTER WIDEN HOLLY ROAD FROM US-395 TO ASTER

2020 $4,773

SAN BERNARDINO

4A07035 LOCAL HIGHWAY

HOLT BLVD CONSTRUCT A BRIDGE ON HOLT BLVD OVER WEST CUCAMONGA CREEK

2018 $8,644

SAN BERNARDINO

4A01325 LOCAL HIGHWAY

HOOK BL US-395 AMETHYST RD WIDEN HOOK FROM US 395 TO 0.4 MILES WEST OF AMETHYST 0 TO 4 LANES

2020 $999

SAN BERNARDINO

4A07383 LOCAL HIGHWAY

HOOK BLVD 1680’ W/O EMERALD RD

AT POWER LINE EASEMENT WIDEN HOOK BLVD FROM 1680’ W/O EMERALD RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $83

SAN BERNARDINO

4A07389 LOCAL HIGHWAY

HOOK BLVD 1820’ E/O US-395 AT POWER LINE EASEMENT WIDEN HOOK BLVD FROM 1820’ E/O US-395 TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $55

SAN BERNARDINO

4A07387 LOCAL HIGHWAY

HOPLAND ST JUST W/O AMETHYST RD

AT POWER LINE EASEMENT WIDEN HOPLAND ST FROM JUST W/O AMETHYST RD TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES

2020 $60

SAN BERNARDINO

4A07309 LOCAL HIGHWAY

HOPLAND ST US-395 COBALT RD WIDEN HOPLAND ST FROM US-395 TO COBALT RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY)

2020 $478

SAN BERNARDINO

4A01212 LOCAL HIGHWAY

INLAND EMPIRE BL VINEYARD AV ARCHIBALD AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $6,070

SAN BERNARDINO

4A01107 LOCAL HIGHWAY

JURUPA AV ETIWANDA AV LIVE OAK SIERRA WIDEN FROM 1 TO 3 LANES EACH DIR 2012 $16,800

Page 374: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

372 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07165 LOCAL HIGHWAY

JURUPA AV LOCUST AVE CEDAR AVE WIDEN JURUPA AVE FROM LOCUST AVE TO CEDAR AVE FROM 2 TO 4 LANES

2020 $2,228

SAN BERNARDINO

4A07111 LOCAL HIGHWAY

JURUPA AVE CEDAR AVE LILAC AVE WIDEN JURUPA AVE FROM CEDAR AVE TO LILAC AVE FROM 2 TO 4 LANES

2030 $561

SAN BERNARDINO

4A07299 LOCAL HIGHWAY

JURUPA AVE LILAC AVE WILLOW AVE WIDEN JURUPA AVE FROM LILAC AVE TO WILLOW AVE FROM 2 TO 4 LANES

2020 $540

SAN BERNARDINO

4A07250 LOCAL HIGHWAY

JURUPA AVE TAMARIND AVE ALDER AVE WIDEN JURUPA AVE FROM TAMARIND AVE TO ALDER AVE FROM 2 TO 6 LANES

2030 $1,012

SAN BERNARDINO

4A01213 LOCAL HIGHWAY

JURUPA ST TURNER AVE ARCHIBALD AVE WIDEN JURUPA ST FROM TURNER AVE TO ARCHIBALD AVE FROM 2 TO 6 LANES

2018 $1,069

SAN BERNARDINO

4A01068 LOCAL HIGHWAY

K AND L STREETS 3RD ST 5TH ST WIDEN TO 1 LANE EACH DIR 2012 $312

SAN BERNARDINO

4120189 LOCAL HIGHWAY

KENDALL DR CAMBRIDGE CAMPUS PKWY WIDEN KENDALL DR FROM CAMBRIDGE AVE TO CAMPUS PKWY FROM 2 TO 4 LANES

2030 $4,200

SAN BERNARDINO

4A07086 LOCAL HIGHWAY

KENDALL DR CAMBRIDGE AVE PINE AVE WIDEN KENDALL DR FROM CAMBRIDGE AVE TO PINE AVE FROM 2 TO 4 LANES

2020 $5,027

SAN BERNARDINO

4A07060 LOCAL HIGHWAY

KENDALL DR PALM AVE CAJON BLVD WIDEN KENDALL DR FROM PALM AVE TO CAJON BLVD FROM 2 TO 4 LANES

2020 $5,366

SAN BERNARDINO

4A07052 LOCAL HIGHWAY

KIMBALL EUCLID HELLMAN WIDEN KIMBALL FROM EUCLID TO HELLMAN FROM 2 TO 4 LANES

2018 $5,900

SAN BERNARDINO

4A07070 LOCAL HIGHWAY

KIOWA RD OCOTILLO RD BEAR VALLEY RD WIDEN KIOWA RD FROM OCOTILLO RD TO BEAR VALLEY RD FROM 2 TO 4 LANES

2023 $4,800

SAN BERNARDINO

4A04017 LOCAL HIGHWAY

KIOWA RD YUCCA LOMA RD BEAR VALLEY RD WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $4,800

SAN BERNARDINO

4120055 LOCAL HIGHWAY

KOALA AIR EXPRESSWAY EL MIRAGE RD WIDEN KOALA FROM AIR EXPRESSWAY TO EL MIRAGE

2030 $2,442

SAN BERNARDINO

4120054 LOCAL HIGHWAY

KOALA CACTUS AIR EXPRESSWAY WIDEN KOALA FROM CACTUS TO AIR EXPRESSWAY

2030 $4,260

SAN BERNARDINO

4120058 LOCAL HIGHWAY

KOALA COLUSA OLEANDER WIDEN KOALA FROM COLUSA TO OLEANDER

2030 $4,592

SAN BERNARDINO

4120057 LOCAL HIGHWAY

KOALA EL MIRAGE RD COLUSA RD WIDEN KOALA FROM EL MIRAGE TO COLUSA

2030 $4,395

Page 375: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 373

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120056 LOCAL HIGHWAY

KOALA PALMDALE RD VILLA WIDEN KOALA FROM PALMDALE TO VILLA

2030 $1,139

SAN BERNARDINO

4A04411 LOCAL HIGHWAY

KOALA RD EL MIRAGE RD DESOTO RD NEW ROAD, 1 LANE EACH DIR 2030 $1,850

SAN BERNARDINO

4A04410 LOCAL HIGHWAY

KOALA RD HOLLY RD EL MIRAGE RD WIDEN FROM 2 TO 4 LANES EACH DIR 2030 $7,181

SAN BERNARDINO

4A04409 LOCAL HIGHWAY

KOALA RD PALMDALE RD HOLLY RD NEW ROAD, 2 LANES EACH DIR 2030 $4,000

SAN BERNARDINO

4A01069 LOCAL HIGHWAY

LA CADENA DR RANCHO AV SOUTH CITY LIMITS WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $2,444

SAN BERNARDINO

4120114 LOCAL HIGHWAY

LA CADENA DR PALM AVE IOWA AVE WIDEN LA CADENA DR FROM PALM AVE TO IOWA AVE FROM 4 TO 6 LANES

2030 $2,873

SAN BERNARDINO

4120115 LOCAL HIGHWAY

LA CADENA DR RANCHO AVE LITTON AVE WIDEN LA CADENA DR FROM RANCHO AVE TO LITTON AVE FROM 4 LANES TO 6 LANES

2030 $3,475

SAN BERNARDINO

4A07382 LOCAL HIGHWAY

LA MESA RD 2010’ E/O TOPAZ RD AT POWER LINE EASEMENT WIDEN LA MESA RD FROM 2010’ E/O TOPAZ RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $98

SAN BERNARDINO

4A07092 LOCAL HIGHWAY

LA MESA RD BALDY MESA CANTINA WIDEN LA MESA RD FROM BALDY MESA TO CANTINA DR FROM 0 LANES TO 4 LANES.

2020 $3,963

SAN BERNARDINO

4A07224 LOCAL HIGHWAY

LA MESA RD CAUGHLIN RD WHITE RD WIDEN LA MESA RD FROM CAUGHLIN RD TO WHITE RD FRM 0 TO 4 LANES

2020 $1,265

SAN BERNARDINO

4A07288 LOCAL HIGHWAY

LA MESA RD WHITE RD BALDY MESA RD WIDEN LA MESA RD FROM WHITE RD TO BALDY MESA RD FROM 0 TO 4 LANES (VICTORVILLE PORTION ONLY)

2020 $632

SAN BERNARDINO

4A07231 LOCAL HIGHWAY

LANKERSHIM AV 660’ N/O BASE LINE 1200’ N/O 9TH ST NEW ROAD CONSTRUCTION 2020 $2,014

SAN BERNARDINO

4A01293 LOCAL HIGHWAY

LEAR AV/SUNFAIR RD

POLELINE RD MCAS NEW ROAD, 2 LANES EACH DIR 2012 $18,500

SAN BERNARDINO

4A01155 LOCAL HIGHWAY

LEMON ST MAUNA LOA MOJAVE RIVER WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $5,000

SAN BERNARDINO

4A0803 LOCAL HIGHWAY

LENWOOD RD 400 FEET NORTH OF BNSF RR

600 FEET SOUTH OF BNSF RR WIDEN FROM 4 LANES TO 6 LANES &#40;3 EA DIR&#41;

2018 $29,081

Page 376: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

374 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120059 LOCAL HIGHWAY

LESSING HOLLY RD BARTLETT RD WIDEN LESSING FROM HOLLY TO BARTLETT

2020 $7,820

SAN BERNARDINO

4120184 LOCAL HIGHWAY

LINDEN AVE BASELINE EASTON AVE WIDEN LINDEN AVE FROM BASELINE TO EASTON AVE FROM 0 TO 4 LANES

2020 $4,292

SAN BERNARDINO

4A07177 LOCAL HIGHWAY

LITTLE LEAGUE DR I-215 FRONTAGE RD BELMONT AVE WIDEN LITTLE LEAGUE DR FROM I-215 FRONTAGE RD TO BELMONT AVE (INCLUDING CULVERT) FROM 2 TO 4 LANES

2030 $1,920

SAN BERNARDINO

4A07134 LOCAL HIGHWAY

LITTLE LEAGUE DR PALM AVE I-215 FRONTAGE RD WIDEN LITTLE LEAGUE DR FROM PALM AVE TO I-215 FRONTAGE RD FROM 2 TO 4 LANES

2030 $2,880

SAN BERNARDINO

4A07308 LOCAL HIGHWAY

LITTLE MOUNTAIN DR

DEVIL CREEK CHANNEL

48TH ST WIDEN LITTLE MOUNTAIN DR FROM DEVIL CREEK CHANNEL TO 48TH ST FROM 2 TO 4 LANES

2030 $480

SAN BERNARDINO

4120133 LOCAL HIGHWAY

LIVE OAK JURUPA AVE SLOVER AVE WIDEN LIVE OAK AVE FROM JURUPA AVE TO SLOVER AVE FROM 2 TO 4 LANES

2030 $2,625

SAN BERNARDINO

4A07187 LOCAL HIGHWAY

LIVE OAK AVE ARROW ROUTE FOOTHILL WIDEN LIVE OAK AVE FROM ARROW ROUTE TO FOOTHILL FROM 2 TO 4 LANES

2020 $1,688

SAN BERNARDINO

4A01371 LOCAL HIGHWAY

LIVE OAK CYN RD WEST CITY LIMIT I-10 WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,527

SAN BERNARDINO

4A01245 LOCAL HIGHWAY

LIVE OAK CYN RD SAN TIMOTEO CYN RD

E. CITY LIMITS WIDEN LIVE OAK CYN RD FROM SAN TIMOTEO CYN RD TO E. CITY LIMITS FROM 2 TO 4 LANES

2020 $5,829

SAN BERNARDINO

4A04110 LOCAL HIGHWAY

LIVE OAK RD VALLEY BLVD MERRILL WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $5,285

SAN BERNARDINO

4120185 LOCAL HIGHWAY

LOCUST AVE BASELINE EASTON AVE WIDEN LOCUST AVE FROM BASELINE TO EASTON AVE FROM 0 TO 4 LANES

2020 $4,292

SAN BERNARDINO

4A07183 LOCAL HIGHWAY

LOCUST AVE JURUPA AVE SANTA ANA AVE WIDEN LOCUST AVE FROM JURUPA AVE TO SANTA ANA AVE FROM 2 TO 4 LANES

2035 $1,705

SAN BERNARDINO

4A07188 LOCAL HIGHWAY

LOCUST AVE SAN BERNARDINO AVE

RANDALL AVE WIDEN LOCUST AVE FROM SAN BERNARDINO AVE TO RANDALL AVE FROM 2 TO 4 LANES

2035 $1,771

SAN BERNARDINO

4A07193 LOCAL HIGHWAY

LOCUST AVE SANTA ANA AVE SLOVER AVE WIDEN LOCUST AVE FROM SANTA ANA AVE TO SLOVER AVE FROM 2 TO 4 LANES

2035 $1,445

Page 377: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 375

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07315 LOCAL HIGHWAY

LOCUST AVE SEVENTH ST ELEVENTH ST WIDEN LOCUST AVE FROM SEVENTH ST TO ELEVENTH ST FROM 2 TO 4 LANES

2020 $439

SAN BERNARDINO

4A07189 LOCAL HIGHWAY

LOCUST AVE VALLEY BLVD SAN BERNARDINO AVE WIDEN LOCUST AVE FROM VALLEY BLVD TO SAN BERNARDINO AVE FROM 2 TO 4 LANES

2020 $1,688

SAN BERNARDINO

4A07255 LOCAL HIGHWAY

LUGONIA AVE ALABAMA ST TENNESEE ST WIDEN LUGONIA AVE FROM ALABAMA ST TO TENNESEE ST FROM 2 TO 4 LANES

2020 $844

SAN BERNARDINO

4A07229 LOCAL HIGHWAY

LUGONIA AVE CALIFORNIA ALABAMA WIDEN LUGONIA AVE FROM CALIFORNIA ST TO ALABAMA ST FROM 2 TO 4 LANES

2020 $1,181

SAN BERNARDINO

4120174 LOCAL HIGHWAY

LUGONIA AVE ORANGE ST WABASH AVE WIDEN LUGONIA AVE FROM ORANGE ST TO WABASH AVE FROM 2 TO 4 LANES

2020 $7,183

SAN BERNARDINO

4A01246 LOCAL HIGHWAY

LUGONIA AVE TENESSEE ST ORANGE ST WIDEN LUGONIA AVE FROM TENESSEE ST TO ORANGE ST FROM 2 TO 4 LANES

2020 $3,355

SAN BERNARDINO

4A07045 LOCAL HIGHWAY

LYTLE CREEK SUMMIT AVE DUNCAN AVE WIDEN LYTLE CREEK FROM SUMMIT AVE TO DUNCAN AVE FROM 0 TO 4 LANES

2030 $7,500

SAN BERNARDINO

4A07217 LOCAL HIGHWAY

MAIN ST 11TH ST 7TH ST WIDEN MAIN ST FROM 11TH ST TO 7TH ST FROM 4 TO 6 LANES

2035 $1,350

SAN BERNARDINO

4A01158 LOCAL HIGHWAY

MAIN ST I-15 ESCONDIDO AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $900

SAN BERNARDINO

4A01157 LOCAL HIGHWAY

MAIN ST I-15 US HWY 395 WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,075

SAN BERNARDINO

4G04027 LOCAL HIGHWAY

MAIN ST IN GRAND TERRACE (SAN BERNARDINO) GRADE SEPARATION AT MAIN ST IN GRAND TERRACE ON THE SAN BERNARDINO LINE

2030 $18,100

SAN BERNARDINO

4A07356 LOCAL HIGHWAY

MAIN ST.(W.B.) S.F.R.R. WCL WIDEN MAIN ST (W.B.) FROM SFRR TO WCL FROM 1 TO 2 LANES

2012 $226

SAN BERNARDINO

200807 LOCAL HIGHWAY

MAIN STREET MAIN STREET WIDENING – BNSF TO WEST CITY LIMITS-WIDENING FROM 1-2 LANES IN THE E/B & W/B DIRECTION-(BRIDGE WIDENING AND APPROACHES OF ABOUT 100’ IN EACH DIRECTION”

2014 $384

SAN BERNARDINO

4A01159 LOCAL HIGHWAY

MAPLE AV EUCALYPTUS AV MAIN ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $5,280

Page 378: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

376 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07090 LOCAL HIGHWAY

MARIPOSA EUCALYPTUS BEAR VALLEY RD WIDEN MARIPOSA FROM EUCALYPTUS TO BEAR VALLEY RD FROM 2 TO 4 LANES

2030 $4,075

SAN BERNARDINO

4A07332 LOCAL HIGHWAY

MARIPOSA RD PALMDALE RD YATES RD WIDEN MARIPOSA RD FROM 0.2 MI. S/O PALMDALE RD TO YATES RD.

2020 $330

SAN BERNARDINO

4G0429 LOCAL HIGHWAY

MAUNA LOA 3RD AVE I AVE GRADE SEPARATION-ADDING LANES FROM 0-4

2030 $21,964

SAN BERNARDINO

4A01161 LOCAL HIGHWAY

MAUNA LOA 7TH AVE LEMON ST NEW ROAD, 2 LANES EACH DIR 2035 $7,000

SAN BERNARDINO

4A01162 LOCAL HIGHWAY

MAUNA LOA MAPLE AVE 7TH AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2035 $4,835

SAN BERNARDINO

4A07120 LOCAL HIGHWAY

MERRILL WEST CITY LIMITS RIVERSIDE WIDEN MERRILL AVE FROM WEST CITY LIMITS TO RIVERSIDE FROM 2 TO 4 LANES

2018 $3,200

SAN BERNARDINO

4A04114 LOCAL HIGHWAY

MERRILL AVE CATAWBA FONTANA AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,400

SAN BERNARDINO

4A01040 LOCAL HIGHWAY

MERRILL AVE EUCLID AVE EAST CITY LIMIT WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,159

SAN BERNARDINO

4A07055 LOCAL HIGHWAY

MERRILL AVE CHERRY CATAWBA WIDEN MERRILL AVE FROM CHERRY AVE TO CATAWBA FROM 2 TO 4 LANES

2020 $5,771

SAN BERNARDINO

4A01214 LOCAL HIGHWAY

MERRILL AVE FROM GROVE AVE TO MILLIKEN AVE

(HAMNER AVE) FROM 2 TO 4

LANES

GROVE AVE MILLIKEN AVE WIDEN MERRILL AVE FROM GROVE AVE TO MILLIKEN AVE (HAMNER AVE) FROM 2 TO 4 LANES

2030 $17,887

SAN BERNARDINO

4A01163 LOCAL HIGHWAY

MESQUITE ST TOPAZ AVE MAPLE AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2023 $675

SAN BERNARDINO

4120140 LOCAL HIGHWAY

MICHIGAN ST COMMERCE WAY VAN BUREN WIDEN MICHIGAN ST FROM COMMERCE WAY AND VAN BUREN ST FROM 2 LANES TO 4 LANES.

2014 $742

SAN BERNARDINO

4A07131 LOCAL HIGHWAY

MIDWAY AVE SH 18/N SH247 PAVE DIRT ROAD 1 LANE IN EACH DIRECTION

2020 $3,000

SAN BERNARDINO

4A07243 LOCAL HIGHWAY

MILL PEPPER AVE MERIDIAN WIDEN MILL FROM PEPPER TO MERIDIAN FROM 2 TO 4 LANES

2030 $960

Page 379: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 377

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A04214 LOCAL HIGHWAY

MILL CREEK AVE FROM RIVERSIDE TO BELLGRAVE

RIVERSIDE BELLGRAVE WIDEN MILL CREEK AVE FROM RIVERSIDE TO BELLGRAVE 2-4 LANES

2030 $3,512

SAN BERNARDINO

4120167 LOCAL HIGHWAY

MILLER RD ETIWANDA AVE TO EAST ST WIDEN MILLER RD FROM ETIWANDA AVE TO EAST ST FROM 2 TO 4 LANES

2030 $1,900

SAN BERNARDINO

4G0117 LOCAL HIGHWAY

MILLIKEN AV IN ONTARIO (LOS ANGELES) SAFETY UPGRADE (LOW OPTION), GRADE SEPARATION (HIGH OPTION)-WIDEN 4-6 LANES

2018 $14,521

SAN BERNARDINO

4120150 LOCAL HIGHWAY

MILLIKEN AVE 5TH ST 700’ SOUTH WIDEN MILLIKEN AVE FROM 5TH ST TO 700’ SOUTH (WEST SIDE)

2030 $279

SAN BERNARDINO

4A04215 LOCAL HIGHWAY

MILLIKEN AVE (HAMNER AVE)

FROM EDISON AVE TO S. CITY LIMITS

FROM 2 TO 6 LANES

EDISON AVE S. CITY LIMITS WIDEN MILLIKEN AVE (HAMNER AVE) FROM EDISON AVE TO S. CITY LIMITS FROM 2 TO 6 LANES

2030 $1,672

SAN BERNARDINO

4A04216 LOCAL HIGHWAY

MILLIKEN AVE (HAMNER AVE)

FROM RIVERSIDE AVE TO EDISON

AVE FROM 2 TO 8 LANES

RIVERSIDE AVE EDISON AVE WIDEN MILLIKEN AVE (HAMNER AVE) FROM RIVERSIDE AVE TO EDISON AVE FROM 2 TO 8 LANES

2030 $4,012

SAN BERNARDINO

4A07233 LOCAL HIGHWAY

MISSION BLVD BENSON AV MILLIKEN AVE WIDEN MISSION BLVD FROM BENSON TO MILLIKEN FROM 4 TO 6 LANES

2018 $17,241

SAN BERNARDINO

4A07182 LOCAL HIGHWAY

MISSION BLVD FROM CENTRAL TO

BENSON FROM 4 TO 6 LANES

CENTRAL BENSON WIDEN MISSION BLVD FROM CENTRAL TO BENSON FROM 4 TO 6 LANES

2030 $1,595

SAN BERNARDINO

4A01276 LOCAL HIGHWAY

MISSION BLVD FROM LA COUNTY LINE TO PIPE LINE

FROM 2 TO 6 LANES

LA COUNTY LINE PIPE LINE WIDEN MISSION BLVD FROM LA COUNTY LINE TO PIPE LINE FROM 2 TO 6 LANES

2030 $1,079

SAN BERNARDINO

4A07312 LOCAL HIGHWAY

MOJAVE DR 1000’ E/O EL EVADO RD

AT POWER LINE EASEMENT WIDEN MOJAVE DR FROM 1000’ E/O EL EVADO RD TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES

2020 $449

Page 380: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

378 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07388 LOCAL HIGHWAY

MOJAVE DR 1190’ E/O US-395 AT POWER LINE EASEMENT WIDEN MOJAVE DR FROM 1190’ E/ US-395 TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES

2020 $57

SAN BERNARDINO

4A07377 LOCAL HIGHWAY

MOJAVE DR JUST W/O COBALT RD

AT POWER LINE EASEMENT WIDEN MOJAVE DR FROM JUST W/O COBALT RD TO AT POWER LINE EASEMENT FROM 4 TO 6 LANES

2020 $141

SAN BERNARDINO

4120060 LOCAL HIGHWAY

MOJAVE DR ASTER RICHARDSON WIDEN MOJAVE DRIVE FROM ASTER TO RICHARDSON

2030 $5,179

SAN BERNARDINO

4120062 LOCAL HIGHWAY

MOJAVE DR RICHARDSON RD LESSING WIDEN MOJAVE DRIVE FROM RICHARDSON TO LESSING

2030 $5,264

SAN BERNARDINO

4120061 LOCAL HIGHWAY

MOJAVE DR US-395 ASTER WIDEN MOJAVE DRIVE FROM US-395 TO ASTER

2030 $5,080

SAN BERNARDINO

4A01165 LOCAL HIGHWAY

MOJAVE ST I-15 MAPLE AVE WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $2,156

SAN BERNARDINO

4A07202 LOCAL HIGHWAY

MONTE VISTA AVE FROM PHILLIPS BLVD TO STATE ST FROM 2 TO 4

LANES

PHILLIPS BLVD STATE ST WIDEN MONTE VISTA AVE FROM PHILLIPS BLVD TO STATE ST FROM 2 TO 4 LANES

2030 $1,716

SAN BERNARDINO

4A01183 LOCAL HIGHWAY

MONTE VISTA AVE FROM SAN

BERNARDINO ST TO ARROW HWY FROM

4 TO 6 LANES

SAN BERNARDINO ST ARROW HWY WIDEN MONTE VISTA AVE FROM SAN BERNARDINO ST TO ARROW HWY FROM 4 TO 6 LANES

2030 $3,872

SAN BERNARDINO

4A07329 LOCAL HIGHWAY

MOUNTAIN AVE BICKMORE EL PRADO WIDEN MOUNTAIN AVE FROM BICKMORE TO EL PRADO

2020 $347

SAN BERNARDINO

4A07172 LOCAL HIGHWAY

MOUNTAIN AVE CHINO EDISON WIDEN MOUNTAIN FROM CHINO TO EDISON FROM 2 TO 4 LANES

2018 $2,000

SAN BERNARDINO

4A01041 LOCAL HIGHWAY

MOUNTAIN AVE PHILADELPHIA ST RIVERSIDE DR WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $1,797

SAN BERNARDINO

4120147 LOCAL HIGHWAY

MOUNTAIN AVE BROOKS ST SIXTH ST WIDEN FROM 4 TO 6 LANES 2018 $3,177

SAN BERNARDINO

4120107 LOCAL HIGHWAY

MOUNTAIN AVE SCHAEFER AVE EDISON WIDEN MOUNTAIN AVE FROM SCHAEFER AVE TO EDISON AVE FROM 2 TO 4 LANES

2030 $207

Page 381: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 379

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120175 LOCAL HIGHWAY

MOUNTAIN VIEW AVE

LUGONIA SAN BERNARDINO WIDEN MOUNTAIN VIEW AVE FROM LUGONIA TO SAN BERNARDINO FROM 1 TO 2 LANES (EAST SIDE)

2020 $501

SAN BERNARDINO

4A07289 LOCAL HIGHWAY

MT VERNON AV BARTON RD 700’ N/O MINONA ST WIDEN MT VERNON AVE FROM BARTON RD 700’ N/O MINONA ST FROM 2 LANES TO 4 LANES.

2018 $616

SAN BERNARDINO

4A01146 LOCAL HIGHWAY

MT VERNON AV CANAL ST NORTH CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $579

SAN BERNARDINO

4A04071 LOCAL HIGHWAY

MT VERNON AV LA CADENA DR I-215 WIDEN FROM 2 TO 4 LANES EACH DIR 2020 $2,305

SAN BERNARDINO

4A07264 LOCAL HIGHWAY

MT VIEW THOMPSON PL ELECTRIC AV WIDEN MT VIEW AVE FROM THOMPSON PL TO ELECTRIC AVE FROM 2 TO 4 LANES

2030 $768

SAN BERNARDINO

4A07211 LOCAL HIGHWAY

MT VIEW AV I-10 SAN BERNARDINO AV WIDEN MT VIEW AVE FROM I-10 TO SAN BERNARDINO AVE FROM 2 TO 4 LANES (WEST SIDE ONLY)

2020 $1,440

SAN BERNARDINO

4120190 LOCAL HIGHWAY

MT VIEW AVE RAILWAY CROSSING WIDEN MT VIEW AVE AT RAILWAY CROSSING FROM 2 TO 4 LANES, INCLUD-ING GATE IMPROVEMENTS

2030 $345

SAN BERNARDINO

200808 LOCAL HIGHWAY

MT. VERNON MT. VERNON AVEN. WIDENING – WIDEN FROM 1-2 LANES NORTHBOUND FROM RAVEN WAY TO PICO ST..

2012 $543

SAN BERNARDINO

200856 LOCAL HIGHWAY

MT. VERNON BRIDGE

MT. VERNON BRIDGE OVER UPRR -ON MT. VERNON AVE. FROM “M” ST. TO I-10 ON RAMP. WIDENING BRIDGE FROM 2-4 LANES (CA338)

2018 $50,000

SAN BERNARDINO

4A04401 LOCAL HIGHWAY

MULBERRY JURUPA AV SLOVER AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,266

SAN BERNARDINO

4A04115 LOCAL HIGHWAY

MULBERRY VALLEY BL SAN BERNARDINO AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,688

SAN BERNARDINO

4A07271 LOCAL HIGHWAY

MULBERRY AVE JURUPA SANTA ANA MULBERRY AVE FROM JURUPA AVE TO SANTA ANA AVE WIDEN FROM 2 TO 4 LANES

2012 $700

SAN BERNARDINO

4G07420 LOCAL HIGHWAY

NATIONAL TRAILS AT ORO GRANDE GRADE SEP

WIDEN UNDERPASS FROM 2-4 LANES

REPLACE GRADE SEPARATION AND WIDEN UNDERPASS FROM 2-4 LANES

2020 $27,287

Page 382: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

380 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A1016 LOCAL HIGHWAY

NATIONAL TRAILS HIGHWAY BRIDGE AT MOJAVE RIVER

MOJAVE RIVER MOJAVE DR REPLACE EXISTING RAILING TO MEET CURRENT STANDARDS

2015 $1,375

SAN BERNARDINO

4A07025 LOCAL HIGHWAY

NATIONAL TRAILS HWY

MOJAVE RIVER WIDEN NATIONAL TRAILS HIGHWAY BRIDGE OVER MOJAVE RIVER &#40;REPLACE EXISTING BRIDGE&#41;

2020 $10,921

SAN BERNARDINO

4A07239 LOCAL HIGHWAY

NATIONAL TRAILS HWY

MOJAVE RIVER 1.6 MI. N/O MOJAVE RIVER WIDEN NATIONAL TRAILS HIGHWAY FROM MOJAVE RIVER TO 1.6 MI. N/O MOJAVE RIVER – 2 TO 4 LANES

2020 $1,017

SAN BERNARDINO

4A01339 LOCAL HIGHWAY

NATIONAL TRAILS HWY

MOJAVE RIVER I-15 WIDEN FROM 1 TO 2 LANES EACH DIR (NOTE: OVERLAPS RTIP#SBD88140 FROM AIR EXPWY TO I-15)

2012 $1,121

SAN BERNARDINO

4120225 LOCAL HIGHWAY

NATIONAL TRAILS HWY

0.63 MI N/O AIR EXPRESSWAY

2.21 MI. N/O AIR EXPWY WIDEN NATIONAL TRAILS HWY FROM 0.63 MI N/O AIR EXPRESSWAY TO 2.21 MI. N/O AIR EXPWY

2020 $580

SAN BERNARDINO

4A07071 LOCAL HIGHWAY

NAVAJO RD SR-18 THUNDERBIRD RD WIDEN NAVAJO RD FROM SR-18 TO THUNDERBIRD RD FROM 2 TO 4 LANES

2018 $4,800

SAN BERNARDINO

4A07112 LOCAL HIGHWAY

NEVADA ST LUGONIA AVE PALMETTO WIDEN NEVADA ST FROM LUGONIA AVE TO PALMETTO FROM 2 TO 4 LANES

2020 $3,375

SAN BERNARDINO

4A07093 LOCAL HIGHWAY

NEW CONNECTOR 3RD ST 5TH ST BUILD A CONNECTOR ROAD BETWEEN 3RD ST AND 5TH ST FROM 0 TO 4 LANES

2020 $4,597

SAN BERNARDINO

4A07041 LOCAL HIGHWAY

OAK GLEN RD COLORADO ST CASA BLANCA AVE WIDEN OAK GLEN RD FROM COLORADO ST TO CASA BLANCA AVE FROM 2 TO 4 LANES

2030 $7,748

SAN BERNARDINO

4120063 LOCAL HIGHWAY

OLEANDER ASTER CAUGHLIN RD WIDEN OLEANDER FROM ASTER TO CAUGHLIN

2030 $8,941

SAN BERNARDINO

4120064 LOCAL HIGHWAY

OLEANDER ECL ADELANTO RD WIDEN OLEANDER FROM ECL TO ADELANTO RD

2030 $5,849

SAN BERNARDINO

4A07197 LOCAL HIGHWAY

OLIVE STREET 0007M W, JACKSON E/0003M W RANCHO AVE WIDEN OLIVE STREET FROM 0007M W, JACKSON E/0003M W, RANCHO AVE FROM 2 TO 4 LANES

2020 $1,553

Page 383: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 381

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A04218 LOCAL HIGHWAY

ONTARIO/HELLMAN AVE FROM

RIVERSIDE DR TO BELLGRAVE FROM

2 TO 4 LANES

RIVERSIDE DR. BELLGRAVE WIDEN ONTARIO/HELLMAN AVE FROM RIVERSIDE DR TO BELLGRAVE FROM 2 TO 4 LANES

2030 $4,346

SAN BERNARDINO

4120176 LOCAL HIGHWAY

ORANGE ST I-10 LUGOINA AVE WIDEN ORANGE ST FROM I-10 TO LUGOINA AVE FROM 2 TO 4 LANES

2020 $2,873

SAN BERNARDINO

4A01248 LOCAL HIGHWAY

ORANGE ST LUGONIA AVE SAN BERNARDINO AVE WIDEN ORANGE ST FROM LUGONIA AVE TO SAN BERNARDINO AVE FROM 2 TO 4 LANES

2020 $1,266

SAN BERNARDINO

4A01247 LOCAL HIGHWAY

ORANGE ST PIONEER AVE N. CITY LIMITS WIDEN ORANGE ST FROM PIONEER AVE TO N. CITY LIMITS FROM 2 TO 4 LANES

2020 $9,074

SAN BERNARDINO

4120177 LOCAL HIGHWAY

ORANGE ST SAN BERNARDINO AVE

PIONEER AVE WIDEN ORANGE ST FROM SAN BERNARDINO AVE TO PIONEER AVE FROM 2 TO 4 LANES

2020 $687

SAN BERNARDINO

4A07054 LOCAL HIGHWAY

ORANGE ST COLTON AV LUGONIA AV WIDEN FROM 1 TO 2 LANES EACH DIR – CALTRANS (STATE ROUTE 38)

2020 $5,850

SAN BERNARDINO

4A07360 LOCAL HIGHWAY

OTTAWA ST HESPERIA RD INDUSTRIAL BLVD WIDEN OTTAWA ST FROM HESPERIA RD TO INDUSTRIAL BLVD FROM 0 TO 4 LANES

2020 $184

SAN BERNARDINO

4A01343 LOCAL HIGHWAY

OTTAWA ST MARIPOSA RD OTTAWA PL WIDEN OTTAWA ST FROM MARIPOSA RD TO OTTAWA PL FROM 0 TO 4 LANES

2012 $899

SAN BERNARDINO

4A07275 LOCAL HIGHWAY

PACIFIC ST 2 LOTS W/O COLE PALM AVE WIDEN FROM 2 TO 4 LANES 2020 $966

SAN BERNARDINO

4A01340 LOCAL HIGHWAY

PALM AV 3RD ST BASELINE WIDEN FROM 2 TO 4 LANES 2020 $3,475

SAN BERNARDINO

4A07247 LOCAL HIGHWAY

PALM AV CAJON BLVD I-215 WIDEN PALM AVE FROM CAJON BLVD TO I-215 FROM 2 TO 4 LANES

2020 $912

SAN BERNARDINO

4A07323 LOCAL HIGHWAY

PALM AV PACIFIC AVE ATLANTIC AVE WIDEN PALM AVE FROM PACIFIC ST TO ATLANTIC AVE FROM 2 LANES TO 4 LANES.

2020 $386

Page 384: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

382 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

200850 LOCAL HIGHWAY

PALM AVE PALM AVE. GRADE SEPARATION , PALM AVE. APPROX. 530’ S/O I-215 PALM AVE. INTERCHANGE TO APPROX. 1450’ S/O CAJON BLVD.-CONSTRUCT AT GRADE RR SEPARATION – BUILD BRIDGE OVERCROSSING SEPARATING TRAFFIC FROM RR CROSSING (NO ADDITIONAL LANES) 2-2 LANES (CA615)

2014 $30,077

SAN BERNARDINO

4120067 LOCAL HIGHWAY

PALMDALE RD ASTER RICHARDSON WIDEN PALMDALE RD FROM ASTER TO RICHARDSON

2035 $10,131

SAN BERNARDINO

4120066 LOCAL HIGHWAY

PALMDALE RD RICHARDSON RD LESSING WIDEN PALMDALE RD FROM RICHARDSON TO LESSING

2035 $9,915

SAN BERNARDINO

4A07023 LOCAL HIGHWAY

PALMDALE RD US 395 I-15 WIDEN PALMDALE RD FROM US 395 TO I-15 FROM 4 TO 6 LANES. 8.5 LANE MILES

2030 $11,603

SAN BERNARDINO

4120065 LOCAL HIGHWAY

PALMDALE RD US-395 ASTER WIDEN PALMDALE RD FROM US-395 TO ASTER

2035 $10,776

SAN BERNARDINO

4A07154 LOCAL HIGHWAY

PALMETTO AVE CALIFORNIA ST ALABAMA ST WIDEN PALMETTO AVE FROM CALIFORNIA ST TO ALABAMA ST FROM 2 TO 4 LANES

2020 $2,565

SAN BERNARDINO

4A07068 LOCAL HIGHWAY

PEPPER FOOTHILL SR-210 WIDEN PEPPER AVE FROM FOOTHILL BLVD TO SR-210 FROM 2 TO 4 LANES

2035 $4,992

SAN BERNARDINO

4A07265 LOCAL HIGHWAY

PEPPER RIALTO FOOTHILL WIDEN PEPPER AVE FROM RIALTO AVE TO FOOTHILL BLVD FROM 2 TO 4 LANES

2035 $750

SAN BERNARDINO

4120186 LOCAL HIGHWAY

PEPPER AVE N. TERMINUS HIGHLAND AVE WIDEN PEPPER AVE FROM N. TERMINUS TO HIGHLAND AVE FROM 2 TO 4 LANES

2014 $13,345

SAN BERNARDINO

4A07200 LOCAL HIGHWAY

PEPPER AVE SLOVER VALLEY WIDEN PEPPER AVE FROM SLOVER TO VALLEY FROM 2 TO 4 LANES

2020 $1,519

SAN BERNARDINO

4120112 LOCAL HIGHWAY

PEPPER AVE I-10 AGUA MANSA RD WIDEN AND EXTEND PEPPER AVE FROM I-10 TO AGUA MANSA RD FROM 0/2 TO 4 LANES

2030 $5,914

SAN BERNARDINO

4A07198 LOCAL HIGHWAY

PERRIS HILL PARK RD

21ST ST PACIFIC ST WIDEN PERRIS HILL PARK RD FROM 21ST ST TO PACIFIC ST FROM 2 TO 4 LANES

2020 $1,839

SAN BERNARDINO

4A01278 LOCAL HIGHWAY

PHELAN RD SHEEP CREEK RD BALDY MESA RD WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $24,797

Page 385: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 383

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07191 LOCAL HIGHWAY

PHILADELPHIA EAST END AV NORTON AVE WIDEN PHILADELPHIA AVE FROM EAST END AVE TO NORTON AVE FROM 2 TO 4 LANES

2020 $1,654

SAN BERNARDINO

4A07293 LOCAL HIGHWAY

PHILADELPHIA LOS ANGELES CRL EAST END AV WIDEN PHILADELPHIA AVE FROM LOS ANGELES CRL TO EAST END AVE FROM 2 TO 4 LANES

2020 $574

SAN BERNARDINO

4A07269 LOCAL HIGHWAY

PHILADELPHIA RAMONA MONTE VISTA WIDEN PHILADELPHIA AVE FROM RAMONA TO MONTE VISTA FROM 2 TO 4 LANES

2020 $709

SAN BERNARDINO

4A01042 LOCAL HIGHWAY

PHILADELPHIA ST CENTRAL AV BENSON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $898

SAN BERNARDINO

4A01043 LOCAL HIGHWAY

PHILADELPHIA ST LA COUNTY LINE CENTRAL AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $2,935

SAN BERNARDINO

4A07138 LOCAL HIGHWAY

PHILADELPHIA ST VINEYARD AV CUCAMONGA CREEK WIDEN FROM 1 TO 2 LANES EACH DIR, INCL. BRIDGE OVER CUCAMONGA CREEK

2018 $3,646

SAN BERNARDINO

4A07266 LOCAL HIGHWAY

PHILADELPHIA ST FROM CAMPUS AVE TO 750’ E/O GROVE AVE FROM 2 TO 4

LANES

CAMPUS AVE 750’ E/O GROVE AVE WIDEN PHILADELPHIA ST FROM CAMPUS AVE TO 750’ E/O GROVE AVE FROM 2 TO 4 LANES

2030 $948

SAN BERNARDINO

4A07252 LOCAL HIGHWAY

PHILLIPS BLVD EAST END AVE ROSWELL AVE WIDEN PHILLIPS BLVD FROM EAST END AVE TO ROSWELL AVE FROM 2 TO 4 LANES

2020 $844

SAN BERNARDINO

4A07124 LOCAL HIGHWAY

PHILLIPS BLVD ROSWELL AVE YORBA AVE WIDEN PHILLIPS BLVD FROM ROSWELL AVE TO YORBA AVE FROM 2 TO 4 LANES

2020 $3,038

SAN BERNARDINO

4A07107 LOCAL HIGHWAY

PHILLIPS BLVD YORBA AV BENSON AV WIDEN PHILLIPS BLVD FROM YORBA AVE TO BENSON AVE FROM 2 TO 4 LANES

2020 $3,443

SAN BERNARDINO

4A07390 LOCAL HIGHWAY

PHILLIPS BLVD FROM LA COUNTY LINE TO EAST END AVE FROM 2 TO 4

LANES

LA COUNTY LINE EAST END AVE WIDEN PHILLIPS BLVD FROM LA COUNTY LINE TO EAST END AVE FROM 2 TO 4 LANES

2030 $103

SAN BERNARDINO

4A04045 LOCAL HIGHWAY

PINE AV EUCLID AV HELLMAN WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $5,368

Page 386: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

384 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07244 LOCAL HIGHWAY

PINE AV KENDALL DR BELMONT AV WIDEN PINE AVE FROM KENDALL DR TO BELMONT AVE FROM 2 TO 4 LANES

2030 $960

SAN BERNARDINO

4A04044 LOCAL HIGHWAY

PINE AV SR-71 EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $22,371

SAN BERNARDINO

4A07116 LOCAL HIGHWAY

PINE AVE SR-71 CHINO CREEK WIDEN PINE AVE FROM SR-71 TO CHINO CREEK (NORTH SIDE ONLY) IN CONJUNC-TION WITH CHINO PROJECT ID 200207

2018 $3,250

SAN BERNARDINO

4C01001 LOCAL HIGHWAY

PINE AVE (FOUR CORNERS)

PINE AVE. RIVERSIDE COUNTY LINE NEW ARTERIAL CORRIDOR LINKING PINE AVE, SCHLEISMAN AVE, ARLINGTON AVE (RIV. CO.)

2030 $3,400

SAN BERNARDINO

4A07216 LOCAL HIGHWAY

PIPELINE AVE CHINO AV RIVERSIDE DR WIDEN PIPELINE AVE FROM CHINO AVE TO RIVERSIDE DR FROM 2 TO 4 LANES

2020 $1,350

SAN BERNARDINO

4A07059 LOCAL HIGHWAY

PIPELINE AVE PHILADELPHIA MISSION BLVD WIDEN PIPELINE AVE FROM PHILADELPHIA AVE TO MISSION BLVD FROM 2 TO 4 LANES

2020 $5,400

SAN BERNARDINO

4A07279 LOCAL HIGHWAY

PIPELINE AVE RIVERSIDE WALNUT WIDEN PIPELINE AVE FROM RIVERSIDE AVE TO WALNUT AVE FROM 2 TO 4 LANES

2020 $675

SAN BERNARDINO

4A07303 LOCAL HIGHWAY

PIPELINE AVE WALNUT .25 M NORTH WIDEN PIPELINE AVE FROM WALNUT AVE TO .25 M NORTH FROM 2 TO 4 LANES

2020 $506

SAN BERNARDINO

4120134 LOCAL HIGHWAY

POPLAR AVE SLOVER AVE VALLEY BLVD WIDEN POPLAR AVE FROM SLOVER AVE TO VALLEY BLVD FROM 0 TO 4 LANES (I-10 OVERCROSSING)

2030 $16,925

SAN BERNARDINO

4120069 LOCAL HIGHWAY

RACCOON AIR EXPRESSWAY EL MIRAGE RD WIDEN RACCOON FROM AIR EXPRESSWAY TO EL MIRAGE

2020 $3,787

SAN BERNARDINO

4120071 LOCAL HIGHWAY

RACCOON CACTUS AIR EXPRESSWAY WIDEN RACCOON FROM CACTUS TO AIR EXPRESSWAY

2020 $3,985

SAN BERNARDINO

4120068 LOCAL HIGHWAY

RACCOON COLUSA OLEANDER WIDEN RACCOON FROM COLUSA TO OLEANDER

2020 $3,695

SAN BERNARDINO

4120070 LOCAL HIGHWAY

RACCOON EL MIRAGE RD COLUSA RD WIDEN RACCOON FROM EL MIRAGE TO COLUSA

2020 $2,658

SAN BERNARDINO

4120072 LOCAL HIGHWAY

RACCOON PALMDALE RD VILLA WIDEN RACCOON FROM PALMDALE TO VILLA

2020 $1,752

Page 387: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 385

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07151 LOCAL HIGHWAY

RAMONA PHILADELPHIA PHILLIPS BLVD WIDEN RAMONA AVE FROM PHILADELPHIA TO PHILLIPS BLVD FROM 2 TO 4 LANES

2020 $2,633

SAN BERNARDINO

4A07032 LOCAL HIGHWAY

RANCHERIAS RD RINCON CORWIN RD WIDEN RANCHERIAS RD FROM RINCON RD TO CORWIN RD FROM 2 TO 4 LANES

2023 $9,450

SAN BERNARDINO

200815 LOCAL HIGHWAY

RANCHERO STREET RANCHERO ST. FROM .3 M E/O MARIPOSA TO HESPERIA CL (3 MILES)-WIDEN 2-4 LANES

2014 $11,025

SAN BERNARDINO

4A07148 LOCAL HIGHWAY

RANCHO COLTON CITY LIMITS 5TH ST WIDEN RANCHO FROM COLTON CITY LIMITS TO 5TH ST FROM 2 TO 4 LANES

2020 $3,218

SAN BERNARDINO

4A07351 LOCAL HIGHWAY

RANCHO RD 2025’ E/O GASLINE RD

AT POWER LINE EASEMENT WIDEN RANCHO RD FROM 2025’ E/O GASLINE RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $281

SAN BERNARDINO

4A07160 LOCAL HIGHWAY

RANCHO RD AMARGOSA NATIONAL TRAILS HWY WIDEN RANCHO FROM AMARGOSA TO NATIONAL TRAILS HWY FROM 0 TO 4 LANES (INCLUDES WAS CROSSING)

2020 $2,405

SAN BERNARDINO

4A07282 LOCAL HIGHWAY

RANCHO RD AMETHYST EL EVADO RD WIDEN RANCHO RD FROM AMETHYST RD TO EL EVADO RD FROM 0 TO 4 LANES

2020 $636

SAN BERNARDINO

4A07257 LOCAL HIGHWAY

RANCHO RD JUST W/O EL EVADO RD

AT POWER LINE EASEMENT WIDEN RANCHO RD FROM JUST W/O EL EVADO TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $844

SAN BERNARDINO

4A07376 LOCAL HIGHWAY

RANCHO RD JUST W/O VILLAGE DR

AT POWER LINE EASEMENT WIDEN RANCHO RD FROM JUST W/O VILLAGE DR TO AT POWER LINE EASEMENT FROM 2 TO 4 LANES

2020 $154

SAN BERNARDINO

4A04412 LOCAL HIGHWAY

RANCHO RD KOALA RD CAUGHLIN RD NEW ROAD, 2 LANES EACH DIR PLUS TURNING LANE

2020 $7,200

SAN BERNARDINO

4A01362 LOCAL HIGHWAY

RANCHO RD NATIONAL TRAILS HWY

STODDARD WELLS RD WIDEN RANCHO RD FROM NATIONAL TRAILS HWY TO STODDARD WELLS RD FROM 0 TO 4 LANES.

2012 $1,210

SAN BERNARDINO

4A07301 LOCAL HIGHWAY

RANCHO RD PACOIMA AT POWER LINE EASEMENT WIDEN RANCHO RD FROM PACOIMA TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $535

SAN BERNARDINO

4120074 LOCAL HIGHWAY

RANCHO ROAD AMETHYST US-395 WIDEN RANCHO ROAD FROM AMETHYST TO US-395

2020 $5,434

Page 388: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

386 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120073 LOCAL HIGHWAY

RANCHO ROAD ASTER RICHARDSON WIDEN RANCHO ROAD FROM ASTER TO RICHARDSON

2020 $3,487

SAN BERNARDINO

4120075 LOCAL HIGHWAY

RANCHO ROAD RICHARDSON RD LESSING WIDEN RANCHO ROAD FROM RICHARDSON TO LESSING

2020 $6,445

SAN BERNARDINO

4120076 LOCAL HIGHWAY

RANCHO ROAD US-395 ASTER WIDEN RANCHO ROAD FROM US-395 TO ASTER

2020 $2,469

SAN BERNARDINO

4A07222 LOCAL HIGHWAY

RANDALL AVE ALDER CEDAR WIDEN RANDALL AVE FROM ALDER AVE TO CEDAR AVE FROM 2 TO 4 LANES

2020 $1,266

SAN BERNARDINO

4120135 LOCAL HIGHWAY

RANDALL AVE ALDER AVE LOCUST AVE WIDEN RANDALL AVE FROM ALDER AVE TO LOCUST AVE FROM 2 TO 4 LANES

2030 $555

SAN BERNARDINO

4A07061 LOCAL HIGHWAY

RANDALL AVE CHERRY AV POPLAR AVE WIDEN RANDALL AVE FROM CHERRY AVE TO POPLAR AVE FROM 2 TO 4 LANES

2020 $5,299

SAN BERNARDINO

200843 LOCAL HIGHWAY

RECHE CANYON RECHE CANYON RD. FROM 1.20 MILES OF S. BARTON ROAD TO 0.42 MILES SOUTH OF BARTON RD (.078 MILES)-WIDEN FROM 2-4 LANES

2014 $5,650

SAN BERNARDINO

4A04077 LOCAL HIGHWAY

RECHE CANYON RD BARTON RD CITY LIMITS WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $1,438

SAN BERNARDINO

4A07204 LOCAL HIGHWAY

RECHE CNYN RD 1.2M S/O BARTON RD

0.78M NORTH BARTON RD WIDEN RECHE CNYN RD FROM 1.2M S/O BARTON RD TO .78M NORTH FROM 2 TO 4 LANES

2030 $2,490

SAN BERNARDINO

4A07313 LOCAL HIGHWAY

RECHE CNYN RD S. CRYSTAL RIDGE RIVERSIDE COUNTY LINE WIDEN RECHE CNYN RD FROM S. CRYSTAL RIDGE TO RIVERSIDE COUNTY LINE FROM 2 TO 4 LANES

2030 $2,570

SAN BERNARDINO

4120116 LOCAL HIGHWAY

RECHE CNYN RD WASHINGTON ST. CITY LIMITS WIDEN AND REALIGN RECHE CNYN RD FROM WASHINGTON ST TO CITY LIMITS FROM 2 TO 4 LANES

2030 $2,112

SAN BERNARDINO

4A01249 LOCAL HIGHWAY

REDLANDS BL WEST CITY LIMITS COLTON AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $6,761

SAN BERNARDINO

4120178 LOCAL HIGHWAY

REDLANDS BLVD ALABAMA ST COLTON AVE WIDEN REDLANDS BLVD AT INTERSEC-TIONS OF ALABAMA ST AND COLTON AVE

2020 $5,595

SAN BERNARDINO

4120180 LOCAL HIGHWAY

RENAISSANCE PKWY

ALDER AVE AYALA DR REALIGN AND RECONSTRUCT RENAISSANCE PKWY FROM ALDER AVE TO AYALA DR

2020 $7,200

Page 389: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 387

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07135 LOCAL HIGHWAY

RIALTO LENA RD TIPPECANOE WIDEN RIALTO AVE FROM LENA RD TO TIPPECANOE AVE FROM 2 TO 4 LANES

2030 $2,880

SAN BERNARDINO

4A07199 LOCAL HIGHWAY

RIALTO RIVERSIDE EAST CITY LIMITS WIDEN RIALTO AVE FROM RIVERSIDE AVE TO EAST CITY LIMITS FROM 2 TO 4 LANES

2018 $1,520

SAN BERNARDINO

4A07178 LOCAL HIGHWAY

RIALTO AVE SIERRA WY WATERMAN AVE WIDEN RIALTO AVE FROM SIERRA WY TO WATERMAN AVE FROM 2 TO 4 LANES

2020 $2,299

SAN BERNARDINO

4120079 LOCAL HIGHWAY

RICHARDSON AIR EXPRESSWAY EL MIRAGE RD WIDEN RICHARDSON FROM AIR EXPRESSWAY TO EL MIRAGE

2030 $4,605

SAN BERNARDINO

4120077 LOCAL HIGHWAY

RICHARDSON COLUSA OLEANDER WIDEN RICHARDSON FROM COLUSA TO OLEANDER

2030 $5,022

SAN BERNARDINO

4120078 LOCAL HIGHWAY

RICHARDSON EL MIRAGE RD COLUSA RD WIDEN RICHARDSON FROM EL MIRAGE TO COLUSA

2030 $4,333

SAN BERNARDINO

4120080 LOCAL HIGHWAY

RICHARDSON MOJAVE DR AIR EXPRESSWAY WIDEN RICHARDSON FROM MOJAVE TO AIR EXPRESSWAY

2030 $5,058

SAN BERNARDINO

4120081 LOCAL HIGHWAY

RICHARDSON PALMDALE RD VICTOR WIDEN RICHARDSON FROM PALMDALE TO VICTOR

2030 $2,167

SAN BERNARDINO

4RL04 LOCAL HIGHWAY

RIDESHARE COUNTYWIDE COUNTYWIDE RIDESHARE 2015 $1,600

SAN BERNARDINO

4A07237 LOCAL HIGHWAY

RIVERSIDE LOCUST CEDAR WIDEN RIVERSIDE AVE FROM LOCUST AVE TO CEDAR AVE FROM 3 TO 4 LANES

2018 $1,060

SAN BERNARDINO

4A01079 LOCAL HIGHWAY

RIVERSIDE AV RIVERSIDE COUNTY LINE

NORTH CITY LIMIT WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $1,467

SAN BERNARDINO

4A01258 LOCAL HIGHWAY

RIVERSIDE AV SOUTH CITY LIMIT SLOVER AV WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $3,186

SAN BERNARDINO

4A01259 LOCAL HIGHWAY

RIVERSIDE AV VALLEY BL N/O SLOVER AV WIDEN FROM 2 TO 4 LANES EACH DIR (NOTE: OVERLAPS RTIP#SBD31808)

2012 $1,800

SAN BERNARDINO

4120187 LOCAL HIGHWAY

RIVERSIDE AVE GATEWAY PLAZA SAN BERNARDINO AVE WIDEN RIVERSIDE AVE FROM GATEWAY PLAZA TO SAN BERNARDINO AVE FROM 4 TO 6 LANES

2018 $755

SAN BERNARDINO

4120188 LOCAL HIGHWAY

RIVERSIDE AVE SIERRA AVE ALDER AVE WIDEN RIVERSIDE AVE FROM SIERRA AVE TO ALDER AVE FROM 3 TO 6 LANES

2020 $8,300

Page 390: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

388 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4120117 LOCAL HIGHWAY

RIVERSIDE AVE RIVERSIDE COUNTY LINE

SANTA ANA RIVER WIDEN RIVERSIDE AVE FROM RIV. COUNTY LINE TO SANTA ANA RIVER FROM 4 TO 6 LANES

2030 $8,791

SAN BERNARDINO

4120118 LOCAL HIGHWAY

RIVERSIDE AVE SANTA ANA RIVER AGUA MANSA RD WIDEN RIVERSIDE AVE FROM SANTA ANA RIVER TO AGUA MANSA RD FROM 4 TO 6 LANES

2030 $1,811

SAN BERNARDINO

4A01046 LOCAL HIGHWAY

RIVERSIDE DR BENSON AVE MAGNOLIA AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $854

SAN BERNARDINO

4A01047 LOCAL HIGHWAY

RIVERSIDE DR FERN AVE EUCLID AVE WIDEN FROM 1 TO 3 LANES EACH DIR 2020 $777

SAN BERNARDINO

4A01048 LOCAL HIGHWAY

RIVERSIDE DR MOUNTAIN AVE MAGNOLIA AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $466

SAN BERNARDINO

4A01049 LOCAL HIGHWAY

RIVERSIDE DR PIPELINE FERN AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $4,777

SAN BERNARDINO

4A01050 LOCAL HIGHWAY

RIVERSIDE DR WEST CITY LIMITS BENSON AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $2,167

SAN BERNARDINO

4120101 LOCAL HIGHWAY

RIVERSIDE DR CENTRAL AVE MOUNTAIN AVE WIDEN RIVERSIDE DR FROM CENTRAL AVE TO MOUNTAIN AVE FROM 4 TO 6 LANES

2020 $4,668

SAN BERNARDINO

4120102 LOCAL HIGHWAY

RIVERSIDE DR MOUNTAIN AVE FERN AVE WIDEN RIVERSIDE DR FROM MOUNTAIN AVE TO FERN AVE FROM 2 TO 6 LANES

2020 $4,126

SAN BERNARDINO

4120103 LOCAL HIGHWAY

RIVERSIDE DR PIPELINE CENTRAL AVE WIDEN RIVERSIDE DR FROM PIPELINE AVE TO CENTRAL AVE FROM 4 TO 6 LANES

2020 $5,972

SAN BERNARDINO

4120108 LOCAL HIGHWAY

RIVERSIDE DR WCL 800’ E/O RESERVIOR AVE WIDEN RIVERSIDE DR FROM WCL TO 800’ E/O RESERVIOR AVE FROM 4 TO 6 LANES (N. SIDE ONLY)

2020 $664

SAN BERNARDINO

4A04219 LOCAL HIGHWAY

RIVERSIDE DR FROM EUCLID

AVE TO MILLIKEN AVE FROM 2 TO 4

LANES

EUCLID AVE MILLIKEN AVE WIDEN RIVERSIDE DR FROM EUCLID AVE TO MILLIKEN AVE FROM 2 TO 4 LANES

2030 $13,707

SAN BERNARDINO

4A01168 LOCAL HIGHWAY

ROCK SPRINGS RD GLENDALE AVE E CITY LIMITS WIDEN FROM 1 TO 2 LANES EACH DIR 2023 $1,500

Page 391: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 389

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07082 LOCAL HIGHWAY

ROCK SPRINGS RD MOJAVE RIVER CL KIOWA RD WIDEN ROCK SPRINGS RD FROM MOJAVE RIVER CRL TO KIOWA RD FROM 2 TO 4 LANES

2020 $4,204

SAN BERNARDINO

4A07123 LOCAL HIGHWAY

ROCK SPRINGS RD GLENDALE AVE MOJAVE RIVER CRL WIDEN ROCK SPRINGS RD FROM GLENDALE AVE TO MOJAVE RIVER CRL FROM 2 LANES TO 4 LANES

2020 $428

SAN BERNARDINO

200816 LOCAL HIGHWAY

ROCK SPRINGS RD. ROCK SPRINGS RD. FROM 0.25 MI. E/O GLENDALE AVE. TO KIOWA (1.86 MILES) WIDEN FROM 2-4 LANES

2014 $20,000

SAN BERNARDINO

4A07058 LOCAL HIGHWAY

ROUNDUP WY KIOWA CENTRAL WIDEN ROUNDUP WY FROM KIOWA RD TO CENTRAL FROM 2 TO 4 LANES

2020 $5,400

SAN BERNARDINO

4G0103/ 4G0109

LOCAL HIGHWAY

SAN ANTONIO AV IN ONTARIO (ALHAMBRA) (LOS ANGELES) SPOT WIDENING (LOW OPTION), GRADE SEPARATION (HIGH OPTION) WIDEN 2-4 LANES

2035 $21,677

SAN BERNARDINO

4A07101 LOCAL HIGHWAY

SAN BERNARDINO WEST CITY LIMITS EAST CITY LIMITS WIDEN SAN BERNARDINO FROM WEST CITY LIMITS TO EAST CITY LIMITS FROM 2 TO 4 LANES

2020 $3,584

SAN BERNARDINO

4A01281 LOCAL HIGHWAY

SAN BERNARDINO AV

ALABAMA ST CALIFORNIA ST WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $5,050

SAN BERNARDINO

4A01080 LOCAL HIGHWAY

SAN BERNARDINO AV

PEPPER AV MERIDIAN AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $507

SAN BERNARDINO

4A01252 LOCAL HIGHWAY

SAN BERNARDINO AV

ROUTE 30 ORANGE ST WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $3,733

SAN BERNARDINO

4A07147 LOCAL HIGHWAY

SAN BERNARDINO AVE

ALABAMA ST REDLANDS CRL WIDEN SAN BERNARDINO AVE FROM ALABAMA ST TO REDLANDS CRL FROM 2 TO 6 LANES

2020 $2,700

SAN BERNARDINO

4A07033 LOCAL HIGHWAY

SAN BERNARDINO AVE

ALDER AVE LAUREL AVE WIDEN SAN BERNARDINO AVE FROM ALDER AVE TO LAUREL AVE FROM 2 TO 4 LANES

2020 $9,011

SAN BERNARDINO

4A07072 LOCAL HIGHWAY

SAN BERNARDINO AVE

CHERRY AVE FONTANA CITY LIMITS AVE WIDEN SAN BERNARDINO AVE FROM CHERRY AVE TO FONTANA CITY LIMITS FROM 2 TO 4 LANES

2020 $4,658

Page 392: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

390 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A01250 LOCAL HIGHWAY

SAN BERNARDINO AVE

CHURCH ST WABASH AVE WIDEN SAN BERNARDINO AVE FROM CHURCH ST TO WABASH AVE FROM 2 TO 4 LANES

2030 $2,665

SAN BERNARDINO

4120119 LOCAL HIGHWAY

SAN BERNARDINO AVE

COUNTY LIMIT RANCHO AVE WIDEN SAN BERNARDINO AVE FROM COUNTY LIMIT TO RANCHO AVE FROM 2 TO 4 LANES

2020 $155

SAN BERNARDINO

4A07109 LOCAL HIGHWAY

SAN BERNARDINO AVE

ETIWANDA AVE CHERRY AVE WIDEN SAN BERNARDINO AVE FROM ETIWANDA AVE TO CHERRY AVE FROM 5 TO 6 LANES

2020 $3,375

SAN BERNARDINO

4A07079 LOCAL HIGHWAY

SAN BERNARDINO AVE

LAUREL AVE RIALTO CITY LIMITS WIDEN SAN BERNARDINO AVE FROM LAUREL AVE TO RIALTO CITY LIMITS FROM 2 TO 4 LANES

2020 $4,421

SAN BERNARDINO

4120179 LOCAL HIGHWAY

SAN BERNARDINO AVE

SR-210 ORANGE ST WIDEN SAN BERNARDINO AVE FROM SR-210 TO ORANGE ST FROM 2 TO 4 LANES

2030 $1,915

SAN BERNARDINO

4A07240 LOCAL HIGHWAY

SAN BERNARDINO AVE

WABASH AVE OPAL AV WIDEN SAN BERNARDINO AVE FROM WABASH AVE TO OPAL AVE FROM 2 TO 4 LANES

2030 $808

SAN BERNARDINO

4120120 LOCAL HIGHWAY

SAN BERNARDINO AVE

PEPPER AVE COUNTY LIMIT WIDEN SAN BERNARDINO AVE FROM PEPPER AVE TO COUNTY LIMIT FROM 2 LANES TO 4 LANES

2020 $1,867

SAN BERNARDINO

200835 LOCAL HIGHWAY

SAN BERNARDINO AVE

SAN BERNARDINO AVE. FROM CHERRY AVE. TO FONTANA CITY LIMITS (LIME AVE.) (1.25 MILES)-WIDEN 2-4 LANES

2012 $3,665

SAN BERNARDINO

4A01184 LOCAL HIGHWAY

SAN BERNARDINO ST FROM LA

COUNTY LINE TO BENSON AVE FROM

4 TO 6 LANES

LA COUNTY LINE BENSON AVE WIDEN SAN BERNARDINO ST FROM LA COUNTY LINE TO BENSON AVE FROM 4 TO 6 LANES

2030 $4,776

SAN BERNARDINO

4A07084 LOCAL HIGHWAY

SAN SEVAINE BASELINE SUMMIT SAN SEVAINE RD FROM BASELINE AVE TO SUMMIT AVE WIDEN FROM 2 TO 4 LANES

2018 $4,200

SAN BERNARDINO

4A01254 LOCAL HIGHWAY

SAN TIMOTEO CYN RD

RR CROSSING LIVE OAK CYN RD WIDEN FROM 1 TO 2 LANES EACH DIR 2030 $6,895

Page 393: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 391

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07132 LOCAL HIGHWAY

SANTA ANA AVE CEDAR AVE CACTUS AVE WIDEN SANTA ANA AVE FROM CEDAR AVE TO CACTUS AVE FROM 2 TO 4 LANES

2020 $2,970

SAN BERNARDINO

4A07159 LOCAL HIGHWAY

SANTA ANA AVE LOCUST CEDAR WIDEN SANTA ANA AVE FROM LOCUST AVE TO CEDAR AVE FROM 2 TO 4 LANES

2020 $2,531

SAN BERNARDINO

4A07158 LOCAL HIGHWAY

SANTA ANA AVE MULBERRY AVE REDWOOD AVE WIDEN SANTA ANA AVE FROM MULLBERRY AVE TO REDWOOD AVE FROM 2 TO 4 LANES

2020 $2,531

SAN BERNARDINO

4120136 LOCAL HIGHWAY

SANTA ANA AVE MULLBERRY AVE ALMOND AVE WIDEN SANTA ANA AVE FROM MULLBERRY AVE TO ALMOND AVE FROM 2 TO 4 LANES

2030 $3,856

SAN BERNARDINO

4A07153 LOCAL HIGHWAY

SANTA ANA AVE TAMARIND LOCUST WIDEN SANTA ANA AVE FROM TAMARIND TO LOCUST AVE FROM 2 TO 4 LANES

2020 $2,565

SAN BERNARDINO

4A01051 LOCAL HIGHWAY

SCHAEFER AV BENSON AV EUCLID AV WIDEN FROM 1 TO 2 LANES EACH DIR 2012 $3,055

SAN BERNARDINO

4A04220 LOCAL HIGHWAY

SCHAEFER AVE FROM EUCLID

AVE TO EDISON AVE FROM 2 TO 4

LANES

EUCLID AVE EDISON AVE WIDEN SCHAEFER AVE FROM EUCLID AVE TO EDISON AVE FROM 2 TO 4 LANES

2030 $31,759

SAN BERNARDINO

4A07362 LOCAL HIGHWAY

SENECA RD 0.4 M E/O HESPERIA RD

ROAD B WIDEN SENECA RD FROM .4 M E/O HESPERIA RD TO ROAD B FROM 0 TO 4 LANES

2020 $172

SAN BERNARDINO

4A07350 LOCAL HIGHWAY

SENECA RD 2340’ W/O EL EVADO RD

AT POWER LINE EASEMENT WIDEN SENECA RD FROM 2340’ W/O EL EVADO RD TO AT POWER LINE EASEMENT FROM 3 TO 4 LANES

2020 $287

SAN BERNARDINO

4A07365 LOCAL HIGHWAY

SENECA RD 2360’ E/O US-395 AT POWER LINE EASEMENT WIDEN SENECA RD FROM 2360’ E/O US-395 TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $165

SAN BERNARDINO

4A07384 LOCAL HIGHWAY

SENECA RD 650’ W/O EMERALD RD

AT POWER LINE EASEMENT WIDEN SENECA RD FROM 650’ W/O EMERALD RD TO AT POWER LINE EASEMENT FROM 0 TO 4 LANES

2020 $83

SAN BERNARDINO

4120083 LOCAL HIGHWAY

SENECA RD ASTER RICHARDSON WIDEN SENECA RD FROM ASTER TO RICHARDSON

2030 $4,373

Page 394: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

392 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07113 LOCAL HIGHWAY

SENECA RD EMERALD RD AMETHYST RD WIDEN SENECA RD FROM EMERALD RD TO AMETHYST RD FROM 2 TO 4 LANES

2020 $3,375

SAN BERNARDINO

4A07378 LOCAL HIGHWAY

SENECA RD HESPERIA RD .2 M E/O HESPERIA RD WIDEN SENECA RD FROM HESPERIA RD TO 0.2 M E/O HESPERIA RD FROM 0 TO 4 LANES

2020 $141

SAN BERNARDINO

4120084 LOCAL HIGHWAY

SENECA RD RICHARDSON RD CAUGHLIN RD WIDEN SENECA RD FROM RICHARDSON TO CAUGHLIN

2030 $3,028

SAN BERNARDINO

4120082 LOCAL HIGHWAY

SENECA RD US-395 DAISY WIDEN SENECA RD FROM US-395 TO DAISY

2030 $3,202

SAN BERNARDINO

4A01354 LOCAL HIGHWAY

SENECA RD US-395 TOPAZ WIDEN SENECA RD FROM US-395 TO TOPAZ FROM 0 TO 4 LANES

2030 $625

SAN BERNARDINO

4A04420 LOCAL HIGHWAY

SH 247 ABERDEEN LINN WIDEN WITHIN ROW TO ACCOMMODATE PASSING LANES

2018 $9,500

SAN BERNARDINO

4G0167 LOCAL HIGHWAY

SHADOW MT HELENDALE RD NTH GRADE SEPARATION BRIDGE OVER MOJAVE WIDEN TO 4 LANES

2018 $14,934

SAN BERNARDINO

4A01284A LOCAL HIGHWAY

SIERRA AVE I-15 LYTLE CREEK RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $679

SAN BERNARDINO

4A04122 LOCAL HIGHWAY

SIERRA AVE SAN BERNARDINO AVE

FOOTHILL BLVD WIDEN FROM 2 TO 3 LANES EACH DIR 2018 $19,600

SAN BERNARDINO

4A04123 LOCAL HIGHWAY

SIERRA AVE SLOVER AVE VALLEY BL WIDEN FROM 3 TO 4 LANES EACH DIR 2018 $1,120

SAN BERNARDINO

4A04125 LOCAL HIGHWAY

SIERRA AVE SUMMIT AVE I-15 WIDEN FROM 1 TO 3 LANES EACH DIR 2014 $7,000

SAN BERNARDINO

4A01284B LOCAL HIGHWAY

SIERRA AVE I-15 LYTLE CREEK RD WIDEN SIERRA AVE FROM I-15 TO LYTLE CREED RD FROM 3 TO 4 LANES

2030 $526

SAN BERNARDINO

4A07034 LOCAL HIGHWAY

SIERRA LAKES PKWY

CHERRY AVE ALMERIA SIERRA LAKES PKWY FROM CHERRY AVE TO ALMERIA AVE WIDEN FROM 2 TO 4 LANES

2018 $8,960

SAN BERNARDINO

4120137 LOCAL HIGHWAY

SIERRA LAKES PKWY

CHERRY AVE BEECH AVE WIDEN SIERRA LAKES PKWY FROM CHERRY AVE TO BEECH AVE FROM 2 TO 4 LANES

2035 $9,843

Page 395: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 393

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07026 LOCAL HIGHWAY

SITTING BULL RD APPLE VALLEY RD NAVAJO RD WIDEN SITTING BULL RD FROM APPLE VALLEY RD TO NAVAJO RD FROM 2 TO 4 LANES

2023 $10,800

SAN BERNARDINO

4120121 LOCAL HIGHWAY

SLOVER PEPPER AVE RIVERSIDE AVE WIDEN SLOVER FROM PEPPER AVE TO RIVERSIDE AVE FROM 2 TO 4 LANES

2030 $3,024

SAN BERNARDINO

4A01285 LOCAL HIGHWAY

SLOVER AV ALDER AV CACTUS AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,420

SAN BERNARDINO

4A01260 LOCAL HIGHWAY

SLOVER AV CACTUS AV RIVERSIDE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,348

SAN BERNARDINO

4A07259 LOCAL HIGHWAY

SLOVER AV TAMARIND E. CITY LIMITS SLOVER AVE FROM TAMARIND AVE TO E. CITY LIMITS WIDEN FROM 4 TO 6 LANES

2018 $840

SAN BERNARDINO

4A07075 LOCAL HIGHWAY

SMOKETREE RD TOPAZ RD AMARGOSA RD WIDEN SMOKETREE RD FROM TOPAZ RD TO AMARGOSA RD FROM 0 TO 4 LANES (INCLUDES WASH CROSSING)

2020 $4,532

SAN BERNARDINO

4A07103 LOCAL HIGHWAY

SO. HIGHLAND AV BASELINE CHERRY SO. HIGHLAND FROM BASELINE RD TO CHERRY AVE WIDEN FROM 0 LANES TO 4 LANES.

2020 $3,500

SAN BERNARDINO

4A07166 LOCAL HIGHWAY

SO. HIGHLAND AV SIERRA PALMETTO SO. HIGHLAND AVE FROM SIERRA AVE TO PALMETTO AVE WIDEN FROM 2 TO 4 LANES

2018 $2,100

SAN BERNARDINO

200804 LOCAL HIGHWAY

SOUTH ARCHIBALD SOUTH ARCHIBALD AVE. GRADE SEPARATION (AT MISSION BLVD) CONSTRUCT A HIGHWAY AND RR GRADE SEPARTION AT EXISTING AT-GRADE CROSSING SOUTH OF ARCHIBALD AND THE UPPR LA LINE-PROJECT TO BUILD NEW FLY-OVER BRIDGE FOR RR – WIDENING FROM 2-6 LANES 3 LANES IN EACH DIRECTION AND LEFT AND RIGHT TURN LANES;DRAINAGE IMPROVMENTS

2014 $57,932

SAN BERNARDINO

4FR04 LOCAL HIGHWAY

SOUTHERN CALIFORNIA LOGISTICS

AIRPORT RAIL PROJECT

AT SCLA AIRPORT TRACK AND INTERMODAL YARD IMPROVEMENTS (PHASES 1 THROUGH 4)

2030 $673,305

Page 396: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

394 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07043 LOCAL HIGHWAY

SPRING VALLEY PKWY

HUERTA RD DRIFTWOOD DR WIDEN SPRING VALLEY PKWY FROM HUERTA RD TO DRIFTWOOD DR FROM 2 TO 4 LANES

2020 $7,425

SAN BERNARDINO

4A07031 LOCAL HIGHWAY

STATE ST FOOTHILL BLVD I-215 WIDEN STATE ST FROM FOOTHILL BLVD TO I-215 FROM 2 TO 4 LANES

2035 $11,492

SAN BERNARDINO

4120191 LOCAL HIGHWAY

STATE ST HIGHLAND AVE N/O CAJON BLVD WIDEN STATE ST FROM HIGHLAND AVE TO N/O CAJON BLVD FROM 2 LANES TO 4 LANES

2035 $6,000

SAN BERNARDINO

200824 LOCAL HIGHWAY

STATE ST STATE STREET FROM ADAMS NORTH TO NOLAN/SHORT ST. (1.44 MILES) WIDEN FROM 2-4 LANES – GRADE SEPARATION

2012 $6,300

SAN BERNARDINO

4A07050 LOCAL HIGHWAY

STATE ST IN SAN BERNARDINO COUNTY

WIDEN TO ULTIMATE 2020 $6,000

SAN BERNARDINO

200801 LOCAL HIGHWAY

STEWART ST STEWART STREET WIDENING WIDEN FROM 2-4 LANES FROM ANDERSON TO CAMPUS ST.

2014 $650

SAN BERNARDINO

4A07359 LOCAL HIGHWAY

STODDARD WELLS RD

DANTE ST I-15 WIDEN STODDARD WELLS FROM DANTE ST TO OSBORNE RD, 0.56 MI. S/O I-15, FROM 2 TO 4 LANES

2020 $187

SAN BERNARDINO

4A07171 LOCAL HIGHWAY

STODDARD WELLS RD

LOS PADRES I-15 WIDEN STODDARD WELLS RD FROM LOS PADRES RD TO I-15 FROM 2 TO 4 LANES

2020 $2,025

SAN BERNARDINO

4A07167 LOCAL HIGHWAY

SUMMIT AVE CHERRY AV SAN SEVAINE SUMMIT AVE FROM CHERRY AVE TO SAN SEVAINE WIDEN FROM 2 LANES TO 4 LANES.

2018 $2,100

SAN BERNARDINO

4A07053 LOCAL HIGHWAY

SUMMIT VALLEY RD 1.88M N/O SH-138 N/O SH-138 2.18M WIDEN SUMMIT VALLEY RD FROM 1.88M N, SR-138 N 2.18M (HSP CL)

2018 $5,886

SAN BERNARDINO

4A07095 LOCAL HIGHWAY

SUMMIT VALLEY RD 4.31M N/O SH-138 N/O SH-138 1.20M WIDEN SUMMIT VALLEY RD FROM 4.31M N, SR-138 &#40;HSP CL&#41; N 1.20M &#40;HSP CL&#41;

2030 $4,173

SAN BERNARDINO

4A07117 LOCAL HIGHWAY

SUMMIT VALLEY RD 4.31M N/O SH-138 N/O SH-138 1.20M WIDEN SUMMIT VALLEY RD FROM 4.31M N, SR-138 (HSP CL) N 1.20M (HSP CL)

2018 $3,240

SAN BERNARDINO

4A07097 LOCAL HIGHWAY

SUMMIT VALLEY RD SH 138 N1.88 MILES TO RANCHERO RD WIDEN SUMMIT VALLEY RD FROM SR-138 TO RANCHERO RD FROM 2 TO 4 LANES

2035 $6,197

Page 397: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 395

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07013 LOCAL HIGHWAY

SUNBURST AVE SH62,N CRESTVIEW WIDEN EXISTING TRAFFIC LANES: ADJUST VERTICAL PROFILE SAFETY

2020 $15,000

SAN BERNARDINO

4120226 LOCAL HIGHWAY

THIRD AVE 0.25 M S/O NISQUALLI RD

NISQUALLI RD WIDEN THIRD AVE FROM .25 M S/O NISQUALLI RD TO NISQUALLI RD FROM 2 TO 4 LANES

2035 $2,012

SAN BERNARDINO

4120227 LOCAL HIGHWAY

THIRD AVE 575’ S/O NISQUALLI RD

SILICA DR WIDEN THIRD AVE FROM 575’ S/O NISQUALLI RD TO SILICA DR FROM 0 TO 4 LANES

2035 $220

SAN BERNARDINO

4120228 LOCAL HIGHWAY

THIRD AVE 600’ N/O BEAR VALLEY RD

BEAR VALLEY RD WIDEN THIRD AVE FROM 600’ N/O BEAR VALLEY RD TO BEAR VALLEY RD FROM 0 TO 4 LANES

2035 $82

SAN BERNARDINO

4A01018 LOCAL HIGHWAY

THUNDERBIRD RD RANCHERIAS RD CENTRAL RD WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $7,200

SAN BERNARDINO

4A07152 LOCAL HIGHWAY

TIPPECANOE MILL ST HARRIMAN WIDEN TIPPECANOE FROM MILL ST TO HARRIMAN FROM 4 TO 6 LANES

2012 $2,622

SAN BERNARDINO

4A07005 LOCAL HIGHWAY

TIPPECANOE AVE SAN BERNARDINO AVE

SANTA ANA RIVER WIDEN BRIDGE FROM 4 TO 6 LANES 2020 $21,600

SAN BERNARDINO

4C01002 LOCAL HIGHWAY

TONNER CANYON (FOUR CORNERS)

GRAND SR-57 NEW ARTERIAL CORRIDOR CONNECTING CHINO HILLS WITH SR-57 (LA/OR CO.) WITH 2 LANES EACH DIR, ACCESS TO SR-57 AT BREA CYN RD OR TONNER CYN RD, CONNECTION TO GRAND AVE AND EUCALYPTUS AVE, NO CONNECTION TO VALENCIA AVE

2030 $288,030

SAN BERNARDINO

4A07379 LOCAL HIGHWAY

TOPAZ RD 360’ N/O SENECA RD AT POWER LINE EASEMENT WIDEN TOPAZ RD FROM 360’ N/O SENECA RD TO AT POWERLINE EASEMENT FROM 0 TO 4 LANES

2020 $138

SAN BERNARDINO

4A07283 LOCAL HIGHWAY

TOPAZ RD EUCALYPTUS SMOKETREE RD WIDEN TOPAZ RD FROM EUCALYPTUS RD TO SMOKETREE RD FROM 0 TO 4 LANES

2020 $636

SAN BERNARDINO

4A07164 LOCAL HIGHWAY

TOPAZ RD HOPLAND LUNA RD WIDEN TOPAZ RD FROM HOPLAND ST TO LUNA ROAD FROM 0 TO 4 LANES

2020 $2,228

SAN BERNARDINO

4A01361 LOCAL HIGHWAY

TOPAZ RD SENECA RD PALMDALE RD WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,315

Page 398: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

396 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07228 LOCAL HIGHWAY

UNIVERSITY PKWY HALLMARK PKWY BNSF GRADE SEPARATION WIDEN UNIVERSITY PKWY FROM HALLMARK PKWY TO BNSF GRADE SEPARATION FROM 2 TO 4 LANES

2012 $1,200

SAN BERNARDINO

4A07039 LOCAL HIGHWAY

VALLEY CHERRY ALDER VALLEY BLVD FROM CHERRY TO ALDER WIDEN FROM 2 TO 4 LANES

2018 $7,840

SAN BERNARDINO

4A07272 LOCAL HIGHWAY

VALLEY BLVD ALMOND CHERRY VALLEY BLVD FROM ALMOND AVE TO CHERRY AVE WIDEN FROM 4 TO 6 LANES

2018 $700

SAN BERNARDINO

4A07284 LOCAL HIGHWAY

VALLEY BLVD CHERRY AVE HEMLOCK WIDEN VALLEY BLVD FROM CHERRY AVE TO HEMLOCK AVE FROM 5 TO 6 LANES

2020 $633

SAN BERNARDINO

4A07201 LOCAL HIGHWAY

VALLEY BLVD ETIWANDA AVE COMMERCE DR WIDEN VALLEY BLVD FROM ETIWANDA AVE TO COMMERCE DR FROM 5 TO 6 LANES

2020 $1,519

SAN BERNARDINO

4120138 LOCAL HIGHWAY

VALLEY BLVD POPLAR AVE ALDER AVE WIDEN VALLEY BLVD FROM SIERRA AVE TO ALDER AVE FROM 4 TO 6 LANES

2035 $2,419

SAN BERNARDINO

4A01261 LOCAL HIGHWAY

VALLEY BLVD SPRUCE AV SYCAMORE AV WIDEN FROM 1 TO 2 LANES EACH DIR 2018 $1,509

SAN BERNARDINO

4A01082 LOCAL HIGHWAY

VALLEY BLVD SYCAMORE AV MT. VERNON AV WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $4,015

SAN BERNARDINO

4120192 LOCAL HIGHWAY

VARIOUS LOCATIONS

VARIOUS ITS PROJECTS THROUGHOUT SAN BERNARDINO COUNTY

2035 $471,291

SAN BERNARDINO

4120193 LOCAL HIGHWAY

VARIOUS LOCATIONS

VARIOUS TRAFFIC SIGNAL PROJECTS THROUGHOUT SAN BERNARDINO COUNTY

2035 $51,992

SAN BERNARDINO

4120086 LOCAL HIGHWAY

VERBENA AIR EXPRESSWAY EL MIRAGE RD WIDEN VERBENA FROM AIR EXPRESSWAY TO EL MIRAGE

2035 $2,479

SAN BERNARDINO

4120085 LOCAL HIGHWAY

VERBENA CACTUS AIR EXPRESSWAY WIDEN VERBENA FROM CACTUS TO AIR EXPRESSWAY

2035 $3,140

SAN BERNARDINO

4120087 LOCAL HIGHWAY

VERBENA EL MIRAGE RD CALLEJA WIDEN VERBENA FROM EL MIRAGE TO CALLEJA

2035 $2,167

SAN BERNARDINO

4120151 LOCAL HIGHWAY

VICTORIA AVE EHS I-15 WIDEN VICTORIA AVE FROM EHS TO I-15 2014 $280

Page 399: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 397

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4G0105 LOCAL HIGHWAY

VINEYARD AV IN ONTARIO &#40;ALHAMBRA&#41; SAFETY UPGRADE &#40;LOW OPTION&#41;, GRADE SEPARATION &#40;HIGH OPTION&#41; WIDEN 4-6 LANES

2018 $55,633

SAN BERNARDINO

4A01222 LOCAL HIGHWAY

VINEYARD AVE FROM 4TH ST TO I-10 FROM 4 TO 6

LANES

4TH ST I-10 WIDEN VINEYARD AVE FROM 4TH ST TO I-10 FROM 4 TO 6 LANES

2030 $1,205

SAN BERNARDINO

4A04223 LOCAL HIGHWAY

VINEYARD AVE FROM RIVERSIDE

DR TO EDISON AVE FROM 2 TO 6

LANES

RIVERSIDE DR. EDISON AVE WIDEN VINEYARD AVE FROM RIVERSIDE DR TO EDISON AVE FROM 2 TO 6 LANES

2030 $5,850

SAN BERNARDINO

4120088 LOCAL HIGHWAY

VINTON AIR EXPRESSWAY EL MIRAGE RD WIDEN VINTON FROM AIR EXPRESSWAY TO EL MIRAGE

2020 $3,182

SAN BERNARDINO

4120089 LOCAL HIGHWAY

VINTON DESERT FLOWER OLEANDER WIDEN VINTON FROM DESERT FLOWER TO OLEANDER

2020 $2,488

SAN BERNARDINO

4120091 LOCAL HIGHWAY

VINTON EL MIRAGE RD COLUSA RD WIDEN VINTON FROM EL MIRAGE TO COLLUSA

2020 $2,488

SAN BERNARDINO

4120092 LOCAL HIGHWAY

VINTON MOJAVE DR AIR EXPRESSWAY WIDEN VINTON FROM MOJAVE TO AIR EXPRESSWAY

2020 $3,855

SAN BERNARDINO

4120090 LOCAL HIGHWAY

VINTON PALMDALE RD VICTOR WIDEN VINTON FROM PALMDALE TO VICTOR

2020 $1,199

SAN BERNARDINO

200837 LOCAL HIGHWAY

VISTA RD. VISTA ROAD GRADE SEPARATION-WIDEN 2-4 LANES AND CONSTRUCT GRADE SEPARATION

2014 $23,000

SAN BERNARDINO

4A07196 LOCAL HIGHWAY

W. VAN LEUVEN ST. EVANS ST. ORANGE GROVE ST. NEW ROAD, 1 LANES EACH DIR 2012 $1,600

SAN BERNARDINO

4A07029 LOCAL HIGHWAY

WAALEW RD CORWIN RD CENTRAL WIDEN WAALEW RD FROM CORWIN RD TO CENTRAL RD FROM 2 TO 4 LANES

2018 $10,000

SAN BERNARDINO

4A07235 LOCAL HIGHWAY

WABASH AV .30 M S/O SEVENTH ST

.13M N/O SEVENTH ST WIDEN WABASH AVE FROM .30 M S/O SEVENTH ST TO .13M N/O SEVENTH ST FROM 2 TO 4 LANES

2020 $1,138

Page 400: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

398 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07321 LOCAL HIGHWAY

WABASH AV 6TH AVE TO 5TH AVE FROM

5TH AVE WIDEN WABASH AVE FROM 6TH AVE TO 5TH AVE FROM 2 TO 4 LANES

2020 $734

SAN BERNARDINO

4A07253 LOCAL HIGHWAY

WABASH AV COLTON AVE SR 38 WIDEN WABASH AVE FROM COLTON AVE TO SR 38 FROM 2 TO 4 LANES

2020 $844

SAN BERNARDINO

4A07381 LOCAL HIGHWAY

WABASH AV REDLANDS CITY LIMITS

I-10 WIDEN WABASH AVE FROM REDLANDS CITY LIMITS TO I-10 FROM 2 TO 4 LANES

2020 $101

SAN BERNARDINO

4A07254 LOCAL HIGHWAY

WABASH AV SR-38 TO SAN BERNARDINO

SAN BERNARDINO WIDEN WABASH AVE FROM SR-38 TO SAN BERNARDINO AVE FROM 2 TO 4 LANES

2020 $1,224

SAN BERNARDINO

4A04224 LOCAL HIGHWAY

WALKER AVE FROM RIVERSIDE TO S.

CITY LIMIT

RIVERSIDE S. CITY LIMITS WIDEN WALKER AVE FROM RIVERSIDE TO S. CITY LIMIT

2030 $4,346

SAN BERNARDINO

4A07077 LOCAL HIGHWAY

WALNUT I-15 SAN SERVAINE WALNUT AVE FROM I-15 TO SAN SERVAINE FROM 2 TO 4 LANES

2018 $4,480

SAN BERNARDINO

4A04137 LOCAL HIGHWAY

WALNUT AV ALMERIA SIERRA WIDEN FROM 1 TO 2 LANES EACH DIR 2014 $5,880

SAN BERNARDINO

4A07194 LOCAL HIGHWAY

WASHINGTON ST BARTON RD I-215 WIDEN WASHINGTON FROM BARTON RD TO I-215 FROM 4 TO 6 LANES

2018 $1,610

SAN BERNARDINO

4120123 LOCAL HIGHWAY

WASHINGTON ST AQUEDUCT LA CADENA DR WIDEN WASHINGTON ST TO FROM AQUEDUCT TO LA CADENA DR FROM 0 TO 2 LANES

2030 $4,136

SAN BERNARDINO

4120122 LOCAL HIGHWAY

WASHINGTON ST WATERMAN I-215 WIDEN WASHINGTON ST FROM WATERMAN TO I-215 FROM 4 TO 6 LANES

2030 $5,640

SAN BERNARDINO

4A01292 LOCAL HIGHWAY

WATERMAN AVE 5TH ST BASELINE AVE WIDEN FROM 2 TO 3 LANES EACH DIR 2030 $6,912

SAN BERNARDINO

4A07003 LOCAL HIGHWAY

WATERMAN AV/I-10 HOSPITALITY LANE REDLANDS BLVD REPLACE I-10 BRIDGE TO WIDEN WATERMAN AVE FROM 4 TO 6 LANES

2030 $30,000

SAN BERNARDINO

4A01376A LOCAL HIGHWAY

WILDWOOD CANYON RD

CALIMESA BLVD COLORADO ST WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $1,359

SAN BERNARDINO

4A01376B LOCAL HIGHWAY

WILDWOOD CANYON RD

COLORADO ST CANYON DR WIDEN FROM 1 TO 2 LANES EACH DIR 2020 $4,785

Page 401: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 399

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

SAN BERNARDINO

4A07022 LOCAL HIGHWAY

WILDWOOD CYN RD OUTER I-10 CALIMESA BLVD NEW RD WIDEN WILDWOOD CYN RD FROMOUTER I-10 ST TO CALIMESA BLVD FROM 2 LANES TO 4 LANES.

2020 $11,905

SAN BERNARDINO

4120170 LOCAL HIGHWAY

WILSON AVE EAST AVE WARDMAN/BULLOCH WIDEN WILSON AVE FROM EAST AVE TO WARDMAN/BULLOCH FROM 0 TO 4 LANES

2030 $4,532

SAN BERNARDINO

4120171 LOCAL HIGHWAY

WILSON AVE MILLIKEN DAY CREEK BLVD WIDEN WILSON AVE FROM MILLIKEN TO DAY CREEK BLVD FROM 0 TO 4 LANES

2030 $5,747

SAN BERNARDINO

4A07051 LOCAL HIGHWAY

WILSON RANCH ROAD

DUNCAN ROAD PALMDALE PAVE DIRT ROAD, 1 LANE EACH DIR 2020 $6,000

SAN BERNARDINO

4A07089 LOCAL HIGHWAY

YATES RD YATES RD. FROM .24 MILE NORTH OF CHINQUAPIN TO .02 MILES SOUTH OF FORTUNA (1.5 MILES) -WIDEN 2-4 LANES

2014 $4,325

SAN BERNARDINO

4120097 LOCAL HIGHWAY

YUCA LOMA RD WEST TOWN LIMITS SR-18 WIDEN YUCA LOMA RD FROM WEST TOWN LIMITS TO SR-18 FROM 2 TO 4 LANES

2030 $8,108

SAN BERNARDINO

4A04418 LOCAL HIGHWAY

YUCAIPA BLVD I-10 BRYANT ST WIDEN FROM 2 TO 3 LANES EACH DIR 2020 $15,642

SAN BERNARDINO

4120098 LOCAL HIGHWAY

YUCCA LOMA RD (MOJAVE BR)

YATES RD W. TOWN LIMITS WIDEN YUCCA LOMA RD (MOJAVE BR) FROM YATES RD TO W TOWN LIMITS FROM 0 TO 4 LANES

2030 $43,095

SAN BERNARDINO

4A01382 LOCAL HIGHWAY

38 SR-38 W. CITY LIMITS E. CITY LIMITS WIDEN SR-38 FROM W. CITY LIMITS TO E. CITY LIMITS FROM 2 TO 4 LANES

2030 $8,967

SAN BERNARDINO

4120093 LOCAL HIGHWAY

395 HIGHWAY 395 PALMDALE RD AIR EXPRESSWAY WIDEN HIGHWAY 395 FROM PALMDALE TO AIR EXPRESSWAY

2035 $31,308

SAN BERNARDINO

4120094 LOCAL HIGHWAY

395 HIGHWAY 395 AIR EXPRESSWAY CALLEJA WIDEN HIGHWAY 395 FROM AIR EXPRESSWAY TO CALLEJA

2035 $23,001

VENTURA VEN030612 TRANSIT ADA SERVICE – CAPITAL LEASE & OPERATING COST

2014 $1,303

VENTURA VEN011219 TRANSIT BUS WASHER REPLACEMENT 2011 $484

VENTURA VEN011214 TRANSIT DBE GOAL EVALUATION/SETTING CONSULTING SERVICE

2014 $58

Page 402: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

400 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN055401 TRANSIT EXPAND TRANSIT MAINTENANCE FACILITY TO ACCOMMODATE SYSTEM EXPANSION

2011 $1,907

VENTURA VEN020902 TRANSIT FINANCIAL MANAGEMENT SYSTEM 2014 $64

VENTURA VEN020901 TRANSIT FUEL TANK REMEDIATION – MTBE PROJECT

2011 $96

VENTURA VEN030608 TRANSIT GROUPED PROJ FOR RECONSTR OR RENOVATION TRANSIT BUILDNGS/STRUCTURES & REHAB TRANSIT VEH – MOORPARK BUSES & TRANSIT CENTER SCOPE: PROJ ARE CONSISTENT W/H 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT – TRANS VEH REHAB & RECONST OR RENOV TRANSIT BUILDNGS/STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINT FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON-CAPAC-ITY INCREASING)

2016 $1,264

VENTURA VEN051005 TRANSIT GROUPED PROJECTS FOR OPER ASST, PLNG, PUR OF REPL VEH OR MIN EXP – ELDERLY & DISABLED NEW FREEDOMS INITIATIVE (PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126, 127,128,EXEMPT TABLES 2&3- PURCHASE OF NEW BUSES TO REPLACE EXIST VEH OR MINOR EXP; OPER ASST TO TRANSIT AGENCIES; PLNG ACT PURS TITLS 23&49 USC)

2014 $2,434

VENTURA VEN54095 TRANSIT GROUPED PROJECTS FOR OPERATING ASSISTANCE TO PARATRANSIT AGENCIES – ADA PARATRANSIT CAPITAL SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

2014 $7,633

Page 403: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 401

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN050401 TRANSIT GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – CAMARILLO AREA TRANSIT SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

2014 $5,300

VENTURA VEN010409 TRANSIT GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – EAST COUNTY ADA PARATRANSIT SERVICE SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT-EGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

2014

VENTURA VEN34206 TRANSIT GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – FIXED ROUTE SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT-EGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

2012 $14,046

VENTURA VEN34253 TRANSIT GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES – OJAI TROLLEY SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

2014

VENTURA VEN981107 TRANSIT GROUPED PROJECTS FOR OPERATING ASSISTANCE TO TRANSIT AGENCIES ADA SERVICE – PARATRANSIT CAPITAL SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – OPERATING ASSISTANCE TO TRANSIT AGENCIES

2012 $5,103

Page 404: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

402 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN057404 TRANSIT GROUPED PROJECTS FOR PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES – REPLACE MAINTENANCE EQUIPMENT SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE OF OFFICE, SHOP, AND OPERATING EQUIPMENT FOR EXISTING FACILITIES

2015 $505

VENTURA VEN061000 TRANSIT GROUPED PROJECTS FOR RECONSTRUCTION OR RENOVATION OF TRANSIT BUILDINGS AND STRUCTURES – CAMARILLO RAIL STATION MAINT SCOPE: PROJECTS CONSISTENT W/ 40 CFR PART 93.126 EXEMPT TABLES 2 & TABLE 3 CATEGORIES – RECONSTR OR RENOVATION OF TRANSIT BUILDINGS & STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINTENANCE FACILITIES, STATIONS, TERMINALS, & ANCILLARY STRUCTURES).( NON-CAPAC-ITY INCREASING)

2014 $600

VENTURA VEN030611 TRANSIT GROUPED PROJECTS FOR RECONSTRUCTION OR RENOVATION OF TRANSIT BUILDINGS/STRUCTURES & REHABILIATION OF TRANSIT VEHICLES SCOPE: PROJECTS ARE CONSISTENT W/H 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CAT – TRANS VEH REHAB & RECONST OR RENOV TRANSIT BUILDNGS/STRUCTURES (E.G., RAIL OR BUS BUILDINGS, STORAGE & MAINT FACILITIES, STATIONS, TERMI-NALS, & ANCILLARY STRUCTURES).( NON-CAPACITY INCREASING)

2014 $2,378

Page 405: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 403

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN64003 TRANSIT GROUPED PROJECTS FOR REHABILITATION OF TRANSIT VEHICLES – FIXED ROUTE & ADA SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OF TRANSIT VEHICLES (IN PM10AND PM2.5NONATTAINMENT OR MAINTE-NANCE AREAS, SUCH PROJECTS ARE EXEMPT ONLY IF THEY ARE IN COMPLI-ANCE WITH CONTROL MEASURES IN THE APPLICABLE IMPLEMENTATION PLAN)

2014 $14,609

VENTURA VEN981118 TRANSIT GROUPED PROJECTS FOR REHABILITATION OF TRANSIT VEHICLES SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – REHABILITATION OF TRANSIT VEHICLES (IN PM10AND PM2.5NONATTAINMENT OR MAINTENANCE AREAS, SUCH PROJECTS ARE EXEMPT ONLY IF THEY ARE IN COMPLIANCE WITH CONTROL MEASURES IN THE APPLICABLE IMPLEMENTATION PLAN)

2012 $3,077

VENTURA VEN059401 TRANSIT GROUPED PROJECTS LISTING FOR PURCHASE/REHAB OF OPERATING EQUIP – VENTURA COUNTY SMARTCARD SYSTEM MAINTENANCE, REHABILITATION & UPGRADE INCLUDING BUS FLEET CHANGES (DEINSTALLS AND INSTALLS) SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES – PURCHASE/REHAB OF OPERATING EQUIPMENT FOR VEHICLES (E.G., RADIOS, FAREBOXES, LIFTS, ETC.)

2014 $3,542

Page 406: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

404 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN990609 TRANSIT GRPD PROJ REHAB/RECON TRACK STRUCT, TRACK, TRACKBED IN EXT ROW; RECON/RENOV TRANS BLGS/STRUCT;VEH;POWER/SIGNAL COMM EQ SCOPE: PROJ CONS W 40 CFR PART 93.126 EXMPT TABLES 2&3 CAT- RECON/RENOV TRANS BLD-INGS/STRUCT;VEH;PWR/SGIN/COMM SYS;REHAB/RENOV TRK STRUC,TRK,TRKBED IN EXT ROW (EG, RAIL/BUS BLDNGS,STORE/MAIN FAC, STATIONS, TERMINALS, & ANCILL STRUCT).NON-CAP INCR.TDCRED=$1,991 10/11, $1,384 11/12

2016 $47,947

VENTURA VEN54036 TRANSIT IN VENTURA COUNTY VENTURA INTERCITY SERVICE TRANSIT AUTHORITY (VISTA) CAPITAL LEASE (INCLUDES PURCHASE OF 40 PARTICULATE TRAPS)

2014 $29,551

VENTURA VEN54057 TRANSIT MARKETING & PASSENGER AWARENESS ACTIVITIES (PLANNING: PROGRAM SUPPORT & ADM)

2014 $2,041

VENTURA VEN030609 TRANSIT METROLINK STATION SECURITY WALL (TRANSIT ENHANCEMENT)

2011 $79

VENTURA VEN057414 TRANSIT MIS EQUIPMENT REPLACE/UPGRADE 2014 $114

VENTURA VEN040405 TRANSIT NEXT BUS UPGRADE FOR REAL-TIME BUS STOP SIGNAGE (TRANSIT ENHANCEMENTS)

2014 $592

VENTURA VEN055410 TRANSIT ONE EXPANSION PARATRANSIT VAN 2012 $121

VENTURA VEN055413 TRANSIT ONE EXPANSION PARATRANSIT VAN 2013 $128

VENTURA VEN011221 TRANSIT PAINT 4 CNG BUSES 2011 $35

VENTURA VEN54056 TRANSIT PLANNING/IMPLEMENTATION OF COORDINATED PARATRANSIT

2014 $786

VENTURA VEN031218 TRANSIT REALIGN MOORPARK RAIL STATION SOUTH PARKING LOT ENTRANCE

2014 $932

Page 407: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 405

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN031242 TRANSIT REPLACE GARAGE CNG BUS HOISTS (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDITS OF $13.)

2012 $113

VENTURA VEN051207 TRANSIT REPLACE TWENTY-EIGHT (28) COMPUTERS

2015 $63

VENTURA VEN031241 TRANSIT SAFETY AND SECURITY PLANNING AND TRAINING

2011 $10

VENTURA VEN010406 TRANSIT SMART CARD DATA MANAGEMENT 2014 $1,121

VENTURA VEN055412 TRANSIT THREE (3) REPLACEMENT PARATRANSIT VANS (CMAQ INCLUDES TRANSPORTATION DEVELOPMENT CREDIT OF $36 IN FY 10/11.)

2012 $317

VENTURA VEN011223 TRANSIT THREE (3) REPLACEMENT UTILITY VANS 2011 $105

VENTURA VEN055409 TRANSIT THREE REPLACEMENT PARATRANSIT VANS – CARRYOVER FROM PRIOR YEAR

2010 $302

VENTURA VEN051203 TRANSIT TITLE VI SURVEYS 2013 $50

VENTURA VEN54069 TRANSIT TRANSIT INFORMATION CENTER 2014 $1,581

VENTURA VEN031244 TRANSIT TRANSIT MARKETING 2011 $30

VENTURA VEN54070 TRANSIT TRANSIT MARKETING (CMAQ INCLUDES TRANSP DEVEL CREDITS OF $57 IN 10/11.)

2014 $2,509

VENTURA VEN990602 TRANSIT TRANSIT PLANNING & PROGRAMMING (PLANNING: PROGRAM SUPPORT & ADM)

2014 $1,935

VENTURA VEN34348 TRANSIT TRANSIT PROGRAMMING & PLANNING 2014 $2,241

VENTURA VEN061006 TRANSIT BUS BENCH REPLACEMENT 2011 $10

VENTURA VEN070203 TRANSIT CAMARILLO METROLINK STATION IMPROVEMENTS INCLUDING PLATFORM AND PEDESTRIAN CIRCULATION, PASSENGER STATION BUILDING/RESTROOMS, PLUS RELATED CONSTRUCTION OF NEW SIDING BETWEEN CAMARILLO AND OXNARD.

2012 $4,424

Page 408: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

406 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN090107 TRANSIT EIGHT (8) CNG-FUELED 25-FOOT TO 40-FOOT BUSES FOR EXPANSION. BUSES WILL BE USED ON ALL GOLD COAST LINES TO REDUCE SPARE RATIO AND INCREASE FREQUENCY WHERE WARRANTED BY DEMAND.

2012 $3,608

VENTURA VEN031246 TRANSIT GFI FAREBOX REPLACEMENT 2010 $288

VENTURA VEN991203 TRANSIT INSTALLATION OF ABOVE GROUND HOIST SYSTEM

2010 $175

VENTURA VEN090201 TRANSIT MARKET/VALENTINE INDUSTRIAL PARK SHUTTLE SERVICE ON MARKET STREET, VALENTINE ROAD, AND TELEPHONE ROAD

2012 $866

VENTURA VEN061007 TRANSIT MILLS ROAD AT MAPLE ADJACENT TO PACIFIC VIEW MALL – BUS TURNOUTS WITH BUS SHELTERS, AND OTHER BUS STOP AMENITIES

2011 $359

VENTURA 5TL0701 TRANSIT MULTI-AGENCY TRANSPORTATION / VEHICLE FACILITY (INCLUDING OJAI TROLLEY MAINTENANCE FACILITY)

2012 $312

VENTURA VEN031203 TRANSIT ONE (1) CNG PARATRANSIT VAN FOR EXPANSION

2012 $100

VENTURA VEN061008 TRANSIT REPLACE MAINTENANCE MIS EQUIPMENT

2011 $500

VENTURA VEN020903 TRANSIT REPLACE TRANSIT RADIO SYSTEM 2010 $278

VENTURA VEN54149 TRANSIT TWO-WAY RADIO SYSTEM REPLACEMENT 2010 $125

VENTURA VEN54115 TRANSIT VISTA BUS SYSTEM PLANNING 2014 $1,679

VENTURA 5TL0703 TRANSIT BUS EXPANSIONS (INCLUDES

PARATRANSIT)

COUNTYWIDE BUS EXPANSIONS (INCLUDES PARATRANSIT)

2035 $41,571

Page 409: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 407

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA 5TR0701 TRANSIT BUS TRANSIT MULTI-AGENCY TRANSPORTATION FACILITY. A LOCATION HAS NOT BEEN DETERMINED. THE FACILITY WILL HAVE PARKING FOR UP TO 40 BUSES AND PARKING FOR 30 EMPLOYEES; LPG, CNG, DIESEL AND GASOLINE FUELING FACILITIES; ADMINISTRATIVE OFFICES INCLUDING TRAINING ROOMS; CREW BUILDING AND/OR BREAK ROOM; AND A FIVE-BAY MAINTENANCE FACILITY. NO PUBLIC PARKING.

2012 $3,500

VENTURA 5TL0706 TRANSIT FACILITY IMPROVEMENTS

COUNTYWIDE NEW TRANSIT FACILITIES & IMPROVEMENTS

2035 $27,714

VENTURA 5CR104 TRANSIT METROLINK COMMUTER RAIL

IN VENTURA COUNTY METROLINK COMMUTER RAIL SERVICE EXPANSION

2035 $32,677

VENTURA 5TL0707 TRANSIT MISC. ITEMS AND AMENITIES, ENHANCEMENTS

COUNTYWIDE MISC. TRANSIT ITEMS 2035 $12,500

VENTURA 5TC0701 TRANSIT MULTIMODAL TRANSPORTATION

CENTER

IN DOWNTOWN VENTURA

SERVICE CENTER, PARKING, LAYOVER, AND RETAIL SPACE FOR RAIL, BUS, AND BICYCLE COMMUTERS.

2014 $50,000

VENTURA 5TL0702 TRANSIT PLANNING & ADMINISTRATION

TRANSIT PLANNING & ADMINISTRATION 2035 $41,667

VENTURA 5TL04 TRANSIT TRANSIT SERVICE EXPANSION

COUNTYWIDE COUNTYWIDE TRANSIT SERVICE EXPANSION

2035 $27,231

VENTURA 5ITS04 STATE HIGHWAY

ITS COUNTYWIDE MISC. ITS PROJECT IMPLEMENTATION 2035 $73,905

VENTURA 5O0702 STATE HIGHWAY

RETROFIT SOUNDWALL

PROGRAM

COUNTYWIDE RETROFIT SOUNDWALL PROGRAM 2035 $13,857

Page 410: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

408 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN051213 STATE HIGHWAY

23 IN MOORPARK RTE 23 MOORPARK AVE FROM THIRD ST TO CASEY RD WIDEN FROM 1 LANE IN EACH DIRECTION TO 1 LANE NB AND 2 LANES SB. REALIGN FIRST ST/POINDEXTER INTERSECTION AND UPGRADE RAIL CROSSING.

2014 $2,095

VENTURA 5A0706 STATE HIGHWAY

33 SR 33 SR 33 CUYAMA RD ROUNDABOUT 2014 $460

VENTURA 5A0705 STATE HIGHWAY

33 SR 33 SR 33 SR 150 AT “Y” ROUNDABOUT 2020 $851

VENTURA 5A0701 STATE HIGHWAY

33 SR-33 AT STANLEY AVE NEW TWO-LANE FREEWAY BRIDGE FOR SB TRAFFIC

2012 $9,000

VENTURA 5A0704 STATE HIGHWAY

33 SR33/SR150 VARIOUS LOCATIONS VARIOUS MINOR SPOT IMPROVEMENTS TO REDUCE CONGESTION ON SR 33 AND 150 IN OJAI VALLEY AND NEAR OJAI

2025 $1,900

VENTURA VEN040401 STATE HIGHWAY

34 IN OXNARD AT RICE AVE. RAILROAD GRADE SEPARATION

2017 $12,327

VENTURA VEN050404 STATE HIGHWAY

101 AT CENTRAL AVE – LANDSCAPING ENHANCEMENTS

2014 $600

VENTURA VEN051210 STATE HIGHWAY

101 IN CAMARILLO RECONFIGURE CENTRAL AVE / ROUTE 101 INTERCHANGE (INCLUDES CENTRAL AVE BRIDGE WIDENING FROM 1 TO 2 LANES EACH DIRECTION)

2018 $37,861

VENTURA VEN031226 STATE HIGHWAY

101 IN CAMARILLO ROUTE 101 AT PLEASANT VALLEY ROAD IMPROVE INTERSECTION WITH SOUTHBOUND RAMPS – WIDEN ONRAMP ENTRANCE FROM 1 TO 2 LANES AND ADD TURN LANES

2018 $1,053

Page 411: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 409

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN051006 STATE HIGHWAY

101 IN OXNARD AT DEL NORTE BLVD – IMPROVE INTERCHANGE, WIDEN DEL NORTE BRIDGE OVER 101 (FROM VENTURA BLVD TO RTE 101 SB RAMPS) FROM 2 TO 4 LANES PLUS LEFT-TURN LANE. ADD NB LOOP ONRAMPS AND REALIGN AND IMPROVE OTHER RAMPS.

2018 $56,706

VENTURA 343 STATE HIGHWAY

101 IN OXNARD AT RICE AVE (SANTA CLARA) RECONSTRUCT INTERCHANGE (T21-#664) (SAFETEA-LU #1565) (SAFETEA-LU #2639 AND ‘TIP’) (TCSP – 2010 APPROP EARMARK)

2012 $83,997

VENTURA VEN053402 STATE HIGHWAY

101 IN OXNARD LANDSCAPING/IRRIGATION ENHANCEMENTS SOUTH SIDE OF ROUTE 101 AT DEL NORTE – REGIONAL STP INCLUDES $9 OF TOLL CREDITS FOR FY 10/11 PE

2014 $694

VENTURA VEN011205 STATE HIGHWAY

101 IN THOUSAND OAKS – IMPROVEMENTS AT VAR LOCATIONS LA CNTY LINE-MOORPARK RD: CONV AUX LANES TO MF LANES, ADD 1 LANE EACH DIRECTION BY SHIFTING CL NORTHWARDS & WIDENING ON NB SIDE, REALIGN & WIDEN RAMPS, CONSTR SOUNDWALLS (EA 19521, 19522), WIDEN 3 BRIDGES ON NORTHSIDE (HAMPSHIRE UC, CONEJO SCHOOL UC, & MOORPARK UC); IMPROVE 101/23 CONNECTORS.(STP=FY 2010 APPROPS EARMARK)(INCL RT 23 PM 3.3/3.8)

2018 $16,330

Page 412: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

410 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN070201 STATE HIGHWAY

101 NEAR MUSSEL SHOALS ADD 1 HOV LANE EACH DIR FROM MOBIL PIER ROAD UC TO S/O CASITAS PASS RD IN SANTA BARBARA CO. (PM R 39.8 TO 2.2). HOV LANES ARE PROPOSED TO BE PART-TIME (AM & PM PEAK PERIODS) ONLY. EXTEND ON/OFF-LANES AT MUSSEL SHOALS & LA CONCHITA FOR BETTER ACCEL AND DECEL; KEEP AS SINGLE LANES. CLOSE EXISTING 3 MEDIAN OPENINGS LOCATED NEAR LA CONCHITA AND MUSSEL SHOALS AND TANK FARM.

2014 $87,760

VENTURA VEN010202 STATE HIGHWAY

101 RECONFIGURE N/B CALIFORNIA ST OFFRAMP (RECONFIGURE RAMP TO TERMINATE AT OAKS ST INSTEAD OF THE CURRENT CALIFORNIA ST LOCATION)

2014 $24,720

VENTURA VEN056406-VEN110301

STATE HIGHWAY

101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PH 2 INCLUDING WENDY DRIVE BRIDGE SOUTHBOUND WIDENING ACROSS ROUTE 101; SB OFF-RAMP IMPROVEMENT TO WIDEN FROM 1 TO 2 LANES AT WENDY DRIVE INTERSECTION TO PROVIDE TURN LANE (RAMP TO REMAIN 1 LANE EXITING FREEWAY) TOLL CREDIT = $88 FOR CON SPLIT FROM VEN056406

2014 $6,300

VENTURA VEN056406-VEN110302

STATE HIGHWAY

101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PH 3 IMPROVE SB ONRAMP (SPLIT FROM VEN056406)

2014 $3,587

Page 413: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 411

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN056406 STATE HIGHWAY

101 ROUTE 101 AT WENDY INTERCHANGE IMPROVEMENTS PHASE I INCLUDING WENDY DRIV BRIDGE NB WIDENING ACROSS ROUTE 101; NB RAMP IMPROVEMENTS; INTERSECTION IMPROVEMENTS; SIGNAL MOD (OTHER PHASES SPLIT TO VEN110301 & VEN110302.) TOLL CREDIT = $77 FOR CON

2014 $6,271

VENTURA VEN54020 STATE HIGHWAY

101 IN CAMARILLO CONSTRUCT AIRPORT NORTH (SPRINGVILLE) INTERCHANGE (CONNECTING FUTURE EXTENSIONS OF VERDULERA ST & PONDEROSA DR) INTERSECTING US 101

2012 $40,000

VENTURA 5M0104 STATE HIGHWAY

101 SR-101 AT LA CONCHITA EXTEND ACCELERATION AND DECELERA-TION LANES; AND CLOSE THREE MEDIAN CROSSINGS NEAR LA CONCHITA.

2014 $12,000

VENTURA VEN34089 STATE HIGHWAY

118 IN MOORPARK L.A. AVE FROM ROUTE 23 (MOORPARK AVE) TO E/O SPRING CONSTRUCT SIDEWALKS, REALIGN ROADWAY AND WIDEN FROM 4 TO 6 LANES

2012 $1,158

VENTURA 12020 STATE HIGHWAY

118 IN MOORPARK LOS ANGELES AVE WIDEN FROM 4 TO 6 LANES BETWEEN MAUREEN AND LETA YANCY

2012 $950

VENTURA VEN051003 STATE HIGHWAY

118 IN SIMI VALLEY LANDSCAPE ENHANCEMENTS FROM WESTERN CITY LIMIT TO EASTERN CITY LIMIT.

2011 $1,400

VENTURA 6566 STATE HIGHWAY

118 NEAR SIMI VALLEY AT ALAMOS CYN RD ADD RAMPS

2018 $2,560

Page 414: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

412 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN071106 STATE HIGHWAY

118 IN SIM VLY WIDEN RTE 118 WB LA CONTY LN TO TAPO CYN FR 3 TO 4 LANES (TAPO CYN TO KUEHNER) AND FR 4 TO 5 LANES (KUEHNER TO COUNTY LN); WIDEN EB TAPO CYN TO TAPO FR 3 TO 4 LANES; WIDEN EB KUEHNER TO LA CNTY LINE FR 4 TO 5 LAN

2012 $29,717

VENTURA 5120001 STATE HIGHWAY

118 RT 23 (NEW LA AVE)

TAPO CYN RD ADD ONE LANE EA DIR FROM RT 23 (NEW LA AVE) TO TAPO CYN RD (PEND-ING ENVIRONMENTAL CLEARANCE) (EA 22550, PPNO 3002)

2018 $506,285

VENTURA 5A0703 STATE HIGHWAY

118 SR-118 AT COLLINS DRIVE INTERCHANGE AND SIGNAL IMPROVEMENT. WIDEN W/B OFF-RAMP TO ADD A FREE RIGHT- TURN LANE AND SIGNAL MODIFICATION.

2011 $1,800

VENTURA 5OM0701 STATE HIGHWAY

118 SR-118 JCN 23 & 34 IN MOORPARK

CONSTRUCT NEW WEIGH STATION 2014 $19,800

VENTURA 5M0801 STATE HIGHWAY

118 VEN-118 & VEN-34 10.72 16.80 11.80 17.66 WIDEN INTERSENTION, ADD TURN LANES, REALIGN DONLON RD (COUNTY PORTION ONLY) OR CONSTRUCT A NEW ALIGNMENT SOMIS BYPASS (PE FUNDING ONLY)

2012 $4,300

VENTURA VEN54187 STATE HIGHWAY

999 2% FOR PLANNING, PROGRAMMING, & MONITORING

2015 $2,395

VENTURA VEN990310 LOCAL HIGHWAY

1000’ E. OF RTE 126/CTR ST/RANCHO CAMULOS PIRU CRK BRIDGE (PHASE I & IV) FENCING RE-LAY TRK, INSTALL PLATFRM @ RANCHO CAMULOS (VEN070101) , BIKE/PED PATH FROM 0.75 MILE WEST OF RANCHO CAMULOS TO RANCHO CAMULOS. (BIKE/PED PATH ALSO IN VEN090504.)

2012 $6,000

VENTURA VEN050402 LOCAL HIGHWAY

ADOLFO ROAD EASTBOUND AT SANTA ROSA ROAD – ADD DUAL LEFT AND RIGHT TURN LANES (TOLL CREDITS = $135 FOR FY 10/11 CON)

2011 $1,177

Page 415: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 413

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN54164 LOCAL HIGHWAY

BICYCLE & PEDESTRIAN TRAIL EXTENSION: FOX CYN BARRANCA FROM RT 150 TO OJAI VALLEY TRAIL

2011 $148

VENTURA VEN990319 LOCAL HIGHWAY

CALIFORNIA ST BRIDGE OVER RT 101 PEDESTRIAN ENHANCEMENTS

2012 $1,671

VENTURA VEN050403 LOCAL HIGHWAY

CALLEGUAS BIKE PATH – CONSTRUCT CLASS I BIKE PATH FOR 0.7 MILES FROM ADOLFO ROAD TO THE ROUTE 101 FREEWAY, WITH CONNECTION TO NEW TRAIL AT VILLAGE AT THE PARK (PHASE II). (CMAQ INCLUDES $191 IN TOLL CREDITS FOR 11/12 CONSTRUCTION.)

2011 $2,083

VENTURA VEN053403 LOCAL HIGHWAY

EAST VENTURA BLVD FROM NYLAND AVE TO EAST OF ALMOND DRIVE – LANDSCAPE ENHANCEMENT, PEDESTRIAN AND BICYCLE FACILITIES, DRAINAGE IMPROVEMENT AND PAVEMENT REHABILITATION

2013 $3,100

VENTURA VENLS07 LOCAL HIGHWAY

GROUPED PROJECTS FOR BRIDGE REHABILITATION AND RECONSTRUCTION – HBP PROGRAM SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – WIDENING NARROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADDI-TIONAL TRAVEL LANES)

2016 $9,358

Page 416: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

414 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN54032 LOCAL HIGHWAY

GROUPED PROJECTS FOR PAVEMNT RESURFACING AND/OR REHABILITATION – LOCAL STREETS & ROADS SCOPE: PROJECTS ARE CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 CATEGORIES – PAVEMENT RESURFACING AND/OR REHABILITATION, EMERGENCY RELIEF (23 U.S.C. 125), WIDENING NAR-ROW PAVEMENTS OR RECONSTRUCTING BRIDGES (NO ADD TRAV LANES) TOLL CRED FOR CON FY11=160, FY12=87, FY13=148, FY14=217.

2014 $29,867

VENTURA VEN056407 LOCAL HIGHWAY

HILLCREST DRIVE FROM TELLER ROAD TO CONEJO BLVD – CLASS II BIKE LANES

2011 $284

VENTURA VEN54019 LOCAL HIGHWAY

IN CAMARILLO ADOLFO RD EXTENSION EXTEND ROAD EASTERLY TO CAMARILLO SPRINGS RD/US 101 (TWO-LANE UNDIVIDED ROAD)

2018 $11,358

VENTURA VEN34094 LOCAL HIGHWAY

IN OXNARD HUENEME RD SAVIERS TO ARCTURUS WIDEN AND CONSTRUCT FROM 2 TO 4 LANES (SAFETEA-LU PROJECT #2639 & ‘TIP’)

2012 $3,616

VENTURA VEN051211 LOCAL HIGHWAY

LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES

2018 $4,417

VENTURA VEN040501 LOCAL HIGHWAY

NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS – CON PHASE (PE & ROW IN 07-VEN54122) – INCL FINANCE COST

2012 $50,625

VENTURA VEN010203 LOCAL HIGHWAY

OJAI VALLEY BIKE TRAIL EXTENSION/FULTON ST EXTENSION (STP INCLUDES TOLL CREDITS OF $54 FOR FY 2010/11 CON.)

2011 $611

Page 417: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 415

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN990317 LOCAL HIGHWAY

OXNARD BLVD 5TH/VINEYARD & ON 5TH ST (RT 34) OXNARD BLVD/ROSE AVE CONSTRUCT NEW BICYCLE & PEDESTRIAN FACILITIES 1.5 MILES IN LENGTH

2012 $4,589

VENTURA VEN93017 LOCAL HIGHWAY

REGIONAL RIDESHARE PROGRAM FOR 10/11, 11/12, 12/13, 13/14, 14/15, & 15/16

2015 $4,160

VENTURA VEN051401 LOCAL HIGHWAY

ROUTE 126 AND SANTA PAULA BRANCH RAILROAD AT POLE CREEK – CLASS I BIKE PATH UNDERCROSSING 0.2 MILES IN LENGTH (CMAQ INCLUDES $8 TOLL CREDITS FOR PE.)

2012 $1,395

VENTURA VEN031229 LOCAL HIGHWAY

ROUTE 126 BIKE PATH – PHASE II BIKE PATH (CLASS I) CROSSING THE HARMON BARRANCA -(INCLUDES $221 OF CMAQ PROVIDING MATCH THROUGH TOLL CREDITS)

2011 $1,930

VENTURA VEN040502 LOCAL HIGHWAY

SANTA ROSA ROAD FROM UPLAND ROAD TO WOODCREEK ROAD WIDEN FROM TWO TO FOUR LANES AND ADD BIKE LANES

2012 $2,113

VENTURA 5TPL04 LOCAL HIGHWAY

SIMI VALLEY BIKE PATH CLASS I 1400-FOOT CONNECTION FROM METROLINK STATION TO STEARNS STREET. (CMAQ INCLUDES TOLL CREDITS OF $23 FOR 2010/11 CON.)

2011 $254

VENTURA VEN051201 LOCAL HIGHWAY

WEST LOS ANGELES AVE FROM WEST CITY LIMIT TO EASY STREET 0.4 MILE CLASS II BIKE LANES – CMAQ INCLUDES $228 OF TOLL CREDITS FOR 11/12 CON.

2011 $1,986

VENTURA VEN054605 LOCAL HIGHWAY

CONEJO CREEK PARK BIKE PATH – CLASS I BIKE PATH FOR 1.4 MILES IN CONEJO CREEK PARK FROM ROUTE 23 TO JANSS ROAD AND PAIGE LANE

2010 $1,601

Page 418: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

416 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN031212 LOCAL HIGHWAY

EXPAND TRAFFIC SIGNAL COORDINATION SYSTEM

2010 $450

VENTURA VEN54168 LOCAL HIGHWAY

FACILITY INCL BIKEWAY/WALKWAY FROM SANTA PAULA CREEK TO PECK RD FENCING, LANDSCAPING, BRIDGE & DRAINAGE, PUBLIC ACCESS POINTS/ SAFETY ITEMS

2011 $4,094

VENTURA VEN34095 LOCAL HIGHWAY

IN OXNARD COLONIA RD/CAMINO DEL SOL RT 1 TO ENTRADA DR CONSTRUCT 4 LANES

2014 $10,269

VENTURA VEN053401 LOCAL HIGHWAY

INSTALL INTERCONNECT CABLE TO CONNECT SIGNALIZED INTERSECTIONS AT VARIOUS LOCATIONS THROUGHOUT THE CITY

2015 $500

VENTURA VEN031216 LOCAL HIGHWAY

INSTALL NEW SIGNALS AT INTERSECTION OF PALM AVE AND ROUTE 126 EB OFF-RAMP, AND TENTH STREET AND ROUTE 126 EB OFF-RAMP

2010 $558

VENTURA VEN056403 LOCAL HIGHWAY

LYNN ROAD FROM ROUTE 101 TO AVENIDA DE LAS FLORES SIGNAL SYNCHRONIZATION IMPROVEMENT (PHASE III)

2011 $460

VENTURA VEN54122 LOCAL HIGHWAY

NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS – PE AND ROW PHASES (CON IN 07-VEN040501) -- PHASE I

2010 $3,362

VENTURA VEN051002 LOCAL HIGHWAY

OLSON ROAD WIDENING FROM FOUR TO SIX LANES FROM PRESIDENTIAL DRIVE TO SIMI VALLEY CITY LIMIT, 2700 FEET

2012 $2,984

VENTURA VEN051004 LOCAL HIGHWAY

RECONSTRUCT AND DEEP LIFT ASPHALT ON VARIOUS ROADS IN VENTURA COUNTY WITHIN CONGRESSIONAL DISTRICT 24

2010 $6,000

Page 419: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 417

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA VEN990341 LOCAL HIGHWAY

SURFERS’ POINT BIKE PATH RESTORATION RESTORE 0.8 KM BIKEWAY SEGMENT DESTROYED BY STORMS ENVIRONMENTAL

2010 $1,964

VENTURA 5N011 LOCAL HIGHWAY

ALONG SP BRANCH RAIL LINE

MONTALVO LOS ANGELES COUNTY LINE SANTA PAULA BRANCH RECREATIONAL TRAIL

2020 $47,917

VENTURA 5A0744 LOCAL HIGHWAY

ARROYO DRIVE E/B SR-118 OFF-RAMP AT COLLINS

DRIVE

CITY EASTERLY LIMITS WIDEN ARROW DRIVE FROM 2 TO 4 LANES

2018 $5,000

VENTURA 5AL07 LOCAL HIGHWAY

ARTERIAL IMPROVEMENTS

COUNTYWIDE ARTERIAL IMPROVEMENTS LUMP SUM 2035 $399,509

VENTURA 5A0725 LOCAL HIGHWAY

CENTRAL AVE WIDENING

IMPROVEMENT

SANTA CLARA AVE. CAMARILLO CITY LIMITS WIDEN FROM TWO LANES TO FOUR LANES

2020 $7,900

VENTURA 5G0405 LOCAL HIGHWAY

GONZALES RD SR-1 (OXNARD BLVD) UPRR TRACKS CONSTRUCT 6 LANE GRADE SEPARA-TION AT SR-1 (OXNARD BLVD) AND UPRR TRACKS WITH LEFT TURN POCKETS

2014 $20,000

VENTURA 5GL04 LOCAL HIGHWAY

GRADE SEPARATION

COUNTYWIDE GRADE SEPARATION IMPROVEMENTS 2019 $143,000

VENTURA 5A0707 LOCAL HIGHWAY

GRIMES CANYON ROAD AND

HITCH BLVD REALIGNMENT

AT SR118 ADD 2ND WESTBOUND THROUGH LANE AND 2ND EASTBOUND THROUGH LANE

2020 $4,000

VENTURA 5A0708 LOCAL HIGHWAY

HARBOR BLVD AT GOZALES ROAD ADD 2ND SOUTHBOUND THROUGH LANE AND 2ND NORTHBOUND THROUGH LANE

2022 $1,219

VENTURA 5A0720 LOCAL HIGHWAY

HARBOR BLVD WIDENING

IMPROVEMENT

OXNARD CITY LIMITS VENTURA CITY LIMITS WIDEN FROM TWO LANES TO FOUR LANES, INCLUDING REPLACEMENT OR WIDENING OF EXISTING BRIDGE

2030 $24,020

VENTURA 5A0715 LOCAL HIGHWAY

HERMOSA RD AT SR 150 INTERSECTION IMPROVEMENTS 2015 $300

VENTURA VEN011202 LOCAL HIGHWAY

HUENEME RD. HUENEME RD FROM OXNARD CITY LIMITS TO RICE RD – WIDEN FROM 2 TO 4 LANES

2018 $6,953

Page 420: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

418 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA 5G0701 LOCAL HIGHWAY

LOS ANGELES AVE LA STREET GRADE SEPARATION. GRADE-SEPARATE LA AVE (MP 437.0) IN SIMI VALLEY. REALIGN 0.30-MILE-LONG CURVE SOUTH OF LOS ANGELES STREET, CONSTRUCT LOS ANGELES AVE OVER-PASS, CONSTRUCT 0.48 MILE OF NEW TRACK TO FRA CLASS 5 STANDARDS.

2019 $93,000

VENTURA 5A0735 LOCAL HIGHWAY

LOS ANGELES AVE APPROXIMATELY 1250’ E/O

SYCAMORE DRIVE

APPROXIMATELY 1000’ E/O SYCAMORE DRIVE

WIDEN TAPO CHANNEL BRIDGE AT LOS ANGELES AVE (15’ ON THE NORTH SIDE & 20’ ON THE SOUTH SIDE). THIS INCLUDES ADDITION OF ONE LANE IN EACH DIRECTION (FROM 4 TO 6 LANES), RELOCATION OF THE EXISITING UTILITIES & MODIFICATIONS TO UPSTREAM & DOWNSTREAM OF THE CHANNEL.

2012 $1,100

VENTURA 5A0730 LOCAL HIGHWAY

LOS ANGELES AVE SEGMENT 1: 200’ E/O ORCHID AVE

SEGMENT 2: 200’ E/O OF SEQUOIA AVE

SEGMENT 1: 100’ W/O SYCAMORE DRIVE SEMENT 2: 100’ W/O OF

DARRAH AVE

WIDEN SOUTH SIDE OF LOS ANGELES AVE BY ADDING A LANE (FROM 4 TO 5 LANES)

2012 $2,750

VENTURA 5AL04 LOCAL HIGHWAY

MISC. ARTERIAL IMPROVEMENTS (NON-CAPACITY)

COUNTYWIDE MISC. ARTERIAL IMPROVEMENTS (NON-CAPACITY)

2035 $122,540

VENTURA 5O0703 LOCAL HIGHWAY

MISC. TRANSPORTATION ENHANCEMENTS

COUNTYWIDE TRANSPORTATION ENHANCEMENT 2035 $13,857

VENTURA 5A0742 LOCAL HIGHWAY

NORTHHILLS PARKWAY

W/B SR-118 OFF-RAMP AT PRINCETON

CITY WESTERLY LIMITS AT SR-118 CONSTRUCT 4-LANE FREEWAY CONNEC-TION ON NEW ALIGNMENT

2023 $10,653

VENTURA 5A0723 LOCAL HIGHWAY

OLIVAS PARK DRIVE PERKIN AVE AUTO CENTER DRIVE CONSTRUCT 4-LANE EXTENSION 2012 $10,000

VENTURA 5A0746 LOCAL HIGHWAY

PEARL ST FOX ST BALD ST GAP CLOSURE EXTENSION 2014 $1,515

VENTURA 5O0701 LOCAL HIGHWAY

PLANTING/ LANDSCAPING

COUNTYWIDE MISC. PLANTING AND LANDSCAPING 2035 $27,714

VENTURA 5A0709 LOCAL HIGHWAY

PLEASANT VALLEY ROAD

AT E. 5TH STREET ADD 2ND SOUTHBOUND THROUGH LANE AND 2ND NORTHBOUND THROUGH LANE

2017 $1,060

Page 421: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 419

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA 5A0721 LOCAL HIGHWAY

PLEASANT VALLEY ROAD WIDENING IMPROVEMENT

DODGE RD LAS POSAS ROAD WIDEN FROM TWO TO FOUR LANES 2030 $18,721

VENTURA VEN071104 LOCAL HIGHWAY

PONDEROSA DRIVE EXTENSION

CONSTRUCT PONDEROSA EXTENSION FROM EARL JOSEPH TO VENTURA BLVD INCLUDING BIKE LANES (SPLIT FROM PROJECT 07-VEN990305)

2014 $5,114

VENTURA 5A0743 LOCAL HIGHWAY

PRINCETON AVE SR-118 OFFRAMP AT PRINCETON AVE

SPRING ROAD WIDEN, REALIGN AND RECONSTRUCT FROM 2 TO FOUR LANES

2018 $8,000

VENTURA 5A0711 LOCAL HIGHWAY

RICE AVE AT CHANNEL ISLANDS BLVD

ADD 3RD NORTHBOUND THROUGH LANE AND 3RD SOUTHBOUND THROUGH LANE AND SOUTHBOUND RIGHT-TURN LANE

2015 $950

VENTURA 5A0710 LOCAL HIGHWAY

RICE AVE AT WOOLEY ROAD ADD 3RD NORTHBOUND THROUGH LANE AND 3RD SOUTHBOUND THROUGH LANE

2015 $950

VENTURA 5A0402 LOCAL HIGHWAY

ROSE AVE AT GONZALEZ RD CONSTRUCT 4 LANE FLYOVER WITH LEFT TURN POCKETS

2018 $20,000

VENTURA 5G0404 LOCAL HIGHWAY

ROSE AVE AT SR-34 (E. FIFTH ST)

CONSTRUCT 4 LANE GRADE SEPARATION WITH LEFT TURN POCKETS

2014 $20,000

VENTURA 5A0719 LOCAL HIGHWAY

SANTA CLARA AVE WIDENING IMPROVEMENT

N/O OXNARD CITY LIMITS

SR 118 WIDEN FROM TWO TO FOUR LANES 2018 $22,000

VENTURA 5A0734 LOCAL HIGHWAY

STEARNS STREET COCHRAN STREET LEEDS STREET WIDENING OF STEARNS STREET TO ADD A LANE IN EACH DIRECTION (FROM 2 TO 4 LANES)

2012 $1,500

VENTURA 5A0728 LOCAL HIGHWAY

TAPO CANYON RD WALNUT STREET LOST CANYON RD. WIDEN TAPO CANYON ROAD TO ADD AN ADDITIONAL LANE IN EACH DIRECTION (FROM 2 TO 4 LANES) AND A DIVIDED CENTER MEDIAN.

2012 $4,500

VENTURA 5A0738 LOCAL HIGHWAY

TAPO STREET WALNUT STREET PRESIDIO DR. WIDENING OF TAPO STREET TO ADD A LANE IN EACH DIRECTION (FROM 2 TO 4 LANES)

2012 $650

Page 422: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

420 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA 5A0736 LOCAL HIGHWAY

TBD BETWEEN FLANAGAN DRIVE

AND EVENING SKY DR. PROVIDES THE MISSING LINK (A 60’ ROAD WITH TWO LANES) BETWEEN TWO STREETS (FLANAGAN DR. & EVENING SKY DR.). FROM 0 TO 2 LANES.

2012 $800

VENTURA 5TDL04 LOCAL HIGHWAY

TDM COUNTYWIDE MISC. TDM (NON-MOTORIZED, TELE-COMMUTE, ETC.)

2035 $27,714

VENTURA 5A0713 LOCAL HIGHWAY

TOPA TOPA ST FOX ST MONTGOMERY ST GAP CLOSURE EXTENSION 2015 $780

VENTURA 5A0401 LOCAL HIGHWAY

VICTORIA AVE AT GONZALES RD CONSTRUCT 4 LANE FLYOVER WITH LEFT TURN POCKETS

2018 $20,000

VENTURA 5A0712 LOCAL HIGHWAY

VICTORIA AVE AT GONZALES ROAD CONVERT SOUTHBOUND RIGHT-TURN LANE TO SHARED 3RD SOUTHBOUND THROUGH LANE/SOUTHBOUND RIGHT TURN LANE, ADD 2ND SOUTHBOUND LEFT-TURN LANE AND NORTHBOUND RIGHT-TURN LANE AND CONVERT DUAL WESTBOUND THROUGH LANE TO WEST-BOUND RIGHT-TURN LANE AND SHARED WESTBOUND THROUGH LANE/2ND WESTBOUND RIGHT-TURN LANE

2020 $900

VENTURA 5A0714 LOCAL HIGHWAY

VICTORIA AVE AT OLIVAS PARK DRIVE

ADD ADDITIONAL EB-WB THROUGH LANES AND NB LEFT TURN LANES

2009 $450

VENTURA 5A0722 LOCAL HIGHWAY

VICTORIA AVE WIDENING

IMPROVEMENT – A

GONZALES ROAD VENTURA CITY LIMITS WIDEN FROM FOUR LANES TO SIX LANES 2030 $14,606

VENTURA 5A0726 LOCAL HIGHWAY

VICTORIA AVE WIDENING

IMPROVEMENT – B

GONZALES ROAD OXNARD CITY LIMITS WIDEN FROM FOUR LANES TO SIX LANES 2030 $8,421

VENTURA 5A0732 LOCAL HIGHWAY

WENDY DRIVE WIDENING

IMPROVEMENTS

BORCHARD ROAD THOUSAND OAKS CITY LIMITS RE-STRIPE FROM TWO TO FOUR LANES; INLCUDES REPLACEMENT OR WIDENING OF EXISTING BRIDGE

2018 $1,600

VENTURA 5A0716 LOCAL HIGHWAY

118 SOMIS RD/SR118/DONLON DR

INTERSECTION IMPROVEMENTS

WIDEN INTERSECTION, ADD TURN LANES, RALIGN DONLON ROAD (COUNTY PORTION ONLY)

2020 $4,000

Page 423: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 421

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VENTURA 5G0102 LOCAL HIGHWAY

118 SR118 NEAR GRIMES CANYON

CROSOOVER ON SR118 NEAR GRIMES CANYON

2011 $50,000

VENTURA 5G0403 LOCAL HIGHWAY

232 SR-232 (VINEYARD AVE)

OXNARD BLVD SAINT MARY’S DRIVE CONSTRUCT 6 LANE GRADE SEPARATION OVER UPRR TRACKS

2014 $20,000

VARIOUS 1TR1013 TRANSIT CALIFORNIA HIGH SPEED RAIL

CALIFORNIA HIGH SPEED RAIL PHASE 2 – ENV/PE

2012 $85,000

VARIOUS 7120010 TRANSIT CALIFORNIA HIGH SPEED RAIL

REGIONWIDE CALIFORNIA HIGH SPEED RAIL – PHASE 1 (INCLUDES METROLINK AVL AND LOSSAN CORRIDOR SPEED UPGRADES)

2035 $33,000,000

VARIOUS 7120012 TRANSIT CLEAN BUSES REGIONWIDE CARB ZERO EMISSION BUS ACCELERATION

2020 $64,000

VARIOUS 7120009 TRANSIT EXPAND BUS SERVICE

REGIONWIDE EXPAND BUS SERVICE: BRT 2035 $568,082

VARIOUS 7120008 TRANSIT EXPAND BUS SERVICE

REGIONWIDE EXPAND BUS SERVICE: POINT-TO-POINT 2035 $808,632

VARIOUS 7120007 TRANSIT EXPAND BUS SERVICE

REGIONWIDE EXPAND BUS SERVICE: PRODUCTIVE CORRIDORS

2035 $1,195,377

VARIOUS 7120011 TRANSIT HIGH SPEED RAIL REGIONWIDE CALIFORNIA NEVADA HIGH SPEED RAIL PLANNING AND ENVIRONMENTAL REVIEW

2016 $45,000

VARIOUS 7120002 TRANSIT TRANSIT OPERATIONS & MAINTENANCE

REGIONWIDE ADDITIONAL O&M AND PRESERVATION – TRANSIT

2035 $15,000,000

VARIOUS 1C0404 STATE HIGHWAY

HIGH DESERT CORRIDOR

I-5 US-395 HIGH DESERT CORRIDOR, CONSTRUCT NEW 4-6 LANE FACILITY: E-W I-14 TO US-395 (CONNECTING AT SB CO #20020144), E-W I-5 TO SR-14, N-S SR-14 TO SR-138.

2020 $6,925,029

VARIOUS 7120003 STATE HIGHWAY

HIGHWAY OPERTIONS &

MAINTENANCE

REGIONWIDE ADDITIONAL O&M AND PRESERVATION – HIGHWAYS

2035 $40,000,000

VARIOUS 7120013 STATE HIGHWAY

STRATEGIC HOT LANE NETWORK

REGIONWIDE STRATEGIC HOT LANE NETWORK 2035 $9,613,464

Page 424: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

422 Project List

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VARIOUS 7120005 STATE HIGHWAY

TRANSPORTATION SYSTEM

MANAGEMENT

REGIONWIDE INCREASED TSM INVESTMENTS (INCLUDES CSMP IMPROVEMENTS)

2035 $2,271,364

VARIOUS 10M0702 LOCAL HIGHWAY

STUDY -- EXPRESS TRAVEL CHOICES (PHASE II) -- (CALTRANS IS THE LEAD AGENCY)

2013 $4,000,000

VARIOUS 7120001 LOCAL HIGHWAY

ARTERIAL OPERATIONS & MAINTENANCE

REGIONWIDE ADDITIONAL O&M AND PRESERVATION – LOCAL STREETS & ROADS

2035 $15,000,000

VARIOUS 7120004 OTHER ACTIVE TRANSPORTATION

REGIONWIDE INCREASED ACTIVE TRANSPORTATION INVESTMENTS

2035 $4,448,509

VARIOUS REG0703 OTHER ARTERIAL OPERATIONS & MAINTENANCE

REGIONWIDE ARTERIAL PRESERVATION/MAINTENANCE AND OPERATIONS PROJECTS

2035 SEE FINANCIAL PLAN LOCAL

STREETS AND ROADS

OPERATIONS AND MAINTENANCE

COST

VARIOUS 7120014 OTHER EAST-WEST FREIGHT CORRIDOR

I-710 JUST WEST OF I-605 EAST-WEST FREIGHT CORRIDOR SEGMENT 1 (UPRR ADJACENT SEGMENT)

2029 $2,413,086

VARIOUS 7120015 OTHER EAST-WEST FREIGHT CORRIDOR

JUST WEST OF I-605 JUST EAST OF SR-57 EAST-WEST FREIGHT CORRIDOR SEGMENT 2 (SAN JOSE CREEK SEGMENT)

2029 $9,102,359

VARIOUS 7120018 OTHER GOODS MOVEMENT BOTTLENECK

RELIEF STRATEGY

REGIONWIDE GOODS MOVEMENT – BOTTLENECK RELIEF STRATEGY

2035 $5,000,000

VARIOUS RRC0703 OTHER GOODS MOVEMENT RESEARCH AND DEVELOPMENT

REGIONWIDE GOODS MOVEMENT RESEARCH AND DEVELOPMENT

2035 $3,771,002

Page 425: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 423

*For modeled projects, represents the Plan network year for which the project was analyzed for the RTP modeling and regional emissions analysis

Financially-Constrained RTP Projects

County RTP ID SystemRoute

#Route Name From To Description

Project Completion

By*

Project Cost ($1,000’s)

VARIOUS REG0701 OTHER HIGHWAY OPERTIONS &

MAINTENANCE

REGIONWIDE STATE HIGHWAY PRESERVATION/MAINTENANCE AND OPERATIONS PROJECTS (INCLUDES SHOPP, HIGHWAY BRIDGE PROGRAM, EMERGENCY RELIEF, PUBLIC LAND HIGHWAYS, HAZARD ELIMINATION AND SAFETY, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, AND SECTION 130 STP RAILROAD PROGRAM PROJECTS)

2035 SEE FINANCIAL PLAN HIGHWAY

OPERATIONS AND MAINTENANCE

COST

VARIOUS 1O0705 OTHER INTERMODAL FACILITIES

INTERMODAL FACILITIES (SCIG & ICTF) 2016 $1,000,000

VARIOUS REG0704 OTHER OTHER PROGRAMS REGIONWIDE RECREATIONAL TRAILS, SCENIC BYWAYS, TRANSPORTATION COMMUNITY AND SYSTEM PRESERVATION PROGRAM PROJECTS

2035 SEE FINANCIAL PLAN OTHER

COST

VARIOUS RRC0702 OTHER REGIONAL RAIL CAPACITY

PROGRAM

REGIONWIDE RAIL PACKAGE – GRADE SEPARATIONS 2035 $5,568,943

VARIOUS RRC0701 OTHER REGIONAL RAIL CAPACITY

PROGRAM

REGIONWIDE RAIL PACKAGE – RAIL CAPACITY EXPANSION

2017 $3,125,625

VARIOUS REG0702 OTHER TRANSIT OPERATIONS & MAINTENANCE

REGIONWIDE TRANSIT PRESERVATION/MAINTENANCE, REHABILITATION/REPLACEMENT AND OPERATIONS PROJECTS

2035 SEE FINANCIAL PLAN TRANSIT

OPERATIONS AND MAINTENANCE

COST

VARIOUS 7120006 OTHER TRANSPORTATION DEMAND

MANAGEMENT

REGIONWIDE INCREASE TDM INVESTMENTS 2035 $3,015,283

VARIOUS 7120017 OTHER I-15 I-15 FREIGHT CORRIDOR

SR-60 I-10 I-15 FREIGHT CORRIDOR (INITIAL SEGMENT)

2029 $856,570

VARIOUS 7120016 OTHER SR-60 EAST-WEST FREIGHT CORRIDOR

JUST EAST OF SR-57 I-15 EAST-WEST FREIGHT CORRIDOR SEGMENT 3 (SR-60 SEGMENT)

2029 $3,777,816

Page 426: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

424 Project List

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005)

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005)

County System Category Route Name From To Description

LOS ANGELES LOCAL HIGHWAY ITS GATEWAY CITIES FORUM ITS GATEWAY CITIES FORUM ITS

LOS ANGELES LOCAL HIGHWAY ITS SAN FERNANDO VALLEY FORUM ITS

SAN FERNANDO VALLEY FORUM ITS

LOS ANGELES LOCAL HIGHWAY ITS SAN GABRIEL VALLEY FORUM ITS

SAN GABRIEL VALLEY FORUM ITS

LOS ANGELES LOCAL HIGHWAY ITS SOUTH BAY FORUM ITS SOUTH BAY FORUM ITS

LOS ANGELES LOCAL HIGHWAY ITS 1ST ST INDIANA ST MEDNIK AVE 1ST ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS ALAMEDA ST SLAUSON AVE NADEAU ST ALAMEDA ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS AMAR RD/TEMPLE AVE NOGALES ST GOLDEN SPRINGS DR AMAR RD/TEMPLE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS ANZA AVE 190TH ST PACIFIC COAST HWY ANZA AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS ARROYO PKWY COLORADO BL GLENARM ST ARROYO PKWY SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS ATLANTIC BL/ATLANTIC AVE PINE ST PACIFIC COAST HWY ATLANTIC BL/ATLANTIC AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS BALDWIN AVE FOOTHILL BL I-10 BALDWIN AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS BARRANCA AVE/BARRANCA ST

SIERRA MADRE AVE CAMERON AVE BARRANCA AVE/BARRANCA ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS BASE LINE ST FOOTHILL BL COUNTY LINE BASE LINE ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS BEVERLY BL POMONA ST PAINTER AVE BEVERLY BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS BLOOMFIELD AVE ROSECRANS AVE DEL AMO BL BLOOMFIELD AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS BOUQUET CANYON RD PLUM CANYON RD SOLEDAD CANYON RD BOUQUET CANYON RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS BROADWAY 124TH ST 157TH ST BROADWAY SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS CITRUS AVE FOOTHILL BL ARROW HWY CITRUS AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS CITY TERRACE DR INDIANA ST EASTERN AVE CITY TERRACE DR SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS COLORADO BL ORANGE GROVE BL MICHILLINDA AVE COLORADO BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS COLORADO ST MICHILLINDA AVE COLORADO PL COLORADO ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS COMPTON AVE SLAUSON AVE 92ND ST COMPTON AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS COMPTON AVE IMPERIAL HWY EL SEGUNDO BL COMPTON AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS DEL AMO BL AVALON BL BLOOMFIELD AVE DEL AMO BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS DIAMOND BAR BL/MISSION BL

BREA CANYON RD COUNTY LINE DIAMOND BAR BL/MISSION BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS DUARTE RD SAN GABRIEL BL HIGHLAND AVE DUARTE RD SIGNAL SYNCHRONIZATION

Page 427: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 425

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005)

County System Category Route Name From To Description

LOS ANGELES LOCAL HIGHWAY ITS E VICTORIA ST SANTA FE AVE SUSANA RD E VICTORIA ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS EL SEGUNDO BL BROADWAY N CENTRAL AVE EL SEGUNDO BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS FLORAL AVE EASTERN AVE MEDNIK AVE FLORAL AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS FOOTHILL AVE LOWELL AVE BRIGGS AVE FOOTHILL AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS FREMONT AVE COLUMBIA ST GARVEY AVE FREMONT AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS GAREY AVE COLLEGE WY SR-60 GAREY AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS GARFIELD AVE PINE ST OLYMPIC BL GARFIELD AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS GARVEY AVE ROSEMEAD BL DURFEE AVE GARVEY AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS GRAND AVE ROWLAND ST LONGVIEW DR GRAND AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS HASLEY CANYON RD/COMMERCE CENTER

BURLWOOD DR I-5 HASLEY CANYON RD/COMMERCE CENTER SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS HAWTHORNE BL 104TH ST MANHATTAN BEACH BL HAWTHORNE BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS HAWTHORNE BL 244TH ST PALOSVERDES DR WEST HAWTHORNE BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS HOOPER AVE SLAUSON AVE 92ND ST HOOPER AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS HUNTINGTON DR/FOOTHILL BL/ALOSTA AVE

FAIR OAKS AVE COUNTY LINE HUNTINGTON DR/FOOTHILL BL/ALOSTA AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS IMPERIAL HWY MONA BL 1ST AVE IMPERIAL HWY SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS INDIAN HILL BL AMERICAN AVE HOLT AVE INDIAN HILL BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS INGLEWOOD AVE 104TH ST 111TH PL INGLEWOOD AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS IRWINDALE AVE FOOTHILL BL ARROW HWY IRWINDALE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS IRWINDALE AVE BADILLO ST CAMERON AVE IRWINDALE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS LA BREA AVE CENTINELA AVE CENTURY BL LA BREA AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS LA CRESCENTA AVE ORANGE AVE I-210 LA CRESCENTA AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS LAMBERT RD WASHINGTON BL GRAYLING AVE LAMBERT RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS LAUREL PARK RD E VICTORIA ST ALAMEDA ST LAUREL PARK RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS LEFFINGWELL RD IMPERIAL HWY VALLEY VIEW AVE LEFFINGWELL RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS LENNOX BL INGLEWOOD AVE FREEMAN AVE LENNOX BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS LONE HILL AVE ROUTE 66 COVINA BL LONE HILL AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS LYONS AVE WILEY CANYON RD NEWHALL AVE LYONS AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MAIN ST EL SEGUNDO BL REDONDO BEACH BL MAIN ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MANCHESTER AVE HOOPER AVE IVY ST MANCHESTER AVE SIGNAL SYNCHRONIZATION

Page 428: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

426 Project List

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005)

County System Category Route Name From To Description

LOS ANGELES LOCAL HIGHWAY ITS MANHATTAN BEACH BL MANHATTAN AVE VAN NESS AVE MANHATTAN BEACH BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MCBEAN PKWY/STEVENSON RANCH PKWY

COPPER HILL DR THE OLD ROAD MCBEAN PKWY/STEVENSON RANCH PKWY SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MIRAMONTE BL 76TH ST 83RD ST MIRAMONTE BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MISSION RD WINCHESTER AVE SANTA ANITA ST MISSION RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MONTEBELLO BL/GREENWOOD AVE

PARAMOUNT BL UNION ST MONTEBELLO BL/GREENWOOD AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MONTROSE AVE FLORENCITA AVE DEL MAR RD MONTROSE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MOUNTAIN AVE FOOTHILL BL DUARTE RD MOUNTAIN AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS MYRTLE AVE/PECK RD/WORKMAN MILL RD/

NORWALK BL/SAN ANTONIO BL/PIONEER BL

HUNTINGTON DR CARSON ST MYRTLE AVE/PECK RD/WORKMAN MILL RD/NORWALK BL/SAN ANTONIO BL/PIONEER BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS NADEAU ST HOOPER AVE SANTA FE AVE NADEAU ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS NORMANDIE AVE 89TH ST EL SEGUNDO BL NORMANDIE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS NORWALK AVE ROSECRANS AVE CARSON ST/WARDLOW RD NORWALK AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS OCEANVIEW BL FOOTHILL FWY FLORENCITA AVE OCEANVIEW BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS OLYMPIC BL INDIANA ST CONCOURSE AVE OLYMPIC BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS PACIFIC BL LIVE OAK ST BROADWAY PACIFIC BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS PENNSYLVANIA AVE ORANGE AVE I-210 PENNSYLVANIA AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS PICO CANYON RD DEAD HORSE CYN I-5 PICO CANYON RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS PRAIRIE AVE 118TH ST REDONDO BEACH BL PRAIRIE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS RAMONA BL/BADILLO ST/COVINA BL

SANTA ANITA AVE I-210 RAMONA BL/BADILLO ST/COVINA BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS RAMSDELL AVE ORANGE AVE MONTROSE AVE RAMSDELL AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS REDONDO BEACH BL/COMPTON BL/SOMERSET BL

FREEMAN AVE WOODRUFF AVE REDONDO BEACH BL/COMPTON BL/SOMERSET BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS ROSECRANS AVE BROADWAY MERCADO AVE ROSECRANS AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS ROSEMEAD BL SAN GABRIEL BL HUNTINGTON DR ROSEMEAD BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS ROSEMEAD BL RUSH ST TELEGRAPH RD ROSEMEAD BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS ROSEMONT AVE FOOTHILL BL MONTROSE AVE ROSEMONT AVE SIGNAL SYNCHRONIZATION

Page 429: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 427

Additional Transportation Systems Management (TSM) Projects (included in RTP ID 7120005)

County System Category Route Name From To Description

LOS ANGELES LOCAL HIGHWAY ITS RYE CANYON RD/COPPER HILL RD

THE OLD ROAD MCBEAN PKWY RYE CANYON RD/COPPER HILL RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SAN DIMAS AVE FOOTHILL BL VIA VERDE SAN DIMAS AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SAN PEDRO ST EL SEGUNDO BL 157TH ST SAN PEDRO ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SANTA ANITA AVE FOOTHILL BL DURFEE AVE SANTA ANITA AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SANTA FE SPRINGS RD/BLOOMFIELD AVE

WHITTIER BL FIRESTONE BL SANTA FE SPRINGS RD/BLOOMFIELD AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SEVILLE AVE GRAND AVE BROADWAY SEVILLE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SLAUSON AVE COMPTON AVE STAMY RD SLAUSON AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SOLEDAD CANYON RD GOLDEN OAK RD GATETON RD SOLEDAD CANYON RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SOUTH ST ATLANTIC AVE CARMENITA RD SOUTH ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS STEVENSON RANCH PKWY PICO CYN I-5 STEVENSON RANCH PKWY SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS SUSANA RD VICTORIA ST DEL AMO BL SUSANA RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS TELEGRAPH RD EASTERN AVE SPRINGVIEW DR TELEGRAPH RD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS TEMPLE CITY BL DUARTE RD I-10 TEMPLE CITY BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS THE OLD ROAD HASLEY CYN PICO CYN THE OLD ROAD SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS TOWNE AVE BASE LINE RD SR-60 TOWNE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS UNION PACIFIC AVE INDIANA ST MARIANNA AVE UNION PACIFIC AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS VALLEY BL TEMPLE CITY BL DURFEE AVE VALLEY BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS VALLEY VIEW AVE LEFFINGWELL RD FIRESTONE BL SOUTH VALLEY VIEW AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS WASHINGTON BL GRAND VISTA AVE SORENSEN AVE WASHINGTON BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS WESTERN AVE 104TH ST 111TH ST WESTERN AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS WHITE AVE FOOTHILL BL LEXINGTON AVE WHITE AVE SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS WHITTIER BL INDIANA ST PARAMOUNT BL WHITTIER BL SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS WILLOW ST I-710 I-605 WILLOW ST SIGNAL SYNCHRONIZATION

LOS ANGELES LOCAL HIGHWAY ITS WILLOWBROOK AVE 124TH ST STOCKWELL ST WILLOWBROOK AVE SIGNAL SYNCHRONIZATION

ORANGE LOCAL HIGHWAY ARTERIAL OPERATIONAL

IMPROVEMENTS, ITS

CENTRAL COUNTY ARTERIALS

ADDITIONAL ARTERIAL AND INTERSECTION OPTIMIZATION – ADDITIONAL TURN LANES, ADVANCED TRAFFIC MANAGE-MENT SYSTEMS, COMMUNICATIONS, IMPROVED LIGHTING AND SAFETY TREATMENTS ON 9 ARTERIALS AND AT 60 INTERSECTIONS IDENTIFIED IN CENTRAL COUNTY MIS

Page 430: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

428 Project List

Strategic Projects

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

IMPERIAL TRANSIT OPERATIONAL, SAFETY

S6120001 VARIOUS VARIOUS CONSTRUCT ROADWAY/RAIL GRADE SEPARATIONS (10 LOCATIONS)

UNION PACIFIC

IMPERIAL STATE HIGHWAY CAPACITY S6120002 8 INTERSTATE 8 AUSTIN RD AUSTIN RD CONSTRUCT FULL INTERCHANGE CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY S6120003 8 INTERSTATE 8 BOWKER RD BOWKER RD IMPROVE INTERCHANGE CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY S6120004 111 STATE ROUTE 111 SHANK RD STATE ROUTE 115 WIDEN AND IMPROVE TO FOUR LANE CONVENTIONAL HIGHWAY

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY S6120005 111 STATE ROUTE 111 INTERSTATE 8 STATE ROUTE 78 WIDEN AND IMPROVE TO SIX LANE FREEWAY; ADD INTERCHANGES AT ATEN RD, WORTHINGTON RD, KEYSTONE RD, AND SR-78

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY S6120006 111 STATE ROUTE 111 YOUNG RD RIVERSIDE COUNTY LINE

WIDEN AND IMPROVE TO FOUR LANE CONVENTIONAL HIGHWAY

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY S6120007 115 STATE ROUTE 115 STATE ROUTE 111 STATE ROUTE 78 WIDEN AND IMPROVE TO FOUR LANE EXPRESSWAY

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY, GOODS MOVEMENT

S6120008 7 STATE ROUTE 7 MCCABE RD MCCABE RD CONSTRUCT NEW INTERCHANGE TO ACCOMMODATE FUTURE AIRPORT ACCESS

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY, GOODS MOVEMENT

S6120009 8 INTERSTATE 8 FORRESTER RD STATE ROUTE 111 WIDEN AND IMPROVE TO SIX LANE FREEWAY

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY, GOODS MOVEMENT

S6120010 115 STATE ROUTE 115 EVAN HEWES HIGHWAY

STATE ROUTE 78 WIDEN AND IMPROVE TO FOUR LANE EXPRESSWAY

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY, GOODS MOVEMENT,

OPERATIONAL

S6120011 78/86 STATE ROUTE 78/STATE ROUTE 86 (DUAL SIGNED)

BRAWLEY BYPASS STATE ROUTE 78 CONSTRUCT NEW FOUR LANE EXPRESSWAY BYPASS ROUTE AROUND THE CITY OF WESTMORLAND

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY, OPERATIONAL,

SAFETY

S6120012 98 STATE ROUTE 98 DOGWOOD RD STATE ROUTE 111 CONSTRUCT GRADE SEPARATED RAILROAD CROSSINGS, NEW ROADWAY SEGMENTS, SIGNALIZATION, CHAN-NELIZATION, AND ROADWAY GEOMET-RIC IMPROVEMENTS,

CALTRANS

IMPERIAL STATE HIGHWAY CAPACITY, SAFETY

S6120013 78/115 STATE ROUTE 78/STATE ROUTE 115

(JUNCTION)

BRAWLEY BYPASS STATE ROUTE 115 WIDEN AND IMPROVE TO FOUR LANE CONVENTIONAL HIGHWAY

CALTRANS

Page 431: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 429

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

IMPERIAL STATE HIGHWAY OPERATIONAL, SAFETY

S6120014 78 STATE ROUTE 78 STATE ROUTE 115 RIVERSIDE COUNTY LINE

PROVIDE OPERATIONAL AND SAFETY IMPROVEMENTS; INTERSECTION IMPROVEMENTS AND ROADWAY GEO-METRIC IMPROVEMENTS

CALTRANS

IMPERIAL LOCAL ARTERIAL CAPACITY S6120015 AUSTIN RD MCCABE RD STATE ROUTE 86 WIDEN AND IMPROVE TO SIX LANE PRIME ARTERIAL

IMPERIAL COUNTY

IMPERIAL LOCAL ARTERIAL CAPACITY S6120016 DOGWOOD RD STATE ROUTE 98 MEAD RD WIDEN AND IMPROVE TO FOUR LANE PRIME ARTERIAL

EL CENTRO

IMPERIAL LOCAL ARTERIAL CAPACITY S6120017 EIGHTH STREET INTERSTATE 8 INTERSTATE 8 WIDEN AND IMPROVE OVERCROSSING EL CENTRO

IMPERIAL LOCAL ARTERIAL CAPACITY S6120018 EIGHTH STREET WAKE AVE CENTINELA WIDEN AND IMPROVE TO FOUR LANE PRIME ARTERIAL

EL CENTRO

IMPERIAL LOCAL ARTERIAL CAPACITY S6120019 IMPERIAL AVENUE MCCABE RD INTERSTATE 8 CONSTRUCT SIX LANE PRIME ARTERIAL

EL CENTRO

IMPERIAL LOCAL ARTERIAL CAPACITY S6120020 IMPERIAL AVENUE INTERSTATE 8 ATEN RD WIDEN AND IMPROVE TO SIX LANE PRIME ARTERIAL

EL CENTRO

IMPERIAL LOCAL ARTERIAL CAPACITY S6120021 KEYSTONE RD FORRESTER RD STATE ROUTE 115 CONSTRUCT NEW SIX LANE PRIME ARTERIAL ON THE KEYSTONE RD CUR-RENT ALIGNMENT

IMPERIAL COUNTY

IMPERIAL LOCAL ARTERIAL CAPACITY S6120022 MCCABE RD AUSTIN RD STATE ROUTE 111 WIDEN AND IMPROVE TO SIX LANE PRIME ARTERIAL

IMPERIAL COUNTY

LOS ANGELES TRANSIT BRT S1120001 0 METRO ORANGE LINE

METRO ORANGE LINE EXTENSION TO BOB HOPE AIRPORT

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT BRT S1120002 0 SR-134 TRANSIT CORRIDOR BRT PROJECT

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT HEAVY RAIL S1120003 0 METRO PURPLE LINE WESTSIDE SUBWAY EXTENSION (BEYOND SEGMENTS IN THE CONSTRAINED PLAN)

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT HIGH-SPEED RAIL S1120004 0 ORANGELINE ORANGE LINE PROJECT EXTENSION – BEYOND WEST SANTA ANA BRANCH RIGHT OF WAY TO UNION STATION

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT HIGH-SPEED RAIL S1120005 0 ORANGELINE ORANGE LINE HIGH SPEED TRANSIT SYSTEM – EXTENSION OF WEST SANTA ANA BRANCH FROM UNION STATION TO PALMDALE

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT LIGHT RAIL S1120006 0 METRO BLUE LINE BLUE LINE EXTENSION TO CALIFORNIA STATE UNIVERSITY LONG BEACH

LOS ANGELES COUNTY MTA

Page 432: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

430 Project List

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

LOS ANGELES TRANSIT LIGHT RAIL S1120007 0 METRO GOLD LINE METRO GOLD LINE EASTSIDE EXTENSION BEYOND PHASE 2 TERMINUS

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT LIGHT RAIL S1120008 0 METRO GREEN LINE GREEN LINE SOUTH TERMINUS AT

TORRANCE

SAN PEDRO, LONG BEACH, AND LOS

ANGELES/ORANGE COUNTY LINE

GREEN LINE FROM GREEN LINE SOUTH TERMINUS AT TORRANCE TO SAN PEDRO, LONG BEACH, AND LOS ANGELES/ORANGE COUNTY LINE

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT LIGHT RAIL S1120009 0 CRENSHAW LIGHT RAIL TRANSIT NORTH FROM EXPOSITION BL

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120010 0 METRO RED LINE RED LINE NORTH HOLLYWOOD STATION TO SYLMAR METROLINK STATION CONNECTION

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120011 0 PORT COMMUNITIES OF LOS ANGELES/

LONG BEACH

ARROYO VERDUGO SUBREGION

NORTH-SOUTH RAIL CORRIDOR BETWEEN PORT COMMUNITIES OF LOS ANGELES/LONG BEACH AND ARROYO VERDUGO SUBREGION-ALTERNATIVE TO SR-710 TUNNEL OPTION

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120012 0 CRENSHAW BL DOWNTOWN LOS ANGELES

HARBOR SUBDIVISION LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120013 0 VENTURA BL/ORANGE LINE

NORTH-EAST SAN FERNANDO VALLEY/SYLMAR

METROLINK STATION

I-405 CORRIDOR NORTH LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120014 0 GLENDALE DOWNTOWN LOS ANGELES

GLENDALE – DOWNTOWN LOS ANGELES CORRIDOR

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120015 0 UCLA/WESTWOOD LAX I-405 CORRIDOR SOUTH LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120016 0 SAN GABRIEL VALLEY

LOS ANGELES/ORANGE COUNTY

LINE

I-605 NORTH-SOUTH CORRIDOR LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120017 0 NORTH HOLLYWOOD PASADENA SR-134 EAST-WEST CORRIDOR CONNECTING NORTH HOLLYWOOD, BURBANK, GLENDALE AND PASADENA

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120018 0 WEST SAN FERNANDO VALLEY

WEST LOS ANGELES

WEST LOS ANGELES COUNTY/WEST SAN FERNANDO VALLEY TO WEST LOS ANGELES DIRECT CONNECTION

LOS ANGELES COUNTY MTA

Page 433: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 431

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

LOS ANGELES TRANSIT OTHER TRANSIT S1120019 0 CITY OF LONG BEACH EASTERN TRANSIT CORRIDOR CONNECTION--DOWNTOWN TO METRO BLUE LINE

LOS ANGELES COUNTY MTA

LOS ANGELES TRANSIT OTHER TRANSIT S1120020 REGIONAL INTERMODAL

CENTER

REGIONAL INTERMODAL CENTER NEAR BOB HOPE AIRPORT

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY ARTERIAL S1120021 126 SR-126 COMMERCE CTR DR COUNTY LINE SR-126 COMMERCE CORRIDOR IMPROVEMENT PROJECT - INTERSECTION IMPROVEMENTS AND WIDENING

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY HOV S1120022 57 SR-57 I-60 I-210 SR-57 HOV LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY HOV S1120023 60 SR-60 US-101 I-605 SR-60 HOV LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY HOV S1120024 101 US-101 ROUTE 23 TOPANGA CANYON ADD HOV LANE ON US-101 LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY HOV S1120025 110 I-110 ADAMS BL UNION STATION I-110 HIGH OCCUPANCY VEHICLE (HOV) VIADUCT

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY HOV S1120026 605 I-605 I-10 I-210 I-605 HOV LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY HOV, IC/RAMPS S1120027 405 I-405 I-405 LAX I-405 DIRECT HOV CONNECTOR TO LAX LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY HOV, IC/RAMPS S1120028 10, 605 I-10/I-605 I-10/I-605 PARTIAL HOV INTERCHANGE LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY HOV, IC/RAMPS S1120029 60, 605 SR-60/I-605 SR-60/I-605 PARTIAL HOV INTERCHANGE

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY IC/RAMPS S1120030 60, 605 SR-60/I-605 SR-60/I-605 INTERCHANGE IMPROVEMENTS

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY IC/RAMPS S1120031 605, 10 I-605/I-10 I-10/605 INTERCHANGE UPGRADE – NB I-605 TO WB I-10 CONNECTOR

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY IC/RAMPS, MIXED FLOW

S1120032 134, 210 SR-134/I-210 SR-134/I-210 INTERCHANGE IMPROVEMENTS

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY IC/RAMPS, MIXED FLOW

S1120033 39, 2 ROUTE 39/ROUTE 2 ROUTE 39 TO ROUTE 2 CONNECTION LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY IC/RAMPS, TRUCK CLIMBING LANES

S1120034 10, 57 I-10/SR-57 I-10 TO SR-57 WB CONNECTOR TRUCK CLIMBING LANE AND OFF-RAMP

LOS ANGELES COUNTY MTA

Page 434: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

432 Project List

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

LOS ANGELES STATE HIGHWAY OTHER NON-EXPANSION

S1120035 210 I-210 BERKSHIRE AV OCEAN VIEW BL I-210 SOUNDWALLS LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY S1120036 5 I-5 I-605 I-710 I-5 CORRIDOR LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY S1120037 5 I-710 I-710 FREIGHT MOVEMENT CORRIDOR (BEYOND I-5)

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY S1120038 10 I-10 I-10/ROBERTSON/NATIONAL AREA CIRCULATION IMPROVEMENT –IMPROVE BOTTLENECK TRA;C ON I-10 AND AROUND FUTURE EXPO VENICE/ROBERTSON STATION

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY S1120039 91, 605, 405

SR-91/I-605/I-405 ADDITIONAL SR-91/I-605/I-405 SOLUTIONS (BEYOND IDENTIFIED HOT SPOTS)

LOS ANGELES COUNTY MTA

LOS ANGELES STATE HIGHWAY S1120040 ALTERNATIVE TO SR-710 TUNNEL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120041 50TH ST EAST CONNECTOR

E-220 TO SR-138/PALMDALE BL ROUNDABOUT

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120042 ALAMEDA ST ALAMEDA ST LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120043 ALONDRA BL ALONDRA BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120044 ARTESIA BL ARTESIA BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120045 ATLANTIC BL ATLANTIC BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120046 AVENUE G SR-14 25TH ST AVENUE G CORRIDOR IMPROVEMENTS - INTERCHANGE IMPROVEMENTS FOR ACCESS TO WILLIAM J. FOX AIRPORT

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120047 AVIATION BL/ROSECRANS AV

AVIATION BL/ROSECRANS AV GRADE SEPARATION – GRADE SEPARATE AVIATION BL UNDER ROSECRANS AV FOR FREE-FLOW NORTH-SOUTH MOVE-MENTS VIA TUNNEL AND AT-GRADE EAST-WEST MOVEMENTS AT SIGNAL-IZED INTERSECTION

LOS ANGELES COUNTY MTA

Page 435: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 433

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120048 BELLFLOWER BL BELLFLOWER BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120049 COLUMBIA WY/AVENUE M

COLUMBIA WY/AVENUE M CORRIDOR IMPROVEMENTS - CAPACITY AND INTERCHANGE IMPROVEMENTS AT SR-14 FROM 10TH ST W TO 15TH ST W, SERVING MAJOR INDUSTRIAL CENTERS AND COURTHOUSE

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120050 DEL AMO BL DEL AMO BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120051 FIRESTONE BL FIRESTONE BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120052 GARFIELD BL GARFIELD BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120053 IMPERIAL HWY IMPERIAL HWY LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120054 LAKEWOOD BL/ROSEMEAD BL

LAKEWOOD BL/ROSEMEAD BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120055 LONG BEACH BL LONG BEACH BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120056 NORWALK BL NORWALK BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120057 PACIFIC COAST HWY PACIFIC COAST HWY LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120058 PARAMOUNT BL PARAMOUNT BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120059 PEARBLOSSOM HWY SR-14 SR-138 PEARBLOSSOM HWY IMPROVEMENT PROJECT - CORRIDOR IMPROVEMENTS BETWEEN SR-14 AND SR-138 TO COM-MUTER/TRUCKING ROUTE

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120060 RANCHO VISTA BL RANCHO VISTA BL GRADE SEPARATION - PROVIDES ACCESS TO PALMDALE REGIONAL AIRPORT AND CONNECTION TO E-220

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120061 ROSECRANS BL ROSECRANS BL LOS ANGELES COUNTY MTA

Page 436: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

434 Project List

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120062 TIERRA SUBIDA AV/10TH ST W

SR-14/10TH ST W SR-14/AV S TIERRA SUBIDA AV/10TH ST W IMPROVEMENT PROJECT - CAPACITY IMPROVEMENTS

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120063 WASHINGTON BL WASHINGTON BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120064 WHITTIER BL WHITTIER BL LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL S1120065 SOUTH BAY PACIFIC COAST HWY INTERSECTION & OPERATIONAL IMPROVEMENTS

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL CAPACITY

ENHANCEMENTS

S1120066 90 SR-90 LINCOLN BL ADMIRALTY WY EXTENSION LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL CAPACITY

ENHANCEMENTS

S1120067 CASTAIC CUTOFF NEW ROAD (LAKE HUGHES RD/SAN FRANCISQUITO CANYON RD)

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL CAPACITY

ENHANCEMENTS

S1120068 DEL AMO BL NORMANDIE AV VERMONT AV CONSTRUCTION OF A ROADWAY TO CLOSE THE GAP ON DEL AMO BL

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL OPERATIONAL

IMPROVEMENTS

S1120069 COLIMA RD INTERSECTION IMPROVEMENTS AT FULLERTON RD

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL OPERATIONAL

IMPROVEMENTS

S1120070 HACIENDA BL INTERSECTION IMPROVEMENTS AT GALE AVE

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL OPERATIONAL

IMPROVEMENTS

S1120071 MALIBU/KANAN DUME TUNNEL LINING PROJECTS

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL OPERATIONAL

IMPROVEMENTS, ARTERIAL WIDENING

S1120072 5 I-5 INTERSECTION IMPROVEMENTS AND WIDENING TO PROVIDE ADDITIONAL LANES ON EAST BOUND AND WEST BOUND APPROACHES AT LAKE HIGHES RD

LOS ANGELES COUNTY MTA

Page 437: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 435

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

LOS ANGELES LOCAL HIGHWAY ARTERIAL OPERATIONAL

IMPROVEMENTS, ARTERIAL WIDENING

S1120073 5 I-5 INTERSECTION IMPROVEMENTS INCLUDING BRIDGE WIDENING AND LANE ADDITIONS AT PARKER RD

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL WIDENING

S1120074 ADMIRALTY WY WIDENING

VIA MARINA FIJI WY WIDENING LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL WIDENING

S1120075 AVENUE L & K ET AL. 40TH ST 50TH ST WIDENING LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL WIDENING

S1120076 AVIATION BL IMPERIAL HIGHWAY ROSECRANS AV WIDENING LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY ARTERIAL WIDENING

S1120077 COLIMA RD ROAD WIDENING (HALLIBURTON RD/CITY OF DIAMOND BAR CITY BOUNDARY)

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY GRADE SEPARATION

S1120078 AVENUE S AVENUE S OVER SCRRA (WEST OF SIERRA HWY)

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY GRADE SEPARATION

S1120079 EL SEGUNDO BL EL SEGUNDO BL OVER UPRR AND METRO AT WILLOWBROOK AV

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY GRADE SEPARATION

S1120080 FULLERTON RD FULLERTON RD UNDER UPRR (AT GALE AV)

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY GRADE SEPARATION

S1120081 SIERRA HWY/BARREL SPRINGS RD

SIERRA HWY/BARREL SPRINGS RD UNDER SCRRA

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY GRADE SEPARATION

S1120082 SR-126/COMMERCE CENTER DR

SR-126/COMMERCE CENTER DR LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY S1120083 FULLERTON RD INTERSECTION IMPROVEMENTS AT PATHFINDER RD

LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY S1120084 GALE AV FULLERTON RD NOGALES ST WIDEN FROM FOUR TO SIX LANES LOS ANGELES COUNTY MTA

LOS ANGELES LOCAL HIGHWAY S1120085 THE OLD ROAD HILLCREST PKWY LAKE HIGHES RD THE OLD ROAD LOS ANGELES COUNTY MTA

ORANGE TRANSIT BRT S2120001 BEACH BOULEVARD BRT

NEW BRT SERVICE BETWEEN HUNTINGTON BEACH AND LA HABRA

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120002 EDINGER AVENUE BRT

NEW BRT SERVICE BETWEEN HUNTINGTON BEACH AND TUSTIN

ORANGE COUNTY TRANS

AUTHORITY

Page 438: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

436 Project List

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

ORANGE TRANSIT BRT S2120003 ENHANCE BRT ROUTES

IMPLEMENT BY PASS LANES AT INTER-SECTIONS REAL-TIME PASSENGER INFORMATION, TRANSIT SIGNAL PRI-ORITY, AND STATION IMPROVEMENTS

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120004 KATELLA AVE BRT NEW BRT SERVICE BETWEEN LONG BEACH AND ORANGE

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120005 LA PALMA AVE BRT NEW BRT SERVICE BETWEEN BUENA PARK AND ANAHEIM

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120006 NEW EXPRESS BUS SERVICE

FROM ANAHEIM TO LAGUNA HILLS

ANAHEIM METROLINK/LAGUNA HILLS TRANSIT CENTER EXPRESS BUS SER-VICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120007 NEW EXPRESS BUS SERVICE

FROM ANAHEIM TO LAGUNA HILLS

HARBOR BLVD/MANCHESTER AVE/LAGUNA HILLS TRANSIT CENTER EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120008 NEW EXPRESS BUS SERVICE FROM INDUSTRY TO

ANAHEIM

INDUSTRY METROLINK/ANAHEIM RESORT EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120009 NEW EXPRESS BUS SERVICE FROM

IRVINE TO NORWALK

ALTON PARKWAY/YALE LOOP TO GOLDENWEST TRANSPORTATION CENTER/GREEN LINE EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120010 NEW EXPRESS BUS SERVICE FROM

LAGUNA NIGUEL/ALISO VIEJO TO

IRVINE

LAGUNA NIGUEL/ALISO VIEJO/IRVINE BUSINESS COMPLEX/UCI EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120011 NEW EXPRESS BUS SERVICE FROM

ORANGE TO LONG BEACH

THE BLOCK AT ORANGE/LONG BEACH TRANSIT MALL EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

Page 439: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 437

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

ORANGE TRANSIT BRT S2120012 NEW EXPRESS BUS SERVICE FROM RANCHO SANTA MARGARITA TO

IRVINE

RANCHO SANTA MARGARITA/IRVINE SPECTRUM EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120013 NEW EXPRESS BUS SERVICE FROM RIVERSIDE TO

ANAHEIM

TYLER GALLERIA/ANAHEIM RESORT EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120014 NEW EXPRESS BUS SERVICE FROM

RIVERSIDE TO BREA

TYLER GALLERIA/YORBA LINDA/BREA EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120015 NEW EXPRESS BUS SERVICE FROM

RIVERSIDE TO IRVINE

TYLER GALLERIA/IRVINE BUSINESS COMPLEX/UCI EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120016 NEW EXPRESS BUS SERVICE FROM SAN CLEMENTE

TO SOUTH COAST METRO

SAN CLEMENTE/UCI/SOUTH COAST METRO EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120017 NEW EXPRESS BUS SERVICE FROM SOUTH COAST

METRO TO LONG BEACH

SOUTH COAST METRO/WARDLOW METRO BLUE LINE STATION EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120018 SERVICE INCREASE TO EXPRESS BUS

ROUTES IN CENTRAL COUNTY

CENTRAL COUNTY EXPRESS BUS SERVICE EXPANSION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BRT S2120019 SOUTH COUNTY BRT NEW BRT SERVICE BETWEEN CENTRAL ORANGE COUNTY AND SOUTH ORANGE COUNTY (VIA IRVINE CENTER DRIVE/MOULTON PARKWAY /GOLDEN LANTERN)

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT BUS S2120020 SYSTEMWIDE LOCAL BUS SERVICE

EXPANSION

DESIGN, IMPLEMENTATION, AND OPERATION OF LOCAL FIXED ROUTE SERVICE

ORANGE COUNTY TRANS

AUTHORITY

Page 440: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

438 Project List

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

ORANGE TRANSIT COMMUTER RAIL S2120021 LOSSAN CAPACITY INCREASE TO SAN

DIEGO BORDER

EXTEND DOUBLE TRACK IN TUNNEL SOUTH OF SAN JUAN CAPISTRANO TO SAN DIEGO COUNTY LINE

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT COMMUTER RAIL S2120022 METROLINK SERVICE EXPANSION

PROGRAM

SERVICE FREQUENCY INCREASE TO ALL STATIONS SOUTH OF LAGUNA NIGUEL/MISSION VIEJO

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT HIGH-SPEED RAIL S2120023 CALIFORNIA-NEVADA SUPER SPEED TRAIN

NEW SERVICE FROM ANAHEIM TO ONTARIO

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT OTHER TRANSIT S2120024 FULLERTON TRANSPORTATION

CENTER

TRANSIT STATION IMPROVEMENTS ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT OTHER TRANSIT S2120025 INTERMODAL STATIONS

NEW INTERMODAL STATIONS IN FOUNTAIN VALLEY, SANTA ANA, WESTMINSTER/GARDEN GROVE AND ANAHEIM

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT OTHER TRANSIT S2120026 IRVINE STATION IRVINE STATION MASTER PLAN – TRANSIT STATION IMPROVEMENTS

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT OTHER TRANSIT S2120027 PACIFIC ELECTRIC RIGHT-OF-WAY

(PEROW)

SPECIFIC IMPROVEMENTS AND DESIGN ALTERNATIVES TO BE DEFINED THROUGH ONGOING INTERCOUNTY STUDIES

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT OTHER TRANSIT S2120028 SANTA ANA REGIONAL

TRANSPORTATION CENTER

EXPAND TO INCLUDE FIXED-GUIDEWAY STATION AND MAINTENANCE/STORAGE FACILITY; BRT STATION; RECON-STRUCTED AND ADDITIONAL PARKING; PEDESTRIAN BRIDGES; CIRCULATION IMPROVEMENTS; AND SANTA ANA BOULEVARD GRADE SEPARATION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE TRANSIT PARK-N-RIDE S2120029 PARK AND RIDES INCREASE ACCESS TO PARK AND RIDES AND INCREASE PARKING CAPACITY

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY HIGHWAY S2120030 IRVINE-CORONA EXPRESSWAY

SR-133/SR-241 IN ORANGE COUNTY

I-15 IN RIVERSIDE TUNNEL (CORRIDOR B) ORANGE COUNTY TRANS

AUTHORITY

Page 441: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 439

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

ORANGE STATE HIGHWAY HIGHWAY OPERATIONAL IMPROVEMENT

S2120031 55 SR-55 SR-91 SR-22 OPERATIONAL IMPROVEMENTS ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY HIGHWAY OPERATIONAL IMPROVEMENT

S2120032 74 SR-74 IMPLEMENT OPERATIONAL IMPROVE-MENTS ON STATE ROUTE 74

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY HOV S2120033 5 I-5 ADD ONE HOV LANE EACH DIRECTION FROM SAN DIEGO COUNTY LINE TO AVENIDA PICO

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY HOV S2120034 55 SR-55 I-405 19TH STREET EXTEND HOV LANES ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY HOV, IC/RAMPS S2120035 55 SR-55 ADD HOV RAMPS AT ALTON PKWY ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY HOV, IC/RAMPS S2120036 405 I-405 ADD HOV RAMPS AT VON KARMAN AVE ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY HOV, IC/RAMPS S2120037 405 I-405 ADD HOV RAMPS AT BEAR ST ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120038 5 I-5 MODIFY INTERCHANGE OF INTERSTATE 5 WITH EL CAMINO REAL

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120039 5 I-5 MODIFY INTERCHANGE OF INTERSTATE 5 WITH PACIFIC COAST HIGHWAY

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120040 5 I-5 IMPROVE INTERCHANGE OF INTERSTATE 5 WITH STATE ROUTE 57 AND STATE ROUTE 22

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120041 22 SR-22 CONNECT STATE ROUTE 22 TO THE PACIFIC ELECTRIC RIGHT-OF-WAY

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120042 73 SR-73 IMPROVE INTERCHANGE OF STATE ROUTE 73 WITH EL TORO RD AND LAGUNA CANYON RD

ORANGE COUNTY TRANS

AUTHORITY

Page 442: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

440 Project List

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

ORANGE STATE HIGHWAY IC/RAMPS S2120043 241 SR-241 ADD NEW INTERCHANGE ON STATE ROUTE 241 AT CROWN VALLEY PKWY

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120044 241 SR-241 ADD NEW INTERCHANGE ON STATE ROUTE 241 AT WEIR CANYON RD

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120045 241 SR-241 IMPROVE INTERCHANGE OF STATE ROUTE 241 NORTHBOUND AND STATE ROUTE 261 SOUTHBOUND AND STATE ROUTE 261 NORTHBOUND AND STATE ROUTE 241 SOUTHBOUND

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120046 405 I-405 IMPROVE INTERCHANGE OF INTERSTATE 405 SOUTHBOUND WITH STATE ROUTE 133 NORTHBOUND

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY IC/RAMPS S2120047 JAMBOREE RD TUSTIN METROLINK STATION DIRECT ACCESS - ADD RAMP FROM JAMBOREE RD TO TUSTIN METROLINK STATION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY MIXED FLOW S2120048 5 I-5 AVENIDA PICO SR-74 ADD ONE MIXED-FLOW LANE IN EACH DIRECTION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY MIXED FLOW S2120049 55 SR-55 19TH STREET INDUSTRIAL WAY EXTEND THE FREEWAY ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY MIXED FLOW S2120050 405 I-405 CULVER DRIVE SR-133 ADD ONE MIXED-FLOW LANE IN EACH DIRECTION

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY TOLL S2120051 TOLL ROADS TRANSPORTATION CORRIDOR AGENCIES – BUILD-OUT OF TOLL CORRIDORS

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY TOLL S2120052 TOLL ROADS FUNDS TO COMPENSATE THE TRANSPORTATION CORRIDOR AGENCIES FOR LOWER TOLLS AND ADDITION OF ONE MIXED-FLOW LANE ON STATE ROUTE 73, STATE ROUTE 133 AND STATE ROUTE 241

ORANGE COUNTY TRANS

AUTHORITY

ORANGE STATE HIGHWAY TRUCK CLIMBING LANE

S2120053 5 I-5 ADD ONE NORTHBOUND TRUCK CLIMB-ING LANE FROM AVENIDA PICO TO AVENIDA VAQUERO

ORANGE COUNTY TRANS

AUTHORITY

Page 443: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 441

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

ORANGE LOCAL HIGHWAY ARTERIAL S2120054 BEACH BLVD AND HARBOR BLVD

CORRIDOR FEASIBILITY STUDY - CONDUCT CORRIDOR FEASIBIL-ITY STUDIES FOR BEACH BLVD AND HARBOR BLVD

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY ARTERIAL CAPACITY

ENHANCEMENTS

S2120055 73, 241 SR-73/SR-241 STATE ROUTE 73/STATE ROUTE 241 ROADWAY CONNECTOR – FOUR LANE LIMITED ACCESS ROAD CONNECTING INTERSTATE 5 AND STATE ROUTE 73 TO ANTONIO PKWY AND COW CAMP RD

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY ARTERIAL OPERATIONAL

IMPROVEMENTS

S2120056 HARBOR BOULEVARD CONSTRUCT GRADE SEPARATED INTERSECTION AT HARBOR BLVD AND BALL RD

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY ARTERIAL OPERATIONAL

IMPROVEMENTS

S2120057 PAULARINO AVENUE AND BAKER AVENUE

AT SR-55

TRAFFIC EFFICIENCY IMPROVEMENTS – IMPROVEMENTS AT OR NEAR FREEWAY INTERCHANGES TO IMPROVE EFFICIENCY

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY ARTERIAL WIDENING

S2120058 HARBOR BLVD WARNER AVE 17TH ST ADD ONE LANE IN EACH DIRECTION ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY GRADE SEPARATION

S2120059 LOSSAN CORRIDOR/17TH ST

NEW RAIL GRADE SEPARATION ON LOSSAN CORRIDOR (SANTA ANA)

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY GRADE SEPARATION

S2120060 LOSSAN CORRIDOR/BALL RD

NEW RAIL GRADE SEPARATION ON LOSSAN CORRIDOR (ANAHEIM)

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY GRADE SEPARATION

S2120061 LOSSAN CORRIDOR/GRAND AVE

NEW RAIL GRADE SEPARATION ON LOSSAN CORRIDOR (SANTA ANA)

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY GRADE SEPARATION

S2120062 LOSSAN CORRIDOR/MAIN ST

NEW RAIL GRADE SEPARATION ON LOSSAN CORRIDOR (ORANGE)

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY GRADE SEPARATION

S2120063 LOSSAN CORRIDOR/ORANGETHORPE AVE

NEW RAIL GRADE SEPARATION ON LOSSAN CORRIDOR (ANAHEIM)

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY GRADE SEPARATION

S2120064 LOSSAN CORRIDOR/SANTA ANA BLVD

NEW RAIL GRADE SEPARATION ON LOSSAN CORRIDOR (SANTA ANA)

ORANGE COUNTY TRANS

AUTHORITY

Page 444: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

442 Project List

Strategic Projects

County System Category RTP ID Route # Route Name From To Description Lead Agency

ORANGE LOCAL HIGHWAY GRADE SEPARATION

S2120065 LOSSAN CORRIDOR/STATE COLLEGE

BLVD

NEW RAIL GRADE SEPARATION ON LOSSAN CORRIDOR(ANAHEIM)

ORANGE COUNTY TRANS

AUTHORITY

ORANGE LOCAL HIGHWAY IC/RAMPS S2120066 MACARTHUR BLVD MACARTHUR BOULEVARD

SR-55 STATE ROUTE 55 RAMP IMPROVEMENT – IMPROVE EASTBOUND ON AND OFF-RAMPS

ORANGE COUNTY TRANS

AUTHORITY

RIVERSIDE TRANSIT INTERCITY RAIL S3120001 COACHELLA VALLEY RAIL SERVICE

L.A. UNION STATION INDIO ESTABLISH DAILY RAIL SERVICE BETWEEN DOWNTOWN LOS ANGELES AND THE COACHELLA VALLEY

LOS ANGELES COUNTY MTA

SAN BERNARDINO

TRANSIT COMMUTER RAIL S4120001 REDLANDS RAIL PHASE III

REDLANDS RAIL PHASE III SAN BERNARDINO ASSOCIATED

GOVERNMENTS

SAN BERNARDINO

TRANSIT OTHER S4120002 SAN BERNARDINO MOUNTAIN-VALLEY RAILWAY SYSTEM

SAN BERNARDINO/HIGHLAND

BIG BEAR LAKE SAN BERNARDINO MOUNTAIN-VALLEY RAILWAY SYSTEM

SAN BERNARDINO ASSOCIATED

GOVERNMENTS

VARIOUS TRANSIT HIGH-SPEED RAIL S7120001 DESERTXPRESS LAS VEGAS PALMDALE HIGH-SPEED RAIL SERVICE FROM LAS VEGAS TO PALMDALE WITH INTERME-DIATE STOP IN VICTORVILLE

VARIOUS AGENCIES

VARIOUS TRANSIT LIGHT RAIL S7120002 0 METRO GOLD LINE MONTCLAIR ONTARIO INTERNATIONAL AIRPORT (ONT)

GOLD LINE FOOTHILL EXTENSION LOS ANGELES COUNTY MTA

VARIOUS STATE HIGHWAY HOT/EXPRESS/MANAGED LANES

S7120003 EXPANDED EXPRESS/HOT LANE NETWORK (BEYOND CONSTRAINED PLAN)

VARIOUS AGENCIES

VARIOUS LOCAL HIGHWAY TOLL S7120004 CORDON PRICING DEMONSTRATION PROJECTS (LOCATIONS TO BE DETERMINED)

VARIOUS AGENCIES

VARIOUS LOCAL HIGHWAY TOLL S7120005 MILEAGE-BASED USER FEE DEMONSTRATION PROJECTS AND IMPLEMENTATION STRATEGY

VARIOUS AGENCIES

VARIOUS OTHER GOODS MOVEMENT

S7120006 LONG-TERM GOODS MOVEMENT EMISSION REDUCTION STRATEGIES FOR RAIL AND TRUCKS; DEMONSTRATION PROJECTS AND IMPLEMENTATION STRATEGY

VARIOUS AGENCIES

Page 445: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

Project List 443

Page 446: SCAG 2012-2035 Draft RTP/SCSrtpscs.scag.ca.gov › Documents › 2012 › draft › SR › 2012dRTP_ProjectList.pdfimpealri transit imp051104 0 in el centro; regional public bus transfer

REGIONAL OFFICESImperial County1405 North Imperial AvenueSuite 1 El Centro, CA 92243 Phone: (760) 353-7800 Fax: (760) 353-1877

Orange CountyOCTA Building 600 South Main Street9th Floor Orange, CA 92863 Phone: (714) 542-3687 Fax: (714) 560-5089

Riverside County3403 10th StreetSuite 805 Riverside, CA 92501 Phone: (951) 784-1513 Fax: (951) 784-3925

San Bernardino CountySanta Fe Depot 1170 West 3rd StreetSuite 140 San Bernardino, CA 92418 Phone: (909) 806-3556 Fax: (909) 806-3572

Ventura County950 County Square DriveSuite 101 Ventura, CA 93003 Phone: (805) 642-2800 Fax: (805) 642-2260

818 West 7th Street, 12th Floor Los Angeles, CA 90017 Phone: (213) 236-1800 Fax: (213) 236-1825www.scag.ca.gov

please recycle 2347 12.20.2011