![Page 1: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/1.jpg)
Scarborough Centre Public Art Master Plan
Jane Perdue, Public Art CoordinatorKelly Dynes, Senior Planner
Toronto Public Art CommissionJuly 12, 2017
![Page 2: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/2.jpg)
Urban Structure Map 2
![Page 3: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/3.jpg)
Scarborough Centre Secondary Plan
![Page 4: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/4.jpg)
There are a number of completed and on-going City of Toronto planning and policy documents, in which support for public art is articulated.
The Public Space and Streetscape Master Plan (2012) reinforces the importance of locating public art in prominent locations, integrating public art with its site and including public art within all types of new private and public development.
Action 6.3 specifically recommends that the City prepare a public art plan for Scarborough Centre to guide acquisitions, ensure quality, identify location and placement for new installations and inform the relocation of existing pieces.
![Page 5: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/5.jpg)
In July 2016, the Scarborough Centre Transportation Master Plan study was initiated. This work will help to inform the Scarborough Centre Public Art Master Plan by identifying a more fine-grained pedestrian friendly transportation network.
Similarly, the ongoing work on the Scarborough Subway Extension and associated bus infrastructure provides a unique opportunity to integrate public art through the design process.
![Page 6: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/6.jpg)
Scarborough Centre Public Art Master PlanDTAH, along with Andrew Davies Public Art Consultants were selected to complete the Public Art Master Plan.
The Master Plan will lay the groundwork for enhancing the public realm with high quality public art in support of the City’s Official Plan policies and will:
• Reinforce urban design objectives for the site, street or district as appropriate;• Assist in identifying public art opportunities at the earliest possible stages ofdevelopment review and in planning for capital projects;• Identify and prioritize a variety of public art types, opportunities and locationsin the public realm;• Provide guidelines for implementation and best practices for art selection;• Result in public art that is of the highest quality, visually stimulating and ofenduring value;• Culturally enrich the Scarborough Centre and respond to local context; and• Have a positive influence in the community and on the City’s cultural andvisual landscape.
![Page 7: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/7.jpg)
The Toronto Public Art Commission (TPAC)July 12, 2017
![Page 8: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/8.jpg)
THE TORONTO PUBLIC ART COMMISSION
Introduction and Background (City) 5-10min.
Presentation 25-30min.
Discussion 25-30min
Conclusion and Next Steps 5-10min.
2
![Page 9: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/9.jpg)
PART 1
INTRODUCTION
3
![Page 10: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/10.jpg)
STUDY OVERVIEW AND TIMELINE
We Are
re
04
COMMUNITY COUNCIL
BACKGROUND ANALYSIS AND CONSULTATION
Oct 2016- Feb 2017
01 02
VISION, PUBLIC ART MASTER PLAN
Feb 2017- April 2017
03
IMPLEMENTATIONSTRATEGIES
Apr 2017 - Mid 2017
Understand Context and Existing Conditions
Local Advisory Committee Meeting #1Jan 17, 2017
Inventory of Existing Collection
Community Consultation #1Jan 25, 2017
School ConsultationFeb 21-27, 2017
Councillor Briefing #1 Nov 22, 2016
Guiding Principles and Vision Statement
Local Advisory Committee Meeting #2March 20, 2017
Draft Public Art Demonstration Plan
Evaluation Methodology and Site Selection Criteria
Community Consultation #2March 27, 2017
Implementation Strategy
Conservation Strategy
Final Report and Demonstration Plan
Scarborough Community Council Presentation
Mid 2017
Toronto Public Art Commission (TPAC) Presentation
eH
4
![Page 11: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/11.jpg)
STUDY AREA
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ayScarborough Town Centre
Highway 401
East Highland Creek
5
![Page 12: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/12.jpg)
13 EXISTING PUBLIC ART WORKSCarl Millies - ‘Hand of God’
James Sutherland - ‘21 Points in Equilibrium’ Uga Drava - ‘Fironacci Cadenza’
6
![Page 13: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/13.jpg)
WHAT IS PUBLIC ART?
• Can be stand alone, site specific, integrated or semi-integrated into other functioning elements such as street furniture, buildings, structures or landscapes.
• Located in the public realm or in a place that is accessible by the public.
• Permanent or temporary.
• Commissioned by or on behalf of the City, public agencies or private developers through a formal process.
• Undertaken or overseen by a professional artist.
7
![Page 14: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/14.jpg)
WHY A PUBLIC ART MASTER PLAN?
• Strategic direction needed.
• Includes guidelines, principles and best practices for future commissioning, implementation and management of public art.
• Process for the City to locate, acquire, manage and maintain public art.
• Implementation plan, budget and conservation strategy.
8
![Page 15: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/15.jpg)
ROLE OF PUBLIC ART IN PLACEMAKING
• Reinforces community and neighborhood identity, and/or reflects community diversity.
• Creates and contributes to memorable places & meaning.
• Adds to the quality of the experience of the private & public realm—“tells a story.”
• Creates a landmark, destination or sense of focus for public spaces.
• Generates cultural, social or economic value.
9
![Page 16: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/16.jpg)
PUBLIC ART TYPES
Independent Sculpture or Discrete Element
Site Specific Works
Integrated / Functional
Happenings (Events or Programmes)
Lantern Festival
LEGO Bridge by Megx, Wuppertal, Germany
Faces of Regent Park by Dan Bergeron, Toronto Marianne Lovink and Scott Eunson - ‘Bike Plants’10
Maman by Louise Bourgeois
![Page 17: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/17.jpg)
SYNERGIES WITH OTHER INITIATIVES IN THE CENTRE
• City Policy Framework
• Scarborough Centre Secondary Plan
• Scarborough Centre Civic Precinct Implementation Plan
• McCowan Precinct Plan
• Scarborough Subway Extension Project Assessment
• Scarborough Centre Transportation Master Plan
• Scarborough Centre Public Space and Streetscape Master Plan
11
![Page 18: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/18.jpg)
PART 2
WHAT WE HEARD
![Page 19: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/19.jpg)
KEY MESSAGES: LAC 1&2 / PUBLIC OPEN HOUSE 1&2
13
Local Advisory
Group
Identity and Culture
Tell the story of Scarborough“Home above the bluffs”“Metamorphosis”“History of the tributary of the Rouge”
Don’t forget pre-European contact
Art Works should celebrate the diversity of Scarborough
Involve the community in the process
Community Consultation
Involve the community
Contribute to a Vibrant
Public Realm
Scale +Impact
Range of scales desired “Large scale ‘memorable ’ piece that puts Scarborough on the map” “up-close and personal pieces”“Consistent theme or narrative over a number of works”
Need for Wayfinding
Public art can contribute greatly to improve wayfinding or be incorporated within a larger wayfinding strategy
Quality of Quantity
Interpretation + Education
Existing collection not well known
Using digital media or other methods to elevate interpretation
Better promotion of public art needed
Realistic and achievable collection
Manage expectations
Coordinate with other initiatives
Making it Happen
Clarity required on what the Public Art Master Plan will do, how it will work and who will use it
Consider local partnerships “UTSC” “Centennial College”
Use Public Art to mark the Civic Centre
Entrance to the TTC is a priority site
Event / temporal based art
Support the use of colour
Support the idea of projections on the Civic Centre
![Page 20: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/20.jpg)
ST. ANDREWS PUBLIC SCHOOL CHARRETTE_ GRADE 7
14
![Page 21: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/21.jpg)
PART 3
STRATEGIC FRAMEWORK
![Page 22: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/22.jpg)
DRAFT PUBLIC ART VISION
“Public art will make Scarborough Centre’s streets, open spaces and parks a delight for residents, workers and visitors alike.
Public art will contribute to the identity and character of the Centre by telling a story about the site’s history, creating landmarks and celebrating the cultural diversity and creativity of all of Scarborough.”
Martin Reis and Urban Arts Collective - PanAm Path mural 16
![Page 23: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/23.jpg)
DRAFT GUIDING PRINCIPLES
Prioritize High Profile Sites and Areas Under-Served by Public Art
Promote Creativity and Innovation
Contribute to Cultural Vitality andSense of Place
Integrate with Public Infrastructureand Facilities, New Buildings, Transit Areas and Open Spaces
Foster Learning, Inquiry and Dialogue
Encourage Works byLocal, National and International Artists
Promote Community Identity, Involvement and Participation
Support Diverse Approaches to Public Art
Provide Opportunities and Initiatives Accessible to All
Connect People and Places
Respecting theAdjoining Neighbourhoods and Employment Lands
SCARBOROUGH CENTRE PUBLIC ART MASTER PLAN
GUIDING PRINCIPLES
17
![Page 24: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/24.jpg)
DRAFT EVALUATION CRITERIA
• Site Selection
• Placement
• Artist Selection
‘Light Play’ by Studio F Minus 18
![Page 25: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/25.jpg)
PART 4
DRAFT PUBLIC ART DEMONSTRATION PLAN
![Page 26: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/26.jpg)
PRIMARY GATEWAYS
20
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
![Page 27: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/27.jpg)
PRIMARY GATEWAYS: PRECEDENTS
Hal Ingberg - Papa’ Winstom Salem Art Park - Artivity on the Green
Alexander Calder - ‘The Red Spider’
Tree Quilts by Fugitive Glue21
![Page 28: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/28.jpg)
SECONDARY GATEWAYS
22
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
![Page 29: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/29.jpg)
SECONDARY GATEWAYS: PRECEDENTS
Ned Khan - ‘Kinetic Facade’
Wendy Taylor - ‘Octo’ Quebec City - Grande Bibliotechque
Eizner Design - Manufaktura Wayfinding Jim Sanborn - ‘All the Ships in a Circle’
Budapest, Hungary - Street Lights23
![Page 30: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/30.jpg)
CULTURAL IDENTITY
24
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
![Page 31: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/31.jpg)
CULTURAL IDENTITY: PRECEDENTS
WRT and Gary Moore - Overtown Pedestrian Mall, Miami, FL
Stuart Green - ‘Fine China’
Scott Eunson and Marianne Lovink - ‘Site Specific’
Studio F Minus - ‘Light Play’
Taiwan Lantern Festival 2006 - c. Stan Chiou25
![Page 32: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/32.jpg)
GREEN IDENTITY
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
26
![Page 33: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/33.jpg)
GREEN IDENTITY: PRECEDENTS EAST + WEST HIGHLAND CREEK
Noel Harding - ‘Elevated Wetlands’
Buster Simpson Linda Gass - ‘Rivulet at Park Creek’27
![Page 34: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/34.jpg)
TRANSIT
28
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
![Page 35: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/35.jpg)
TRANSIT: PRECEDENTS
Jody Pinto - Charlotte (NC) Transit Shelters
Karen Shanski and Eduardo Aquino - ‘Something Happens Here’James Sutherland - “Spadina Summer’29
![Page 36: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/36.jpg)
INFRASTRUCTURE / STRUCTURES
30
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
![Page 37: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/37.jpg)
INFRASTRUCTURE / STRUCTURES: PRECEDENTS
I-5 Bridge Ravenna Blvd, Seattle
Megx - ‘Lego Bridge’Interactive Arts Collective - ‘Untitled’31
![Page 38: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/38.jpg)
PRIVATE DEVELOPMENT SITES [NOT EXACT LOCATIONS]
32
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
![Page 39: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/39.jpg)
PRIVATE DEVELOPMENT SITES: PRECEDENTS
Katherine Harvey - ‘Gardiner Streams’
Shayne Dark - ‘Double Vision’ + ‘Double Take’
Tom Otterness - ‘Immigrant Family’ 33
![Page 40: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/40.jpg)
DRAFT DEMONSTRATION PLAN
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
1.A
2
6
1.B3
1.D
Gateways: Primary
Gateways: Secondary
Places: Green Identity Places: Cultural Identity
Transit
Infrastructure /Structures
Private Development [Not Exact Locations]
34
![Page 41: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/41.jpg)
PART 5
IMPLEMENTATION +BUDGET +
CONSERVATION STRATEGY
35
![Page 42: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/42.jpg)
PRIORITIES
Immediate to Short Term
• Concentrate efforts in the Civic Precinct to help strengthen the heart of the Centre
• Celebrate and promote the existing collection. I.e. art walk, use of social media, interpretation, other.
• Intersection improvements or state of good repair: Ellesmere and Borough Drive Approaches
• Bushby/ Town Centre Promenade to connect the Civic Precinct to the new park and public school site in the McCowan Precinct
Vivid Sydney Light Show
36
![Page 43: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/43.jpg)
PRIORITIES
Medium Term
• Expand public art intensity outwards from Albert Campbell Square.
• Link public art to all public and private investment opportunities and munipal projects
James McLeod - ‘Evolution Unrolling’
37
![Page 44: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/44.jpg)
PRIORITIES
Long Term
• Future Scarborough Centre transit investment and on-going public and private investment opportunities.
James Angus - ‘Untitled’ (Perth City, AU) Tadashi-Kawamata - ‘Untitled’
Michael-Hayden - ‘Arc-en-Ciel’ (Yorkdale Station)38
![Page 45: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/45.jpg)
13 PRIORITY PROJECTS
Borough Drive
Golden Gate
Frank Faubert Woods
Albert Campbell Square
Woodlot
Civic Green
Civic CommonWoodlot
Woodlot
Progress Avenue
Progress Avenue
Bushby Drive
Ellesmere Road
Corporate Drive
Gra
ngew
ay A
venu
eC
onsi
lium
Pla
ce
TTC Yard
West Highland Creek
Lee Centre
Park
Bria
n H
arris
on W
ay
Scarborough Town Centre
Highway 401
East Highland Creek
1
23
45
6
7 89
9
10
1112
13
39
![Page 46: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/46.jpg)
EXAMPLE PRIORITY PROJECT: #5 PLACES: GREEN IDENTITY
Claude Cormier - ‘Solange’Tanghe River Park- ‘Red Ribbon’ Lea Turto - ‘Sacred Realm of the Forest Elf’
No. Site Type
Priority Location
Public Art Objectives
Type Partnership Opportunities
Budget Range
Time Horizon
5 Places: Green Identity
Frank Faubert Woodlot
Conceptually connected artwork along the n/s pathways through the woodlot.
Site Specific Arts or nature organizations, Economic Development & Culture
Small Medium Term
40
![Page 47: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/47.jpg)
EXAMPLE PRIORITY PROJECT: #7 PLACES: CULTURAL IDENTITY
Silo Projections - Quebec City ‘Just a Rumor’ - Anna Schlueit-Haber
No. Site Type
Priority Location
Public Art Objectives
Type Partnership Opportunities
Budget Range
Time Horizon
7 Places: Cultural Identity
Albert Campbell Square
Work with community to engage public art within an event or series of on-going events
Temporary Corporate, Tourism Toronto, Art Councils, UofT, Centennial College, Ecomonic Development & Culture
Medium Immediate to Short Term
41
![Page 48: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/48.jpg)
IMPLEMENTATION STRATEGIES
Budgets and Artist Call Ranges
Funding Strategies
Acquisition Strategies
Art Selection Process
Maintenance and Conservation Recommendations
“Rainbow Net’ by Toshiko Horiuchi-Macadam, Japan
42
![Page 49: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/49.jpg)
MAKING IT HAPPEN
Work in a Coordinated and Strategic Way
• Work with partners and stakeholders in planning and delivery.
• Link and align the public art implementation plan to upcoming or ongoing initiatives, development or municipal capital projects.
Update Regularly
• Evaluate at minimum 5 year periods.
• Any changes should be done in regard to main principles and strategies of this plan.
43
Measure Success over Time
• Document the successes that result.
• Learn from previous projects.
• Apply lessons learned to those that follow.
![Page 50: ScarbTrTuLh Centre Public Art Master Plan · Oct 2016- Feb 2017. 01 02. VISION, PUBLIC ART MASTER PLAN. Feb 2017- April 2017. 03. IMPLEMENTATION STRATEGIES . Apr 2017 - Mid 2017](https://reader034.vdocument.in/reader034/viewer/2022042606/5f64e2167b5c3d0e6c633e3b/html5/thumbnails/50.jpg)
NEXT STEPS
• Incorporate feedback from TPAC
• Final Report + Demonstration Plan
• Scarborough Community Council Presentation
For more information visit: www.toronto.ca/scpublicart
James Angus - ‘Untitled’ (Perth City, AU)
44