Annual Mining Reporting Form - Energy and Earth Resources Page 1 of 6 RtGULATION VICTORIA Schedule 19: Annual Activity and Expenditure Return Mineral Resources (Sustainable Development) (Mineral Industries) Regulations 2013 - Regulation 35 Section 1: Mining licence number and operation name: (One licence only per form) Mining Licence Number Operation Name Licensee Operator (if not licensee) Reporting Period MIN 5004 Hazelwood Mine Hazelwood Power Corporation 2013/2 014 Declaration : To the best of my knowledge and belief the particulars entered on this return and in th e attachments are correct and no figures, information or diagrams required under Regulation 35 of the Mineral Resources (Sustainable Development) (Mineral Industries) Regulations 2013 have been omitted. Signature: Date: Name: (Block letters) Job Tit le : Telephone REPORT 4th September 2014 Stan Kemsley Manager Tech nical Compliance - Mine Section 2: Expenditure (Schedule 19, Section 4 to 9) Wages and Salaries Land Access Compensation - Access to land (Private) - Native Title Compensation Expenditure on equipment, plant or machinery Overheads* (should not exceed 20% of the total expenditure) Expenditure on rehabilitation Expenditure on exploration (as distinct from mining) if any; under the following headings: Office Studies Airborne exploration surveys $123,753 Nil Nil http: // www.energyandresources.vie.gov .au/earth-resources/licensing-and-approvals/minerals/li... 410912014 DEDJTR.1007.001.0189

Upload: phungnguyet

Post on 01-Sep-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Annual Mining Reporting Form - Energy and Earth Resources Page 1 of 6

.t!:~VED E.~r·.i:i;· ;~ESOURces RtGULATION VICTORIA

Schedule 19: Annual Activity and Expenditure Return Mineral Resources (Sustainable Development) (Mineral Industries) Regulations 2013 - Regulation 35

Section 1: Mining licence number and operation name: (One licence only

per form)

Mining Licence Number

Operation Name

Licensee

Operator (if not licensee)

Reporting Period

MIN 5004

Hazelwood Mine

Hazelwood Power Corporation

2013/2014

Declaration : To the best of my knowledge and belief the particulars entered on this return and in the attachments are correct and no figures, information or diagrams required under Regulation 35 of the Mineral Resources (Sustainable Development)

(Mineral Industries) Regulations 2013 have been omitted.

Signature:

Date:

Name: (Block letters)

Job Title:

Telephone

REPORT

4th September 2014

Stan Kemsley

Manager Technica l Compliance - Mine

Section 2: Expenditure (Schedule 19, Section 4 to 9)

Wages and Salaries

Land Access Compensation - Access to land (Private) - Native Title Compensation

Expenditure on equipment, plant or machinery

Overheads* (should not exceed 20% of the total expenditure)

Expenditure on rehabilitation

Expenditure on exploration (as distinct from mining) if any; under the following headings:

Office Studies

Airborne exploration surveys

$123,753

Nil

Nil

http://www.energyandresources.vie.gov .au/earth-resources/licensing-and-approvals/minerals/li... 410912014

DEDJTR.1007.001.0189

spencer.mitten
Comment on Text
Keep

Annual Mining Reporting Form - Energy and Earth Resources

Remote sensing imagery

Ground exploration - mapping, surveying etc ...

Expenditure on mining work undertaken.

Drilling

Surface Development - costeaning or bulk sampling

Total expenditure for licence

Nil

Nil

Nil

Nil

Nil

$76,399,377

Page 2 •of 6

*Allowable overhead costs include rent, office supplies, photocopying, tenement management, Aboriginal Heritage Surveys,

equipment maintenance, accommodation, construction materials, field materials and administrative costs. An acceptable level

of overheads should not be more than 20% of the total claim. Accommodation claims should include attaching details eg:

period of accommodation, number of people, location of accommodation etc.

Section 3: Production (Schedule 19, Section 1 Ob)

Specific ore or mineral produced for Period

Brown Coal

Total quantity of ore or mineral produced (tonnes, m3, ounces, grams)

16,486,937

Total value of ore or minerals produced ($000)

Metallic content of production (%)

N/A

Important note: if your operation includes more than one title you may choose to complete the following pages of this report

using combined data for all titles at your site. If doing so please indicate the title numbers below.

Title Numbers: N/A

Section 4: Mining Works (Schedule 19, 1 Oa,c,d)

ARE YOUR MINING WORKS IN ACCORDANCE WITH YOUR

APPROVED WORK PLAN?

4. 1 Underground Mining

ARE THERE ANY UNDERGROUND MINE WORKINGS AT THE SITE?

YES Complete this section @Go to section 4.2

Details of underground workings

s No

1. Attach a detailed current plan of any underground mine to this report. Plans should clearly indicate dimensions, structural

features, access points, ventilation, services and security measures.

2. Provide a description of any shaft or underground development during the reporting period, including the depth or

distance developed. (Attach additional pages if necessary)

http://www.cnergyandresources.vic.gov.au/earth-resources/licensing-and-approvals/minerals/li... 4/09/2014

DEDJTR.1007.001.0190

spencer.mitten
Comment on Text
keep

Annual Mining Reporting Form - Energy and Earth Resources Page 3 of 6

4. 2 Surface mine facilities and works

1. Describe any development or extensions to surface mine facilities and works; (Attach additional pages if necessary)

2 . If there have been significant changes a scale plan of the site should be attached to clearly indicate developments or

extensions to the site over the reporting period. (eg Infrastructure, dams, plant, etc)

As per t he Appr ove d Work Plan , developme nt of the Mine ha s co~ti~ued to the West . The attache d Drawing (LV66/20-l /034) shows the ope r a ting face positions for tne Mine at t he s ~ s rt of July 20 13 a nd e nd o f Ju~e 2014

Section 5: Land Disturbance and Land Rehabilitation (Schedule 19,

sections 11 ,a,b,c,d)

5.1 Details of land disturbance and rehabilitation

A the total current area of land disturbed

The proportion of this area that has been disturbed in relation to each of the following:

Pits

ii Overburden and waste rock dumps

iii Tailings storage facilities

iv Infrastructure

B Area of land disturbed during the fast reporting period

C Area rehabilitated over the fast reporting period

The proportion of this area that has been disturbed in relation to each of the following:

Pits

ii Overburden and waste rock dumps

iii Tailings storage facil ities

2445 ha

1181 ha

823 ha

47 ha

Nil ha

22.8 ha

7 ha

7 ha

0 ha

Nil

ha

http://www.energyandresources.vic.gov.au/earth-resourcesllicensing-and-approvals/minerals/li... 4/09/2014

DEDJTR.1007.001.0191

Annual Mining Repo11ing Form - Energy and Earth Resources

iv Infrastructure Nil ha

Page 4-of 6

D Proportion of the area rehabilitated over the reporting period (C above) that was revegetated with local 0 native species: %

5.2 Estimate of rehabilitation liability

What is the current bond for the site

What is the current estimated rehabilitation liability for the site

Describe any methods and assumptions used in calculation

$ 15,000,000

$ 850,000

The method and assumptions used for calculating the liability for the next reporting period were : For the July 2014 to December 2014 period the estimate based on scoped works for rehabiliLation of the Northern Batters (see Drawing LV66/20 - l/053) was $800 , 000

For the January 2015 to June 2015 period the estimate is $50 , 000 based on minor maintenance and rehabilitation preparation for the reaminder of the year.

Thus the total Estimated Liability for the 2014/2015 reporting period is $850 , 000

http://www.energyandresources.vie.gov .au/eaith-resources/licensing-and-approvals/minerals/li .. . 410912014

DEDJTR.1007.001.0192

spencer.mitten
Comment on Text
keep

Annual Mining Reporting Fonn - Energy and Earth Resources Page 5 of 6

Section 6: Dams and Waste Streams (Schedule 19, section 12a,b)

ARE THERE ANY TAILINGS DAMS WITHIN THE LICENSED AREA?

~omplete this section NO Go to section 7

6.1 Tailings Dams

Status and area of tailings dams

Operational Care and maintenance Partially rehabilitated Rehabilitated Totals

Number in each 2 2 status category

Total area in each 47 47 category (ha)

6.2 Volume and composition of tailings produced Section 12a

Please complete and attach a Tailings Storage Data Sheet (separate) for each tailings storage facility at the site.

6.3 Volume and composition of tailings produced Section 12b

Where possible, quantify other significant waste streams generated on-site during the reporting period: (Attach additional

pages if necessary).

Waste Stream Composition Quantity

Hazelwood Ash Pond No Ashing Waste, EPA land1 19130

Hazelwood Ash Pond No EPA landfill general wast 139150

Management measures

EPA licenced landfill usin

EPA licenced landfill usin

Section 7: Environmental Management (Schedule 19, Section 12)

7.1 Environment Monitoring

DO YOUR APPROVED WORK PLAN AND/OR THE ASSOCIATED WORK PLAN CONDITIONS REQUIRE YOU TO CARRY

OUT ENVIRONMENTAL MONITORING?

@omplete this section NO

Provide a statements outlining whether the licensee has complied with environmental monitoring requirements during the

reporting period as outlined under the work plan and conditions, including details of any non-compliances that have not

otherwise been reported in accordance with regulation 33 (reportable events).

http://www.energyandresources.vie.gov .au/earth-resourcesflicensi ng-and-approvals/mi nerals/li. .. 410912014

DEDJTR.1007.001.0193

Annual Mining Reporting Form - Energy and Earth Resources Page 6of6

The MIN 5004 licence has the following requiremnts Environmental Elements a nd outputs for t he reporting period :

Environmental Review Conunittee - - conducted quarterly Dust Mo nito ring - ~arget is 4mg / m2 - Achieved 2 . 4g/n2 Dust com9laints - Nil Noi se complaints - Nil

---------------------· - - -

Energy and Earth Resources

t__ _____ ~-

DEPARTMENT OF STATE DEVELOPMENT

BUStNESS AND INNOVATION

St.lie CQo.>emment

Vic tort

http://www.energyandresources.vic.gov.au/earth-resources/licensing-and-approvals/minerals/li.. . 410912014

DEDJTR.1007.001.0194

-tt<Ul1ltM9

••• • I •••• e

4

COCl. ING POICl l'OWEA STATION

TAILIMCS 14!! he

IHMA, - 1,2,3,41

TOTAi. DISTlllBED LMCJS

MllE 1'1'16 l!l!!l he

MllE 2813 1836 he

MllE 2814 18'1!! he

MllE 2914 244!! he

MllE FACE • 11712913

MllE FACE • 3116/2914

MEA Cl' LAIC> DISTIJlllED Dll'ING LAST REPORTING PERIDO 22.8 he

© All RIGHTS RESERVED NO PAqT Of 1115 DRAWN;

G~~ ~"'" "'~Z MAY9ER[PllOOUCEDDI! '~r'" ~~ ~ COP(OINANYFORMORBY

ANY M[ANS WITHOUT TH[ WRlll[N P[RHJSSICN Of GDF SUH HAZEL WOOD

ORAWN IWt GDF SUEZ HAZELWOOD. PO BOX 195. HORWELL.VICTORIA. 3840. AUSTRALIA J DATE Ml: JOtl - - l CHECKCO IOIS ORG No LV66/20 - l/034 R3Ev i-----;,- ;-, -----------------~---;r----; DATE

~?.".1---;--~~~~~~~---r----+--_:-_-_-~----i~ 1 =- HAZELWOOD MINE 0t:SIUNE01111111A1£0 DISTURBED LANDS

112014 B 2011. AR[A, ASH POt.'llS. OB om>S' NEii SH£tl AT AUGUST 2014

DATE REV j 110/fl[ OESCRIPllON CHKO Al'PV APPROVED lGOf SUEZI

A

B

0

m201d034B.dr:in 04i o9i 2014 13 58 ·53~===(=AO=O=FOR=H=A=l ======='==="'=====\l=OR=K=OR=OE=R=NO====~====f=ILE=N=O=======A="3=V='

DEDJTR.1007.001.0195

r:: +

'i ~ • ; a: < < z 0 ;:: <

ii5 • < "':c

r

,, I!

I• OY>Oln• WO'D> +

DEDJTR.1007.001.0196

Tailings Storage Data Sheet - Energy and Earth Resources

Tailings Storage data sheet Download the PDF version of this document: J- Tailtngs Storage data sheet

Project Data

LicenseM'ork Authority:

Licensee:

Operation/Site name:

TSF name:

Location:

Municipality:

TSF centre coordinates (GDA94):

Name data provider:

Telephone:

TSF Data

TSF Status:

EPA

Hazelwood Power Corporation

MIN 5004

Hazelwood Ash Pond No 1 (HAP1)

Hazelwood Mine

Latrobe City

5764295N

Hazelwood Mine

North

Date: 4/9/14

447508E

Proposed ~nal) Type of TSF1 EPA landfill

Care and Maintenance Part rehabilitated

Number of Cells2 1

East

Rehabilitated

Catchment area3 12 Ha Nearest watercourse Bennets Creek

Date deposition completed Date deposition started (mrn/yy) 1960's

Tailings discharge method4 Slurry Water recovery methods Outside wall pump

Bottom of facility sealed or lined? Y/N Y

Depth to original groundwater level

Ore process7 Gravity Separation

IMPOUNDMENT VOLUME: Present 401,200

MASS OF SOLIDS STORED: Present

tonnes

Foundation soils Wall lifting by

m

Foundation rocks Upstream Downstream

MAX WALL HEIGHT (AGL)9 Present 6

CREST LENGTH

IMPOUNDMENT AREA

Present 1 ,380 m

Present 12 Ha

Type of seal or liner6 Clay

Original groundwater

Material storage rates 19, 130 m3

m3 Expected maximum 446,070

Expected maximum

tonnes

Centre line

m Expected

m Expected max

m Expected max

mg/1

m

Page I of 2

m3

m

m

http://www.energyandresources.vie.gov .au/earth-resources/licensing-and-approvals/minerals/g... 510912014

DEDJTR.1007.001.0197

Tailings Storage Data Sheet - Energy and Earth Resources P.age·2of2

Properties of Tailings

rDs 10 8575 Solids content%

mg/1 pH 12.2

Deposited density WAD CN11 Total CN tlm3 mg/1 mg/1

Chemical Constituents of tailings12

Solid I Constituent Liquid Conc.(units)13 Constituent

Sulphate liquid 4100 mg/I Al203

Sodium liquid 2350 mg/I Fe203

Chloride liquid 1110 mg/I MgO

Calcium liquid 838 mg/I S03

Potassium liquid 188 mg/I Ti02

Si02 solid 36 .2% db K20

Cao sol id 21 .9% db Na20

(To print this form, please use the Printer Friendly link at the top of this page)

Energy and Earth Resources

DEPARTMENT OF STATE DEVELOPMENT

BUSINESS ANO INNOVATION

Solid I Liquid

Conc.(units)11

solid 9.4% db

solid 8.6% db

solid 7.3% db

solid 1.6% db

solid 0.77% db

solid 0.46% db

solid 0.4% db

State Government

Victoria

http://www. energyandresources. vie.gov. au/ ea11h-resources/ licensi ng-and-approvals/minerals/ g... 5/09/201 4

DEDJTR.1007.001.0198

Tailings Storage Data Sheet - Energy and Earth Resources

Tailings Storage data sheet Download the PDF version of this document: )- Tailings Storage data sheet

Project Data

License/Work Authority: EPA Date: 4/9/14

Licensee:

Operation/Site name:

Hazelwood Power Corporation

MIN5004

TSF name:

Location:

Hazelwood Ash Pond No 4 (HAP4)

Hazelwood Mine

Municipality : Latrobe City

TSF centre coordinates (GDA94): 5765100N

Name data provider:

Telephone:

Hazelwood Mine

TSF Data

TSF Status:

Proposed ~ Care and Maintenance

Type of TSF1 EPA Landfill

Catchment area3 37.4 Ha

Date deposition started (mm/yy) 1980

Tailings discharge method4 Slurry

Bottom of facility sealed or lined? Y/N Y

Depth to original groundwater level

Ore process7 Gravity Separation

IMPOUNDMENT VOLUME: Present 5,930,361

MASS OF SOLIDS STORED: Present

tonnes

Foundation soils Wall lifting by

m

Foundation rocks Upstream Downstream

MAX WALL HEIGHT (AGL)9 Present 26 m

CREST LENGTH Present 2,267 m

North 448491E

Part rehabilitated

Number of Cells2 1

East

Rehabilitated

Nearest watercourse Bennetts Creek

Date deposition completed

Water recovery methods Floating Pump

Type of seal or liner6 Clay

Original groundwater mgf1

Material storage rate8 139, 150 m3

m3 Expected maximum 7,920,415

Expected maximum

tonnes

Centre line

m Expected

m Expected max

Page l of 2

m3

m

m

http://www. energyandresources. vi c.gov .au/ earth-resources/I icensing-and-approval s/mi neral s/ g... 510912014

DEDJTR.1007.001.0199

Tailings Storage Data Sheet - Energy and Earth Resources P.age 2·of 2

IMPOUNDMENT AREA Present 32 Ha m Expected max m

Properties of Tailings

TDS10 7850 Solids content%

mg/1 pH 11.0

Deposited density WAD CN11 Total CN Um3 mg/1 mg/1

Chemical Constituents of tailings12

Solid I Constituent Liquid Conc.(units}13 Constituent

Si02 solid 36.2% db K20

Cao solid 21 .9% db Na20

AL203 solid 9.4% db Sulphate

Fe203 solid 8 .6% db Sodium

MgO solid 7.3% db Chloride

S03 solid 1.6% db Calcium

Ti02 solid 0 .77% db Potassium

(To print this form, please use the Printer Friendly link at the top of this page)

I Energy and Earth Resources

DEPARTMENT OF STATE DEVELOPMENT

BUSINESS AND INNOVATION I __ _

------------ ---- ------ - -

Solid I Liquid

Conc.(units)1 1

solid 0.46% db

solid 0.4% db

liquid 4100 mg/I

liquid 2550 mg/I

liquid 925 mg/I

liquid 240 mg/I

liquid 228 mg/I

St<it~ GO\o',,.-n~nl

Victoria