SchedulesGC21 (Edition 2) - General Conditions of Contract
Schedule 19 - Document Submission
Schedule
Document Submissions Schedule for Pre-agree Variation
The following documents must be provided by the Contractor for the Pre-agreed Variations outlined in Schedule 10:
Planning DocumentationThe Contractor will co-ordinate with and assist the Principal in the preparation of the necessary Planning Documentation. This will include the preparation of the Construction Management Plans and other documents including relevant design certification etc.
1. Design Management Plan including but not limited to:• Design Management strategy & program• Stakeholder & User Group Strategy• Design Review and Sign-Off Process.• Design Deliverables Schedule
2, Preliminary Design: (Mezzanines only)• Architectural drawings, schedules & reports including but not limited
to:o Architectural Design Report including interface with &
impacts on the SFSR Project, o Tenancy Layouts & Schedule of Accommodation o Elevations o Sectionso General Arrangement Drawings o Benchmarking & Finisheso Visualisations & three-dimensional renders for marketing
purposes.
3. Schematic design:• Architectural design package including drawings, schedules & reports
including but not limited to:o Architectural Design Report including interface with &
impacts on the SFSR Project, o Elevations o Sections & Details o General Arrangement Drawings o Detailed Plans o Interior Layout Drawings o Finishes Schedules & Specifications o FF&E Scheduleo Schedule of Accommodation & Room Data Sheets o Samples Schedule
![Page 2: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/2.jpg)
SchedulesGC21 (Edition 2) - General Conditions of Contract
o Visualisations & three-dimensional renders for marketingpurposes.
• All other necessary design deliverables as required in the Project Brief or Pre-Agreed Variation Briefs to document the co-ordinated design, including but not limited to:
o Structural■ Structural Scheme Design Report■ Structural Plans■ Structural Details & Sections
o Building Services including Stonnwater and Aquatic Engineering:
■ Building Services Schematic Design Report including integration and/or augmentation of the SFSR Building Services.
■ Building Services Schematic Plans■ Utility Reticulation Plans■ Plant Room Spatial■ Schedule of Plant■ Diversions and Relocations
o Catering & Hospitality Design Package
4. 60% Detail Design• An updated Architectural design package including an update to the
drawings, schedules & reports as listed in Schematic Design, and all additional documents required to define the co-ordinated design, including but not limited to:
o Samples & Finishes Boards o Waterproofing Details o Roof, Faqade & Glazing Details o Wayfmding & Signageo Door & Hardware, Window & Louvre Schedules o Architectural Elements/Metalworks Detail o Finishes Detailso Detailed Interior Layouts / Room Layout Sheets o Sanitary Fixtures o Joiner Details o Acoustie Details
• All other necessary design deliverables as required in the Project Brief or Pre-Agreed Variation Brief to document the co-ordinated design, including an update to the documents listed in the Schematic Design and additional documents such as:
o Structural Specificationo Building Services including Stormwater and Aquatic
Engineering:■ Building Services Specifications■ Plant Room Layouts and key sections■ Building Services Detailed Plans (including pipework
& ductwork reticulation)o Catering & Hospitality Design Package
![Page 3: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/3.jpg)
SchedulesGC21 (Edition 2) - General Conditions of Contract
RequiredDocument
Contractor's Project PlansWithin 30 Days after the Date of ContractWork Health and Safety Management
Plan30 Days after Contract AwardCommunity Engagement Plan30 Days after Contract AwardStakeholder Management PlanWithin 30 Days after the Date of ContractEnvironmental Management Planand10 Days prior to commencement of any activities on the Site
Construction Management Plan
30 days after Contract AwardDesign Management Plan30 Days after Contract AwardConstruction Traffic Management Plan
(inch traffic control plans)30 Days after Contract AwardRisk Management Plan30 Days after Contract AwardQuality Management Plan30 Days after Contract AwardWorkplace Relations management Plan10 Days prior to commencement of any activities on the Site
Remediation Action Plan
9 months prior to the Contract Completion Date, with regularly updated completion program (at least monthly)At least 10 Business Days before first mobilising to the Site
Completion Plan (inch Completion Program)
Asbestos Management Plan
Within 28 days of completing that workWork as Executed Drawings
Not less than 20 Business Days before commencing the work to which they apply
Inspection and Test Plans
Per Schedule 40, Section 4.1Conformance records
Within 60 days after the Date of Contract and a Participation Report must be submitted when the Contract is 90% complete
Aboriginal Participation Plan
Before works commence in an area adjacent to property or assets
Dilapidation Reports
No later than the seventh (7th) day of each month
WHS Management Monthly Report
Within 14 days after the Date of Contract and every month during construction
Contract Program
![Page 4: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/4.jpg)
SchedulesGC21 (Edition 2) - General Conditions of Contract
RequiredDocumentWith each payment claimEnvironmental Management Monthly
Report
Submit a progress report every two months, and a summary report before Completion in the form of a Waste Recycling and Purchasing Report
Waste Management Progress Report
Before commencing works affected by samples
Sample register
Prior to orderingPlant and Equipment Details
As soon as practicable from date of contract award
Communications and Document Management system
On the last Business Day prior to the end of each calendar month Payment Claim
Within 13 weeks after achieving Completion of the whole of the WorksFinal Payment Claim
![Page 5: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/5.jpg)
SchedulesGC21 (Edition 2) • Generai Conditions of Contract
Schedule 20 - Site Access Schedule
Part A - Site Plan
Phase 1 Site Plan
Phase 2 Site Plan
![Page 6: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/6.jpg)
SchedulesGC21 (Edition 2) - Generai Conditions of Contract
Part B - Site Access Dates(a) The Site boundary shifts to include site infrastructure additional to
those nominated at the time of Contractor site possession over a period of set access dates. The infrastructure and the access dates for the Contractor are set out in Table 3.
(b) Please refer to Schedule 20 Part A - Site Plan for information on site infrastructure and area location details.
Site and Site Infrastructure:Site Access Date for Contractor
Partial SFS precinct as per Phase 1 Site Plan (See attachment)Remainder of Site as per Phase 2 Site Plan (see attachment)
9 January 2020
28 February 2020
Table 3 - Contractor Site Access Dates for Site Areas
![Page 7: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/7.jpg)
SchedulesGC21 (Edilion 2) - General Conditions of Contract
Part C - Site Access ConditionsThe Contractor must complete the Stadium Works, and the Off-Site Works without compromising the full and efficient operation of site infrastructure in the SCOT Precinct.
Site Infrastructure operational throughout work in connection with the contract:
(a)
(b)
SCO, including the SCO basement. Scheduled shut downs of Paddington Lane will be required throughout business hours to facilitate necessary in ground and high risk works within or immediately adjacent to the Lane. These shut downs will require detailed plaiming (including consultation and communication with the relevant stakeholders).
The Rugby Australia House building including the pedestrian and carpark access off Moore Park Road and pedestrian access off MPl to the rear of the building.
(iii) the Rugby Australia House building carpark access off Moore Park Road. This includes entry to the carpark from Moore Park Road via the Sheridan Building with carpark exit from Rugby Australia House building (via a separate layback from the entry) on Moore Park Road as indicated in Figure 1 - Rugby Australia House Building Access Requirements at Site Possession.
(i)
(ii)
&
and from RugbyAustralia HouseBuilding to bemaintainedthroughout Works.
Figure 1 - Rugby AustraUa House Building Access Requirements at SitePossession
![Page 8: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/8.jpg)
SchedulesGC21 (Edilion 2) - General Conditions of Contract
(iv) the newly designed and constructed entrance and associated existing carpark exit access from Moore Park Road to the Rugby Australia House building will form part of Stage 2 works as indicated in Figure 2 - Rugby Australia House Building Access Requirements as Designed and Constructed by the Contractor.
Figure 3 - Rugby Australia House Building Access from Moore Park Road as Designed and Constructed by the
ContractorM
tPedestrian access toand from RugbyAustralia HouseBuilding to bemaintainedthroughout Works. J and from Rugby
fP? Australia HouseBuitdlr>g to be >,maintair>edthroughout Works.
Rugby Austraba HouseBuilding
stir BOUNDARY
Figure 2 - Rugby Australia House Building Access Requirements as Designedand Constructed by the Contractor.
sue Boo''da
Figure 3 - Rugby Australia House Building Access from Moore Park Road asDesigned and Constructed by the Contractor
![Page 9: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/9.jpg)
SchedulesGC21 (Edition 2) - General Conditions of Contract
Rugby League Central, including pedestrian and carpark access off Driver Avenue and MPl to the rear driveway of the building as indicated in Figure 4 - Rugby League Central Pedestrian Access Points and
(v)
Figure 5 - Rugby League Central Vehicle Access Points;(Vi)
1
Figure 4 - Rugby League Central Pedestrian Access Points
Site Boundai y
Figure 5 - Rugby League Central Vehicle Access Points
Figure 6 - Satellite OB Uplink Position
Site Infrastructure operational for part of the work in connection with the contract:
(c)
![Page 10: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/10.jpg)
SchedulesGC21 (Edition 2) - General Conditions of Contract
Operational Continuity as per Schedule 40;
(ii) Event access as per Schedule 20 and Schedule 39; and
(iii) The Walk of Honour (east of the Indoor Cricket Centre) such that sufficient safe curtilage for access to practice wickets and tennis courts is provided for Stage 1 work in connection with the contract.
The Contractor must ensure that safe pedestrian access and emergency egress is provided to all buildings and areas listed in paragraph (a) at all times during which the building and areas are operational.
The Contractor must ensure that that fire appliances, including aerial appliances, can access any point of the northern fa9ade of the SCO at all times for the duration of the Works.
Emergency access and egress to SCG via Paddington Lane from Moore Park Road is required to remain operational throughout work in connection with the contract. Access is to be maintained to the booster facilities for the fire services, fire hydrant and sprinkler systems. Emergency access to SCG/SCG Plaza and Noble Bradman Stand via Paddington Lane from Moore Park Road is required to remain operational throughout work in connection with the contract. If access is required to be altered to these areas then the Contractor is to request change in access to FRNSW in writing two (2) days prior so that operational plans may be enacted whilst access is restricted. In the event of access being restricted advice is to be forwarded to the following:
(i)
(d)
(e)
(f)
[email protected]; and
The Principal.
(i)
(ii)
(iii)
(iv)
(Paddington Lane) The Contractor must maintain access for all vehicles, including Austroads Class 9 six-axle articulated vehicles and Outside Broadcast (OB) trucks from Moore Park Road to the SCG Basement via Paddington Lane at all times except where Scheduled shut downs are in place.
Handover is defined as the point at which the Contractor must stop using Paddington Lane, Driver Avenue (south of Rugby League Central) or the SCG forecourt as per the requirement of the event tier and provide exclusive use to the Principal. These areas are to be clean and clear at the time of handover.
(g)
(h)
![Page 11: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/11.jpg)
SchedulesGC21 (Edition 2) - General Conditions of Contract
(i) SCG Events
It is forecast the SCOT will host SCG Events during the Works (refer to Schedule 39 for Event details);
For each SCG Event the Contractor must comply with Schedule 39 and the requirements applicable to that Event for:
(A) Event timings and information;
Bump-in and Bump-out activities, impacts and timings;
(C) Handover;
(D) Site walk; and
(E) Disruptive works.
The Contractor must ensure that all general and emergency egress paths from the SCG, including the egress path from SCG “Gate H” to Moore Park Road and the SCG Plaza, are safe and handed over to the SCGT. The Contractor must alter site fencing and hoarding if required.
The Contractor must coordinate a site walk with the SCGT as per the timings nominated in Schedule 39 relevant to the Event, and must rectify any issues identified during the site walk immediately.
For each SCG Event, the Contractor must ensure that noise and dust is minimised and construction is not visible to Patrons from Ground Level during an SCG Event. The Principal may instruct the Contractor to cease disruptive works at any time during a SCG Event.
(i)
(ii)
(B)
(iii)
(iv)
(V)
![Page 12: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/12.jpg)
SchedulesGC21 (Edition 2) - General Conditions of Contract
Phase 1 Site Plan
![Page 13: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/13.jpg)
I II I I II I1 R.I 1I II
TENDERING NOTES.45,5 — NOTES=e:
SFSR - John Holland Site Handover/Access Drawing - Rev 1 (13.12.2019) SUBJECT TO ALLOW FOR THE FOLLOWING: 1. FOR CIVIL GENERAL NOTES AND LEGEND REFER TO DRAWING NO. CICW-DRG-0005,
2. ALL PIPED DRAINAGE SYSTEMS ARE PROPOSED TO BE PRIVATELY OWNED AND MAINTAINED WITH THE EXCEPTION OF THE SYDNEY
3. SYDNEY WATER TRUNK STORMWATER DIVERSION TO BE COMPLETED TO THE REQUIREMENTS OF SYDNEY WATER. THIS WORK IS THE RESPONSIBILITY OF OTHERS. /
1500 m SUBSOIL DRAINAGElOONo. FLUSHING POINTS50No. RAINWATER DOWN-PIPE CONNECTIONS TO MAINS350 m ACO K200 TRENCH DRAIN550 m ACO K100 TRENCH DRAIN50% OF STORMWATER PIT COVERS TO HAVE GRATED INLET LIDS, 50% TO BE SOLID,ALL COVERS TO BE CLASS D
2 ALL GRATED INLET PITS TO BE FITTED WITH ECOSOL DROP TRAP (SEDIMENT ANDGPT FILTER) OR SIMILAR APPROVEDALL PITS TO BE SIZED AS 1200x1200 mm UNLESS RPE SIZE EXCEEDS 01200.
AALL PIPES TO BE REINFORCED CONCRETE, RUBBER RING CLASS 3 UNO.INSTALLATION, BEDDING AND BACKFILLING OF ALL DRAINAGE PIPES SHALL BE INACCORDANCE WITH AS3725 AND RMS MD R11.A01 ,A.2 HS3 SUPPORT USING TRENCHINSTALLATION METHODS FOR CONCRETE PIPES.PROVIDE MIN. 0.5% LONGITUDINAL FALL FOR ALL PIPES. 1% DESIRABLE
RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL TEMPORARY WORKS TO ENABLE CONSTRUCTION OF THE STORMWATER SYSTEMS.PITCH DRAINAGE DESIGN AND SPECIFICATION BY OTHERS.
5.
DRAINAGE NETWORK 1: PUBLIC DOMAINAND OVERLAND FLOW
PIPE SIZE REQUIRED TO INTERCEPTOVERLAND FLOW FROM MOORE PARKROAD SUBJECT TO DETAILED DESIGN.
5
DRAINAGE NETWORK 3: ROOF AREA (EAST)AND PUBLIC DOMAIN (EAST CONCOURSE)
1C
T I I I
Paddington Lane Shared Access to be coordinated and agreed with SC&SGT
GPT 2: GROSS POLLUTANT 2 |CI6-0»19| HL RC t DCTRAP AS ECOSOL GPT 46(W FOR TENDEROR SIMILAR APPROVED I 06-08-19 I ~AA RC [ DC
FOR TENDERSECONDARY TREATMENT 2: RC I (X0 I 12-07-19 I AAECOSOL STORM PIT CLASS 2 (20L/S) FCR TENDER
!«.. I ci«. \
CONTROL CHAMBER WITH 0300 ARUPORIFICE TO RESTRICT FLOWS TOlA MATCH EXISTING PEAK DURING100 YR STORM
uvat. isicb 9,«n. NSW. ma r>i*«iioen2o r«i ..siioiiMio SMI
CONNECT NEW DRAIN inswTO EXISTING PITG4
EXISTING PITG3TO BE RETAINEDIL. 39.57
SYDNEY FOOTBALL STADIUM REDEVELOPMENT
see BASEMENTACCESSRESTRICTED
DRAINAGEPLANEXISTING CHAMBER
LIDRL. 41.42IL IN 39.24
1 500ILOUT 37,80 (CULVERT)
SMU<
FOR TENDER
CtCW-DR&4}M266403 2
12a£&£N.-MOO-XXXX
![Page 14: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/14.jpg)
SchedulesGC21 (Edition 2) - General Conditions of Contract
Phase 2 Site Plan
![Page 15: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/15.jpg)
t wrnKMf CO (onHK^nof pn LID
![Page 16: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/16.jpg)
![Page 17: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/17.jpg)
![Page 18: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/18.jpg)
![Page 19: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/19.jpg)
![Page 20: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/20.jpg)
![Page 21: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/21.jpg)
![Page 22: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/22.jpg)
![Page 23: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/23.jpg)
![Page 24: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/24.jpg)
![Page 25: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/25.jpg)
![Page 26: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/26.jpg)
![Page 27: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/27.jpg)
![Page 28: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/28.jpg)
![Page 29: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/29.jpg)
![Page 30: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/30.jpg)
![Page 31: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/31.jpg)
![Page 32: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/32.jpg)
![Page 33: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/33.jpg)
![Page 34: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/34.jpg)
![Page 35: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/35.jpg)
![Page 36: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/36.jpg)
![Page 37: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/37.jpg)
![Page 38: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/38.jpg)
![Page 39: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/39.jpg)
![Page 40: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/40.jpg)
![Page 41: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/41.jpg)
![Page 42: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/42.jpg)
![Page 43: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/43.jpg)
![Page 44: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/44.jpg)
![Page 45: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/45.jpg)
![Page 46: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/46.jpg)
![Page 47: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/47.jpg)
![Page 48: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/48.jpg)
![Page 49: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/49.jpg)
![Page 50: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/50.jpg)
![Page 51: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/51.jpg)
![Page 52: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/52.jpg)
![Page 53: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/53.jpg)
![Page 54: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/54.jpg)
![Page 55: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/55.jpg)
![Page 56: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/56.jpg)
![Page 57: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/57.jpg)
![Page 58: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/58.jpg)
![Page 59: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/59.jpg)
![Page 60: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/60.jpg)
![Page 61: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/61.jpg)
![Page 62: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/62.jpg)
![Page 63: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/63.jpg)
![Page 64: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/64.jpg)
![Page 65: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/65.jpg)
![Page 66: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/66.jpg)
![Page 67: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/67.jpg)
![Page 68: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/68.jpg)
![Page 69: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/69.jpg)
![Page 70: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/70.jpg)
![Page 71: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/71.jpg)
![Page 72: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/72.jpg)
![Page 73: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/73.jpg)
![Page 74: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/74.jpg)
![Page 75: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/75.jpg)
![Page 76: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/76.jpg)
![Page 77: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/77.jpg)
![Page 78: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/78.jpg)
![Page 79: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/79.jpg)
![Page 80: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/80.jpg)
![Page 81: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/81.jpg)
![Page 82: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/82.jpg)
![Page 83: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/83.jpg)
![Page 84: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/84.jpg)
![Page 85: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/85.jpg)
![Page 86: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/86.jpg)
![Page 87: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/87.jpg)
![Page 88: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/88.jpg)
![Page 89: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/89.jpg)
![Page 90: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/90.jpg)
![Page 91: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/91.jpg)
![Page 92: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/92.jpg)
![Page 93: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/93.jpg)
![Page 94: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/94.jpg)
![Page 95: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/95.jpg)
![Page 96: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/96.jpg)
![Page 97: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/97.jpg)
![Page 98: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/98.jpg)
![Page 99: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/99.jpg)
![Page 100: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/100.jpg)
![Page 101: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/101.jpg)
![Page 102: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/102.jpg)
![Page 103: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/103.jpg)
![Page 104: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/104.jpg)
![Page 105: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/105.jpg)
![Page 106: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/106.jpg)
![Page 107: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/107.jpg)
![Page 108: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/108.jpg)
![Page 109: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/109.jpg)
![Page 110: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/110.jpg)
![Page 111: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/111.jpg)
![Page 112: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/112.jpg)
![Page 113: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/113.jpg)
![Page 114: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/114.jpg)
![Page 115: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/115.jpg)
![Page 116: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/116.jpg)
![Page 117: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/117.jpg)
![Page 118: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/118.jpg)
![Page 119: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/119.jpg)
![Page 120: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/120.jpg)
![Page 121: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/121.jpg)
![Page 122: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/122.jpg)
![Page 123: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/123.jpg)
![Page 124: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/124.jpg)
![Page 125: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/125.jpg)
![Page 126: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/126.jpg)
![Page 127: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/127.jpg)
![Page 128: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/128.jpg)
![Page 129: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/129.jpg)
![Page 130: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/130.jpg)
![Page 131: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/131.jpg)
![Page 132: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/132.jpg)
![Page 133: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/133.jpg)
![Page 134: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/134.jpg)
![Page 135: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/135.jpg)
![Page 136: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/136.jpg)
![Page 137: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/137.jpg)
![Page 138: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/138.jpg)
![Page 139: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/139.jpg)
![Page 140: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/140.jpg)
![Page 141: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/141.jpg)
![Page 142: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/142.jpg)
![Page 143: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/143.jpg)
![Page 144: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/144.jpg)
![Page 145: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/145.jpg)
![Page 146: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/146.jpg)
![Page 147: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/147.jpg)
![Page 148: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/148.jpg)
![Page 149: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/149.jpg)
![Page 150: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/150.jpg)
![Page 151: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/151.jpg)
![Page 152: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/152.jpg)
![Page 153: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/153.jpg)
![Page 154: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/154.jpg)
![Page 155: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/155.jpg)
![Page 156: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/156.jpg)
![Page 157: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/157.jpg)
![Page 158: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/158.jpg)
![Page 159: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/159.jpg)
![Page 160: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/160.jpg)
![Page 161: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/161.jpg)
![Page 162: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/162.jpg)
![Page 163: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/163.jpg)
![Page 164: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/164.jpg)
![Page 165: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/165.jpg)
![Page 166: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/166.jpg)
![Page 167: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/167.jpg)
![Page 168: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/168.jpg)
![Page 169: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/169.jpg)
![Page 170: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/170.jpg)
![Page 171: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/171.jpg)
![Page 172: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/172.jpg)
![Page 173: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/173.jpg)
![Page 174: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/174.jpg)
![Page 175: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/175.jpg)
![Page 176: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/176.jpg)
![Page 177: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/177.jpg)
![Page 178: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/178.jpg)
![Page 179: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/179.jpg)
![Page 180: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/180.jpg)
![Page 181: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/181.jpg)
![Page 182: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/182.jpg)
![Page 183: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/183.jpg)
![Page 184: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/184.jpg)
![Page 185: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/185.jpg)
![Page 186: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/186.jpg)
![Page 187: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/187.jpg)
![Page 188: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/188.jpg)
![Page 189: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/189.jpg)
![Page 190: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/190.jpg)
![Page 191: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/191.jpg)
![Page 192: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/192.jpg)
![Page 193: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/193.jpg)
![Page 194: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/194.jpg)
![Page 195: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/195.jpg)
![Page 196: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/196.jpg)
![Page 197: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/197.jpg)
![Page 198: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/198.jpg)
![Page 199: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/199.jpg)
![Page 200: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/200.jpg)
![Page 201: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/201.jpg)
![Page 202: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/202.jpg)
![Page 203: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/203.jpg)
![Page 204: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/204.jpg)
![Page 205: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/205.jpg)
![Page 206: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/206.jpg)
![Page 207: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/207.jpg)
![Page 208: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/208.jpg)
![Page 209: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/209.jpg)
![Page 210: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/210.jpg)
![Page 211: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/211.jpg)
![Page 212: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/212.jpg)
![Page 213: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/213.jpg)
![Page 214: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/214.jpg)
![Page 215: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/215.jpg)
![Page 216: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/216.jpg)
![Page 217: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/217.jpg)
![Page 218: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/218.jpg)
![Page 219: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/219.jpg)
![Page 220: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/220.jpg)
![Page 221: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/221.jpg)
![Page 222: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/222.jpg)
![Page 223: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/223.jpg)
![Page 224: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/224.jpg)
![Page 225: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/225.jpg)
![Page 226: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/226.jpg)
![Page 227: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/227.jpg)
![Page 228: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/228.jpg)
![Page 229: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/229.jpg)
![Page 230: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/230.jpg)
![Page 231: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/231.jpg)
![Page 232: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/232.jpg)
![Page 233: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/233.jpg)
![Page 234: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/234.jpg)
![Page 235: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/235.jpg)
![Page 236: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/236.jpg)
![Page 237: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/237.jpg)
![Page 238: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/238.jpg)
![Page 239: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/239.jpg)
![Page 240: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/240.jpg)
![Page 241: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/241.jpg)
![Page 242: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/242.jpg)
![Page 243: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/243.jpg)
![Page 244: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/244.jpg)
![Page 245: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/245.jpg)
![Page 246: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/246.jpg)
![Page 247: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/247.jpg)
![Page 248: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/248.jpg)
![Page 249: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/249.jpg)
![Page 250: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/250.jpg)
![Page 251: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/251.jpg)
![Page 252: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/252.jpg)
![Page 253: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/253.jpg)
![Page 254: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/254.jpg)
![Page 255: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/255.jpg)
![Page 256: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/256.jpg)
![Page 257: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/257.jpg)
![Page 258: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/258.jpg)
![Page 259: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/259.jpg)
![Page 260: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/260.jpg)
![Page 261: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/261.jpg)
![Page 262: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/262.jpg)
![Page 263: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/263.jpg)
![Page 264: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/264.jpg)
![Page 265: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/265.jpg)
![Page 266: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/266.jpg)
![Page 267: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/267.jpg)
![Page 268: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/268.jpg)
![Page 269: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/269.jpg)
![Page 270: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/270.jpg)
![Page 271: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/271.jpg)
![Page 272: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/272.jpg)
![Page 273: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/273.jpg)
![Page 274: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/274.jpg)
![Page 275: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/275.jpg)
![Page 276: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/276.jpg)
![Page 277: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/277.jpg)
![Page 278: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/278.jpg)
![Page 279: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/279.jpg)
![Page 280: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/280.jpg)
![Page 281: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/281.jpg)
![Page 282: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/282.jpg)
![Page 283: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/283.jpg)
![Page 284: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/284.jpg)
![Page 285: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/285.jpg)
![Page 286: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/286.jpg)
![Page 287: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/287.jpg)
![Page 288: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/288.jpg)
![Page 289: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/289.jpg)
![Page 290: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/290.jpg)
![Page 291: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/291.jpg)
![Page 292: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/292.jpg)
![Page 293: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/293.jpg)
![Page 294: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/294.jpg)
![Page 295: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/295.jpg)
![Page 296: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/296.jpg)
![Page 297: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/297.jpg)
![Page 298: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/298.jpg)
![Page 299: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/299.jpg)
![Page 300: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/300.jpg)
![Page 301: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/301.jpg)
![Page 302: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/302.jpg)
![Page 303: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/303.jpg)
![Page 304: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/304.jpg)
![Page 305: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/305.jpg)
![Page 306: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/306.jpg)
![Page 307: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/307.jpg)
![Page 308: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/308.jpg)
![Page 309: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/309.jpg)
![Page 310: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/310.jpg)
![Page 311: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/311.jpg)
![Page 312: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/312.jpg)
![Page 313: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/313.jpg)
![Page 314: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/314.jpg)
![Page 315: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/315.jpg)
![Page 316: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/316.jpg)
![Page 317: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/317.jpg)
![Page 318: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/318.jpg)
![Page 319: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/319.jpg)
![Page 320: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/320.jpg)
![Page 321: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/321.jpg)
![Page 322: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/322.jpg)
![Page 323: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/323.jpg)
![Page 324: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/324.jpg)
![Page 325: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/325.jpg)
![Page 326: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/326.jpg)
![Page 327: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/327.jpg)
![Page 328: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/328.jpg)
![Page 329: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/329.jpg)
![Page 330: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/330.jpg)
![Page 331: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/331.jpg)
![Page 332: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/332.jpg)
![Page 333: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/333.jpg)
![Page 334: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/334.jpg)
![Page 335: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/335.jpg)
![Page 336: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/336.jpg)
![Page 337: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/337.jpg)
![Page 338: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/338.jpg)
![Page 339: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/339.jpg)
![Page 340: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/340.jpg)
![Page 341: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/341.jpg)
![Page 342: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/342.jpg)
![Page 343: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/343.jpg)
![Page 344: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/344.jpg)
![Page 345: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/345.jpg)
![Page 346: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/346.jpg)
![Page 347: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/347.jpg)
![Page 348: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/348.jpg)
![Page 349: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/349.jpg)
![Page 350: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/350.jpg)
![Page 351: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/351.jpg)
![Page 352: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/352.jpg)
![Page 353: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/353.jpg)
![Page 354: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/354.jpg)
![Page 355: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/355.jpg)
![Page 356: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/356.jpg)
![Page 357: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/357.jpg)
![Page 358: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/358.jpg)
![Page 359: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/359.jpg)
![Page 360: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/360.jpg)
![Page 361: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/361.jpg)
![Page 362: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/362.jpg)
![Page 363: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/363.jpg)
![Page 364: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/364.jpg)
![Page 365: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/365.jpg)
![Page 366: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/366.jpg)
![Page 367: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/367.jpg)
![Page 368: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/368.jpg)
![Page 369: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/369.jpg)
![Page 370: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/370.jpg)
![Page 371: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/371.jpg)
![Page 372: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/372.jpg)
![Page 373: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/373.jpg)
![Page 374: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/374.jpg)
![Page 375: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/375.jpg)
![Page 376: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/376.jpg)
![Page 377: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/377.jpg)
![Page 378: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/378.jpg)
![Page 379: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/379.jpg)
![Page 380: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/380.jpg)
![Page 381: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/381.jpg)
![Page 382: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/382.jpg)
![Page 383: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/383.jpg)
![Page 384: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/384.jpg)
![Page 385: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/385.jpg)
![Page 386: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/386.jpg)
![Page 387: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/387.jpg)
![Page 388: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/388.jpg)
![Page 389: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/389.jpg)
![Page 390: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/390.jpg)
![Page 391: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/391.jpg)
![Page 392: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/392.jpg)
![Page 393: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/393.jpg)
![Page 394: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/394.jpg)
![Page 395: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/395.jpg)
![Page 396: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/396.jpg)
![Page 397: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/397.jpg)
![Page 398: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/398.jpg)
![Page 399: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/399.jpg)
![Page 400: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/400.jpg)
![Page 401: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/401.jpg)
![Page 402: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/402.jpg)
![Page 403: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/403.jpg)
![Page 404: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/404.jpg)
![Page 405: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/405.jpg)
![Page 406: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/406.jpg)
![Page 407: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/407.jpg)
![Page 408: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/408.jpg)
![Page 409: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/409.jpg)
![Page 410: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/410.jpg)
![Page 411: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/411.jpg)
![Page 412: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/412.jpg)
![Page 413: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/413.jpg)
![Page 414: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/414.jpg)
![Page 415: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/415.jpg)
![Page 416: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/416.jpg)
![Page 417: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/417.jpg)
![Page 418: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/418.jpg)
![Page 419: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/419.jpg)
![Page 420: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/420.jpg)
![Page 421: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/421.jpg)
![Page 422: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/422.jpg)
![Page 423: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/423.jpg)
![Page 424: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/424.jpg)
![Page 425: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/425.jpg)
![Page 426: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/426.jpg)
![Page 427: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/427.jpg)
![Page 428: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/428.jpg)
![Page 429: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/429.jpg)
![Page 430: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/430.jpg)
![Page 431: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/431.jpg)
![Page 432: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/432.jpg)
![Page 433: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/433.jpg)
![Page 434: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/434.jpg)
![Page 435: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/435.jpg)
![Page 436: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/436.jpg)
![Page 437: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/437.jpg)
![Page 438: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/438.jpg)
![Page 439: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/439.jpg)
![Page 440: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/440.jpg)
![Page 441: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/441.jpg)
![Page 442: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/442.jpg)
![Page 443: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/443.jpg)
![Page 444: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/444.jpg)
![Page 445: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/445.jpg)
![Page 446: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/446.jpg)
![Page 447: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/447.jpg)
![Page 448: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/448.jpg)
![Page 449: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/449.jpg)
![Page 450: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/450.jpg)
![Page 451: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/451.jpg)
![Page 452: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/452.jpg)
![Page 453: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/453.jpg)
![Page 454: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/454.jpg)
![Page 455: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/455.jpg)
![Page 456: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/456.jpg)
![Page 457: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/457.jpg)
![Page 458: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/458.jpg)
![Page 459: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/459.jpg)
![Page 460: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/460.jpg)
![Page 461: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/461.jpg)
![Page 462: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/462.jpg)
![Page 463: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/463.jpg)
![Page 464: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/464.jpg)
![Page 465: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/465.jpg)
![Page 466: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/466.jpg)
![Page 467: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/467.jpg)
![Page 468: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/468.jpg)
![Page 469: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/469.jpg)
![Page 470: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/470.jpg)
![Page 471: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/471.jpg)
![Page 472: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/472.jpg)
![Page 473: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/473.jpg)
![Page 474: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/474.jpg)
![Page 475: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/475.jpg)
![Page 476: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/476.jpg)
![Page 477: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/477.jpg)
![Page 478: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/478.jpg)
![Page 479: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/479.jpg)
![Page 480: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/480.jpg)
![Page 481: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/481.jpg)
![Page 482: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/482.jpg)
![Page 483: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/483.jpg)
![Page 484: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/484.jpg)
![Page 485: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/485.jpg)
![Page 486: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/486.jpg)
![Page 487: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/487.jpg)
![Page 488: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/488.jpg)
![Page 489: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/489.jpg)
![Page 490: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/490.jpg)
![Page 491: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/491.jpg)
![Page 492: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/492.jpg)
![Page 493: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/493.jpg)
![Page 494: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/494.jpg)
![Page 495: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/495.jpg)
![Page 496: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/496.jpg)
![Page 497: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/497.jpg)
![Page 498: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/498.jpg)
![Page 499: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/499.jpg)
![Page 500: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/500.jpg)
![Page 501: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/501.jpg)
![Page 502: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/502.jpg)
![Page 503: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/503.jpg)
![Page 504: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/504.jpg)
![Page 505: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/505.jpg)
![Page 506: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/506.jpg)
![Page 507: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/507.jpg)
![Page 508: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/508.jpg)
![Page 509: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/509.jpg)
![Page 510: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/510.jpg)
![Page 511: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/511.jpg)
![Page 512: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/512.jpg)
![Page 513: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/513.jpg)
![Page 514: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/514.jpg)
![Page 515: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/515.jpg)
![Page 516: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/516.jpg)
![Page 517: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/517.jpg)
![Page 518: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/518.jpg)
![Page 519: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/519.jpg)
![Page 520: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/520.jpg)
![Page 521: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/521.jpg)
![Page 522: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/522.jpg)
![Page 523: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/523.jpg)
![Page 524: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/524.jpg)
![Page 525: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/525.jpg)
![Page 526: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/526.jpg)
![Page 527: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/527.jpg)
![Page 528: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/528.jpg)
![Page 529: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/529.jpg)
![Page 530: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/530.jpg)
![Page 531: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/531.jpg)
![Page 532: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/532.jpg)
![Page 533: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/533.jpg)
![Page 534: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/534.jpg)
![Page 535: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/535.jpg)
![Page 536: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/536.jpg)
![Page 537: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/537.jpg)
![Page 538: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/538.jpg)
![Page 539: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/539.jpg)
![Page 540: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/540.jpg)
![Page 541: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/541.jpg)
![Page 542: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/542.jpg)
![Page 543: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/543.jpg)
![Page 544: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/544.jpg)
![Page 545: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/545.jpg)
![Page 546: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/546.jpg)
![Page 547: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/547.jpg)
![Page 548: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/548.jpg)
![Page 549: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/549.jpg)
![Page 550: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/550.jpg)
![Page 551: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/551.jpg)
![Page 552: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/552.jpg)
![Page 553: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/553.jpg)
![Page 554: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/554.jpg)
![Page 555: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/555.jpg)
![Page 556: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/556.jpg)
![Page 557: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/557.jpg)
![Page 558: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/558.jpg)
![Page 559: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/559.jpg)
![Page 560: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/560.jpg)
![Page 561: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/561.jpg)
![Page 562: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/562.jpg)
![Page 563: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/563.jpg)
![Page 564: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/564.jpg)
![Page 565: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/565.jpg)
![Page 566: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/566.jpg)
![Page 567: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/567.jpg)
![Page 568: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/568.jpg)
![Page 569: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/569.jpg)
![Page 570: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/570.jpg)
![Page 571: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/571.jpg)
![Page 572: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/572.jpg)
![Page 573: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/573.jpg)
![Page 574: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/574.jpg)
![Page 575: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/575.jpg)
![Page 576: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/576.jpg)
![Page 577: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/577.jpg)
![Page 578: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/578.jpg)
![Page 579: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/579.jpg)
![Page 580: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/580.jpg)
![Page 581: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/581.jpg)
![Page 582: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/582.jpg)
![Page 583: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/583.jpg)
![Page 584: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/584.jpg)
![Page 585: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/585.jpg)
![Page 586: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/586.jpg)
![Page 587: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/587.jpg)
![Page 588: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/588.jpg)
![Page 589: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/589.jpg)
![Page 590: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/590.jpg)
![Page 591: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/591.jpg)
![Page 592: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/592.jpg)
![Page 593: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/593.jpg)
![Page 594: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/594.jpg)
![Page 595: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/595.jpg)
![Page 596: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/596.jpg)
![Page 597: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/597.jpg)
![Page 598: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/598.jpg)
![Page 599: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/599.jpg)
![Page 600: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/600.jpg)
![Page 601: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/601.jpg)
![Page 602: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/602.jpg)
![Page 603: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/603.jpg)
![Page 604: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/604.jpg)
![Page 605: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/605.jpg)
![Page 606: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/606.jpg)
![Page 607: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/607.jpg)
![Page 608: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/608.jpg)
![Page 609: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/609.jpg)
![Page 610: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/610.jpg)
![Page 611: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/611.jpg)
![Page 612: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/612.jpg)
![Page 613: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/613.jpg)
![Page 614: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/614.jpg)
![Page 615: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/615.jpg)
![Page 616: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/616.jpg)
![Page 617: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/617.jpg)
![Page 618: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/618.jpg)
![Page 619: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/619.jpg)
![Page 620: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/620.jpg)
![Page 621: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/621.jpg)
![Page 622: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/622.jpg)
![Page 623: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/623.jpg)
![Page 624: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/624.jpg)
![Page 625: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/625.jpg)
![Page 626: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/626.jpg)
![Page 627: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/627.jpg)
![Page 628: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/628.jpg)
![Page 629: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/629.jpg)
![Page 630: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/630.jpg)
![Page 631: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/631.jpg)
![Page 632: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/632.jpg)
![Page 633: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/633.jpg)
![Page 634: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/634.jpg)
![Page 635: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/635.jpg)
![Page 636: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/636.jpg)
![Page 637: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/637.jpg)
![Page 638: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/638.jpg)
![Page 639: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/639.jpg)
![Page 640: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/640.jpg)
![Page 641: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/641.jpg)
![Page 642: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/642.jpg)
![Page 643: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/643.jpg)
![Page 644: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/644.jpg)
![Page 645: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/645.jpg)
![Page 646: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/646.jpg)
![Page 647: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/647.jpg)
![Page 648: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/648.jpg)
![Page 649: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/649.jpg)
![Page 650: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/650.jpg)
![Page 651: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/651.jpg)
![Page 652: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/652.jpg)
![Page 653: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/653.jpg)
![Page 654: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/654.jpg)
![Page 655: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/655.jpg)
![Page 656: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/656.jpg)
![Page 657: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/657.jpg)
![Page 658: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/658.jpg)
![Page 659: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/659.jpg)
![Page 660: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/660.jpg)
![Page 661: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/661.jpg)
![Page 662: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/662.jpg)
![Page 663: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/663.jpg)
![Page 664: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/664.jpg)
![Page 665: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/665.jpg)
![Page 666: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/666.jpg)
![Page 667: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/667.jpg)
![Page 668: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/668.jpg)
![Page 669: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/669.jpg)
![Page 670: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/670.jpg)
![Page 671: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/671.jpg)
![Page 672: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/672.jpg)
![Page 673: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/673.jpg)
![Page 674: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/674.jpg)
![Page 675: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/675.jpg)
![Page 676: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/676.jpg)
![Page 677: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/677.jpg)
![Page 678: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/678.jpg)
![Page 679: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/679.jpg)
![Page 680: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/680.jpg)
![Page 681: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/681.jpg)
![Page 682: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/682.jpg)
![Page 683: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/683.jpg)
![Page 684: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/684.jpg)
![Page 685: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/685.jpg)
![Page 686: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/686.jpg)
![Page 687: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/687.jpg)
![Page 688: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/688.jpg)
![Page 689: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/689.jpg)
![Page 690: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/690.jpg)
![Page 691: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/691.jpg)
![Page 692: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/692.jpg)
![Page 693: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/693.jpg)
![Page 694: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/694.jpg)
![Page 695: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/695.jpg)
![Page 696: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/696.jpg)
![Page 697: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/697.jpg)
![Page 698: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/698.jpg)
![Page 699: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/699.jpg)
![Page 700: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/700.jpg)
![Page 701: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/701.jpg)
![Page 702: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/702.jpg)
![Page 703: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/703.jpg)
![Page 704: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/704.jpg)
![Page 705: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/705.jpg)
![Page 706: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/706.jpg)
![Page 707: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/707.jpg)
![Page 708: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/708.jpg)
![Page 709: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/709.jpg)
![Page 710: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/710.jpg)
![Page 711: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/711.jpg)
![Page 712: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/712.jpg)
![Page 713: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/713.jpg)
![Page 714: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/714.jpg)
![Page 715: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/715.jpg)
![Page 716: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/716.jpg)
![Page 717: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/717.jpg)
![Page 718: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/718.jpg)
![Page 719: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/719.jpg)
![Page 720: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/720.jpg)
![Page 721: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/721.jpg)
![Page 722: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/722.jpg)
![Page 723: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/723.jpg)
![Page 724: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/724.jpg)
![Page 725: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/725.jpg)
![Page 726: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/726.jpg)
![Page 727: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/727.jpg)
![Page 728: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/728.jpg)
![Page 729: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/729.jpg)
![Page 730: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/730.jpg)
![Page 731: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/731.jpg)
![Page 732: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/732.jpg)
![Page 733: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/733.jpg)
![Page 734: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/734.jpg)
![Page 735: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/735.jpg)
![Page 736: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/736.jpg)
![Page 737: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/737.jpg)
![Page 738: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/738.jpg)
![Page 739: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/739.jpg)
![Page 740: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/740.jpg)
![Page 741: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/741.jpg)
![Page 742: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/742.jpg)
![Page 743: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/743.jpg)
![Page 744: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/744.jpg)
![Page 745: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/745.jpg)
![Page 746: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/746.jpg)
![Page 747: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/747.jpg)
![Page 748: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/748.jpg)
![Page 749: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/749.jpg)
![Page 750: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/750.jpg)
![Page 751: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/751.jpg)
![Page 752: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/752.jpg)
![Page 753: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/753.jpg)
![Page 754: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/754.jpg)
![Page 755: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/755.jpg)
![Page 756: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/756.jpg)
![Page 757: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/757.jpg)
![Page 758: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/758.jpg)
![Page 759: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/759.jpg)
![Page 760: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/760.jpg)
![Page 761: Schedule 19 Document Submission Schedule · 2020-02-20 · Conformance records Per Schedule 40, Section 4.1 Within 60 days after the Date of Contract and a Participation Report must](https://reader034.vdocument.in/reader034/viewer/2022050206/5f59d8de4d25dc7b54619aa3/html5/thumbnails/761.jpg)