(SMB Electrical Services)Schedule of Rates 044-05/06 - Tom Simpson Park Lighting Upgrade
Total Exclusive of
GSTGST
Total Inclusive of
GST
1 Mobilisation and Site Establishment: $2,000.00 $200.00 $2,200.00
2 Traffic Management: - - -
3 Electricity Supply: - - -
4 Disconnection and Removal of Redundant Equipment: $2,000.00 $200.00 $2,200.00
5 Trenching and Backfilling and Directional Drilling: $28,000.00 $2,800.00 $30,800.00
6 Inspection, Testing & Commissioning: $500.00 $50.00 $550.00
7 Earthing: $675.00 $67.50 $742.50
8 Switchboards: $16,000.00 $1,600.00 $17,600.00
9 Relocation of Main Switchboard (Optional): $4,500.00 $450.00 $4,950.00
10 Cabling & Access: $12,000.00 $1,200.00 $13,200.00
11 Lighting Installation Including Installation of Luminaries: $45,000.00 $4,500.00 $49,500.00
12 Supply of Luminaries: $55,000.00 $5,500.00 $60,500.00
13 Supply of Light Poles: $42,000.00 $4,200.00 $46,200.00
14 Painting of Light Poles: $16,500.00 $1,650.00 $18,150.00
15 Installation of Light Poles Including Concrete Footings: $15,000.00 $1,500.00 $16,500.00
16 Manuals and “Record” Drawings: $1,200.00 $120.00 $1,320.00
17 Maintenance During the Defects Liability Period: $1,000.00 $100.00 $1,100.00
18 Sundries: $6,000.00 $600.00 $6,600.00
$500.00 $50.00 $550.00
$247,875.00 $24,787.50 $272,662.50
Description
Total Tendered Contract Price:
No.
Revised Scope:
SMB Electrical ServicesU3/39 Winton Road
JOONDALUP WA 6027ABN: 96 218 644 198
Stephen BillinsPhone: (08) 9301 1485
Fax: (08) 9301 [email protected]
1
-
(SMB Electrical Services)Schedule of Rates 044-05/06 - Tom Simpson Park Lighting Upgrade
Hourly Rate Exclusive of
GSTGST
Hourly Rate Inclusive of
GST
$60.00 $6.00 $66.00
$30.00 $3.00 $33.00
$25.00 $2.50 $27.50
- - -
% Cost Exclusive of
GSTGST
% Cost Inclusive of
GST
9% 1.0% 10%
Per KM Exclusive of
GSTGST
Per KM Inclusive of
GST
- - -
Rate Exclusive of
GSTGST Rate Inclusive of GST
$20.00 $2.00 $22.00
$40.00 $4.00 $44.00
$160.00 $16.00 $176.00
Rate Exclusive of
GSTGST Rate Inclusive of GST
$500.00 $50.00 $550.00
$300.00 $30.00 $330.00
$100.00 $10.00 $110.00
$2,000.00 $200.00 $2,200.00
Per Metre Exclusive of
GSTGST
Per Metre Inclusive of
GST
$85.00 $8.50 $93.50
- - -
SCHEDULE OF VARIATIONS
1) Labour (Normal Time)
4) ExcavationTrenching, for 600 mm Cable Depth, Including Danger Tape,
Backfilling, Compaction and Reinstatement of Paving.
Supply on Additional Pole (with Rag Bolt Assembly):
Casting of Footing:
Assembly and Erection:
2) Equipment
Contractor:
Trade Assistant:
Apprentice:
Labour:
Percentage cost mark up on invoice cost of materials:
For 10m to 20m:
3) Transport
Luminaire Installation with Pole Wiring:
Sand
Soft Rock
Hard Rock
5) Pole
6) Horizontal Thrust Bore Under Road
Car Or Utility Vehicle (Up To 1 Tonne):
For 5m to 10m:
2