schedule of works bill

276
This content is © of Estimating Service 2015. ITEM 1.11 Qty Unit Rate £ p ITEM 1.11 A PRELIMINARIES/GENERAL CONDITIONS A40 Contractor's general cost items: Management and staff Site administrative staff Provide general site supervision/administration a Project Manager; say 2 days/week for 14 weeks with additional 2 days for completion & handover 6.00 week 1136.44 6,818.64 b Labourer for manual unloading of materials 10.00 week 454.57 4,545.70 A PRELIMINARIES/GENERAL CONDITIONS A41 Contractor's general cost items: Site accommodation Temporary offices and the like Hire of temporary accommodation c Portaloo hire 14.00 nr/wk 6.25 87.50 www.estimatingservice.co.uk To Collection £ 11,451.84 Page 3 / 1

Upload: natalie-reid

Post on 15-Aug-2015

16 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 1.11

Qty Unit Rate £ p

ITEM 1.11

A PRELIMINARIES/GENERAL CONDITIONS

A40 Contractor's general cost items: Management

and staff

Site administrative staff

Provide general site supervision/administration

a

Project Manager; say 2 days/week for 14 weeks

with additional 2 days for completion & handover 6.00 week 1136.44 6,818.64

b Labourer for manual unloading of materials 10.00 week 454.57 4,545.70

A PRELIMINARIES/GENERAL CONDITIONS

A41 Contractor's general cost items: Site

accommodation

Temporary offices and the like

Hire of temporary accommodation

c Portaloo hire 14.00 nr/wk 6.25 87.50

www.estimatingservice.co.uk To Collection £ 11,451.84

Page 3 / 1

Page 2: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 1.11

Qty Unit Rate £ p

Collection

Total from Page 3 / 1 £ 11,451.84

www.estimatingservice.co.uk To Summary £ 11,451.84

Page 3 / 2

Page 3: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 1.23

Qty Unit Rate £ p

ITEM 1.23

Z PC SUMS

PC Sums associated with the project

a provide health & safety site signage item 227.29 227.29

www.estimatingservice.co.uk To Collection £ 227.29

Page 3 / 3

Page 4: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 1.23

Qty Unit Rate £ p

Collection

Total from Page 3 / 3 £ 227.29

www.estimatingservice.co.uk To Summary £ 227.29

Page 3 / 4

Page 5: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 1.27

Qty Unit Rate £ p

ITEM 1.27

A PRELIMINARIES/GENERAL CONDITIONS

A44 Contractor's general cost items: Temporary

works

Scaffolding up to 10m high

Independent scaffolding

a Erect and subsequently dismantle 99.17 m2 15.60 1,547.05

www.estimatingservice.co.uk To Collection £ 1,547.05

Page 3 / 5

Page 6: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 1.27

Qty Unit Rate £ p

Collection

Total from Page 3 / 5 £ 1,547.05

www.estimatingservice.co.uk To Summary £ 1,547.05

Page 3 / 6

Page 7: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 1.36

Qty Unit Rate £ p

ITEM 1.36

A PRELIMINARIES/GENERAL CONDITIONS

A42 Contractor's general cost items: Services and

facilities

Provide the following services and facilities

Rubbish disposal

a Skips 2.00 nr 238.65 477.30

www.estimatingservice.co.uk To Collection £ 477.30

Page 3 / 7

Page 8: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 1.36

Qty Unit Rate £ p

Collection

Total from Page 3 / 7 £ 477.30

www.estimatingservice.co.uk To Summary £ 477.30

Page 3 / 8

Page 9: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.1

Qty Unit Rate £ p

ITEM 2.1

Z PC SUMS

PC Sums associated with the project

a

mechanical & electrical disconnections & removals;

no details on survey drawings item 568.22 568.22

www.estimatingservice.co.uk To Collection £ 568.22

Page 3 / 9

Page 10: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 9 £ 568.22

www.estimatingservice.co.uk To Summary £ 568.22

Page 3 / 10

Page 11: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.2

Qty Unit Rate £ p

ITEM 2.2

C EXISTING SITE/BUILDINGS/SERVICES

C90 Alterations - spot items

Temporary screens

softwood framing with plywood and polythene to

one side only

a clear away on completion of works 4.66 m2 44.06 205.32

www.estimatingservice.co.uk To Collection £ 205.32

Page 3 / 11

Page 12: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 11 £ 205.32

www.estimatingservice.co.uk To Summary £ 205.32

Page 3 / 12

Page 13: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.4

Qty Unit Rate £ p

ITEM 2.4

C EXISTING SITE/BUILDINGS/SERVICES

C20 Demolition

Disconnect redundant services and demolish

individual structures to

ground level; grub out slab and foundations

Dispose of spoil off site; disposal costs included

within rates

a structure not exceeding 50 m3 19.33 m3 69.84 1,350.01

Z PC SUMS

PC Sums associated with the project

b

lift and salvage all paving within the area of the new

build; no details on survey drawing item 142.05 142.05

c

cutting back vegetation to facilitate access for

extension; no details on survey drawing item 380.71 380.71

www.estimatingservice.co.uk To Collection £ 1,872.77

Page 3 / 13

Page 14: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 13 £ 1,872.77

www.estimatingservice.co.uk To Summary £ 1,872.77

Page 3 / 14

Page 15: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.5

Qty Unit Rate £ p

ITEM 2.5

Z PC SUMS

PC Sums associated with the project

a

strip out existing kitchen units/worktops and dispose

of off-site; no details on survey drawing item 380.71 380.71

b

provide temporary covering to roof structure and

protection to floor coverings item 227.29 227.29

C EXISTING SITE/BUILDINGS/SERVICES

C20 Demolition

Demolishing parts of concrete structures

Plain concrete beds

c 150 mm thick 11.12 m2 32.63 362.85

C90 Alterations - spot items

Remove finishings

Floors

d linoleum 11.12 m2 3.59 39.92

C20 Demolition

Pulling down - including removal of debris

Demolish external brickwork walls in cement

mortar; disposal of

debris off-site

e 2 x 102.5 mm thick skins forming cavity wall 10.61 m2 50.32 533.90

C90 Alterations - spot items

Removing fittings and fixtures

Doors including frame; dispose of debris off-site or

set

aside for re-use

f single door 4.00 nr 15.95 63.80

Windows; dispose of debris off-site or set aside for

re-use

g casement window 1.15 m2 24.58 28.27

Removing plumbing and engineering installations

Sanitary fittings, including capping off service and

waste pipes and

bringing forward services

h WC 1.00 nr 136.37 136.37

i wash hand basin 1.00 nr 36.75 36.75

Remove finishings

Ceilings

j plasterboard 2.31 m2 6.29 14.53

www.estimatingservice.co.uk To Collection £ 1,824.38

Page 3 / 15

Page 16: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.5

Qty Unit Rate £ p

C EXISTING continued ...

C90 Alterations - spot items continued ...

Remove finishings continued ...

Walls, without backing

a wallpaper 9.31 m2 2.43 22.62

Coverings

Stripping and repairs to slate and tile roofs

b

plain or interlocking tiles; dispose of debris

off-site 21.37 m2 9.56 204.30

www.estimatingservice.co.uk To Collection £ 226.92

Page 3 / 16

Page 17: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 2.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 15 £ 1,824.38

Total from Page 3 / 16 £ 226.92

www.estimatingservice.co.uk To Summary £ 2,051.30

Page 3 / 17

Page 18: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 3.1

Qty Unit Rate £ p

ITEM 3.1

R DISPOSAL SYSTEMS

R12 Drainage below ground

Excavation by machine

Trenches for drain pipes not exceeding 200 mm

nominal size,

grading bottoms, earthwork support and backfilling

with excavated

material; average depth

a 0.75 m 7.65 m 12.38 94.71

b 1.00 m 10.70 m 25.48 272.64

Disposal of material arising from drainage excavations

Excavated material; bulking factor 1.25

c loaded by hand from spoil heaps 3.10 m3 54.44 168.76

Imported granular material

150 mm beds and side filling to half height of pipes

Unplasticised PVC pipes and fittings to BS 4660

110 mm pipes

d in trenches 18.35 m 9.30 170.66

Extra for

e long radius bends 2.00 nr 15.82 31.64

f single junction 1.00 nr 22.94 22.94

g slip coupler 3.00 nr 5.07 15.21

Accessories

h back inlet bottle gulley 1.00 nr 86.23 86.23

i bottle gulley 1.00 nr 69.91 69.91

Testing drains

Water test

j 100 mm drains 18.35 m 1.43 26.24

www.estimatingservice.co.uk To Collection £ 958.93

Page 3 / 18

Page 19: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 3.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 18 £ 958.93

www.estimatingservice.co.uk To Summary £ 958.93

Page 3 / 19

Page 20: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 3.7

Qty Unit Rate £ p

ITEM 3.7

Manholes

Unplasticised PVC inspection chambers 450 mm

diameter; set in cement mortar 1:3, depth to invert

a 1035 mm 1.00 nr 205.89 205.89

www.estimatingservice.co.uk To Collection £ 205.89

Page 3 / 20

Page 21: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 3.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 20 £ 205.89

www.estimatingservice.co.uk To Summary £ 205.89

Page 3 / 21

Page 22: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 3.8

Qty Unit Rate £ p

ITEM 3.8

Surface drainage systems

ACO Drain K100 channel with galvanised steel

lockable grating

a set in gound, bedded and haunched in concrete 7.68 m 45.80 351.74

b extra for end cap 2.00 nr 5.98 11.96

www.estimatingservice.co.uk To Collection £ 363.70

Page 3 / 22

Page 23: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 3.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 22 £ 363.70

www.estimatingservice.co.uk To Summary £ 363.70

Page 3 / 23

Page 24: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 3.9

Qty Unit Rate £ p

ITEM 3.9

Soakaways

Modular soakaway crates

a aquavoid light duty soakaway crates 1.00 m3 246.83 246.83

www.estimatingservice.co.uk To Collection £ 246.83

Page 3 / 24

Page 25: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 3.9

Qty Unit Rate £ p

Collection

Total from Page 3 / 24 £ 246.83

www.estimatingservice.co.uk To Summary £ 246.83

Page 3 / 25

Page 26: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 4.1

Qty Unit Rate £ p

ITEM 4.1

D20 Excavating and filling

Excavating by machine

Trenches, width over 0.30 m, maximum depth not

exceeding

a 1.00 m 8.63 m3 32.46 280.13

Disposal

Off site to tip average 15 km from site

b loaded by hand from spoil heaps 10.78 m3 54.43 586.76

Surface treatments

Compacting

c bottom of excavation 12.33 m2 0.61 7.52

E IN SITU CONCRETE/LARGE PRECAST CONCRETE

E10 Mixing/casting/curing in-situ concrete

Ready mixed concrete

Plain in situ concrete 1:2:4 - 20 mm aggregate

d foundations 7.71 m3 137.74 1,061.98

E41 Worked finishes/Cutting to in situ concrete

Worked finishes

Tamping by mechanical means

e level 15.41 m2 0.93 14.33

www.estimatingservice.co.uk To Collection £ 1,950.71

Page 3 / 26

Page 27: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 4.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 26 £ 1,950.71

www.estimatingservice.co.uk To Summary £ 1,950.71

Page 3 / 27

Page 28: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 4.5

Qty Unit Rate £ p

ITEM 4.5

D20 Excavating and filling

Excavating by machine

To reduce levels, maximum depth not exceeding

a 0.25 m 0.09 m3 32.42 2.92

Disposal

Off site to tip average 15 km from site

b loaded by hand from spoil heaps 0.11 m3 54.42 5.99

Surface treatments

Compacting

c bottom of excavation 0.71 m2 0.60 0.43

E IN SITU CONCRETE/LARGE PRECAST CONCRETE

E10 Mixing/casting/curing in-situ concrete

Ready mixed concrete

d beds, thickness not exceeding 150 mm 0.09 m3 138.84 12.50

E41 Worked finishes/Cutting to in situ concrete

Worked finishes

Tamping by mechanical means

e level 0.60 m2 0.93 0.56

Trowelling

f level 0.60 m2 3.82 2.29

www.estimatingservice.co.uk To Collection £ 24.68

Page 3 / 28

Page 29: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 4.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 28 £ 24.68

www.estimatingservice.co.uk To Summary £ 24.68

Page 3 / 29

Page 30: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.1

Qty Unit Rate £ p

ITEM 5.1

D20 Excavating and filling

Excavating by machine

To reduce levels, maximum depth not exceeding

a 1.00 m 12.97 m3 32.46 421.01

Disposal

Off site to tip average 15 km from site

b loaded by hand from spoil heaps 16.21 m3 54.44 882.47

Surface treatments

Compacting

c bottom of excavation 43.22 m2 0.61 26.36

www.estimatingservice.co.uk To Collection £ 1,329.84

Page 3 / 30

Page 31: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 30 £ 1,329.84

www.estimatingservice.co.uk To Summary £ 1,329.84

Page 3 / 31

Page 32: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.3 - 5.7

Qty Unit Rate £ p

ITEM 5.3 - 5.7

D20 Excavating and filling

Filling to excavations

Imported MOT Type 1 material

a not exceeding 0.25 m 4.89 m3 69.09 337.85

Imported sand

b not exceeding 0.25 m 0.98 m3 57.27 56.12

Surface treatments

Compacting

c surface of filling 32.59 m2 0.61 19.88

J WATERPROOFING

J40 Flexible sheet tanking/ damp proof

membranes

Tanking and damp proofing

Polythene medium weight sheet underlay lapped

150 mm at joints

d horizontally 44.50 m2 1.68 74.76

E IN SITU CONCRETE/LARGE PRECAST CONCRETE

E10 Mixing/casting/curing in-situ concrete

Ready mixed concrete

Plain in situ concrete 1:2:4 - 20 mm aggregate

e slabs, thickness not exceeding 150 mm 4.89 m3 157.65 770.91

E41 Worked finishes/Cutting to in situ concrete

Worked finishes

Tamping by mechanical means

f level 32.59 m2 0.93 30.31

P BUILDING FABRIC SUNDRIES

P10 Sundry insulation/proofing work/fire stops

Vapour barriers

Vapour barriers

g Polythene vapour barrier 32.59 m2 2.46 80.17

Insulating boards

Celotex Insulation Fast-R range

h 75 mm 32.59 m2 17.58 572.93

Celotex Insulation T-Break range

i 20 mm 4.47 m2 8.19 36.61

www.estimatingservice.co.uk To Collection £ 1,979.54

Page 3 / 32

Page 33: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.3 - 5.7

Qty Unit Rate £ p

M SURFACE FINISHES

M10 Cement sand/Concrete screeds/toppings

Cement and sand 1:3, work to floors

Screeded beds, level and to falls not exceeding 15

degrees from

horizontal, over 300 mm wide

a 75 mm 32.59 m2 17.96 585.32

www.estimatingservice.co.uk To Collection £ 585.32

Page 3 / 33

Page 34: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.3 - 5.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 32 £ 1,979.54

Total from Page 3 / 33 £ 585.32

www.estimatingservice.co.uk To Summary £ 2,564.86

Page 3 / 34

Page 35: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.8

Qty Unit Rate £ p

ITEM 5.8

D20 Excavating and filling

Excavating by hand

To reduce levels, maximum depth not exceeding

a 1.00 m 4.00 m3 20.11 80.44

Disposal

Off site to tip average 15 km from site

b loaded by hand from spoil heaps 5.00 m3 54.44 272.20

Surface treatments

Compacting

c bottom of excavation 13.33 m2 0.61 8.13

www.estimatingservice.co.uk To Collection £ 360.77

Page 3 / 35

Page 36: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 35 £ 360.77

www.estimatingservice.co.uk To Summary £ 360.77

Page 3 / 36

Page 37: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.9

Qty Unit Rate £ p

ITEM 5.9

J WATERPROOFING

J40 Flexible sheet tanking/ damp proof

membranes

Tanking and damp proofing

Polythene medium weight sheet underlay lapped

150 mm at joints

a horizontally 20.57 m2 1.68 34.56

E IN SITU CONCRETE/LARGE PRECAST CONCRETE

E10 Mixing/casting/curing in-situ concrete

Ready mixed concrete

Plain in situ concrete 1:2:4 - 20 mm aggregate

b slabs, thickness not exceeding 150 mm 2.00 m3 157.65 315.30

E41 Worked finishes/Cutting to in situ concrete

Worked finishes

Tamping by mechanical means

c level 13.33 m2 0.93 12.40

P BUILDING FABRIC SUNDRIES

P10 Sundry insulation/proofing work/fire stops

Vapour barriers

Vapour barriers

d Polythene vapour barrier 13.33 m2 2.46 32.79

Insulating boards

Celotex Insulation Fast-R range

e 75 mm 13.33 m2 17.58 234.34

Celotex Insulation T-Break range

f 20 mm 2.70 m2 8.19 22.11

M SURFACE FINISHES

M10 Cement sand/Concrete screeds/toppings

Cement and sand 1:3, work to floors

Screeded beds, level and to falls not exceeding 15

degrees from

horizontal, over 300 mm wide

g 75 mm 13.33 m2 17.96 239.41

www.estimatingservice.co.uk To Collection £ 890.91

Page 3 / 37

Page 38: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.9

Qty Unit Rate £ p

Collection

Total from Page 3 / 37 £ 890.91

www.estimatingservice.co.uk To Summary £ 890.91

Page 3 / 38

Page 39: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.10

Qty Unit Rate £ p

ITEM 5.10

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Floor members

a 50 x 75mm 6.00 m 4.11 24.66

b 50 x 150mm 38.72 m 6.24 241.61

Solid bridging between joists (measured over the

joists)

c 50 x 150mm 5.87 m 9.98 58.58

Metalwork

Galvanised steel joist hangers - built in

d 50 x 150mm 32.00 nr 3.77 120.64

Galvanised steel straps

e heavy duty steel strap; once bent; 1200 mm long 6.00 nr 12.23 73.38

K LININGS/SHEATHING/DRY PARTITIONING

K20 Timber board

flooring/sheathing/linings/casings

Flooring

Chipboard Type C4 flooring tongued and grooved all

edges, width

exceeding 300 mm, thickness

f 22mm 14.60 m2 15.49 226.15

P BUILDING FABRIC SUNDRIES

P10 Sundry insulation/proofing work/fire stops

Insulating quilts

Acoustic insulating quilts

g 100 mm 14.60 m2 10.08 147.17

www.estimatingservice.co.uk To Collection £ 892.20

Page 3 / 39

Page 40: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.10

Qty Unit Rate £ p

Collection

Total from Page 3 / 39 £ 892.20

www.estimatingservice.co.uk To Summary £ 892.20

Page 3 / 40

Page 41: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.11

Qty Unit Rate £ p

ITEM 5.11

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Wall or partition members

a 50 x 75mm 4.25 m 4.82 20.49

www.estimatingservice.co.uk To Collection £ 20.49

Page 3 / 41

Page 42: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 5.11

Qty Unit Rate £ p

Collection

Total from Page 3 / 41 £ 20.49

www.estimatingservice.co.uk To Summary £ 20.49

Page 3 / 42

Page 43: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.1

Qty Unit Rate £ p

ITEM 6.1

C EXISTING SITE/BUILDINGS/SERVICES

C20 Demolition

Pulling down - including removal of debris

Demolish external brickwork walls in cement

mortar; disposal of

debris off-site

a 2 x 102.5 mm thick skins forming cavity wall 3.00 m2 50.32 150.96

F MASONRY

F31 Precast concrete sills/lintels/copings/features

Lintels

Prestressed lintels 65 mm x 100 mm bedded

b 1200 mm 2.00 nr 22.42 44.84

F30 Accessories/Sundry items for brick/block/stone

walling

Closing cavities

Thermabate cavity closers

c 100 mm cavity 10.95 m 9.57 104.79

Proprietary items

Wall extension profiles, single flange, plugging and

screwing

d 100mm 21.10 m 9.81 206.99

www.estimatingservice.co.uk To Collection £ 507.58

Page 3 / 43

Page 44: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 43 £ 507.58

www.estimatingservice.co.uk To Summary £ 507.58

Page 3 / 44

Page 45: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.2

Qty Unit Rate £ p

ITEM 6.2

F MASONRY

F10 Brick/Block walling

Precast concrete dense aggregate blocks to BS 6073

Walls, facework one side

a

100 mm solid; in gauged mortar 1:3; below DPC

level 23.09 m2 34.99 807.92

Class B engineering bricks in cement mortar 1:3

Walls

b 102.5 mm 4.87 m2 83.07 404.55

F30 Accessories/Sundry items for brick/block/stone

walling

Damp proof courses

Polythene

c horizontal 100mm wide 41.11 m 0.63 25.90

www.estimatingservice.co.uk To Collection £ 1,238.37

Page 3 / 45

Page 46: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 45 £ 1,238.37

www.estimatingservice.co.uk To Summary £ 1,238.37

Page 3 / 46

Page 47: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.3

Qty Unit Rate £ p

ITEM 6.3

E IN SITU CONCRETE/LARGE PRECAST CONCRETE

E10 Mixing/casting/curing in-situ concrete

Ready mixed concrete

Plain in situ concrete 1:2:4 - 20 mm aggregate

a filling to hollow walls 1.21 m3 179.08 216.69

Forming cavities

50 - 100 mm cavities in hollow walls with 225 mm

wall-ties at 5 per

m2 using

b 3 mm vertical-twist ties 67.71 m2 1.85 125.26

P BUILDING FABRIC SUNDRIES

P10 Sundry insulation/proofing work/fire stops

Cavity wall Insulation

Slab insulation to masonry walls

c 60 mm thick Celotex cavity insulation 67.71 m2 15.22 1,030.55

www.estimatingservice.co.uk To Collection £ 1,372.50

Page 3 / 47

Page 48: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 47 £ 1,372.50

www.estimatingservice.co.uk To Summary £ 1,372.50

Page 3 / 48

Page 49: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.4

Qty Unit Rate £ p

ITEM 6.4

F MASONRY

F10 Brick/Block walling

Precast concrete dense aggregate blocks to BS 6073

Walls, facework one side

a

100 mm solid; in gauged mortar 1:4; above DPC

level 59.75 m2 34.20 2,043.45

www.estimatingservice.co.uk To Collection £ 2,043.45

Page 3 / 49

Page 50: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 49 £ 2,043.45

www.estimatingservice.co.uk To Summary £ 2,043.45

Page 3 / 50

Page 51: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.5

Qty Unit Rate £ p

ITEM 6.5

F MASONRY

F10 Brick/Block walling

Facing bricks in gauged mortar 1:4

Walls, facework one side; PC supply rate for bricks

£750/1000

a 102.5 mm 73.18 m2 96.07 7,030.40

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Dummy frames for brickwork

b 50 x 100mm 34.60 m 6.15 212.79

www.estimatingservice.co.uk To Collection £ 7,243.19

Page 3 / 51

Page 52: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 51 £ 7,243.19

www.estimatingservice.co.uk To Summary £ 7,243.19

Page 3 / 52

Page 53: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.6

Qty Unit Rate £ p

ITEM 6.6

F MASONRY

F30 Accessories/Sundry items for brick/block/stone

walling

Damp proof courses

Polythene

a vertical 100mm wide 21.10 m 0.63 13.29

www.estimatingservice.co.uk To Collection £ 13.29

Page 3 / 53

Page 54: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 53 £ 13.29

www.estimatingservice.co.uk To Summary £ 13.29

Page 3 / 54

Page 55: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.7

Qty Unit Rate £ p

ITEM 6.7

F MASONRY

F30 Accessories/Sundry items for brick/block/stone

walling

Closing cavities

Thermabate cavity closers

a 100 mm cavity 17.00 m 9.57 162.69

www.estimatingservice.co.uk To Collection £ 162.69

Page 3 / 55

Page 56: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 55 £ 162.69

www.estimatingservice.co.uk To Summary £ 162.69

Page 3 / 56

Page 57: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.8

Qty Unit Rate £ p

ITEM 6.8

F MASONRY

F30 Accessories/Sundry items for brick/block/stone

walling

Cavity trays

Polythene

a horizontal exceeding 225 mm 5.09 m2 10.68 54.36

Stop Ends

b lintel stop end 10.00 nr 1.85 18.50

www.estimatingservice.co.uk To Collection £ 72.86

Page 3 / 57

Page 58: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 57 £ 72.86

www.estimatingservice.co.uk To Summary £ 72.86

Page 3 / 58

Page 59: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.9

Qty Unit Rate £ p

ITEM 6.9

F MASONRY

F30 Accessories/Sundry items for brick/block/stone

walling

Cavity trays

Type W Cavity weep ventilator

a wall weep vent 25.00 nr 1.37 34.25

www.estimatingservice.co.uk To Collection £ 34.25

Page 3 / 59

Page 60: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.9

Qty Unit Rate £ p

Collection

Total from Page 3 / 59 £ 34.25

www.estimatingservice.co.uk To Summary £ 34.25

Page 3 / 60

Page 61: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.10

Qty Unit Rate £ p

ITEM 6.10

L WINDOWS/DOORS/STAIRS

L10 Windows/rooflights/screens/louvres

Bedding and pointing frames

Pointing in mastic sealant

a window frames 14.81 m 2.30 34.06

L20 Doors/shutters/hatches

Bedding and pointing frames

Pointing in mastic sealant

b door frames 18.65 m 2.30 42.90

www.estimatingservice.co.uk To Collection £ 76.96

Page 3 / 61

Page 62: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.10

Qty Unit Rate £ p

Collection

Total from Page 3 / 61 £ 76.96

www.estimatingservice.co.uk To Summary £ 76.96

Page 3 / 62

Page 63: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.11

Qty Unit Rate £ p

ITEM 6.11

F MASONRY

F30 Accessories/Sundry items for brick/block/stone

walling

Galvanised steel lintels

Galvanised steel standard lintels

a 2100mm 2.00 nr 68.53 137.06

Galvanised steel heavy duty lintels

b 3900mm 1.00 nr 267.48 267.48

Galvanised steel eaves lintels

c 1200mm 1.00 nr 30.16 30.16

d 1350mm 1.00 nr 32.94 32.94

www.estimatingservice.co.uk To Collection £ 467.64

Page 3 / 63

Page 64: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.11

Qty Unit Rate £ p

Collection

Total from Page 3 / 63 £ 467.64

www.estimatingservice.co.uk To Summary £ 467.64

Page 3 / 64

Page 65: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.12

Qty Unit Rate £ p

ITEM 6.12

F MASONRY

F10 Brick/Block walling

Facing bricks in gauged mortar 1:4

Flush bands

a 215 mm, brick on end 6.33 m 19.98 126.47

www.estimatingservice.co.uk To Collection £ 126.47

Page 3 / 65

Page 66: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.12

Qty Unit Rate £ p

Collection

Total from Page 3 / 65 £ 126.47

www.estimatingservice.co.uk To Summary £ 126.47

Page 3 / 66

Page 67: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.13

Qty Unit Rate £ p

ITEM 6.13

F MASONRY

F30 Accessories/Sundry items for brick/block/stone

walling

Closing cavities

Thermabate cavity closers

a 100 mm cavity 10.88 m 9.57 104.12

F31 Precast concrete sills/lintels/copings/features

Copings

400 x 900 mm twice weathered and throated

copings bedded

b straight 10.88 m 61.70 671.30

H CLADDING/COVERING

H71 Lead sheet coverings/flashings

Flashings, aprons

Code 4 lead, horizontal, 150 mm lapped joints,

fixing with lead clips

and wedges

c 300 mm girth 10.01 m 24.82 248.45

www.estimatingservice.co.uk To Collection £ 1,023.87

Page 3 / 67

Page 68: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.13

Qty Unit Rate £ p

Collection

Total from Page 3 / 67 £ 1,023.87

www.estimatingservice.co.uk To Summary £ 1,023.87

Page 3 / 68

Page 69: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.14

Qty Unit Rate £ p

ITEM 6.14

C EXISTING SITE/BUILDINGS/SERVICES

C41 Repairing/renovating/conserving masonry

Brickwork

Cut out

a

brickwork to allow for cavity tray installation,

make good with new

facing bricks 0.75 m2 112.14 84.11

F30 Accessories/Sundry items for brick/block/stone

walling

Cavity trays

Polythene

b horizontal exceeding 225 mm 1.50 m2 10.68 16.02

Type W Cavity weep ventilator

c wall weep vent 14.00 nr 1.37 19.18

H CLADDING/COVERING

H71 Lead sheet coverings/flashings

Flashings, aprons

Code 4 lead, horizontal, 150 mm lapped joints,

fixing with lead clips

and wedges

d 300 mm girth 5.98 m 24.82 148.42

www.estimatingservice.co.uk To Collection £ 267.73

Page 3 / 69

Page 70: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.14

Qty Unit Rate £ p

Collection

Total from Page 3 / 69 £ 267.73

www.estimatingservice.co.uk To Summary £ 267.73

Page 3 / 70

Page 71: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.15

Qty Unit Rate £ p

ITEM 6.15

F MASONRY

F31 Precast concrete sills/lintels/copings/features

Padstones

Padstones bedded

a 400 x 100 x 150 mm 1.00 nr 25.08 25.08

b 250 x 100 x 150 mm 1.00 nr 23.51 23.51

c 50 x 280 x 218 mm 1.00 nr 23.51 23.51

Lintels

Prestressed lintels 65 mm x 100 mm bedded

d 750 mm 2.00 nr 18.60 37.20

www.estimatingservice.co.uk To Collection £ 109.30

Page 3 / 71

Page 72: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.15

Qty Unit Rate £ p

Collection

Total from Page 3 / 71 £ 109.30

www.estimatingservice.co.uk To Summary £ 109.30

Page 3 / 72

Page 73: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.16

Qty Unit Rate £ p

ITEM 6.16

F MASONRY

F10 Brick/Block walling

Precast concrete dense aggregate blocks to BS 6073

Walls, facework one side

a

100 mm solid; in gauged mortar 1:4; above DPC

level 3.89 m2 34.20 133.04

www.estimatingservice.co.uk To Collection £ 133.04

Page 3 / 73

Page 74: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.16

Qty Unit Rate £ p

Collection

Total from Page 3 / 73 £ 133.04

www.estimatingservice.co.uk To Summary £ 133.04

Page 3 / 74

Page 75: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.17

Qty Unit Rate £ p

ITEM 6.17

F MASONRY

F31 Precast concrete sills/lintels/copings/features

Lintels

Prestressed lintels 65 mm x 100 mm bedded

a 1200 mm 2.00 nr 22.42 44.84

www.estimatingservice.co.uk To Collection £ 44.84

Page 3 / 75

Page 76: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.17

Qty Unit Rate £ p

Collection

Total from Page 3 / 75 £ 44.84

www.estimatingservice.co.uk To Summary £ 44.84

Page 3 / 76

Page 77: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.18

Qty Unit Rate £ p

ITEM 6.18

C EXISTING SITE/BUILDINGS/SERVICES

C90 Alterations - spot items

Forming new window opening in existing wall

Temporary support, close cavity, make good

reveals, build in

standard lintel

a through cavity wall 0.39 m2 278.21 108.50

www.estimatingservice.co.uk To Collection £ 108.50

Page 3 / 77

Page 78: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.18

Qty Unit Rate £ p

Collection

Total from Page 3 / 77 £ 108.50

www.estimatingservice.co.uk To Summary £ 108.50

Page 3 / 78

Page 79: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.19

Qty Unit Rate £ p

ITEM 6.19

C EXISTING SITE/BUILDINGS/SERVICES

C41 Repairing/renovating/conserving masonry

Brickwork

Cut out

a brickwork to allow for new meter box installation 0.25 m2 74.44 18.61

F MASONRY

F30 Accessories/Sundry items for brick/block/stone

walling

Meter Boxes

b recessed electric meter box 1.00 nr 29.54 29.54

Galvanised steel lintels

Single element lintels

c 750mm 1.00 nr 14.47 14.47

F30 Accessories/Sundry items for brick/block/stone

walling

Cavity trays

Polythene

d horizontal exceeding 225 mm 0.28 m2 10.70 3.00

Type W Cavity weep ventilator

e wall weep vent 3.00 nr 1.37 4.11

www.estimatingservice.co.uk To Collection £ 69.73

Page 3 / 79

Page 80: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.19

Qty Unit Rate £ p

Collection

Total from Page 3 / 79 £ 69.73

www.estimatingservice.co.uk To Summary £ 69.73

Page 3 / 80

Page 81: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.20

Qty Unit Rate £ p

ITEM 6.20

F MASONRY

F10 Brick/Block walling

Precast concrete dense aggregate blocks to BS 6073

Walls, facework one side

a

100 mm solid; in gauged mortar 1:4; above DPC

level 0.78 m2 34.20 26.68

Forming cavities

50 - 100 mm cavities in hollow walls with 225 mm

wall-ties at 5 per

m2 using

b 3 mm vertical-twist ties 0.39 m2 1.84 0.72

P BUILDING FABRIC SUNDRIES

P10 Sundry insulation/proofing work/fire stops

Cavity wall Insulation

Slab insulation to masonry walls

c 60 mm thick Celotex cavity insulation 0.39 m2 15.22 5.94

www.estimatingservice.co.uk To Collection £ 33.33

Page 3 / 81

Page 82: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 6.20

Qty Unit Rate £ p

Collection

Total from Page 3 / 81 £ 33.33

www.estimatingservice.co.uk To Summary £ 33.33

Page 3 / 82

Page 83: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 7.2

Qty Unit Rate £ p

ITEM 7.2

G STRUCTURAL/CARCASSING METAL/TIMBER

G10 Structural steel framing

Framing, fabrication

Fabricated steelwork

a columns 40 - 100 kg/m 0.41 tonne 1562.48 640.62

Erection on site

b permanent erection 0.41 tonne 503.62 206.48

Surface treatments at fabrication workshop

c shot blasting & priming 6.97 m2 8.81 61.41

d 30 minute intumescent fire paint 6.97 m2 14.81 103.23

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Boxing out steelwork

e 50 x 50mm 27.84 m 3.75 104.40

www.estimatingservice.co.uk To Collection £ 1,116.13

Page 3 / 83

Page 84: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 7.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 83 £ 1,116.13

www.estimatingservice.co.uk To Summary £ 1,116.13

Page 3 / 84

Page 85: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 7.3

Qty Unit Rate £ p

ITEM 7.3

G STRUCTURAL/CARCASSING METAL/TIMBER

G10 Structural steel framing

Framing, fabrication

Fabricated steelwork

a beams less than 40 kg/m 0.08 tonne 1896.31 151.70

Fittings

b general fiitings; plates, nuts, bolts etc. 0.01 tonne 2492.91 24.93

Erection on site

c permanent erection 0.08 tonne 503.60 40.29

Surface treatments at fabrication workshop

d shot blasting & priming 3.17 m2 8.81 27.93

e 30 minute intumescent fire paint 3.17 m2 14.82 46.98

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Boxing out steelwork

f 50 x 50mm 9.64 m 3.75 36.15

www.estimatingservice.co.uk To Collection £ 327.98

Page 3 / 85

Page 86: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 7.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 85 £ 327.98

www.estimatingservice.co.uk To Summary £ 327.98

Page 3 / 86

Page 87: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 7.5

Qty Unit Rate £ p

ITEM 7.5

G STRUCTURAL/CARCASSING METAL/TIMBER

G10 Structural steel framing

Framing, fabrication

Fabricated steelwork

a columns less than 40 kg/m 0.14 tonne 1787.01 250.18

Erection on site

b permanent erection 0.14 tonne 503.61 70.51

www.estimatingservice.co.uk To Collection £ 320.69

Page 3 / 87

Page 88: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 7.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 87 £ 320.69

www.estimatingservice.co.uk To Summary £ 320.69

Page 3 / 88

Page 89: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 7.6

Qty Unit Rate £ p

ITEM 7.6

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Flat roof members

a 50 x 150mm 6.94 m 6.34 44.00

Metalwork

Bolts & Timber Connectors

b M12 bolt with nut; 130 mm long 7.00 nr 2.26 15.82

www.estimatingservice.co.uk To Collection £ 59.82

Page 3 / 89

Page 90: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 7.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 89 £ 59.82

www.estimatingservice.co.uk To Summary £ 59.82

Page 3 / 90

Page 91: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.1

Qty Unit Rate £ p

ITEM 8.1

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Wall plates bedded

a 75 x 100mm 10.90 m 8.08 88.07

Metalwork

Galvanised steel straps

b

light duty wall plate strap; once bent; 1200 mm

long 18.00 nr 9.22 165.96

www.estimatingservice.co.uk To Collection £ 254.03

Page 3 / 91

Page 92: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 91 £ 254.03

www.estimatingservice.co.uk To Summary £ 254.03

Page 3 / 92

Page 93: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.2

Qty Unit Rate £ p

ITEM 8.2

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Flat roof members

a 50 x 150mm 37.59 m 6.34 238.32

b 50 x 200mm 24.33 m 7.52 182.96

c 50 x 50mm angle fillets 34.96 m 3.15 110.12

d sawn softwood firrings 61.92 m 9.38 580.81

Metalwork

Anchor bolts

e M12 anchor bolt; 115 mm long 28.00 nr 3.30 92.40

Bolts & Timber Connectors

f M12 bolt with nut; 130 mm long 31.00 nr 2.26 70.06

Galvanised steel straps

g heavy duty steel strap; once bent; 1200 mm long 6.00 nr 12.23 73.38

Speedy joist hangers

h 100mm 8.00 nr 5.21 41.68

i 50mm 44.00 nr 3.54 155.76

www.estimatingservice.co.uk To Collection £ 1,545.50

Page 3 / 93

Page 94: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 93 £ 1,545.50

www.estimatingservice.co.uk To Summary £ 1,545.50

Page 3 / 94

Page 95: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.3

Qty Unit Rate £ p

ITEM 8.3

K LININGS/SHEATHING/DRY PARTITIONING

K20 Timber board

flooring/sheathing/linings/casings

Roof decking

WBP plywood

a 18mm WBP plywood exceeding 300 mm wide 9.57 m2 17.65 168.91

www.estimatingservice.co.uk To Collection £ 168.91

Page 3 / 95

Page 96: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 95 £ 168.91

www.estimatingservice.co.uk To Summary £ 168.91

Page 3 / 96

Page 97: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.4

Qty Unit Rate £ p

ITEM 8.4

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Flat roof members

a 50 x 100mm 24.68 m 6.21 153.26

www.estimatingservice.co.uk To Collection £ 153.26

Page 3 / 97

Page 98: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 97 £ 153.26

www.estimatingservice.co.uk To Summary £ 153.26

Page 3 / 98

Page 99: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.5

Qty Unit Rate £ p

ITEM 8.5

P BUILDING FABRIC SUNDRIES

P10 Sundry insulation/proofing work/fire stops

Insulating quilts

Acoustic insulating quilts

a 100 mm 1.91 m2 10.08 19.25

www.estimatingservice.co.uk To Collection £ 19.25

Page 3 / 99

Page 100: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 99 £ 19.25

www.estimatingservice.co.uk To Summary £ 19.25

Page 3 / 100

Page 101: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.6

Qty Unit Rate £ p

ITEM 8.6

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Flat roof members

a 50 x 150mm 10.67 m 6.34 67.65

Metalwork

Bolts & Timber Connectors

b M12 bolt with nut; 130 mm long 15.00 nr 2.26 33.90

www.estimatingservice.co.uk To Collection £ 101.55

Page 3 / 101

Page 102: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 101 £ 101.55

www.estimatingservice.co.uk To Summary £ 101.55

Page 3 / 102

Page 103: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.7

Qty Unit Rate £ p

ITEM 8.7

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Flat roof members

a 50 x 100mm 17.26 m 6.21 107.18

www.estimatingservice.co.uk To Collection £ 107.18

Page 3 / 103

Page 104: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 103 £ 107.18

www.estimatingservice.co.uk To Summary £ 107.18

Page 3 / 104

Page 105: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.9

Qty Unit Rate £ p

ITEM 8.9

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Pitched roof members

a 50 x 150mm 111.32 m 7.65 851.60

b 50 x 225mm 17.70 m 8.99 159.12

www.estimatingservice.co.uk To Collection £ 1,010.72

Page 3 / 105

Page 106: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.9

Qty Unit Rate £ p

Collection

Total from Page 3 / 105 £ 1,010.72

www.estimatingservice.co.uk To Summary £ 1,010.72

Page 3 / 106

Page 107: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.11

Qty Unit Rate £ p

ITEM 8.11

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Pitched roof members

a 50 x 150mm 36.30 m 7.65 277.70

www.estimatingservice.co.uk To Collection £ 277.70

Page 3 / 107

Page 108: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.11

Qty Unit Rate £ p

Collection

Total from Page 3 / 107 £ 277.70

www.estimatingservice.co.uk To Summary £ 277.70

Page 3 / 108

Page 109: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.12

Qty Unit Rate £ p

ITEM 8.12

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Pitched roof members

a 50 x 150mm 1.60 m 7.64 12.22

K LININGS/SHEATHING/DRY PARTITIONING

K20 Timber board

flooring/sheathing/linings/casings

Flooring

Chipboard Type C4 flooring tongued and grooved all

edges, width

exceeding 300 mm, thickness

b 22mm 14.19 m2 15.49 219.80

www.estimatingservice.co.uk To Collection £ 232.03

Page 3 / 109

Page 110: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.12

Qty Unit Rate £ p

Collection

Total from Page 3 / 109 £ 232.03

www.estimatingservice.co.uk To Summary £ 232.03

Page 3 / 110

Page 111: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.13

Qty Unit Rate £ p

ITEM 8.13

P BUILDING FABRIC SUNDRIES

P10 Sundry insulation/proofing work/fire stops

Insulating quilts

Thermal insulating quilts

a 170 mm Knauf Earthwool 14.19 m2 3.75 53.21

b 100 mm Knauf Earthwool 14.19 m2 2.57 36.47

www.estimatingservice.co.uk To Collection £ 89.68

Page 3 / 111

Page 112: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.13

Qty Unit Rate £ p

Collection

Total from Page 3 / 111 £ 89.68

www.estimatingservice.co.uk To Summary £ 89.68

Page 3 / 112

Page 113: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.14

Qty Unit Rate £ p

ITEM 8.14

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Pitched roof members

a 50 x 175mm C24 14.61 m 8.41 122.87

b 75 x 100mm 5.48 m 9.10 49.87

c 75 x 175mm 2.95 m 11.51 33.95

d 50 x 100mm 1.51 m 6.21 9.38

Metalwork

Bolts & Timber Connectors

e M12 bolt with nut; 130 mm long 26.00 nr 2.26 58.76

www.estimatingservice.co.uk To Collection £ 274.83

Page 3 / 113

Page 114: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.14

Qty Unit Rate £ p

Collection

Total from Page 3 / 113 £ 274.83

www.estimatingservice.co.uk To Summary £ 274.83

Page 3 / 114

Page 115: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.15

Qty Unit Rate £ p

ITEM 8.15

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Eaves and verge boarding

Impregnated wrought softwood eaves and verge

boarding, width not exceeding 300 mm

a 32 x 225mm boards 12.75 m 16.49 210.25

www.estimatingservice.co.uk To Collection £ 210.25

Page 3 / 115

Page 116: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.15

Qty Unit Rate £ p

Collection

Total from Page 3 / 115 £ 210.25

www.estimatingservice.co.uk To Summary £ 210.25

Page 3 / 116

Page 117: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.16

Qty Unit Rate £ p

ITEM 8.16

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Pitched roof members

a 50 x 50mm plugged and screwed 11.96 m 4.56 54.54

Eaves and verge boarding

WBP plywood

b 9mm Softwood plywood - 225mm wide 12.75 m 8.72 111.18

www.estimatingservice.co.uk To Collection £ 165.72

Page 3 / 117

Page 118: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.16

Qty Unit Rate £ p

Collection

Total from Page 3 / 117 £ 165.72

www.estimatingservice.co.uk To Summary £ 165.72

Page 3 / 118

Page 119: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.17

Qty Unit Rate £ p

ITEM 8.17

C EXISTING SITE/BUILDINGS/SERVICES

C20 Demolition

Demolishing parts of timber structures

Removing roof timbers

a fascia or barge boards; dispose of debris off-site 6.50 m 13.16 85.54

www.estimatingservice.co.uk To Collection £ 85.54

Page 3 / 119

Page 120: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.17

Qty Unit Rate £ p

Collection

Total from Page 3 / 119 £ 85.54

www.estimatingservice.co.uk To Summary £ 85.54

Page 3 / 120

Page 121: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.18

Qty Unit Rate £ p

ITEM 8.18

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Pitched roof members

a 50 x 125mm 13.06 m 6.91 90.24

b 50 x 100mm 5.60 m 6.21 34.78

Eaves and verge boarding

WBP plywood

c 12mm softwood WBP plywood over 300mm wide 2.27 m2 25.18 57.16

Impregnated wrought softwood eaves and verge

boarding, width not exceeding 300 mm

d 32 x 225mm boards 3.54 m 16.49 58.37

Metalwork

Bolts & Timber Connectors

e M12 bolt with nut; 130 mm long 8.00 nr 2.26 18.08

Anchor bolts

f M12 anchor bolt; 115 mm long 16.00 nr 3.30 52.80

H CLADDING/COVERING

H60 Plain roof tiling

Sub-contract purchase

Clay plain tiles; Dreadnought machine made

smooth red or other

equal and approved on 19 x 38mm treated battens

and breather membrane

g roof coverings to 64mm lap 2.56 m2 76.86 196.76

Extra over for

h double course at eaves 2.53 m 12.09 30.59

i verges; single undercloak course 1.01 m 10.57 10.68

H71 Lead sheet coverings/flashings

Flashings, aprons

Code 4 lead, horizontal, 150 mm lapped joints,

fixing with lead clips

and wedges

j 300 mm girth 2.53 m 24.81 62.77

Code 4 lead, stepped, 150 mm lapped joints, fixing

with lead clips

and wedges

k 300 mm girth 1.01 m 33.32 33.65

www.estimatingservice.co.uk To Collection £ 645.88

Page 3 / 121

Page 122: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.18

Qty Unit Rate £ p

H CLADDING/COVERING continued ...

H71 Lead sheet coverings/flashings continued ...

Soakers and slates

Code 4 lead soakers (fixing by slater or tiler)

a 175 x 165 mm 7.00 nr 2.27 15.89

www.estimatingservice.co.uk To Collection £ 15.89

Page 3 / 122

Page 123: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 8.18

Qty Unit Rate £ p

Collection

Total from Page 3 / 121 £ 645.88

Total from Page 3 / 122 £ 15.89

www.estimatingservice.co.uk To Summary £ 661.77

Page 3 / 123

Page 124: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.5

Qty Unit Rate £ p

ITEM 9.5

H CLADDING/COVERING

H60 Plain roof tiling

Sub-contract purchase

Extra over for

a valleys; cutting both sides 7.74 m 26.14 202.32

www.estimatingservice.co.uk To Collection £ 202.32

Page 3 / 124

Page 125: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 124 £ 202.32

www.estimatingservice.co.uk To Summary £ 202.32

Page 3 / 125

Page 126: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.6

Qty Unit Rate £ p

ITEM 9.6

Clay plain tiles; Dreadnought machine made

smooth red or other

equal and approved on 19 x 38mm treated battens

and breather membrane

a roof coverings to 64mm lap 42.21 m2 76.86 3,244.26

www.estimatingservice.co.uk To Collection £ 3,244.26

Page 3 / 126

Page 127: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 126 £ 3,244.26

www.estimatingservice.co.uk To Summary £ 3,244.26

Page 3 / 127

Page 128: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.7

Qty Unit Rate £ p

ITEM 9.7

Extra over for

a double course at eaves 12.64 m 12.09 152.82

www.estimatingservice.co.uk To Collection £ 152.82

Page 3 / 128

Page 129: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 128 £ 152.82

www.estimatingservice.co.uk To Summary £ 152.82

Page 3 / 129

Page 130: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.8

Qty Unit Rate £ p

ITEM 9.8

H CLADDING/COVERING

H60 Plain roof tiling

Sub-contract purchase

Extra over for

a bonnet hip tiles; cutting both sides 14.25 m 86.13 1,227.35

b hip irons 2.00 nr 4.08 8.16

www.estimatingservice.co.uk To Collection £ 1,235.51

Page 3 / 130

Page 131: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 130 £ 1,235.51

www.estimatingservice.co.uk To Summary £ 1,235.51

Page 3 / 131

Page 132: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.11

Qty Unit Rate £ p

ITEM 9.11

H CLADDING/COVERING

H60 Plain roof tiling

Sub-contract purchase

Extra over for

a ridge tiles 2.73 m 32.82 89.60

www.estimatingservice.co.uk To Collection £ 89.60

Page 3 / 132

Page 133: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 9.11

Qty Unit Rate £ p

Collection

Total from Page 3 / 132 £ 89.60

www.estimatingservice.co.uk To Summary £ 89.60

Page 3 / 133

Page 134: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 10.1

Qty Unit Rate £ p

ITEM 10.1

J WATERPROOFING

J42 Built up roof coverings

Bauder Waterproof System

a

to timber or metal decking; pitch not exceeding 5

degrees 9.57 m2 46.61 446.06

b

kerb detail to Bauder waterproof membrane, girth

not exceeding 400mm 24.59 m 57.48 1,413.43

Tapered Insulation Board Underlays

c tapered PIR board; mechanically fastened 9.57 m2 70.50 674.69

www.estimatingservice.co.uk To Collection £ 2,534.18

Page 3 / 134

Page 135: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 10.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 134 £ 2,534.18

www.estimatingservice.co.uk To Summary £ 2,534.18

Page 3 / 135

Page 136: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 10.4

Qty Unit Rate £ p

ITEM 10.4

H71 Lead sheet coverings/flashings

Flashings, aprons

Code 4 lead, horizontal, 150 mm lapped joints,

fixing with lead clips

and wedges

a 300 mm girth 9.36 m 24.82 232.32

www.estimatingservice.co.uk To Collection £ 232.32

Page 3 / 136

Page 137: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 10.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 136 £ 232.32

www.estimatingservice.co.uk To Summary £ 232.32

Page 3 / 137

Page 138: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 10.5

Qty Unit Rate £ p

ITEM 10.5

H CLADDING/COVERING

H71 Lead sheet coverings/flashings

Outlets

Code 4 lead, 150 mm lapped joints, fixing with lead

cleats and brass

scews

a 600 mm girth 1.00 m 88.25 88.25

www.estimatingservice.co.uk To Collection £ 88.25

Page 3 / 138

Page 139: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 10.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 138 £ 88.25

www.estimatingservice.co.uk To Summary £ 88.25

Page 3 / 139

Page 140: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 10.6

Qty Unit Rate £ p

ITEM 10.6

C EXISTING SITE/BUILDINGS/SERVICES

C90 Alterations - spot items

Coverings

Stripping and repairs to slate and tile roofs

a

roofing felt or single ply waterproofing membrane;

dispose of debris off-site 2.99 m2 6.10 18.24

J WATERPROOFING

J42 Built up roof coverings

Bauder Waterproof System

b

to timber or metal decking; pitch not exceeding 5

degrees 2.99 m2 46.61 139.36

c

kerb detail to Bauder waterproof membrane, girth

not exceeding 400mm 12.28 m 57.48 705.85

Tapered Insulation Board Underlays

d tapered PIR board; mechanically fastened 2.99 m2 70.50 210.80

H71 Lead sheet coverings/flashings

Flashings, aprons

Code 4 lead, horizontal, 150 mm lapped joints,

fixing with lead clips

and wedges

e 300 mm girth 12.28 m 24.82 304.79

www.estimatingservice.co.uk To Collection £ 1,379.04

Page 3 / 140

Page 141: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 10.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 140 £ 1,379.04

www.estimatingservice.co.uk To Summary £ 1,379.04

Page 3 / 141

Page 142: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.1

Qty Unit Rate £ p

ITEM 11.1

C EXISTING SITE/BUILDINGS/SERVICES

C90 Alterations - spot items

Gutterwork

Remove gutters and supports, dispose of debris

off-site

a cast iron 27.67 m 9.06 250.69

Rainwater pipework

Remove rainwater pipes and supports, dispose of

debris off-site

b cast iron rainwater stack 6.09 m 9.06 55.18

www.estimatingservice.co.uk To Collection £ 305.87

Page 3 / 142

Page 143: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 142 £ 305.87

www.estimatingservice.co.uk To Summary £ 305.87

Page 3 / 143

Page 144: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.2

Qty Unit Rate £ p

ITEM 11.2

R DISPOSAL SYSTEMS

R10 Rainwater pipework/gutters

Brett Martin Cascade rainwater system

Gutters

a 112mm half round gutter 35.26 m 23.67 834.60

www.estimatingservice.co.uk To Collection £ 834.60

Page 3 / 144

Page 145: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 144 £ 834.60

www.estimatingservice.co.uk To Summary £ 834.60

Page 3 / 145

Page 146: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.3

Qty Unit Rate £ p

ITEM 11.3

R DISPOSAL SYSTEMS

R10 Rainwater pipework/gutters

Brett Martin Cascade rainwater system

Rainwater pipes

a 68mm round downpipes 11.29 m 32.87 371.10

www.estimatingservice.co.uk To Collection £ 371.10

Page 3 / 146

Page 147: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 146 £ 371.10

www.estimatingservice.co.uk To Summary £ 371.10

Page 3 / 147

Page 148: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.4

Qty Unit Rate £ p

ITEM 11.4

R DISPOSAL SYSTEMS

R10 Rainwater pipework/gutters

Brett Martin Cascade rainwater system

Extra for

a hopper head 2.00 nr 54.68 109.36

www.estimatingservice.co.uk To Collection £ 109.36

Page 3 / 148

Page 149: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 148 £ 109.36

www.estimatingservice.co.uk To Summary £ 109.36

Page 3 / 149

Page 150: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.5

Qty Unit Rate £ p

ITEM 11.5

R DISPOSAL SYSTEMS

R10 Rainwater pipework/gutters

Brett Martin Cascade rainwater system

Extra for

a angles 5.00 nr 24.42 122.10

b stopped ends 2.00 nr 12.05 24.10

c outlets 4.00 nr 24.00 96.00

d offset 4.00 nr 43.66 174.64

www.estimatingservice.co.uk To Collection £ 416.84

Page 3 / 150

Page 151: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 11.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 150 £ 416.84

www.estimatingservice.co.uk To Summary £ 416.84

Page 3 / 151

Page 152: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 12.2

Qty Unit Rate £ p

ITEM 12.2

L WINDOWS/DOORS/STAIRS

L10 Windows/rooflights/screens/louvres

Supply & fix

a

Manufacturer quotation; windows and doors; supply

& fix item 8551.68 8,551.68

www.estimatingservice.co.uk To Collection £ 8,551.68

Page 3 / 152

Page 153: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 12.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 152 £ 8,551.68

www.estimatingservice.co.uk To Summary £ 8,551.68

Page 3 / 153

Page 154: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 12.4

Qty Unit Rate £ p

ITEM 12.4

P BUILDING FABRIC SUNDRIES

P20 Unframed isolated trims/skirtings/sundry items

Window boards

MDF with rounded nosing

a 25 x 219 mm 3.14 m 11.36 35.67

b returned ends 8.00 nr 1.28 10.24

www.estimatingservice.co.uk To Collection £ 45.91

Page 3 / 154

Page 155: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 12.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 154 £ 45.91

www.estimatingservice.co.uk To Summary £ 45.91

Page 3 / 155

Page 156: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 12.5

Qty Unit Rate £ p

ITEM 12.5

L WINDOWS/DOORS/STAIRS

L10 Windows/rooflights/screens/louvres

Fixing only

a Fix only softwood casement windows 0.38 m2 46.93 17.83

www.estimatingservice.co.uk To Collection £ 17.83

Page 3 / 156

Page 157: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 12.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 156 £ 17.83

www.estimatingservice.co.uk To Summary £ 17.83

Page 3 / 157

Page 158: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 13.1

Qty Unit Rate £ p

ITEM 13.1

L WINDOWS/DOORS/STAIRS

L10 Windows/rooflights/screens/louvres

Roof Lights

Monodraught diamond dome sunpipe

a 300mm diameter 2.00 nr 344.88 689.76

www.estimatingservice.co.uk To Collection £ 689.76

Page 3 / 158

Page 159: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 13.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 158 £ 689.76

www.estimatingservice.co.uk To Summary £ 689.76

Page 3 / 159

Page 160: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 13.3

Qty Unit Rate £ p

ITEM 13.3

Z PC SUMS

PC Sums associated with the project

a supply of lantern lights from HLI Building Products item 3668.42 3,668.42

b

fixing of lantern lights including wireways for electrical

connections item 454.57 454.57

www.estimatingservice.co.uk To Collection £ 4,122.99

Page 3 / 160

Page 161: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 13.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 160 £ 4,122.99

www.estimatingservice.co.uk To Summary £ 4,122.99

Page 3 / 161

Page 162: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.1

Qty Unit Rate £ p

ITEM 14.1

M SURFACE FINISHES

M20 Plastered/Rendered/Roughcast coatings

Gypsum plasterboard to BS 1230

Fixing with screws to ceilings

a 12.5 mm Plain Wallboard over 300 mm wide 57.77 m2 10.68 616.98

www.estimatingservice.co.uk To Collection £ 616.98

Page 3 / 162

Page 163: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 162 £ 616.98

www.estimatingservice.co.uk To Summary £ 616.98

Page 3 / 163

Page 164: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.2

Qty Unit Rate £ p

ITEM 14.2

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Wall or partition members

a 50 x 50mm 47.97 m 3.75 179.89

M SURFACE FINISHES

M20 Plastered/Rendered/Roughcast coatings

Gypsum plasterboard to BS 1230

Fixing with screws to ceilings

b 12.5 mm Plain Wallboard over 300 mm wide 10.25 m2 10.68 109.47

www.estimatingservice.co.uk To Collection £ 289.36

Page 3 / 164

Page 165: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 164 £ 289.36

www.estimatingservice.co.uk To Summary £ 289.36

Page 3 / 165

Page 166: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.3

Qty Unit Rate £ p

ITEM 14.3

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Wall or partition members

a 50 x 75mm 60.19 m 4.81 289.51

P BUILDING FABRIC SUNDRIES

P10 Sundry insulation/proofing work/fire stops

Insulating quilts

Acoustic insulating quilts

b 50 mm 7.55 m2 5.57 42.05

M SURFACE FINISHES

M20 Plastered/Rendered/Roughcast coatings

Gypsum plasterboard to BS 1230

Fixing with screws to timber or steel stud framing

c 12.5 mm Plain Wallboard over 300 mm wide 30.20 m2 9.89 298.68

www.estimatingservice.co.uk To Collection £ 630.25

Page 3 / 166

Page 167: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 166 £ 630.25

www.estimatingservice.co.uk To Summary £ 630.25

Page 3 / 167

Page 168: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.4

Qty Unit Rate £ p

ITEM 14.4

K LININGS/SHEATHING/DRY PARTITIONING

K11 Rigid sheet flooring/sheathing/linings/casings

Sheet linings and casings

Tile backer boards

a 12.5mm Wediboard 5.93 m2 36.89 218.76

www.estimatingservice.co.uk To Collection £ 218.76

Page 3 / 168

Page 169: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 168 £ 218.76

www.estimatingservice.co.uk To Summary £ 218.76

Page 3 / 169

Page 170: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.5

Qty Unit Rate £ p

ITEM 14.5

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Wall or partition members

a 38 x 50mm 52.80 m 4.44 234.43

M SURFACE FINISHES

M20 Plastered/Rendered/Roughcast coatings

Gypsum plasterboard to BS 1230

Fixing with screws to timber or steel stud framing

b 12.5 mm Plain Wallboard over 300 mm wide 20.86 m2 9.89 206.31

www.estimatingservice.co.uk To Collection £ 440.74

Page 3 / 170

Page 171: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 170 £ 440.74

www.estimatingservice.co.uk To Summary £ 440.74

Page 3 / 171

Page 172: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.6

Qty Unit Rate £ p

ITEM 14.6

M SURFACE FINISHES

M20 Plastered/Rendered/Roughcast coatings

Retarded hemihydrate gypsum ("Thistle") plasters to

BS 1191, Class B

3 mm board finish on walls or ceilings including

scrimming joints

a over 300 mm wide 93.73 m2 7.96 746.09

Plastering sundries

Galvanised plaster beads

b thin coat angle bead 52.55 m 1.86 97.74

www.estimatingservice.co.uk To Collection £ 843.83

Page 3 / 172

Page 173: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 172 £ 843.83

www.estimatingservice.co.uk To Summary £ 843.83

Page 3 / 173

Page 174: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.8

Qty Unit Rate £ p

ITEM 14.8

M SURFACE FINISHES

M20 Plastered/Rendered/Roughcast coatings

Retarded hemihydrate gypsum ("Thistle") plasters to

BS 1191, Class B

13 mm two coat plastering on brick or block walls

a over 300 mm wide 62.70 m2 22.81 1,430.19

www.estimatingservice.co.uk To Collection £ 1,430.19

Page 3 / 174

Page 175: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 174 £ 1,430.19

www.estimatingservice.co.uk To Summary £ 1,430.19

Page 3 / 175

Page 176: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.10

Qty Unit Rate £ p

ITEM 14.10

M SURFACE FINISHES

M20 Plastered/Rendered/Roughcast coatings

Gypsum plasterboard to BS 1230

Fixing with screws to ceilings

a 12.5 mm Plain Wallboard over 300 mm wide 9.17 m2 10.68 97.94

Retarded hemihydrate gypsum ("Thistle") plasters to

BS 1191, Class B

3 mm board finish on walls or ceilings including

scrimming joints

b over 300 mm wide 9.17 m2 7.96 72.99

www.estimatingservice.co.uk To Collection £ 170.93

Page 3 / 176

Page 177: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 14.10

Qty Unit Rate £ p

Collection

Total from Page 3 / 176 £ 170.93

www.estimatingservice.co.uk To Summary £ 170.93

Page 3 / 177

Page 178: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.1

Qty Unit Rate £ p

ITEM 15.1

L WINDOWS/DOORS/STAIRS

L20 Doors/shutters/hatches

Softwood door frames and linings

Door lining sets

a 32 x 115mm internal door lining with loose stops 3.00 nr 32.73 98.19

www.estimatingservice.co.uk To Collection £ 98.19

Page 3 / 178

Page 179: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 178 £ 98.19

www.estimatingservice.co.uk To Summary £ 98.19

Page 3 / 179

Page 180: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.2

Qty Unit Rate £ p

ITEM 15.2

Z PC SUMS

PC Sums associated with the project

a supply of internal doors, 4 nr @ £120 each item 495.90 495.90

L WINDOWS/DOORS/STAIRS

L20 Doors/shutters/hatches

Fixing

b hang internal door in 1 pair of butt hinges 4.00 nr 19.25 77.00

www.estimatingservice.co.uk To Collection £ 572.90

Page 3 / 180

Page 181: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 180 £ 572.90

www.estimatingservice.co.uk To Summary £ 572.90

Page 3 / 181

Page 182: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.3

Qty Unit Rate £ p

ITEM 15.3

Z PC SUMS

PC Sums associated with the project

a supply of JEDO door lever handles, 4 @ £17.49 each item 72.28 72.28

b supply of JEDO satin thumb turn item 7.97 7.97

P BUILDING FABRIC SUNDRIES

P21 Ironmongery

Fixing only to softwood

Door handles

c lever handles on rose 4.00 pair 9.24 36.96

Latches

d thumb latches 1.00 nr 15.40 15.40

e 75mm mortice latch 3.00 nr 20.53 61.59

Butt hinges

f 100mm 4.00 pair 7.96 31.84

www.estimatingservice.co.uk To Collection £ 226.04

Page 3 / 182

Page 183: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 182 £ 226.04

www.estimatingservice.co.uk To Summary £ 226.04

Page 3 / 183

Page 184: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.4

Qty Unit Rate £ p

ITEM 15.4

Z PC SUMS

PC Sums associated with the project

a additional ironmongery item 309.94 309.94

www.estimatingservice.co.uk To Collection £ 309.94

Page 3 / 184

Page 185: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 184 £ 309.94

www.estimatingservice.co.uk To Summary £ 309.94

Page 3 / 185

Page 186: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.5

Qty Unit Rate £ p

ITEM 15.5

Z PC SUMS

PC Sums associated with the project

a

supply & fix new section of staircase including

mopstick handrails item 516.56 516.56

www.estimatingservice.co.uk To Collection £ 516.56

Page 3 / 186

Page 187: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 186 £ 516.56

www.estimatingservice.co.uk To Summary £ 516.56

Page 3 / 187

Page 188: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.7

Qty Unit Rate £ p

ITEM 15.7

P BUILDING FABRIC SUNDRIES

P20 Unframed isolated trims/skirtings/sundry items

Skirtings, picture rails, architraves and the like

Wrought softwood skirtings

a 25 x 75 mm Torus 48.09 m 4.54 218.33

Wrought softwood architraves

b 19 x 75 mm chamfered 40.00 m 4.38 175.20

www.estimatingservice.co.uk To Collection £ 393.53

Page 3 / 188

Page 189: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 188 £ 393.53

www.estimatingservice.co.uk To Summary £ 393.53

Page 3 / 189

Page 190: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.8

Qty Unit Rate £ p

ITEM 15.8

Z PC SUMS

PC Sums associated with the project

a provide gas bottle enclosure; supply & fix item 774.84 774.84

www.estimatingservice.co.uk To Collection £ 774.84

Page 3 / 190

Page 191: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 190 £ 774.84

www.estimatingservice.co.uk To Summary £ 774.84

Page 3 / 191

Page 192: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.8

Qty Unit Rate £ p

ITEM 15.8

Z PC SUMS

PC Sums associated with the project

a supply gas bottles and switchover valve item 118.81 118.81

www.estimatingservice.co.uk To Collection £ 118.81

Page 3 / 192

Page 193: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 15.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 192 £ 118.81

www.estimatingservice.co.uk To Summary £ 118.81

Page 3 / 193

Page 194: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.3

Qty Unit Rate £ p

ITEM 16.3

Z PC SUMS

PC Sums associated with the project

a sealant sub-contractor for 0.5 day item 258.28 258.28

www.estimatingservice.co.uk To Collection £ 258.28

Page 3 / 194

Page 195: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 194 £ 258.28

www.estimatingservice.co.uk To Summary £ 258.28

Page 3 / 195

Page 196: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.4

Qty Unit Rate £ p

ITEM 16.4

Z PC SUMS

PC Sums associated with the project

a

Lamona Ceramic 1.5 bowl sink including waste and

taps item 357.98 357.98

N FURNITURE/EQUIPMENT

N13 Sanitary appliances/fittings

Fixing only equipment

Connections to service and waste pipes not

included

b

Sink units with waste and overflow fittings, plug

and chain - fitted to sink units 1.00 nr 107.57 107.57

www.estimatingservice.co.uk To Collection £ 465.55

Page 3 / 196

Page 197: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 196 £ 465.55

www.estimatingservice.co.uk To Summary £ 465.55

Page 3 / 197

Page 198: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.5

Qty Unit Rate £ p

ITEM 16.5

Z PC SUMS

PC Sums associated with the project

a

Lamona Ceramic single bowl sink including waste

and taps item 189.06 189.06

N FURNITURE/EQUIPMENT

N13 Sanitary appliances/fittings

Fixing only equipment

Connections to service and waste pipes not

included

b

Sink units with waste and overflow fittings, plug

and chain - fitted to sink units 1.00 nr 107.57 107.57

www.estimatingservice.co.uk To Collection £ 296.63

Page 3 / 198

Page 199: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 198 £ 296.63

www.estimatingservice.co.uk To Summary £ 296.63

Page 3 / 199

Page 200: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.6

Qty Unit Rate £ p

ITEM 16.6

Z PC SUMS

PC Sums associated with the project

a Supply ROCA Easy 900 x 900 x 80mm shower tray item 146.51 146.51

b Supply ROCA shower waste to suit above tray item 64.35 64.35

c Supply ROCA L90 shower mixer valve item 204.16 204.16

d Supply ROCA Raindream circular shower head item 173.22 173.22

e Supply ROCA 500mm support arm item 43.05 43.05

f Supply ROCA L90 basin mixer tap item 178.64 178.64

g Supply ROCA Nexo 500 corner cloakroom basin item 97.46 97.46

h Supply ROCA Nexo close coupled WC item 223.89 223.89

i Supply ROCA Nexo WC seat & cover item 50.55 50.55

j Supply Mira Beam 900mm pivot shower door item 231.81 231.81

N FURNITURE/EQUIPMENT

N13 Sanitary appliances/fittings

Fixing only equipment

Connections to service and waste pipes not

included

k Shower tray 1.00 nr 115.60 115.60

l Shower mixer 1.00 nr 139.96 139.96

m Shower screen 1.00 nr 180.10 180.10

n Wash hand basin 1.00 nr 86.28 86.28

o

Vitreous china lavatory basins with waste fitting,

plug, chain and

stay, bracket plugged to wall 1.00 nr 93.91 93.91

www.estimatingservice.co.uk To Collection £ 2,029.49

Page 3 / 200

Page 201: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 200 £ 2,029.49

www.estimatingservice.co.uk To Summary £ 2,029.49

Page 3 / 201

Page 202: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.7

Qty Unit Rate £ p

ITEM 16.7

R DISPOSAL SYSTEMS

R11 Foul drainage above ground

Sub-contract purchase

a 32mm waste pipe including elbows and branches 3.00 m 8.36 25.08

b 40mm waste pipe including elbows and branches 9.00 m 9.89 89.01

c 110mm waste pipe including elbows and branches 0.30 m 0.00 0.00

d two storey soil stack 1.00 nr 563.05 563.05

www.estimatingservice.co.uk To Collection £ 677.14

Page 3 / 202

Page 203: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 16.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 202 £ 677.14

www.estimatingservice.co.uk To Summary £ 677.14

Page 3 / 203

Page 204: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 17.1

Qty Unit Rate £ p

ITEM 17.1

M SURFACE FINISHES

M40 Stone/Concrete/Quarry/Ceramic tiling/Mosaic

Floor Tiles

Fixing with adhesive

a

over 300 mm wide; ASS Daple stube panaria

wood effect tiles 200 x 905mm 50.54 m2 89.07 4,501.60

Floor & Wall Tiles

b

over 300 mm wide; Nettuno noce Cisa Let

Fontare tiles 333 x 333mm 22.19 m2 177.92 3,948.04

www.estimatingservice.co.uk To Collection £ 8,449.64

Page 3 / 204

Page 205: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 17.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 204 £ 8,449.64

www.estimatingservice.co.uk To Summary £ 8,449.64

Page 3 / 205

Page 206: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 17.3

Qty Unit Rate £ p

ITEM 17.3

M SURFACE FINISHES

M40 Stone/Concrete/Quarry/Ceramic tiling/Mosaic

Floor & Wall tiling accessories

Schulter Ditra matting

a Ditra 25 matting over 300 mm wide 54.10 m2 12.98 702.22

www.estimatingservice.co.uk To Collection £ 702.22

Page 3 / 206

Page 207: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 17.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 206 £ 702.22

www.estimatingservice.co.uk To Summary £ 702.22

Page 3 / 207

Page 208: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 18.1

Qty Unit Rate £ p

ITEM 18.1

M SURFACE FINISHES

M60 Painting/Clear finishing

General surfaces

Two coats of Dulex coloured matt emulsion paint

over 300 mm girth

a smooth plaster 140.93 m2 5.35 753.98

Knot, prime, stop and paint one undercoat and one

coat of satinwood finish paint on joinery

b over 300 mm girth 15.12 m2 5.93 89.66

c isolated surfaces, not exceeding 300 mm girth 93.09 m 2.24 208.52

General surfaces, externally

Knot, prime, stop and paint two undercoats and

one coat of gloss

finish paint on joinery

d over 300 mm girth 3.20 m2 9.07 29.02

e isolated surfaces, not exceeding 300 mm girth 35.17 m 3.45 121.34

M52 Decorative papers/fabrics

Generally

Prepare, size and hang wallpaper supplied by

others to

f walls 51.22 m2 4.93 252.51

www.estimatingservice.co.uk To Collection £ 1,455.03

Page 3 / 208

Page 209: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 18.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 208 £ 1,455.03

www.estimatingservice.co.uk To Summary £ 1,455.03

Page 3 / 209

Page 210: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 19.1

Qty Unit Rate £ p

ITEM 19.1

M SURFACE FINISHES

M51 Edge fixed carpeting

Underlay

Latex carpet underlay to floors level and to falls not

exceeding 15 degrees from horizontal on timber

base

a exceeding 300 m wide 28.45 m2 2.39 68.00

Fitted carpet

Medium duty tufted wool/nylon carpet fixed with

gripper rods to floors level and to floors not

exceeding 15 degrees from horizontal on timber

base

b exceeding 300 m wide 28.45 m2 32.58 926.90

www.estimatingservice.co.uk To Collection £ 994.90

Page 3 / 210

Page 211: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 19.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 210 £ 994.90

www.estimatingservice.co.uk To Summary £ 994.90

Page 3 / 211

Page 212: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 21.1

Qty Unit Rate £ p

ITEM 21.1

Z PC SUMS

PC Sums associated with the project

a

Supply of Kitchen & Utility units; Ref Howdens

quotation dated 1st April 2015 item 10565.08 10,565.08

b Fitting of Kitchen, Utility units and white goods item 2066.25 2,066.25

www.estimatingservice.co.uk To Collection £ 12,631.33

Page 3 / 212

Page 213: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 21.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 212 £ 12,631.33

www.estimatingservice.co.uk To Summary £ 12,631.33

Page 3 / 213

Page 214: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 22.1

Qty Unit Rate £ p

ITEM 22.1

P BUILDING FABRIC SUNDRIES

P30 Trenches/Pipeways/Pits for buried

engineering services

Excavate by hand

Trenches to receive service pipes, cables etc,

grade bottom, fill in and compact and remove

surplus - earthwork support not included - average

depth not exceeding

a 1.00 m, electricity duct 2.06 m 28.50 58.71

www.estimatingservice.co.uk To Collection £ 58.71

Page 3 / 214

Page 215: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 22.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 214 £ 58.71

www.estimatingservice.co.uk To Summary £ 58.71

Page 3 / 215

Page 216: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 22.2

Qty Unit Rate £ p

ITEM 22.2

P BUILDING FABRIC SUNDRIES

P30 Trenches/Pipeways/Pits for buried

engineering services

Excavate by hand

Trenches to receive service pipes, cables etc,

grade bottom, fill in and compact and remove

surplus - earthwork support not included - average

depth not exceeding

a 1.00 m, water service pipe 8.74 m 27.75 242.54

www.estimatingservice.co.uk To Collection £ 242.54

Page 3 / 216

Page 217: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 22.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 216 £ 242.54

www.estimatingservice.co.uk To Summary £ 242.54

Page 3 / 217

Page 218: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 22.3

Qty Unit Rate £ p

ITEM 22.3

Z PC SUMS

PC Sums associated with the project

a

UK Power Networks quotation to divert electricity

supply item 892.62 892.62

www.estimatingservice.co.uk To Collection £ 892.62

Page 3 / 218

Page 219: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 22.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 218 £ 892.62

www.estimatingservice.co.uk To Summary £ 892.62

Page 3 / 219

Page 220: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 22.4

Qty Unit Rate £ p

ITEM 22.4

D GROUNDWORK

D20 Excavating and filling

Filling to make up levels

Imported MOT Type 1 material

a not exceeding 0.25 m 1.79 m3 68.99 123.49

Surface treatments

Compacting

b surface of filling 17.83 m2 0.61 10.88

Q PAVING/PLANTING/FENCING/SITE FURNITURE

Q25 Slab/Brick/Sett/Cobble pavings

Plain PCC slab paving

Salvaged paving; 50 mm thick slabs, 50 mm sand

base, 6 mm straight joints both ways, pointing in

cement mortar (1:3), level and to falls only, slab

size

c 450 x 450mm 17.83 m2 12.39 220.91

www.estimatingservice.co.uk To Collection £ 355.28

Page 3 / 220

Page 221: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 22.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 220 £ 355.28

www.estimatingservice.co.uk To Summary £ 355.28

Page 3 / 221

Page 222: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.1

Qty Unit Rate £ p

ITEM 23.1

Z PC SUMS

PC Sums associated with the project

a

Thermo Floor quoation for the supply & installation of

under floor heating item 2200.55 2,200.55

www.estimatingservice.co.uk To Collection £ 2,200.55

Page 3 / 222

Page 223: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 222 £ 2,200.55

www.estimatingservice.co.uk To Summary £ 2,200.55

Page 3 / 223

Page 224: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.2

Qty Unit Rate £ p

ITEM 23.2

T MECHANICAL HEATING/COOLING/REFRIGERATION

SYSTEMS

T73 Works associated with Heating installations

Sub-contract purchase

a Worcester Bosch boiler 1.00 nr 1737.86 1,737.86

b 210L Megaflo hot water cylinder 1.00 nr 1953.00 1,953.00

www.estimatingservice.co.uk To Collection £ 3,690.86

Page 3 / 224

Page 225: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 224 £ 3,690.86

www.estimatingservice.co.uk To Summary £ 3,690.86

Page 3 / 225

Page 226: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.6

Qty Unit Rate £ p

ITEM 23.6

S PIPED SUPPLY SYSTEMS

S10 Cold Water

Sub-contract purchase

a cold water point 5.00 nr 163.86 819.30

S11 Hot water

Sub-contract purchase

b hot water point 4.00 nr 280.43 1,121.72

www.estimatingservice.co.uk To Collection £ 1,941.02

Page 3 / 226

Page 227: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 226 £ 1,941.02

www.estimatingservice.co.uk To Summary £ 1,941.02

Page 3 / 227

Page 228: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.7

Qty Unit Rate £ p

ITEM 23.7

T MECHANICAL HEATING/COOLING/REFRIGERATION

SYSTEMS

T73 Works associated with Heating installations

Sub-contract purchase

a central heating service point 5.00 nr 562.63 2,813.15

b 500mm radiator with TRV 1.00 nr 175.79 175.79

c 1000mm radiator with TRV 2.00 nr 194.24 388.48

d 1600mm radiator with TRV 4.00 nr 267.08 1,068.32

e

Towel rail - fix only; supply of towel rail taken

elsewhere* 1.00 nr 97.84 97.84

Z PC SUMS

PC Sums associated with the project

f supply of towel rail item 413.25 413.25

www.estimatingservice.co.uk To Collection £ 4,956.83

Page 3 / 228

Page 229: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 228 £ 4,956.83

www.estimatingservice.co.uk To Summary £ 4,956.83

Page 3 / 229

Page 230: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.8

Qty Unit Rate £ p

ITEM 23.8

S PIPED SUPPLY SYSTEMS

S10 Cold Water

Sub-contract purchase

a scale inhibitor 1.00 nr 68.19 68.19

www.estimatingservice.co.uk To Collection £ 68.19

Page 3 / 230

Page 231: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 23.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 230 £ 68.19

www.estimatingservice.co.uk To Summary £ 68.19

Page 3 / 231

Page 232: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 24.1

Qty Unit Rate £ p

ITEM 24.1

V ELECTRICAL SUPPLY/POWER LIGHTING

SYSTEMS

V22 General Low Voltage power

Sub-contract purchase

Complete supply & fix installations

a consumer unit 1.00 nr 554.61 554.61

b earth bonding 1.00 nr 201.55 201.55

c testing & commisioning 1.00 nr 100.23 100.23

d 2-Gang switched socket outlet; White 19.00 nr 36.68 696.92

e extractor fan 4.00 nr 66.60 266.40

f boiler electrics 1.00 nr 552.90 552.90

g non-illuminated fused spur 12.00 nr 41.22 494.64

V23 Smoke/Heat/Gas alarms

Smoke alarms

h hard wired smoke alarm 3.00 nr 79.95 239.85

Heat alarms

i hard wired heat alarm 1.00 nr 79.95 79.95

V24 Telecoms and Data

TV, FM/DAB service points

j TV point 2.00 nr 32.94 65.88

www.estimatingservice.co.uk To Collection £ 3,252.93

Page 3 / 232

Page 233: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 24.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 232 £ 3,252.93

www.estimatingservice.co.uk To Summary £ 3,252.93

Page 3 / 233

Page 234: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 24.23

Qty Unit Rate £ p

ITEM 24.23

V ELECTRICAL SUPPLY/POWER LIGHTING

SYSTEMS

V21 General lighting

Sub-contract purchase

Complete supply & fix installations

a bulkhead light 1.00 nr 75.15 75.15

b downlighter 41.00 nr 54.08 2,217.28

c ceiling rose; White 2.00 nr 49.00 98.00

d photocell floodlight 6.00 nr 183.09 1,098.54

e 1-Gang, 1-Way: Light switch: White 8.00 nr 36.80 294.40

f 2-Gang, 2-Way: Light switch: White 2.00 nr 75.57 151.14

g 1-Gang, 1-Way: Pull Cord Light Switch: White 1.00 nr 35.58 35.58

www.estimatingservice.co.uk To Collection £ 3,970.09

Page 3 / 234

Page 235: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 24.23

Qty Unit Rate £ p

Collection

Total from Page 3 / 234 £ 3,970.09

www.estimatingservice.co.uk To Summary £ 3,970.09

Page 3 / 235

Page 236: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 24.28

Qty Unit Rate £ p

ITEM 24.28

V ELECTRICAL SUPPLY/POWER LIGHTING

SYSTEMS

V50 Electric underfloor heating

Electric Under Floor heating to

a wet rooms 3.56 m2 110.88 394.73

b programmable floor thermostat 1.00 nr 97.32 97.32

K LININGS/SHEATHING/DRY PARTITIONING

K20 Timber board

flooring/sheathing/linings/casings

Flooring

Plywood, width exceeding 300 mm, thickness

c 9mm 3.56 m2 12.73 45.32

www.estimatingservice.co.uk To Collection £ 537.37

Page 3 / 236

Page 237: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 24.28

Qty Unit Rate £ p

Collection

Total from Page 3 / 236 £ 537.37

www.estimatingservice.co.uk To Summary £ 537.37

Page 3 / 237

Page 238: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 27.1

Qty Unit Rate £ p

ITEM 27.1

Z PC SUMS

PC Sums associated with the project

a contingency sum item 7748.43 7,748.43

www.estimatingservice.co.uk To Collection £ 7,748.43

Page 3 / 238

Page 239: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 27.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 238 £ 7,748.43

www.estimatingservice.co.uk To Summary £ 7,748.43

Page 3 / 239

Page 240: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.1

Qty Unit Rate £ p

ITEM 28.1

C EXISTING SITE/BUILDINGS/SERVICES

C90 Alterations - spot items

Remove finishings

Floors

a carpeting 4.74 m2 4.42 20.95

Walls, without backing

b ceramic wall tiles 21.67 m2 5.95 128.94

Removing fittings and fixtures

Timber mouldings

c

skirtings, architraves or dado rail; dispose of

debris off-site or set

aside for re-use 13.78 m 2.81 38.72

Removing plumbing and engineering installations

Sanitary fittings, including capping off service and

waste pipes and

bringing forward services

d WC 1.00 nr 136.37 136.37

e wash hand basin 1.00 nr 36.75 36.75

f bath 1.00 nr 223.27 223.27

Radiators

g medium 1.00 nr 66.44 66.44

C20 Demolition

Demolishing parts of timber structures

Softwood studded partitions; dispose of debris

off-site

h plasterboard finish 0.75 m2 14.15 10.61

Z PC SUMS

PC Sums associated with the project

i

disconnect electrical installation and make safe for

proceeding works item 129.14 129.14

www.estimatingservice.co.uk To Collection £ 791.19

Page 3 / 240

Page 241: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.1

Qty Unit Rate £ p

Collection

Total from Page 3 / 240 £ 791.19

www.estimatingservice.co.uk To Summary £ 791.19

Page 3 / 241

Page 242: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.2

Qty Unit Rate £ p

ITEM 28.2

P BUILDING FABRIC SUNDRIES

P31 Holes/Chases/Covers/Supports for services

Chases

Vertical rough chases

a 50 x 50 mm 2.40 m 22.71 54.50

www.estimatingservice.co.uk To Collection £ 54.50

Page 3 / 242

Page 243: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.2

Qty Unit Rate £ p

Collection

Total from Page 3 / 242 £ 54.50

www.estimatingservice.co.uk To Summary £ 54.50

Page 3 / 243

Page 244: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.3

Qty Unit Rate £ p

ITEM 28.3

G STRUCTURAL/CARCASSING METAL/TIMBER

G20 Carpentry/Timber framing/First fixing

Impregnated sawn softwood - SC3 Grade

Wall or partition members

a 50 x 50mm 31.80 m 3.75 119.25

K LININGS/SHEATHING/DRY PARTITIONING

K11 Rigid sheet flooring/sheathing/linings/casings

Sheet linings and casings

Tile backer boards

b 12.5mm Wediboard 3.87 m2 36.89 142.76

www.estimatingservice.co.uk To Collection £ 262.01

Page 3 / 244

Page 245: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.3

Qty Unit Rate £ p

Collection

Total from Page 3 / 244 £ 262.01

www.estimatingservice.co.uk To Summary £ 262.01

Page 3 / 245

Page 246: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.4

Qty Unit Rate £ p

ITEM 28.4

V ELECTRICAL SUPPLY/POWER LIGHTING

SYSTEMS

V50 Electric underfloor heating

Electric Under Floor heating to

a wet rooms 4.74 m2 110.87 525.52

b programmable floor thermostat 1.00 nr 97.32 97.32

K LININGS/SHEATHING/DRY PARTITIONING

K20 Timber board

flooring/sheathing/linings/casings

Flooring

Plywood, width exceeding 300 mm, thickness

c 9mm 4.74 m2 12.73 60.34

M SURFACE FINISHES

M40 Stone/Concrete/Quarry/Ceramic tiling/Mosaic

Floor Tiles

Fixing with adhesive

d

over 300 mm wide; Nettuno noce Cisa Let

Fontare tiles 333 x 333mm 4.74 m2 177.92 843.34

M SURFACE FINISHES

M40 Stone/Concrete/Quarry/Ceramic tiling/Mosaic

Floor & Wall tiling accessories

Schulter Ditra matting

e Ditra 25 matting over 300 mm wide 4.74 m2 12.98 61.53

www.estimatingservice.co.uk To Collection £ 1,588.05

Page 3 / 246

Page 247: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.4

Qty Unit Rate £ p

Collection

Total from Page 3 / 246 £ 1,588.05

www.estimatingservice.co.uk To Summary £ 1,588.05

Page 3 / 247

Page 248: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.5

Qty Unit Rate £ p

ITEM 28.5

M SURFACE FINISHES

M40 Stone/Concrete/Quarry/Ceramic tiling/Mosaic

Wall Tiles

Fixing with adhesive

a

over 300 mm wide; Nettuno noce Cisa Let

Fontare tiles 333 x 333mm 22.70 m2 177.92 4,038.78

www.estimatingservice.co.uk To Collection £ 4,038.78

Page 3 / 248

Page 249: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.5

Qty Unit Rate £ p

Collection

Total from Page 3 / 248 £ 4,038.78

www.estimatingservice.co.uk To Summary £ 4,038.78

Page 3 / 249

Page 250: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.6

Qty Unit Rate £ p

ITEM 28.6

Z PC SUMS

PC Sums associated with the project

a Supply ROCA L90 shower mixer valve item 204.16 204.16

b Supply ROCA Raindream circular shower head item 173.22 173.22

c Supply ROCA 500mm support arm item 43.05 43.05

N FURNITURE/EQUIPMENT

N13 Sanitary appliances/fittings

Fixing only equipment

Connections to service and waste pipes not

included

d Shower mixer 1.00 nr 139.96 139.96

www.estimatingservice.co.uk To Collection £ 560.39

Page 3 / 250

Page 251: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.6

Qty Unit Rate £ p

Collection

Total from Page 3 / 250 £ 560.39

www.estimatingservice.co.uk To Summary £ 560.39

Page 3 / 251

Page 252: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.7

Qty Unit Rate £ p

ITEM 28.7

M SURFACE FINISHES

M20 Plastered/Rendered/Roughcast coatings

Retarded hemihydrate gypsum ("Thistle") plasters to

BS 1191, Class B

3 mm board finish on walls or ceilings including

scrimming joints

a over 300 mm wide 4.70 m2 7.96 37.41

www.estimatingservice.co.uk To Collection £ 37.41

Page 3 / 252

Page 253: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.7

Qty Unit Rate £ p

Collection

Total from Page 3 / 252 £ 37.41

www.estimatingservice.co.uk To Summary £ 37.41

Page 3 / 253

Page 254: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.8

Qty Unit Rate £ p

ITEM 28.8

Z PC SUMS

PC Sums associated with the project

a Supply ROCA Mali cast iron bath item 505.94 505.94

b Supply ROCA Nexo 550 x 440mm wall hung basin item 118.51 118.51

c Supply ROCA Nexo close coupled WC item 223.89 223.89

d Supply ROCA Nexo WC seat & cover item 50.55 50.55

e

Supply ROCA Victoria V2 chrome deck mounted

bath filler item 134.76 134.76

N13 Sanitary appliances/fittings

Fixing only equipment

Connections to service and waste pipes not

included

f Wash hand basin 1.00 nr 86.28 86.28

g

Vitreous china lavatory basins with waste fitting,

plug, chain and

stay, bracket plugged to wall 1.00 nr 93.91 93.91

h

Baths with cradle and brackets, waste, and

overflow fittings, plug and chain 1.00 nr 167.63 167.63

www.estimatingservice.co.uk To Collection £ 1,381.47

Page 3 / 254

Page 255: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.8

Qty Unit Rate £ p

Collection

Total from Page 3 / 254 £ 1,381.47

www.estimatingservice.co.uk To Summary £ 1,381.47

Page 3 / 255

Page 256: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.9

Qty Unit Rate £ p

ITEM 28.9

R11 Foul drainage above ground

Sub-contract purchase

a 32mm waste pipe including elbows and branches 3.00 m 8.36 25.08

b 40mm waste pipe including elbows and branches 3.00 m 9.89 29.67

c 110mm waste pipe including elbows and branches 0.30 m 0.00 0.00

www.estimatingservice.co.uk To Collection £ 54.75

Page 3 / 256

Page 257: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.9

Qty Unit Rate £ p

Collection

Total from Page 3 / 256 £ 54.75

www.estimatingservice.co.uk To Summary £ 54.75

Page 3 / 257

Page 258: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.10

Qty Unit Rate £ p

ITEM 28.10

T MECHANICAL HEATING/COOLING/REFRIGERATION

SYSTEMS

T73 Works associated with Heating installations

Sub-contract purchase

a

Towel rail - fix only; supply of towel rail taken

elsewhere* 1.00 nr 97.84 97.84

Z PC SUMS

PC Sums associated with the project

b supply of towel rail item 413.25 413.25

www.estimatingservice.co.uk To Collection £ 511.09

Page 3 / 258

Page 259: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.10

Qty Unit Rate £ p

Collection

Total from Page 3 / 258 £ 511.09

www.estimatingservice.co.uk To Summary £ 511.09

Page 3 / 259

Page 260: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.11

Qty Unit Rate £ p

ITEM 28.11

V ELECTRICAL SUPPLY/POWER LIGHTING

SYSTEMS

V21 General lighting

Sub-contract purchase

Complete supply & fix installations

a downlighter 7.00 nr 54.08 378.56

b 1-Gang, 1-Way: Pull Cord Light Switch: White 1.00 nr 35.58 35.58

www.estimatingservice.co.uk To Collection £ 414.14

Page 3 / 260

Page 261: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.11

Qty Unit Rate £ p

Collection

Total from Page 3 / 260 £ 414.14

www.estimatingservice.co.uk To Summary £ 414.14

Page 3 / 261

Page 262: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.12

Qty Unit Rate £ p

ITEM 28.12

V ELECTRICAL SUPPLY/POWER LIGHTING

SYSTEMS

V22 General Low Voltage power

Sub-contract purchase

Complete supply & fix installations

a extractor fan 1.00 nr 66.60 66.60

b non-illuminated fused spur 1.00 nr 41.22 41.22

www.estimatingservice.co.uk To Collection £ 107.82

Page 3 / 262

Page 263: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.12

Qty Unit Rate £ p

Collection

Total from Page 3 / 262 £ 107.82

www.estimatingservice.co.uk To Summary £ 107.82

Page 3 / 263

Page 264: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.13

Qty Unit Rate £ p

ITEM 28.13

Z PC SUMS

PC Sums associated with the project

a supply and install glass shelving item 180.80 180.80

www.estimatingservice.co.uk To Collection £ 180.80

Page 3 / 264

Page 265: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.13

Qty Unit Rate £ p

Collection

Total from Page 3 / 264 £ 180.80

www.estimatingservice.co.uk To Summary £ 180.80

Page 3 / 265

Page 266: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.14

Qty Unit Rate £ p

ITEM 28.14

P BUILDING FABRIC SUNDRIES

P20 Unframed isolated trims/skirtings/sundry items

Skirtings, picture rails, architraves and the like

Wrought softwood skirtings

a 25 x 75 mm Torus 6.73 m 4.54 30.55

Wrought softwood architraves

b 19 x 75 mm chamfered 5.00 m 4.38 21.90

www.estimatingservice.co.uk To Collection £ 52.45

Page 3 / 266

Page 267: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.14

Qty Unit Rate £ p

Collection

Total from Page 3 / 266 £ 52.45

www.estimatingservice.co.uk To Summary £ 52.45

Page 3 / 267

Page 268: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.15

Qty Unit Rate £ p

ITEM 28.15

M SURFACE FINISHES

M60 Painting/Clear finishing

General surfaces

Two coats of Dulex coloured matt emulsion paint

over 300 mm girth

a smooth plaster 4.74 m2 5.35 25.36

Knot, prime, stop and paint one undercoat and one

coat of satinwood finish paint on joinery

b over 300 mm girth 3.78 m2 5.93 22.42

c isolated surfaces, not exceeding 300 mm girth 11.73 m 2.24 26.28

www.estimatingservice.co.uk To Collection £ 74.05

Page 3 / 268

Page 269: Schedule of Works Bill

This content is © of Estimating Service 2015. ITEM 28.15

Qty Unit Rate £ p

Collection

Total from Page 3 / 268 £ 74.05

www.estimatingservice.co.uk To Summary £ 74.05

Page 3 / 269

Page 270: Schedule of Works Bill

This content is © of Estimating Service 2015.

Qty Unit Rate £ p

Summary

ITEM 1.11 Page 3 / 2 £ 11,451.84

ITEM 1.23 Page 3 / 4 £ 227.29

ITEM 1.27 Page 3 / 6 £ 1,547.05

ITEM 1.36 Page 3 / 8 £ 477.30

ITEM 2.1 Page 3 / 10 £ 568.22

ITEM 2.2 Page 3 / 12 £ 205.32

ITEM 2.4 Page 3 / 14 £ 1,872.77

ITEM 2.5 Page 3 / 17 £ 2,051.30

ITEM 3.1 Page 3 / 19 £ 958.93

ITEM 3.7 Page 3 / 21 £ 205.89

ITEM 3.8 Page 3 / 23 £ 363.70

ITEM 3.9 Page 3 / 25 £ 246.83

ITEM 4.1 Page 3 / 27 £ 1,950.71

ITEM 4.5 Page 3 / 29 £ 24.68

ITEM 5.1 Page 3 / 31 £ 1,329.84

ITEM 5.3 - 5.7 Page 3 / 34 £ 2,564.86

ITEM 5.8 Page 3 / 36 £ 360.77

ITEM 5.9 Page 3 / 38 £ 890.91

ITEM 5.10 Page 3 / 40 £ 892.20

ITEM 5.11 Page 3 / 42 £ 20.49

www.estimatingservice.co.uk Carried Forward £ 28,210.90

Page 3 / 270

Page 271: Schedule of Works Bill

This content is © of Estimating Service 2015.

Qty Unit Rate £ p

Summary continued ... 28,210.90

ITEM 6.1 Page 3 / 44 £ 507.58

ITEM 6.2 Page 3 / 46 £ 1,238.37

ITEM 6.3 Page 3 / 48 £ 1,372.50

ITEM 6.4 Page 3 / 50 £ 2,043.45

ITEM 6.5 Page 3 / 52 £ 7,243.19

ITEM 6.6 Page 3 / 54 £ 13.29

ITEM 6.7 Page 3 / 56 £ 162.69

ITEM 6.8 Page 3 / 58 £ 72.86

ITEM 6.9 Page 3 / 60 £ 34.25

ITEM 6.10 Page 3 / 62 £ 76.96

ITEM 6.11 Page 3 / 64 £ 467.64

ITEM 6.12 Page 3 / 66 £ 126.47

ITEM 6.13 Page 3 / 68 £ 1,023.87

ITEM 6.14 Page 3 / 70 £ 267.73

ITEM 6.15 Page 3 / 72 £ 109.30

ITEM 6.16 Page 3 / 74 £ 133.04

ITEM 6.17 Page 3 / 76 £ 44.84

ITEM 6.18 Page 3 / 78 £ 108.50

ITEM 6.19 Page 3 / 80 £ 69.73

ITEM 6.20 Page 3 / 82 £ 33.33

www.estimatingservice.co.uk Carried Forward £ 43,360.48

Page 3 / 271

Page 272: Schedule of Works Bill

This content is © of Estimating Service 2015.

Qty Unit Rate £ p

Summary continued ... 43,360.48

ITEM 7.2 Page 3 / 84 £ 1,116.13

ITEM 7.3 Page 3 / 86 £ 327.98

ITEM 7.5 Page 3 / 88 £ 320.69

ITEM 7.6 Page 3 / 90 £ 59.82

ITEM 8.1 Page 3 / 92 £ 254.03

ITEM 8.2 Page 3 / 94 £ 1,545.50

ITEM 8.3 Page 3 / 96 £ 168.91

ITEM 8.4 Page 3 / 98 £ 153.26

ITEM 8.5 Page 3 / 100 £ 19.25

ITEM 8.6 Page 3 / 102 £ 101.55

ITEM 8.7 Page 3 / 104 £ 107.18

ITEM 8.9 Page 3 / 106 £ 1,010.72

ITEM 8.11 Page 3 / 108 £ 277.70

ITEM 8.12 Page 3 / 110 £ 232.03

ITEM 8.13 Page 3 / 112 £ 89.68

ITEM 8.14 Page 3 / 114 £ 274.83

ITEM 8.15 Page 3 / 116 £ 210.25

ITEM 8.16 Page 3 / 118 £ 165.72

ITEM 8.17 Page 3 / 120 £ 85.54

ITEM 8.18 Page 3 / 123 £ 661.77

www.estimatingservice.co.uk Carried Forward £ 50,543.02

Page 3 / 272

Page 273: Schedule of Works Bill

This content is © of Estimating Service 2015.

Qty Unit Rate £ p

Summary continued ... 50,543.02

ITEM 9.5 Page 3 / 125 £ 202.32

ITEM 9.6 Page 3 / 127 £ 3,244.26

ITEM 9.7 Page 3 / 129 £ 152.82

ITEM 9.8 Page 3 / 131 £ 1,235.51

ITEM 9.11 Page 3 / 133 £ 89.60

ITEM 10.1 Page 3 / 135 £ 2,534.18

ITEM 10.4 Page 3 / 137 £ 232.32

ITEM 10.5 Page 3 / 139 £ 88.25

ITEM 10.6 Page 3 / 141 £ 1,379.04

ITEM 11.1 Page 3 / 143 £ 305.87

ITEM 11.2 Page 3 / 145 £ 834.60

ITEM 11.3 Page 3 / 147 £ 371.10

ITEM 11.4 Page 3 / 149 £ 109.36

ITEM 11.5 Page 3 / 151 £ 416.84

ITEM 12.2 Page 3 / 153 £ 8,551.68

ITEM 12.4 Page 3 / 155 £ 45.91

ITEM 12.5 Page 3 / 157 £ 17.83

ITEM 13.1 Page 3 / 159 £ 689.76

ITEM 13.3 Page 3 / 161 £ 4,122.99

ITEM 14.1 Page 3 / 163 £ 616.98

www.estimatingservice.co.uk Carried Forward £ 75,784.24

Page 3 / 273

Page 274: Schedule of Works Bill

This content is © of Estimating Service 2015.

Qty Unit Rate £ p

Summary continued ... 75,784.24

ITEM 14.2 Page 3 / 165 £ 289.36

ITEM 14.3 Page 3 / 167 £ 630.25

ITEM 14.4 Page 3 / 169 £ 218.76

ITEM 14.5 Page 3 / 171 £ 440.74

ITEM 14.6 Page 3 / 173 £ 843.83

ITEM 14.8 Page 3 / 175 £ 1,430.19

ITEM 14.10 Page 3 / 177 £ 170.93

ITEM 15.1 Page 3 / 179 £ 98.19

ITEM 15.2 Page 3 / 181 £ 572.90

ITEM 15.3 Page 3 / 183 £ 226.04

ITEM 15.4 Page 3 / 185 £ 309.94

ITEM 15.5 Page 3 / 187 £ 516.56

ITEM 15.7 Page 3 / 189 £ 393.53

ITEM 15.8 Page 3 / 191 £ 774.84

ITEM 15.8 Page 3 / 193 £ 118.81

ITEM 16.3 Page 3 / 195 £ 258.28

ITEM 16.4 Page 3 / 197 £ 465.55

ITEM 16.5 Page 3 / 199 £ 296.63

ITEM 16.6 Page 3 / 201 £ 2,029.49

ITEM 16.7 Page 3 / 203 £ 677.14

www.estimatingservice.co.uk Carried Forward £ 86,546.19

Page 3 / 274

Page 275: Schedule of Works Bill

This content is © of Estimating Service 2015.

Qty Unit Rate £ p

Summary continued ... 86,546.19

ITEM 17.1 Page 3 / 205 £ 8,449.64

ITEM 17.3 Page 3 / 207 £ 702.22

ITEM 18.1 Page 3 / 209 £ 1,455.03

ITEM 19.1 Page 3 / 211 £ 994.90

ITEM 21.1 Page 3 / 213 £ 12,631.33

ITEM 22.1 Page 3 / 215 £ 58.71

ITEM 22.2 Page 3 / 217 £ 242.54

ITEM 22.3 Page 3 / 219 £ 892.62

ITEM 22.4 Page 3 / 221 £ 355.28

ITEM 23.1 Page 3 / 223 £ 2,200.55

ITEM 23.2 Page 3 / 225 £ 3,690.86

ITEM 23.6 Page 3 / 227 £ 1,941.02

ITEM 23.7 Page 3 / 229 £ 4,956.83

ITEM 23.8 Page 3 / 231 £ 68.19

ITEM 24.1 Page 3 / 233 £ 3,252.93

ITEM 24.23 Page 3 / 235 £ 3,970.09

ITEM 24.28 Page 3 / 237 £ 537.37

ITEM 27.1 Page 3 / 239 £ 7,748.43

ITEM 28.1 Page 3 / 241 £ 791.19

ITEM 28.2 Page 3 / 243 £ 54.50

www.estimatingservice.co.uk Carried Forward £ 141,540.43

Page 3 / 275

Page 276: Schedule of Works Bill

This content is © of Estimating Service 2015.

Qty Unit Rate £ p

Summary continued ... 141,540.43

ITEM 28.3 Page 3 / 245 £ 262.01

ITEM 28.4 Page 3 / 247 £ 1,588.05

ITEM 28.5 Page 3 / 249 £ 4,038.78

ITEM 28.6 Page 3 / 251 £ 560.39

ITEM 28.7 Page 3 / 253 £ 37.41

ITEM 28.8 Page 3 / 255 £ 1,381.47

ITEM 28.9 Page 3 / 257 £ 54.75

ITEM 28.10 Page 3 / 259 £ 511.09

ITEM 28.11 Page 3 / 261 £ 414.14

ITEM 28.12 Page 3 / 263 £ 107.82

ITEM 28.13 Page 3 / 265 £ 180.80

ITEM 28.14 Page 3 / 267 £ 52.45

ITEM 28.15 Page 3 / 269 £ 74.05

www.estimatingservice.co.uk Total for Bill £ 150,803.65

Page 3 / 276