science laboratory infrastructure (sli) presentation to slac ... ppa.pdfmay 11, 2010 » 50%...
TRANSCRIPT
![Page 1: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/1.jpg)
Science Laboratory Infrastructure (SLI) Presentation to SLAC
Particle Physics and AstrophysicsDepartment Heads
Thursday, May 20th
![Page 2: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/2.jpg)
Page 2
Agenda
Project Overview» Building 028
» Building 052
» Building 041
Communication Strategy» Migration Plan
» Communication Plan
![Page 3: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/3.jpg)
Page 3
RSB Project Team
![Page 4: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/4.jpg)
Page 4
Site Map
![Page 5: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/5.jpg)
Page 5
Project Overview
Mission Need» Promote collaboration between support groups
» Construct modern office space
• Fully compliant with Americans Disability Act (ADA) Guidelines
• Compliant with Department of Energy Order 430.2B – Renewable Energy and Transportation Management
» Promote “One Laboratory” – Complement cutting-edge scientific programs
![Page 6: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/6.jpg)
Page 6
RSB Project Scope
Project Scope» Dismantle and Removal
• Existing trailers in new building footprint (13) ~20,ooo square feet
» New Construction• New Research Support Building (B052) in the range of
53,000 - 64,000 square feet
» Complete Renovation• Administrative & Engineering Building (B041) ~48,000
square feet (44,000 of existing + 4,000 new = 48,000)• Warehouse/User Building (B028) ~20,000 square feet
![Page 7: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/7.jpg)
Page 7
B028 Project Scope
Scope» Renovation of existing 20,000 sf metal building to
convert space
» Design will be structured for a single phase of construction
» Convert salvage yard into parking
» Building will meet LEED® Gold Certification
» Budget is $6.5 - 7M
![Page 8: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/8.jpg)
Page 8
B028 Project Schedule
Design scheduled to be complete Jun 28, 2010» 50% submittal submitted on Apr 28, 2010
» 100% submittal on schedule for May 31, 2010
» Construction documents ready for bid Jun 28, 2010
Construction schedule» Construction Award in Jan 2011
» Construction Complete in Sep 2011
» Building Occupancy in Oct 2011
![Page 9: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/9.jpg)
Page 9
B028 Rendering
PROPOSED NORTH ELEVATION
PROPOSED EAST ELEVATION
New Windows
New Sunscreen
New CMU
![Page 10: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/10.jpg)
Page 10
B052 Project Scope
Design and Construction of new Office Building » New three story office building
» 53,000 to 64,000 square feet
» LEED® Gold Certification
» Estimated Construction Value $35M - $45M
» Space Planning is finalized to be consistent with new Laboratory initiatives
» Demolition of existing 13 trailers in the new building footprint (~ 20,000 square feet)
» Re-route existing utilities in new building footprint
![Page 11: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/11.jpg)
Page 11
B052 Rendering
![Page 12: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/12.jpg)
Page 12
B052 Project Schedule
Design/Build criteria documents schedule completion –May 11, 2010
» 50% submittal completed on Mar 25, 2010
» 90% submittal completed Apr 15, 2010
» 100% submittal on schedule for May 11, 2010
» Design/Build criteria documents ready for Design/Build Proposals Aug 2010
Design/Build Construction schedule» Contract Award in Jan 2011
» Construction Complete in Dec 2012
» Building Occupancy in Feb 2013
![Page 13: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/13.jpg)
Page 13
Building 041 Project Scope
Complete building renovation (48,000 gsf)» Demolition of all building systems down to existing
structure
» Construction of all new building systems
» Enclosure of new 2-story building lobby, including new interior stairway & new 2-story curtain wall
» All new ADA compliant access, restrooms, and 2-stop hydraulic elevator
» New interior office layout with 40% open offices
» LEED® Gold Certification
» Estimated Construction Value $15M - $20M
![Page 14: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/14.jpg)
Page 14
Building 041 Rendering
![Page 15: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/15.jpg)
Page 15
B041 Project Schedule
Design scheduled to be complete May 2011» 30% submittal on schedule for Aug 2010
» 60% submittal on schedule for Nov 2010
» 90% submittal on schedule for Feb 2011
» 100% submittal on schedule for Mar 2011
» Construction documents ready for bid May 2011
Construction Schedule» Construction Award in Jan 2013
» Construction Complete in May 2014
» Building Occupancy – Jun 2014
![Page 16: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/16.jpg)
Page 16
RSB Communication Strategy
Over the course of the next four years, the RSB Project will construct or renovate over 125,000 GSF of new and existing office space, which will:
» Require relocation of several hundred staff members, some more than once
» Impact parking, utilities, and vehicular & pedestrian circulation within SLAC
The RSB Project Communication Strategy is to stimulate two-way dialogue to proactively identify and address staff issues and concerns
![Page 17: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/17.jpg)
Page 17
RSB Project Draft Migration Plan
![Page 18: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/18.jpg)
Page 18
PEP City Migration Plan
Move 43 staff from 280 to 901
Move 65 staff from PEP City
Move 41 Staff within 280 into new spaces
![Page 19: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/19.jpg)
Page 19
Communication Strategy Objectives
Provide status of construction progress
Provide timely communication to impacted staff » Parking, utilities, vehicular & pedestrian circulation
» Planning and timing of relocations
Foster a sense of excitement around the renovated and newly constructed buildings
Develop Communication Plan » Provides mechanisms and venues to communicate and
inform target audiences of these impacts
![Page 20: Science Laboratory Infrastructure (SLI) Presentation to SLAC ... PPA.pdfMay 11, 2010 » 50% submittal completed on Mar 25, 2010 » 90% submittal completed Apr 15, 2010 » 100% submittal](https://reader033.vdocument.in/reader033/viewer/2022060904/60a00bf88ed6023c2a62d624/html5/thumbnails/20.jpg)
Page 20
Communication Plan
Audiences» Directorates with impacted research & support staff
» Directors & Managers of impacted staff
» Impacted Staff
» Staff at large
» DOE
Venues» Presentations to Directorates
» Town Hall meetings
» “Coffee clutches”
» SLAC Today articles and announcements
• RSB Banner – Link to RSB Website