scm241

20
SCM241 Production Planning in ERP for Functional Consultant SAP ERP - Production Course Outline Course Version: 98 Course Duration: 5 Day(s) Publication Date: 2014 Publication Time:

Upload: lnarayan

Post on 16-Sep-2015

37 views

Category:

Documents


4 download

DESCRIPTION

sap p

TRANSCRIPT

  • SCM241Production Planning in ERP for

    Functional Consultant

    SAP ERP - Production

    Course OutlineCourse Version: 98Course Duration: 5 Day(s)Publication Date: 2014Publication Time:

  • Copyright

    Copyright SAP AG. All rights reserved.

    No part of this publication may be reproduced or transmitted in any form or for any purpose withoutthe express permission of SAP AG. Additionally this publication and its contents are providedsolely for your use, this publication and its contents may not be rented, transferred or sold withoutthe express permission of SAP AG. The information contained herein may be changed withoutprior notice.

    Some software products marketed by SAP AG and its distributors contain proprietary softwarecomponents of other software vendors.

    Trademarks

    Microsoft, WINDOWS, NT, EXCEL, Word, PowerPoint and SQL Server areregistered trademarks of Microsoft Corporation.

    IBM, DB2, OS/2, DB2/6000, Parallel Sysplex, MVS/ESA, RS/6000, AIX,S/390, AS/400, OS/390, and OS/400 are registered trademarks of IBM Corporation.

    ORACLE is a registered trademark of ORACLE Corporation.

    INFORMIX-OnLine for SAP and INFORMIX Dynamic ServerTM are registeredtrademarks of Informix Software Incorporated.

    UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

    Citrix, the Citrix logo, ICA, Program Neighborhood, MetaFrame, WinFrame,VideoFrame, MultiWin and other Citrix product names referenced herein are trademarksof Citrix Systems, Inc.

    HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C, WorldWide Web Consortium, Massachusetts Institute of Technology.

    JAVA is a registered trademark of Sun Microsystems, Inc.

    JAVASCRIPT is a registered trademark of Sun Microsystems, Inc., used under license fortechnology invented and implemented by Netscape.

    SAP, SAP Logo, R/2, RIVA, R/3, SAP ArchiveLink, SAP Business Workflow, WebFlow, SAPEarlyWatch, BAPI, SAPPHIRE, Management Cockpit, mySAP.com Logo and mySAP.comare trademarks or registered trademarks of SAP AG in Germany and in several other countriesall over the world. All other products mentioned are trademarks or registered trademarks oftheir respective companies.

    Disclaimer

    THESEMATERIALS ARE PROVIDED BY SAP ON AN "AS IS" BASIS, AND SAP EXPRESSLYDISCLAIMS ANY AND ALL WARRANTIES, EXPRESS OR APPLIED, INCLUDINGWITHOUT LIMITATION WARRANTIES OF MERCHANTABILITY AND FITNESS FOR APARTICULAR PURPOSE, WITH RESPECT TO THESE MATERIALS AND THE SERVICE,INFORMATION, TEXT, GRAPHICS, LINKS, OR ANY OTHER MATERIALS AND PRODUCTSCONTAINED HEREIN. IN NO EVENT SHALL SAP BE LIABLE FOR ANY DIRECT,INDIRECT, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR PUNITIVE DAMAGES OF ANYKIND WHATSOEVER, INCLUDING WITHOUT LIMITATION LOST REVENUES OR LOSTPROFITS, WHICH MAY RESULT FROM THE USE OF THESE MATERIALS OR INCLUDEDSOFTWARE COMPONENTS.

    g201471331441

  • SCM241 Contents

    Contents

    Course Overview ....................................................................... v

    Course Goals .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .viCourse Objectives ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .vi

    Unit 1: Overview Of Production Planning In ECC .............................. 1

    SAP ERP Supply Chain Planning Overview ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

    Unit 2: MRP Basics .................................................................... 2

    Concept of MRP... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2MRP Types ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2Prerequisites for Running MRP .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2Methods for Executing a planning run... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Settings in the Planning Run ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Introduction Net Requirements Calculation ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

    Unit 3: Effects Of Demand On MRP................................................ 4

    Introduction To Demand Management .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Make to Stock Planning Strategies ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Effects Of Sales Order ATP On MRP .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4Make to Order Planning Strategies ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Effects Of Safety Stock On MRP .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Planning Stock Transfers With MRP ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Dependent Requirements In MRP... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Adjusting Planned Independent Requirements .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

    Unit 4: Effects Of Stock On MRP ................................................... 6

    Stock Types in Production Planning... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Effects Of Quality Inspection On MRP .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Storage Locations In the MRP Run... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

    Unit 5: Effects Of Receipts In The Planning Run ............................... 7

    Firming Receipts (Manual Changes) .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Capacity Planning In The Planned Order.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7ATP in the Planned order .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Firming Types And The Planning Time Fence ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Fixed Receipts In MRP... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Roll Forward Period ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

    2014 SAP AG. All rights reserved. iii

  • SCM241 Contents

    Unit 6: Controlling Receipt Quantities ............................................ 9

    Static Lot Sizing Procedures ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Periodic Lot Size Procedures ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Additional Receipt Controls.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Dynamic Safety Stock ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10Scrap In MRP... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

    Unit 7: Source Determination For New Receipts In MRP .................... 11

    Source Determination Overview ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11Master Data Selection during the Planning Run ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11Basic Dates Scheduling in the Planning Run ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11Lead Time Scheduling in the Planning Run ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Quota Arrangements .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

    Unit 8: Additional Topics In MRP..................................................13

    Discontinuation in Production Planning ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13Long-term planning requirements .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

    Unit 9: Appendix (Self Study) ......................................................14

    Continuous Input/Output .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14Cross Plant Planning in ECC.... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14Tcodes , Menu Paths, and BADIs... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

    2014 SAP AG. All rights reserved. iv

  • SCM241 Course Overview

    Course OverviewThis course is designed for anyone who wishes to enable Material Requirements Planning inECC. As a participant of this course you will learn the intricacies of how to use MRP to planthe replenishment of materials. This will include reviewing the fields in the Material Master,Bill of Material, Routing, and configuration.

    Target AudienceThis course is intended for the following audiences:

    Consultants Implementing MRP/MPS in SAP ERP

    Customers or Users who will be using MRP/MPS on a daily basis

    Course PrerequisitesRequired Knowledge

    Working knowledge of the following master data objects in SAP ERP

    Material Masters

    Bills of material

    Task Lists/Routings

    Work Centers/Resources

    Master Recipes

    Recommended Knowledge

    General understanding of Production Planning process and industry terms

    General understanding of SAP ERP applications and the integration to ProductionPlanning (PP)

    2014 SAP AG. All rights reserved. v

  • SCM241 Course Overview

    Course GoalsThis course will prepare the participant to:

    Gain an overview of the basic principals of SAP ERP Production Planning

    Demonstrate the tools that a production planner would use on a daily basis

    Demonstrate how Planning strategies are used to control the planning and inventoryprocess

    Gain detailed working knowledge of:

    Demand Managements (DM)

    Materials Requirements Planning (MRP)

    Master Production Scheduling (MPS)

    Long Term Planning (LTP)

    Demonstrate how to configure MRP in SAP ERP

    Course ObjectivesAfter completing this course, the participant will be able to:

    Gain an overview of the basic principals of SAP ERP Production Planning

    Explain the intricacies if the net requirement calculation

    Demonstrate how Planning strategies are used to control the planning and inventoryprocess

    Gain detailed working knowledge of MRP/MPS in SAP ERP

    Demonstrate how to configure MRP in SAP ERP

    2014 SAP AG. All rights reserved. vi

  • SCM241 Course Outline

    Unit 1Overview Of Production Planning In ECC

    Unit OverviewThis unit will give you an overview of some of the steps to be performed by a supply chainplanner using SAP ERP.

    Lesson: SAP ERP Supply Chain Planning Overview

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Outline the steps in the SAP ERP Supply Chain Planning process

    Demonstrate knowledge of the different planning techniques in SAP ERP

    2014 SAP AG. All rights reserved. 1

  • SCM241 Course Outline

    Unit 2MRP Basics

    Unit OverviewThis unit will discuss the basics relevant to production planning. You will be introduced tovarious concepts of planning using SAP ERP as well as some of the transactions that will beused throughout the balance of the course to trigger replenishments for large amounts ofmaterial.

    Lesson: Concept of MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain the Fundamental concept of Materials Requirements Planning (MRP)

    Explain the purpose of independent requirements.

    Lesson: MRP Types

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain how the different planning techniques can influence your business process

    Explain how Consumption based planning is used in SAP ERP

    Explain howmaster production schedulingwill fit into the production planning process

    Demonstrate how to execute an MPS planning run.

    Lesson: Prerequisites for Running MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Identify the minimum configuration requirements in order to exe-cute a planning run in SAP ERP

    2014 SAP AG. All rights reserved. 2

  • SCM241 Course Outline

    Lesson: Methods for Executing a planning run

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain the different techniques of executing planning runs in SAP ERP

    Lesson: Settings in the Planning Run

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate the purpose of the settings in the planning run

    Explain the purpose of the planning file and how it influences thesettings in the planning run.

    Lesson: Introduction Net Requirements Calculation

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain how the planning run works in detail.

    2014 SAP AG. All rights reserved. 3

  • SCM241 Course Outline

    Unit 3Effects Of Demand On MRP

    Unit OverviewIn this unit we will discuss the effect of demand on the MRP run. We will begin witha discussion around the planning strategies for both make to stock and make to orderenvironments. We will also look at how the MRP run will affect the ATP check, how safetystock can be used to protect against variability in supply and demand, and how to handleplanned independent requirements that go into the past.

    Lesson: Introduction To Demand Management

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain where Demand Management is in the flow of the sup-ply chain planning process.

    Demonstrate various functions in Demand Management

    Lesson: Make to Stock Planning Strategies

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain how Net Requirements planning differs from Planning with Final Assembly

    Demonstrate how to plan at the sub assembly level

    Explain the concepts of Consumption and Reduction

    Identify several popular planning strategies and their characteristics.

    Lesson: Effects Of Sales Order ATP On MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Understand the concept of the ATP check

    Explain the fundamentals of the ATP check

    2014 SAP AG. All rights reserved. 4

  • SCM241 Course Outline

    Lesson: Make to Order Planning Strategies

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain how make to order works in SAP ERP

    Demonstrate how to plan at the sub assembly level while still maintainingmake to order at the finished good level

    Identify several popular planning strategies and their characteristics

    Lesson: Effects Of Safety Stock On MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how to activate safety stock

    Demonstrate how to minimize the reaction to safety stock to avoid excess inventories.

    Lesson: Planning Stock Transfers With MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain how to perform Cross location planning in SAP ERP

    Demonstrate how cross location planning works in SAP ERP

    Lesson: Dependent Requirements In MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how to terminate the creation of dependent requirements

    Explain how to propagate make-to-order through the BOM by us-ing the individual/collective flag

    Demonstrate how to group dependent demands within a periods

    Identify how to manage bulk materials in the production.

    Lesson: Adjusting Planned Independent Requirements

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how to reorganize planned independent requirements

    Demonstrate how to use a material specific adjustment period to be more precise

    2014 SAP AG. All rights reserved. 5

  • SCM241 Course Outline

    Unit 4Effects Of Stock On MRP

    Unit OverviewIn this unit we will discuss how stock affects the MRP run, including quality inspection stock,blocked stock, stock in transit, and how QM lots can help plan the proper availability date ofmaterials. We will also discuss how to plan a storage location separately in the MRP run.

    Lesson: Stock Types in Production Planning

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain the concept of stock types in SAP ERP

    Explain how in transit stock types are used in production planning

    Explain how configuration of stock types can influence the planning run.

    Lesson: Effects Of Quality Inspection On MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate modeling Quality inspection stock and its effect on MRP

    Demonstrate modeling the use of QM lots and its effect on production.

    Lesson: Storage Locations In the MRP Run

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Describe the storage location MRP procedure

    Explain the different options of separate storage location MRP

    2014 SAP AG. All rights reserved. 6

  • SCM241 Course Outline

    Unit 5Effects Of Receipts In The Planning Run

    Unit OverviewIn this unit we will discuss the effect of receipts on the MRP run. We will demonstrate howreceipts firmed manually, by the ATP check, capacity planning, planning time fence, andmanual firming fence interact with the MRP run. Discover how simulative MRP can helpyou plan a feasible schedule and how to handle active planned independent requirementsthat have gone into the past.

    Lesson: Firming Receipts (Manual Changes)

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Identify activities that cause firming

    Demonstrate how manual firming works

    Demonstrate how firmed receipts affect the net requirements calculationwhen using the Rescheduling Horizon functionality

    Lesson: Capacity Planning In The Planned Order

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate the effects of capacity planning on planed orders and MRP

    Lesson: ATP in the Planned order

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain the purpose of Available to Promise (ATP) in planned orders.

    Demonstrate how to execute (ATP)

    2014 SAP AG. All rights reserved. 7

  • SCM241 Course Outline

    Lesson: Firming Types And The Planning Time Fence

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how planning time fences can benefit material planners

    Describe the pros and cons of the different firming types

    Apply manual time fences to planning situations

    Recognize when and how to execute simulative MRP runs

    Lesson: Fixed Receipts In MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Create fixed receipts

    Demonstrate the effects of fixed receipts on net requirement calculations

    Lesson: Roll Forward Period

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how the Roll Forward period can increase the feasi-bility of your production plans

    2014 SAP AG. All rights reserved. 8

  • SCM241 Course Outline

    Unit 6Controlling Receipt Quantities

    Unit OverviewIn this unit we will investigate the second step in the planning run, lot size, and how thatinfluences the quantity of the planned orders. In addition, we will look at how the coverageprofile can help you determine a variable quantity for safety stock. And finally we will look atthe effect scrap has on the planned order and operation quantities.

    Lesson: Static Lot Sizing Procedures

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how Lot size techniques influence the size of planned orders

    Lesson: Periodic Lot Size Procedures

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how Periodic Lot Size techniques work

    Demonstrate how Planning Calendars can be utilized in MRP

    Demonstrate Long Term lot sizes in MRP

    Explain how to schedule replenishments when grouping requirements

    Lesson: Additional Receipt Controls

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how minimum and maximum limits impact MRP

    Demonstrate how rounding values influence MRP

    Demonstrate how rounding Profiles impact MRP

    Demonstrate how Overlapping influence MRP

    Examine how Safety time affects MRP results

    2014 SAP AG. All rights reserved. 9

  • SCM241 Course Outline

    Lesson: Dynamic Safety Stock

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how the Coverage profile works

    Lesson: Scrap In MRP

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain how the assembly and component scrap in the material masterfield affect the production process

    Explain how the component scrap and operation scrap percentage in thebill of material affect the production process

    Explain how the scrap in the percentage field in the routing affectsthe production confirmation process

    2014 SAP AG. All rights reserved. 10

  • SCM241 Course Outline

    Unit 7Source Determination For New Receipts In

    MRP

    Unit OverviewIn this unit we will look at how the system determines the BOM and routing to use whenmore than one is available and valid. We will also take a detailed look at how basic andlead time scheduling work.

    Lesson: Source Determination Overview

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain what happens if multiple sources of supply exist.

    Lesson: Master Data Selection during the Planning Run

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how a bill of material will be chosen during the plan-ning run if multiple BOMs exist

    Demonstrate how a task list will be chosen during the planningrun if multiple routings exist.

    Demonstrate how a production version will be chosen during theplanning run if multiple versions exist.

    Identify how configuration can influence master data determination

    Lesson: Basic Dates Scheduling in the Planning Run

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how Basic Scheduling works in the Planning run

    Demonstrate how scheduling works for Externally Procured materials.

    2014 SAP AG. All rights reserved. 11

  • SCM241 Course Outline

    Lesson: Lead Time Scheduling in the Planning Run

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how Lead Time Scheduling works in the Planning run

    Demonstrate knowledge of configuring lead time scheduling.

    Lesson: Quota Arrangements

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how to split demand between multiple sources

    2014 SAP AG. All rights reserved. 12

  • SCM241 Course Outline

    Unit 8Additional Topics In MRP

    Unit OverviewThis unit discuss how to plan the discontinuation of a material without leaving dead stock.We will also look at how long term planning can help us to run some test scenarios withoutaffecting the active pland.

    Lesson: Discontinuation in Production Planning

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how to phase in a product using Simple Discontinuation

    Demonstrate how to phase in a product using Parallel Discontinuation

    Lesson: Long-term planning requirements

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Discuss the usage of long-term planning

    Execute long-term planning

    2014 SAP AG. All rights reserved. 13

  • SCM241 Course Outline

    Unit 9Appendix (Self Study)

    Unit Overview

    Lesson: Continuous Input/Output

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Demonstrate how to initiate a continuous output for a long production run

    Demonstrate how to initiate continuous input for components that willnot be used discretely but continuously

    Lesson: Cross Plant Planning in ECC

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Explain the Special Procurement Withdrawal from another plant planning technique

    Describe the special procurement technique Production in Alternative Plant

    Lesson: Tcodes , Menu Paths, and BADIs

    Lesson ObjectivesAfter completing this lesson, the participant will be able to:

    Application and Configuration menu paths

    2014 SAP AG. All rights reserved. 14

    tocOverview Of Production Planning In ECCLesson: SAP ERP Supply Chain Planning Overview

    MRP BasicsLesson: Concept of MRPLesson: MRP TypesLesson: Prerequisites for Running MRPLesson: Methods for Executing a planning runLesson: Settings in the Planning RunLesson: Introduction Net Requirements Calculation

    Effects Of Demand On MRPLesson: Introduction To Demand ManagementLesson: Make to Stock Planning StrategiesLesson: Effects Of Sales Order ATP On MRPLesson: Make to Order Planning StrategiesLesson: Effects Of Safety Stock On MRPLesson: Planning Stock Transfers With MRPLesson: Dependent Requirements In MRPLesson: Adjusting Planned Independent Requirements

    Effects Of Stock On MRPLesson: Stock Types in Production PlanningLesson: Effects Of Quality Inspection On MRPLesson: Storage Locations In the MRP Run

    Effects Of Receipts In The Planning RunLesson: Firming Receipts (Manual Changes)Lesson: Capacity Planning In The Planned OrderLesson: ATP in the Planned orderLesson: Firming Types And The Planning Time FenceLesson: Fixed Receipts In MRPLesson: Roll Forward Period

    Controlling Receipt QuantitiesLesson: Static Lot Sizing ProceduresLesson: Periodic Lot Size ProceduresLesson: Additional Receipt ControlsLesson: Dynamic Safety StockLesson: Scrap In MRP

    Source Determination For New Receipts In MRPLesson: Source Determination OverviewLesson: Master Data Selection during the Planning RunLesson: Basic Dates Scheduling in the Planning RunLesson: Lead Time Scheduling in the Planning RunLesson: Quota Arrangements

    Additional Topics In MRPLesson: Discontinuation in Production PlanningLesson: Long-term planning requirements

    Appendix (Self Study)Lesson: Continuous Input/OutputLesson: Cross Plant Planning in ECCLesson: Tcodes , Menu Paths, and BADIs