scope of work

1
INSTALLATION OF INTERCONNECTING WALKWAY WITH STAIRS BETWEEN INLET SEPARATORS V-0701 A/B/C AT FDP-1 Contract no.: HT 003 SS11 Contractor: Al-Jalhami SCOPE OF WORK: 1. Marking and Excavation for laying up the civil foundation. The activities includes cutting of existing floor slab, backfilling, compaction and restoration same as original. 2. Inspection and approval by ESD upon every activity. 3. Pouring of reinforced concrete foundations and footing as per drawing provided by OND. 4. Inspection of protective coating on concrete structures by ESD. 5. Procurement of structural materials for initializing fabrication work. 6. Inspection of procured materials by ESD. 7. Shop fabrication of structural members as per drawing provided by OND. 8. All structural members after fabrication will be sent for Galvanization. 9. Inspection of galvanized structures by ESD. 10. On Site erection of structures by bolting and welding

Upload: richard-periyanayagam

Post on 25-Sep-2015

6 views

Category:

Documents


5 download

DESCRIPTION

123

TRANSCRIPT

INSTALLATION OF INTERCONNECTING WALKWAY WITH STAIRS BETWEEN INLET SEPARATORS V-0701 A/B/C AT FDP-1

Contract no.: HT 003 SS11 Contractor: Al-Jalhami

SCOPE OF WORK:

1. Marking and Excavation for laying up the civil foundation. The activities includes cutting of existing floor slab, backfilling, compaction and restoration same as original.2. Inspection and approval by ESD upon every activity.3. Pouring of reinforced concrete foundations and footing as per drawing provided by OND.4. Inspection of protective coating on concrete structures by ESD.5. Procurement of structural materials for initializing fabrication work.6. Inspection of procured materials by ESD. 7. Shop fabrication of structural members as per drawing provided by OND.8. All structural members after fabrication will be sent for Galvanization.9. Inspection of galvanized structures by ESD.10. On Site erection of structures by bolting and welding as per drawing.11. Final paint touch up work on welded areas.12. Final inspection and approval of erected structure by ESD, MSS, and OND.13. Handing over the completed structure to OND.14. Site restoration and De-mobilization.