Comments Welcome The Mountain City, Ruby Mountains, and Jarbidge Ranger District of the Humboldt-Toiyabe National Forest welcomes your comments on the proposed Pole Creek Pipeline Extension Project which is located on both private and National Forest System land within the Humboldt-Toiyabe National Forest. The project proposal is for the construction of approximately 4 miles of new livestock water pipeline on National Forest System land.
Proposed Action The proposal is to construct a new (1.5 inch diameter) livestock water pipeline that would connect the existing Pole Creek Pipeline to the existing East Nevada Strip Pipeline. Connecting these two pipelines would require the construction of approximately 4 miles of water pipeline within a 10 feet wide right of way across National Forest System land. The new line would capture surplus flows from the Pole Creek Pipeline and tie into the East Nevada Strip Pipeline just above the point the waterline leaves the National Forest System land. The point of diversion would begin on private land along the existing Pole Creek Pipeline. The new pipeline would cross National Forest System land, and connect to the existing East Nevada Strip Pipeline on adjacent public land managed by the Bureau of Land Management. No new points of use would be constructed. See attached maps. The project is located within Elko County, Nevada. The legal description is T47N, R59, Sections 22, 23, and 24 and T47N, R60, Section 19. Mount Diablo Meridian.
Decision Framework The deciding officer would decide whether or not to approve the proposed action on National Forest System land. Actions on private land are outside of the decision framework.
Scoping Document
Pole Creek Pipeline Extension Project
![Page 2: Scoping Document and Notice of Proposed Actionclearinghouse.nv.gov/public/Notice/2018/E2018-187.pdf · B ur eaof L nd M g m t Forest Service Private 0 0.15 0.3 0.6 0.9 1.2 Miles This](https://reader031.vdocument.in/reader031/viewer/2022021911/5c5b676c09d3f24a368bb2a2/html5/thumbnails/2.jpg)
Page 2 of 3
Expected Analysis A proposed action may be categorically excluded from further analysis and documentation in an environmental impact statement (EIS) or environmental assessment (EA) only if there are no extraordinary circumstances related to the proposed action and the proposed action is with a category listed in 36 CFR Section 220.6. The preliminary assessment is that this proposal fits within the following category – Approval, modification, or continuation of minor special uses of NFS lands that require less than five contiguous acres of land (36 CFR 220.6(e) 3). If during the analysis it is apparent that an environmental assessment or environmental impact statement is required, then the Forest Service would reassess the project and adjust the analysis as necessary.
Analysis Time Frames This project will be posted on the Quarterly Schedule of Proposed Actions (SOPA) in June of 2018; and the analysis should be completed in July of 2018.
Implementation Time Frames Implementation for the project is expected to begin in August of 2018 and continue through fall of 2018 and into 2019 if needed.
Comment Process The Forest Service encourages your comments on this proposed action, along with supporting reasons that the responsible official should consider in reaching a decision. Comments received in response to this solicitation, including names and addresses of those who comment, will be considered part of the public record for this project, will be available for public inspection, and will be released if requested under the Freedom of Information Act. To be most effective, we ask that comments be submitted no later than June 28, 2018. Submit written comments to Joshua Nicholes, District Ranger, Mountain City, Ruby Mountains, and Jarbidge Ranger District, 660 South 12th Street, Suite 108, Elko, NV 89801. The office business hours for those submitting comments in person are: 7:30 a.m. to 4:30 p.m. Monday through Friday, excluding federal holidays. Electronic comments must be submitted in a format such as an email message, plain text (.txt), rich text format (.rtf), and Word (.doc) to:
[email protected]. Electronic comments may be submitted by selecting the “Comment on this Project” link on the Project website at:
http://www.fs.fed.us/nepa/nepa_project_exp.php?project=53948
![Page 3: Scoping Document and Notice of Proposed Actionclearinghouse.nv.gov/public/Notice/2018/E2018-187.pdf · B ur eaof L nd M g m t Forest Service Private 0 0.15 0.3 0.6 0.9 1.2 Miles This](https://reader031.vdocument.in/reader031/viewer/2022021911/5c5b676c09d3f24a368bb2a2/html5/thumbnails/3.jpg)
Page 3 of 3
Contact For further information please contact Doug Clarke, Project Coordinator at 775-778-6127 or [email protected].
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English.
To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture, Office of the Assistant Secretary for Civil Rights, 1400 Independence Avenue, SW, Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: [email protected].
USDA is an equal opportunity provider, employer and lender
![Page 4: Scoping Document and Notice of Proposed Actionclearinghouse.nv.gov/public/Notice/2018/E2018-187.pdf · B ur eaof L nd M g m t Forest Service Private 0 0.15 0.3 0.6 0.9 1.2 Miles This](https://reader031.vdocument.in/reader031/viewer/2022021911/5c5b676c09d3f24a368bb2a2/html5/thumbnails/4.jpg)
æ
×
×
T46N
T47N
T16S
T45N
7
7 77
7
1
7
23456
9
7 8
98
7
9
1
98
4
9
8
7
2 35
8
8
5
9
24
88
9 9
7
9
8
9
8
7
8
8 9
4
8
3
9
9
53
8
9 7
9
8
2
8
16
9
7
6
7
6
7
156 4 3 2 1 56 4 3 2 234
1
56 63 15 4 2
6 645 13 2 56 4 2315 4 23
7
18
19
30
19
30
18 18
19
30
19
18
1
19
18
11
11
11
11
11
11
6
11
11
11
11 11
11
11
11
12
13
19
24
18
11
25
36
20
31
1
32
2 1
17
29
4
32
3
30
1
3533
16
5
20
17
12
34
10
19
16
30
19
21
28
13
21
18
28
31
20
10
21
10
16
15
23
21
22
19
24
26
13
16
28
12
18
22
27
24
27
10
19
33
12
16
20
16
1514
24
26
13
2223
30
14
15
28
23
21
25
17
20
29
21
35 36
22
26
27
24
23
12
26
26
13
12
31
20
33
25
24
36
17
24
10
17
25
35
13
22
21
36
27
10
24
25
12
15
34
23 24
17
17
34
12
14
32
29
12
15
29
26
23
25
22
33
33
18
10
23
20
14
24
29
21
27
34
26
15
16
34
27
14
16
32
20
25
28
13
36
28
10
2929
20
17
16 15
35
16
21
28
32
35
27
13
1922
2729
1723
31
14 18
35
20
34
13
29
16
24
25
33
18
30
28
13
18
26
22
17
21
31
12
20
36
14
12
23
20
15
10
26
2829
17
10
17
29
31
35
20
15
22 23
16
17
15
14
17
32 33
15
14
19
34
21
12
23
16
22
22
27
20
2024
17
22
29
32
23
22
28
10
14
22
21
13
27
23
15
10
30
14
2527
21
14
21
10
23
15
16
22
16
30
21
14
25
20
28
26
15
33 35
16
24
34
21
11
17
19
10
30
19
14
13
14
1210
1818
28
15
23
26
31
22
10
30
19
18
32
27
15
31
36
14
25
23
24
13
26
12
1
2627
1
2829
36
25
5
30
24
12
13
25
1213
26
30
19
18
12
24
30 27
13
25
28
36
26
24
29
23
11
14
24
12
13
13
25
12
24
1
2526
25
2627
36
6
27 252830 2829 30 29
2
25
13
4 3 2 61 5 4 3 2 1 6 5 4 3
31 3133 3432
2
35 3136 353236 33 34 3635343332
323633 34
3135
35
31
R60E
R59E
R58E
R61E
R9E R11ER10E R12E
R8E
R57E
. This GIS product was compiled from various sources and may be corrected, updated, modified, or replaced at any time. For more information contact: Elko Zone Forest Service Office, Elko,Nevada (775) 738-5171.
CRK 5/18
Pole Creek Pipeline Extension ProjectMountain City-Ruby Mountain-Jarbidge Ranger District
Humboldt-Toiyabe National Forest
Location Map
Jarbidge
ProjectVicinity
Pole Creek Guard StationMahoney Ranger Station
Forest ServicePrivateBureau of Land Management
![Page 5: Scoping Document and Notice of Proposed Actionclearinghouse.nv.gov/public/Notice/2018/E2018-187.pdf · B ur eaof L nd M g m t Forest Service Private 0 0.15 0.3 0.6 0.9 1.2 Miles This](https://reader031.vdocument.in/reader031/viewer/2022021911/5c5b676c09d3f24a368bb2a2/html5/thumbnails/5.jpg)
Spring
I N S
I D E
Creek
D E S E R T
H U M B O L D T
D E S
E R
T
Creek
Poison
Creek
Point 75Terminus
Point 74
Point 73
Point 72Point 71
Point 70Point 69
Point 68Point 67
Point 66 Point 65Point 64 Point 63
Point 62
Point 61 Point 60Point 59
Point 58
Point 57
Point 56
Point 55Point 54
Point 53
Point 52Point 51
Point 50Point 49
Point 48Point 47
Point 46Beginning
58075
5828
9
58288
58327
58288A
58074
18294
58288B
1829
4A
18295
T47NR59E
R60E
.1:24,000
LegendProposed pipeline
pipeline pointsLand Ownership
Bureau of Land ManagementForest ServicePrivate
0 0.3 0.6 0.9 1.20.15Miles
This GIS product was compiled from various sources and may be corrected, updated, modified, or replaced at any time. For more information contact: Elko Zone Forest Service Office, Elko,Nevada (775) 738-5171.
Pole Creek Pipeline Extension ProjectT. 47 N., R. 59 E. Section 22, 23, 24Robinson Creek, NV-ID USGS 7.5 min. QuadrangleT. 47 N., R. 60 E. Section 19Caudle Creek, NV-ID USGS 7.5 min. Quadrangle
created by C.R.K. 5/18
![Page 6: Scoping Document and Notice of Proposed Actionclearinghouse.nv.gov/public/Notice/2018/E2018-187.pdf · B ur eaof L nd M g m t Forest Service Private 0 0.15 0.3 0.6 0.9 1.2 Miles This](https://reader031.vdocument.in/reader031/viewer/2022021911/5c5b676c09d3f24a368bb2a2/html5/thumbnails/6.jpg)
æ
×
×
T46N
T47N
T16S
T45N
7
777
7
1
7
23456
9
7 8
98
7
9
1
98
4
9
8
7
235
8
8
5
9
24
88
99
7
9
8
9
8
7
8
8 9
4
8
3
9
9
53
8
97
9
8
2
8
16
9
7
6
7
6
7
156 4 3 2 1 56 4 3 2234
1
56 63 15 4 2
6 645 13 256 4 2315 4 23
7
18
19
30
19
30
1818
19
30
19
18
1
19
18
11
11
11
11
11
11
6
11
11
11
11 11
11
11
11
12
13
19
24
18
11
25
36
20
31
1
32
2 1
17
29
4
32
3
30
1
3533
16
5
20
17
12
34
10
19
16
30
19
21
28
13
21
18
28
31
20
10
21
10
16
15
23
21
22
19
24
26
13
16
28
12
18
22
27
24
27
10
19
33
12
16
20
16
1514
24
26
13
2223
30
14
15
28
23
21
25
17
20
29
21
35 36
22
26
27
24
23
12
26
26
13
12
31
20
33
25
24
36
17
24
10
17
25
35
13
22
21
36
27
10
24
25
12
15
34
23 24
17
17
34
12
14
32
29
12
15
29
26
23
25
22
33
33
18
10
23
20
14
24
29
21
27
34
26
15
16
34
27
14
16
32
20
25
28
13
36
28
10
2929
20
17
16 15
35
16
21
28
32
35
27
13
1922
2729
17
23
31
14 18
35
20
34
13
29
16
24
25
33
18
30
28
13
18
26
22
17
21
31
12
20
36
14
12
23
20
15
10
26
2829
17
10
17
29
31
35
20
15
22 23
16
17
15
14
17
32 33
15
14
19
34
21
12
23
16
22
22
27
20
2024
17
22
29
32
23
22
28
10
14
22
21
13
27
23
15
10
30
14
2527
21
14
21
10
23
15
16
22
16
30
21
14
25
20
28
26
15
3335
16
24
34
21
11
17
19
10
30
19
14
13
14
1210
1818
28
15
23
26
31
22
10
30
19
18
32
27
15
31
36
14
25
23
24
13
26
12
1
2627
1
2829
36
25
5
30
24
12
13
25
1213
26
30
19
18
12
24
30 27
13
25
28
36
26
24
29
23
11
14
24
12
13
13
25
12
24
1
2526
25
2627
36
6
27 252830 2829 30 29
2
25
13
4 3 2 61 5 4 3 2 1 6 5 4 3
31 3133 3432
2
35 3136 353236 33 34 36353433
323236
33 3431
3535
31
R60
ER59
E
R58
E
R61
E
R9ER11ER10E R12E
R8E
R57E
. This GIS product was compiled from various sources and may be corrected, updated, modified, or replaced at any time. For more information contact: Elko Zone Forest Service Office, Elko,Nevada (775) 738-5171.
CRK 5/18
Pole Creek Pipeline Extension ProjectMountain City-Ruby Mountain-Jarbidge Ranger District
Humboldt-Toiyabe National Forest
Location Map
Jarbidge
ProjectVicinity
Pole Creek Guard StationMahoney Ranger Station
Forest ServicePrivateBureau of Land Management
![Page 7: Scoping Document and Notice of Proposed Actionclearinghouse.nv.gov/public/Notice/2018/E2018-187.pdf · B ur eaof L nd M g m t Forest Service Private 0 0.15 0.3 0.6 0.9 1.2 Miles This](https://reader031.vdocument.in/reader031/viewer/2022021911/5c5b676c09d3f24a368bb2a2/html5/thumbnails/7.jpg)
Spring
I N S
I D E
Creek
D E S E R T
H U M B O L D T
D E S
E R
T
Creek
Poison
Creek
Point 75Terminus
Point 74
Point 73
Point 72Point 71
Point 70Point 69
Point 68Point 67
Point 66 Point 65Point 64 Point 63
Point 62
Point 61 Point 60Point 59
Point 58
Point 57
Point 56
Point 55Point 54
Point 53
Point 52Point 51
Point 50Point 49
Point 48Point 47
Point 46Beginning
58075
5828
9
58288
58327
58288A
58074
18294
58288B
1829
4A
18295
T47NR59E
R60E
.1:24,000
LegendProposed pipeline
pipeline pointsLand Ownership
Bureau of Land ManagementForest ServicePrivate
0 0.3 0.6 0.9 1.20.15Miles
This GIS product was compiled from various sources and may be corrected, updated, modified, or replaced at any time. For more information contact: Elko Zone Forest Service Office, Elko,Nevada (775) 738-5171.
Pole Creek Pipeline Extension ProjectT. 47 N., R. 59 E. Section 22, 23, 24Robinson Creek, NV-ID USGS 7.5 min. QuadrangleT. 47 N., R. 60 E. Section 19Caudle Creek, NV-ID USGS 7.5 min. Quadrangle
created by C.R.K. 5/18