scoping notice: arizona minerals inc proposal for...

5
United States Department of Agriculture Forest Service Coronado National Forest Sierra Vista Ranger District 5990 S. Highway 92 Hereford, Arizona 85615 Phone (520) 378-0311 FAX (520) 378-0519 Caring for the Land and Serving People Printed on Recycled Paper SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR MINERAL EXPLORATION IN THE PATAGONIA MOUNTAINS. Dear Friends and Neighbors of the Coronado National Forest: I am writing today to let you know that the Coronado National Forest (Forest) is considering a request by Arizona Minerals Inc. a.k.a. Wildcat Silver (Proponent) for approval of a Plan of Operations (PoO) to implement a minerals exploration program on National Forest land at their Hardshell Mine project in the Patagonia Mountains. The project area is located within the Sierra Vista Ranger District in Santa Cruz County, Arizona, about 6 miles southeast of the town of Patagonia, in Section 4, Township 23 South, Range 16 East, Gila and Salt River Meridian (see attached map). With this Scoping Notice, I am providing a description of the proposed action and inviting your comments on the scope of the upcoming National Environmental Policy Act (NEPA) review of the proposal. Information on how and when to comment is provided below. PROPOSED ACTION The Forest proposes to approve the following minerals exploration activities that are described in the PoO. The activities described below would replace or be a continuation of the currently on- going drilling activity on the private land within the project area, which has been operating since the latter part of 2010 in the same manner as described below. If approved, drilling operations would commence upon approval of the PoO and would be completed in less than 11 months. Access The proponent would access the project area from the town of Patagonia by way of Harshaw Road, a county road which is also identified as National Forest System roads 49 and 58. Access within the project would be on Forest Roads (FR) 4682 and 4687 which run in and out of both Proponents’ private land and on Forest land (see attached map). Also, approximately 3,900 feet of temporary low standard access road would be constructed on Forest land to provide vehicle access to the drill sites. The proponent could also conduct maintenance on approximately 7,500 feet of Forest System roads FR 4682 and 4687 within the project area. A lockable gate has been installed by the Proponent on FR 4682 near the first point of entry onto the private land. The Forest Service does not have legal access across the private land, but would be granted specific access for inspection and reclamation purposes relevant to the proposed activities. File Code: 2810/1950 Date: April 28, 2011

Upload: others

Post on 10-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR …a123.g.akamai.net/7/123/11558/abc123/forestservic... · SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR MINERAL EXPLORATION

United States Department of Agriculture

Forest Service

Coronado National Forest Sierra Vista Ranger District

5990 S. Highway 92 Hereford, Arizona 85615 Phone (520) 378-0311 FAX (520) 378-0519

Caring for the Land and Serving People Printed on Recycled Paper

SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR MINERAL EXPLORATION IN THE PATAGONIA MOUNTAINS. Dear Friends and Neighbors of the Coronado National Forest: I am writing today to let you know that the Coronado National Forest (Forest) is considering a request by Arizona Minerals Inc. a.k.a. Wildcat Silver (Proponent) for approval of a Plan of Operations (PoO) to implement a minerals exploration program on National Forest land at their Hardshell Mine project in the Patagonia Mountains. The project area is located within the Sierra Vista Ranger District in Santa Cruz County, Arizona, about 6 miles southeast of the town of Patagonia, in Section 4, Township 23 South, Range 16 East, Gila and Salt River Meridian (see attached map). With this Scoping Notice, I am providing a description of the proposed action and inviting your comments on the scope of the upcoming National Environmental Policy Act (NEPA) review of the proposal. Information on how and when to comment is provided below. PROPOSED ACTION

The Forest proposes to approve the following minerals exploration activities that are described in the PoO. The activities described below would replace or be a continuation of the currently on-going drilling activity on the private land within the project area, which has been operating since the latter part of 2010 in the same manner as described below. If approved, drilling operations would commence upon approval of the PoO and would be completed in less than 11 months.

Access The proponent would access the project area from the town of Patagonia by way of Harshaw Road, a county road which is also identified as National Forest System roads 49 and 58. Access within the project would be on Forest Roads (FR) 4682 and 4687 which run in and out of both Proponents’ private land and on Forest land (see attached map). Also, approximately 3,900 feet of temporary low standard access road would be constructed on Forest land to provide vehicle access to the drill sites. The proponent could also conduct maintenance on approximately 7,500 feet of Forest System roads FR 4682 and 4687 within the project area.

A lockable gate has been installed by the Proponent on FR 4682 near the first point of entry onto the private land. The Forest Service does not have legal access across the private land, but would be granted specific access for inspection and reclamation purposes relevant to the proposed activities.

File Code: 2810/1950 Date: April 28, 2011

Page 2: SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR …a123.g.akamai.net/7/123/11558/abc123/forestservic... · SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR MINERAL EXPLORATION

Traffic from Patagonia to the project site could include travel by four crew trucks per shift, twice a day, with road maintenance and site construction equipment as needed. Travel by Proponents’ supervision and engineering staff, suppliers, contractors and various service vehicles could account for over two dozen round trips per day by trucks ranging from half ton to one ton capacity or larger. In addition there could be as many as 15 trips per day by water tankers ranging in size up to 4,500 gallon capacity, hauling water on the Harshaw road from a source a mile or so north of the project site where water would be purchased.

Drilling The proposed program of work for road construction and drilling is a continuation of, and would be similar to, the on-going exploration activity on the private land within the project area which began in December, 2010. Drilling operations on Forest land could be ongoing around the clock seven days a week in 12-hour shifts, 7 days per week and could continue for up to 300 days. The drilling operations would be conducted using as many as four drill rigs, using both reverse circulation (RC) and diamond core drilling types, to complete up to fifteen holes on Forest land to maximum depths of 2500-ft deep with a maximum 8-inch surface collar diameter. Each drill site or pad would be approximately 40 ft × 50 ft in size, including a drilling mud pit or sump having the dimensions of up to 10 ft × 15 ft × 8 ft deep. Forest Service stipulations would require that one face of each pit be ramped to allow escape from the pit and that drill sites be surrounded by yellow “CAUTION” tape until the pit has been reclaimed and all drilling equipment has been removed. At any given time, the equipment on a drill site could include the drill rig, a pipe trailer or truck, a water truck, a fuel &service truck, a crew truck and incidental service and Proponent personnel with their vehicles.

A maximum of four sites would be drilled at any one time. Core and RC samples would be transported by truck to a work site on private land for testing and evaluation, and retained for future reference.

Reclamation Reclamation would consist of both a concurrent phase and a post-drilling phase. Concurrent reclamation would include plugging each hole before the drill rig is moved off the site. This would be done in accordance with Arizona Department of Water Resources regulations by backfilling with bentonite mud below the water line, filling from the top of the water table to within 20 ft of the surface with a mixture of bentonite drilling mud and drill cuttings, and filling the remaining 20 ft with neat cement. When the drill rig is moved away from a site, all equipment and supplies would be removed from the site along with any trash and other non-native materials. Post-drilling reclamation would include filling the mud pits at the drill sites, leveling berms not needed for erosion control, and replanting the site with native vegetation. The low standard, temporary access roads providing access to the drill sites would be recontoured or bermed with additional drainage bars and cut-outs to prevent erosion, replanted with native vegetation and the entrances would be blocked to obstruct traffic.

YOUR OPPORTUNITY TO COMMENT The Forest Service values public input as part of its NEPA process. You are encouraged to submit comments regarding the proposed action and the scope of the NEPA analysis of this

Page 3: SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR …a123.g.akamai.net/7/123/11558/abc123/forestservic... · SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR MINERAL EXPLORATION

project.1

Written comments may be sent by U.S. mail to Mr. Richard Ahern, Minerals Program Manager, Coronado National Forest, Supervisor’s Office, 300 West Congress Street, Tucson, AZ 85701; by facsimile to his attention at (520) 388-8305; and by electronic mail (email) to

To receive full consideration and to best assist the Forest Service in this effort, your comments should be submitted within 30 days of your receipt of this notice.

[email protected]. You may submit email comments in any of the following ways: text of your email, in a Microsoft Word (.doc or .docx) attachment, or in rich-text format (.rtf). Please identify your facsimile and email comments with "Arizona Minerals Exploration NEPA" in the subject line.

To provide telephone or in-person comments and for further information on the project, please contact Mr. Ahern at (520) 388-8327, by e-mail at [email protected] or visit the Forest Supervisor’s office at the address above between the hours of 8:00 a.m. and 4:30 p.m. daily, Monday through Friday, excluding Federal holidays. Questions on the NEPA process may be directed to Ms. Andrea W. Campbell, Forest NEPA Coordinator, at (520) 388-8352. Thank you for your interest and participation in the activities of the Coronado National Forest. Sincerely,

ANNETTE H CHAVEZ District Ranger Enclosures: Figure 1: Project Location Map Figure 2: Project Area Map

1 Comments and personally identifying information associated with them, such as names and addresses, become part of the administrative record of this NEPA review. This information is available to a third-party upon request under the authority of the Freedom of Information Act (FOIA). If you do not wish for your personal information to be released in response to a FOIA request, you may choose not to include it with your comments. Or, you may request an exemption from FOIA with your comment submittal. Should you choose the latter, you will be informed by the Forest Service as to whether or not your request qualifies for an exemption. If it does not, you will be offered an opportunity to resubmit your comments without personal information or to withhold them.

Page 4: SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR …a123.g.akamai.net/7/123/11558/abc123/forestservic... · SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR MINERAL EXPLORATION

MesaTempe

Tucson

Peoria

Nogales

Gilbert

Phoenix

Chandler

Avondale

GlendaleSun City

Prescott

Scottsdale

Casa Grande

Sierra Vista

Green Valley

Flowing Wells

Fountain Hills

Apache JunctionParadise Valley

Inter

state

17

Interstate 8In

tersta

te 19

Interstate 10

Interstate 10

Interstate 10

Interstate 10

_

Mexico

Hardshell Project Location

Arizona, USA

Figure 1. Arizona Minerals Inc. - Hardshell Project Location Map Santa Cruz County Arizona

USFS Plan of Operations Application dated Jan. 2011

Page 5: SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR …a123.g.akamai.net/7/123/11558/abc123/forestservic... · SCOPING NOTICE: ARIZONA MINERALS INC PROPOSAL FOR MINERAL EXPLORATION

Existing Roadnot surveyed

Existing Roadnot surveyed

Existing Roadnot surveyed

Existing Roadnot surveyed

Existing Roadnot surveyed

Existing Roadnot surveyed

1966 Roadnot surveyed

HERMOSA

ALTA

CAMDEN MINE

CAMDEN NO.2

HARDSHELL NO.1

HARDSHELL NO.15

21

1

2

3

4

5

6

7

8

22

9

10

23

13

14

15

16

17

18

19

20

4846

12

11

44

SHELL-2A SHEL

L-2B

_̂_̂

_̂_̂

1073000.000000

1073000.000000

1074000.000000

1074000.000000

1075000.000000

1075000.000000

1076000.000000

1076000.000000

1660

00.00

0000

1660

00.00

0000

1670

00.00

0000

1670

00.00

0000

1680

00.00

0000

1680

00.00

0000

1690

00.00

0000

1690

00.00

0000

1700

00.00

0000

1700

00.00

0000

1710

00.00

0000

1710

00.00

0000

Figure 2. Arizona Minerals Inc. - Hardshell ProjectUSFS Plan of Operation - Proposed Drill Hole Location Map (revised 4/20/2011)

³

DH3

DH4DH6

DH10

DH2

DH1 DH5

DH8

DH9

DH7

DH14

DH17DH15

DH16DH11

0 500 1,000 1,500 2,000250Feet

Legend_̂ Proposed DH on USFS

USFS_Proposed New Road ConstructionUSFS_Roads to be Maintained