screen shot for sap

16
Screen Shot: OKKP Available to Promise (ATP) Attachments:23 Added by Manu Bhatia , last edited by Ido Mosseri on Jun 26, 2012 (view change ) show comment What do we need to know? Dates:- Order Date Date on which the sales order is entered. System proposes the current date by default. Material Availability Date The date on which the material must be available. On the material availability date, the vendor must start the activities relevant for delivery, such as picking and packing the goods. The

Upload: arijit-bhattacharya

Post on 10-Aug-2015

39 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Screen Shot for SAP

Screen Shot:

OKKP

Available to Promise (ATP)

Attachments:23 Added by Manu Bhatia, last edited by Ido Mosseri  on Jun 26, 2012  (view change) show comment

What do we need to know?

Dates:-Order Date

 Date on which the sales order is entered. System proposes the current date by default.

Material Availability Date

 The date on which the material must be available. On the material availability date, the vendor must start the activities relevant for

delivery, such as picking and packing the goods. The material availability date must be sufficiently early enough so that the goods

are prepared by the loading date.

Transportation Planning Date

Page 2: Screen Shot for SAP

 We must arrange transportation by this date, so that the delivery can be sent to the customer. The date from which the organization

of goods transport must begin. The transportation planning date must be selected early enough so that the transport is available on

the loading date to load the goods.

Loading Date

Picking and packing must be completed by this date so that the goods are ready for loading.

Goods Issue Date

 Goods must physically leave the shipping point by this date. The date on which the goods must leave the company to arrive at the

customer location in time.

 

Delivery Date

Customer should receive delivery of the goods by this date. The date on which goods are to arrive at the customer's premises.

Example: The delivery date can be the delivery date requested by the customer (desired delivery date) or the date confirmed in the

vendor's order acknowledgment or shipping confirmation (confirmed or acknowledged delivery date). 

Times:-Pick/Pack Time

 Difference between the material availability date and loading date.

Transportation Lead Time

 Number of days required for organizing a shipment for an item to be delivered.

Loading Time

 Difference between loading date and goods issue date.

Transit Time

 Number of days required for delivering an item from your company to the customer via a certain route.

How do we View Availability Situation?Run Transaction: CO09

Enter Plant & Checking Rule, against which the Availability is to be checked. For Sales Order Checking Rule = A, Delivery = B, Back

Order = BO 

Page 3: Screen Shot for SAP

 

In this screen, we can see:

Availability Checking Group (Avail Check): 02

Check Rule : A

End Lead Time Refers to the end of Replenishment Lead Time. If that is not included in the Configuration, then this field is not

visible.

Totals Display:** Receipts = Sum of all +ve Quantities in Rec./Reqd qty Column

(Leave out the last row, MRP Element 001, since it is a total)

These are all the Planned Incoming Movementso Issues = Sum of all -ve Quantities in Rec./Reqd qty Column

These are all the Planned Outgoing Movementso Confirmed issues = Sum of all (+ve) Quantities in Confirmed Column

These are the confirmations against ATP.

When is Availability Check Triggered?While creating a Sales Order, Production Order, Delivery, etc. Below is a screen from Sales Order. At the bottom is a button for

Check Material Availability. Also while creating the order, if the Availability situation cannot meet the requested delivery date, the

system goes to Availability screen automatically. (Discussed later)

Run Transaction: VA01

How we arrive at a Confirmed Delivery Date?Below is the logic the system uses to check availability:

Using the Scheduling data from Delivery & Transportation Scheduling, the system does the backward calculation from the

Requested Delivery Date. This is used to arrive at Material Availability Date.

On the Material Availability Date, system checks the Available Qty, as seen in CO09 in column Cum. ATP Qty. If the Available Qty is

> than Required Qty, Requested Delivery Date is confirmed. Otherwise,

System moves into the future till it finds the required Available Qty. The new date is then the new Material Availability Date.

On getting the confirmed Material Availability Date, system does the Forward Scheduling to arrive at a Confirmed Delivery date.

Backwards Scheduling

Page 4: Screen Shot for SAP

Control of Availability Check

Page 5: Screen Shot for SAP

  

Forward Scheduling

Page 6: Screen Shot for SAP

  Result of Availability Check: Some Sample Scenarios

Page 7: Screen Shot for SAP

Above is the Availability Screen as seen in Sales Order. It has following Buttons:

One-time delivery

In the results of Availability, we have 3 options to choose from. This is Case 1, when we can confirm the Customer's Requested

delivery Date. The details of this are visible in the first sub screen below.

Complete dlv.

This is Case 2, when we can confirm the Customer's Requested complete delivery at a future Date. The details of this are visible in

the second sub screen below.

Delivery proposal

Page 8: Screen Shot for SAP

This is Case 3, when we can confirm the Customer's Requested delivery in partial quantities at future dates. The details of this are

visible in the third sub screen below.

Continue

If we select one of the above options, the same gets saved in the ATP results. Otherwise, we can select this button. In that case,

system leaves the ATP screen without saving the ATP results. 

Case: Confirmation on Requested Delivery Date

Page 9: Screen Shot for SAP

Case: Confirmation after Requested Delivery Date (Complete Delivery) 

Case: Confirmation after Requested Delivery Date (Partial Delivery)

Page 10: Screen Shot for SAP

See the screens below corresponding to this situation.The first screen shows the Availability (CO09) Overview. We have an incoming PO on 19 Jan. 

!image034.jpg!In the second screen

Page 11: Screen Shot for SAP

We have created a SO (VA01) on 09 Feb, with requested Delivery date for 09 Feb. 

Now we change the Availability situation, by changing the PO Date to 12 Feb. See the screens below corresponding to this situation.

The first screen shows the Availability (CO09) Overview. We have an incoming PO on 12 Feb. See the new Cum ATP qty. date wise

accordingly.

!image038.jpg!In the second screen

We have created a SO on 09 Feb, with requested Delivery date for 09 Feb.

See that the Delivery got staggered according to the new Availability situation.

Case: Confirmation after Requested Delivery Date (Replenishment Lead Time)

Page 12: Screen Shot for SAP

In the screens below, we have simulated the RLT.

In the first scenario RLT is not activated, see below: 'Check without RLT'. The system considers only the confirmed inward

movements. So out of 500 only 21 is confirmed.

See IMG Guide > SD > BF > AC & TOR > AC > AC with ATP > Control of Availability Check

Page 13: Screen Shot for SAP

See VA01 

 

In the second scenario RLT is activated, but corresponding data in material master is not maintained. Material is procured In-House

(E), but In-house Production time (1st screenshot) & RLT (2ndscreenshot) are not maintained. The system assumes both these times

as Zero. So, complete 500 are confirmed immediately. See MM01

Page 14: Screen Shot for SAP

 

 In the third scenario RLT is activated, corresponding data in material master is maintained. Material is procured In-House (E), In-

house Production time (10 days) & RLT (not maintained). The system confirms 21 on basis of incoming material. Rest 479 is

confirmed after 14 days. This is because 10 working days for in-house production + 4 holidays (Sat-Sun).

Page 15: Screen Shot for SAP

 

 

In the fourth scenario RLT is activated, corresponding data in material master is maintained. Material is procured In-House (E), In-

house Production time (10 days) & RLT (20 days). The system confirms 21 on basis of incoming material. Rest 479 is confirmed

after 14 days. This is because 20 working days for in-house production + 8 holidays (Sat-Sun).

Page 16: Screen Shot for SAP

What Configuration & Data do we need?Controlling Elements:-Requirements Type

Requirements Class

Schedule Line Category

Delivery Item Category

Checking Group

Checking Rule

Scope of Check

Strategy Group

Partial Delivery Agreement

Replenishment Lead TimeMaterial Master Data:-MRP 1 > MRP Group

MRP 2 > Planned Delivery Time

MRP 2 > GR Processing Time

MRP 3 > Checking Group for Availability Check

MRP 3 > Strategy Group

MRP 3 > Total Replenishment Lead Time Scheduling Data:-Transit Time

Loading Time

Pick/Pack Time

Transportation Planning Lead Time