SCRUM IN A FLASH A quick introduction of SCRUM

Upload: david-adam

Post on 15-Apr-2017

231 views

Category:

Leadership & Management


0 download

TRANSCRIPT

Page 1: Scrum in-a-flash

SCRUM IN A FLASH

A quick introduction of SCRUM

Page 2: Scrum in-a-flash

ROLES➤ Roles are people: product owner, scrum master,

development team.➤ Development team: 3 to 9 people, whoever gets the

work done: Developers, Testers, Business analysts, DBAs, etc, etc, etc. ( how it is possible only 3 to 9 people? ) “Self Organise”

➤ Product Owner: owns product backlog. Product Owner is one and only one person

➤ SCRUM Master: one person, anyone but the product owner: Facilitator, Coach.

Page 3: Scrum in-a-flash

EVENTS➤ Events are Meetings & time boxes: Sprint, Sprint Planning

Meeting, Daily Scrum, Sprint Review, Sprint Retrospective.➤ Sprint: Fixed time period, protected time boxes. ➤ Spring planning meeting: Development team decide how long

the sprint will be and what to be done in the Sprint.➤ Daily Scrum: AKA daily stand up. Information update among the

team. Focused on the next release / spring goal. Scrum Master facilitate, but not lead, the meeting.

➤ Sprint Review: Present the work of the sprint. Attended by all development team, PO and anyone interested in. Update to stakeholders and gathering feedbacks.

➤ Sprint Retrospective: Internal meeting of the development team. Lessons learnt.

Page 4: Scrum in-a-flash

ARTEFACTS➤ Artefacts are the things: Product Backlog, Sprint

Backlog, Increment.➤ Product Backlog: Owned by Product Owner. Product

Backlog Refinement for PBI.➤ Sprint Backlog: The amount of the user stories to be

finished in a sprint, sorted by a single priority criteria.➤ Increment: Product Increment. Release ready final

product.

Page 5: Scrum in-a-flash

BACKLOG & DOR (DEFINITION OF READY)➤ Product Backlog Item/Sprint Backlog Item. PBI/SBI. Owned

by Product Owner (PO).➤ Product Road Map.➤ Keep the “Backlog Ready”. Backlog Refinement Meetings.

Not Officially required by the SCRUM Guide.PO, SCRUM Master & Development TeamDiscuss items on the BacklogEstimateDiscuss Priorities & Dependencies between PBIsGoal: Top PBIs are… Understood, Estimated, Small enough to be done in a single sprint.Goal: 3 to 4 Sprints of “Ready” PBIs.

➤ Filled with every conceivable feature➤ If the PBIs towards the top of the Backlog are

understandable and do-able by the TEAM in a single Sprint, those PBIs are deemed “Ready”.

Page 6: Scrum in-a-flash

USER STORY➤ User Story: a natural language description of an expected

product feature.➤ Format:

➤ On the Back, there is the Acceptance Criteria (AC).➤ Epics & Themes➤ IVEST: Independent, Negotiable, Valuable, Estimate-able, Small,

Testable.➤ User Story <= Tasks.

Page 7: Scrum in-a-flash

ESTIMATION➤ Estimation is something you should do as a team➤ You’re not estimating how long it’ll take an individual

to deliver the PBI. It’s “always” the team.➤ Story points: 1,2,3,5,8,13,21,40,80,120,infinity➤ Story point estimation. Estimation poker. In Scrum and

in story point estimation, you’re estimating how long it takes for “THE TEAM” to deliver the PBI to Definition of Done.

Page 8: Scrum in-a-flash

DEFINITION OF DONE (DOD)➤ Definition of Done (DoD) = Everything it takes to call a feature “done”. A

written definition of done is as close as a “magic silver bullet” as you’ll find in software.

➤ A written DoD helps deflect blame and annoyance when you say “no”.➤ A written DoD helps.➤ The “Two Second Fix” Request.➤ When developing your written DoD, you’ll discuss a lot more than just

coding. Code by itself isn’t that useful.➤ Software delivery focuses on

the “big picture” of gettingsoftware to the point thatit can actually be used.

Page 9: Scrum in-a-flash

VELOCITY➤ Velocity: a mount of story points can be delivered in a

single print on average. Statics report. Planning.

Page 10: Scrum in-a-flash

TECHNICAL DEBT➤ Technical Debt is a compromise. It has long term

consequences (repercussions).

Page 11: Scrum in-a-flash

WIP LIMIT➤ WIP: Working In Progress➤ Reset between each iteration / sprint➤ WIP limit per iteration / sprint

Page 12: Scrum in-a-flash

SHOW STOPPER➤ What is a Show Stopper?

Page 13: Scrum in-a-flash

TOOLS FOR SCRUM➤ Tools are not important.

Physical board.ExcelInformation Radiator

➤ SCRUM has barely enough documentation.➤ Electronic tools like JIRA: good for any teams,

including distributed teams. But it has limitations.

Page 14: Scrum in-a-flash

RELEASE & DEPLOYMENT, CI & DEVOS, OH MY….➤ Automation as much as possible.➤ Tools matter.➤ Release and version management: git has no alternative.➤ Automatic testing. Test Driven Development (TDD) - PHPunit,

SimpleTest, Junit, Ant, build script - it is not just unit test code. Behaviour Driven Development (BDD) - Behat (behat.org), cucumber (cucumber.io).

➤ Version control and Release tag for production ready.➤ Standards are very important. But needs enforceable. Thus

Continuous Integration needs support this.➤ Environment management. Vagrant, Docker, cloud. Code first vs DB

first. Configuration as code.➤ Push button deployment.➤ Release management: not just code update. Release action list.