December 2009 - SCTE proposes solar solution in support of our Smart Energy Management Initiative – SEMI(Conceptual artwork from Alpha Technologies)
![Page 2: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/2.jpg)
December 2009 - Online mapping reference check to see how much unobstructed southern facing rooftop SCTE has on our building (space for a total of 18 kW)– SCTE receives bids for the project
![Page 3: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/3.jpg)
December 2009 – Output of sun chart for 140 Philips Rd, Exton PA 19341
![Page 4: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/4.jpg)
February 2010 - SCTE selects Alpha Energy as the solar project solution provider
![Page 5: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/5.jpg)
April 2010 - After submitting permit requests SCTE and Alpha needed to appear before the township board to get approval of proposed installation – safety and aesthetics were taken into consideration
![Page 6: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/6.jpg)
July 2010 - An interconnect application needed to be filed with the local electricity grid provider, giving SCTE and Alpha permission to connect the new solar system to their system
![Page 7: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/7.jpg)
March 2010 - Site inspection illustrating panel height (5’ 9”) for township approval
![Page 8: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/8.jpg)
May 2010 - Power purchase agreement (PPA) and contract negotiations completed between Alpha and SCTE to insure fair system options for both companies
Power Purchase Agreement
![Page 9: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/9.jpg)
Monthly Production Dollars
![Page 10: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/10.jpg)
11.28 kW Electricity Production
![Page 11: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/11.jpg)
May 2010 – Alpha drafts engineering documents and hardware is ordered
![Page 12: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/12.jpg)
June 2010 - SMA inverters, Sharp panels and Shletter aluminum mounting system
![Page 13: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/13.jpg)
July 2010 - Lift used to move materials onto the roof deck
![Page 14: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/14.jpg)
July 2010 - First load of materials unloaded onto the roof
![Page 15: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/15.jpg)
July 2010 - Cutting the “spaghetti matting” to shape
![Page 16: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/16.jpg)
July 2010 - Placing the pans precisely over the building’s support joists
![Page 17: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/17.jpg)
July 2010 - Lifting the pavers that will weigh the pans down
![Page 18: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/18.jpg)
July 2010 - Getting ready to finish up placing the pans
![Page 19: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/19.jpg)
July 2010 - Placing the support frames into position over the center of the pans
![Page 20: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/20.jpg)
July 2010 - Placing the support frames into position over the center of the pans
![Page 21: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/21.jpg)
July 2010 - Placing the support frames into position over the center of the pans
![Page 22: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/22.jpg)
July 2010 - Assembling the rails and frame support
![Page 23: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/23.jpg)
July 2010 - Assembling the rails and frame support
![Page 24: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/24.jpg)
July 2010 - Checking the second section rack placement and preparing that build
![Page 25: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/25.jpg)
July 2010 - Making progress on the racking assembly
![Page 26: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/26.jpg)
July 2010 - First section of racking assembled
![Page 27: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/27.jpg)
July 2010 - Making progress on the rack installation
![Page 28: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/28.jpg)
July 2010 - Racking assembly completed
![Page 29: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/29.jpg)
July 2010 - Racking assembly completed
![Page 30: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/30.jpg)
July 2010 - Racking assembly completed
![Page 31: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/31.jpg)
July 2010 - Average July full sun roof top temperature (164 degrees Fahrenheit)
![Page 32: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/32.jpg)
July 2010 - Beginning work of hanging the panels
![Page 33: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/33.jpg)
July 2010 - Hanging the first panel – ensure that the placement is square
![Page 34: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/34.jpg)
July 2010 - Checking the square reference point
![Page 35: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/35.jpg)
July 2010 - Tying the square reference string into place
![Page 36: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/36.jpg)
July 2010 - Squaring off the second row of panels
![Page 37: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/37.jpg)
July 2010 - Beginning the install of second row of panels
![Page 38: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/38.jpg)
July 2010 - Placing the upper row of panels
![Page 39: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/39.jpg)
July 2010 - Placing the upper row of panels
![Page 40: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/40.jpg)
July 2010 - Hanging the upper row of panels
![Page 41: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/41.jpg)
July 2010 - Progress hanging the second row of panels
![Page 42: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/42.jpg)
July 2010 - Temperature of the back of panels (full sun - 136 degrees Fahrenheit)
![Page 43: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/43.jpg)
July 2010 - Installing the conduit mounting brackets to the frame
![Page 44: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/44.jpg)
July 2010 - Installing the conduit mounting brackets to the frame
![Page 45: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/45.jpg)
July 2010 - Getting the combiner box ready on the rooftop
![Page 46: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/46.jpg)
July 2010 - Combiner box ready for conduit and cabling
![Page 47: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/47.jpg)
July 2010 - Preparing to mount the conduit
![Page 48: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/48.jpg)
July 2010 - All panels racked and ready for wiring procedures
![Page 49: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/49.jpg)
July 2010 - Look down the back of the array after panel wire clean up is completed
![Page 50: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/50.jpg)
July 2010 - Cleaning up positive and negative panel connection cables with wire ties
![Page 51: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/51.jpg)
July 2010 - Cleaning up the positive and negative panel cables with panel clips
![Page 52: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/52.jpg)
July 2010 - First row of wind shield deflector braces installed
![Page 53: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/53.jpg)
July 2010 - First row of wind shield deflector braces installed
![Page 54: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/54.jpg)
July 2010 - Grounding clip installed on every panel and rack piece
![Page 55: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/55.jpg)
July 2010 - Fishing the DC and ground wire through the conduit under the array
![Page 56: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/56.jpg)
July 2010 - Installing the first disconnect box
![Page 57: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/57.jpg)
July 2010 - Working on the disconnect boxes
![Page 58: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/58.jpg)
July 2010 - Lightning arrestor attached to the roof top disconnect boxes
![Page 59: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/59.jpg)
July 2010 - Conduit taking the DC power from the disconnect boxes to the combiner box
![Page 60: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/60.jpg)
July 2010 - Combiner box taking the power down the side of the building
![Page 61: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/61.jpg)
July 2010 - Disconnect box on the roof
![Page 62: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/62.jpg)
July 2010 - Disconnect boxes on the roof
![Page 63: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/63.jpg)
July 2010 - Two disconnect switches on the roof
![Page 64: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/64.jpg)
July 2010 - Sensor control box mounted adjacent to the array
![Page 65: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/65.jpg)
July 2010 - Anemometer and ambient air temperature devices
![Page 66: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/66.jpg)
July 2010 - Back of panel temperature sensor
![Page 67: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/67.jpg)
July 2010 - Look down the back of the array at the wind shields
![Page 68: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/68.jpg)
July 2010 - Completed arrays
![Page 69: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/69.jpg)
July 2010 - Completed arrays
![Page 70: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/70.jpg)
July 2010 - Completed arrays
![Page 71: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/71.jpg)
July 2010 - Completed arrays
![Page 72: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/72.jpg)
July 2010 - Completed arrays
![Page 73: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/73.jpg)
July 2010 - Completed arrays
![Page 74: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/74.jpg)
July 2010 - View from ground level at the side of SCTE’s building
![Page 75: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/75.jpg)
July 2010 - View of the panels from ground level behind SCTE’s building
![Page 76: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/76.jpg)
July 2010 - Drilling a hole in the cement block to feed the cable into the building
![Page 77: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/77.jpg)
July 2010 - Examining the internal workings of the inverter
![Page 78: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/78.jpg)
July 2010 - Getting ready to mount the new meter
![Page 79: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/79.jpg)
July 2010 – Mounting the new inverters and system boxes
![Page 80: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/80.jpg)
July 2010 - Mounting the inverters and new breaker boxes
![Page 81: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/81.jpg)
July 2010 - Getting ready to pull cable
![Page 82: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/82.jpg)
July 2010 - Preparing to pull the rooftop wires into the building
![Page 83: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/83.jpg)
July 2010 - Preparing to pull the rooftop wires into the building
![Page 84: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/84.jpg)
July 2010 - Preparing to pull the rooftop wires into the building
![Page 85: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/85.jpg)
July 2010 - Completing the AC/DC wiring requirements
![Page 86: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/86.jpg)
July 2010 - Completing the AC/DC wiring requirements
![Page 87: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/87.jpg)
July 2010 - Preparing for the DC to AC wiring project
![Page 88: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/88.jpg)
July 2010 - Installation of new system meter and circuit breakers
![Page 89: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/89.jpg)
July 2010 - Brining the DC cable feed into the combiner box inside the building
![Page 90: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/90.jpg)
July 2010 - Inverter statistics
![Page 91: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/91.jpg)
July 2010 - Inverter output LCD board
![Page 92: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/92.jpg)
July 2010 - Inner workings of the inverter shut off switch
![Page 93: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/93.jpg)
August 2010 - Overview of the inner workings of the inverter
![Page 94: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/94.jpg)
August 2010 - Initial look of the inverter receiving DC power from the panels
![Page 95: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/95.jpg)
August 2010 - Initial reading of output coming off the panels
![Page 96: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/96.jpg)
August 2010 - Alpha and SCTE team assembling on the roof for the launch ceremonies
![Page 97: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/97.jpg)
August 2010 - Launch of the power purchase agreement and solar system
![Page 98: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/98.jpg)
August 2010 - Alpha and SCTE team on the roof for opening day
![Page 99: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/99.jpg)
Today - SCTE front lobby display
![Page 100: SCTE Solar Story](https://reader031.vdocument.in/reader031/viewer/2022021422/5880c8f81a28abba3b8b6e31/html5/thumbnails/100.jpg)
System Specifications• 11.28 kW DC• 10 kW AC• Phase: 3phase • Voltage: 208 • Frequency: 60Hz• 48 Sharp 235 mono-crystalline modules• Schletter ballasted racking system• 2 SMA Sunnyboy 5000US inverters• Data Monitoring – website, data logging, weather