sd 59 peace river south finding solutions for vulnerable readers in k/1/2

24
SD 59 PEACE RIVER SOUTH FINDING S OLUTI ONS FOR V ULN ERABLE READERS I N K/1 /2

Upload: marjorie-wheeler

Post on 18-Jan-2016

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

SD 59 P

EACE RIV

ER

SOUTH

F I ND

I NG

SO

LUT I O

NS F

OR

VU

L NE R

AB

L E

RE A

DE R

S IN

K/ 1

/ 2

Page 2: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

WHAT DO VULNERABLE READERS NEED?

They need Kindergarten, grade one and grade two teachers, administrators and specialists to take

intervention-action urgently!!!!!

Grade 3 is TOO late start an intervention for most vulnerable readers.

Page 3: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2
Page 4: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

Vulnerable learners need us to act urgently, to close this experiential gap.

WHAT ACTION WILL WE TAKE?

Page 5: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

SD 59 PEACE RIVER SOUTH PROCESS

How did we get our teachers on board?

How many joined?

What were their reactions?

What did we do differently during the course of the year?

How did we measure the results – pre/post?

Page 6: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

THE VISION

• 120 minutes of daily, uninterrupted time for literacy

• Reporting out on literacy, numeracy and social/emotional learning

• PE/Art/Music are integrated. These and any other prep blocks are scheduled in the afternoon

• Other curricular area themes are incorporated into the three focus areas but are not reported on the report card.

• An inquiry/activity based environment

Page 7: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

WE DID IT WITH….

Explicit instruction and frequent playful practice in a PLAY-BASED ENVIRONMENT

Page 8: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

TEACHER COMMITMENT

• Implement pilot classroom structure including literacy centers, which may be developed in collaboration with the

Speech/Language department

• Engage in monthly after school Professional Learning Community (PLC) sessions on a variety of primary teaching

and learning strategies.

• In the first year: participate in 8 days of work with Dr. Janet Mort, including Saturdays

• In Year Two and Three, new teachers have a two day workshop with Janet Mort

Page 9: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

TEACHER COMMITMENT

• Share and reflect on data to inform planning and instruction

• Engage in structured data collection:

• On-going formative assessment data

• Collection of bubble sheets in January and June, into the project facilitators

• Teachers were given the opportunity to attend “The Summits for Vulnerable Readers.” The commitment was

they would share out at the next PLC on the sessions they had attended.

Page 10: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

WHAT OTHER FACTORS CAME INTO PLAY?

• TEACHERS’ ATTITUDE

• CLASSROOM PRACTICE

• USING RTI TO IDENTIFY STRATEGIC AND INTENSIVE INTERVENTIONS

• MORALE

• CHILDREN’S ACHIEVEMENT

• DATA COLLECTION?

Page 11: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2
Page 12: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

2013-2014 DATA Kindergarten AK Rhyme Rhyme Isolation Blending Segmentation

Deletion Disc. Prod. Syllable

 Jan 13% 62% 47% 65% 69% 46%

62%June 63% 79% 70% 82% 84% 67%

73% Jan: 157 studentsJune: 164 students  Grade 1 AK Isolation Isolation Blending Segment

Seg. Phonemes Med FinalJan 51% 54% 79% 68% 75%

51%June 91% 83% 90% 83% 87%

81%  Jan: 191 studentsJune: 183 students

Page 13: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

Sd 59 Peace River South: Early Intervention

KINDERGARTEN DATA

0

20

40

60

80

100

120

140

160

23-Jan-1410-Jun-14

Page 14: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

Sd 59 Peace River South: Early Intervention

GRADE 1 DATA

Alphabet Knowledge

Isolation Medial Isolation Final Blending Segmentation Segmentation Phonemes

0

20

40

60

80

100

120

140

160

180

23-Jan-1410-Jun-14

Page 15: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

2014/2015 DATA

This year we chose three schools to look at their data.

The reason these three schools were picked is because all of the primary classes were in the project last year and all of the primary classes were in the project this year as well.

Here is the data for the grade 1’s.

Page 16: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

SCHOOL A

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Not MeetingMeeting

Page 17: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

SCHOOL B

Alpha

bet 1

00%

Alpha

bet 5

0%

Rhym

ing

(K)

Phon

o Sk

ills (

K)

Sylla

bale

s (K)

Segm

enta

tion

(K)

Isola

tion

(K)

Delet

ion

(K)

Isola

tion

Media

l (1)

Isola

tion

Final

(1)

Segm

enta

tion

(1)

Blend

ing

(1)

Delet

ion

(1)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Not MeetingMeeting

Page 18: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

SCHOOL C

Alpha

bet 1

00%

Dat

e

Alpha

bet 5

0% D

ate

Rhym

ing

(K)

Phon

o Sk

ills (

K)

Sylla

bale

s (K)

Segm

enta

tion

(K)

Isola

tion

(K)

Delet

ion

(K)

Isola

tion

Media

l (1)

Isola

tion

Final

(1)

Segm

enta

tion

(1)

Blend

ing

(1)

Delet

ion

(1)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Not MeetingMeeting

Page 19: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

DISTRICT – KINDERGARTEN – JUNE 2015

Alpha

bet 1

00%

Rhy. D

isc

rhy.

Pro

d

isola

tion

blen

ding

syl

l.

segm

ent.

dele

tion

isola

tion

med

isola

tion

final

Blend

ing

segm

ent

seg.

Pho

nem

es

Delet

ion

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Not MeetingMeeting

Page 20: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

DISTRICT – GRADE 1 – JUNE 2015

Alpha

bet 1

00%

Rhy. D

isc

rhy.

Pro

d

isola

tion

blen

ding

syl

l.

segm

ent.

dele

tion

isola

tion

med

isola

tion

final

Blend

ing

segm

ent

seg.

Pho

nem

es

Delet

ion

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Not MeetingMeeting

Page 21: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

GRADE 1 FOUNTAS AND PINNELL – JAN. 2015

1-4 6-810-12 14+

LEVELS

Page 22: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

GRADE 1 –F & P – JUNE 2015

1-4 6-8 10-1214-16 18+

Page 23: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

SUMMARY

• When looking at the Kindergarten Screenings done in September and June a significant amount of students who had failed, were passing in June. In comparison to other

years, more students were passing the Kindergarten Screen in June.

• The Circle Chart tracking device is popular and works well to inform daily instruction.

• Children are thriving and learning to read and write in joyful, challenging environments

• Teachers are excited, enthusiastic, and proud; they are learning new skills and applying them with results they can

measure

• Quantitative data is confirming the qualitative data.

• Created a dynamic professional learning community with the primary teachers in the district!!

Page 24: SD 59 PEACE RIVER SOUTH FINDING SOLUTIONS FOR VULNERABLE READERS IN K/1/2

ON-GOING COMMITMENT

• The project will be on-going and will be adjusted based on literacy data. The Kindergarten cohort will be specifically

tracked from 2013 to 2017 when these students will be exiting grade 3.

• New participants will be welcomed at the beginning of each year and existing participants will continue to be supported.

• Provide targeted funding to support travel and professional development.

• Facilitate the PLC’s and provide meals for gatherings

• Provide facilitation for the development and use of an alternate report card

• Teachers are opening their classrooms to visiting districts.