sdrc 9.3.1 learning report october 2017 · a hard-wired protection system that automatically...
TRANSCRIPT
![Page 1: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/1.jpg)
DRAFT – SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP
Page 1 of 35
Powerful-CB SDRC 9.3.1 Learning Report Understanding customers’ requirements October 2017
![Page 2: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/2.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 2 of 35
Project overview
The Powerful-CB (Power Electronic Fault Limiting Circuit Breaker) project aims to demonstrate that Fault-Limiting
Circuit Breakers (FLCBs) can enable more Distributed Generation (DG) to connect to fault-level constrained networks.
A power electronic FLCB is a solid-state circuit breaker that operates 20 times faster than traditional vacuum circuit
breakers. It can block 100% of fault level contribution but allows load current to flow normally before and after the fault
as soon as the fault has been cleared.
We will be trialling two methods to allow generators to connect to fault-level constrained 11kV networks:
Method 1 – Installing a device at a substation, to allow multiple generators to connect; and
Method 2 – Installing a device at a customer site, to allow a single generator to connect.
The journey towards a low carbon economy is revolutionising the way we produce, distribute and consume electricity.
Whilst we continue to operate and invest in our network to maintain a safe, secure, and sustainable power supply to
8.2 million homes and businesses, we need to make use of smart, flexible, and innovative techniques to ensure
delivery of our outputs, minimise the cost impact on consumers, and manage the increased complexity of this low
carbon world.
To date we have over 300MW of combined heat and power (CHP) connected to our London network but the ability to
connect more may be limited as a result of fault level constraints. The traditional fault level solutions are an inhibit
agreement (therefore restricting output), connection at a higher voltage level and network reinforcement with the latter
two resulting in an expensive connection which may make projects financially unfeasible.
We are transforming our business into a Distribution System Operator1 to respond to the needs of our customers, both
now and in the future, and working with the wider industry to help deliver decarbonisation of the electricity system at
the least cost. The Government’s Carbon Plan and the Department of Energy & Climate Change (now known as BEIS)
Community Energy Strategy report2 highlight the importance of CHP in achieving the UK’s carbon targets. The Mayor
of London’s target3 is to generate 25% of London’s heat and power requirements locally by 2025. We expect this to
encourage CHP and district heating for new developments.
1 http://futuresmart.ukpowernetworks.co.uk/ 2 https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/275163/20140126Community_Energy_Strategy.pdf 3 https://www.london.gov.uk/what-we-do/planning/london-plan/current-london-plan/london-plan-chapter-five-londons-response/poli-0
![Page 3: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/3.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 3 of 35
1 Executive summary
This is the first Powerful-CB Successful Delivery Reward Criteria (SDRC) report which outlines the engagement we
have had with customers to understand their requirements and showcases some of the key results and learning points
that have been made so far in the project. Understanding customer requirements is an important activitity in the project
and we have had discussions and feedback from customers and other stakeholders on the FLCB device cost,
operation, maintenance, and BAU rollout plans amongst other topics. Method 2 trial participation has been a key
engagement point for many customers and these engagement activities have naturally run in conjunction with trial
recruitment.
Since the project initiation, we have engaged with customers and other stakeholders at a number of external events,
through social media, mailing lists, our Powerful-CB online survey and the launch of a project customer working group.
Our key learning points have arisen from data across engagement with multiple customers through survey answers as
well as individual conversations. The key areas and learning points which are discussed in detail in the report are
shown below:
We have gained valuable feedback from customers and other stakeholders on the merits and challenges of both
methods through a variety of engagement activities. We have seen positive engagement and interest from a range of
different customers. This report is designed to outline our learning so far from engaging with customers and
stakeholders and we will report further in project progress reports and future SDRC reports as the project develops.
Powerful-CB has wide scale applicability
FLCB technology is of interest to a wide range of customer types from a geographic spread
Identified customers opinions on benefits and concerns
Customers have expressed a range of potential benefits and concerns relating to Powerful-CB but some
key themes emerged relating to finance and technology maturity
Explored potential commercial and logistical arrangements
Future success will depend on appropriate tailoring of commercial and logistical options and
arrangements
![Page 4: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/4.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 4 of 35
2 Table of contents
1 Executive summary ................................................................................................................................................... 3 2 Table of contents ....................................................................................................................................................... 4 3 Glossary .................................................................................................................................................................... 5 4 About us .................................................................................................................................................................... 6 5 Workstream 3 (WS3) summary ................................................................................................................................. 7 6 Stakeholder engagement .......................................................................................................................................... 8 7 Our engagement timeline .......................................................................................................................................... 9 8 Key learning ............................................................................................................................................................ 11
8.1 Powerful-CB has wide scale applicability .................................................................................................... 12 8.2 Identified customers opinions on benefits and concerns ............................................................................. 13 8.3 Explored potential commercial and logistical arrangements ....................................................................... 15
9 Challenges, mitigations and next steps .................................................................................................................. 17 9.1 Challenges and mitigation methods ............................................................................................................. 17 9.2 Next steps .................................................................................................................................................... 17
10 Conclusion ............................................................................................................................................................... 19 11 Appendix ................................................................................................................................................................. 20
11.1 Stakeholder engagement summary ............................................................................................................. 20 11.2 DG customer forum 9 February 2017 .......................................................................................................... 21 11.3 DG customer forum 18 July 2017 ................................................................................................................ 22 11.4 Powerful-CB survey ..................................................................................................................................... 23 11.5 Customer surgeries ...................................................................................................................................... 26 11.6 Customer working group 6 September 2017 ............................................................................................... 27 11.7 Association of Decentralised Energy (ADE) membership forums ............................................................... 28 11.8 Frequently Asked Questions – Method 2 (Applied Materials) ..................................................................... 29 11.9 Understanding Customers’ Requirements information gathering form ........................................................ 33 11.10 Site Selection Criteria form .......................................................................................................................... 35
![Page 5: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/5.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 5 of 35
3 Glossary
Term Description
ADE Association for Decentralised Energy
BAU Business As Usual
CB Circuit Breaker – Protection device that interrupts the flow of current in an electric circuit in the event of a fault.
CHP Combined Heat and Power – Simultaneous generation of usable heat and power (usually electricity) in a single process; more efficient than generating heat and power separately.
DG Distributed Generation – Generators that are connected to the distribution network.
DNO Distribution Network Operator
ENWL Electricity North West Limited
Fault Current A surge of energy that flows through the network in the event of a fault. The energy comes from the momentum of rotating generators and motors connected to the network.
Fault Level The maximum fault current that could theoretically flow during a fault.
“Make” fault level is the maximum fault current that could flow during the first current peak of the fault, and that a circuit breaker closing onto a fault would need to safely handle.
“Break” fault level is the maximum fault current that could be flowing 100ms after the start of the fault, and that a circuit breaker clearing the fault would need to be able to interrupt.
Fault Level Headroom
The difference between fault level and fault rating at a particular substation or part of the network; corresponding to the amount of generation that can be connected to the network without exceeding its fault rating.
FCL Fault Current Limiter – a FLMT that attenuates fault current by increasing its impedance (only) during a fault.
FLCB Fault Limiting Circuit Breaker – a FLMT that blocks fault level contributions from a transformer / bus coupler / generator by disconnecting it before the first current peak of the fault.
FLMT Fault Level Mitigation Technology – a technical solution that reduces fault levels on the network.
GB Great Britain
GLA The Greater London Authority
Inhibit / Intertrip Scheme
A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the event of a transformer outage or other abnormal network configuration that causes elevated fault levels.
M1 Method 1 - Installation of a FLCB at a substation
M2 Method 2 - Installation of a FLCB at a customer’s premises
RIIO-ED1 The current electricity distribution price control, running from 2015 to 2023
Rotating DG A generator that converts mechanical energy to electrical energy using a synchronous AC rotating alternator, e.g. CHP and diesel standby generators. These types of generators have a much larger impact on fault levels than inverter-connected generators e.g. solar PV.
SDRC Successful Delivery Reward Criteria
Triad The Triads are the three half-hour settlement periods with highest system demand between November and February, separated by at least ten clear days. National Grid uses the Triads to determine Transmission Network Use of System charges for customers with half-hour metering.
TRL Technology Readiness Level
UKPN UK Power Networks
UPS Uninterruptible Power Supply
WPD Western Power Distribution
![Page 6: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/6.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 6 of 35
4 About us
UK Power Networks provides power to a quarter of the UK’s population via its electricity distribution networks and is
committed to:
Maintaining a safe, secure and sustainable power supply to over eight million homes and businesses in
London, the South East and the East of England;
Developing what is already Britain’s biggest electricity network – including over 112,000 11kV secondary circuit
breakers;
Strengthening our links with the local communities we serve and building on the skills base of the 5,500 people
who work for us across the network; and
Giving our customer the best possible service and maintaining operational efficiency across our network areas.
We have a clear vision to be the best performing Distribution Network Operator (DNO) in the UK over the 2015/16 to
2018/19 regulatory period, the first four years of RIIO-ED1. We will achieve this by demonstrating industry leadership in
the three areas below:
The safest The most reliable The lowest cost
The best employer The best service
The most innovative
The most socially
responsible
Our innovation strategy follows our corporate vision, which underpins our mission and provides clarity of purpose. A
key success indicator in delivering our vision is to be classed as the “Most Innovative DNO”; as such it is core to how
we do business. A successful innovation programme will support all three elements of our corporate vision; for example
innovation is a central component of our strategy continuing to be the lowest cost electricity distributor. Our innovation
procedure outlines the objectives of innovation – showing why we innovate.
Delivering high
performance today
through innovation
and the benchmark
for best practice.
A future-ready
distribution business
providing new services,
which meet the needs of
tomorrow’s customers.
Consistently credited as an
active facilitator of, and not an
obstacle to the low carbon
transition.
Efficient
&
Effective
Future
Ready
Low
Carbon
Ready
![Page 7: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/7.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 7 of 35
5 Workstream 3 (WS3) summary The activities in WS3 are designed to engage with customers and other external stakeholders on matters relating to the Powerful-CB trial and the wider use of FLCBs in the UKPN area and the rest of GB. Specifically, the activities are broken down into two categories, which were explained in the Full Submission Proposal4 as:
WS3a - Customer dialogue
WS3a is designed to both inform stakeholders of what the two Methods are and what they can technically accomplish for them, as well as gather information on what their criteria would be to assess the suitability of the two Methods if connecting new generation. It aims to gain an insight on the customer requirements and expectations for potentially using either of the two Methods for a new connection. This will be achieved by engaging with relevant customers through focus groups and workshops. Our approach will be to target specifically those people most likely to connect new CHP generation and also those generation customers who see connections costs as a primary barrier to new connections. The result will be an open dialogue with customers to understand their decision parameters. These may include space, cost/security trade-off, etc. Additionally, through our relationship with the Greater London Authority we will seek to better understand CHP and district heating use cases for both Methods, considering the needs of councils and developers. The user requirements and expectations will inform the work in WS3b.
The technical requirements will be based on the results from WS1 and WS2. These requirements define the
constraints which are inevitable with the technology. The customer expectations for how the technologies will work best
for their needs will be gained through customer dialogue in WS3a, from feedback from the trial participant, and from
reviewing other similar projects like ENWL’s Respond project’s customer survey5. The information gathering will be
designed with the purpose of demonstrating the commercial feasibility of the FLCB technology. This may include cost
benefit analysis of the FLCBs technology, market size and receptiveness.
WS3b - Suitability assessment
Once we have learned what customer needs are for using the two different Methods, we will conduct a desktop based exercise to match these expectations against technical constraints and variations. We will then combine those requirements against how the devices best meet customer needs from WS3a to develop the inputs which customers can use for their own individual commercial business cases. Specifically, the assessment will explore the trade-offs between different needs and technical constraints. The results and learning will be captured in the ‘Learning Report – suitability assessment’ report, presenting the assessment of the suitability of the different trialled solutions. This will be based on the measured technical performance and identified customers’ needs. The end result will present information DG customers can use as part of potential business cases to support investment in DG.
4 https://www.ofgem.gov.uk/system/files/docs/2016/11/powerful-cb_nic_fsp_resubmission_2016-10-20-1700_non-confidential.pdf 5 http://www.enwl.co.uk/docs/default-source/respond-key-documents/respond-customer-report-may-2017.pdf?sfvrsn=4
![Page 8: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/8.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 8 of 35
6 Stakeholder engagement
Stakeholder engagement and learning dissemination activities are key to the successful delivery of Innovation projects.
Below are our four stages to successful engagement.
Customers
Project sponsors
Suppliers
DNOs
Collaborate
Consult
Inform
Clear direction
Identify methods of
communication
Frequency of
communications
Listen “you said”
Deliver
o We did
o We will do
2. Assess interest 1. Identify stakeholders 3. Develop plan 4. Engage
Appendix
11.1, 11.2, 11.3 &
11.4
Appendix
11.5
Appendix
11.1
Appendix
11.2, 11.3, 11.4, 11.5 &
11.6
![Page 9: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/9.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP
Page 9 of 35
7 Our engagement timeline
Attended ENWL RESPOND learning event and WPD FlexDGrid final dissemination event.
Peer learning was an important aspect and we attended two DNO events; concerns around Triad revenue for existing customers were identified by
ENWL and this encouraged us to ask the ‘right questions’ early on.
Emailed to the DG mailing
list (circa 780 stakeholders)
Jul-17
Jan-17 Network external online
Feb-17
We were keen to spread the word with our well-established DG mailing list in addition to releasing a
news article. The platform for our initial face-to-face communication was the bi-annual DG customer
forum. This event identified a potential trial participant and detailed customer dialogue then
commenced. See Appendix 11.2
SurveyMonkey published
In order for customers to engage without a face-to-face meeting and to provide the ability for anonymity, the project team launched the Powerful-
CB survey, which we circulated to customers and other stakeholders through a range of internal and external mailing lists, social media outlets
and via direct conversation. The survey asked nine simple questions, none of which were mandatory. The aim of the survey was to assess
customer interest in and the understanding of the project, the technology and the trial. See Appendix 11.4
We collated an FAQ document (see Appendix 11.8). It is understandable and expected that many of the queries and much of the interest lay in the
commercial arrangements of the technology and its applications on the electricity distribution networks.
Feedback from the event has been positive and a potential trial site was identified during the day .
![Page 10: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/10.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 10 of 35
See next
steps section
9.2
77% of attendees rated the topic
‘very useful’
DG customer forum
Jul-17
Returning to the DG customer forum in July provided us with an opportunity to engage further with
this community. We explained the problem some customers are facing and the methods we wish to
trial. Referring to the feedback provided at the event, 77% of the audience rated the topic as “very
useful” and we followed up with 16 customers who asked to be kept informed about the project.
Arranging surgeries to provide customers with the opportunity to discuss their requirements and
concerns proved worthwhile. To date 10 customers have met with us to discuss their experiences
and nine potential sites have been identified to trial M2. See Appendix 11.3
Sept-17
Next event Mar-18
Our first customer working group was held Wednesday 6 September 2017. Seven stakeholders
from a variety of backgrounds joined us. Our presentation covered previous fault level limiting
technologies tried and tested, how our London 11kV network operates, the current mitigation
solutions offered, what power electronics are and the terms of reference for the group.
Many customers who we have engaged with, from the initial DG Customer Forum in February
through to the working group, have shown interest in the technology once maturity levels have
increased and the technology can be used in a BAU situation.
![Page 11: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/11.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 11 of 35
8 Key learning
Engaging with customers has been a vital aspect of this project to date. In addition to finding a customer site for the
M2 trial, it is important to the ongoing success of the technology and the trial, that customer requirements and needs
are discussed and shared in the early stages of prototyping. In order to achieve this, we have undertaken a number of
different customer engagement activities in order to engage with a wide range of customers, but also to talk more in
depth with stakeholders who expressed a particular interest. The learning which we have gained from customer
engagement to date has been insightful and this section discusses our key learning points.
We have showcased a sample of the data as evidence for these learning points, sourced from our customer survey,
surgeries, DG customer forum presentations and Powerful-CB customer working group. A full set of data from these
sources, including a breakdown of customer surgery attendance by customer type and a full survey response dataset
can be found in our Appendices.
General Feedback
86% of survey respondents said fault level
constraints had caused issues in them connecting to the network Survey result
“There are a few [site]
options, within the broader
GB area, where I know fault
level has been an issue.”
Customer surgery
79% of survey respondents said finance was a
concern Survey result
23% of survey respondents said fault level
constraints were the most important issue on the networks at present Survey result
NUISANCE TRIPPING
was listed as the second top concern of survey
respondents
Survey result
77% of those who attended the DG customer
forum Jul-17 rated the project ‘very useful’ DG customer forum Jul-17
CHEAPER, QUICKER connections were the major incentives
Survey result “UKPN have taken a positive pro-
active approach to this serious
problem. The results should assist
the growth of DG on the congested
GB distribution network.”
Powerful-CB customer working group Sept-17
“I think it is really positive, that you realise, you can have a wonderful technical
solution, but it’s really “hearts and minds” with the customer to ensure that
they’re on board, and they understand, what it is you are providing and where
the benefits to them are, because quite often you can stumble on that point!”
Customer surgery
“This project is extremely interesting, in that it offers solutions to a growing problem within the UK electricity networks.”
Powerful-CB customer working group Sept-17
![Page 12: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/12.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 12 of 35
8.1 Powerful-CB has wide scale applicability
Key Learning Point: FLCB technology is of interest to a wide range of customer types from a geographic
spread
Response to the engagement activities has been positive, with strong interest in the project. 86% of survey
respondents have previously encountered issues with fault level. 23% of customers shared their opinion that fault level
constraints were the most important network issue at present, as well as 62% answering that it was an issue equal to
others the network is currently facing. This is encouraging, indicating that there may be many applications of the
technology once the project concludes. It solidifies the justification of the project and shows there is a need to tackle
fault level constraints using new technology.
It has been particularly notable that
many customers were interested in the
wider application of this technology,
beyond the London network and even
beyond the UK Power Networks’
licensee areas. This encouraging
customer feedback will mean that
engagement with other DNOs
throughout the project will be vital to see
the future success of the technology in
the rest of the country. For our project, it
means that engagement beyond our
networks’ boundaries will be important
for future dissemination events.
In addition to this, we have had the opportunity to
discuss this project with a number of customers who
own or operate inverter-fed generation and storage,
both at events and at customer surgeries. While these
generation types are generally not seen to contribute
significantly to fault levels, the interest from these
generators in FLCB technology shows that fault level
constraints are beginning to be of concern to a range of
customer types.
Inverter-fed generators contribute significantly less to fault level than synchronous generators. This means that if an
inverter-fed generator is unable to connect because of fault level issues, it is because there is zero fault level
headroom, hence they can only connect if they can reduce their fault level contribution to zero. For customers wishing
to use fault limiting technology to enable their network connection in these cases, an FLCB is the only device that can
achieve the 100% reduction in fault contribution that is required.
We will continue to engage with the wide customer base throughout the project, through the customer working group
and other external events to continue to gain insight to the applicability of FLCB devices beyond the Powerful-CB trial.
0
2
4
6
8
10
12
14
London
SE
Ea
st
An
oth
er
DN
O r
egio
n
Oth
er
- outs
ide G
B
Mu
lti- w
ithin
GB
Mu
lti- inte
rnatio
nally
8. In which region are you based?
“Fault level headroom is frequently a
problem for our energy storage sites,
and we have been looking at devices
to reduce our fault contribution.”
Customer email
![Page 13: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/13.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 13 of 35
8.2 Identified customers opinions on benefits and concerns
Key Learning Point: Customers have expressed a range of potential preferences and business drivers relating
to Powerful-CB but some key themes emerged relating to finance and technology maturity
One of the key aims of customer engagement
activities to date has been to understand
customers’ views on potential benefits and
concerns relating to trial participation and the wider
use of FLCB technology.
Feedback and data on this theme has reflected customer
interests surrounding costs and connection offers; survey
results have shown that cheaper and quicker connections
are the key drivers in terms of expected benefits. While this
is not surprising, the fact that only 36% of customers
showed firmer connections being a driver is linked to the
wide interest discussed in the previous section.
In terms of technology concerns, finance is rated as the
greatest concern, as 79% of respondents listed this in their
survey answer. A close second, nuisance tripping at 77%
shows operational concerns which are discussed further in
the below section.
0
2
4
6
8
10
12
14P
rom
ise
of a firm
er
con
nection
Ad
ditio
nal fin
ancia
lin
centive
Quic
ke
r C
on
nection
Cheape
r C
onnectio
n
Ab
ility
to o
pera
te in
abnorm
al netw
ork
con
ditio
ns
Fa
ult R
ide thro
ugh
cap
abili
ty Oth
er
4. What would encourage you to install a FLCB at your site? (Please tick as many as applicable and add others in the comment
box)More choice of technology
02468
1012
Sp
ace
Fin
ance
Weig
ht
Nuis
an
ce
Trip
pin
g
Logis
tics o
fin
sta
llatio
n
Inte
rfere
nce w
ith
ancill
ary
serv
ices
Te
chnolo
gy
Ma
turity
Oth
er
5. If you were considering installing an FLCB at your site, what would concern you? (please tick as many as applicable and add others or more information in comment box)
“The fault limiting idea is something I've
had an interest in for some time now. It
has always appeared too costly
especially for larger generators.”
Customer email
“If it allows connection in areas we
could not do before, then £300k
[projected cost for Method 2] is fine”
Powerful-CB customer working group feedback
“How will the [cost] change over time? Will the cost
vary depending on [generator] size?”
Powerful-CB customer working group feedback
“Fault levels are also a large issue in other
DNO regions, we are curious as to if this
might help us in the future.”
Customer email
Our project attracted interest from customers
in other DNO regions and we were pleased
to hear the solution already has an appetite
for deployment outside of our area.
![Page 14: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/14.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 14 of 35
From initial engagement, it has been encouraging that customers who do not have a suitable trial site would still be
interested in engaging further with the project and technology as the technology progresses upwards along the TRL
scale and into BAU applications. This evidence continued into survey results where 21% respondents showed they
would be interested once the FLCB technology is BAU and 37% were interested in engaging with UKPN throughout the
trial on defining requirements.
Throughout surgeries with customers, it has been useful to explore customer concerns surrounding technology
operations further. Discussions surrounding the device operation have often alleviated customer concerns, and have
allowed us to determine where future effort is required in communications and project awareness. A concern around
the environmental conditions for the M2 device to be situated in, for example in a boiler room, will be addressed in a
future design meeting.
Question: Will the FLCB disconnect
the generator or does it just provide
an enhanced level of monitoring and
control to shut off any faults should it
occur at time of network
abnormalities?
Customer surgery
Answer: The idea is that it disconnects really
quickly, so it does not actually contribute to fault
level, so rather than trip you when we are running
abnormally, we would allow you to continue
operating until we actually get a fault. Under these
conditions, your generator is tripped, before you
can contribute current to the fault.
Customer surgery
“We are used to living in a world of
planned and unplanned outages...
For us, adding more capacity is worth
small additional risk”
Customer surgery
As noted in the survey responses, interaction with ancillary services
is a concern for a number of customers. When discussing this in
more detail during customer surgeries, it has been interesting to
listen to different customer views on this matter – with some
accepting interactions with ancillary service contracts as an
acceptable part of their risk profile. This potential area of concern is
one we would like to address further with customers at a future
customer working group event.
9%
18%
55%
18%
How are you able to help?
I’d like to trial a FLCB on my premises as part of my generation project
I’d like to engage during the trial to help UKPN understand customer’s requirements for fault level solutions
I’d like to know more once it’s ready for BAU
I’m not interested in this technology
![Page 15: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/15.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 15 of 35
8.3 Explored potential commercial and logistical arrangements
Key Learning Point: Future success will depend on appropriate commercial and logistical options and
arrangements
Customers have been keen to discuss the connection offer and agreement arrangements for sites using M2 FLCB
devices.
Customers’ opinions on the differing
benefits of the two methods has been a
focus area of engagement activities. Our
initial interaction with customers at the DG
Customer Forum in February 2017 showed
that the majority of customers favoured the
M2 customer located solution. The survey
results show that the majority of
respondents see benefits in both M1 and
M2. These differing results could have a
number of influencing factors including
more answer options (the ability to answer
‘both’ in the survey) and more
understanding of the M1 substation
solution.
“From my perspective … as an end user or developer, I am interested in
the customer version [M2]” Customer surgery
0
2
4
6
8
10
Customer Site Substation No preference - both beneficial No preference - neitherbeneficial
3. Would you have a preference over where an FLCB was located?
“I have seen it happen before, it all goes
swimmingly and then there is different
perceptions of responsibilities for the asset, who
owns it and what happens if it breaks. It would
be good to get [those issues] out of the way
now.”
Customer surgery
![Page 16: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/16.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 16 of 35
Discussions surrounding connection offers and
connection agreements have been prevalent in
engagement activities. Although the initial target
customer base for M2 trial participation consisted of
customers on inhibit connection agreements, it has been
promising to hear from a number of customers to whom
this criteria does not apply. In fact, many of the
customers who have come forward with potential trial
sites are not on such a connection agreement and only
36% of survey respondents indicated that a firmer
connection would be an incentive of interest. Instead,
many customers operate sites where existing generation
is connected but there is a desire to increase the export
capacity in the coming years, and they may not be able
to due to fault level. The exact nature of connection
offers for sites with FLCB devices installed will be a
focus area of work when engaging with customers and
internal stakeholders as the project progresses.
Survey answers surrounding the installation/ownership/operation/maintenance responsibilities were diverse – there
was no clear preference amongst survey respondents and this continues to provide varying preferences as we
continue further discussions with customers. This is certainly an area that will need more focus moving forwards,
particularly when looking beyond the trial site. Decisions into the offerings made to customers will be vital in ensuring
successful uptake of the FLCB technology.
“I would expect the
installation works to be a
contestable element [of the
connection offer]”
Powerful-CB customer working group
“From a financial point of view, you want to know
how often your generator will be switched off; no
one will lend money if the business case does not
stack up!”
Powerful-CB customer working group
0123456789
10
Insta
llatio
n y
ou
Insta
llatio
n 3
rd p
art
y
Ow
ne
rsh
ip y
ou
Ow
ne
rsh
ip 3
rd p
art
y
Op
era
tio
n y
ou
Op
era
tio
n 3
rd p
art
y
Ma
inte
na
nce y
ou
Ma
inte
na
nce 3
rd p
art
y
6. If you were to have an FLCB installed at your site, who would you prefer to carry out these responsibilities for the equipment?
‘You’ meaning customer
![Page 17: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/17.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 17 of 35
9 Challenges, mitigations and next steps
The financial considerations around the installation and operation of FLCB devices and the connection agreement that
follows is of particular interest to the project team moving forwards.
9.1 Challenges and mitigation methods
When discussing the needs of customers in relation to the trial, the project team have aimed to ensure participation
from a wide stakeholder group. In order to achieve this, we have identified a number of potential challenges that could
prevent achieving wider stakeholder engagement and accordingly a number of methods to mitigate the potential impact
of these challenges.
Potential Challenge Mitigation Methods
Customers have engaged with us
more about M2 than M1
- Our survey asks questions relating to both methods
- We plan to hold a customer working group focusing on M1 in the future
- We engaged with a number of customers, not only those interested in
participating in the trial
The customers who engage are
not representative of the wider
generator community
- By making use of existing internal communication channels such as the
DG customer forums, DG customer mailing list, we engaged with a
number of different customer types
- By making use of external communication channels through our
connections with the Association of Decentralised Energy
Customers may not want to
engage face to face
- By publishing a SurveyMonkey which allowed anonymity
- By providing paper copies of the survey for people to complete and return
offline
Customers only want to engage
through channels they already
know
- By working with the relevant UKPN connections teams to engage with
customers
- Having members of the connections teams present during customer
surgeries
Reduced interest from
customers due to capacity range
of device
- Ensuring conversation with customers is open to both M1 and M2 devices
to widen the interest and participation
- Capturing future requirements for product evolution
Throughout the remainder of the trial, we will continue to manage these challenges as well as update with new
challenges that we become aware of. We will publish these in our project progress reports.
9.2 Next steps
The work in understanding customer needs will continue and develop as the trial moves forward. We will continue to
engage with customers and other stakeholders on this topic and continue to report on learnings through project
progress reports. To date, our activities in understanding customer needs have given us a good overview and
introduction to the key requirements and concerns of customers.
Our next steps will be to dig deeper into the areas that interest stakeholders, in particular surrounding the financial
aspects of the technology and its application on our electricity networks. We will review customers’ technical questions
and concerns with our technology partners and aim to modify the design where possible, to best meet customers’
decision parameters.
Those who attended the customer working group event held 6 September 2017 were engaged and willing to interact in
an open forum to discuss their concerns. We plan to run further customer working group events with invited guest
speakers from a number of organisations, including a site visit of the trial sites at a later point during the project.
![Page 18: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/18.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 18 of 35
The range of customer engagement activities and approach has enabled breadth and depth in discussion, and we will
continue with this approach as we move forwards in the project. The activities currently planned are outlined below:
Planned Activity Description Indicative dates/milestones
Further customer working groups - Plan a schedule of future
working group events
- Engage with external
speakers on relevant topics
- Target March 2018 for next
working group to include
details on trial participants
Public Seminar/Webinar - Plan a schedule of learning
events
- Target summer 2018 for
dissemination of trial
learning to far
Further Customer Surgeries - Continue to engage with
customers who are
interested in becoming trial
participants
- Site Selection to be carried
out in November 2017
Draft Trial Contract / Connection
Agreement
- Contract negotiation also
allows for commercial
arrangements to be open to
discussion for the BAU case
- Internal stakeholder
engagement required
![Page 19: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/19.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 19 of 35
10 Conclusion
This first Powerful-CB SDRC report has showcased our learning so far in the task of understanding customer needs of
the Powerful-CB methods – an area where the project team have made good progress to date. A number of formal
customer engagement activities have taken place which have led to a better understanding of customer requirements
and a greater awareness of the project amongst potential M2 trial participants. Customer and wider stakeholder
engagement has been positive, with a wide range of different stakeholders expressing interest in the technology even if
they are not eligible to be trial participants for M2. This interest shows good promise in transitioning the technology
from innovation trial to BAU.
We will continue to refine our understanding of customers’ requirements as the project progresses. Customer
engagement so far has identified a number of areas that require further focus and attention, in particular surrounding
the commercial aspect of the technology, not just capital expenditure but connection agreements for future projects
using the technology in both methods. A number of other activities will attract focus in WS3 moving forwards,
noticeably engagement with other DNOs and better understanding of CHP and district heating applications through
interactions with the ADE and the GLA. WS3 activities will continue to be reported in project progress reports and
future SDRCs.
In summary, the aims of WS3 and how and when they will be evidenced is shown in the below table:
Workstream 3 Aim Evidence Where evidence is found
Inform stakeholders of what the
two methods are and what they
can technically accomplish for
them
- Engagement activities
- Slide deck used in customer
working group
- Appendix 11.2 & 11.3
- Appendix 11.6
Gather information on customer
requirements and criteria for
assessing the suitability of the
two methods
- Answers to survey questions
- Data from customer
surgeries
- Appendix 11.4
- Appendix 11.5
Better understand the CHP and
district heating use case for both
methods
Engagement with:
- ADE
- GLA membership
- Appendix 11.7
- Introduction meeting 30
November 2016, participation in
customer working group 6
September 2017. Follow up
meeting to be arranged
Gather insight on the customer
expectations for how the
technologies will work best for
their needs
- Answers to survey questions
- Data from customer
surgeries
- Appendix 11.4
- Appendix 11.5
Explore trade-offs between
different needs and technical
constraints
- Discussions at customer
working group
- Appendix 11.6
Delivery of the agreed number of
engagement activities with
customers
- Customer engagement
overview
- Section 8
![Page 20: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/20.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 20 of 35
11 Appendix
11.1 Stakeholder engagement summary
Our plan captures whom we have engaged with, their interest level and if they wished to collaborate, to consult or if
they wish to be kept informed about the project.
Internal stakeholders include our Major Connections teams, Distribution Planners and Service Development team. We
have attended two other DNO dissemination events (WPD FlexDGrid and ENWL RESPOND).
55 stakeholders, covering developers, installers, consultants, independent connection providers, government,
associations and universities have engaged with us, with the following roles:
Collaborate 17;
Consult 8; and
Inform 30.
Communication channels we have used include, the DG customer forums, SurveyMonkey, LinkedIn, EventBrite and
the ADE.
We have also shared details of our project with the DG mailing list. This distribution list is managed by our Service
Development team and incorporates over 700 stakeholders subscribed to receive information related to DG.
We will be presenting at The Low Carbon Networks & Innovation conference 6 December 2017. This event will provide
us with the opportunity to further disseminate the project’s learning to date.
![Page 21: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/21.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 21 of 35
11.2 DG customer forum 9 February 2017
The DG customer forum is a UKPN event held bi-annually, to provide our DG stakeholders the opportunity to give their
feedback on our service, consult on our processes and procedures, hear our plans and help us to develop future
initiatives. The event was open to all, which means the audience was diverse covering asset owners, connection
providers, consultants, community energy groups, developers, local authorities and utility companies.
We utilised this event6 to assess the interest of the project and to help identify potential trial participants.
6 http://www.ukpowernetworks.co.uk/internet/en/our-services/documents/DG_customer_forum_presentation_9_February_2017.pdf
9%
18%
55%
18%
How are you able to help?
I’d like to trial a FLCB on my premises as part of my generation project
I’d like to engage during the trial to help UKPN understand customer’s requirements for fault level solutionsI’d like to know more once it’s ready for BAU
I’m not interested in this technology
05
101520
Asset Owner CommunityEnergy
Consultant DG Developer Energy/Utilitycompany
IndependentConnections
Provider
Operator Owner Storage andflexibleservicesprovider
Stakeholder group
05
10152025
AD Biomass CHP Diesel Gas Other Solar PV Steam Storage Waste Wind
Technology type
14
0 5 10 15 20 25 30
<50kW
>50kW to <250kW
>250kW to <1MW
>1MW to <5MW
>5MW to <50MW
>50MW
Capacity bracket
35%
65%
Which do you think is the best place to install a FCL or FLCB?
DNO Substation Customers' premises
![Page 22: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/22.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 22 of 35
11.3 DG customer forum 18 July 2017
Customers who showed particular interest through
any other engagement activity were invited to
participate in an individual customer surgery with
the Powerful-CB team, to discuss any particular
interest or concern further. These surgeries have
been predominantly used to discuss potential trial
sites for M2 with 8 surgeries resulting in 9 potential
trial sites being identified. A number of relevant
thoughts and comments have been raised and
noted by the project team.
0
5
10
15
Asset Owner CommunityEnergy
Consultant DGDeveloper
Energy/Utilitycompany
IndependentConnections
Provider
Operator Other Owner Storage andflexibleservicesprovider
Stakeholder groupHousing
associationUtility
8
0
20
40
AD Biomass CHP Diesel Gas Other Solar PV Steam Storage Tidal Waste Wind
Generation type
22
0 10 20 30 40
<50kW
>50kW to <250kW
>250kW to <1MW
>1MW to <5MW
>5MW to <50MW
>50MW
Capacity bracket
16 customers
expressed an
interest in the
project
31%
![Page 23: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/23.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 23 of 35
11.4 Powerful-CB survey
The survey questions and answers are found in the following pages:
0
2
4
6
8
10
12
14
Yes No - neverattempted to
connect
No - never causeda problem
1. Have Fault Current Headroom Constraints ever caused an issue for you connecting
generation to a network?
0
1
2
3
4
5
6
7
8
9
10
CustomerSite
Substation Nopreference -
bothbeneficial
Nopreference -
neitherbeneficial
3. Would you have a preference over where an FLCB was located?
0123456789
Mo
st im
po
rtan
tis
sue
An
im
po
rta
nt
issue
equ
al to
oth
ers
An
im
po
rta
nt
issue
but
oth
ers
are
more
imp
ort
an
t
Not
an
urg
en
tis
sue
2. How important to you is it to improve methods of managing fault current on the network in comparison to other network issues? E.g. voltage constraints, thermal constraints, reverse power flow, upstream
transmission constraints?
Screen shot of online survey
![Page 24: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/24.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 24 of 35
0
2
4
6
8
10
12
Sp
ace
Fin
an
ce
We
igh
t
Nu
isa
nce
Tri
ppin
g
Log
istics o
fin
sta
llatio
n
Inte
rfe
ren
ce
with
ancill
ary
se
rvic
es
Te
ch
no
logy M
atu
rity
Oth
er
5. If you were considering installing an FLCB at your site, what would concern you? (please tick as many as applicable and add others or
more information in comment box)
0
1
2
3
4
5
6
7
8
9
10
Insta
llatio
n Y
ou
Insta
llatio
n 3
rd p
art
y
Ow
ne
rsh
ip y
ou
Ow
ne
rsh
ip 3
rd p
art
y
Op
era
tio
n y
ou
Op
era
tio
n 3
rd p
art
y
Ma
inte
na
nce y
ou
Ma
inte
na
nce 3
rd p
art
y
6. If you were to have an FLCB installed at your site, who would you prefer to carry out
these responsibilities for the equipment?
0
1
2
3
4
5
6
7
8
Inte
reste
d in
tri
al
Inte
reste
d in
he
arin
g m
ore
once
BA
U
Inte
reste
d b
ut site
doe
s n
ot
qua
lify
Inte
reste
d to
en
ga
ge
on
futu
re r
eq
uire
me
nts
Not
inte
reste
d
7. How would you like to engage with this technology?
0
2
4
6
8
10
12
14
Pro
mis
e o
f a
firm
er
con
nectio
n
Ad
ditio
na
l fina
ncia
lin
ce
ntive
Qu
icker
Co
nn
ectio
n
Che
ap
er
Con
ne
ction
Ab
ility
to o
pera
te in
abn
orm
al n
etw
ork
con
ditio
ns
Fa
ult R
ide
thro
ugh
cap
abili
ty Oth
er
4. What would encourage you to install a FLCB at your site? (Please tick as many as applicable and add others in the comment
box)
More choice of technology and system
![Page 25: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/25.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 25 of 35
0
2
4
6
8
10
12
14
Lon
do
n
SE
Ea
st
An
oth
er
DN
O r
egio
n
Oth
er
- o
uts
ide
GB
Mu
lti- w
ith
in G
B
Mu
lti- in
tern
atio
na
lly
8. In which region are you based?
0
1
2
3
4
5
6
Custo
me
r (g
en
)
Custo
me
r (l
oa
d)
DN
O
Acad
em
ic
Indu
str
y b
od
y
Ge
nera
tor
ma
nu
factu
rer
Cir
cu
it B
rea
ke
rm
an
ufa
ctu
rer
Oth
er
(sp
ecify)
9. What type of organisation do you belong to? (Please tick as many as applicable and
write others in the comment box)
![Page 26: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/26.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 26 of 35
11.5 Customer surgeries
We followed up with interested stakeholders by inviting them to join us either by Skype call or in person to a customer
surgery. The surgeries were hosted by, the Project Lead, Workstream Lead and a Distribution Planning Engineer. By
having the right people in the room, we were able to answer questions and alleviate some concerns as well as capture
issues that need addressing. The quotes and comments from these surgeries are provided throughout the document.
Surgery Breakdown:
Surgery Customer Type (e.g. generator, consultant) Potential M2 trial site
identified? (Y/N)
1 Manufacturer and Energy Management Advisor Yes
2 Consultant Yes
3 Provider Yes
4 Consultant Yes
5 Consumer Yes
6 Industry body No
7 Energy Development Company Yes
8 Facilities Manager Yes
![Page 27: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/27.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 27 of 35
11.6 Customer working group 6 September 2017
Invitation shared with:
DG mailing list (782 stakeholders); and
Kellie Dillon’s (Innovation Workstream Lead 3 & 4) LinkedIn connections (circa 400).
Eventbrite:
204 views of invitation; and
7 attendees.
Feedback questions Satisfaction
The location & facilities were accessible & satisfactory 86%
The forum was appropriate for my job role 92%
The information coverage was relevant & necessary 94%
The facilitator(s) responded to questions in an information & satisfactory manner 96%
I felt engaged throughout the workshop 90%
The facilitator(s) encouraged healthy & effective discussions 94%
Overall I felt the session was productive and valuable 94%
Would you be interested in attending future customer working groups? 90%
Powerful-CB customer working group presentation http://bit.ly/P-CB_CWG_presentation_06-09-17
![Page 28: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/28.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 28 of 35
11.7 Association of Decentralised Energy (ADE) membership forums
We were invited to speak about Powerful-CB at two ADE events through our relationship with the ADE and their
support of this project.
ADE District Heating and Cooling forum: 11 October 2017
14 members attended the forum. We previously shared the link to our survey and invitation to our customer working
group, with the ADE mailing list.
ADE Commercial forum 18 October 2017
We presented to 11 members of the Commercial forum.
“Does the device have to be installed
inside or can it be outside?”
ADE District Heating and Cooling forum
“We have a fault level issue outside
of your area, what should we do?”
ADE Commercial forum
“I thought your presentation at the ADE was about the best piece of
technical news for CHP developers in the last couple of years”
Customer email
“Talk to us, we still need to capture
the issues you are facing to help
us evolve the solution”
UKPN response
“We are at the early design stage
so can adapt to suit the
environment”
UKPN response
![Page 29: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/29.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 29 of 35
11.8 Frequently Asked Questions – Method 2 (Applied Materials)
What is the technology about?
Connecting generators to electricity networks requires that the network has the capacity to accept the generator
connection. A number of criteria need to be met, including voltage control, thermal capacity of the conductors and that
the network infrastructure can handle the force and heating effects of a short circuit. The device we are trialing is
designed to switch off the generator very quickly when there is a network fault or disturbance such that the generator
does not provide any energy into the fault.
How does it work?
Power electronic switches (Insulated Gate Bipolar Transistors) are stacked in series and parallel configurations to carry
the current and switch it off when a fault occurs. Current transformers measure the magnitude and derive the rate of
change of current and when thresholds are exceeded. The switching process is very fast - 6µs, so there is sufficient
time to determine if the current will exceed the capacity of the switches.
Are these IGBTs new technology?
Not really – they have been used since the 1980s and form the basis of many variable speed industrial drives and
generators. They are however new to the electricity distribution network industry.
Industrial variable speed drives have harmonics associated with them. Will your system cause harmonics on
my site?
No – this is not an issue as the switches are on (or off) continuously.
IGBTs have failure modes which include failure to short circuit – how do I know that the device will work?
We engineer the device to avoid stressing the IGBTs with over-voltage, over-current and heat. We also periodically test
the operation of the device seamlessly so that the generator is not disturbed, but we prove the operation of the
switches.
How do you remove the heat from the unit?
We marshal the heat to an exit point on the top of the unit and from there ducts are needed to take it out of the room.
How do you connect the unit into my network?
The device is cable connected. We are providing top or bottom cable entry points.
How much current and voltage can it take?
Up to 400A, (maybe 500A with some testing), so about 7.5MVA at 11kV.
How big is the unit?
We are targeting a device that is 2.4m deep x 2m long x 2.2m tall. A possible re-configuration would be 1.2m deep x
4m long x 2.2m tall. The squarer configuration would need front and rear ventilation and access (about 1m), with cable
connection access at one end (about 1m). The long, thin configuration would need front ventilation and access with
cable connection access at both ends.
![Page 30: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/30.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 30 of 35
In addition there will be for this installation, isolators and a bypass circuit breaker. The details of the installation will be
site specific.
Can the unit be delivered/assembled in/from parts?
The unit is designed to be delivered/assembled as a single unit, or broken down into parts that can be carried through
a standard door. We recognize for retro-fit installations that unusual solutions to space constraints, e.g. installing into a
substation basement may be necessary.
How heavy is the unit?
This has not yet been calculated but a few tonnes is likely to be the answer.
What are the risks to my site?
While there are a whole range of risks associated with installing new equipment, we think that we will address most of
them in the design and installation procedures. Residual risks result from the fast acting nature and limited overload
capability of the base switching technology.
Nuisance tripping may occur when there is a fast rising spike caused by partial discharge, lightning, energizing
transformers or starting motors.
Site challenges will be captured and disseminated in future reports.
What are the advantages to my site?
The site will be protected from the grid were there to be a fault on the site side of the limiter. This will mitigate damage
to the rest of the site infrastructure. The site (or future sites) will also be able to connect to the UKPN network without
further reinforcement work. Finally, the technology can potentially be developed to integrate fault ride-through
capability, allowing future connections to the grid.
What are the benefits to UKPN and Applied Materials?
UKPN will have another tool in the toolbox to allow the connection of generation, desirable to support the expansion of
CHP in London. Applied Materials get a showcase for their mark 2 solid state fault current limiter.
![Page 31: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/31.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 31 of 35
Is this the first installation?
A similar piece of technology has been installed on a transformer neutral in Victoria, Australia. It was designed to
detect fault current flowing to earth and disconnect the neutral point with the hope that this would prevent bush fires.
The site in Australia is a bush fire testing site where they drop a cable to the ground to try to ignite a specially prepared
piece of the bush (in a container). The limiter has seen over 800 faults, and works as intended but sadly the
capacitance in the cable leaves enough residual current to discharge resulting in bush fires.
How does the installation differ from mine?
The Australian installation is at 22kV, in a transformer neutral point and sees little load current. Yours has much more
current and three phases, and the periodic testing of the IGBTs is new for this project to meet the UK safety case. In
fact there is an independent assessment of the safety case for deploying IGBTs in this application for this project.
Can I visit the installation?
Arrangements for site visits will be discussed with the trial participant. Site access will depend on a number of factors
and those who wish to visit the operational site should register their interest with the Powerful-CB team.
What impact will it have on site protection schemes?
This will be investigated on a site by site basis once a potential trial site is identified.
What happens if it develops a fault or I no longer want to use it?
We will install a bypass and isolation system around the limiter. Operation of the bypass would require the network fault
level to remain within limits.
How do I bypass it?
This will be worked out with UKPN later in the trial.
How do I operate it?
The operations of the device have not been completely specified, however it is likely to require little operation if any at
all. An automatic re-closing scheme is likely to be part of the device once any residual safety issues are resolved.
Can I use it as a circuit breaker?
No – this is a specialist piece of equipment which provides a huge reduction in fault current contribution (nearly 100%)
but does not completely isolate the fault from the generator. It does not for example provide galvanic isolation.
What maintenance does it need?
The unit has fans that suck in filtered air. The filters need to be replaced/cleaned on a frequent basis (as yet
undetermined). The cooling fans also have a working lifetime and will require replacement after several years (again,
frequency undetermined). Likewise uninterruptable power supply batteries only have a finite life and will require
replacement too. The latter two maintenance activities will require outages and are expected to be undertaken by
Applied Materials or its associates. Fan replacement/cleaning could be done by the customer.
Who owns the unit at the end of the project?
Assuming the project is successful, a reference site is more important to Applied Materials than the cost of the
equipment. They will be willing to gift the device to either UKPN or the customer as appropriate.
![Page 32: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/32.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 32 of 35
What power does the unit consume?
Energy consumed will include 36 x 20W for the cooling fans, + PLC, Communication equipment, display and,
potentially, a duct fan. Approximate total consumption will be under 3kW in total.
Are there any other losses?
There are some losses associated with the semi-conductor devices, hence the cooling. Approximately 1kW in terms of
power consumption for the fans and control and around 4kW at full load for thermal losses. A high impedance
transformer or a current limiting reactor may be 10X these losses.
Applied Materials is an American Company, is there a local contact?
Yes – Applied Materials has a UK presence and a specialist engineer based in the UK.
What do you want from me?
A demonstration site location, acceptance of the losses/power requirements, access to site for installation,
maintenance, customer visits and the like, photographs and videos, background information on your installation and
access to the data gathered by the system (like currents, faults, etc.) along with background data which we can use for
publications, marketing, etc.
![Page 33: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/33.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 33 of 35
11.9 Understanding Customers’ Requirements information gathering form
Safety is at the heart of everything we do. We will be working closely with our safety case expert
Frazer-Nash Consultancy Ltd, to develop the engineering knowledge necessary to safely and
effectively demonstrate Fault Limiting Circuit Breakers (FLCBs).
Switchgear will be installed to enable the FLCB to be isolated and by passed if necessary.
Decision parameters
Inhibit/Intertrip
A hard-wired protection system that automatically disconnects generators from the network under
pre-defined conditions, typically in the event of a transformer outage or other abnormal network
configuration that causes elevated fault levels.
Powerful-CB relationship to inhibit
Under traditional “inhibit scheme”, your generator would need to disconnect and would be unable
to export whenever our network is running in an abnormal configuration. If you installed a FLCB
through Powerful-CB, your generator would be tripped only if a fault occurs on our network, and
you would be allowed to restart your generator after a few seconds.
1. How long would it take you to restart and resynchronise your generator after an
unplanned generator trip?
2. Can you resync your generator remotely and is this done through a third party?
3. Would an inhibit scheme ever be preferable to Powerful-CB?
4. What are your biggest concerns and why?
a. Damage to the generator
b. Restarting time
c. Impact on site operations
d. Contractual obligations
e. Penalty payments from capacity and balancing services contracts
f. Logistics of installation
g. Commercial arrangements
Cost
5. What generation capacity would make your business case feasible if you were to
incorporate Powerful-CB at a cost of circa £300k? Please give details if possible
6. For your business case, what is the optimal cost? Please give details if possible
7. How would you prefer financing work for the substation solution?
Shared amongst generators, based on capacity or other?
Please share any thoughts or requirements you have on this matter.
![Page 34: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/34.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 34 of 35
Space
The Powerful-CB is modular and can be stacked in two ways:
2.4 deep x 2m long x 2.2m tall
1.2m deep x 4m long x 2.2m tall
8. Do you have a preference? Please explain:
9. Would your site accommodate either solution?
Weight
10. The unit is likely to weigh a few tonnes, would this hinder its use at your site(s)?
Technical
11. Would your generator be impacted from being abruptly disconnected?
12. Is ride-through faults something in which you are or would be interested in?
a. Would the additional footprint of this device be a showstopper?
b. What level of fault limiting can your generator handle without causing a
load rejection trip?
Frequency Response
13. Is your generator used for ancillary services? If yes
How many unplanned trips/ how many interrupted minutes per year would cause a
problem for your ancillary services contracts?
Is your contract via an aggregator?
Commercial
14. As part of the trial, we, our partner (Applied Materials) and potentially other clients would
need to access the trial site.
Do you envisage any of the above to be an issue for you?
What kind of access arrangements would you want in place? (host arrangements, access
cards, CSCS)
Operation
15. Are you looking to convert an existing connection agreement from Short Term Parallel to
Long Term Parallel?
![Page 35: SDRC 9.3.1 Learning Report October 2017 · A hard-wired protection system that automatically disconnects generators from the network under pre-defined conditions, typically in the](https://reader034.vdocument.in/reader034/viewer/2022042321/5f0aab197e708231d42cc040/html5/thumbnails/35.jpg)
SDRC 9.3.1 Understanding customers’ requirements
UK Power Networks (Operations) Limited. Registered in England and Wales. Registered No. 3870728. Registered Office: Newington House, 237 Southwark Bridge Road, London, SE1 6NP Page 35 of 35
11.10 Site Selection Criteria form
Criteria Essential Desirable
Location Within UKPN network area Within London
Connected to a fault-
level constrained
substation
Generation Type Synchronous
Generation Rating 1MW minimum
5MW maximum
Connection Type Non-Firm (inhibit)
Generator Operation Regular
Customer Operation Critical business activities not impacted
by trial activities
Willingness to be involved in
media/outreach
Space Enough space to install the FLCB
2.4m deep x 2m long by 2.2m tall
Site name and address
Meter Point Administration
Number (Export and
Import)
Generator type
Fuel type
Maximum Export Capacity
Maximum Import Capacity
How many hours per year
does your generator run?
Any special Connection
Agreement terms?
You can contact us with any questions by email to [email protected]
Please note the cost of the installation and device will be covered by the project. If you have any questions please
contact us on the details below:
Kellie Dillon | Innovation Workstream Lead | 07875 116 657 | [email protected]
Laura Daniels | Innovation Project Lead | 07840 386 059 | [email protected]