seahurst park, the largest shoreline park between seattle ... park... · project is the largest...
TRANSCRIPT
Seahurst Park, the largest shoreline park between Seattle and Tacoma, is within a highly urbanized watershed, where 60% of marine shorelines are hardened with bulkheads. The project is the largest bulkhead removal and beach restoration project on Puget Sound.
Seattle
Olympia
Victoria
Haro
Strait
P
ug
et
So
un
d
Tacoma
Strait of Juan de Fuca
WASHINGTON
Seahurst ParkBurien, Washington
Watershed Boundary Seahurst Park
Project landscape architects played a key role in a regional shoreline restoration and conservation prioritization, a scientifi c analysis focusing on 90 miles of Puget Sound shoreline. Seahurst Park emerged as a key site for potential salmon habitat conservation and restoration.
Vashon Island(Uninc. King Co.)
Maury Isla
nd
Seattle
Burien
Federal Way
Des Moines
NormandyPark
ReachMagnolia
Elliott Bay
Burien
Burien to Des Moines
Des Moines to Federal Way
East Maury
Study Area Drift Cells
Seahurst Park
East Vashon
North Vashon
West Vashon
West Quartermaster
Inner Quartermaster
East Quartermaster
Net Shore DriftAdapted from Johannessen (2005)
Vashon Island(Uninc. King Co.)
Maury Isla
nd
Dockton
Elliott Bay
DumasBay
Magnolia
Lincoln Park
Seattle
Burien
Federal Way
Des Moines
NormandyPark
Current FunctionPercentile of Shoreline Length
90% - 100% High Function
80% - 90%
60% - 80%
40% - 60%
0% - 40% Low Function
Existing Habitat Function
Seahurst Park
Ecosystem Processes
Conceptual Model of Ecological Processes and Salmon Responses
Natural Process Controls
Combine to Create and Maintain
Human-habitat Interactions: Stressors and Management
Habitat:• Biotic• Physical• Chemical
Salmon Responses:• Individuals• Populations• Evolutionary
SignificantUnits
Park amenities were in vulnerable places, armor degraded habitat and
limited beach access.
Natural landslides/sediment supply were cut off from the beach, lowering
it 3–4 feet over 30 years.
Armoring increases wave refl ectivity and erosion, leading
to more armor.
Existing Grade: Concrete Bulkhead
Proposed Grade: Restored Beach and Wetland
Section C: North Shoreline
Existing Path
Section B: Central Shoreline Section A: South Shoreline
Remove Rock and Gabions / Restore Beach
Existing Grade: Concrete Bulkhead
Proposed Grade: Restored Beach and Public Access
Existing Grade: Gabions
Proposed Grade: Restored Beach
Relocated Trail
Project landscape architects led the master planning team that analyzed, designed, and executed a multi-objective project focused on balancing ecosystem restoration, recreation, environmental education, and coastal resiliency with signifi cant stakeholder and community outreach. Master Plan - Overall Park
City of Burien Parks, Recreation & Cultural ServicesCoastalGeologicService
Consultant Team
0 400
ApproximateScalein Feet
LegendExistingParkBoundary
ParkAcquisition
TrailorConservationEasement
ParkEntry
InvasivePlantRemoval/NativePlanting
NativeConiferReforestation PlantingRoadandParking
UnpavedRoad
MajorTrail
MinorTrail
TrailBridgeHighlineSeniorCenterSiteandAdjacent PropertiesAcquisition
Pedestrian Connection
Salmon CreekRavineOpenSpace
ShorewoodNeighborhood
“Plant Community” Trail LowerParkingLot(SeeShorelinePlan)
HurstwoodNeighborhood
“Geology”Trail
“Nearshore”Trail
Picnic Shelter/LawnArea
CreekandWetlandRestoration
MainAccessRoadandParking
BrownPropertyAcquisition
“Water”Trail
Upper ParkingLotwithTurnaround
SeahurstNeighborhood
Hurstwood Neighborhood
Shorewood Neighborhood
LegendExisting Park BoundaryPark AcquisitionTrailor Conservation EasementPark EntryInvasive Plant Removal/Native PlantingNative Conifer Reforestation PlantingRoad and ParkingUnpaved RoadMajor TrailMinor TrailTrail Bridge
Brown Property Acquisition
Picnic Shelter/Lawn Area
Creek and Wetland RestorationMain Access Road and Parking
Lower Parking Lot
Puget Sound“Nearshore” Trail
Upper Parking Lot with Turnaround“Water” Trail
“Geology” Trail
Ambaum Blvd
13th
Ave SW
Senior Center Site and Adjacent Properties Acquisition
Pedestrian Connection
“Plant Community” Trail
Ravine Open Space
Seahurst Neighborhood
Master Plan – Overall Park
Existing Grade: Gabions
Trail
Restored Natural Beach
Picnic Shelter Picnic Area & Lawn
Restore Native Shrub Understory
Preserve Creek Delta
Expand Lower Parking Area
“Heart of the Park”Concentrated Park Development Area
Beach Access Steps
Restored Central Beach
Main Path & Emergency Access
ADA Forest Trail
Shoreline Environmental Education Area
Rocky Tidepool Habitat
Marine Technology Lab
Ramp to Beach
Shoreline Conservation Area Master Plan – Shoreline
Before
After
During
To restore ESA-listed salmon habitat, improve recreation access and educational uses, and improve infrastructure resilience to sea level rise, shoreline armor was removed, facilities and infrastructure were relocated, and a softer, more fl exible beach was designed.
The restoration approach reconnected the bluff-to-beach sediment supply. Softening and rebuilding the beach also decreased erosion, which is exacerbated by the increased wave refl ection and scour that results from shoreline armor.
Before Project
After Project
Landslide Material
Steep Unstable
Bluffs
Park Upland Fill & Utilities
Seawall Toe & Perched
Beach Armoring
Beach Lowering Wave Refraction Sediment Scour
Puget Sound
PowerWater
Sewer
Landslide Material
Relocate Park Facilities & Utilities
Landward
Beach Reconstruction
Puget Sound Projected Sea Level Rise
Restored Beach & Riparian Zone
Bank
Back
shor
e
Beac
h Fa
ce
Low
Tid
e Te
rrac
e
RIPARIAN ZONE INTERTIDAL ZONE
LOW TIDE TERRACE
SUBTIDAL ZONE
NEARSHORE / COASTAL ZONE
Erosion
Landslides
Littoral D
rift
Mechanical Energy
Courtesy of King County. Used with permission
Natural and designed sediment accretion zones (areas that catch and hold sediment) could support upland recreation and education facilities without hard armoring. Ecological processes and site uses informed a sustainable, restorative design strategy.
The project restores habitat from the intertidal zone, through wetlands, and up into the overhanging riparian vegetation layer; this restoration with improved water quality, will benefi t a wide variety of species, including salmonids and the species they rely upon.
The project team engaged with education programs, including the Seattle Aquarium Beach Naturalist Program, Highline School District’s Marine Technology Lab, and the Environmental Science Center to ensure new park features would add lasting value to their missions.
The restored, daylighted stream near the Environmental Science Center building provides 30 cubic yards of natural beach-material delivery each year. This material, formerly a maintenance problem that was trucked off site, now adds to the long-term sustainability of the project.
Seahurst Park provides opportunities to touch nature in a culturally and economically-diverse community. The beach and fi ve daylighted streams are popular with children and families from Burien and the wider Seattle-Tacoma region.
The project removed 90% of the park’s shoreline armor, leaving in place only a small vestige to protect one of the site’s two educational buildings. The beach was restored throughout the park and in front of this remaining bulkhead.
Focused beach access points were entirely reconstructed, and an ADA-accessible trail and emergency access route to serve environmental education buildings runs the length of the project.
Seahurst Park seamlessly integrates recreation access, educational facilities, and restored habitats including beachgrass-planted backshore areas, emergent ahd shrub-planted wetlands, and multi-layered riparian zones.
A combination of planning and analysis, design, and community involvement transformed the park, from armored and unsustainable to more natural, fl exible, resilient, and ecologically sound.