8/16/2010 1 The Ohio State University William Oxley Thompson Memorial Library Memorial Library Renovation & Addition 2009 AD original construction 1913 major revisions/additions 1950, 1965, 1977 Presented By Stephen Metz, PE, LEED AP Shelley Metz Baumann Hawk Inc Shelley Metz Baumann Hawk, Inc. Project Team Architect Structural Engineer MEP Engineer Civil Engineer Acock Associates Architects / Gund Partnership Shelley Metz Baumann Hawk Heapy Engineering EMH&T Landscape Consultant Construction Manager Concrete Contractor Steel Erector Steel Fabricator Demolition Contractor MSI TurnerSmoot Lithko Contracting Columbus Steel Erectors Concord Fabricators Lowendick Original 1913 Allen & Collins plan

Upload: others

Post on 05-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

1

The Ohio State UniversityWilliam Oxley Thompson

Memorial LibraryMemorial LibraryRenovation & Addition

2009 AD

original construction 1913major revisions/additions 1950, 1965, 1977

Presented By

Stephen Metz, PE, LEED AP Shelley Metz Baumann Hawk IncShelley Metz Baumann Hawk, Inc.

Project TeamArchitect

Structural EngineerMEP EngineerCivil Engineer

Acock Associates Architects / Gund Partnership

Shelley Metz Baumann HawkHeapy EngineeringEMH&T

Landscape ConsultantConstruction ManagerConcrete ContractorSteel ErectorSteel FabricatorDemolition Contractor

MSITurnerSmootLithko ContractingColumbus Steel ErectorsConcord FabricatorsLowendick

Original 1913 Allen & Collins plan

Page 2: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

2

1950 Addition

1965 Grand Reference Room “Addition”

1977 Addition

Page 3: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

3

2002 Floor Plan

Functional Evolution

1950:The Main Library primarily as a warehouse for print media

2009:The Main Library primarily as a place for peopleto gather, study, collaborate, access information, & conduct research

2009 Renovation Winners & LosersActive/social/dynamic areas Collection size

(i.e. atria, café, stairs)  Collection DuplicationWiFiPower accessibilityQuiet study Individual & group studyPersonal spacesComputer work stationsReading roomsExhibit spaces & GalleryHeritage Display (President Portraits)Daylighting

Design Schemes

To save the tower or not to save the tower….

Page 4: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

4

Page 5: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

5

Evolution of the Oval

Page 6: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

6

Renovated  Spaces

Original Grand Reference Room

1965 Grand Reference Room “Addition”

Fireplace Gift of 1912

Page 7: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

7

1950 OSU Seal – Within the new East Atrium

New Spaces

Existing Tower Attic Tower Reading Room

Existing Tower Uses

Page 8: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

8

Page 9: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

9

Structural Systems1913 Building – Structural Steel / Brick Bearing WallsTower – CIP Concrete Two-Way Slab

– Composite Steel / Concrete ColumnsComposite Steel / Concrete Columns– Structural Steel Roof

70’s Addition – CIP Concrete Waffle SlabNew Addition – CIP Concrete Pan Joist Slab

– CIP Concrete Two-Way Slab– Structural Steel Roof

Original 1913 Allen & Collins plan

Page 10: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

10

Page 11: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

11

Page 12: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

12

Page 13: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

13

Page 14: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

14

Page 15: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

15

Page 16: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

16

Page 17: SEAoO Thompson Library PPT 09-17-10 · 8/16/2010 3 2002 Floor Plan Functional Evolution 1950: The Main Library primarily as a warehouse for print media 2009: The Main Library primarily

8/16/2010

17

Questions?

Stephen Metz, PE, LEED AP 