seaport global coal conference - alphanr.com global 081618.pdf · about alpha 2. 3 2018 production...
TRANSCRIPT
![Page 1: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/1.jpg)
Confidential – Authorized Use Only
Seaport Global Coal Conference August 16, 2018
![Page 2: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/2.jpg)
2,750 Employees
14 Underground Mines
7 Surface Operations
9 Prep Plants
• 9 Rail Loadouts (CSX and NS)
• 2 Kanawha River Barge Loadouts
Our Operations
ABOUT Alpha
2
![Page 3: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/3.jpg)
3
2018 Production
Our Production
53%Metallurgical
47%Thermal
55%Underground
39%Surface
6%Purchase
![Page 4: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/4.jpg)
4
Met Production
2018 Production
55% 22% 13% 10%
HVA HVB LV MV
57% Export
43%Domestic
![Page 5: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/5.jpg)
Our Operations ─ West Virginia
*Projection
![Page 6: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/6.jpg)
Capital Projects Review
▪ Brooks Run South
▪ Road Fork 52 Low Vol Reserves
▪ Mid West Virginia Surface
▪ Workman Creek Coal Handling
Facility for Met Reserves
▪ Coal River East
▪ Black Eagle Mine at Marfork
▪ Panther Eagle Mine to Full Production
▪ Brooks Run West
▪ Lynn Branch High Vol Reserves
Capital Projects by Operating Group
6
![Page 7: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/7.jpg)
Capital Projects
7
Road Fork 52 Low Vol Reserves
• High quality met slope is 80% complete
• Access to 29 MM tons of reserves in Pocahontas
3 seam
• Output capacity in excess of 1 million tons/year
• Anticipate startup in Q2, 2019
Workman Creek Belt for Met Reserves
• 2,000 TPH conveyor system to Marfork plant
• 70+ million metallurgical reserve tons
• High quality coking coal seams
• Completed in June, 2018
• Cost savings of $3 a raw ton for trucking,
removes trucks from local highways
![Page 8: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/8.jpg)
Capital Projects
8
Black Eagle Mine adjacent to Marfork
• Immediate access to a premier High Vol A reserve
block located west of the Big Coal River
• High quality Eagle Seam reserve is among the
thickest remaining within Alpha’s portfolio of met
reserves
• Reserve base of 23+ MM tons
• Completion expected in Q4, 2018
Panther Eagle Mine at Marfork
• Fully permitted premium High Vol A reserve,
replacing depleting Brushy Eagle mine
• 1st unit production in Q4, 2018
• 2nd unit production staffing up now
• 8 MM tons of Marfork High Vol A reserves
![Page 9: Seaport Global Coal Conference - alphanr.com Global 081618.pdf · ABOUT Alpha 2. 3 2018 Production Our Production 53% Metallurgical 47% Thermal 55% Underground 39% Surface 6% Purchase](https://reader030.vdocument.in/reader030/viewer/2022021803/5b987b5f09d3f22f0a8c10aa/html5/thumbnails/9.jpg)
Capital Projects
9
Lynn Branch
• Reserve base of 16.5 MM tons of High Vol B in #2
gas seam
• Replacement for Bandmill mines as their reserves
are exhausted
• Preliminary permit design completed
• Permit to be submitted in Q4, 2018