search results recreational trails program project database

19
Search Results Recreational Trails Program Project Database Your search for projects in State: WV, Total Results : 333 State Project Year Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds WV 2014 S338-TEA/CR- S338-TEA/CR- Unspecified/Unidentifi able $22,400 $5,600 $28,000 WV 2014 S309-NOR/TH- S309-NOR/TH- Unspecified/Unidentifi able $49,653 $12,413 $62,066 WV 2014 U347-TRA/IL- U347-TRA/IL- Unspecified/Unidentifi able $11,600 $2,900 $14,500 WV 2014 U306-MIL/TO- U306-MIL/TO- Unspecified/Unidentifi able $8,000 $2,000 $10,000 WV 2014 U313-CRE/EK- U313-CRE/EK- Unspecified/Unidentifi able $15,290 $4,000 $19,290 WV 2014 U353-SPO/RT- U353-SPO/RT- Unspecified/Unidentifi able $25,600 $6,400 $32,000 WV 2014 U330-HAT/FI- U330-HAT/FI- Unspecified/Unidentifi able $50,000 $12,500 $62,500 WV 2014 U333-NBR/T-1 U333-NBR/T-1 Unspecified/Unidentifi able $50,000 $12,500 $62,500 WV 2014 X384-WVN/RT- X384-WVN/RT- Unspecified/Unidentifi able $80,000 $20,000 $100,000 WV 2014 U334-FKM/TN- U334-FKM/TN- Unspecified/Unidentifi able $14,100 $3,525 $17,625 WV 2014 U331-DEC/KE- U331-DEC/KE- Unspecified/Unidentifi able $23,122 $5,781 $28,903 WV 2014 U313-LEW/IS- U313-LEW/IS- Unspecified/Unidentifi able $19,200 $4,800 $24,000 WV 2014 U303-BOO/NE- U303-BOO/NE- Unspecified/Unidentifi able $8,000 $2,000 $10,000 WV 2014 U333-NBR/T-1 U333-NBR/T-1 Unspecified/Unidentifi able $32,000 $8,000 $40,000

Upload: others

Post on 23-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Search Results Recreational Trails Program Project Database

Search Results Recreational Trails Program Project Database

Your search for projects in State: WV, Total Results : 333

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2014 S338-TEA/CR- S338-TEA/CR- Unspecified/Unidentifi

able

$22,400 $5,600 $28,000

WV 2014 S309-NOR/TH- S309-NOR/TH- Unspecified/Unidentifi

able

$49,653 $12,413 $62,066

WV 2014 U347-TRA/IL- U347-TRA/IL- Unspecified/Unidentifi

able

$11,600 $2,900 $14,500

WV 2014 U306-MIL/TO- U306-MIL/TO- Unspecified/Unidentifi

able

$8,000 $2,000 $10,000

WV 2014 U313-CRE/EK- U313-CRE/EK- Unspecified/Unidentifi

able

$15,290 $4,000 $19,290

WV 2014 U353-SPO/RT- U353-SPO/RT- Unspecified/Unidentifi

able

$25,600 $6,400 $32,000

WV 2014 U330-HAT/FI- U330-HAT/FI- Unspecified/Unidentifi

able

$50,000 $12,500 $62,500

WV 2014 U333-NBR/T-1 U333-NBR/T-1 Unspecified/Unidentifi

able

$50,000 $12,500 $62,500

WV 2014 X384-WVN/RT- X384-WVN/RT- Unspecified/Unidentifi

able

$80,000 $20,000 $100,000

WV 2014 U334-FKM/TN- U334-FKM/TN- Unspecified/Unidentifi

able

$14,100 $3,525 $17,625

WV 2014 U331-DEC/KE- U331-DEC/KE- Unspecified/Unidentifi

able

$23,122 $5,781 $28,903

WV 2014 U313-LEW/IS- U313-LEW/IS- Unspecified/Unidentifi

able

$19,200 $4,800 $24,000

WV 2014 U303-BOO/NE- U303-BOO/NE- Unspecified/Unidentifi

able

$8,000 $2,000 $10,000

WV 2014 U333-NBR/T-1 U333-NBR/T-1 Unspecified/Unidentifi

able

$32,000 $8,000 $40,000

Page 2: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2014 U302-YAN/KA- U302-YAN/KA- Unspecified/Unidentifi

able

$50,000 $12,500 $62,500

WV 2014 U313-CRE/EK- U313-CRE/EK- Unspecified/Unidentifi

able

$710 Unknown $710

WV 2017 Tools and Equipment Asphalt Repair Trail

Equipment

Asphalt Repair Trail Equipment $14,400 $2,880 $17,280

WV 2002 Fork Mountain Trail Maintenance Unspecified/Unidentifi

able

$16,000 $4,000 $20,000

WV 2003 Mon River Trail Construct Trail Unspecified/Unidentifi

able

$160,000 $40,000 $200,000

WV 2007 Trail Construction Trail Construction Construct Free Ride Bicycle trail in City Park Unspecified/Unidentifi

able

$16,800 $4,200 $21,000

WV 2007 Rail-Trail Trail Maintenance Maintenance on rail-trail Unspecified/Unidentifi

able

$18,862 $4,715 $23,577

WV 2007 Trail Construction Trail Construction Construct walking trail at school Unspecified/Unidentifi

able

$20,000 $5,000 $25,000

WV 2007 Trail Construction Trail Construction Construct walking trail at elementary school Unspecified/Unidentifi

able

$20,000 $5,000 $25,000

WV 2007 Trail Construction Trail Construction Construct Nature Trail Unspecified/Unidentifi

able

$20,000 $5,000 $25,000

WV 2007 Upper Falls Public Information Facilities Develop Trail Brochure, install Kiosks and

signage and develop portage trail around

Upper Falls

Unspecified/Unidentifi

able

$24,800 $6,200 $31,000

WV 2007 Trail Construction Trail Construction Construct rail-trail Unspecified/Unidentifi

able

$44,000 $11,000 $55,000

WV 2007 Trail Construction Trail Construction and Sign

Installation

Construct trail system, install signage,

develop brochures

Unspecified/Unidentifi

able

$66,650 $16,662 $83,312

WV 2007 Accessible Trail Construction Accessible Trail Construction Construct ADA Trail in State Park Unspecified/Unidentifi

able

$69,696 $17,424 $87,120

WV 2007 Various Trails Trail Maintenance Maintain multi-county motorized trail system. Unspecified/Unidentifi

able

$137,101 $34,275 $171,376

WV 2007 Various Trails Trail Maintenance Maintain multi-county motorized trail system. Unspecified/Unidentifi

able

$137,101 $34,275 $171,376

Page 3: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2007 OHV Trail Construction OHV Trail Construction Construct ATV Trails and Trailhead Unspecified/Unidentifi

able

$160,000 $40,000 $200,000

WV 2008 Various Trails Develop and Publish Map

and Trail Guide

Develop and publish new map and trail guide

for state park

Unspecified/Unidentifi

able

$6,640 $1,660 $8,300

WV 2008 Public Information Develop and Publish

Rail-Trail Guide

Develop and publish rail-trail guide Unspecified/Unidentifi

able

$14,400 $3,600 $18,000

WV 2008 Trail Construction Trail Construction Construct walking trail in community park Unspecified/Unidentifi

able

$18,400 $4,600 $23,000

WV 2008 Trail Construction Trail Construction Construct extension to community trail at

housing project

Unspecified/Unidentifi

able

$18,400 $4,600 $23,000

WV 2008 Rail-Trail Trail Improvements Resurface rail-trail Unspecified/Unidentifi

able

$24,000 $6,000 $30,000

WV 2008 Trail Construction Trail Construction Pave walking trail in community park Unspecified/Unidentifi

able

$24,858 $6,214 $31,072

WV 2008 Rail-Trail Trail Construction Pave Rail-Trail Unspecified/Unidentifi

able

$26,000 $6,500 $32,500

WV 2008 Trail Construction Trail Construction Construct walking trail at elementary school Unspecified/Unidentifi

able

$28,658 $7,164 $35,822

WV 2008 Trail Construction Trail Construction and

Improvements

Improve and extend trail in nature preserve Unspecified/Unidentifi

able

$31,350 $7,837 $39,187

WV 2008 Trail Construction Trail Construction Purchase Equipment Unspecified/Unidentifi

able

$40,000 $10,000 $50,000

WV 2008 Trail Construction Trail Construction Construct extension to community trail in

park.

Unspecified/Unidentifi

able

$40,000 $10,000 $50,000

WV 2008 Water Trail Improvements Water Trail Development Develop water trail on Greenbrier River Unspecified/Unidentifi

able

$48,000 $12,000 $60,000

WV 2008 Trail Construction Trail Construction Construct paved walking trail in community

park

Unspecified/Unidentifi

able

$50,000 $12,500 $62,500

WV 2008 Trail Construction Trail Construction for

Equestrians

Develop equestrian trail system Unspecified/Unidentifi

able

$75,000 $18,750 $93,750

WV 2008 Rail-Trail Rail Bridge Reconstruction

for Trail

Convert railroad trestle to trail bridge Unspecified/Unidentifi

able

$80,000 $20,000 $100,000

Page 4: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2009 Unspecified/Unidentifiable Unspecified/Unidentifiable Unspecified/Unidentifi

able

$4,800 $1,200 $6,000

WV 2009 Rail-Trail Maintenance On Rail-Trail Maintenance on rail-trail Unspecified/Unidentifi

able

$12,000 $3,000 $15,000

WV 2009 Construct Bridge and Trail

Maintenance

Construct Bridge and Trail

Maintenance

Construct bridge and maintenance on trail

surface

Unspecified/Unidentifi

able

$27,520 $6,880 $34,400

WV 2009 Construct Trail Construct Trail to Connect

State Park to National

Scenic River

Construct trail to connect state park to

National Scenic River

Unspecified/Unidentifi

able

$29,000 $7,250 $36,250

WV 2009 Construct Construction Construct Connector Trail Construct connector trail. Unspecified/Unidentifi

able

$32,800 $8,200 $41,000

WV 2009 Trail Construction Trail Construction Construct walking trail Unspecified/Unidentifi

able

$40,000 $10,000 $50,000

WV 2009 Construct Nature Trail

Around Pond

Construct Nature Trail

Around Pond

Construct nature trail around pond Unspecified/Unidentifi

able

$40,000 $10,000 $50,000

WV 2009 Construct Equestrian Trail Construct Equestrian Trail Construct equestrian trail. Unspecified/Unidentifi

able

$40,000 $10,000 $50,000

WV 2009 Trail Construction Trail Construction In

Community Park

Develop and construct walking trail in

community park

Unspecified/Unidentifi

able

$40,000 $10,000 $50,000

WV 2009 Rail-Trail Bridges Renovations to Rail-Trail

Bridges

Renovations to rail-trail bridges Unspecified/Unidentifi

able

$40,000 $10,000 $50,000

WV 2009 Trail Construction Trail Construction Develop and construct walking trail in state

park

Unspecified/Unidentifi

able

$59,200 $14,800 $74,000

WV 2009 State Park Trails Trail Rehabilitation Renovate walking trails in State Park Unspecified/Unidentifi

able

$80,000 $20,000 $100,000

WV 2009 Construct ATV Trails and

Trailhead

Construct ATV Trails and

Trailhead

Construct ATV Trails and Trailhead Unspecified/Unidentifi

able

$80,000 $20,000 $100,000

WV 2009 Acquisition Develop

Rail-Trail

Acquire and Develop

Rail-Trail

Acquire/develop-rail trail. Unspecified/Unidentifi

able

$80,000 $20,000 $100,000

WV 2009 US Fish and Wildlife Service

Fish Hatchery Project

Trail Construction Develop and construct trail at US Fish and

Wildlife Service Fish Hatchery

Unspecified/Unidentifi

able

$80,000 $20,000 $100,000

WV 2009 Trail Construction Trail Construction and

Trailhead

Construct trail and trailhead. Unspecified/Unidentifi

able

$220,000 $55,000 $275,000

Page 5: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 1996 Monongalia County Trails Trail Construction Construct Trails, Restoration of Trails 1 Monongalia $10,518 $10,518 $21,036

WV 1996 Cairo Trails Trailhead Construction Parking and Landscaping 1 Ritchie $10,814 $10,814 $21,628

WV 1996 Marion County Trails Trail Construction Develop Trail 1 Marion $12,500 $12,500 $25,000

WV 1996 Mon River Trail Bridge Improvements Bridge Decking 1 Preston $33,168 $33,168 $66,336

WV 1996 Mon River Trail Install Signs Install Signage and Barricades 1 Monongalia, Preston $10,518 $2,630 $13,148

WV 1997 Paden City Trail Trail Construction Construct Trail 1 Tyler $2,500 $2,500 $5,000

WV 1997 Little Kanawha River Install Signs Signage 1 Ritchie $4,795 $4,795 $9,590

WV 1997 Mon Valley Trails Trail Construction Construct Trail 1 Monongalia $6,304 $6,304 $12,608

WV 1997 Morgantown Trails Trail Construction Construct Trail 1 Monongalia $12,500 $12,500 $25,000

WV 1997 Philippi Trail Trail Construction Construct Connecting Trails Throughout City 1 Barbour $31,550 $31,550 $63,100

WV 1997 Various Equestrian Trails Trailhead Improvements for

Equestrians

Construct Horse Trail 1 Harrison $12,415 $3,104 $15,519

WV 1998 Pleasants County School

Trails

Trail Improvements Improvements to Trail 1 Pleasants $5,130 $5,130 $10,260

WV 1998 Various Trails Trail Construction Construct Trail 1 Hancock $6,250 $1,563 $7,813

WV 1998 Rail-Trail Development Rail-Trail Development Development of Rail-Trail 1 Monongalia, Preston $12,500 $3,125 $15,625

WV 2000 Rockwall Trail Construct Trail 1 Pleasants $2,000 $1,000 $3,000

WV 2000 Gobbler's Knob Club Trail Construction 1 Pleasants $2,000 $1,000 $3,000

WV 2000 Monongah River Trail, Ralph

S. Larue Trail

Trailhead 1 Marion $14,013 $3,504 $17,517

WV 2000 Bridgeport City Park Trail Construct Trail 1 Harrison $17,147 $4,286 $21,433

WV 2000 Paden City Trail Trail Construction Construct Trail 1 Wetzel, Tyler $9,600 $4,800 $14,400

WV 2000 East Wetzel Trail Construct Trail 1 Wetzel $26,770 $6,800 $33,570

WV 2000 Sisterville River Trail Construct Trail 1 Tyler $42,710 $10,677 $53,387

WV 2000 Thomas Loop Trail Trail Construction Construct Trail 1 Tucker $9,845 $14,330 $24,175

WV 2000 Yankee Trail Construct Trail, Restrooms, Fountain,

Parking, Pavilion

1 Brooke $79,800 $19,995 $99,795

WV 2000 Mon River Trail Trail Construction Construct Trail 1 Monongalia $80,000 $40,000 $120,000

WV 2000 Little Kanawha Connector

Trail

Trail Construction Construct Trail 1 Wood $80,000 $40,000 $120,000

WV 2000 Marion County Project Develop Off-Road Vehicle Trail 1 Marion $25,000 $6,250 $31,250

WV 2001 Gentle Trail Trail Renovations 1 Tucker $16,067 $4,017 $20,084

WV 2001 Pioneer Trail Bridge Renovation 1 Brooke $18,240 $4,560 $22,800

Page 6: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2001 Mannington Rail-Trail Construct Trail 1 Marion $30,000 $7,500 $37,500

WV 2001 Little Kanoba Connector Construct Trail 1 Wood $30,000 $7,500 $37,500

WV 2001 West Fork River Trail Trailhead, Restroom 1 Marion $16,000 $8,000 $24,000

WV 2001 Caperton Trail Trailhead 1 Monongalia $80,000 $20,000 $100,000

WV 2002 Cooper's Rock Roadside

Trail

Construct Trail 1 Monongalia, Preston $10,983 $2,745 $13,728

WV 2002 Lubeck Volunteer Fire

Department Community Park

Trail

Improvements 1 Wood $16,000 $4,000 $20,000

WV 2002 Valley Falls State Park Maintenance 1 Marion $17,246 $4,312 $21,558

WV 2002 Westover Trail Construct Trail 1 Monongalia $20,905 $5,227 $26,132

WV 2002 Swisher Nature Area Trail Construct Trail 1 Mineral $34,819 $8,704 $43,523

WV 2002 Yankee Connector Trail Construct Trail 1 Brooke $40,000 $10,000 $50,000

WV 2002 Lost Creek Trail Construct Trail 1 Harrison $40,000 $10,000 $50,000

WV 2002 Marion County Parks and

Recreation Commission Trail

Maintenance 1 Marion $40,000 $10,000 $50,000

WV 2002 West Virginia Botanic

Gardens

Construct Trail 1 Monongalia $55,480 $13,870 $69,350

WV 2002 North Marion Rail-Trail Construct Trail 1 Marion $40,000 $50,000 $90,000

WV 2003 Bethany Trails Maintenance 1 Brooke $21,322 $5,331 $26,653

WV 2003 North Bend Lake Trail Construct Trail 1 Doddridge $80,000 $20,000 $100,000

WV 2003 Clarksburg-McWhorter Trail Construct Trail 1 Harrison $80,000 $20,000 $100,000

WV 2004 West Milford City Building Trailhead Construction Construct comfort station. 1 Harrison $8,094 $2,024 $10,118

WV 2004 Gobblers Knob Trail Bridge Installation and Trail

Renovation

Phase II Further development and swinging

bridge.

1 Pleasants $11,390 $2,848 $14,238

WV 2004 Mon River Trail, Caperton

Trail

Install Signs Signage and Kiosks for rail-trail. 1 Monongalia $15,200 $3,800 $19,000

WV 2004 Grantsville Trails Trail Construction Paved walking trail. 1 Calhoun $28,000 $7,000 $35,000

WV 2004 Marion County Trail

(MCTrail)

Trail Construction Pave Rail-Trail 1 Marion $40,000 $10,000 $50,000

WV 2004 Mon River Trail, Caperton

Trail, Deckers Creek Trail

Purchase Trail Maintenance

Equipment

Truck, trailer, attachments for mower. 1 Monongalia, Marion,

Preston

$41,600 $10,400 $52,000

Page 7: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2004 North Bend Rail-Trail State

Park

Purchase Trail Maintenance

Equipment

Purchase backhoe and attachments. 1 Ritchie $46,928 $11,732 $58,660

WV 2004 Mon River Trail, Caperton

Trail, Deckers Creek Trail

Rail-Trail Development Develop rail-trail. (Combined with earlier

development project.)

1 Monongalia $60,000 $15,000 $75,000

WV 2004 Kingwood-Tunnelton

Rail-Trail

Rail-Trail Development and

Acquisition

Acquisition of right of way and development

of rail-trail.

1 Preston $80,000 $20,000 $100,000

WV 2005 Sistersville Trail Sistersville Trail Bridge Project merged into earlier project 1 Tyler $0 Unknown $0

WV 2005 Gilmer County Trail 1 Gilmer $4,158 $1,040 $5,198

WV 2005 Cheat Ranger District Trails Cheat Ranger District

Maintenance

Repair trails in Dolly Sods vicinity 1 Multiple Counties $5,000 $1,250 $6,250

WV 2005 Blackwater Falls State Park Blackwater Falls Equipment Acquire equipment to patrol trails. 1 Tucker $10,000 $2,500 $12,500

WV 2005 Edison Arboretum Trail Construction Construct non-motorized trail and trailside

class room.

1 Wood $12,000 $3,000 $15,000

WV 2005 Canaan Valley Trails Trail Renovation Repair and maintain trail system in Tucker

County

1 Tucker $23,900 $5,975 $29,875

WV 2005 Homecrest Manor Trail Trail Construction Construct walking trail in housing project 1 Wood $32,000 $8,000 $40,000

WV 2005 Clarksburg City Park Trail Trail Construction Construct walking trail through city park. 1 Harrison $33,321 $8,330 $41,651

WV 2005 Deckers Creek Deckers Creek

Maintenance/Upgrade

Repair trail surface and drainage where

needed.

1 Monongalia, Preston $47,160 $11,790 $58,950

WV 2005 Bethlehem Community Park

Trail

1 Ohio $50,000 $12,500 $62,500

WV 2005 Philippi Trail Trail Construction Develop and construct extension to existing

trail

1 Barbour $55,200 $13,800 $69,000

WV 2005 Barnum Rail-Trail Barnum Rail-Trail Extension Acquire property and develop extension to

existing rail-trail.

1 Mineral $58,380 $14,595 $72,975

WV 2005 Barbour County Park Trail Trail Construction Design and construct walking trail in county

park.

1 Barbour $72,800 $18,200 $91,000

WV 2006 Mannington Rail-Trail Mannington Trail

Improvements

1 Marion $4,000 $1,000 $5,000

WV 2006 Follansbee Connector Trail Trail Construction Construct trail to connect Follansbee Nature

Trail to nearby street and install trailside

amenities.

1 Brooke $18,840 $4,710 $23,550

Page 8: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2006 Terra Alta Community Park

Trail

Trail Construction Construct non-motorized trail connecting park

and school.

1 Preston $40,000 $10,000 $50,000

WV 2006 Veteran's Memorial Park

Trail

Trail Improvements Pave fitness trail 1 Harrison $52,000 $13,000 $65,000

WV 2006 Kingwood-Tunnelton

Rail-Trail

Rail-Trail Development Project merged with 2004 project 1 Preston $80,000 $20,000 $100,000

WV 2007 Jody Hulka Memorial

Handicap Trail

Trail Renovation Repair and maintain Jody Hulka Memorial

Handicap Trail

1 Hancock $12,600 $3,150 $15,750

WV 2007 Williamston Trail Construction Construct trail around wetland in

Williamstown

1 Wood $40,000 $10,000 $50,000

WV 2008 South Wheeling Rail-Trail Rail-Trail Construction Construct rail-trail in South Wheeling 1 Ohio $32,000 $8,000 $40,000

WV 2009 Davis to Canaan Valley

Wildlife Refuge

Trail Construction Construct trail to connect Davis to Canaan

Valley Wildlife Refuge

1 Tucker $62,623 $15,655 $78,278

WV 2010 Rail-Trail Improvements Rail-Trail Improvements Improve surface of rail-trail 1 Wetzel $10,716 $536 $11,252

WV 2010 Monongah Trailhead Monongah Trailhead Shelter Construct shelter at trailhead. 1 Marion $8,000 $742 $8,742

WV 2010 Canaan Valley Wildlife

Refuge

Canaan Valley Wildlife

Refuge

Construct Pedestrian Trail 1 Tucker $36,767 $1,212 $37,979

WV 2010 West Fork River Trail Coons Run Bridge Repair bridge and West Fork River Trail

surface

1 Marion $40,000 $10,000 $50,000

WV 2010 North Bend Rail-Trail North Bend Rail-Trail,

Mountwood Park

Develop and construct an equestrian trail 1 Wood $32,800 $8,200 $41,000

WV 2011 Ferguson Memorial Park Ferguson Memorial Park Construct Trail 1 Harrison $8,000 $2,000 $10,000

WV 2011 Monongahela River Trails,

Van Hoorhis Trailhead

Monongahela River Trails,

Van Hoorhis Trailhead

Equipment purchase, trailhead improvements 1 Monongalia $78,400 $19,600 $98,000

WV 2011 Fort Boreman Historic Park Fort Boreman Historic Park Repair and upgrade existing trail 1 Wood $78,682 $19,671 $98,353

WV 2012 West Fork River Trail West Fork River Trail Construct restroom facility 1 Harrison $29,856 $7,464 $37,320

WV 2012 Various Trails Construct new trails, maintain existing trails 1 Tucker $34,521 $9,630 $44,151

WV 2013 Brooke Pioneer Trail Brooke; for use on Brooke Pioneer Trail;

purchase of a tractor with attachments for

trail maintenance

1 Brooke, Ohio $32,000 $8,000 $40,000

WV 2013 North Bend State Park Trails Ritchie; North Bend State Park; CN 8 miles of

multi-use trail designed to equestrian

standards

1 Ritchie $40,000 $10,000 $50,000

Page 9: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2013 Coopers Rock State Forest Coopers Rock State Forest Monongalia and Preston; Coopers Rock

State Forest; develop media for kiosks and

interpretive signs; removal and install new

kiosks

1 Monongalia, Preston $13,296 $3,324 $16,620

WV 2015 Trail Relocation Trail Relocation 1 Harrison $24,200 $6,050 $30,250

WV 2015 Mon River Trail, Caperton

Trail

Mon River/Caperton Trail

Connector-Star City River

Landing

1 Monongalia $96,000 $24,000 $120,000

WV 2015 Mon River Trail Collins Ferry Road: Mon

River Trail Connector

1 Monongalia $60,000 $15,000 $75,000

WV 2015 Foundry Street Foundry Street

Linkage-Downtown to

Rail-Trail

1 Monongalia $34,320 $8,580 $42,900

WV 2015 Deckers Creek Trail Deckers Creek Trail Surface

Repair Project

1 Monongalia, Preston $101,376 $25,344 $126,720

WV 2015 Tucker County Trails Tucker County Rocks! 1 Tucker $120,000 $30,000 $150,000

WV 2016 Alum Cave Trail Phase 2 Alum Cave Trail Phase 2 Trail Construction 1 Barbour $96,000 $19,200 $115,200

WV 2016 Cheat River Rail-Trail Cheat River Rail-Trail Phase

1

Rail-Trail Design and Construction 1 Preston $150,000 $30,000 $180,000

WV 2016 Corricks Ford Battlefield

Park

Corricks Ford Battlefield

Park

Park Development Project 1 Tucker $80,000 $16,000 $96,000

WV 2016 North Bend Rail-Trail North Bend Rail-Trail Design and Construction 1 Doddridge, Harrison $80,000 $16,000 $96,000

WV 2016 North Fork Blackwater Trail North Fork Blackwater Trail

Development Project

Trail design and construction 1 Tucker $74,238 $14,848 $89,086

WV 2016 Northern Rail-Trail Northern Rail-Trail Rail-trail Design and Construction 1 Preston $71,600 $14,320 $85,920

WV 2017 Cranberry Glades Botanical

Area Trails

Cranberry Glades Boardwalk

Trail Replacement

Cranberry Glades Boardwalk Trail

Replacement

1 Nicholas $100,000 $20,000 $120,000

WV 2017 Deckers Creek Deckers Creek Trail

Landslide Repair

Landslide Repair 1 Monongalia, Preston $36,000 $7,200 $43,200

WV 2018 Mon River Trail, Caperton

Trail

Caperton Rail-Trail Drainage

Upgrades & Repairs

Design and construction to repair and

upgrade the drainage infrastructure of the

Caperton/Mon River Trail located within

Monongalia County, WV.

1 Monongalia $58,000 $11,600 $69,600

Page 10: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2018 Caperton Trail Caperton Trail Lighting

Project

Design and construction of lighting for the

half mile Caperton/Mon River Trail section

along the Morgantown Wharf District located

within Monongalia County, WV.

1 Monongalia $150,000 $30,000 $180,000

WV 2018 West Fork River Access West Fork River Access Construction of new trailhead and trail to

provide access to the West Fork River

located in Shinnston, WV.

1 Harrison $5,000 $1,000 $6,000

WV 2018 Northern Rail-Trail Northern Rail-Trail Design of approximately 10 linear miles of

new rail trail corridor for the WV Northern

Rail-Trail located within Preston County, WV.

1 Preston $100,000 $20,000 $120,000

WV 2001 Allegheny Trail Bridge, Trailhead, Signage, Shelter 1, 2, 3 Tucker, Randolph,

Pocahontas,

Greenbriar

$50,001 $12,500 $62,501

WV 2005 Safety and Education Division of Motor Vehicles

(Dev.) ATV Safety Program

Purchase and distribute ATV safety literature

and Public Service Announcements.

1, 2, 3 Statewide $91,315 $22,829 $114,144

WV 2006 Safety and Education Division of Motor Vehicles

(DMV) ATV Safety Program

Project merged with 2005 project 1, 2, 3 Statewide $0 Unknown $0

WV 2007 Various Trails Trail Marking Re Blaze trails in three state parks 1, 2, 3 Multiple Counties $8,000 $2,000 $10,000

WV 2007 Various Trails Trail Construction Construct fishing access trail 1, 2, 3 Multiple Counties $10,000 $2,500 $12,500

WV 2008 Various Trails Purchase GPS Equipment Purchase GPS Equipment for trail

maintenance

1, 2, 3 Multiple Counties $4,000 $1,000 $5,000

WV 2013 Acquire Equipment Acquire Equipment Statewide, acquire equipment 1, 2, 3 Statewide $127,113 $31,779 $158,892

WV 1997 Shepherdstown Men's Trail Trail Construction Construct Trails 2 Jefferson $3,305 $3,305 $6,610

WV 1997 Elk District Trails Trail Construction Construct Trail 2 Braxton $8,250 $8,250 $16,500

WV 1997 St. Albans Trails Trail Construction Construct, Improve Trails 2 Kanawha $9,700 $9,700 $19,400

WV 1997 Hurricane Trails 2 Putnam $10,893 $10,893 $21,786

WV 1998 Jackson County Trails 2 Jackson $12,500 $12,500 $25,000

WV 1998 Putnam County Trails Trail Construction Construct Trail 2 Putnam $12,500 $12,500 $25,000

WV 2000 River Trail Trail Construction Construct Trail 2 Upshur $22,504 $5,726 $28,230

WV 2000 Walk Memorial Handicapped

Trail

Accessible Trail

Improvements

ADA 2 Kanawha $59,570 $32,920 $92,490

WV 2001 Nature Trail Trail Renovation 2 Jackson $22,400 $5,600 $28,000

WV 2001 Tuscarora Creek Linear Park Construct Trail 2 Berkeley $50,001 $12,500 $62,501

Page 11: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2001 Tracer Fork Trail Bridges 2 Kanawha $55,000 $13,750 $68,750

WV 2001 Poorhouse Farm Park Trail Bridge 2 Berkeley $12,000 $30,000 $42,000

WV 2002 Paw Paw Town Park Trail Construct Trail 2 Morgan $6,000 $1,500 $7,500

WV 2002 Yankauer Nature Preserve Maintenance, Improvements 2 Berkeley $11,344 $2,836 $14,180

WV 2002 Warm Springs Middle School

Trail

Construct Trail 2 Bath $16,000 $4,000 $20,000

WV 2002 Braxton County Nature Trail Improvements 2 Braxton $20,000 $5,000 $25,000

WV 2003 Rich Mountain Battlefield

Trails

Construct Trail 2 Randolph $8,622 $2,155 $10,777

WV 2003 Randolph County Project Develop Model Sections 2 Randolph $25,000 $25,000 $50,000

WV 2004 Ravenswood Park Trail Construction Construct Trail 2 Jackson $17,434 $4,358 $21,792

WV 2004 Glendale Park Trail Extend previously constructed trail. 2 Mercer $29,600 $7,400 $37,000

WV 2004 Mathers Side Trail Trail Improvements Stone stairs on Mathers, improved signage

through town.

2 Jefferson $57,299 $14,325 $71,624

WV 2005 Middle Ridge Trail Construct new trail 2 Kanawha $36,524 $9,131 $45,655

WV 2005 Valley Park Trail Develop extension to existing trail system 2 Putnam $46,240 $11,560 $57,800

WV 2005 Buckhannon River Trail Construct .49 mile extension to Buckhannon

trail system

2 Upshur $49,949 $12,487 $62,436

WV 2005 Clay County Park Trail 2 Clay $74,751 $18,688 $93,439

WV 2006 Homestead School Walking

Trail

Trail Construction Construct walking trail at elementary school 2 Randolph $7,832 $1,958 $9,790

WV 2006 Tuscarora Trail Bridge Installation Install bridge on Big Blue Trail as it goes

through Morgan County

2 Morgan $14,200 $3,550 $17,750

WV 2006 Paw Paw Trail Trailhead Construction Build Trailhead 2 Morgan $40,916 $10,229 $51,145

WV 2006 Jackson County Rail-Trail Rail-Trail Development Develop and construct rail-trail near Ripley 2 Jackson $80,000 $20,000 $100,000

WV 2007 Calhoun County Park Trail Construction Construct trail in Calhoun County Park 2 Calhoun $33,222 $8,305 $41,527

WV 2007 Wine Cellar Park Trail Renovation and

Construction

Repair Resurface and extend trail to Laura

Anderson Lake in Wine Cellar Park

2 Kanawha $36,848 $9,212 $46,060

WV 2007 Gauley Mountain Trail Trail Renovation Repair and maintain Gauley Mountain Trail in

Mon National Forest

2 Randolph $48,000 $12,000 $60,000

WV 2007 Bridge Installation Bridge Installation Construct three bridges on Kanawha Trace 2 Kanawha $80,000 $20,000 $100,000

WV 2008 Water Trail Improvements Water Trail Development Develop water trail on historic Mill Creek 2 Randolph $25,000 $6,250 $31,250

WV 2009 Tuscarora Trail Install Prefabricated Bridge Install prefab bridge on Tuscarora Trail 2 Morgan $17,200 $4,300 $21,500

Page 12: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2010 Sleepy Creek Wildlife

Management Area

Pedestrian Bridge

Sleepy Creek Wildlife

Management Area

Pedestrian Bridge

Install Pedestrian Bridge 2 Morgan $17,139 $491 $17,630

WV 2010 Buckhannon Riverfront Buckhannon Riverfront Construct Pedestrian Trail 2 Upshur $40,000 $10,000 $50,000

WV 2011 Wardensville Trails Buy trail building tools, equipment, and

storage building

2 Hampshire $6,100 $1,525 $7,625

WV 2012 Flowing Springs Park Flowing Springs Park Construct non-motorized trail 2 Jefferson $64,000 $16,000 $80,000

WV 2012 Kanawha State Forest Kanawha State Forest Construct non-motorized trail 2 Kanawha $80,000 $20,000 $100,000

WV 2013 East End Park Trail Charleston, Kanawha, East End Park/Dixie

St; const accessible trail loop around East

End Park

2 Kanawha $15,250 $3,050 $18,300

WV 2013 Wallace Hartman Nature

Preserve Trail

Wallace Hartman Nature

Preserve Trail

Kanawha; Wallace Hartman Nature Preserve;

construct non-motorized trail, trailhead,

facilities, improve existing trails

2 Kanawha $10,000 $2,000 $12,000

WV 2013 Reynolds Street Trail Spencer, Roane, Reynolds St, const of non

motor trails

2 Roane $40,000 $10,000 $50,000

WV 2015 Nature Trails Nature Trails-Phase II Trail

Maintenance Equipment

2 Kanawha $56,320 $14,080 $70,400

WV 2015 Kanawha County Trail

System

Kanawha County Trail

System

2 Kanawha $80,000 $20,000 $100,000

WV 2015 Kanawha County Trail

System

Kanawha County Trailhead

Facility

2 Kanawha $40,000 $10,000 $50,000

WV 2015 Golf Course Ridge Trail Golf Course Ridge Trail 2 Lewis $32,947 $8,237 $41,184

WV 2017 Hatfield-McCoy Trail System Kanawha County Trailhead

Facility

Design and construction. 2 Kanawha $50,000 $10,000 $60,000

WV 2017 Hatfield-McCoy Trail System Logan County Trail System

Construction

Design and construction. 2 Logan $50,000 $10,000 $60,000

WV 2017 Hatfield-McCoy Trail System Logan County Trailhead

Facility

Design and construction. 2 Logan $50,000 $10,000 $60,000

WV 2017 Hatfield-McCoy Trail System McDowell County Trail

System Construction

Design and construction. 2 McDowell $50,000 $10,000 $60,000

Page 13: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2018 Appalachian National Scenic

Trail

Loudoun Heights A.T.

Relocation

Construction of approximately 1,540 linear

feet of new trail along the Appalachian

National Scenic Trail outside the town of

Harpers Ferry.

2 Jefferson $50,000 $10,000 $60,000

WV 2018 Glendale Park Nature Trail Glendale Park Nature Trail

equipment

Design and construction to resurface

recreational trails and purchase of tractor with

attachments for maintenance of Glendale

Park in Elkins, WV.

2 Randolph $31,419 $6,282 $37,701

WV 2018 Hatfield-McCoy Trail System Construction of Boone

County Trail System

Purchase of 4 trucks for the construction and

maintenance of the Hatfield McCoy

Recreation Area consisting of approximately

200 miles of trail located within Boone and

Wayne Counties, WV.

2 Boone $150,000 $30,000 $180,000

WV 2018 Hatfield-McCoy Trail System Equipment for Lincoln

County Trail System

Purchase of a D5 dozer for maintenance of

the Hatfield McCoy Recreation Area

consisting of approximately 100 miles of trail

located within Lincoln County, WV.

2 Lincoln $150,000 $30,000 $180,000

WV 2018 Hatfield-McCoy Trail System Equipment for Wayne

County Trail System

Purchase of a D5 dozer for construction and

maintenance of the Hatfield McCoy

Recreation Area consisting of approximately

100 miles of trail within Wayne County, WV.

2 Wayne $150,000 $30,000 $180,000

WV 2018 Hatfield-McCoy Trail System Maintenance Equipment for

Boone and Wayne Counties

Purchase of 4 trucks for the construction and

maintenance of the Hatfield McCoy

Recreation Area consisting of approximately

200 miles of trail located within Boone and

Wayne Counties, WV.

2 Boone, Wayne $100,000 $20,000 $120,000

WV 2006 Monongahela National

Forest

Monongahela National

Forest Trail Maintenance

Maintain trails in Monongahela National

Forest.

2, 3 Multiple Counties $50,000 $12,500 $62,500

WV 2015 Wayne County Trail System Wayne County Trail System 2, 3 Wayne, Kanawha,

McDowell, Mingo,

Wyoming

$80,000 $20,000 $100,000

WV 1996 Greenbrier River Trail Trail Construction Trail Development 3 Pocahontas $10,000 $10,000 $20,000

WV 1996 Greenbrier River Trail Trail Improvements Improvements 3 Greenbrier $12,500 $12,500 $25,000

Page 14: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 1996 Pocahontas County Rail

Trails

Removal of R R Ties 3 Pocahontas $14,578 $14,578 $29,156

WV 1996 Richwood Trails Trail Construction Develop Trail 3 Nicholas $15,000 $15,000 $30,000

WV 1996 Hatfield-McCoy Trail System Design and Engineering Design and Engineer 3 Mingo, McDowell,

Wayne, Boone,

Lincoln, Wyoming,

Logan

$83,160 $20,790 $103,950

WV 1997 Huntington Trails Trail Construction Construct/Improve Trails 3 Cabell $10,000 $10,000 $20,000

WV 1997 Princeton Trails Trail Construction Construct and Improve Trails 3 Mercer $10,000 $10,000 $20,000

WV 1997 Ritter Park Pathway Trail Construction Construct Underpass 3 Cabell $12,180 $12,180 $24,360

WV 1997 Hatfield-McCoy Trail System Trailhead Construction Construct Trail Head Facility 3 Mingo $64,750 $16,188 $80,938

WV 1998 Holly River Trails Trail Construction Construct Trail 3 Webster $2,656 $2,656 $5,312

WV 1998 McDowell County Trails Trail Construction Construct Trail 3 McDowell $3,080 $3,080 $6,160

WV 1998 Union Trails Trail Improvements Improvements 3 Monroe $12,500 $12,500 $25,000

WV 1998 West Virginia Race Park

Trails

Trailhead Improvements Construct and Improve Trail Head Facilities 3 Raleigh $22,500 $22,500 $45,000

WV 1998 Raleigh County Parks Trailhead Improvements Construct Trail Facilities 3 Raleigh $25,000 $6,250 $31,250

WV 2000 Mom's Mountain Trail and Trailhead

Construction

Construct Info Building, Restroom 3 Raleigh $22,400 $11,200 $33,600

WV 2000 27th Street Park Trail Trail Construction Construct Trail 3 Cabell $80,000 $20,000 $100,000

WV 2000 Hatfield-McCoy Trail System Trail Construction Construct Trails 3 Logan $172,388 $43,097 $215,485

WV 2001 Potato Knob Trail Boardwalk, Improvements 3 Webster $13,426 $3,356 $16,782

WV 2001 Browning Fork Trail Construct Trail 3 Mingo, Logan $64,000 $16,000 $80,000

WV 2001 Ansted Rail-Trail Construct Trail 3 Fayette $34,000 $17,000 $51,000

WV 2001 Panther State Forest Trails Trail Renovations 3 McDowell $77,791 $19,448 $97,239

WV 2001 Matewan Connector Construct Trails, Trailhead 3 Mingo $80,000 $20,000 $100,000

WV 2001 Mom's Mountain Facility 3 Raleigh $11,000 $22,000 $33,000

WV 2002 West Fork Trail Construct Trail 3 Pocahontas $8,000 $2,000 $10,000

WV 2002 Props Run Trail Construct Trail 3 Pocahontas $11,500 $3,500 $15,000

WV 2002 Glenwood Park Walking Trail Construct Trail 3 Mercer $14,800 $3,700 $18,500

WV 2002 Kanawha Trace Trail Maintenance, Improvements 3 Cabell $50,560 $12,640 $63,200

WV 2002 West Virginia Tech Trails Maintenance, Improvements 3 Fayette $67,300 $16,825 $84,125

Page 15: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2002 Hatfield-McCoy Trail System Construct Trail, Purchase Equipment 3 Unspecified/Unidentifi

able

$197,681 $49,420 $247,101

WV 2003 Spruce Trails Construct Trail 3 Pocahontas $9,600 $2,400 $12,000

WV 2003 Fitzpatrick Park Trail Construct Trail 3 Raleigh $10,456 $2,614 $13,070

WV 2003 Hatfield-McCoy Trail System Construct Trail 3 Lincoln, Wyoming $205,339 $51,334 $256,673

WV 2004 Old Main Building Trail Renovation Restore trail system. 3 Nicholas $7,759 $1,940 $9,699

WV 2004 Beech Fork State Park

Nature Trail

Trail Improvements Resurface trail. 3 Wayne $47,472 $11,868 $59,340

WV 2004 Huntington Museum of Art

Nature Trail

Trail Renovation Rehabilitation of nature trail. 3 Cabell $67,711 $16,928 $84,639

WV 2004 Lewisburg and Ronceverte

Rail-Trail

Rail-Trail Development Develop rail-trail. 3 Greenbrier $80,000 $20,000 $100,000

WV 2004 Hatfield-McCoy Trail System OHV Area Development Design and develop multi-county motorized

trail system and trailheads

3 Boone, Logan Mingo,

McDowell, Wyoming

$284,321 $71,080 $355,401

WV 2005 Greenbrier River Trail Greenbrier River Trail

Equipment

Purchase dump bed trail for rail-trail

maintenance

3 Greenbrier,

Pocahontas

$6,400 $1,600 $8,000

WV 2005 Seneca State Forest Trail Construct new connection section for existing

trail

3 Pocahontas $10,566 $2,642 $13,208

WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Single Track Construct motorized trail for dirt bikes. 3 Boone, Mingo $40,000 $10,000 $50,000

WV 2005 Laurel Fork Trail Design and construct ADA accessible trail

and trailhead with accessible trailside

amenities.

3 Webster $41,480 $10,370 $51,850

WV 2005 Bluefield City Park Trail

System

Bluefield City Park Tail

System

Repair, construct and maintain trail system in

city park.

3 Mercer $56,000 $14,000 $70,000

WV 2005 White Oak Rail-Trail Develop and pave rail-trail inside of city 3 Fayette $56,800 $14,200 $71,000

WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Mercer

County

Construct motorized trail in Mercer County 3 Mercer $60,000 $15,000 $75,000

WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Equipment Purchase maintenance and construction

equipment for motorized trail system.

3 Boone, Logan, Mingo,

McDowell, Wyoming

$493,681 $123,420 $617,101

WV 2006 Bluefield City Park Trail

System

Bluefield City Park Trail,

Phase II

Project merged with 2005 project 3 Mercer $0 Unknown $0

WV 2006 Durbin-Frank Rail-Trail Rail-Trail Development Construct Rail-Trail between Durbin Depot

and Whibney Park.

3 Pocahontas $24,000 $6,000 $30,000

Page 16: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2006 Muddlety Trail Accessible Trail Construction Design and build ADA accessible nature trail

at school.

3 Nicholas $30,000 $7,500 $37,500

WV 2006 Glenwood Park Trail Trail Construction Develop and construct extension to lakeside

trail in Glenwood Park.

3 Mercer $38,088 $9,522 $47,610

WV 2006 Hawks Nest Rail-Trail Hawks Nest Rail-Trail

Trailhead

Construct improvements to trailhead 3 Fayette $39,490 $9,872 $49,362

WV 2006 Hatfield-McCoy Trail System Trailhead Construction Build trailhead for motorized trail system. 3 Wayne $50,064 $12,516 $62,580

WV 2006 L & R Rail-Trail Construct Lewisburg end of L & R Rail-Trail 3 Greenbrier $50,418 $12,604 $63,022

WV 2006 Waterways Trail Trail Construction Construct non-motorized trail in county park. 3 Boone $60,000 $15,000 $75,000

WV 2006 Fork Mountain Trail Bridge Installation Construct bridge to connect Fork Mtn. Trail to

town

3 Nicholas $73,700 $18,425 $92,125

WV 2006 Hatfield-McCoy Trail System Trailhead Construction Build trailhead for motorized trail system. 3 Mercer $90,064 $22,516 $112,580

WV 2006 Hatfield-McCoy Trail System Trail Construction Build motorized trail system 3 Wayne $90,064 $22,516 $112,580

WV 2007 Alderson Elementary School Trail Construction and Sign

Installation

Construct walking trail at Alderson

Elementary School

3 Greenbrier, Monroe $15,520 $3,880 $19,400

WV 2007 Camp Arrowhead Accessible Trail Construction Construct ADA Trail at Camp Arrowhead 3 Cabell $700,007 $175,001 $875,008

WV 2008 Twin Branch Adventure

Center

Trail Construction Construct trail at Twin Branch Adventure

center

3 McDowell $11,625 $2,906 $14,531

WV 2008 Hawks Nest Trail Renovation Renovate historic overlook trail at Hawks

Nest

3 Fayette $29,000 $7,250 $36,250

WV 2010 Burning Rock ATV Park Burning Rock ATV Park Develop trails and trailheads in ATV Park 3 Raleigh $80,000 $3,631 $83,631

WV 2010 Rail-Trail Development Rail-Trail Development Develop Rail-Trail 3 Greenbrier $80,000 $20,000 $100,000

WV 2010 Various Water Trails Develop water trail 3 Pocahontas,

Greenbrier

$48,000 $12,000 $60,000

WV 2010 Hatfield-McCoy Trail System Hatfield-McCoy Trail System Development of a motorized trail system and

equipment purchase

3 Statewide $435,500 $108,875 $544,375

WV 2010 Beech Fork State Park Trail

System

Beech Fork State Park Repair and Rehabilitate Trail System 3 Wayne, Cabell $80,000 $20,000 $100,000

WV 2010 Cowen Trails Trail Development and

Construction

Develop and Construct Pedestrian Trail 3 Webster $40,000 $10,000 $50,000

WV 2011 Waterways Park Waterways Park Construct Trail 3 Boone $50,000 $12,500 $62,500

WV 2011 Man Park Man Park Develop and construct 3,800 feet of trail and

rehabilitate 3,000 feet of existing trail

3 Logan $40,000 $1,000 $41,000

Page 17: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2011 Summit Lake Summit Lake Renovate trail and rebuild pedestrian bridge 3 Nicholas $27,520 $6,880 $34,400

WV 2011 Camden Clinic Camden Clinic Construct non-motorized trail 3 Taylor $36,000 $9,000 $45,000

WV 2013 Rotary Park Trail Cabell, Huntington, Rotary Park, const new

trail.

3 Cabell, Wayne $12,000 $3,000 $15,000

WV 2013 Potts Valley Rail Trail Monroe, Potts Valley Rail Trail, preliminary

engineering

3 Monroe $3,213 $803 $4,016

WV 2013 Rainelle Recreation Trail Trail Construction Greenbrier; Rainelle; design and construct

trail; installation of signage, clearing of brush

& downed trees

3 Greenbrier $7,500 $1,875 $9,375

WV 2013 Mabscott Trails Purchase Equipment Mabscott, Raleigh, purchase trail building tool

equip.

3 Raleigh $27,440 $6,860 $34,300

WV 2015 Confederate Cemetery

Recreational Trail

Confederate Cemetery

Recreational Trail

3 Greenbrier $80,000 $20,000 $100,000

WV 2015 Rainelle Recreation Trail Rainelle Recreation Trail:

Phase II

3 Greenbrier $48,000 $12,000 $60,000

WV 2015 Wayne County Trail System Wayne County Trailhead

Facility

3 Logan, Mingo $40,000 $10,000 $50,000

WV 2015 Wellness Trails Wellness Trails 3 Mason $120,000 $30,000 $150,000

WV 2016 Babcock State Park Babcock State Park Purchase Equipment 3 Fayette $37,700 $7,540 $45,240

WV 2017 Burning Rock Eastern Trails Burning Rock Eastern Trails

Project

Trail construction. 3 Raleigh $120,000 $24,000 $144,000

WV 2016 Barboursville Park

Equestrian Trail

Barboursville Park

Equestrian Trail

Trail Design 3 Cabell $56,000 $11,200 $67,200

WV 2016 Anthony Creek Boat Launch Anthony Creek Boat Launch Launch Design and Construction 3 Greenbrier $28,000 $5,600 $33,600

WV 2017 Hatfield-McCoy Trail System Boone County Trailhead

Facility

Design and construct trailhead facility, 3 Boone $50,000 $10,000 $60,000

WV 2016 Guyandotte Water Trail Guyandotte Water Trail Design and construction 3 Lincoln, Logan, Mingo $125,000 $25,000 $150,000

WV 2016 Hatfield-McCoy Trail System Indian Ridge and

Pocahontas Trail

Build motorized trail system 3 McDowell $80,000 $16,000 $96,000

WV 2016 Hatfield-McCoy Trail System Rockhouse and Pinnacle

Creek Trail

Build motorized trail system 3 Logan $80,000 $16,000 $96,000

WV 2016 Hastfield-McCoy Trail

System

Bearwallow and Buffalo

Mountain Trail

Build motorized trail system 3 Logan $80,000 $16,000 $96,000

Page 18: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2016 Burning Rock ATV Park Burning Rock ATV Park Maintenance, Equipment and Trail Expansion 3 Raleigh $120,000 $24,000 $144,000

WV 2017 Greenbrier River Trail Greenbrier River Trail

Resurfacing

Resurface 50 miles of trail with gravel. 3 Greenbrier,

Pocahontas

$120,000 $24,000 $144,000

WV 2017 Meadow River Trail Meadow River Trail Phase III Develop Rail-Trail 3 Greenbrier $150,000 $30,000 $180,000

WV 2017 Narrow Gauge Trail Narrow Gauge Rail Trail

Restoration Project

Restoration project. 3 Fayette $150,000 $30,000 $180,000

WV 2017 Watoga State Park Trail

System

Park Trails and

Improvements

Park Trails and Improvements 3 Pocahontas $150,000 $30,000 $180,000

WV 2018 Athens Park Trail Athens Park Trail Design and construction of a walking trail

within the Athens Town Park located in

Athens, WV.

3 Mercer $60,157 $12,031 $72,188

WV 2018 Bluestone National Scenic

River Trail Causeway

Bluestone National Scenic

River Trail Causeway

Design and construction of drainage

infrastructure to prevent erosion of the

Bluestone National Scenic Trail Causeway

between Bluestone and Pipestem State

Parks.

3 Summers $10,000 $2,000 $12,000

WV 2018 Brush Creek River Access Bluestone River Water Trail

Group

Design of a hiking trail with river access along

Brush Creek from the community of Gardner

to the Bluestone National Scenic River, on to

Pipestem State Park and along Camp Creek

to Camp Creek State Park all within Mercer

County , WV.

3 Mercer $150,000 $30,000 $180,000

WV 2018 Bridge Buttress Rock,

Needleseye Park

Fayette County Climbing

Access Stabilization and

Development

Design and construction to rehabiltate the

Bridge Buttress rock climbing and hiking

recreation area with erosion control as well

as creating new trails and staging areas for

hiking, rocking climbing and bouldering in

Needleseye Park located within...

3 Fayette $100,000 $20,000 $120,000

WV 2018 Greenbrier River Trail Greenbrier River Trail

Facilities Replacement and

Enhancement Project

Construction to replace the facilities of the

Greenbrier River Trail including the vault

toilet, well with hand pump and Adirondack

shelter that were lost during the the 2016

flood.

3 Greenbrier $53,000 $10,600 $63,600

Page 19: Search Results Recreational Trails Program Project Database

State

Project

Year

Trail Name

Project Name

Description

Cong. District(s)

County(s)

RTP Funds

Other Funds

Total Funds

WV 2018 Greenbrier River Trail -

Marlin Mountain Trail

Connector

Marlinton Ranger District

Forest and Community

Connections

Design and construction of approximately 2.2

linear miles of trail along the abandoned

Halfway Run road bed to create a trail

connection between the Greenbrier River

Trail and the Marlin Mountain Trail within

Marlinton, WV.

3 Pocahontas $25,000 $5,000 $30,000

Grand

Totals

(all

results)

$16,797,099 $4,410,102 $21,207,201