PRODUCT BROCHURE Installation Benefits of Secant Piles Using dedicated piling rigs, secant pile walls are formed by constructing two types of overlapping piles. ‘Soft’ piles are constructed at set intervals before ‘hard’ piles are cut into the unreinforced set, forming a continuous structure. Soft piles are often constructed using a lower strength of concrete to speed up construction, with these piles ultimately acting as a seal between the hard load bearing piles. Suitable for wet, loose, or soft soil ground Low noise and vibration free Higher wall stiffness compared to sheet piles Permanent shoring solution and can be incorporated into the final structure Secant Piles Our Secant piles offer an effective solution for constructing retaining walls, basements and foundations on water charged or difficult ground. By constructing retaining walls through a series of overlapping contiguous flight auger (CFA) piles, we are able to create a finished watertight permanent wall that requires no additional wall system to be built in front.

Upload: duongkiet

Post on 08-Mar-2018

231 views

Category:

Documents


1 download

TRANSCRIPT

PRODUCT BROCHURE

Installation Benefits of Secant Piles

Using dedicated piling rigs, secant pile walls are formed by constructing two types of overlapping piles. ‘Soft’ piles are constructed at set intervals before ‘hard’ piles are cut into the unreinforced set, forming a continuous structure. Soft piles are often constructed using a lower strength of concrete to speed up construction, with these piles ultimately acting as a seal between the hard load bearing piles.

Suitable for wet, loose, or soft soil ground

Low noise and vibration free

Higher wall stiffness compared to sheet piles

Permanent shoring solution and can be incorporated into the final structure

Secant PilesOur Secant piles offer an effective solution for constructing retaining walls, basements and foundations on water charged or difficult ground. By constructing retaining walls through a series of overlapping contiguous flight auger (CFA) piles, we are able to create a finished watertight permanent wall that requires no additional wall system to be built in front.

Our Commitment to Quality Assurance

At SFL Piletech we not only pride ourselves on our customised solutions, but also our impressive safety record and commitment to quality assurance. We have a professional obligation to follow the piling code, and as such are committed to delivering sustainable, safe and high quality products and services.

We provide a full complement of quality assurance documentation and certification for the wide variety of projects we undertake. All of our piling and retention systems are designed by our expert team of in-house engineers using Australian standards. We provide engineering certificates that cover the design and construction of our works and all constructions are documented to provide full traceability of the materials and dimensions of all constructed elements.

In 2013 we were awarded the Fluor Safety Excellence Award for our work on the Santos Gladstone Liquefied Natural Gas (GLNG) Upstream Project. Between February 1st 2011 and May 12th 2013 we were responsible for delivering 5,000,000 work hours without a lost time incident; something that to this day we are extremely proud about.