10-10-2015 1:100@A1 02 1 SECL/2349/BW/GF/051 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. ALL LEVELS ARE IN METERS UNLESS OTHERWISE SPECIFIED PROJECT No. DATE SCALE DRAWN CHKD APPD REV. 2349 AS MS -- DRAWING NO. SH.NO. DRAWING NO. STRUCT. ENG. ARCHITECT M.E.P. TECH.M. P.M. CHECKED BY REVIEWED BY CONTRACTOR PROJECT CONSULTANT CLIENT REFERENCE DRAWINGS REVISION DETAILS DRAWING NO. REV. DRAWING TITLE Sl.No. REV. DATE DRAWN CHKD MODIFICATIONS LEGEND: NOTES K E Y P L A N P.O.BOX 119364 DUBAI,UAE. ENGINEERING & CONTRACTING LLC. TEL-8867500,FAX-8867800 Email: [email protected] Web site: www.sobha-me.com DATE GROUND FLOOR MS VJ PART-1 ISSUE FOR APPROVAL 00 10-10-2015 AS MS 1 A-02 8 GROUND FLOOR PLAN 28-10-2015 BLOCK WORK LAYOUT 2 A-421 to A-425 2 SCHEDULE OF DOORS & WINDOWS 07-09-2015 DRAWINGS STATUS REVISED AS PER CONSULTANT COMMENTS 01 20-10-2015 AS MS REVISED AS PER LATEST IFC DWGS 02 29-10-2015 AS MS 3 A-420 2 SCHEDULE OF DOORS & WINDOWS 28-10-2015 MEP BUILDERS WORK OPENINGS, REFER TO SAMA GROUND FLOOR COORDINATION SHOP DRAWING NO. SECL/2349/MEP/GF/CO-100-REV. 0 NOTE:- 4 A-423 3 SCHEDULE OF DOORS & WINDOWS 28-10-2015 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Upload: syampk

Post on 15-Jul-2016

224 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SECL-2349-BW-GF-051 R02-part 1.pdf

10-10-2015 1:100@A1 02

1

SECL/2349/BW/GF/051

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

2. ALL LEVELS ARE IN METERS UNLESS OTHERWISE SPECIFIED

PROJECT No. DATE SCALE DRAWN CHKD APPD REV.

2349 AS MS --

DRAWING NO.

SH.NO.

DRAWING NO.

STRUCT. ENG. ARCHITECT M.E.P. TECH.M. P.M.

CHECKED BY REVIEWED BY

CONTRACTOR

PROJECT

CONSULTANT

CLIENT

REFERENCE DRAWINGS

REVISION DETAILS

DRAWING NO. REV. DRAWING TITLESl.No.

REV. DATE DRAWN CHKD MODIFICATIONS

LEGEND:

NOTES

K E Y P L A N

P.O.BOX 119364DUBAI,UAE.

ENGINEERING & CONTRACTING LLC.

TEL-8867500,FAX-8867800Email: [email protected] site: www.sobha-me.com

DATE

GROUND FLOOR

MS VJ

PART-1

ISSUE FOR APPROVAL

00 10-10-2015 AS MS

1 A-02 8 GROUND FLOOR PLAN 28-10-2015

BLOCK WORK LAYOUT

2 A-421 to A-425 2 SCHEDULE OF DOORS & WINDOWS 07-09-2015

DRAWINGS STATUS

REVISED AS PER CONSULTANT COMMENTS

01 20-10-2015 AS MS

REVISED AS PER LATEST IFC DWGS

02 29-10-2015 AS MS

3 A-420 2 SCHEDULE OF DOORS & WINDOWS 28-10-2015

MEP BUILDERS WORK OPENINGS, REFER TO

SAMA GROUND FLOOR COORDINATION SHOP

DRAWING NO. SECL/2349/MEP/GF/CO-100-REV. 0

NOTE:-

4 A-423 3 SCHEDULE OF DOORS & WINDOWS 28-10-2015

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PR

OD

UC

ED

B

Y A

N A

UT

OD

ES

K E

DU

CA

TIO

NA

L P

RO

DU

CT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT