secondary raw materials for concrete precast products · seramco - secondary raw materials for...

31
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 1 Secondary Raw Materials for Concrete precast products Introducing new products, applying the circular economy Prof. Dr.-Ing. Christian Glock

Upload: others

Post on 12-Oct-2019

20 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 1

Secondary Raw Materials for Concrete precast products

Introducing new products, applying the circular economy

Prof. Dr.-Ing. Christian Glock

Page 2: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 2

Gliederung

1. Interreg NWE (Länder, Ziele, Prioritäten)

2. SeRaMCo-Projekt

3. Antragsphase

4. Erfahrungen Antragphase

5. Projektumsetzung

6. Erfahrungen Umsetzungsphase

7. Fazit

Page 3: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 3

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

IrelandUK

France

Belgium

The Netherlands

Germany

Luxembourg

Switzerland

8 teilnehmende Länder

Fläche 845 000 km²

Bevölkerung 180 Mio. Menschen

Page 4: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 4

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Projekt…

… sollte Partner aus mindestens drei Ländernzusammenbringen, von denen zwei aus dem NWE-Raum stammen müssen …

… sollte die Veränderungen und Ergebnisse, die sie erreichen wollen, so weit wie möglich identifizieren und quantifizieren und sicherstellen, dass diese zu den Ambitionen des Programms passen …

Page 5: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 5

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Allgemeine Zielsetzung

„Um ein wichtiger wirtschaftlicher Akteur auf der Welt zu werden und einen attraktiven Ort zum Arbeiten und Leben mit hohem Innovationsgrad, Nachhaltigkeit und Zusammenhalt zu schaffen“

Um dieses Ziel zu erreichen:

Unterschiede in der wirtschaftlichen, ökologischen und sozialen Leistung der Regionen von NWE verringern

Steigerung der Gesamtleistung im gesamten NWE-Raum

Page 6: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 6

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Innovation

SO1: To enhance innovation performance of enterprises

Low Carbon

SO2: To facilitate the implementation of low-carbon, energy and climate protection strategies

SO3: To facilitate the uptake of low carbon technologies, products, processes and services in sectors with high energy saving potential

SO4: To facilitate the implementation of transnational low-carbon solutions in transport systems

Resource and materials efficiency

SO5: To optimise (re)use of material and natural resources in NWE

Page 7: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 7

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Gesamtziel

Erhöhung der Verwendung von Bauabfällen (CBTC: concrete, briks, tiles and ceramics) als Sekundärrohstoff für Zement und Betonfertigteile

Basis Verwendung von rezyklierten Gesteinskörnungen ca. 3 Mil. Tonnen in NWE

Geschätzte Nettoveränderung

- kurzfristig (Projektende) … + 50.000 t/a

- mittelfristig (nach 5 a) … + 1 Million t/a

- langfristig (nach 10 a) … + 13 Millionen t/a

Page 8: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 8

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Unterziele (Sub-objectives):

1. Voraussetzungen für hochwertiges Recycling von Beton, Ziegeln, Fliesen und Keramik entwickeln, um deren Verwendung als Sekundärrohstoff für Zement und Betonfertigteile zu ermöglichen

2. Entwicklung und Charakterisierung neuer Zement-und Betonmischungen, die die Verwendung der hochwertigen recycelten Abfälle ermöglichen

3. Entwicklung und Herstellung innovativer Zement-und Fertigprodukte aus recycelten Zuschlagstoffen und deren Vorbereitung auf die Vermarktung und Marktdurchdringung

Page 9: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 9

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

11 Partners3 Sub-Partners3 Associated Partners

17 Partner aus5 EU-Ländern(Deutschland, Frankreich, Niederlande, Belgien, Luxemburg)

Partnerschaft

Page 10: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 10

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Projektpartner

Page 11: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 11

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

CDW-unknown origin

CDW-known origin

developed treatment

AggregateSandcement mixes

concrete mixes

Str. Elements

Non-str. Elements

cement3 pilot projects

Projektidee

WP T1

WP T2

WP T3

Page 12: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 12

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

LONG TERM EFFECTS COMMUNICATION PROJECT MANAGEMENT

WPT1: Best process of materials treatment

WPT2: Developing new cement and new concrete mixes for use of recycled materials

WPT3: Generating and implementing innovative cement and concrete products based on recycled aggregates

Pilot 1: test, implement and promote precast products in the city of Seraing (Belgium)

Pilot 2: test, implement and promote precast products in Saarlouis (Germany)

Pilot 3: test, implement and promote precast products in Moselle region DC57 (France)

UNIKLS&P UNIKL

Ulg

UL

ULux

Ulg

UNIKL

Cerema

Arbeitspakete

Page 13: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 13

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Mar 2017 Oct 2017Mar2019

Sep 2019

Jun 2020 Sep 2020

LONG TERM EFFECTS

COMMUNICATION

PROJECT MANAGEMENT

WP T1

WP T2

WP T3

WP T3

WP T3

WP T3

38 Monate - Zeitplan

Page 14: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 14

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Market Analysis Roll-out plan

Business Model

LONG TERM EFFECTS

Page 15: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 15

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

COMMUNICATION

Activities & Deliverables

1. Start-up activities including communication strategy Detailed Communication strategy communication workshop with all PP, incl. goals, target groups Key messages & tactics Promotional material package (leaflet & poster)

2. Public Event(s) High-level conferences Presentation of findings at key multipliers Public openings of investments

3. Publication(s) (non- and scientific articles & Documentary videos)

4. Digital activities ( Website, social media, newsletter)

To inform the actors of the supply chain about the methods and products developed in the project and to engage them for replacing the raw materials in pre-cast concrete products with secondary raw materials

Communication Strategy

Public Events

Publication & Digital Activities

COMMUNICATION

Page 16: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 16

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Project Management Team (PMT)

Project ManagerCommunication Manager

Financial Manager

Advisory Board(AB)

13 Members

Thematik Working Groups (WGs)WG-1: Best process for materials treatment

WG-2: Developing

new cement mixes

WG-4: Generating and implementing

innovative cement and concrete products

WG-3: Developing new concrete mixes

Steering Committee

(SC)12 Members

PROJECT MANAGEMENT

Page 17: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 17

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Activities &Deliverables

1. Day-to-day management and coordination project manual - for PPs steering committee (7 meetings) activity reporting (to programme)

2. Financial management Financial management tool Financial monitoring reports Financial reporting (to programme

3. Risk management Risk management plan Updating the RMP Mid-term evaluation

4. First level controlling Set-up controlling and audit trails Audits

Project manual

Steering Committee

Activity reporting

1- Day-to-day management and coordination

PM – Activities & Deliverables

Page 18: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 18

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Tools Monitoring reports

Activity reporting

2-Financial management

PM – Activities & Deliverables

Page 19: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 19

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Plan Plan updating7 updates

Mid-term evaluation

3-Risk management

PM – Activities & Deliverables

Page 20: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 20

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

4- First Level Controlling

Set-up controlling and audit trails

Audits

PM – Activities & Deliverables

Page 21: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 21

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Die Erfahrungen der Antragsphase lassen sich nach folgenden Kriterien kategorisieren:

1. Projektidee

2. Partnerschaft

3. Projektorganisation

4. Antrag & EMS

Page 22: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 22

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Fokussiert, konkret und realistisch

Messbare Ergebnisse, die marktorientiert sind und Programmzielen dienen

Basiert auf vorhandener Forschung und Erfahrung aus andern nationalen und internationalen Projekten (besonders EU Projekte)

Kann gut zu einer Prioritätsachse zugeordnet werden

1. Projektidee

Page 23: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 23

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

2. Partnerschaft

Nicht zu viele Partner

Unterschiede der Länder im Stand der Technik bezüglich Projektthema beachten

Keine zwei Partner für ähnliche / gleiche Aufgabe zuordnen

Diversität der Fachkompetenzen der Partner soll Austausch fördern

Budget angemessen zur Aktivitäten und zum Personalbedarf

Arbeitsumfang in Arbeitspaket „Project Management“ nicht unterschätzen

Page 24: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 24

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

3. Projektorganisation

Projektidee klar definieren und frühzeitig abstimmen

2-3 Partnertreffen in Antragphase (physisch)

Aufgaben, Beiträge und Verantwortungen zur Antragskizze beim ersten Partnertreffen präzise verteilen

Lead-Partner (LP) definiert feste Termine für Abgaben

Excel-Tabellen für gesamtes Budget sowie für das Budget jeder Partner erstellen(EMS-Vorgaben beachten wegen Übertragung )

Ausreichendes Budget für FLC-Kosten einplanen

Page 25: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 25

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

4. Antrag & EMS

Antrag muss Projektidee, Objectives, Sub-objectives, Aktivitäten und Deliverables klar und verständlich darstellen

„Baseline“und „Changes (results)“ müssen in Zahlen angegeben werden

Begriffe „joint development, joint evaluation, joint …“ und „Erfahrungsaustausch“ müssen gelebt werden

Übertragungsaufwand der Antragstexte und Budget aus Word-und Excel-Datei in EMS nicht unterschätzen (ca. 20 Arbeitsstunden) - Störungen in EMS einrechnen

In EMS soll nach jedem Text „ Speicher“ betätigt werden

1 Tag vor der Abgabe alles in EMS übertragen

Page 26: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 26

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Umsetzungsphase

Page 27: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 27

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Status-quo

17/46 Deliverables

Communication und Long-term gemäß Plan

Best Practice bei Materialaufbereitungs- und Recyclingmethoden

Best Practice bei der Herstellung von Beton und Zement aus rezyklierten Gesteinskörnungen

Erste Ergebnisse der Entwicklung neuer Zement-und Betonmischungen

Industrielle Produktion von Zement aus recyceltem Sand hat bei VICAT begonnen

Entwicklung neuer Konzepte für Fertigprodukte von TU Delft

Page 28: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 28

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Aufgaben müssen zu Projektstart eindeutig auf Projektpartner verteilt werden

Aktivitäten in den verschiedenen Arbeitspaketen sollen streng nach Takt entsprechend Antrag durchgeführt werden

Aktivitäten wie Pilotprojekte erfordern frühzeitige Abstimmung mit zuständigen Behörden und/oder Verantwortlichen

Enge und frühzeitige Abstimmung jedes Projektpartners mit ihrem jeweiligen FLC

Lead Partner (LP) soll Fristen für Erstellung der Partnerreporte setzen um Abgabeverspätungen zu vermeiden

Erfahrungen

Page 29: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 29

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Besuch Schulung für Finanzmanager und First Level Controller (FLC) um sich Organisation und Abrechnungsarten anzueignen

Förderfähigkeitsregeln sind verständlich und in der Programmbeschreibung ordnungsgemäß erläutert

Schnelle Beantwortung bei Abrechnungsfragen seitens OFD

Projekt ist in Antragsphase soweit detailliert, das Implementation erleichtert

Definierte Deliverables aus Antragphase können in der Implementation gesteuert werden

Erfahrener Projektpartner für Kommunikation im Projekt

Erfahrungen

Page 30: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 30

Interreg NWE

Länder

Ziele

Prioritäten

SeRaMCo

Kurzvorstellung

Antragsphase

Erfahrungen – A.

Umsetzungsphase

Erfahrungen – U.

Fazit

Fazit:

Ein Interreg-Projekt …

…ermöglicht guten Austausch und Zusammenarbeit mit Partnern aus derselben Branche in NWE

… öffnet Türen für weitere grenzüberschreitende Projekte

… erfordert viel organisatorischen und verwaltungstechnischen Aufwand

… lohnt die Mühe

Page 31: Secondary Raw Materials for Concrete precast products · SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr

SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 31

Vielen Dank für Ihre Aufmerksamkeit!

Ich freue mich auf Ihre Fragen.

Prof. Dr.-Ing. Christian Glock