section 1: e. 105 director... · 2015-02-10 · project implementation section 2: quebec to e. 93rd...

5

Upload: others

Post on 27-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Section 1: E. 105 Director... · 2015-02-10 · Project Implementation Section 2: Quebec to E. 93rd Street. Title Subtitle Date Title Subtitle ... Geotechnical Drilling Inspection
Page 2: Section 1: E. 105 Director... · 2015-02-10 · Project Implementation Section 2: Quebec to E. 93rd Street. Title Subtitle Date Title Subtitle ... Geotechnical Drilling Inspection

8

PROPOSED NS RAIL BRIDGE OVER THE BOULEVARD

PROPOSED BRIDGE OVER NS RAILROAD

AND GCRTA RED LINE

PROPOSED BRIDGE OVER GCRTA BLUE AND GREEN LINES

PROPOSED BRIDGE OVER KINGSBURY

RUN VALLEY

PROPOSED E. 55TH

BRIDGE OVER THE BOULEVARD

Section 1: E. 105th Street Corridor to Quebec

Section 3: E. 93rd Street to E. 55th Street

87

Project Implementation

Section 2: Quebec to E. 93rd Street

Page 3: Section 1: E. 105 Director... · 2015-02-10 · Project Implementation Section 2: Quebec to E. 93rd Street. Title Subtitle Date Title Subtitle ... Geotechnical Drilling Inspection

Title

Subtitle

Date

Title

Subtitle

Date

Section 2 CUY-10-20.09 PID 98695• Design Build Project

• Advertising Date 4/9/2015 (preliminary plans available)

• Pre-Bid Meeting dates between 5/28/2015 - 6/3/2015

• Sale Date 7/2/2015 (bids due)

Project Schedule

Estimated Cost is $32M

Project Schedule– 9

Page 4: Section 1: E. 105 Director... · 2015-02-10 · Project Implementation Section 2: Quebec to E. 93rd Street. Title Subtitle Date Title Subtitle ... Geotechnical Drilling Inspection

Project Work Types For DesignSection 2

The Design Build Team mustlist relevant prequalification categories for Consultant and Sub-Consultants to show that the prequalification requirements listed are satisfied.

CATEGORY

Roadway:Bicycle Facilities and Enhancement DesignComplex Roadway Design

Subsurface Utility Engineering

Bridge Design:Level 2 Bridge Design Level 3 Bridge Design (for the elements of the bridge proposed by the DBT that exceed Level 2 Bridge Design) Bridge Design Sub-factors: Complex geometry

Soils/Geotechnical Services:Geotechnical Engineering ServicesGeotechnical Testing LaboratoryGeotechnical Field Exploration ServicesGeotechnical Drilling Inspection Services

Traffic Signal Design:Traffic Signal System Design

Highway Lighting Design:Complex Lighting Design

Environmental Documentation:Environmental Site Assessment Phase II

Page 5: Section 1: E. 105 Director... · 2015-02-10 · Project Implementation Section 2: Quebec to E. 93rd Street. Title Subtitle Date Title Subtitle ... Geotechnical Drilling Inspection

CODE DESCRIPTION

1 Clearing & Grubbing

2 Building Removal

4 Roadway Excavation & EmbankmentConstruction

5 Major Roadway Excavations

6 Incidental Grading

7 Soil Stabilization

8 Temporary Soil Erosion & Sediment Control

9 Aggregate Bases

10 Flexible Paving

12 Rigid Paving

13 Pavement Planning, Milling, Scarification

15 Sawing

16 Flexible Replacement17 Rigid Pavement Replacement21 Level 2 Bridge23 Reinforcing Steel

CODE DESCRIPTION

26 Structural Steel Painting27 Expansion & Contraction Joints, Joint

sealers, Bearing Devices28 Caissons / Drilled Shafts34 Earth Retaining Structures35 Drainage (Culverts, Misc.)36 Guardrail / Attenuators38 Misc. Concrete

39 Maintenance of Traffic

42 Signing

43 Highway Lighting

44 Traffic Signals-Standard

45 Pavement Markings

46 Landscaping

48 Trucking

50 Railroad Track Construction53 Piling54 Post-Tensioning Bridge Members55 Fiber Optic Cable Installation, Splicing,

Termination and Testing – Traffic Signal System

Anticipated Project Work Types For Construction - Section 2