SECTION 1
INTRODUCTION TO POST-TENSIONED CONCRETE
DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE
![Page 2: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/2.jpg)
NOTE: MOMENT DIAGRAM CONVENTION
• In PT design, it is preferable to draw moment diagrams to the tensile face of the concrete section. The tensile face indicates what portion of the beam requires reinforcing for strength.
• When moment is drawn on the tension side, the diagram matches the general drape of the tendons. The tendons change their vertical location in the beam to follow the tensile moment diagram. Strands are at the top of the beam over the support and near the bottom at mid span.
• For convenience, the following slides contain moment diagrams drawn on both the tensile and compressive face, denoted by (T) and (C), in the lower left hand corner. Please delete the slides to suit the presenter's convention.
![Page 3: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/3.jpg)
REVIEW: FUNDAMENTALS OF
PRESTRESSED CONCRETE
NEW: DIFFERENCES
BETWEEN PRE-TENSIONING AND POST-TENSIONING
![Page 4: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/4.jpg)
REVIEW OF REINFORCED CONCRETE
Critical Point for Cracking
Stages of BehaviorUncracked
σ
Cracked (~Elastic)
σ
Ultimate
σ
![Page 5: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/5.jpg)
REVIEW OF REINFORCED CONCRETE
Mcr
My
Mn
Mom
ent
Curvature
Large deflections due to cracking
Steel is not engaged until after cracking
![Page 6: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/6.jpg)
REVIEW OF REINFORCED CONCRETE
Reinforcement is PASSIVE
Steel crosses cracks, but does not prevent them
![Page 7: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/7.jpg)
![Page 8: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/8.jpg)
QUESTION TO PONDERSuppose a R/C beam has too much cracking and too
much deflection. How might you propose to fix it? (i.e. not replace it)
Tension (bending) + Compression (“squeezing”) =
Net Zero Stress
“Sqeezed” Before Loading (Pre-compressed):
Pre-Compression (“prestressing”) + Tension (bending) =
Net Zero Stress
![Page 9: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/9.jpg)
HOW TO BUILD IT?
Prestressing: Concrete pre-compressed before loading in bending (flexural tension)
1. Pre-Tensioning: Steel tensioned before concrete is placed
2. Post-Tensioning: Steel tensioned after concrete is hardened
Prestressing is ACTIVE – can prevent cracks from forming
![Page 10: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/10.jpg)
PRE-TENSIONING
1. Tension Strands
2. Cast Concrete – Bond strands to concrete
3. Cut Strands – Transfer force to concrete
![Page 11: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/11.jpg)
POST-TENSIONING
1. Cast Concrete with Duct
2. Feed Strands through Duct
3. Tension Strands
4. Grout Duct (or other corrosion protection)
Section
![Page 12: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/12.jpg)
POST-TENSIONING• Post-tensioning can take on any profile
• Draped configurations are much more common than straight tendons• Why?
![Page 13: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/13.jpg)
PRE-TENSIONING
Post-Tensioning
Force Transfer by Steel-Concrete bond
Force Transfer at end anchor
Strain Compatibility and Force Equilibrium:
Steel held at length longer than it “wants” to be: Tension
Concrete compressed shorter than it “wants” to be: Compression
![Page 14: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/14.jpg)
Pre-Tensioned elements are often precast in a factory and shipped to the site
Post-Tensioned elements can be cast and tensioned in the final location (cast-in-place). They can also be precast.
![Page 15: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/15.jpg)
PRE-TENSIONINGINSTALL PRESTRESSING STRANDS
![Page 16: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/16.jpg)
PRE-TENSIONINGTENSION STRANDS
![Page 17: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/17.jpg)
PRE-TENSIONINGSTRANDS AFTER TENSIONING
![Page 18: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/18.jpg)
PRE-TENSIONINGINSTALL MILD REINFORCEMENT
![Page 19: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/19.jpg)
PRE-TENSIONINGINSTALL INSERTS AND ASSEMBLIES
![Page 20: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/20.jpg)
PRE-TENSIONINGSET FORM SIDES
![Page 21: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/21.jpg)
PRE-TENSIONINGPLACE CONCRETE
![Page 22: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/22.jpg)
PRE-TENSIONINGCURE CONCRETE WITH ACCELERATED
METHODS
![Page 23: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/23.jpg)
PRE-TENSIONINGREMOVE GIRDER FROM CASTING BED
![Page 24: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/24.jpg)
PRE-TENSIONINGMOVE GIRDER TO STORAGE
![Page 25: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/25.jpg)
PRE-TENSIONINGTRANSPORT TO JOBSITE
![Page 26: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/26.jpg)
PRE-TENSIONINGGIRDERS IN FINISHED STRUCTURE
![Page 27: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/27.jpg)
POST-TENSIONINGDucts for Post-Tensioning
![Page 28: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/28.jpg)
POST-TENSIONING
![Page 29: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/29.jpg)
POST-TENSIONING
![Page 30: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/30.jpg)
POST-TENSIONING
![Page 31: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/31.jpg)
POST-TENSIONING
![Page 32: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/32.jpg)
POST-TENSIONING
![Page 33: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/33.jpg)
POST-TENSIONING
![Page 34: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/34.jpg)
POST-TENSIONINGStressing Strands:
Multiple Strands: Multistrand
Single Strand: Monostrand
![Page 35: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/35.jpg)
HOW ARE STRANDS ANCHORED?
Cast against concrete at end of beam
![Page 36: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/36.jpg)
HOW ARE STRANDS ANCHORED?
Concrete
Duct
Strand
Anchor cast in concrete
![Page 37: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/37.jpg)
POST-TENSIONING:Bonded System(at high point)
Unbonded System
Grout
“PT Coating” (grease)
![Page 38: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/38.jpg)
GROUTING POST-TENSIONED SYSTEMS
Grout In
Vent
Vent
![Page 39: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/39.jpg)
POST-TENSIONING
![Page 40: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/40.jpg)
STRUCTURAL EFFECT OF PRESTRESSING
True for Pre- and Post-Tensioning
Pre-Stressing
+
Applied Load
=
T C T C
Total Stress
T C
Stress Limits
![Page 41: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/41.jpg)
STRUCTURAL EFFECT OF PRESTRESSING
True for Pre- and Post-Tensioning
Pre-Stressing
+
Applied Load
=
T C T C
Total Stress
T C
+
T C
Service
Transfer
![Page 42: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/42.jpg)
ECCENTRIC PRESTRESSING
Eccentricity in prestressing:- Desirable at midspan- Not productive, even detrimental, at end of span
Strategies for pre-tensioned systems:- Draped / harped profiles
Temporarily held in place before concrete is hardened
- DebondingNot all strands are active at end of span
Strategies for post-tensioned systems:- Install ducts in desired profile
![Page 43: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/43.jpg)
COMMON CONFIGURATIONSPre-tensioning:
Draped
Debonded
Post-tensioning:
![Page 44: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/44.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
(T)
![Page 45: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/45.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
(C)
![Page 46: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/46.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
Option 1
Good:• Efficient at midspan• Easy to construct
Bad:• Counter-productive over
support(T)
![Page 47: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/47.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
Option 1
Good:• Efficient at midspan• Easy to construct
Bad:• Counter-productive over
support(C)
![Page 48: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/48.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
Option 2
Good:• Efficient over support• Easy to construct
Bad:• Counter-productive at
midspan(T)
![Page 49: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/49.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
Option 2
Good:• Efficient over support• Easy to construct
Bad:• Counter-productive at
midspan(C)
![Page 50: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/50.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
Option 3
Good:• Efficient over support• Efficient at midspan
Bad:• Difficult to construct
(T)
![Page 51: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/51.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
Option 3
Good:• Efficient over support• Efficient at midspan
Bad:• Difficult to construct
(C)
![Page 52: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/52.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
Option 4
Requires post-tensioning; very difficult to achieve by pre-tensioning
No net eccentricity
No net eccentricity
(T)
![Page 53: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/53.jpg)
PROBLEM FOR THOUGHT…Where should the prestressing be placed?
Tension
Tension
Mom
ent
Dia
gram
Option 4
Requires post-tensioning; very difficult to achieve by pre-tensioning
No net eccentricity
No net eccentricity
(C)
![Page 54: SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE](https://reader036.vdocument.in/reader036/viewer/2022062321/56649dc95503460f94abfbb3/html5/thumbnails/54.jpg)
SUMMARY: PRESTRESSED
CONCRETE Efficient use of materials – concrete maintained in compression, crack control
Smaller deflections/thinner members Longer spans Corrosion resistance Less material; reduced environmental
impact