Mission Assurance Organization
Project Manager Systems
Assurance Manager
Quality Assurance
• Quality Engineering
• S/W Quality Assurance
• Inspection/Audits
• Certification/Training
• NCRCA
• MRB
Systems Safety and Reliability
• Systems Safety Engineer
• Reliability Engineer
• Environmental Program
Materials Engineering
• Materials Engineer
• Coupon Analysis
• Material Usage Agreements
• Analysis Lab
Parts Engineering
• Parts Engineer
• Parts Selection/stocking
• Alerts
• Analysis Lab
Systems Review Office
OSSMA (Code 300)
•
GSFC
GSFC
ST5 PDR June 19-20, 2001 20-3
Mission Assurance Requirements• Tailored from the requirements suggested by the
Mission Assurance Guidelines GPG 8730.4.2
• Contained in “Mission Assurance Requirements for the ST5 Project”, ST5-495-010
• Technical Reviews in addition to Peer Reviews– System Concept Review (SCR) – Completed May 2000
– Preliminary Design Review (PDR) – June 19-20, 2001
– Critical Design Review (CDR)
– Pre-Environmental Review (PER)
– Mission Operations Review (MOR)
– Pre-Shipment Review (PSR)
– Flight Operations Review (FOR)
– Flight Readiness Review (FRR)
GSFC
ST5 PDR June 19-20, 2001 20-4
Mission Assurance Requirements•Design Verification
– Performance Verification Plan (PVP)
– Verification Program based upon GEVS-SE
– Verification Matrix (for both H/W and S/W)
– Environmental Test Matrix
– Procedures and Reports
– Protoflight and Acceptance testing to ST5 S/C Specification and Requirements document (ST5-495-007) • Protoflight testing shall be performed on the first Flight Unit of the ST5
constellation
• Acceptance testing shall be performed on follow-on Flight Units
GSFC
ST5 PDR June 19-20, 2001 20-5
•Safety
– “ST5 System Safety Implementation Plan”, ST5-495-040 - Approved
– Assumes use of ELV, and not Shuttle
– Developers provide required information for GSFC Safety Engineer
– GSFC has overall safety responsibility
•Parts Requirements
– PPL-21, Grade 2 as baseline. Lot specific Qualification and DPA implemented based on part heritage. Parts Control Plan currently in draft form; is being implemented for all subsystems.
– Parts Control Board review of selected parts. Approved parts will be added to ST5 PAPL and posted on web site.
Mission Assurance Requirements
GSFC
ST5 PDR June 19-20, 2001 20-6
•Electronic Packaging and Process– NASA Workmanship Standards
– Coupon Evaluation
•Materials– NASA Publication 1124, Outgassing Data for Selecting S/C
Materials, shall be used as a guide.
– Materials approved via a Materials Control Board chaired by Project Materials Engineer
– Materials must meet CVCM level 0.1% and TML of 1.0%
– Non-approved materials or nonconventional use of materials processed via Materials Usage Agreement (MUA)
– GSFC S-313-100, GSFC Fastener Integrity Requirements
Mission Assurance Requirements
GSFC
ST5 PDR June 19-20, 2001 20-7
•Reliability
– FMEA – To be completed by CDR
– Fault Tree Analysis - To be completed by CDR
– Probability Risk Assessment (PRA)
– Assessments shall include Worst Case Analysis, Parts Stress Analysis, and limited life items program
Mission Assurance Requirements
GSFC
ST5 PDR June 19-20, 2001 20-8
Mission Assurance Requirements
•Quality Manual (or equivalent) required from major subcontractors (All are due prior to CDR)– Cold Gas Micro-Thruster System - Marotta Scientific Controls, Inc.
• Approved
– Li-Ion Battery - AEA Technology
– X-Band Transponder Communications System - AeroAstro
• Received Draft Version
– Flexible Cable - Lockheed Martin Astronautics, Denver
– Autonomous Ground-Based Constellation Management S/W - JPL/Bester Tracking Systems, Inc
– Magnetometer - UCLA
• Received Draft Version
GSFC
ST5 PDR June 19-20, 2001 20-9
Mission Assurance Requirements
•Contamination
– Contamination Control Plan
•S/W
– S/W Management Plan
• Configuration Control
• Quality Assurance
• Testing
• Performance Validation Matrix
• IV&V
– MOA with Code 307 outlining the extent of IV&V