SECTION 5APPENDICES
146 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
APPENDIX 1EXTERNAL SCRUTINY
PARLIAMENTARY COMMITTEES This section reports on Defence’s activities in relation to parliamentary committee inquiries and activities from 1 July 2008 to 30 June 2009. Further information on the parliamentary reports, inquiries and hearings detailed below can be accessed through the Australian Parliament House website, www.aph.gov.au.
Joint CommitteesJoint Committee on Public Accounts & AuditInquiry into Financial Management & Equipment Acquisition in the Department of Defence & Defence Materiel Organisation
On 8 August 2008, the Committee tabled its report, Report No 411 – Progress on equipment acquisition and financial reporting in Defence. Defence prepared a Government response that was tabled on 28 January 2009.
Report No 412 – Audit Reports reviewed during the 41st Parliament
On 25 August 2008, the Committee tabled its report, making one recommendation of Defence interest. Defence prepared a Government response that was tabled on 18 June 2009.
Review of the Auditor General’s Report No 27: Management of the M-113 Armoured Personnel Carrier Upgrade Project
On 15 June 2009, Defence witnesses provided evidence at a public hearing. No questions were taken on notice.
Joint Standing Committee on Foreign Affairs, Defence & TradeInquiry into Defence Annual Report 2005-06
Following the tabling of the Committee’s review of the Defence Annual Report 2005-06 on 2 June 2008, Defence prepared a Government response which was tabled in Parliament on 13 November 2008.
Inquiry into Australia’s relationship with ASEAN
On 12 September 2008, Defence witnesses attended a public committee hearing. Three questions were taken on notice and Defence submitted the responses to the Committee on 7 January 2009. The Committee tabled its report on 24 June 2009.
Inquiry into Australia’s Trade and Investment Relations with Asia, the Pacific and Latin America
On 2 October 2008, Defence provided a submission to the Committee.
Inquiry into Defence Annual Report 2006-07
The Committee’s response was tabled on 1 December 2008, with five recommendations. The Government response has been developed and provided to the Department of the Prime Minister and Cabinet.
Inquiry into Defence Annual Report 2007-08
On 16 April 2009, Defence witnesses attended a public hearing where 14 questions were taken on notice. Responses were provided to the Committee on 24 June 2009. A supplementary hearing was held on 19 June 2009 with five questions taken on notice. Responses to these five questions had not been provided to the committee at the conclusion of 2008-09.
Inquiry into RAAF F-111 Deseal/Reseal workers and their families
On 17 April 2009, Defence witnesses provided evidence at a committee hearing. On 25 June 2009, the Committee tabled its report, with the Department of Veterans’ Affairs leading the development of the Government response.
APPENDIX 1 EXTERNAL SCRUTINY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 147
Parl
iam
enta
ry C
omm
itte
es
Visits by the Committee On 28-29 July 2008, the Committee attended a two day public hearing for the F111 Deseal/Reseal Inquiry.On 1 September 2008, the Committee attended a Defence Intelligence Organisation Brief.On 28-29 October 2008, the Committee visited the Submarine Force Element Group at HMAS Stirling.13 March 2009, the Committee attended the Avalon Airshow.31 March-1 April 2009, the Committee visited the Army Aviation Training Centre in Oakey, Enoggera Barracks and the ARH/MRH-90 assembly facility in Brisbane. 5 June 2009, the Committee visited Headquarters Special Operations Command, Holsworthy Barracks.
Joint Standing Committee on TreatiesTreaty between Australia and the United States Concerning Defense Trade Cooperation
Defence provided responses to Committee on 5 August 2008 to eight questions that were taken on notice during a public hearing on 16 June 2008.
Agreement with the United Arab Emirates on Defence Cooperation
On 25 August 2008, Defence witnesses gave evidence at a committee hearing. One question was taken on notice and the response was provided to the Committee on 22 September 2008. On 16 October 2008, the Committee tabled its report and the Agreement has been ratified.
Agreement between the Government of Australia and the Government of the French Republic regarding Defence Cooperation and Status of Forces
On 26 August 2008, the Agreement was tabled. On 15 September 2008, Defence witnesses gave evidence at a committee hearing and three questions were taken on notice. On 16 October, Defence provided responses to the Committee and the Committee’s report was tabled.
Agreement between the Government of Australia and the North Atlantic Treaty Organisation on the Security of Information
Defence witnesses provided evidence at a hearing on 23 February 2009. No questions were taken on notice. On 12 March 2009, the Committee tabled its report, with one recommendation. As the recommendation required no action, Defence has not prepared a Government response.
Report No 95 – Review into treaties tabled on 4 June, 17 June and 26 August 2008
On 24 April 2009, Defence was invited to respond to the Committee’s report and recommendations. The response was cleared by the Minister for Defence on 29 June 2009.
Convention on Cluster Munitions On 15 June 2009, Defence witnesses gave evidence at a committee hearing. A supplementary hearing was held on 22 June 2009. Two questions were taken on notice and Defence developed responses which were submitted to the Tabling Office by the Department of Foreign Affairs and Trade (DFAT). Defence is now contributing to a DFAT-led Government response.
Joint Standing Committee on Electoral MattersInquiry into 2007 Federal Election On 5 August 2008, Defence provided a submission to the
Committee and on 17 October 2008, Defence witnesses gave evidence at a committee hearing. No questions were taken on notice.
Parliamentary Joint Committee on Intelligence & SecurityReview of administration and expenditure No 6 – Australian intelligence agencies
Defence lodged a submission with the Committee on 1 August 2008. Defence representatives provided evidence to the Committee at private hearings on 28 August (the Defence Signals Directorate), 16 October (the Defence Intelligence Organisation) and 13 November 2008 (the Defence Imagery and Geospatial Organisation).
Review of administration and expenditure No 7 – Australian intelligence agencies
Defence lodged a submission with the Committee on 19 February 2009. Defence representatives provided evidence to the Committee at a private hearing on 21 April 2009.
Visits by the Committee There were no visits to the Defence intelligence agencies by the Committee during 2008-09.
Additional briefing In February 2009, Defence provided a briefing to the Committee at their request on the Defence security vetting process.
APPENDIX 1 EXTERNAL SCRUTINY
148 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Senate Committees
Joint Standing Committee on Public WorksReport No 6/2008 – Construction of New Warehousing Facilities at Wadsworth Barracks, East Bandiana, Victoria
This project was considered by the Committee at a public hearing on 7 August 2008 and cleared by Parliament on 4 September 2008. Construction commenced in May 2009 and is expected to be completed in 2010.
Report No 8/2008 – Australian Super Hornet Facilities Project, RAAF Base Amberley, Queensland
This project was considered by the Committee at a public hearing on 20 August 2008 and cleared by Parliament on 23 October 2008. Construction commenced in early 2009 and is expected to be completed by late 2010.
Report No 9/2008 – Puckapunyal Redevelopment, Victoria
This project was considered by the Committee at a public hearing on 6 November 2008 and cleared by Parliament on 3 December 2008. Construction is expected to start in the second half of 2009 and be completed in 2011.
Report No 1/2009 – Enhanced Land Force Stage 1 Facilities project, Lavarack Barracks, Townsville, Queensland and other Defence bases around Australia
This project was considered by the Committee at a public hearing on 22 January 2009 and cleared by Parliament on 19 March 2009. Construction is expected to start in the second half of 2009 and be completed in 2011.
Report No 2/2009 – RAAF Base Edinburgh Redevelopment Stage 2, South Australia
This project was considered by the Committee at a public hearing on 21 April 2009 and cleared by Parliament on 28 May 2009. Construction is expected to commence in the second half of 2009, with completion expected in 2011.
Senate Standing Committee on Foreign Affairs Defence & TradeBudget Supplementary Estimates Defence witnesses appeared at a hearing on 22 October
2008 and three questions were taken on notice at the hearing. Responses were provided to the Committee on 4 December 2008.
Budget Additional Estimates Defence witnesses provided evidence to the Committee on 25 February 2009. Twelve questions were taken on notice during the hearing. Defence received two additional written questions. Responses were forwarded to the Committee on 29 April 2009.
Budget Estimates 2008-09 On 3 and 4 June 2009, Defence gave evidence to the Committee at a public hearing. Eleven questions were taken on notice, and a further eight were received in writing. Responses had not been provided to the Committee at the conclusion of 2008-09.
Inquiry into Australia’s involvement in Peacekeeping Operations
On 1 August 2008, the Committee tabled its report, making 38 recommendations. Defence has commenced drafting a Government response. Due to the complexity of the issues involved, the Minister has extended the due date for the Government response to the second half of 2009.
Review of reforms to Australia’s military justice system
On 24 September 2008, the Committee tabled its report, making 13 recommendations. Defence is currently developing a Government response in consultation with the Department of the Prime Minister and Cabinet.
Inquiry into Economic and Security Challenges facing PNG
On 21 November 2008, Defence attended a public hearing. Five questions were taken on notice and responses were forwarded to the Committee on 7 January 2009. On 19 June 2009, Defence attended a follow-up hearing. Five questions were taken on notice with responses to be provided later in 2009.
Inquiry into the Provision of Defence Legislation (Miscellaneous Amendments) Bill 2008
On 12 February 2009, Defence provided responses to three written questions on notice from the Committee. On 20 February 2009, the Committee tabled its report.
Mortimer Review A private session was held by the Committee with Mr Mortimer on 19 March 2009. The Government’s response was released on 2 May 2009.
Inquiry into Naval Shipbuilding There was no Government response prepared by Defence as action was pursued through the White Paper process.
APPENDIX 1 EXTERNAL SCRUTINY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 149
Parl
iam
enta
ry C
omm
itte
es
House Committees
Senate Standing Committee on EconomicsInquiry into the Current State of Australia’s Space, Science and Industry Sector
Defence officials attended a public hearing on 29 July 2008 and took one question on notice. The response was provided to the Committee on 29 August 2008.
Senate Standing Committee on Environment, Communications & the ArtsInquiry into the Operation of the Environmental Protection and Biodiversity Conservation Act.
On 23 September 2008, Defence provided a submission to the Committee. On 9 December 2008, Defence witnesses gave evidence at a public hearing and no questions were taken on notice. The Committee tabled two reports on 18 March 2009 and 30 April 2009. Defence will not provide a Government response as the recommendations did not relate to Defence’s activities.
House of Representatives Standing Committee on Industry, Science & InnovationInquiry into Research Training and Research Workforce in Australian Universities
Defence provided a submission in 2007-08 and the Committee tabled its report on 1 December 2008. There were no recommendations that directly related to Defence.
House of Representatives Standing Committee on Legal & Constitutional AffairsInquiry into Whistleblowing Protection
On 2 September 2008, Defence provided a submission to the Committee. On 25 February 2009, the Committee tabled its report with one recommendation of Defence interest. Defence is currently developing the Government response in consultation with the Department of the Prime Minister and Cabinet.
House of Representatives Standing Committee on PetitionsPublic Hearings on Petitions On 24 September 2008, Defence witnesses provided
evidence at a public hearing. No questions were taken on notice.
House of Representatives Standing Committee on CommunicationsInquiry into Cyber Crime On 29 June 2009, Defence provided a submission to the
Committee.
APPENDIX 1 EXTERNAL SCRUTINY
150 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
AUDITOR-GENERAL’S REPORTSThis section provides specific information on the Auditor-General’s reports that were completed in 2008-09 that relate to Defence’s and the DMO’s activities. Audit Report No 23 – Management of the Collins-class Operations Sustainment, tabled 25 February 2009
The audit focused on performance information reporting by the submarine System Program Offices on reliability, safety systems and logistic support services. In the context of the sustainability arrangements, the audit considered combat system upgrades and personnel escape and rescue systems. The ANAO made one recommendation in the audit report. Defence and DMO agreed to the recommendation, with qualification, noting that progress would be made as resources allowed.
Audit Report No 27 – Management of the M113 Armoured Personnel Carrier Upgrade Project, tabled 27 March 2009
The objectives of this audit were to assess: • the progress of the M113 Armoured Personnel Carrier Upgrade
Project against stated schedule, cost and technical performance objectives
• the DMO’s progress in implementing the recommendations and addressing the findings of ANAO Audit Report No. 3 2005–06, Management of the M113 Armoured Personnel Carrier Upgrade Project.
Defence and DMO agreed to all three recommendations made in the report.
Audit Report No 31 – Army Reserve Forces, tabled 8 May 2009
The objective of this audit was to: • assess the Army’s progress in addressing the issues previously
identified in Defence reviews and ANAO audits as affecting the Army Reserve’s capability
• identify the extent that the Army Reserve is capable of contributing to contemporary Australian Defence Force capability requirements through fulfilling its assigned roles and tasks.
Defence agreed to all four recommendations contained in the audit report. Defence has already started action to implement several of the recommendations which will remediate deficiencies and improve capability.
Audit Report No 32 – Management of the Tendering Process for the Construction of the Joint Operation Headquarters, tabled 19 May 2009
The objective of the audit was to review Defence’s management of the Head Quarters Joint Operations Command project’s tender process, including probity management, for the construction of the joint operation headquarters in order to provide assurance that the policy principles for the use of private financing had been followed.No recommendations were raised; however, Defence is addressing issues outlined in the report.
Audit Report No 41 – The Super Seasprite, tabled 17 June 2009
The focus of the audit was on Defence’s and the DMO’s administration of the Super Seasprite project. In light of the Government's decision to cancel the project, the objective of the audit was revised to place greater emphasis on those issues that resulted in the failure of the project to provide the required capability, and highlighting project management lessons for major Defence acquisitions going forward. The audit report made seven recommendations. Defence and the DMO agreed to five recommendations without qualification and two recommendations with qualification.
Audit Report No 48 – Planning and Approval of Defence Major Capital Equipment Projects, tabled 30 June 2009
The objective of this audit was to assess whether the strengthened two–pass approval process for major capital equipment projects is being implemented effectively.Defence and the DMO agreed to all four recommendations made in the report. Defence and the DMO will implement the recommendations through the Defence Strategic Reform Program.
APPENDIX 1 EXTERNAL SCRUTINY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 151
Free
dom
of
info
rmat
ion
Cross-Portfolio ReportsDefence and the DMO also contributed to three cross-portfolio Auditor-General’s reports in 2008-09:
FREEDOM OF INFORMATIONThis section provides additional information on Defence’s FOI processes and how members of the public can lodge an FOI request. Detailed information that meets the reporting requirements under Section 8 of the Freedom of Information Act 1982 is also included.
Defence’s functions and decision making powersInformation about Defence’s structure and functions, including its organisational chart, can be found in section 2 – Organisational Governance. Information about legislation administered by the Minister for Defence is published in the Administrative Arrangements Order. Further information relating to decision making powers can be found in the online version of this report.
Authorised decision makersDecisions on requests made to Defence under the Act may be made by the Minister for Defence, the Secretary of Defence, or by persons acting under authority. The authority to release documents or to refuse requests for access to documents is held widely throughout Defence at the Director level (Executive Level 2 and Colonel or equivalent rank) and above.
Authority to make decisions of other kinds under the Freedom of Information legislation, such as the power to impose charges on applicants, has also been delegated to appropriate officers. Details can be obtained from the Defence Freedom of Information Directorate, using the address and contact numbers below.
Audit Report No 19 – CMAX Communications Contract for the 2020 Summit, tabled 4 February 2009
The objectives of this audit were to:• examine whether the appointment of CMAX Communications Pty Ltd
as a provider of communications support and advice for the 2020 Summit was consistent with the Commonwealth procurement framework and sound principles of public administration
• assess the effectiveness of the administration of the CMAX Communications contract by the Department of Prime Minister & Cabinet.
The audit report made one recommendation for the Department of the Prime Minister and Cabinet.
Audit Report No 20 – Approval of Funding for Public Works, tabled 5 February 2009
The objective of the audit was to assess:• the planning and delivery of capital works projects by proponent
agencies.• the extent to which projects have delivered on what was intended• the extent to which proponent agencies have complied with the
requirements of the Public Works Committee Act 1969 and approved procedures.
Defence and the DMO agreed to all four recommendations made in the report.
Audit Report No 25 – Green Office Procurement and Sustainable Office Management, tabled 11 March 2009
The objective of this audit was to assess and report on the progress being made by Government agencies in achieving better practice in green office procurement and sustainable office management. Sixty-three agencies were included in an audit survey. Detailed validation was carried out in nine of these agencies, including Defence.Defence agreed to all seven recommendations made in the report. Defence has established several energy and sustainability programs and initiatives that are attending to the ANAO’s recommendations.
APPENDIX 1 EXTERNAL SCRUTINY
152 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Procedures and contact pointsA request for access to documents under the Act must be made in writing and provide sufficient information concerning the documents to enable Defence to identify them. The request has to be accompanied by a $30 application fee and should include a telephone number and a return address in Australia at which the applicant can be contacted. In some cases, a fee may not be required or may be remitted by Defence.
Requests under the Act should be sent to:
Freedom of Information and Records Management Branch CP2-3-050 Campbell Park Offices CANBERRA ACT 2600
Phone: (02) 6266 2200 Facsimile: (02) 6266 2112 Email: [email protected]
Applicants seeking access to documents may be liable to pay charges at rates prescribed by the Freedom of Information (Fees and Charges) Regulations.
PrivacyDefence is subject to the Privacy Act 1988 and, when dealing with personal information, it must comply with the 11 Information Privacy Principles prescribed in the Act.
Decision making and other powers affecting members of the publicInformation regarding decision making and other powers affecting members of the public is available through the Defence website at www.defence.gov.au/foi.
Arrangements for public participationAustralian Defence Human Research Ethics CommitteeThe Australian Defence Human Research Ethics Committee’s mission is to promote and encourage ethical health research in the military context, with responsibility for the review and monitoring of all human research in Defence. It is structured in accordance with the National Health and Medical Research Council’s national statement on ethical conduct in research involving human participants and has representatives external to Defence.
Defence Families of AustraliaDefence Families of Australia is an independent advisory group convened by Defence to represent the diversity of today’s Defence families. Its aim is to improve the quality of life for ADF families by providing them with a forum for expressing their views, for reporting and making recommendations to the CDF, and for influencing policy that affects ADF families.
Defence Reserves Support CouncilThe Defence Reserves Support Council provides a link between the ADF, employers and the community from which the Reserves are drawn. The council aims to enhance the capability contribution of the Reserve to the ADF by assisting Defence in promoting the benefits of employing Reservists and encouraging support for the Reserve by promoting flexible partnerships with the community in general and with employers in particular.
APPENDIX 1 EXTERNAL SCRUTINY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 153
Free
dom
of
info
rmat
ion
Environmental Advisory CommitteesEnvironmental Advisory Committees provide advice on environment and heritage matters relating to Defence areas. These areas include Shoalwater Bay Training Area, Townsville Field Training Area, Greenbank Training Area and Wide Bay Training Area, Queensland; Jervis Bay Marine Park, ACT/NSW; Garden Island, Western Australia; and Mount Bundy Training Area and Bradshaw Field Training Area, Northern Territory. The committees consist of representatives from Defence, the local community and business organisations.
National Workplace Relations CommitteeThe National Workplace Relations Committee, established under the Defence Collective Agreement 2006–2009, deals with a wide range of employment matters affecting Defence civilian employees. It provides a forum for management and union delegates to consult on current and future Defence workplace policies and conditions.
Royal Australian Air Force Veterans’ Residences TrustThe purpose of the Royal Australian Air Force Veterans’ Residences Trust is to provide residences so that qualifying former members of the Royal Australian Air Force (RAAF) and their dependants, in needy circumstances, can be accommodated. There are three Trustees:
• one trustee is nominated by the Returned Services League of Australia
• a second trustee is nominated by the RAAF Association and
• the third trustee is nominated by the Chief of Air Force, and may be a currently serving or a former member of the RAAF.
Defence Special Needs Support Group The Defence Special Needs Support Group is an independent volunteer organisation dedicated to providing support, information and assistance to Australian Defence Force families who have members with special needs.
Categories of documentsDocuments available as part of a public register and subject to a fee or other chargeDocuments in this category relate to oceanographic data (copies of original survey documents, and hydrographic and oceanographic data held by the Navy on computer file).
Documents available for purchase by the publicDefence has a number of documents available for purchase including:
• annual flying safety calendar, aeronautical maps and charts, supplements and planning documents, and aerial photographs
• Defence cataloguing handbooks and information
• documents that are available for inspection or purchase by the public in accordance with section 9 of the Act, that is manuals, instructions and the like that are used by, or are available to, Defence staff for making decisions affecting the public
• draft and final environmental impact statements (held by, and available from, the Defence Support Group)
• journals and magazines published by Service schools
APPENDIX 1 EXTERNAL SCRUTINY
154 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
• manuals that have been cleared for release and sale to the public (for example, the Defence Freedom of Information Manual, which is available through the Freedom of Information Directorate)
• Service newspapers (available by annual subscription)
• tide tables (Australian national tide tables and navigational charts and publications are available for purchase either through appointed chart agents or directly from the Hydrographic Office).
Documents available free of charge to the public Defence holds a wide range of documentary material that can be provided free of charge—and some are available online. These include:
• academic calendars and prospectuses for Defence educational institutions
• academic publications and research papers
• booklets and brochures from the Defence Community Organisation
• Cadet Policy Manual
• capability development guides, including the Defence Capability Plan and the Defence Simulation Manual
• corporate videos
• fact sheets
• flying and ground safety publications made available by the Air Force
• general Defence material (pamphlets, brochures, and posters), and the Australian Defence Force Journal available on request or at Defence exhibitions, launches and open days
• Defence magazine
• Defence Family Matters magazine
• the Defence Fast Facts booklet
• information on military retirement and superannuation schemes
• manuals and guides relating to APS and ADF pay and conditions, including the Australian Defence Force Member's Guide to ADF Pay and Conditions of Service, the Defence Force Pay and Conditions Manual, the Defence Collective Agreement 2006–2009, the Defence Workplace Relations Manual, and exempt legislative instruments under the Defence Act 1903, including determinations made under section 58B and 58H of the Defence Act 1903
• material relating to the activities of the DSTO, consisting of brochures and booklets, research news, selected technical reports, technical and research press releases and lectures given at professional, commercial and public events
• notices to mariners, containing hydrographic advice to correct navigational charts, as well as documents and detailed information about exercises and firings (issued by the Navy)
• organisational material (functional statements, organisation charts and duty statements)
• outcomes of Defence Reviews and investigations
• pamphlets and brochures on graduate employment programs and scholarships in Defence for APS employees and APS graduate careers page on the internet
APPENDIX 1 EXTERNAL SCRUTINY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 155
Free
dom
of
info
rmat
ion
• pamphlets, brochures, guides and application forms relating to export control and obligations imposed through export controls, including the Australian export control list (part of the Defence and Strategic Goods List)
• personnel documentation and records, including medical and psychological records (ordinarily only released to the subject of the records or to a third party authorised by the subject)
• policy documents, such as the Strategic Reform Program: Delivering Force 2030 and the Defence Update 2007, Strategy Planning Framework Handbook, Joint Operations for the 21st Century and Force 2020 (These documents can be accessed at www.defence.gov.au)
• procurement manuals and guidelines produced by the DMO
• procurement policy and procedural guides, contract templates and Defence industry statements
• scientific publications
• recruitment pamphlets, brochures and video media, the 'career explorer' computer software program on ADF career options, and an internet home page on ADF career options
• technical material, including technical details of obsolete and selected current equipment, unclassified technical reports and Defence (Australia) Standards
• transcripts of public seminars conducted by Defence
• information and reports about unexploded ordnance on non-Defence land.
Electronic documents Defence’s internet homepage contains material that may be of interest to the general public, including departmental media releases and speeches, statutory reports, including Defence annual reports and the Defence Portfolio Budget Statements and Additional Estimates Statements, Service-specific information, including Service newspapers, journals, handbooks and academic papers; and export control information.
Information is available on the Asia Pacific Civil-Military Centre of Excellence, including the Centre’s Strategic Statement, Strategic Plan, organisational structure, staff biographies and activity reports
Departmental press releases are available by email from the press release service by subscription. Photos of a Defence nature are also freely available from the image gallery on the site, but copyright laws apply. Ministerial press releases and speeches are linked to the Defence website.
Other documentsDefence maintains records in various forms and locations relating to its functions. Records are retained for varying periods depending on their administrative and historical value and are disposed of in accordance with standards and practices approved by the National Archives of Australia. Some categories of documents held are:
• accounting records
• arrangements with other Government agencies and with state and territory governments and agencies
• Cabinet documents (including submissions, memoranda, minutes and promulgation of decisions)
• committee records
APPENDIX 1 EXTERNAL SCRUTINY
156 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
• documents setting out conditions of service (including documents relating to financial conditions for overseas service)
• contractual documents, requests for tender documents and industry study reports
• departmental instructions, circulars and reference books
• documents concerning quality assurance
• guidelines held in electronic form by the Directorate of Classified Archival Records Review that are used in determining which matter, if any, contained in classified Defence historical records is exempt from public access under paragraphs 33(1)(a) and (b) of the Archives Act 1983. New guidelines are created, or existing ones revised or abolished, from time to time
• documents relating to industrial matters (including agenda and minutes of meetings of various industrial committees and councils, occupational health and safety committees and policy on industrial practices within the department)
• international agreements and arrangements held in a register of agreements.
• ministerial submissions and briefing papers
• personal documentation (for example, recruitment, enlistment and promotion documents and those relating to medical and psychological issues)
• technical publications (relating to the maintenance of ADF material, and drawings, specifications and standards relating to ships, aircraft and other equipment in use)
• working papers (internal working papers are maintained throughout the organisation on a wide range of policy, technical and administrative subjects).
Facilities for accessing documentsThe following areas within Defence maintain access points at which information about their activities is available:
Defence Science and Technology OrganisationDirector Defence Science Communications Defence Science and Technology Organisation Department of Defence CANBERRA ACT 2600
Phone: (02) 6128 6376
Ministerial Support and Public Affairs DivisionDirector General Public Affairs Department of Defence CANBERRA ACT 2600
Phone: (02) 6265 2999
Defence Publishing ServiceACT/Southern NSW Region Defence Support Group Department of Defence CANBERRA ACT 2600
Phone: (02) 6266 2022
APPENDIX 1 EXTERNAL SCRUTINY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 157
Free
dom
of
info
rmat
ion
Hydrographic OfficeLocked Bag 8801 WOLLONGONG NSW 2500
Phone: (02) 4221 8612
Documents that are available for inspection or purchase by the public in accordance with section 9 of the Freedom of Information Act 1982 are listed in an index available through the National Archives of Australia and through the Defence Freedom of Information and Records Management Branch. Arrangements to inspect listed documents, or to purchase copies, may be made by contacting the Freedom of Information and Records Management Branch.
158 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
APPENDIX 2MILITARY JUSTICE
REFORMING THE MILITARY JUSTICE SYSTEMAn effective military justice system that is able to achieve an appropriate balance between the need to maintain discipline and the need to pay due regard to the rights of individuals is a vital element in ensuring the operational effectiveness of the ADF. The ongoing military justice reform program has introduced many changes to strengthen that balance and improve public confidence in the accountability, transparency and fairness of the system. This was confirmed during the reporting period both by internal monitoring and independent external review of the system in operation.
Oversight of the Military Justice SystemThe means to ensure an ongoing scrutiny of the military justice system is one of the important safeguards of its continued health and effectiveness. While this is a responsibility of all levels of command, ongoing monitoring of the system is conducted on a routine basis by the office of the IGADF through its military justice audit program, analysis of statistical data, and administrative inquiry processes. In 2008-09 this routine monitoring was complemented by the independent Street-Fisher review and hearings conducted by the Senate Standing Committee on Foreign Affairs Defence and Trade.
Senate Standing Committee on Foreign Affairs Defence and Trade Fourth Progress ReportThe Senate Standing Committee on Foreign Affairs, Defence and Trade tabled its fourth and final progress report on reforms to Australia’s military justice system in September 2008. The report acknowledged the considerable progress made to improve the military justice system and encouraged Defence to continue the reform momentum with a focus on transparency, accountability, independence and scrutiny to preserve and promote the integrity of Australia’s military justice system. The Committee made 13 recommendations relating to the AMC, ADFIS, the Inspector General of the ADF (IGADF) and Defence Legal. A Government response is expected to be tabled in Parliament early in the next reporting period.
Independent Military Justice ReviewAn independent review into the health of the reformed military justice system conducted by Sir Laurence Street and Air Marshal Fisher (Retired) commenced on 14 April 2008. The review team conducted 128 interviews with members and functional groupings within Defence, along with 58 visits to ADF establishments, commands and units over a six month period.
APPENDIX 2 MILITARY JUSTICE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 159
Refo
rmin
g th
e M
ilita
ry J
usti
ce S
yste
m
The team delivered its report on 23 January 2009. Its principal conclusions were that the military justice system:
• is delivering and should continue to deliver impartial, rigorous and fair outcomes
• has greater transparency and enhanced oversight
• is substantially more independent of the chain of command
• is effective in maintaining a high standard of discipline both domestically and in the operational theatre.
The review team identified a number of areas where further improvements could be made to the reformed military justice system and made 49 recommendations to address these issues and ensure the system is better positioned for the future. The final report was publicly released in March 2009.
The Defence response and implementation plan for the report was considered by the Chiefs of Service Committee (COSC) on 26 March 2009. Of the 49 recommendations, 45 were agreed and a comprehensive plan for implementation of the recommendations over a three year period was approved. Progress will be reported to the COSC on a quarterly basis.
The Australian Military CourtThe Australian Military Court (AMC) completed its first full year of operation in calendar year 2008, having commenced in October 2007. A busy year included the move to permanent purpose built quarters in Canberra, articulation of business processes, and the establishment of staffing and budget levels. Separate action was also commenced to select a number of part-time military judges to assist the Chief Judge, and two permanent military judges.
In calendar year 2008, 91 trials were conducted resulting in 571 convictions. Of note, one third of all trials and 79 per cent of convictions were for offences involving the misuse of Commonwealth credit cards. The Street-Fisher review recommended the creation of a new offence under the Defence Force Discipline Act 1982 that would allow, under certain conditions, for such offences to be tried at the summary level thus freeing the Court to deal with more serious matters. A further 23 trials were conducted during the remainder of the 2009 reporting period.
During the reporting period a number of challenges to the jurisdiction of the AMC were lodged in the High Court and Federal Court. On 26 August 2009, the High Court of Australia handed down its decision in Lane v Morrison [2009] HCA 29. The Court unanimously declared that the provisions establishing the AMC in the Defence Force Discipline Act 1982, were invalid.
Further detail on the operation of the AMC and the office of the Director of Military Prosecutions (DMP) is available from their respective annual reports as tabled in Parliament in June 2009.
Reform of the ADF Investigative CapabilityImplementation of the 2006 Audit of the Australian Defence Force Investigative Capability Report (Whiddett/Adams Report) continued during the reporting period under the direction of the Provost Marshal ADF. At 30 June 2009, 78 of the 99 recommendations were implemented and three more were nearing completion. Progress was reported on a quarterly basis to the COSC through IGADF.
APPENDIX 2 MILITARY JUSTICE
160 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Recruitment, retention and cultural issues in ADFIS were also identified by Sir Laurence Street and Air Marshal Fisher (Retired) as requiring urgent attention. To assist remediation, a high-level governance board, chaired by the Vice Chief of the Defence Force, was established in December 2008. Membership includes the IGADF, Head Defence Legal, and an Assistant Commissioner of the Australian Federal Police. Although recruiting and retention issues continue to prove challenging, there is full confidence that all recommendations will be implemented within the forecast five year change management period.
Progress against the Learning Culture InquiryImplementation of recommendations arising from the 2006 inquiry led by Mr Andrew Podger AO, into the learning culture at ADF training institutions continued steadily throughout 2008-09. By the end of the reporting period, 32 of the 46 agreed recommendations had been fully implemented, and significant progress had been made toward finalising the remaining 14. All actions necessary to fulfill Defence’s commitments are expected to be completed in the 2009-10 financial year.
Military DisciplineFrom all available evidence, discipline across the ADF is generally well maintained and dispensed equitably and fairly. Feedback from IGADF focus group surveys indicates that an overwhelming majority of ADF members surveyed are satisfied with the maintenance of discipline in their respective Services.
A revised system of summary procedures that simplified evidential requirements and enhanced the rights of ADF members to elect trial by, or appeal to, the AMC, successfully commenced operation on 20 September 2008 after a comprehensive ADF-wide training program. Further experience with the revised arrangements in practice will indicate whether any additional adjustments to the system will be necessary.
Use of the less formal Discipline Officer Scheme to deal with minor infractions has increased. The expansion of the scheme to now apply to all ADF members up to the rank of Army Captain or equivalent, has been well received. Previously the scheme was limited to members who were officer cadets, or members below non-commissioned rank.
Adverse Administrative ActionA further enhancement to the visibility and oversight of military justice processes during the reporting period was achieved with the capture of the first full year of adverse administrative sanction data through the Conduct Reporting and Tracking System. 778 sanctions were recorded in calendar year 2008 and a further 505 sanctions in the first half of calendar year 2009. The availability of this data enables adverse administrative action to be better monitored. The requirement to report administrative sanction outcomes has also encouraged a greater awareness of procedural fairness obligations and the need to properly substantiate adverse administrative decisions.
Conduct of Administrative InquiriesIGADF military justice audits indicate that general awareness of, and compliance with, guidance provided for the conduct of quick assessments has greatly improved over the reporting period. This now better serves command in ascertaining the facts and identifying appropriate action following an incident.
APPENDIX 2 MILITARY JUSTICE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 161
Refo
rmin
g th
e M
ilita
ry J
usti
ce S
yste
m
Capture of data relating to administrative inquiries in the ADF’s Administrative Inquiry Tracking System, which became operational in 2006, has proved somewhat problematic. The system was intended to provide visibility of formal inquiries conducted under the Defence (Inquiry) Regulations and enable monitoring of the implementation of agreed recommendations arising from such inquiries. Difficulties with reporting compliance have identified a need to conduct a functional review during the next reporting period to improve the system’s utility as a governance management tool and its ‘user friendliness’.
The Right to ComplainIt was observed in last year’s report that at the grassroots level there was a more mature approach to the complaint submission and handling process than had previously existed. The 2008 Defence Attitude Survey and Military Justice Supplement confirm that the majority of respondents believe that complaints made to the chain of command would be dealt with fairly and impartially.
IGADF military justice audit focus group feedback supports this observation, leading to the conclusion that ADF units provide a fair, equitable and inclusive work environment with very few exceptions. Unfortunately, difficulties in recruiting and retaining suitably qualified case officers to staff redresses of grievance for decision by Service Chiefs, led to a backlog in the latter half of the reporting period and a consequent increase in the time taken to deal with complaints. Action to overcome the shortage of case officers has been taken and it is expected that the backlog will be cleared by the end of 2009. Further details on complaints handling is available in section 3 Chapter 8, Output Group 1.13, People Strategies and Policies of this Report.
162 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
APPENDIX 3DEFENCE COOPERATION
PROGRAMIn 2008-09, the Program’s achievements included:
• Papua New Guinea
- The Defence Cooperation Program (DCP) with Papua New Guinea (PNG) continues to provide support to the PNG Defence Force (PNGDF) through a program of training, exercises and infrastructure upgrades. Defence recently supported the upgrade of the water reticulation system at Taurama Barracks and the training of 70 PNGDF members in Australia. The DCP progress was reviewed at the Ministerial Forum held in Brisbane in June 2009 and Australia reaffirmed its continued support for the development of a professional defence force in PNG with improved capabilities in core areas such as border and maritime security.
• South Pacific Region
- In 2008–09, Defence’s South Pacific engagement focused on capacity building and security forces’ professional development. DCP assistance to the Cook Islands, Federated States of Micronesia, Kiribati, Palau, Republic of Marshall Islands, Samoa, Solomon Islands, Tonga, Tuvalu and Vanuatu totalled $12.4m, which included training for 194 people. The ADF in-country advisers worked closely with their South Pacific counterparts to foster regional capability. The ADF continued to lead the military component of the Regional Assistance Mission to Solomon Islands. Defence engagement with Fiji remained suspended.
• Pacific Patrol Boat Program
- The Pacific Patrol Boat Program completed its 22nd year of contribution to the maritime surveillance and fisheries protection in the Pacific. Defence supports the patrol boats, which are owned by the Pacific Island Nations, by providing in-country operational and technical advisors, funding for fuel and maintenance, and continuing the Life Extension Program which will double the service life of the patrol boats. Through additional fuel provided under the Sea Days Incentive Program, Defence has continued to encourage Pacific Island Nations to increase the number of sea days spent patrolling their maritime territories.
• South-East Asia
- Defence continues to work closely on security cooperation with partner countries in the region, specifically, Brunei, Cambodia, Indonesia, Laos, Malaysia, the Philippines, Singapore, Thailand and Vietnam. Priority areas for cooperation include counter-terrorism, peacekeeping, maritime security, defence reform, and English language training. Over 400 candidates from the region were trained in Australia during 2008-09. Participation in ASEAN Regional Forum activities continues to be focused on humanitarian assistance and disaster relief.
APPENDIX 3 DEFENCE COOPERATION PROGRAM
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 163
Def
ence
Coo
pera
tion
Pro
gram
• Multinational Activities
- Australia supported four successful regional multilateral maritime surveillance activities, involving nineteen Pacific Patrol Boats and fifteen regional countries. Defence continued to engage closely with quadrilateral security partners (United States, New Zealand and France) in the Pacific to ensure our security engagement remains coordinated, particularly with regard to supporting aerial maritime surveillance in Pacific Island Nations.
• Five Power Defence Arrangements.- Australia’s membership of the Five Power Defence Arrangements (FPDA) remains
a key element of defence cooperation between the five member nations (Malaysia, Singapore, Australia, New Zealand and the United Kingdom) and continues to provide a stabilising influence in the region. The FPDA continues to develop its joint and combined capacity to meet conventional threats, as well as its capacity to confront emerging non-conventional regional security challenges by incorporating maritime security and humanitarian assistance and disaster relief scenarios into exercises.
• East Timor
- The DCP with East Timor was expanded in 2008-09, with the number of in-country advisers supporting the DCP increased from 18 to 24. The DCP continued to focus on building the capacity of the East Timorese Defence Force and Secretariat of Defence, particularly in the areas of engineering, maritime security, logistics, infantry training, medical skills and English language. A significant achievement was the construction of a specialist training facility for the East Timor Defence Force at Metinaro.
APPENDIX 3 DEFENCE COOPERATION PROGRAM
164 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A3.1 Defence Cooperation Program funding
NOTE
1. Predominantly relates to support of the Pacific Patrol Boat Program, including the Life Extension Program.
2007-08 Estimated
actual $m
2008-09 Budget
estimate $m
2008-09 Actual
$mPapua New Guinea 9.773 13.357 12.293South PacificEast Timor 8.500 8.197 14.085Vanuatu 1.400 1.366 1.660Solomon Islands 1.900 1.689 1.924Tonga 2.200 2.047 2.949Western Samoa 0.500 0.462 0.853Cook Islands 0.450 0.373 0.307Fiji 0.504 0.192 0.292Marshall Islands 0.850 0.775 1.033Federated States of Micronesia 0.897 0.897 0.941Tuvalu 1.400 1.186 1.110Kiribati 0.765 0.765 0.740Palau 0.808 0.858 0.566
Multilateral General Assistance[1] 13.025 18.940 20.817
Sub-total South Pacific 33.199 37.747 47.277
South-East Asia Singapore 0.121 0.150 0.044Philippines 5.792 10.140 7.887Thailand 3.068 2.922 3.595Malaysia 4.547 4.466 5.376Indonesia 5.009 5.105 4.780Vietnam 2.128 1.928 2.265Cambodia and Laos 0.764 1.187 1.189Brunei 0.093 0.063 0.088
Sub-total South-East Asia 21.522 25.961 25.224Other regional activities 9.454 8.453 7.872
Total Defence Cooperation funding 73.948 85.518 92.666
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 165
APPENDIX 4MAJOR CAPITAL
FACILITIESThe Major Capital Facilities Program funds the construction of buildings and infrastructure including specialised ranges, training and accommodation facilities, maintenance hangars, messes and warehouse facilities. The program develops facilities and infrastructure to support the introduction of new military equipment into operational service, as well as maintaining facilities to support Defence personnel where they work, live and train. The program comprises approved and unapproved major and medium projects.
Approval processes for capital facilities projects vary according to value. Major capital facilities projects costing over $15m are subject to the Government’s approval and review by the Joint Statutory Committee on Public Works (PWC). Projects approved by the PWC in 2008-09 are listed in Appendix 1—External Scrutiny. Medium facilities projects have budgets between $250,000 and $15m. Medium facilities projects between $8m and $15m are subject to Departmental or the Government’s approval, but are generally not subject to inquiry by the PWC.
Total expenditure on Defence's Major Capital Facilities Program in 2008-09 was $963.4m. This was $205.1m above the projected result of $758.3m.
Capital expenditure in 2008-09 was $860.8m, of which $754.6m was spent on major capital facilities projects (Table A4.1) and $96.1m on medium capital facilities projects (Table A4.4). The balance of $10.1m was expended on acquisitions and a number of smaller projects in their defects liability periods.
Operating expenditure in 2008-09 was $102.6m. Operating expenses include all costs incurred in developing projects, such as completing preliminary designs, environmental clearances and cost plans for projects.
APPROVED MAJOR CAPITAL FACILITIES PROJECTSTable A4.1 and the following descriptions provide details on progress and expenditure during 2008-09 on major capital facilities projects. Major capital facilities projects are those expected to cost more than $15m.
APPENDIX 4 MAJOR CAPITAL FACILITIES
166 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A4.1 Approved major capital facilities projects by state and federal electorateTotal
Estimated Expenditure
$m
Cumulative Expenditure
to 30 June 2009
$m
2008-09 Budget
Estimate
$m
2008-09 Additional
Estimate
$m
2008-09 Actual
expenditure
$m
NEW SOUTH WALES Eden-MonaroHeadquarters Joint Operations Command
Command, Control, Communications, Computing and Intelligence Systems 99.7[1] 90.9 42.1 56.6 47.8
GilmoreHMAS Albatross
Multi Role Helicopter
Facilities[2] – 3.1 – 5.1 3.1
Hughes Holsworthy
Special Operations Working Accommodation and Base Redevelopment Stage 1 207.7 184.1 13.0 14.6 13.0171 Aviation Squadron Relocation 92.0 81.9 17.0 13.2 11.8
Newcastle Williamtown
RAAF Williamtown Redevelopment Stage 1 and Airborne Early Warning and Control Works and Multi Role Tanker Transport Pavement Works 132.7[3] 126.0 15.4 12.0 12.0
Total New South Wales 532.1 486.0 87.5 101.5 87.7
Victoria IndiBandiana
Joint Logistics Unit Victoria – Warehousing 36.4 1.3 – 3.0 1.3
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 167
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
Jagajaga Watsonia
Defence Force School of Signals 101.3 26.3 60.0 25.0 23.8
McEwenMonegeetta
Land Engineering Agency Test Services Relocation 35.9 9.0 20.0 10.0 9.0
Puckapunyal
Redevelopment[4] 41.7 0.3 - - 0.3
Total Victoria 215.3 36.9 80.0 38.0 34.4
Queensland Blair Amberley
RAAF Amberley Redevelopment Stage 3 331.5 169.3 130.0 150.0 156.8Heavy Airlift Capability – Permanent
Facilities[5] - 108.9 80.0 80.0 97.6Australian Super
Hornet Facilities[6] 110.1 18.0 – 16.0 18.0
BrisbaneEnoggera
Base Redevelopment Stage 1 80.2 29.0 – 25.5 29.0Multi Role Helicopter
Facilities[2] – 7.6 – 7.0 7.6
GroomOakey
Multi Role Helicopter
Facilities[2] – 6.9 – 8.2 6.9
Leichhardt Cairns
HMAS Cairns Redevelopment 76.3 68.0 18.0 18.0 16.0
Total Estimated
Expenditure
$m
Cumulative Expenditure
to 30 June 2009
$m
2008-09 Budget
Estimate
$m
2008-09 Additional
Estimate
$m
2008-09 Actual
expenditure
$m
APPENDIX 4 MAJOR CAPITAL FACILITIES
168 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Herbert Townsville
Lavarack Barracks Redevelopment Stage 4 207.2 110.1 69.0 69.0 67.8Heavy Airlift Capability – Permanent
Facilities[5] – 14.3 10.0 14.0 14.3Multi Role Helicopter
Facilities[2] – 9.4 – 7.7 9.4
Total Queensland 805.3 541.5 307.0 395.4 423.4
South Australia
WakefieldEdinburgh Defence Precinct
Hardened and Networked Army Facilities 597.4[7] 85.0 – 85.0 85.0
RAAF Edinburgh
Redevelopment
Stage 2[4] 99.6 0.2 - - 0.2Heavy Airlift Capability – Permanent
Facilities[5] – 21.3 20.0 20.0 19.6
Total South Australia 697.0 106.5 20.0 105.0 104.8
Western Australia
PearceRAAF Pearce – Redevelopment Stage 1 142.2 26.1 34.0 36.8 25.4Heavy Airlift Capability – Permanent
Facilities[5] – – 0.2 0.2 –Total Western Australia 142.2 26.1 34.2 37.0 25.4
Northern Territory
Lingiari RAAF Tindal
Redevelopment Stage 5 58.7 1.2 – 2.0 1.2
Total Estimated
Expenditure
$m
Cumulative Expenditure
to 30 June 2009
$m
2008-09 Budget
Estimate
$m
2008-09 Additional
Estimate
$m
2008-09 Actual
expenditure
$m
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 169
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
Airborne Early Warning and Control Aircraft Facilities 64.2 1.1 – 4.8 1.1
Timber Creek
Bradshaw Field Training Area Infrastructure 72.6 71.1 7.6 6.5 6.3
Solomon Darwin
Darwin Naval Base – Patrol Boat Facilities 19.2 14.8 1.4 2.0 1.5
Robertson Barracks Redevelopment 72.1 1.4 – 9.7 1.4RAAF Darwin Redevelopment Stage 2 49.8 1.2 – 1.8 1.2Heavy Airlift Capability – Permanent
Facilities[5] – 32.6 20.0 16.0 32.6Total Northern Territory 336.6 123.4 29.0 42.8 45.3
Australian Capital Territory
CanberraDefence Signals Directorate
Australian Capital Territory
Accommodation[4] 29.1 12.5 – – 12.5
FraserHMAS Creswell Redevelopment 83.6 7.5 9.7 6.0 7.5
Total Australian Capital Territory 112.7 20.0 9.7 6.0 20.0
Other
MalaysiaRoyal Malaysian Air Force – Butterworth
Australian Defence Force Facilities Rationalisation 23.6 14.1 14.0 11.5 13.6
Total Other 23.6 14.1 14.0 11.5 13.6
Total Estimated
Expenditure
$m
Cumulative Expenditure
to 30 June 2009
$m
2008-09 Budget
Estimate
$m
2008-09 Additional
Estimate
$m
2008-09 Actual
expenditure
$m
APPENDIX 4 MAJOR CAPITAL FACILITIES
170 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
NOTES
1. Increase in approved budget is related to price supplementation, out-turning, land acquisition, relocation and project management.
2. Multi Role Helicopter Facilities has an approved budget of $168.7m (including $31.5m for simulation facilities being delivered and reported by the DMO) covering four locations: HMAS Albatross (Nowra); RAAF Base Townsville; the Army Aviation Centre (Oakey); and Gallipoli Barracks, Enoggera (Brisbane).
3. The budget figure is the approved project budgets for the RAAF Williamtown Redevelopment Stage 1 and Airborne Early Warning and Control Works projects and the addition of the Multi Role Tanker Transport Pavement Works project. Budget amended subsequent to publication of Portfolio Budget Statements 2008-09.
4. Project approved after publication of the Portfolio Additional Estimates Statements 2008-09.
5. RAAF Amberley Heavy Airlift Capability – Permanent Facilities has an approved budget of $268.2m covering five locations, RAAF Base Amberley, RAAF Base Edinburgh, RAAF Base Darwin, RAAF Base Townsville and RAAF Base Pearce.
6. The $117.1m budget for Australian Super Hornet facilities includes both the development and delivery phase budgets. The delivery phase budget of $110.1m has been adjusted to reflect the final expenditure from the development phase.
7. The $623.7m budget for Hardened and Networked Army facilities includes the development and delivery phase budgets. The delivery phase budget of $597.4m has been updated to reflect the final expenditure from the development phase.
8. These projects cross both State and electoral boundaries. Expenditure estimates and results for 2008-09 are provided in the table for each location.
Various locations[8]
Multi Role Helicopter Facilities 137.2Heavy Air Lift – Permanent Facilities 268.2Enhanced land Force Facilities – Stage 1 793.1Defence Facilities at HMAS Harman and other locations 111.1
Total Various 1,309.6Programming Adjustments - - -28.9 -161.8 -TOTAL 4,174.4 1,354.5 552.5 575.4 754.6
Total Estimated
Expenditure
$m
Cumulative Expenditure
to 30 June 2009
$m
2008-09 Budget
Estimate
$m
2008-09 Additional
Estimate
$m
2008-09 Actual
expenditure
$m
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 171
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
Table A4.2 Performance of major capital facilities projectsLocation Status 2008-09 AchievementsNew South WalesHeadquarters Joint Operations Command – Provision of Command, Control, Communications, Computing, Intelligence Systems, Land Acquisition and Other Costs
This project delivered the new Headquarters Joint Operations Command facility near Bungendore NSW (provided under public private partnership arrangements) with command, control, communications, and computing and intelligence systems. The project included land acquisition, relocation and project management costs necessary to establish the new capability for effective command and control of ADF operations. Remaining activities include finalisation of land acquisition with one landowner and rectification of defects.
Holsworthy—Special Operations Working Accommodation and Base Redevelopment Stage 1
This project provides facilities to support Special Operations Command elements including the Tactical Assault Group (East) and the Incident Response Regiment. It also includes an upgrade of the base infrastructure. Key working accommodation and supporting base infrastructure upgrades were completed in October 2008. The remaining works are scheduled for completion in 2010.
Holsworthy—171 Aviation Squadron Relocation
This project provides facilities to support 171 Aviation Squadron. The key facilities were completed and occupied in March 2009. The remaining works are scheduled for completion in 2010.
Williamtown—RAAF Base Williamtown Redevelopment Stage 1 and Airborne Early Warning and Control Works and Multi Role Tanker Transport Pavement Works
This project has provided a major upgrade to the base infrastructure. The project also included the construction of a new headquarters building, hangar and working accommodation for the airborne early warning and control capability. The remaining project element, construction of an ordnance loading complex, commenced in 2008 and is expected to be completed in late 2009.
VictoriaBandiana—Joint Logistics Unit Victoria Warehousing
This project will provide new and upgraded warehousing, storage and ancillary support facilities at Bandiana. Construction commenced in May 2009 and is expected to be completed in 2010.
Watsonia—Defence Force School of Signals
This project will provide new working accommodation, improved security arrangements and upgraded living in accommodation for the Defence Force School of Signals at Simpson Barracks. Construction commenced in October 2008, and is on the revised schedule following initial delays experienced in tendering the works. Completion is expected in 2011.
APPENDIX 4 MAJOR CAPITAL FACILITIES
172 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Monegeetta—Land Engineering Agency Test Services Relocation
This project will relocate existing land materiel test and evaluation functions, currently conducted at Maribyrnong, to new facilities at Monegeetta. Construction commenced in January 2009, and is on a revised schedule following initial delays experienced in tendering the works. Completion is expected in 2010.
Puckapunyal Redevelopment This project will address a number of shortcomings in existing training facilities, engineering infrastructure, security provisions and personnel facilities at the base. Procurement of a construction contractor is progressing on schedule for construction to start in the second half of 2009. Completion is expected in 2011.
QueenslandAmberley—RAAF Base Amberley Redevelopment Stage 3
This project will provide new trainee living-in accommodation and messing facilities, physical fitness facilities, office, medical and working accommodation, consolidation of maintenance facilities, construction of a new fuel farm and a base security upgrade. Construction is ahead of schedule, with key facilities expected to be completed progressively in the second half of 2009. Completion is expected in 2011.
RAAF Base Amberley—Australian Super Hornet Facilities
This project will provide new, expanded and modified facilities and infrastructure at RAAF Base Amberley to support the introduction into service of the Super Hornet aircraft. Construction commenced in early 2009 and is on schedule for completion by late 2010.
Cairns—HMAS Cairns Redevelopment This project provides a combination of new and refurbished facilities to accommodate a full range of operational and support functions at HMAS Cairns including appropriate berthing space and shore services to accommodate all vessels to be home-ported. The construction phase of the project was completed in July 2009.
Townsville—Lavarack Barracks Stage 4 This project will provide upgraded working accommodation for various Army elements located at Lavarack Barracks. Facilities for B Squadron 3rd/4th Cavalry Regiment were completed on schedule in 2009. Construction of the facilities for 4th Field Regiment and 3rd Combat Engineer Regiment are progressing on schedule.
Location Status 2008-09 Achievements
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 173
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
Enoggera—Base Redevelopment Stage 1
This project will provide new working accommodation for Headquarters 7th Brigade, address shortcomings in base engineering services, and provide a new combined catering and messing facility. Construction commenced in late 2008 and is progressing on schedule. Completion is expected in 2010.
South AustraliaEdinburgh Defence Precinct—Hardened and Networked Army Facilities
This project will provide facilities and infrastructure to support the establishment of a mechanised battle group in the Edinburgh Defence Precinct. Some additional infrastructure will also be provided at Murray Bridge and in the Cultana Training Area. Construction commenced in late 2008, and the works are progressing on schedule. While the project is not expected to be completed until 2012, facilities are expected to be progressively available for occupation starting in December 2010.
RAAF Base Edinburgh – Redevelopment Stage 2
This project will provide new working accommodation and upgrades to engineering services. Parliamentary clearance was obtained on 28 May 2009. Procurement of construction contractors is progressing on schedule for construction to start in the second half of 2009. Completion is expected in 2011.
Western AustraliaRAAF Base Pearce—Redevelopment Stage 1
This project will provide new and refurbished operational, training, domestic support and aircraft maintenance facilities, improvements and upgrading of engineering services and demolition of redundant facilities. Construction commenced in July 2008. Progress has been affected by delays in procuring subcontractors. Notwithstanding these delays, the project is expected to be completed on schedule in 2011.
Northern TerritoryKatherine—RAAF Base Tindal Redevelopment Stage 5
This project comprises a number of elements to expand and upgrade existing working accommodation, construct new working accommodation and to augment electrical and water supply infrastructure. Progress has been affected by delays in procuring the managing contractor for the project. Procurement of subcontractors is on schedule. Construction is expected to start in the second half of 2009, with completion in 2011.
Location Status 2008-09 Achievements
APPENDIX 4 MAJOR CAPITAL FACILITIES
174 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Katherine—RAAF Base Tindal Airborne Early Warning and Control Facilities
This project will provide facilities and infrastructure at RAAF Base Tindal to support the introduction into service of the new airborne early warning and control aircraft. The scope of work includes new taxiways, operational facilities and working accommodation. Progress has been affected by delays in procuring the managing contractor for the project. Construction is expected to start in the second half of 2009 and is due for completion in 2011.
Timber Creek—Bradshaw Field Training Area Infrastructure
This project provides engineering services and infrastructure to allow the use of Bradshaw as a field training area for the 1st Brigade. The construction phase of this project was completed in early 2009.
Darwin—Darwin Naval Base Patrol Boat Facilities
This project provides upgraded facilities at the Darwin Naval Base for the new Armidale class patrol boats. Minor works remain to be finalised in the second half of 2009.
Darwin—Robertson Barracks Redevelopment
This project comprises three individual project elements: the Robertson Barracks Redevelopment project; LAND 907 facilities project; and the Hardened and Networked Army facilities project. The Robertson Barracks Redevelopment will provide new and upgraded facilities for training, emergency response, working accommodation and equipment support. The LAND 907 facilities project will provide parking and working accommodation for heavy tank transport vehicles and other tank support services. The Hardened and Networked Army project will provide additional working accommodation and other support facilities. While delays have been experienced in contracting the managing contractor, construction is expected to start in late 2009 and be completed in 2012.
Darwin—RAAF Base Darwin Redevelopment Stage 2
This project will upgrade existing facilities including fuel farms and workshops and construct a new logistics headquarters. Design work is well advanced and procurement of contractors is progressing satisfactorily. Construction is expected to start in late 2009 and be completed in 2011.
Australian Capital TerritoryHMAS Creswell Redevelopment This project will provide new and
upgraded facilities for the training of Navy officers upon initial entry and senior sailors in the areas of leadership, management and personal development. Construction commenced in June 2009. The project completion date has been revised to mid 2011 to reflect an extended design and procurement phase.
Location Status 2008-09 Achievements
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 175
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
Defence Signals Directorate—ACT Accommodation
This project provides working accommodation for the Defence Signals Directorate. Construction commenced in January 2009 and is progressing on schedule. Completion is expected by early 2010.
MalaysiaRMAF Butterworth—Australian Defence Force Facilities Rationalisation
The project will provide three new headquarters buildings, a combined armoury, a sewage treatment plant, and will refurbish some other existing support facilities. Construction commenced in 2008 and is on schedule for completion in 2010.
Various LocationsMulti Role Helicopter Facilities This project will provide a range of
helicopter shelters, maintenance and operational facilities, simulator buildings and deeper maintenance facilities to support the introduction into service of the Multi Role Helicopter aircraft. The project will involve a mix of new facilities, refurbishment and adaptive reuse of existing facilities. The proposed facilities and infrastructure will be located at RAAF Base Townsville, the Army Aviation Centre (Oakey), HMAS Albatross (Nowra), and Gallipoli Barracks, Enoggera (Brisbane). Construction works is progressing on schedule at all four sites, with progressive completion expected to start by early 2010.
Heavy Air Lift Capability—Permanent Facilities
This project will provide new facilities for the introduction into service of the C-17 Globemaster III Heavy Lift aircraft. The scope of the project includes a headquarters, maintenance facilities, air movements and cargo facilities, a simulator, warehousing and support facilities an airfield pavement works at the RAAF Base Amberley home base. The upgrading of airfield pavements, movements and cargo facilities and supporting infrastructure at RAAF Bases Edinburgh, Townsville, Darwin and Pearce will also be included. Construction is on schedule, with key facilities at RAAF Bases Darwin, Edinburgh, Townsville and Amberley expected to be completed progressively starting in the second half of 2009.
KEY
Achieved Substantially Achieved
Partially achieved
Location Status 2008-09 Achievements
APPENDIX 4 MAJOR CAPITAL FACILITIES
176 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Status of Major Projects foreshadowed for Government &/or Parliamentary Joint Statutory Committee on Public Works Consideration in 2008-09 Table A4.3 lists those facilities proposals presented by Defence to the Government and the PWC in 2008-09.
Table A4.3 Program of Major Works (by state, federal electorate and locality)Status as at 30 June 2009
VictoriaIndiBandiana: Joint Logistics Unit Victoria – Warehousing Expediency motion
4 September 2008
McEwenPuckapunyal Redevelopment Expediency motion
3 December 2008
Queensland
BlairAmberley: RAAF Base Amberley – Australian Super Hornet Facilities
Expediency motion23 October 2008
BrisbaneEnoggera: Base Redevelopment Stage 1 Expediency motion
25 June 2008RAAF Base TownsvilleAdditional Chinook Helicopter Facilities In development
South Australia
WakefieldEdinburgh Defence Precinct: Hardened and Networked Army Facilities
Expediency motion25 June 2008
Edinburgh: RAAF Base Edinburgh Redevelopment Stage 2 Expediency motion28 May 2008
Northern Territory
SolomonDarwin: RAAF Base Darwin Redevelopment Stage 2 Expediency motion
25 June 2008Darwin: Robertson Barracks Redevelopment (includes LAND 907 and Hardened and Networked Army projects)
Expediency motion25 June 2008
Lingiari
Katherine: RAAF Base Tindal Redevelopment Stage 5 Expediency motion25 June 2008
Katherine: RAAF Base Tindal Airborne Early Warning and Control Facilities
Expediency motion25 June 2008
Various locationsMulti Role Helicopter Facilities Expediency motion
25 June 2008Enhanced Land Force – Facilities Stage 1 Expediency motion
19 March 2009
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 177
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
ExemptionsDefence sought and obtained exemptions from PWC scrutiny for the following projects:
• RAAF Base Tindal – Airfield Pavements and Airfield Lighting project on the basis of repetitive works
• Defence facilities at HMAS Harman and Other Locations project on the basis that the works were for Defence purposes.
• Defence Signals Directorate ACT Accommodation projects on the basis that the works were for Defence purposes.
Approved projects under private financing arrangementsEden-Monaro—Headquarters Joint Operations CommandThe Headquarters Joint Operations Command Project amalgamated Joint Operations staff located in Canberra and Sydney into an integrated staff structure at the General John Baker Complex headquarters facility constructed approximately 11 kilometres south-west of Bungendore, New South Wales. The building infrastructure for the Headquarters Joint Operations Command Project was handed over to Defence on 9 July 2008.
Single Living Environment and Accommodation Precinct (Single LEAP) Phase 1In the 2004-05 Budget, the Government announced funding of $113.2m over the following four financial years, and a commitment of ongoing funding thereafter, to remediate the worst of the permanent single members’ living-in accommodation around Australia, potentially through public private partnership (PPP) arrangements.
In December 2006, Defence and Plenary Living (LEAP 1) Pty Ltd entered into a PPP contract for delivery of 1,395 accommodation units at RAAF Base Amberley, near Ipswich, Queensland (295 units); Holsworthy Barracks in Liverpool, New South Wales (600 units); and Gallipoli Barracks in Enoggera, Queensland (500 units). The PPP agreement provided that Plenary would fund, design and construct facilities at the three sites and thereafter, provide accommodation services and facilities maintenance for a period of 30 years. Construction activities were completed on the third and final facility in January 2009, approximately 3.5 months ahead of schedule. Each facility generally runs at or near full occupancy.
Approved projects being developed for private financing arrangementsProject Single Living Environment and Accommodation Precinct (Single LEAP) Phase 2Project Single LEAP Phase 2 represents an extension to the Phase 1 requirements for permanent Living-in-Accommodation to meet Defence’s previously identified priorities. Project Single LEAP Phase 2 is expected to provide contemporary units and associated facilities and services at further ADF bases across Australia. The project has been affected by delays in procurement, arising generally as a result of the global financial crisis. Procurement action is continuing and Defence expects to put a recommendation to the Government in 2009-10.
APPENDIX 4 MAJOR CAPITAL FACILITIES
178 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Other major capital facilities projects foreshadowed for 2008-09Defence Site Platypus Contamination RemediationThe Minister for the Environment, Heritage and the Arts, the Hon Peter Garrett AM MP, formally gazetted the transfer of the former HMAS Platypus site in Neutral Bay, Sydney, New South Wales, to the Sydney Harbour Federation Trust (Trust) in June 2009. A Memorandum of Understanding that sets out the arrangements for the vesting of the site to the Trust and the rights and obligations of the Trust and Defence in relation to the land has also been executed. The Australian Government, through Defence, will provide for the contamination remediation of the site and $20m was transferred to the Trust in 2008-09 as the first tranche of funding for the cost of remediation.
Approved medium capital facilities projectsTable A4.4 shows spending in 2008-09 for medium facilities projects. Medium facilities projects are those expected to cost between $250,000 and $15m.
Table A4.4 Approved medium capital facilities by state and federal electorateTotal
estimated expenditure
$’000
Cumulative expenditure
to 30 June 2009
$’000
2008-09 Budget
estimate
$’000
2008-09 Revised
estimate
$’000
2008-09 Actual
Expenditure
$’000
New South Wales
Kingsford Smith Randwick
Disposal and Rationalisation –Interim Works 15,650 12,316 2,640 7,760 6,337
LindsayDefence Establishment: Orchard Hills
Follow-on Stand-off
Weapon Facilities[1] 6,125 2,835 2,783 2,750 2,802Standard missile test facility
modifications[2] 1,960 1,024 – – 1,024Office Accommodation and Entry Redevelopment 2,020 202 – 1,800 202
WentworthHMAS Watson
Bridge simulator
building upgrade[2] 1,700 – – – –
Total New South Wales 27,455 16,377 5,423 12,310 10,365
Victoria
Flinders HMAS Cerberus
West Head Gunnery Range 13,395 7,578 12,000 7,500 7,464
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 179
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
IndiBandiana
Army Logistics Training Corp – Supply Training Wing Upgrade 9,157 2,653 – 3,000 2,653
Melbourne Ports
DSTO Environmental Test Chamber 3,500 828 3,000 1,000 766
McEwenMonegeetta
Land Engineering Agency Perimeter Security Fence
Upgrade[2] 2,500 423 - - 423
Total Victoria 28,552 11,482 15,000 11,500 11,306
Queensland
BlairAmberley
RAAF Base Amberley Contaminated Land Remediation 5,590 3,780 1,100 170 -Enhanced Land Force Stage 1 Works – Living in
Accommodation[2] 10,400 8,817 - - 8,817
BrisbaneEnoggera
8/9th Battalion Royal Australian Regiment Interim Working Accommodation 2,700 2,278 - 2,700 2,278
9th Battalion Royal Queensland Regiment Interim Working Accommodation 4,323 2,738 - 4,323 2,738
Capricornia Rockhampton
Western Street Depot Redevelopment 11,700 11,048 7,000 9,870 9,965
Washramp[2] 1,106 837 - - 837Shoalwater Bay Training Area
Urban Operation Training Facility
Enhancement[2] 1,353 1,121 - - 1,121
Total estimated
expenditure
$’000
Cumulative expenditure
to 30 June 2009
$’000
2008-09 Budget
estimate
$’000
2008-09 Revised
estimate
$’000
2008-09 Actual
Expenditure
$’000
APPENDIX 4 MAJOR CAPITAL FACILITIES
180 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
GroomOakey
Weapons Training Simulator System 2,000 1,809 700 730 829
HerbertMount Stuart Training Area
Explosive Ordnance Roads Upgrade 1,159 1,070 - 1,000 1,070Townsville Field Training Area
Urban Operations Training Facility 4,462 1,900 - 4,260 1,900
Lavarack Barracks
Joint Theatre Distribution Systems
Facilities[3] 13,300 4,301 - 3,400 4,301
Combat Training Centre - Interim Working Accommodation 4,000 2,063 - 4,000 2,063
KennedyMacrossan Depot
Joint Theatre Distribution Systems
Facilities[3] - 5,310 - 3,300 5,310
Total Queensland 62,093 47,072 8,800 33,753 41,229
South Australia
BoothbyWarradale Barracks
Weapons Training Simulator System 2,300[4] 1,655 - 1,995 1,655
Wakefield Edinburgh Defence Precinct Minor
Facilities[2] 4,409 12 - - 12RAAF Base Edinburgh
Electronic Warfare Test and Evaluation Pod Support
Facility[2] 1,300 63 - - 63
Total estimated
expenditure
$’000
Cumulative expenditure
to 30 June 2009
$’000
2008-09 Budget
estimate
$’000
2008-09 Revised
estimate
$’000
2008-09 Actual
Expenditure
$’000
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 181
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
Port WakefieldExplosives Storehouse Replacement 13,250 8,361 10,000 8,000 8,343
Defence Science and Technology Organisation: Edinburgh
Countermine Facility Refurbishment 2,550 2,300 2,400 2,000 2,280Weapons Systems Division Refurbishment 1,350 1,229 1,200 1,100 1,218Combat Missions Systems Research Centre Extension 1,950 1,699 1,800 1,700 1,689Over The Horizon Radar System Program Office Additional Working Accommodation 4,000 3,709 3,850 3,500 3,661
Total South Australia 31,109 19,028 19,250 18,295 18,921
Western Australia Brand
ANZAC System Program Office - Office Refurbishment 3,450[4] 3,438 3,220 3,144 3,362
Garden Island
Navy Personnel and Training Centre (West) and School of Survivability and Ship Safety (West) 4,470 2,354 3,850 2,000 2,176
CurtinCampbell Barracks
Helicopter Underwater Escape
Training Facility[2] 9,723 99 - - 99Project REDFIN Interim Hangar
Facility[2] 2,000 118 - - 118FremantleIrwin Barracks
Western Australia University Regiment Relocation 807 519 - 800 519
Total estimated
expenditure
$’000
Cumulative expenditure
to 30 June 2009
$’000
2008-09 Budget
estimate
$’000
2008-09 Revised
estimate
$’000
2008-09 Actual
Expenditure
$’000
APPENDIX 4 MAJOR CAPITAL FACILITIES
182 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
PearceBindoon Training Range: Access Control Facility 2,730 259 2,255 400 259
Total Western Australia 23,180 6,787 9,325 6,344 6,533
Tasmania
FranklinFort Direction
Explosive Storage
Upgrade[2] 6,400 207 - - 207Total Tasmania 6,400 207 - - 207
Nothern TerritoryLingiariTimber Creek
Bradshaw Field Training Area Instrumented Air
Weapons Range[2] 4,400 3,640 - - 3,640RAAF Base Tindal
Follow-on Stand-off
Weapon Facilities[1] - 2,970 2,614 2,950 2,970SolomonDarwin
Naval Fuel Installation Rectification 7,200[4] 321 6,060 2,340 321
RAAF Base DarwinSpecial Operations Forward Mounting Facility 5,585 733 5,070 5,070 532
Total Northern Territory 17,185 7,664 13,744 10,360 7,463Australian Capital Territory
CanberraMajura Field Training Area
Camp Blake Kitchen
Redevelopment[2] 3,500 59 - - 59Total Australian Capital Territory 3,500 59 - - 59TOTAL 199,474 108,676 71,542 92,562 96,083
Total estimated
expenditure
$’000
Cumulative expenditure
to 30 June 2009
$’000
2008-09 Budget
estimate
$’000
2008-09 Revised
estimate
$’000
2008-09 Actual
Expenditure
$’000
APPENDIX 4 MAJOR CAPITAL FACILITIES
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 183
App
rove
d M
ajor
Cap
ital
Fac
iliti
es P
roje
cts
NOTES
1. Follow-on Stand-off Weapon Facilities has an approved budget of $6.125m covering two locations: Defence Establishment Orchard Hills and RAAF Base Tindal.
2. Project approved after publication of the Portfolio Additional Estimates Statements 2008-09.
3. Joint Theatre Distribution Systems Facilities has an approved budget of $13.3m covering two locations, Lavarack Barracks and Macrossan Depot.
4. Budget increase approved after publication of the Portfolio Additional Estimates Statements 2008-09.
Medium capital projects proposed for consideration in 2008–09.Table A4.5 shows details on the progress of new (proposed) medium capital facilities projects foreshadowed in 2008–09.
Table A4.5 Status of proposed medium capital projects for consideration in 2008-09 by state, federal electorate and locality
Federal electorate
Locality Status as at 30 June 2009
New South WalesLindsay Orchard Hills: Office Accommodation and Entry
RedevelopmentApproved
Orchard Hills: Modification of Standard Missile Test Facility ApprovedHughes Liverpool Military Area: High Voltage Reticulation System
UpgradeNow a major project
Hunter Singleton: School of Infantry: Urban Operations Training Facility
In development
Wentworth HMAS Watson: Bridge Simulator ApprovedVictoriaIndi Bandiana: Supply Wing Army Logistics Training Centre Upgrade ApprovedMcEwen Land Engineering Agency: Proving Ground Perimeter Security ApprovedGippsland RAAF Base East Sale: School of Air Traffic – Tower Visual
Simulator Facility ExtensionIn development
QueenslandCapricornia Shoalwater Bay Training Area: Camp Growl Stage 2 In development
Field Firing Target System In development3 Phase Power Supply In development
Flynn Over the Horizon Radar: 3 Phase Power Supply Cancelled by Sponsor
Groom Oakey Fuel Farm upgrade In developmentHerbert Lavarack Barracks: Stockpile Remediation Withdrawn:
incorporated into major capital facilities project
Mount Stuart Training Area: Explosive Ordnance Depot ApprovedTownsville Field Training Area: Urban Operations Training Facility
Approved
South AustraliaBoothby Warradale Barracks: Weapons Training Simulation System
FacilityApproved
Wakefield Port Wakefield: Battery Firing Facility In developmentPort Wakefield: Vibration Test Facility In developmentEdinburgh Defence Precinct: Minor Units Facilities ApprovedWoomera Prohibited Area: Disposal Explosive Ordnance Storage Facilities
In development
APPENDIX 4 MAJOR CAPITAL FACILITIES
184 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Western AustraliaCurtin Swanbourne: Campbell Barracks: Helicopter Underwater
Escape Training FacilityApproved
Swanbourne: Campbell Barracks: Project REDFIN Facilities Stage 1A
Approved
TasmaniaBass Scottsdale: Specific Nutritional Capability In development
Franklin Fort Direction: Explosive Ordnance Upgrade ApprovedNorthern TerritorySolomon Darwin: Shoal Bay Receiving Station Facilities Upgrade In development
Timber Creek: Bradshaw Field Training Area – Instrumented Air Weapons Range
Approved
Robertson Barracks: 1 Aviation Regiment Facilities Upgrade In developmentRobertson Barracks: Barracks Power Supply Upgrade In development
Australian Capital TerritoryFraser 1 Joint Public Affairs Unit Facility In development
Majura Field Training Area: Camp Blake Kitchen Upgrade Approved
Various LocationsCountermine Capability Facilities (Land 144) In developmentSpecial Operations: National Storage Facilities In developmentJoint Theatre Distribution Systems Facilities ApprovedData Centre Infrastructure Upgrade Approved
Federal electorate
Locality Status as at 30 June 2009
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 185
APPENDIX 5 ENVIRONMENTAL
MANAGEMENTThis section reports on Defence’s environmental performance and contribution during 2008-09 to ecologically sustainable development under section 516A of the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act).
Overall, Defence continued to improve environmental performance through the implementation of the Defence Environmental Strategic Plan 2006-20091. The section also reports on Defence’s administration of the Commonwealth Policy on the Management of Land Affected by Unexploded Ordnance.
LAND MANAGEMENT & BIODIVERSITY CONSERVATIONDefence completed a review of its internal planning guidance for the management of feral animals, weeds, environmental diseases and overabundant native species on the Defence estate so that it is more closely aligned with the Government’s AusBIOSEC framework. To assist Defence personnel in implementing this guidance, a number of technical publications were developed.
Defence has piloted a draft policy for measuring and monitoring the sustainability of Defence training areas at Majura, Cultana and Puckapunyal based on the identification of key indicators and thresholds.
Under the Defence Biodiversity Conservation Program a range of policies, processes, surveys and monitoring initiatives are implemented to conserve biodiversity values on priority sites, including meeting the requirements of threat abatement plans and recovery plans.
The Threatened Species Database was updated with recent EPBC and state listings, further facilitating wider access to centralised information on national and state-listed threatened species and ecological communities occurring on the Defence estate. The database assists in informing planning and management strategies for the Defence estate. To complement the database, an investigation was undertaken to determine the extent of critical habitat occurring on the Defence estate.
1. The plan can be accessed at: www.defence.gov.au/environment/strat_plan.pdf
APPENDIX 5 ENVIRONMENTAL MANAGEMENT
186 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
INTERACTION WITH MARINE & AQUATIC ENVIRONMENTS Defence activities in the marine environment were undertaken in accordance with the ADF Maritime Activities Environmental Management Plan1. The plan guides the full range of activities Defence is likely to undertake in the marine environment, including the use of military sonar. The plan is reviewed and updated as required to take into account the adoption of new technology and improvements in scientific knowledge.
HERITAGE MANAGEMENT Defence developed guidelines for assessing heritage significance and is currently completing the Recognising Our Heritage: Self Assessment Kit, a sub-component of the Defence Heritage Toolkit.
Other achievements included finalising public notifications for 12 Heritage Management Plans, commencing a second round of public notifications for 30 recently completed Plans and continuing to integrate heritage considerations into Defence business processes.
CLIMATE CHANGEDefence continued to implement initiatives in support of the Government’s agenda on climate change. This included work to set climate change and sustainability policies and targets for implementation across the Defence estate. A discussion paper on climate change impacts on Defence was circulated internally. Responses will assist to develop the Defence Climate Change and Sustainable Development Strategy.
ENERGY MANAGEMENT Earth Hour 2009 was promoted widely across Defence and many Defence bases across Australia participated by switching off non-essential lights and other electrical equipment in facilities wherever possible.
In line with the Government’s commitment toward use of E10 fuel, Defence has mandated the use of E10 fuel where possible in Defence fleet cars.
Roll-out of an electricity sub-metering system continued. Sub-meters will be installed at Defence sites over a three year period to support energy management improvements at different facility types.
Defence achieved a reduction of more than five per cent across the estate in electricity usage. This achievement is attributed in part to the initiative that commenced in June 2008 to automatically power down computers on the Defence network at night.
Defence implemented a program of pilot trials to investigate more efficient technologies. A pilot project in South Queensland involved upgrades to the lighting system of a large warehouse that is estimated to reduce greenhouse gas emissions by 205 tonnes per annum. Upgrades and adjustment of the heating ventilation and air conditioning controls has also occurred at many sites. Time control of air conditioning
1. For further information refer to: www.navy.gov.au/environment
APPENDIX 5 ENVIRONMENTAL MANAGEMENT
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 187
Wat
er &
was
te m
anag
emen
t
and hot water systems by linking to the Building Management System has lowered power consumption by reducing the running time of hot water units and air conditioning plant. The development of the new Hardened and Networked Army facilities in Edinburgh (SA), provided an opportunity for gas connection to reduce reliance on electricity and improve energy efficiency.
WATER & WASTE MANAGEMENT Defence continued to incorporate water management and waste minimisation strategies into its business processes. Defence actively participated in regional water reduction strategies, including the audit of water infrastructure to identify leaks and recycling of water at vehicle washpoints. The new Hardened and Networked Army facility in Edinburgh (SA) incorporates rainwater harvesting and recycling of approximately 53 megalitres a year.
Under the National Packaging Covenant, Defence met its reporting obligations in October 2008 and developed a data management tracking system to assist with future reporting on agreed sites.
POLLUTION PREVENTION & CONTAMINATED SITES MANAGEMENT Defence has a program to manage and remediate land that has historically been contaminated by Defence use. The National Contaminated Sites Remediation Program has been underway for six years and has completed initial desktop studies at the 70 highest risk sites, detailed contamination risk investigations at 60 sites and managed 44 site remediation projects. Defence continued to participate in the Cooperative Research Centre for Contamination Assessment and Remediation of the Environment, and continued formal staff training on contamination assessment and remediation technologies through the University of South Australia.
Defence also remained involved in four collaborative research projects to provide access to leading edge technologies and improve the understanding and cost-effective management of contaminated sites in Defence.
Defence developed a policy that mandated zero release of fire fighting Aqueous Film Forming Foam to the environment, and withdrawal of certain types of related products from service. Defence also conducted a national review of the pollution prevention measures in place at fire training grounds.
NATIONAL ENVIRONMENT PROTECTION MEASURES Defence continued to contribute to the Minister for the Environment, Heritage and the Arts’ Annual Report on the Government’s implementation of National Environment Protection Measures (NEPMs) and the effectiveness of those NEPMs. Defence continued to report under the National Pollutant Inventory (NPI).
In consultation with the Department of the Environment, Water, Heritage and the Arts, Defence has developed alternative arrangements for streamlining implementation of the National Pollutant Inventory and Movement of Controlled Waste NEPMs across Defence.
APPENDIX 5 ENVIRONMENTAL MANAGEMENT
188 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Defence reported to the NPI on fuel storage and emissions at 36 facilities, and developed NPI handbooks for Defence staff and its contractors. A review of a range of contracts was also undertaken to ensure measures are in place to allow Defence contractors to meet the requirements of the Movement of Controlled Waste NEPM.
INFRASTRUCTURE DEVELOPMENTDefence continued to implement its green buildings policy for designing energy, water and waste efficiencies into new building developments and, where feasible, incorporated green building features into its existing building stock when they were repaired or refurbished1.
OZONE-DEPLETING SUBSTANCES & SYNTHETIC GREENHOUSE GASES Joint Logistics Command continued to work closely with the Department of the Environment, Water, Heritage and the Arts, and Fire Protection Association Australia to ensure that all permits, licenses and exemptions necessary for the effective management of ozone depleting substances (ODS) and synthetic greenhouse gases (SGG) are in place. To support Defence’s ozone layer and climate protection objectives, Joint Logistics Command developed a Manual that delivers a framework for import and export of ODS and SGG, fire protection systems, plus refrigeration and air-conditioning systems. A presentation on Defence’s leadership in ozone and climate protection was delivered at the ‘Importance of Military Organisations in Protecting the Climate’ conference in Paris, November 20082.
ENVIRONMENTAL TRAINING & AWARENESS Defence continued to develop and deliver environmental training and awareness initiatives. These included environmental induction programs for personnel using Defence bases and training areas, inclusions in Service courses and development of training videos. The revised Defence Environmental Education Strategy was completed.
Defence continued the annual scheme of Environment and Heritage Awards by the Chief of the Defence Force and the Secretary of Defence. At a ceremony in September 2008, six individuals and teams were recognised for major achievements in environmental management.
1. More information can be found at: www.defence.gov.au/im/policy/green_building
2. More information can be found at: www.igsd.org/conferences/Paris2008/2d%20Tope.pdf
APPENDIX 5 ENVIRONMENTAL MANAGEMENT
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 189
Stra
tegi
c pa
rtne
rshi
ps
STRATEGIC PARTNERSHIPSDefence continued to establish and maintain strategic partnerships with universities, local community groups, key stakeholders, local governments and non-government organisations1.
DEFENCE ENVIRONMENTAL MANAGEMENT SYSTEM Defence has continued to implement and develop its Environmental Management System (EMS) at sites across the estate including bases, training areas and offices. Under the EMS, Defence implements a risk-based approach to the assessment and management of potential adverse impacts to the environment. To ensure continual improvement a national program of EMS management reviews at major sites was conducted. Work commenced to refresh and implement streamlined and consolidated EMS frameworks across the Northern Territory/Kimberley, Sydney Central and Sydney West South regions. A refreshed EMS administration framework was implemented across ACT region. Recertification was obtained by Puckapunyal Military Area, Victoria, and certification was maintained for the EMS at RAAF Base Townsville, Queensland.
Further progress was made in implementing the Defence EMS in Groups and Services, planning and business processes. Examples include:
• improvements to environmental procedures under environmental management plans covering ADF Maritime Activities, Air Operations (draft procedures) and Joint Logistics Command Warehouse Activities (draft procedures)
• completion of Navy- and RAAF-specific environmental awareness videos
• development and maintenance of environment-specific websites, including by Infrastructure Division, the Navy, the Air Force, the DMO, Joint Logistics Command and the Defence Science and Technology Organisation
• the Navy’s introduction of a perpetual award for Fleet Environmental Performance to promote environmental stewardship in Fleet units and
• improvements made to Navy and Joint Logistics Command incident reporting systems.
1. More information can be found at: www.defence.gov.au/environment
APPENDIX 5 ENVIRONMENTAL MANAGEMENT
190 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
ENVIRONMENTAL IMPACT ASSESSMENT Defence routinely undertakes environmental impact assessments to ensure that the effects of Defence activities on the environment are appropriately considered and managed. The level of environmental impact assessment conducted for a specific Defence activity depends upon the degree of environmental risk posed by the activity.
After taking into account the values and resilience of the receiving environment, Defence activities that pose only a low risk to the environment are typically controlled through existing management practices such as standard operating procedures, standing orders, environmental management plans and environmental clearance certificates. Examples include routine individual and small unit training, minor construction works such as refurbishments and the use of some new or upgraded equipment.
Defence activities such as large scale training, major infrastructure works, the introduction of major equipment and any activity likely to affect important environmental values require a higher level of environmental impact assessment. This may involve literature reviews, field surveys, impact prediction (modelling), evaluation of alternatives and identification of impact mitigation measures. For some projects Defence seeks input from state and local governments, the local community and the general public.
Environmental assessments and approvals were issued for 12 important Defence infrastructure and capability related projects in 2008-09. An example is the comprehensive environmental impact assessment of Stage 1 of the Enhanced Land Force (ELF) project. Preliminary environmental advice or studies were completed on a further 222 projects.
DEFENCE REFERRALS UNDER THE EPBC ACTUnder the EPBC Act, Defence is required to consult with the Department of the Environment, Water, Heritage and the Arts to ensure that Defence activities that will have, or are likely to have, a significant impact on the environment only proceed with the approval of the Minister for the Environment, Heritage and the Arts. In 2008-09, Defence formally referred two actions for assessment and approval under the EPBC Act, as shown in the following table.
Table A5.1 Defence actions referred under the EPBC Act, 2008-09
Referral Title Number Date referred Referral decision Current statusSoil remediation works at Belconnen Naval Transmitting Station, ACT.
2008/4251 4 August 2008 Approval required Assessment completed. Approved with conditions
Australian Super Hornet flying operations at RAAF Base Amberley, QLD.
2008/4410 21 August 2008 Approval required Assessment in progress
APPENDIX 5 ENVIRONMENTAL MANAGEMENT
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 191
Def
ence
Env
iron
men
t &
Her
itag
e Pa
nel
DEFENCE ENVIRONMENT & HERITAGE PANELThe Defence Environment and Heritage Panel provide a range of specialist environmental consultancy services throughout Defence to assist in the identification, mitigation and management of environmental risks and impacts. A new panel was established in February 2009. Environmental and heritage work to the value of $11.9m was undertaken from July 2008 to February 2009. Under the new panel, a further $5.9m of environmental and heritage work was undertaken to June 2009.
INCIDENT REPORTINGDefence maintained its environmental incident reporting processes under the Defence EMS to ensure continual improvement and to support good environmental performance. 324 incidents were reported in 2008-09 across the estate and none was considered significant.
ADMINISTRATION OF COMMONWEALTH POLICY ON THE MANAGEMENT OF LAND AFFECTED BY UNEXPLODED ORDNANCE (UXO)Defence provided advice to federal, state and local government authorities and individual land holders on the policy, technical and commercial aspects of UXO management in Australia. Relationships established with administrations in all states and territories were maintained in 2008-09 and continue to be effective.
The National Unexploded Ordnance Office upgraded its geographic information system and website detailing sites in Australia that are confirmed as, or suspected of being, contaminated by UXO. As at 30 June 2009, the National Office has identified 1,215 sites. The website1 continues to provide information to the public on UXO safety matters to enable determinations to be made whether or not individual land titles of interest are potentially contaminated. If affected, appropriate advice is offered and an e-mail contact provided.
Defence financed two UXO surveys in conjunction with the Western Australia government to confirm the categorisation of potential UXO sites at Chidlow and Northam.
The Defence Unexploded Ordnance Panel was established in 2001 and continues to provide an efficient and effective means to deliver Defence-sponsored investigative surveys and remediation projects. The panel currently comprises three specialist commercial contractors and one consultant. Non-Defence organisations are free to contact the UXO companies that are accredited to the Defence UXO Panel and to engage them directly for UXO services.
1. The website is at: www.defence.gov.au/uxo
APPENDIX 5 ENVIRONMENTAL MANAGEMENT
192 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Defence placed full-page UXO warnings in school children’s handbooks in all states and territories. Defence also provided UXO safety posters and leaflets to National Parks and Wildlife Service offices and for distribution to state police and members of the public.
There was one reported unexploded ordnance-related incident that caused two members of the Australian public to be injured. As at 30 June 2009, there have been no instances in Australia where a member of the public has been injured by UXO except where UXO has been deliberately disturbed and mishandled.
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 193
APPENDIX 6MAJOR CAPITAL
EQUIPMENT PROGRAMPUBLIC DEFENCE CAPABILITY PLAN 2009The Public DCP 2009 contains equipment acquisition proposals planned for Government consideration (first or second pass approval) in the next four years, covering a range of Defence capabilities, including land forces, air forces, maritime forces (both surface and sub-surface), strike and network centric warfare. The plan is reviewed and updated annually to take account of changing strategic circumstances, new technologies and changed priorities.
The DCP is implemented through a strengthened ‘two pass’ approval by the Government. The Group continued to improve the effectiveness of the capability development process, notably in the use of test and evaluation and simulation prior to pre-second pass consideration. In 2008-09, the Government agreed to four first pass project approvals and seven second pass approvals, plus a number of other studies and project development activities. Notable approvals included first pass approval for Joint Counter Improvised Explosive Device capability (JP 154 Phase 1) and Amphibious Watercraft Replacement (JP 2048 Phase 3) and second pass approval for Enhanced Land Force Additional Upgraded M113 Armoured Personnel Carriers (LAND 106), Military Satellite Capability (JP 2008 Phase 5A) and Direct Fire Support Weapon (Land 40 Phase 2). Funding for initial studies for the SEA 1000 program to replace the Collins class submarines was also approved during 2008-09.
THE APPROVED MAJOR CAPITAL EQUIPMENT PROGRAMThe approved major capital equipment program comprises projects which, following approval, are transferred from the DCP under Capability Development Group to the DMO to manage the acquisition phase. Funding for approved major capital equipment projects, is provided by Defence to the DMO under separate Materiel Acquisition Agreements for each project.
For most of 2008-09, projects costing between $8m and $50m were approved jointly by the Minister for Defence and the Minister for Finance and Deregulation, and those costing more than $50m by the National Security Committee of Cabinet. After April 2009, these thresholds changed so projects costing $20m-$100m required joint Ministerial approval, and projects costing more than $100m received approval from the Committee.
APPENDIX 6 MAJOR CAPITAL EQUIPMENT PROGRAM
194 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Since the creation of the DCP in 2000, some 250 major projects or phases of projects have been approved with an all-up cost of approximately $49.0b. During 2008-09, a number of projects and studies were approved at a cost of around $1.1b, as shown in Table A6.1. Some of the projects listed in the Portfolio Budget Statements 2008-09 for consideration by Government were deferred pending the release of the White Paper in May 2009. The Government will be presented with further projects for consideration in 2009-10.
Table A6.1 List of Major Capital Equipment Projects Approved by the Government in 2008-09
NOTES:
1. This project has received a partial second pass approval in 2008-09, with the remainder to be approved later.
2. This project has been split into two parts: Part 1: Acquisition-FMS case – 1, and Part 2: Through Life Support (TLS) – 5.
Key to Project Status Categories
Project
No Phase Name
Approval Budget
(Band $m)
Status as at 30 June
2009Support to the Development of the Major Capital Equipment Program
RPDE Rapid Prototyping and Development & Evaluation
<$100m
CTD 13 Capability and Technology Demonstrator <$100m
PDF 2009 Project Development Funding 2009 <$100m
First Pass Approval
AIR 9000 SCAP 1 Seahawk Capability Assurance Program 1 <$100m 4
LAND 121 4 Overlander - Field Vehicles and Trailers <$100m 4
JP 154 1 Joint Counter Improvised Explosive Device <$100m 4
JP 2048 3 Amphibious Watercraft Replacement <$100m 4
Second Pass Approval
AIR 5276 CAP 1 Capability Assurance Program 1 <$100m 2
AIR 5440 1 C-130J Block Upgrade Project - Global Program Arrangement[1]
<$100m 5[2]
JP 2089 2A Tactical Information Exchange Domain (Data Links)
<$100m 1
LAND 106 Enhanced Land Force Additional Upgraded M113 Armoured Personnel Carriers
$100m-$500m 1
JP 2068 2B.1 Computer Network Defence <$100m 4
JP 2008 5A Military Satellite Capability $100m-$500m 4
JP 2030 8 ADF Joint Command Support Environment <$100m 1
DEF 224 3 Force Level Electronic Warfare <$100m 1
LAND 40 2 Direct Fire Support Weapon $100m-$500m 2
JP 2008 3F Military Satellite Capability <$100m 2
1 Project under way (contract signed)2 Tender Closed3 Out to Tender4 Yet to go to Tender5 Various: Either contributing to more than one project or consisting of several internal
phases of varying status
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 195
APPENDIX 7PEOPLE
DEFENCE ACTUAL STAFFING This section outlines the changes in the workforce that occurred during 2008-09 and provides workforce information as at 30 June 2009. It includes numbers of people (headcount), employment categories, locations and gender information. The figures shown for APS staff do not include those employed by the DMO.
At 30 June 2009, Defence had 70,311 permanent employees comprising 55,068 permanent ADF members and 15,243 APS staff.
In the 12 months to June 2009, the permanent ADF strength increased by 1,925. The Reserve Force comprised 25,493 employees. The total ADF workforce was 81,106, and included 17,918 Navy Permanent, Gap Year and Reserve members, 45,166 Army Permanent, Gap Year and Reserve members and 18,022 Air Force Permanent, Gap Year and Reserve members. In the 12 months to 30 June 2009, the Reserve component of the ADF increased by 617, from 24,876 to 25,493. This included both Reservists on Continuous Full Time Service and Active Reserves. At 30 June 2009, 2,630 Reservists were also Defence APS employees.
At 30 June 2009 there were 15,243 APS staff. This number included all APS staff recorded as active employees and included full-time, part-time, ongoing and non-ongoing, and paid and unpaid employees.
Figure A7.1 shows the percentage of Defence people by type of service (ADF, APS, Reserves) and Figure A7.2 by the Service to which they belong. In addition to military and APS employees, Defence engages a number of contractors as part of its total workforce. Further details are provided in Table 2.8 in Chapter 2.
Figure A7.1 Defence workforce estimate by type as at 30 June 2009
Permanent ADF
Gap Year
Reserves
APS
Contractors
56.5%
0.4%16.3%
26.2%
0.6%
APPENDIX 7 PEOPLE
196 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Figure A7.2 Defence workforce estimate by Service as at 30 June 2009
Tables A7.1 through to A7.6 provide information on Defence staffing levels showing rank/level, gender, location and with some tables highlighting Defence Senior Management.
Table A7.1 Defence workforce comparison as at 30 June 2008 and 30 June 2009
NOTES
1. Figures do not include Gap Year program, which is reported in Table A7.2, nor any Reserves including those on Continuous Full-Time Service.
2. The Navy's permanent strength as at 30 June 2008 adjusted to account for retrospective transactions. The Army's permanent strength as at 30 June 2008 adjusted to account for retrospective transactions. The Air Force's permanent strength as at 30 June 2008 adjusted to account for one retrospective separation.
3. APS strength as at 30 June 2008 was adjusted to account for retrospective hire, separation and transfer transactions.
4. Net Transfers represents the net effect of transfers between Defence and the DMO for APS. This figure may differ from the DMO figures in Volume 2 of this report due to differing data run dates.
5. APS figures include paid and unpaid employees, which covers full-time, part-time, ongoing and non-ongoing employees.
Navy Army Air Force ADF APS[6]
30 June 2008
Permanent[1][2] 12,876 26,425 13,842 53,143
APS[3] 15,884Total (as at 30 June 2008) 12,876 26,425 13,842 53,143 15,884Separations
Permanent[1] 1,383 2,767 893 5,043APS 1,823Sub-Total 1,383 2,767 893 5,043 1,823
Net Transfers[4]
APS 71Sub-Total 71Additions
Permanent[1] 1,484 4,170 1,314 6,968APS 1,253Sub-Total 1,484 4,170 1,314 6,968 1,253
Permanent[1] 12,977 27,828 14,263 55,068APS 15,243Total (as at 30 June 2009) 12,977 27,828 14,263 55,068 15,243Variation 101 1,403 421 1,925 -641
Navy
Army
Air Force
APS
Contractors
0.4%
18.4%
46.4%
18.5%
16.3%
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 197
Def
ence
act
ual s
taff
ing
Table A7.2 Defence Gap Year comparison as at 30 June 2008 and 30 June 2009
NOTES
1. 700 participants are recruited each calendar year. However, the distribution within each calendar year (and consequently financial year totals) varies as Service intake and training schedules dictate.
Navy Army Air Force ADF TotalParticipants as at 30 June 2008 82 387 97 566
Additions[1]
Ab initio 187 324 112 623Transferred from Reserves 1 2 - 3Sub-Total 188 326 112 626Outgoing
Transferred to Permanent 41 125 21 187Transferred to Reserves 8 231 39 278Other separations from Gap Year 51 83 48 182Sub-Total 100 439 108 647Participants as at 30 June 2009 170 274 101 545Variation 88 -113 4 -21
APPENDIX 7 PEOPLE
198 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Defence workforce by gender & employment categoryTable A7.3 ADF Permanent, Gap Year and Reserves Forces, and APS, by gender and employment category[1][2][3]
As at 30 June 2008 As at 30 June 2009Men % Women % Men % Women %
Navy[4][5]
Trained ForceOfficers 1,754 13.6 393 3.1 1,753 13.5 397 3.1Other Ranks 6,304 49.0 1,202 9.3 6,376 49.1 1,242 9.6
Training ForceOfficers 638 5.0 204 1.6 616 4.7 205 1.6Other Ranks 1,841 14.3 540 4.2 1,857 14.3 531 4.1
Total Navy 10,537 81.8 2,339 18.2 10,602 81.7 2,375 18.3
Army[6]
Trained ForceOfficers 4,165 15.8 644 2.4 4,241 15.2 677 2.4Other Ranks 16,655 63.0 1,582 6.0 17,255 62.0 1,676 6.0
Training ForceOfficers 775 2.9 156 0.6 892 3.2 159 0.6Other Ranks 2,269 8.6 179 0.7 2,752 9.9 176 0.6
Total Army 23,864 90.3 2,561 9.7 25,140 90.3 2,688 9.7
Air Force[7]
Trained ForceOfficers 3,034 21.9 643 4.6 3,143 22.0 680 4.8Other Ranks 7,311 52.8 1,365 9.9 7,446 52.2 1,417 9.9
Training ForceOfficers 536 3.9 172 1.2 520 3.6 176 1.2Other Ranks 678 4.9 103 0.7 758 5.3 123 0.9
Total Air Force 11,559 83.5 2,283 16.5 11,867 83.2 2,396 16.8ADF PermanentTrained Force
Officers 8,953 16.8 1,680 3.2 9,137 16.6 1,754 3.2Other Ranks 30,270 57.0 4,149 7.8 31,077 56.4 4,335 7.9
Training ForceOfficers 1,949 3.7 532 1.0 2,028 3.7 540 1.0Other Ranks 4,788 9.0 822 1.5 5,367 9.7 830 1.5
Total ADF Permanent 45,960 86.5 7,183 13.5 47,609 86.5 7,459 13.5
Gap YearNavy 35 6.2 47 8.3 79 14.5 91 16.7Army 310 54.8 77 13.6 204 37.4 70 12.8Air Force 58 10.2 39 6.9 59 10.8 42 7.7Total Gap Year 403 71.2 163 28.8 342 62.8 203 37.2
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 199
Def
ence
act
ual s
taff
ing
NOTES
1. Figures in this table show actual employee numbers (headcount) as at 30 June 2008 and 30 June 2009.
2. ADF Permanent headcount does not include Gap Year participants who are reported separately in this table.
3. Percentage figures are calculated against the individual Service totals. The Service totals for 2008–09 can be found in Table A7.1.
4. The Navy’s permanent strength as at 30 June 2008 adjusted to account for retrospective separations and members who failed to enlist.
5. Seaman-ranked sailors have been classified in the Training Force.
6. The Army’s permanent strength as at 30 June 2008 adjusted to account for retrospective transactions.
7. The Air Force’s permanent strength as at 30 June 2008 adjusted for one retrospective separation and incorrect recording of gender.
8. Reserves include all active members (training, deployed and other part-time military work commitments) and those on Continuous Full-Time Service as at 30 June 2009.
9. The APS headcount does not include DMO employees.
10. 30 June 2009 figures for APS include 2,630 APS employees that are also counted as Reserve members.
11. APS strength as at 30 June 2008 adjusted to account for retrospective hire, separation and transfer transactions.
12. Grand Total only includes ADF Permanent and APS.
13. The Air Force's reserve strength as at 30 June 2008 adjusted for retrospective transactions.
Reserves[8]
Navy 3,749 15.1 939 3.8 3,826 15.0 945 3.7Army 14,341 57.6 2,404 9.7 14,678 57.6 2,386 9.4
Air Force(13) 2,705 10.9 738 3.0 2,851 11.2 807 3.2Total Reserves 20,795 83.6 4,081 16.4 21,355 83.8 4,138 16.2
APS[9][10][11] 9,185 57.8 6,699 42.2 8,720 57.2 6,523 42.8
Total[12] 55,145 79.9 13,882 20.1 56,329 80.1 13,982 19.9
As at 30 June 2008 As at 30 June 2009Men % Women % Men % Women %
APPENDIX 7 PEOPLE
200 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A7.4 APS by gender and category[1][2][3]
NOTES
1. Figures in this table are actual employee numbers (headcount) as at 30 June 2008 and 30 June 2009.
2. Figures include paid and unpaid employees.
3. Figures do not include DMO employees.
4. Figures for 2007-08 adjusted to account for retrospective transactions.
5. Part-time now includes staff with weekly hours less than the standard hours, regardless of position type, rather than only members in part-time positions.
As at 30 June 2008[4] As at 30 June 2009
Full-time Part-time[5] Total Full-time Part-time[5] Total
Ongoing employeesMales 8,896 108 9,004 8,457 121 8,578Females 5,851 637 6,488 5,624 666 6,290Total Ongoing 14,747 745 15,492 14,081 787 14,868
Non-ongoing employeesMales 160 21 181 122 20 142Females 172 39 211 198 35 233Total Non-ongoing 332 60 392 320 55 375Males 9,056 129 9,185 8,579 141 8,720Females 6,023 595 6,618 5,822 701 6,523Total APS 15,079 805 15,884 14,401 842 15,243
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 201
Def
ence
act
ual s
taff
ing
Defence Workforce by Employment LocationTable A7.5 Distribution of Defence workforce by employment location as at 30 June 2009[1]
NOTES
1. Figures in this table show actual employees numbers (headcount) as at 30 June 2009, not average funded strengths.
2. ACT includes employees located at Jervis Bay.
3. Overseas figures represent employees posted for long-term duty.
4. Permanent Forces figures include paid and unpaid members.
5. Employees are shown in the location that they are administered.
6. Members serving on ships are included against the state or territory in which the ship is home-ported.
7. Reserve Forces figures include Reserves on Continuous Full-Time Service.
8. APS figures include paid and unpaid employees, which covers full-time, part-time, ongoing and non-ongoing staff.
9. APS figures do not include DMO employees.
10. 30 June 2009 figures for APS include 2,630 APS employees that are also counted as Reserve members.
NSW Vic. Qld SA WA Tas. NT ACT[2] O/S[3] Total
Permanent Forces[4][5][6] Navy 6,076 1,807 850 70 2,194 19 639 1,147 175 12,977Army 6,925 3,105 9,941 559 836 88 3,895 2,186 293 27,828Air Force 5,191 1,005 2,823 1,797 428 14 1,013 1,696 296 14,263Sub-total 18,192 5,917 13,614 2,426 3,458 121 5,547 5,029 764 55,068
Gap Year Navy – 170 - - - - - - - 170Army 125 103 42 - - - 4 - - 274Air Force 1 100 - - - - - - - 101Sub-total 126 373 42 – – – 4 – – 545
Reserve Forces[6][7] Navy 1,215 489 710 166 833 177 100 1,078 3 4,771Army 4,784 2,915 4,249 1,340 1,781 579 721 687 8 17,064Air Force 881 459 927 392 261 52 123 563 - 3,658Sub-total 6,880 3,863 5,886 1,898 2,875 808 944 2,328 11 25,493ADF Total 25,198 10,153 19,542 4,324 6,333 929 6,495 7,357 775 81,106
APS[8][9][10] 2,374 2,540 1,130 1,853 422 97 399 6,341 87 15,243Total 27,572 12,693 20,672 6,177 6,755 1,026 6,894 13,698 862 96,349
APPENDIX 7 PEOPLE
202 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A7.6 Distribution of APS by employment location as at 30 June 2009[1][2]
NOTES
1. Figures in this table show actual employee numbers as at 30 June 2009 and include paid and unpaid staff.
2. Figures do not include APS employees in DMO.
3. ACT includes employees located at Jervis Bay.
4. Overseas figures represent staff on long-term duty.
5. Senior Executive Service includes Band 1, 2 and 3 SES, Chief of Division and Medical Officer Class 6 classifications.
6. SES relief staffing indicates non-SES officers who are temporarily acting in SES positions. These officers are on Additional Responsibility Payments (ARP) while the incumbents are taking leave, acting in higher positions or on secondment to other agencies.
7. Includes Executive Levels 1 and 2.
8. Executive relief staffing indicates APS levels on Additional Responsibility Payments while the incumbents are taking leave, acting in higher positions or on secondment to other agencies.
9. Other APS levels include levels 1 to 6.
NSW Vic. Qld SA WA Tas. NT ACT[3] O/S[4] Total
Secretary - - - - - - - 1 - 1Senior Executive Service[5] 1 5 1 8 - - - 99 1 115SES relief staffing[6] - - - - - - - 12 - 12Executive levels[7] 258 566 72 736 54 7 37 2,224 59 4,013Executive relief staffing[8] 30 9 9 20 5 1 8 218 1 301Other APS Levels[9] 2,085 1,960 1,048 1,089 363 89 354 3,787 26 10,801Total 2,374 2,540 1,130 1,853 422 97 399 6,341 87 15,243
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 203
AD
F w
orkf
orce
man
agem
ent
ADF WORKFORCE MANAGEMENTADF workforce entry and separation rates contribute to maintaining total ADF workforce strength within a small bandwidth of workforce size approved by government. At the end of the financial year the ADF had achieved +0.6 per cent (+333) of its workforce strength targets as reported in the Portfolio Additional Estimates Statements 2008-09 , made up of Navy -0.4 per cent (-49), Army +1.4 per cent (+370) and Air Force +0.1 per cent (+12).
ADF workforce entryADF enlistments include all entrants (ab initio recruits and prior service entrants) who joined the ADF in the financial year. The ADF enlisted 6,968 permanent members, 6,020 men and 948 women, for the 12 months up to 30 June 2009, as shown in Table A7.7. This was 108 less than in 2007-08. In addition, a total of 626 people (396 men and 230 women) were enlisted in the ADF Gap Year initiative.
Of the total number enlisted, 1,517 entrants had prior military service in either the Reserves, another Service, another nation, previous permanent force or transferred from the Gap Year initiative. There were 5,451 ab initio entrants.
Table A7.7 Permanent Force workforce entry, 2007-08 and 2008-09[1][2][3]
NOTES
1. Figures in this table show actual Permanent Force employees enlisted from all sources (headcount).
2. Enlistments exclude Reserves commencing periods of continuous full-time service.
3. Figures include ab initio enlistees and inter- and intra-service transfers processed by the Services. Tables A7.8 and A7.9 provide the split between prior service enlistments and ab initio recruiting respectively.
4. Army, Navy and Air Force enlistments shown in the Defence Annual Report 2007-08 have been adjusted due to backdated transactions.
5. Gap Year participants are not included in Permanent Force figures.
6. The remainder of the 700 Gap Year participants for the 2009 calendar year will be recruited progressively between July and November 2009.
Navy[4] Army[4] Air Force[4] ADF Total
Men Women Men Women Men Women Men Women 2007-08Trained ForceOfficers 34 8 154 25 106 35 294 68 362Other Ranks 66 5 375 49 131 24 572 78 650Training Force Officers 122 55 355 59 162 64 639 178 817Other Ranks 1,023 321 2,785 222 719 177 4,527 720 5,247Total 1,245 389 3,669 355 1,118 300 6,032 1,044 7,076
Gap Year[5] 44 56 400 102 60 40 504 198 7022008-09 Trained Force Officers 37 4 140 28 85 17 262 49 311Other Ranks 71 11 518 74 127 14 716 99 815Training Force Officers 95 48 359 61 187 57 641 166 807Other Ranks 962 256 2776 214 663 164 4,401 634 5,035Total 1,165 319 3,793 377 1,062 252 6,020 948 6,968
Gap Year[5] 87 101 247 79 62 50 396 230 626[6]
APPENDIX 7 PEOPLE
204 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A7.8 Permanent Force prior service entry, 2007-08 and 2008-09[1][2]
NOTES
1. Figures in this table show actual employees (headcount).
2. Defence Force Recruiting processed 184 people with prior military service.
3. Army, Navy and Air force enlistments in the Defence Annual Report 2007-09 have been adjusted due to backdated transactions.
Navy Army Air Force ADF Total
Men Women Men Women Men Women Men Women
2007-08[3]
Overseas entrants 42 4 131 4 49 6 222 14 236Reserve transfers 36 4 489 83 100 19 625 106 731Service transfers 26 3 24 6 64 16 114 25 139Re-enlistments 29 6 120 7 58 9 207 22 229Gap Year transfers 1 - 52 13 - - 53 13 66Total 134 17 816 113 271 50 1,221 180 1,4012008-09 Overseas entrants 30 – 93 4 42 2 165 6 171Reserve transfers 58 13 577 83 79 18 714 114 828Service transfers 16 7 45 8 63 10 124 25 149Re-enlistments 24 1 103 2 46 6 173 9 182Gap Year transfers 17 24 88 37 11 10 116 71 187Total 145 45 906 134 241 46 1,292 225 1,517
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 205
AD
F w
orkf
orce
man
agem
ent
Table A7.9 ADF Permanent Force ab initio entry, 2007-08 and 2008-09Navy Army Air Force ADF
2007-08[1]
Total inquiries[2] 9,358 32,395 13,657 55,410Formal applications 3,213 7,427 3,167 13,807
Ab initio enlisted[3] 1,483 3,095 1,097 5,675Target enlistments 2,045 4,081 1,286 7,412
Enlistments achieved (%) 73 76 85 77
2008-09[4]
Total inquiries[5] 13,391 38,315 21,250 72,956Formal applications 3,651 8,229 3,868 15,748Ab initio enlisted 1,294 3,130 1,027 5,451Target enlistments 1,802 4,143 1,194 7,139
Enlistments achieved (%) 72 76 86 76
NOTES
1. Inquires and applications inclusive of Gap Year.
2. In 2007-08, 8,433 inquiries were received from people undecided on Service or commitment.
3. The number of Army applicants enlisted as shown in the Defence Annual Report 2007-08 has been adjusted due to retrospective transactions.
4. Inquires and applications exclusive of Gap Year.
5. In 2008-09, 13,156 inquiries were received from people undecided on Service or commitment.
Figures A7.3 to A7.6 show the number of full-time ADF members recruited (shaded bars) and the percentage achieved (line) of the annual target by each Service and the ADF over the last 10 financial years. The number of permanent workforce entry into each Service and the ADF decreased slightly in 2008-09.
Figure A7.3 Navy full-time ab initio entry 1999-00 to 2008-092,000
1,500
1,000
500
0
100%
80%
60%
40%
20%
0%
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
Figure A7.4 Army full-time ab initio entry 1999-00 to 2008-09
0
1,000
2,000
3,000
4,000
0%
20%
40%
60%
80%
100%
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
APPENDIX 7 PEOPLE
206 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Figure A7.5 Air Force full-time ab initio entry 1999-00 to 2008-091,500
1,000
500
0
100%
80%
60%
40%
20%
0%
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
Figure A7.6 ADF full-time ab initio entry 1999-00 to 2008-097,000
6,000
5,000
4,000
3,000
2,000
1,000
0
100%
80%
60%
40%
20%
0%
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
Table A7.10 ADF Gap Year entry activity 2007–08 and 2008-09[1]
Navy Army Air Force ADF
2007-08
Total inquiries[1] 983 5,534 806 7,323Formal applications 255 1,010 243 1,508Ab initio enlisted 100 500 100 700Transfers from Reserve - 2 - 2Target 100 500 100 700
Percentage achieved (%) 100 100 100 100
2008-09[2]
Total inquiries[3] 1483 4,927 1647 8,057Formal applications 529 812 327 1,668Ab initio enlisted 187 324 112 623
Transfers from Reserves[4] 1 2 - 3Target 192 317 116 625
Percentage achieved (%) 98 103 97 100
NOTES
1. 8,433 inquiries were received from people undecided on Service or commitment in 2007-08.
2. The inquiries and applications are for the period 1 May 2008 to 30 Apr 2009 and not the whole financial year. This is due to the Gap Year campaign running between these dates.
3. 13,156 inquiries were received from people undecided on Service or commitment in 2008-09.
4. Two Army Reservists transferred to Army Gap Year and one transferred to Navy Gap Year.
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 207
AD
F w
orkf
orce
man
agem
ent
Table A7.11 Reserve Force entry activity, 2007-08 and 2008-09[1][2]
Navy Army Air Force ADF
2007-08
Total inquiries[1] 967 10,742 1,689 13,398Formal applications 188 3,962 543 4,693Applicants enlisted 71 2,207 262 2,540Target 144 2,150 439 2,733
Enlistments achieved (%) 49 103 60 93
2008-09
Total inquiries[2] 1,066 12,680 1,415 15,161Formal applications 255 4,479 483 5,217Applicants enlisted 99 2,056 215 2,370Target 127 2,787 340 3,254
Enlistments achieved (%) 78 74 63 73
NOTES
1. In addition, there were 8,433 inquiries about Tri-Service, Permanent and Reserve Force who were undecided on which Service they wished to join and whether they were interested in Permanent or Reserve commitment.
2. In addition, there were 13,156 inquiries about Tri-Service, Permanent, Gap Year and Reserve Force who were undecided on which Service they wished to join and whether they were interested in Permanent, Gap Year or Reserve commitment.
Figures A7.7 to A7.10 show the number of part-time ADF members recruited (shaded bars) and the percentage achieved (line) of the annual target by each Service and the ADF over the last ten financial years.
Figure A7.7 Navy part-time entry 1999-00 to 2008-09
0
20
40
60
100
80
120
0%
20%
40%
60%
80%
100%
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
APPENDIX 7 PEOPLE
208 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Figure A7.8 Army part-time entry 1999-00 to 2008-09
0
500
1,000
1,500
2,500
2,000
3,000
3,500
0%
20%
40%
60%
80%
100%
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
Figure A7.9 Air Force part-time entry 1999-00 to 2008-09350
300
250
200
150
100
50
0
100%
80%
60%
40%
20%
0%
y / /
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
Figure A7.10 ADF part-time entry 1999-00 to 2008-093,500
3,000
2,500
2,000
1,500
1,000
500
0
100%
80%
60%
40%
20%
0%
1999
-00
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 209
AD
F w
orkf
orce
man
agem
ent
ADF SeparationsAs at 30 June 2009, the 12-month rolling separation rates for the Permanent Force were:
• Navy – 10.8 per cent
• Army – 10.3 per cent
• Air Force – 6.4 per cent
• ADF – 9.4 per cent.
Table A7.12 ADF Permanent Forces separations, 2007-08 and 2008-09[1][2][3]
NOTES
1. Figures in this table show actual employees (headcount).
2. Classifications are not mutually exclusive, and an individual is placed in only one group. The order of classifications is as follows: age retirement; cadets and trainees; and the remainder are classified as voluntary or involuntary.
3. Personnel on maternity leave or on leave without pay, Reservists rendering continuous full-time service and Gap Year are not included.
4. 'Voluntary' includes voluntary redundancies and resignations.
5. 'Involuntary' primarily comprises members who are medically unfit, unsuitable for further duty, who died whilst serving or who fell into the 'Management Initiated Early Retirement' category.
6. Amendments to Navy and Army 2007-08 figures are due to retrospective separations.
7. Amendments to Air Force 2007-08 figures are due to a retrospective separation and a duplicate transaction.
Voluntary[4] Involuntary[5] Age retirement
Trainees Total
2007-08
Navy[6] Officers 111 15 1 47 174Other Ranks 751 176 3 308 1,238
Army[6] Officers 276 30 - 134 440Other Ranks 1,374 447 - 481 2,302
Air Force[7] Officers 193 16 3 52 264Other Ranks 519 65 6 128 718
Total Permanent Forces
Officers 580 61 4 233 878Other Ranks 2,644 688 9 917 4,258Total 3,224 749 13 1,150 5,136
2008-09Navy Officers 139 24 - 66 229
Other Ranks 624 171 - 359 1,154Army Officers 249 53 1 109 412
Other Ranks 1,361 490 - 504 2,355Air Force Officers 196 19 - 54 269
Other Ranks 443 68 1 112 624
Total Permanent Forces
Officers 584 96 1 229 910Other Ranks 2,428 729 1 975 4,133Total 3,012 825 2 1,204 5,043
APPENDIX 7 PEOPLE
210 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Figures A7.11 to A7.14 show the variation in the 12 month rolling separation rate for the ADF and each Service over the last 10 years. The higher separation rate in 2001 is due to the impact of the 2000-01 Air Force redundancy program. The lower separation rates between June 2002 and June 2005 are due to two reasons: an increase in Army recruiting in the previous two to four years and as a result members being obliged to serve out their initial period of service and therefore unable to leave; and fewer Air Force members were able to separate following the Air Force redundancy program. ADF long-term separation rates typically vary between 10 and 13 per cent. Current low separation rates result from the combined impact of retention initiatives taken by Defence and the impact of the Global Financial Crisis.
Figure A7.11 Navy separation rates, 2000-09
0.0%
2.0%
4.0%
6.0%
10.0%
8.0%
12.0%
14.0%
16.0%
June 00 June 02 June 04 June 06 June 08
Figure A7.12 Army separation rates, 2000-09
0.0%
2.0%
4.0%
6.0%
10.0%
8.0%
12.0%
14.0%
16.0%
June 00 June 02 June 04 June 06 June 08
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 211
AD
F w
orkf
orce
man
agem
ent
Figure A7.13 Air Force separation rates, 2000-09
0.0%
2.0%
4.0%
6.0%
10.0%
8.0%
12.0%
14.0%
16.0%
June 00 June 02 June 04 June 06 June 08
Figure A7.14 ADF separation rates, 2000-09
0.0%
2.0%
4.0%
6.0%
10.0%
8.0%
12.0%
14.0%
16.0%
June 00 June 02 June 04 June 06 June 08
APPENDIX 7 PEOPLE
212 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
APS separationsTable A7.13 APS separations 2007-08 and 2008-09[1]
NOTES
1. Figures do not include DMO employees.
2. Voluntary figures include voluntary redundancies (due to Commercial Support Program, Defence Reform Program or Program Initiated).
3. Involuntary figures include breach of conduct, invalidity retirement, involuntary redundancies, lack of qualifications, non-performance, term probation and death.
4. Resignation/retirement figures include resignation, retirement (minimum age and SES) and completion of non-ongoing (may include some suspended records affecting the end headcount).
5. Transfers include transfers/promotions to other government departments. Movements between Defence and the DMO are not included.
6. Figures for 2007-08 adjusted to account for retrospective transactions.
Voluntary[2] Involuntary[3] Resignation/ Retirement[4]
Transfers[5] Total
2007-08Senior Executive Service - - 9 2 11Senior Officers 2 15 243 97 357Other Staff 17 46 1,235 177 1,475
Total APS (2007-08)[6] 19 61 1,487 276 1,8432008-09 Senior Executive Service - - 5 8 13Senior Officers 18 16 176 74 284Other Staff 356 61 975 134 1,526Total APS (2008-09) 374 77 1,156 216 1,823
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 213
AD
F w
orkf
orce
man
agem
ent
Defence senior managementTable A7.14 Star-ranked officers as at 30 June 2009[1][2]
NOTES
1. Officers on acting or higher duties are not included.
2. Figures do not include Reservists, including Reservists on CFTS.
3. Promotions include those officers promoted between levels.
4. Separations include only permanent officers who have separated from Defence or transferred to Reserves.
5. Figures include three Chaplains (one from each Service).
Table A7.15 APS Senior Executive Service employees as at 30 June 2009[1][2][3]
Total star rank 2008-09 promotions[3] 2008-09 separations[4]
Men Women Total Men Women Total Men Women TotalFour starNavy - - - - - - - - -Army - - - - - - - - -Air Force 1 - 1 - - - - - -Three star Navy 2 - 2 1 - 1 1 - 1Army 3 - 3 - - - 1 - 1Air Force 1 - 1 1 - 1 1 - 1Two star Navy 9 - 9 1 - 1 1 - 1Army 16 1 17 2 - 2 3 - 3Air Force 9 - 9 3 - 3 4 - 4One star
Navy[5] 32 2 34 6 - 6 8 - 8
Army[5] 50 2 52 8 1 9 6 - 6
Air Force[5] 37 2 39 7 1 8 2 - 2Total 160 7 167 29 2 31 27 - 27
Total SES 2008-09 Engagements[4] 2008-09 Separations[5]
Men Women Total Men Women Total Men Women TotalSenior ExecutiveSecretary 1 – 1 – – – – – –Band 3 7 1 8 1 – 1 2 – 2
Band 2[6] 19 4 23 3 – 3 1 1 2Band 1 48 20 68 1 – 1 7 2 9Chief of Division – – – – – – - – -Grade 3 3 – 3 – – – – – –Grade 2 10 3 13 – – – - – -Senior Executive
Relief Staff[7] 7 5 12 – – – – – –Total 95 33 128 5 – 5 10 3 13
APPENDIX 7 PEOPLE
214 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
NOTES
1. Figures in this table show actual employee numbers at their substantive level, but not staff on longer term unpaid leave.
2. Gains and losses do not reflect movement of officers between levels in each of the Senior Executive Service and Chief of Division streams.
3. Numbers exclude SES officers in the DMO. These figures are reported in Volume 2 of this report.
4. Engagement figures include new engagements and transfers from other agencies.
5. Separation figures include resignations, retirements, redundancies, promotions and transfers to other departments.
6. Senior Executive Band 2 includes Medical Officer Grade 6.
7. Relief Staff indicates non-SES officers who are temporarily acting in SES/Chief of Division positions while the incumbents are taking leave, acting in higher positions or on overseas duty.
Remunerating Defence’s peopleDefence remuneration is underpinned by a legal framework that provides separate mechanisms for setting pay and conditions for ADF members and Defence APS employees. The main legislation relevant to remuneration in Defence is the Defence Act 1903, Fair Work Act 2009 and the Public Service Act 1999.
The independent Defence Force Remuneration Tribunal is responsible for setting pay and pay-related allowances for members of the ADF. Other financial conditions of service that recognise the special characteristics of service are determined by the Minister for Defence under section 58B of the Defence Act 1903.
Defence non-SES APS employees are covered by a collective agreement. Some non-SES positions have remuneration supplemented by public service determinations or set by Australian workplace agreements. SES employees have remuneration and conditions of service set by contract, public service determinations or Australian workplace agreements. Star rank officers’ remuneration and conditions of service are set by the Star Ranks Remuneration Arrangement.
Main features of Defence workplace arrangements and agreementsBoth the ADF and Defence APS employee workplace arrangements and agreements present a package of pay and conditions which include a values-based employment framework, flexible working and leave arrangements. Defence workplace arrangements and agreements recognise the importance of recruiting and retaining the best people.
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 215
AD
F w
orkf
orce
man
agem
ent
Table A7.16 Defence APS base salary ranges by classification as at 30 June 2009
NOTES
1. SES and non-SES individual arrangements salary ranges exclude the DMO.
2. Includes rates for Chief of Division 3.
3. Includes rates for Chief of Division 2 and Medical Officer Class 6.
4. Certified Agreement salary ranges also apply to APS employees in the DMO.
5. Includes rates for Academic, Legal and Science specialist structures.
6. Includes rates for Public Affairs and Legal specialist structures.
7. Includes rates for Public Affairs specialist structures.
8. Includes rates for Registered Nurse and Occupational Health Nurse specialist structures.
9. Includes rates for Enrolled Nurse specialist structures.
Salary Range ($)Classification Minimum Maximum
Individual arrangements[1]
SES Band 3[2] 222,548 305,100
SES Band 2[3] 150,325 210,351SES Band 1 124,348 148,754Non-SES 53,622 163,130
Collective Agreement[4]
Executive Level 2 95,511 151,442[5]
Executive Level 1 82,809 101,402[6]
APS Level 6 65,520 77,103[7]
APS Level 5 59,807 64,062[8]
APS Level 4 53,622 58,864APS Level 3 48,112 52,572APS Level 2 42,239 47,484[9]
APS Level 1 37,323 41,896
APPENDIX 7 PEOPLE
216 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A7.17 ADF salary ranges as at 30 June 2009
NOTES
1. (E) is ‘equivalent rank’ across the Services.
2. General (E) and some Lieutenant General (E) rates are set by the Remuneration Tribunal.
3. Includes rates for Medical Officers on specialist structure.
4. Includes rates for Dental Officers on specialist structure.
5. Includes transitional rates for other rank appointed as officer.
6. Includes rates for Service Warrant Officer.
7. Includes rates for Chaplains on specialist structure.
Salary Range ($)Classification Minimum MaximumOfficer of the Permanent Force (Equivalent)
General (E)[1] 312,840[2] 312,840[2]
Lieutenant General (E) 242,510[2] 250,100[2]
Major General (E) 189,138 208,052Brigadier (E) 127,430[7] 184,226Colonel (E) 113,727[7] 165,058[4]
Lieutenant Colonel (E) 92,383[7] 155,262[3]
Major (E) 70,025 139,584[3]
Captain (E) 54,844 135,068[3]
Lieutenant (E) 45,592 95,569[5]
2nd Lieutenant (E) 42,597 89,217[5]
Other rank of the Permanent Force (Equivalent)Warrant Officer Class 1 (E) 62,105 102,244[6]
Warrant Officer Class 2 (E) 57,202 88,570Staff Sergeant (E) 55,283 85,444Sergeant (E) 49,430 81,715Corporal (E) 42,714 74,722Lance Corporal (E) 39,290 69,452Private Proficient (E) 38,479 68,641Private (E) 37,684 67,846
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 217
AD
F w
orkf
orce
man
agem
ent
Table A7.18 Defence Workplace Agreements and Arrangements as at 30 June 2009
NOTES
1. Excludes the Secretary who is appointed by the Prime Minister.
2. Excludes DMO civilian employees.
3. Includes one SES Band 1 officer on temporary transfer to another agency, noting that he still has an active agreement with Defence.
4. Statutory office holders not included in headcount figures in previous tables.
5. Includes ADF members billeted to the DMO.
6. Star rank numbers reflect permanent personnel only.
7. Includes ADF Permanent Force and Reservists up to the rank of COL (E).
8. Includes ADF Permanent Force. Figures do not include those Members covered by the Specialist Officer Salary Structure.
SES Non SES
Civilian[1][2]
APS employees covered by Collective Agreement - 15,129APS employees covered by individual arrangements 122[3] 49
Statutory office holder[4] 1 -
Australian Defence Force[5] Star Rank[6] Non-Star Rank[7]
Members covered by ADF Workplace Remuneration Arrangement[8] - 80,939Members covered by Star Ranks Remuneration Arrangement 157 -Specialist Officer Salary Structure - Chaplains 3 -ADF Statutory Office Holders 7 -
APPENDIX 7 PEOPLE
218 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A7.19 Defence performance pay[1][2][3]
NOTES
1. Subject to performance, employees may be entitled to a higher pay point within the salary band for their classification. This salary advancement is not considered performance pay. An employee whose employment conditions are governed by the DeCA and who is at the top of his or her classification’s salary band may, subject to performance, receive a lump sum payment of the greater of $500 or one per cent of his or her rate of pay (adjusted for part-time hours, if applicable). As this lump sum payment does not affect the employee’s nominal salary, it is considered performance pay.
2. The data in this table represents employees who were paid performance pay at any point during 2008-09. The DMO’s APS performance pay is reported separately in Volume 2 of this report.
3. Under the DeCA, employees who were within one per cent of the top of their salary range were eligible to receive a combination of performance progression (increase in rate of salary) and the top of range lump sum payment. Their salary was increased until it reached the top of the range, and the bonus described in footnote 1 was paid, reduced by the dollar amount of salary increase.
4. For reporting purposes, employees who were on the top of their salary range as at 31 October 2008 are considered to have been eligible for the top of range lump sum payment. This eligibility data does not include those employees who received the combination of a salary increase and a lump sum payment as described in note 3. The eligibility data does not include those employees who are at the top of the lower classification within a broadband. For this reason, the numbers of employees in the table above who received the bonus in some classifications is greater than the number who appear to have been eligible.
5. Medical Officer grades have been included in the EL2 classification.
Level (Substantive)
Staff eligible[4]
Number of staff paid
Aggregated Amount paid
$
Average payment
$
Range
$APS Trainee 2 2 1,000 500 500-500APS Level 1 195 192 92,858 484 133-500
APS Level 1-3 22 11 5,481 498 367-526APS Level 2 1,012 947 445,233 470 52-526APS Level 3 1,045 815 393,725 483 127-526APS Level 3–4 102 95 49,734 524 65-571APS Level 3 – EL1 (Legal) 15 9 8,852 984 984-984APS Level 4 727 546 297,171 544 102-589APS Level 4–5 327 275 161,594 588 70-621APS Level 4-6 33 49 31,648 646 247-726APS Level 5 1,458 1,061 644,173 607 52-726APS Level 5–6 7 5 3,630 726 726-726APS Level 6 1,870 1,544 1,086,252 704 102-749APS 6 – EL1 (Academic) 20 15 13,151 877 467-906Executive Level 1 1,331 1,192 955,033 801 80-1,300
Executive Level 2[5] 899 798 893,071 1,119 133-2,188Total 9,065 7,556 5,082,606 673 52-2,188
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 219
AD
F w
orkf
orce
man
agem
ent
Table A7.20 Non-salary benefits as at 30 June 2009[1][2]
NOTES
1. Non-salary benefits are dependent upon eligibility criteria and may not be available to all employees.
2. Excludes Senior Executive Staff and non-Senior Executive Staff employees on Australian Workplace Agreements or determinations made under Section 24(1) of the Public Service Act 1999 in the DMO.
All non SES employees could access the following benefits:
Employee assistance program Flexible remuneration packaging Learning and developmentTransition management services, including financial adviceFlexible working arrangements including home-based and part-time work
Subject to availability, eligibility criteria and operational requirements, employees could also access:
Defence-supported child careStudy assistanceDefence amenitiesDependant care costs Time off for long business travel Mobile phone for official useFamily care roomsAirline lounge membershipHome office equipment
Under individual remuneration arrangements, SES staff could access all the above benefits, together with the following benefits:
Motor vehicle for official and private use, plus fuel Professional membershipsFinancial advice on remuneration and conditions of serviceHome office equipmentParking
ADF Non-Star Rank members could access the following benefits:
Flexible remuneration packaging Learning and developmentMedical and dental treatmentPharmaceuticalsHousing and accommodation benefitsTransition management services, including financial advice
Subject to availability, eligibility criteria and operational requirements, ADF non-Star Rank members could also access:
Defence supported child careStudy assistanceDefence amenitiesDependant Care costs Time off for long business travel Mobile phone for official useFamily care roomsAirline lounge membershipHome office equipment
ADF Star Rank members could access all the above benefits, together with the following benefits:
Motor vehicle for official and private use, plus fuel ParkingProfessional membershipsFinancial advice on remuneration and conditions of serviceHome office equipment
APPENDIX 7 PEOPLE
220 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
EQUITY & DIVERSITYIn order to maintain competitiveness in the employment marketplace, and to support the expansion of the ADF, Defence is striving to create an organisation that is more broadly attractive to, and representative of, the Australian community than is presently the case. This will ensure greater diversity within the Defence workforce.
The Workplace Equity and Diversity Plan 2007-09 details Defence’s commitment to the principles of equity and diversity and includes performance indicators to ensure compliance with legal obligations and Defence’s values. The Plan can be found at www.defence.gov.au/fr.
GenderThe Chief of the Defence Force’s external Reference Group on Women is making recommendations based on their own experiences in non-traditional workplaces to overcome systemic, cultural, attitudinal and behavioural aspects of the ADF environment that directly or indirectly discriminate against the recruitment, retention, development and management of women.
To gain a greater understanding of the issues facing Defence women, since 1 July 2008 the then Minister for Defence Science and Personnel held 15 ministerial meetings with both ADF and civilian women, across a broad range of ranks, experiences and length of service.
To improve the recruitment of women to the ADF, Defence Force Recruiting is continuing to implement the ADF Recruitment of Women Strategy. This strategy aims to increase the number of women recruited by improving awareness of the career options available and by better preparing candidates for the physical and mental challenges they will encounter.
To improve retention, Defence is continuing to investigate strategies in the areas of career management, flexible working arrangements, training and professional development, work and family balance and support. In March 2009, the CDF developed an action plan to consolidate current initiatives linked to gender, the outcomes of the round table meetings and the reference group initiatives.
The three Services are also implementing personnel initiatives that will have a direct impact on the retention and development of women.
Examples of initiatives in the Navy included the cultural reform component of New Generation Navy and involvement with the Australian Women’s Leadership Symposium. The Army initiatives included efforts to improve representation in combat support roles and new tailored physical fitness and reconditioning programs for women. Examples within the Air Force included a new ‘inclusivity’ program, efforts to ensure female representation in key positions as role models, and investigating a ‘Stay in Touch’ initiative to actively engage members during extended periods of leave and make it easier for them to transition back to work.
Indigenous participationThe Directorate of Indigenous Affairs was launched in July 2008 to provide a single point of contact for Defence Indigenous issues. The Directorate oversees the implementation of initiatives and strategies arising from the Defence Reconciliation Action Plan which is available at www.defence.gov.au/fr.
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 221
Equi
ty &
div
ersi
ty
The report on the Defence Reconciliation Action Plan 2007-2009, will be available online, and outlines what Defence has done to advance Indigenous recruitment, retention and participation in the last two years. Development of the Defence Reconcilation Action Plan 2010-12 is continuing following extensive consultation with the ADF, including the Regional Force Surveillance Units, APS employees and external stakeholders.
The ADF Indigenous Employment Strategy, which was formally launched by the then Minister of Defence Science and Personnel in July 2008, encompasses initiatives to attract and recruit more Indigenous people from remote, regional and urban communities throughout Australia. Work is in progress under its three themes of changing perceptions; specialised pathways; and ongoing support to Indigenous ADF members. A cultural integration package is being developed to assist Defence workplaces in embracing cultural diversity on a daily basis. Indigenous pre-recruitment courses have been trialed in Townsville, Newcastle and Western Sydney, resulting in a promising level of enlistments. The Defence Aboriginal and Torres Strait Islander Network has been reinvigorated with 110 delegates registered for a conference planned for July 2009.
The APS Indigenous Employment Strategy is under review to comprehensively address the attraction and retention of Indigenous Australians through increasing opportunities to participate more fully in the Defence APS workforce. This includes participation by Defence in the National Indigenous Cadetship Project, Indigenous Graduate Recruitment, Indigenous entry level recruitment and the Indigenous Contract Management Diploma Course. Directorate APS staff have attended several Indigenous Employment and Careers Expos in Queensland. In addition, the Defence Science Indigenous Scholarship was awarded for the first time in March 2009.
People with a disabilityDefence's reporting requirements in its employer role under the Commonwealth Disability Strategy framework are met by its input into the annual Australian Public Service Commission’s State of the Service Report.
The Disability Action Plan, published by Defence in December 2008, is structured around the recommendations of the Management Advisory Committee's 2006 report Employment of people with disability in the APS. Deputy Secretary People Strategies and Policy is the Defence Diversity Champion and, as part of Defence's ongoing commitment to whole–of–government initiatives, is participating in an APS–wide committee that will drive the employment of people with disability more broadly across the APS.
The implementation of the action plan has focused on removing barriers to employment and supporting existing employees with disability.
In partnership with the Australian Employers’ Network on Disability, Defence participated in a paid work experience program and provided placements for three students. Recruitment advertising and information packs material have been reviewed and a diversity statement included.
To support retention, Defence has established an online network, undertaken a review of the reasonable adjustment policy and updated the disability intranet website. The process for the delivery of assistive technology has been revised and delivery times improved. Additionally, training and resources have been provided to supervisors of employees with disability.
APPENDIX 7 PEOPLE
222 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
OCCUPATIONAL HEALTH & SAFETYOccupational Health & Safety Management System developmentProgress with realising the objectives and priorities of the Defence Occupational Health and Safety Strategy 2007-2012 occurred under the oversight of a reinvigorated Defence OHS Committee. The committee is now jointly chaired by the Deputy Secretary People Strategies and Policy and the Vice Chief Defence Force (VCDF), with the broader membership expanded to include representation from the Services and those Groups that play a key role in influencing OHS outcomes across the organisation. Members renewed their commitment to promoting a culture of safety throughout Defence, and prioritising the management of health and safety within core business.
The Services and Groups continued to effect improvements in their systems to ensure alignment with the whole-of-Defence OHS Management System. In addition, significant effort was invested in determining the future development path for evolving and maturing Defence’s occupational medicine and occupational hygiene capability.
Education and awareness, recognition & rewardExperts in OHS have long recognised that strong leadership and an active learning culture will improve occupational accident, injury and illness performance within an organisation. Defence is committed to improving these aspects of its OHS performance and has in place an expanding range of education and awareness programs aimed at achieving greater levels of knowledge and commitment.
This year marked the sixth year of the Defence Occupational Health and Safety Awards, which represent the pinnacle of occupational health and safety awards within Defence. The awards are targeted at recognising and rewarding innovative OHS practices and solutions.
The quality and innovation of solutions shown by entrants to these awards continues to improve, indicating Defence people recognise that they can individually, and as part of a team, improve occupational health and safety in their workplaces. Winners of Defence Awards continue to achieve national recognition and success at the Safety, Rehabilitation and Compensation Commission Safety Awards and in the Australian Safety and Compensation Council – Safe Work Australia Awards.
Safety, Rehabilitation and Compensation Commission Safety Awards finalists included Defence Support Group, South Australia for the ‘Flying the Falcons’ program, which provided an alternative approach to bird management at Defence establishments. Lieutenant Commander Tracey Elliot received a high commendation for her work on developing an injury prevention and fitness program for Australian Defence Force Academy Cadets. Defence has finalists and winners in the 2009 awards to be presented in September 2009.
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 223
Occ
upat
iona
l Hea
lth
& S
afet
y
Management informationDefence recognises the importance of information to understand and effectively manage its OHS performance. A project is underway that will acquire a commercial-off-the-shelf management information system. The Occupational Health and Safety Management Information System will be an enterprise wide solution for use by personnel throughout the Groups and Services. Its use will enable identifying areas to improve occupational health and safety outcomes with the potential to reduce the high capability and financial costs of work-related injuries and illnesses.
Defence Civilian Injury/Illness Prevention & Management SystemDefence investment in the prevention and management of workplace injury and illness through the Defence Civilian Injury/Illness Prevention and Management System, has resulted in a 12 per cent reduction in the incidence of work related injury and illness in 2008-09. An 81 per cent return to work performance for 2008-09 compares favourably with the overall performance of all Commonwealth agencies.
The effectiveness of the Defence Civilian Injury/Illness Prevention and Management System is also evident through a further reduction in the Defence civilian workers’ compensation premium rate from 1.27 per cent of payroll in 2007-08 to 1.01 per cent for 2008-09, well below the Commonwealth average of 1.36 per cent.
ADF Rehabilitation ProgramThe ADF Rehabilitation Program was developed to ensure that injured or ill ADF members receive early referral for rehabilitation assessment and coordinated management to deal with their injury or illness quickly, thereby supporting their early return to duty. The rate of referrals decreased marginally during the year as a result of improved understanding on the part of Medical Officers as to how to best use referral triggers for the system to achieve positive outcomes. The case closure rate reduced slightly during the year as a result of the initial introduction of the ISIS accounts processing system. The program met budget targets, with an efficiency and effectiveness model applied ensuring rehabilitation cases only remained open which offered value to the ADF member and value for money for Defence.
Health and Safety Management ArrangementsHealth and safety management arrangements apply to ADF members and Defence employees as well as contractors and third parties in certain circumstances. Defence has implemented health and safety management arrangements within a flexible framework, taking into consideration the risks, hazards and organisational structure and size of units, ships, bases and establishments.
Notification and reporting of incidentsThe collection of OHS information such as incidents provides an ongoing record for Defence people who have suffered an injury or exposure. This information may later be retrieved if a compensation claim is made. Moreover, it enables Defence to identify trends when developing preventative strategies and OHS policy, ensuring a safer working environment. The figures shown in the following three tables may be updated in subsequent years to include incidents that occurred in previous years but which may not have been reported or recorded for that year at the time of preparation of that year’s annual report.
APPENDIX 7 PEOPLE
224 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A7.21 Incident reporting[1]
NOTES
1. Includes all people working for, or affected by, Defence undertakings, that is ADF, APS, Reserves, contractors and members of the public.
2. Includes the DMO's incident reports.
3. An incident report records an event that causes, or has potential to cause, injury or illness to Defence employees or other people, as a result of a Defence undertaking.
4. Comcare reportable deaths.
5. Serious personal injury is defined as an injury or disease in a person caused by work–related employment for which the person needs to be given emergency treatment by a registered medical practitioner, treated in a hospital as a casualty without being admitted to hospital, or admitted to hospital.
6. Incapacity is when an employee is unable to perform work for 30 or more consecutive days or shifts.
7. A dangerous occurrence is a near miss event that could have, but did not result in fatality, serious personal injury or incapacity. This includes exposures.
Incident Performance ReportingFigure A7.15 Comcare Reportable Incidents 2008-09
2006-07 2007-08 2008-09
Total incident reports[2][3] 18,474 16,389 14,207
Comcare notifiable deaths[4] 3 3 9
Serious personal injury[5] 897 1,119 1,214
Incapacity[6] 241 166 104
Dangerous occurrence[7] 1,249 1,337 1,358Total Comcare notifiable 2,390 2,625 2,685
1,500
1,250
1,000
750
500
250
0
2004-05 2005-06 2006-07 2007-08 2008-09
Death Incapacity Dangerous occurenceSerious personal injury
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 225
Occ
upat
iona
l Hea
lth
& S
afet
y
Investigations by ComcareDetails of investigations conducted by Comcare across Defence over the last three years are reported in the following table.
Table A7.22 Investigations by Comcare[1]
NOTES
1. Includes DMO data.
2. Comcare undertakes three categories of OHS investigations: review of previous investigation, targeted (at specific OHS concerns), and reactive (in response to an accident or incident).
Notices issued to Defence by Comcare investigatorsThe number of notices issued to Defence by Comcare investigators over the last three years is reported in the following table.
Table A7.23 Comcare notices[1]
NOTES
1. Includes DMO data.
2. Based on incidents and occurrences that contravene the OHS Act or Regulations.
3. Issued to remove an immediate threat to the health or safety of personnel.
4. Issued for a specific period of time to remove a threat to the health or safety of personnel.
5. Issued to individuals to inform them of a specific breach of the OHS Act.
6. Issued when Comcare requires plant or substances from an incident as evidence, or to carry out testing.
7. Issued where an investigation reveals a breach of the Act but Comcare has decided not to pursue a statutory enforcement option
2006-07 2007-08 2008-09
Reports[2]
Review of previous investigations 11 17 1Targeted investigations 2 13 4Reactive investigations 56 69 44Total 69 99 49
Reports 2006-07 2007-08 2008-09
Improvement notices[2] 19 3 5
Prohibition notices[3] 6 7 4
Do not disturb notices[4] 3 3 5
Letters of statutory obligation[5] 4 - -
Removal of plant or substances[6] 1 1 1
Letter of Warning[7] – – 1Total 33 14 16
APPENDIX 7 PEOPLE
226 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Federal Court ProsecutionIn 2007, an Australian Army Cadet died as the result of a peanut allergy while participating in a Unit bivouac in the Wombat State Forest, Victoria. Details of the Federal Court’s findings are discussed in Chapter 6 - External Scrutiny.
In addition to the civil proceedings, Comcare has accepted an enforceable undertaking from the ADF, which requires the ADF to make mandatory improvements in its systems to protect cadet safety. Comcare will be closely monitoring the Australian Defence Force implementation of the enforceable undertaking to ensure that the objective of safety in cadet activities is met. The major remedial actions involve:
• reviewing and improving the Army Cadet risk management framework, policies and training
• reviewing and improving warning labels on combat ration packs and restricting issue.
Asbestos ManagementComcare commenced an investigation into the Navy’s alleged use of asbestos without exemptions on 9 December 2008. The focus of the Comcare investigation is on ensuring that there is no immediate risk to Navy personnel, contractors and the public. Comcare is examining Defence’s systems to identify and control use of asbestos in naval platforms and will determine if there were any breaches of OHS laws. Defence continues to assist Comcare and the Safety Rehabilitation and Compensation Commission in the conduct of the investigation.
As this is a whole of Defence management issue, governance arrangements have been revised, with the VCDF now the single point of authority and accountability. A working group has also been established to guide implementation of Defence's Asbestos Eradication and Management Plan. A key element of this plan is to conduct a 100 per cent physical audit of all ADF sites.
COMPLAINT HANDLING & RESOLUTIONADF Redress of Grievance 257 new applications for redress of grievance were received. Of these, 117 (45.5 per cent) were withdrawn1, not granted or not reviewable; the remainder being granted, partially granted or still under review. 259 applications were finalised at unit level. Of these, 150 (58 per cent) were withdrawn, not granted or not reviewable; the remainder being granted or partly granted2. The primary focus of complaints remain termination of service decisions, career management issues, and conditions of service entitlements
Approximately one third of applicants who are dissatisfied with the redress decision of their commanding officer refer their complaint to their Service Chief or to the CDF for further review.
1. Withdrawn complaints are those withdrawn by the member prior to the authority making a formal decision on the merits of the complaint. This includes complaints withdrawn due to an acceptable outcome being provided through administrative resolution or alternative dispute resolution, and those withdrawn because the member does not wish to proceed with the complaint.2. Redresses of grievance recorded as finalised may have been received in the preceding year. Redresses of grievance are finalised when the complainant chooses not to pursue the grievance further or when the process of inquiry and merit decision is complete. A complainant who is not satisfied with the out-come of a redress of grievance submitted at unit level has a right to refer the complaint for inquiry by the Service Chief. Officers, warrant officers, chief petty officers and flight sergeants have a further right to refer the complaint for inquiry by the CDF if not satisfied with the Service Chief level inquiry.
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 227
Com
plai
nt h
andl
ing
& r
esol
utio
n
When a redress of grievance is referred to the CDF or a Service Chief, priority is allocated based on the nature of the complaint. Higher numbers of referrals contesting termination of service decisions, particularly under Part VIII of the Defence Act 1903, is creating a backlog of cases as these cases are given the highest priority. As a consequence there has been an increase in the number of referrals to the Defence Force Ombudsman complaining of delays in processing redresses of grievance to the Service Chiefs.
Figure A7.16 Military redresses of grievance received and finalised 2006–07 to 2008–09275
270
265
260
255
250
245
240
235
230
225
265
2006-07 2007-08 2008-09
Received Finalised
270
257
241
248
259
APS Review of Actions The total number of applications for Review of Actions received across Defence increased by 20 from 66 the previous year. This past year has seen Fairness and Resolution Branch provide additional training and advice to regional Review of Actions delegates and their staff, with a particular focus on assessing the entitlement to review and how to best manage applications accepted for review. This ‘outreach’ is considered to have increased the general awareness of the Review Of Actions review entitlement in Defence and therefore contributed to the increase in the overall applications received.
APPENDIX 7 PEOPLE
228 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Figure A7.17 APS reviews of actions received and finalised, 2006–07 to 2008–09[1]
NOTE
1. Includes DMO figures.
Unacceptable BehaviourIn 2008–09, 873 complaints of unacceptable behaviour were received. Although there has been a 12 per cent increase from last year, this figure continues to represent complaints from less than one per cent of the Defence workforce. During the reporting period, 822 complaints were finalised with 551 (63 per cent) being substantiated.
Figure A7.18 shows the total number of complaints reported over the past three years. This includes ADF members, Defence APS employees, complaints against contractors or where the identity of the respondent is unknown.
Figure A7.18 Reported unacceptable behaviour complaints received and finalised, 2006–07 to 2008–09[1]
NOTE
1. Includes DMO figures.
100
90
80
70
60
50
40
30
20
10
0
73
Received
2006-07 2007-08 2008-09
Finalised
66
86
61
7984
1,000
900
800
700
600
500
400
300
200
100
0
846
2006-07 2007-08 2008-09
Received Finalised
766
873
648
506
822
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 229
Com
plai
nt h
andl
ing
& r
esol
utio
n
Alternative Dispute Resolution, Prevention & Early Intervention StrategiesFairness and Resolution Centres in each mainland capital city provide a one–stop–shop for assistance and support in relation to dispute resolution and equity issues for the Defence population.
Significant focus in 2008 and 2009 has been placed on improving prevention and early intervention strategies and processes to enhance the capacity of commanders, managers and individuals to resolve conflict in the workplace. These strategies assist personnel to better understand a difficult workplace dynamic that adversely impacts on them, and then helps them to develop creative and constructive options and alternatives for early and effective resolution.
In addition, a suite of Defence on-line learning and face-to-face awareness and training packages has been developed during 2008-09 to assist commanders, managers and individuals in the timely resolution of workplace conflict.
The increased use of these services and support is a positive shift away from reliance on formal complaint procedures.
Figure A7.19 Alternative dispute resolution interventions, 2006–07 to 2008–09[1]
NOTE
1. Includes DMO figures.
300
250
200
150
100
50
0
2531
03
Mediation
2006-07 2007-08 2008-09
Workplace conference Conflict coaching Interactive problem solving
85
123
79
81
136
270
8
APPENDIX 7 PEOPLE
230 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
COMPENSATION FOR DETRIMENT CAUSED BY DEFECTIVE ADMINISTRATIONThe Defence Legal Division in Defence Support manages claims made under the Compensation for Detriment Caused by Defective Administration (CDDA) scheme. The Department of Finance and Deregulation has general oversight of the scheme1.
In Defence, the majority of claims made under the scheme are from current serving and former members of the ADF. Although the scheme has not been developed specifically to deal with ADF disputes, it is a means by which ADF members can seek compensation, whether or not their redress of grievance has been upheld. The restrictive criteria that apply under the scheme means that compensation cannot be awarded in many instances, although the member may have grounds for complaint.
A revised Chief Executive Instruction on the range of discretionary mechanisms was released on 1 July 2009. These mechanisms include the CDDA scheme, compensation under section 73 of the Public Service Act 1999, and Act of Grace and ex-gratia payments. The revised Chief Executive Instruction describes the mechanisms more broadly, with specific reference to the Finance Circular 2006/05 – Discretionary Compensation Mechanisms.
Table A7.24 Compensation for Detriment Cause by Defective Administration Claims Summary
APS CODE OF CONDUCT The Australian Public Service (APS) Code of Conduct and APS values are set out in the Public Service Act 1999. The code sets out the conduct expected of APS employees and obliges all employees to uphold the APS values. The values establish the framework in which the APS operates, underpinning relationships and behaviour.
During 2008-09, Defence finalised investigations of 107 employees for breaches of the Code of Conduct. This figure represents less than one per cent of the Defence APS workforce. The total number of suspected breaches was 157 (note that an employee can be suspected of more than one breach). Of the 107 employees investigated, 45 were found to have breached at least one element of the code and 71 sanctions were imposed. Employment was terminated in seven cases, reduction in classification was applied in five cases and a financial penalty was applied in 22 cases. The remaining sanctions involved formal reprimands and counselling. A further 18 employees resigned during the investigative process and before any sanctions were imposed.
1. An explanation of how the scheme and other discretionary remedies operate can be found on the Department of Finance and Deregulation website at www.finance.gov.au.
Financial Year Claims Received Payments Made Amounts Paid ($)2008-09 41 20 624,5582007-08 34 19 451,4972006-07 40 20 652,0352005-06 50 20 321,6602004-05 47 29 332,0622003-04 54 21 359,010
APPENDIX 7 PEOPLE
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 231
APS
Cod
e of
Con
duct
Of the 45 employees found to have breached the Code this year, five appealed to the Office of the Merit Protection Commissioner for reviews of the finding of a breach and the sanctions applied. The Commissioner upheld the delegate’s decisions in four of the cases and declined to review the fifth case.
In 2008-09, there was an increase in cases of bullying and harassment cases as well as inappropriate behaviour cases. Several of these did not proceed to the finding of a breach as the respondents were found to be medically not fit for duty.
Table A7.25 Code of conduct investigations2006-07 2007-08 2008-09
Number of employees investigated 86 126 107Number of employees who breached the Code 67 79 45Number of sanctions issued 86 166 71Terminations 9 14 7Financial sanctions 22 34 27
232 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
APPENDIX 8PURCHASING & CONTRACTING
ASSESSMENT OF PURCHASING AGAINST CORE POLICIES & PRINCIPLES Defence's purchasing policies are developed and managed by the DMO in accordance with the Commonwealth Procurement Guidelines. Defence's purchasing activities are governed by the Defence Chief Executive Instructions and a range of associated internal guidance on procurement processes and practices. During 2008-09, this ensured that Defence's purchasing was undertaken in an accountable and transparent manner compliant with relevant legislation and general Government policies. Competitive procurement processes were encouraged, ensuring value for money through the efficient, effective and ethical use of resources. As required by the Commonwealth Procurement Guidelines, Defence's Annual Procurement Plan 2008-09 is available online at www.tenders.gov.au.
As an initiative of the Strategic Reform Program, a centre of procurement and contracting excellence will be established in the Defence Support Group to provide guidance and strategies to ensure Defence non-equipment procurement is undertaken with an improved commercial approach. Additionally, these reforms will ensure an efficient and consistent approach to non-equipment procurement and contracting across the whole of Defence.
Purchaser-provider arrangementsDefence Materiel OrganisationUnder the Defence/DMO Business Model acquisition and sustainment of capital equipment are governed by a series of Materiel Acquisition Agreements and Materiel Sustainment Agreements. An initial prepayment transaction is made to the DMO at the commencement of each financial year based on all approved activities. Based upon advice provided by the DMO, Defence’s prepayment is progressively reduced during the year as expenses are recorded, or assets recognised.
The acquisition of major and minor capital equipment is governed by a series of Materiel Acquisition Agreements between Defence and the DMO. The 2008-09 prepayment was based upon estimated cash flow requirements for all currently approved major capital projects, including their operating component.
The sustainment of equipment by the DMO is governed by a series of Materiel Sustainment Agreements. The 2008-09 prepayment covered the product costs for all materiel products. The contracted component covers payments by the DMO to external suppliers for repairs and maintenance, inventory purchases including explosive ordnance, general stores, fuel and repairable items.
APPENDIX 8 PURCHASING & CONTRACTING
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 233
Ass
essm
ent
of p
urch
asin
g ag
ains
t co
re p
olic
ies
& p
rinc
iple
s
The DMO also received prepayment for both acquisition and sustainment service fees from Defence for new government approvals throughout the year. The DMO acquisition service fee is funded on the basis that it will cover project staffing and associated overheads. Similarly, the DMO sustainment service fee covers the DMO operating costs, including staff and overheads in the delivery of the sustainment program. From 2009-10, the DMO’s operating costs will be directly appropriated to the DMO.
Department of Foreign Affairs & Trade Defence maintains a service-level agreement and a memorandum of understanding with the Department of Foreign Affairs and Trade (DFAT) for the provision of services at DFAT-managed overseas posts. The agreement facilitates efficient and effective Australian Government business overseas by avoiding unnecessary duplication of common services at overseas posts.
The services provided for Defence under the agreement include personnel administration, residential and office accommodation, security, financial advice and transactional processing for Australian-based and program support staff engaged at overseas posts. The cost of the agreement was $3.9m in 2008-09.
Defence Housing AustraliaDefence and Defence Housing Australia (DHA) have two formal agreements: the Services Agreement for Housing and Related Requirements (the Services Agreement); and the Relocation Services Agreement. The agreements formalise the relationship between Defence as purchaser and DHA as provider of housing and related services.
During 2008-09, the Services Agreement was reviewed to incorporate the allocation and tenancy management of Defence housing into the contract arrangements as an Addendum. Under the agreement, DHA continues to provide suitable housing for Defence members to meet the operational needs of Defence in accordance with Defence policy. Defence expects DHA to provide appropriate numbers of houses in suitable locations in accordance with Defence policy. Under the Relocation Services Agreement DHA coordinates and administers domestic relocations.
During 2008–09, the cost to Defence for DHA to provide housing and relocation services for ADF members was $452.4m. This amount includes a number of projects initiated by Defence to address specific housing needs, including upgrading of on-base heritage housing and the implementation of the Member Choice Accommodation for Members Without Dependents posted to Darwin.
ComcareDefence pays an annual workers compensation premium to Comcare to meet the cost of workers compensation claims for APS personnel who suffer work-related injuries or illnesses during the year and the cost of managing those claims. The premium paid for 2008-09 was $13.3m.
Defence is also required to pay regulatory contributions to Comcare to fund costs incurred by Comcare and the Safety Rehabilitation and Compensation Commission for regulatory functions performed under the Safety Rehabilitation and Compensation Act 1988 and the Occupational Health and Safety Act 1991. For 2008-09, the regulatory contributions were $6.2m for the ADF and $0.5m for APS personnel.
Defence has a positive working relationship with Comcare, which promotes regular review of claims management performance and Defence’s injury prevention and return to work performance indicators, as well as sharing information to improve performance. Defence was satisfied with the level of service provided by Comcare in 2008-09.
APPENDIX 8 PURCHASING & CONTRACTING
234 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
ComSuperDefence pays ComSuper an agreed annual administration fee for providing administration services (excluding optional administration services) for current and former military personnel who are either contributing, deferred benefit, or pensioner members of the MSBS, DFRDB or the Defence Forces Retirement Benefits Scheme. The expenses for 2008-09 were $23.22m.
The Department of Finance and Deregulation is responsible for negotiating the Commonwealth-wide superannuation administration services provided by ComSuper for APS employees. Defence is required to pay the fees negotiated for APS employees which for 2008-09 were $3.807m.
Performance service level standards which form part of the 2007-09 Service Level Agreement negotiated with the MSB Board, the DFRDB Authority, ComSuper and Defence, apply to the delivery of services provided by ComSuper. ComSuper’s overall performance against its service level standards for 2008-09 was 88.25 per cent, representing a 4.25 per cent increase from the previous year.
The improvement results from initiatives and changes put in place during the year. These have resulted in the payment of benefits in a timelier manner, the issue of member statements earlier, improvements in the processing and reconsideration of invalidity matters and the more effective handling of complaints and ministerial representations.
APPENDIX 8 PURCHASING & CONTRACTING
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 235
Cont
ract
s
CONTRACTS ANAO access clausesThe Defence contracting templates include standard clauses providing for Auditor-General access to contractor and major subcontractors premises, records and accounts. Defence has identified the following contracts which do not comply with the requirement to provide Auditor-General access.
Table A8.1 Contracts that do not include the ANAO access clauseContractor Amount Purpose Reason for exclusionProject Outcomes Pty Ltd
$519,930 Support for the Interim Flight Screening and Basic Flying Training Project Team
Contract was entered into under DMOSS standing offer panel. Deed for DMOSS was signed in 2005.
CIT Solutions Pty Ltd $134,518 Provision of civil accreditation for Air Force
Contract was drafted prior to DPPI 11/2008 being issued (contract was effective 1 August 2008).
CIT Solutions Pty Ltd $102,888 Air Force accreditation Contract was drafted prior to DPPI 11/2008 being issued (contract was effective 1 August 2008).
LAM Agency Pty Ltd $1,950,000 Developing, maintaining and evaluating local area marketing for Defence Force Recruiting Centres (DFRCs) and Army Reserve Units
Contract was drafted by legal advisors engaged through Defence Legal. The contract does not make specific provision for audit access, but includes the following clause:8.6.1 During the performance of the Contract, the Contractor shall permit the Commonwealth Representative or any person authorised by the Commonwealth Representative access to its premises, and access to any of its records or accounts in connection with performance of work under the Contract. The Commonwealth may copy any records or accounts for the purposes of the Contract.
Australian Surf Rowing Team
$166,000 Defence sponsorship Sponsorship standard agreements were developed by legal advisors engaged through Defence Legal.
Australian Football League (AFL)
$900,000 Defence advertisements
Sponsorship standard agreements were developed by legal advisors engaged through Defence Legal.
APPENDIX 8 PURCHASING & CONTRACTING
236 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Contracts exempt from AusTenderIn 2008-09, Defence reported a total of 59 contracts, standing offers or variations thereto, with a total value of $83.525m, which were subject to an exemption under the Freedom of Information Act 1982.
ConsultanciesDefence engages consultants where it lacks specialist expertise or when independent research and assessment are required. The process for selecting consultants is consistent with the Commonwealth Procurement Guidelines and Defence’s procurement policies.
During 2008-09, Defence entered into 817 new consultancy contracts reporting total actual expenditure (including GST) of $41.1m. In addition, 508 ongoing consultancy contracts report a total $31.7m actual expenditure (including GST).
Information on consultancy contracts can be found on the AusTender website at www.tenders.gov.au.
Table A8.2 Total expenditure on consulting contracts over 3 years, 2006-07 to 2008-09
Table A8.3 shows a summary by Defence Group of consultancies let with a total contract value of $10,000 (including GST) or more, in 2008-09. The details of consultancy contracts let in 2008-09 are available in the online version of this Report on the Defence website at www.defence.gov.au/annualreports.
Table A8.3 Consultancies let in 2008-09 by Output Group
2006-07 2007-08 2008-09
$47.3m $68.0m $72.8m
Output GroupNumber of
contracts letTotal contract
value ($)
Office of the Secretary and CDF 16 1,210,351
Navy Capabilities 4 2,319,437
Army Capabilities 20 2,026,610
Air Force Capabilities 4 383,959
Intelligence Capabilities 19 1,401,243
Defence Support 347 29,763,159
Defence Science and Technology 5 176,082
Chief Information Officer 17 8,728,845
Vice Chief of the Defence Force 41 9,286,640
Joint Operations Command 5 2,454,762
Chief Finance Officer 6 2,204,155
People Strategies and Policy 23 1,383,113
Total 507 61,338,356
APPENDIX 8 PURCHASING & CONTRACTING
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 237
Lega
l Exp
ense
s
LEGAL EXPENSESExpenditure on internal and external legal services in 2008-09 is shown in the following tables. Internal expenses include salaries for military and civilian staff, divisional operating costs and military justice reimbursements. External expenses are professional fees, disbursements and legal assistance at Commonwealth expense.
Table A8.4 Estimated Expenditure on Internal and External Legal Services 2007-08 and 2008-09
Table A8.5 Estimated Cost Breakdown of Internal Legal Expenses
Table A8.6 Estimated Cost Breakdown of External Legal Expenses
ADVERTISING & MARKET RESEARCHParticulars of amounts relating to advertising and market research paid by, or on behalf of, Defence during 2008-09 are shown in the following tables, including details of the persons or organisations paid. Particulars of payments less than $10,900 (including GST) are not included. Advertising and market research information for the DMO is available in Volume 2 of this report.
Type of Legal Expenditure2007-08
$m2008-09
$mInternal 30.2 34.6External 26.4 24.9Total 56.6 59.5
Items2007-08
$m2008-09
$mSalaries for military lawyers 12.3 13.1Salaries for civilian staff 10.1 11.9ADF Reserve legal officers 4.7 5.6Operating costs of Defence Legal Division 2.5 2.2Military justice reimbursements 0.6 1.8Total 30.2 34.6
Items2007-08
$m2008-09
$m
Professional fees—Defence legal panel 20.4 21.0Disbursements 4.4 3.3Legal Assistance at Commonwealth Expense 1.6 0.6Total 26.4 24.9
APPENDIX 8 PURCHASING & CONTRACTING
238 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A8.7 Total advertising and market research expenditure by type of agency
Table A8.8 Total advertising and market research expenditure by Output Group
NOTES
1. At the end of 2008-09 International Policy moved to the Office of the Secretary and CDF Group.
2. Joint health services have moved from Defence Support Group to Vice Chief of the Defence Force Group.
2006-07 2007-08 2008-09$ $ $
Advertising 8,023,058 6,627,677 19,630,165Market Research 1,096,037 1,340,252 646,701Polling - - -Direct Mail - 81,652 224,033Media Advertising 25,810,444 35,249,329 34,600,399
Total 34,929,539 43,298,910 55,101,298
2006-07 2007-08 2008-09$ $ $
Office of the Secretary and Chief of the Defence Force Group [1] - 166,063 141,179Navy 675,279 396,950 259,737Army 334,319 169,071 147,678Air Force 323,085 417,846 307,672
Intelligence, Security & International Policy [1] 1,564,418 969,749 497,371
Defence Support Group [2] 1,808,044 1,943,137 1,300,542Defence Science and Technology Organisation 728,744 345,373 94,394Chief Information Officer Group 169,854 190,973 328,796
Vice Chief of the Defence Force Group [2] 131,278 1,466,167 482,421Joint Operations Command 22,747 51,631 15,413Capability Development Group - - -Chief Finance Officer Group - 28,783 35,115People Strategies and Policy Group 29,171,771 37,153,167 51,385,840Total 34,929,539 43,298,910 54,996,158
APPENDIX 8 PURCHASING & CONTRACTING
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 239
Adv
erti
sing
& M
arke
t Re
sear
ch
Table A8.9 Particulars of advertising and market research by Output Group2008-09 Purpose
$Office of the Secretary and Chief of the Defence Force GroupAdvertising
HMA Blaze Pty Ltd 87,290 Recruitment advertising — CivilianHMA Blaze Pty Ltd 53,889 Public Notices
Total Office of the Secretary & Chief of the Defence Force Group
141,179
NavyAdvertising
HMA Blaze Pty Ltd 68,235 Recruitment advertising Universal McCann Australia 24,920 Recruitment advertisingNavy Newspaper 32,356 General advertising
Media Advertising Universal McCann Australia 92,560 Advertising - Fleet Air Arm Museum & RAN
Heritage CollectionHMA Blaze Pty Ltd 20,840 Advertisement placements including
dissemination feesSpatchurst Design Associates Pty Ltd
20,826 Advertising - Fleet Air Arm Museum & RAN Heritage Collection
Total Navy 259,737 ArmyMedia Advertising
HMA Blaze Pty Ltd 47,264 Public AnnouncementsArmy Newspaper 26,517 Public AnnouncementsHMA Blaze Pty Ltd 11,083 Recruitment advertising - CivilianArmy Newspaper 32,785 Recruitment advertising - MilitaryNavy Newspaper 11,743 Recruitment advertising - MilitaryRAAF Newspaper 18,288 Recruitment advertising - Military
Total Army 147,678 Air Force Advertising
White Pages 14,698 Directory ListingAffiliate Marketing Solutions Pty Ltd
20,000 Online advertising - Facebook and NineMSN
Paula M Promotions 20,596 Advertising / promotional materialsHMA Blaze Pty Ltd 153,548 Recruitment Advertising
Media Advertising Fairfax Radio Network 42,230 Promotional / recruitment advertisingKids Media Pty Ltd 56,600 Promotional / recruitment advertising
Total Air Force 307,672 Intelligence, Security & International Policy Advertising
Expressions 12,823 Development of marketing programMedia Advertising
HMA Blaze Pty Ltd 467,082 Recruitment advertisingHaymarket Media 17,466 Recruitment advertising
Total Intelligence, Security & International Policy
497,371
APPENDIX 8 PURCHASING & CONTRACTING
240 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Defence Support GroupAdvertising
HMA Blaze Pty Ltd 1,023,895 Recruitment advertising — CivilianAPS Commission 276,647 Recruitment advertising — Civilian
Total Defence Support Group 1,300,542Defence Science and Technology Organisation
Advertising
HMA Blaze Pty Ltd 94,394 Recruitment advertising — Civilian
Total Defence Science and Technology Organisation
94,394
Chief Information Officer GroupAdvertising
HMA Blaze Pty Ltd 181,178 Recruitment advertising — Civilian
Media Advertising
The Australian 100,836
The Canberra Times 46,782
Total Chief Information Officer Group
328,796
Vice Chief of the Defence Force GroupAdvertising
Lawrence Computing 11,375 Civilian recruitment advertisingMedia Advertising
Universal McCann 245,754 Defence Reserve Support Council Communication Strategy
HMA Blaze Pty Ltd 88,144 Advertising generalHMA Blaze Pty Ltd 137,148 Civilian Recruitment advertising
Total Vice Chief of the Defence Force Group
482,421
Joint Operations CommandAdvertising
Island Sun Newspaper 15,413 Weapon firing practice (firing area safety alerts)
Total Joint Operations Command
15,413
Chief Finance Officer GroupMedia Advertising
The Canberra Times 13,995 Recruitment advertising — CivilianThe Australian 21,120 Recruitment advertising — Civilian
Total Chief Finance Officer Group
35,115
People Strategies and PolicyAdvertising
HMA Blaze Pty Ltd 2,058,806 Planning and placement of non-campaign advertising for Defence Force Recruitment
HMA Blaze Pty Ltd 106,868 Recruitment advertising - CivilianGeorge Paterson Y&R Pty Ltd 6,175,394 Printing, Production, Retainer Fees
2008-09 Purpose$
APPENDIX 8 PURCHASING & CONTRACTING
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 241
Adv
erti
sing
& M
arke
t Re
sear
ch
Visual Jazz 3,197,645 Online Advertisement CreationADIQ Pty Ltd 127,500 Data collection for campaign advertisingAFL Northern Territory 50,000 General SponsorshipAustralian Association of Career Councillors
65,600 Sponsorship of CDAA Conference
Australian Business Case Studies Pty Ltd
35,000 Business Case Study Project
Australian Football League 1,270,088 SponsorshipAustralian Medical Students Association
24,409 2008 Sponsorship AMSA
Australian Surf Rowers 163,368 Sponsorship & Navy Naming RightsAwards Australia 60,000 SponsorshipBasketball Australia 205,085 Sponsorship of WNBLWorkz4u Ltd 13,637 Annual Scientific Meeting-Trauma SocietyEngineering Australia 20,091 SponsorshipEOC Group 208,474 Sponsorship-Employment ExposHobsons Australia Pty Ltd 23,500 Sponsorship of ACS SeminarsLAM Agency Pty Ltd 1,889,726 Non-campaign media advertising for Defence
Force RecruitingManpower Services (Aust) Pty Ltd
808,518 Event Vehicle Program running costs. Merchandise.
Medical Student Association Notre
12,273 Sponsorship Activities 2009
Melbourne Careers Expo Pty Ltd
18,900 Exhibitor Fees
Military Shop 12,317 Merchandise Funding for Army AviationReed Business Information Pty Ltd
17,225 General Practitioners Conference
Regent Cinemas 82,164 ADF Careers cinema advertisingReinvent Your Career 24,720 Career ExposRoyal Agriculture Society of NSW
13,118 Exhibition Space at Royal Easter Show
Ryebuck Media Pty Ltd 675,000 Management fees for the implementation of the Defence 2020 program
Self Adhesive Markings 12,971 Navy crest, Surf RowersSensis Pty Ltd 50,000 WAP AdvertisingVETNETWORK 15,000 Sponsorship of Conference
Market Research
Open Mind Research Group Pty Ltd
120,268 Qualitative research to maximise ADF recruitment targets
Blue Moon 200,150 Market Research on ADF recruitment
Visual Jazz 13,614 Buzz monitoring Project
Woolcott Research Pty Ltd 311,960 Qualitative research to maximise ADF recruitment targets
Direct Mail Canprint rebilled by Manpower
138,537 Direct Marketing campaign
2008-09 Purpose$
APPENDIX 8 PURCHASING & CONTRACTING
242 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Canberra Mailing & Envelopes 64,551 Store & Distribute merchandise & collateUnimail Pty Ltd 18,025 Unigrad and Univac Package
Media Advertising Universal McCann Australia 33,081,338 Advertisement placement including
dissemination feesTotal PSP Group 51,385,840
2008-09 Purpose$
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 243
APPENDIX 9 FINANCIAL
TRANSPARENCYASSET MANAGEMENTDefence manages some $61.6b in assets. This comprises approximately $33.9b of specialist military equipment, $13.9b of land and buildings, $4.9b of inventory, $0.9b of heritage and cultural assets, $0.5b of intangibles and $7.5b of other assets such as cash, receivables and prepayments.
In accordance with section 44 of the Financial Management and Accountability Act 1997, the Chief Executive of Defence has a responsibility to manage Defence assets in a way that promotes efficient, effective and ethical use of Commonwealth resources.
Although Defence reports major non-financial assets on its balance sheet, the DMO acts as project manager on behalf of Defence for both the acquisition and sustainment of Defence military assets and inventories.
During 2008-09, Defence continued to build on the 2007-08 improvements in asset management and reporting, particularly in relation to monitoring and reporting of non-control accounts, and improving system and business process controls. This included:
• continuing to systematically improve the logistic and accounting management processes for General Stores Inventory and Repairable Items
• enhancing a monthly management assurance program covering controls, reconciliations and analytics
• implementing a Defence-wide cycle of balance sheet reconciliations for all non-control accounts
• reducing the balance of non-control accounts, resulting in more accurate asset records
• designing and implementing new reporting processes that place greater focus on the value of assets under construction.
EFFICIENCIESIn 2008-09, Defence embarked upon a program to implement internal efficiencies and economies to identify savings of up to $10b across 10 years, for reinvestment in higher priority activities. This program has been incorporated by the Defence Strategic Reform Program.
An initial exercise identified savings and efficiencies in a range of non-operational areas across Defence totalling $477.6m in 2008-09. Further efficiencies resulted in additional savings of $174.6m, giving total savings of $652.2m in 2008-09. Table A9.1details the savings achieved by Defence.
APPENDIX 9 FINANCIAL TRANSPARENCY
244 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A9.1 Savings achieved
NOTES
1. Budget Estimates are consistent with Portfolio Budget Statements 2008-09.
2. Revised Estimates are consistent with Portfolio Additional Estimates Statements 2008-09.
3. Variation figures are the difference between Actual Result and Revised Estimate.
4. Funds not required in 2008-09 moved to future years.
PAYMENT OF ACCOUNTSIn 2008-09, Defence paid 1,455,884 or 93.2 per cent of all payment transactions within a 30-day target. This result is ahead of the 90 per cent Government benchmark. The volume of payments through Defence Purchase and Travel cards represents more than 69 per cent of all payments, which continues to have a positive effect on the paid by due date result.
Table A9.2 Accounts paid by due date, 2006-07 to 2008-09
2008-09Budget
Estimate[1]
$m
2008-09Revised
estimate[2]
$m
2008-09Actual result
$m
2008-09Variation[3]
$mSavingsEfficiencies in the sustainment procurement cycle 26 26 31 5Reduction in the sustainment budget to fund the sinking of HMAS Adelaide 3 3 3 -Reduction in the major capital facilities program to fund the Kings Highway upgrade 23 23 23 -Reduction in administrative travel and other administration costs 13 13 55 43Reduction in scientific research programs 2 2 2 -Reduction in project definition costs for major capital equipment projects 10 10 10 -
Sub-total savings 77 77 124 47
Reprogramming savings[4] 191 191 191 -Savings to fund overseas Operations measures 209 209 209 -Additional savings achievedReduction in minor capital purchases - - 6 6Savings in acquisition contracts - - 50 50Savings in major capital facilities program - - 7 7Savings in defence capability plan - - 9 9Savings in other capital purchases - - 3 3Savings in employee-related costs - - 19 19Efficiencies in a range of other programs - - 33 33Sub-total additional savings achieved - - 128 128
Total Savings Achieved 478 478 652 175
2006-07 2007-08 2008-09Number of accounts paid 1,662,503 1,654,870 1,562,259Accounts paid by due date 1,585,716 1,530,079 1,455,884Percentage of accounts paid by due date 95.4 92.5 93.2
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 245
Gra
nts
GRANTSFor the period 1 January to 30 June 2009 A grant of $10m was made to the Special Air Service Resources Trust.
Information on grants awarded by Defence since 1 January 2009 is available at http://www.defence.gov.au/publications/web_based_reporting.xls.
For the period 1 January to 30 June 2009The following table provides details of the Discretionary Grants Program administered
Table A9.3 Summary of Discretionary Grants approved, 2007-08 to 31 December 2008
NOTES
1. GST inclusive where applicable.
Grant Program2007-08 [1]
$’0002008-09 [1]
$’000Army Military History Research Grants Scheme 55 75Defence Family Support Funding Program 911 1,057
Other grants The Australian Army Centenary History of the Great War 1914-1918 Five-volume series of publications re-examining Australia’s participation in the Great War (multi-year grant) - 30Australian Member Committee of the Council for Security Cooperation in the Asia-Pacific (multi-year grant) 95 55Kokoda Foundation 102 110Livingstone Shire Council 1,895 -International Institute for Strategic Studies for the Asia Seminar Series 81 -International Institute for Strategic Studies for the Shangri-La Dialogue 121 -Townsville Maritime Historical Society Inc 200 -Murdoch University 15 -Royal United Services Institute of Australia 86 -Submarine Institute of Australia 208 -Associate Professor Neville Meaney - 18
Total 3,769 1,345
APPENDIX 9 FINANCIAL TRANSPARENCY
246 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Army Military History Research Grants SchemeThis scheme supports and encourages research into the role and involvement of the Army in the development of the nation. Recipients of grants and expenditure under the scheme in 2008-09 are shown in Table A9.4. Table A9.4 Army Military History Research Grants Scheme Expenditure, 2008-09Grantee Title of research Amount
of Grant $
Australian Capital Territory Mr Rhys Crawley To assist in research towards a PhD and a book on the
August 1915 offensive at Gallipoli13,000
Ms Victoria D’Alton The administrative and bureaucratic analysis of the AIF and Victoria Cross on the Western Front
5,000
Dr Ian Howie-Willis A biography of Major General Sir Samuel Burston 5,000Ms Kerry Neale Facially disfigured Commonwealth Great War veterans 9,700Mr Nick Fletcher and Mr Craig Tibbits
A Unit history of the 56th Battalion 2,800
Total Australian Capital Territory 35,500New South Wales Mr Phillip Bradley The Salamaua Campaign 7,000Mr Peter Dean Lieutenant General Sir Frank Berryman 6,000Total New South Wales 13,000South AustraliaDr Michelle Cunningham Re-evaluating the Sandakan Death March 6,000Dr Paul Skrebels The 27th Battalion Unit History 6,000
Total South Australia 12,000Western Australia Mr David Evans Australian diplomacy in Portuguese Timor 2,000Mr Graham McKenzie Smith Parts two and three of every Australian Army Unit in WWII 5,000Total Western Australia 7,000TasmaniaDr David Coombes The Australian Army’s contribution to the Battle of
Bullecourt7,500
Total Tasmania 7,500Grand Total 75,000
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 247
Gra
nts
Defence Family Support Funding ProgramThe Defence Family Support Funding Program provides funds to support projects and services initiated by Defence families. The program is also available to existing groups in the community composed of, or benefiting, Defence families. Net grant expenditure on the Defence Family Support Funding program in 2008-09 is summarised in Table A9.5.
Table A9.5 Defence Family Support Funding Program direct grants expenditure, 2008-09
OrganisationAmount of grant
$
Australian Capital TerritoryDuntroon Community Centre Inc 38,890Duntroon Community Centre Inc – Capital Crafters 4,630Duntroon Community Centre Inc – Playschool 6,800Duntroon Community Centre Inc – Playgroup 1,532Gungahlin Defence Families Playgroup 1,879
Total Australian Capital Territory 53,731
New South WalesBanksia House Interest Group – Parents Playgroup 5,198Banksia House Interest Group – Administration 2,322Banksia House Interest Group – Craft Group 1,330Shoalhaven Defence Families Association Inc Nowra 10,195Waratah Interest Group Inc, Liverpool 5,180Waratah Interest Group Inc, Liverpool – Coffee, Craft and Chat 2,620Anklebiters Playgroup – Randwick 1,409
Kissingpoint Cottage 33,025Northern Beaches Defence Families Playgroup 8,010Defence Special Needs Support Group (Williamtown) 1,040RAAF Williamtown Umbrella Support Group Inc – Administration 1,585RAAF Williamtown Umbrella Support Group – Welcome Baskets 4,040RAAF Williamtown Umbrella Support Group – Craft Group 1,950RAAF Williamtown Umbrella Support Group – Toy Library 2,037RAAF Williamtown Umbrella Support Group – Toy Library – New Airconditioner 996Forest Hill Defence Community Group Inc 3,380RAAF Wagga Playgroup 1,300Kapooka Playgroup 1,698Blamey Community Group 8,603
Total New South Wales 95,918
Northern TerritoryTindal Kids Space 28,902Tindal Community Times 1,133Tindal Playgroup 3,845Katherine Playgroup 800Casuarina Street Primary School 3,158Billeroy Road Community Centre RAAF Darwin 38,649Larrakeyah Neighbourhood House 40,867
APPENDIX 9 FINANCIAL TRANSPARENCY
248 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
North Australia Area Family Support Committee Inc 46,630Robertson Barracks Family Group Inc – Administration 13,754Robertson Barracks Family Group Inc 6,382Robertson Barracks Family Group Inc – Administration 6,810The Top Ender Tri Services Newsletter Inc 72,548
Total Northern Territory 263,478
QueenslandDefence Groups in Gallipoli 13,884Pine Rivers Family Association Inc 915Kokoda Barracks Families Association 8,630Toowoomba Defence Families Support Association Inc 26,959Tri-Service Defence Families Support Association Inc 29,721Tropical North Family Centre Inc 42,529Defence Community and Recreation Centre 33,716Defence Community and Recreation Centre – Shade and Fencing 17,076Defence Community and Recreation Centre – Extreme Tuesdays 595
Total Queensland 174,025
South AustraliaWoodside Defence Families Association – Administration 21,506
Woodside Defence Families Association – Family Welcome 684Woodside Defence Families Association – Kids Club 517Woodside Defence Families Association – Playgroup 334Woodside Defence Families Association – Craft Group 668Woodside Defence Families Association – Community Hall 460North East Defence Community Playgroup 3,060
Total South Australia 27,229
TasmaniaDowsing Point Community Centre Inc 24,410Total Tasmania 24,410VictoriaCerberus Cottage Family and Friends Inc 39,572East Sale Family Group 27,078Bandiana Neighbourhood House Inc – Outdoor Play 2,310Bandiana Neighbourhood House Inc – Coffee Machine and Furniture 1,484Bandiana Neighbourhood House Inc – Childcare Support 2,860NECANA Association Inc 3,451NECANA Association Inc – Pac-a-Picnic 5,350NECANA Association Inc – Community Development Worker 22,000NECANA Association Inc – Hume Coffee Club 2,120Baranduda Community Centre 2,750Mactier Community Centre 31,668Defence Special Needs Support Group (Melbourne West) 2,540
OrganisationAmount of grant
$
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 249
Gra
nts
Defence Special Needs Support Group (National) 13,100Defence Special Needs Support Group (National) Coordinators Conference 28,100Williams Defence Community House 38,715Williams Defence Community House – Wippa Snappa’s Playgroup 2,320Williams Defence Community House – Craft Groups 4,235Williams Defence Community House – Melbourne West Deployment Support Group 1,620Williams Defence Community House – Williams Defence Community Newsletter 3,205Puckapunyal and District Neighbourhood Centre Inc 41,922Puckapunyal Kindergarten Association Inc 4,862Little Tackers Playgroup 3,740
Total Victoria 285,002
Western AustraliaMarilla House Community Centre Inc 33,313Karrakatta Community House Inc 39,439Special Air Service Regiment Auxiliary 17,880Pilbara Regiment Family Group 9,020Pearce Community Toy Library and Social Group Inc 2,053
Total Western Australia 101,705
InternationalButterworth Support Group (Malaysia) – Administration 1,800Butterworth Support Group (Malaysia) – Furphy Printing Magazine 400Butterworth Support Group (Malaysia) – Play Equipment 500Butterworth Support Group (Malaysia) – Welcome Packs 420Butterworth Support Group (Malaysia) – Santa Suit 250Port Moresby Australian Defence Families Club 9,282
Total International 12,652
Grand Total 1,038,150
OrganisationAmount of grant
$
APPENDIX 9 FINANCIAL TRANSPARENCY
250 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Table A9.6 Defence Family Support Funding Program seeding grants expenditure, 2008-09
OTHER GRANTSThe Australian Army Centenary History of the Great War 1914-1918 A grant of $30,000 was made to Professor Jeffrey Grey, of University College, Australian Defence Force Academy to publish a five volume series of publications re-examining Australia’s participation in The Great War, in time to commemorate the centenary of this conflict in August 2014. This is a multi-year grant totalling $400,000.
Australian Member Committee of the Council for Security Cooperation in the Asia-PacificA grant of $55,000 was made to the Australian Member Committee of the Council for Security Cooperation in the Asia-Pacific (Aus-CSCAP). Aus-CSCAP seeks to facilitate and promote dialogue on security issues in the Asia-Pacific. Many of these issues are of direct relevance to Australia’s strategic environment. Aus-CSCAP provides a forum in which Defence personnel can informally discuss issues with a range of experts from academic, diplomatic and governmental backgrounds.
Kokoda FoundationA grant of $110,000 was made to the Kokoda Foundation to assist with funding for the Australia-United States Trilogy Dialogue with the topic of 'Strategy Options for the Western Pacific' held on 20-23 November 2008. The Kokoda Foundation aims to foster research and innovative thinking on Australia’s future security challenges. The Kokoda Foundation is a not-for-profit organisation that focuses on issues relating to national security and whole-of-nation responses to crises and threats.
Associate Professor Neville MeaneyA grant of $18,000 was made to Associate Professor Neville Meaney, of the University of Sydney, to support the publication costs of A History of Australian Defence and Foreign Policy, 1901-23. The grant would also subsidise Sydney University Press to publish his previous work Australia and World Crisis, 1914-23, as well as reprint another previous work entitled The Search for Security in the Pacific.
OrganisationAmount of grant
$
New South WalesShoalhaven Defence Community Family association Inc – Nowra. 2,250
Total New South Wales 2,250
QueenslandDefence Community and Recreation Centre – Weipa 8,250
Total Queensland 8,250
VictoriaBandiana Neighbourhood House 1,920Cerberus Cottage Family and Friends Inc 1,000Puckapunyal Kindergarten Association Inc 5,000
Total Victoria 7,920
Grand Total 18,420
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 251
Fina
ncia
l sta
tem
ents
FINANCIAL STATEMENTS
APPENDIX 9 FINANCIAL TRANSPARENCY
252 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 253
Fina
ncia
l sta
tem
ents
APPENDIX 9 FINANCIAL TRANSPARENCY
254 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence
Financial Statements for the Period Ended 30 June 2009
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 255
Fina
ncia
l sta
tem
ents
The above statement should be read in conjunction with the accompanying notes.
Department of Defence INCOME STATEMENT for the period ended 30 June 2009
2009 2008
Notes $'000 $'000
INCOME
Revenue
Revenue from Government 3A 20,268,308 19,693,267
Sale of goods and rendering of services (including cost recovery) 3B 728,560 688,840
Rental income 3C 9,083 7,073
Other revenue 3D 23,792 42,724
Total revenue 21,029,743 20,431,904
Gains
Foreign exchange 4G - 1,077
Reversals of previous asset write-downs and impairments 3E 642,299 648,476
Other gains 3F 1,424 3,295
Total gains 643,723 652,848
Total Income 21,673,466 21,084,752
EXPENSES
Employee benefits 4A 8,278,901 7,521,605
Suppliers 4B 8,858,112 8,418,858
Grants 4C 14,349 18,000
Depreciation and amortisation 4D 3,907,639 3,657,849
Finance costs 4E 94,366 44,146
Write-down and impairment of assets 4F 1,345,808 1,952,353
Foreign exchange losses 4G 434 -
Losses from asset sales 4H 91,819 2,152
Other expenses 4I 25,148 54,815
Total Expenses 22,616,576 21,669,778
Surplus (Deficit) attributable to the Australian Government (943,110) (585,026)
APPENDIX 9 FINANCIAL TRANSPARENCY
256 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
2009 2008
Notes $'000 $'000
ASSETS
Financial Assets
Cash and cash equivalents 5A 28,088 29,223
Trade and other receivables 5B 612,538 462,185
491,408
Total financial assets 640,626
Non-Financial Assets
Land and buildings 6A, 6G 13,922,381 12,837,055
Specialist military equipment 6B, 6G 33,796,794 32,401,931
Plant and equipment 6C, 6G 1,102,356 1,147,762
Infrastructure 6D, 6G 5,052,145 4,710,245
Intangibles 6E, 6G 468,504 357,625
Heritage and cultural assets 6F, 6G 869,393 807,931
Inventories 6H 4,942,343 4,952,741
Prepayments 6I 529,682 1,055,217
58,270,507
151,294
58,913,209
Total non-financial assets 60,683,598
Assets held for sale 6J 23,768
Total Assets 61,347,992
LIABILITIES
Payables
Suppliers 7A 839,270 857,995
Other payables 7B 322,214 290,153
1,148,148
Total payables 1,161,484
Interest Bearing Liabilities
Leases 8 870,169 404,988
404,988
Total interest bearing liabilities 870,169
Provisions
Employee provisions 9A 1,937,067 1,763,721
Restoration, decontamination and decommissioning 9B 644,730 615,572
Other provisions 9C 28,340 24,603
2,403,896
3,957,032
Total provisions 2,610,137
Total Liabilities 4,641,790
NET ASSETS
56,706,202 54,956,177
Department of Defence BALANCE SHEET as at 30 June 2009
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 257
Fina
ncia
l sta
tem
ents
Department of Defence BALANCE SHEET (Continued) as at 30 June 2009
2009 2008
Notes $'000 $'000
EQUITY
Contributed equity 9,279,271 7,388,861
Reserves 13,636,846 12,834,121
Retained surplus (accumulated deficit) 33,790,085 34,733,195
TOTAL EQUITY 56,706,202 54,956,177
Current Assets 1,862,340 2,314,245
Non-Current Assets 59,485,652 56,598,964
Current Liabilities 2,957,687 2,820,126
Non-Current Liabilities 1,684,103 1,136,906
The above statement should be read in conjunction with the accompanying notes.
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
258D
EFENCE AN
NU
AL REPORT 2008-09 VO
LUM
E 1
1 Refer Note 16: Accounting for errors
The above statement should be read in conjunction with the accompanying notes
Department of Defence STATEMENT OF CHANGES IN EQUITY as at 30 June 2009
Retained Surpluses Asset Revaluation Reserve Contributed Equity Total Equity
2009
$'000
2008
$'000
2009
$'000
2008
$'000
2009
$'000
2008
$'000
2009
$'000
2008
$'000
Opening balance
Balance carried forward from previous period 1Adjustment for errors
34,733,195
-
35,384,970
(66,749)
12,834,121
-
11,900,862
-
7,388,861
-
6,876,202
-
54,956,177
-
54,162,034
(66,749)
Adjusted opening balance 34,733,195 35,318,221 12,834,121 11,900,862 7,388,861 6,876,202 54,956,177 54,095,285
Income and Expenses
Asset revaluation movements - -
802,725 933,259 - - 802,725 933,259
Subtotal income and expenses recognised directly in equity
Surplus (Deficit) for the period
-
(943,110)
-
(585,026)
802,725
-
933,259
-
-
-
-
-
802,725
(943,110)
933,259
(585,026)
Total income and expenses attributable to the Australian Government (943,110) (585,026) 802,725 933,259 - - (140,385) 348,233
Transactions with owners
Distributions to owners
Returns of equity
Returns to OPA - - - - (579,632) (1,490,897) (579,632) (1,490,897)
Contributions by owners
Appropriations (equity injection) - - - - 2,470,042 1,998,806 2,470,042 1,998,806
Restructuring (Note 10) - - - - - 4,750 - 4,750
Sub-total transactions with owners - - - - 1,890,410 512,659 1,890,410 512,659
Transfers between equity components
Closing balance attributable to the Australian Government
- - - - - - - -
33,790,085 34,733,195 13,636,846 12,834,121 9,279,271 7,388,861 56,706,202 54,956,177
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 259
Fina
ncia
l sta
tem
ents
2009 2008
Notes $'000 $'000
OPERATING ACTIVITIES
Cash received
Goods and services (including cost recovery) 614,609 579,628
Appropriations (current year) 20,023,700 19,659,706
Appropriations (prior year) 96,065 50,000
Net GST received 502,992 460,131
Other cash received 15,062 80,665
Total cash received 21,252,428 20,830,130
Cash used
Employees (7,941,096) (7,259,990)
Suppliers (7,989,626) (7,731,738)
Net GST paid (514,113) (459,476)
Grants (14,349) (17,894)
Other cash used (1,646) (800)
Total cash used (16,460,830) (15,469,898)
Net cash flows from (used by) operating activities 11 4,791,598 5,360,232
INVESTING ACTIVITIES
Cash received
Proceeds from sales of land and buildings 23,738 24,486
Proceeds from sales of plant and equipment 35,440 40,300
Proceeds from sales of specialist military equipment 2,585 2
Other cash received 944 595
Total cash received 62,707 65,383
Cash used
Purchase of land and buildings (851,345) (608,490)
Purchase of plant and equipment (145,722) (156,956)
Purchase of specialist military equipment (3,691,703) (3,594,036)
Purchase of infrastructure (73,232) (53,099)
Purchase of intangibles (74,105) (60,287)
Purchase of inventory (1,809,094) (1,412,631)
Purchase of heritage and cultural assets (50) (19)
Selling costs on sale of assets (21,267) (12,459)
Finance costs (63,680) (15,193)
Total cash used (6,730,198) (5,913,170)
Net cash flows from (used by) investing activities
(6,667,491) (5,847,787)
Department of Defence CASH FLOW STATEMENT for the period ended 30 June 2009
APPENDIX 9 FINANCIAL TRANSPARENCY
260 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence CASH FLOW STATEMENT (Continued) for the period ended 30 June 2009
The above statement should be read in conjunction with the accompanying notes.
2009 2008
Notes $'000 $'000
FINANCING ACTIVITIES
Cash received
Appropriations - contributed equity (current year) 1,805,180 1,998,630
Appropriations - contributed equity (prior year) 148,002 -
Total cash received 1,953,182 1,998,630
Cash used
Repayment of debt (including finance lease principal) (62,209) (24,039)
Return of contributed equity (15,781) (1,490,897)
Total cash used (77,990) (1,514,936)
Net cash flows from (used by) financing activities 1,875,192 483,694
Net increase/(decrease) in cash held (701) (3,861)
Cash and cash equivalents at the beginning of the reporting period 29,223 32,007
Effect of exchange rate movements on cash and cash equivalents
Cash and cash equivalents at the end of the reporting period
4G
5A
(434) 1,077
28,088 29,223
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 261
Fina
ncia
l sta
tem
ents
Department of Defence SCHEDULE OF COMMITMENTS as at 30 June 2009
BY TYPE
Commitments receivable
Lease rental income1
GST recoverable on commitments2
2009
$'000
(27,929)
(2,616,751)
2008
$'000
(28,295)
(2,628,851)
Total commitments receivable (2,644,680) (2,657,146)
Capital commitments payable
Land and buildings3
Infrastructure, plant and equipment4
Specialist military equipment5
Other capital commitments6
1,371,085
272,440
17,218,048
51,372
2,125,079
90,371
17,488,587
61,907
Total capital commitments payable 18,912,945 19,765,944
Other commitments payable
Operating leases7
Research and development8
Other non-capital commitments9
5,066,414
181,861
12,707,508
4,304,564
107,090
12,903,248
Total other commitments payable 17,955,783 17,314,902
Net commitments by type 34,224,048 34,423,700
BY MATURITY
Commitments receivable
Lease rental revenue
One year or less (14,673) (14,349)
From one to five years (5,029) (5,306)
Over five years (8,227) (8,640)
Total lease rental revenue (27,929) (28,295)
Other commitments receivable
One year or less (857,458) (300,455)
From one to five years (1,379,439) (1,801,457)
Over five years (379,854) (526,939)
Total other commitments receivable (2,616,751) (2,628,851)
Commitments payable
Capital commitments
One year or less 5,786,856 1,424,983
From one to five years 10,642,710 13,827,475
Over five years
Total capital commitments
2,483,379
18,912,945
4,513,486
19,765,944
APPENDIX 9 FINANCIAL TRANSPARENCY
262 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence SCHEDULE OF COMMITMENTS (continued) as at 30 June 2009
2009 2008
$'000 $'000
Operating lease commitments
One year or less 648,739 394,513
From one to five years 2,176,121 1,785,419
Over five years 2,241,554 2,124,632
4,304,564
Total operating lease commitments 5,066,414
Other commitments
One year or less 4,082,180 2,529,938
From one to five years 6,054,456 7,541,847
Over five years 2,752,733 2,938,553
13,010,338
34,423,700
Total other commitments
Net commitments by maturity
12,889,369
34,224,048
NOTE:
Commitments are GST inclusive where relevant. Commitments managed by the Defence Materiel Organisation (DMO) on
behalf of Defence total $21.085m, comprising:
commitments receivable of $1,901m;
capital commitments of $17,478m; and
other commitments payable of $5,508m.
The 2007-08 comparative commitment balances have been amended to include GST in respect of commitments managed by
the DMO on behalf of Defence.
1. The lease rental income includes rental contributions from Defence service members for residences sub-leased by Defence.
The lease term is normally 3 to 5 years. The lease rental receivable is calculated for 28 days which is the minimum period of
notice Defence members are required to provide before terminating the lease.
2. GST recoverable on commitments payable.
3. Outstanding contractual payments for buildings under construction.
4. Infrastructure, plant and equipment capital commitments include outstanding contractual payments for such items of
plant and equipment as the maintenance of hardware and software.
5. Outstanding contractual payments for specialist military equipment under construction. The majority of these
commitments relate to Materiel Acquisition Agreements with the DMO.
6. Other capital commitments include contractual payments for software licence agreements.
7. Operating leases included are effectively non-cancellable and are described in the table below.
8. Outstanding commitments on research and development projects including Through Life Support agreements.
9. Outstanding commitments on supplier type expenditure including general goods and services, communications, domestic,
overseas travel, removal costs, and Materiel Sustainment expenditure payable to the DMO.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 263
Fina
ncia
l sta
tem
ents
Department of Defence SCHEDULE OF COMMITMENTS (continued) as at 30 June 2009
Nature of leases General description of leasing arrangement
DHA property leases Defence leases residences under a service agreement with
Defence Housing Australia (DHA) to provide accommodation
to eligible service members. The total commitment has been
calculated based on an initial forecast of housing demand for
the period of the agreement, which is 12 years. Lease
payments are subject to the terms and conditions of the lease
and are payable to DHA.
Other property leases Defence leases both residential and commercial properties in
Australia and overseas in support of its activities. Lease
payments are subject to the terms and conditions of the lease.
Generally the leases are subject to market reviews, reviews
in accordance with agreed indexation or a combination of
both. The terms range between 1 and 101 years.
Aircraft leases Defence leases aircraft in support of scientific and military
operations and in support of parliamentary services. Lease
terms range between 2 and 12 years.
Equipment leases Defence has leases for items of equipment including computer
hardware, photocopiers and communication equipment.
General lease terms are 2 to 5 years.
Property revenue leases Defence receives revenue from the lease of property and
office space. Office space is generally let to contractors in
support of Defence activities and to other government
agencies or to local civic authorities. The terms of these
leases range between 1 and 99 years.
The above schedule should be read in conjunction with the accompanying notes.
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
264D
EFENCE AN
NU
AL REPORT 2008-09 VO
LUM
E 1
Department of Defence SCHEDULE OF CONTINGENCIES as at 30 June 2009
Contingent Liabilities Claims for damages/costs Total
2009 2008 2009 2008
$’000 $’000 $’000 $’000
Balance from previous period 100,146 99,602 100,146 99,602
New 60,146 21,282 60,146 21,282
Re-measurement (63,416) 14,477 (63,416) 14,477
Liabilities recognised (12,430) (35,215) (12,430) (35,215)
Expired - - - -
Total Contingent Liabilities 84,446 100,146 84,446 100,146
Contingent Assets
2009 2008 2009 2008
$’000 $’000 $’000 $’000
Balance from previous period 2,690 1,122 2,690 1,122
New 639 1,673 639 1,673
Re-measurement (2,460) 490 (2,460) 490
Assets recognised - (590) - (590)
Expired (13) (5) (13) (5)
Total Contingent Assets 856 2,690 856 2,690
Net Contingent Assets (Liabilities) (83,590) (97,456)
There are no guarantees, indemnities, warranties or letters of comfort disclosed in this schedule as the possibility of any outflow on settlement is remote. Contingent assets and contingent liabilities are classified, measured and disclosed in accordance with the requirements of AASB 137. Details of each class of contingent liability and contingent asset, including those not included above because they cannot be quantified, are disclosed in Note 12: Contingent Liabilities and Assets. The above schedule should be read in conjunction with the accompanying notes.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 265
Fina
ncia
l sta
tem
ents
Department of Defence SCHEDULE OF ADMINISTERED ITEMS for the period ended 30 June 2009
2009 2008
Notes $'000 $'000
INCOME ADMINISTERED ON BEHALF OF GOVERNMENT
Revenue
Non-taxation revenue
Sale of goods and rendering of services 17A 22 3,625
Fees and fines 17B 2,874 -
Interest 17C 244 124
Dividends 17D 72,723 134,263
Military superannuation contributions 17E 831,091 756,982
Other revenue 17F 9,527 215
Total non-taxation revenue 916,481 895,209
Total revenues administered on behalf of Government 916,481 895,209
Gains
Foreign exchange gains 17G 671 -
Total gains administered on behalf of Government 671 -
TOTAL INCOME ADMINISTERED ON BEHALF OF
GOVERNMENT 917,152 895,209
EXPENSES ADMINISTERED ON BEHALF OF
GOVERNMENT
Employee benefits 18A 3,465,720 2,849,405
Subsidies 18B 35,302 11,284
Grants 18C - 26,800
Other expenses 18D 9 4,327
TOTAL EXPENSES ADMINISTERED ON BEHALF OF
GOVERNMENT 3,501,031 2,891,816
The above schedule should be read in conjunction with the accompanying notes.
Administered activities performed by Defence on behalf of the Government relate mainly to the provision of
superannuation and housing support services to current and retired Defence personnel. Defence also administers
reimbursements from the United Nations for costs associated with East Timor and returns the receipts to the
Government.
APPENDIX 9 FINANCIAL TRANSPARENCY
266 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence SCHEDULE OF ADMINISTERED ITEMS (continued) as at 30 June 2009
2009 2008
Notes $'000 $'000
ASSETS ADMINISTERED ON BEHALF OF
GOVERNMENT
Financial assets
Cash and cash equivalents 19A - -
Receivables 19B 59,448 55,306
Investments 19C/25 1,882,388 1,767,825
Total financial assets 1,941,836 1,823,131
Non-financial assets
Other non-financial assets - prepayments 19D 90,361 85,506
Total non-financial assets 90,361 85,506
TOTAL ASSETS ADMINISTERED ON BEHALF OF
GOVERNMENT 2,032,197 1,908,637
LIABILITIES ADMINISTERED ON BEHALF OF
GOVERNMENT
Payables
Other payables 20A 38,444 25,242
Total payables 38,444 25,242
Provisions
Employee provisions 20B/21 42,659,000 33,622,000
Total provisions 42,659,000 33,622,000
TOTAL LIABILITIES ADMINISTERED ON BEHALF OF
GOVERNMENT 42,697,444 33,647,242
Current Assets 149,809 140,812
Non-Current Assets 1,882,388 1,767,825
Current Liabilities 1,778,444 1,575,242
Non-Current Liabilities 40,919,000 32,072,000
Administered activities performed by Defence on behalf of the Government relate mainly to the provision of
superannuation and housing support services to current and retired Defence personnel. Defence also administers
reimbursements from the United Nations for costs associated with East Timor and returns the receipts to the
Government.
The above schedule should be read in conjunction with the accompanying notes.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 267
Fina
ncia
l sta
tem
ents
Department of Defence SCHEDULE OF ADMINISTERED ITEMS (continued) for the period ended 30 June 2009
2009 2008
Notes $'000 $'000
ADMINISTERED CASH FLOWS
OPERATING ACTIVITIES
Cash received
Sale of goods and rendering of services 200 69
Fees and fines received 2,874 -
Interest 245 146
Net GST received 60 175
Superannuation contributions 866,674 790,924
Other 9,527 215
Total cash received 879,580 791,529
Cash used
Subsidies (30,556) (12,200)
Employees (1,650,486) (1,517,426)
Grants - (26,800)
Net GST Paid (60) -
Other cash used (9) (4,502)
Total cash used (1,681,111) (1,560,928)
Net cash flows from (used by) operating activities (801,531) (769,399)
INVESTING ACTIVITIES
Cash received
Dividends 69,031 83,604
Total cash received 69,031 83,604
Net cash flows from (used by) investing activities 69,031 83,604
Net Increase (Decrease) in cash held (732,500) (685,795)
Cash and cash equivalents at the beginning of the reporting period - 39
Cash from Official Public Account for:
Appropriations 1,681,302 1,560,929
1,681,302 1,560,929
Cash to Official Public Account for:
Appropriations (948,774) (875,173)
(948,774) (875,173)
Effect of exchange rate movements on cash and cash equivalents (28) -
Cash and cash equivalents at the end of the reporting period 19A - -
Administered activities performed by Defence on behalf of the Government relate mainly to the provision of
superannuation and housing support services to current and retired Defence personnel. Defence also administers
reimbursements from the United Nations for costs associated with East Timor and returns the receipts to the
Government.
The above schedule should be read in conjunction with the accompanying notes.
APPENDIX 9 FINANCIAL TRANSPARENCY
268 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Notes
1 Summary of Significant Accounting Policies
2 Events after the Balance Sheet Date
3 Income
4 Expenses
5 Financial Assets
6 Non-Financial Assets
7 Payables
8 Interest Bearing Liabilities
9 Provisions
10 Restructuring
11 Cash Flow Reconciliation
12 Contingent Liabilities and Assets
13 Executive Remuneration
14 Remuneration of Auditors
15 Financial Instruments
16 Accounting for Errors
17 Income Administered on Behalf of Government
18 Expenses Administered on Behalf of Government
19 Assets Administered on Behalf of Government
20 Liabilities Administered on Behalf of Government
21 Defined Benefit Superannuation Plans Administered on Behalf of Government
22 Administered Reconciliation Table
23 Administered Commitments
24 Administered Contingent Liabilities and Assets
25 Administered Investments
26 Administered Financial Instruments
27 Administered Accounting for Errors
28 Appropriations
29 Special Accounts
30 Compensation and Debt Relief
31 Assets Held in Trust
32 Reporting of Outcomes
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 269
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 1: Summary of Significant Accounting Policies
1.1 Objective of Defence
Defence is an Australian Government controlled entity which comprises the Department of Defence, as an Australian
Public Service organisation, and the Australian Defence Force. The objective of Defence is to defend Australia and its
national interests. Defence has implemented a new outcome and output structure in 2008-09. The new structure will
increase the Government’s and the community’s visibility of what Defence delivers, as it is aligned with Defence’s
internal resource allocations and accountabilities.
Under this new structure, Defence has reported against the following three outcomes:
• Outcome 1 – Australia’s national interests are protected and advanced through the provision of military capabilities and the promotion of security and stability;
• Outcome 2 – Military operations and other tasks directed by Government to achieve the desired results; and
• Outcome 3 – Defence’s support to the Australian community and civilian authorities achieves the desired results.
Defence activities contributing toward these outcomes are classified as either departmental or administered.
Departmental activities involve the use of the assets, liabilities, revenues and expenses controlled or incurred by
Defence in its own right. Administered activities involve the management or oversight by Defence, on behalf of the
Government, of items controlled or incurred by the Government.
Defence’s Outcome 1 includes both departmental and administered items, while Outcomes 2 and 3 are departmental
only. Defence’s administered appropriations included in Outcome 1 relate to Superannuation and Housing Support
Services for current and retired Defence personnel.
An overview of Defence’s outcome and output structure is described in Chapter 3 of the Annual Report.
The continued existence of Defence in its present form, and with its present programs, is dependent on Australian
Government policy and on continuing appropriations by Parliament for Defence’s administration and programs.
1.2 Basis of Preparation of the Financial Statements
The financial statements and notes are required by section 49 of the Financial Management and Accountability Act 1997
and are a General Purpose Financial Report.
The financial statements and notes have been prepared in accordance with:
• Finance Minister’s Orders (or FMOs) for reporting periods ending on or after 1 July 2008; and
• Australian Accounting Standards and Interpretations issued by the Australian Accounting Standards Board (AASB) that apply for the reporting period.
The financial statements and notes have been prepared on an accrual basis and are in accordance with the historical
cost convention, except for certain assets at fair value. Except where stated, no allowance is made for the effect of
changing prices on the results or the financial position.
The financial statements and notes are presented in Australian dollars and values are rounded to the nearest thousand
dollars unless disclosure of the full amount is specifically required.
Unless alternative treatment is specifically required by an accounting standard or the FMOs, assets and liabilities are
recognised in the balance sheet when, and only when, it is probable that the future economic benefits will flow to the
entity (in the case of an asset) or it is probable that the outflow of resources embodying economic benefits will result
APPENDIX 9 FINANCIAL TRANSPARENCY
270 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
(in the case of a liability) and the amounts of the assets or liabilities can be reliably measured. However, assets and
liabilities arising under agreements equally proportionately unperformed are not recognised unless required by an
accounting standard. Liabilities and assets that are unrecognised are reported in the Schedule of Commitments and
the Schedule of Contingencies (other than Unquantifiable Contingencies, which are reported at Note 12).
Unless alternative treatment is specifically required by an accounting standard, income and expenses are recognised in
the income statement when, and only when, the flow, consumption or loss of economic benefits has occurred and can
be reliably measured.
Administered transactions
Administered revenues, expenses, assets, liabilities and cash flows reported in the Schedule of Administered Items and
related notes are accounted for on the same basis and using the same policies as for departmental items, except as
otherwise stated in Note 1.27.
Trust transactions
Defence has responsibility for transactions and balances relating to trust funds on behalf of third parties external to the
Australian Government. As Defence acts only in a custodial role in respect of these transactions, they are not
recognised in the financial statements but are disclosed in Note 31: Assets Held in Trust.
1.3 Significant Accounting Judgements and Estimates
(a) Significant accounting judgements
In the process of applying Defence’s accounting policies listed in this note, management has made no judgements that
would have a significant impact on the amounts recorded in the financial statements.
(b) Significant accounting estimates and assumptions
The carrying amounts of certain assets and liabilities are often determined based on estimates and assumptions of
future events. The key estimates and assumptions Defence has made are:
• Provisions for land decontamination, site restoration and SME decommissioning are based on Defence’s
estimates of future obligations relating to the underlying assets. Some of these estimates are supported by
external valuer’s opinions;
• Provisions for annual leave and long service leave are estimates based on expert actuarial assumptions on
the likely tenure of existing staff, patterns of leave claims and payouts, future salary movements and future
discount rates;
• Estimates and assumptions have been made in relation to inventory obsolescence in order to determine the
remaining service potential for inventory items which have experienced obsolescence or impairment and
the pricing of certain legacy items;
• Low value asset pooling estimates have been made to determine the net book value of other plant and
equipment asset pools. These include estimates relating to useful economic lives and disposal rates;
• Defence assesses non-financial assets for impairment by monitoring impairment indicators specific to an
asset’s use in the Defence context. Where these indicators signify that an asset is impaired, management has
made an estimate of the recoverable amount of those assets to determine any impairment loss;
• Defence heritage and cultural assets are stored, managed, repaired and restored in ways that will maintain
their heritage and cultural value over time. As such, an assumption is made that these assets have indefinite
useful lives and therefore no depreciation is recognised; and
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 271
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
• Other provisions relate to common law claims and are subject to considerable uncertainty. However, based
on advice from the Australian Government Actuary (AGA), Defence is of the view that the estimate of the
liability is sufficiently reliable to recognise as a provision.
1.4 Changes in Australian Accounting Standards
(a) Adoption of new Australian Accounting Standard requirements
No accounting standard has been adopted earlier than the application date as stated in the standard. The following
new standards are applicable to Defence in the current reporting period.
AASB 1050 Administered Items
This standard applies to Defence for the first time for the 2008-09 financial reporting period. AASB 1050 has been
issued as a result of removal AAS 29. Some minor changes and additional requirements have been included in AASB
1050 on transition from AAS 29. There are no significant changes to Defence’s reporting and disclosure of
Administered Items as a result of the application of this Standard.
AASB 1052 Disaggregated Disclosures
This standard applies to Defence for the 2008-09 financial reporting period. The requirements of this standard relate to
the apportionment of income, expenses, assets and liabilities by major activity (outcomes) where they are reliably
attributable.
Other standards, amendments or interpretations which have become effective in the current reporting period have had
no financial or disclosure impact or do not apply to the operations of Defence.
(b) Future Australian Accounting Standard requirements
The Australian Accounting Standards Board has issued new standards, amendments to standards or interpretations
that will be effective in future reporting periods. The following standards and amendments will be applicable to
Defence from 2009-10 and are expected to have no material impact on the financial statements. The adoption of
these standards and amendments is based on Defence’s initial assessment at reporting date.
• AASB 1 First-time Adoption of Australian Accounting Standards
• AASB 3 Business Combinations
• AASB 8 Operating Segments
• AASB 101 Presentation of Financial Statements
• AASB 123 Borrowing Costs
• AASB 127 Consolidated and Separate Financial Statements
• AASB 1039 Concise Financial Reports
• AASB 2007-3 Amendments to Australian Accounting Standards arising from AASB 8
• AASB 2007-6 Amendments to Australian Accounting Standards arising from AASB 123
• AASB 2007-8 Amendments to Australian Accounting Standards arising from AASB 101
• AASB 2007-10 Further Amendments to Australian Accounting Standards arising from AASB 101
• AASB 2008-1 Amendments to Australian Accounting Standard – Share-based Payments: Vesting Conditions and
Cancellations
• AASB 2008-2 Amendments to Australian Accounting Standards – Puttable Financial Instruments and Obligations
arising on Liquidation
• AASB 2008-3 Amendments to Australian Accounting Standards arising from AASB 3 and AASB 127
• AASB 2008-5 Amendments to Australian Accounting Standards arising from the Annual Improvements Project
• AASB 2008-6 Further Amendments to Australian Accounting Standards arising from the Annual Improvements
Project
APPENDIX 9 FINANCIAL TRANSPARENCY
272 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
• AASB 2008-7 Amendments to Australian Accounting Standards – Cost of an Investment in a Subsidiary, Jointly
Controlled Entity or Associate
• AASB 2008-8 Amendments to Australian Accounting Standards - Eligible Hedged Items
• AASB 2008-9 Amendments to AASB 1049 for Consistency with AASB 101
• AASB 2008-11 Amendments to Australian Accounting Standard – Business Combinations Among Not-for-Profit
Entities
• AASB 2008-13 Amendments to Australian Accounting Standards arising from AASB Interpretation 17 –
Distributions of Non-cash Assets to Owners
• AASB 2009-1 Amendments to Australian Accounting Standards – Borrowing costs of Not-for-Profit Public Sector
Entities
• AASB 2009-2 Amendments of Australian Accounting Standards – Improving Disclosures about Financial Instruments
• AASB 2009-4 Amendments to Australian Accounting Standards arising from the Annual Improvements Process
• AASB 2009-5 Further Amendments to Australian Accounting Standards arising from the Annual Improvements
Process
• AASB 2009-6 Amendments to Australian Accounting Standards
• AASB 2009-7 Amendments to Australian Accounting Standards
• Interpretation 1 – Changes in Existing Decommissioning, Restoration and Similar Liabilities
• Interpretation 12 Service Concession Arrangements
• Interpretation 15 Agreements for the Construction of Real Estate
• Interpretation 16 Hedges of a Net Investment in a Foreign Operation
• Interpretation 17 Distributions of Non-cash Assets to Owners
• Interpretation 18 Transfers of Assets from Customers
Other standards, amendments or interpretations issued which will become effective in future reporting periods will
have no financial or disclosure impact or will not apply to the operations of Defence.
1.5 Revenue
(a) Revenue from Government
Amounts appropriated for departmental output appropriations for the year (adjusted for any formal additions and
reductions) are recognised as revenue when Defence gains control of the appropriation, except for certain amounts
that relate to activities that are reciprocal in nature, in which case revenue is recognised only when it has been earned.
Defence draws down appropriations on a just-in-time basis. The undrawn appropriations as at 30 June 2009 are
reflected as a receivable and are available for drawdown to meet future obligations. Appropriations receivable are
recognised at their nominal amounts.
(b) Revenue from Sale of Goods and Rendering of Services
Revenue from the sale of goods is recognised when:
• the risks and rewards of ownership have been transferred to the buyer;
• Defence retains no managerial involvement nor effective control over the goods;
• the revenue and transaction costs can be reliably measured; and
• it is probable that the economic benefits associated with the transaction will flow to Defence.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 273
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Revenue from the rendering of services is recognised by reference to the stage of completion of contracts at reporting
date. The revenue is recognised when:
• the amount of revenue, stage of completion and transaction costs incurred can be reliably measured; and
• it is probable the economic benefits of the transaction will flow to the entity.
The stage of completion of contracts at the reporting date is determined by reference to the proportion that costs
incurred to date bear to the estimated costs of the transaction.
(c) Rental Revenue
Rental revenue is accounted for on a straight line basis over the lease term. Contingent rental revenue is recognised as
revenue in the periods in which it is earned. Lease incentives granted are recognised as an integral part of the total
rental revenue.
(d) Resources Received Free of Charge
Resources received free of charge are recognised as revenue when and only when a fair value can be reliably
determined and the services would have been purchased if they had not been donated. Use of those resources is
recognised as an expense. Fair value is determined based on actual full cost if the resources were to be purchased.
1.6 Gains
(a) Contributions of Assets
Contributions of assets at no cost of acquisition or for nominal consideration are recognised as gains at their fair value
when the asset qualifies for recognition (with the exception of assets valued at cost), unless received from another
Government agency as a consequence of a restructuring of administrative arrangements (Refer to Note 1.9(b)). Fair
value is assessed by asset class as described in Note 1.19(f).
(b) Sale of Assets
Gains from disposal of non-current assets are recognised when control of the asset has passed to the buyer. The gain
or loss on disposal of non-current assets is determined as the difference between the carrying amount of the asset at the
time of disposal and the net proceeds of disposal.
(c) Other Gains
Gains may be realised or unrealised and are usually recognised on a net basis. These include gains arising on foreign
exchange transactions and balances.
1.7 Impairment of Assets
Defence applies its impairment testing to the smallest identifiable group of assets that is useful to Defence in achieving
its objectives and whose utility/usefulness is largely independent of the utility provided to Defence by other assets or
groups of assets. All relevant assets were assessed for impairment during the year. Where indications of impairment
exist, the asset’s recoverable amount is estimated and an impairment adjustment made if the asset’s recoverable
amount is less than its carrying amount.
The recoverable amount of an asset is the higher of its fair value less costs to sell and its value in use. Value in use is
the present value of the future cash flows expected to be derived from the asset. Where the future economic benefit of
an asset is not primarily dependent on the asset’s ability to generate future cash flows, and the asset would be replaced
if Defence was deprived of the asset, its value in use is taken to be its depreciated replacement cost.
APPENDIX 9 FINANCIAL TRANSPARENCY
274 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
1.8 Grants
Contributions by Defence to other government entities, private sector organisations and individuals which have been
identified as a grant are recognised as an expense when incurred.
1.9 Transactions with the Australian Government as Owner
(a) Equity injections
Amounts appropriated which are designated as ‘equity injections’ (less any formal reductions) are recognised directly
in contributed equity in that year. Equity injection appropriations in Acts passed after the commencement of the
period are recognised from the date of royal assent.
(b) Restructuring of Administrative Arrangements
Net assets/liabilities received from or relinquished to another Australian Government agency or authority under a
restructuring of administrative arrangements are recognised as contributions or distributions of equity respectively, at
their net book value.
(c) Other Distributions to Owners including Repayments of Appropriations
The FMOs require that distributions to owners be debited to contributed equity unless it is a dividend. In 2008-09
appropriation drawn of $3.3m (2007-08: $nil) was returned to the Official Public Account together with property
disposal proceeds of $11.6m (2007-08: $16.6m). In recognising the repayments and reductions of appropriations
funding, during the year the Minister for Finance and Deregulation issued determinations to reduce Departmental
appropriations as follows:
Date Year Departmental Items Equity Injections
$’000 $’000
23 Oct 2008 2008-2009 3,296 -
24 Apr 2009
2008-2009
Total
-
3,296
560,556
560,556
1.10 Cash and Cash Equivalents
Cash and cash equivalents includes cheques and other negotiable instruments, notes and coins held, and any deposits
in bank account held at call with a bank or financial institution. Cash is measured at its nominal amount.
1.11 Financial Risk Management
Under relevant legislation and Australian Government policy, Defence is restricted from entering into borrowings,
some investments and entering into derivative transactions to offset risk exposure. As such Defence’s exposure to risk
is primarily related to credit risk on trade receivables and foreign currency risk in relation to payments to overseas
suppliers of goods and services received. However, this exposure is minimal in terms of the operations of Defence.
Defence is also exposed to some contract price escalation risk. This risk exposure is due to the difference in the basis
on which Defence is funded for price escalations from government (being the non-farm GDP deflator) to the price
escalation clauses embedded within the contracts. The risk of increased cost is managed by Defence to ensure
exposure to the Commonwealth is minimised.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 275
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
1.12 Derecognition of Financial Assets and Liabilities
Financial assets are derecognised when the contractual rights to the cash flows from the financial assets expire or the
assets are transferred to another entity. In the case of a transfer to another entity, it is necessary that the risks and
rewards of ownership are also transferred.
Financial liabilities are derecognised when the obligation under the contract is discharged, cancelled or has expired.
1.13 Receivables
Receivables for goods and services, which have 30 day terms, are measured at the nominal amounts due less any
allowance for impairment. The collectability of receivables is assessed periodically with allowance made for doubtful
debts when there is objective evidence that Defence will not be able to collect the debt. No allowance is made for
Australian Government, foreign government and employee debts as they are normally deemed to be collectable unless
there is objective evidence to the contrary.
1.14 Employee Benefits
Defence’s workforce comprises Australian Public Service (APS, i.e. civilians) and Australian Defence Force (ADF,
i.e. military) personnel. Employee benefits for each workforce component are based on the relevant employment
agreements and legislation.
Liabilities for services rendered by employees are recognised at the reporting date to the extent that they have not been
settled.
Liabilities for wages and salaries (including non-monetary benefits), annual leave and other entitlements expected to
be settled within 12 months of the reporting date are measured at their nominal amounts which are calculated with
regard to the rates expected to be paid on settlement of the liability.
All other employee benefit liabilities (including long service leave) are measured at the present value of the estimated
future cash outflows to be made in respect of services provided by employees up to the reporting date.
(a) Leave
The liability for employee benefits includes provisions for annual leave and long service leave. The liability for annual
leave is measured at the amounts expected to be paid when the liability is settled. No provision has been made for
sick leave as all sick leave is non-vesting and the average sick leave taken in future years by employees of Defence is
estimated to be less than the annual entitlement for sick leave.
The leave liabilities are calculated on the basis of employees’ remuneration, including Defence’s employer
superannuation contribution rates to the extent that leave is likely to be taken during service rather than paid out on
termination. Where there is a legal obligation to payment of leave within 12 months, even when payment is not
expected, the liability is disclosed as current.
The liability for annual leave for employees reflects the value of total annual leave entitlements at 30 June 2009 and is
recognised as a current liability, with amounts expected to be taken or paid within 12 months measured at nominal
values and amounts not expected to be taken or paid within 12 months measured at net present value.
The liability for long service leave has been determined by reference to the work of the Australian Government
Actuary. The estimate of the present value of the liability takes into account attrition rates and pay increases through
promotion and inflation.
APPENDIX 9 FINANCIAL TRANSPARENCY
276 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
(b) Separation and Redundancy
Provision is made for separation and redundancy benefit payments. Defence recognises a provision for termination
when it has a detailed formal plan for the terminations and has informed those employees affected that the
terminations will be carried out.
(c) Superannuation – APS Employees
Permanently appointed APS employees of Defence are members of the Commonwealth Superannuation Scheme
(CSS), the Public Sector Superannuation Scheme (PSS), the PSS Accumulation Plan (PSSap) and other
superannuation schemes held outside the Commonwealth.
The CSS and PSS are defined benefit schemes for the Australian Government. The PSSap is a defined contribution
scheme.
The liability for defined benefits is recognised in the financial statements of the Australian Government and is settled
by the Australian Government in due course. This liability is reported by the Department of Finance and
Deregulation as an administered item.
Defence makes employer contributions to the employee superannuation schemes at rates determined by an actuary to
be sufficient to meet the current cost to the Government of the superannuation entitlements of the department’s
employees. Defence accounts for these contributions as if they were contributions to defined contribution plans in
accordance with AASB 119.
(d) Superannuation – ADF Members
The Defence Force Retirement and Death Benefits Scheme (DFRDB) and the Military Superannuation Benefits
Scheme (MSBS) are defined benefit superannuation plans for ADF members. Defence accounts for these
contributions in its departmental statements as if they were contributions to defined contribution plans in accordance
with AASB 119. The liability for DFRDB and MSBS is recognised in Defence’s administered statements.
1.15 Leases
A distinction is made between finance leases and operating leases. Finance leases effectively transfer from the lessor
to the lessee substantially all the risks and benefits incidental to ownership of leased non-current assets. In operating
leases, the lessor effectively retains substantially all such risks and benefits.
Where a non-current asset is acquired by means of a finance lease, the asset is capitalised and recognised at the lower
of the fair value of the leased asset and the present value of minimum lease payments at the inception of the contract
and a liability is also recognised at the same time for the same amount.
The discount rate used to calculate the present value of the minimum lease payments is the interest rate implicit in the
lease. Non-current assets acquired under a finance lease are amortised over the useful life of the asset. Lease
payments are allocated between the principal component and the interest expense.
Operating lease payments are expensed on a straight line basis over the term of the lease which is representative of the
pattern of benefits derived from the leased assets.
Lease incentives taking the form of ‘free’ leasehold improvements and rent holidays are recognised as an integral part
of the total consideration agreed for the use of the leased asset.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 277
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
1.16 Suppliers and Other Payables
Suppliers and other payables are recognised at amortised cost. Defence’s suppliers and other payables are of short
duration and are recognised at the amount of cash or cash equivalents required to settle the liability. Liabilities are
recognised to the extent that the goods or services have been received (irrespective of having been invoiced).
1.17 Contingent Liabilities and Contingent Assets
Contingent Liabilities and contingent assets are not recognised in the balance sheet but are disclosed in the relevant
schedules and notes. They may arise from uncertainty as to the existence of a liability or asset, or represent an existing
liability or asset in respect of which settlement is not probable or the amount cannot be reliably measured. Contingent
assets are disclosed when settlement is probable but not virtually certain, and contingent liabilities are disclosed when
settlement is greater than remote.
1.18 Acquisition of Assets
Assets are recorded at cost on acquisition except as stated below. The cost of acquisition includes the fair value of
assets transferred in exchange and liabilities undertaken. Financial assets are initially measured at their fair value plus
transaction costs where appropriate.
Assets acquired at no cost, or for nominal consideration are initially recognised as assets and revenues at their fair
value at the date of acquisition, unless acquired as a consequence of restructuring of administrative arrangements. In
the latter case, assets are initially recognised at the amounts at which they were recognised in the transferor agency’s
accounts immediately prior to the restructuring.
1.19 Property, Plant and Equipment including Land, Buildings, Infrastructure, Heritage and Cultural
Assets, and Specialist Military Equipment
(a) Individual Asset Recognition Threshold
Purchases of property, plant and equipment including land, buildings and infrastructure are recognised initially at cost
where they meet the individual asset capitalisation threshold. Individual items are capitalised where the individual
value is equal to or exceeds $5,000 for buildings, infrastructure and heritage and cultural assets, $2,000 for other plant
and equipment and $0.01 for specialist military equipment and land.
(b) Componentisation
Major assets, such as specialist military equipment, are componentised if it is likely that the components will have
useful lives that differ significantly from the other parts of the asset. The useful life of components may be determined
with reference to the individual asset items, or, over the life of the related primary asset.
(c) Decontamination, Restoration and Decommissioning Costs
Where a legal or constructive obligation arises on acquisition to restore an asset back to its original condition, or
dismantle an asset at the end of its useful life, the net present value of estimated restoration and decommissioning
costs are capitalised and added to the cost of the underlying asset and depreciated over the asset’s useful life. At the
same time, a corresponding provision is recognised for these costs. When discounting is applied, the carrying amount
of the provision is adjusted to reflect the passage of time and any incremental costs are recognised as finance costs.
Where a legal or constructive obligation arises as a result of the operations of Defence (i.e. use of the asset) the cost of
restoration is recognised as an expense in the period in which the obligation arises.
APPENDIX 9 FINANCIAL TRANSPARENCY
278 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
One of the following past events would give rise to a constructive obligation:
• a public announcement or statement by Government or Defence that a site would be restored;
• the existence of an established pattern of past practice of restoring sites of a particular nature or type; or
• a specific policy adopted by Government with regard to restoration of sites of a particular nature or type.
(d) Reversal of Previous Asset Write-Downs
These are amounts relating to assets which have been previously written down or expensed in prior periods. In the
current year, these items have been either reversed as a write down or capitalised for the first time due to either
exceeding the capitalisation threshold or through identification during stocktakes. They may include identification of
heritage and cultural assets not previously recognised as assets.
(e) Assets under construction (AUC)
Assets under construction (AUC) are carried at cost and are separately identified as ‘work in progress’ in Note 6. They
include expenditure to date on major military capability and facilities projects. AUC projects are reviewed annually
for indicators of impairment. Prior to rollout into service, the accumulated AUC balance is reviewed to ensure
accurate capitalisation.
(f) Subsequent valuations
Land, buildings, infrastructure, plant and equipment and heritage and cultural assets are measured and disclosed at
fair value, less any accumulated depreciation and accumulated impairment losses. Specialist military equipment is
carried at cost less any accumulated depreciation and accumulated impairment losses, in accordance with the Finance
Minister’s Orders.
The basis for determining fair value is by reference to the highest and best use that is physically possible, legally
permissible and financially feasible. Where an active and liquid market exists, fair value is determined by reference to
market values, noting the highest and best use criteria and any specific factors that have been noted by the valuer.
Fair values for each class of asset are determined as shown below:
Asset Class Active and Liquid Market Exists Active and Liquid Market does not exist
Land Market selling price Replacement cost
Buildings Market selling price Depreciated replacement cost or net present
value of lease payments for leased assets
Infrastructure Market selling price Depreciated replacement cost
Plant & Equipment Market selling price Depreciated replacement cost or net present
value of lease payments for leased assets
Heritage and Cultural Estimated market selling price Depreciated reproduction cost
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 279
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Following initial recognition at cost, valuations are conducted with sufficient frequency to ensure that the carrying
amounts of assets do not materially differ from the assets’ fair values as at the reporting date. Revaluations for land,
buildings and infrastructure are conducted every three years; other plant and equipment are revalued annually on a
sample basis.
Revaluation adjustments are made on a class basis. Any revaluation increment is credited to equity under the heading
of asset revaluation reserve except to the extent that it reverses a previous revaluation decrement of the same class that
was previously recognised through profit and loss. Revaluation decrements for a class of assets are recognised through
profit and loss except to the extent that they reverse a previous revaluation increment for that class.
Any accumulated depreciation as at the revaluation date is eliminated against the gross carrying amount of the asset
and the asset is restated to the revalued amount.
Refer to Note 1.20 for policy regarding revaluation of intangible assets.
(g) Depreciation
Property plant and equipment items having limited useful lives are systematically depreciated over their estimated
useful lives on a straight-line basis. Pooled assets are depreciated using an estimated useful life based on the average
useful lives of similar assets.
The aggregate amount of depreciation allocated for each class of asset during the reporting period is disclosed in Note
4D.
Depreciation rates (useful lives) are reviewed at each reporting date and necessary adjustments are made in the
current, or current and future reporting periods, as appropriate. Residual values are re-estimated only when assets are
revalued.
The following are minimum and maximum useful lives for the different asset classes. These are not necessarily
indicative of typical useful lives for these asset classes.
2008-09 2007-08
Buildings 3 to 96 years 2 to 90 years
Infrastructure 4 to 93 years 3 to 87 years
Specialist military equipment 2 to 70 years 2 to 70 years
Other plant and equipment 2 to 70 years 2 to 70 years
Assets under finance lease 2 to 62 years 2 to 62 years
Heritage and cultural assets within Defence have been assessed to have indefinite lives. These heritage and cultural
assets are stored, managed, displayed, repaired and restored in ways that will maintain their cultural or heritage value
over time. Where conservation, restoration and preservation activities demonstrate that an asset will be maintained
for an indefinite period, these items are considered to have indefinite useful lives and therefore not subject to
depreciation. This is in accordance with the implementation guidance (G4) provided in AASB 116.
Heritage and cultural items include artefacts and memorabilia that are or may be of national historical or cultural
significance. While many of these items represent military achievements, others are associated with developments in
science and exploration, or with significant personal achievements. Some land and buildings may be of historical or
cultural significance.
APPENDIX 9 FINANCIAL TRANSPARENCY
280 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
While some heritage buildings are used as office accommodation, residences, storage and gymnasiums they are
primarily held for heritage and cultural purposes. Defence has assessed that the primary purpose of holding these
heritage and cultural buildings is for their heritage and cultural significance. As such, Defence will continue to classify
these assets as heritage and cultural items with an indefinite useful life and therefore will not be subject to depreciation.
Road earthworks are depreciated over the estimated useful life of the asset except where an engineering review has
determined the useful life to be indefinite, in which case no depreciation is applied.
1.20 Intangibles
Defence’s intangibles primarily comprise externally acquired and internally developed computer software for internal
use. Intangibles with gross values greater than $150,000 are only capitalised when they meet the recognition criteria
in AASB 138 Intangible Assets.
Software is amortised on a straight–line basis over its anticipated useful life. The useful lives of Defence software are
2-26 years (2007-08: 2-20 years). All software assets are assessed annually for indications of impairment.
Defence recognises its intangible assets initially at cost and measures those which have an active market at fair value
subsequent to initial recognition. If an intangible asset is acquired at no cost or for nominal consideration, other than
those acquired through restructuring, it is recognised initially at fair value as at the date of acquisition.
All Defence intangible assets are currently stated at cost or fair value less any subsequent accumulated amortisation
and accumulated impairment losses.
Acquired intellectual property may form part of the acquisition of particular tangible assets. Where the acquired
intellectual property is inseparable from the underlying tangible asset it is reflected in the value of the tangible asset in
the balance sheet.
Defence reviews the useful life of intangible assets annually based on the service potential of the assets. All Defence
intangible assets have a finite useful life and are amortised over their anticipated useful life. Where there is an
indication that the service potential of an intangible asset is impaired, the recoverable amount of that asset is
determined based on the remaining service potential. Where the recoverable amount is lower than the carrying
amount, the asset is written down to its recoverable amount.
1.21 Inventories
Defence holds inventory for its own use and does not ordinarily hold inventory for sale. Sales of inventory relate to
minor fuel sales to foreign governments. Inventory held for use is valued at cost adjusted where applicable for loss of
service potential. Defence considers that loss of operating capacity due to obsolescence is the most appropriate basis
for loss of service potential of its inventories.
Costs incurred in bringing each item of inventory (primarily explosive ordnance and general stores inventory) to its
present location and condition that are capable of being allocated on a reasonable basis are assigned to inventory. The
costs of inventories are assigned by using the weighted average cost formula.
Inventories acquired at no cost or nominal consideration are measured at current replacement cost at the date of
acquisition.
1.22 Assets Held for Sale
Non-current assets are classified as held for sale if the carrying amount is to be recovered principally through a sale
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 281
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
transaction rather than through continuing use. Classification as held for sale occurs when the asset is available for
immediate sale in its present condition, and the sale is highly probable. On classification as held for sale, the asset is
measured at the lower of its carrying amount and fair value less costs to sell. Any write down to fair value less costs to
sell is recognised as an impairment loss. Assets which have been classified as held for sale are no longer subject to
depreciation or amortisation.
1.23 Prepayments
Prepayments, excluding those paid to DMO or to employees as retention benefit payments, are recognised if the value
of the payment is $50,000 or greater.
Prepayments made to DMO for acquisition and sustainment services and to employees for retention benefits, are
recognised when the payment is made irrespective of the amount.
1.24 Foreign Currency
Transactions denominated in a foreign currency are converted at the exchange rate on the date of transaction. Foreign
currency receivables and payables are translated at the exchange rate at the balance date.
Non-financial items that are measured at cost in a foreign currency are translated using the spot exchange rate at the
date of the initial transaction. Non-financial items that are measured at fair value in a foreign currency are translated
using the spot exchange rates at the date when the fair value was determined.
All exchange gains and losses are reported in the income statement.
1.25 Taxation
Defence is exempt from all forms of taxation except Fringe Benefits Tax (FBT), the Goods and Services Tax (GST)
and certain excise and customs duties.
Revenues, expenses, assets and liabilities are recognised net of GST, except:
• where the amount of GST incurred is not recoverable from the Australian Taxation Office; and
• for receivables and payables which are recognised inclusive of GST.
1.26 Investments in Co-operative Research Centres
Defence has partial ownership in, and participates in the governance of, several Co-operative Research Centres
(CRC’s). These include the Co-operative Research Centre for Advance Composite Structures (CRC ACS), the Co-
operative Research Centre for Integrated Engineering Asset Management (CRC IEAM), the Co-operative Research
Centre for Contamination Assessment and Remediation of the Environment (CRC CARE), CAST CRC Limited Co-
operative Research Centre (CAST CRC) and Co-operative Research Centre for Spatial Information (CRC SI).
Defence does not have control, joint control or significant influence over these entities.
Because Defence’s investments in these entities are immaterial, they have not been recognised in the financial
statements.
APPENDIX 9 FINANCIAL TRANSPARENCY
282 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
1.27 Reporting of Administered Activities
Administered revenues, expenses, assets, liabilities, contingencies and commitments and cash flows are disclosed in
the Schedule of Administered Items and related notes.
Except where otherwise stated below, administered items are accounted for on the same basis and using the same
policies as for departmental items, including the application of Australian Accounting Standards.
(a) Administered Cash Transfers to and from Official Public Account
Revenue collected by Defence, for use by the Australian Government rather than Defence, is administered revenue.
Collections are transferred to the Official Public Account (OPA) maintained by the Department of Finance and
Deregulation. Cash is drawn down from the OPA to make payments under parliamentary appropriations on behalf of
the Australian Government. These transfers to and from the OPA are reported as adjustments to the administered
cash held by Defence on behalf of the Government and reported as such in the Statement of Cash Flows in the
Schedule of Administered Items and in the Administered Reconciliation Table in Note 22. The Schedule of
Administered Items largely reflects the Australian Government’s transactions, through Defence, with parties outside
the Australian Government.
(b) Revenue
All administered revenues relate to activities performed by Defence on behalf of the Australian Government.
Administered revenues mainly comprise military superannuation contributions, payments received from the United
Nations and foreign governments, bank interest and dividends paid by Defence Housing Australia.
(c) Administered Investments
Defence reports the Australian Government’s capital investment in Defence Housing Australia (DHA) which is
outlined at Notes 19C and 25. The investment is classified as ‘available for sale’ and is measured at fair value using the
net assets valuation approach in accordance with the FMOs. The investment was assessed for impairment at year end
and no indicators of impairment were noted.
(d) Military Retention Benefits
Certain categories of ADF personnel who are members of the Military Superannuation Benefits Scheme (MSBS) and
have had 15 years of service receive retention benefits as an incentive for continued service. Retention benefit
payments are initially recorded as prepayments and amortised over the expected period of service.
(e) Military Superannuation
The Defence Force Retirement and Death Benefits Scheme (DFRDB) is a fully unfunded scheme and the Military
Superannuation and Benefits Scheme (MSBS) is a partly funded scheme. MSBS member contributions are paid into
the Military Super and Benefits Fund that is controlled by the MSB Board and are therefore not reflected in the
Schedule of Administered Items. The Australian Government, on behalf of the MSB Fund, makes funded benefit
payments to members of the scheme and is reimbursed by the MSB Fund for these payments.
The Australian Government Actuary (AGA) estimates the unfunded provisions and expected future cash flows as at
30 June each year. These estimates are reflected in the Schedule of Administered Items. The AGA completes a full
review of the unfunded liabilities (Long Term Cost Report) every three years. This was last completed in 2008.
Actuarial gains and losses for defined benefit plans are recognised applying the “direct to equity” option as outlined in
AASB 119.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 283
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
(f) Other Guarantees
There are no quantifiable administered amounts guaranteed by the Commonwealth to disclose in the Schedule of
Administered Items. There is one unquantifiable guarantee disclosed in the Administered Contingent Liabilities and
Contingent Assets Note (Note 24). At the time of completion of the financial statements there was no reason to
believe that the guarantees would be called upon and therefore recognition of a liability was not required.
(g) Indemnities
There are currently no quantifiable indemnities to disclose in the Schedule of Administered Items. There is one
unquantifiable contingency disclosed in the Administered Contingent Liabilities and Contingent Assets Note (Note
24). At the time of completion of the financial statements there was no reason to believe that the indemnities would
be called upon and therefore no recognition of any liability was required.
(h) Subsidies
Defence administers the Defence Home Owner Subsidy scheme on behalf of the Government.
Subsidy liabilities are recognised to the extent that:
(i) the services required to be performed by the recipient have been performed; or
(ii) eligibility criteria have been satisfied, but payments due have not been made.
(i) Payments to CAC Act Bodies
From 2008-09, payments to CAC Act bodies from amounts appropriated for that purpose are classified as
administered expenses, loans receivable or as an increase to the carrying amount of the investment in the relevant
portfolio department. Pre 2008-09 loan appropriations are not recognised in the accounts of the relevant portfolio
department. Defence acts as the relevant portfolio agency for Defence Housing Australia.
Note 2: Events after the Balance Sheet Date
There are no post balance date events with a material effect on the financial statements.
APPENDIX 9 FINANCIAL TRANSPARENCY
284 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 3: Income
Revenue
Note 3A: Revenue from Government
Appropriations:
Departmental outputs 20,268,308 19,693,267
Total revenue from Government 20,268,308 19,693,267
Note 3B: Sale of goods and rendering of services (including cost
recovery)
Sale of goods to:
Related entities 10,153 6,532
External parties 126,276 126,319
Total sale of goods 136,429 132,851
Rendering of services to:
Related entities 394,542 356,881
External parties 197,589 199,108
Total rendering of services 592,131 555,989
Total sale of goods and rendering of services (including cost recovery) 728,560 688,840
Note 3C: Rental income
Operating leases:
Other 9,083 7,073
Total rental income 9,083 7,073
Note 3D: Other revenue
Settlement of damages 3,284 17,224
Foreign military sales refunds 4,243 1,859
Other minor revenues 9,948 17,758
Resources received free of charge
Total other revenue
6,317 5,883
23,792 42,724
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 285
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Gains
Note 3E: Reversals of previous asset write-downs and
impairments
Specialist military equipment 456,521 414,180
Land and buildings 29,880 27,478
Plant and equipment 13,721 61,656
Infrastructure 13,569 5,667
Heritage and cultural assets 18,711 1,023
Software and intangibles - 15,333
525,337Total property, plant and equipment and intangibles 532,402
Receivables 517 4,874
Inventory 109,380 118,265
648,476Total reversal of previous asset write-downs 642,299
Note 3F: Other gains
Other gains
Total other gains
1,424
1,424
3,295
3,295
APPENDIX 9 FINANCIAL TRANSPARENCY
286 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 4: Expenses
Note 4A: Employee benefits
Australian Public Service (APS) employee benefits
Wages and salaries 949,586 940,755
Superannuation:
Defined contribution plan 38,692 37,724
Defined benefit plans 132,713 129,390
Leave and other entitlements 133,497 129,007
Fringe Benefits Tax 8,044 5,259
Separation and redundancies 14,298 179
Other allowances 25,123 22,216
Health expenses 5,706 5,232
Other employee expenses 786 1,461
Total APS employee benefits 1,308,445 1,271,223
Australian Defence Force (ADF) employee benefits
Wages and salaries
Superannuation – defined contribution plan
Housing1
Leave and other entitlements
Fringe Benefits Tax
Overseas allowances
Separation and redundancies
Other allowances
Health expenses
Other employee expenses
3,585,981
976,949
570,621
474,927
290,579
253,371
3,818
316,452
262,297
235,461
3,220,990
846,659
515,606
411,213
295,644
273,972
1,780
311,474
221,965
151,079
Total ADF employee benefits 6,970,456 6,250,382
Total employee benefits 8,278,901 7,521,605
1 Housing expenses include lease payments made to DHA for the provision of housing for Australian Defence Force (ADF) members with families. Due to their nature, these payments are classified as employee expenses. Residences leased from DHA are subleased by Defence to ADF members for a nominal charge. Sublease expenses paid by Defence to DHA and recognised as part of ADF Housing expenses were $370.42m (2007-08: $335.56m).
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 287
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 4B: Suppliers
Provision of goods - related entities 17,457 14,990
Provision of goods - external parties 1,406,559 1,309,738
Rendering of services - related entities 3,464,958 3,302,968
Rendering of services - external parties 3,568,361 3,464,238
Operating lease rentals – related entities:
Minimum lease repayments 10,752 13,965
Operating lease rentals – external parties:
Minimum lease repayments 358,268 289,184
Contingent rentals 7,727 1,124
Sublease 4,427 5,139
Workers Compensation premiums 19,603 17,512
Total suppliers expenses 8,858,112 8,418,858
Note 4C: Grants
Public sector:
State and Territory Governments 48 14
Local Governments - 1,895
Private sector:
Non-profit organisations 11,301 15,883
Overseas
Total grants
3,000
14,349
208
18,000
APPENDIX 9 FINANCIAL TRANSPARENCY
288 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 4D: Depreciation and amortisation
Depreciation
Buildings 430,462 406,319
Buildings - leasehold improvements 12,490 12,025
Specialist military equipment 2,868,376 2,656,342
Plant and equipment 224,691 266,950
Infrastructure 246,883 229,371
Total depreciation 3,782,902 3,571,007
Amortisation
Buildings under finance lease 43,842 27,202
Plant and equipment under finance lease 18,701 -
Software under finance lease 11,761 10,824
Software 47,069 45,488
Intangibles – other 3,364 3,328
Total amortisation 124,737 86,842
Total depreciation and amortisation 3,907,639 3,657,849
The aggregate amounts of depreciation or amortisation
expensed during the reporting period for each class of
depreciable asset are as follows:
Buildings 486,794 445,546
Specialist military equipment 2,868,376 2,656,342
Plant and equipment 243,392 266,950
Infrastructure 246,883 229,371
Software and intangibles 62,194 59,640
Total depreciation and amortisation 3,907,639 3,657,849
Note 4E: Finance costs
Finance leases 77,574 31,602
Unwinding of discount for site restoration, decontamination and
decommissioning 16,788 12,540
Bank interest
Total finance costs
4 4
94,366 44,146
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 289
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 4F: Write-down and impairment of assets
Financial assets
Receivables 5,302 2,170
Total financial assets 5,302 2,170
This is represented by:
Bad debts written off 1,561 360
Impairment allowance 3,741 1,810
5,302 2,170
Non financial assets
Specialist military equipment
Assets in use 374,551 1,020,734
Work in progress 255,425 365,778
Total specialist military equipment 629,976 1,386,512
Land and buildings
Assets in use 73,031 33,816
Work in progress 2,817 19,638
Total land and buildings 75,848 53,454
Plant and equipment
Assets in use 14,280 42,932
Work in progress 8,345 25,015
Total plant and equipment 22,625 67,947
Infrastructure
Assets in use 459 4,581
Work in progress 4,431 39,605
Total infrastructure 4,890 44,186
Intangibles
Assets in use 4,103 4,691
Work in progress 3,732 8,525
Total intangibles 7,835 13,216
Heritage and cultural assets
Assets in use
Total heritage and cultural assets
908
908
-
-
APPENDIX 9 FINANCIAL TRANSPARENCY
290 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Inventory
Write-down of general stores inventory 342,527 267,913
Write-down of explosive ordnance 254,273 116,955
Write-down of fuel 1,624 -
Total inventory 598,424 384,868
Total write-down and impairment of assets 1,345,808 1,952,353
Note 4G: Foreign exchange
Foreign exchange gains
Non-speculative 14,312 3,729
Less foreign exchange losses
Non-speculative
Total net gain (loss) foreign exchange
(14,746)
(434)
(2,652)
1,077
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 291
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 4H: Losses from sale of assets
Land and buildings
Proceeds from sale 19,870 24,486
Carrying value of assets sold (16,048) (14,853)
Selling expense (17,046) (10,618)
Net gain (loss) from sale of land and buildings (13,224) (985)
Specialist military equipment
Proceeds from sale 41,816 2
Carrying value of assets sold (124,500) -
Selling expense (320) (161)
Net gain (loss) from sale of specialist military equipment (83,004) (159)
Other infrastructure, plant and equipment
Proceeds from sale 35,441 40,300
Carrying value of assets sold (31,942) (40,223)
Selling expense (1,625) (1,195)
Net gain (loss) from sale of other infrastructure, plant and equipment 1,874 (1,118)
Other assets
Proceeds from sale 4,810 595
Selling expense (2,275) (485)
Net gain (loss) from sale of other assets 2,535 110
Total net gain (loss) from sale of assets (91,819) (2,152)
Note 4I: Other expenses
Act of Grace payment Section 33 293 81
Ex-gratia payments 620 157
APS payments - 19
Defective Administration Scheme payments 734 543
Restoration in use costs
Total other expenses
23,501 54,015
25,148 54,815
APPENDIX 9 FINANCIAL TRANSPARENCY
292 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 5: Financial Assets
Note 5A: Cash and cash equivalents
Cash on hand 4,794 4,614
Cash at bank - at call 23,294 24,609
Total cash and cash equivalents 28,088 29,223
Cash and cash equivalents are recognised as current assets.
Note 5B: Trade and other receivables
Goods and services 73,258 80,852
Less: Impairment allowance account (6,522) (3,302)
Net goods and services receivables 66,736 77,550
GST receivable from the Australian Taxation Office 104,244 88,096
Appropriation receivable: 348,914 247,363
Accrued revenue 29,316 34,835
Other 63,328 14,341
Total trade and other receivables (net) 612,538 462,185
Trade and other receivables are represented by:
Current 604,546 456,784
Non-current 7,992 5,401
Total trade and other receivables (net) 612,538 462,185
Trade and other receivables (gross) are aged as follows:
Not overdue 598,670 441,003
Overdue by:
Less than 30 days 1,814 4,994
30 to 60 days 6,393 1,541
61 to 90 days 639 2,339
More than 90 days 11,544 15,610
Total trade and other receivables (gross) 619,060 465,487
The impairment allowance account is aged as follows:
Not overdue - -
Overdue by:
Less than 30 days - -
30 to 60 days (2,879) -
61 to 90 days (16) (780)
More than 90 days
Total impairment allowance account
(3,627) (2,522)
(6,522) (3,302)
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 293
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Reconciliation of impairment allowance account 2009 2008
$'000 $'000
Opening balance (3,302) (6,437)
Amounts written off 423 360
Amounts recovered and reversed 98 4,874
Increase / decrease recognised in net surplus/deficit (3,741) (2,099)
Closing balance (6,522) (3,302)
Note 6: Non-Financial Assets
Note 6A: Land and buildings
Freehold land
at fair value * 4,366,438 4,432,686
Total freehold land 4,366,438 4,432,686
Buildings on freehold land
at fair value * 8,070,426 7,718,889
Accumulated depreciation (241,193) (209,062)
Total buildings on freehold land 7,829,233 7,509,827
Work in progress – at cost 980,842 484,657
Buildings held under finance lease 894,364 535,640
Accumulated amortisation (148,496) (125,755)
745,868 409,885
Total buildings 9,555,943 8,404,369
Total land and buildings 13,922,381 12,837,055
* All independent valuations were conducted by the Australian Valuation Office in accordance with the revaluation
policy stated at Note 1.19(f).
APPENDIX 9 FINANCIAL TRANSPARENCY
294 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 6B: Specialist military equipment
Specialist military equipment in use other than repairable items
at cost 44,449,822 42,312,376
Accumulated depreciation (25,265,019) (23,136,189)
Accumulated impairment losses (237,554) (152,631)
Net carrying value of specialist military equipment 18,947,249 19,023,556
Repairable items
at cost 10,728,059 10,611,732
Accumulated depreciation (6,191,698) (6,497,736)
Accumulated impairment losses (97,203) (69,830)
Net carrying value of repairable items 4,439,158 4,044,166
Work in progress * 10,410,387 9,334,209
Total specialist military equipment 33,796,794 32,401,931
* Included in work in progress for specialist military equipment is $152m that is subject to Government review and
decision.
Note 6C: Plant and equipment
at fair value * 1,328,416 1,718,027
Accumulated depreciation (473,665) (739,480)
Accumulated impairment losses (2,720) (22)
852,031 978,525
Work in progress 175,522 169,237
Plant and equipment under finance lease 93,504 -
Accumulated amortisation (18,701) -
74,803 -
Total plant and equipment 1,102,356 1,147,762
* All independent valuations were conducted by the Australian Valuation Office in accordance with the revaluation
policy stated at Note 1.19(f).
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 295
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 6D: Infrastructure
at fair value * 5,058,624 4,712,863
Accumulated depreciation (115,075) (74,962)
4,943,549 4,637,901
Work in progress 108,596 72,344
Total infrastructure 5,052,145 4,710,245
* All independent valuations were conducted by the Australian Valuation Office in accordance with the revaluation
policy stated at Note 1.19(f).
APPENDIX 9 FINANCIAL TRANSPARENCY
296 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 6E: Intangibles
Computer Software
Purchased
at cost 359,888 270,484
Accumulated amortisation (150,787) (116,178)
Accumulated impairment losses (2,711) -
206,390 154,306
Work in progress 146,839 130,202
Computer software under finance lease 126,015 64,944
Accumulated amortisation (76,705) (64,944)
49,310 -
Total purchased computer software 402,539 284,508
Internally Generated
at cost 86,114 76,879
Accumulated amortisation (52,123) (43,548)
Total internally generated computer software 33,991 33,331
Total computer software 436,530 317,839
Other Intangibles
Purchased
at cost 60,947 61,127
Accumulated amortisation (39,400) (37,437)
21,547 23,690
Work in progress 6,015 15,573
Total other intangibles purchased 27,562 39,263
Internally Generated
at cost 6,021 1,277
Accumulated amortisation (1,609) (754)
Total other intangibles internally generated 4,412 523
Total other intangibles 31,974 39,786
Total intangibles 468,504 357,625
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 297
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$’000 $’000
Note 6F: Heritage and cultural assets
at fair value *
Total heritage and cultural assets
869,393
869,393
807,931
807,931
*All valuations were either conducted by management or independently in accordance with the revaluation policy stated
at Note 1.19(f)
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
298D
EFENCE AN
NU
AL REPORT 2008-09 VO
LUM
E 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 6G: Analysis of property, plant and equipment, and intangibles
Table A: Reconciliation of the Opening and Closing Balances of Property, Plant and Equipment, and Intangibles (2008-2009)
Item Land
$’000
Buildings
$’000
Specialist
Military
Equipment
$’000
Infrastructure
$’000
Plant and
Equipment
(owned and
leased)
$’000
Heritage
and
Cultural
Assets
$’000
Computer
Software
Purchased
$’000
Computer
Software
Internally
Generated
$’000
Other
Intangibles
Purchased
$’000
Other
Intangibles
Internally
Generated
$’000
Total
$’000
As at 1 July 2008
Gross Book value 4,432,686 8,739,186 62,258,317 4,785,207 1,887,264 807,931 465,630 76,879 76,700 1,277 83,531,077
Accumulated depreciation/amortisation and impairment - (334,817) (29,856,386) (74,962) (739,502) - (181,122) (43,548) (37,437) (754) (31,268,528)
Net book value 1 July 2008 4,432,686 8,404,369 32,401,931 4,710,245 1,147,762 807,931 284,508 33,331 39,263 523 52,262,549
Additions: by purchase 2,123 928,660 4,377,038 94,906 211,982 50 95,501 862 7,312 - 5,718,434
by finance lease - 386,418 - - 93,504 - 61,071 - - - 540,993
Revaluations/impairments through equity (29,019) 431,125 - 393,431 (35,723) 42,911 - - - - 802,725
Reclassifications (237) (86,523) 9,160 91,770 (31,043) 698 11,856 12,900 (13,325) 4,744 -
Depreciation/amortisation expense - (486,794) (2,868,376) (246,883) (243,392) - (48,896) (9,933) (2,510) (855) (3,907,639) Revaluations/write-downs and impairments recognised in operating result (30,262) (45,586) (629,976) (4,890) (22,625) (908) (1,488) (3,169) (3,178) - (742,082)
Other movements:
Reversal of previous asset write-downs 31 29,849 456,521 13,569 13,721 18,711 - - - - 532,402
Transfers in (out) - - 49,319 (3) (148) - (13) - - - 49,155
Transfers to/from Assets Held for Sale (8,511) 10,100 125,677 - 260 - - - - - 127,526
Disposals Other disposals (373) (15,675) (124,500) - (31,942) - - - - - (172,490)
Net book value as at 30 June 2009 represented by:
Gross book value 4,366,438 9,945,632 65,588,268 5,167,220 1,597,442 869,393 632,742 86,114 66,962 6,021 88,326,232
Accumulated depreciation/amortisation and impairment - (389,689) (31,791,474) (115,075) (495,086) - (230,203) (52,123) (39,400) (1,609) (33,114,659)
Closing net book value 4,366,438 9,555,943 33,796,794 5,052,145 1,102,356 869,393 402,539 33,991 27,562 4,412 55,211,573
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
DEFEN
CE ANN
UAL REPO
RT 2008-09 VOLU
ME 1
299
Financial statements
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 6G: Analysis of property, plant and equipment, and intangibles Table B: Reconciliation of the Opening and Closing Balances of Property, Plant and Equipment, and Intangibles (2007-2008)
Item Land Buildings Specialist Infrastructure Plant and
Equipment
(owned and
leased)
Heritage Computer Computer Other
Intangibles
Purchased
$’000
Other Total
Military and Software Software Intangibles
Equipment Cultural Purchased Internally Internally
Assets Generated Generated
$’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000
As at 1 July 2007
Gross Book value
Accumulated depreciation/amortisation and impairment
3,880,314
-
8,221,058
(222,089)
60,357,208
(27,797,736)
4,671,540
(43,646)
1,865,930
(651,686)
763,944
-
352,566
(140,170)
48,941
(22,320)
70,968
(34,240)
1,277
(623)
80,233,746
(28,912,510)
Net book value 1 July 2007 3,880,314 7,998,969 32,559,472 4,627,894 1,214,244 763,944 212,396 26,621 36,728 654 51,321,236
Additions:
by purchase
by finance lease
Revaluations/impairments through equity
Reclassifications
Depreciation/amortisation expense Write-downs and impairments recognised in operating result
3,322
-
434,508
-
-
(1,207)
597,179
118,129
295,141
(119,962)
(445,546)
(52,247)
3,596,392
-
-
(58,076)
(2,656,342)
(1,386,512)
55,113
-
169,777
125,351
(229,371)
(44,186)
244,820
-
(8,130)
7,181
(266,950)
(67,947)
19
-
41,963
982
-
-
30,717
-
-
85,687
(48,301)
(11,212)
50,263
-
-
(35,542)
(8,011)
-
2
-
-
7,734
(3,197)
(2,004)
13,243
-
-
(13,355)
(131)
-
4,591,070
118,129
933,259
-
(3,657,849)
(1,565,315)
Other movements
Reversal of previous asset write-downs
Transfers in(Out)
Transfers to/from Assets Held for Sale
7,340
-
114,213
20,138
(1)
1,618
414,180
59,067
(126,250)
5,667
-
-
61,656
(389)
3,500
1,023
-
-
15,221
-
-
-
-
-
-
-
-
112
-
-
525,337
58,677
(6,919)
Disposals
Other disposals (5,804) (9,049) - - (40,223) - - - - - (55,076)
Net book value as at 30 June 2008 represented by:
Gross book value
Accumulated depreciation/amortisation and impairment
Closing net book value
4,432,686
-
8,739,186
(334,817)
62,258,317
(29,856,386)
4,785,207
(74,962)
1,887,264
(739,502)
807,931
-
465,630
(181,122)
76,879
(43,548)
76,700
(37,437)
1,277
(754)
83,531,077
(31,268,528)
4,432,686 8,404,369 32,401,931 4,710,245 1,147,762 807,931 284,508 33,331 39,263 523 52,262,549
APPENDIX 9 FINANCIAL TRANSPARENCY
300 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$’000 $’000
Note 6H: Inventories
Inventories – General 1,899,116 2,021,926
Inventories – Explosive ordnance 2,945,939 2,827,501
Inventories – Fuel 97,288 103,314
Total inventories 4,942,343 4,952,741
Inventories are represented by:
Current 713,665 659,728
Non-current 4,228,678 4,293,013
Total inventories 4,942,343 4,952,741
Inventory valuation dissection
Balance at cost as at 1 July 4,952,741 4,840,542
Inventory acquired during period 1,522,956 1,428,719
Inventory recognised during period 109,380 118,265
Inventory consumed during period (1,040,300) (913,224)
Inventory write downs during period (598,424) (384,868)
Transfers to inventory during period 18,867 667
Transfers from inventory during period (22,877) (137,360)
Closing balance as at 30 June 4,942,343 4,952,741
Note 6I: Prepayments
Capital prepayments 332,052 828,531
Non capital prepayments 197,630 226,686
Total prepayments 529,682 1,055,217
Prepayments are represented by:
Current 492,273 1,017,216
Non-current 37,409 38,001
Total 529,682 1,055,217
Note 6J: Assets held for sale
Land and buildings 22,265 23,854
Specialist Military Equipment 573 126,250
Other infrastructure, plant and equipment
Total assets held for sale
930
23,768
1,190
151,294
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 301
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$’000 $’000
Note 7: Payables
Note 7A: Suppliers
Trade creditors - non capital 755,244 811,088
Trade creditors - capital 84,026 46,907
Total supplier payables 839,270 857,995
Supplier payables are represented by:
Current 839,270 857,995
Non-current - -
Total supplier payables 839,270 857,995
Note 7B: Other payables
Australian Public Service (APS) employee payables:
Salaries and wages * 17,936 13,520
Superannuation * 2,764 3,218
Separations and redundancies * 68 18
Australian Defence Force (ADF) employee payables:
Salaries and wages * 90,513 64,233
Superannuation * 27,293 11,994
Other 183,640 197,170
Total other payables 322,214 290,153
Other payables are represented by:
Current 288,790 262,328
Non-current
Total other payables
33,424 27,825
322,214 290,153
* Salaries and wages, superannuation and separations and redundancy employee payables have been reclassified to
other payables from employee provisions consistent with the Finance Minister’s Orders.
APPENDIX 9 FINANCIAL TRANSPARENCY
302 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 8: Interest Bearing Liabilities *
Finance leases payable:
Within one year
Minimum lease payments 115,954 58,452
Deduct: future finance charges (70,240) (34,498)
In one to five years
Minimum lease payments 493,099 231,499
Deduct: future finance charges (244,268) (111,057)
In more than five years
Minimum lease payments 1,159,182 368,040
Deduct: future finance charges (583,558) (107,448)
Finance leases recognised on the balance sheet 870,169 404,988
Lease liability is represented by:
Current 45,715 23,954
Non-current
Net lease liability
824,454
870,169
381,034
404,988
* 19 finance leases exist in relation to properties and technology. The leases are non-cancellable and for fixed terms with
an average remaining term of 11 years. The maximum number of years remaining is 30 relating to the Amberley Single
Leap finance lease to May 2039. The lease assets secure the lease liabilities. Interest rates applied averaged 8.00% (2008:
6.67%).
Contingent rent (representing the portion of the lease payments made in 2008-09 that were not fixed and subject to CPI
finance lease contract clauses) were expensed in the periods in which they were incurred on 3 finance leases and were
reported in Employee Benefits Expenses (refer Note 4A).
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 303
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
The classification of current employee provisions includes amounts for which there is not an unconditional right to
defer settlement by one year, hence in the case of employee provisions the above classification does not represent the
amount expected to be settled within one year of reporting date. Employee provisions expected to be settled in twelve
months from the reporting date are $630.99m (2008: $600.74m), in excess of one year are $1,306.07m (2008:
$1,162.98m).
* Salaries and wages, superannuation and separations and redundancy employee payables have been reclassified to
other payables from employee provisions consistent with the Finance Minister’s Orders.
2009 2008
$'000 $'000
Note 9: Provisions
Note 9A: Employee provisions *
Australian Public Service (APS) employee provisions
Leave 427,972 416,402
Total APS employee provisions 427,972 416,402
Australian Defence Force (ADF) employee provisions
Leave 1,450,764 1,325,949
Other provisions 58,331 21,370
Total ADF employee provisions 1,509,095 1,347,319
Total employee provisions 1,937,067 1,763,721
Employee provisions are represented by:
Current 1,685,170 1,575,745
Non-current
Total employee provisions
251,897 187,976
1,937,067 1,763,721
APPENDIX 9 FINANCIAL TRANSPARENCY
304 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009
$'000
Note 9B: Restoration, decontamination and decommissioning
Provisions for restoration and decommissioning 310,097
Provision for decontamination1 334,633
2008
$'000
272,790
342,782
Total restoration, decontamination and decommissioning provisions 644,730 615,572
Restoration, decontamination and decommissioning provisions are represented by:
Current 86,987 85,559
Non-current 557,743 530,013
Total restoration, decontamination and decommissioning provisions 644,730 615,572
Refer to Note 9D for reconciliation 1. This provision does not represent the total cost of remediating contamination on all Defence sites rather, it provides an
estimate of the present obligation that exists in relation to these sites (see Note 1.19(c) for the accounting policy on this
matter).
Note 9C: Other provisions
Other provisions 28,340 24,603
Total other provisions 28,340 24,603
Other provisions are represented by:
Current 28,340 14,545
Non-current -
Total other provisions 28,340
10,058
24,603
Refer to Note 9D for reconciliation
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 305
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 9D: Reconciliation of provision
balances Restoration and Decontamination Other
decommissioning provision provisions
provision
$’000 $’000
$’000
Carrying amount at 1 July 2008 272,790 342,782 24,603
Payments made during financial year (4,077) (61,871) (510)
Additional provisions made 31,748 93,789 20,519
Unwinding of the discounted amount
arising from the passage of time 14,961 1,828 -
Amounts reversed
Closing balance 2009
(5,325)
310,097
(41,895)
334,633
(16,272)
28,340
APPENDIX 9 FINANCIAL TRANSPARENCY
306 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 10: Restructuring
2008-09: There were no restructuring adjustments during 2008-09.
2007-08: Transfer of assets from the Department of Immigration and Citizenship
A number of demountable buildings and plant and equipment assets from the Woomera Immigration Reception and
Processing Centre were transferred from the Department of Immigration and Citizenship to the Department of Defence
during 2007-08.
The net book value of assets transferred from the Department of Immigration and Citizenship for no consideration
and recognised as at the date of transfer were:
2009 2008
$'000 $'000
Total assets recognised - 4,750
Net assets assumed - 4,750
Net increase (decrease) in net assets during the year
- 4,750
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 307
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 11: Cash Flow Reconciliation
Reconciliation of cash and cash equivalents as per Balance
Sheet to Cash Flow Statement
Cash at year end per Cash Flow Statement 28,088 29,223
Balance Sheet items comprising above cash 'Financial Asset-Cash' 28,088 29,223
Reconciliation of net surplus/(deficit) to net cash from/(used
by) operating activities:
Operating result (943,110) (585,026)
Depreciation and amortisation 3,907,639 3,657,849
Foreign exchange (gains) losses 434 (1,077)
Reversals of previous asset write-downs (641,781) (643,602)
(Gains) losses from assets sales 91,819 2,152
Net write-down and impairment of assets 1,340,506 1,950,183
Finance costs 94,366 44,146
Inventory consumption or expensed 1,042,037 918,130
Reallocation of appropriation receipts (3,296) 176
Restoration in use costs 23,501 54,015
Decrease/(increase) in trade and other receivables (154,821) 39,497
Decrease/(increase) in inventories (616,615) (117,685)
Decrease/(increase) in prepayments 525,534 (224,054)
Increase/(decrease) in employee provisions 173,348 99,032
Increase/(decrease) in other provisions 3,737 (21,697)
Increase/(decrease) in suppliers (83,761) 81,767
Increase/(decrease) in other payables
Net cash from/(used by) operating activities
32,061 106,426
4,791,598 5,360,232
APPENDIX 9 FINANCIAL TRANSPARENCY
308 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 12: Contingent Liabilities and Assets Quantifiable Contingencies The Schedule of Contingencies for the Financial Year 2008-09 reports non-remote, quantifiable contingent liabilities as at 30 June 2009 in respect of claims for damages/costs of $84.45 million (2007-08: $100.15m). This amount represents an estimate of the Department’s liability based on precedent. This estimated figure is determined by conducting an objective analysis of the probable amount payable for all the matters managed by Defence’s Legal Services Panels and those matters being handled in-house by Defence Legal Division, and by making appropriate adjustments where the same matters are reported on by the members of Defence’s Legal Services Panels and Defence Legal Division. However, as an estimate, the exact amount that will become payable under these claims is uncertain. The Department of Defence is defending the claims or trying to resolve them by recourse to alternative dispute resolution measures. Consequently, the timing of outflows resulting from the claims will depend on the nature of each individual case. The Schedule also reports contingent assets in respect of claims by the Department of $0.86m (2007-08: $2.69m). The Department is expecting to succeed in its claims, although the cases are continuing. The estimated figures is determined by conducting an objective analysis of the probable amounts owing to the Department for all matters managed by Defence’s Legal Services Panels and those matters being handled in-house by Defence Legal Division. Defence also manages its exposure to financial risk through participating in Comcover - the Australian Government’s general insurance self-managed fund. Where appropriate, Defence liabilities are covered under Comcover’s General Liability, Professional Indemnity, Directors’ and Officers’ Liability, Aviation Liability and Marine Liability policies. These policies cover Defence’s legal liabilities, subject to the policy terms and conditions and only cover liabilities resulting from indemnities where the liability would have arisen in the absence of the indemnity. The extent to which particular indemnities given by Defence are or are not covered by Comcover is determined on a case by case basis, given the facts of each situation and subject to guidance under Financial Management Guidance No. 6 ‘Guidelines for Issuing and Managing Indemnities, Guarantees, Warranties and Letters of Comfort’) and Financial Management and Accountability Regulation (FMAR) 10 and Comcover guidelines in regard to contract indemnities. Subject to Defence obtaining Finance Minister approval under FMAR 10, separate agreement is needed from Comcover in respect of insurance coverage applications for particular indemnities. Unquantifiable Contingencies ADI Limited – Officers’ and Directors’ Indemnities Under the sale agreements for ADI Ltd, the Australian Government agreed to indemnify the directors, officers and employees for claims and legal costs associated with assistance related to the sale of the Australian Government’s shares in the company. The Australian Government has provided an indemnity to ADI Ltd for uninsured losses relating to specific heads of claims. HMAS Voyager / HMAS Melbourne claims Minimal provision has been made for settlement of claims arising from the HMAS Voyager / HMAS Melbourne collision in 1964. With one exception, all outstanding claims were resolved in the current financial year. Decontamination of Defence sites Defence has made financial provision for the possible costs involved in restoring, decontaminating and decommissioning Defence sites in Australia where a legal or constructive obligation has arisen (see Note 9B and Note 1.19(c) for further information). Litigation cases The Department of Defence is involved in a wide range of litigation and other claims for compensation and/or damages that may result in litigation where the matters are not able to be finalised by use of negotiation. The litigation includes common law liability claims, including for injury alleged to have resulted from the F-111 Deseal/Reseal programmes, and asbestos claims. Claims have also been received for damage caused by the use of Defence Practice Areas.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 309
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Remote Contingencies Defence’s remote contingencies can be divided into four categories: (1) contingencies from the Defence Indemnities Register in ROMAN (for guarantees, indemnities and warrantees in contracts and agreements); (2) those arising from matters managed by Defence’s Legal Services Panels, (3) those arising from matters being handled in-house by Defence Legal Division, and (4) vehicle-related indemnities involved in the leases of senior executive vehicles taken out under the Fleet Management Agreement between the Commonwealth Government (represented by the Department of Finance and Deregulation) and LeasePlan Australia Ltd as the Fleet Manager under the Agreement and the novated lease arrangements utilised by Defence employees through salary sacrificing arrangements with various financiers. All categories are considered too remote to be included on the Schedule of Contingencies. In total, there are 8,108 instances (2007-08: 7,998) of unquantifiable remote contingent liabilities and 97 instances (2007-08: 65) of quantifiable remote contingent liabilities, to the value of $2,102.14m (2007-08: $2,101.85m). There are 3 (2007-08: 3) instances of unquantifiable remote contingent assets and 25 (2007-08: 6) instances of quantifiable remote contingent assets. A major part of the increase in the numbers and values for contingent liability matters from the 2007-08 financial year is due to the settlement of a large number of matters that had been previously reported as contingent liability matters, and the inclusion for the first time of information relating to contingent liability matters being handled in-house by Defence Legal Division. The difference in the values for contingent assets is also due to the finalisation of a number of legal matters where the issues were finalised during the financial year 2008-09 up to 30 June 2009, and the inclusion for the first time of information relating to contingent asset matters being handled in-house by Defence Legal Division. The remote contingencies managed by Defence’s Legal Services Panels and matters being handled in-house by Defence Legal Division have been objectively assessed as having a less than 5% chance of crystallising and, as such, are considered remote. Similarly, contingencies on the ROMAN Indemnities Register are remote, because no actual liability has ever arisen from them or from similar types of contingent liabilities that have been on Defence’s Indemnities Register in the past. In addition, there is no record of any indemnity under the Fleet Management Agreement and the novated lease arrangements having crystallised.
APPENDIX 9 FINANCIAL TRANSPARENCY
310 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 13: Executive Remuneration
The number of senior executives who received, or were due to receive, total remuneration of $130,000 or more are set
out below:
Remuneration Band 2009 2008
$130,000 to $144,999 3 7
$145,000 to $159,999 10 5
$160,000 to $174,999 15 15
$175,000 to $189,999 20 28
$190,000 to $204,999 29 31
$205,000 to $219,999 24 23
$220,000 to $234,999 23 27
$235,000 to $249,999 39 26
$250,000 to $264,999 20 26
$265,000 to $279,999 17 20
$280,000 to $294,999 24 17
$295,000 to $309,999 12 12
$310,000 to $324,999 10 7
$325,000 to $339,999 2 1
$340,000 to $354,999 7 4
$355,000 to $369,999 3 -
$370,000 to $384,999 3 4
$385,000 to $399,999 1 1
$400,000 to $414,999 3 1
$415,000 to $429,999 - 3
$430,000 to $444,999 1 1
$445,000 to $459,999 1 -
$460,000 to $474,999 1 -
$475,000 to $489,999 1 2
$490,000 to $504,999 1 -
$505,000 to $519,999 3 -
$535,000 to $549,999 - 1
$610,000 to $624,999 1 -
262
Total 274
The aggregate amount of total remuneration of senior executives shown
above.
68,508,086
62,797,657
The aggregate amount of separation and redundancy/termination benefit
payments during the year to executives shown above. 2,087,700 1,683,690
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 311
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 13: Executive Remuneration (continued)
The Executive Remuneration Note includes remuneration details for Defence Senior Executives: the Secretary of
Defence, the Chief of the Defence Force (CDF), APS SES, ADF Star Ranked Officers, Chief of Division Grades 2 and
3, Medical Officer Grade 6 and Chaplains. In addition Executives who act in substantive SES or Star Ranked
positions are included in the note if they meet the criteria while acting at that level.
Included in the above Note:
• total remuneration based on salary and allowances, accrued superannuation, redundancy payments, accrued leave,
car parking, motor vehicle costs and fringe benefits tax, where the total remuneration exceeds $130,000;
• for ADF members only, the value of health and housing subsidy and a number of other miscellaneous allowances
(such as field allowances, career transition training, separation and retention allowances);
• remuneration paid to Senior Executives on secondment from other departments or Agencies; and
• all Military Star Ranked Officers who have been posted to the Defence Materiel Organisation (DMO) for the 2008-
09 financial year who exceed the threshold of $130,000, in accordance with Department of Finance and
Administration advice. In 2008-09 there were 25 such Officers (2007-08 25). The total remuneration for these Officers
was $6,166,555 including $501,791 in separation/redundancy payments (2007-08 $5,931,145 including $146,330 in
separation/redundancy payments). Whilst these Officers undertake a management function within DMO they remain
employees of the Department of Defence. Defence has received a payment from the DMO for these Officers in
accordance with the Military Workforce Agreement.
Not included in the Note:
• Senior Executives who are employed overseas for a period exceeding six months;
• remuneration of Senior Executives employed by Defence but on secondment to another department/agency; and
• reimbursements of out of pocket expenses.
APPENDIX 9 FINANCIAL TRANSPARENCY
312 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
No other services were provided by the Auditor-General.
2009 2008
$ $
Note 14: Remuneration of Auditors
Financial statement audit services are provided free
of charge to the Department.
The fair value of the services provided by the
Auditor-General was: 4,975,000 4,975,000
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 313
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 15: Financial Instruments
Financial risk management objectives and policies
Details of the significant accounting policies and methods adopted, including the criteria for recognition and the basis
for measurement in respect of each class of financial asset and financial liability are disclosed in Note 1 to the financial
statements.
In accordance with Australian Government policy, Defence does not enter into reportable derivative financial
instruments.
2009 2008
$'000 $'000
(a) Categories of financial instruments
Financial assets
Loans and receivables
Cash and cash equivalents 28,088 29,223
Trade and other receivables 159,380 126,726
Carrying amount of financial assets 187,468 155,949
Financial Liabilities
At amortised cost
Suppliers 839,270 857,995
Other payables 233,241 211,191
Finance lease 870,169 404,988
Carrying amount of financial liabilities 1,942,680 1,474,174
(b) Net income and expense from financial assets
Loans and receivables
Exchange gains /(loss) 1,492 (935)
Impairment (4,785) 2,704
Net gain/(loss) on financial assets (3,293) 1,769
There is no interest income from financial assets not at fair value through the profit or loss.
(c) Net income and expense from financial liabilities
At amortised cost
Exchange gains /(loss) (1,926) 2,012
Interest expense (77,578)
Net gain/(loss) on financial liabilities (79,504)
(31,606)
(29,594)
There is no interest expense from financial liabilities not at fair value through the profit or loss.
APPENDIX 9 FINANCIAL TRANSPARENCY
314 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 15: Financial Instruments (continued)
(d) Fair values of financial instruments
The fair values of cash, non-interest bearing monetary financial assets, trade creditors and finance leases approximate their
carrying amounts (AASB 7 paragraph 29). Finance Leases are recognised at the lower of fair value and net present value of
the minimum lease payments (AASB 117) at lease inception. The carrying amounts reported represent the amounts required
to settle each liability.
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
DEFEN
CE ANN
UAL REPO
RT 2008-09 VOLU
ME 1
315
Financial statements
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 15: Financial Instruments (continued)
(e) Credit risk
Defence's maximum credit risk at the reporting date in relation to each class of recognised financial assets is the carrying amount of those assets as indicated in the Balance Sheet. Defence has
endorsed policies and procedures for debt management to reduce the incidence of credit risk. The majority of goods or services provided by Defence are provided to other government entities and
employees and therefore represent minimal credit risk exposure for Defence.
The carrying amount of financial assets, net of impairment losses, reported in the Balance Sheet represents Defence’s exposure to credit risk. Defence has no significant exposures to any
concentrations of credit risk.
Credit quality of financial assets not past due or individually determined as impaired:
0 to 30 days 31 to 60 days 61 to 90 days Over 90 days Total
Notes
2009 2008 2009 2008 2009 2008 2009 2008 2009 2008
$'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000
Financial assets:
Trade and other receivables 5B 1,814 4,994 3,514 1,541 623 1,559 7,917 13,088 13,868 21,182
Total 1,814 4,994 3,514 1,541 623 1,559 7,917 13,088 13,868 21,182
Not Past Not Past
Due Nor Due Nor Past Due or Past Due or
Impaired Impaired Impaired Impaired
Notes
2009 2008 2009 2008
$'000 $'000 $'000 $'000
Financial assets:
Cash and cash equivalents 5A 28,088 29,223 - -
Trade and other receivables 5B 145,510 105,544 20,390 24,484
Total 173,598 134,767 20,390 24,484
Ageing of financial assets past due but not impaired:
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
316D
EFENCE AN
NU
AL REPORT 2008-09 VO
LUM
E 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 15: Financial Instruments (continued)
(f) Liquidity risk
Defence's financial liabilities are payables and finance leases. The exposure to liquidity risk is based on the notion that Defence will encounter difficulty in meeting its obligations
associated with financial liabilities. This is highly unlikely due to appropriation funding and mechanisms available to Defence (e.g. Advance to the Finance Minister) and internal
policies and procedures put in place to ensure there are appropriate resources to meet its financial obligations.
The following table illustrates the maturities for financial liabilities.
Notes
On demand Within 1 year 1 to 2 years 2 to 5 years > 5 years Total
2009 2008 2009 2008 2009 2008 2009 2008 2009 2008 2009 2008
$'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000
Financial liabilities:
Suppliers 7A - - 839,270 857,995 - - - 839,270 857,995
Other payables 7B - - 199,818 183,368 369 330 7,148 7,513 25,906 19,980 233,241 211,191
Finance lease 8 - - 45,714 23,954 65,037 26,459 183,794 93,983 575,624 260,592 870,169 404,988
Total - - 1,084,802 1,065,317 65,406 26,789 190,942 101,496 601,530 280,572 1,942,680 1,474,174
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 317
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 15: Financial Instruments (continued)
(g) Market risk
Currency risk
Foreign currency transactions are recorded at the rate of exchange at the date of the transaction.
Foreign currency receivables, payables and provisions are translated at exchange rates current at the balance date. Exchange gains and
losses are brought to account in determining the operating result for the year. These exchange gains and losses are not speculative and
no hedging is undertaken.
Defence is exposed to foreign exchange rate risk through primary financial assets and liabilities yet a change in risk variable will not
have a significant effect on the Balance Sheet or the Income Statement.
The following table summarises the currency risk in respect of recognised financial assets and financial liabilities.
United
States
Dollars
A$'000
Malaysian
Ringgit
A$’000
Arab
Emirates
Dirham
A$’000
Euros
A$'000
Kuwait
Dinar
A$'000
British
Pounds
A$’000
Singapore
Dollar
A$’000
Solomon
Islands
Dollar
A$'000
Other
A$'000
Total
A$’000
Financial
Assets
Cash 6,089 536 233 92 68 - - 53 53 7,124
Receivables
Financial
Liabilities
1,965 20 775 130 467 - - 1,334 140 4,831
8,054 556 1,008 222 535 - - 1,387 193 11,955
Suppliers 21,542 1,565 7 869 7 1,875 99 - 82 26,046
Departmental currency risk is minimised through budget supplementation for any adverse movements in exchange rates on financial
assets and financial liabilities held in foreign currencies.
Interest rate risk
Defence reports interest-bearing finance leases that bear interest at a fixed interest rate at inception. Therefore, a change in interest
rates at the reporting date would have a nil impact.
Other price risk
Defence is exposed to a variety of commodity price risks relating to various supply contracts. These do not have a material impact
on Defence’s financial liabilities.
APPENDIX 9 FINANCIAL TRANSPARENCY
318 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 16: Accounting for Errors
Defence has made adjustments to correct accounting errors identified during the current financial year but relating to prior years, in accordance with the requirements of AASB 108 Accounting Policies, Changes in Accounting Estimates and Errors. a) Buildings under Construction were reclassified to Buildings in Use in 2008-09. These assets should have commenced depreciation prior to 2008-09. Depreciation expense and accumulated depreciation in the comparative 2007-08 year within the 2008-09 financial statements have been retrospectively increased by $2.975m and $4.442m respectively. b) Expenditure on the Hornet Upgrade project was incorrectly capitalised to Assets Under Construction - Specialist Military Equipment (SME) in the financial years 2005-06 to 2007-08. Corrections in the 2008-09 financial statements decreased SME and retained earnings by $5.380m as at 1 July 2007, with a further decrease in SME and a corresponding increase in suppliers expense in 2007-08 of $9.071m. c) Defence had previously included recoverable amounts of Diesel Fuel Rebate (DFR) in the cost of fuel inventory. Refunds of DFR from the Australian Taxation Office were separately recognised as other revenue. In 2008-09, in accordance with AASB 102 Inventories, Defence offset DFR revenue against the cost of fuel inventory. In the 2008-09 financial statements, the 2007-08 comparative year amounts for fuel inventory, other revenue and inventory consumption have been restated. Closing fuel inventory has been reduced by $24.911m, inventory consumption has been reduced by $37.126m and other revenue has been reduced by $33.509m. Fuel inventory as at 1 July 2007 has been reduced by $28.530m. d) Following statistical analysis by Data Analysis Australia, General Stores Inventory (GSI) purchase costs in 2007-08 were estimated to be understated by 6%. Corrections in the 2008-09 financial statements increased the closing balance of GSI in 2007-08 by $33.146m with a corresponding increase to reversal of previous asset write downs. Based on an estimated full year annual consumption rate of 25% reducing balance, the closing balance of GSI was also decreased by $4.143m in 2007-08, with a corresponding increase in suppliers expense, to correct the estimated understatement in GSI consumption expense in 2007-08. e) Prior to 2007-08, Defence had incorrectly capitalised $31.372m in costs relating to various SME projects. In the 2008-09 financial statements, the 2007-08 comparative year amount for SME has been reduced accordingly. f) Employee housing expenses of $11.309m in 2007-08 were reclassified from suppliers expenses to employee expenses, as the expenses were considered employee benefits under AASB 119 Employee Benefits. g) Write off of Explosive Ordinance (EO) was erroneously understated by $4.212m in 2007-08. The 2007-08 comparative year amount for EO write offs in the 2008-09 financial statements has been retrospectively increased by $4.212m. h) Defence properties managed by Defence Housing Australia (DHA) with a net book value of $275.926m as at 30 June 2008 were erroneously classified as Assets Held For Sale (AHFS). The 2007-08 comparative year amount for AHFS in the 2008-09 financial statements has been retrospectively reduced by $275.926m, with corresponding increases to land and buildings of $273.423m, infrastructure of $.159m and heritage and cultural assets of $2.344m.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 319
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 16A: Reconciliation of Equity as at 1 July 2007
Previous Adjustment Adjusted
Balance for Errors Balance
1 July 2007 1 July 2007
$'000 $’000 $'000
ASSETS
Financial assets
Cash and cash equivalents 32,007 32,007
Trade and other receivables 501,682 501,682
Total financial assets 533,689 - 533,689
Non-financial assets
Land and buildings 11,880,750 (a) (1,467) 11,879,283
Specialist military equipment 32,596,224 (b)(e) (36,752) 32,559,472
Plant and equipment 1,214,244 1,214,244
Infrastructure 4,627,894 4,627,894
Intangibles 276,399 276,399
Heritage and cultural assets 763,944 763,944
Inventories 4,869,072 (c) (28,530) 4,840,542
Prepayments 762,123 762,123
Total non-financial assets 56,990,650 (66,749) 56,923,901
Assets held for sale 144,375 144,375
TOTAL ASSETS 57,668,714 (66,749) 57,601,965
LIABILITIES
Payables
Suppliers 757,120 757,120
Other payables 183,727 183,727
Total payables 940,847 - 940,847
Interest bearing liabilities
Leases 313,588 313,588
Total interest bearing liabilities 313,588 - 313,588
Provisions
Employee provisions 1,664,689 1,664,689
Restoration, decontamination and decommissioning 541,256 541,256
Other provisions 46,300 46,300
Total provisions 2,252,245 - 2,252,245
TOTAL LIABILITIES 3,506,680 - 3,506,680
NET ASSETS 54,162,034 (66,749) 54,095,285
EQUITY
Contributed equity 6,876,202 6,876,202
Reserves 11,900,862 11,900,862
Retained surpluses (accumulated deficit)
TOTAL EQUITY
35,384,970 (66,749) 35,318,221
54,162,034 (66,749) 54,095,285
APPENDIX 9 FINANCIAL TRANSPARENCY
320 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 16B: Reconciliation of Equity as at 30 June 2008
Previous Adjustment Adjusted
Balance for Errors Balance
30 June 2008 30 June 2008
$'000 $'000 $'000
ASSETS
Financial assets
Cash and cash equivalents 29,223 29,223
Trade and other receivables 462,185 462,185
491,408
Total financial assets 491,408 -
Non-financial assets
Land and buildings 12,568,074 (a)(h) 268,981 12,837,055
Specialist military equipment 32,447,754 (b)(e) (45,823) 32,401,931
Plant and equipment 1,147,762 1,147,762
Infrastructure 4,710,086 (h) 159 4,710,245
Intangibles 357,625 357,625
Heritage and cultural assets 805,587 (h) 2,344 807,931
Inventories 4,952,862 (c)(d)(g) (121) 4,952,741
Prepayments 1,055,217 1,055,217
58,270,507
151,294
58,913,209
Total non-financial assets 58,044,967 225,540
Assets held for sale 427,220 (h) (275,926)
TOTAL ASSETS 58,963,595 (50,386)
LIABILITIES
Payables
Suppliers 857,995 857,995
Other payables 290,153 290,153
1,148,148
Total payables 1,148,148 -
Interest bearing liabilities
Leases 404,988 404,988
404,988
Total interest bearing liabilities 404,988 -
Provisions
Employee provisions 1,763,721 1,763,721
Restoration, decontamination and decommissioning 615,572 615,572
Other provisions 24,603 24,603
2,403,896
3,957,032
54,956,177
Total provisions 2,403,896 -
TOTAL LIABILITIES 3,957,032 -
NET ASSETS 55,006,563 (50,386)
EQUITY
Contributed equity 7,388,861 7,388,861
Reserves 12,834,121 12,834,121
Retained surpluses (accumulated deficit)
TOTAL EQUITY
34,783,581
55,006,563
(50,386)
(50,386)
34,733,195
54,956,177
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 321
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 16C: Reconciliation of Operating results as at 30 June 2008
Previous Adjustment Adjusted
Balance for Errors Balance
30 June
2008 30 June 2008
$'000 $’000 $'000
INCOME
Revenue
Revenue from Government 19,693,267 19,693,267
Sale of goods and rendering of services (including
cost recovery) 688,840 688,840
Rental revenue 7,073 7,073
Other revenue 76,233 (c) (33,509) 42,724
Total revenue 20,465,413 (33,509) 20,431,904
Gains
Foreign exchange 1,077 1,077
Reversals of previous asset write-downs 615,330 (d) 33,146 648,476
Other gains 3,295 3,295
Total gains 619,702 33,146 652,848
TOTAL INCOME 21,085,115 (363) 21,084,752
EXPENSES
Employee benefits 7,510,296 (f) 11,309 7,521,605
Suppliers 8,454,080 (b)(c)(d)(f) (35,222) 8,418,858
Grants 18,000 18,000
Depreciation and amortisation 3,654,874 (a) 2,975 3,657,849
Finance costs 44,146 44,146
Write-down and impairment of assets 1,948,141 (g) 4,212 1,952,353
Losses from sale of assets 2,152 2,152
Other expenses 54,815 54,815
TOTAL EXPENSES 21,686,504 (16,726) 21,669,778
NET SURPLUS OR (DEFICIT)
ATTRIBUTABLE TO THE AUSTRALIAN
GOVERNMENT (601,389) 16,363 (585,026)
APPENDIX 9 FINANCIAL TRANSPARENCY
322 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 16D: Explanation of material adjustments to the Cash Flow Statement for year ended 30 June 2008
Previous Adjustment for Adjusted
Balance Errors Balance
30 June 2008 30 June 2008
$'000 $’000 $'000
OPERATING ACTIVITIES
Cash Received
Goods and Services (including cost recovery) 579,628 579,628
Appropriations (current year) 19,659,706 19,659,706
Appropriations (prior year) 50,000 50,000
Net GST received 460,131 460,131
Other cash received 114,174 (c) (33,509) 80,665
Total cash received 20,863,639 (33,509) 20,830,130
Cash Used
Employees (7,248,681) (f) (11,309) (7,259,990)
Suppliers (7,733,976) (b)(f) 2,238 (7,731,738)
Net GST paid (459,476) (459,476)
Grants (17,894) (17,894)
Other cash used (800) (800)
Total cash used (15,460,827) (9,071) (15,469,898)
Net cash flows from (used by) operating activities 5,402,812 (42,580) 5,360,232
INVESTING ACTIVITIES
Cash Received
Proceeds from sales of land and buildings 24,486 24,486
Proceeds from sales of plant and equipment 40,300 40,300
Proceeds from sales of specialist military equipment 2 2
Other cash received 595 595
Total cash received 65,383 - 65,383
Cash Used
Purchase of land and buildings (608,490) (608,490)
Purchase of plant and equipment (156,956) (156,956)
Purchase of specialist military equipment (3,603,107) (b) 9,071 (3,594,036)
Purchase of infrastructure (53,099) (53,099)
Purchase of intangibles (60,287) (60,287)
Purchase of inventory (1,446,140) (c) 33,509 (1,412,631)
Purchase of heritage and cultural assets (19) (19)
Selling costs on sale of assets (12,459) (12,459)
Finance costs (15,193) (15,193)
Total cash used
Net cash flows from (used by) investing activities
(5,955,750) 42,580 (5,913,170)
(5,890,367) 42,580 (5,847,787)
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 323
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 16D: Explanation of material adjustments to the Cash Flow Statement for year ended 30 June 2008 (continued)
Previous Adjustment for Adjusted
Balance Errors Balance
30 June 2008 30 June 2008
$'000 $’000 $'000
FINANCING ACTIVITIES
Cash Received
Appropriations – contributed equity (current year) 1,998,630 1,998,630
Total cash received 1,998,630 - 1,998,630
Cash Used
Repayment of debt (including finance lease
principal) (24,039) (24,039)
Return of contributed equity (1,490,897) (1,490,897)
Total cash used (1,514,936) - (1,514,936)
Net cash flows from (used by) finance activities 483,694 - 483,694
Net increase/ (decrease) in cash held (3,861) - (3,861)
Cash and cash equivalents at the beginning of the
reporting period 32,007 32,007
Effect of exchange rate movements on cash and cash
equivalents 1,077 1,077
Cash and cash equivalents at the end of the
reporting period 29,223 - 29,223
APPENDIX 9 FINANCIAL TRANSPARENCY
324 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 17: Income Administered on Behalf of Government
Revenue
Non-taxation revenue
Note 17A: Sale of goods and rendering of services
Rendering of services - external parties - United Nations 22 3,625
Total sale of goods and rendering of services 22 3,625
Note 17B: Fees and fines
Fees and fines 2,874 -
Total fees and fines 2,874 -
Note 17C: Interest
Deposits 244 124
Total interest 244 124
Note 17D: Dividends
Australian Government Entities - Defence Housing Australia 47,343 102,979
Competitive Neutrality Revenue - Defence Housing Australia 25,380 31,284
Total dividends 72,723 134,263
Note 17E: Military superannuation contributions
Military superannuation contributions 831,091 756,982
Total military superannuation contributions 831,091 756,982
Note 17F: Other revenue
Other 9,527 215
Total other revenue 9,527 215
Gains
Note 17G: Foreign exchange gains
Foreign exchange gains
Non-speculative 671 -
Total net gain (loss) foreign exchange 671 -
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 325
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 18: Expenses Administered on Behalf of Government
Expenses
Note 18A: Employee benefits
Superannuation 3,429,000 2,818,000
Retention benefits 36,720 31,405
Total employee benefits 3,465,720 2,849,405
Note 18B: Subsidies
Payable to related entities - Defence Force Home Loans Assistance
Subsidy 8,348 11,284
Payable to related entities - Defence Home Ownership Assistance
Scheme 26,954 -
Total subsidies 35,302 11,284
Note 18C: Grants
Public Sector:
State and Territory Governments - 26,800
Total grants - 26,800
Note 18D: Other expenses
Chartered Special Purpose Aircraft 9 4,327
Total other expenses 9 4,327
APPENDIX 9 FINANCIAL TRANSPARENCY
326 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 19: Assets Administered on Behalf of Government
Financial assets
Note 19A: Cash and cash equivalents
Administered bank account - -
Total cash and cash equivalents - -
Note 19B: Receivables
Goods and services receivable – external parties 4,712 4,316
Accrued superannuation 384 331
Dividends 47,344 44,279
Competitive neutrality 7,008 6,380
Total receivables 59,448 55,306
Receivables are aged as follows:
Not overdue 55,172 55,125
Overdue by:
Less than 30 days 20 19
30 to 60 days - -
61 to 90 days 6 41
More than 90 days 4,250 121
Total receivables 59,448 55,306
Note 19C: Investments
Commonwealth authorities - Defence Housing Australia 1,882,388 1,767,825
Total investments 1,882,388 1,767,825
Non-financial assets
Note 19D: Other non-financial assets
Prepayments - retention benefits 90,361 85,506
Total other non-financial assets 90,361 85,506
Assets are represented by:
Current 149,809 140,812
Non-current 1,882,388 1,767,825
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 327
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
$'000 $'000
Note 20: Liabilities Administered on Behalf of Government
Payables
Note 20A: Other payables
Other payables 38,444 25,242
Total other payables 38,444 25,242
Provisions
Note 20B: Employee provisions
Superannuation - DFRDB 26,689,000 22,917,000
Superannuation - MSBS 15,970,000 10,705,000
Total provisions 42,659,000 33,622,000
Liabilities are represented by:
Current 1,778,444 1,575,242
Non-current 40,919,000 32,072,000
APPENDIX 9 FINANCIAL TRANSPARENCY
328 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 21: Defined Benefit Superannuation Plans Administered on Behalf of Government
Defence administers on behalf of the Australian Government, two defined benefit superannuation plans for ADF members.
The two plans are the Defence Force Retirement and Death Benefits Scheme (DFRDB) and the Military Superannuation
and Benefits Scheme (MSBS). A general description of the plans and Defence's accounting policy for recognising actuarial
gains and losses can be found in Note 1.27(e) of these statements. The following is a reconciliation of the two plans as
required by AASB 119: Employee Benefits.
2009 2008
$'000 $'000
Defence Force Retirement and Death Benefits Scheme (DFRDB)
The amounts recognised in the balance sheet are as follows:
Present value of funded obligations
Fair value of plan assets
-
-
-
-
- -
Present value of unfunded obligations 26,689,000 22,917,000
Unrecognised past service cost - -
Net liability in balance sheet 26,689,000 22,917,000
Amounts in balance sheet:
Liabilities 26,689,000 22,917,000
Assets - -
Net liability in balance sheet 26,689,000 22,917,000
The amounts recognised in the income statement are as follows:
Current service cost 154,000 156,000
Interest on obligation 1,471,000 1,413,000
Expected return on plan assets
Past service cost
-
-
-
-
Losses (gains) on curtailments and settlements - -
Expense 1,625,000 1,569,000
Net actuarial losses (gains) recognised in equity 3,563,000 5,000
Changes in the value of the defined benefit obligation are as follows:
Net liability at 1 July
22,917,000
22,662,000
Current service cost 154,000 156,000
Interest cost 1,471,000 1,413,000
Actuarial losses (gains) 3,563,000 5,000
Benefits paid
Past service cost
(1,416,000)
-
(1,319,000)
-
Net liability as at 30 June 26,689,000 22,917,000
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 329
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
$’000
Opening balance as at 30 June 2004 -
2004-05 loss 3,528,000
30 June 2005 cumulative loss 3,528,000
2005-06 gain (2,457,000)
30 June 2006 cumulative loss 1,071,000
2006-07 gain (1,503,000)
30 June 2007 cumulative gain (432,000)
2007-08 loss 5,000
30 June 2008 cumulative gain (427,000)
2008-09 loss 3,563,000
30 June 2009 cumulative loss 3,136,000
Note 21: Defined Benefit Superannuation Plans Administered on Behalf of Government (continued)
2009 2008
$'000 $'000
Changes in the fair value of plan assets are as follows:
Opening fair value of plan assets - -
Contributions by employer 1,416,000 1,319,000
Benefits paid (1,416,000) (1,319,000)
Closing value of plan assets - -
Principle actuarial assumptions at the reporting date (expressed as weighted averages):
Discount rate at 30 June 5.60% 6.60%
Expected return on plan assets 0.00% 0.00%
Future salary increases * 4.00% 4.00%
Future pension increases 2.50% 2.50%
The principle actuarial assumptions, relating to demographics, used to update the Scheme liability at 30 June 2009 are
based on assumptions applicable as at 30 June 2008. Assumptions for the comparative financial year are based on those
which were applicable as at 30 June 2005.
* Separate promotional salary scales are used to allow for promotional salary increases.
Notes:
1. Current service cost includes the cost of benefits accruing as a result of contributions deducted from members’ salaries
that are paid into Consolidated Revenue.
2. Benefits payable under the Defence Force Retirement and Death Benefits Act 1973 are paid from Consolidated Revenue on an
emerging (or pay as you go) basis. Benefits paid under the Defence Act 1903 Determination are paid by the Department of
Defence on an emerging cost basis. Thus contributions made equal benefits paid for the DFRDB.
3. The expected employer contributions in respect of 2009-10 are $1,510m which is the expected amount of benefit
payments. Note that member contributions paid to Consolidated Revenue would be an offset to this.
4. The figures shown above include the 3% Productivity Benefit.
5. The cumulative actuarial losses and gains recognised in equity are as follows:
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 329
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
$’000
Opening balance as at 30 June 2004 -
2004-05 loss 3,528,000
30 June 2005 cumulative loss 3,528,000
2005-06 gain (2,457,000)
30 June 2006 cumulative loss 1,071,000
2006-07 gain (1,503,000)
30 June 2007 cumulative gain (432,000)
2007-08 loss 5,000
30 June 2008 cumulative gain (427,000)
2008-09 loss 3,563,000
30 June 2009 cumulative loss 3,136,000
Note 21: Defined Benefit Superannuation Plans Administered on Behalf of Government (continued)
2009 2008
$'000 $'000
Changes in the fair value of plan assets are as follows:
Opening fair value of plan assets - -
Contributions by employer 1,416,000 1,319,000
Benefits paid (1,416,000) (1,319,000)
Closing value of plan assets - -
Principle actuarial assumptions at the reporting date (expressed as weighted averages):
Discount rate at 30 June 5.60% 6.60%
Expected return on plan assets 0.00% 0.00%
Future salary increases * 4.00% 4.00%
Future pension increases 2.50% 2.50%
The principle actuarial assumptions, relating to demographics, used to update the Scheme liability at 30 June 2009 are
based on assumptions applicable as at 30 June 2008. Assumptions for the comparative financial year are based on those
which were applicable as at 30 June 2005.
* Separate promotional salary scales are used to allow for promotional salary increases.
Notes:
1. Current service cost includes the cost of benefits accruing as a result of contributions deducted from members’ salaries
that are paid into Consolidated Revenue.
2. Benefits payable under the Defence Force Retirement and Death Benefits Act 1973 are paid from Consolidated Revenue on an
emerging (or pay as you go) basis. Benefits paid under the Defence Act 1903 Determination are paid by the Department of
Defence on an emerging cost basis. Thus contributions made equal benefits paid for the DFRDB.
3. The expected employer contributions in respect of 2009-10 are $1,510m which is the expected amount of benefit
payments. Note that member contributions paid to Consolidated Revenue would be an offset to this.
4. The figures shown above include the 3% Productivity Benefit.
5. The cumulative actuarial losses and gains recognised in equity are as follows:
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 331
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 21: Defined Benefit Superannuation Plans Administered on Behalf of Government (continued)
2009 2008
$'000 $'000
Changes in the fair value of plan assets are as follows:
Opening fair value of plan assets 2,929,000 2,774,000
Expected return on plan assets 215,000 202,000
Actuarial gains and losses (612,000) (284,000)
Contributions by employer 330,000 261,000
Funded non-employer contributions 206,000 201,000
Benefits paid (257,000) (225,000)
2,811,000 2,929,000
The major categories of plan assets as a percentage of total assets are as follows:
Australian equities 19% 20%
Overseas equities 11% 13%
Property trusts 5% 7%
Private equity 18% 16%
Hedge funds 3% 6%
Infrastructure 10% 10%
Cash, debt instruments and other 34% 28%
Principle actuarial assumptions at the reporting date (expressed as weighted averages):
Discount rate at 30 June (unfunded component) 5.6% 6.6%
Discount rate at 30 June (funded component) 6.6% 6.9%
Expected return on plan assets 7.0% 7.0%
Future salary increases * 4.0% 4.0%
Future pension increases 2.5% 2.5%
The principle actuarial assumptions, relating to demographics, used to update the Scheme liability at 30 June 2009 are based
on assumptions applicable as at 30 June 2008. Assumptions for the comparative financial year are based on those which were
applicable as at 30 June 2005. * Separate promotional salary scales are used to allow for promotional salary increases.
APPENDIX 9 FINANCIAL TRANSPARENCY
332 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 21: Defined Benefit Superannuation Plans Administered on Behalf of Government (continued)
Notes:
1. Employer contributions of 3% of superannuation salary are paid into the MSBS Fund. The balance of superannuation
benefits payable, after allowing for any funded part of the benefit, under the Military Superannuation and Benefits Act 1991 are
paid from Consolidated Revenue on an emerging (or pay as you go) basis. In addition, employer salary sacrifice
contributions are paid into the MSBS fund.
2. The expected employer contributions in respect of 2009-10 are $390m.
3. The expected return on assets reflects the fact that the majority of plan assets are in growth assets which would be
expected to return a premium over fixed interest investments in the long term. In recent years, the real yield on Government
bonds has been of the order of 2.5% p.a. to 3.5% p.a. In this context, a 4.5% p.a. real rate of return on plan assets seems
reasonable giving a nominal rate of return on plan assets of 7% p.a.
4. The cumulative actuarial losses and gains recognised in equity are as follows:
$’000
Opening balance as at 30 June 2004 -
2004-05 Liability loss 2,551,000
2004-05 Asset gain (75,000)
30 June 2005 cumulative loss 2,476,000
2005-06 Liability gain (1,642,000)
2005-06 Asset gain (169,000)
30 June 2006 cumulative loss 665,000
2006-07 Liability gain (901,000)
2006-07 Asset gain (212,000)
30 June 2007 cumulative gain (448,000)
2007-08 Liability gain (365,000)
2007-08 Asset loss 284,000
30 June 2008 cumulative gain (529,000)
2008-09 Liability loss 3,179,000
2008-09 Asset loss 612,000
30 June 2009 cumulative loss 3,262,000
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 333
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 21: Defined Benefit Superannuation Plans Administered on Behalf of Government (continued)
5. The comparative figures for 2007-08 incorporate figures from the draft financial statements previously used and have not
been restated to be based on the audited financial statements for the MSBS Fund for 2007-08. The difference between the
draft net asset value and the audited net asset value as at 30 June 2008 has been included in investment income for 2008-09.
6. On 1 July 2007 the compulsory retirement age for most Defence personnel was increased from 55 to 60 years of age. As a
consequence of this change, which was unintended, death and invalidity benefits increased and had to be recalculated. An
allowance has been incorporated in the service costs for MSBS to cover the higher benefits payable (excluding invalidity C
benefits).
For the 2008-09 financial year, service costs have been increased by approximately $325m to cover the higher level of benefits
payable in respect of deaths and invalidities arising during 2007-08 and the permanent increase in benefits from 1 July 2008.
Any potential changes made to the legislation to rectify the unintended consequence of increases in benefits will not apply
retrospectively but will only apply for future accrual of benefits.
APPENDIX 9 FINANCIAL TRANSPARENCY
334 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
2009 2008
Notes $'000 $'000
Note 22: Administered Reconciliation Table
Opening administered assets less administered liabilities as at 1 July (31,738,605) (31,290,259)
Adjustment for errors - 639,749
Adjusted opening administered assets less administered liabilities as at 1 July (31,738,605) (30,650,510)
Plus: Administered income 17 917,152 895,209
Less: Administered expenses (non CAC) 18 (3,501,031) (2,891,816)
Payments to CAC Act bodies - -
Administered transfers to/from Australian Government:
Appropriation Transfers from Official Public Account
Annual Appropriations Administered Expenses (non CAC) - 26,800
Annual Appropriations for payment to CAC Act bodies - -
Special Appropriations (limited) (non CAC) 9 4,502
Special Appropriations (limited) paid to CAC Act bodies - -
Special Appropriations (unlimited) (non CAC) 1,681,293 1,529,627
Special Appropriations (unlimited) paid to CAC Act bodies - -
Transfers to Official Public Account (948,774) (875,173)
Administered revaluation taken to/from reserves 1 114,563 29,452
Actuarial gains/(loss) (7,189,854) 193,304
Closing administered assets less administered liabilities as at 30 June (40,665,247) (31,738,605)
1 Comparative administered revaluation taken to/from reserves has been updated to reflect the adjustment for error
discussed in note 27.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 335
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 23: Administered Commitments
There are no material Administered commitments to report for the current or prior year.
Note 24: Administered Contingent Liabilities and Assets
Unquantifiable Administered Contingencies
Legal Claims
During this year and prior years, ComSuper made some under payments and overpayments of pensions and benefits. While these
underpayments and overpayments have been corrected, there is a possibility of legal claims against the Commonwealth.
No claims have been received to date.
Guarantees
The Military Superannuation and Benefits Scheme (MSBS) provides occupational superannuation benefits for members of the
Australian Defence Force. Much of the day-to-day administration associated with the MSBS is conducted by ComSuper. Under the
Military Superannuation and Benefits Act 1991 the actions of ComSuper and its Commissioner are deemed to be those of the Military
Superannuation and Benefits Board (MSB Board). Defence has indemnified the MSB Board for certain specified claims that are made
in relation to acts of ComSuper and/or its Commissioner that are not recoverable elsewhere.
Contingent Assets
There are no contingent assets to report in the current or prior year.
Note 25: Administered Investments
The Australian Government holds a 100% interest in Defence Housing Australia which is a Government Business
Enterprise.
The principal activity of Defence Housing Australia is:
To deliver total housing and relocation services that meet Defence operational and client needs through a strong customer and
business focus.
APPENDIX 9 FINANCIAL TRANSPARENCY
336 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
2009
$'000
2008
$'000
(a) Categories of financial instruments
Financial Assets
Loans and receivables
Cash and cash equivalents - -
Receivables 59,448 55,306
Available for sale
Investment – Defence Housing Australia 1,882,388 1,767,825
Carrying amount of financial assets 1,941,836 1,823,131
Financial Liabilities
At amortised cost
Subsidies payable - -
Other payables 38,444 25,242
Carrying amount of financial liabilities 38,444 25,242
(b) Net income and expense from financial assets
Loans and receivables
Interest revenue - 3
Exchange gain/(loss) 671 -
Net gain/(loss) on loans and receivables 671 3
Available for sale
Dividend revenue 72,723 134,263
Net gain/(loss) on available for sale 72,723 134,263
Net gain/(loss) from financial assets
73,394 134,266
(c) Net income and expense from financial liabilities
There were no net gain/ (loss) from financial liabilities.
(d) Fair values of financial instruments
The fair values of Defence Administered financial instruments approximate their carrying amounts.
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 26: Administered Financial Instruments
Details of the significant accounting policies and methods adopted, including the criteria for recognition and the basis for
measurement in respect of each class of financial asset and financial liability are disclosed in Note 1 to the financial statements.
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
DEFEN
CE ANN
UAL REPO
RT 2008-09 VOLU
ME 1
337
Financial statements
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 26: Administered Financial Instruments (continued)
(e) Credit risk
Defence's maximum credit risk at the reporting date in relation to each class of recognised financial assets is the carrying amount of those assets as indicated in the Schedule of
Administered Items: Assets and Liabilities. Defence has endorsed policies and procedures for debt management to reduce the incidence of credit risk. The majority of goods or
services provided by Defence are provided to other government entities and employees and therefore represent minimal credit risk exposure for Defence.
The carrying amount of financial assets, net of impairment losses, reported in the Schedule of Administered Items: Assets and Liabilities represents Defence’s exposure to credit
risk. Defence has no significant exposures to any concentrations of credit risk.
Credit quality of financial assets not past due or individually determined as impaired:
Not Past Due Not Past Due Past Due or Past Due or
Nor Impaired Nor Impaired Impaired Impaired
2009 2008 2009 2008
Notes $'000 $'000 $'000 $'000
Financial assets:
Cash and cash equivalents 19A - - - -
Receivables 19B 55,172 55,125 4,276 181
Investments 19C 1,882,388 1,767,825 - -
Total 1,937,560 1,822,950 4,276 181
Ageing of financial assets past due but not impaired:
Notes
0-30 Days 31-60 Days 61-90 Days Over 90 Days Total
2009 2008 2009 2008 2009 2008 2009 2008 2009 2008
$’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000
Financial assets:
Receivables 19B 20 19 - - 6 41 4,250 121 4,276 181
Total 20 19 - - 6 41 4,250 121 4,276 181
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
338D
EFENCE AN
NU
AL REPORT 2008-09 VO
LUM
E 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 26: Administered Financial Instruments (continued)
(f) Liquidity risk
Defence's administered financial liabilities are payables. The exposure to liquidity risk is based on the notion that Defence will encounter difficulty in meeting its obligations associated with
financial liabilities. This is highly unlikely due to appropriation funding and mechanisms available to Defence (e.g. Advance to the Finance Minister) and internal policies and procedures put
in place to ensure there are appropriate resources to meet its financial obligations. The followings table illustrates the maturities for financial liabilities
Financial liabilities:
On demand Within 1 year 1 to 2 years 2 to 5 years > 5 years Total
2009 2008 2009 2008 2009 2008 2009 2008 2009 2008 2009 2008
Note $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000
Other payable 20A 33,704 24,760 4,740 482 - - - - - - 38,444 25,242
Total 33,704 24,760 4,740 482 - - - - - - 38,444 25,242
(g) Market risk
Defence Administered has no material exposure to currency risk, interest rate risk or other price risk.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 339
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 27: Administered Accounting for Errors
(a) In Defence’s 2007-08 financial statements, a receivable from the United Nations of $3.585m was not reported. In the
2008-09 financial statements, the 2007-08 comparative year amounts for receivables and sale of good and rendering of
services revenue have been restated.
(b) Under the Finance Ministers Orders for Financial Reporting 2008-09 Administered Investments in Portfolio Entities are
required to be measured at fair value. In previous financial years, Defence measured its Administered Investment in
Defence Housing Authority (DHA) based on DHA’s net assets as reported in DHA’s published financial statements.
These statements were prepared on a ‘for profit’ basis, with DHA’s investments measured at historical cost in accordance
with AASB 140 Investment Properties. In 2008-09, Defence measured its investment in DHA based on DHA’s ‘not for
profit’ financial statements. These statements are prepared for whole of government reporting purposes only and measure
DHA’s investments at fair value in accordance with AASB 116 Property, Plant & Equipment.
The change in the measurement of Defence’s investment in DHA is a prior period error. Retrospective adjustments have
been made in Defence’s 2008-09 financial statements in accordance with AASB 108 Accounting Policies, Changes in
Accounting Estimates and Errors, which increase Defence’s investment in DHA by $639.749m as at 1 July 2007 and
$698.382 at 30 June 2008.
Financial Assets administered on behalf of Government at 1 July 2007
Previous Balance 1 July 2007
Adjustment for Errors
Adjusted Balance 1 July 2007
Financial assets
Cash and cash equivalents Receivables Investments
Total financial assets
$'000
39 490
1,098,624 1,099,153
$'000
-
$'000
39 490
1,738,373 1,738,902
(b) 639,749
639,749
Financial Assets administered on behalf of Government at 30 June 2008
Previous Balance Adjustment for Adjusted Balance 30 June 2008 Errors 30 June 2008
$'000 $'000 $'000
Financial assets Cash and cash equivalents - - - Receivables 51,721 (a) 3,585 55,306 Investments 1,069,443 (b) 698,382 1,767,825 Total financial assets 1,121,164 701,968 1,823,131
APPENDIX 9 FINANCIAL TRANSPARENCY
340 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 27: Administered Accounting for Errors (continued)
Income administered on behalf of Government in 2007-08
Previous Balance 2007-08
Adjustment for Errors
Adjusted Balance 2007-08
Non-taxation Revenue Revenue Sale of goods and rendering of services Fees and fines Interest Dividends Military Superannuation contributions Other Revenue Total non-taxation revenue Total revenues administered on behalf of Government
$'000
40 -
124 134,263
756,982 215
891,624
891,624
(a)
$'000
3,585 - - -
- -
3,585
3,585
$'000
3,625 -
124 134,263 756,982 3,800 895,209
895,209
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 341
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 28: Appropriations
As per Note 1, Defence is structured to meet three outcomes:
Outcome 1: Australia’s national interests are protected and advanced through the provision of military capabilities and the promotion of security and stability;
Outcome 2: Military operations and other tasks directed by Government to achieve the desired results; and
Outcome 3: Defence’s support to the Australian community and civilian authorities achieves the desired results.
Accordingly for Tables A to C below, all items are attributable to three outcomes.
Note 28A: Acquittal of Authority to Draw Cash from the Consolidated Revenue Fund for Ordinary Annual Services Appropriations
Particulars Departmental Outputs Total
2009 2008 2009 2008
$’000 $’000 $’000 $’000
Balance brought forward from previous period (Appropriation
Acts)
Appropriation Act:
Appropriation Act (No. 1) 2008-09
Appropriation (NTER) Act (No. 1) 2007-08
Appropriation Act (No. 3) 2008-09
Departmental appropriations reduced (Appropriation Act s10)
Comcover receipts (Appropriation Act s12)
Advance to the Finance Minister (Appropriation Act s14)
FMA Act:
Repayments to the Commonwealth) (FMA Act s30)
Appropriations to take account of recoverable GST (FMA
Act s30A)
Relevant Agency receipts (FMA Act s31)
Total appropriation available for payments
Cash payments made during the year (GST inclusive)
Balance of Authority to Draw Cash from the Consolidated
Revenue Fund for Ordinary Annual Services
Appropriations and as represented by:
182,574
19,392,037
-
839,176
(3,296)
-
-
205,635
514,113
658,424
202,236
19,170,126
15,500
507,641
-
1,026
-
823,825
459,476
638,931
182,574
19,392,037
-
839,176
(3,296)
-
-
205,635
514,113
658,424
202,236
19,170,126
15,500
507,641
-
1,026
-
823,825
459,476
638,931
21,788,663 21,818,761 21,788,663 21,818,761
(21,487,951) (21,636,187) (21,487,951) (21,636,187)
300,712 182,574 300,712 182,574
Cash at bank and on hand
Departmental appropriations receivable
GST receivable from the ATO
Adjustments under s101.13 of the Finance Minister’s Orders
not reflected above
28,088
244,608
65,111
(37,095)
29,223
99,361
53,990
-
28,088
244,608
65,111
(37,095)
29,223
99,361
53,990
-
Total as at 30 June 300,712 182,574 300,712 182,574
APPENDIX 9 FINANCIAL TRANSPARENCY
342 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 28: Appropriations (continued)
Note 28B: Acquittal of Authority to Draw Cash from the Consolidated Revenue Fund for Other
than Ordinary Annual Services Appropriations
Operating
Outcome 1Non-operating Total
Particulars
SPP Equity Previous Years’
Outputs
2009
$’000
2008
$’000
2009
$’000
2008
$’000
2009
$’000
2008
$’000
2009
$’000
2008
$’000
Balance brought forward from
previous period (Appropriation Acts) - - 83,828 83,828 64,174 - 148,002 83,828
Appropriation Act:
Appropriation Act (No.2) 2008-09 23,300 - 2,365,736 1,998,630 - 64,174 2,389,036 2,062,804
Appropriation Act (No.4) 2008-09 - 26,800 - - - - - 26,800
Appropriation Act (No. 6) 2008-09 - - - - - - - -
Departmental appropriations
reduced (Appropriation Act s13) - - (560,556) (1,474,315) - - (560,556) (1,474,315)
CAC Act body payment items - - - - - - - -
reduced (Appropriation Act s14)
FMA Act
Repayments to the
Commonwealth (FMA Act s30) - - - - - -
Appropriations to take account of - - - - - - - -
recoverable GST (FMA Act s30A)
Total appropriations available for 23,300 26,800 1,889,008 608,143 64,174 64,174 1,976,482 699,117
payments
Cash payments made during the year - (26,800) (1,889,008) (524,315) (64,174) (1,953,182) (551,115)
(GST inclusive)
Balance of Authority to Draw Cash
from the Consolidated Revenue Fund
for Other Than Ordinary Annual 23,300 - - 83,828 - 64,174 23,300 148,002
Services Appropriations and as
represented by:
Cash at bank and on hand - - - - - - - -
Departmental appropriations - - 104,306 83,828 - 64,174 104,306 148,002
receivable
Undrawn, unlapsed administered
appropriations 23,300 - - - - - 23,300 -
Adjustments under s101.13 of the
Finance Minister’s Orders not
reflected above
- - (104,306) - - - (104,306) -
Total as at 30 June 23,300 - - 83,828 - 64,174 23,300 148,002
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 343
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 28: Appropriations (continued)
Particulars
Operating Non-operating
Total Outcome 1 Equity
Previous Years’
Outputs SPP
2009 2008 2009 2008 2009 2008 2009 2008
1Reduction in administered items
Total administered items appropriated 23,300,000 - - - - - 23,300,000 -
Less administered items required per
Appropriation Act s12:
Appropriation Act (No.2) 2008-09 - - - - - - - -
Appropriation Act (No.4) 2008-09
Appropriation Act (No. 6) 2008-09 - - - - - - - -
Other annual appropriation acts
Total administered items required
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - - - - - - -
Total reduction in administered
items – effective 2009-2010 23,300,000 - - - - - 23,300,000 -
1 This is the first year of administered items being reduced under section 12. Numbers in this table are not rounded.
Note 28C: Acquittal of Authority to Draw Cash from the Consolidated Revenue Fund - Administered Special Appropriations
(Unlimited Amount)
The responsible agency is Defence and ComSuper has drawn against the following Special Administered Appropriations
(Unlimited Amount)
Defence Force Retirement Benefits Act 1948
Purpose: The Defence Force Retirement Benefits Act 1948 is an act to provide Retirement Benefits for
Members of the Defence Force who enlisted before 1 October 1972, and for other purposes.
All transactions under this Act are disclosed as administered items
2009 2008
Outcome 1
$’000 $’000
Cash payments made during the year
Appropriations credited to Special Accounts
(66,280)
-
(67,015)
-
Repayments to the Commonwealth (FMA Act s30)
Total charged to appropriation
- -
(66,280) (67,015)
Estimated Actual * **(91,639)
APPENDIX 9 FINANCIAL TRANSPARENCY
344 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 28: Appropriations (continued)
Defence Force Retirement and Death Benefits Act 1973
Purpose: Defence Force Retirement and Death Benefits Act 1973 is an act to make provision for and in
relation to a Scheme for Retirement and Death Benefits for Members of the Defence Force who enlisted before
1 October 1991.
All transactions under this Act are disclosed as administered items
2009 2008
Outcome 1
$’000
$’000
Cash payments made during the year
Appropriations credited to Special Accounts
Repayments to the Commonwealth (FMA Act s30)
Total charged to appropriation
(1,317,920)
-
2,229
(1,228,488)
-
1,964
(1,315,691) (1,226,524)
Estimated Actual * ** (1,442,361)
Military Superannuation and Benefits Act 1991
Purpose: Military Superannuation and Benefits Act 1991 is an Act to make provision for and in relation to
an occupational superannuation scheme for, and the payment of other benefits to members of the Defence
Force, and for related purposes.
All transactions under this Act are disclosed as administered items
2009 2008
Outcome 1
$’000 $’000
Cash payments made during the year
Appropriations credited to Special Accounts
Repayments to the Commonwealth (FMA Act s30)
Total charged to appropriation
(223,888)
-
116
(193,060)
-
115
(223,772) (192,945)
Estimated Actual * ** (1,215,600)
The responsible agency is Defence and Defence has drawn against the following Special Administered Appropriations
(Unlimited Amount)
Defence Force (Home Loans Assistance) Act 1990
Purpose: Defence Force (Home Loans Assistance) Act 1990 is an Act to provide for the payment of home loan
subsidies in respect of certain members of the Defence Force and certain other persons, and for related purposes.
All transactions under this Act are disclosed as administered items
2009 2008
Outcome 1
$’000 $’000
Cash payments made during the year (8,550)
-
-
(12,200)
-
-
(8,550) (12,200)
Appropriations credited to Special Accounts
Repayments to the Commonwealth (FMA Act s30)
Total charged to appropriation
Estimated Actual (8,909) ** (11,250)
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 345
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 28: Appropriations (continued)
Military Superannuation and Benefits Act 1991
Purpose: Military Superannuation and Benefits Act 1991 is an Act to make provision for and in relation to
retention benefits for ADF personnel.
2009 2008
Outcome 1
All transactions under this Act are disclosed as administered items $’000 $’000
Cash payments made during the year (42,400) (28,864)
Appropriations credited to Special Accounts - -
Repayments to the Commonwealth (FMA Act s30)
Total charged to appropriation
- -
(42,400) (28,864)
Estimated Actual (42,000) **(42,000)
Defence Home Ownership Assistance Scheme Act 2008
Purpose: Defence Home Ownership Assistance Scheme Act 2008 is an Act to provide financial assistance to
members of the Defence Force, and certain other persons, for the purchase, maintenance and development of
their homes, and for related purposes.
All transactions under this Act are disclosed as administered items
2009 2008
Outcome 1
$’000 $’000
Cash payments made during the year (22,255) -
Appropriations credited to Special Accounts - -
Repayments to the Commonwealth (FMA Act s30)
Total charged to appropriation
- -
(22,255) -
Estimated Actual (43,989) ** 0
2009 2008 Totals for Unlimited Special Administered Appropriations
Outcome 1
$’000 $’000
Cash payments made during the year (1,681,293) (1,529,627)
Appropriations credited to Special Accounts - -
Repayments to the Commonwealth (FMA Act s30) 2,345 2,079
Total charged to appropriation (1,678,948) (1,527,548)
Estimated Actual *(3,332,898) ** (2,802,850)
*2008-09 full year estimated actual as published in the 2009-10 PBS. The total cannot be allocated between the DFRB, DFRDB
and MSBS.
** 2007-08 full year estimated actual as published in the 2008-09 PBS
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
346D
EFENCE AN
NU
AL REPORT 2008-09 VO
LUM
E 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 28: Appropriations (continued)
Note 28D: Disclosure by Agent in relation to Appropriations
Parliamentary Entitlements Act 1990
Purpose: An act relating to the provision of benefits to the
Members of each House of Parliament for charter of
Special Purpose Aircraft. This act is administered by the
Department of Finance and Deregulation.
All transactions under this Act are disclosed as
Department of Defence Total
Departmental Administered Departmental Administered
2009 2008 2009 2008 2009 2008 2009 2008
$’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000
Total receipts - - 9 4,502 - - 9 4,502
Total payments - - (9) (4,502) - - (9) (4,502)
Balance - - - - - - - -
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 347
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 28: Appropriations (continued)
Note 28E: Acquittal of Authority to draw cash from the Consolidated Revenue Fund – Special Appropriations*
No special appropriations were drawn upon by Defence under the following legislation containing Special
Appropriation clauses that are administered by the Department.
1 Air Force Act 1923
2 Approved Defence Projects Protection Act 1947
3 Cockatoo and Schnapper Islands Act 1949
4 Commonwealth and State Housing Agreement (Service Personnel) Act 1990
5 Control of Naval Waters Act 1918
Defence Act 1903, except to the extent administered by the Prime Minister and the Attorney-General and other 6
than sections 58F to 58Q, 61, 61A, 61B, 61C, 118A and 118B and paragraph 124(1)(qba)
7 Defence Force Discipline Act 1982
8 Defence Force Retirement and Death Benefits (Pension Increases) Acts
9 Defence Forces Retirement Benefits (Pension Increases) Acts
10 Defence Forces Special Retirement Benefits Act 1960
11 Defence Housing Australia Act 1987
12 Defence Reserve Service (Protection) Act 2001
13 Defence (Parliamentary Candidates) Act 1969
14 Defence (Road Transport Legislation Exemption) Act 2006
15 Defence (Special Undertakings) Act 1952
16 Explosives Act 1961
17 Geneva Conventions Act 1957, Part IV
Intelligence Services Act 2001, in so far as it relates to that part of the Department of Defence known as the
18 Defence Intelligence and Geospatial Organisation, the Defence Intelligence Organisation and the Defence Signals
Directorate
Military Rehabilitation and Compensation Act 2004, Chapter 3, in relation to rehabilitation of serving members
19 of the Australian Defence Force; and Chapter 6, in relation to treatment for injuries and diseases of serving
members of the Australian Defence Force
20 Naval Defence Act 1910
21 Royal Australian Air Force Veterans' Residences Act 1953
22 Services Trust Funds Act 1947
23 War Gratuity Act 1945
24 War Service Estates Act 1942
25 Weapons of Mass Destruction (Prevention of Proliferation) Act 1995
26 Williamstown Dockyard Employees Act 1987
* Other FMA agencies may utilise the Special Appropriations contained within these Acts. Amounts drawn down by
other agencies are required to be reported in their own financial statements.
The Department of Veteran's Affairs is part of the Defence Portfolio and is responsible for various legislation. Refer to
Department of Veteran Affairs 2008-09 Financial Statements for details.
APPENDIX 9 FINANCIAL TRANSPARENCY
348 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 29: Special Accounts
2009 2008
$’000 $’000
Services for other Governments and Non-Agency Bodies Account (Special Public Moneys)
Legal Authority: Financial Management and Accountability Act 1997 s20 and s21
Appropriation: Financial Management and Accountability Act 1997 s20 and s21
Purpose: For expenditure in connection with services performed on behalf of other Governments and Non-Agency Bodies. This account was abolished
and replaced by the Services for Other Entities and Trust Moneys Special Account on 25 June 2009.
This account is non-interest bearing.
Balance carried from previous period 58,444 23,484
Costs recovered 63,374 63,208
GST credits (FMA Act section 30A) 3,073 1,997
Total credits 124,891 88,689
Payments made to suppliers (43,410)
(30,245)
Transfer to Service for Other Entitles and Trust Moneys Special Account (81,481) -
Total debits (124,891) (30,245)
Balance carried forward to next period and represented by: - 58,444
Cash - transferred to the Official Public Account - 58,444
Total balance carried to the next period
- 58,444
Note: Payments made to suppliers was previously overstated by $42,216.75 in 2007-08 due to credit payments which
had not been reflected on the Appropriation and Cash Management (ACM) system. ACM was updated in early July
2008 so that the current position is correct.
Defence Endowments Special Account (Special Public Moneys)
Legal Authority: Financial Management and Accountability Act 1997 s20
Appropriation: Financial Management and Accountability Act 1997 s20
Purpose: For expenditure in accordance with the conditions of each endowment.
The Defence Endowments Account was replaced with the newly established Defence Endowments Special Account on 23 June 2009. There were
no significant changes to the operation of this account.
This account is interest bearing.
Balance carried from previous period 297 306
Costs recovered - -
GST credits (FMA Act section30A) 1 -
Other receipts 46 27
Total credits 344 333
Payments made to recipients (31) (36)
Total debits (31) (36)
Balance carried forward to next period and represented by: 313 297
Cash - transferred to the Official Public Account 313 297
Total balance carried to the next period 313 297
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 349
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 29: Special Accounts (continued)
2009
$’000
2008
$’000
Fedorczenko Legacy Special Account (Special Public Moneys)
Legal Authority: Financial Management and Accountability Act 1997 s20
Appropriation: Financial Management and Accountability Act 1997 s20
Purpose: For expenditure in relation to the defence of Australia of the residue of the estate of the late Petro Fedorczenko.
The Fedorczenko Legacy Fund Account was replaced with the newly established Fedorczenko Legacy Special Account on 23 June 2009. There
were no significant changes to the operation of this account.
This account is interest bearing.
Balance carried from previous period 156 160
Other receipts 11 10
Total credits 167 170
Payments made to suppliers - (14)
Total debits - (14)
Balance carried forward to next period and represented by: 167 156
Cash - transferred to the Official Public Account 167 156
Total balance carried to the next period 167 156
Other Trust Moneys Account (Special Public Moneys)
Legal Authority: Financial Management and Accountability Act 1997 s20 and s21
Appropriation: Financial Management and Accountability Act 1997 s20 and s21
Purpose: For expenditure of moneys temporarily held on trust or otherwise for the benefit of a person other than the Commonwealth.
This account was abolished and replaced by the Services for Other Entities and Trust Moneys Special Account on 25 June 2009.
This account is non-interest bearing.
Balance carried from previous period 2,058 4,271
Costs recovered 4,084 3,053
GST credits (FMA section30A) 15 (16)
Total credits 6,157 7,308
Payments made to suppliers (3,238) (5,250)
Transfer to Services for Other Entities and Trust Moneys Special Account (2,919) -
Total debits (6,157) (5,250)
Balance carried forward to next period and represented by: - 2,058
Cash - transferred to the Official Public Account - 2,058
Total balance carried to the next period - 2,058
APPENDIX 9 FINANCIAL TRANSPARENCY
350 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 29: Special Accounts (continued)
2009 2008
$’000 $’000
Young Endeavour Youth Program Special Account (Special Public Moneys)
Legal Authority: Financial Management and Accountability Act 1997 s20
Appropriation: Financial Management and Accountability Act 1997 s20
Purpose: For the receipt and payment of money in connection with the operations and activities of the STS Young Endeavour, as specified by the
Young Endeavour Program Board of Management or by the Commonwealth.
The Young Endeavour Youth Program Operating Fund Accounts (YEYPOFA) was replaced with the Young Endeavour Youth Program Special
Account (YEYPSA) established on 17th March 2009. There was no significant change to the operation of this special account.
This account is interest bearing.
Balance carried from previous period 866 875
Costs recovered 99264
GST credits (FMA section30A) (3)
(15)
Total credits 1,127 959
Payments made to suppliers (184) (93)
Total debits (184) (93)
Balance carried forward to next period and represented by: 943 866
Cash - transferred to the Official Public Account 943 714
Cash - held by Defence - 152
Total balance carried to the next period 943 866
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 351
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 29: Special Accounts (continued)
2009 2008
$’000 $’000
Services for Other Entities and Trust Moneys – Defence Special Account (Special Public Moneys)
Legal Authority: Financial Management and Accountability Act 1997 s20
Appropriation: Financial Management and Accountability Act 1997 s20
Purpose: This account was created to disburse amounts held on trust or otherwise for the benefit of persons other than the Commonwealth. This
account amalgamates the provisions of the Other Trust Moneys and Services for Other Governments special accounts, and provides an additional
debiting clause to reduce the special account by amounts that are not Special Public Money. This special account was established on 24 June 2009.
This account is non interest bearing.
Balance carried from previous period - -
Costs recovered 6 -
GST credits (FMA section30A) 208 -
Transfer from Services for other Government and Non-agency Bodies
Special Account 81,481 -
Transfer from Other Trust Moneys Special Account 2,919 -
Total credits 84,614 -
Payments made to suppliers (9,695) -
Total debits (9,695) -
Balance carried forward to next period and represented by: 74,919 -
Cash - transferred to the Official Public Account 74,919 -
Total balance carried to the next period 74,919 -
APPENDIX 9 FINANCIAL TRANSPARENCY
352 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 30: Compensation and Debt Relief
Compensation and Debt Relief- Administered
No 'Act of Grace' expenses were incurred during the reporting
period (2007-08: 284 expenses)*.
No waivers of amounts owing to the Australian Government were
made pursuant to subsection 34(1) of the Financial Management and
Accountability Act 1997 (2007-08: No waivers).
No ex-gratia payments were provided for during the reporting
period (2007-08: No payments). - -
2009
$
-
No expenses were paid on a periodic basis (2007-08: 284 periodic
expenses amounting to $96,934). No amounts were outstanding in
relation to payments being made on a periodic basis as at 30 June
2009 ($1,470,000 at 30 June 2008). This estimate was determined
by the Australian Government Actuary**. - -
-
2008
$
96,934
-
* All current year Act of Grace payments were made from Departmental funding.
* * ComSuper made ‘Act of Grace’ payments from Defence’s administered special appropriation.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 353
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 30: Compensation and Debt Relief (continued)
2009 2008
$ $
Compensation and Debt Relief- Departmental
19 'Act of Grace' payments made during the reporting period
pursuant to authorisation given under s33 (1) of the Financial
Management and Accountability Act 1997 (2007-08: 3 payments
made).
292,251 81,483
There was 1‘Act of Grace’ payments outstanding at the end of
the reporting period (2007-08: 0 payments outstanding). 11,419 -
5 waivers of amounts owing to the Commonwealth made during
the reporting period pursuant to subsection 34(1) of the Financial
Management and Accountability Act 1997 (2007-08: 20 waivers
made). 135,982 230,797
19 ex-gratia payments made during the reporting period (2007-
08: 8 payments made). 790,000 187,092
1 ex-gratia payment outstanding at the end of the reporting
period (2007-08: 6 payments outstanding). 40,000 210,000
24 payments made under 'Defective Administration Scheme'
during the reporting period (2007-08: 23 payments made). 734,091 542,578
There were 0 payments outstanding under the ‘Defective
Administration Scheme’ (2007-08: 6 payments outstanding). - 84,949
0 payments were made during the reporting period under s73
of the Public Service Act 1999 (2007-08: 3 payments made). - 20,316
There were 0 payments outstanding under s73 of the Public
Service Act 1999 at 30 June 2009 (2007-08: 0 payments
outstanding). - -
APPENDIX 9 FINANCIAL TRANSPARENCY
354 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 31: Assets Held in Trust
2009 2008
$’000 $’000
Young Endeavour Youth Program Public Fund (Trust)
Legal Authority: Financial Management and Accountability Act 1997 s20.
Appropriation: Financial Management and Accountability Act 1997 s20.
Purpose: To create a capital fund for the purpose of furthering youth development initiatives, to make specific acquisitions and to support the Young
Endeavour Youth Scheme through sail training for young Australians.
The fund is listed as a deductible gift recipient.
This account is interest bearing.
Balance carried from previous period 152 147
Other receipts 742 6
Total credits 894 153
Payments made to suppliers - (1)
Total debits - (1)
Balance carried forward to next period 894 152
This balance has been disclosed as “Cash – Transferred to OPA” in Note 29 Special Accounts – Young Endeavour Youth Program
Special Account (Special Public Moneys).
Peter Mitchell Trust Fund (Trust)
Legal Authority: Financial Management and Accountability Act 1997 s20
Appropriation: Financial Management and Accountability Act 1997 s20
Purpose: For expenditure of moneys temporarily held on trust or otherwise for the benefit of a person other than the Commonwealth.
Balance carried from previous period 1 1
Other receipts 11 9
Total credits 12 10
Payments made to suppliers (10) (9)
Total debits (10) (9)
Balance carried forward to next period and represented by: 2 1
Cash – transferred to the Official Public Account 2 1
This balance has been included under Other Trust Moneys in Note 29 Special Accounts and after the 24th June 2009 in Services for
Other Entities and Trust Moneys (Special Public Moneys).
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 355
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 31: Assets Held in Trust (continued)
2009 2008
$’000 $’000
RAAF Air Power Conference (Trust)
Legal Authority: Financial Management and Accountability Act 1997 s20
Appropriation: Financial Management and Accountability Act 1997 s20
Purpose: For expenditure of moneys temporarily held on trust or otherwise for the benefit of a person other than the Commonwealth.
Balance carried from previous period 228 197
Other receipts - 31
Total credits 228 228
Payments made to suppliers - -
Total debits - -
Balance carried forward to next period and represented by: 228 228
Cash – transferred to the Official Public Account 228 228
This balance has been included under Other Trust Moneys in Note 29 Special Accounts and after the 24th June 2009 in Services for
Other Entities and Trust Moneys (Special Public Moneys).
APPENDIX 9 FINANCIAL TRANSPARENCY
356 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 31: Assets Held in Trust (continued)
Comcare Trust Account (Trust)
Legal Authority: Financial Management Accountability Act 1997 s21.
Appropriation: Financial Management Accountability Act 1997 s21.
Purpose: Moneys held in trust and advanced to Defence by Comcare for the purposes of distributing compensation payments made in accordance with the
Safety Rehabilitation and Compensation Act 1998.
The transactions of the account have been disclosed in Note 29 Special Accounts - Services for Other Governments and Non-Agency
Bodies and after the 24th June 2009 in Services for Other Entities and Trust Moneys (Special Public Moneys).
Defence Endowments Special Account (Trust)
The transactions of the account have been disclosed in Note 29 of Special Accounts.
Fedorczenko Legacy Fund Special Account (Trust)
The transactions of the account have been disclosed in Note 29 of Special Accounts.
Non-Cash Assets
Defence accommodates and operates some non-cash assets on behalf of other governments; however, their disclosure
would compromise the activities of these assets. In accordance with clauses 17.6 and 38.4 of the FMOs the Minister for
Finance granted an exemption from disclosing these assets. Assets that can be declared amount to $20,196.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 357
Fina
ncia
l sta
tem
ents
Department of Defence NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS for the period ended 30 June 2009
Note 32: Reporting of Outcomes
As per Financial Statement Note 1, Defence is structured to meet three outcomes, as follows:
OUTCOME 1. AUSTRALIA’S NATIONAL INTERESTS ARE PROTECTED AND ADVANCED
THROUGH THE PROVISION OF MILITARY CAPABILITIES AND THE PROMOTION OF
SECURITY AND STABILITY
1.1 Office of the Secretary and CDF
1.2 Navy Capabilities
1.3 Army Capabilities
1.4 Air Force Capabilities
1.5 Intelligence Capabilities
1.6 Defence Support
1.7 Defence Science and Technology
1.8 Chief Information Officer
1.9 Vice Chief of the Defence Force
1.10 Joint Operations Command
1.11 Capability Development
1.12 Chief Finance Officer
1.13 People Strategies and Policy
1.14 Superannuation and Housing Support Services for Current and Retired Defence Personnel and
other Administered Items
OUTCOME 2. MILITARY OPERATIONS AND OTHER TASKS DIRECTED BY
GOVERNMENT TO ACHIEVE THE DESIRED RESULTS
2.1 Operations Contributing to the Security of the Immediate Neighbourhood
2.2 Operations Supporting Wider Interests
OUTCOME 3. DEFENCE’S SUPPORT TO THE AUSTRALIAN COMMUNITY AND CIVILIAN
AUTHORITIES TO ACHIEVE THE DESIRED RESULTS
3.1 Defence Contribution to National Support Tasks in Australia
APPENDIX 9 FINANCIAL TRANSPARENCY
358 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
This page is intentionally blank
Fina
ncia
l sta
tem
ents
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 359
Department of DefenceNOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTSfor the year ended 30 June 2009
Note 32: Reporting of Outcomes
Table 32A: Net Cost of Outcome Delivery
Outcome 1 Outcome 2 Outcome 3 Payments to CAC Act bodies Total Outcomes2009 2008 2009 2008 2009 2008 2009 2008 2009 2008$'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000
ExpensesAdministered 3,501,031 2,891,816 3,501,031 2,891,816Departmental 21,866,049 20,883,782 735,970 762,055 14,557 23,941 22,616,576 21,669,778
Total expensesCosts recovered from provision of goods and services to the non-government sector
25,367,080 23,775,598 735,970 762,055 14,557 23,941 - - 26,117,607 24,561,594
Administered 9,527 215 9,527 215Departmental 99,992 109,937 5,448 12,138 - 678 105,440 122,753
Total costs recovered 109,519 110,152 5,448 12,138 - 678 - - 114,967 122,968Other external incomeAdministered
RevenueNon-taxation
Goods and services 22 3,625 22 3,625Fees and Fines 2,874 - 2,874 -Interest 244 124 244 124Dividends 72,723 134,263 72,723 134,263Military superannuation 831,091 756,982 831,091 756,982Other sources of non-taxation revenues - - - -
Total revenue 906,954 894,994 - - - - - - 906,954 894,994Gains
Net foreign exchange gains 671 - 671 -Total gains 671 - - - - - - - 671 -
Total administered income 907,625 894,994 - - - - - - 907,625 894,994Departmental
RevenueGoods and services revenue 623,476 566,255 623,476 566,255Rental Income 9,083 7,073 - - - - 9,083 7,073Other revenue 23,436 42,556 - - - - 23,436 42,556Total revenue 655,995 615,884 - - - - - - 655,995 615,884
GainsReversals of previous asset write-downs 642,299 648,476 - - - - 642,299 648,476Foreign Exchange Gains - 1,077 - - - - - 1,077Other gains 1,424 3,295 - - - - 1,424 3,295
Total gains 643,723 652,848 - - - - - - 643,723 652,848Total departmental income 1,299,718 1,268,732 - - - - - - 1,299,718 1,268,732Total other external income 2,207,343 2,163,726 - - - - - - 2,207,343 2,163,726Net cost/(contribution) of outcome 23,050,217 21,501,720 730,522 749,918 14,557 23,263 - - 23,795,297 22,274,900
APPENDIX 9 FINANCIAL TRANSPARENCY
360 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
Output 1.1 Output 1.2 Output 1.3 Output 1.4 Output 1.5 Output 1.6 Output 1.7 Output 1.8 Output 1.9 Output 1.10 Output 1.11 OOutcome 1 Output 1.1 Output 1.2 Output 1.3 Output 1.4 Output 1.5 Output 1.6 Output 1.7 Output 1.8 Output 1.9 Output 1.10 Output 1.11
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
2009$'000
2008$'000
Departmental expensesEmployee Benefits 53,152 1,172,204 2,389,312100,604 1,349,977 2,703,106 1,375,132 1,216,926 228,284 256,727 965,967 925,768 254,767 253,154 102,532 87,357 483,576 428,619 67,142 62,579 32,387 30,964Suppliers 103,710 17,787 1,438,937 405,821 1,586,058 584,244 1,538,505 586,990 219,887 269,411 1,564,097 1,568,176 138,529 143,786 445,957 463,117 589,021 512,193 26,511 34,788 96,848 44,017Grants 3,204 494 - 4,609 10,104 56 - 5 - - 1,041 12,836 - - - - - - - - - -Depreciation and amortisation 1,858 381 1,080,237 1,045,310 630,188 513,143 1,181,965 1,080,238 53,611 54,260 754,482 696,886 20,456 18,721 127,684 114,740 8,011 1,278 1,924 1,747 680 472Finance costs - - 4,749 2,808 1,654 414 6,975 3,545 - - 67,362 21,818 - - 13,621 - - - - - - -Write-down and impairment of assets 1,111 796 178,567 342,374 298,805 49,671 81,372 117,177 3,363 37,795 81,227 110,531 637 125 12,350 19,590 609,522 462,172 141 401 14 3Losses from asset sales (201) (5) 84,983 - (3,474) (2,097) (2,300) 1 453 (53) 12,489 1,314 6 4 (53) (13) 26 3,451 1 - - -Foreign exchange losses 5 - - - - - 4 - - - (32) - - - - - - - 2 - - -Other expenses - - 12 (54) 2,110 67 340 95 - - 22,466 54,644 - - - - - - - - - -
Total departmental expenses 210,291 72,605 4,137,462 2,973,072 5,228,551 3,534,810 4,181,993 3,004,977 505,598 618,139 3,469,097 3,391,973 414,395 415,790 702,091 684,791 1,690,156 1,407,713 95,721 99,515 129,929 75,456Funded by:Revenue
Revenues from Government 184,039 62,719 3,620,958 2,568,228 4,575,839 3,053,473 3,659,929 2,595,788 442,481 533,968 3,036,030 2,930,088 362,664 359,172 614,445 591,616 1,479,164 1,216,025 83,771 85,964 113,709 65,181Sale of goods and rendering of services 1,403 830 41,165 36,453 54,475 50,470 100,331 100,796 1,736 20,769 221,344 203,743 38,886 37,584 1,141 16,666 261,350 207,658 (47) 369 - 2Rental Income 15 - - - - - - - - 57 8,629 6,870 - - - - 439 149 - - - -Other revenue 1,696 2,640 228 (32,948) 586 583 401 478 781 1,206 4,003 2,680 85 197 1,042 844 1,714 40,935 212 44 189 309
Total revenue 187,153 66,189 3,662,351 2,571,733 4,630,900 3,104,526 3,760,661 2,697,062 444,998 556,000 3,270,006 3,143,381 401,635 396,953 616,628 609,126 1,742,667 1,464,767 83,936 86,377 113,899 65,492Gains
Reversal of previous asset write-downs 122 2 116,320 35,701 158,868 90,420 175,474 36,466 2,010 149 65,328 47,898 518 623 3,285 60,737 109,022 137,198 94 - 1 -Foreign exchange gains - - - 1 - (19) - - - 0 - - - - - - - - - - - -Other gains - - 525 - 1 - 103 - - - 796 (18,372) - - - - - - - - - -
Total gains 122 2 116,845 35,702 158,869 90,401 175,577 36,466 2,010 149 66,124 29,526 518 623 3,285 60,737 109,022 137,198 94 - 1 -Total departmental income 187,275 66,191 3,779,196 2,607,435 4,789,769 3,194,927 3,936,238 2,733,528 447,008 556,149 3,336,130 3,172,907 402,153 397,576 619,913 669,863 1,851,689 1,601,965 84,030 86,377 113,900 65,492
Outcome 2 Output 2.1 Output 2.2 Total Outcome 22009 2008 2009 2008 2009 2008
Departmental expensesEmployee BenefitsSuppliersGrantsDepreciation and amortisationFinance costsWrite-down and impairment of assetsLosses from asset salesForeign exchange lossesOther expenses
Total departmental expenses 178,459 224,453 557,511 537,602 735,970 762,055Funded by:Revenue
$'000
42,837 47,816 195,813 209,204 238,650 257,020135,622
- - - - - -------
$'000
176,637
------
$'000
361,611
-----
87
$'000
328,398
------
$'000
497,233
-----
87
$'000
505,035
------
Revenues from Government 271,353 476,344 847,714 1,141,336 1,119,067 1,617,680Sale of goods and rendering of servicesRental Income - - - - - -Other revenue
Total revenue 276,651 487,742 847,865 1,142,076 1,124,516 1,629,818Gains
5,298
- - - - - -
11,398 151 740 5,449 12,138
Reversal of previous asset write-downsForeign exchange gains - - -- -Other gains
Total gains - - - - - -Total departmental income
- - - - - -
- - - - - -
276,651(98,192) (263,289) (290,354) (604,474) (388,546) (867,763)
487,742 847,865 1,142,076 1,124,516 1,629,818
Outcome 3 Output 3.1 Total Outcome 32009 2008 2009 2008$'000 $'000 $'000 $'000
Departmental expensesEmployee Benefits 2,365 1,882 2,365 1,882Suppliers 12,192 22,059 12,192 22,059Grants - - - -Depreciation and amortisation - - - -Finance costs - - - -Write-down and impairment of assets - - - -Losses from asset sales - - - -Foreign exchange losses - - - -Other expenses - - - -
Total departmental expenses 14,557 23,941 14,557 23,941Funded by:Revenue
Revenues from Government 12,863 35,483 12,863 35,483Sale of goods and rendering of services - 678 - 678Rental Income - - - -Other revenue - - - -
Total revenue 12,863 36,161 12,863 36,161Gains
Reversal of previous asset write-downs - - - -Foreign exchange gains - - - -Other gains - - - -
Total gains - - - -Total departmental income 12,863 36,161 12,863 36,161
Department of DefenceNOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTSfor the year ended 30 June 2009
Table 32B: Major Classes of Departmental Incomes and Expenses by Output group and Outputs
Output 2.1 Output 2.2
155,713 212,973 496,917 536,860 652,630 749,833
1,694 (12,220) 1,694 (12,220)
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 361
Fina
ncia
l sta
tem
ents
Output 1.12 Output 1.13Output 1.12 Output 1.13 Total Outcome 1
2009 2008 2009 2008 2009 2008$'000 $'000 $'000 $'000 $'000 $'000
318,607 323,292 55,805 62,648 8,037,886 7,262,703396,835 3,052,669 203,792 208,767 8,348,687 7,891,764
- - - - 14,349 18,00046,400 130,566 143 106 3,907,639 3,657,849
4 15,560 - - 94,366 44,14678,444 811,720 254 - 1,345,808 1,952,353
(109) (450) - - 91,819 2,152456 - - - 434 -132 63 - - 25,061 54,815
840,769 4,333,419 259,994 271,521 21,866,049 20,883,782
735,810 3,743,337 227,537 234,547 19,136,378 18,040,1041,326 678 1 5 723,111 676,024
- - - - 9,083 7,07312,844 25,461 12 295 23,792 42,724
749,980 3,769,476 227,550 234,847 19,892,364 18,765,925
8,001 239,281 3,254 - 642,299 648,476- 1,095 - - - 1,077- 21,667 - - 1,424 3,295
8,001 262,043 3,254 - 643,723 652,848757,981 4,031,519 230,804 234,847 20,536,087 19,418,773
APPEND
IX 9 FINAN
CIAL TRANSPAREN
CY
362D
EFENCE AN
NU
AL REPORT 2008-09 VO
LUM
E 1
Department of DefenceNOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTSfor the year ended 30 June 2009
Note 32C: Major Classes of Departmental Assets and Liabilities by Outcome
Outcome 1 Outcome 2 Outcome 3 Total
2009$'000
2008*$'000
2009$'000
2008*$'000
2009$'000
2008*$'000
2009$'000
2008*$'000
Departmental AssetsCash and cash equivalents 25,847 - 2,241 - - - 28,088 -Trade and other receivables 590,280 - 22,256 - 3 - 612,539 -Land and buildings 13,922,381 - - - - - 13,922,381 -Specialist military equipment 33,796,794 - - - - - 33,796,794 -Plant and equipment 1,102,356 - - - - - 1,102,356 -Infrastructure 5,052,145 - - - - - 5,052,145 -Intangibles 468,503 - - - - - 468,503 -Heritage and cultural assets 869,393 - - - - - 869,393 -Inventories 4,942,343 - - - - - 4,942,343 -Prepayments 529,578 - 104 - - - 529,682 -Assets held for saleTotal Departmental Assets
Depatmentral Liabilities
23,76861,323,388
--
-24,601
--
-3
--
23,76861,347,992
--
Suppliers 804,721 - 34,543 - 6 - 839,270 -Other payables 322,214 - - - - - 322,214 -Leases 870,169 - - - - - 870,169 -Employee provisions 1,937,067 - - - - - 1,937,067 -Restoration, decontamination and decomissioning 644,730 - - - - - 644,730 -Other provisionsTotal Departmental Liabilities
28,3404,607,241
--
-34,543
--
-6
--
28,3404,641,790
--
* The 2007-08 comparative figures have not been reported as Defence's Outcome structure changed on 1 July 2008, and the assets and liabilities are not reliably attributable to Outcome.
APPENDIX 9 FINANCIAL TRANSPARENCY
DEFENCE ANNUAL REPORT 2008-09 VOLUME 1 363
Fina
ncia
l sta
tem
ents
Department of DefenceNOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTSfor the year ended 30 June 2009
Table 32D: Major Classes of Administered Income, Expenses, Assets and Liabilities by Outcome
Outcome 1 Total
2009 2008 2009 2008$'000 $'000 $'000 $'000
Administered ExpensesSubsidiesEmployee benefits 3,465,720 2,849,405 3,465,720 2,849,405SuppliersGrants - 26,800 - 26,800Foreign exchange lossesCAC Act body payment item - - - -Other expenses
Total Administered Expenses
35,302 11,284 35,302 11,284
- - - -
- - -
9 4,327 9 4,3273,501,031 2,891,816 3,501,031 2,891,816
Administered IncomeSale of goods and rendering of servicesFees and finesInterest
222,874
244
3,625-
124
222,874
244
3,625-
124DividendsMilitary superannuation contributionsOther revenueNet foreign exchange gains
Total Administered Income
72,723831,091
9,527671
917,152
134,263756,982
215-
895,209
72,723831,091
9,527671
917,152
134,263756,982
215-
895,209
Administered AssetsCash and cash equivalentsReceivablesInvestmentsPrepayments
Total Administered Assets
-59,448
1,882,38890,361
2,032,197
-55,306
1,767,82585,506
1,908,637
-59,448
1,882,38890,361
2,032,197
-55,306
1,767,82585,506
1,908,637
Administered LiabilitiesSubsidies - - - -Other payablesEmployee provisions
Total Administered Liabilities
38,44442,659,00042,697,444
25,24233,622,00033,647,242
38,44442,659,00042,697,444
25,24233,622,00033,647,242
364 DEFENCE ANNUAL REPORT 2008-09 VOLUME 1
APPENDIX 10DEFENCE ANNUAL REPORT 2007-08
ERRORS & OMISSIONS Page 130 Alternative Dispute ResolutionA paragraph and some text from the preceding paragraph were omitted on page 130. The second paragraph onwards after the ‘Alternative Dispute Resolution’ heading should read:
‘From 2006 to 2007, the use of Alternative Dispute Resolution interventions almost doubled, and a similar increase is expected for 2008–09. This reflects a greater awareness across Defence of the effectiveness of Alternative Dispute Resolution, increased access to skilled practitioners, successful outcomes, and an external assessment undertaken over the formative years of the program enabling better shaping of the product.
Mediation and workplace conferencing continue to be accessed as appropriate, and have been successful strategies for individuals and work groups in dispute over workplace issues. Conflict coaching provides individuals at all levels with opportunities to be guided through the causes of their conflict and to identify suitable responses and strategies to deal with that conflict.”’
Page 261 Defence Annual Report 2006-07A correction to the Defence Annual Report 2006-07 (Volume 1) was omitted from Appendix 12-Errors and Omissions of the Defence Annual Report 2007-08 (Volume 1). The correction is to page 261 of Appendix 10-Consultancies of the Defence Annual Report 2006-07 (Volume 1), Table A10.3.
The information in Table A10.3 regarding the number of contracts let and total contract value of Personnel Executive consultancies is incorrect. The line should read:
Group Number of contracts let Total contract value ($)Personnel Executive 5 323,741