section 5 structures - index html · or ground ructures ar walls with t any sectio for bridge d...

24
January 31, 2013 Structures SECTION 5 STRUCTURES

Upload: others

Post on 16-Oct-2019

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January 31, 2013 Structures

SECTION 5

STRUCTURES

Page 2: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structures January 31, 2013

Page 3: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January

5.01

This secfor buildsystems

Major stretainingheight aroadwayOverheatraffic), t

Refer toMajor stcosts forstructureconstrucconstrucenvironm

For bridgManual.hydraulienginee

The Resthe preli

1. Cfo

2. Bra

3. A

4. A

5. R

6. Ca

7. Ra

y 31, 2013

MAJO

ction providings, bridge

s or ground

tructures arg walls witht any sectio

y for bridgead sign strutunnels and

the CDOTtructures shr deviationse selection ction of a brction and mmental cons

ges over w Hydraulic c engineer,r with a P.E

sident Enginminary info

Current and or both upp

Bridge situaailroads (br

Any hydraul

Any region d

Requiremen

Corridor aespplicable.

Request a foccess, traff

R STRU

es guidances, snow shimproveme

re bridges ah both a totaon of over 5s and culve

uctures (sigd high mast

T Bridge Dehould be ans from the mprocess anridge rather

maintenancesiderations

aterways redesign of th, or by a hyE. license.

neer is respormation inc

proposed er and lowe

tion sheet wridge site da

ics report, r

design reco

nts for elect

sthetics, en

oundation rfic control, a

UCTURE

ce for prelimheds, tunneent systems

and culvertsal length gre5 feet. The erts, and alon bridges, ct light stand

sign Manuanalyzed indimost econond must be r than a large costs, stru.

equirementhe bridge o

ydraulic eng

ponsible forcluding the

roadway aner features,

with all topoata).

right-of-way

ommendatio

rical condu

vironmenta

report from and the loc

5-1

E – BRID

minary enginels, geotechs, and hydr

s with a totaeater than length is mong the topcantilevers

dards also a

al, Section vidually for

omical desigagreed to bge culvert isuctural aest

ts, please reopening shagineer unde

r submittingfollowing:

nd waterwa, with alignm

ography inc

y restriction

ons, includi

it, lighting,

al considera

the Geotecations for d

DGE

neering plahnical strucraulic struct

al length of 100 feet an

measured alp of the wal

and butterfare major st

3, for minimr the optimagn need to by the Resis determinethetics, hyd

efer to the Call be comper the super

g to the Pro

ay plans, prment data.

cluding con

ns, and sele

ng deviatio

and utility l

ation, and a

chnical groudrilling to be

an submittactures featutures.

f 20 feet or nd a maximong the cel for retaininflies extendtructures.

mum designal design. Abe consideident Engined from estdraulic need

CDOT Draileted by a lrvision of a

oject Structu

rofiles, and

tours, utiliti

ected guard

ons from M

locations.

architectura

up and arrae surveyed.

Struct

l and approuring wall

greater andmum expose

nterline of ng walls. ding over

n loading. Any substanered in the neer. The timated ds, and

inage Desiglicensed hydraulic

ural Engine

cross-secti

es, and

drail types.

Standards.

al concepts,

ange for .

tures

oval

d ed

ntial

gn

eer

ions

.

, if

Page 4: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur Any subthe Proje

The Proj

1. R

2. Pe

3. Ps

4. P

5. R

For a coDesign M

The follorespons

1. Sabcd

2. P

abcdef.

3. F

abcd

e

res

bsequent reect Structur

ject Structu

Review preli

Prepare struconomic st

Prepare struize, and loc

Prepare stru

Request fou

omplete desManual.

owing is a bibilities of t

Structure co. Attend D. Obtain a. Review p. Determin

Preliminary . Review b. Prepare . Prepare . Prepare . Prepare Attend F

Final bridge . Design a. Prepare . Provide i. Attend F

SpecificaFinal Offprior to th

. Provide findependSubsecti

visions to tral Enginee

ural Engine

iminary alig

ucture conctudies.

ucture layoucation.

ucture selec

undation rep

scription of

brief overviehe Project S

oncept studyDesign Scop

nd review bpreliminary ne conceptu

bridge desibridge site dengineeringgeneral layselection redrawings foield Inspec

design all structuraall structuraindependeninal Office

ation. At thefice Reviewhe overall pfinal structudent designons 19.1.4

he roadwayer without d

er’s respon

gnments an

cept study, i

uts and spe

ction report

port from th

responsibil

ew of the bStructural E

y ping Reviewbridge site dalignment

ual structur

ign data. g and econ

youts and seport. or foundatiotion Review

l elements.al plans andnt design, dReview ande discretion

w or a structproject Finaural submittn check noteD and 19.1

5-2

y alignmentelay.

nsibilities inc

nd bridge sit

including ap

ecific details

s and/or wa

he Resident

lities, see S

ridge desigEngineer:

w meeting.data. to determin

re layout an

nomic recompecial deta

on investigaw (FIR) and

d specificat

detail, and qd make req of the Resure advanc

al Office Retal (i.e., the es, field pa.4E of the C

ts or profile

clude:

te data.

ppropriate e

s that reflec

all selection

t Engineer.

Section 19.1

gn process o

ne structurend alternativ

mmendationails.

ations. d make requ

tions. quantity chequired revissident Engince plan revieview.

final detail ckage and CDOT Brid

Ja

es shall be t

engineering

ct a specific

n reports.

See Secti

1 of the CD

outlining th

e location. ve structure

ns.

uired revisio

eck. ions to Planneer, a sepew meeting

letter, finalrating pack

dge Design

anuary 31, 2

transmitted

g and

c structure t

on 5.06.

DOT Bridge

e

e types.

ons to layo

ns and parate strucg may be h

l design nokage), see Manual.

2013

d to

type,

ut.

cture eld

tes,

Page 5: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January

f.

The Resalignme

Addition1. CDO2. AAS3. AAS4. CDO5. CDO

y 31, 2013

Provide rconstruc

sident Enginnt and clea

nal RefereOT Bridge D

HTO LRFDHTO Manu

OT Bridge ROT Drainage

revised plantion.

neer shouldarances.

nces: Design ManD Bridge Deual for BridgRating Manue Design M

ns and spe

d compare

nual esign Specige Evaluatioual

Manual

5-3

ecifications a

the roadwa

ifications on

as per the

ay and bridg

FOR comm

ge plans to

Struct

ments for

o verify grad

tures

de,

Page 6: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

5.02

A culvercosts, w

A culverof the rolines of acenterlinmore.(S1.4-3, -4

http://wwmanual/

For strucProject Sbe useddetermin

All culveProject Sexplorat

For culvManual.

HydraulicompletHoweveLarger dchannel

The folloconcrete

1. WC

2. Fbd

res

MAJO

rt is used inwhen either

rt is consideoadway of 2arches. It mnes of the eee CDOT B

4, -5 & -6.)

ww.colorado/01_genera

ctures equaStructural E. If the M Sne if a struc

erts not inclStructural Etion and fou

verts over th

ic design ofed by a qua

er, this knowdrainage str

improveme

owing procee box culve

When selectCDOT Pipe

For major stoth a culveetermine th

R STRU

n lieu of a balternative

ered a majo20 feet or mmay also incexterior pipeBridge Deta

odot.info/libl_instructio

al to or exceEngineer foStandard Plactural selec

uded in theEngineer. Tundation rep

he waterwa

f a drainagealified enginwledge requructures, foents, shall b

edures andrt on the pr

ting pipe mMaterial Se

tructures, thert or bridgehe most eco

UCTURE

ridge basedis viable hy

or structuremore betweeclude multipes plus the ail Manual,

brary/bridgeons.pdf/view

eeding 20 fr a structurans do apption report

e CDOT M&The Project port.

ys requirem

e structure,neer with kuirement vaor example, be designe

documentaroject:

aterial, deselection Po

he hydraulice alternativeonomical al

5-4

E – CULV

d on estimaydraulically

if it has anen the insidple pipes, wradius of eSection 1.4

e/bridge-maw

feet, the Rere selectionply, it is up twould be b

&S StandardStructural E

ments, refer

, such as a nowledge oaries accordconcrete bd by an eng

ation are re

signers shalicy.

c designer wes. The roalternative.

VERT

ated construy.

n opening mde faces of where the ceach of the e4 Structure

anuals/bridg

esident Eng report if thto the Residbeneficial.

rd Plans shaEngineer w

r to the CD

concrete bof hydrologyding to the box culvertsgineer spec

equired whe

all use the re

will provideadway and

Ja

uction and

measured athe outside

clear distancexterior pipNumber, F

ge-detail-

gineer musthe M Standadent Engine

all be desigwill request a

DOT Drainag

box culvert, y and hydracomplexity

s, storm sewcialized in t

en designin

ecommend

e adequate structural d

anuary 31, 2

maintenanc

long the cee walls or spce between

pes is 20 feeFigures

t contact thard Plans ceer to

gned by thea foundatio

ge Design

shall be aulics. of design.

wers and that field.

ng a culvert

dations of th

designs fordesigners w

2013

ce

enter pring n the et or

e can’t

e on

t or

he

r will

Page 7: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January

3. Abth

Addition1. CDO2. CDO3. CDO4. AAS5. CDO

y 31, 2013

A cost compest choice he cost com

nal RefereOT RoadwayOT DrainageOT Bridge D

HTO LRFDOT Pipe Ma

parison shoto be const

mparison alt

nces: y Design Ge Design M

Design ManD Bridge Deterial Selec

ould be madtructed. Proternatives.

Guide Manual nual esign Speciction Policy

5-5

de to determoject grade

ifications .

mine what sadjustmen

structure altnts should b

Struct

ternative isbe included

tures

s the in

Page 8: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

5.03

An unusnew or clong bridacceptaarch, sethat devhighwaydesign; exceedinconcrete

Unusual

1. b

2. s

3. tu

4. gim

5. hd

6. usy

FHWA Wbridges,Selectioaid projethe prevsquare fand maj

The ResInspectioEngineestructureforward

The ResStructur

res

MAJO

sual bridge complex dedge spans, ble practicegmental co

viate from Ay bridges subridges using 500 feete or steel.

l structures

uildings;

now sheds

unnels;

eotechnicamprovemen

ydraulic stresigns, or d

nusual hydystems, sto

Washington tunnels, hyn Report shects, the FHvious sentenfeet and all or geotech

sident Enginon Review

er will provides, and tunthem to the

sident Enginal Engineer

R STRU

is one invoesigns with

or (4) desiges. Exampleoncrete, moAASHTO bruch as: bridng three-dit; and bridg

are:

;

al structuresnt systems;

ructures thadesign tech

draulic strucormwater pu

n Headquarydraulic struhould be suHWA Divisonce) that habridges onnical featur

neer shall sand Final Ode the Resinels. The loe Washingt

neer must cr. The Struc

UCTURE

olving: (1) dunique opegns with proes of unusu

ovable, or tridge design

dges requirimensional

ges with ma

s featuring n

at involve cohniques tha

ctures, suchumping fac

rters shall auctures, anubmitted to on Office shave an estim

n the Nationres.

submit a StOffice Revieident Enginocal FHWAon Headqu

coordinate cture Selec

5-6

E – UNUS

ifficult or unerational or ocedures thual bridges russ bridgesn standardsng abnormcomputer a

ajor support

new or com

omplex streat are atypic

h as those scilities, dam

approve all nd geotechn

the FHWAhall approvemated total

nal Highway

ructure Selew plans toneer with plaA Division wuarters for a

the requirection Report

SUAL

nique founddesign fea

hat depart finclude ca

s. Other exs or AASHTal dynamicanalysis; brting elemen

mplex wall s

eam stabilitcal or uniqu

serving largs or levees

movable brnical structu

A for review e all other bl deck areay System, m

lection Repo the FHWAans for brid

will review thapproval as

ed submittat submitted

Ja

dation charatures, (3) efrom currenble-stayed,

xamples areTO guide spc analysis foridges with nts of “ultra”

systems or

ty countermue; or

ge storm drs.

ridges and ures. A Struand approv

bridges (not greater tha

major hydra

port as well A. The Projedges, earth hose submis appropriat

ls with the d with the in

anuary 31, 2

acteristics, exceptionallntly recogni, suspensioe bridge typpecificationor seismic spans ” high stren

ground

measures,

rainage

unusual ucture val. On fedt included ian 125,000aulic structu

as the Fielect Structurretaining ittals and mte.

Project nitial reques

2013

(2) y zed

on, pes s for

ngth

eral-n

0 ures,

d ral

may

st for

Page 9: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January review ameasure

Addition1. CDO2. AAS

y 31, 2013

and approvaes, and stud

nal RefereOT Bridge D

HTO LRFD

al shall incldies of alte

nces: Design ManD Bridge De

ude environrnate spans

nual esign Speci

5-7

nmental cos and bridg

ifications

oncerns andge types.

d suggested

Struct

d mitigation

tures

n

Page 10: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

5.04

Pedestriother codistricts,centers.

Pedestrifreewayimpose traffic. Totherwis

When dethe samarchitectThe Resthe prelithe strucelectron

The Projproposegeneral accommrequest

The desaccessib

Public sincludedare in th

Addition1. AAS2. CDO3. Desi

Publ

res

PEDES

ian facilitiesonditions me, factory are

ian separats or expresan extreme

They are alsse warrante

esigning pee as for antural considsident Enginminary geocture. Additic format.

ject Structued alignmen

layout for tmodations fo

that the ap

sign of pedebility for the

afety featurd in the deshe CDOT R

nal RefereHTO Policy

OT Bridge Dign of Pedeication N50

STRIAN

s should beerit their useas, school

tion, either ssways whee inconvenieso desirableed and the s

edestrian ovy other highderations shneer is respometric layotionally, top

ural Enginents submittehe selectedor the phys

ppropriate fo

estrian overe physically

res such asign of the soadway De

nces: y on GeomeDesign Manestrian Over040.38, FHW

OVERP

e provided wse. These fal zones, ath

over or undere cross stence or safe at locationseparation

verpasses ahway structhould be coponsible forout, verticalpography of

er is responed and prepd structure ically handoundation in

rpasses andhandicapp

s vertical clestructures. Design Guide

etric Designnual rpass and UWA

5-8

PASSES

where pedeacilities are hletic fields,

der the roadtreets are tefety hazardns where this economi

and underpture where onsidered (sr providing profiles, an

f the surrou

nsible for reparing a strwith appropicapped. Thnvestigation

d underpasped, and bic

earance, feDesign critee.

n of Highwa

Underpass

S AND UN

estrian voluusually loc

, parks, and

dway, is userminated o to pedestr

he need forcally and e

passes, thethe same gsee Sectionthe Projectnd cross se

unding area

eviewing anructure selepriate widthhe Project Sns be comp

sses shouldcycle traffic

encing and eria for ove

ays and Str

to Accomm

Ja

NDERPA

ume, traffic cated in cend other maj

ually desiraor where corians due tor a pedestriaenvironment

e requiremegeometric an 5.01 of tht Structural ections for ta should be

nd commenection reporhs, clearancStructural Epleted.

d accommoc, where wa

lighting shoerpasses an

reets

modate the

anuary 31, 2

ASSES

volume, or ntral busineor activity

able at onditions o heavy vehan crossingtally feasib

ents should and his manual)

Engineer wthe locationprovided in

nting on thert including ces, and Engineer sh

odate arranted.

ould be nd underpas

Handicapp

2013

ess

hicle g is le.

be

. with n of n

e a

hall

sses

ped,

Page 11: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January 4. Pede

Regu5. AAS6. AAS7. AAS8. AAS9. CDO

y 31, 2013

estrian and ulations, TitHTO LRFDHTO GuideHTO GuideHTO LRFD

OT Roadway

Bicycle Actle 23, High

D Bridge Dee for the Plae SpecificatD Guide Spey Design G

ccommodatihways, Partesign Specianning, Destions for Deecifications

Guide

5-9

ions and Prt 652 ifications sign and Opesign of FRPs for the Des

rojects, Cod

peration of P Pedestriasign of Ped

de of Fede

f Pedestrianan Bridges destrian Bri

Struct

ral

n Facilities

idges

tures

Page 12: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

5.05

Aesthetiinclude fincorporstructure

CorridorNEPA PResidenguideline

PreliminSelectio

Visually commenstructurein a struand treastructure

Addition1. CDO2. Bridg

Rese3. Bridg

res

ARCH

ically pleasfeatures anrating archites could be

rs typically hProcess or fnt Engineer es. An arch

nary design n Report (s

appealing nces becaue design hacture at low

atments mue. Aesthetic

nal RefereOT Bridge Dge Aesthetiearch Coungescape –

ITECTU

ing structurnd treatmentectural fea

e in service

have an exfrom a localwill determ

hitect may b

and architesee Section

structures suse inclusioas begun. Sw cost whilest be thoro

cs are impo

nces: Design Manics Around ncil, 1991 The Art of D

RAL AN

res should nt that proveatures and a

50 to 75 ye

xisting archil entity pref

mine the strube consulte

ectural detan 5.07 of thi

should be an of these d

Some aesthe others incughly inves

ortant in hig

nual the World,

Designing B

5-10

ND AEST

be compatie to be endaesthetic treears.

tectural-aeference. Thucture spec

ed for ideas

ails must bes manual.)

adopted andetails is no

hetically plecrease cost stigated befh-profile, fr

Transporta

Bridges, Fre

THETIC

ible with theduring. Careeatment in

sthetic themhe Project Scific architeon feature

e document

d developeot easily acasing featusignificant

fore they arrequently vi

ation Resea

ederick Got

Ja

TREATM

eir surrounde must be ea structure

me developStructural Ectural treats and treat

ted in the S

ed early befccomplishedures can bely. New or ure incorporaiewed struc

arch Board

ttemoeller,

anuary 31, 2

MENTS

dings and exercised we because s

ped during tngineer anment ments.

Structure

fore final ded after the

e incorporatuntried featated into a ctures.

(TRB) Nati

1998

2013

when some

the d

esign

ted tures

onal

Page 13: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January

5.06

The founbased obridges,and retastructureinclusion

When a send a fResidenlocations

The Resor survecompletGeotechEnginee

Any quebe addrerespons

The Geogeology

The Geoshould p

Addition1. CDO2. AAS

y 31, 2013

FOUNRECO

ndation inven existing s major conc

aining wallse design son in the Stru

boring or afoundation int Engineers for the str

sident Enginey crew will ed the accehnical Enginer will have

estions the Gessed to thible for exa

otechnical Eplan sheet

otechnical Eparticipate i

nal RefereOT Bridge D

HTO LRFD

DATIONMMEND

estigation gsubsurface crete box c. Investigat

o that prelimucture Sele

a geotechniinvestigatio. A copy of ructure bori

neer will bearrange for

ess and traneer and ththe final bo

Geotechnice Project S

amining the

Engineer wt and geote

Engineer shn the follow

nces: Design ManD Bridge De

N INVESTDATION

gathers dataconditions.

culverts, higtion requestminary foundection Repo

cal study ison request,

the requesings will be

e responsibr traffic conffic control

he Project Soring locatio

cal EngineeStructural En

site and sc

will analyze sechnical rep

hould be incw-up and re

nual esign Speci

5-11

TIGATIO

a and provi. Typical re

gh-mast lights should bdation reco

ort prepared

s required, tincluding th

st and the gsent to the

ble for obtaintrol. When has been a

Structural Eons surveye

er may havengineer. Thcheduling u

subsurfaceport.

cluded in thesolution of

ifications

ON AND

ides foundaequests inclhting, sign se made at

ommendatiod by the Pro

the Projecthe propose

general layoe Geotechn

ning accesthe Reside

arranged, hngineer in wed for inclus

e related tohe Geotechutility locate

e data and p

he Design Sany structu

ation recomude foundastructures, the concepons are avaoject Struct

t Structural ed General out with appnical Progra

s. The Resent Engineehe shall notiwriting. Thesion in the

o the boringhnical Engines, as requir

provide an

Scoping Reural problem

Struct

mmendationation studiesound walls

ptual stageailable for tural Engine

Engineer wLayout, to t

proximate am Manage

sident Enginer has ify the e Resident report.

locations sneer is red.

engineering

eview and ms identifie

tures

ns es for s, of

eer.

will the

er.

neer

shall

g

ed.

Page 14: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

5.07

A structurecommwill proc

During tEngineewith Secmajor cu

Selectiobut othe

1. S

2. S

3. S

4. E

5. C

6. H

7. L

8. O

The ResrequiredSection

Prior to prepare the Resiand to thto the Fi

res

STRUC

ure selectiomended seleceed.

he concepter shall devection 19 of tulverts, see

n of the beer requireme

Site requirem

Safety (durin

Structural (fu

Environmen

Construction

Hydraulics (

ife cycle co

Other (comm

sident Engind to prepare5.01 of this

commencinand distrib

ident Enginhe FHWA. Tield Inspect

CTURE

on report doection and e

tual and preelop a structhe CDOT B

e Section 5.

st structureents to be c

ments (topo

ng construc

uture widen

tal (appear

n (ease of c

stream flow

osts (mainte

mitments to

neer will pre a structures manual.

ng the final ute a struct

neer. The RThe structution Review

SELECT

ocuments thestablishes

eliminary decture selectBridge Des02.

e type alternconsidered

ography, al

ction, traffic

ning, founda

rance, wetla

construction

w, bank and

enance, du

o officials an

ovide the Pe layout, st

structure dture selecti

Resident Enure selectiow meeting.

5-12

TION RE

he importanthe basis u

esign stagetion report f

sign Manual

native may include:

ignment)

c, detours)

ation condit

ands, public

n, false wor

d pier protec

rability)

nd commun

Project Struructure sele

design, the on report, igineer shan report sho

EPORT

nt factors thupon which

es of a projefor all majol. For a stru

be based i

tions)

c exposure

rk, season)

ction, culve

nity, team s

ctural Engiection repo

Project Struncluding anll make distould be rev

Ja

hat lead to th the final st

ect, the Proor structuresucture selec

n part on th

)

ert alternate

studies)

neer the infort, and fina

uctural Engn economictribution witviewed and

anuary 31, 2

the tructure des

oject Structus in accordaction report

he lowest c

es, scour)

formation al design. Se

gineer will c analysis, tthin the Reapproved

2013

sign

ural ance t for

ost,

ee

to egion prior

Page 15: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January

5.08

Retainingrade chthe avai

Retaininretention

1. A

2. As

3. Ast

Factors

1. S

2. B

3. E

Retaininenvironmshould b

The Projresponsalternatia founda

The requDesign M

The defaStructur

1. Dp

2. DC

y 31, 2013

RETAI

ng walls arehange. Thelable R.O.W

ng walls aren and sourc

An externall

An internallyelf-supporti

A hybrid or mtabilized sy

affecting th

Spatial cons

Behavior co

Economic co

ng walls shomental factobe designed

ject Structuible for the ve wall desation invest

uired documManual, Se

ault wall deal Engineer

Default desirocess (see

Design alterCDOT Bridg

INING W

e used primey are also W, as well a

e classified ce of suppo

y stabilized

y stabilized ing.

mixed systeystems.

he selection

straints -- Fu

nstraints --

onsideratio

ould be desors comprod for a mini

ural Engineselection a

signs may btigation and

mentation fection 5.

esign and der will includ

gn -- Definee the CDOT

rnatives -- Tge Design M

WALLS

arily for retused whenas other ap

into three cort:

d system us

system use

em combine

n of a retain

unctions of

Earth pres

ns -- Enviro

signed to reomising the mum servic

er in coopeand design be developed foundation

for the wall

esign alterne:

ed to meanT Bridge De

The productManual, Sub

5-13

aining soilsit is necess

plications.

categories a

ses a physic

es soil reinf

es element

ning wall are

f a wall, spa

ssure, water

onmental, a

esist corrosidurability o

ce life of 75

eration with of the best-ed. The Pron report.

selection re

native docu

n the best wesign Manu

ts of the debsections 5

s or roadwasary to con

according t

cal structur

forcement t

ts of both ex

e:

ace limitatio

r table, foun

aesthetic.

ion, deterioof the wall. 5 to 100 yea

the Reside-suited waloject Struct

eport is out

umentation

wall obtaineual, Subsec

esign select5.4 and 5.5)

ay cuts and ntain the roa

to basic me

re to hold th

to make the

xternally an

ons, propos

ndation pre

oration, andPermanentars.

ent Engineel type. Whetural Engine

tlined in the

provided b

d from the ction 5.6).

tion proces).

Struct

fills to creaadway fill w

echanisms o

he retained

e retained s

nd internally

sed profile.

essure.

d other t retaining w

er will be ere appropreer will requ

e CDOT Bri

y the Proje

selection

s (see the

tures

ate a within

of

soil.

soil

y

walls

riate, uest

idge

ct

Page 16: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur For a pr

Addition1. CDO2. AAS

res

oprietary w

nal RefereOT Bridge DSHTO LRFD

wall, refer to

nces: Design ManD Bridge De

o Section 2.

ual esign Spec

5-14

24 Propriet

cifications

tary Items i

Ja

n this manu

anuary 31, 2

ual.

2013

Page 17: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January

5.09

The Resresponsthe Resiheight, astructurawill need

Addition1. CDO2. AAS3. AAS

y 31, 2013

NOISE

sident Enginible for the ident Enginand configual design and to review

nal RefereOT Bridge D

HTO LRFDHTO Guide

E WALLS

neer, in cooselection o

neer will prouration. Thend requestithe structu

nces: Design ManD Bridge Dee Specificat

S

operation wof the best-sovide the Pre Project Stng the founral plans fo

nual esign Specitions for Str

5-15

with the Projsuited wall roject Strucructural En

ndation inveor any poten

ifications ructural Des

oject Structutype. Base

ctural Enginngineer will estigation. Tntial conflic

sign of Sou

ural Engineed on the noneer with thbe responsThe Reside

cts with buri

und Barriers

Struct

er, will be oise analyshe alignmensible for theent Engineeied utilities.

s

tures

is, nt, e er

Page 18: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

5.10

A structumay afferail heigcan be pthicknes

The ResEnginee

The ProjResidenresurfacwater pr

The Resresurfac

Addition1. CDO

res

ANALY

ural analysiect the loadht, its bridgplaced on ass of aspha

sident Enginer for resurf

ject Structunt Engineercing, recomroofing mem

sident Engincing method

nal RefereOT Bridge D

YSIS OF

is is performd carrying cge expansioa structure ilt after resu

neer will refacing of str

ural Engine. The memomended re

mbrane, an

neer will infd.

nces: Design Man

F STRUC

med beforeapacity of t

on devices, f there is ad

urfacing sha

quest recomructures.

er will sendo will includpairs to mad bridge ra

form the Pr

nual

5-16

CTURES

e a structurethe structuror a combidequate loaall be limite

mmendatio

d a surfacinde conditionaintain the iil upgrades

roject Struc

S TO BE

e is resurfacre, its verticination therad carryingd to 3 inche

ons from the

ng recommens related tntegrity of t

s to maintai

ctural Engin

Ja

RESUR

ced becauscal clearancreof. Additiog capacity. Tes on the s

e Project St

endation mto the structthe riding sn roadway

neer of the f

anuary 31, 2

RFACED

se resurfacce, its bridgonal pavemThe total

structure.

tructural

emo to the ture

surface, exissafety.

final propos

2013

D

ing e

ment

sting

sed

Page 19: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January

5.11

An existleft in pla

The Resinvolving

The ResEngineedocume

The Resthe Form

The decdocume

Addition1. For f

http:/2. CDO

y 31, 2013

DETER

ting structurace.

sident Enging the existin

sident Enginer regardingntation acc

sident Enginm 463, Des

cision to leanted.

nal Refereforms, see C//www.colo

OT Bridge D

RMINE E

re must me

neer will furng structure

neer shall rg the adequcording to th

neer shall cign Standa

ave bridges

nces: CDOT on-liradodot.info

Design Man

EXISTIN

eet criteria a

rnish the Pes and prop

request recuacy of the he CDOT B

compare thrds, to dete

that are na

ine forms lio/library/forual

5-17

G STRU

as establish

roject Strucposed desig

ommendatexisting str

Bridge Desig

e bridge wiermine adeq

arrower tha

brary rms

UCTURA

hed by FHW

ctural Engingn.

ions from thructure andgn Manual

idth with thequacy of th

n the propo

AL ADEQ

WA and CD

neer pertine

he Project S recommenfor repair o

e requiremehe bridge wi

osed roadw

Struct

QUACY

DOT, if it is t

ent data

Structural ndations anor replacem

ents shownidth.

way should

tures

to be

nd ment.

n on

be

Page 20: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

5.12

FHWA aRehabilirail unlecriteria p

CrashwoHighwayHardwarto crash

The ProjEngineeresponsbridge ra

Approve

The folloroadway

1. Th

2. Tlimtoh

When a than 45 bridge e

WorkingDesign a

DetailedConstru

res

CRAS

approved critated bridgss a varianpresented in

orthy rail is y Researchre (MASH),-tested rail

ject Structuer regardingible for deteail in place.

ed documen

owing bridgy classificat

Type 7 or Tyighways pr

Type 3 or anmited applio use type 1ighway sys

bridge alsomph, a bar

edge may b

g drawings wand Manag

d drawings oction Plans

HWORT

rashworthy es on all prce is appron the CDO

defined ash Program R, or rail whic.

ural Engineg the replacermining w

ntation for v

ge rails are tions:

ype 10M onrojects.

ny approvedcations bec10M for all stem.

o serves perrier to shiee warranted

with currengement Bra

of bridge ras as determ

THY BRI

bridge railrojects, regoved. The vT Bridge De

s crash testeReport 350,ch has bee

er will provcement of ehether to in

variances a

required fo

n National H

d crash tescause of itsnew constr

edestrians old them frod as determ

tly approvench.

ail with revisined by the

5-18

DGE RA

must be prardless of f

variance shaesign Manu

ed in accor, AASHTO

en approved

ide a recomexisting bridnstall new b

and design d

r new or re

Highway Sy

sted bridge s 27-inch heruction requ

or cyclists am the trave

mined by th

ed bridge ra

sions or moe Resident E

AIL

rovided on funding, shall include aual, Section

rdance withManual for

d by the FH

mmendationdge rail. Thebridge rail o

decisions s

ehabilitated

ystem (NHS

rail on locaeight. Thereuiring a stee

and the poseled way ane Resident

ail are availa

odifications Engineer.

Ja

all new bridall use crasan analysisn 2.

h the Nationr Assessing

HWA as bei

n to the Ree Resident or to leave t

shall be in t

bridges on

S) and non-

al roads. Tyefore, CDOel bridge ra

sted speed nd a pedestt Engineer o

able from th

are to be in

anuary 31, 2

dges. shworthy brs based on

nal Cooperag Safety ng equivale

sident Engineer is

the existing

he project f

the followi

-NHS state

ype 3 has OT has electail on the sta

limit is greatrian rail at or Staff Brid

he Bridge

ncluded in

2013

ridge

ative

ent

s

file.

ng

ted ate

ater the dge.

the

Page 21: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January Addition1. 23 C2. AAS3. AAS4. AAS5. AAS

y 31, 2013

nal RefereCFR Part 62

HTO GuideHTO LRFDHTO RoadHTO Stand

nces: 25, Design Se for SelectD Bridge Dedside Designdard Specifi

Standards fting, Locatinesign Specin Guide fications for

5-19

for Highwayng, and Desifications

r Highway B

ys signing Tra

Bridges

affic Barriers

Struct

rs

tures

Page 22: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

5.13

All highwguidelineoverpasfacilitieschannelappropri

Vertical wideningis achiev

Minimum

The Restraffic shconsiderapproprithe high

Addition1. 23 C2. AAS3. AAS4. AAS5. AAS6. CDO

res

VERTI

way projectes set by thses, under, overhead s, and canaiate clearan

clearance ag and overlved.

m vertical c

sident Enginhifts. Clearared. If minimiate signingway constr

nal RefereCFR Part 62

HTO PolicyHTO GuideHTO LFRDHTO Stand

OT Bridge D

ICAL CL

ts shall meehe FHWA apasses, railines, sign

als. The Rences.

applies to tay. A forma

learances a

neer must vances to falmum clearag shall be inruction plan

nces: 25, Design Sy on Geomee for the DeD Bridge Dedards SpeciDesign Man

LEARAN

et or exceedand CDOT.lroad and tbridges, si

esident Eng

he full paveal variance

are listed in

verify verticse work an

ances cannncluded in tns for all str

Standards fetric Designevelopmentesign Speciifications fo

nual (Sectio

5-20

NCE OF S

d minimumThese clearansportatiognal mast a

gineer is res

ement widthis required

n the CDOT

cal clearancnd shoring dot be mainthe plans. Vuctures.

for Highwayn of Highwat of Bicycle ifications or Highway n 2)

STRUCT

m vertical clearances shaon facilitiesarms, navigsponsible fo

h, includingd if less clea

T Roadway

ces for all pduring constained durin

Vertical clea

ys ays and StrFacilities

Bridges

Ja

TURE

earances aall pertain ts, bicycle angational streor determin

g provisionsarance than

Design Gu

phases on dstruction shng construcarances sha

reets

anuary 31, 2

ccording too all nd pedestrieams,

ning the

s for future n the minim

uide, Chapte

detours andould be ction, all be show

2013

o

an

mum

er 6.

d

wn on

Page 23: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

January

5.14

For consfor evaluor not th

The matThe matsave the

http://int

The accwill contmust betechniqucompletdesignatABC ma

The docprocesswhetherevaluatio

This cur“CDOT_evaluatiomay moto determin-depthspecialtyTraffic, Hthe softw

The abodiagram

y 31, 2013

ACCE

struction pruating Accehey are app

terials for Aterials are ce files to yo

tranet/engin

celerated brtain one or written and

ue will be used during thted Staff Br

aterials.

cument “CD. The proce

r or not ABCon as to wh

rsory evalua_Prescopingon show thve on to a mine which

h evaluationy groups inHydraulics, ware are to

ove informam that is incl

LERATE

rojects that elerated Bripropriate for

ABC evaluacompressedur local com

neering/staf

ridge constrmore bridgd added to sed on the he ABC evaridge Engin

DOT_ABC_Sess is a twoC is approphat type of A

ation is to bg_ABC_Raat an ABC more in-de

h ABC methn is requiredcluding butetc. to exebecome pa

tion is repreuded in the

ED BRID

include onedge Constrr any given

tion can bed in a Zip fimputer.

ff-bridge/ac

ruction metes. After cothe projectproject. Thaluation. Th

neer for guid

Selection_Oo-phase appriate for a gABC techni

be done durating_Attachtechnique ipth evaluat

hod best med, the desigt not limitedecute the ABart of the pr

esented grae document

5-21

DGE CON

e or more bruction (ABproject.

e downloadele. Downloa

ccelerated-b

hodology isompletion o file explaine justificatiohe design tedance and

Overview” cproach. Ongiven projecique will be

ring the scohment_B.” Iis appropriation using theets the progn team shad to: Staff BBC Decisioroject files.

aphically int titled, “AB

NSTRUC

bridges, CDC) techniqu

ed at the inad the mate

bridge-cons

s to be evaof the evaluning why oron letter sheam may cinformation

contains ane phase is ct. The sec

e employed

oping phaseIf the resultate for the phe “ABC Deoject’s goalall scheduleridge, Utilitn Making S

n Figure 5-1C_Workflow

CTION (A

DOT has deues, to dete

nternet link erials, unzip

struction/vie

luated for aation, a jus

r why not anhould includchoose to wn regarding

n overview a cursory e

cond phase .

e using the ts of the cuproject, theecision Maks and conse a meetingties, EnvironSoftware. T

1. This is thw_Attachm

Struct

ABC)

eveloped a ermine whe

given belowp the files,

ew

all projects tstification len ABC de materialswork with th

the use of

of the ABCevaluation ais an in-de

spreadshersory

e design teaking Softwa

straints. If thg with all nmental, he results o

e same ment _A.”

tures

tool ether

w. and

that etter

s e the

C as to

epth

eet

am are” he

of

Page 24: SECTION 5 STRUCTURES - index html · or ground ructures ar walls with t any sectio for bridge d sign stru unnels and the CDOT ructures sh deviations selection tion of a br tion and

Structur

res

ABBC EvaluatF

tion and De

5-22

igure 5-1 ecision Makking Matrix

Ja

Workflow

anuary 31, 22013