Section 7 – Erosion Control Details
Revision Date Erosion Control General Notes EC-000 SEPT 2019 Erosion Control General Notes EC-001 SEPT 2019 Stabilized Construction Entrance EC-010 SEPT 2019 Sediment Fence EC-040 SEPT 2019 Sidewalk Subgrade Curb Barrier EC-055 SEPT 2019 Sediment Trap EC-060 SEPT 2019 Sediment Basin EC-070 SEPT 2019 Interceptor Swales and Dikes EC-080 SEPT 2019 Surface Roughening EC-085 SEPT 2019 Filter Fabric Inlet Barrier EC-090 SEPT 2019 Filter Mat Inlet Protection EC-095 SEPT 2019 Inlet Protection Biofilter Bags EC-120 SEPT 2019 Rock Check Dam EC-130 SEPT 2019 Geotextile Encased Check Dam EC-140 SEPT 2019 Erosion Control Blanket EC-150 SEPT 2019 Channel Installation EC-155 SEPT 2019 Pipe Slope Drain EC-170 SEPT 2019 Straw Wattles EC-180 SEPT 2019 Plastic Covering/Sheeting EC-190 SEPT 2019 Concrete Washout EC-200 SEPT 2019
EROSION CONTROL GENERAL NOTES
EC - 000
SEPT 2019
K.H.
K.H.
EROSION CONTROL GENERAL NOTES
EC - 001
SEPT 2019
EROSION CONTROL SYMBOLS
EC - 005
SEPT 2019
K.H.
1
0
0
'
M
I
N
.
*
O
F
I
N
G
R
E
S
S
/
E
G
R
E
S
S
A
R
E
A
F
U
L
L
W
I
D
T
H
1
5
'
M
I
N
.
DEPTH
4" - 8" QUARRY SPALLS
SUBGRADE REINFORCEMENT
GEOTEXTILE REQUIRED
R
=
2
5
'
M
I
N
.
12" MIN.
INSTALL TEMPORARY DRIVEWAY
CULVERT IF THERE IS A ROADSIDE
DITCH PRESENT
(2" MIN SIZE FOR SINGLE
FAMILY/DUPLEX SITES)
1
'
x
1
'
D
I
T
C
H
E
S
O
N
B
O
T
H
S
I
D
E
S
O
F
P
A
D
T
O
T
R
A
P
S
E
D
I
M
E
N
T
E
X
I
S
T
I
N
G
R
O
A
D
O
R
P
A
V
E
M
E
N
T
STABILIZED CONSTRUCTION ENTRANCE
EC - 010
SEPT 2019
K.H.
1'-6"2' 6"
8' M
AX
.
AT
TA
CH
F
IL
TE
R F
AB
RIC
T
O P
OS
TS
US
IN
G S
TA
PL
ES
, R
IN
G W
IR
ES
, O
R
EQ
UIV
AL
EN
T
2" x 2
" W
OO
D P
OS
TS
,
ST
EE
L F
EN
CE
P
OS
TS
,
RE
BA
R, O
R E
QU
IV
AL
EN
T
2" x 2
" B
Y 1
4 G
A. W
IR
E
OR
E
QU
IV
AL
EN
T B
AC
KIN
G
(6
' IF
N
OT
U
SIN
G
W
IR
E M
ES
H B
AC
KIN
G)
FIL
TE
R F
AB
RIC
M
AT
ER
IA
L
(3
6" W
ID
E R
OL
LS
)
LIN
E T
RE
NC
H W
IT
H F
IL
TE
R
FA
BR
IC
A
ND
B
AC
KF
IL
L W
IT
H
NA
TIV
E S
OIL
O
R 3
/4
" - 1
.5
"
CL
EA
N G
RA
VE
L
6"
FIL
TE
R F
AB
RIC
MA
TE
RIA
L
6"
MIN
IM
UM
6"x 6
" T
RE
NC
H
4' 0"
FR
ON
T V
IE
WS
ID
E V
IE
W
BU
RY
F
IL
TE
R F
AB
RIC
6
"
NO
TES:
1.SE
DIM
ENT
FEN
CE S
HALL
BE
INST
ALLE
D TO
FO
LLO
W C
ON
TOU
RS W
HERE
FEA
SIBL
E.
2.FE
NCE
PO
STS
SHAL
L BE
SPA
CED
A M
AXIM
UM
OF
8 FE
ET A
PART
(6 F
EET
IF N
OT
USI
NG
WIR
E SU
PPO
RT B
ACKI
NG)
AN
D DR
IVEN
SEC
URE
LY IN
TO T
HE G
ROU
ND
A M
INIM
UM
OF
18 IN
CHES
.
3.PR
EPAR
E A
6” X
6”
TREN
CH O
N T
HE U
PHIL
L SI
DE O
F TH
E PO
STS
FOR
STAP
LED
FEN
CIN
G AN
D O
N T
HE D
OW
NHI
LL S
IDE
OF
THE
POST
S FO
R FE
NCI
NG
WIT
H ST
ITCH
ED L
OO
P.
4.LI
NE
TREN
CH W
ITH
FILT
ER F
ABRI
C AN
D BA
CKFI
LL W
ITH
NAT
IVE
SOIL
OR
¾”
TO 1
.5”
CLEA
N G
RAVE
L AN
D CO
MPA
CT S
O T
HAT
THE
FILT
ER F
ABRI
C LI
ES 6
” VE
RTIC
ALLY
BELO
W F
INIS
HED
GRAD
E.
5.W
HEN
STA
NDA
RD S
TREN
GTH
FILT
ER F
ABRI
C IS
USE
D, A
2”
X 2”
BY
14 G
A W
IRE
SUPP
ORT
BAC
KIN
G (O
R EQ
UIV
ALEN
T) S
HALL
BE
USE
D. W
HEN
EXT
RA-S
TREN
GTH
FILT
ERFA
BRIC
AN
D CL
OSE
R PO
ST S
PACI
NG
ARE
USE
D, T
HE W
IRE
BACK
ING
MAY
BE
ELIM
INAT
ED.
6.FA
STEN
FIL
TER
FABR
IC A
ND
BACK
ING
SECU
RELY
TO
THE
PO
STS
USI
NG
HEAV
Y-DU
TY W
IRE
STAP
LES
AT L
EAST
1 IN
CH L
ON
G, R
ING
WIR
ES O
R EQ
UIV
ALEN
T. F
ILTE
R FA
BRIC
SHAL
L N
OT
BE S
TAPL
ED T
O E
XIST
ING
TREE
S.
7.W
HEN
JOIN
TS A
RE N
ECES
SARY
, FIL
TER
FABR
IC S
HALL
BE
SPLI
CED
TOGE
THER
ON
LY A
T A
SUPP
ORT
PO
ST, W
ITH
A M
INIM
UM
6-IN
CH O
VERL
AP, A
ND
BOTH
EN
DS S
ECU
RELY
FAST
ENED
TO
THE
PO
ST.
8.SE
DIM
ENT
FEN
CES
SHAL
L BE
INSP
ECTE
D IM
MED
IATE
LY A
FTER
EAC
H RA
INFA
LL A
ND
AT L
EAST
DAI
LY D
URI
NG
PRO
LON
GED
RAIN
FALL
. SE
DIM
ENT
DEPO
SITS
MU
ST B
ERE
MO
VED
WHE
N T
HEY
REAC
H AP
PRO
XIM
ATEL
Y O
NE-
HALF
THE
HEI
GHT
OF
THE
FEN
CE.
DAM
AGED
FEN
CE S
HALL
BE
REM
OVE
D AN
D RE
PLAC
ED P
ROM
PTLY
.
9.SE
DIM
ENT
FEN
CES
SHAL
L O
NLY
BE
REM
OVE
D W
HEN
THE
UPS
LOPE
ARE
A HA
S BE
EN P
ERM
ANEN
TLY
STAB
ILIZ
ED.
10.
REFE
R TO
BM
P C2
33 IN
VO
LUM
E II
OF
THE
STO
RMW
ATER
MAN
AGEM
ENT
MAN
UAL
FO
R W
ESTE
RN W
ASHI
NGT
ON
FO
R M
ORE
INFO
RMAT
ION
SEDIMENT FENCE
EC - 040
SEPT 2019
K.H.
SIDEWALK SUBGRADE CURB BARRIER
EC - 055
SEPT 2019
K.H.
2' SETTLING DEPTH
1.5' SEDIMENT STORAGE
4' MIN.
5' M
AX
.
1' OVERFLOW DEPTH
OUTFLOW CHANNEL IF
CONSTRUCTED BY
EXCAVATION
CROSS SECTION
O
V
E
R
F
L
O
W
S
P
I
L
L
W
A
Y
6
'
M
I
N
.
L
E
N
G
T
H
3
1
3
1
SEDIMENT TRAP OUTLET
6' MIN.
TO BE CONSTRUCTED
BY EXCAVATION
WASHED GRAVEL
GEOTEXTILE
FILTER FABRIC
FENCING
1'
3
4
" - 1
1
2
"
NOTES:
1. SEDIMENT TRAPS SHALL BE LIMITED TO DRAINAGE AREAS OF LESS THAN 3 ACRES. FOR DRAINAGE AREAS GREATERTHAN 3 ACRES, SEE EC-070 (SEDIMENT BASIN).
2. THE SEDIMENT TRAP IS TO BE LOCATED IN A LOW AREA WHERE THE TRAP WILL INTERCEPT ALL OR MOST OF THERUNOFF FROM THE DISTURBED AREA.
3. THE SEDIMENT TRAP MAY BE FORMED COMPLETELY BY EXCAVATION OR BY CONSTRUCTION OF A COMPACTEDEMBANKMENT.
4. SEDIMENT TRAPS ARE TO HAVE A LEVEL BOTTOM, 3:1 OR FLATTER SIDE SLOPES AND A LENGTH-TO-WIDTH RATIO OF3.
5. THE SEDIMENT TRAP SHALL DISCHARGE TO A STABILIZED CONVEYANCE, OUTLET OR LEVEL SPREADER. A SEDIMENTFENCE SHALL BE CONSTRUCTED IMMEDIATELY DOWNSTREAM OF THE OUTFLOW POINT.
6. INSPECT ONCE PER WEEK AND WITHIN 24 HOURS FOLLOWING A 0.5 INCH RAIN EVENT.
7. REMOVE SEDIMENT FROM THE TRAP WHEN IT REACHES 1 FOOT IN DEPTH.
8. REFER TO BMP C240 IN VOLUME II OF THE STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON FORMORE INFORMATION.
2" - 4" ROCK
SEDIMENT TRAP
EC - 060
SEPT 2019
K.H.
POND LENGTH >= 3 X POND WIDTH
A
A
L
E
V
E
L
B
O
T
T
O
M
RISER PIPE W/ ANCHOR BASE
OUTLET PIPE
EMERGENCY
OVERFLOW
SPILLWAY CREST
PERFORATED DRAIN PIPE
IN GRAVEL-FILLED TRENCH
SEDIMENT FENCE
(OPTIONAL)
LEVEL BOTTOM
3' MAX
STORAGE DEPTH
2' MIN
SETTLING DEPTH
DEWATERING OUTLET
RISER PIPE OPEN AT TOP
(PRINCIPLE SPILLWAY)
FREEBOARD
SPILLWAY DEPTH
6' MIN.
PROVIDE TRASH RACK
ON RISER PIPES ³ 18" DIA.
EMERGENCY OVERFLOW
SPILLWAY CREST
OUTLET PIPE
ANTI-SEEP COLLARS
RIP-RAP
(ENERGY DISSIPATION)
ANCHOR BASE TO
PREVENT FLOTATION
PERFORATED DRAIN PIPE LINE
TRENCH W/ FILTER FABRIC
SECTION A - A
3
1
2
1
PLAN VIEW
RIP RAP
INLET
SEDIMENT
FENCE
DRAIN ROCK
SEDIMENT
FENCE
RIP RAP
1'
1'
NOTES:
1. SEDIMENT BASINS MAY BE CONSTRUCTED BY BERMS OR BY PARTIAL OR COMPLETE EXCAVATION. BASIN LENGTHS SHALL BE 3 TO 6 TIMES THEMAXIMUM BASIN WIDTH.
2. GRADE BOTTOM OF BASIN AS LEVEL AS POSSIBLE.
3. ALL INLETS AND OUTLETS SHALL BE PROTECTED BY RIP-RAP. OVERFLOW SPILLWAY SHALL BE LINED WITH 2” - 4” ROCK.
4. PERFORATED PIPE TRENCH SHALL BE COMPLETELY LINED WITH FILTER FABRIC.
5. THE SEDIMENT BASIN SHALL DISCHARGE TO A STABILIZED CONVEYANCE, OUTLET OR LEVEL SPREADER. A SEDIMENT FENCE SHALL BECONSTRUCTED IMMEDIATELY DOWNSTREAM OF THE OUTFLOW POINT.
6. INSPECT ONCE PER WEEK AND WITHIN 24 HOURS FOLLOWING A 0.5 INCH RAIN EVENT.
7. REMOVE SEDIMENT FROM THE BASIN WHEN IT REACHES 1 FOOT IN DEPTH.
8. SEDIMENT BASINS SHALL BE SIZED AND DESIGNED BY A LICENSED CIVIL ENGINEER.
9. STRUCTURES HAVING A MAXIMUM STORAGE CAPACITY AT THE TOP OF BERM OF 10 ACRE-FT (435,600 FT3) OR MORE ARE SUBJECT TO THEWASHINGTON DAM SAFETY REGULATIONS (CHAPTER 173-175 WAC).
10. REFER TO BMP C241 IN VOLUME II OF THE STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON FOR MORE INFORMATION.
SEDIMENT BASIN
EC - 070
SEPT 2019
K.H.
1' MIN.
2' MIN.
LEVEL BOTTOM
SWALE SPACING DEPENDS
ON SLOPE GRADIENT
18" MIN.
2:1 MAX. SLOPE
DIKE MATERIAL COMPACTED
TO 95% OF ASTM D1556
DIKE SPACING DEPENDS
ON SLOPE GRADIENT
2' MIN.
2:1 MAX. SLOPE
NOTES:
1. SWALES OR DIKES ARE DESIGNED TO INTERCEPT STORMWATER RUNOFF TO EITHER PREVENT IT FROM ENTERING A DISTURBED AREA OR TOREDIRECT SEDIMENT-LADEN WATER LEAVING A DISTURBED AREA.
2. INTERCEPTOR SWALES SHALL MEET THE FOLLOWING CRITERIA:
A. BOTTOM WIDTH: 2 FEET MINIMUM
B. DEPTH: 1 FOOT MINIMUM
3. INTERCEPTOR DIKES SHALL MEET THE FOLLOWING CRITERIA:
A. TOP WIDTH: 2 FEET MINIMUM
B. HEIGHT: 1.5 FEET MINIMUM ON BERM
4. SIDE SLOPES OF SWALES/DIKES SHALL BE NO GREATER THAN 2:1.
5. MAXIMUM SLOPE OF FLOW PATH ALONG SWALES AND PERPENDICULAR TO DIKES SHALL BE EQUAL TO OR LESS THAN 5 PERCENT.
6. HORIZONTAL SPACING OF SWALES/DIKES BASED ON SITE SLOPE:
Slope 3-5% 5-10% 10-25% 25%-50%Distance 300 FT 200 FT 100 FT 50 FT
7. FLOWS SHOULD DISCHARGE TO A SUITABLE OUTLET (SUCH AS A SEDIMENT TRAP OR SEDIMENT BASIN).
8. DIKES AND SWALES SHALL BE STABILIZED WITH TEMPORARY OR PERMANENT VEGITATION OR OTHER CHANNEL PROTECTION THROUGHOUTTHE CONSTRUCTION PHASE; STEEPER GRADES REQUIRE CHECK DAMS.
9. INSPECT ONCE PER WEEK AND WITHIN 24 HOURS FOLLOWING A 0.5 INCH RAIN EVENT. REPAIR ANY DAMAGE IMMEDIATELY.
10. REFER TO BMP C200 IN VOLUME II OF THE STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON FOR MORE INFORMATION.
INTERCEPTOR SWALES AND DIKES
EC - 080
SEPT 2019
K.H.
SURFACE ROUGHENING
EC - 085
SEPT 2019
K.H.
FILTER FABRIC
(ALL FOUR SIDES)
INLET WITH GRATE
FILTER FABRIC
MATERIAL STAPLED
TO STAKES
RUNOFF WATER
WITH SEDIMENT
INLET WITH GRATE
BURY FILTER FABRIC
(MINIMUM 6" DEPTH)
WOOD STAKES
(2" X 2" X 3')
WOOD STAKES
(2" X 2" X 3')
FILTER FABRIC INLET BARRIER
EC - 090
SEPT 2019
K.H.
PLAN VIEW
FILTER MAT
BACK OF CURB
CURB INLET
CURB INLET
FILTER MAT
STREET CURB INLET GRATE
7 ZIP TIES
AND HOLD-DOWN PADS
FLAT STREET GRATE
8 ZIP TIES
AND HOLD-DOWN PADS
NOTES:
1. FOR USE ON DROP INLETS AND CURB INLETS IN PAVED AREAS.
2. POSITION FILTER MAT ON INLET GRATE WITH MINIMUM 1 INCH
OVERLAP ON EACH SIDE.
3. ATTACH WITH CABLE TIES. USE A MINIMUM OF 7 TIES FOR CURB
INLET GRATES AND 8 FOR FLAT INLET GRATE.
4. INSPECT ONCE PER WEEK AND WITHIN 24 HOURS FOLLOWING A 0.5
INCH RAIN EVENT.
5. REMOVE DEBRIS AND SEDIMENT BUILDUP FROM BEHIND AND TOP
OF MAT.
6. REPLACE WITH NEW FILTER MAT AS NEEDED TO ENSURE PROPER
FUNCTION.
CROSS SECTION VIEW
1" MIN.
INLET PROTECTION FILTER MAT
EC - 095
SEPT 2019
K.H.
AA
FLO
W
BIO
FILT
ER
B
AG
ST
AK
ES
BIO
FILT
ER
B
AG
ST
AK
E
BIO
FILT
ER
B
AG
FLO
WF
LO
W
BIO
FILT
ER
B
AG
S
ST
AK
ES
PL
AN
DIT
CH
IN
LE
T
SE
CT
IO
N A
-A
CA
TC
H B
AS
IN
AR
EA
D
RA
IN
FLO
W
DIT
CH
B
OT
TO
M
FA
CE
O
F C
UR
B
18" M
AX
.
INLET PROTECTION BIOFILTER BAGS
EC - 120
SEPT 2019
K.H.
1
2
'L'
1
2
'L' = THE DISTANCE SUCH THAT POINTS
'A' & 'B' ARE THE SAME ELEVATION
EXTENDED SECTION A-A
SPILLWAY POINT B
1' SUMP
OPTIONAL
F
LO
W
A
A
.
18"
VIEW LOOKING UPSTREAM
EXISTING
CHANNEL
EFFECTIVE DAM
HEIGHT VARIES
BASED ON FLOW
2" - 4" ROCK
SPILLWAY
WEIR DEPTH 'D'
8" MIN
1
2
1
2
SPILLWAY
8" MIN
EFFECTIVE HEIGHT
VARIES BASED
ON FLOW
8" MIN
POINT A
1
2
ROCK CHECK DAM
EC - 130
SEPT 2019
K.H.
A
B
FLOW
FR
ON
T A
PR
ON
RE
AR
A
PR
ON
ST
AP
LE
S (T
YP
.)
(3
' M
AX
. S
PA
CIN
G)
BA
CK
O
F D
IT
CH
(T
YP
.)
C
DIT
CH
L
CH
EC
K D
AM
3" M
IN
.
BA
CK
O
F D
IT
CH
(T
YP
.)
P
LA
N V
IE
W
S
EC
TIO
N A
FL
OW
DIG
T
RE
NC
H A
PP
RO
XIM
AT
EL
Y 6
" W
ID
E
AN
D D
EE
P, S
TA
PL
E E
ND
O
F F
IL
TE
R F
AB
RIC
AN
D B
AC
KF
IL
L W
IT
H N
AT
IV
E M
AT
ER
IA
L
CH
EC
K D
AM
OR
IE
NT
T
HE
S
EW
N E
DG
E O
F T
HE
C
HE
CK
D
AM
N
TO
WA
RD
T
HE
U
PS
TR
EA
M S
ID
E
ST
AP
LE
S (T
YP
.)
8" M
IN
. L
EN
GT
H
S
EC
TIO
N B
IS
OM
ET
RIC
V
IE
W
RE
AR
A
PR
ON
FR
ON
T A
PR
ON
BA
CK
O
F D
IT
CH
(T
YP
.)
F
L
O
W
A
B
GEOTEXTILE ENCASED CHECK DAM
EC - 140
SEPT 2019
K.H.
6" MIN. END OVERLAP
STAPLE OVERLAPS
EXTEND BLANKET 2 FEET BEYOND TOE OF SLOPE,
TURN THE END UNDER 4" & STAPLE @ 12" INTERVALS.
MIN. 6"
EDGE OVERLAP
ANCHOR TOP 12 INCHES
OF BLANKET IN 6" x 6" TRENCH
AND STAPLE AT 12" INTERVALS.
EXTEND BLANKET FAR ENOUGH
OVER CREST OF SLOPE TO
PREVENT UNDERCUTTING.
INITIAL CHANNEL ANCHOR TRENCH
12
"
EROSION CONTROL BLANKET-SLOPE INSTALLATION
EC - 150
SEPT 2019
K.H.
LONGITUDINAL ANCHOR TRENCH TERMINAL SLOPE & CHANNEL ANCHOR TRENCH
6"
12"
6"
INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT
12"
6"
6"
STAKE @ 3'-5'
INTERVALS.
C
H
A
N
N
E
L
B
O
T
T
O
M
CHECK SLOT @ 25' INTERVALS
ISOMETRIC VIEW
EROSION CONTROL BLANKET-CHANNEL INSTALLATION
EC - 155
SEPT 2019
K.H.
INTERCEPTOR DIKE
12" MIN.
STANDARD FLARED
END SECTION
PROVIDE RIPRAP PAD
OR EQUIVALENT ENERGY
DISSIPATION
CPEP, HDPE OR EQUIVALENT PIPE
DIKE MATERIAL COMPACTED
90% MODIFIED PROCTOR
1. USED TO DIVERT RUNOFF AWAY FROM BARE SOIL AREAS ON SLOPES.
2. USE DIVERSION DIKES OR SWALES TO COLLECT WATER AT THE TOP OF SLOPE.
3. THRUST BLOCKS SHALL BE INSTALLED ANYTIME 90 DEGREE BENDS ARE UTILIZED.
4. PIPE SHALL BE SECURED ALONG ITS ENTIRE LENGTH TO PREVENT MOVEMENT. INSTALL
STEEL "T" POSTS ON BOTH SIDES OF PIPE AND WIRE PIPE TO POSTS. POSTS SHALL HAVE A
MINIMUM SPACING OF 20 FEET.
5. INLET AND ALL SECTIONS MUST BE SECURELY FASTENED TOGETHER, FUSED OR HAVE
GASKETED WATERTIGHT FITTINGS.
6. DISCHARGE TO A STABILIZED STABILIZED OUTLET.
7. INSPECT ONCE PER WEEK AND WITHIN 24 HOURS FOLLOWING A 0.5 INCH RAIN EVENT.
CHECK FOR CLOGGING AND UNDERCUTTING OF THE INLET. OUTLET SHALL BE FREE OF
EROSION.
8. REFER TO BMP C204 IN VOLUME II OF THE STORMWATER MANAGEMENT MANUAL FOR
WESTERN WASHINGTON FOR MORE INFORMATION.
NOTES:
PROVIDE RIPRAP PAD
OR EQUIVALENT ENERGY
DISSIPATION
PIPE SLOPE DRAIN
EC - 170
SEPT 2019
K.H.
L
E
N
G
T
H
V
A
R
I
E
S
1
2
"
M
I
N
I
M
U
M
O
V
E
R
L
A
P
(
T
Y
P
.
)
S
P
A
C
I
N
G
3
6
"
O
.
C
.
CONTOUR LINE (TYP.)
ANGLE TERMINAL END UPHILL 24" TO 48"
TO PREVENT FLOW AROUND WATTLE
(TYP.)
2" × 2" × 24" WOODEN
STAKE (TYP.)
STAGGER OVERLAPS (TYP.)
3'-4'
STRAW ROLLS MUST
BE PLACED ALONG
SLOPE CONTOURS
1
0
'
-
2
5
'
SEDIMENT, ORGANIC MATTER,
AND NATIVE SEEDS ARE
CAPTURED BEHIND THE ROLLS.
SPACING DEPENDS ON
SOIL TYPE AND SLOPE
STEEPNESS
LIVE STAKE
1" X 1" STAKE
4
"
-
5
"
8"-10" DIAMETER
STRAW WATTLES
EC - 180
SEPT 2019
K.H.
PLASTIC COVERING/SHEETING
EC - 190
SEPT 2019
K.H.
WASHOUT STRUCTURE WITH WOOD PLANKS
EXCAVATED WASHOUT STRUCTURE
CONCRETE WASHOUT
EC - 200
SEPT 2019
K.H.