19 June 2009 2116660A PR_6931 Section 94A Levy Development Contributions Plan 2009 Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Ernst & Young Centre, Level 27, 680 George Street Sydney NSW 2000 GPO Box 5394 Sydney NSW 2001 Australia Telephone +61 2 9272 5100 Facsimile +61 2 9272 5101 Email [email protected] NCSI Certified Quality System ISO 9001

Upload: others

Post on 13-Mar-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

19 June 2009

2116660A PR_6931

Section 94A Levy Development Contributions Plan 2009

Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798

Ernst & Young Centre, Level 27, 680 George Street Sydney NSW 2000 GPO Box 5394 Sydney NSW 2001 Australia Telephone +61 2 9272 5100 Facsimile +61 2 9272 5101 Email [email protected] NCSI Certified Quality System ISO 9001

© Parsons Brinckerhoff Australia Pty Limited (PB) [2006].

Copyright in the drawings, information and data recorded in this document (the information) is the property of PB. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by PB. PB makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information.

Author: Stacy Warren

Signed: .....................................................................................................

Reviewer: .....................................................................................................

Signed: .....................................................................................................

Approved by: .....................................................................................................

Signed: .....................................................................................................

Date: .....................................................................................................

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page i

Contents

Page Number

Part A: Summary schedules ...............................................................................................................1

Part B: Expected development and demand for public facilities ...................................................2

Part C: Administration and Operation ...............................................................................................3 1.1 What is the name of this plan? 3 1.2 Application of this plan 3 1.3 When does this development contributions plan commence? 3 1.4 What is the purpose of this contributions plan 3 1.5 Exemptions to the levy 3 1.6 Pooling of levies 4 1.7 Construction certificates and the obligation of accredited certifiers 4 1.8 How will the levy be calculated 4 1.9 When is the levy payable 5 1.10 How will the levy be adjusted 5 1.11 Can deferred or periodic payments be made? 7 1.12 Credit for existing development 7

Dictionary .....................................................................................................................................................9

Schedule 1..................................................................................................................................................11 List of tables Table 1: Summary of works program 1 Table 2: Levies payable for development 1 Table 3: Works schedule 11

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 1

Part A: Summary schedules

The works schedule and associated maps included in Schedule 1 identify both the public facilities and the locations of such facilities for which section 94A levies will be required.

Levies paid to council under a condition authorised by this plan will be applied towards meeting the cost of provision or augmentation of public facilities that have been or will be provided. Table 1 provides a summary of new public facilities, which will be provided by council over the next 10 years, as well as the estimated cost of provision. Table 2 sets out the rate of the levy to be charged, dependant on the estimated cost of construction.

Table 1: Summary of works program

Public facilities Cost

Rural road Construction/ Upgrade $517,500

Rural bridges $1,120,000

Bus Shelters $40,000

Traffic facilities $160,000

Urban Road upgrades including kerb and guttering $2,657,500

Community facilities $601,100

Urban and Civic improvements $95,000

Recreation facilities $465,000

Table 2: Levies payable for development

Cost of construction Rate of levy

$0 - $100,000 0%

$100,001 - $200,000 0.5%

In excess of $200,000 1%

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 2

Part B: Expected development and demand for public facilities

The relationship between expected development and the demand is established through:

the population projections undertaken by the Australian Bureau of Statistics (2006) indicate likely growth of 2.9%, with a total growth target population of approximately 32,188 residents by 2020

the Goulburn Mulwaree Strategy 2020

the likely population growth will require the provision of additional public facilities

the likely population growth will diminish the existing population’s enjoyment and standards of public facilities.

Figure 1-1 Land to which this plan applies

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 3

Part C: Administration and Operation

1.1 What is the name of this plan? The plan is called Goulburn Mulwaree Shire Council Section 94A Levy Plan 2009.

1.2 Application of this plan The Plan applies to all land within the Goulburn Mulwaree local government area, as shown in Figure 1-1. The plan does not apply to land and land uses, as identified in the Goulburn Mulwaree local government area Section 94 Development Contributions Plan, Amendment No. 1.

Land:

Ducks Lane

Common Street

Mary’s Mount

Clyde Street.

Land Uses:

Extractive Industries (Quarries) and Mines.

1.3 When does this development contributions plan commence? The Plan commenced on 20 February 2009.

Following amendment No. 1 to Goulburn Mulwaree S94 Contributions Plan, consequential minor adjustments (clause 32 (3) (a) EP&A Regulations 2000), were adopted on:

16 June 2009 to:

- Clauses 1.2, 1.3 and 1.12

1.4 What is the purpose of this contributions plan The primary purposes of this contributions plan are:

to authorise the imposition of a condition on certain development consents and complying development certificates requiring the payment of a contribution pursuant to section 94A of the Environmental Planning and Assessment Act 1979

to assist the council to provide the appropriate public facilities which are required to maintain and enhance amenity and service delivery within the area

to publicly identify the purposes for which the levies are required.

1.5 Exemptions to the levy The levy will not be imposed in respect of development:

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 4

where the proposed cost of carrying out the development is $100,000 or less

for the purpose of disabled access

for the sole purpose of providing affordable housing

for the purpose of reducing a building’s use of potable water (where supplied from water mains) or energy

for the sole purpose of the adaptive reuse of an item of environmental heritage, or

that has been the subject of a condition under section 94 under a previous development consent relating to the subdivision of the land on which the development is to be carried out.

Council may consider exempting other development, or components of developments from the section 94A levy on a case by case basis. For such claims to be considered, a development application will need to include a comprehensive submission arguing the case for exemption.

1.6 Pooling of levies This plan expressly authorises section 94A levies paid for different purposes to be pooled and applied (progressively or otherwise) for those purposes. The priorities for the expenditure of the levies are shown in the works schedule.

1.7 Construction certificates and the obligation of accredited certifiers In accordance with clause 146 of the Environmental Planning and Assessment Regulation 2000, a certifying authority must not issue a construction certificate for building work or subdivision work under a development consent unless it has verified that each condition requiring the payment of levies has been satisfied.

In particular, the certifier must ensure that the applicant provides a receipt(s) confirming that levies have been fully paid and copies of such receipts must be included with copies of the certified plans provided to the council in accordance with clause 142(2) of the of the Environmental Planning and Assessment Regulation. Failure to follow this procedure may render such a certificate invalid.

The only exceptions to the requirement are where a works in kind, material public benefit, dedication of land or deferred payment arrangement has been agreed by the council. In such cases, council will issue a letter confirming that an alternative payment method has been agreed with the applicant.

1.8 How will the levy be calculated The levy will be determined on the basis of the rate as set out in summary schedule. The levy will be calculated as follows:

Levy payable = %C x $C

Where

%C is the levy rate applicable

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 5

$C is the proposed cost of carrying out the development

The proposed cost of carrying out the development will be determined in accordance with clause 25J of the Environmental Planning and Assessment Regulation 2000. The procedures set out in Schedule 1 to this plan must be followed to enable the council to determine the amount of the levy to be paid.

The value of the works must be provided by the applicant at the time of the request and must be independently certified by a Quantity Surveyor who is registered with the Australian Institute of Quantity Surveyors or a person who can demonstrate equivalent qualifications.

Without limitation to the above, council may review the valuation of works and may seek the services of an independent person to verify the costs. In these cases, all costs associated with obtaining such advice will be at the expense of the applicant and no construction certificate will be issued until such time that the levy has been paid.

1.9 When is the levy payable A levy must by paid to the council at the time specified in the condition that imposes the levy. If no such time is specified, the levy must be paid prior to the issue of a construction certificate or complying development certificate.

1.10 How will the levy be adjusted Contributions required as a condition of consent under the provisions of this plan will be adjusted at the time of payment of the contribution in accordance with the following formula:

Contribution = $Co + A

at time of payment

Where

$ Co is the original contribution as set out in the consent

A is the adjustment amount which is =

$Co x ([Current Index - Base Index])

[Base Index]

Where:

Current Index (CPI) is the CPI as published by the Australian Taxation office (ATO) available at the time of review of the contribution rate;

Base Index (CPI) is the CPI as published by the ATO at the date of adoption of this plan which is 165.5 as at December 2008

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 6

Note: In the event that the Current CPI is less than the previous CPI, the Current CPI shall be taken as not less than the previous CPI.

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 7

1.11 Can deferred or periodic payments be made? Deferred or periodic payments may be permitted in the following circumstances:

deferred or periodic payment of the contribution will not prejudice the timing or the manner of the provision of public facilities included in the works program

in other circumstances considered reasonable by council.

If council does decide to accept deferred or periodic payment, council may require the applicant to provide a bank guarantee by a bank for the full amount of the contribution or the outstanding balance on condition that:

the bank guarantee be by a bank for the amount of the total contribution, or the amount of the outstanding contribution, plus an amount equal to thirteen (13) months interest plus any charges associated with establishing or operating the bank security

the bank unconditionally pays the guaranteed sum to the council if the council so demands in writing not earlier than 12 months from the provision of the guarantee or completion of the work

the bank must pay the guaranteed sum without reference to the applicant or landowner or other person who provided the guarantee, and without regard to any dispute, controversy, issue or other matter relating to the development consent or the carrying out of development

the bank's obligations are discharged when payment to the council is made in accordance with this guarantee or when council notifies the bank in writing that the guarantee is no longer required

where a bank guarantee has been deposited with council, the guarantee shall not be cancelled until such time as the original contribution and accrued interest are paid.

1.12 Credit for existing development Contributions will be levied according to the estimated increase in demand. An amount equivalent to the contribution attributable to any existing (or approved) development on the site of a proposed new development will be allowed for in the calculation of contributions.

For the purposes of calculating the contribution rates of various dwelling types, the occupancy rate for different types of developments used in this plan are listed in the following Table:

Assumed occupancy rates for residential development

Development type Assumed occupancy rate

1 bedroom unit 1.0 person per dwelling

2 bedroom unit 1.5 persons per dwelling

3+ bedroom unit 2.0 persons per dwelling

Dwelling house 2.0 persons per dwelling

Residential subdivision 2.0 persons per lot

Credit will be given for existing residential development dependant on the number and size of dwellings in the event of site redevelopment.

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 8

Where a development does not fall within any of the items noted above, the Council would determine the credit on the basis of the likely demand that the existing development would create.

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 9

Dictionary

In this plan, unless the context or subject matter otherwise indicates or requires, the following definitions apply:

applicant means the person, company or organisation submitting a development application.

civic improvement means a work carried out to improve the appearance or use of public areas, such as streets, malls, footpaths and the like.

community facility means a building or place owned or controlled by the Council or a body of persons which may provide for the physical, social, cultural or intellectual development or welfare of the local community, but does not include a building or place elsewhere defined in this section.

contribution means the dedication of land, the making of a monetary contribution or the provision of a material public benefit, as referred to in section 94 of the Environmental Planning and Assessment Act 1979.

Council means the Goulburn Mulwaree Council.

EP&A Act means the Environmental Planning and Assessment Act 1979.

EP&A Regulation means the Environmental Planning and Assessment Regulation 2000.

floor space area for the purposes of this plan means the sum of the areas of each floor of a building where the area of each floor is taken to be the area within the outer face of the external enclosing walls as measured at 1.4 metres above each floor level, excluding:

(a) columns, fin walls, sun control devices, awnings and any other elements, projections or works outside the general lines of the outer face of the external wall; and

(b) lift towers, cooling towers, machinery and plant rooms, ancillary storage space and air-conditioning ducts; and

(c) car parking needed to meet any requirements of the Council and any internal designated vehicular or pedestrian access; and

(d) space for the loading and unloading of goods; and

(e) internal public arcades and thoroughfares, terraces and balconies and outer walls less than 1.4 metres high.

Goulburn Mulwaree LEP means the Goulburn Mulwaree Local Environmental Plan 2009.

Goulburn Mulwaree means the Goulburn Mulwaree LGA.

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 10

Material public benefit means something provided by an applicant, other than the dedication of land or the payment of a monetary contribution, which does not relate to an item appearing in the works schedule of a contributions plan.

planning agreement means an agreement between council or other consent authorities and developers where contributions are secured by way of negotiation. A planning agreement is voluntary by all parties to the agreement or may be another arrangement between a planning authority and a developer under which the developer is required to dedicate land free of cost, pay a monetary contribution, or provide any other material public benefit to be used for or applied towards a public purpose.

public facilities means any public amenity or public service, as referred to in section 94 of the Environmental Planning and Assessment Act 1979, including a "community facility" and a "recreation facility", the need for which has increased or been created by development.

recreation facility means a building or place used for sporting activities, recreation or leisure activities, whether or not operated for the purpose of gain, but does not include a building or place elsewhere defined in this section.

Strategy means the Goulburn Mulwaree Strategy 2020

RTA means the NSW Roads and Traffic Authority.

works in kind means the undertaking of a work or provision of a facility by an applicant which is already nominated in the works schedule of a contributions plan.

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 11

Schedule 1 Works Schedule Completed works for which contributions will be recouped

DESCRIPTION ESTIMATED COST

Health Care/ Community Centre, George Street, Marulan

$510,000

Meridian Park, Marulan – Picnic facilities, playground equipment and off street parking

$60,000

Cycle path, off Blackshaw Road linking the Mulwaree track and pathway off Park Road

$45,000

Works in progress for which contributions will continue to be levied

1. Nil

New public facilities for which contributions will be sought

Table 3: Works schedule

DESCRIPTION

ESTIMATED COST

STAGING

Low Priority: 6-10 years

Medium Priority :3-6 years

High Priority (H1, H2, H3): 0-3 years

Rural road Construction/ Upgrade1

Oallen Ford Road, Windellama $48,700 H1

Caoura Road, Tallong 75,400 H1

Painters Lane, Tirrannaville 125,000 H1

Collector Road, Tarago 150,000 H3

Windellama Road, Windellama 103,700 H1

Jerrara Road, Bungonia 14,700 H1

Rosemont Road, Brisban Grove 120,000 H2

Rural bridges upgrades or replacements

Henry Parks Road, Parkesbourne 200,000 H2

Inverary Road, Bungonia 200,000 H3

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 12

DESCRIPTION

ESTIMATED COST

STAGING

Low Priority: 6-10 years

Medium Priority :3-6 years

High Priority (H1, H2, H3): 0-3 years

Mayfield Road, Mayfield 300,000 M

Lumley Road, Bungonia – Tarago 300,000 L

Bus Shelters

Bungonia 10,000 H1

Park Road, Goulburn 10,000 H2

Bourke Street, Goulburn 10,000 H3

Rex Street, Goulburn 10,000 M

Traffic facilities

Marulan BP Service Centre Northbound Lane off Hume Highway, Goulburn, upgrade to the Marulan off ramp (north bound)

100,000 H1

Sloane/ Clifford Streets, roundabout 500,000 H2

Sloane/ Clinton Streets, roundabout 500,000 H3

Bourke/ Verner Streets, roundabout 500,000 L

Urban Road upgrades2

Goulburn:

Princess Street (plus kerb and gutter) 82,000 H1

Rex Street (plus Kerb and gutter) 103,000 H1

Dewhirst Street (plus kerb and gutter) 90,000 H1

Faithfull St 200,000 H1

Bradley and Mulwaree Streets (plus kerb and gutter)

275,000 H2

Sowerby Street 100,000 H2

Tallong village (kerb and gutter) 11,500 H2

Tarago village (kerb and gutter) 10,000 H3

Clinton Street 100,000 H3

Mundy Street 100,000 H3

Henderson Street (kerb and gutter) 80,000 H3

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 13

DESCRIPTION

ESTIMATED COST

STAGING

Low Priority: 6-10 years

Medium Priority :3-6 years

High Priority (H1, H2, H3): 0-3 years

Addison Street 190,000 H3

Rose Street 30,000 H3

Edward Street 30,000 H3

Queen, McDermott, Bourke and Lisgar Street 370,000 M

Kelso Street 50,000 M

Hurst Street 50,000 M

Taralga Road (kerb and gutter) 90,000 M

Sloane, Grafton, Reynolds and Union Street 360,000 M

Jubilee Street 30,000 M

Churchill Street 50,000 M

Hillview Street 30,000 M

May Street (kerb and gutter) 100,000 M

Ridge Street (kerb and gutter) 110,000 L

Marulan:

Wollondilly Street (kerb and gutter) 11,000 H1

Tallong:

Caoura Road (kerb and gutter) 11,500 H2

Tarago:

King Street (kerb and gutter) 10,000 H3

Bungonia:

Oallen Ford Road (kerb and gutter) 5,000 M

Community facilities

Regional Aquatic centre:

Noise attenuation upgrade 122,000 H1

First sun shade 9,100 H2

Water tanks 20,000 H2

Outdoor pool wet deck upgrade 115,000 H3

Second sun shade 10,000 M

BBQ area upgrade 10,000 M

Water recycling upgrade 110,000 M

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 14

DESCRIPTION

ESTIMATED COST

STAGING

Low Priority: 6-10 years

Medium Priority :3-6 years

High Priority (H1, H2, H3): 0-3 years

Meridian Park, Marulan:

Meridian Park, Marulan, landscaping (pathway, planning and irrigation infrastructure)

Toilets 75,000 H3

Urban and Civic improvements

Wollondilly River and Mulwaree Ponds Foreshore Improvements 3

75,000 H1

Water works museum, Crookwell Road, Goulburn, picnic area including tables, seating and BBQ area

20,000 H2

Recreation facilities

Goulburn:

Belmore park upgrade, including water bore and irrigation infrastructure

110,000 H2

Victoria Park upgrade, including fencing, landscape and dedicated garden

75,000 H1

Roberts Park upgrade, landscaping, picnic shelters, paths and will tree control

60,000 H2

Hudson park upgrade, including playing surface improvements and fencing

60,000 H3

Prell Park upgrade including re-turf areas and improved fencing

60,000 H3

Goodhew Park upgrade, including toilet block, pathway and landscaping

70,000 M

Marulan:

Portland Ave Sporting fields, access roads and parking area

30,000 H2

Notes: 1. Works include clearing, pavement widening and improvements (7m sealed pavement) and

associated drainage works. Roads will be progressively upgraded in accordance with Ausroad Standards.

2. Works include kerb and guttering, sealing, associated underground drainage, erosion and stormwater control works, and landscape planting.

3. Proposed works include ongoing improvements to Mulwaree Ponds foreshore including willow tree removal, installation of picnic areas, cycle paths and seating along the scenic walkway adjacent to the river.

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 15

APPENDIX A

Procedure

A cost summary report is required to be submitted to allow council to determine the contribution that will be required. The following should be provided:

A cost summary report must be completed for works with a value no greater than $200,000.

A Quantity Surveyor’s Detailed Cost Report must be completed by a registered Quantity Surveyor for works with a value greater that $200,000.

To avoid doubt, section 25J of the Environmental Planning and Assessment Regulation 2000 (attached) sets out the things that are included in the estimation of the construction costs by adding up all the costs and expenses that have been or are to be incurred by the applicant in carrying out the development, including the following:

if the development involves the erection of a building, or the carrying out of engineering or construction work—the costs of or incidental to erecting the building, or carrying out the work, including the costs (if any) of and incidental to demolition, excavation and site preparation, decontamination or remediation

if the development involves a change of use of land—the costs of or incidental to doing anything necessary to enable the use of the land to be changed

if the development involves the subdivision of land—the costs of or incidental to preparing, executing and registering the plan of subdivision and any related covenants, easements or other rights.

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 16

Cost Summary Report

[Development Cost no greater than $200,000.

DEVELOPMENT APPLICATION No. REFERENCE:

COMPLYING DEVELOPMENT CERTIFICATE APPLICATION No. CONSTRUCTION CERTIFICATE No. DATE:

APPLICANT’S NAME:

APPLICANT’S ADDRESS:

DEVELOPMENT NAME:

DEVELOPMENT ADDRESS:

ANALYSIS OF DEVELOPMENT COSTS:

Demolition and alterations $ Hydraulic services $ Structure $ Mechanical services $ External walls, windows and doors

$ Fire services $

Internal walls, screens and doors

$ Lift services $

Wall finishes $ External works $ Floor finishes $ External services $ Ceiling finishes $ Other related work $ Fittings and equipment $ Sub-total $

Sub-total above carried forward

$

Preliminaries and margin $ Sub-total $ Consultant Fees $ Other related development costs

$

Sub-total $ Goods and Services Tax $ TOTAL DEVELOPMENT COST

$

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 17

I certify that I have: • inspected the plans the subject of the application for development consent or construction

certificate. • calculated the development costs in accordance with the definition of development costs in

clause 25J of the Environmental Planning and Assessment Regulation 2000 at current prices. • included GST in the calculation of development cost.

Signed: ____________________________________ Name: ____________________________________

Position and Qualifications: ____________________________________

Date: ____________________________________

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 18

Registered* Quantity Surveyor’s Detailed Cost Report

[Development Cost in excess of $200,000.

*A member of the Australian Institute of Quantity Surveyors

DEVELOPMENT APPLICATION No.

REFERENCE:

COMPLYING DEVELOPMENT CERTIFICATE APPLICATION No.

CONSTRUCTION CERTIFICATE No.

DATE:

APPLICANT’S NAME: ___________________________________________________________________

APPLICANT’S ADDRESS: ___________________________________________________________________

DEVELOPMENT NAME: ___________________________________________________________________

DEVELOPMENT ADDRESS: ___________________________________________________________________

DEVELOPMENT DETAILS:

Gross Floor Area – Commercial m2 Gross Floor Area – Other m2

Gross Floor Area – Residential m2 Total Gross Floor Area m2

Gross Floor Area – Retail m2 Total Site Area m2

Gross Floor Area – Car Parking m2 Total Car Parking Spaces

Total Development Cost $

Total Construction Cost $

Total GST $

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 19

ESTIMATE DETAILS:

Professional Fees $ Excavation

% of Development Cost % Cost per square metre of site area

% of Construction Cost % Car Park

Demolition and Site Preparation $ Cost per square metre of site area

Cost per square metre of site area $ /m2 Cost per space

Construction – Commercial $ Fit-out – Commercial

Cost per square metre of

commercial area

$ /m2 Cost per m2 of commercial area

Construction – Residential $ Fit-out – Residential

Cost per square metre of residential

area

$ /m2 Cost per m2 of residential area

Construction – Retail $ Fit-out – Retail

Cost per square metre of retail area $ /m2 Cost per m2 of retail area

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 20

I certify that I have:

inspected the plans the subject of the application for development consent or construction certificate.

prepared and attached an elemental estimate generally prepared in accordance with the Australian Cost Management Manuals from the Australian Institute of Quantity Surveyors.

calculated the development costs in accordance with the definition of development costs in the S94A Development Contributions Plan of the council of [insert] at current prices.

included GST in the calculation of development cost.

measured gross floor areas in accordance with the Method of Measurement of Building Area in the AIQS Cost Management Manual Volume 1, Appendix A2.

Signed: ____________________________________ Name: ____________________________________

Position and Qualifications: ____________________________________

Date: ____________________________________

Section 94A Levy Development Contributions Plan

PARSONS BRINCKERHOFF 2116660A PR_6931 Page 21

25J Section 94A levy—determination of proposed cost of development

(1) The proposed cost of carrying out development is to be determined by the consent authority, for the purpose of a section 94A levy, by adding up all the costs and expenses that have been or are to be incurred by the applicant in carrying out the development, including the following:

(a) if the development involves the erection of a building, or the carrying out of engineering or construction work—the costs of or incidental to erecting the building, or carrying out the work, including the costs (if any) of and incidental to demolition, excavation and site preparation, decontamination or remediation,

(b) if the development involves a change of use of land—the costs of or incidental to doing anything necessary to enable the use of the land to be changed,

(c) if the development involves the subdivision of land—the costs of or incidental to preparing, executing and registering the plan of subdivision and any related covenants, easements or other rights.

(2) For the purpose of determining the proposed cost of carrying out development, a consent authority may have regard to an estimate of the proposed cost of carrying out the development prepared by a person, or a person of a class, approved by the consent authority to provide such estimates.

(3) The following costs and expenses are not to be included in any estimate or determination of the proposed cost of carrying out development:

(a) the cost of the land on which the development is to be carried out, (b) the costs of any repairs to any building or works on the land that are to be retained

in connection with the development, (c) the costs associated with marketing or financing the development (including

interest on any loans), (d) the costs associated with legal work carried out or to be carried out in connection

with the development, (e) project management costs associated with the development, (f) the cost of building insurance in respect of the development, (g) the costs of fittings and furnishings, including any refitting or refurbishing,

associated with the development (except where the development involves an enlargement, expansion or intensification of a current use of land),

(h) the costs of commercial stock inventory, (i) any taxes, levies or charges (other than GST) paid or payable in connection with

the development by or under any law, (j) the costs of enabling access by disabled persons in respect of the development, (k) the costs of energy and water efficiency measures associated with the

development, (l) the cost of any development that is provided as affordable housing, (m) the costs of any development that is the adaptive reuse of a heritage item. (4) The proposed cost of carrying out development may be adjusted before payment,

in accordance with a contributions plan, to reflect quarterly or annual variations to readily accessible index figures adopted by the plan (such as a Consumer Price Index) between the date the proposed cost was determined by the consent authority and the date the levy is required to be paid.

(5) To avoid doubt, nothing in this clause affects the determination of the fee payable for a development application.