section no. 1 bill no. 1 · 2019-07-22 · model preambles will be entertained. tenderers are...

255
Amount Item No Quantity Rate For Gauteng Growth and Development Agency (GGDA) At Bonaero Park Construction of New JMP Buildings SECTION NO. 1 BILL NO. 1 PRELIMINARIES Unless otherwise stated all items in this bill will be Work Group 190 CPA WORK GROUP The JBCC Principal Building Agreement (March 2014 Edition 6.1) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described BUILDING AGREEMENT AND PRELIMINARIES The following documents form an integral part of this agreement: a) JBCC Principal Building Agreement Contract Data Edition 6.1 March 2014 b) JBCC Nominated/ Selected Sub Contract Agreement Edition 6.1 March 2014 c) JBCC Nominated/ Selected Sub Contract Agreement Contract Data Edition 6.1 March 2014 -1- Preliminaries Bill No. 1 PRELIMINARIES Section No. 1 Part C2. Pricing Data Carried to Collection R

Upload: others

Post on 20-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 1

BILL NO. 1

PRELIMINARIES

Unless otherwise stated all items in this bill will be WorkGroup 190

CPA WORK GROUP

The JBCC Principal Building Agreement (March 2014Edition 6.1) prepared by the Joint Building ContractsCommittee shall be the applicable building agreement,amended as hereinafter described

BUILDING AGREEMENT AND PRELIMINARIES

The following documents form an integral part of thisagreement:

a) JBCC Principal Building Agreement Contract DataEdition 6.1 March 2014

b) JBCC Nominated/ Selected Sub Contract AgreementEdition 6.1 March 2014

c) JBCC Nominated/ Selected Sub Contract AgreementContract Data Edition 6.1 March 2014

-1-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 2: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

The Model Preambles for Trades (September 2008edition) as published by the Association of South AfricanQuantity Surveyors shall be deemed to be incorporatedin these bills of quantities and no claims arising frombrevity of description of items fully described in the saidModel Preambles will be entertained.

Tenderers are advised to study the GP ASC Rev 0(General specifications of materials and methods to beused for building contracts) before pricing the bill. Thedocument is readily available at GDID offices forinspection as and when required.

PREAMBLES FOR TRADES

Supplementary preambles are incorporated in these billsof quantities to satisfy the requirements of this project.Such supplementary preambles shall take precedenceover the provisions of the said Model Preambles

The contractor's prices for all items throughout thesebills of quantities must take account of and include forall of the obligations, requirements and specificationsgiven in the said Model Preambles and in anysupplementary preambles

The measuring system used for the preparation of thebills of quantities is the Standard System of MeasuringBuilding Work (seventh edition, 2015) published by theAssociation of South African Quantity Surveyors(ASAQS)

STANDARD SYSTEM OF MEASURING BUILDING WORK

Any reference to the words "Tender" or "Tenderer"herein and/or in any other documentation shall beconstrued to have the same meaning as the words"Bid" or "Bidder"

MEANING OF TERMS "TENDER / TENDERER"

-2-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 3: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

The ASAQS Preliminaries (March 2014 edition)published by the Association of South African QuantitySurveyors for use with the JBCC Principal BuildingAgreement shall be deemed to be incorporated in thesebills of quantities

PRELIMINARIES

The contractor is deemed to have referred to the above-mentioned documents for the full intent and meaning ofeach clause

The clauses in the above-mentioned documents areherein after referred to by clause number and headingonly. Where standard clauses or alternatives are notentirely applicable to this agreement such modifications,corrections or supplements as will apply are given undereach relevant clause heading and such modifications,corrections or supplements shall take precedence notwithstanding anything to the contrary contained in theabove-mentioned documents

Where any item is not relevant to this agreement suchitem is marked N/A (signifying “not applicable”)

Should the contractor select Option A in terms of clause26.9.4 of the contract data for the purpose of adjustmentof these preliminaries, the amount entered into theamount column in these preliminaries is to be dividedinto one or more of the three categories providednamely fixed (F), value related (V) and time related (T)

PRICING OF PRELIMINARIES

Items not priced in these Preliminaries shall be deemedto be included elsewhere in these Bills of Quantities

-3-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 4: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION A: PRINCIPAL BUILDING AGREEMENT (JBCC-CODE EDITION 6.1, MARCH 2014)

Item

Clause 1.0 - Definitions and interpretationF:............................. V:............................ T:............................

1

INTERPRETATION

Clause 1.1 Definition of "Commencement Date" isadded:

"COMMENCEMENT DATE" means the date that theagreement, made in terms of the Form of Offer andAcceptance, comes into effect

Clause 1.1 Definition of "Guarantee for Construction" isamended by replacing it with the following:

"GUARANTEE FOR CONSTRUCTION" means aguarantee at call obtained by the contractor from aninstitution approved by the employer in terms of theemployer's construction guarantee form as selected inthe schedule

Clause 1.1 Definition of "Construction Period" isamended by replacing it with the following:

"CONSTRUCTION PERIOD" means the periodcommencing on the commencement date and ending onthe date of practical completion

Clause 1.1 Definition of "Corrupt Practice" is added:

"CORRUPT PRACTICE" means the offering, giving,receiving or soliciting of anything of value to influencethe action of a public official in the procurement processor in contract execution

-4-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 5: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Clause 1.1 Definition of "Fraudulent Practice" is added:

"FRAUDULENT PRACTICE" means a mispresentationof facts in order to influence a procurement process orthe execution of a contract to the detriment of anytenderer and includes collusive practice amongtenderers (prior to or after the tender submission)designed to establish tender prices at artificial non-competitive levels and to deprive the tenderer of thebenefits of free and open competition

Clause 1.1 Definition of "Interest" is amended byreplacing it with the following:

"INTEREST" means the interest rates applicable on thiscontract, whether specifically indicated in the relevantclauses or not, will be the rate as determined by theMinister of Finance, from time to time, in terms ofsection 80(1)(b) of the Public Finance Management Act,1999 (Act No. 1 of 1999)

Clause 1.1 Definition of "Principal Agent" is amended byreplacing it with the following:

"PRINCIPAL AGENT" means the person or entityappointed by the employer and named in the schedule.In the event of a principal agent not being appointed,then all the duties and obligations of a principal agent asdetailed in the agreement shall be fulfilled by arepresentative of the employer as named in theschedule

Clause 1.1 Definition of "Security" is amended byreplacing it with the following:

"SECURITY" means the form of security provided by theemployer or contractor, as stated in the schedule, fromwhich the contractor or employer may recover expenseor loss

Item

Clause 2.0 - Law, Regulations and Notices F:............................. V:............................ T:............................

2

Clause 2.5 is amended by replacing the words"registered post, telefax or e-mail" with "prepaidregistered post"

-5-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 6: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

ItemClause 3.0 - Offer and Acceptance F:............................. V:............................ T:............................

3

Item

Clause 4.0 - Assignment and Cession F:............................. V:............................ T:............................

4

ItemClause 5.0 - Contract Documents F:............................. V:............................ T:............................

5

Clause 5 is amended by the addition of the followingsub-clause 5.7:

The contractor shall supply and keep a copy of theJBCC Series Principal Building Agreement andPreliminaries applicable to this contract on the site, towhich the employer, principal agent and agents shallhave access at all times

ItemClause 6.0 - Employer’s Agents F:............................. V:............................ T:............................

6

ItemClause 7.0 - Design Responsibility F:............................. V:............................ T:............................

7

Clause 7.0 is deemed to be amended by adding thefollowing new sub-clause 7.4:

The Contractor shall promptly inform the Principal Agentof any patent defects or errors in any design. Inidentifying any patent defects or errors the Contractorshall use its best endeavours.

ItemClause 8.0 - Works risk F:............................. V:............................ T:............................

8

INSURANCE AND SECURITY

-6-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 7: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Clause 8.0 is deemed to be amended by the addition ofthe new clause 8.8 and 8.9:

8.8 Unless specifically stated to the contrary, wheretrade names have been used in the tender documentsto specify materials and goods, this has been done withthe sole purpose of indicating the standard and qualityrequired by the principal agent. The contractor shall befree to supply those of other manufacturers or suppliersprovided that they match the standard and qualityrequired. The onus shall be on the contractor to provethat the materials and goods supplied by him are ofsimilar standard and quality to those specified.

8.9 The risks for loss or damage to the works resultingfrom such materials and goods and for latent defects insuch materials and goods shall be that of the contractor,whether the materials and goods as specified orotherwise are supplied. Where it is specifically statedthat no other trade name will be acceptable then theabove mentioned risks will remain with the employer.

ItemClause 9.0 - Indemnities F:............................. V:............................ T:............................

9

ItemClause 10.0 - Insurances F:............................. V:............................ T:............................

10

Clause 10.0 is amended by the addition of the followingclauses:

10.12 Damage to the Works(a) Without in any way limiting the contractor'sobligations in terms of the contract, the contractor shallbear the full risk of damage to and/or destruction of theworks by whatever cause during construction of theworks and hereby indemnifies and holds harmless theemployer against any such damage. The contractorshall take such precautions and security measures andother steps for the protection and security of the worksas the contractor may deem necessary

(b) The contractor shall at all times proceed immediatelyto remove or dispose of any debris arising from damageto or destruction of the works and to rebuild, restore,replace and/or repair the works

-7-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 8: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

(c) Where the employer bears the risk in terms of thiscontract, the contractor shall, if requested to do so,reinstate any damage or destroyed portions of the worksand the costs of such reinstatement shall be measuredand valued in terms of 32.0 hereof

10.13 Injury to Persons or loss of or damage toProperties(a) The contractor shall be liable for and herebyindemnifies the employer against any liability, loss, claimor proceeding whether arising in common law or bystatute, consequent upon personal injuries to or thedeath of any person whomsoever arising out of or in thecourse of or caused by the execution of the worksunless due to any act or negligence of any person forwhose actions the employer is legally liable

(b) The contractor shall be liable for and herebyindemnifies the employer against any liability, loss, claimor proceeding consequent upon loss of or damage toany moveable or immovable or personal property orproperty contiguous to the site, whether belonging to orunder the control of the employer or any other body orperson, arising out of or in the course of or by reason ofthe execution of the works unless due to any act ornegligence of any person for whose actions theemployer is legally liable

(c) The contractor shall, upon receiving a contractinstruction from the principal agent, cause the same tobe made good in a perfect and workmanlike manner athis own cost and in default thereof the employer shallbe entitled to cause it to be made good and to recoverthe cost thereof from the contractor or to deduct thesame from amounts due to the contractor

(d) The contractor shall be responsible for the protectionand safety of such portions of the premises placedunder his control by the employer for the purpose ofexecuting the works until the issue of the certificate ofpractical completion

-8-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 9: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

(e) Where the execution of the works involves the risk ofremoval of or interference with support to adjoiningproperties including land or structures or any structuresto be altered or added to, the contractor shall obtainadequate insurance and will remain adequately insuredor insured to the specific limit stated in the contractagainst the death of or injury to persons or damage tosuch property consequent on such removal orinterference with the support until such portion of theworks has been completed

(f) The contractor shall at all times proceed immediatelyat his own cost to remove or dispose of any debris andto rebuild, restore, replace and/or repair such propertyand to execute the works

10.14 It is the responsibility of the contractor to ensurethat he has adequate insurance to cover his risk andliability as mentioned in 10.12 and 10.13. Withoutlimiting the contractor's obligations in terms of thecontract, the contractor shall, within twenty-one (21)calendar days of the commencement date but beforecommencement of the works, submit to the employerproof of such insurance policy, if requested to do so

ItemClause 11.0 - Security F:............................. V:............................ T:...........................

11

Clause 11.4 is deleted

ItemClause 12.0 - Duties of the Parties F:............................ V:............................T:............................

12

EXECUTION

Clause 12.1.1 and 12.2.2 are amended by replacing itwith:

No clause

ItemClause 13.0 - Setting Out F:............................. V:............................ T:............................

13

Item

Clause 14.0 - Nominated Subcontractors F:......................... V:............................ T:............................

14

-9-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 10: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Clause 14.1.5 is amended by replacing it with thefollowing:

No clause

Note: See item B9.1 hereinafter for adjustment ofattendance on nominated subcontractors executing workallowed for under provisional sums

Item

Clause 15.0 - Selected Subcontractors F:......................... V:............................ T:............................

15

ItemClause 16.0 - Direct Contractors F:............................. V:............................ T:............................

16

ItemClause 17.0 - Contract Instructions F:............................. V:............................ T:............................

17

Item

Clause 18.0 - Interim Completion = N/S Subcontract Agreement F: ............................ V:...........................T:...........................

18

COMPLETION

ItemClause 19.0 - Practical Completion F:.......................... V:............................ T:............................

19

ItemClause 20.0 - Sectional Completion F:.......................... V:............................ T:............................

20

Item

Clause 21.0 - Defects Liability Period and Final Completion F:............................. V:............................ T:............................

21

Item

Clause 22.0 - Latent Defects Liability Period F:.......................... V:............................ T:............................

22

Item

Clause 23.0 - Revision of the Date for Practical Completion F:............................. V:............................ T:............................

23

-10-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 11: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

Clause 24.0 - Penalty for Late or Non-Completion

The penalty per calendar day is 1.75 cents per R100.00 of the contract value.

F:............................. V:............................ T:............................

24

Item

Clause 25.0 - Payment

Payment shall be subject to the contractor giving the employer a tax invoice for the amount due

F:............................. V:............................ T:............................

25

PAYMENT

Item

Clause 26.0 - Adjustment of the Contract Value and Final Account F:............................. V:............................ T:............................

26

Item

Clause 27.0 - Recovery of Expense and/or Loss F:............................. V:............................ T:............................

27

Item

Clause 28.0 - Suspension by the Contractor F:............................. V:............................ T:............................

28

SUSPENSION AND TERMINATION

Clause 28.1.1 is amended by the addition of thefollowing clause: No clause

ItemClause 29.0 - Termination F:............................. V:............................ T:............................

29

Clause 29.1 is amended by the addition of the followingclauses:

29.1.4 refuses or neglects to comply strictly with any ofthe conditions of contract

TERMINATION BY THE EMPLOYER

-11-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 12: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

29.1.5 estate being sequestrated, liquidated orsurrendered in terms of the insolvency laws in forcewithin the Republic of South Africa

29.1.6 in the judgement of the employer, has engaged incorrupt or fraudulent practices in competing for or inexecuting the contract

Clause 29.14.1 is deleted and is amended by theaddition of the following clause: No clause

TERMINATION BY THE CONTRACTOR

Clause 29.0 is amended by the addition of the followingclause:

29.33 Notwithstanding any clause to the contrary, oncancellation of this agreement either by the employer orthe contractor; or for any reason whatsoever, thecontractor shall on written instruction, discontinue withthe works on a date stated and withdraw himself fromthe site. The contractor shall not be entitled to refuse towithdraw from the works on the grounds of any lien orright of retention or on the grounds of any other rightwhatsoever

Item

Clause 30.0 - Dispute ResolutionF:............................. V:............................ T:............................

30

DISPUTE RESOLUTION

Item

Clause 41.0 - STATE CLAUSESF:............................. V:............................ T:............................

31

SUBSTITUTE PROVISIONS

Item

Clause 42.0 - THE SCHEDULE F:............................. V:............................ T:............................

32

CONTRACT VARIABLES

-12-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 13: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Tenderers are referred to the Contract Data for variablespertaining to this contract

SECTION B: JBCC PRELIMINARIES

Item

B1.1 Definitions and interpretationF:............................. V:............................ T:............................

33

B1.0 DEFINITIONS AND INTERPRETATION

See also clause A1.0 of Section A for additional and/oramended definitions which shall apply equally to thisSection

Item

B2.1 Checking of documentsF:............................. V:............................ T:............................

34

B2.0 DOCUMENTS

Item

B2.2 Provisional bills of quantitiesF:............................. V:............................ T:............................

35

Item

B2.3 Availability of construction documentationF:............................. V:............................ T:............................

36

Item

B2.4 Interests of agentsF:............................. V:............................ T:............................

37

Item

B2.5 Priced documentsF:............................. V:............................ T:............................

38

Item

B2.6 Tender submission

Clause 2.6 is amended by replacing "JBCC Form of Tender" with "Part C1.1 Form of Offer and Acceptance "

F:............................. V:............................ T:............................

39

-13-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 14: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

B3.1 Defined works areaF:............................. V:............................ T:............................

40

B3.0 THE SITE

Item

B3.2 Geotechnical investigation

The results are incorporated in Annexure B of the Bid Document

F:............................. V:............................ T:............................

41

Item

B3.3 Inspection of the siteF:............................. V:............................ T:............................

42

Item

B3.4 Existing premises occupiedF:............................. V:............................ T:............................

43

Item

B3.5 Previous work - dimensional accuracyF:............................. V:............................ T:............................

44

Item

B3.6 Previous work - defectsF:............................. V:............................ T:............................

45

Item

B3.7 Services - knownF:............................. V:............................ T:............................

46

Item

B3.8 Services - unknownF:............................. V:............................ T:............................

47

Item

B3.9 Protection of treesF:............................. V:............................ T:............................

48

Item

B3.10 Articles of valueF:............................. V:............................ T:............................

49

-14-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 15: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

B3.11 Inspection of adjoining propertiesF:............................. V:............................ T:............................

50

Item

B4.1 Management of the worksF:............................. V:............................ T:............................

51

B4.0 MANAGEMENT OF CONTRACT

Item

B4.2 Programme for the worksF:............................. V:............................ T:............................

52

Item

B4.3 Progress meetingsF:............................. V:............................ T:............................

53

Item

B4.4 Technical meetingsF:............................. V:............................ T:............................

54

Item

B4.5 Labour and plant recordsF:............................. V:............................ T:............................

55

Item

B5.1 Samples of materialsF:............................. V:............................ T:............................

56

B5.0 SAMPLES, SHOP DRAWINGS AND MANUFACTURERSÆ INSTRUCTIONS

Item

B5.2 Workmanship samplesF:............................. V:............................ T:............................

57

Item

B5.3 Shop drawingsF:............................. V:............................ T:............................

58

Item

B5.4 Compliance with manufacturers' instructionsF:............................. V:............................ T:............................

59

-15-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 16: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

B6.1 Deposits and feesF:............................. V:............................ T:............................

60

B6.0 TEMPORARY WORKS AND PLANT

Item

B6.2 Enclosure of the worksF:............................. V:............................ T:............................

61

Item

B6.3 AdvertisingF:............................. V:............................ T:............................

62

Item

B6.4 Plant, equipment, sheds and officesF:............................. V:............................ T:............................

63

Item

B6.5 Main notice boardF:............................. V:............................ T:............................

64

Item

B6.6 Subcontractors' notice boardF:............................. V:............................ T:............................

65

Item

B7.1 LocationF:............................. V:............................ T:............................

66

B7.0 TEMPORARY SERVICES

Item

B7.2 Water

Option A- provided by the Contractor including necessary temporary plumbing

F:............................. V:............................ T:............................

67

-16-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 17: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

B7.3 Electricity

Option A- provided by the Contractor including necessary temporary installation work

F:............................. V:............................ T:............................

68

Item

B7.4 Telecommunication facilitiesF:............................. V:............................ T:............................

69

Item

B7.5 Ablution facilities

Option A- provided by the Contractor

F:............................. V:............................ T:............................

70

Item

B8.1 Responsibility for prime cost amountsF:............................. V:............................ T:............................

71

B8.0 PRIME COST AMOUNTS

Item

B9.1 General attendanceF:............................. V:............................ T:............................

72

B9.0 ATTENDANCE ON N/S SUBCONTRACTORS

Item

B9.2 Special attendanceF:............................. V:............................ T:............................

73

Item

B9.3 Commissioning - fuel, water and electricityF:............................. V:............................ T:............................

74

Item

B10.1 Statutory taxes, duties and leviesF:............................. V:............................ T:............................

75

B10.0 FINANCIAL ASPECTS

-17-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 18: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

B10.2 Payment for preliminariesF:............................. V:............................ T:............................

76

Item

B10.3 Adjustment of preliminaries

Clauses B10.3.1 and B10.3.2 are amended by replacing "within fifteen (15) working days of taking possession of the site" with "when submitting his priced bills of quantities / lump sum document"

F:............................. V:............................ T:............................

77

Item

B10.4 Payment certificate cash flowF:............................. V:............................ T:............................

78

Item

B11.1 Protection of the worksF:............................. V:............................ T:............................

79

B11.0 GENERAL

Item

B11.2 Protection / isolation of existing / sectionally occupied worksF:............................. V:............................ T:............................

80

Item

B11.3 Security of the worksF:............................. V:............................ T:............................

81

Item

B11.4 Notice before covering workF:............................. V:............................ T:............................

82

Item

B11.5 DisturbanceF:............................. V:............................ T:............................

83

Item

B11.6 Environmental disturbanceF:............................. V:............................ T:............................

84

-18-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 19: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

B11.7 Works cleaning and clearingF:............................. V:............................ T:............................

85

Item

B11.8 VerminF:............................. V:............................ T:............................

86

Item

B11.9 Overhand workF:............................. V:............................ T:............................

87

Item

B11.10 Instruction manuals and guaranteesF:............................. V:............................ T:............................

88

Item

B11.11 As built informationF:............................. V:............................ T:............................

89

Item

B11.12 Tenant installationsF:............................. V:............................ T:............................

90

Item

B12.1 Schedule of variablesF:............................. V:............................ T:............................

91

B12.0 SCHEDULE OF VARIABLES

This schedule contains all variables referred to in thisdocument and is divided into pre-tender and post-tendercategories. The pre-tender category must be completedin full and included in the tender documents. Both thepre-tender and post-tender categories form part of thesePreliminaries

12.1.1 Provisional bills of quantities

The quantities are provisional NO

12.1 PRE-TENDER INFORMATION

12.1.2 Availability of construction documentation

Construction documentation is complete YES

-19-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 20: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

12.1.3 Interests of agents

Details: None

12.1.4 Defined works area

Details: Construction in accordance with the scope ofwork depicted in the bid document and within theboundaries pointed out by the Principal Agent at theJewellery Manufacturing Precinct existing site.

12.1.5 Geotechnical investigation

Details: Refer to the Civil Engineer's report and specification.

12.1.6 Existing premises occupied:

Specific requirements: The noise levels need to bekept at minimum levels. Air pollution needs to bereduced to minimum.

12.1.7 Previous work - dimensional accuracy[3.5] Details:

The contractor shall, after taking possession of the site and before commencing the work, check the existing levels, lines, profiles and the like and satisfy himself as to the dimensional accuracy of all work executed under the previous contract which may affect his work. Should any inaccurate or defective work be found the contractor shall immediately notify the principal agent in writing requesting his instructions with regard thereto and afford every facility to those rectifying such inaccurate or defective work.

12.1.8 Previous work - defects

Details: Not applicable

-20-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 21: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

12.1.9. Services - known[3.7] Details:

Should the contractor encounter any existing services such as underground cables, pipes or sewer during the execution of the works he shall notify the principal agent immediately and suspend all affected work in the immediate vicinity until instruction to proceed has been given by the principal agent.

12.1.10 Protection of trees[3.9] Specific requirements:

Only those trees and shrubs indicated as such on the drawings shall be removed or cut down. The remainder of the trees and shrubs shall be left undamaged.

12.1.11 Inspection of adjoining properties

Specific requirements: The contractor needs to inspectand take pictures of all the existing buildings close to theworks and report to the Principal Agent of his findings.

12.1.12 Enclosure of the works

Specific requirements: The contractor shall erect,maintain and remove on completion of the works aperimeter hoarding and fence around the site including adanger warning tape.

12.1.13 Offices

Specific requirements: The contractor shall provide,maintain and remove on completion of the works anoffice for the exclusive use of the principal agent, toaccommodate a minimum of 20 seats, suitablyinsulated and ventilated, provided with electric lightingand fitted with boarded floor, desk, chair, drawing stool,drawing board and lock-up drawers for drawings. Theoffice shall be kept clean and fit for use at all times

-21-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 22: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

12.1.14 Main notice board

Specific requirements: The contractor shall provide,erect where directed, maintain and remove oncompletion of the works a notice board size 3 x 3m,constructed of suitable boarding with flat smooth surfaceand with edging bead 19mm thick round outer edgesand projecting 12mm from face of boarding and roundedon front edge. The board shall be securely fixed tohoarding, where hoarding is provided, or fixed to andincluding a suitable supporting structure of timber ortubular posts and braces. The board is to be paintedivory white and the bead and 12mm wide dividing linesdark green. All wording shall be inscribed in dark greenas per the coat of arms for SA. All wording shall beinscribed in dark green painted sans serif lettering

12.1.15 Subcontractors' notice board

A notice board is required NO

12.1.16 Water

Option A (by contractor) YES

Option B (by employer - free of charge) NO

Option C (by employer - metered) NO

12.1.17 Electricity

Option A (by contractor) YES

Option B (by employer - free of charge) NO

Option C (by employer - metered) NO

-22-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 23: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

12.1.18 Telecommunications

Telephone

Option A (by contractor) YES

Option B (by employer - free of charge) NO

Option C (by employer - metered) NO

Facsimile

Option A (by contractor) YES

Option B (by employer - free of charge) NO

Option C (by employer - metered) NO

E-mail

Option A (by contractor) YES

Option B (by employer - free of charge) NO

Option C (by employer - metered) NO

12.1.19 Ablution facilities

Option A (by contractor) YES

Option B (by employer - free of charge) NO

Option C (by employer - metered) NO

12.1.20 Protection of existing/sectionally occupied works

Protection is required: Yes

-23-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 24: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

12.1.21 Special attendance

Subcontractor (1) details:

Subcontractor (2) details:

Subcontractor (3) details:

Subcontractor (4) details:

12.1.22 Protection of the works

Specific requirements:

12.1.23 Disturbance

Specific requirements: The contractor shall keep thesite, structures, etc well watered during operations toprevent dust and shall provide and erect and removeon completion of the works all necessary temporary dustscreens all to the satisfaction of the principal agent

12.1.24 Environmental disturbance

Specific requirements:

12.2.1 Payment of preliminaries

Option A (prorated) YES/NO

Option B (calculated) YES/NO

12.2 POST-TENDER INFORMATION

12.2.2 Adjustment of preliminaries

Option A (three categories) YES/NO

Option B (detailed breakdown) YES/NO

Section C contains specific preliminary items whichapply to this contract except where N/A (NotApplicable) appears against an item

SECTION C: SPECIFIC PRELIMINARIES

-24-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 25: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

C1.0 CONTRACT DRAWINGS

* The drawings issued with the tender documents do notcomprise the complete set but serve as a guide only fortendering purposes and for indicating the scope of thework to enable the tenderer to acquaint himself with thenature and extent of the works and the manner in whichthey are to be executed

Should any part of the drawings not be clearlyunderstood by the tenderer he shall, before submittinghis tender, obtain clarification in writing from theprincipal agent

F:............................. V:............................T:............................

92

Item

C2.0 GENERAL PREAMBLES

F:............................. V:............................T:............................

93

Item

C4.0 IMPORTED MATERIALS AND EQUIPMENT

Where imported items are listed in the tenderdocuments, the tenderer shall provide all theinformation called for, failing which the price of any suchitem, materials or equipment shall be excluded fromcurrency fluctuations. (refer to Schedule of ImportedMaterials and Equipment Part T2.2) to be completed bytenderer)

F:............................. V:............................T:............................

94

-25-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 26: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

C5.0 OCCUPATIONAL HEALTH AND SAFETY ACT

The contractor shall comply with all the requirements setout in the Construction Regulations, 2003 issued underthe Occupational Health and Safety Act, 1993 (Act No85 of 1993)

It is required of the contractor to thoroughly study theHealth and Safety Specification that must be readtogether with and is deemed to be incorporated underthis Section of the bills of quantities / lump sumdocument

The contractor must take note that compliance with theand Health and Safety Specification is compulsory. Inthe event of partial or total non-compliance, the principalagent, notwithstanding the provisions of clause A31.0 ofSection A or any other clause to the contrary, reservesthe right to delay issuing any progress paymentcertificate until the contractor provides satisfactory proofof compliance. The contractor shall not be entitled toany compensation of whatsoever nature, includinginterest, due to such delay of payment

Provision for pricing of the Occupational Health andSafety Act, Construction Regulations and Health andSafety Specification is made under this clause and it isexplicitly pointed out that all requirements of theaforementioned are deemed to be priced hereunder andno additional claims in this regard shall be entertained

F:............................. V:............................T:............................

95

-26-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 27: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Item

C6.0 Accommodation of Traffic during Construction

The Contractor shall take all necessary steps and useevery accommodate traffic including, erecting thenecessary road signs and adopting safety precautions,etc during the construction of the works in compliancewith the regulations and laws applicable to this site andshall be solely responsible for any complaints, damagesor claims in this regard including removing at completionor when directed suitable and approved works, etc

F:............................. V:............................T:............................

96

Agreement

AGREEMENT

Category : Fixed R.........................................................

Category : Value R.........................................................

Category : Time R.........................................................

SUMMARY OF CATEGORIES

-27-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Collection R

Page 28: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1Total Brought Forward from Page No.

Preliminaries

Section No. 1

Bill No. 1

AmountPageNo

PRELIMINARIES

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

-28-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried Forward R

Page 29: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Preliminaries

Section No. 1

Bill No. 1

AmountPageNo

PRELIMINARIES

COLLECTION

Brought Forward R

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

27

26

25

24

23

22

21

20

19Total Brought Forward from Page No.

-29-

PreliminariesBill No. 1PRELIMINARIESSection No. 1

Part C2. Pricing Data

Carried to Final Summary R

Page 30: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 1

EARTHWORKS (PROVISIONAL)

Unless otherwise stated all items in this bill will be WorkGroup 104

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

A soils investigation has been carried out on site by theengineer and please refer to the engineer's report andspecification for more information.

SOILS INVESTIGATION REPORT

Descriptions of excavations shall be deemed to include all ground conditions classifiable as "earth" described in the above soil investigation report, and where conditions of a more difficult character are indicated, these are separately measured

NATURE OF GROUND

-30-

Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 31: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Should the contractor consider that the excavation at any point are in "soft rock" or "hard rock", he must notify the Representative / Agent immediately in order that an inspection may be made and a decision arrived at by the Representative / Agent as to the category of such excavation. Should the contractor fail to give such notification, the excavation shall be deemed to be in earth and shall be valued accordingly.

EXCAVATIONS IN CONDITIONS OTHER THAN "EARTH"

The information on subterranean water is included in the soils investigation report can be viewed at the Engineer's offices.

SUBTERRANEAN WATER

Formwork and working space has been measured to the sides of concrete wall, footings & bases and no formwork or additional backfilling necessary due to over excavations will be measured to wall footings. Backfilling to such over excavations areas must be compacted to the same degree and in the same manner as the backfilling to the remainder of such excavation, only required if specified by the Engineer.

WORKING SPACE

Descriptions of carting away of excavated material shallbe deemed to include loading excavated material ontotrucks directly from the excavations or, alternatively,from stock piles situated on the building site.

CART AWAY OF EXCAVATED MATERIAL

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC

1,086m3Trenches1

Excavation in earth or compacted filling not exceeding 2m deep

-31-

Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 32: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

238m3Holes2

12m3Thickening under surface beds3

134m3Soft rock4

Extra over excavations in earth for exacavation in:

67m3Hard rock5

929m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

6

Extra over all excavations for carting away

3,201m2Sides of trench and hole excavations not exceeding 1,5mm deep

7

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

8

Keeping excavations free of water

FILLING, ETC

407m3Backfilling to trenches, holes, etc9

Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 100% Mod AASHTO density

611m3Under floors, steps, pavings, etc10

Earth filling of G5 material supplied by the contractor compacted in 150mm layers compacted to 95% Mod AASHTO density

611m3Under floors, steps, pavings, etc11

Earth filling of G7 material supplied by the contractor compacted in 150mm layers to 95% Mod AASHTO to density

-32-

Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 33: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

122m3Under floors etc12

Coarse river sand filling supplied by the contractor

4,112m2

Compaction of ground surface under floors, etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 90% Mod AASHTO density

13

Compaction of surfaces

8No"Modified AASHTO Density" test14

Prescribed density tests on filling

SOIL POISONING

4,112m2Under floors, etc including forming and poisoning shallow furrows etc and filling in furrows and ramming

15

Soil insecticide under a 10 year guarantee by firm of specialist

4,885m2To bottoms and sides of trenches, etc 16

-33-

Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 34: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Earthworks (Provisional)

Section No. 2

Bill No. 1

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

33

32

31

30Total Brought Forward from Page No.

-34-

Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 35: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 2

CONCRETE, FORMWORK AND REINFORCEMENT

Unless otherwise stated concrete will be Work Group 110

CPA WORK GROUP

Unless otherwise stated formwork will be Work Group 111

Unless otherwise stated reinforcement will be Work Group 114

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

-35-

Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 36: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Description of formwork shall be deemed to include use and waste only (except where described as "left in" or "permanent"), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use

FORMWORK TO BASES, PILE CAPS, ETC

The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself.

Formworks to soffits of solid etc shall be deemed to be slabs not exceeding 250mm thick unless otherwise described

Formwork to sides of bases, pile caps, etc will only be measured where it is prescribed for design reasons

Formwork necessitated by irregularity or collapse of excavated surfaces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in "Earthworks"

UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

47m3Blinding under footings and bases1

15MPa/19mm Concrete in:

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

462m3Strip footings2

30MPa/19mm Concrete in:

26m3Pile caps3

-36-

Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 37: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

182m3Bases4

31m3Lift shaft bases5

12m3Thickening under floors6

REINFORCED CONCRETE

715m3Surface beds cast in panels on waterproofing7

30MPa/19mm Concrete in:

50m3Apron8

90m3Stairs including landings, beams and inverted beams9

16m3Isolated beams10

17m3Walls11

1m3Vanity slabs12

230m3Cavity infill13

3,918m3Slabs including beams and inverted beams14

6m3Retaining walls in foundations (Provisional)15

40MPa/19mm concrete in:

67m3Retaining walls16

14m3Walls in foundations (Provisional)17

135m3Walls18

21m3Columns in foundations (Provisional)19

143m3Columns20

-37-

Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 38: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

3,038No

Making and testing 150 x 150 x 150mm concrete strength test cube and submit report to the Representative / Agent (only successful tests will be paid for)

21

TEST CUBES (PROVISIONAL)

1,285No

Hoop iron anchors between concrete and brickwork (Provisional)

22

CONCRETE SUNDRIES

94No810mm Diameter pile23

Cutting off and removing excess length of precast concrete pile as necessary, including stripping back for a height not exceeding 300mm to expose reinforcement, trimming to defined level and bending reinforcement as necessary for casting into pile cap

11,314m2Surface beds, slabs, etc to falls24

Finishing top surfaces of concrete smooth with a wood float

4,235m2Surface beds, slabs, etc25

Finishing top surfaces of concrete smooth with a power float with approved concrete floor hardener added (5kg/m²) and curing with an approved curing compound at a rate not exceeding 11m²/liter and finish to a broomed non-slip surface

14NoBedding approximately 20mm thick under 200 x 200mm base plate

26

15MPa non-shrink grout

-38-

Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 39: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

MOVEMENT JOINTS, ETC

857mNot exceeding 300mm wide27

Two layers of 375 micron dampproof course in slip joints between horizontal concrete and brick surfaces including cement mortar bed

857mNot exceeding 300mm high to edges of surface beds28

Expansion joints with 10mm bitumen impregnated softboard closed cell expanded polyethylene between vertical concrete and brick surfaces

82mNot exceeding 300mm wide through columns29

Expansion joints with 10mm bitumen impregnated softboard between vertical concrete surfaces, including necessary formwork

815m5 x 10mm Saw cuts in top of concrete30

Saw cut joints

229mSurface beds not exceeding 300mmm thick31

Horizontal construction joints through concrete including thick cement slurry to one face

ROUGH FORMWORK (DEGREE OF ACCURACY II)

54m2Retaining walls in foundations32

Rough formwork to sides

289m2Retaining walls with total height not exceeding 3.5m above bearing level

33

10m2Walls in foundations (Provisional)34

467m2Inner face of shaft walls35

226m2Rectangular columns in foundations (Provisional)36

-39-

Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 40: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

289m2Retaining walls with total height not exceeding 3.5m above bearing level

37

Smooth formwork to sides

250m2Outer face of walls flush with perimeter of concrete structure

38

97m2Walls with total height not exceeding 3500mm above bearing level

39

462m2Walls with total height exceeding 3500mm and not exceeding 5000mm above bearing level

40

1,508m2

Rectangular columns with total height exceeding 3500mm and not exceeding 5000mm above bearing level

41

1,225mEdges, risers, ends and reveals not exceeding 300mm high or wide.

42

290mSloping and stepped outer edges of stairs not exceeding 300mm high extreme

43

11,523m2

Slabs propped up exceeding 3500mm and not exceeding 5000mm high above bearing level

44

Smooth formwork to soffits

15m2Slabs over shafts45

113m2Landings46

227m2Stairs with sloping soffits47

9m2Vanity slabs48

1,728m2Beams propped up exceeding 3500mm and not exceeding 5000mm high

49

Smooth formwork to sides and soffits

-40-

Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 41: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

86m2Isolated beams propped up exceeding 3500mm and not exceeding 5000mm high

50

REINFORCEMENT (PROVISIONAL)

212.62tIn Varying diameters51

Mild steel reinforcement to structural concrete work

409.59tIn Varying diameters52

High tensile steel reinforcement to structural concrete work

109m2Mesh Ref 193 fabric reinforcement in concrete surface beds, etc

53

Fabric reinforcement

4,112m2Mesh Ref 311 fabric reinforcement in concrete surface beds, etc

54

-41-

Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 42: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Concrete, Formwork and Reinforcement

Section No. 2

Bill No. 2

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

41

40

39

38

37

36

35Total Brought Forward from Page No.

-42-

Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 43: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 3

PRECAST CONCRETE

Unless otherwise stated all items in this bill will be WorkGroup 112

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

Blocks, sills, etc measured linear shall be made in suitable lengths. Large size setting out drawings shall be prepared where necessary and submitted to the architect for approval before moulds are made

SIZES

Where kerbstones, blocks, etc are laid in ground descriptions shall be deemed to include necessary excavation, filling in and ramming

GENERAL

-43-

Precast ConcreteBill No. 3MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 44: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

PRECAST CONCRETE

3m

450mm Wide x 510mm High benches including building into position on brick wall as Detail DT56 attached at back of these bill of quantities

1

25MPa Precast concrete left rough from the mould, including bedding, jointing and pointing and reinforcement

4No500 x 500 x 800mm high Precast concrete dustbin with 50mm diameter hole at the bottom for drainage.

2

415m750 x 240mm Concrete coping3

-44-

Precast ConcreteBill No. 3MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 45: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Precast Concrete

Section No. 2

Bill No. 3

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

44

43Total Brought Forward from Page No.

-45-

Precast ConcreteBill No. 3MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 46: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 4

MASONRY

Unless otherwise stated all items in this bill will be WorkGroup 116

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

BRICKWORK

Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick

Sizes in descriptions

Descriptions of hollow walls shall be deemed to include leaving every fifth perpend of the bottom course of the external skin open as a weep hole.

Hollow walls etc

Walls in two skins described as "bagged and sealed" shall be deemed to include having the outer face of the inner skin bagged with 1:6 cement and sand mixture and sealed with two coats "Brixeal" bitumen emulsion waterproofing coating.

-46-

MasonryBill No. 4MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 47: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Bricks shall be ordered timeously to obtain uniformity in size and colour

Face bricks

Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc

Pointing

BLOCKWORK

Blocks are to be either solid or hollow modular dense concrete masonry units having a compressive strength of 7 MPa

Concrete masonry units

Wall ties shall be polypropylene "Permaties" complying with BS 76377. Ties for hollow walls shall be of sufficient length to allow not less than 75mm of each end to be built into the blockwork. Ties are to be spaced at intervals of not more than 1m in the horizontal direction and not more than 400mm staggered in the vertical direction except at openings, vertical joints or ends of walls where they are to be placed vertically above each other

Wall ties for blockwork

Blockwork shall comply with SABS 0145 "Concrete Masonry Construction"

Blockwork

Surfaces to be plastered shall have joints raked out to a depth of at least 10mm to provide a key. Cavities of hollow walls shall be kept free of mortar droppings or other undesirable matter. Every second perpend of the bottom course of the external skin of hollow walls shall be left open as a weep hole

-47-

MasonryBill No. 4MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 48: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Descriptions of blockwork shall be deemed to include standard complementary blocks such as corner, three-quarter, half and quarter blocks required in the construction of corners, reveals, jambs, ends, etc to solid and hollow walls and for bonding as necessary

Standard complementary blocks

Blocks shall be of approved manufacture, sound, well burnt or cured and uniform and true in size, shape and colour

DECORATIVE BLOCKS

Samples of all masonry building units, except those for walls described as "load bearing", shall consist of a minimum of 6 units. Samples of building units to be used in walls described as "load bearing" shall consist of30 units from every 30 000 units delivered to site

SAMPLES

FOUNDATIONS (PROVISIONAL)

696m2One brick walls1

Brickwork of NFX bricks (14 MPA nominal compressive strength) in class I mortar

148m2260mm Infilll brick wall2

61m2330mm brick wall3

SUPERSTRUCTURE

878m2Half brick walls4

Brickwork in NFP clay bricks (7 Mpa nominal compressive strength) in Class II mortar

6,831m2One brick walls5

2,905m2260mm Infilll brick wall6

662m2330mm brick wall7

-48-

MasonryBill No. 4MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 49: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

BRICKWORK SUNDRIES

241m220mm Fibre board built in vertically between brick skins8

Joint forming material in movement joints

2,583m75mm Wide reinforcement built in horizontally9

Brickwork reinforcement

33,217m150mm Wide reinforcement built in horizontally10

2,338.90kg6,3mm Diameter mild steel bar reinforcement cut to lengths and built into brick lintels

11

1,064m110 x 75mm Lintels in lengths not exceeding 3m12

Concrete prestressed fabricated lintels

34m110 x 75mm Lintels in lengths exceeding 3m not exceeding 5m

13

106m220 x 75mm Lintels in lengths not exceeding 3m14

2,757No30 x 1,6mm Wall tie 500mm long with one end cast into concrete and other end built into brickwork

15

Galvanised hoop iron cramps, ties, etc

330m110mm Wide turning piece to lintels etc16

Turning pieces

FACE BRICKWORK

42m2Extra over brickwork for face brickwork in foundations (Provisional)

17

Approved face bricks pointed with recessed horizontal and vertical joints (Allow PC Amount of R 4 500.00 per thousand delivered to site excluding VAT)

886m2Extra over brickwork for face brickwork18

-49-

MasonryBill No. 4MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 50: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

370m2One brick wall faced both sides19

220mBrick-on-edge header course lintel pointed on face and 110mm soffit

20

Brick-on-edge header course copings, sills, etc approved face bricks pointed with recessed joints on all exposed faces

110m

Cut face brick-on-edge external window cill, 180mm wide, set sloping and slightly projecting in cement mortar and pointed on top, front edge and projecting soffit including all necessary fair raking cutting to facings under and fair and fitted ends

21

1No

Construct a sample panel 2000mm long x 1500mm high of one brick wall in cement mortar faced and pointed on both sides in stretcher bond and with brick-on-edge coping to top including pointing to top and both sides and with and including necessary excavations for and including 15MPa/38mm mass concrete strip footing in a position as directed by the Representative/Agent and including demolishing and removal after completion of all brickwork

22

Sample panel

-50-

MasonryBill No. 4MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 51: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Masonry

Section No. 2

Bill No. 4

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

50

49

48

47

46Total Brought Forward from Page No.

-51-

MasonryBill No. 4MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 52: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 5

WATERPROOFING

Unless otherwise stated all items in this bill will be WorkGroup 120

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Waterproofing of roofs, basements, etc shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with necessary ridges, hips and valleys. Descriptions of sheet or membrane waterproofing shall be deemed to include additional labour to turn-ups and turn-downs

Waterproofing

DAMPPROOFING OF WALLS AND FLOORS

301m2In walls1

One layer approved 375 micron embossed black polyethylene damp proof course

4,112m2Under surface beds2

One layer 250 micron green polyethylene waterproof sheeting complying with SABS 952 Type C in widest practicable widths with all joints lapped and sealed with pressure sensitive tape all in strict accordance with the manufacturer's requirements

-52-

WaterproofingBill No. 5MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 53: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

WATERPROOFING TO ROOFS ETC

4,068m2On flat roofs3

4mm Abegum dual reinforced membrane, fully bonded by means of "torch fusion" with 75mm side laps and 100mm end laps

508m

Additional membrane 150mm girth at turn-ups including flashing strip 150mm girth and sealing top edge into groove with mastic

4

508mSealing edges to brickwork or concrete including trowelled mastic bead

5

34NoDressing and sealing into 150mm internal diameter outlet, including additional membrane

6

508m30 x 30mm Triangular fillet7

PROTECTIVE STONE DRESSING

233m250mm Thick on waterproofing to flat roofs8

Clean crushed stone dressing free of pyrite or other contaminants, of 20 - 25mm stone evenly spread with larger stones around outlets

PROTECTIVE ROOFING PAINT

4,117m2On waterproofing to roofs9

Two coats bituminous aluminium paint

JOINT SEALANTS, ETC

857m10 x 25mm In expansion joints in floors including raking out expansion joint filler as necessary

10

Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc

-53-

WaterproofingBill No. 5MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 54: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

815m5 x 10mm In saw cut joints in floors11

Polyurethane sealing compound including backing cord, bond breaker, primer, etc

229m5 x 10mm In construction joints in floors12

857m5 x 10mm In horizontal slip joints in walls13

89m5 x 10mm In vertical expansion joints, including raking out expansion joint filler as necessary

14

-54-

WaterproofingBill No. 5MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 55: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Waterproofing

Section No. 2

Bill No. 5

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

54

53

52Total Brought Forward from Page No.

-55-

WaterproofingBill No. 5MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 56: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 6

ROOF COVERINGS, ETC

Unless otherwise stated all items in this bill will be WorkGroup 124

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

Descriptions of all roof coverings are deemed to includefor all straight cutting

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

-56-

Roof Coverings, EtcBill No. 6MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 57: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

PROFILED METAL SHEETING AND ACCESSORIES

Note:

The Contractor is to submit a certificate signed by the merchant, stating that the galvanised roof covering supplied complies with the required thickness specified

____________________

0,58mm Thick Clotan Craft-Lock profile ISQ300 Z600 spelter galvanised steel roof sheeting

101m2Roof covering with pitch not exceeding 25 degrees1

-57-

Roof Coverings, EtcBill No. 6MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 58: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Roof Coverings, Etc

Section No. 2

Bill No. 6

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

57

56Total Brought Forward from Page No.

-58-

Roof Coverings, EtcBill No. 6MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 59: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 7

CARPENTRY AND JOINERY

Unless otherwise stated all items in this bill will be WorkGroup 126

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Rates for all timber shall be deemed to include for treatment against insect pests

Treatment against insect pests

All softwood for this job shall be treated to combat and prevent the spread of certain insect pests in accordance with Government Gazette Notice No R451 of 28 March 1969 and any amendments thereto. Proof of treatment shall be lodged with the Employer prior to the use of any timber in the works.

Descriptions of timber which is given linear, angles, rebates, grooves, chamfers, moulded edges, etc . are to be deemed to include for mitres, intersections, splay cut ends, stops, etc

Mitres, intersections, etc

Descriptions of timber, etc shall be deemed to include for straight cutting and notching

-59-

Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 60: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Items described as "nailed" shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete

Fixing

Items described as "plugged" shall be deemed to include for screwing to fibre, plastic or metal plugs at not exceeding 600mm centres or shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete.

Descriptions are to be deemed to include for nails, screws, plugs, adhesives, holes, sin- kings, pelleting, etc

Descriptions of structural timber are to be deemed to include for joints in the length, holes, splay cut ends and mitres

Structural timber

All softwood structural timber shall be of stress grade V5 or M5 in accordance with SWABS specification 563 unless otherwise stated

Descriptions of fibre cement fascias and barge boards shall be deemed to include for mitres, end junctions, screws, bolts, wall anchors, holes, etc.

Fascias, etc.

Rates for timber door frames shall be deemed to include for approved mild steel stay pegs in floors and hoop-iron clamps to walls, including holes, building in, etc

Door frames

Particle board shall comply with the following specifications:

a) SABS 1300 Particle board: exterior and flooring type

b) SABS 1301 Particle board: interior type

Particle board:

-60-

Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 61: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Descriptions of frames shall be deemed to include frames, transomes, mullions, rails, etc

Joinery:

Descriptions of hardwood joinery shall be deemed to include pelleting of bolt holes

Laminate finish shall be glued under pressure. Edge strips shall be butt jointed at junctions with adjacent similar finish

Decorative laminate finish:

EAVES, VERGES, ETC

1,500m15 x 225mm Fascias and barge boards including galvanised steel H-profile jointing strips

1

High density plain fibre-cement fascias and barge boards

SKIRTINGS

2,762m19 x 76mm Skirting with and including 19mm quarter round nailed to walls

2

Wrought Meranti

550m25 x 110mm Skirtings stepped over treads and risers of stairs including 25mm quadrant bead, nailed

3

DOORS

34No40mm Door 750 x 2100mm high (D5)4

Solid laminated flush panel door with hardboard face suitable for paint on both sides and two wrought meranti concealed vertical edge strips, hung to steel frames

5No40mm Door 900 x 2000mm high (D6)5

38No40mm Door 900 x 2100mm high (D6,D7 & D9)6

-61-

Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 62: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1No40mm Door 900 x 2125mm high (D6)7

6No40mm Double door 1800 x 2000mm high (D12)8

Fire doors are to be in accordance with SANS 1253unless specified otherwise by the Fire Engineer

Fire doors with galvanised steel sheet cladding

19No

Class B fire door 900 x 2032mm high including pressedsteel frame for one brick wall, panic bolts, handles andlocksets and preparing frame for door closer (fireescape door)

9

DUCT COVERS

160m2

15mm Duct covers in 400mm widths, fixed at 350mm centres along edges with brass dome headed screws in cup washers

10

Fibre-cement high density plain flat sheets

THE FOLLOWING FITTINGS IN BATHROOMS

15No

2 500 x 600 x 30mm thick overall Rastenburg granite vanity top with three 560 x 400mm overall holes for drop-in WHB (WHB elsewhere) at approximately 680mmcentres with all exposed edges large bevel edged, fixed to supports using dabs of 100% black silicon edhesive along all supports with all joints filled with matching polyester resin glue including three. Granite surface to be sealed using an approved stone sealer, all in accordance with manufacturer's recommendations.

11

Bathroom vanity tops

-62-

Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 63: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Carpentry and Joinery

Section No. 2

Bill No. 7

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

62

61

60

59Total Brought Forward from Page No.

-63-

Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 64: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 8

CEILINGS, PARTITIONS AND ACCESS FLOORING

Unless otherwise stated ceilings will be Work Group 129

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

All softwood to be South African Pine

TIMBER

SUSPENDED CEILINGS

11,523m2Ceilings suspended not exceeding 1m below concrete slab

1

Fissured finished gypsum ceiling tiles size 1200 x 600 x 12,5mm thick laid on and including SQ/T38 White powder coated main tees, cross tees, hold-down clips, wedges, etc with galvanised 19mm strap suspension hangers at hanger centre not exceeding 1200mm

-64-

Ceilings, Partitions and Access FlooringBill No. 8MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 65: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

44NoExtra over ceiling for 600 x 600mm opening for ventialtion/ air conditioning (provisional)

2

176NoExtra over ceiling for 600 x 1200mm opening for light fittings (provisional)

3

3,304mShadowline cornice, plugged to walls4

47 x 35mm SM25 recessed shadowline cornice

-65-

Ceilings, Partitions and Access FlooringBill No. 8MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 66: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Ceilings, Partitions and Access Flooring

Section No. 2

Bill No. 8

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

65

64Total Brought Forward from Page No.

-66-

Ceilings, Partitions and Access FlooringBill No. 8MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 67: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 9

IRONMONGERY

Unless otherwise stated all items in this bill will be WorkGroup 132

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

-67-

IronmongeryBill No. 9MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 68: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Where applicable finishes to ironmongery are indicated by suffixes in accordance with the following list :

CH Chromium platedSC Satin chromium platedPT Epoxy coatedPB Polished brassPL Polished and lacqueredBS Satin bronze and lacqueredAS Anodised silverAB Anodised bronzeAG Anodised goldABL Anodised blackGE Grey enamelledSE Silver enamelledSD Sanded

FINISHES TO IRONMONGERY

---------------------------------------

THE FOLLOWING IRONMONGERY FIXED TO DOORS, ETC.

84No75mm Three lever upright mortice lockset with satin chrome furniture

1

"YALE" or similar approved

156No

100mm Chromium plated bow handle bolted through door with the bolt ends hammered to prevent the nuts being removed

2

Handles

12NoOverhead surface mounted type door closer with aluminium casing

3

Door closers

90No38mm Rubber door stop plugged and screwed to wall or floor

4

SUNDRIES

-68-

IronmongeryBill No. 9MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 69: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1No

Approved white built-in type medicine cabinet size 380 x 610 x 100mm deep with mirror front and glass shelves and building in in tiled or plastered wall including forming recess in brickwork and making good

5

4No3mm Thick x 32mm wide plate with letters "KITCHEN"6

Clear perspex name plate reverse engraved and enamelled in lettering 25mm high to suit, twice countersunk holed for and tapscrewed to steel door frame with chromium plated dome-headed selftapping screws

28No

190 x 190 x 3mm Thick white perspex international FB2 sign plate with red fire extinguisher symbol plugged to brickwork

7

Indicator plates countersunk holed for and screwed to door or brickwork with chromium plated dome-headed screws

8No75 x 150mm Aluminium international toilet sign with MALE and/or FEMALE figure screwed to door

8

NOTE

The kitchen cupboard units shall be of steel construction with baked enamel finish of approved colour with 18mm interior particle board worktops finished on one side and on edges with 1,2mm standard grade high pressure plastic laminate of approved pattern and colour

KITCHEN CUPBOARD UNITS

Adjacent worktops of different units shall be neatly butt-jointed and finished off with matching cover strips and prices are to include for same

All doors are to be supplied with standard locks and duplicate keys and prices of units are to include for lockable doors where applicable

Prices for sink units are to include for stainless steel sinks with draining boards with single or double sinks, each complete with chromium plated flanged waste fitting, plug and chain

-69-

IronmongeryBill No. 9MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 70: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Prices for all units are to include for fixing in position to plastered walls and on floors with screed, protecting against injury and cleaning down on completion

____________________

4No

Sink unit 1350mm long with 1200 x 535mm opening for a double bowl sink (sink elsewhere), one shelf and three doors

9

Floor and sink units

VERTICAL BLINDS

3NoPurpose made blinds for window type W1, 1713 x 900mm high

10

Approved vertical blinds with natural anodised aluminium track and accessories, 127mm fabric vanes in Mexico Navy or Georgia Navy Category 3 colour with cupped chain links, weights, opening mechanism for opening outwards to both sides, ropes, etc and plugged to brickwork or concrete

87NoPurpose made blinds for window type W1, 1200 x 2400mm high

11

2NoPurpose made blinds for window type W1, 7400 x 900mm high

12

15NoPurpose made blinds for window type W2, 1713 x 1200mm high

13

1NoPurpose made blinds for window type W2, 1200 x 1500mm high

14

2NoPurpose made blinds for window type W2, 9280 x 900mm high

15

2NoPurpose made blinds for window type W3, 4750 x 900mm high

16

22NoPurpose made blinds for window type W3, 4750 x 1200mm high

17

-70-

IronmongeryBill No. 9MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 71: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

24NoPurpose made blinds for window type W4, 1500 x 2000mm high

18

2NoPurpose made blinds for window type W5, 4760 x 1500mm high

19

1NoPurpose made blinds for window type W6, 7550 x 1500mm high

20

3NoPurpose made blinds for window type W1, 600 x 1800mm high

21

16NoPurpose made blinds for window type W2, 600 x 2720mm high and 600 x 2905mm high

22

3NoPurpose made blinds for window type W3, 2530 x 600mm high

23

5NoPurpose made blinds for window type W4, 4000 x 600mm high

24

1NoPurpose made blinds for window type W5, 3640 x 600mm high

25

1NoPurpose made blinds for window type W6, 5000 x 600mm high

26

1NoPurpose made blinds for window type W7A, 7420 x 600mm high

27

2NoPurpose made blinds for window type W7B, 7420 x 600mm high

28

15NoPurpose made blinds for window type W8, 1800 x 2720mm high AND 1800 x 2905mm high

29

15NoPurpose made blinds for window type W9, 2100 x 1800mm high

30

15NoPurpose made blinds for window type W10, 5200 x 1800mm high

31

15NoPurpose made blinds for window type W11, 5700 x 1800mm high

32

-71-

IronmongeryBill No. 9MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 72: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1NoPurpose made blinds for window type W12, 3000 x 1800mm high

33

1NoPurpose made blinds for window type W13, 4690 x 1800mm high

34

1NoPurpose made blinds for window type W14, 900 x 1800mm high

35

13NoHand dryer fixed to wall as per manufacturers specifications

36

BATHROOM FITTINGS

13NoDispenser bin code 426096 fixed to wall as per manufacturer's specifications

37

33NoHerman Bischoff Toilet roll holder code HB 125 V NW 50

38

13NoFrankie SD 80 soap dispenser fixed to wall as per manufacturer's specifications

39

20No80 x 800mm long projecting standard stainless steel straight back grab rail plugged

40

20No300 x 300 x 300 x 80mm projecting standard stainless steel dog leg side grab rail plugged

41

PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC

20No1200 x 1000mm high Pinning Board, plugged42

Approved Carpet Pinning Boards with aluminium frame, pen tray, and fixing components including round plastic corners all installed as per manufacturer's recommendation

20No1500 x 1000mm high Writing Board, plugged43

Approved White Writing Boards with aluminium frame, pen tray, and fixing components including round plastic corners all installed as per manufacturer's recommendation

-72-

IronmongeryBill No. 9MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 73: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Ironmongery

Section No. 2

Bill No. 9

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

72

71

70

69

68

67Total Brought Forward from Page No.

-73-

IronmongeryBill No. 9MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 74: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 10

STRUCTURAL STEELWORK

Unless otherwise stated all items in this bill will be WorkGroup 134

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Descriptions of bolts shall be deemed to include nuts and washers

Descriptions

Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete

Descriptions of L-shaped and U-shaped anchor bolts shall be deemed to include bending, threading, nuts and washers and embedding in concrete. Where anchor bolts are described as embedded in sides or soffits of concrete it shall be deemed to include holes through formwork.

STEEL COLUMNS AND BEAMS

1.28t100 x 100 x 6mm Square hollow section1

Welded columns in single lengths with flat section base, top, bearer and connection plates bolted to concrete

-74-

Structural SteelworkBill No. 10MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 75: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

2.90t100 x 100 x 6mm Square hollow section 2

Welded beams in single lengths with flat section bearer and connection plates bolted to steel columns

STEEL TRUSSES

3.27tLattice trusses 9362mm long x 1150m high extreme 3

Welded roof trusses of angle rafters, tie beams, rails, struts, braces, cleats, etc and flat bearer, gusset and connection plates, bolted to steel/concrete

PURLINS, GIRTS, BRACING, ETC

0.19t60 x 40 x 3mm Square hollow section bracings4

Purlins and girts bolted to steel

0.31t175 x 50 x 20kg/m x 2,5mm Lipped channel section purlins

5

PLATES, BOLTS, ETC

14.00No200 x 200mm Base plates to columns6

12mm thick base plates with 6 20mm holes

84.00NoM20 x 150mm Concrete anchor bolts7

Friction bolts to base plates

-75-

Structural SteelworkBill No. 10MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 76: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Structural Steelwork

Section No. 2

Bill No. 10

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

75

74Total Brought Forward from Page No.

-76-

Structural SteelworkBill No. 10MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 77: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 11

METALWORK

Unless otherwise stated all items in this bill will be WorkGroup 136

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

Descriptions of bolts shall be deemed to include nuts and washers

Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete

Metalwork described as "holed for bolts" shall be deemed to include the bolts unless otherwise described

DESCRIPTIONS

---------------------------------------

-77-

MetalworkBill No. 11MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 78: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Note:

Where the balustrading meets brickwork, 18mm steel dowels must be inserted in the brickwork including grouting and welded to the balustrading for stability

STEEL HANDRAILS, BALUSTRADES, ETC

141m

Horizontal balustrading 1000mm high of 75mm circular hollow section top, middle and bottom rail with 25 circular hollow section balusters at maximum 200mm centres with each baluster welded to a 100 x 100 x 6mmthick base plate and two times holed for and including 2No expansion bolts and vertical abusters welded to top and bottom rails at 100mm centres

1

Stainless steel welded and bolted patent balustrading to concrete or steel

290m

Rakingl balustrading 1000mm high of 75mm circular hollow section top, middle and bottom rail with 25 circular hollow section balusters at maximum 200mm centres with each baluster welded to a 100 x 100 x 6mmthick base plate and two times holed for and including 2No expansion bolts and vertical abusters welded to top and bottom rails at 100mm centres

2

20NoExtra over for L-intersection of horizontal balustrades 3

20NoExtra over for L-intersection of raking balustrades4

20NoExtra over for junction of end of horizontal with end of raking balustrades

5

20NoExtra over for flat closed end6

436m75mm External diameter 3mm thick continuous pipe rails

7

132NoExtra over 75mm diameter pipe for rounded end8

66NoExtra over 75mm diameter pipe for bend to 100mm internal radius

9

-78-

MetalworkBill No. 11MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 79: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

33No

Purpose made lockable toilet roll holder formed of 100 x 3mm flat section holder 500mm girth twice bent to U-shape with internal angles slightly rounded, twice holed for and bolted to wall with and including M8 x 70mm expansion bolts; both ends of U-shaped holder once holed for and including 27,5mm (external) diameter x 2mm thick pipe roller, 275mm long, with end provided with 40mm diameter x 3mm thick flat section flange plate and other end once holed for padlock (elsewhere).

10

Mild steel sundries

PRESSED STEEL DOOR FRAMES

34NoFrame for door 750 x 2100mm high (D3)11

1, 2mm Double rebated frames suitable for half brick walls with two 100mm steel butt hinges per leaf

5NoFrame for door 900 x 2000mm high (D6)12

2NoFrame for door 900 x 2100mm high (D6 & D7)13

1NoFrame for door 900 x 2125mm high (D6)14

36NoFrame for door 900 x 2000mm high (D9)15

1,6mm Double rebated frames suitable for one brick walls with four 100mm steel butt hinges per leaf

6No

Frame for double door size 1800 x 2000 (D12)

16

NOTE

The rates for strongroom doors, wall safes and ventilators shall include for fixing in position complete

____________________

STRONGROOM, RECORD ROOM DOORS, VENTILATORS, ETC

1NoStandard DS1 record room door for wall opening 1960 x 830mm as shown on detail. (Detail No. D-W)

17

-79-

MetalworkBill No. 11MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 80: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1No

Double ended steel telescopic ventilator for wall opening size 185 x 185mm suitable for and built into 150mm thick wall, complete with face plates on both sides, drop shutter mechanism operating from fuseable metal plug, wire gauze and baffle plates

18

3No

Roll-Up Serranda Series 2800 glavanised mild steel crank operated 75 x 0,6mm thick slatted curtain roller shutter for opening 2400 x 2000mm high with standard bottom rail with overhead box, with 75mm wide guides, extruded aluminium T-bar with rubber seal, powder coated ancilliary components icnluding 4,5mm thick end plates, guide rails, etc, with centre lock, fixed to brickwork and concrete to Engineer's details and with canopy cover. (D3 & D10)

19

HOT-DIPPED GALVANISED STEEL ROLLER SHUTTER DOORS FIXED COMPLETE TO BRICKWORK

GALVANISED STEEL MINOR WORK

400m300mm high Fascias and barge boards including galvanised steel H-profile jointing strips

20

1.6mm thick powder coated sheet metal bend into profile complete with concealed fixings and drip joints

380kg50 x 50 x 5mm Angle section frames21

Welded frames to duct covers

300No10mm Expansion anchor with loose bolt22

ALUMINIUM WINDOWS, DOORS, ETC

3NoPurpose made window type W1, 1713 x 900mm high23

Charcoal powder coated window units complete with subframes, ironmongery, 4.00mm thick clear float glass with Low E coating, sealing, etc and fixing to brickwork or concrete

87NoPurpose made window type W1, 1200 x 2400mm high24

-80-

MetalworkBill No. 11MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 81: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

2NoPurpose made window type W1, 7400 x 900mm high25

15NoPurpose made window type W2, 1713 x 1200mm high26

1NoPurpose made window type W2, 1200 x 1500mm high27

2NoPurpose made window type W2, 9280 x 900mm high28

2NoPurpose made window type W3, 4750 x 900mm high29

22NoPurpose made window type W3, 4750 x 1200mm high30

24NoPurpose made window type W4, 1500 x 2000mm high31

2NoPurpose made window type W5, 4760 x 1500mm high32

1NoPurpose made window type W6, 7550 x 1500mm high33

3NoPurpose made window type W1, 600 x 1800mm high34

16NoPurpose made window type W2, 600 x 2720mm high and 600 x 2905mm high

35

3NoPurpose made window type W3, 2530 x 600mm high36

5NoPurpose made window type W4, 4000 x 600mm high37

1NoPurpose made window type W5, 3640 x 600mm high38

1NoPurpose made window type W6, 5000 x 600mm high39

1NoPurpose made window type W7A, 7420 x 600mm high40

2NoPurpose made window type W7B, 7420 x 600mm high41

15NoPurpose made window type W8, 1800 x 2720mm high AND 1800 x 2905mm high

42

15NoPurpose made window type W9, 2100 x 1800mm high43

15NoPurpose made window type W10, 5200 x 1800mm high44

15NoPurpose made window type W11, 5700 x 1800mm high45

-81-

MetalworkBill No. 11MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 82: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1NoPurpose made window type W12, 3000 x 1800mm high46

1NoPurpose made window type W13, 4690 x 1800mm high47

1NoPurpose made window type W14, 900 x 1800mm high48

10No

1425 x 2000mm Purpose made white anodised Aluminium single door with a purpose made aluminium frame and glazed panels to fit dimensions and glazed with 4mm clear glass above 2100mm and 6mm safety glass below 2100mm as shown on detail, DPS - 46260/35mm lock bracket and DPS - H28SN handles (D4)

49

Charcoal Powder coated aluminium doors including 6.00mm toughened clear float safety glass complete with subframes, ironmongery, sealing, etc and fixing to brickwork or concrete

4No

3800 x 2465mm Purpose made white anodised Aluminium stacking door with four purpose made aluminium frame and glazed panels to fit dimensions and glazed with 4mm clear glass above 2100mm and 6mm safety glass below 2100mm as shown on detail, DPS - 46260/35mm lock bracket and DPS - H28SN handles (SF01)

50

4No

900 x 2125mm Purpose made white anodised Aluminium single door with a purpose made aluminium frame and glazed panels to fit dimensions and glazed with 4mm clear glass above 2100mm and 6mm safety glass below 2100mm as shown on detail, DPS - 46260/35mm lock bracket and DPS - H28SN handles (SF02)

51

-82-

MetalworkBill No. 11MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 83: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Metalwork

Section No. 2

Bill No. 11

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

82

81

80

79

78

77Total Brought Forward from Page No.

-83-

MetalworkBill No. 11MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 84: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 12

PLASTERING

Unless otherwise stated all items in this bill will be WorkGroup 142

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

Plaster described as "on brickwork" shall be deemed to include for small portions of plaster on concrete flush with brickwork and prices should include for all the necessary preparatory work

PLASTER ON CONCRETE

---------------------------------------

SCREEDS

11,481m2 50mm Thick on floors and landings1

1:3 Cement screeds wood floated on concrete

-84-

PlasteringBill No. 12MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 85: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

264m2 50mm Thick on treads and risers of stairs2

4,068m2Average 30mm thick on roof slab to falls and currents3

GRANOLITHIC

161m230mm Thick on floors4

Untinted granolithic on concrete

141mAverage 20mm thick 100mm High skirting5

INTERNAL PLASTER

14,782m2On walls6

Cement plaster on brickwork

149m2On narrow widths7

11,637m2On ceilings8

Cement plaster on concrete

479m2On sloping soffits of stairs9

22m2In narrow widths on sloping outer edges of stairs10

EXTERNAL PLASTER

4,998m2On brick walls. 11

Cement plaster on brickwork

409m2On narrow widths12

19m2 x 30mm Flat section galvanised mild steel water bar embedded in floor finish

13

CORNER PROTECTORS, DIVIDING STRIPS, ETC.

-85-

PlasteringBill No. 12MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 86: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Plastering

Section No. 2

Bill No. 12

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

85

84Total Brought Forward from Page No.

-86-

PlasteringBill No. 12MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 87: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 13

TILING

Unless otherwise stated all items in this bill will be WorkGroup 144

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 4:1 cement plaster backing and descriptions of tiling on concrete floors, etc shall be deemed to include 3:1 cement mortar bedding

DESCRIPTIONS

---------------------------------------

-87-

TilingBill No. 13MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 88: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

WALL TILING

787m2On walls1

200 x 300 x 10mm Limestone Serpentine Natural riven tiles, cut from 300 x 300 x 10mm Limestone Serpentine Natural riven tiles or similar approved, fixed with tile adhesive to plaster (plaster elsewhere) and flush pointed with tinted grouting compound

4m2On walls in isolated panels, splashbacks, etc.2

6m2On narrow widths3

32NoFair exposed cutting and fitting around pipe not exceeding 50mm internal diameter (Provisional)

4

33No

Fair exposed cutting and fitting around pipe exceeding 50 and not exceeding 100mm internal diameter (Provisional)

5

FLOOR TILING

11,314m2On floors and landings6

300 x 300mm Non-slip ceramic floor tiles (allow a PCAmount of R 250.00/m2 excluding VAT) fixed with an approved tile adhesive on screed (screed elsewhere) and flush pointed with tinted waterproof jointing compound

346m2On treads and risers7

-88-

TilingBill No. 13MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 89: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

VANITY SLABS

6No

20mm Thick 'Proquartz" custom design vanity slab or similar approved with 200mm high splashback, overall size 700mm long x 530mm wide x 300mm high including 2No. basin and pre-drilled holes for soap dispenser, tap, and sink waste sitting on 25 x 25mm angle section frame complete with 1No. mirror size 400 x 1000mm high set at an angle with one side fixed to 25 x 25mm natural anodised aluminium angle section (See Detail 01) and the other on splashback (See Architect's Drawings)

8

The following vanity tops have been measured as complete units, i.e. the components of the units have not been separately measured. The descriptions therefore of such units shall be deemed to include all components; cutouts for basins, splashbacks, downstands, recesses, mouldings, assembling, mild steel support brackets, rawlbolts, fixing to walls, etc., all as per Architect's detail referred to in the description

66mExternal PVC trimming to corners (Provisional)9

SUNDRIES

19mAluminium edge trim in door threshold (Provisional)10

-89-

TilingBill No. 13MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 90: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Tiling

Section No. 2

Bill No. 13

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

89

88

87Total Brought Forward from Page No.

-90-

TilingBill No. 13MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 91: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 14

PLUMBING AND DRAINAGE (PROVISIONAL)

Unless otherwise stated all items in this bill will be WorkGroup 148

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Soil, waste and vent pipes and fittings shall be solvent weld jointed

uPVC pipes and fittings:

Pipes for water supply shall be of the class stated

uPVC pressure pipes and fittings:

Pipes of 40mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings

Pipes of 50mm diameter and greater shall have sockets and spigots with push in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints

-91-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 92: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Pipes shall be hard drawn and half-hard pipes of the class stated. Class 0 (thin walled hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), class 2 (half-hard) and class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper waste, vent and anti-syphon pipes, capillary solder fittings and compression fittings shall be "Cobra Watertech" type. Capillary solder fittingsshall comply with ISO 2016. Only compression fittings shall be used in walls or in ground

Copper pipes:

Unless specifically otherwise stated, descriptions of pipes shall be deemed to include fixing to drywalls etc, building in or suspending not exceeding 1m below suspension level

Fixing of pipes

Where fittings have reducing ends or branches they are described as "reducing". In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained

Reducing fittings

Descriptions of waste unions shall be deemed to include rubber or vulcanite plugs and chains fixed to fittings

Waste unions

RAINWATER DISPOSAL

34No150mm diameter cast iron full-flow side outlet (centre bolt)

1

Rainwater outlets

-92-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 93: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

10No

Spreader 250mm long for 100mm diameter pipe with half closed ends and 20mm diameter holes at 50mm centres

2

34No280 x 163 x 213mm Deep rainwater head with outlet for 100mm diameter pipe

3

34No

100mm diameter x 500mm long galvanised mild steel overflow pipes built into brickwork and upstand beams, 250mm above slab

4

Overflow pipes

416m110mm pipes5

uPVC rain water disposal pipes cast into concrete columns

68No110mm Bends6

Extra over uPVC pipes for fittings

210m110mm Pipes7

Welded HDPe 4PN pipes cast in concrete

110m160mm Pipes8

105m200mm Pipes9

30No110mm Bend10

Extra over HDPe pipes for fittings

20No110mm Junction11

20No160mm Bend12

20No160mm Junction13

20No160mm to 110mm Reducing junction14

20No200mm Bend15

20No200mm Junction16

-93-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 94: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

20No200mm to 160mm Reducing junction17

34No56mm outlet with a flow upto 25l/s including contact sheet

18

Approved syphonic roof drainage system with negative pressure fixed complete with all necessary accessories to concrete roofs all in accordance to manufacturer's instructions

34No110mm outlet with a flow upto 100l/s including contact sheet

19

SANITARY FITTINGS

Stainless steel for basins, washtorughs, bedpan, sinks, etc shall be type 304 (18/10)

Stainless steel

4No

Double end bowl drop-on sink and drainer, size 1200 x 535mm with 32 x 7mm fascia complete with chromium plated waste, plug, and chain and fixing in top of timber cabinet (elsewhere) in antifungal silicone

20

33No

Supply and install new "Duravit D-Code" or similar approved floor mounted water closet, Pan back entry, fully glazed toilet seat white 'duroplast PP with stainless hinges model No. 2115090002 plus 0067310000, 100mm outlet, screwed with stainless steel screws to plugs in wall and bowl seated on wall. ABE dow corning 785 acetoxy slicone sealant to be used

21

Vitreus China

26NoWash hand basin size 510 x 400mm with semi concealed brackets to wall using 2 x 10mm bolts

22

33NoSupply and install new Geberit Sigma 20 flush system 115.781SN.1

23

'Geberit' or similar approved

33NoSupply and install new Geberit Duofix cisterns24

-94-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 95: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

6No

Supply and install new "Duravit Mode " Dune Oval underslung Basin with overflow Model No. 0439560051 with 45mm waste outlet fixed with brackets screwed to the underside of the vanity slab and sealed with ABE dow corning 785 acetoxy slicone sealant where basin rim meets vanity slab and APLOS 15mm Chrome plated one Tap hole basin mixer code AL-853 with vandal proof plug

25

'Duravit' or similar approved

33No"Duravit D Code" pan seat (22280900002) and cover reinforced lateral hinge (0060410000)

26

4No38mm Sink waste union27

WASTE UNIONS ETC

32No38mm Basin waste union28

TRAPS ETC

36No40mm Deep seal "P" or "S" trap29

"Marley" or similar approved

TAPS, VALVES, ETC

72No15mm Underwall pattern stopcock30

"Probrass Sondo" or similar approved

33No15mm Star bibcock31

10No

Cobra Watertech 15mm chrome plated square pattern elbow action pillar tap with aerator with blue indicator for cold water (Code: 505-21B).

32

"Sanitaryware" or similar approved

10No

Cobra Watertech 15mm chrome plated square pattern elbow action pillar tap with aerator with blue indicator for hot water (Code: 505-21B).

33

-95-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 96: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

44No

Universal 15mm single lever pillartap "C spout" with starlight chrome finnish with mosseur and flexible connection hose

34

4No"Cascade Professionl 115020" Sink mixer manufacture form from solid brass with chrome plated finish.

35

64No15mm Chromium plated angle regulating valve36

64No15 x 350mm CP flexable connector37

SANITARY PLUMBING

120m160mm Pipes 38

uPVC class 34 pipes

98m110mm Pipe on walls39

110mm uPVC SV Pipes

152m50mm Pipes40

uPVC pipes

198m110mm Pipes41

36No50mm Bend42

Extra over uPVC pipes for fittings

36No50mm Junction43

64No110 x 50mm Strap-on boss44

33No110 x 110 x 50mm Reducing double junction45

8No160mm Access reducing junction46

33No110mm Access bend47

33No110mm Access junction48

33No110mm Pan connectors49

-96-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 97: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

8No110mm Rodding eye50

8No110mm Inspection eye51

32No50mm x 45 Degree IE Bend52

48No50mm x 45 Degree Plain Bend53

8NoWire balloon grating in top of pipe not exceeding 100mmdiameter

54

Sundries

ItemTesting waste pipe system55

WATER SUPPLIES

20m15mm Pipes56

Class O copper pipes

1,170m22mm Pipes57

40No15mm Fittings58

Extra over copper pipes for fittings

650No22mm Fittings59

ItemTesting water supply pipe system60

Sundries

28No4,5kg Carbon dioxide fire extinguisher61

FIRE APPLIANCES ETC

14No

"Everyway" hose reel complete with 30m plastic hose, chromium plated stop cock, shut-off noozle and wall bracket

62

-97-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 98: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

14NoStandard steel "Fire Brand" fire extinguisher cupboard for two 4.5kg extenguishers

63

WATER SUPPLY TO FIRE APPLIANCES

84m50mm Pipes64

Galvanised steel pipes

42m50mm Pipes chased into walls65

14No50mm Bend66

Extra over for galvanised steel pipes for steel fittings

14No50mm Tee67

10No31.8mm "CNTX750" straight satin finish grab rail plugged

68

"Vaal Paragon" or similar approved

10No31.8mm "CNTX21" 90 Degree satin finish grab rail plugged

69

HOLES ETC

100NoReinforced concrete slab, beam, wall, etc70

Core drilling of hole for pipe not exceeding 100mm

100NoReinforced concrete slab, beam, wall, etc71

Core drilling of hole for pipe exceeding 100mm and not exceeding 150mm diameter

SUBSOIL DRAINAGE

10m319mm Crushed stone encasing to pipes72

Geo Pipe

-98-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 99: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

70m2

Geofabric filter blanket wrapped around 300 x 300mm stone encasing with 150mm side and 300mm end laps, including stitching

73

50m150mm Pipes laid in stone encasing (encasing elsewhere)

74

Slotted PVC-U flexible drainage pipes

5No20mm Mesh galvanised wire netting stopper in end of 150mm pipe

75

5No150mm End cap76

Extra over slotted PVC-U flexible drainage pipes for fittings

6No150mm Bend77

6No150mm Junction78

Weep Holes

20m50mm Pipes79

uPVC pipes

-99-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 100: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Plumbing and Drainage (Provisional)

Section No. 2

Bill No. 14

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

99

98

97

96

95

94

93

92

91Total Brought Forward from Page No.

-100-

Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 101: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 15

GLAZING

Unless otherwise stated all items in this bill will be WorkGroup 150

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

---------------------------------------

MIRRORS

21No

6mm "GG" quality polished glass mirror 2000 x 1500mm high with polished edges fixed to wall with four 35mm round nose chromium plated mirror screws

1

Silvered float glass copper backed mirrors with polished edges holed for and fixed with chromium plated dome capped mirror screws with foam backing strip all round to plugs in walls

-101-

GlazingBill No. 15MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 102: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 2

BILL NO. 16

PAINTWORK

Unless otherwise stated all items in this bill will be WorkGroup 152

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

All materials for paintwork for which South African Bureau of Standards specifications have been published shall comply the requirements of such specifications and shall bear the standardisation mark of the South African Bureau of Standards on the container or packing. Materials for paintwork for which no SABS specifications have been published shall be of a brand and manufacture approved by the Director-General prior to its use

PAINT SPECIFICATION

-102-

PaintworkBill No. 16MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 103: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Paintwork in different colours has not been measured separately, except for colours which have a value of 7 orless on the Munsell system as described above as well as for the following:

Paintwork on mouldings and bands picked out in colours differing from the surrounding paintwork of the same material

Paintwork on walls, ceilings, etc to patterns in more than one colour are described separately as "in patterned multi-colours"

Paint in dado's has not been measured separately, neither are cutting in of edges measured. Prices shall include for cutting in of contrasting colours or paints and masking as required.

DISTINCTION FOR COLOUR

Painting of profiled surfaces are measured over the flat area, unless otherwise described

PROFILED SURFACES

Prices for painting structural steelwork are to include for corrosion protection as PW 371 clause 18.9.1 (c). See "Metalwork" for 18.9.1(a) (b) and (d)

PROTECTION AGAINST CORROSION

All damaged paint areas are to be repaired in accordance with the original specification after completion of erection

All paint to structural steelwork is to be sourced from an approved paint manufacturer and to be applied in accordance with the manufacturers specifications

All bolts are to be degreased prior to erection and painted after erection

STRUCTURAL STEELWORK

---------------------------------------

-103-

PaintworkBill No. 16MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 104: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

PAINTWORK, ETC TO NEW WORK

ON CONCRETE SURFACES

199m2On concrete walls and lift shaft1

Prepare and apply one coat solvent free epoxy polyamide sealer and three coats based epoxy polyamide paint

11,523m2On ceilings and beams2

1,173m2On columns3

ON FLOATED PLASTER

14,137m2On internal plastered walls4

Prepare, stop and apply one coat masonry primer and two coats acrylic PVA paint

5,408m2On external plastered walls5

340m2On plastered soffits of stairs6

ON METAL

227m2On pressed steel door frames7

Prepare, touch up factory primer and apply one coat universal undercoat and two full coats high gloss enamel paint

7m2On strongroom doors and frames8

50m2On structural steel 9

ON WOOD

2,762mOn backs of frames, linings, etc not exceeding 300mm wide or girth

10

Two coats wood primer

-104-

PaintworkBill No. 16MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 105: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

2,762mOn skirtings, rails, etc. not exceeding 300mm girth11

Prepare, stop and apply two full coats polyurethane clear eggshell varnish, lightly sanded down between coats

284m2On doors12

Prepare, stop and apply one coat wood primer and two coats PVA paint

-105-

PaintworkBill No. 16MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Collection R

Page 106: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Paintwork

Section No. 2

Bill No. 16

AmountPageNo

MAIN BUILDINGS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

105

104

103

102Total Brought Forward from Page No.

-106-

PaintworkBill No. 16MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried Forward to Summary of Section No. 2 R

Page 107: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

MAIN BUILDINGS

SECTION SUMMARY - MAIN BUILDINGS

BillNo

PageNo

Amount

Section No. 2

34Earthworks (Provisional)1

42Concrete, Formwork and Reinforcement2

45Precast Concrete3

51Masonry4

55Waterproofing5

58Roof Coverings, Etc6

63Carpentry and Joinery7

66Ceilings, Partitions and Access Flooring8

73Ironmongery9

76Structural Steelwork10

83Metalwork11

86Plastering12

90Tiling13

100Plumbing and Drainage (Provisional)14

101Glazing15

106Paintwork16

-107-

MAIN BUILDINGSSection No. 2

Part C2. Pricing Data

Carried to Final Summary R

Page 108: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 3

BILL NO. 1

EARTHWORKS (PROVISIONAL)

Unless otherwise stated all items in this bill will be WorkGroup 104

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

A soils investigation has been carried out on site by the engineer and the report can be viewed at the Engineer's offices.

SOILS INVESTIGATION REPORT

Descriptions of excavations shall be deemed to include all ground conditions classifiable as "earth" described in the above soil investigation report, and where conditions of a more difficult character are indicated, these are separately measured

NATURE OF GROUND

-108-

Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 109: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Should the contractor consider that the excavation at any point are in "soft rock" or "hard rock", he must notify the Representative / Agent immediately in order that an inspection may be made and a decision arrived at by the Representative / Agent as to the category of such excavation. Should the contractor fail to give such notification, the excavation shall be deemed to be in earth and shall be valued accordingly

EXCAVATIONS IN CONDITIONS OTHER THAN "EARTH"

The information on subterranean water is included in the soils investigation report can be viewed at the Engineer's offices.

SUBTERRANEAN WATER

Formwork and working space has been measured to the sides of concrete wall footings & bases and no formwork or additional backfilling necessary due to over excavations will be measured to wall footings. Backfilling to such over excavations areas must be compacted to the same degree and in the same manner as the backfilling to the remainder of such excavation, only required if specified by the Engineer.

WORKING SPACE

Descriptions of cart away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or from stock piles situated on the building site

CART AWAY OF EXCAVATED MATERIAL

-109-

Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 110: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

EXCAVATION, FILLING, ETC OTHER THAN BULK

EXCAVATION, ETC

1,321m3Holes1

Excavation in earth or compacted filling not exceeding 2m deep

132m3Soft rock2

Extra over excavations in earth for exacavation in:

66m3Hard rock3

1,321m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

4

Extra over all excavations for carting away

1,650m2Sides of trench and hole excavations not exceeding 1,5mm deep

5

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

6

Keeping excavations free of water

FILLING, ETC

1,502m3Under floors, steps, pavings, etc7

Earth filling of G5 material supplied by the contractor compacted in 150mm layers compacted to 95% Mod AASHTO to density

751m3

Extra over G5 imported material for stabilisation with 4% cement at a recommended rate by the engineer to archive C4 quality

8

-110-

Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 111: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

150m3Under floors etc9

Coarse river sand filling supplied by the contractor

5,006m2

Compaction of ground surface under floors, etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 90% Mod AASHTO density

10

Compaction of surfaces

10No"Modified AASHTO Density" test11

Prescribed density tests on filling

SOIL POISONING

5,006m2Under floors, etc including forming and poisoning shallow furrows etc and filling in furrows and ramming

12

Soil insecticide under a 10 year guarantee by firm of specialist

2,509m2To bottoms and sides of trenches, etc 13

-111-

Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 112: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Earthworks (Provisional)

Section No. 3

Bill No. 1

AmountPageNo

CONCRETE PARKADE

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

111

110

109

108Total Brought Forward from Page No.

-112-

Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried Forward to Summary of Section No. 3 R

Page 113: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 3

BILL NO. 2

CONCRETE, FORMWORK AND REINFORCEMENT

Unless otherwise stated concrete will be Work Group 110

CPA WORK GROUP

Unless otherwise stated formwork will be Work Group 111

Unless otherwise stated reinforcement will be Work Group 114

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

-113-

Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 114: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Description of formwork shall be deemed to include use and waste only (except where described as "left in" or "permanent"), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use

FORMWORK TO BASES, PILE CAPS, ETC

The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself.

Formworks to soffits of solid etc shall be deemed to be slabs not exceeding 250mm thick unless otherwise described

Formwork to sides of bases, pile caps, etc will only be measured where it is prescribed for design reasons

Formwork necessitated by irregularity or collapse of excavated surfaces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in "Earthworks"

UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

38m3Blinding under footings and bases1

15MPa/19mm Concrete in:

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

851m3Bases2

25MPa/19mm Concrete in:

3m3Lift shaft bases3

-114-

Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 115: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

REINFORCED CONCRETE

751m3Surface beds cast in panels on waterproofing4

25MPa/19mm Concrete in:

3,520m3Slabs including beams and inverted beams5

30MPa/19mm concrete in:

90m3Ramps including beams and inverted beams6

21m3Stairs including landings, beams and inverted beams7

74m3Isolated beams8

297m3Walls9

323m3Columns10

40MPa/19mm concrete in:

2,984No

Making and testing 150 x 150 x 150mm concrete strength test cube and submit report to the Representative / Agent (only successful tests will be paid for)

11

TEST CUBES (PROVISIONAL)

CONCRETE SUNDRIES

18,546m2Surface beds, slabs, etc12

Finishing top surfaces of concrete smooth with a power float with approved concrete floor hardener added (5kg/m²) and curing with an approved curing compound at a rate not exceeding 11m²/liter and finish to a broomed non-slip surface

345m2Sloping surface beds, slaps, ramps etc. to fall and currents.

13

-115-

Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 116: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

90NoBedding approximately 20mm thick under 200 x 200mm base plate

14

15MPa non-shrink grout

MOVEMENT JOINTS, ETC

336mNot exceeding 300mm wide15

Two layers of 375 micron dampproof course in slip joints between horizontal concrete and brick surfaces including cement mortar bed

1,001mNot exceeding 300mm high through slabs16

Expansion joints with 10mm bitumen impregnated softboard between vertical concrete surfaces, including necessary formwork

3,709m4 x 30mm Saw cuts in top of concrete17

Saw cut joints

ROUGH FORMWORK (DEGREE OF ACCURACY II)

11m2Inner face of shaft walls18

Rough formwork to sides

14m2Walls with total height exceeding 3500mm and not exceeding 5000mm above bearing level

19

SMOOTH FORMWORK (DEGREE OF ACCURACY II)

1,949m2Walls with total height not exceeding 3500mm above bearing level

20

Smooth formwork to sides

1,696m2Rectangular columns propped up not exceeding 3500mm high above bearing level

21

-116-

Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 117: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

79mSloping and stepped outer edges of stairs not exceeding 300mm high extreme

22

812mEdges, risers, ends and reveals not exceeding 300mm high or wide.

23

18No1500mm Diameter column 3500mm high24

Smooth formwork to circular and partly circular columns

13,540m2

Slabs propped up not exceeding 3500mm high above bearing level

25

Smooth formwork to soffits

345m2

Sloping slabs propped up not exceeding 3500mm high above bearing level

26

31m2Landings27

62m2Stairs with sloping soffits28

1,354m2Beams propped up exceeding 3500mm and not exceeding 5000mm high

29

Smooth formwork to sides and soffits

411m2Isolated beams propped up not exceeding 3500mm high above bearing level

30

18NoOpening not exceeding 1m girth through not exceeding 300mm slab

31

Smooth formwork to form

REINFORCEMENT (PROVISIONAL)

244.01tIn Varying diameters32

Mild steel reinforcement to structural concrete work

-117-

Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 118: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

421.79tIn Varying diameters33

High tensile steel reinforcement to structural concrete work

2,503No

12mm Diameter dowel bar 600mm long with one end embedded 300mm deep in side of concrete at butt joint and other end greased and wrapped in polythene sheeting, including hole through formwork, 10mm jointex caulking and uPVC tight fitting sleeve

34

High tensile steel dowel bars

5,006m2Mesh Ref 311 fabric reinforcement in concrete surface beds, etc

35

Fabric reinforcement

162No1500 x 80 x 46mm Sloping precast concrete parking stop block fixed with epoxy to concrete floors

36

VEHICLE CONTROL

-118-

Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 119: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Concrete, Formwork and Reinforcement

Section No. 3

Bill No. 2

AmountPageNo

CONCRETE PARKADE

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

118

117

116

115

114

113Total Brought Forward from Page No.

-119-

Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried Forward to Summary of Section No. 3 R

Page 120: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 3

BILL NO. 3

WATERPROOFING

Unless otherwise stated all items in this bill will be WorkGroup 120

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Waterproofing of roofs, basements, etc shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with necessary ridges, hips and valleys. Descriptions of sheet or membrane waterproofing shall be deemed to include additional labour to turn-ups and turn-downs

Waterproofing

DAMPPROOFING OF WALLS AND FLOORS

5,006m2Under surface beds1

One layer 250 micron green polyethylene waterproof sheeting complying with SABS 952 Type C in widest practicable widths with all joints lapped and sealed with pressure sensitive tape all in strict accordance with the manufacturer's requirements

-120-

WaterproofingBill No. 3CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 121: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

WATERPROOFING TO ROOFS ETC

3,873m2On flat roofs2

4mm Abegum dual reinforced membrane, fully bonded by means of "torch fusion" with 75mm side laps and 100mm end laps

610m

Additional membrane 150mm girth at turn-ups including flashing strip 150mm girth and sealing top edge into groove with mastic

3

610m30 x 30mm Triangular fillet4

PROTECTIVE ROOFING PAINT

3,964m2On waterproofing to roofs5

Two coats bituminous aluminium paint

JOINT SEALANTS, ETC

3,709m3 x 30mm In saw cut joints in floors6

Two-part grey polysulphide sealing compound applied with a caulking gun, including backing cord, bond breaker, primer, etc

1,001m10 x 25mm In expansion joints in floors including raking out expansion joint filler as necessary

7

336m5 x 10mm In horizontal slip joints in walls8

-121-

WaterproofingBill No. 3CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 122: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Waterproofing

Section No. 3

Bill No. 3

AmountPageNo

CONCRETE PARKADE

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

121

120Total Brought Forward from Page No.

-122-

WaterproofingBill No. 3CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried Forward to Summary of Section No. 3 R

Page 123: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 3

BILL NO. 4

STRUCTURAL STEELWORK

Unless otherwise stated all items in this bill will be WorkGroup 134

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Descriptions of bolts shall be deemed to include nuts and washers

Descriptions

Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete

Descriptions of L-shaped and U-shaped anchor bolts shall be deemed to include bending, threading, nuts and washers and embedding in concrete. Where anchor bolts are described as embedded in sides or soffits of concrete it shall be deemed to include holes through formwork.

STEEL TRUSSES ETC

5.61t203 x 203 x 46kg/m Universal column1

Welded columns in single lengths with flat section base, top, bearer and connection plates bolted to concrete

-123-

Structural SteelBill No. 4CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 124: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

8.71t200 x 100 x 22.4kg/m IPE beam2

Welded beams in single lengths with flat section bearer and connection plates bolted to steel columns

PURLINS, GIRTS, BRACING, ETC

1.29t100 x 55 x 8.1kg/m IPE bracing3

Welded bracing etc with flat section connection plates bolted to steel

PLATES, BOLTS, ETC

0.13tHigh tensile bolts4

Bolts to trusses etc

36.00No300 x 200mm Base plates bolted to bracing5

12mm thick base plates with 6 20mm holes

90.00No200 x 200mm Base plates to columns6

360.00NoM20 x 150mm Concrete anchor bolts7

Friction bolts to base plates

-124-

Structural SteelBill No. 4CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 125: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Structural Steel

Section No. 3

Bill No. 4

AmountPageNo

CONCRETE PARKADE

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

124

123Total Brought Forward from Page No.

-125-

Structural SteelBill No. 4CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried Forward to Summary of Section No. 3 R

Page 126: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 3

BILL NO. 5

METALWORK

Unless otherwise stated all items in this bill will be WorkGroup 136

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

Descriptions of bolts shall be deemed to include nuts and washers

Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete

Metalwork described as "holed for bolts" shall be deemed to include the bolts unless otherwise described

DESCRIPTIONS

---------------------------------------

-126-

MetalworksBill No. 5CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 127: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Note:

Where the balustrading meets brickwork, 18mm steel dowels must be inserted in the brickwork including grouting and welded to the balustrading for stability

STEEL HANDRAILS, BALUSTRADES, ETC

58m

Horizontal balustrading 1000mm high of 75mm circular hollow section top, middle and bottom rail with 25 circular hollow section balusters at maximum 200mm centres with each baluster welded to a 100 x 100 x 6mmthick base plate and two times holed for and including 2No expansion bolts and vertical abusters welded to top and bottom rails at 100mm centres

1

Stainless steel welded and bolted patent balustrading to concrete or steel

79m

Raking balustrading 1000mm high of 75mm circular hollow section top, middle and bottom rail with 25 circular hollow section balusters at maximum 200mm centres with each baluster welded to a 100 x 100 x 6mmthick base plate and two times holed for and including 2No expansion bolts and vertical abusters welded to top and bottom rails at 100mm centres

2

20NoExtra over for L-intersection of horizontal balustrades 3

20NoExtra over for L-intersection of raking balustrades4

20NoExtra over for junction of end of horizontal with end of raking balustrades

5

20NoExtra over for flat closed end6

24NoExtra over 75mm diameter pipe for rounded end7

6NoExtra over 75mm diameter pipe for bend to 100mm internal radius

8

-127-

MetalworksBill No. 5CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 128: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Metalworks

Section No. 3

Bill No. 5

AmountPageNo

CONCRETE PARKADE

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

127

126Total Brought Forward from Page No.

-128-

MetalworksBill No. 5CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried Forward to Summary of Section No. 3 R

Page 129: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 3

BILL NO. 6

PLUMBING AND DRAINAGE (PROVISIONAL)

Unless otherwise stated all items in this bill will be WorkGroup 148

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Soil, waste and vent pipes and fittings shall be solvent weld jointed

uPVC pipes and fittings:

Pipes for water supply shall be of the class stated

uPVC pressure pipes and fittings:

Pipes of 40mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings

Pipes of 50mm diameter and greater shall have sockets and spigots with push in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints

-129-

Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 130: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Pipes shall be hard drawn and half-hard pipes of the class stated. Class 0 (thin walled hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), class 2 (half-hard) and class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper waste, vent and anti-syphon pipes, capillary solder fittings and compression fittings shall be "Cobra Watertech" type. Capillary solder fittingsshall comply with ISO 2016. Only compression fittings shall be used in walls or in ground

Copper pipes:

Unless specifically otherwise stated, descriptions of pipes shall be deemed to include fixing to drywalls etc, building in or suspending not exceeding 1m below suspension level

Fixing of pipes

Where fittings have reducing ends or branches they are described as "reducing". In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained

Reducing fittings

Descriptions of waste unions shall be deemed to include rubber or vulcanite plugs and chains fixed to fittings

Waste unions

RAINWATER DISPOSAL

18No150mm diameter cast iron full-flow side outlet (centre bolt)

1

Rainwater outlets

-130-

Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 131: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

10No

Spreader 250mm long for 100mm diameter pipe with half closed ends and 20mm diameter holes at 50mm centres

2

34No280 x 163 x 213mm Deep rainwater head with outlet for 100mm diameter pipe

3

36No

100mm diameter x 500mm long galvanised mild steel overflow pipes built into upstand beams, 250mm above slab

4

Overflow pipes

182m110mm pipes5

uPVC rain water disposal pipes cast into concrete columns

54No110mm Bends6

Extra over uPVC pipes for fittings

210m110mm Pipes7

Welded HDPe 4PN pipes cast in concrete

110m160mm Pipes8

105m200mm Pipes9

30No110mm Bend10

Extra over HDPe pipes for fittings

20No110mm Junction11

20No160mm Bend12

20No160mm Junction13

20No160mm to 110mm Reducing junction14

20No200mm Bend15

20No200mm Junction16

-131-

Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 132: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

20No200mm to 160mm Reducing junction17

34No56mm outlet with a flow upto 25l/s including contact sheet

18

Approved syphonic roof drainage system with negative pressure fixed complete with all necessary accessories to concrete roofs all in accordance to manufacturer's instructions

34No110mm outlet with a flow upto 100l/s including contact sheet

19

-132-

Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 133: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Plumbing and Drainage (Provisional)

Section No. 3

Bill No. 6

AmountPageNo

CONCRETE PARKADE

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

132

131

130

129Total Brought Forward from Page No.

-133-

Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried Forward to Summary of Section No. 3 R

Page 134: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 3

BILL NO. 7

GLAZING

Unless otherwise stated all items in this bill will be WorkGroup 150

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

---------------------------------------

GLAZING FIXED TO STRUCTURAL STEEL

182m2Panes exceeding 0,5m2 and not exceeding 2m21

6mm High penetration resistance (HPR) clear laminated safety glass

1,213m2Panes exceeding 2m2 and not exceeding 4m22

-134-

GlazingBill No. 7CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried Forward to Summary of Section No. 3 R

Page 135: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 3

BILL NO. 8

PAINTWORK

Unless otherwise stated all items in this bill will be WorkGroup 152

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent

TRADE NAMES

All materials for paintwork for which South African Bureau of Standards specifications have been published shall comply the requirements of such specifications and shall bear the standardisation mark of the South African Bureau of Standards on the container or packing. Materials for paintwork for which no SABS specifications have been published shall be of a brand and manufacture approved by the Director-General prior to its use

PAINT SPECIFICATION

-135-

PaintworkBill No. 8CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 136: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Paintwork in different colours has not been measured separately, except for colours which have a value of 7 orless on the Munsell system as described above as well as for the following:

Paintwork on mouldings and bands picked out in colours differing from the surrounding paintwork of the same material

Paintwork on walls, ceilings, etc to patterns in more than one colour are described separately as "in patterned multi-colours"

Paint in dado's has not been measured separately, neither are cutting in of edges measured. Prices shall include for cutting in of contrasting colours or paints and masking as required.

DISTINCTION FOR COLOUR

Painting of profiled surfaces are measured over the flat area, unless otherwise described

PROFILED SURFACES

Prices for painting structural steelwork are to include for corrosion protection as PW 371 clause 18.9.1 (c). See "Metalwork" for 18.9.1(a) (b) and (d)

PROTECTION AGAINST CORROSION

All damaged paint areas are to be repaired in accordance with the original specification after completion of erection

All paint to structural steelwork is to be sourced from an approved paint manufacturer and to be applied in accordance with the manufacturers specifications

All bolts are to be degreased prior to erection and painted after erection

STRUCTURAL STEELWORK

---------------------------------------

-136-

PaintworkBill No. 8CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 137: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

PAINTWORK, ETC TO NEW WORK

ON CONCRETE SURFACES

2,047m2On concrete walls and lift shaft1

Prepare and apply one coat solvent free epoxy polyamide sealer and three coats based epoxy polyamide paint

14,479m2On ceilings and beams2

1,955m2On columns3

ON METAL

465m2On structural steel 4

Prepare, touch up factory primer and apply one coat universal undercoat and two full coats high gloss enamel paint

All road markings in thermoplastic.

Colour: whitePaint application rate (mm): 1.2Premix bead application rate (%): 35Initial coefficient of retro-retro reflective: 200 (minicandleas/lux/m2)

Colour: yellowPaint application rate (mm): 1.2Premix bead application rate (%): 35Initial coefficient of retro-retro reflective: 135 (minicandleas/lux/m2)

ROAD MARKINGS

5,438m100mm Wide line 5

Approved reflectorised thermoplastic road marking paint, including proper preparation of surfaces

1,241m300mm wide line6

-137-

PaintworkBill No. 8CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 138: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

190m300mm wide line painted circular7

435NoNumeral or letter 300mm high8

240NoTraffic arrow 500 x 300 mm wide extreme9

21NoStandard "STOP" sign10

27NoStandard "EXIT" sign11

24No"RM17.3" disabled person parking bay (white), suitable size for 3.5 x 5m parking bay

12

105m2Pedesrian crossing13

-138-

PaintworkBill No. 8CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Collection R

Page 139: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Paintwork

Section No. 3

Bill No. 8

AmountPageNo

CONCRETE PARKADE

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

138

137

136

135Total Brought Forward from Page No.

-139-

PaintworkBill No. 8CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried Forward to Summary of Section No. 3 R

Page 140: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

CONCRETE PARKADE

SECTION SUMMARY - CONCRETE PARKADE

BillNo

PageNo

Amount

Section No. 3

112Earthworks (Provisional)1

119Concrete, Formwork and Reinforcement2

122Waterproofing3

125Structural Steel4

128Metalworks5

133Plumbing and Drainage (Provisional)6

134Glazing7

139Paintwork8

-140-

CONCRETE PARKADESection No. 3

Part C2. Pricing Data

Carried to Final Summary R

Page 141: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 4

BILL NO. 1

BULK EARTHWORKS (PROVISIONAL)

Unless otherwise stated all items in this bill will be WorkGroup 104

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described

DESCRIPTIONS

REMOVAL OF EXISTING WORK

2,213m280mm Thick concrete block paving on sand bedding1

Taking out pavers setting aside for re-use and later relaying in similar new position

BULK EXCAVATION, FILLING, ETC TO FORM BUILDING PLATFORMS

3,224m3Open face excavation2

Open face excavation in earth over sloping site

161m3Soft rock3

Extra over bulk excavation in earth for excavation in

-141-

Bulk Earthworks (Provisional)Bill No. 1EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 142: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

81m3Hard rock4

3,224m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

5

Extra over all excavations for carting away

242m2To faces of bulk excavations exceeding 1.5m deep6

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

7

Keeping excavations free of water

FILLING, ETC

1,088m3Filling to form level platforms, etc 8

Earth filling of G5 material supplied by the contractor compacted in 150mm layers to 98% Mod AASHTO to density

725m3Filling to form level platforms, etc 9

Earth filling of G7 material supplied by the contractor compacted in 150mm layers to 95% Mod AASHTO to density

3No"Natural California Bearing Ratio" test10

Prescribed density tests on filling

-142-

Bulk Earthworks (Provisional)Bill No. 1EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 143: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Bulk Earthworks (Provisional)

Section No. 4

Bill No. 1

AmountPageNo

EXTERNAL WORKS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

142

141Total Brought Forward from Page No.

-143-

Bulk Earthworks (Provisional)Bill No. 1EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried Forward to Summary of Section No. 4 R

Page 144: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 4

BILL NO. 2

ROADWORKS AND PARKING

Unless otherwise stated all items in this bill will be WorkGroup 154

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described

DESCRIPTIONS

BULK EXCAVATION, FILLING, ETC

1,335m3Open face excavation1

Open face excavation over sloping site

1,298m3Reducing levels for roads2

Excavation in earth or compacted filling not exceeding 2m deep

267m3Soft rock3

Extra over bulk excavation in earth for excavation in

-144-

Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 145: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

134m3Hard rock4

2,633m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

5

Extra over all excavations for carting away

790m2To faces of bulk excavations not exceeding 1.5m deep6

Risk of collapse of excavations

ItemKeeping excavations free of all water other than subterranean water

7

Keeping excavations free of water

LAYER WORK

334m3Selected lower layer G9 gravel-soil material compacted to 93% Mod AASHTO density

8

Earth filling material supplied by the contractor under parking areas, roadways, etc compacted in 150mm layers

334m3Selected upper layer G7 gravel-soil material compacted to 93% Mod AASHTO density

9

668m3Subbase course of G5 natural gravel material, compacted to 95% Mod AASHTO density

10

668m3Base course of G1 natural gravel material, compacted to98% Mod AASHTO density

11

1,336m3

Extra over subbase and/or base course of natural gravel material for stabilisation with 4% cement at a recommended rate by the engineer to archive C4 quality

12

140m3Under parking areas13

Coarse river sand filling supplied by the contractor

-145-

Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 146: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

3,356m2

Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density

14

Compaction of surfaces

Note: The contractor is to allow in his rates for all density tests required to comply with the relevant specifications and drawings and in order to ensure that the required densities are obtained. The contractor shall only be paid under the following items for over and above the required tests as specified by the Engineer to be done by an independent laboratory.

Prescribed density tests on filling (To be only executed as directed by the engineer)

4NoModified AASHTO Density test 15

4NoRoad Indicator test 16

4NoField Density test including "Optimum Moisture Content" (four readings per test)

17

SOIL POISONING

3,356m2Under paving etc 18

Weedkiller under a 10 year guarantee by a firm of specialist

PAVING

513m2Paving of 60mm thick blocks including edge blocks, to falls

19

Paving of double zig-zag (shape S-A) interlocking precast concrete paving blocks complying with SANS 1058, with butt joints on 25mm thick river sand bed with sand swept into joints, including preparation of ground or filling

630m2Paving of 80mm thick blocks including edge blocks, to falls

20

-146-

Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 147: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

175mFair circular cutting21

2,213m2

Relaying existing 80mm thick blocks including edge blocks, to falls

22

MAKING GOOD OF EXISTING ROAD SURFACE, PAVEMENT, ETC

1,007m2Paving in patches23

Making good existing road paving

KERBING

218m

Kerb (SABS 927 fig 7) 180 x 280mm high with 500 x 150mm thick unreinforced concrete base and 150 x 150 x 300mm overall unreinforced concrete haunching at back of each joint including excavation, backfilling, etc

24

Precast concrete finished smooth on exposed surfaces including bedding, jointing and pointing

114m

Kerb (SABS 927 fig 7) 180 x 280mm high with 500 x 150mm thick unreinforced concrete base and 150 x 150 x 300mm overall unreinforced concrete haunching at back of each joint circular on plan exceeding 4m radius formed with short lengths of straight kerb including excavation, backfilling, etc

25

118m

Kerb (SABS 927 fig 3) 150 x 300mm high with 500 x 150mm reinforced concrete base and 150 x 150 x 300mm unreinforced concrete haunching at back of each joint including excavation, backfilling, etc

26

61m

Kerb (SABS 927 fig 3) 150 x 300mm high with 500 x 150mm thick unreinforced concrete base and 150 x 150 x 300mm overall unreinforced concrete haunching at back of each joint circular on plan exceeding 4m radius formed with short lengths of straight kerb including excavation, backfilling, etc

27

474mChannel (SABS 927 fig 3) 300 x 150mm high against kerb including excavation, backfilling, etc

28

-147-

Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 148: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

10m200 x 150mm Concrete edge beam29

Concrete edge beam

10mCut unit to fit edge beam30

All road markings in thermoplastic.

Colour: whitePaint application rate (mm): 1.2Premix bead application rate (%): 35Initial coefficient of retro-retro reflective: 200 (minicandleas/lux/m2)

Colour: yellowPaint application rate (mm): 1.2Premix bead application rate (%): 35Initial coefficient of retro-retro reflective: 135 (minicandleas/lux/m2)

ROAD MARKINGS

358m2Top of helipad concrete slab31

Approved reflectorised thermoplastic road marking paint, including proper preparation of surfaces

95m100mm wide32

95m150mm wide33

20m2White characters and symbols34

20m2Yellow characters and symbols35

20NoDisabled parking sign36

20NoStandard "STOP" sign37

20NoDirection arrow 1500mm long38

10No1350 x 4000mm Yield sign39

-148-

Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 149: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

50m300mm wide line painted circular40

18NoNumeral or letter 300mm high41

1NoNumeral or letter "H" 5500mm high x 3600mm wide42

11NoTraffic arrow 500 x 300 mm wide extreme43

57m2Pedesrian crossing44

ROAD SIGNS

20No610mm "STOP" sign45

Standard road sign with standard 75mm diameter x 2710mm high galvanized mild steel circular hollow section fixing post bedded into and including 550 x 800mm 25MPa concrete base, 12mm diameter x 300mm long anchor pin, excavation, backfilling, compaction, cartaway, etc

20No610mm "DISABLED" sign46

10NoStandard Yield sign47

10No900 x 779mm Pedestrian Crossing48

GABIONS AND INTERLOCKING BLOCK RETAINING STRUCTURES

1,300m2

Retaining structure with stepped face and curves as required to suit slopes, of 420 x 300 x 210mm high approved type interlocking planter blocks laid with horizontal bed joints to 26 degree slope including average 150mm thick compacted earth filling behind blocks and filling the blocks with garden soil lightly tamped as the work proceeds

49

Approved precast concrete interlocking planter blocks finished smooth on exposed surfaces

2,213m3On cleared ground50

Filling of graded crushed stone, consolidated

-149-

Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 150: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Roadworks and Parking

Section No. 4

Bill No. 2

AmountPageNo

EXTERNAL WORKS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

149

148

147

146

145

144Total Brought Forward from Page No.

-150-

Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried Forward to Summary of Section No. 4 R

Page 151: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 4

BILL NO. 3

SEWER RETICULATION (PROVISIONAL)

Unless otherwise stated all items in this bill will be WorkGroup 146

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described

DESCRIPTIONS

SEWER PIPEWORK

30m110mm Pipes vertically or ramped to cleaning eyes etc (no excavation)

1

uPVC class 34 pipes including excavation, bedding, backfilling and compaction and disposal of surplus material

40m110mm Pipes laid in and including trenches not exceeding 1m deep

2

40m160mm Pipes laid in and including trenches not exceeding 1m deep

3

-151-

Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 152: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

40m160mm Pipes laid in and including trenches exceeding 1m and not exceeding 2m deep

4

40m160mm Pipes laid in and including trenches exceeding 2m and not exceeding 3m deep

5

30m3Soft rock6

Extra over trench and hole excavations in earth for excavation in

20m3Hard rock7

30No110mm Bend8

Extra over uPVC class 34 pipes for fittings

30No110mm Junction9

35No110mm Access bend10

35No110mm Access junction11

35No160mm to 110mm Reducing bend12

35No160mm to 110mm Reducing junction13

35No160mm to 110mm Reducer14

35No160mm Access bend15

35No160mm Access junction16

40No

110mm Gulley not exceeding 1mm deep formed of trap, vertical pipe and gulley head with loose grating, encased in 15MPa unreinforced concrete, with top of gulley 50mm above surrounding finished surfaces, top surface of concrete splayed and with 1:3 cement plaster on exposed surfaces

17

uPVC Gulley

-152-

Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 153: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

40m350 x 350mm 15MPa Unreinforced concrete encasing around 110mm vertical pipe

18

Sundries

40m350 x 350mm 15MPa Unreinforced concrete encasing around 160mm horizontal pipe

19

60No110mm uPVC cleaning eye to end of 110mm uPVC pipe20

60No

350 x 350 x 50mm Thick precast concrete inspection eye marker slab finished smooth on exposed surfaces with letters "I.O." or "I.E." on top and placed flush in ground or paving

21

ItemTesting soil drainage system22

MANHOLES

10No980mm diameter (internally) Precast concrete manhole not exceeding 1.0m deep internally

23

Precast concrete manholes with medium duty concrete manhole cover and frame, frame bedded in 1:3 cement mortar, spacers bedded in 1:6 cement mortar and precast concrete slab including excavations, backfilling, compaction, risk of collapse, cartaway surplus material, 300mm thick unreinforced 20MPa/19mm concrete base projecting 75mm wide from walls, benching, junctions, channelling, and step irons all in accordance with engineer's drawings for the following depths:

10No980mm diameter (internally) Precast concrete manhole exceeding 1.0m and not exceeding 2.0m deep internally

24

5No

1250mm diameter overall (internally) Precast concrete manhole exceeding 2.0m and not exceeding 3.0m deep internally

25

5No

1250mm diameter overall (internally) Precast concrete manhole exceeding 3.0m and not exceeding 4.0m deep internally

26

-153-

Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 154: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

5No

Cutting into side of existing manhole chamber for and connecting 160mm pipe including inserting 160mm channel junction and making good concrete benching

27

SEWER CONNECTION

-154-

Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 155: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Sewer Reticulation (Provisional)

Section No. 4

Bill No. 3

AmountPageNo

EXTERNAL WORKS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

154

153

152

151Total Brought Forward from Page No.

-155-

Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried Forward to Summary of Section No. 4 R

Page 156: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 4

BILL NO. 4

WATER RETICULATION (PROVISIONAL)

Unless otherwise stated all items in this bill will be WorkGroup 146

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described

DESCRIPTIONS

WATER PIPEWORK

60m63mm Pipes laid in and including trenches not exceeding 1m deep

1

HDPe PE 100PN 12.5 pipes including excavation, bedding, backfilling and compaction and disposal of surplus material

60m110mm Pipes laid in and including trenches not exceeding 1m deep

2

60m110mm Pipes laid in and including trenches exceeding 1m and not exceeding 2m deep

3

-156-

Water Reticulation (Provisional)Bill No. 4EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 157: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

55No63mm Elbow4

Extra over HDPe pipe for fittings

55No63mm Equal Tee5

55No110mm Elbow6

55No110mm Equal Tee7

55No110mm to 63mm Reducer8

55No110mm to 100mm Reducer connection to steel pipe9

55No110 x 100mm Compression flange adapter10

70m100mm Pipes laid in and including trenches not exceeding 1m deep

11

Galvanised medium steel pressure pipes wrapped in denso including excavation, bedding, backfilling and compaction and disposal of surplus material

55No100mm Elbow12

Extra over galvanised medium steel pressures pipes for steel fittings

50m3Soft rock13

Extra over trench and hole excavations in earth for excavation in

40m3Hard rock 14

60m100mm Diameter pipes15

Galvanised medium steel pressure pipes

25No100mm Equal Tee16

Extra over galvanised medium steel pressures pipes for steel fittings

25No100mm Elbow17

-157-

Water Reticulation (Provisional)Bill No. 4EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 158: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

25No150mm to 100mm Reducing Elbow18

25No150mm Elbow19

30No63mm Brass gate valve20

Sundries

30No100mm Brass gate valve21

30No110mm Brass gate valve22

30No110mm Brass non-return valve23

25No

620 x 550mm Meter/Valve box including brick chamber below not exceeding 1m deep internally, medium weight frame and cover, excavation, backfilling, compaction and disposal of surplus material

24

25m3Unreinforced concrete in thrust blocks at bends, tees, etc including necessary extra excavation, formwork, etc

25

ItemTesting water supply pipe system26

ItemAllow for connecting to existing water supplies27

WATER CONNECTION

-158-

Water Reticulation (Provisional)Bill No. 4EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 159: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Water Reticulation (Provisional)

Section No. 4

Bill No. 4

AmountPageNo

EXTERNAL WORKS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

158

157

156Total Brought Forward from Page No.

-159-

Water Reticulation (Provisional)Bill No. 4EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried Forward to Summary of Section No. 4 R

Page 160: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 4

BILL NO. 5

STORMWATER RETICULATION (PROVISIONAL)

Unless otherwise stated all items in this bill will be WorkGroup 146

CPA WORK GROUP

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described

DESCRIPTIONS

STORMWATER PIPEWORK

20m450mm Pipes laid in and including trenches not exceeding 1m deep

1

Class 75D concrete pipes including excavation, bedding, backfilling and compaction and disposal of surplus material

20m450mm Pipes in and including trenches exceeding 1m and not exceeding 2m deep.

2

20m

450mm Pipes laid in and including trenches exceeding 2m and not exceeding 3m deep.

3

-160-

Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 161: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

20m3Soft rock4

Extra over trench and hole excavations in earth for excavation in

10m3Hard rock5

STORMWATER V-DRAINS

560m1100 x 100mm thick channels 6

V-Drain formed of 25Mpa/19mm reinforced in-situ concrete including mesh ref 395, 250micron polyethylene sheeting, finishing top of concrete smooth with a steel trowel, excavation, filling, compaction and cartaway excess materials

GRID INLET

50No1200 x 1000mm Brick grid inlet not exceeding 1.0m deep internally

7

Grid inlet with 814 x 620mm flat-iron grid cover hinged to and including 75 x 50 x 65kg/m angle iron frame, frame anchored in and including 230 x 210mm 25MPa/19mm concrete ring beam with fishtail lugs at corners on top of one brick wall including excavations, backfilling, compaction, risk of collapse, cartaway surplus material, 200mm thick reinforced 25MPa/19mm concrete base, Ref 395 mesh, brickforce, plaster to exposed walls, benching, junctions, channelling, and step irons for the following depths:

40No1200 x 1000mm Brick grid inlet exceeding 1.0m and not exceeding 2.0m deep internally

8

-161-

Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 162: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

CATCHPIT

5No1500 x 630mm Brick catchpit not exceeding 1.0m deep internally

9

Catchpit of 100mm thick reinforced 25MPa/19mm precast concrete cover slab, 100mm thick reinforced 25MPa/19mm concrete base flush with wall, one brick wall, brickforce, plaster to exposed walls, spacer, adaptor slabs, benching, junctions, channelling, and step irons including excavations, backfilling, compaction, risk of collapse, etc all in accordance engineer's drawing for the following depths:

5No1500 x 630mm Brick catchpit exceeding 1.0m and not exceeding 2.0m deep internally

10

JUNCTION BOX

10No1200 x 1000mm overall Junction box not exceeding 1.0m deep internally

11

Junction box of 150mm thick reinforced 25MPa/19mm precast concrete cover slab, 75mm thick reinforced 25MPa/19mm concrete base flush with wall, one brick wall, brickforce, plaster to exposed walls, spacer, adaptor slabs, benching, junctions, channelling, and step irons including excavations, backfilling, compaction, risk of collapse, etc all in accordance to engineer's drawing for the following depths:

10No1200 x 1000mm overall Junction box exceeding 1.0m and not exceeding 2.0m deep internally

12

-162-

Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 163: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

MANHOLES

10No1100 x 1100mm Brick manhole not exceeding 1.0m deep internally

13

Manhole with medium duty concrete manhole cover and frame, constructed of 150mm thick reinforced 25MPa/19mm precast concrete cover slab, 75mm thick reinforced 25MPa/19mm concrete base flush with wall, one brick wall, brickforce, plaster to exposed walls, spacer, adaptor slabs, benching, junctions, channelling, and step irons including excavations, backfilling, compaction, risk of collapse, etc all in accordance to engineer's drawing for the following depths:

10No1100 x 1100mm Brick manhole exceeding 1.0m and not exceeding 2.0m deep internally

14

5No

Cutting into side of existing inspection chamber for and connecting 450mm pipe including inserting 450mm channel junction and making good concrete benching

15

STORMWATER CONNECTION

-163-

Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Collection R

Page 164: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Stormwater Reticulation (Provisional)

Section No. 4

Bill No. 5

AmountPageNo

EXTERNAL WORKS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

163

162

161

160Total Brought Forward from Page No.

-164-

Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried Forward to Summary of Section No. 4 R

Page 165: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

EXTERNAL WORKS

SECTION SUMMARY - EXTERNAL WORKS

BillNo

PageNo

Amount

Section No. 4

143Bulk Earthworks (Provisional)1

150Roadworks and Parking2

155Sewer Reticulation (Provisional) 3

159Water Reticulation (Provisional) 4

164Stormwater Reticulation (Provisional)5

-165-

EXTERNAL WORKSSection No. 4

Part C2. Pricing Data

Carried to Final Summary R

Page 166: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 5

BILL NO. 1

PROVISIONAL SUMS

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUPPLEMENTARY PREAMBLES

Work listed under the heading "DIRECTCONTRACTORS WORK" will commence during theexecution of this contract and the contractor shall allowfree access to the site for these direct contractors. Thecontractor shall prepare a programme in conjunctionwith these direct contractors in order to complete thework successfully. The direct contractors will beregarded as nominated sub-contractors but payment willnot be made to them via the contractor. The estimatedvalues of these contracts are listed to enable thecontractor to determine profit and attendances, ifrequired

Work executed by direct contractors

Unless otherwise described, all prime cost amounts andprovisional sums exclude the cash discount of 5% andinclude for delivery to site of all articles concerned. Allprime cost amounts and provisional sums are net andinclude for delivery to site of all articles concerned.

General

The contractor is referred to the Preliminaries for furtheramplification of "Prime Cost Amounts and ProvisionalSums"

Preliminaries

-166-

Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5

Part C2. Pricing Data

Carried to Collection R

Page 167: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

NOMINATED/SELECTED SUB-CONTRACT

12,600,000.00Item

Provide an amount of R 12,600,000.00 (Twelve Million Six Hundred Thousand Rand) nett for Piling Installation to be omitted in part or whole as instructed by Principal Agent

1

Piling Installation

ItemAdd for profit upon above, if required.2

ItemAttend upon the above, if required.3

7,000,000.00Item

Provide an amount of R 7,000,000.00 (Seven Million Rand) nett for ICT Infrastructure Installation to be omitted in part or whole as instructed by Principal Agent

4

ICT Infrastructure Installation

ItemAdd for profit upon above, if required.5

ItemAttend upon the above, if required.6

250,000.00Item

Provide an amount of R 250,000.00 (Two Hundred and Fifty Thousand Rand) nett for Specialised Fire Protection and Air Conditioning for the Main Server Room to be omitted in part or whole as instructed by Principal Agent

7

Specialised Fire Protection and Air Conditioning for the Main Server Room

ItemAdd for profit upon above, if required.8

ItemAttend upon the above, if required.9

16,720,000.00Item

Provide an amount of R 16,720,000,00 (Sixteen Million, Seven Hundred and Twenty Thousand Rand) nett for Glazed Curtain Wall Installation to be installed by a specialist as instructed by the Principal Agent

10

Glazed Curtain Wall Installation

ItemAdd for profit upon above, if required.11

-167-

Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5

Part C2. Pricing Data

Carried to Collection R

Page 168: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

ItemAttend upon the above, if required.12

5,000,000.00Item

Provide an amount of R 5,000,000,00 (Five Million Rand) nett for Façade Steelwork Installation to be installed by a specialist as instructed by the Principal Agent

13

Façade Steelwork

ItemAdd for profit upon above, if required.14

ItemAttend upon the above, if required.15

4,000,000.00Item

Provide an amount of R 4,000,000.00 (Four Million Rand) nett for Landscaping to be used whole or in part as instructed by Principal Agent

16

Landscaping

ItemAdd for profit upon above, if required.17

ItemAttend upon the above, if required.18

1,800,000.00Item

Provide an amount of R 1,800,000.00 (One Million Eight Hundred Thousand Rand) nett for Concrete Boundary Wall Installation to be used whole or in part as instructedby Principal Agent

19

Concrete Boundary Wall

ItemAdd for profit upon above, if required.20

ItemAttend upon the above, if required.21

900,000.00Item

Provide an amount of R 900,000.00 (Nine Hundred Thousand Rand) nett for Building Signage Installation to be used whole or in part as instructed by Principal Agent

22

Building Signage

ItemAdd for profit upon above, if required.23

ItemAttend upon the above, if required.24

-168-

Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5

Part C2. Pricing Data

Carried to Collection R

Page 169: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

300,000.00Item

Provide an amount of R 300,000.00 (Three Hundred Thousand Rand) nett for Directional Signage Installation to be used whole or in part as instructed by Principal Agent

25

Directional Signage

ItemAdd for profit upon above, if required.26

ItemAttend upon the above, if required.27

2,600,000.00Item

Provide an amount of R 2 600 000.00 (Two Million Six Hundred Thousand Rand) nett for Fire Sprinkler System Installation to be omitted in part or whole as instructed by Principal Agent

28

Fire Sprinkler System Installation (Parkade)

ItemAdd for profit upon above, if required.29

ItemAttend upon the above, if required.30

192,000.00Item

Provide an amount of R 192,000.00 (One Hundred and Ninety-Two Thousand Rand) nett for Community Liason Officer to be omitted in part or whole as instructed by Principal Agent

31

Community Liason Officer

ItemAdd for profit upon above, if required.32

ItemAttend upon the above, if required.33

Note: This allowance is for skills development of students who are taking courses within the Built Environment field.

Skills Development for Built Environment Students

4,000,000.00Item

Allow an amount of R 4,000,000.00 (Four Million Rand) nett for Skills Development to be used whole or in part as instructed by Principal Agent

34

ItemAdd for profit upon above, if required.35

-169-

Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5

Part C2. Pricing Data

Carried to Collection R

Page 170: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

ItemAttend upon the above, if required.36

The following budgetary allowances are for work to be executed by the contractor and will be measured and valued at rates in these bill of quantities.

BUDGETARY ALLOWANCES

28,000,000.00Item

Provide the sum of R 28,000,000.00 (Twenty-Eight Million Rand) nett for Constructing Building 7 to be used as directed by the Principal Agent or deducted in whole or in part.

37

Construction of Building 7 (Approx. 1684m2) as per Architect's Design

1,500,000.00Item

Provide the sum of R 1,500,000.00 (One Million Five Hundred Thousand Rand) nett for Constructing Refuse Yards to be used as directed by the Principal Agent or deducted in whole or in part.

38

Construction of Refuse Yards as per Architect's Design

600,000.00Item

Provide the sum of R 600,000.00 (Six Hundred Thousand Rand) nett for Enclosing Mini-subs to be used as directed by the Principal Agent or deducted in whole or in part.

39

Enclosing Mini-subs as per Architect's Design

400,000.00Item

Provide the sum of R 400,000.00 (Four Hundred Thousand Rand) nett for Completing Existing Guard Houses to be used as directed by the Principal Agent or deducted in whole or in part.

40

Completing existing Guard Houses

500,000.00Item

Provide the sum of R 500,000.00 (Five Hundred Thousand Rand) for sundry builder's work to make good work after work done by direct contractors, executed complete to be used as directed by the Principal Agent or deducted in whole or in part.

41

General Builders Work in Association With Direct Contractors

-170-

Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5

Part C2. Pricing Data

Carried to Collection R

Page 171: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Provisional Sums

Section No. 5

Bill No. 1

AmountPageNo

PROVISIONAL SUMS

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

170

169

168

167

166Total Brought Forward from Page No.

-171-

Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5

Part C2. Pricing Data

Carried to Final Summary R

Page 172: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 6

BILL NO. 1

MAIN SUPPLY

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

Installation to be done according to SANS 10142 and SANS 10400

SUPPLEMENTARY PREAMBLES

SUM

Supply and install new 800kVA, DYN11, 11000/400 Volt mini-substations including construction of . The new mini-substations to be supplied complete with ring main units, concrete plinth and low voltage panels as indicated in the drawing

1

MAIN SUPPLY

SUM50kW solar panel system complete with batteries and inverters for the parkade and fence

2

1No630A MV Checking Metering Unit to be installed in substation

3

1No63A, 6kA SABS Approved Circuit Breaker4

1No150A, 6kA SABS Approved Circuit Breaker5

1No200A, 10kA SABS Approved Circuit Breaker6

2No250A, 6kA SABS Approved Circuit Breaker7

1No500A, 16kA SABS Approved Circuit Breaker8

1No800A, 25kA SABS Approved Circuit Breaker9

-172-

Main SupplyBill No. 1ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 173: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Note: All Cables Rate Shall Include Cables Terminations and Joints

CABLES

2,000mSupply and install 70mm2 x 3c XLPE + cables installed in existing sleeve

10

2,000mProvision for 70mm2 earth wire11

100m16mm2 4-core XPLE cu cable + 10 BECW12

1,200m95mm2 4-core XPLE cu cable + 50 BECW13

1,300m185mm2 4-core XPLE cu cable + 95 BECW14

400m35mm2 4-core PVC insulated cu cable + 16mm² BCEW15

800m95mm2 4-core PVC insulated cu cable + 50mm² BCEW16

1,152m3Excavation17

TRENCHING

720m3Imported materials (river sand)18

504m3Soilcrete19

504m3Backfilling20

7No600x600x1000mm concrete manhole21

SLEEVES

5,200m50mmØ 22

High-density polyethylene (HDPE) flexible sleeve piping laid in trench (trench and backfilling measured elsewhere) Including Joints and 5x90 Degree long radius bends for high-density polyethylene (HDPE) Flexible Sleeve Piping

4,500m110mmØ 23

-173-

Main SupplyBill No. 1ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 174: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

5,500m160mmØ 24

-174-

Main SupplyBill No. 1ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 175: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Main Supply

Section No. 6

Bill No. 1

AmountPageNo

ELECTRICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

174

173

172Total Brought Forward from Page No.

-175-

Main SupplyBill No. 1ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried Forward to Summary of Section No. 6 R

Page 176: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 6

BILL NO. 2

LOW VOLTAGE SUPPLY

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

Distribution Boards should be installed according to SANS 10142 and SANS 10400

SUPPLEMENTARY PREAMBLES

Supply and installation of a weatherproof pre-manufactured low voltage distribution board, complete with sheet metal tray, frames, sub-frames, busbars, legend card, circuit breakers, fuses, relay, volt-meter, ammeter, transformer, earth leakage unit, timer, switch, etc.

3NoBottom entry flash mounted distribution board1

Main Distribution Board

2NoBottom entry free standing distribution board2

16No100A, 10kA SABS Approved Circuit breaker3

1No200A, 10kA SABS Approved Circuit Breaker4

2No250A, 10kA SABS Approved Circuit Breaker5

2No300A, 16kA SABS Approved Circuit breaker for UPS6

5No500A, 16kA SABS Approved Circuit Breaker7

1No600A, 16kA SABS Approved Circuit Breaker8

-176-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 177: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1No800A, 16kA SABS Approved Circuit Breaker9

2No250A, Automatic Change Over switch to feed Generator10

1No800A, Automatic Change Over switch to feed Generator11

5No500A, Automatic Change Over switch to feed Generator12

1No600A, Automatic Change Over switch to feed Generator13

5No160A, 10kA, 3Pole SABS Approved Circuit Breaker14

6No200A, 10kA, 3Pole SABS Approved Circuit Breaker15

2No300A, 10kA, 3Pole SABS Approved Circuit Breaker for HVAC

16

1No40A, 6kA, 3Pole SABS Approved Circuit Breaker for Lift17

4No80A, 6kA, 3Pole SABS Approved Circuit Breaker for Lift18

1No100A, 6kA, 3Pole SABS Approved Circuit Breaker for low ground

19

1No160A, 6kA, 3Pole SABS Approved Circuit Breaker for low ground

20

2No10A, 6kA, 1Pole SABS Approved for Timer switch21

28No10A, 6kA, 1Pole SABS Approved Circuit Breaker22

30No20A, 6kA, 1Pole SABS Approved Circuit Breaker23

8No63A, 6kA, 3Pole SABS Earth Leakage24

3No100A 3phase Metering Unit25

4No160A 3phase Metering Unit26

3No200A 3phase Metering Unit27

5No500A 3phase Metering Unit28

1No600A 3phase Metering Unit29

-177-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 178: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1No800A 3phase Metering Unit30

10No63A, 6kA, SABS Approved Bus Bar31

1No200A, 30kA SABS Approved Bus Bar32

2No250A, 30kA SABS Approved Bus Bar33

1No500A, 30kA SABS Approved Bus Bar34

1No800A, 30kA SABS Approved Bus Bar35

10No40KA, 3Pole SABS Approved Surge Arrestor36

1No200A, 3Pole SABS Approved Meter Unit37

6No250A, 3Pole SABS Approved Meter Unit38

40NoDB Blanks39

5NoDB Lable Booklets40

5NoDB Conversion Clips41

5NoClip in Neutral Bar42

4NoBottom entry free standing distribution kiosk43

Distribution Board for ground floor

4No200A, 10kA, 3Pole SABS Approved Circuit Breaker44

6No80A, 6kA, 3Pole SABS Approved Circuit Breaker45

6No80A, 6kA, 3Pole SABS Approved Smart Metering unit46

1No160A, 10kA, 3Pole SABS Approved Circuit Breaker47

2No100A, 10kA, 3Pole SABS Approved Circuit Breaker48

15No40A, 6kA, 3Pole SABS Approved Circuit Breaker49

65No20A, 6kA, 1Pole SABS Approved Circuit Breaker50

-178-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 179: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

46No10A, 6kA, 3Pole SABS Approved Circuit Breaker51

20No63A, 6kA, 3Pole SABS Approved Earth Leakage52

8No100A, 6kA, 3Pole SABS Approved Bus Bar53

8No200A, 6kA, 3Pole SABS Approved Bus Bar54

4No160A, 6kA, 3Pole SABS Approved Bus Bar55

14No63A, 6kA, SABS Approved Bus Bar56

25No40KA, 3Pole SABS Approved Surge Arrestor57

60NoDB Blanks58

20NoDB Lable Booklets59

20NoDB Conversion Clips60

20NoClip in Neutral Bar61

1NoBottom entry free standing distribution kiosk62

4No63A, 6kA, SABS Approved Bus Bar63

5NoSurface mounted distribution board64

Distribution Board for lift

4No80A, 6kA, 3Pole SABS Approved Circuit Breaker65

1No40A, 6kA, 3Pole SABS Approved Circuit Breaker66

20No32A, 6kA, 3Pole SABS Approved Circuit Breaker67

15No20A, 6kA, 1Pole SABS Approved Circuit Breaker68

10No10A, 6kA, 3Pole SABS Approved Circuit Breaker69

5No63A, 6kA, 3Pole SABS Approved Earth Leakage70

5No80A, 6kA, 3Pole SABS Approved Bus Bar71

-179-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 180: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

5No63A, 6kA, SABS Approved Bus Bar72

5No40KA, 3Pole SABS Approved Surge Arrestor73

10NoDB Blanks74

5NoDB Lable Booklets75

5NoDB Conversion Clips76

20NoClip in Neutral Bar77

2NoBottom entry free standing distribution kiosk78

Distribution Board for First Floor

4No200A, 10kA, 3Pole SABS Approved Circuit Breaker79

4No80A, 6kA, 3Pole SABS Approved Circuit Breaker80

12No80A, 6kA, 3Pole SABS Approved Smart Metering unit81

10No20A, 6kA, 1Pole SABS Approved Circuit Breaker82

10No10A, 6kA, 3Pole SABS Approved Circuit Breaker83

8No63A, 6kA, 3Pole SABS Approved Earth Leakage84

8No200A, 6kA, 3Pole SABS Approved Bus Bar85

8No63A, 6kA, SABS Approved Bus Bar86

12No40KA, 3Pole SABS Approved Surge Arrestor87

3NoSurface mounted distribution board88

3No160A, 10kA, 3Pole SABS Approved Circuit Breaker89

6No100A, 10kA, 3Pole SABS Approved Circuit Breaker90

27No32A, 6kA, 3Pole SABS Approved Circuit Breaker91

36No20A, 6kA, 1Pole SABS Approved Circuit Breaker92

-180-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 181: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

27No10A, 6kA, 1Pole SABS Approved for Timer switch93

54No10A, 6kA, 3Pole SABS Approved Circuit Breaker94

27No63A, 6kA, 3Pole SABS Approved Earth Leakage95

27No63A, 6kA, 3Pole SABS Approved Bus Bar96

3No160A, 10kA, 3Pole SABS Approved Bus Bar97

6No100A, 10kA, 3Pole SABS Approved Bus Bar98

9No40KA, 3Pole SABS Approved Surge Arrestor99

60NoDB Blanks100

17NoDB Lable Booklets101

17NoDB Conversion Clips102

44NoClip in Neutral Bar103

2NoBottom entry free standing distribution kiosk104

Distribution Board for Second Floor

4No200A, 10kA, 3Pole SABS Approved Circuit Breaker105

4No80A, 6kA, 3Pole SABS Approved Circuit Breaker106

4No80A, 6kA, 3Pole SABS Approved Smart Metering unit107

10No20A, 6kA, 1Pole SABS Approved Circuit Breaker108

10No10A, 6kA, 3Pole SABS Approved Circuit Breaker109

8No63A, 6kA, 3Pole SABS Approved Earth Leakage110

8No200A, 6kA, 3Pole SABS Approved Bus Bar111

8No63A, 6kA, SABS Approved Bus Bar112

12No40KA, 3Pole SABS Approved Surge Arrestor113

-181-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 182: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

2NoSurface mounted distribution board114

6No160A, 10kA, 3Pole SABS Approved Circuit Breaker115

18No32A, 6kA, 3Pole SABS Approved Circuit Breaker116

24No20A, 6kA, 1Pole SABS Approved Circuit Breaker117

18No10A, 6kA, 1Pole SABS Approved for Timer switch118

36No10A, 6kA, 3Pole SABS Approved Circuit Breaker119

18No63A, 6kA, 3Pole SABS Approved Earth Leakage120

18No63A, 6kA, 3Pole SABS Approved Bus Bar121

6No160A, 10kA, 3Pole SABS Approved Bus Bar122

6No40KA, 3Pole SABS Approved Surge Arrestor123

48NoDB Blanks124

14NoDB Lable Booklets125

14NoDB Conversion Clips126

32NoClip in Neutral Bar127

30NoFlush Mounted distribution kiosk128

Distribution Boards for tenants

32No80A, 6kA, 3Pole SABS Approved Circuit Breaker129

160No20A, 6kA, 1Pole SABS Approved Circuit Breaker130

160No10A, 6kA, 3Pole SABS Approved Circuit Breaker131

128No63A, 6kA, 3Pole SABS Approved Earth Leakage132

32No80A, 6kA, 3Pole SABS Approved Bus Bar133

128No63A, 6kA, SABS Approved Bus Bar134

-182-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 183: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

32No20KA, 3Pole SABS Approved Surge Arrestor135

128NoDB Blanks136

32NoDB Lable Booklets137

32NoDB Conversion Clips138

32NoClip in Neutral Bar139

2NoBottom entry flash mounted distribution board140

Distribution Boards to Guard House

2No63A, 6kA SABS Approved Circuit Breaker141

4No20A, 6kA, 1Pole SABS Approved Circuit Breaker142

4No10A, 6kA, 1Pole SABS Approved Circuit Breaker143

2No63A, 6kA, 3Pole SABS Earth Leakage144

2No63A 3phase Metering Unit145

2No63A, 6kA SABS Approved Bus Bar146

4No20KA, 3Pole SABS Approved Surge Arrestor147

16NoDB Blanks148

2NoDB Lable Booklets149

2NoDB Conversion Clips150

2NoClip in Neutral Bar151

SUMSupply and install Maximum smart meter Kiosk No1 with 1250A main breaker and 1250/5 CT as per drawing

152

Main External Kiosk

SUMSupply and install Maximum smart meter Kiosk No1 with 1000A main breaker and 1000/5 CT as per drawing

153

-183-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 184: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SUMSupply and install Maximum smart meter Kiosk No4 with 200A main Breaker and 200/5 CT as per drawing

154

SUMSupply and install Maximum smart meter Sub-kiosk No1 with 150A main Breaker for the pump house

155

-184-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 185: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Low Voltage Supply

Section No. 6

Bill No. 2

AmountPageNo

ELECTRICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

184

183

182

181

180

179

178

177

176Total Brought Forward from Page No.

-185-

Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried Forward to Summary of Section No. 6 R

Page 186: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 6

BILL NO. 3

SOCKET OUTLET AND ISOLATORS

Socket Outlet and Light Switch should be installed according to SANS 10142 and SANS 10400

PREAMBLES

Supply, installation and commission of low voltage socket outlets and Isolators

816No16A Single Three-pin flash mounted metal socket outlet1

Socket Outlet

168No16A Single Three-pin socket outlet mounted in power skirting

2

284No16A Double Three-pin switched flash mounted socket outlet

3

26No32A Industrial Plugs4

900NoRJ45 Telephone Outlet on Powerskirting 5

206No20A Single Pole Isolator6

Isolators

20No20A Double Pole Isolator7

40No32A Three Pole Isolator8

-186-

Socket OutletBill No. 3ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried Forward to Summary of Section No. 6 R

Page 187: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 6

BILL NO. 4

LIGHTING

Lighting should be installed and wired in according to SANS 10142 and SANS 10400

PREAMBLES

Supply, installation and commission of energy saving lights and light switches with 5Amps plugs

261No34W LED Downlight complete with 6A plug1

Lighting

1,233No35W 600x1200 LED Panel silimar or equal to Beka 2

149No65W LED Vapourline light fitting3

4NoLEDdisk-Maxi 128LED/70W OPTIC 2304

18NoRegent Beam ceiling mini-color Charcoal5

28NoLED Regent F105Q (Beam Double) Silver6

68No64 LED/216W Optic 7

16No

One 36W Linear fittings (suspended or surface mounted), 4000K, fitted with Opal diffuser, 3600 lumens, 100lm/watt, 3 yr warranty similar or equal to Genesis

8

1,936NoNeon Flex Mushroom mould injection connectors with cable length 5m /per set F27FSECX / F27FBEC5X

9

Façade Lights

-187-

LightingBill No. 4ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 188: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

646No

Vossloh-Schwabe IP67 150W LED Constant voltage Driver LEDRIVERIP67150

10

2,036NoAluminum mounting clips for flush and mushroom head, width 11mm, length 1m F11AMC

11

8No80A 3p 6kA circuit breaker to be installed in each minsub

12

External Lights

16NoFree standing distribution kiosk with 60A 3p 6kA main breaker with at least 5x20A 1p circuit breaker

13

1,400No16mm2 4-core PVC SWA insulated cu cable + 10mm² BCEW

14

86No

A 8W LED in ground up-lighter with a round stainless steel trim. Remote driver should be installed in a remote mounted waterproof box

15

2,900m

High-density polyethylene (HDPE) flexible 50mmØsleeve piping laid in trench including Joints and 15x90Degree long radius bends for high-density polyethylene(HDPE) Flexible Sleeve Piping

16

80No

One LED Pole Top, Round Area Light, 50W, 6905 lumens, 138 lm/watt, CCT 3000k, Heavy duty die cast aluminium, UV stabilised polyester powder coating, 3 yr warranty similar or equal to Genesis

17

80No

Supply and install Bekaway or similar approved TC-Tel 57W LED light mounted on 5m mounting height galvanised pole for perimeter light

18

35No9W landscape light mounted on 1m high galvanised pole equal or similar to Beka Citrine

19

47No2x4 Single Lever Flash Mounted Switch One Way20

Light Switches

47No2x4 Two Lever Flash Mounted Switch One Way21

-188-

LightingBill No. 4ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 189: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

47No2x4 Three Lever Flash Mounted Switch One Way22

22NoUtrasonic sensor switch gor light set @30min23

15No10A Photo cell24

22No10A Timer Switch25

-189-

LightingBill No. 4ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 190: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Lighting

Section No. 6

Bill No. 4

AmountPageNo

ELECTRICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

189

188

187Total Brought Forward from Page No.

-190-

LightingBill No. 4ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried Forward to Summary of Section No. 6 R

Page 191: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 6

BILL NO. 5

LIGHTNING PROTECTION

Allow for complete earthing and lightning protection of the building, including bonding of the reinforcing steel and steel columns. Total cost for the provision of lightning points for the building as indicated on the layout drawings and specific drawings including testing and issuance of certificates thereof. Contractors shall allow for the installation and testing to be performed by approved specialists such as HHK.

PREAMBLES

SUMSoil Resistivity Tests1

General Soil Resistivity Tests for the Buildings

SUM

Complete earth test measurements and provide certificate of compliance for completed lightning protection installation

2

General Testing and Certification for The Buildings

SUMMarked up as Built drawings of lightning protection installation

3

SUM

Total cost for design, supply, install and commission of lightning protection for the buildings based on structural construction drawings including bare cooper earth wire plant earth ring, Earth Spike Complete with Terminations Clamps,Bolts,etc. Bonding Terminations and Connections Between Concrete reinforcing and Trench EarthAluminium Air Conductor Complete with Conductor Guide, Connections to Roof Materials and Connections to trench Earth .

4

Building

-191-

Lightning ProtectionBill No. 5ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 192: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SUMTest and Commissioning of lightning protection5

Test and Commissioning

-192-

Lightning ProtectionBill No. 5ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 193: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Lightning Protection

Section No. 6

Bill No. 5

AmountPageNo

ELECTRICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

192

191Total Brought Forward from Page No.

-193-

Lightning ProtectionBill No. 5ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried Forward to Summary of Section No. 6 R

Page 194: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 6

BILL NO. 6

The rates for cable trays shall include for hangers, splices, jointing, drilling; Conduit includes all bends, tee-pieces, joints, locknuts, etc.

WIRING AND CONDUITS

27,700m2.5mm² Bare Copper Earth Wire1

Cabling

27,700m2.5mm2 PVC SWA Cable2

16,460m4mm² Bare Copper Earth Wire3

16,460m4mm2 PVC SWA Cable4

13,100m6mm² Bare Copper Earth Wire5

13,100m6mm2 PVC SWA Cable6

1,000m50mm2 3core PVC SWA Cable7

400m35mm2 4-core PVC insulated cu cable + 16mm² BCEW8

800m70mm2 4-core PVC insulated cu cable + 35mm² BCEW9

1,500m95mm2 4-core PVC insulated cu cable + 50mm² BCEW10

500m150mm2 4-core PVC insulated cu cable + 95mm² BCEW

11

6.0Sets2.5mm2 3Core PVC SWA Cable + 2.5mm² Bare Copper Earth Wire

12

Cable Terminations

-194-

Wiring and ConduitsBill No. 6ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 195: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

6.0Sets4mm2 3Core PVC SWA Cable + 4mm² Bare Copper Earth Wire

13

6.0Sets6mm2 3Core PVC SWA Cable + 6mm² Bare Copper Earth Wire

14

5.0Sets25mm2 4-core PVC insulated cu cable + 16mm² BCEW15

1.0Sets35mm2 4-core PVC insulated cu cable + 16mm² BCEW16

4.0Sets35mm2 4-core PVC insulated cu cable + 25mm² BCEW17

2.0Sets50mm2 4-core PVC insulated cu cable + 25mm² BCEW18

1.0Sets70mm2 4-core PVC insulated cu cable + 35mm² BCEW19

3.0Sets95mm2 4-core PVC insulated cu cable + 50mm² BCEW20

3.0Sets120mm2 4-core PVC insulated cu cable + 70mm² BCEW

21

6.0Sets2.5mm2 3Core PVC SWA Cable + 2.5mm² Bare Copper Earth Wire

22

Cable Joints

6.0Sets4mm2 3Core PVC SWA Cable + 4mm² Bare Copper Earth Wire

23

6.0Sets6mm2 3Core PVC SWA Cable + 6mm² Bare Copper Earth Wire

24

1.0Sets35mm2 4-core PVC insulated cu cable + 25mm² BCEW25

5.0Sets25mm2 4-core PVC insulated cu cable + 16mm² BCEW26

2.0Sets35mm2 4-core PVC insulated cu cable + 16mm² BCEW27

1.0Sets35mm2 4-core PVC insulated cu cable + 25mm² BCEW28

3.0Sets50mm2 4-core PVC insulated cu cable + 25mm² BCEW29

3.0Sets95mm2 4-core PVC insulated cu cable + 50mm² BCEW30

-195-

Wiring and ConduitsBill No. 6ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 196: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

5.0Sets120mm2 4-core PVC insulated cu cable + 70mm² BCEW

31

5.0Sets120mm2 4-core PVC insulated cu cable + 70mm² BCEW

32

14,100m20mm PVC Conduit Pipe33

Conduits and Accessories

20.0Sets20mm PVC Couplings34

40.0Sets20mm Steel Couplings35

4,300mTwo Compartment P9000 Galvanised Trunking ( Grey)36

Power Skirting and Cable Tray

4,300mSingle Compartment P2000 Galvanised power skirting for comms.

37

300m300mm Heavy Duty Cable Tray38

-196-

Wiring and ConduitsBill No. 6ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 197: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Wiring and Conduits

Section No. 6

Bill No. 6

AmountPageNo

ELECTRICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

196

195

194Total Brought Forward from Page No.

-197-

Wiring and ConduitsBill No. 6ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried Forward to Summary of Section No. 6 R

Page 198: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 6

BILL NO. 7

BACK UP SUPPLY

2No300kVA Volvo Penta TAD1341GE 3Phase Prime Power Silent with Weatherproof Canopy

1

Generators

2No800kVA Volvo Penta TAD1341GE 3Phase Prime Power Silent with Weatherproof Canopy

2

1No

50 kVA Base c/w int batt cab Three phase in single phase out double conversion UPS Equal to Gama Centric or Similar Approved

3

UPS

2No

100 kVA Base c/w int batt cab Three phase in single phase out double conversion UPS Equal to Gama Centric or Similar Approved

4

2No

300 kVA Base c/w int batt cab Three phase in single phase out double conversion UPS Equal to Gama Centric or Similar Approved

5

SUMTest and Commissioning of back up supply6

Test and Commissioning

-198-

Back Up SupplyBill No. 7ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried Forward to Summary of Section No. 6 R

Page 199: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 6

BILL NO. 8

BMS

CCTV

49No

NVH-5231 - 2MP Fixed Vandal Proof Dome camera H.265(IMX290+Hi3516D) with IntelliVision Standard VCA (Intelligent Motion / Intrusion / Tampering), 1/2.8" CMOS 2MP@30fps, Quad streaming, D/N(ICR), True WDR, 2D/3DNR, Smart codec with dynamic ROI (Hi-Stream), 3.7mm Lens, 24IR LEDs, Alarm In/Out(1/1), Audio In/Out (1/1), 12VDC/PoE

1

CAMERAS

40No

NUH-64J1 - 4MP MVF IR Bullet camera H.265 (OV4689+Hi3516A) with IntelliVision Professional VCA (Intelligent Motion / Intrusion / Tampering / Line Detector (Counting) / Loitering / Human Detect), 1/3" CMOS 4MP@30fps, Quad streaming, D/N(ICR), True WDR, 2D/3DNR, Smart Focus (P-Iris), Smart codec with dynamic ROI (Hi-Stream), Motorized VariFocal 2.8-12mm Lens, 34IR LEDs, Alarm In/Out(1/1), Audio In/Out (1/1), 12VDC/PoE

2

20No5m high galvanised pole for external cameras3

3,600mCAT-6 UTP multi strand cable (Supplied, Installed and Commisioned).

4

WIRING

1,300No

Making off cable, CAT-6 (RJ-45 + boot) (Supplied, Installed and Commissioned)

5

-199-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 200: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

7No

HNR-6400S H.265/264 NVR (server type) 64CH NON POE VERSION Network Video Recorder, H.265 @ 4K Realtime, 2U 19” Server Rack Mountable, 8 SATA Internal HDD, iSCSI Support, Intelligent Multi-Stream management, Management, Various Recording Profiling and Advanced Event Search (Thumbnail/Area/Panoramic), Scheduled backup into HAS-08IE/HAS-16I (iSCSI storage), Emergency Video upload into Cloud Service (RCS, Google Drive, Dropbox)

6

VIDEO RECORDING SYSTEM

5No

2TB 3.5" surveillance HDD, SATA 6Gb/s, 128MB Cache, 4096 Bytes/ sector, Maximum Data Transfer Rate 180MB/s, 3-year Limited Warranty NOTE: Hard Drives to be installedas follows: 1. HNR-6400S (8 units), 2. HNR-6400S (8 units), 3. HVM-80600S (8 Units)

7

2No

6TB 3.5" surveillance HDD, SATA 6Gb/s, 128MB Cache, 4096 Bytes/ sector, Maximum Data Transfer Rate 180MB/s, 3-year Limited Warranty NOTE: Hard Drives to be installed as follows: 1. HNR-6400S (8 units), 2. HNR-6400S (8 units), 3. HVM-80600S (8 Units)

8

16No24" LED Monitor (Upto Full HD Resolution), HDMI Input, 5 Year Warranty

9

MONITORS

4No42" LED Monitor (Upto 4K Resolution), DisplayPort and HDMI input, 5 Year Warranty

10

5No

Dual Display - T5500/Xeon X5650 2.66GHz-6C-12Mb/12GB DDR3/1 x 500GB SATA/DVDRW/2.5GB Quadro 5000/Win7Pro64Bit/3 Year NBD. 12 HD IMAGES OVER DUAL DISPLAY with 2 x 21.5in - U2212HM LED Widescreen Ultrasharp 1920x1080 DVDI-D . Operating system included. Complete with all accessories (Supplied, Installed and Commissioned).

11

COMPUTERS

-200-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 201: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

5No

Titanium 2.0 Central Monitoring Software (CMS) IP License-free for Windows OS/ Mac iOS: Remotely monitor Hitron IP cameras or similar approved, NVRs, AHD DVRS, Hybrid DVRs, Compression/ storage devices, etc. Up to 64CH Live view, Playback, Event management Realtime. E-Map Support with event pop-up, Multi-screen layout supports up to 4 monitors with 4K UHD (PC Graphics card required), Instantaneous recording, Playback modes: Calendar & Time Search, Event Search, Export of footage. Includes Titanium Mobile Recommended Hardware Specifications for Operator PC: Intel Core i7-9700 (12MB Cache, up to 4.6GHZ), 8GB - 16GB DDR3 RAM, Minimum 256GB M.2 PCIe x4 SSD (Solid State Drive) , 500GB SATA Hard Drive, DVD-RW, 500 Watt PSU, Gigabit Ethernet RJ45, PCI Express 3.0 compliant with x16 PCI slot, Windows 10 Professional 64 bit, USB Keyboard & Mouse Recommended Graphics card for Four Screen Display: Geforce GPU, 6GB GDDR5 (192-bit), Supportsup to 4 monitor outputs, Max resolution (7680 x 4320 @ 60Hz), 6-pin PCIE power input, PCI Express 3.0 16x Bus Interface, 3 x DisplayPort, 1 x HDMI, 1 x DVI-D, 3 Year warranty

12

SOFTWARE, CONFIGURATION, TRAINING, MAINTENANCE AND MANUALS

SUM Integration and Configuration of the C.C.T.V. System13

SUM

Terminations, Connectors & Labels for all the above mentioned hardware (Supplied, Installed, Tested and Commissioned).

14

SPARES AND LABELLING

SUMSYNTELL ANPR Control Room Server, including 16 lane ANPR Engine

15

ONCE OFF FIXED COST

SUMProject Management and on site end user training16

CONFIGURATION, TRAINING, MAINTENANCE AND MANUAL

-201-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 202: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

ACCESS CONTROL

54No

Smart Controler +: Connects up to 4 TBS Biometric devices (RS-485), PSU included, 4 relays, 8 I/O lines, Network ready LAN 10/100Mbps (RJ45), 4 USB 2.0, Embedded Linux OS, Indoor Wallmount (Din-rail incl.)

17

CONTROLL

2No150*180 tunnel size Dual View X-Ray Scanners for Baggage with all accessories and mounting equipment

18

6No3m Boom gate with control motors with card reader and remote control

19

8No

2D + Terminal Heavy Duty Indoor/ Outdoor (Surface-mount), Multispectral sensor, Built-in RFID Reader (Mifare, Classic or Desfire), 5" Touchscreen, pre-configured for Access Control & T/A, Vandal Resistant, IP65 Rated, Liveness detection, Template on Card, User-template capacity 10 000, Transaction storage-capacticy 100 000, PSU including adaptor and clamps, LAN adaptor with RJ45 Plug, RS232 / RS 485, Wiegand, 2 Relay Output

20

BIOMETRIC READERS

24No

2D+ MSP Terminal-Indoor (Surface-mount), Mifare RFIDBuilt-in, Multispectral Sensor, Liveness Detection (Anti-spoofing), for highest accuracy in high-risk/ harsh environments, Access Control and T & A, Vandal resistant, 10 000 Template capacity, 100 000 Transaction capacity, RS232 / RS 485, Wiegand, Relay Output, POE injector with extrernal splitter, LAN Adaptor with RJ45 Plug, Surface-mount adaptor plate.

21

24No

2D+ MSP Terminal-Outdoor (Flush-mount), Mifare RFID Built-in, Multispectral Sensor, Liveness Detection (Anti-spoofing), for highest accuracy in high-risk/ harsh environments, Access Control and T & A, Vandal resistant, 10 000 Template capacity, 100 000 Transaction capacity, RS232 / RS 485, Wiegand, Relay Output, POE injector with extrernal splitter, LAN Adaptor with RJ45 Plug, Surface-mount adaptor plate.

22

-202-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 203: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

8No

2D Station-Indoor (wall mount), Mifare RFID Built-in, Access Control and T & A, Vandal resistant, 5 000 Template capacity, 100 000 Transaction capacity, RS232 / RS 485, Wiegand, Relay Output, POE injector with extrernal splitter, LAN Adaptor with RJ45 Plug, Surface-mount

23

28No

Magnetic Lock 300kg Standard Surface Mount Magnetic Lock complete with all brackets and other accessories (Supplied, Installed and Commissioned).

24

MAGNETIC AND ELECTRO-MECHANICAL LOCKS

28No

BREAK GLASS TYPE 1 – ACCESS CONTROL : GREEN over-ride unit (No backbox) (Supplied, Installed and Commissioned).

25

BREAK GLASS UNIT

4NoBREAK GLASS LENSES TYPE 2 – RESETABLE PLASTIC (Supplied, Installed and Commissioned)

26

20NoBREAK GLASS COVERS (Supplied, Installed and Commissioned)

27

10NoBREAKGLASS COVER SEALS (1 pack of four seals) (Supplied, Installed and Commissioned).

28

39No

Door Position Switch Type 1 - Flush Mount complete with all accessories (Supplied, Installed and Commissioned).

29

DOOR POSITION SWITCHES

2,400mMylar cable 0.22mm2 x 8 core(Supplied, Installed and Commissioned).

30

WIRING AND CONNECTORS

2,400mCAT-6 UTP - multi-strand cable (Supplied, Installed and Commissioned)

31

2,400m1.5mm² x 2 core PVC/PVC Cabtyre fire retardant multi strand cable (Supplied, Installed and Commissioned).

32

-203-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 204: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1,200NoRJ-45 connectors complete with boot (Supplied, Installed and Commissioned).

33

2NoRead-Only MiFare DesFIRE EV1 Proximity Cards including a card holder and lanyard

34

CARD AND PRINTERS

3NoDye Sublimation card printer (Supplied and Properly Stored).

35

3NoDye Sublimation printer ribbons (Supplied and Properly Stored).

36

1No1.2 X 1.2 m White Backboard for Photos (Supplied, Installed and Commissioned).

37

1No3 MegaPixel Web-Camera with backlight compensation for Photos (Supplied, Installed and Commissioned).

38

1NoSoftware and Card Template Setup for the Client (Supplied, Installed and Commissioned).

39

1No

2D Enrol: Touch-based USB Enrollment device, quality assessment and duplicate verification, captures user fingerprints for Access Control, Time Attendance, civil/ criminal applications

40

COMPUTER AND ENROLLEMENT STATION

1NoRFID Enrollment (including RFID writer)41

2NoCOMPUTER – Front Desk & Card Production Stations. Supplied and installed complete with all accessories.

42

1No

COMPUTER – Control Room Workstation complete with all accessories (Supplied, Installed and Commissioned)

43

SUMBio Admin Rights Manager-Unlimited Zones & Schedules

44

SOFTWARE, CONFIGURATION, TRAINING, MAINTENANCE AND MANUALS

-204-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 205: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SUMWeb Based/ Remote Enrolment45

SUMUser Actions & Template Management46

SUMVideo Integration

SUMSystem Configuration47

SUMTraining of the CLIENTS staff48

SUM3 X Full Sets of Operating and Maintenance Manuals for the entire integrated system

49

SUM

Maintenance for the Entire Integrated Security System for the first 12-months of maintenance coinciding with the guarantee / warranty period. TBS CAR

50

6No8 PORT 1000BASE-SX SWITCH as per as general specification (Supplied, Installed and Commissioned).

51

NETWORK EQUIPMENT

6No12 PORT 1000BASE-SX SWITCH as per as general specification (Supplied, Installed and Commissioned).

52

6No

24 PORT 10/100 PoE ETHERNET SWITCH WITH 2 GBIC PORTS as per general specification (Supplied, Installed and Commissioned)

53

1No

Astrophysics XIS100XD 180KV X-Ray machine - Large Tunnel Baggage & Parcel X-Ray Inspection System for DELIVERY AREA

54

METAL DETECTORS & X-RAY MACHINES

1No1000mm Entry Roller Bed55

1No1000mm Exit Roller Bed56

1NoAstrophysics XIS6040 160KV X-Ray machine for RECEPTION AREA

57

1No500mm Entry Roller Bed58

1No500mm Exit Roller Bed59

-205-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 206: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1NoAstrophysics WT2000 Multi-Zone Walk Through M/D60

8No47U 19" Rack including all fixing materials (Supplied, Installed and Commissioned).

61

SPLICE BOXES, PATCH PANELS, RACKS AND SPLICES

8No12U 19" Rack including all fixing materials (Supplied, Installed and Commissioned).

62

85No

S-4: Surface mount magnetic contact with tamper switch; length – 58,5 mm, width – 16,5 mm, 15,3 mm, optional pad of 3,3 mm, magnet of dimensions: length – 58,5 mm, width – 14,8 mm and height – 8,3 mm (white)

63

ALARM SYSTEM

6NoB-4M: Gate magnetic contact Medium (in metal casing)64

30NoCobalt Plus: Digital Dual Technology motion detector (microwave anti-masking, BRACKET A included

65

6NoSPW-210 R: Indoor siren, PC-LEXAN case (red)66

18No

INT-SF-SSW: Partition keypad for INTEGRA - White backlighting of keypad, with flap (white backlighting of keypad and display; silver front, silver frame, white back

67

18NoINTEGRA 64 control panel - main board, EN50131 norm GRADE 3 compliant

68

18NoETHM-1 PLUS: TCP/IP communication module for INTEGRA and VERSA control panels (without cable

69

18No

OPU-4P: Plastic box for control panels, expansion modules and GSM modules, dimensions 266 x 286 x 100 mm, (without transformer)

70

18NoTR 60 VA: Transformer 230 V/20 AC, 60 VA for OPU-3 P and OPU-4 P

71

18NoINT-E: Zone expansion module for INTEGRA, VERSA and PERFECTA – 8 zones, tamper

72

-206-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 207: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

18No

OPAL GY SET Outdoor dual technology motion detector Grey hermetic enclosure (IP-54), approach area detection (angle bracket and ball-joint bracket included)

73

21NoIntegrum Pro 20: Pack of 20 licences (per license)74

6No42" LED Monitor (Upto 4K Resolution), DisplayPort and HDMI input, 5 Year Warranty

75

6No24" LED Monitor (Upto Full HD Resolution), HDMI Input, 5 Year Warranty

76

6No

Recommended Hardware Specifications for Operator PC: Intel Core i7-9700 (12MB Cache, up to 4.6GHZ), 8GB - 16GB DDR3 RAM, Minimum 256GB M.2 PCIe x4 SSD (Solid State Drive) , 500GB SATA Hard Drive, DVD-RW, 500 Watt PSU, Gigabit Ethernet RJ45, PCI Express 3.0 compliant with x16 PCI slot, Windows 10 Professional 64 bit, USB Keyboard & Mouse Recommended Graphics card for Four Screen Display: Geforce GPU, 6GB GDDR5 (192-bit), Supports up to 4 monitor outputs, Max resolution (7680 x 4320 @ 60Hz), 6-pin PCIE power input, PCI Express 3.0 16x Bus Interface, 3 x DisplayPort, 1 x HDMI, 1 x DVI-D, 3 Year warranty

77

9No

SP-4001R: Outdoor siren with optical (ultra bright LEDs) and acoustical signalling (piezo) – plastic PC LEXAN case, metal shield (red)

78

9NoB-4L: Gate magnetic contact large (in metal cashing)79

2,900mMylar cable 0.22mm2 x 8 core(Supplied, Installed and Commissioned).

80

WIRING AND CONNECTIONS

2,900mCAT-6 UTP - multi-strand cable (Supplied, Installed and Commissioned)

81

2,900m1,5mm² x 2core PVC/PVC Cabtyre fire retardant multi strand cable ( supplied, installed and commissioned)

82

1,400NoRJ-45 connectors complete with boot (Supplied, Installed and Commissioned).

83

-207-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 208: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

4,000mSingle mode fiber optic cable with all connectors and accessories

84

4No

Control Room Operators Desk as per the detail drawing inclusive of all fixing materials, brackets and all other accessories required to make this installation complete (Supplied, Installed, Tested and Commissioned).

85

CONTROL ROOM

4No

Control Room Operators Orthopaedic Chair for 12 hour shifts inclusive of all other accessories required to make this installation complete (Supplied, Installed, Tested and Commision

86

5No

Raised Access Floor as per the GENERAL SPECIFICATION inclusive of all brackets and fixing materials and all other accessories to make the installation complete (Supplied, Installed, Tested and Commissioned). {Please note that the contractor should allow for a self levelling epoxy coating on the floor prior to installing the raised access floor}

87

1No

Smalls: Connectors, cable ties, drill bits, grinding disks, consumables and other material necessary to complete the installation as intended.

88

SUMTesting and commissioning of the building management system

89

TESTING AND COMMISIONING

-208-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Collection R

Page 209: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

BMS

Section No. 6

Bill No. 8

AmountPageNo

ELECTRICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

208

207

206

205

204

203

202

201

200

199Total Brought Forward from Page No.

-209-

BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried Forward to Summary of Section No. 6 R

Page 210: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

ELECTRICAL INSTALLATION

SECTION SUMMARY - ELECTRICAL INSTALLATION

BillNo

PageNo

Amount

Section No. 6

175Main Supply1

185Low Voltage Supply2

186Socket Outlet3

190Lighting 4

193Lightning Protection5

197Wiring and Conduits6

198Back Up Supply7

209BMS8

-210-

ELECTRICAL INSTALLATIONSection No. 6

Part C2. Pricing Data

Carried to Final Summary R

Page 211: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 7

BILL NO. 1

HVAC INSTALLATION

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

Supply, delivery, installation, commissioning and 12 months maintenance of the following HVAC equipment as shown on the tender drawings.

SUPPLEMENTARY PREAMBLES

LOWER GROUND FLOOR

INDOOR UNITS

1NoHeat Reclaim Fresh Air Unit, flow rate 1000m3/h1

AIR CONDITIONING UNIT:

1NoHeat Reclaim Fresh Air Unit, flow rate 1500m3/h2

2NoInstallation of heat reclaim fresh air unit3

5NoVRV Ceiling cassette units , rated cooling 9kw4

5NoInstallation of VRV Ceiling Cassette5

2NoBranch box: 4 branches6

A/C UNITS ACCESSORIES

4NoRemote Controller7

-211-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 212: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

75mPIPE ɸ 9.528

COPPER PIPING COMPLETE WITH ARMAFLEX OR FRK INSULATION WITH ALL ACCESSORIES

75mPIPE ɸ 15.99

40mPVC Drain PIPE ɸ 3210

65mExtra over pipe fittings11

45m200 Dia 12

SUPPLY AIR DUCTING (CIRCULAR DUCTING_INTERNAL INSULATION)

45mØ20013

FLEXI DUCTING

32mØ20014

SUPPLY AIR DUCTING

32mØ25015

32mØ30016

32mØ35017

2NoØ350 to Ø300 , concentric duct taper18

TRANSFORMATION PIECE

1NoØ300 to Ø250, concentric duct taper19

1NoØ200 to Ø250, concentric duct taper20

20No90 Degree, round duct long radius, elbow. Ø20021

10No90 Degree, round duct long radius, elbow. Ø25022

12No90 Degree, round duct long radius, elbow. Ø30023

12No90 Degree, round duct long radius, elbow. Ø35024

-212-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 213: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

2NoReturn air Grillie, 200 Dia connect size, and flow rate :208 l/s

25

DIFFUSERS

2NoReturn air Grillie, 200 Dia connect size, and flow rate :278 l/s

26

3Nodia 20027

STOP END

3Nodia 35028

24NoØ20029

SPIGOT

2No600 x 400 mm, All Weather Return Air Grille30

RETURN AIR PLENUM BOX

5NoØ20031

BALANCING DAMPERS

1No

VRV Heat Recovery type: Total Capacity of 22.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

32

VRV OUTDOOR UNITS

1NoInstallation 33

1No

VRV Heat Recovery type: Total Capacity of 28 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

34

1NoInstallation 35

-213-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 214: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect

TOILETS

AIR EXTRACTION

1No124l/s @115Pa, Extract Air Fan c/w filters and accessories

36

Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.

5NoAir disc valve, neck size dia 200, Flow rate 35l/s37

2No400 x 400 Door grille 38

1NoInstallation 39

FIRE DAMPER

5NoFire Damper 200 dia 40

Galvanised steel, 120 minute damper

8NoFire Damper 350 dia41

GROUND FLOOR

INDOOR UNITS

3NoHeat reclaim fresh air Unit, flow rate 1500 m3/h42

AIR CONDITIONING UNIT:

3NoInstallation of heat reclaim fresh air unit43

9NoVRV ceiling cassette units , rated cooling 7.1kw44

-214-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 215: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

10NoInstallation of VRV ceiling cassette units45

4NoCeiling Ducted Hide Away Unit, HAU-GF-1; 22.4 kW Cooling capacity.

46

4NoInstallation47

1NoVRV Ceiling Ducted Hide Away Unit; 22.4 kW Cooling capacity

48

1NoInstallation 49

2NoWall mounted unit: 2.8 kW Cooling capacity including outdoor units

50

1NoInstallation 51

2NoWall mounted unit; 5.2 kW Cooling capacity including outdoor units

52

1NoInstallation 53

1NoCeiling cassette units , rated cooling 2.8kw. Including outdoor unit.

54

SECURITY ROOM

1NoInstallation 55

3NoBranch box: 4 branches56

A/C UNITS ACCESSORIES

16NoRemote Controller57

212mPIPE ɸ 9.5258

COPPER PIPING COMPLETE WITH ARMAFLEX OR FRK INSULATION WITH ALL ACCESSORIES

187mPIPE ɸ 15.959

77mPVC Drain PIPE ɸ 3260

-215-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 216: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

50mPVC PIPE ɸ 15.961

25mPVC PIPE ɸ 15.1062

112mExtra over pipe fittings63

165mØ200 64

SUPPLY AIR DUCTING (CIRCULAR DUCTING_INTERNAL INSULATION)

30mØ300 65

30mØ350 66

30mØ450 67

24m300 x 400mm68

SUPPLY AIR DUCTING (SQUARE DUCTING_INTERNAL INSULATION)

24m400 x 400mm69

165mØ20070

FLEXI DUCTING

50mØ20071

SUPPLY AIR DUCTING

40mØ25072

50mØ30073

50mØ35074

10mØ40075

7NoHAU to ø 350 mm76

TRANSFORMATION PIECE

8NoØ450 to Ø35077

-216-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 217: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

10NoØ350 to Ø30078

2NoØ300 to Ø25079

2NoØ350 to Ø300 , concentric duct taper80

1NoØ300 to Ø250, concentric duct taper81

1NoØ200 to Ø250, concentric duct taper82

4No90 Degree, round duct long radius, elbow. Ø20083

4No90 Degree, round duct long radius, elbow. Ø25084

3No90 Degree, round duct long radius, elbow. Ø30085

3No90 Degree, round duct long radius, elbow. Ø35086

8NoSquare Diffuser, 200 Dia connect size, and flow rate :81 l/s

87

DIFFUSERS

24NoSquare Diffuser, 200 Dia connect size, and flow rate :100 l/s

88

2NoReturn air Grillie, 200 Dia connect size, and flow rate :208 l/s

89

2NoReturn air Grillie, 200 Dia connect size, and flow rate :278 l/s

90

3NoØ20091

STOP END

2NoØ25092

5NoØ30093

3NoØ35094

-217-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 218: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

56NoØ20095

SPIGOT

2No600 x 400 mm, All Weather Return Air Grille96

RETURN AIR PLENUM BOX

6No1200 x 600 mm Return air grille and box97

37NoØ20098

BALANCING DAMPERS

16NoØ200 BD99

1lotElectrical Works Associated with the above installations100

ELECTRICAL WORKS

SECURITY ROOM

1No4 way blow cassette, 2.8 kW Cooling capacity .101

VRV CASSETTE TYPE INDOOR UNIT

1NoInstallation 102

1NoRemote Controller103

1lotAC Accessories104

1NoCassette Ceiling Unit 5.6 kW Cooling capacity .105

VRV CASSETTE TYPE INDOOR UNIT - CEILING MOUNTED

1NoRemote Controller106

1NoInstallation107

-218-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 219: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

44mPIPE ɸ 9.52108

COPPER PIPING COMPLETE WITH ARMAFLEX Complete with Armaflex or FRK Insulation with all Accessories

44mPIPE ɸ 15.9109

44mPVC Drain PIPE ɸ 32110

44mExtra over pipe fittings111

1lotElectrical Works Associated with the above installations112

ELECTRICAL WORKS

1NoBranch box: 6 branches113

BRANCH BOX

2NoBranch box: 8 branches114

2No

VRV Heat Recovery type: Total Capacity of 22.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

115

VRV OUTDOOR UNITS

2NoInstallation 116

2No

VRV Heat Recovery type: Total Capacity of 28 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

117

2NoInstallation 118

2No

VRV Heat Recovery type: Total Capacity of 50 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

119

2NoInstallation 120

-219-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 220: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect

TOILETS

13NoAnodized grade aluminium, 400 x 400 Door grille121

AIR TERMINALS

14No35 l/s , Ø150 Disc valve122

AIR EXTRACTION FAN

2No280l/s @115Pa, Extract Air Fan c/w filters and accessories

123

Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.

16NoAir disc valve, neck size dia 200, Flow rate 35l/s124

6No400 x 400 Door grille 125

2NoInstallation 126

2No105 l/s @ 75 E.S.P (EAF -01)127

2No175.7 l/s @ 115 E.S.P (EAF -01)128

1No150 x 150 - 35-40l/s @ 50Pa E.S.P (EF-01)129

Wall Fan, C/W outdoor louvre sized to suite fan, all required accessories to ensure a fully functional installation and suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.

-220-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 221: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

FIRST FLOOR

INDOOR UNITS

2NoHeat Reclaim Fresh Air Unit, flow rate 2000m3/hr130

AIR CONDITIONING UNIT:

2NoInstallation of heat reclaim fresh air unit131

10NoVRV Ceiling cassette units, rated cooling 11.2kw132

10NoInstallation of VRV Ceiling Cassette133

6NoCeiling Ducted Hide Away Unit, HAU-GF-1; 22.4 kW Cooling capacity.

134

6NoInstallation135

1NoVRV Ceiling Ducted Hide Away Unit; 9.0 kW Cooling capacity

136

1NoInstallation137

1NoVRV Ceiling Ducted Hide Away Unit; 11.2 kW Cooling capacity

138

1NoInstallation 139

2NoBranch box: 6 branches140

A/C UNITS ACCESSORIES

12NoRemote Controller141

225mPIPE ɸ 9.52142

COPPER PIPING COMPLETE WITH ARMAFLEX OR FRK INSULATION WITH ALL ACCESSORIES

225mPIPE ɸ 15.9143

90mPVC Drain PIPE ɸ 32144

-221-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 222: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

50mPVC PIPE ɸ 15.9145

120mExtra over pipe fittings146

165mØ200 147

SUPPLY AIR DUCTING (CIRCULAR DUCTING_INTERNAL INSULATION)

30mØ300 148

30mØ350 149

30mØ450 150

185mØ200151

FLEXI DUCTING

32mØ200152

SUPPLY AIR DUCTING

38mØ250153

38mØ300154

38mØ350155

10NoHAU to ø 350 mm156

TRANSFORMATION PIECE

8NoØ450 to Ø350157

12NoØ350 to Ø300158

4NoØ300 to Ø250159

8NoØ300 to Ø200160

2NoØ350 to Ø300 , concentric duct taper161

1NoØ300 to Ø250, concentric duct taper162

-222-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 223: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1NoØ200 to Ø250, concentric duct taper163

4No90 Degree, round duct long radius, elbow. Ø200164

4No90 Degree, round duct long radius, elbow. Ø250165

3No90 Degree, round duct long radius, elbow. Ø300166

3No90 Degree, round duct long radius, elbow. Ø350167

16NoSquare Diffuser, 200 Dia connect size, and flow rate :81 l/s

168

DIFFUSERS

36NoSquare Diffuser, 200 Dia connect size, and flow rate :100 l/s

169

2NoReturn air Grillie, 200 Dia connect size, and flow rate :208 l/s

170

2NoReturn air Grillie, 200 Dia connect size, and flow rate :278 l/s

171

3NoØ200172

STOP END

4NoØ250173

6NoØ300174

3NoØ350175

76NoØ200176

SPIGOT

2No600 x 400 mm, All Weather Return Air Grille177

RETURN AIR PLENUM BOX

10No1200 x 600 mm Return air grille and box178

-223-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 224: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

65NoØ200179

BALANCING DAMPERS

36NoØ200 BD180

1lotElectrical Works Associated with the above installations181

ELECTRICAL WORKS

1NoBranch box: 1 branch182

BRANCH BOX

1NoBranch box: 4 branches183

2NoBranch box: 8 branches184

3No

VRV Heat Recovery type: Total Capacity of 50 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

185

VRV OUTDOOR UNITS

3NoInstallation 186

2No

VRV Heat Recovery type: Total Capacity of 56 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

187

2NoInstallation 188

Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect

TOILETS

7NoAnodized grade aluminium, 400 x 400 Door grille189

AIR TERMINALS

-224-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 225: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1NoAnodized grade aluminium, 450 x 450 Door grille190

6No35 l/s , Ø150 Disc valve191

AIR EXTRACTION FAN

1No280l/s @115Pa, Extract Air Fan c/w filters and accessories

192

Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.

4NoAir disc valve, neck size dia 200, Flow rate 35l/s193

6No400 x 400 Door grille 194

1NoInstallation 195

1No105 l/s @ 75 E.S.P (EAF -01)196

4No150 x 150 - 35-40l/s @ 50Pa E.S.P (WF1)197

Wall Fan, C/W outdoor louvre sized to suite fan, all required accessories to ensure a fully functional installation and suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.

1,000,000.00ItemProvision Sum for all electrical supply including metering and cabling

198

ELECTRICAL METERING AND CABLING

SECOND FLOOR

INDOOR UNITS

2NoHeat Reclaim Fresh Air Unit, flow rate 2000m3/hr199

AIR CONDITIONING UNIT:

-225-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 226: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

2NoInstallation of heat reclaim fresh air unit200

3NoVRV Ceiling cassette units, rated cooling 9kw201

3NoVRV Ceiling cassette units, rated cooling 11.2kw202

6NoInstallation of VRV Ceiling Cassette203

6NoCeiling Ducted Hide Away Unit, HAU-GF-1; 22.4 kW Cooling capacity.

204

6NoInstallation205

1NoVRV Ceiling Ducted Hide Away Unit; 22.4 kW Cooling capacity

206

1NoInstallation 207

2NoBranch Boxes: 4 Branches208

A/C UNITS ACCESSORIES

11NoRemote Controller209

200mPIPE ɸ 9.52210

COPPER PIPING COMPLETE WITH ARMAFLEX OR FRK INSULATION WITH ALL ACCESSORIES

175mPIPE ɸ 15.9211

25mPVC Drain PIPE ɸ 15.9212

40mPVC Drain PIPE ɸ 32213

50mPVC PIPE ɸ 15.9214

25mPIPE ɸ 15.10215

100mExtra over pipe fittings216

-226-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 227: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

165mØ200 217

SUPPLY AIR DUCTING (CIRCULAR DUCTING_INTERNAL INSULATION)

30mØ300 218

30mØ350 219

30mØ450 220

165mØ200221

FLEXI DUCTING

40mØ200222

SUPPLY AIR DUCTING

40mØ250223

40mØ300224

40mØ350225

8NoHAU to ø 350 mm226

TRANSFORMATION PIECE

8NoØ450 to Ø350227

10NoØ350 to Ø300228

2NoØ300 to Ø250229

8NoØ300 to Ø200230

2NoØ350 to Ø300 , concentric duct taper231

1NoØ300 to Ø250, concentric duct taper232

1NoØ200 to Ø250, concentric duct taper233

4No90 Degree, round duct long radius, elbow. Ø200234

-227-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 228: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

4No90 Degree, round duct long radius, elbow. Ø250235

3No90 Degree, round duct long radius, elbow. Ø300236

3No90 Degree, round duct long radius, elbow. Ø350237

44NoSquare Diffuser, 200 Dia connect size, and flow rate :100 l/s

238

DIFFUSERS

2NoReturn air Grillie, 200 Dia connect size, and flow rate :208 l/s

239

2NoReturn air Grillie, 200 Dia connect size, and flow rate :278 l/s

240

3NoØ200241

STOP END

2NoØ250242

6NoØ300243

3NoØ350244

68NoØ200245

SPIGOT

2No600 x 400 mm, All Weather Return Air Grille246

RETURN AIR PLENUM BOX

8No1200 x 600 mm Return air grille and box247

49NoØ200248

BALANCING DAMPERS

36NoØ200 BD249

-228-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 229: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1lotElectrical Works Associated with the above installations250

ELECTRICAL WORKS

1NoBranch box: 4 branches251

BRANCH BOX

2NoBranch box: 8 branches252

2No

VRV Heat Recovery type: Total Capacity of 22.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

253

VRV OUTDOOR UNITS

2NoInstallation 254

1No

VRV Heat Recovery type: Total Capacity of 28 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

255

1NoInstallation 256

1No

VRV Heat Recovery type: Total Capacity of 33.6 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

257

1NoInstallation 258

2No

VRV Heat Recovery type: Total Capacity of 67.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

259

2NoInstallation 260

-229-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 230: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect

TOILETS

7NoAnodized grade aluminium, 400 x 400 Door grille261

AIR TERMINALS

6No35 l/s , Ø150 Disc valve262

AIR EXTRACTION FAN

2No124l/s @115Pa, Extract Air Fan c/w filters and accessories

263

Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.

6NoAir disc valve, neck size dia 200, Flow rate 35l/s264

2No400 x 400 Door grille 265

1NoInstallation 266

1No105 l/s @ 75 E.S.P (EAF -01)267

4No150 x 150 - 35-40l/s @ 50Pa E.S.P (WF1)268

Wall Fan, C/W outdoor louver sized to suite fan, all required accessories to ensure a fully functional installation and suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commisioned in position as per specification.

-230-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 231: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

FIRE DAMPER

5NoFire Damper 200 dia 269

Galvanised steel, 120 minute damper

8NoFire Damper 350 dia270

BUILDING 8

Indoor Unit: Indoor units each c/w an wired LCD remote controller installed as specified and as indicated in drawing with the following cooling duties

INDOOR UNITS

CCU-01:

1No4 way blow cassette: 5.6 kW Cooling capacity 271

Cassette Type VRV

1NoInstallation 272

1NoRemote controller273

1lotAC Accessories274

12mPIPE ɸ 9.52275

Copper Piping Complete With Armaflex or FRK Insulation with all Accessories

12mPIPE ɸ 15.9276

12mPVC Drain PIPE ɸ 32277

12mExtra over pipe fittings278

1lotElectrical works associated with the above installations279

Electrical work

-231-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 232: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

CCU-02:

8No4 way blow cassette: 5.6 kW Cooling capacity 280

Cassette Type VRV

8NoInstallation 281

8NoRemote controller282

1lotAC Accessories283

40mPIPE ɸ 9.52284

Copper Piping Complete With Armaflex or FRK Insulation with all Accessories

40mPIPE ɸ 15.9285

40mPVC Drain PIPE ɸ 32286

40mExtra over pipe fittings287

1lotElectrical works associated with the above installations288

Electrical work

CCU-03:

2No1 way blow cassette: 2.8 kW Cooling capacity 289

Cassette Type VRV

2NoInstallation 290

2NoRemote controller291

1lotAC Accessories292

15mPIPE ɸ 9.52293

Copper Piping Complete With Armaflex or FRK Insulation with all Accessories

15mPIPE ɸ 15.9294

-232-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 233: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

15mPVC Drain PIPE ɸ 32295

15mExtra over pipe fittings296

1lotElectrical works associated with the above installations297

Electrical work

CCU-04:

9No1 way blow cassette; 3.6 kW Cooling capacity 298

Cassette Type VRV

9NoInstallation 299

9NoRemote controller300

1lotAC Accessories301

80mPIPE ɸ 9.52302

Copper Piping Complete With Armaflex or FRK Insulation with all Accessories

80mPIPE ɸ 15.9303

80mPVC Drain PIPE ɸ 32304

80mExtra over pipe fittings305

1lotElectrical works associated with the above installations306

Electrical work

-233-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 234: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

CCU-05:

1No4 way blow cassette; 9 kW Cooling capacity 307

Cassette Type VRV

1NoInstallation 308

1NoRemote controller309

1lotAC Accessories310

80mPIPE ɸ 9.52311

Copper Piping Complete With Armaflex or FRK Insulation with all Accessories

80mPIPE ɸ 15.9312

80mPVC Drain PIPE ɸ 32313

80mExtra over pipe fittings314

1lotElectrical works associated with the above installations315

Electrical work

CCU-06:

2No1 way blow cassette; 4.5 kW Cooling capacity 316

Cassette Type VRV

2NoInstallation 317

2NoRemote controller318

1lotAC Accessories319

80mPIPE ɸ 9.52320

Copper Piping Complete With Armaflex or FRK Insulation with all Accessories

80mPIPE ɸ 15.9321

-234-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 235: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

80mPVC Drain PIPE ɸ 32322

80mExtra over pipe fittings323

1lotElectrical works associated with the above installations324

Electrical work

CCU-07:

1No4 way blow cassette; 4.5 kW Cooling capacity 325

Cassette Type VRV

1NoInstallation 326

1NoRemote controller327

1lotAC Accessories328

10mPIPE ɸ 9.52329

Copper Piping Complete With Armaflex or FRK Insulation with all Accessories

10mPIPE ɸ 15.9330

10mPVC Drain PIPE ɸ 32331

10mExtra over pipe fittings332

1lotElectrical works associated with the above installations333

Electrical work

CCU-08:

1No4 way blow cassette; 4.5 kW Cooling capacity 334

Cassette Type VRV

1NoInstallation 335

1NoRemote controller336

-235-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 236: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1lotAC Accessories337

12mPIPE ɸ 9.52338

Copper Piping Complete With Armaflex or FRK Insulation with all Accessories

12mPIPE ɸ 15.9339

12mPVC Drain PIPE ɸ 32340

12mExtra over pipe fittings341

1lotElectrical works associated with the above installations342

Electrical work

VRV OUTDOOR UNITS

2No

VRV Heat Recovery type: Total Capacity of 28 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

343

ODU-01

2NoInstallation 344

1No

VRV Heat Recovery type: Total Capacity of 40 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

345

ODU-02

1NoInstallation 346

1No

VRV Heat Recovery type: Total Capacity of 50.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.

347

ODU-03

1NoInstallation348

-236-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 237: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1No4 connectable indoor units349

BRANCH BOX

1No8 connectable indoor units350

1No10 connectable indoor units351

Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect

TOILETS

6NoAnodized grade aluminium, 450 x 450 Door grille

AIR TERMINALS

10No35 l/s , Ø150 Disc valve352

AIR EXTRACTION FAN

2No175.7 l/s @ 115 E.S.P (EAF -01)353

Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.

4No150 x 150 - 35-40l/s @ 50Pa E.S.P (EF-01)354

Wall Fan, C/W outdoor louver sized to suite fan, all required accessories to ensure a fully functional installation and suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commisioned in position as per specification.

10mØ200355

SUPPLY AIR DUCTING

10mØ300356

-237-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 238: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

10mØ350357

10mØ400358

-238-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 239: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

228

227

226

225

224

223

222

221

220

219

218

217

216

215

214

213

212

211Total Brought Forward from Page No.

HVAC Installation

Section No. 7

Bill No. 1

AmountPageNo

MECHANICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

-239-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried Forward R

Page 240: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

HVAC Installation

Section No. 7

Bill No. 1

AmountPageNo

MECHANICAL INSTALLATION

COLLECTION

Brought Forward R

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

238

237

236

235

234

233

232

231

230

229Total Brought Forward from Page No.

-240-

HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried Forward to Summary of Section No. 7 R

Page 241: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 7

BILL NO. 2

FIRE PROTECTION INSTALLATION

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

Supply, delivery, installation, commissioning and 12 months maintenance of the following Fire Fighting equipment as shown on the tender drawings:

SUPPLEMENTARY PREAMBLES

FIRE PROTECTION

FIRE HOSE REELS

61No30m pvc fire hose reel c/w a drum, shut off valve 90˚ bend and dia. 7mm aluminium nozzle

1

Supply and install 30m fire hose reel complete with accessories

227mDiameter 25mm Galvanised Mild Steel Pipe2

227mDiameter 32mm Galvanised Mild Steel Pipe3

FIRE EXTINGUISHER

158No

4.5kg of Dry Chemical Powder fire extinguishers c/w

red fire extinguisher cabinet

4

Supply and install portable fire extinguisher complete with wall mounted cabinet and accessories

-241-

Fire Protection InstallationBill No. 2MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 242: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

36No890mm Heigh x 590mm Width x 285mm Depth Fire Extinguishers Cabinet.

5

10No5.0kg of Carbon Dioxide fire extinguishers complete with mounting wooden plate

6

FIRE HYDRANT

28NoDia.65 Right angle hydrant 7

Supply and install fire hydrant complete with 65mm dia brass right angle fire hydrants complete with all accessories

FIRE SIGNAGE

230NoStatutory Signage8

Supply and install all statutory signs on chromadek or complete with hangers or support where required.

Supply, deliver, installation, testing, commissioning and handing over in working order and maintenance during guarantee period.

ADDRESSABLE FIRE DETECTION INSTALLATION

5NoComputer workstation complete with all associated peripheral equipment, i5 PC with 15-18' monitor

9

FRONT END EQUIPMENT

5NoMaestro systems software graphics package (Management software)

10

5NoFire Control panel - 3 loop analogue addressable (complete with network card)

11

5NoFire Control panel - Slave Panel12

5NoFire panel standby batteries - 12v 28 a/h13

5NoAllow for a 24 way output board or equivalent to enable interfacing with other services.

14

-242-

Fire Protection InstallationBill No. 2MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 243: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

240NoAddressable optical smoke detectors c/w bases15

DETECTION FIELD DEVICES

60NoAddressable rate of rise heat detectors c/w bases16

50NoAddressable interface units17

15NoAddressable line isolators18

42NoManual breakglass units complete with resettable elements and transparent covers.

19

39NoAddressable sounders20

2,770mPH120 1mm 1 pair Fire resistant cable21

1,140mDiameter 25mm steel conduit22

990mDiameter 100mm sleeve for electronics services.23

950mP4000 Data Cable Tray (Truncking)24

1lotInstallation 25

INSTALLATION

-243-

Fire Protection InstallationBill No. 2MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 244: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Fire Protection Installation

Section No. 7

Bill No. 2

AmountPageNo

MECHANICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

243

242

241Total Brought Forward from Page No.

-244-

Fire Protection InstallationBill No. 2MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried Forward to Summary of Section No. 7 R

Page 245: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 7

BILL NO. 3

WET SERVICES INSTALLATION

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

HOT WATER GENERATION:

4No

SANS 1307, Direct solar heating system, 300 litre, 3 kW backup electrical element, 400kPa approved geyser. Complete with solar collector (2000x1000)

1

Supply and installation of domestic geyser installations including shut-off valves, strainers, non-return valves, expansion relief valve, safety valve, drain piping and electrical. And all accessories required to ensure a fully functioning system

40m35 mm ф Copper piping2

WATER RETICULATION PIPING

128m28 mm ф Copper piping3

115m22 mm ф Copper piping4

115m15 mm ф Copper piping5

8No76 mm Bend6

EXTRA OVER COPPER PIPING FOR FITTING.

8No67 mm Bend7

3No54 mm Bend8

-245-

Wet Services InstallationBill No. 3MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 246: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

12No42 mm Bend9

48No22 mm Bend10

48No15 mm Bend11

140No22 mm Tee12

96No15 mm Tee13

32No28-15 mm Reducing tee14

40No28-22 mm Reducing tee15

140No22-15 mm Reducing tee16

24No42 mm Straight coupler suitable for male or female connection

17

24No35 mm Straight coupler suitable for male or female connection

18

140No22 mm Straight coupler suitable for male or female connection

19

96No15 mm Straight coupler suitable for male or female connection

20

10No32 mm Shut off valve 21

VALVES TO COPPER PIPING

152No22 mm Shut off valve 22

76No15 mm Shut off valve 23

12No76 mm Non Return Valve24

3No32 mm Non Return Valve25

360,000.00ItemAllow a provisional sum for supply and install complete smart water meters as per the engineer's specification

26

SMART METER

-246-

Wet Services InstallationBill No. 3MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 247: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

1lotInstallation 27

INSTALLATION

-247-

Wet Services InstallationBill No. 3MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 248: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Wet Services Installation

Section No. 7

Bill No. 3

AmountPageNo

MECHANICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

247

246

245Total Brought Forward from Page No.

-248-

Wet Services InstallationBill No. 3MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried Forward to Summary of Section No. 7 R

Page 249: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 7

BILL NO. 4

LIFT INSTALLATION

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

The Contractor shall supply, install, and commission according to the drawings .The rates shall include material, labour, all mounting of accessories, including all connection to the point of supply.

SUPPLEMENTARY PREAMBLES

Supply and Installation of Lift - Paraplegic and Passenger lift

4NoSupply and install a new passenger lift 800kg, 3 stops, bi/parting doors and 1 car opening

1

Design, supply, delivery, install and commissioning of the new lift installation according to the relevant SANS specifications and as specified:

1NoSupply and install a new passenger lift 800kg, 4 stops, bi/parting doors and 1 car opening

2

2NoSupply and install a new passenger lift 2500kg, 4 stops, bi/parting doors and 1 car opening

3

7No

Perform all required inspections and test as required by the Occupational Health and Safety Act, No. 85 of 1993, and as prescribed in SABS 1545 and SABS 1543, including issuing of the required certificate.

4

SUMCompilation of three sets of maintenance manual5

-249-

Lift InstallationBill No. 4MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 250: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SUMMaintenance during 12 month guarantee period 6

8NoSupply and install new electrical distribution boards 7

8NoSupply and install new lift pit stainless steel sump pump8

5NoTraining9

-250-

Lift InstallationBill No. 4MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Collection R

Page 251: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

Lift Installation

Section No. 7

Bill No. 4

AmountPageNo

MECHANICAL INSTALLATION

COLLECTION

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

250

249Total Brought Forward from Page No.

-251-

Lift InstallationBill No. 4MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried Forward to Summary of Section No. 7 R

Page 252: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

AmountItemNo

Quantity Rate

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

SECTION NO. 7

BILL NO. 5

GENERAL ITEMS

The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.

PREAMBLES

SUMTraining of personnel1

General Items

24NoO & M manuals with as built drawings2

SUM12 Months maintenance & Guarantee3

SUMProgramming of the works4

SUMWorkshop drawings & Equipment Submissions5

-252-

General ItemsBill No. 5MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried Forward to Summary of Section No. 7 R

Page 253: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

MECHANICAL INSTALLATION

SECTION SUMMARY - MECHANICAL INSTALLATION

BillNo

PageNo

Amount

Section No. 7

240HVAC Installation1

244Fire Protection Installation2

248Wet Services Installation3

251Lift Installation4

252General Items5

-253-

MECHANICAL INSTALLATIONSection No. 7

Part C2. Pricing Data

Carried to Final Summary R

Page 254: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

PageNo

FINAL SUMMARY

SectionNo

Amount

29PRELIMINARIES1

107MAIN BUILDINGS2

140CONCRETE PARKADE3

165EXTERNAL WORKS4

171PROVISIONAL SUMS5

210ELECTRICAL INSTALLATION6

253MECHANICAL INSTALLATION7

RSUB TOTAL

Item

Allow 5% (Five Percent) of the works including preliminaries as Contingency Amount for the unforeseen and the sum provided is under the sole control of the client and upon approval by the Client Representative and deducted in whole or in part.

CONTINGENCY AMOUNT

RSUB TOTAL

9,280,000.00Item

Allow an amount of R 9 280 000.00 (Nine Million Two Hundred and Eighty Thousand Rand) for escalation of prices to be used as directed by the Principal Agent or deducted in whole or in part.

ESCALATIONS (CPAP) PROVISIONAL

RSUB TOTAL

RProvision for Value-Added Tax (VAT) at 15 percent

-254-

Part C2. Pricing Data

Carried Forward R

Page 255: SECTION NO. 1 BILL NO. 1 · 2019-07-22 · Model Preambles will be entertained. Tenderers are advised to study the GP ASC Rev 0 (General specifications of materials and methods to

For Gauteng Growth and Development Agency (GGDA)

At Bonaero Park

Construction of New JMP Buildings

RBrought Forward

PageNo

FINAL SUMMARY

SectionNo

Amount

Note:

Tenderers must submit their tenders on the official form supplied for this purpose.

-255-

Part C2. Pricing Data

Carried to Form of Tender R