section no. 1 bill no. 1 · 2019-07-22 · model preambles will be entertained. tenderers are...
TRANSCRIPT
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 1
BILL NO. 1
PRELIMINARIES
Unless otherwise stated all items in this bill will be WorkGroup 190
CPA WORK GROUP
The JBCC Principal Building Agreement (March 2014Edition 6.1) prepared by the Joint Building ContractsCommittee shall be the applicable building agreement,amended as hereinafter described
BUILDING AGREEMENT AND PRELIMINARIES
The following documents form an integral part of thisagreement:
a) JBCC Principal Building Agreement Contract DataEdition 6.1 March 2014
b) JBCC Nominated/ Selected Sub Contract AgreementEdition 6.1 March 2014
c) JBCC Nominated/ Selected Sub Contract AgreementContract Data Edition 6.1 March 2014
-1-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
The Model Preambles for Trades (September 2008edition) as published by the Association of South AfricanQuantity Surveyors shall be deemed to be incorporatedin these bills of quantities and no claims arising frombrevity of description of items fully described in the saidModel Preambles will be entertained.
Tenderers are advised to study the GP ASC Rev 0(General specifications of materials and methods to beused for building contracts) before pricing the bill. Thedocument is readily available at GDID offices forinspection as and when required.
PREAMBLES FOR TRADES
Supplementary preambles are incorporated in these billsof quantities to satisfy the requirements of this project.Such supplementary preambles shall take precedenceover the provisions of the said Model Preambles
The contractor's prices for all items throughout thesebills of quantities must take account of and include forall of the obligations, requirements and specificationsgiven in the said Model Preambles and in anysupplementary preambles
The measuring system used for the preparation of thebills of quantities is the Standard System of MeasuringBuilding Work (seventh edition, 2015) published by theAssociation of South African Quantity Surveyors(ASAQS)
STANDARD SYSTEM OF MEASURING BUILDING WORK
Any reference to the words "Tender" or "Tenderer"herein and/or in any other documentation shall beconstrued to have the same meaning as the words"Bid" or "Bidder"
MEANING OF TERMS "TENDER / TENDERER"
-2-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
The ASAQS Preliminaries (March 2014 edition)published by the Association of South African QuantitySurveyors for use with the JBCC Principal BuildingAgreement shall be deemed to be incorporated in thesebills of quantities
PRELIMINARIES
The contractor is deemed to have referred to the above-mentioned documents for the full intent and meaning ofeach clause
The clauses in the above-mentioned documents areherein after referred to by clause number and headingonly. Where standard clauses or alternatives are notentirely applicable to this agreement such modifications,corrections or supplements as will apply are given undereach relevant clause heading and such modifications,corrections or supplements shall take precedence notwithstanding anything to the contrary contained in theabove-mentioned documents
Where any item is not relevant to this agreement suchitem is marked N/A (signifying “not applicable”)
Should the contractor select Option A in terms of clause26.9.4 of the contract data for the purpose of adjustmentof these preliminaries, the amount entered into theamount column in these preliminaries is to be dividedinto one or more of the three categories providednamely fixed (F), value related (V) and time related (T)
PRICING OF PRELIMINARIES
Items not priced in these Preliminaries shall be deemedto be included elsewhere in these Bills of Quantities
-3-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION A: PRINCIPAL BUILDING AGREEMENT (JBCC-CODE EDITION 6.1, MARCH 2014)
Item
Clause 1.0 - Definitions and interpretationF:............................. V:............................ T:............................
1
INTERPRETATION
Clause 1.1 Definition of "Commencement Date" isadded:
"COMMENCEMENT DATE" means the date that theagreement, made in terms of the Form of Offer andAcceptance, comes into effect
Clause 1.1 Definition of "Guarantee for Construction" isamended by replacing it with the following:
"GUARANTEE FOR CONSTRUCTION" means aguarantee at call obtained by the contractor from aninstitution approved by the employer in terms of theemployer's construction guarantee form as selected inthe schedule
Clause 1.1 Definition of "Construction Period" isamended by replacing it with the following:
"CONSTRUCTION PERIOD" means the periodcommencing on the commencement date and ending onthe date of practical completion
Clause 1.1 Definition of "Corrupt Practice" is added:
"CORRUPT PRACTICE" means the offering, giving,receiving or soliciting of anything of value to influencethe action of a public official in the procurement processor in contract execution
-4-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Clause 1.1 Definition of "Fraudulent Practice" is added:
"FRAUDULENT PRACTICE" means a mispresentationof facts in order to influence a procurement process orthe execution of a contract to the detriment of anytenderer and includes collusive practice amongtenderers (prior to or after the tender submission)designed to establish tender prices at artificial non-competitive levels and to deprive the tenderer of thebenefits of free and open competition
Clause 1.1 Definition of "Interest" is amended byreplacing it with the following:
"INTEREST" means the interest rates applicable on thiscontract, whether specifically indicated in the relevantclauses or not, will be the rate as determined by theMinister of Finance, from time to time, in terms ofsection 80(1)(b) of the Public Finance Management Act,1999 (Act No. 1 of 1999)
Clause 1.1 Definition of "Principal Agent" is amended byreplacing it with the following:
"PRINCIPAL AGENT" means the person or entityappointed by the employer and named in the schedule.In the event of a principal agent not being appointed,then all the duties and obligations of a principal agent asdetailed in the agreement shall be fulfilled by arepresentative of the employer as named in theschedule
Clause 1.1 Definition of "Security" is amended byreplacing it with the following:
"SECURITY" means the form of security provided by theemployer or contractor, as stated in the schedule, fromwhich the contractor or employer may recover expenseor loss
Item
Clause 2.0 - Law, Regulations and Notices F:............................. V:............................ T:............................
2
Clause 2.5 is amended by replacing the words"registered post, telefax or e-mail" with "prepaidregistered post"
-5-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
ItemClause 3.0 - Offer and Acceptance F:............................. V:............................ T:............................
3
Item
Clause 4.0 - Assignment and Cession F:............................. V:............................ T:............................
4
ItemClause 5.0 - Contract Documents F:............................. V:............................ T:............................
5
Clause 5 is amended by the addition of the followingsub-clause 5.7:
The contractor shall supply and keep a copy of theJBCC Series Principal Building Agreement andPreliminaries applicable to this contract on the site, towhich the employer, principal agent and agents shallhave access at all times
ItemClause 6.0 - Employer’s Agents F:............................. V:............................ T:............................
6
ItemClause 7.0 - Design Responsibility F:............................. V:............................ T:............................
7
Clause 7.0 is deemed to be amended by adding thefollowing new sub-clause 7.4:
The Contractor shall promptly inform the Principal Agentof any patent defects or errors in any design. Inidentifying any patent defects or errors the Contractorshall use its best endeavours.
ItemClause 8.0 - Works risk F:............................. V:............................ T:............................
8
INSURANCE AND SECURITY
-6-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Clause 8.0 is deemed to be amended by the addition ofthe new clause 8.8 and 8.9:
8.8 Unless specifically stated to the contrary, wheretrade names have been used in the tender documentsto specify materials and goods, this has been done withthe sole purpose of indicating the standard and qualityrequired by the principal agent. The contractor shall befree to supply those of other manufacturers or suppliersprovided that they match the standard and qualityrequired. The onus shall be on the contractor to provethat the materials and goods supplied by him are ofsimilar standard and quality to those specified.
8.9 The risks for loss or damage to the works resultingfrom such materials and goods and for latent defects insuch materials and goods shall be that of the contractor,whether the materials and goods as specified orotherwise are supplied. Where it is specifically statedthat no other trade name will be acceptable then theabove mentioned risks will remain with the employer.
ItemClause 9.0 - Indemnities F:............................. V:............................ T:............................
9
ItemClause 10.0 - Insurances F:............................. V:............................ T:............................
10
Clause 10.0 is amended by the addition of the followingclauses:
10.12 Damage to the Works(a) Without in any way limiting the contractor'sobligations in terms of the contract, the contractor shallbear the full risk of damage to and/or destruction of theworks by whatever cause during construction of theworks and hereby indemnifies and holds harmless theemployer against any such damage. The contractorshall take such precautions and security measures andother steps for the protection and security of the worksas the contractor may deem necessary
(b) The contractor shall at all times proceed immediatelyto remove or dispose of any debris arising from damageto or destruction of the works and to rebuild, restore,replace and/or repair the works
-7-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
(c) Where the employer bears the risk in terms of thiscontract, the contractor shall, if requested to do so,reinstate any damage or destroyed portions of the worksand the costs of such reinstatement shall be measuredand valued in terms of 32.0 hereof
10.13 Injury to Persons or loss of or damage toProperties(a) The contractor shall be liable for and herebyindemnifies the employer against any liability, loss, claimor proceeding whether arising in common law or bystatute, consequent upon personal injuries to or thedeath of any person whomsoever arising out of or in thecourse of or caused by the execution of the worksunless due to any act or negligence of any person forwhose actions the employer is legally liable
(b) The contractor shall be liable for and herebyindemnifies the employer against any liability, loss, claimor proceeding consequent upon loss of or damage toany moveable or immovable or personal property orproperty contiguous to the site, whether belonging to orunder the control of the employer or any other body orperson, arising out of or in the course of or by reason ofthe execution of the works unless due to any act ornegligence of any person for whose actions theemployer is legally liable
(c) The contractor shall, upon receiving a contractinstruction from the principal agent, cause the same tobe made good in a perfect and workmanlike manner athis own cost and in default thereof the employer shallbe entitled to cause it to be made good and to recoverthe cost thereof from the contractor or to deduct thesame from amounts due to the contractor
(d) The contractor shall be responsible for the protectionand safety of such portions of the premises placedunder his control by the employer for the purpose ofexecuting the works until the issue of the certificate ofpractical completion
-8-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
(e) Where the execution of the works involves the risk ofremoval of or interference with support to adjoiningproperties including land or structures or any structuresto be altered or added to, the contractor shall obtainadequate insurance and will remain adequately insuredor insured to the specific limit stated in the contractagainst the death of or injury to persons or damage tosuch property consequent on such removal orinterference with the support until such portion of theworks has been completed
(f) The contractor shall at all times proceed immediatelyat his own cost to remove or dispose of any debris andto rebuild, restore, replace and/or repair such propertyand to execute the works
10.14 It is the responsibility of the contractor to ensurethat he has adequate insurance to cover his risk andliability as mentioned in 10.12 and 10.13. Withoutlimiting the contractor's obligations in terms of thecontract, the contractor shall, within twenty-one (21)calendar days of the commencement date but beforecommencement of the works, submit to the employerproof of such insurance policy, if requested to do so
ItemClause 11.0 - Security F:............................. V:............................ T:...........................
11
Clause 11.4 is deleted
ItemClause 12.0 - Duties of the Parties F:............................ V:............................T:............................
12
EXECUTION
Clause 12.1.1 and 12.2.2 are amended by replacing itwith:
No clause
ItemClause 13.0 - Setting Out F:............................. V:............................ T:............................
13
Item
Clause 14.0 - Nominated Subcontractors F:......................... V:............................ T:............................
14
-9-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Clause 14.1.5 is amended by replacing it with thefollowing:
No clause
Note: See item B9.1 hereinafter for adjustment ofattendance on nominated subcontractors executing workallowed for under provisional sums
Item
Clause 15.0 - Selected Subcontractors F:......................... V:............................ T:............................
15
ItemClause 16.0 - Direct Contractors F:............................. V:............................ T:............................
16
ItemClause 17.0 - Contract Instructions F:............................. V:............................ T:............................
17
Item
Clause 18.0 - Interim Completion = N/S Subcontract Agreement F: ............................ V:...........................T:...........................
18
COMPLETION
ItemClause 19.0 - Practical Completion F:.......................... V:............................ T:............................
19
ItemClause 20.0 - Sectional Completion F:.......................... V:............................ T:............................
20
Item
Clause 21.0 - Defects Liability Period and Final Completion F:............................. V:............................ T:............................
21
Item
Clause 22.0 - Latent Defects Liability Period F:.......................... V:............................ T:............................
22
Item
Clause 23.0 - Revision of the Date for Practical Completion F:............................. V:............................ T:............................
23
-10-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
Clause 24.0 - Penalty for Late or Non-Completion
The penalty per calendar day is 1.75 cents per R100.00 of the contract value.
F:............................. V:............................ T:............................
24
Item
Clause 25.0 - Payment
Payment shall be subject to the contractor giving the employer a tax invoice for the amount due
F:............................. V:............................ T:............................
25
PAYMENT
Item
Clause 26.0 - Adjustment of the Contract Value and Final Account F:............................. V:............................ T:............................
26
Item
Clause 27.0 - Recovery of Expense and/or Loss F:............................. V:............................ T:............................
27
Item
Clause 28.0 - Suspension by the Contractor F:............................. V:............................ T:............................
28
SUSPENSION AND TERMINATION
Clause 28.1.1 is amended by the addition of thefollowing clause: No clause
ItemClause 29.0 - Termination F:............................. V:............................ T:............................
29
Clause 29.1 is amended by the addition of the followingclauses:
29.1.4 refuses or neglects to comply strictly with any ofthe conditions of contract
TERMINATION BY THE EMPLOYER
-11-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
29.1.5 estate being sequestrated, liquidated orsurrendered in terms of the insolvency laws in forcewithin the Republic of South Africa
29.1.6 in the judgement of the employer, has engaged incorrupt or fraudulent practices in competing for or inexecuting the contract
Clause 29.14.1 is deleted and is amended by theaddition of the following clause: No clause
TERMINATION BY THE CONTRACTOR
Clause 29.0 is amended by the addition of the followingclause:
29.33 Notwithstanding any clause to the contrary, oncancellation of this agreement either by the employer orthe contractor; or for any reason whatsoever, thecontractor shall on written instruction, discontinue withthe works on a date stated and withdraw himself fromthe site. The contractor shall not be entitled to refuse towithdraw from the works on the grounds of any lien orright of retention or on the grounds of any other rightwhatsoever
Item
Clause 30.0 - Dispute ResolutionF:............................. V:............................ T:............................
30
DISPUTE RESOLUTION
Item
Clause 41.0 - STATE CLAUSESF:............................. V:............................ T:............................
31
SUBSTITUTE PROVISIONS
Item
Clause 42.0 - THE SCHEDULE F:............................. V:............................ T:............................
32
CONTRACT VARIABLES
-12-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Tenderers are referred to the Contract Data for variablespertaining to this contract
SECTION B: JBCC PRELIMINARIES
Item
B1.1 Definitions and interpretationF:............................. V:............................ T:............................
33
B1.0 DEFINITIONS AND INTERPRETATION
See also clause A1.0 of Section A for additional and/oramended definitions which shall apply equally to thisSection
Item
B2.1 Checking of documentsF:............................. V:............................ T:............................
34
B2.0 DOCUMENTS
Item
B2.2 Provisional bills of quantitiesF:............................. V:............................ T:............................
35
Item
B2.3 Availability of construction documentationF:............................. V:............................ T:............................
36
Item
B2.4 Interests of agentsF:............................. V:............................ T:............................
37
Item
B2.5 Priced documentsF:............................. V:............................ T:............................
38
Item
B2.6 Tender submission
Clause 2.6 is amended by replacing "JBCC Form of Tender" with "Part C1.1 Form of Offer and Acceptance "
F:............................. V:............................ T:............................
39
-13-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
B3.1 Defined works areaF:............................. V:............................ T:............................
40
B3.0 THE SITE
Item
B3.2 Geotechnical investigation
The results are incorporated in Annexure B of the Bid Document
F:............................. V:............................ T:............................
41
Item
B3.3 Inspection of the siteF:............................. V:............................ T:............................
42
Item
B3.4 Existing premises occupiedF:............................. V:............................ T:............................
43
Item
B3.5 Previous work - dimensional accuracyF:............................. V:............................ T:............................
44
Item
B3.6 Previous work - defectsF:............................. V:............................ T:............................
45
Item
B3.7 Services - knownF:............................. V:............................ T:............................
46
Item
B3.8 Services - unknownF:............................. V:............................ T:............................
47
Item
B3.9 Protection of treesF:............................. V:............................ T:............................
48
Item
B3.10 Articles of valueF:............................. V:............................ T:............................
49
-14-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
B3.11 Inspection of adjoining propertiesF:............................. V:............................ T:............................
50
Item
B4.1 Management of the worksF:............................. V:............................ T:............................
51
B4.0 MANAGEMENT OF CONTRACT
Item
B4.2 Programme for the worksF:............................. V:............................ T:............................
52
Item
B4.3 Progress meetingsF:............................. V:............................ T:............................
53
Item
B4.4 Technical meetingsF:............................. V:............................ T:............................
54
Item
B4.5 Labour and plant recordsF:............................. V:............................ T:............................
55
Item
B5.1 Samples of materialsF:............................. V:............................ T:............................
56
B5.0 SAMPLES, SHOP DRAWINGS AND MANUFACTURERSÆ INSTRUCTIONS
Item
B5.2 Workmanship samplesF:............................. V:............................ T:............................
57
Item
B5.3 Shop drawingsF:............................. V:............................ T:............................
58
Item
B5.4 Compliance with manufacturers' instructionsF:............................. V:............................ T:............................
59
-15-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
B6.1 Deposits and feesF:............................. V:............................ T:............................
60
B6.0 TEMPORARY WORKS AND PLANT
Item
B6.2 Enclosure of the worksF:............................. V:............................ T:............................
61
Item
B6.3 AdvertisingF:............................. V:............................ T:............................
62
Item
B6.4 Plant, equipment, sheds and officesF:............................. V:............................ T:............................
63
Item
B6.5 Main notice boardF:............................. V:............................ T:............................
64
Item
B6.6 Subcontractors' notice boardF:............................. V:............................ T:............................
65
Item
B7.1 LocationF:............................. V:............................ T:............................
66
B7.0 TEMPORARY SERVICES
Item
B7.2 Water
Option A- provided by the Contractor including necessary temporary plumbing
F:............................. V:............................ T:............................
67
-16-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
B7.3 Electricity
Option A- provided by the Contractor including necessary temporary installation work
F:............................. V:............................ T:............................
68
Item
B7.4 Telecommunication facilitiesF:............................. V:............................ T:............................
69
Item
B7.5 Ablution facilities
Option A- provided by the Contractor
F:............................. V:............................ T:............................
70
Item
B8.1 Responsibility for prime cost amountsF:............................. V:............................ T:............................
71
B8.0 PRIME COST AMOUNTS
Item
B9.1 General attendanceF:............................. V:............................ T:............................
72
B9.0 ATTENDANCE ON N/S SUBCONTRACTORS
Item
B9.2 Special attendanceF:............................. V:............................ T:............................
73
Item
B9.3 Commissioning - fuel, water and electricityF:............................. V:............................ T:............................
74
Item
B10.1 Statutory taxes, duties and leviesF:............................. V:............................ T:............................
75
B10.0 FINANCIAL ASPECTS
-17-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
B10.2 Payment for preliminariesF:............................. V:............................ T:............................
76
Item
B10.3 Adjustment of preliminaries
Clauses B10.3.1 and B10.3.2 are amended by replacing "within fifteen (15) working days of taking possession of the site" with "when submitting his priced bills of quantities / lump sum document"
F:............................. V:............................ T:............................
77
Item
B10.4 Payment certificate cash flowF:............................. V:............................ T:............................
78
Item
B11.1 Protection of the worksF:............................. V:............................ T:............................
79
B11.0 GENERAL
Item
B11.2 Protection / isolation of existing / sectionally occupied worksF:............................. V:............................ T:............................
80
Item
B11.3 Security of the worksF:............................. V:............................ T:............................
81
Item
B11.4 Notice before covering workF:............................. V:............................ T:............................
82
Item
B11.5 DisturbanceF:............................. V:............................ T:............................
83
Item
B11.6 Environmental disturbanceF:............................. V:............................ T:............................
84
-18-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
B11.7 Works cleaning and clearingF:............................. V:............................ T:............................
85
Item
B11.8 VerminF:............................. V:............................ T:............................
86
Item
B11.9 Overhand workF:............................. V:............................ T:............................
87
Item
B11.10 Instruction manuals and guaranteesF:............................. V:............................ T:............................
88
Item
B11.11 As built informationF:............................. V:............................ T:............................
89
Item
B11.12 Tenant installationsF:............................. V:............................ T:............................
90
Item
B12.1 Schedule of variablesF:............................. V:............................ T:............................
91
B12.0 SCHEDULE OF VARIABLES
This schedule contains all variables referred to in thisdocument and is divided into pre-tender and post-tendercategories. The pre-tender category must be completedin full and included in the tender documents. Both thepre-tender and post-tender categories form part of thesePreliminaries
12.1.1 Provisional bills of quantities
The quantities are provisional NO
12.1 PRE-TENDER INFORMATION
12.1.2 Availability of construction documentation
Construction documentation is complete YES
-19-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
12.1.3 Interests of agents
Details: None
12.1.4 Defined works area
Details: Construction in accordance with the scope ofwork depicted in the bid document and within theboundaries pointed out by the Principal Agent at theJewellery Manufacturing Precinct existing site.
12.1.5 Geotechnical investigation
Details: Refer to the Civil Engineer's report and specification.
12.1.6 Existing premises occupied:
Specific requirements: The noise levels need to bekept at minimum levels. Air pollution needs to bereduced to minimum.
12.1.7 Previous work - dimensional accuracy[3.5] Details:
The contractor shall, after taking possession of the site and before commencing the work, check the existing levels, lines, profiles and the like and satisfy himself as to the dimensional accuracy of all work executed under the previous contract which may affect his work. Should any inaccurate or defective work be found the contractor shall immediately notify the principal agent in writing requesting his instructions with regard thereto and afford every facility to those rectifying such inaccurate or defective work.
12.1.8 Previous work - defects
Details: Not applicable
-20-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
12.1.9. Services - known[3.7] Details:
Should the contractor encounter any existing services such as underground cables, pipes or sewer during the execution of the works he shall notify the principal agent immediately and suspend all affected work in the immediate vicinity until instruction to proceed has been given by the principal agent.
12.1.10 Protection of trees[3.9] Specific requirements:
Only those trees and shrubs indicated as such on the drawings shall be removed or cut down. The remainder of the trees and shrubs shall be left undamaged.
12.1.11 Inspection of adjoining properties
Specific requirements: The contractor needs to inspectand take pictures of all the existing buildings close to theworks and report to the Principal Agent of his findings.
12.1.12 Enclosure of the works
Specific requirements: The contractor shall erect,maintain and remove on completion of the works aperimeter hoarding and fence around the site including adanger warning tape.
12.1.13 Offices
Specific requirements: The contractor shall provide,maintain and remove on completion of the works anoffice for the exclusive use of the principal agent, toaccommodate a minimum of 20 seats, suitablyinsulated and ventilated, provided with electric lightingand fitted with boarded floor, desk, chair, drawing stool,drawing board and lock-up drawers for drawings. Theoffice shall be kept clean and fit for use at all times
-21-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
12.1.14 Main notice board
Specific requirements: The contractor shall provide,erect where directed, maintain and remove oncompletion of the works a notice board size 3 x 3m,constructed of suitable boarding with flat smooth surfaceand with edging bead 19mm thick round outer edgesand projecting 12mm from face of boarding and roundedon front edge. The board shall be securely fixed tohoarding, where hoarding is provided, or fixed to andincluding a suitable supporting structure of timber ortubular posts and braces. The board is to be paintedivory white and the bead and 12mm wide dividing linesdark green. All wording shall be inscribed in dark greenas per the coat of arms for SA. All wording shall beinscribed in dark green painted sans serif lettering
12.1.15 Subcontractors' notice board
A notice board is required NO
12.1.16 Water
Option A (by contractor) YES
Option B (by employer - free of charge) NO
Option C (by employer - metered) NO
12.1.17 Electricity
Option A (by contractor) YES
Option B (by employer - free of charge) NO
Option C (by employer - metered) NO
-22-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
12.1.18 Telecommunications
Telephone
Option A (by contractor) YES
Option B (by employer - free of charge) NO
Option C (by employer - metered) NO
Facsimile
Option A (by contractor) YES
Option B (by employer - free of charge) NO
Option C (by employer - metered) NO
Option A (by contractor) YES
Option B (by employer - free of charge) NO
Option C (by employer - metered) NO
12.1.19 Ablution facilities
Option A (by contractor) YES
Option B (by employer - free of charge) NO
Option C (by employer - metered) NO
12.1.20 Protection of existing/sectionally occupied works
Protection is required: Yes
-23-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
12.1.21 Special attendance
Subcontractor (1) details:
Subcontractor (2) details:
Subcontractor (3) details:
Subcontractor (4) details:
12.1.22 Protection of the works
Specific requirements:
12.1.23 Disturbance
Specific requirements: The contractor shall keep thesite, structures, etc well watered during operations toprevent dust and shall provide and erect and removeon completion of the works all necessary temporary dustscreens all to the satisfaction of the principal agent
12.1.24 Environmental disturbance
Specific requirements:
12.2.1 Payment of preliminaries
Option A (prorated) YES/NO
Option B (calculated) YES/NO
12.2 POST-TENDER INFORMATION
12.2.2 Adjustment of preliminaries
Option A (three categories) YES/NO
Option B (detailed breakdown) YES/NO
Section C contains specific preliminary items whichapply to this contract except where N/A (NotApplicable) appears against an item
SECTION C: SPECIFIC PRELIMINARIES
-24-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
C1.0 CONTRACT DRAWINGS
* The drawings issued with the tender documents do notcomprise the complete set but serve as a guide only fortendering purposes and for indicating the scope of thework to enable the tenderer to acquaint himself with thenature and extent of the works and the manner in whichthey are to be executed
Should any part of the drawings not be clearlyunderstood by the tenderer he shall, before submittinghis tender, obtain clarification in writing from theprincipal agent
F:............................. V:............................T:............................
92
Item
C2.0 GENERAL PREAMBLES
F:............................. V:............................T:............................
93
Item
C4.0 IMPORTED MATERIALS AND EQUIPMENT
Where imported items are listed in the tenderdocuments, the tenderer shall provide all theinformation called for, failing which the price of any suchitem, materials or equipment shall be excluded fromcurrency fluctuations. (refer to Schedule of ImportedMaterials and Equipment Part T2.2) to be completed bytenderer)
F:............................. V:............................T:............................
94
-25-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
C5.0 OCCUPATIONAL HEALTH AND SAFETY ACT
The contractor shall comply with all the requirements setout in the Construction Regulations, 2003 issued underthe Occupational Health and Safety Act, 1993 (Act No85 of 1993)
It is required of the contractor to thoroughly study theHealth and Safety Specification that must be readtogether with and is deemed to be incorporated underthis Section of the bills of quantities / lump sumdocument
The contractor must take note that compliance with theand Health and Safety Specification is compulsory. Inthe event of partial or total non-compliance, the principalagent, notwithstanding the provisions of clause A31.0 ofSection A or any other clause to the contrary, reservesthe right to delay issuing any progress paymentcertificate until the contractor provides satisfactory proofof compliance. The contractor shall not be entitled toany compensation of whatsoever nature, includinginterest, due to such delay of payment
Provision for pricing of the Occupational Health andSafety Act, Construction Regulations and Health andSafety Specification is made under this clause and it isexplicitly pointed out that all requirements of theaforementioned are deemed to be priced hereunder andno additional claims in this regard shall be entertained
F:............................. V:............................T:............................
95
-26-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Item
C6.0 Accommodation of Traffic during Construction
The Contractor shall take all necessary steps and useevery accommodate traffic including, erecting thenecessary road signs and adopting safety precautions,etc during the construction of the works in compliancewith the regulations and laws applicable to this site andshall be solely responsible for any complaints, damagesor claims in this regard including removing at completionor when directed suitable and approved works, etc
F:............................. V:............................T:............................
96
Agreement
AGREEMENT
Category : Fixed R.........................................................
Category : Value R.........................................................
Category : Time R.........................................................
SUMMARY OF CATEGORIES
-27-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Collection R
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1Total Brought Forward from Page No.
Preliminaries
Section No. 1
Bill No. 1
AmountPageNo
PRELIMINARIES
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
-28-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried Forward R
Preliminaries
Section No. 1
Bill No. 1
AmountPageNo
PRELIMINARIES
COLLECTION
Brought Forward R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
27
26
25
24
23
22
21
20
19Total Brought Forward from Page No.
-29-
PreliminariesBill No. 1PRELIMINARIESSection No. 1
Part C2. Pricing Data
Carried to Final Summary R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 1
EARTHWORKS (PROVISIONAL)
Unless otherwise stated all items in this bill will be WorkGroup 104
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
A soils investigation has been carried out on site by theengineer and please refer to the engineer's report andspecification for more information.
SOILS INVESTIGATION REPORT
Descriptions of excavations shall be deemed to include all ground conditions classifiable as "earth" described in the above soil investigation report, and where conditions of a more difficult character are indicated, these are separately measured
NATURE OF GROUND
-30-
Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Should the contractor consider that the excavation at any point are in "soft rock" or "hard rock", he must notify the Representative / Agent immediately in order that an inspection may be made and a decision arrived at by the Representative / Agent as to the category of such excavation. Should the contractor fail to give such notification, the excavation shall be deemed to be in earth and shall be valued accordingly.
EXCAVATIONS IN CONDITIONS OTHER THAN "EARTH"
The information on subterranean water is included in the soils investigation report can be viewed at the Engineer's offices.
SUBTERRANEAN WATER
Formwork and working space has been measured to the sides of concrete wall, footings & bases and no formwork or additional backfilling necessary due to over excavations will be measured to wall footings. Backfilling to such over excavations areas must be compacted to the same degree and in the same manner as the backfilling to the remainder of such excavation, only required if specified by the Engineer.
WORKING SPACE
Descriptions of carting away of excavated material shallbe deemed to include loading excavated material ontotrucks directly from the excavations or, alternatively,from stock piles situated on the building site.
CART AWAY OF EXCAVATED MATERIAL
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC
1,086m3Trenches1
Excavation in earth or compacted filling not exceeding 2m deep
-31-
Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
238m3Holes2
12m3Thickening under surface beds3
134m3Soft rock4
Extra over excavations in earth for exacavation in:
67m3Hard rock5
929m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
6
Extra over all excavations for carting away
3,201m2Sides of trench and hole excavations not exceeding 1,5mm deep
7
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
8
Keeping excavations free of water
FILLING, ETC
407m3Backfilling to trenches, holes, etc9
Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 100% Mod AASHTO density
611m3Under floors, steps, pavings, etc10
Earth filling of G5 material supplied by the contractor compacted in 150mm layers compacted to 95% Mod AASHTO density
611m3Under floors, steps, pavings, etc11
Earth filling of G7 material supplied by the contractor compacted in 150mm layers to 95% Mod AASHTO to density
-32-
Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
122m3Under floors etc12
Coarse river sand filling supplied by the contractor
4,112m2
Compaction of ground surface under floors, etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 90% Mod AASHTO density
13
Compaction of surfaces
8No"Modified AASHTO Density" test14
Prescribed density tests on filling
SOIL POISONING
4,112m2Under floors, etc including forming and poisoning shallow furrows etc and filling in furrows and ramming
15
Soil insecticide under a 10 year guarantee by firm of specialist
4,885m2To bottoms and sides of trenches, etc 16
-33-
Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Earthworks (Provisional)
Section No. 2
Bill No. 1
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
33
32
31
30Total Brought Forward from Page No.
-34-
Earthworks (Provisional)Bill No. 1MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 2
CONCRETE, FORMWORK AND REINFORCEMENT
Unless otherwise stated concrete will be Work Group 110
CPA WORK GROUP
Unless otherwise stated formwork will be Work Group 111
Unless otherwise stated reinforcement will be Work Group 114
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
-35-
Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Description of formwork shall be deemed to include use and waste only (except where described as "left in" or "permanent"), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use
FORMWORK TO BASES, PILE CAPS, ETC
The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself.
Formworks to soffits of solid etc shall be deemed to be slabs not exceeding 250mm thick unless otherwise described
Formwork to sides of bases, pile caps, etc will only be measured where it is prescribed for design reasons
Formwork necessitated by irregularity or collapse of excavated surfaces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in "Earthworks"
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
47m3Blinding under footings and bases1
15MPa/19mm Concrete in:
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
462m3Strip footings2
30MPa/19mm Concrete in:
26m3Pile caps3
-36-
Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
182m3Bases4
31m3Lift shaft bases5
12m3Thickening under floors6
REINFORCED CONCRETE
715m3Surface beds cast in panels on waterproofing7
30MPa/19mm Concrete in:
50m3Apron8
90m3Stairs including landings, beams and inverted beams9
16m3Isolated beams10
17m3Walls11
1m3Vanity slabs12
230m3Cavity infill13
3,918m3Slabs including beams and inverted beams14
6m3Retaining walls in foundations (Provisional)15
40MPa/19mm concrete in:
67m3Retaining walls16
14m3Walls in foundations (Provisional)17
135m3Walls18
21m3Columns in foundations (Provisional)19
143m3Columns20
-37-
Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
3,038No
Making and testing 150 x 150 x 150mm concrete strength test cube and submit report to the Representative / Agent (only successful tests will be paid for)
21
TEST CUBES (PROVISIONAL)
1,285No
Hoop iron anchors between concrete and brickwork (Provisional)
22
CONCRETE SUNDRIES
94No810mm Diameter pile23
Cutting off and removing excess length of precast concrete pile as necessary, including stripping back for a height not exceeding 300mm to expose reinforcement, trimming to defined level and bending reinforcement as necessary for casting into pile cap
11,314m2Surface beds, slabs, etc to falls24
Finishing top surfaces of concrete smooth with a wood float
4,235m2Surface beds, slabs, etc25
Finishing top surfaces of concrete smooth with a power float with approved concrete floor hardener added (5kg/m²) and curing with an approved curing compound at a rate not exceeding 11m²/liter and finish to a broomed non-slip surface
14NoBedding approximately 20mm thick under 200 x 200mm base plate
26
15MPa non-shrink grout
-38-
Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
MOVEMENT JOINTS, ETC
857mNot exceeding 300mm wide27
Two layers of 375 micron dampproof course in slip joints between horizontal concrete and brick surfaces including cement mortar bed
857mNot exceeding 300mm high to edges of surface beds28
Expansion joints with 10mm bitumen impregnated softboard closed cell expanded polyethylene between vertical concrete and brick surfaces
82mNot exceeding 300mm wide through columns29
Expansion joints with 10mm bitumen impregnated softboard between vertical concrete surfaces, including necessary formwork
815m5 x 10mm Saw cuts in top of concrete30
Saw cut joints
229mSurface beds not exceeding 300mmm thick31
Horizontal construction joints through concrete including thick cement slurry to one face
ROUGH FORMWORK (DEGREE OF ACCURACY II)
54m2Retaining walls in foundations32
Rough formwork to sides
289m2Retaining walls with total height not exceeding 3.5m above bearing level
33
10m2Walls in foundations (Provisional)34
467m2Inner face of shaft walls35
226m2Rectangular columns in foundations (Provisional)36
-39-
Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
289m2Retaining walls with total height not exceeding 3.5m above bearing level
37
Smooth formwork to sides
250m2Outer face of walls flush with perimeter of concrete structure
38
97m2Walls with total height not exceeding 3500mm above bearing level
39
462m2Walls with total height exceeding 3500mm and not exceeding 5000mm above bearing level
40
1,508m2
Rectangular columns with total height exceeding 3500mm and not exceeding 5000mm above bearing level
41
1,225mEdges, risers, ends and reveals not exceeding 300mm high or wide.
42
290mSloping and stepped outer edges of stairs not exceeding 300mm high extreme
43
11,523m2
Slabs propped up exceeding 3500mm and not exceeding 5000mm high above bearing level
44
Smooth formwork to soffits
15m2Slabs over shafts45
113m2Landings46
227m2Stairs with sloping soffits47
9m2Vanity slabs48
1,728m2Beams propped up exceeding 3500mm and not exceeding 5000mm high
49
Smooth formwork to sides and soffits
-40-
Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
86m2Isolated beams propped up exceeding 3500mm and not exceeding 5000mm high
50
REINFORCEMENT (PROVISIONAL)
212.62tIn Varying diameters51
Mild steel reinforcement to structural concrete work
409.59tIn Varying diameters52
High tensile steel reinforcement to structural concrete work
109m2Mesh Ref 193 fabric reinforcement in concrete surface beds, etc
53
Fabric reinforcement
4,112m2Mesh Ref 311 fabric reinforcement in concrete surface beds, etc
54
-41-
Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Concrete, Formwork and Reinforcement
Section No. 2
Bill No. 2
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
41
40
39
38
37
36
35Total Brought Forward from Page No.
-42-
Concrete, Formwork and ReinforcementBill No. 2MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 3
PRECAST CONCRETE
Unless otherwise stated all items in this bill will be WorkGroup 112
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
Blocks, sills, etc measured linear shall be made in suitable lengths. Large size setting out drawings shall be prepared where necessary and submitted to the architect for approval before moulds are made
SIZES
Where kerbstones, blocks, etc are laid in ground descriptions shall be deemed to include necessary excavation, filling in and ramming
GENERAL
-43-
Precast ConcreteBill No. 3MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
PRECAST CONCRETE
3m
450mm Wide x 510mm High benches including building into position on brick wall as Detail DT56 attached at back of these bill of quantities
1
25MPa Precast concrete left rough from the mould, including bedding, jointing and pointing and reinforcement
4No500 x 500 x 800mm high Precast concrete dustbin with 50mm diameter hole at the bottom for drainage.
2
415m750 x 240mm Concrete coping3
-44-
Precast ConcreteBill No. 3MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Precast Concrete
Section No. 2
Bill No. 3
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
44
43Total Brought Forward from Page No.
-45-
Precast ConcreteBill No. 3MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 4
MASONRY
Unless otherwise stated all items in this bill will be WorkGroup 116
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
BRICKWORK
Where sizes in descriptions are given in brick units, "one brick" shall represent the length and "half brick" the width of a brick
Sizes in descriptions
Descriptions of hollow walls shall be deemed to include leaving every fifth perpend of the bottom course of the external skin open as a weep hole.
Hollow walls etc
Walls in two skins described as "bagged and sealed" shall be deemed to include having the outer face of the inner skin bagged with 1:6 cement and sand mixture and sealed with two coats "Brixeal" bitumen emulsion waterproofing coating.
-46-
MasonryBill No. 4MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Bricks shall be ordered timeously to obtain uniformity in size and colour
Face bricks
Descriptions of recessed pointing to fair face brickwork and face brickwork shall be deemed to include square recessed, hollow recessed, weathered pointing, etc
Pointing
BLOCKWORK
Blocks are to be either solid or hollow modular dense concrete masonry units having a compressive strength of 7 MPa
Concrete masonry units
Wall ties shall be polypropylene "Permaties" complying with BS 76377. Ties for hollow walls shall be of sufficient length to allow not less than 75mm of each end to be built into the blockwork. Ties are to be spaced at intervals of not more than 1m in the horizontal direction and not more than 400mm staggered in the vertical direction except at openings, vertical joints or ends of walls where they are to be placed vertically above each other
Wall ties for blockwork
Blockwork shall comply with SABS 0145 "Concrete Masonry Construction"
Blockwork
Surfaces to be plastered shall have joints raked out to a depth of at least 10mm to provide a key. Cavities of hollow walls shall be kept free of mortar droppings or other undesirable matter. Every second perpend of the bottom course of the external skin of hollow walls shall be left open as a weep hole
-47-
MasonryBill No. 4MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Descriptions of blockwork shall be deemed to include standard complementary blocks such as corner, three-quarter, half and quarter blocks required in the construction of corners, reveals, jambs, ends, etc to solid and hollow walls and for bonding as necessary
Standard complementary blocks
Blocks shall be of approved manufacture, sound, well burnt or cured and uniform and true in size, shape and colour
DECORATIVE BLOCKS
Samples of all masonry building units, except those for walls described as "load bearing", shall consist of a minimum of 6 units. Samples of building units to be used in walls described as "load bearing" shall consist of30 units from every 30 000 units delivered to site
SAMPLES
FOUNDATIONS (PROVISIONAL)
696m2One brick walls1
Brickwork of NFX bricks (14 MPA nominal compressive strength) in class I mortar
148m2260mm Infilll brick wall2
61m2330mm brick wall3
SUPERSTRUCTURE
878m2Half brick walls4
Brickwork in NFP clay bricks (7 Mpa nominal compressive strength) in Class II mortar
6,831m2One brick walls5
2,905m2260mm Infilll brick wall6
662m2330mm brick wall7
-48-
MasonryBill No. 4MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
BRICKWORK SUNDRIES
241m220mm Fibre board built in vertically between brick skins8
Joint forming material in movement joints
2,583m75mm Wide reinforcement built in horizontally9
Brickwork reinforcement
33,217m150mm Wide reinforcement built in horizontally10
2,338.90kg6,3mm Diameter mild steel bar reinforcement cut to lengths and built into brick lintels
11
1,064m110 x 75mm Lintels in lengths not exceeding 3m12
Concrete prestressed fabricated lintels
34m110 x 75mm Lintels in lengths exceeding 3m not exceeding 5m
13
106m220 x 75mm Lintels in lengths not exceeding 3m14
2,757No30 x 1,6mm Wall tie 500mm long with one end cast into concrete and other end built into brickwork
15
Galvanised hoop iron cramps, ties, etc
330m110mm Wide turning piece to lintels etc16
Turning pieces
FACE BRICKWORK
42m2Extra over brickwork for face brickwork in foundations (Provisional)
17
Approved face bricks pointed with recessed horizontal and vertical joints (Allow PC Amount of R 4 500.00 per thousand delivered to site excluding VAT)
886m2Extra over brickwork for face brickwork18
-49-
MasonryBill No. 4MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
370m2One brick wall faced both sides19
220mBrick-on-edge header course lintel pointed on face and 110mm soffit
20
Brick-on-edge header course copings, sills, etc approved face bricks pointed with recessed joints on all exposed faces
110m
Cut face brick-on-edge external window cill, 180mm wide, set sloping and slightly projecting in cement mortar and pointed on top, front edge and projecting soffit including all necessary fair raking cutting to facings under and fair and fitted ends
21
1No
Construct a sample panel 2000mm long x 1500mm high of one brick wall in cement mortar faced and pointed on both sides in stretcher bond and with brick-on-edge coping to top including pointing to top and both sides and with and including necessary excavations for and including 15MPa/38mm mass concrete strip footing in a position as directed by the Representative/Agent and including demolishing and removal after completion of all brickwork
22
Sample panel
-50-
MasonryBill No. 4MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Masonry
Section No. 2
Bill No. 4
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
50
49
48
47
46Total Brought Forward from Page No.
-51-
MasonryBill No. 4MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 5
WATERPROOFING
Unless otherwise stated all items in this bill will be WorkGroup 120
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Waterproofing of roofs, basements, etc shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with necessary ridges, hips and valleys. Descriptions of sheet or membrane waterproofing shall be deemed to include additional labour to turn-ups and turn-downs
Waterproofing
DAMPPROOFING OF WALLS AND FLOORS
301m2In walls1
One layer approved 375 micron embossed black polyethylene damp proof course
4,112m2Under surface beds2
One layer 250 micron green polyethylene waterproof sheeting complying with SABS 952 Type C in widest practicable widths with all joints lapped and sealed with pressure sensitive tape all in strict accordance with the manufacturer's requirements
-52-
WaterproofingBill No. 5MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
WATERPROOFING TO ROOFS ETC
4,068m2On flat roofs3
4mm Abegum dual reinforced membrane, fully bonded by means of "torch fusion" with 75mm side laps and 100mm end laps
508m
Additional membrane 150mm girth at turn-ups including flashing strip 150mm girth and sealing top edge into groove with mastic
4
508mSealing edges to brickwork or concrete including trowelled mastic bead
5
34NoDressing and sealing into 150mm internal diameter outlet, including additional membrane
6
508m30 x 30mm Triangular fillet7
PROTECTIVE STONE DRESSING
233m250mm Thick on waterproofing to flat roofs8
Clean crushed stone dressing free of pyrite or other contaminants, of 20 - 25mm stone evenly spread with larger stones around outlets
PROTECTIVE ROOFING PAINT
4,117m2On waterproofing to roofs9
Two coats bituminous aluminium paint
JOINT SEALANTS, ETC
857m10 x 25mm In expansion joints in floors including raking out expansion joint filler as necessary
10
Two-part grey polysulphide sealing compound including backing cord, bond breaker, primer, etc
-53-
WaterproofingBill No. 5MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
815m5 x 10mm In saw cut joints in floors11
Polyurethane sealing compound including backing cord, bond breaker, primer, etc
229m5 x 10mm In construction joints in floors12
857m5 x 10mm In horizontal slip joints in walls13
89m5 x 10mm In vertical expansion joints, including raking out expansion joint filler as necessary
14
-54-
WaterproofingBill No. 5MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Waterproofing
Section No. 2
Bill No. 5
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
54
53
52Total Brought Forward from Page No.
-55-
WaterproofingBill No. 5MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 6
ROOF COVERINGS, ETC
Unless otherwise stated all items in this bill will be WorkGroup 124
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
Descriptions of all roof coverings are deemed to includefor all straight cutting
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
-56-
Roof Coverings, EtcBill No. 6MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
PROFILED METAL SHEETING AND ACCESSORIES
Note:
The Contractor is to submit a certificate signed by the merchant, stating that the galvanised roof covering supplied complies with the required thickness specified
____________________
0,58mm Thick Clotan Craft-Lock profile ISQ300 Z600 spelter galvanised steel roof sheeting
101m2Roof covering with pitch not exceeding 25 degrees1
-57-
Roof Coverings, EtcBill No. 6MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Roof Coverings, Etc
Section No. 2
Bill No. 6
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
57
56Total Brought Forward from Page No.
-58-
Roof Coverings, EtcBill No. 6MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 7
CARPENTRY AND JOINERY
Unless otherwise stated all items in this bill will be WorkGroup 126
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Rates for all timber shall be deemed to include for treatment against insect pests
Treatment against insect pests
All softwood for this job shall be treated to combat and prevent the spread of certain insect pests in accordance with Government Gazette Notice No R451 of 28 March 1969 and any amendments thereto. Proof of treatment shall be lodged with the Employer prior to the use of any timber in the works.
Descriptions of timber which is given linear, angles, rebates, grooves, chamfers, moulded edges, etc . are to be deemed to include for mitres, intersections, splay cut ends, stops, etc
Mitres, intersections, etc
Descriptions of timber, etc shall be deemed to include for straight cutting and notching
-59-
Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Items described as "nailed" shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete
Fixing
Items described as "plugged" shall be deemed to include for screwing to fibre, plastic or metal plugs at not exceeding 600mm centres or shall be deemed to be fixed with hardened steel nails or shot pins to brickwork or concrete.
Descriptions are to be deemed to include for nails, screws, plugs, adhesives, holes, sin- kings, pelleting, etc
Descriptions of structural timber are to be deemed to include for joints in the length, holes, splay cut ends and mitres
Structural timber
All softwood structural timber shall be of stress grade V5 or M5 in accordance with SWABS specification 563 unless otherwise stated
Descriptions of fibre cement fascias and barge boards shall be deemed to include for mitres, end junctions, screws, bolts, wall anchors, holes, etc.
Fascias, etc.
Rates for timber door frames shall be deemed to include for approved mild steel stay pegs in floors and hoop-iron clamps to walls, including holes, building in, etc
Door frames
Particle board shall comply with the following specifications:
a) SABS 1300 Particle board: exterior and flooring type
b) SABS 1301 Particle board: interior type
Particle board:
-60-
Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Descriptions of frames shall be deemed to include frames, transomes, mullions, rails, etc
Joinery:
Descriptions of hardwood joinery shall be deemed to include pelleting of bolt holes
Laminate finish shall be glued under pressure. Edge strips shall be butt jointed at junctions with adjacent similar finish
Decorative laminate finish:
EAVES, VERGES, ETC
1,500m15 x 225mm Fascias and barge boards including galvanised steel H-profile jointing strips
1
High density plain fibre-cement fascias and barge boards
SKIRTINGS
2,762m19 x 76mm Skirting with and including 19mm quarter round nailed to walls
2
Wrought Meranti
550m25 x 110mm Skirtings stepped over treads and risers of stairs including 25mm quadrant bead, nailed
3
DOORS
34No40mm Door 750 x 2100mm high (D5)4
Solid laminated flush panel door with hardboard face suitable for paint on both sides and two wrought meranti concealed vertical edge strips, hung to steel frames
5No40mm Door 900 x 2000mm high (D6)5
38No40mm Door 900 x 2100mm high (D6,D7 & D9)6
-61-
Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1No40mm Door 900 x 2125mm high (D6)7
6No40mm Double door 1800 x 2000mm high (D12)8
Fire doors are to be in accordance with SANS 1253unless specified otherwise by the Fire Engineer
Fire doors with galvanised steel sheet cladding
19No
Class B fire door 900 x 2032mm high including pressedsteel frame for one brick wall, panic bolts, handles andlocksets and preparing frame for door closer (fireescape door)
9
DUCT COVERS
160m2
15mm Duct covers in 400mm widths, fixed at 350mm centres along edges with brass dome headed screws in cup washers
10
Fibre-cement high density plain flat sheets
THE FOLLOWING FITTINGS IN BATHROOMS
15No
2 500 x 600 x 30mm thick overall Rastenburg granite vanity top with three 560 x 400mm overall holes for drop-in WHB (WHB elsewhere) at approximately 680mmcentres with all exposed edges large bevel edged, fixed to supports using dabs of 100% black silicon edhesive along all supports with all joints filled with matching polyester resin glue including three. Granite surface to be sealed using an approved stone sealer, all in accordance with manufacturer's recommendations.
11
Bathroom vanity tops
-62-
Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Carpentry and Joinery
Section No. 2
Bill No. 7
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
62
61
60
59Total Brought Forward from Page No.
-63-
Carpentry and JoineryBill No. 7MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 8
CEILINGS, PARTITIONS AND ACCESS FLOORING
Unless otherwise stated ceilings will be Work Group 129
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
All softwood to be South African Pine
TIMBER
SUSPENDED CEILINGS
11,523m2Ceilings suspended not exceeding 1m below concrete slab
1
Fissured finished gypsum ceiling tiles size 1200 x 600 x 12,5mm thick laid on and including SQ/T38 White powder coated main tees, cross tees, hold-down clips, wedges, etc with galvanised 19mm strap suspension hangers at hanger centre not exceeding 1200mm
-64-
Ceilings, Partitions and Access FlooringBill No. 8MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
44NoExtra over ceiling for 600 x 600mm opening for ventialtion/ air conditioning (provisional)
2
176NoExtra over ceiling for 600 x 1200mm opening for light fittings (provisional)
3
3,304mShadowline cornice, plugged to walls4
47 x 35mm SM25 recessed shadowline cornice
-65-
Ceilings, Partitions and Access FlooringBill No. 8MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Ceilings, Partitions and Access Flooring
Section No. 2
Bill No. 8
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
65
64Total Brought Forward from Page No.
-66-
Ceilings, Partitions and Access FlooringBill No. 8MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 9
IRONMONGERY
Unless otherwise stated all items in this bill will be WorkGroup 132
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
-67-
IronmongeryBill No. 9MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Where applicable finishes to ironmongery are indicated by suffixes in accordance with the following list :
CH Chromium platedSC Satin chromium platedPT Epoxy coatedPB Polished brassPL Polished and lacqueredBS Satin bronze and lacqueredAS Anodised silverAB Anodised bronzeAG Anodised goldABL Anodised blackGE Grey enamelledSE Silver enamelledSD Sanded
FINISHES TO IRONMONGERY
---------------------------------------
THE FOLLOWING IRONMONGERY FIXED TO DOORS, ETC.
84No75mm Three lever upright mortice lockset with satin chrome furniture
1
"YALE" or similar approved
156No
100mm Chromium plated bow handle bolted through door with the bolt ends hammered to prevent the nuts being removed
2
Handles
12NoOverhead surface mounted type door closer with aluminium casing
3
Door closers
90No38mm Rubber door stop plugged and screwed to wall or floor
4
SUNDRIES
-68-
IronmongeryBill No. 9MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1No
Approved white built-in type medicine cabinet size 380 x 610 x 100mm deep with mirror front and glass shelves and building in in tiled or plastered wall including forming recess in brickwork and making good
5
4No3mm Thick x 32mm wide plate with letters "KITCHEN"6
Clear perspex name plate reverse engraved and enamelled in lettering 25mm high to suit, twice countersunk holed for and tapscrewed to steel door frame with chromium plated dome-headed selftapping screws
28No
190 x 190 x 3mm Thick white perspex international FB2 sign plate with red fire extinguisher symbol plugged to brickwork
7
Indicator plates countersunk holed for and screwed to door or brickwork with chromium plated dome-headed screws
8No75 x 150mm Aluminium international toilet sign with MALE and/or FEMALE figure screwed to door
8
NOTE
The kitchen cupboard units shall be of steel construction with baked enamel finish of approved colour with 18mm interior particle board worktops finished on one side and on edges with 1,2mm standard grade high pressure plastic laminate of approved pattern and colour
KITCHEN CUPBOARD UNITS
Adjacent worktops of different units shall be neatly butt-jointed and finished off with matching cover strips and prices are to include for same
All doors are to be supplied with standard locks and duplicate keys and prices of units are to include for lockable doors where applicable
Prices for sink units are to include for stainless steel sinks with draining boards with single or double sinks, each complete with chromium plated flanged waste fitting, plug and chain
-69-
IronmongeryBill No. 9MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Prices for all units are to include for fixing in position to plastered walls and on floors with screed, protecting against injury and cleaning down on completion
____________________
4No
Sink unit 1350mm long with 1200 x 535mm opening for a double bowl sink (sink elsewhere), one shelf and three doors
9
Floor and sink units
VERTICAL BLINDS
3NoPurpose made blinds for window type W1, 1713 x 900mm high
10
Approved vertical blinds with natural anodised aluminium track and accessories, 127mm fabric vanes in Mexico Navy or Georgia Navy Category 3 colour with cupped chain links, weights, opening mechanism for opening outwards to both sides, ropes, etc and plugged to brickwork or concrete
87NoPurpose made blinds for window type W1, 1200 x 2400mm high
11
2NoPurpose made blinds for window type W1, 7400 x 900mm high
12
15NoPurpose made blinds for window type W2, 1713 x 1200mm high
13
1NoPurpose made blinds for window type W2, 1200 x 1500mm high
14
2NoPurpose made blinds for window type W2, 9280 x 900mm high
15
2NoPurpose made blinds for window type W3, 4750 x 900mm high
16
22NoPurpose made blinds for window type W3, 4750 x 1200mm high
17
-70-
IronmongeryBill No. 9MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
24NoPurpose made blinds for window type W4, 1500 x 2000mm high
18
2NoPurpose made blinds for window type W5, 4760 x 1500mm high
19
1NoPurpose made blinds for window type W6, 7550 x 1500mm high
20
3NoPurpose made blinds for window type W1, 600 x 1800mm high
21
16NoPurpose made blinds for window type W2, 600 x 2720mm high and 600 x 2905mm high
22
3NoPurpose made blinds for window type W3, 2530 x 600mm high
23
5NoPurpose made blinds for window type W4, 4000 x 600mm high
24
1NoPurpose made blinds for window type W5, 3640 x 600mm high
25
1NoPurpose made blinds for window type W6, 5000 x 600mm high
26
1NoPurpose made blinds for window type W7A, 7420 x 600mm high
27
2NoPurpose made blinds for window type W7B, 7420 x 600mm high
28
15NoPurpose made blinds for window type W8, 1800 x 2720mm high AND 1800 x 2905mm high
29
15NoPurpose made blinds for window type W9, 2100 x 1800mm high
30
15NoPurpose made blinds for window type W10, 5200 x 1800mm high
31
15NoPurpose made blinds for window type W11, 5700 x 1800mm high
32
-71-
IronmongeryBill No. 9MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1NoPurpose made blinds for window type W12, 3000 x 1800mm high
33
1NoPurpose made blinds for window type W13, 4690 x 1800mm high
34
1NoPurpose made blinds for window type W14, 900 x 1800mm high
35
13NoHand dryer fixed to wall as per manufacturers specifications
36
BATHROOM FITTINGS
13NoDispenser bin code 426096 fixed to wall as per manufacturer's specifications
37
33NoHerman Bischoff Toilet roll holder code HB 125 V NW 50
38
13NoFrankie SD 80 soap dispenser fixed to wall as per manufacturer's specifications
39
20No80 x 800mm long projecting standard stainless steel straight back grab rail plugged
40
20No300 x 300 x 300 x 80mm projecting standard stainless steel dog leg side grab rail plugged
41
PINNING BOARDS, WRITING BOARDS, PROJECTION SCREENS, ETC
20No1200 x 1000mm high Pinning Board, plugged42
Approved Carpet Pinning Boards with aluminium frame, pen tray, and fixing components including round plastic corners all installed as per manufacturer's recommendation
20No1500 x 1000mm high Writing Board, plugged43
Approved White Writing Boards with aluminium frame, pen tray, and fixing components including round plastic corners all installed as per manufacturer's recommendation
-72-
IronmongeryBill No. 9MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Ironmongery
Section No. 2
Bill No. 9
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
72
71
70
69
68
67Total Brought Forward from Page No.
-73-
IronmongeryBill No. 9MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 10
STRUCTURAL STEELWORK
Unless otherwise stated all items in this bill will be WorkGroup 134
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Descriptions of bolts shall be deemed to include nuts and washers
Descriptions
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete
Descriptions of L-shaped and U-shaped anchor bolts shall be deemed to include bending, threading, nuts and washers and embedding in concrete. Where anchor bolts are described as embedded in sides or soffits of concrete it shall be deemed to include holes through formwork.
STEEL COLUMNS AND BEAMS
1.28t100 x 100 x 6mm Square hollow section1
Welded columns in single lengths with flat section base, top, bearer and connection plates bolted to concrete
-74-
Structural SteelworkBill No. 10MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
2.90t100 x 100 x 6mm Square hollow section 2
Welded beams in single lengths with flat section bearer and connection plates bolted to steel columns
STEEL TRUSSES
3.27tLattice trusses 9362mm long x 1150m high extreme 3
Welded roof trusses of angle rafters, tie beams, rails, struts, braces, cleats, etc and flat bearer, gusset and connection plates, bolted to steel/concrete
PURLINS, GIRTS, BRACING, ETC
0.19t60 x 40 x 3mm Square hollow section bracings4
Purlins and girts bolted to steel
0.31t175 x 50 x 20kg/m x 2,5mm Lipped channel section purlins
5
PLATES, BOLTS, ETC
14.00No200 x 200mm Base plates to columns6
12mm thick base plates with 6 20mm holes
84.00NoM20 x 150mm Concrete anchor bolts7
Friction bolts to base plates
-75-
Structural SteelworkBill No. 10MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Structural Steelwork
Section No. 2
Bill No. 10
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
75
74Total Brought Forward from Page No.
-76-
Structural SteelworkBill No. 10MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 11
METALWORK
Unless otherwise stated all items in this bill will be WorkGroup 136
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
Descriptions of bolts shall be deemed to include nuts and washers
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete
Metalwork described as "holed for bolts" shall be deemed to include the bolts unless otherwise described
DESCRIPTIONS
---------------------------------------
-77-
MetalworkBill No. 11MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Note:
Where the balustrading meets brickwork, 18mm steel dowels must be inserted in the brickwork including grouting and welded to the balustrading for stability
STEEL HANDRAILS, BALUSTRADES, ETC
141m
Horizontal balustrading 1000mm high of 75mm circular hollow section top, middle and bottom rail with 25 circular hollow section balusters at maximum 200mm centres with each baluster welded to a 100 x 100 x 6mmthick base plate and two times holed for and including 2No expansion bolts and vertical abusters welded to top and bottom rails at 100mm centres
1
Stainless steel welded and bolted patent balustrading to concrete or steel
290m
Rakingl balustrading 1000mm high of 75mm circular hollow section top, middle and bottom rail with 25 circular hollow section balusters at maximum 200mm centres with each baluster welded to a 100 x 100 x 6mmthick base plate and two times holed for and including 2No expansion bolts and vertical abusters welded to top and bottom rails at 100mm centres
2
20NoExtra over for L-intersection of horizontal balustrades 3
20NoExtra over for L-intersection of raking balustrades4
20NoExtra over for junction of end of horizontal with end of raking balustrades
5
20NoExtra over for flat closed end6
436m75mm External diameter 3mm thick continuous pipe rails
7
132NoExtra over 75mm diameter pipe for rounded end8
66NoExtra over 75mm diameter pipe for bend to 100mm internal radius
9
-78-
MetalworkBill No. 11MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
33No
Purpose made lockable toilet roll holder formed of 100 x 3mm flat section holder 500mm girth twice bent to U-shape with internal angles slightly rounded, twice holed for and bolted to wall with and including M8 x 70mm expansion bolts; both ends of U-shaped holder once holed for and including 27,5mm (external) diameter x 2mm thick pipe roller, 275mm long, with end provided with 40mm diameter x 3mm thick flat section flange plate and other end once holed for padlock (elsewhere).
10
Mild steel sundries
PRESSED STEEL DOOR FRAMES
34NoFrame for door 750 x 2100mm high (D3)11
1, 2mm Double rebated frames suitable for half brick walls with two 100mm steel butt hinges per leaf
5NoFrame for door 900 x 2000mm high (D6)12
2NoFrame for door 900 x 2100mm high (D6 & D7)13
1NoFrame for door 900 x 2125mm high (D6)14
36NoFrame for door 900 x 2000mm high (D9)15
1,6mm Double rebated frames suitable for one brick walls with four 100mm steel butt hinges per leaf
6No
Frame for double door size 1800 x 2000 (D12)
16
NOTE
The rates for strongroom doors, wall safes and ventilators shall include for fixing in position complete
____________________
STRONGROOM, RECORD ROOM DOORS, VENTILATORS, ETC
1NoStandard DS1 record room door for wall opening 1960 x 830mm as shown on detail. (Detail No. D-W)
17
-79-
MetalworkBill No. 11MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1No
Double ended steel telescopic ventilator for wall opening size 185 x 185mm suitable for and built into 150mm thick wall, complete with face plates on both sides, drop shutter mechanism operating from fuseable metal plug, wire gauze and baffle plates
18
3No
Roll-Up Serranda Series 2800 glavanised mild steel crank operated 75 x 0,6mm thick slatted curtain roller shutter for opening 2400 x 2000mm high with standard bottom rail with overhead box, with 75mm wide guides, extruded aluminium T-bar with rubber seal, powder coated ancilliary components icnluding 4,5mm thick end plates, guide rails, etc, with centre lock, fixed to brickwork and concrete to Engineer's details and with canopy cover. (D3 & D10)
19
HOT-DIPPED GALVANISED STEEL ROLLER SHUTTER DOORS FIXED COMPLETE TO BRICKWORK
GALVANISED STEEL MINOR WORK
400m300mm high Fascias and barge boards including galvanised steel H-profile jointing strips
20
1.6mm thick powder coated sheet metal bend into profile complete with concealed fixings and drip joints
380kg50 x 50 x 5mm Angle section frames21
Welded frames to duct covers
300No10mm Expansion anchor with loose bolt22
ALUMINIUM WINDOWS, DOORS, ETC
3NoPurpose made window type W1, 1713 x 900mm high23
Charcoal powder coated window units complete with subframes, ironmongery, 4.00mm thick clear float glass with Low E coating, sealing, etc and fixing to brickwork or concrete
87NoPurpose made window type W1, 1200 x 2400mm high24
-80-
MetalworkBill No. 11MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
2NoPurpose made window type W1, 7400 x 900mm high25
15NoPurpose made window type W2, 1713 x 1200mm high26
1NoPurpose made window type W2, 1200 x 1500mm high27
2NoPurpose made window type W2, 9280 x 900mm high28
2NoPurpose made window type W3, 4750 x 900mm high29
22NoPurpose made window type W3, 4750 x 1200mm high30
24NoPurpose made window type W4, 1500 x 2000mm high31
2NoPurpose made window type W5, 4760 x 1500mm high32
1NoPurpose made window type W6, 7550 x 1500mm high33
3NoPurpose made window type W1, 600 x 1800mm high34
16NoPurpose made window type W2, 600 x 2720mm high and 600 x 2905mm high
35
3NoPurpose made window type W3, 2530 x 600mm high36
5NoPurpose made window type W4, 4000 x 600mm high37
1NoPurpose made window type W5, 3640 x 600mm high38
1NoPurpose made window type W6, 5000 x 600mm high39
1NoPurpose made window type W7A, 7420 x 600mm high40
2NoPurpose made window type W7B, 7420 x 600mm high41
15NoPurpose made window type W8, 1800 x 2720mm high AND 1800 x 2905mm high
42
15NoPurpose made window type W9, 2100 x 1800mm high43
15NoPurpose made window type W10, 5200 x 1800mm high44
15NoPurpose made window type W11, 5700 x 1800mm high45
-81-
MetalworkBill No. 11MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1NoPurpose made window type W12, 3000 x 1800mm high46
1NoPurpose made window type W13, 4690 x 1800mm high47
1NoPurpose made window type W14, 900 x 1800mm high48
10No
1425 x 2000mm Purpose made white anodised Aluminium single door with a purpose made aluminium frame and glazed panels to fit dimensions and glazed with 4mm clear glass above 2100mm and 6mm safety glass below 2100mm as shown on detail, DPS - 46260/35mm lock bracket and DPS - H28SN handles (D4)
49
Charcoal Powder coated aluminium doors including 6.00mm toughened clear float safety glass complete with subframes, ironmongery, sealing, etc and fixing to brickwork or concrete
4No
3800 x 2465mm Purpose made white anodised Aluminium stacking door with four purpose made aluminium frame and glazed panels to fit dimensions and glazed with 4mm clear glass above 2100mm and 6mm safety glass below 2100mm as shown on detail, DPS - 46260/35mm lock bracket and DPS - H28SN handles (SF01)
50
4No
900 x 2125mm Purpose made white anodised Aluminium single door with a purpose made aluminium frame and glazed panels to fit dimensions and glazed with 4mm clear glass above 2100mm and 6mm safety glass below 2100mm as shown on detail, DPS - 46260/35mm lock bracket and DPS - H28SN handles (SF02)
51
-82-
MetalworkBill No. 11MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Metalwork
Section No. 2
Bill No. 11
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
82
81
80
79
78
77Total Brought Forward from Page No.
-83-
MetalworkBill No. 11MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 12
PLASTERING
Unless otherwise stated all items in this bill will be WorkGroup 142
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
Plaster described as "on brickwork" shall be deemed to include for small portions of plaster on concrete flush with brickwork and prices should include for all the necessary preparatory work
PLASTER ON CONCRETE
---------------------------------------
SCREEDS
11,481m2 50mm Thick on floors and landings1
1:3 Cement screeds wood floated on concrete
-84-
PlasteringBill No. 12MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
264m2 50mm Thick on treads and risers of stairs2
4,068m2Average 30mm thick on roof slab to falls and currents3
GRANOLITHIC
161m230mm Thick on floors4
Untinted granolithic on concrete
141mAverage 20mm thick 100mm High skirting5
INTERNAL PLASTER
14,782m2On walls6
Cement plaster on brickwork
149m2On narrow widths7
11,637m2On ceilings8
Cement plaster on concrete
479m2On sloping soffits of stairs9
22m2In narrow widths on sloping outer edges of stairs10
EXTERNAL PLASTER
4,998m2On brick walls. 11
Cement plaster on brickwork
409m2On narrow widths12
19m2 x 30mm Flat section galvanised mild steel water bar embedded in floor finish
13
CORNER PROTECTORS, DIVIDING STRIPS, ETC.
-85-
PlasteringBill No. 12MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Plastering
Section No. 2
Bill No. 12
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
85
84Total Brought Forward from Page No.
-86-
PlasteringBill No. 12MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 13
TILING
Unless otherwise stated all items in this bill will be WorkGroup 144
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
Unless described as "fixed with adhesive to plaster (plaster elsewhere)" descriptions of tiling on brick or concrete walls, columns, etc shall be deemed to include 4:1 cement plaster backing and descriptions of tiling on concrete floors, etc shall be deemed to include 3:1 cement mortar bedding
DESCRIPTIONS
---------------------------------------
-87-
TilingBill No. 13MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
WALL TILING
787m2On walls1
200 x 300 x 10mm Limestone Serpentine Natural riven tiles, cut from 300 x 300 x 10mm Limestone Serpentine Natural riven tiles or similar approved, fixed with tile adhesive to plaster (plaster elsewhere) and flush pointed with tinted grouting compound
4m2On walls in isolated panels, splashbacks, etc.2
6m2On narrow widths3
32NoFair exposed cutting and fitting around pipe not exceeding 50mm internal diameter (Provisional)
4
33No
Fair exposed cutting and fitting around pipe exceeding 50 and not exceeding 100mm internal diameter (Provisional)
5
FLOOR TILING
11,314m2On floors and landings6
300 x 300mm Non-slip ceramic floor tiles (allow a PCAmount of R 250.00/m2 excluding VAT) fixed with an approved tile adhesive on screed (screed elsewhere) and flush pointed with tinted waterproof jointing compound
346m2On treads and risers7
-88-
TilingBill No. 13MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
VANITY SLABS
6No
20mm Thick 'Proquartz" custom design vanity slab or similar approved with 200mm high splashback, overall size 700mm long x 530mm wide x 300mm high including 2No. basin and pre-drilled holes for soap dispenser, tap, and sink waste sitting on 25 x 25mm angle section frame complete with 1No. mirror size 400 x 1000mm high set at an angle with one side fixed to 25 x 25mm natural anodised aluminium angle section (See Detail 01) and the other on splashback (See Architect's Drawings)
8
The following vanity tops have been measured as complete units, i.e. the components of the units have not been separately measured. The descriptions therefore of such units shall be deemed to include all components; cutouts for basins, splashbacks, downstands, recesses, mouldings, assembling, mild steel support brackets, rawlbolts, fixing to walls, etc., all as per Architect's detail referred to in the description
66mExternal PVC trimming to corners (Provisional)9
SUNDRIES
19mAluminium edge trim in door threshold (Provisional)10
-89-
TilingBill No. 13MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Tiling
Section No. 2
Bill No. 13
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
89
88
87Total Brought Forward from Page No.
-90-
TilingBill No. 13MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 14
PLUMBING AND DRAINAGE (PROVISIONAL)
Unless otherwise stated all items in this bill will be WorkGroup 148
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Soil, waste and vent pipes and fittings shall be solvent weld jointed
uPVC pipes and fittings:
Pipes for water supply shall be of the class stated
uPVC pressure pipes and fittings:
Pipes of 40mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings
Pipes of 50mm diameter and greater shall have sockets and spigots with push in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints
-91-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Pipes shall be hard drawn and half-hard pipes of the class stated. Class 0 (thin walled hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), class 2 (half-hard) and class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper waste, vent and anti-syphon pipes, capillary solder fittings and compression fittings shall be "Cobra Watertech" type. Capillary solder fittingsshall comply with ISO 2016. Only compression fittings shall be used in walls or in ground
Copper pipes:
Unless specifically otherwise stated, descriptions of pipes shall be deemed to include fixing to drywalls etc, building in or suspending not exceeding 1m below suspension level
Fixing of pipes
Where fittings have reducing ends or branches they are described as "reducing". In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained
Reducing fittings
Descriptions of waste unions shall be deemed to include rubber or vulcanite plugs and chains fixed to fittings
Waste unions
RAINWATER DISPOSAL
34No150mm diameter cast iron full-flow side outlet (centre bolt)
1
Rainwater outlets
-92-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
10No
Spreader 250mm long for 100mm diameter pipe with half closed ends and 20mm diameter holes at 50mm centres
2
34No280 x 163 x 213mm Deep rainwater head with outlet for 100mm diameter pipe
3
34No
100mm diameter x 500mm long galvanised mild steel overflow pipes built into brickwork and upstand beams, 250mm above slab
4
Overflow pipes
416m110mm pipes5
uPVC rain water disposal pipes cast into concrete columns
68No110mm Bends6
Extra over uPVC pipes for fittings
210m110mm Pipes7
Welded HDPe 4PN pipes cast in concrete
110m160mm Pipes8
105m200mm Pipes9
30No110mm Bend10
Extra over HDPe pipes for fittings
20No110mm Junction11
20No160mm Bend12
20No160mm Junction13
20No160mm to 110mm Reducing junction14
20No200mm Bend15
20No200mm Junction16
-93-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
20No200mm to 160mm Reducing junction17
34No56mm outlet with a flow upto 25l/s including contact sheet
18
Approved syphonic roof drainage system with negative pressure fixed complete with all necessary accessories to concrete roofs all in accordance to manufacturer's instructions
34No110mm outlet with a flow upto 100l/s including contact sheet
19
SANITARY FITTINGS
Stainless steel for basins, washtorughs, bedpan, sinks, etc shall be type 304 (18/10)
Stainless steel
4No
Double end bowl drop-on sink and drainer, size 1200 x 535mm with 32 x 7mm fascia complete with chromium plated waste, plug, and chain and fixing in top of timber cabinet (elsewhere) in antifungal silicone
20
33No
Supply and install new "Duravit D-Code" or similar approved floor mounted water closet, Pan back entry, fully glazed toilet seat white 'duroplast PP with stainless hinges model No. 2115090002 plus 0067310000, 100mm outlet, screwed with stainless steel screws to plugs in wall and bowl seated on wall. ABE dow corning 785 acetoxy slicone sealant to be used
21
Vitreus China
26NoWash hand basin size 510 x 400mm with semi concealed brackets to wall using 2 x 10mm bolts
22
33NoSupply and install new Geberit Sigma 20 flush system 115.781SN.1
23
'Geberit' or similar approved
33NoSupply and install new Geberit Duofix cisterns24
-94-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
6No
Supply and install new "Duravit Mode " Dune Oval underslung Basin with overflow Model No. 0439560051 with 45mm waste outlet fixed with brackets screwed to the underside of the vanity slab and sealed with ABE dow corning 785 acetoxy slicone sealant where basin rim meets vanity slab and APLOS 15mm Chrome plated one Tap hole basin mixer code AL-853 with vandal proof plug
25
'Duravit' or similar approved
33No"Duravit D Code" pan seat (22280900002) and cover reinforced lateral hinge (0060410000)
26
4No38mm Sink waste union27
WASTE UNIONS ETC
32No38mm Basin waste union28
TRAPS ETC
36No40mm Deep seal "P" or "S" trap29
"Marley" or similar approved
TAPS, VALVES, ETC
72No15mm Underwall pattern stopcock30
"Probrass Sondo" or similar approved
33No15mm Star bibcock31
10No
Cobra Watertech 15mm chrome plated square pattern elbow action pillar tap with aerator with blue indicator for cold water (Code: 505-21B).
32
"Sanitaryware" or similar approved
10No
Cobra Watertech 15mm chrome plated square pattern elbow action pillar tap with aerator with blue indicator for hot water (Code: 505-21B).
33
-95-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
44No
Universal 15mm single lever pillartap "C spout" with starlight chrome finnish with mosseur and flexible connection hose
34
4No"Cascade Professionl 115020" Sink mixer manufacture form from solid brass with chrome plated finish.
35
64No15mm Chromium plated angle regulating valve36
64No15 x 350mm CP flexable connector37
SANITARY PLUMBING
120m160mm Pipes 38
uPVC class 34 pipes
98m110mm Pipe on walls39
110mm uPVC SV Pipes
152m50mm Pipes40
uPVC pipes
198m110mm Pipes41
36No50mm Bend42
Extra over uPVC pipes for fittings
36No50mm Junction43
64No110 x 50mm Strap-on boss44
33No110 x 110 x 50mm Reducing double junction45
8No160mm Access reducing junction46
33No110mm Access bend47
33No110mm Access junction48
33No110mm Pan connectors49
-96-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
8No110mm Rodding eye50
8No110mm Inspection eye51
32No50mm x 45 Degree IE Bend52
48No50mm x 45 Degree Plain Bend53
8NoWire balloon grating in top of pipe not exceeding 100mmdiameter
54
Sundries
ItemTesting waste pipe system55
WATER SUPPLIES
20m15mm Pipes56
Class O copper pipes
1,170m22mm Pipes57
40No15mm Fittings58
Extra over copper pipes for fittings
650No22mm Fittings59
ItemTesting water supply pipe system60
Sundries
28No4,5kg Carbon dioxide fire extinguisher61
FIRE APPLIANCES ETC
14No
"Everyway" hose reel complete with 30m plastic hose, chromium plated stop cock, shut-off noozle and wall bracket
62
-97-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
14NoStandard steel "Fire Brand" fire extinguisher cupboard for two 4.5kg extenguishers
63
WATER SUPPLY TO FIRE APPLIANCES
84m50mm Pipes64
Galvanised steel pipes
42m50mm Pipes chased into walls65
14No50mm Bend66
Extra over for galvanised steel pipes for steel fittings
14No50mm Tee67
10No31.8mm "CNTX750" straight satin finish grab rail plugged
68
"Vaal Paragon" or similar approved
10No31.8mm "CNTX21" 90 Degree satin finish grab rail plugged
69
HOLES ETC
100NoReinforced concrete slab, beam, wall, etc70
Core drilling of hole for pipe not exceeding 100mm
100NoReinforced concrete slab, beam, wall, etc71
Core drilling of hole for pipe exceeding 100mm and not exceeding 150mm diameter
SUBSOIL DRAINAGE
10m319mm Crushed stone encasing to pipes72
Geo Pipe
-98-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
70m2
Geofabric filter blanket wrapped around 300 x 300mm stone encasing with 150mm side and 300mm end laps, including stitching
73
50m150mm Pipes laid in stone encasing (encasing elsewhere)
74
Slotted PVC-U flexible drainage pipes
5No20mm Mesh galvanised wire netting stopper in end of 150mm pipe
75
5No150mm End cap76
Extra over slotted PVC-U flexible drainage pipes for fittings
6No150mm Bend77
6No150mm Junction78
Weep Holes
20m50mm Pipes79
uPVC pipes
-99-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Plumbing and Drainage (Provisional)
Section No. 2
Bill No. 14
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
99
98
97
96
95
94
93
92
91Total Brought Forward from Page No.
-100-
Plumbing and Drainage (Provisional)Bill No. 14MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 15
GLAZING
Unless otherwise stated all items in this bill will be WorkGroup 150
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
---------------------------------------
MIRRORS
21No
6mm "GG" quality polished glass mirror 2000 x 1500mm high with polished edges fixed to wall with four 35mm round nose chromium plated mirror screws
1
Silvered float glass copper backed mirrors with polished edges holed for and fixed with chromium plated dome capped mirror screws with foam backing strip all round to plugs in walls
-101-
GlazingBill No. 15MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 2
BILL NO. 16
PAINTWORK
Unless otherwise stated all items in this bill will be WorkGroup 152
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
All materials for paintwork for which South African Bureau of Standards specifications have been published shall comply the requirements of such specifications and shall bear the standardisation mark of the South African Bureau of Standards on the container or packing. Materials for paintwork for which no SABS specifications have been published shall be of a brand and manufacture approved by the Director-General prior to its use
PAINT SPECIFICATION
-102-
PaintworkBill No. 16MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Paintwork in different colours has not been measured separately, except for colours which have a value of 7 orless on the Munsell system as described above as well as for the following:
Paintwork on mouldings and bands picked out in colours differing from the surrounding paintwork of the same material
Paintwork on walls, ceilings, etc to patterns in more than one colour are described separately as "in patterned multi-colours"
Paint in dado's has not been measured separately, neither are cutting in of edges measured. Prices shall include for cutting in of contrasting colours or paints and masking as required.
DISTINCTION FOR COLOUR
Painting of profiled surfaces are measured over the flat area, unless otherwise described
PROFILED SURFACES
Prices for painting structural steelwork are to include for corrosion protection as PW 371 clause 18.9.1 (c). See "Metalwork" for 18.9.1(a) (b) and (d)
PROTECTION AGAINST CORROSION
All damaged paint areas are to be repaired in accordance with the original specification after completion of erection
All paint to structural steelwork is to be sourced from an approved paint manufacturer and to be applied in accordance with the manufacturers specifications
All bolts are to be degreased prior to erection and painted after erection
STRUCTURAL STEELWORK
---------------------------------------
-103-
PaintworkBill No. 16MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
PAINTWORK, ETC TO NEW WORK
ON CONCRETE SURFACES
199m2On concrete walls and lift shaft1
Prepare and apply one coat solvent free epoxy polyamide sealer and three coats based epoxy polyamide paint
11,523m2On ceilings and beams2
1,173m2On columns3
ON FLOATED PLASTER
14,137m2On internal plastered walls4
Prepare, stop and apply one coat masonry primer and two coats acrylic PVA paint
5,408m2On external plastered walls5
340m2On plastered soffits of stairs6
ON METAL
227m2On pressed steel door frames7
Prepare, touch up factory primer and apply one coat universal undercoat and two full coats high gloss enamel paint
7m2On strongroom doors and frames8
50m2On structural steel 9
ON WOOD
2,762mOn backs of frames, linings, etc not exceeding 300mm wide or girth
10
Two coats wood primer
-104-
PaintworkBill No. 16MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
2,762mOn skirtings, rails, etc. not exceeding 300mm girth11
Prepare, stop and apply two full coats polyurethane clear eggshell varnish, lightly sanded down between coats
284m2On doors12
Prepare, stop and apply one coat wood primer and two coats PVA paint
-105-
PaintworkBill No. 16MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Collection R
Paintwork
Section No. 2
Bill No. 16
AmountPageNo
MAIN BUILDINGS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
105
104
103
102Total Brought Forward from Page No.
-106-
PaintworkBill No. 16MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried Forward to Summary of Section No. 2 R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
MAIN BUILDINGS
SECTION SUMMARY - MAIN BUILDINGS
BillNo
PageNo
Amount
Section No. 2
34Earthworks (Provisional)1
42Concrete, Formwork and Reinforcement2
45Precast Concrete3
51Masonry4
55Waterproofing5
58Roof Coverings, Etc6
63Carpentry and Joinery7
66Ceilings, Partitions and Access Flooring8
73Ironmongery9
76Structural Steelwork10
83Metalwork11
86Plastering12
90Tiling13
100Plumbing and Drainage (Provisional)14
101Glazing15
106Paintwork16
-107-
MAIN BUILDINGSSection No. 2
Part C2. Pricing Data
Carried to Final Summary R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 3
BILL NO. 1
EARTHWORKS (PROVISIONAL)
Unless otherwise stated all items in this bill will be WorkGroup 104
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
A soils investigation has been carried out on site by the engineer and the report can be viewed at the Engineer's offices.
SOILS INVESTIGATION REPORT
Descriptions of excavations shall be deemed to include all ground conditions classifiable as "earth" described in the above soil investigation report, and where conditions of a more difficult character are indicated, these are separately measured
NATURE OF GROUND
-108-
Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Should the contractor consider that the excavation at any point are in "soft rock" or "hard rock", he must notify the Representative / Agent immediately in order that an inspection may be made and a decision arrived at by the Representative / Agent as to the category of such excavation. Should the contractor fail to give such notification, the excavation shall be deemed to be in earth and shall be valued accordingly
EXCAVATIONS IN CONDITIONS OTHER THAN "EARTH"
The information on subterranean water is included in the soils investigation report can be viewed at the Engineer's offices.
SUBTERRANEAN WATER
Formwork and working space has been measured to the sides of concrete wall footings & bases and no formwork or additional backfilling necessary due to over excavations will be measured to wall footings. Backfilling to such over excavations areas must be compacted to the same degree and in the same manner as the backfilling to the remainder of such excavation, only required if specified by the Engineer.
WORKING SPACE
Descriptions of cart away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or from stock piles situated on the building site
CART AWAY OF EXCAVATED MATERIAL
-109-
Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
EXCAVATION, FILLING, ETC OTHER THAN BULK
EXCAVATION, ETC
1,321m3Holes1
Excavation in earth or compacted filling not exceeding 2m deep
132m3Soft rock2
Extra over excavations in earth for exacavation in:
66m3Hard rock3
1,321m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
4
Extra over all excavations for carting away
1,650m2Sides of trench and hole excavations not exceeding 1,5mm deep
5
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
6
Keeping excavations free of water
FILLING, ETC
1,502m3Under floors, steps, pavings, etc7
Earth filling of G5 material supplied by the contractor compacted in 150mm layers compacted to 95% Mod AASHTO to density
751m3
Extra over G5 imported material for stabilisation with 4% cement at a recommended rate by the engineer to archive C4 quality
8
-110-
Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
150m3Under floors etc9
Coarse river sand filling supplied by the contractor
5,006m2
Compaction of ground surface under floors, etc, including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 90% Mod AASHTO density
10
Compaction of surfaces
10No"Modified AASHTO Density" test11
Prescribed density tests on filling
SOIL POISONING
5,006m2Under floors, etc including forming and poisoning shallow furrows etc and filling in furrows and ramming
12
Soil insecticide under a 10 year guarantee by firm of specialist
2,509m2To bottoms and sides of trenches, etc 13
-111-
Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
Earthworks (Provisional)
Section No. 3
Bill No. 1
AmountPageNo
CONCRETE PARKADE
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
111
110
109
108Total Brought Forward from Page No.
-112-
Earthworks (Provisional)Bill No. 1CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 3
BILL NO. 2
CONCRETE, FORMWORK AND REINFORCEMENT
Unless otherwise stated concrete will be Work Group 110
CPA WORK GROUP
Unless otherwise stated formwork will be Work Group 111
Unless otherwise stated reinforcement will be Work Group 114
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
-113-
Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Description of formwork shall be deemed to include use and waste only (except where described as "left in" or "permanent"), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use
FORMWORK TO BASES, PILE CAPS, ETC
The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself.
Formworks to soffits of solid etc shall be deemed to be slabs not exceeding 250mm thick unless otherwise described
Formwork to sides of bases, pile caps, etc will only be measured where it is prescribed for design reasons
Formwork necessitated by irregularity or collapse of excavated surfaces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in "Earthworks"
UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
38m3Blinding under footings and bases1
15MPa/19mm Concrete in:
REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES
851m3Bases2
25MPa/19mm Concrete in:
3m3Lift shaft bases3
-114-
Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
REINFORCED CONCRETE
751m3Surface beds cast in panels on waterproofing4
25MPa/19mm Concrete in:
3,520m3Slabs including beams and inverted beams5
30MPa/19mm concrete in:
90m3Ramps including beams and inverted beams6
21m3Stairs including landings, beams and inverted beams7
74m3Isolated beams8
297m3Walls9
323m3Columns10
40MPa/19mm concrete in:
2,984No
Making and testing 150 x 150 x 150mm concrete strength test cube and submit report to the Representative / Agent (only successful tests will be paid for)
11
TEST CUBES (PROVISIONAL)
CONCRETE SUNDRIES
18,546m2Surface beds, slabs, etc12
Finishing top surfaces of concrete smooth with a power float with approved concrete floor hardener added (5kg/m²) and curing with an approved curing compound at a rate not exceeding 11m²/liter and finish to a broomed non-slip surface
345m2Sloping surface beds, slaps, ramps etc. to fall and currents.
13
-115-
Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
90NoBedding approximately 20mm thick under 200 x 200mm base plate
14
15MPa non-shrink grout
MOVEMENT JOINTS, ETC
336mNot exceeding 300mm wide15
Two layers of 375 micron dampproof course in slip joints between horizontal concrete and brick surfaces including cement mortar bed
1,001mNot exceeding 300mm high through slabs16
Expansion joints with 10mm bitumen impregnated softboard between vertical concrete surfaces, including necessary formwork
3,709m4 x 30mm Saw cuts in top of concrete17
Saw cut joints
ROUGH FORMWORK (DEGREE OF ACCURACY II)
11m2Inner face of shaft walls18
Rough formwork to sides
14m2Walls with total height exceeding 3500mm and not exceeding 5000mm above bearing level
19
SMOOTH FORMWORK (DEGREE OF ACCURACY II)
1,949m2Walls with total height not exceeding 3500mm above bearing level
20
Smooth formwork to sides
1,696m2Rectangular columns propped up not exceeding 3500mm high above bearing level
21
-116-
Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
79mSloping and stepped outer edges of stairs not exceeding 300mm high extreme
22
812mEdges, risers, ends and reveals not exceeding 300mm high or wide.
23
18No1500mm Diameter column 3500mm high24
Smooth formwork to circular and partly circular columns
13,540m2
Slabs propped up not exceeding 3500mm high above bearing level
25
Smooth formwork to soffits
345m2
Sloping slabs propped up not exceeding 3500mm high above bearing level
26
31m2Landings27
62m2Stairs with sloping soffits28
1,354m2Beams propped up exceeding 3500mm and not exceeding 5000mm high
29
Smooth formwork to sides and soffits
411m2Isolated beams propped up not exceeding 3500mm high above bearing level
30
18NoOpening not exceeding 1m girth through not exceeding 300mm slab
31
Smooth formwork to form
REINFORCEMENT (PROVISIONAL)
244.01tIn Varying diameters32
Mild steel reinforcement to structural concrete work
-117-
Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
421.79tIn Varying diameters33
High tensile steel reinforcement to structural concrete work
2,503No
12mm Diameter dowel bar 600mm long with one end embedded 300mm deep in side of concrete at butt joint and other end greased and wrapped in polythene sheeting, including hole through formwork, 10mm jointex caulking and uPVC tight fitting sleeve
34
High tensile steel dowel bars
5,006m2Mesh Ref 311 fabric reinforcement in concrete surface beds, etc
35
Fabric reinforcement
162No1500 x 80 x 46mm Sloping precast concrete parking stop block fixed with epoxy to concrete floors
36
VEHICLE CONTROL
-118-
Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
Concrete, Formwork and Reinforcement
Section No. 3
Bill No. 2
AmountPageNo
CONCRETE PARKADE
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
118
117
116
115
114
113Total Brought Forward from Page No.
-119-
Concrete, Formwork and ReinforcementBill No. 2CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 3
BILL NO. 3
WATERPROOFING
Unless otherwise stated all items in this bill will be WorkGroup 120
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Waterproofing of roofs, basements, etc shall be laid under a ten year guarantee. Waterproofing to roofs shall be laid to even falls to outlets etc with necessary ridges, hips and valleys. Descriptions of sheet or membrane waterproofing shall be deemed to include additional labour to turn-ups and turn-downs
Waterproofing
DAMPPROOFING OF WALLS AND FLOORS
5,006m2Under surface beds1
One layer 250 micron green polyethylene waterproof sheeting complying with SABS 952 Type C in widest practicable widths with all joints lapped and sealed with pressure sensitive tape all in strict accordance with the manufacturer's requirements
-120-
WaterproofingBill No. 3CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
WATERPROOFING TO ROOFS ETC
3,873m2On flat roofs2
4mm Abegum dual reinforced membrane, fully bonded by means of "torch fusion" with 75mm side laps and 100mm end laps
610m
Additional membrane 150mm girth at turn-ups including flashing strip 150mm girth and sealing top edge into groove with mastic
3
610m30 x 30mm Triangular fillet4
PROTECTIVE ROOFING PAINT
3,964m2On waterproofing to roofs5
Two coats bituminous aluminium paint
JOINT SEALANTS, ETC
3,709m3 x 30mm In saw cut joints in floors6
Two-part grey polysulphide sealing compound applied with a caulking gun, including backing cord, bond breaker, primer, etc
1,001m10 x 25mm In expansion joints in floors including raking out expansion joint filler as necessary
7
336m5 x 10mm In horizontal slip joints in walls8
-121-
WaterproofingBill No. 3CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
Waterproofing
Section No. 3
Bill No. 3
AmountPageNo
CONCRETE PARKADE
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
121
120Total Brought Forward from Page No.
-122-
WaterproofingBill No. 3CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 3
BILL NO. 4
STRUCTURAL STEELWORK
Unless otherwise stated all items in this bill will be WorkGroup 134
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Descriptions of bolts shall be deemed to include nuts and washers
Descriptions
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete
Descriptions of L-shaped and U-shaped anchor bolts shall be deemed to include bending, threading, nuts and washers and embedding in concrete. Where anchor bolts are described as embedded in sides or soffits of concrete it shall be deemed to include holes through formwork.
STEEL TRUSSES ETC
5.61t203 x 203 x 46kg/m Universal column1
Welded columns in single lengths with flat section base, top, bearer and connection plates bolted to concrete
-123-
Structural SteelBill No. 4CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
8.71t200 x 100 x 22.4kg/m IPE beam2
Welded beams in single lengths with flat section bearer and connection plates bolted to steel columns
PURLINS, GIRTS, BRACING, ETC
1.29t100 x 55 x 8.1kg/m IPE bracing3
Welded bracing etc with flat section connection plates bolted to steel
PLATES, BOLTS, ETC
0.13tHigh tensile bolts4
Bolts to trusses etc
36.00No300 x 200mm Base plates bolted to bracing5
12mm thick base plates with 6 20mm holes
90.00No200 x 200mm Base plates to columns6
360.00NoM20 x 150mm Concrete anchor bolts7
Friction bolts to base plates
-124-
Structural SteelBill No. 4CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
Structural Steel
Section No. 3
Bill No. 4
AmountPageNo
CONCRETE PARKADE
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
124
123Total Brought Forward from Page No.
-125-
Structural SteelBill No. 4CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 3
BILL NO. 5
METALWORK
Unless otherwise stated all items in this bill will be WorkGroup 136
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
Descriptions of bolts shall be deemed to include nuts and washers
Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete
Metalwork described as "holed for bolts" shall be deemed to include the bolts unless otherwise described
DESCRIPTIONS
---------------------------------------
-126-
MetalworksBill No. 5CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Note:
Where the balustrading meets brickwork, 18mm steel dowels must be inserted in the brickwork including grouting and welded to the balustrading for stability
STEEL HANDRAILS, BALUSTRADES, ETC
58m
Horizontal balustrading 1000mm high of 75mm circular hollow section top, middle and bottom rail with 25 circular hollow section balusters at maximum 200mm centres with each baluster welded to a 100 x 100 x 6mmthick base plate and two times holed for and including 2No expansion bolts and vertical abusters welded to top and bottom rails at 100mm centres
1
Stainless steel welded and bolted patent balustrading to concrete or steel
79m
Raking balustrading 1000mm high of 75mm circular hollow section top, middle and bottom rail with 25 circular hollow section balusters at maximum 200mm centres with each baluster welded to a 100 x 100 x 6mmthick base plate and two times holed for and including 2No expansion bolts and vertical abusters welded to top and bottom rails at 100mm centres
2
20NoExtra over for L-intersection of horizontal balustrades 3
20NoExtra over for L-intersection of raking balustrades4
20NoExtra over for junction of end of horizontal with end of raking balustrades
5
20NoExtra over for flat closed end6
24NoExtra over 75mm diameter pipe for rounded end7
6NoExtra over 75mm diameter pipe for bend to 100mm internal radius
8
-127-
MetalworksBill No. 5CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
Metalworks
Section No. 3
Bill No. 5
AmountPageNo
CONCRETE PARKADE
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
127
126Total Brought Forward from Page No.
-128-
MetalworksBill No. 5CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 3
BILL NO. 6
PLUMBING AND DRAINAGE (PROVISIONAL)
Unless otherwise stated all items in this bill will be WorkGroup 148
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Soil, waste and vent pipes and fittings shall be solvent weld jointed
uPVC pipes and fittings:
Pipes for water supply shall be of the class stated
uPVC pressure pipes and fittings:
Pipes of 40mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings
Pipes of 50mm diameter and greater shall have sockets and spigots with push in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints
-129-
Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Pipes shall be hard drawn and half-hard pipes of the class stated. Class 0 (thin walled hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), class 2 (half-hard) and class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper waste, vent and anti-syphon pipes, capillary solder fittings and compression fittings shall be "Cobra Watertech" type. Capillary solder fittingsshall comply with ISO 2016. Only compression fittings shall be used in walls or in ground
Copper pipes:
Unless specifically otherwise stated, descriptions of pipes shall be deemed to include fixing to drywalls etc, building in or suspending not exceeding 1m below suspension level
Fixing of pipes
Where fittings have reducing ends or branches they are described as "reducing". In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained
Reducing fittings
Descriptions of waste unions shall be deemed to include rubber or vulcanite plugs and chains fixed to fittings
Waste unions
RAINWATER DISPOSAL
18No150mm diameter cast iron full-flow side outlet (centre bolt)
1
Rainwater outlets
-130-
Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
10No
Spreader 250mm long for 100mm diameter pipe with half closed ends and 20mm diameter holes at 50mm centres
2
34No280 x 163 x 213mm Deep rainwater head with outlet for 100mm diameter pipe
3
36No
100mm diameter x 500mm long galvanised mild steel overflow pipes built into upstand beams, 250mm above slab
4
Overflow pipes
182m110mm pipes5
uPVC rain water disposal pipes cast into concrete columns
54No110mm Bends6
Extra over uPVC pipes for fittings
210m110mm Pipes7
Welded HDPe 4PN pipes cast in concrete
110m160mm Pipes8
105m200mm Pipes9
30No110mm Bend10
Extra over HDPe pipes for fittings
20No110mm Junction11
20No160mm Bend12
20No160mm Junction13
20No160mm to 110mm Reducing junction14
20No200mm Bend15
20No200mm Junction16
-131-
Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
20No200mm to 160mm Reducing junction17
34No56mm outlet with a flow upto 25l/s including contact sheet
18
Approved syphonic roof drainage system with negative pressure fixed complete with all necessary accessories to concrete roofs all in accordance to manufacturer's instructions
34No110mm outlet with a flow upto 100l/s including contact sheet
19
-132-
Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
Plumbing and Drainage (Provisional)
Section No. 3
Bill No. 6
AmountPageNo
CONCRETE PARKADE
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
132
131
130
129Total Brought Forward from Page No.
-133-
Plumbing and Drainage (Provisional)Bill No. 6CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 3
BILL NO. 7
GLAZING
Unless otherwise stated all items in this bill will be WorkGroup 150
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
---------------------------------------
GLAZING FIXED TO STRUCTURAL STEEL
182m2Panes exceeding 0,5m2 and not exceeding 2m21
6mm High penetration resistance (HPR) clear laminated safety glass
1,213m2Panes exceeding 2m2 and not exceeding 4m22
-134-
GlazingBill No. 7CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried Forward to Summary of Section No. 3 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 3
BILL NO. 8
PAINTWORK
Unless otherwise stated all items in this bill will be WorkGroup 152
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Items, materials or methods to be used specified by trade names or catalogue numbers are only an indication of the quality required. Items, materials or methods of similar quality may be used with prior written approval from the Representative / Agent
TRADE NAMES
All materials for paintwork for which South African Bureau of Standards specifications have been published shall comply the requirements of such specifications and shall bear the standardisation mark of the South African Bureau of Standards on the container or packing. Materials for paintwork for which no SABS specifications have been published shall be of a brand and manufacture approved by the Director-General prior to its use
PAINT SPECIFICATION
-135-
PaintworkBill No. 8CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Paintwork in different colours has not been measured separately, except for colours which have a value of 7 orless on the Munsell system as described above as well as for the following:
Paintwork on mouldings and bands picked out in colours differing from the surrounding paintwork of the same material
Paintwork on walls, ceilings, etc to patterns in more than one colour are described separately as "in patterned multi-colours"
Paint in dado's has not been measured separately, neither are cutting in of edges measured. Prices shall include for cutting in of contrasting colours or paints and masking as required.
DISTINCTION FOR COLOUR
Painting of profiled surfaces are measured over the flat area, unless otherwise described
PROFILED SURFACES
Prices for painting structural steelwork are to include for corrosion protection as PW 371 clause 18.9.1 (c). See "Metalwork" for 18.9.1(a) (b) and (d)
PROTECTION AGAINST CORROSION
All damaged paint areas are to be repaired in accordance with the original specification after completion of erection
All paint to structural steelwork is to be sourced from an approved paint manufacturer and to be applied in accordance with the manufacturers specifications
All bolts are to be degreased prior to erection and painted after erection
STRUCTURAL STEELWORK
---------------------------------------
-136-
PaintworkBill No. 8CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
PAINTWORK, ETC TO NEW WORK
ON CONCRETE SURFACES
2,047m2On concrete walls and lift shaft1
Prepare and apply one coat solvent free epoxy polyamide sealer and three coats based epoxy polyamide paint
14,479m2On ceilings and beams2
1,955m2On columns3
ON METAL
465m2On structural steel 4
Prepare, touch up factory primer and apply one coat universal undercoat and two full coats high gloss enamel paint
All road markings in thermoplastic.
Colour: whitePaint application rate (mm): 1.2Premix bead application rate (%): 35Initial coefficient of retro-retro reflective: 200 (minicandleas/lux/m2)
Colour: yellowPaint application rate (mm): 1.2Premix bead application rate (%): 35Initial coefficient of retro-retro reflective: 135 (minicandleas/lux/m2)
ROAD MARKINGS
5,438m100mm Wide line 5
Approved reflectorised thermoplastic road marking paint, including proper preparation of surfaces
1,241m300mm wide line6
-137-
PaintworkBill No. 8CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
190m300mm wide line painted circular7
435NoNumeral or letter 300mm high8
240NoTraffic arrow 500 x 300 mm wide extreme9
21NoStandard "STOP" sign10
27NoStandard "EXIT" sign11
24No"RM17.3" disabled person parking bay (white), suitable size for 3.5 x 5m parking bay
12
105m2Pedesrian crossing13
-138-
PaintworkBill No. 8CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Collection R
Paintwork
Section No. 3
Bill No. 8
AmountPageNo
CONCRETE PARKADE
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
138
137
136
135Total Brought Forward from Page No.
-139-
PaintworkBill No. 8CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried Forward to Summary of Section No. 3 R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
CONCRETE PARKADE
SECTION SUMMARY - CONCRETE PARKADE
BillNo
PageNo
Amount
Section No. 3
112Earthworks (Provisional)1
119Concrete, Formwork and Reinforcement2
122Waterproofing3
125Structural Steel4
128Metalworks5
133Plumbing and Drainage (Provisional)6
134Glazing7
139Paintwork8
-140-
CONCRETE PARKADESection No. 3
Part C2. Pricing Data
Carried to Final Summary R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 4
BILL NO. 1
BULK EARTHWORKS (PROVISIONAL)
Unless otherwise stated all items in this bill will be WorkGroup 104
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described
DESCRIPTIONS
REMOVAL OF EXISTING WORK
2,213m280mm Thick concrete block paving on sand bedding1
Taking out pavers setting aside for re-use and later relaying in similar new position
BULK EXCAVATION, FILLING, ETC TO FORM BUILDING PLATFORMS
3,224m3Open face excavation2
Open face excavation in earth over sloping site
161m3Soft rock3
Extra over bulk excavation in earth for excavation in
-141-
Bulk Earthworks (Provisional)Bill No. 1EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
81m3Hard rock4
3,224m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
5
Extra over all excavations for carting away
242m2To faces of bulk excavations exceeding 1.5m deep6
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
7
Keeping excavations free of water
FILLING, ETC
1,088m3Filling to form level platforms, etc 8
Earth filling of G5 material supplied by the contractor compacted in 150mm layers to 98% Mod AASHTO to density
725m3Filling to form level platforms, etc 9
Earth filling of G7 material supplied by the contractor compacted in 150mm layers to 95% Mod AASHTO to density
3No"Natural California Bearing Ratio" test10
Prescribed density tests on filling
-142-
Bulk Earthworks (Provisional)Bill No. 1EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
Bulk Earthworks (Provisional)
Section No. 4
Bill No. 1
AmountPageNo
EXTERNAL WORKS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
142
141Total Brought Forward from Page No.
-143-
Bulk Earthworks (Provisional)Bill No. 1EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 4
BILL NO. 2
ROADWORKS AND PARKING
Unless otherwise stated all items in this bill will be WorkGroup 154
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described
DESCRIPTIONS
BULK EXCAVATION, FILLING, ETC
1,335m3Open face excavation1
Open face excavation over sloping site
1,298m3Reducing levels for roads2
Excavation in earth or compacted filling not exceeding 2m deep
267m3Soft rock3
Extra over bulk excavation in earth for excavation in
-144-
Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
134m3Hard rock4
2,633m3Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor
5
Extra over all excavations for carting away
790m2To faces of bulk excavations not exceeding 1.5m deep6
Risk of collapse of excavations
ItemKeeping excavations free of all water other than subterranean water
7
Keeping excavations free of water
LAYER WORK
334m3Selected lower layer G9 gravel-soil material compacted to 93% Mod AASHTO density
8
Earth filling material supplied by the contractor under parking areas, roadways, etc compacted in 150mm layers
334m3Selected upper layer G7 gravel-soil material compacted to 93% Mod AASHTO density
9
668m3Subbase course of G5 natural gravel material, compacted to 95% Mod AASHTO density
10
668m3Base course of G1 natural gravel material, compacted to98% Mod AASHTO density
11
1,336m3
Extra over subbase and/or base course of natural gravel material for stabilisation with 4% cement at a recommended rate by the engineer to archive C4 quality
12
140m3Under parking areas13
Coarse river sand filling supplied by the contractor
-145-
Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
3,356m2
Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density
14
Compaction of surfaces
Note: The contractor is to allow in his rates for all density tests required to comply with the relevant specifications and drawings and in order to ensure that the required densities are obtained. The contractor shall only be paid under the following items for over and above the required tests as specified by the Engineer to be done by an independent laboratory.
Prescribed density tests on filling (To be only executed as directed by the engineer)
4NoModified AASHTO Density test 15
4NoRoad Indicator test 16
4NoField Density test including "Optimum Moisture Content" (four readings per test)
17
SOIL POISONING
3,356m2Under paving etc 18
Weedkiller under a 10 year guarantee by a firm of specialist
PAVING
513m2Paving of 60mm thick blocks including edge blocks, to falls
19
Paving of double zig-zag (shape S-A) interlocking precast concrete paving blocks complying with SANS 1058, with butt joints on 25mm thick river sand bed with sand swept into joints, including preparation of ground or filling
630m2Paving of 80mm thick blocks including edge blocks, to falls
20
-146-
Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
175mFair circular cutting21
2,213m2
Relaying existing 80mm thick blocks including edge blocks, to falls
22
MAKING GOOD OF EXISTING ROAD SURFACE, PAVEMENT, ETC
1,007m2Paving in patches23
Making good existing road paving
KERBING
218m
Kerb (SABS 927 fig 7) 180 x 280mm high with 500 x 150mm thick unreinforced concrete base and 150 x 150 x 300mm overall unreinforced concrete haunching at back of each joint including excavation, backfilling, etc
24
Precast concrete finished smooth on exposed surfaces including bedding, jointing and pointing
114m
Kerb (SABS 927 fig 7) 180 x 280mm high with 500 x 150mm thick unreinforced concrete base and 150 x 150 x 300mm overall unreinforced concrete haunching at back of each joint circular on plan exceeding 4m radius formed with short lengths of straight kerb including excavation, backfilling, etc
25
118m
Kerb (SABS 927 fig 3) 150 x 300mm high with 500 x 150mm reinforced concrete base and 150 x 150 x 300mm unreinforced concrete haunching at back of each joint including excavation, backfilling, etc
26
61m
Kerb (SABS 927 fig 3) 150 x 300mm high with 500 x 150mm thick unreinforced concrete base and 150 x 150 x 300mm overall unreinforced concrete haunching at back of each joint circular on plan exceeding 4m radius formed with short lengths of straight kerb including excavation, backfilling, etc
27
474mChannel (SABS 927 fig 3) 300 x 150mm high against kerb including excavation, backfilling, etc
28
-147-
Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
10m200 x 150mm Concrete edge beam29
Concrete edge beam
10mCut unit to fit edge beam30
All road markings in thermoplastic.
Colour: whitePaint application rate (mm): 1.2Premix bead application rate (%): 35Initial coefficient of retro-retro reflective: 200 (minicandleas/lux/m2)
Colour: yellowPaint application rate (mm): 1.2Premix bead application rate (%): 35Initial coefficient of retro-retro reflective: 135 (minicandleas/lux/m2)
ROAD MARKINGS
358m2Top of helipad concrete slab31
Approved reflectorised thermoplastic road marking paint, including proper preparation of surfaces
95m100mm wide32
95m150mm wide33
20m2White characters and symbols34
20m2Yellow characters and symbols35
20NoDisabled parking sign36
20NoStandard "STOP" sign37
20NoDirection arrow 1500mm long38
10No1350 x 4000mm Yield sign39
-148-
Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
50m300mm wide line painted circular40
18NoNumeral or letter 300mm high41
1NoNumeral or letter "H" 5500mm high x 3600mm wide42
11NoTraffic arrow 500 x 300 mm wide extreme43
57m2Pedesrian crossing44
ROAD SIGNS
20No610mm "STOP" sign45
Standard road sign with standard 75mm diameter x 2710mm high galvanized mild steel circular hollow section fixing post bedded into and including 550 x 800mm 25MPa concrete base, 12mm diameter x 300mm long anchor pin, excavation, backfilling, compaction, cartaway, etc
20No610mm "DISABLED" sign46
10NoStandard Yield sign47
10No900 x 779mm Pedestrian Crossing48
GABIONS AND INTERLOCKING BLOCK RETAINING STRUCTURES
1,300m2
Retaining structure with stepped face and curves as required to suit slopes, of 420 x 300 x 210mm high approved type interlocking planter blocks laid with horizontal bed joints to 26 degree slope including average 150mm thick compacted earth filling behind blocks and filling the blocks with garden soil lightly tamped as the work proceeds
49
Approved precast concrete interlocking planter blocks finished smooth on exposed surfaces
2,213m3On cleared ground50
Filling of graded crushed stone, consolidated
-149-
Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
Roadworks and Parking
Section No. 4
Bill No. 2
AmountPageNo
EXTERNAL WORKS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
149
148
147
146
145
144Total Brought Forward from Page No.
-150-
Roadworks and ParkingBill No. 2EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 4
BILL NO. 3
SEWER RETICULATION (PROVISIONAL)
Unless otherwise stated all items in this bill will be WorkGroup 146
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described
DESCRIPTIONS
SEWER PIPEWORK
30m110mm Pipes vertically or ramped to cleaning eyes etc (no excavation)
1
uPVC class 34 pipes including excavation, bedding, backfilling and compaction and disposal of surplus material
40m110mm Pipes laid in and including trenches not exceeding 1m deep
2
40m160mm Pipes laid in and including trenches not exceeding 1m deep
3
-151-
Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
40m160mm Pipes laid in and including trenches exceeding 1m and not exceeding 2m deep
4
40m160mm Pipes laid in and including trenches exceeding 2m and not exceeding 3m deep
5
30m3Soft rock6
Extra over trench and hole excavations in earth for excavation in
20m3Hard rock7
30No110mm Bend8
Extra over uPVC class 34 pipes for fittings
30No110mm Junction9
35No110mm Access bend10
35No110mm Access junction11
35No160mm to 110mm Reducing bend12
35No160mm to 110mm Reducing junction13
35No160mm to 110mm Reducer14
35No160mm Access bend15
35No160mm Access junction16
40No
110mm Gulley not exceeding 1mm deep formed of trap, vertical pipe and gulley head with loose grating, encased in 15MPa unreinforced concrete, with top of gulley 50mm above surrounding finished surfaces, top surface of concrete splayed and with 1:3 cement plaster on exposed surfaces
17
uPVC Gulley
-152-
Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
40m350 x 350mm 15MPa Unreinforced concrete encasing around 110mm vertical pipe
18
Sundries
40m350 x 350mm 15MPa Unreinforced concrete encasing around 160mm horizontal pipe
19
60No110mm uPVC cleaning eye to end of 110mm uPVC pipe20
60No
350 x 350 x 50mm Thick precast concrete inspection eye marker slab finished smooth on exposed surfaces with letters "I.O." or "I.E." on top and placed flush in ground or paving
21
ItemTesting soil drainage system22
MANHOLES
10No980mm diameter (internally) Precast concrete manhole not exceeding 1.0m deep internally
23
Precast concrete manholes with medium duty concrete manhole cover and frame, frame bedded in 1:3 cement mortar, spacers bedded in 1:6 cement mortar and precast concrete slab including excavations, backfilling, compaction, risk of collapse, cartaway surplus material, 300mm thick unreinforced 20MPa/19mm concrete base projecting 75mm wide from walls, benching, junctions, channelling, and step irons all in accordance with engineer's drawings for the following depths:
10No980mm diameter (internally) Precast concrete manhole exceeding 1.0m and not exceeding 2.0m deep internally
24
5No
1250mm diameter overall (internally) Precast concrete manhole exceeding 2.0m and not exceeding 3.0m deep internally
25
5No
1250mm diameter overall (internally) Precast concrete manhole exceeding 3.0m and not exceeding 4.0m deep internally
26
-153-
Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
5No
Cutting into side of existing manhole chamber for and connecting 160mm pipe including inserting 160mm channel junction and making good concrete benching
27
SEWER CONNECTION
-154-
Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
Sewer Reticulation (Provisional)
Section No. 4
Bill No. 3
AmountPageNo
EXTERNAL WORKS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
154
153
152
151Total Brought Forward from Page No.
-155-
Sewer Reticulation (Provisional)Bill No. 3EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 4
BILL NO. 4
WATER RETICULATION (PROVISIONAL)
Unless otherwise stated all items in this bill will be WorkGroup 146
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described
DESCRIPTIONS
WATER PIPEWORK
60m63mm Pipes laid in and including trenches not exceeding 1m deep
1
HDPe PE 100PN 12.5 pipes including excavation, bedding, backfilling and compaction and disposal of surplus material
60m110mm Pipes laid in and including trenches not exceeding 1m deep
2
60m110mm Pipes laid in and including trenches exceeding 1m and not exceeding 2m deep
3
-156-
Water Reticulation (Provisional)Bill No. 4EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
55No63mm Elbow4
Extra over HDPe pipe for fittings
55No63mm Equal Tee5
55No110mm Elbow6
55No110mm Equal Tee7
55No110mm to 63mm Reducer8
55No110mm to 100mm Reducer connection to steel pipe9
55No110 x 100mm Compression flange adapter10
70m100mm Pipes laid in and including trenches not exceeding 1m deep
11
Galvanised medium steel pressure pipes wrapped in denso including excavation, bedding, backfilling and compaction and disposal of surplus material
55No100mm Elbow12
Extra over galvanised medium steel pressures pipes for steel fittings
50m3Soft rock13
Extra over trench and hole excavations in earth for excavation in
40m3Hard rock 14
60m100mm Diameter pipes15
Galvanised medium steel pressure pipes
25No100mm Equal Tee16
Extra over galvanised medium steel pressures pipes for steel fittings
25No100mm Elbow17
-157-
Water Reticulation (Provisional)Bill No. 4EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
25No150mm to 100mm Reducing Elbow18
25No150mm Elbow19
30No63mm Brass gate valve20
Sundries
30No100mm Brass gate valve21
30No110mm Brass gate valve22
30No110mm Brass non-return valve23
25No
620 x 550mm Meter/Valve box including brick chamber below not exceeding 1m deep internally, medium weight frame and cover, excavation, backfilling, compaction and disposal of surplus material
24
25m3Unreinforced concrete in thrust blocks at bends, tees, etc including necessary extra excavation, formwork, etc
25
ItemTesting water supply pipe system26
ItemAllow for connecting to existing water supplies27
WATER CONNECTION
-158-
Water Reticulation (Provisional)Bill No. 4EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
Water Reticulation (Provisional)
Section No. 4
Bill No. 4
AmountPageNo
EXTERNAL WORKS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
158
157
156Total Brought Forward from Page No.
-159-
Water Reticulation (Provisional)Bill No. 4EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried Forward to Summary of Section No. 4 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 4
BILL NO. 5
STORMWATER RETICULATION (PROVISIONAL)
Unless otherwise stated all items in this bill will be WorkGroup 146
CPA WORK GROUP
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
The Tenderer is referred to the previous Section and theprevious and successive Bills in this Section forpreambles and full descriptions of materials and itemsdescribed in this Bill, which will apply equally to the workin this Bill unless otherwise described
DESCRIPTIONS
STORMWATER PIPEWORK
20m450mm Pipes laid in and including trenches not exceeding 1m deep
1
Class 75D concrete pipes including excavation, bedding, backfilling and compaction and disposal of surplus material
20m450mm Pipes in and including trenches exceeding 1m and not exceeding 2m deep.
2
20m
450mm Pipes laid in and including trenches exceeding 2m and not exceeding 3m deep.
3
-160-
Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
20m3Soft rock4
Extra over trench and hole excavations in earth for excavation in
10m3Hard rock5
STORMWATER V-DRAINS
560m1100 x 100mm thick channels 6
V-Drain formed of 25Mpa/19mm reinforced in-situ concrete including mesh ref 395, 250micron polyethylene sheeting, finishing top of concrete smooth with a steel trowel, excavation, filling, compaction and cartaway excess materials
GRID INLET
50No1200 x 1000mm Brick grid inlet not exceeding 1.0m deep internally
7
Grid inlet with 814 x 620mm flat-iron grid cover hinged to and including 75 x 50 x 65kg/m angle iron frame, frame anchored in and including 230 x 210mm 25MPa/19mm concrete ring beam with fishtail lugs at corners on top of one brick wall including excavations, backfilling, compaction, risk of collapse, cartaway surplus material, 200mm thick reinforced 25MPa/19mm concrete base, Ref 395 mesh, brickforce, plaster to exposed walls, benching, junctions, channelling, and step irons for the following depths:
40No1200 x 1000mm Brick grid inlet exceeding 1.0m and not exceeding 2.0m deep internally
8
-161-
Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
CATCHPIT
5No1500 x 630mm Brick catchpit not exceeding 1.0m deep internally
9
Catchpit of 100mm thick reinforced 25MPa/19mm precast concrete cover slab, 100mm thick reinforced 25MPa/19mm concrete base flush with wall, one brick wall, brickforce, plaster to exposed walls, spacer, adaptor slabs, benching, junctions, channelling, and step irons including excavations, backfilling, compaction, risk of collapse, etc all in accordance engineer's drawing for the following depths:
5No1500 x 630mm Brick catchpit exceeding 1.0m and not exceeding 2.0m deep internally
10
JUNCTION BOX
10No1200 x 1000mm overall Junction box not exceeding 1.0m deep internally
11
Junction box of 150mm thick reinforced 25MPa/19mm precast concrete cover slab, 75mm thick reinforced 25MPa/19mm concrete base flush with wall, one brick wall, brickforce, plaster to exposed walls, spacer, adaptor slabs, benching, junctions, channelling, and step irons including excavations, backfilling, compaction, risk of collapse, etc all in accordance to engineer's drawing for the following depths:
10No1200 x 1000mm overall Junction box exceeding 1.0m and not exceeding 2.0m deep internally
12
-162-
Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
MANHOLES
10No1100 x 1100mm Brick manhole not exceeding 1.0m deep internally
13
Manhole with medium duty concrete manhole cover and frame, constructed of 150mm thick reinforced 25MPa/19mm precast concrete cover slab, 75mm thick reinforced 25MPa/19mm concrete base flush with wall, one brick wall, brickforce, plaster to exposed walls, spacer, adaptor slabs, benching, junctions, channelling, and step irons including excavations, backfilling, compaction, risk of collapse, etc all in accordance to engineer's drawing for the following depths:
10No1100 x 1100mm Brick manhole exceeding 1.0m and not exceeding 2.0m deep internally
14
5No
Cutting into side of existing inspection chamber for and connecting 450mm pipe including inserting 450mm channel junction and making good concrete benching
15
STORMWATER CONNECTION
-163-
Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Collection R
Stormwater Reticulation (Provisional)
Section No. 4
Bill No. 5
AmountPageNo
EXTERNAL WORKS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
163
162
161
160Total Brought Forward from Page No.
-164-
Stormwater Reticulation (Provisional)Bill No. 5EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried Forward to Summary of Section No. 4 R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
EXTERNAL WORKS
SECTION SUMMARY - EXTERNAL WORKS
BillNo
PageNo
Amount
Section No. 4
143Bulk Earthworks (Provisional)1
150Roadworks and Parking2
155Sewer Reticulation (Provisional) 3
159Water Reticulation (Provisional) 4
164Stormwater Reticulation (Provisional)5
-165-
EXTERNAL WORKSSection No. 4
Part C2. Pricing Data
Carried to Final Summary R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 5
BILL NO. 1
PROVISIONAL SUMS
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUPPLEMENTARY PREAMBLES
Work listed under the heading "DIRECTCONTRACTORS WORK" will commence during theexecution of this contract and the contractor shall allowfree access to the site for these direct contractors. Thecontractor shall prepare a programme in conjunctionwith these direct contractors in order to complete thework successfully. The direct contractors will beregarded as nominated sub-contractors but payment willnot be made to them via the contractor. The estimatedvalues of these contracts are listed to enable thecontractor to determine profit and attendances, ifrequired
Work executed by direct contractors
Unless otherwise described, all prime cost amounts andprovisional sums exclude the cash discount of 5% andinclude for delivery to site of all articles concerned. Allprime cost amounts and provisional sums are net andinclude for delivery to site of all articles concerned.
General
The contractor is referred to the Preliminaries for furtheramplification of "Prime Cost Amounts and ProvisionalSums"
Preliminaries
-166-
Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
NOMINATED/SELECTED SUB-CONTRACT
12,600,000.00Item
Provide an amount of R 12,600,000.00 (Twelve Million Six Hundred Thousand Rand) nett for Piling Installation to be omitted in part or whole as instructed by Principal Agent
1
Piling Installation
ItemAdd for profit upon above, if required.2
ItemAttend upon the above, if required.3
7,000,000.00Item
Provide an amount of R 7,000,000.00 (Seven Million Rand) nett for ICT Infrastructure Installation to be omitted in part or whole as instructed by Principal Agent
4
ICT Infrastructure Installation
ItemAdd for profit upon above, if required.5
ItemAttend upon the above, if required.6
250,000.00Item
Provide an amount of R 250,000.00 (Two Hundred and Fifty Thousand Rand) nett for Specialised Fire Protection and Air Conditioning for the Main Server Room to be omitted in part or whole as instructed by Principal Agent
7
Specialised Fire Protection and Air Conditioning for the Main Server Room
ItemAdd for profit upon above, if required.8
ItemAttend upon the above, if required.9
16,720,000.00Item
Provide an amount of R 16,720,000,00 (Sixteen Million, Seven Hundred and Twenty Thousand Rand) nett for Glazed Curtain Wall Installation to be installed by a specialist as instructed by the Principal Agent
10
Glazed Curtain Wall Installation
ItemAdd for profit upon above, if required.11
-167-
Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
ItemAttend upon the above, if required.12
5,000,000.00Item
Provide an amount of R 5,000,000,00 (Five Million Rand) nett for Façade Steelwork Installation to be installed by a specialist as instructed by the Principal Agent
13
Façade Steelwork
ItemAdd for profit upon above, if required.14
ItemAttend upon the above, if required.15
4,000,000.00Item
Provide an amount of R 4,000,000.00 (Four Million Rand) nett for Landscaping to be used whole or in part as instructed by Principal Agent
16
Landscaping
ItemAdd for profit upon above, if required.17
ItemAttend upon the above, if required.18
1,800,000.00Item
Provide an amount of R 1,800,000.00 (One Million Eight Hundred Thousand Rand) nett for Concrete Boundary Wall Installation to be used whole or in part as instructedby Principal Agent
19
Concrete Boundary Wall
ItemAdd for profit upon above, if required.20
ItemAttend upon the above, if required.21
900,000.00Item
Provide an amount of R 900,000.00 (Nine Hundred Thousand Rand) nett for Building Signage Installation to be used whole or in part as instructed by Principal Agent
22
Building Signage
ItemAdd for profit upon above, if required.23
ItemAttend upon the above, if required.24
-168-
Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
300,000.00Item
Provide an amount of R 300,000.00 (Three Hundred Thousand Rand) nett for Directional Signage Installation to be used whole or in part as instructed by Principal Agent
25
Directional Signage
ItemAdd for profit upon above, if required.26
ItemAttend upon the above, if required.27
2,600,000.00Item
Provide an amount of R 2 600 000.00 (Two Million Six Hundred Thousand Rand) nett for Fire Sprinkler System Installation to be omitted in part or whole as instructed by Principal Agent
28
Fire Sprinkler System Installation (Parkade)
ItemAdd for profit upon above, if required.29
ItemAttend upon the above, if required.30
192,000.00Item
Provide an amount of R 192,000.00 (One Hundred and Ninety-Two Thousand Rand) nett for Community Liason Officer to be omitted in part or whole as instructed by Principal Agent
31
Community Liason Officer
ItemAdd for profit upon above, if required.32
ItemAttend upon the above, if required.33
Note: This allowance is for skills development of students who are taking courses within the Built Environment field.
Skills Development for Built Environment Students
4,000,000.00Item
Allow an amount of R 4,000,000.00 (Four Million Rand) nett for Skills Development to be used whole or in part as instructed by Principal Agent
34
ItemAdd for profit upon above, if required.35
-169-
Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
ItemAttend upon the above, if required.36
The following budgetary allowances are for work to be executed by the contractor and will be measured and valued at rates in these bill of quantities.
BUDGETARY ALLOWANCES
28,000,000.00Item
Provide the sum of R 28,000,000.00 (Twenty-Eight Million Rand) nett for Constructing Building 7 to be used as directed by the Principal Agent or deducted in whole or in part.
37
Construction of Building 7 (Approx. 1684m2) as per Architect's Design
1,500,000.00Item
Provide the sum of R 1,500,000.00 (One Million Five Hundred Thousand Rand) nett for Constructing Refuse Yards to be used as directed by the Principal Agent or deducted in whole or in part.
38
Construction of Refuse Yards as per Architect's Design
600,000.00Item
Provide the sum of R 600,000.00 (Six Hundred Thousand Rand) nett for Enclosing Mini-subs to be used as directed by the Principal Agent or deducted in whole or in part.
39
Enclosing Mini-subs as per Architect's Design
400,000.00Item
Provide the sum of R 400,000.00 (Four Hundred Thousand Rand) nett for Completing Existing Guard Houses to be used as directed by the Principal Agent or deducted in whole or in part.
40
Completing existing Guard Houses
500,000.00Item
Provide the sum of R 500,000.00 (Five Hundred Thousand Rand) for sundry builder's work to make good work after work done by direct contractors, executed complete to be used as directed by the Principal Agent or deducted in whole or in part.
41
General Builders Work in Association With Direct Contractors
-170-
Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5
Part C2. Pricing Data
Carried to Collection R
Provisional Sums
Section No. 5
Bill No. 1
AmountPageNo
PROVISIONAL SUMS
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
170
169
168
167
166Total Brought Forward from Page No.
-171-
Provisional SumsBill No. 1PROVISIONAL SUMSSection No. 5
Part C2. Pricing Data
Carried to Final Summary R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 6
BILL NO. 1
MAIN SUPPLY
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
Installation to be done according to SANS 10142 and SANS 10400
SUPPLEMENTARY PREAMBLES
SUM
Supply and install new 800kVA, DYN11, 11000/400 Volt mini-substations including construction of . The new mini-substations to be supplied complete with ring main units, concrete plinth and low voltage panels as indicated in the drawing
1
MAIN SUPPLY
SUM50kW solar panel system complete with batteries and inverters for the parkade and fence
2
1No630A MV Checking Metering Unit to be installed in substation
3
1No63A, 6kA SABS Approved Circuit Breaker4
1No150A, 6kA SABS Approved Circuit Breaker5
1No200A, 10kA SABS Approved Circuit Breaker6
2No250A, 6kA SABS Approved Circuit Breaker7
1No500A, 16kA SABS Approved Circuit Breaker8
1No800A, 25kA SABS Approved Circuit Breaker9
-172-
Main SupplyBill No. 1ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Note: All Cables Rate Shall Include Cables Terminations and Joints
CABLES
2,000mSupply and install 70mm2 x 3c XLPE + cables installed in existing sleeve
10
2,000mProvision for 70mm2 earth wire11
100m16mm2 4-core XPLE cu cable + 10 BECW12
1,200m95mm2 4-core XPLE cu cable + 50 BECW13
1,300m185mm2 4-core XPLE cu cable + 95 BECW14
400m35mm2 4-core PVC insulated cu cable + 16mm² BCEW15
800m95mm2 4-core PVC insulated cu cable + 50mm² BCEW16
1,152m3Excavation17
TRENCHING
720m3Imported materials (river sand)18
504m3Soilcrete19
504m3Backfilling20
7No600x600x1000mm concrete manhole21
SLEEVES
5,200m50mmØ 22
High-density polyethylene (HDPE) flexible sleeve piping laid in trench (trench and backfilling measured elsewhere) Including Joints and 5x90 Degree long radius bends for high-density polyethylene (HDPE) Flexible Sleeve Piping
4,500m110mmØ 23
-173-
Main SupplyBill No. 1ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
5,500m160mmØ 24
-174-
Main SupplyBill No. 1ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
Main Supply
Section No. 6
Bill No. 1
AmountPageNo
ELECTRICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
174
173
172Total Brought Forward from Page No.
-175-
Main SupplyBill No. 1ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 6
BILL NO. 2
LOW VOLTAGE SUPPLY
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
Distribution Boards should be installed according to SANS 10142 and SANS 10400
SUPPLEMENTARY PREAMBLES
Supply and installation of a weatherproof pre-manufactured low voltage distribution board, complete with sheet metal tray, frames, sub-frames, busbars, legend card, circuit breakers, fuses, relay, volt-meter, ammeter, transformer, earth leakage unit, timer, switch, etc.
3NoBottom entry flash mounted distribution board1
Main Distribution Board
2NoBottom entry free standing distribution board2
16No100A, 10kA SABS Approved Circuit breaker3
1No200A, 10kA SABS Approved Circuit Breaker4
2No250A, 10kA SABS Approved Circuit Breaker5
2No300A, 16kA SABS Approved Circuit breaker for UPS6
5No500A, 16kA SABS Approved Circuit Breaker7
1No600A, 16kA SABS Approved Circuit Breaker8
-176-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1No800A, 16kA SABS Approved Circuit Breaker9
2No250A, Automatic Change Over switch to feed Generator10
1No800A, Automatic Change Over switch to feed Generator11
5No500A, Automatic Change Over switch to feed Generator12
1No600A, Automatic Change Over switch to feed Generator13
5No160A, 10kA, 3Pole SABS Approved Circuit Breaker14
6No200A, 10kA, 3Pole SABS Approved Circuit Breaker15
2No300A, 10kA, 3Pole SABS Approved Circuit Breaker for HVAC
16
1No40A, 6kA, 3Pole SABS Approved Circuit Breaker for Lift17
4No80A, 6kA, 3Pole SABS Approved Circuit Breaker for Lift18
1No100A, 6kA, 3Pole SABS Approved Circuit Breaker for low ground
19
1No160A, 6kA, 3Pole SABS Approved Circuit Breaker for low ground
20
2No10A, 6kA, 1Pole SABS Approved for Timer switch21
28No10A, 6kA, 1Pole SABS Approved Circuit Breaker22
30No20A, 6kA, 1Pole SABS Approved Circuit Breaker23
8No63A, 6kA, 3Pole SABS Earth Leakage24
3No100A 3phase Metering Unit25
4No160A 3phase Metering Unit26
3No200A 3phase Metering Unit27
5No500A 3phase Metering Unit28
1No600A 3phase Metering Unit29
-177-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1No800A 3phase Metering Unit30
10No63A, 6kA, SABS Approved Bus Bar31
1No200A, 30kA SABS Approved Bus Bar32
2No250A, 30kA SABS Approved Bus Bar33
1No500A, 30kA SABS Approved Bus Bar34
1No800A, 30kA SABS Approved Bus Bar35
10No40KA, 3Pole SABS Approved Surge Arrestor36
1No200A, 3Pole SABS Approved Meter Unit37
6No250A, 3Pole SABS Approved Meter Unit38
40NoDB Blanks39
5NoDB Lable Booklets40
5NoDB Conversion Clips41
5NoClip in Neutral Bar42
4NoBottom entry free standing distribution kiosk43
Distribution Board for ground floor
4No200A, 10kA, 3Pole SABS Approved Circuit Breaker44
6No80A, 6kA, 3Pole SABS Approved Circuit Breaker45
6No80A, 6kA, 3Pole SABS Approved Smart Metering unit46
1No160A, 10kA, 3Pole SABS Approved Circuit Breaker47
2No100A, 10kA, 3Pole SABS Approved Circuit Breaker48
15No40A, 6kA, 3Pole SABS Approved Circuit Breaker49
65No20A, 6kA, 1Pole SABS Approved Circuit Breaker50
-178-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
46No10A, 6kA, 3Pole SABS Approved Circuit Breaker51
20No63A, 6kA, 3Pole SABS Approved Earth Leakage52
8No100A, 6kA, 3Pole SABS Approved Bus Bar53
8No200A, 6kA, 3Pole SABS Approved Bus Bar54
4No160A, 6kA, 3Pole SABS Approved Bus Bar55
14No63A, 6kA, SABS Approved Bus Bar56
25No40KA, 3Pole SABS Approved Surge Arrestor57
60NoDB Blanks58
20NoDB Lable Booklets59
20NoDB Conversion Clips60
20NoClip in Neutral Bar61
1NoBottom entry free standing distribution kiosk62
4No63A, 6kA, SABS Approved Bus Bar63
5NoSurface mounted distribution board64
Distribution Board for lift
4No80A, 6kA, 3Pole SABS Approved Circuit Breaker65
1No40A, 6kA, 3Pole SABS Approved Circuit Breaker66
20No32A, 6kA, 3Pole SABS Approved Circuit Breaker67
15No20A, 6kA, 1Pole SABS Approved Circuit Breaker68
10No10A, 6kA, 3Pole SABS Approved Circuit Breaker69
5No63A, 6kA, 3Pole SABS Approved Earth Leakage70
5No80A, 6kA, 3Pole SABS Approved Bus Bar71
-179-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
5No63A, 6kA, SABS Approved Bus Bar72
5No40KA, 3Pole SABS Approved Surge Arrestor73
10NoDB Blanks74
5NoDB Lable Booklets75
5NoDB Conversion Clips76
20NoClip in Neutral Bar77
2NoBottom entry free standing distribution kiosk78
Distribution Board for First Floor
4No200A, 10kA, 3Pole SABS Approved Circuit Breaker79
4No80A, 6kA, 3Pole SABS Approved Circuit Breaker80
12No80A, 6kA, 3Pole SABS Approved Smart Metering unit81
10No20A, 6kA, 1Pole SABS Approved Circuit Breaker82
10No10A, 6kA, 3Pole SABS Approved Circuit Breaker83
8No63A, 6kA, 3Pole SABS Approved Earth Leakage84
8No200A, 6kA, 3Pole SABS Approved Bus Bar85
8No63A, 6kA, SABS Approved Bus Bar86
12No40KA, 3Pole SABS Approved Surge Arrestor87
3NoSurface mounted distribution board88
3No160A, 10kA, 3Pole SABS Approved Circuit Breaker89
6No100A, 10kA, 3Pole SABS Approved Circuit Breaker90
27No32A, 6kA, 3Pole SABS Approved Circuit Breaker91
36No20A, 6kA, 1Pole SABS Approved Circuit Breaker92
-180-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
27No10A, 6kA, 1Pole SABS Approved for Timer switch93
54No10A, 6kA, 3Pole SABS Approved Circuit Breaker94
27No63A, 6kA, 3Pole SABS Approved Earth Leakage95
27No63A, 6kA, 3Pole SABS Approved Bus Bar96
3No160A, 10kA, 3Pole SABS Approved Bus Bar97
6No100A, 10kA, 3Pole SABS Approved Bus Bar98
9No40KA, 3Pole SABS Approved Surge Arrestor99
60NoDB Blanks100
17NoDB Lable Booklets101
17NoDB Conversion Clips102
44NoClip in Neutral Bar103
2NoBottom entry free standing distribution kiosk104
Distribution Board for Second Floor
4No200A, 10kA, 3Pole SABS Approved Circuit Breaker105
4No80A, 6kA, 3Pole SABS Approved Circuit Breaker106
4No80A, 6kA, 3Pole SABS Approved Smart Metering unit107
10No20A, 6kA, 1Pole SABS Approved Circuit Breaker108
10No10A, 6kA, 3Pole SABS Approved Circuit Breaker109
8No63A, 6kA, 3Pole SABS Approved Earth Leakage110
8No200A, 6kA, 3Pole SABS Approved Bus Bar111
8No63A, 6kA, SABS Approved Bus Bar112
12No40KA, 3Pole SABS Approved Surge Arrestor113
-181-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
2NoSurface mounted distribution board114
6No160A, 10kA, 3Pole SABS Approved Circuit Breaker115
18No32A, 6kA, 3Pole SABS Approved Circuit Breaker116
24No20A, 6kA, 1Pole SABS Approved Circuit Breaker117
18No10A, 6kA, 1Pole SABS Approved for Timer switch118
36No10A, 6kA, 3Pole SABS Approved Circuit Breaker119
18No63A, 6kA, 3Pole SABS Approved Earth Leakage120
18No63A, 6kA, 3Pole SABS Approved Bus Bar121
6No160A, 10kA, 3Pole SABS Approved Bus Bar122
6No40KA, 3Pole SABS Approved Surge Arrestor123
48NoDB Blanks124
14NoDB Lable Booklets125
14NoDB Conversion Clips126
32NoClip in Neutral Bar127
30NoFlush Mounted distribution kiosk128
Distribution Boards for tenants
32No80A, 6kA, 3Pole SABS Approved Circuit Breaker129
160No20A, 6kA, 1Pole SABS Approved Circuit Breaker130
160No10A, 6kA, 3Pole SABS Approved Circuit Breaker131
128No63A, 6kA, 3Pole SABS Approved Earth Leakage132
32No80A, 6kA, 3Pole SABS Approved Bus Bar133
128No63A, 6kA, SABS Approved Bus Bar134
-182-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
32No20KA, 3Pole SABS Approved Surge Arrestor135
128NoDB Blanks136
32NoDB Lable Booklets137
32NoDB Conversion Clips138
32NoClip in Neutral Bar139
2NoBottom entry flash mounted distribution board140
Distribution Boards to Guard House
2No63A, 6kA SABS Approved Circuit Breaker141
4No20A, 6kA, 1Pole SABS Approved Circuit Breaker142
4No10A, 6kA, 1Pole SABS Approved Circuit Breaker143
2No63A, 6kA, 3Pole SABS Earth Leakage144
2No63A 3phase Metering Unit145
2No63A, 6kA SABS Approved Bus Bar146
4No20KA, 3Pole SABS Approved Surge Arrestor147
16NoDB Blanks148
2NoDB Lable Booklets149
2NoDB Conversion Clips150
2NoClip in Neutral Bar151
SUMSupply and install Maximum smart meter Kiosk No1 with 1250A main breaker and 1250/5 CT as per drawing
152
Main External Kiosk
SUMSupply and install Maximum smart meter Kiosk No1 with 1000A main breaker and 1000/5 CT as per drawing
153
-183-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SUMSupply and install Maximum smart meter Kiosk No4 with 200A main Breaker and 200/5 CT as per drawing
154
SUMSupply and install Maximum smart meter Sub-kiosk No1 with 150A main Breaker for the pump house
155
-184-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
Low Voltage Supply
Section No. 6
Bill No. 2
AmountPageNo
ELECTRICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
184
183
182
181
180
179
178
177
176Total Brought Forward from Page No.
-185-
Low Voltage SupplyBill No. 2ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 6
BILL NO. 3
SOCKET OUTLET AND ISOLATORS
Socket Outlet and Light Switch should be installed according to SANS 10142 and SANS 10400
PREAMBLES
Supply, installation and commission of low voltage socket outlets and Isolators
816No16A Single Three-pin flash mounted metal socket outlet1
Socket Outlet
168No16A Single Three-pin socket outlet mounted in power skirting
2
284No16A Double Three-pin switched flash mounted socket outlet
3
26No32A Industrial Plugs4
900NoRJ45 Telephone Outlet on Powerskirting 5
206No20A Single Pole Isolator6
Isolators
20No20A Double Pole Isolator7
40No32A Three Pole Isolator8
-186-
Socket OutletBill No. 3ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 6
BILL NO. 4
LIGHTING
Lighting should be installed and wired in according to SANS 10142 and SANS 10400
PREAMBLES
Supply, installation and commission of energy saving lights and light switches with 5Amps plugs
261No34W LED Downlight complete with 6A plug1
Lighting
1,233No35W 600x1200 LED Panel silimar or equal to Beka 2
149No65W LED Vapourline light fitting3
4NoLEDdisk-Maxi 128LED/70W OPTIC 2304
18NoRegent Beam ceiling mini-color Charcoal5
28NoLED Regent F105Q (Beam Double) Silver6
68No64 LED/216W Optic 7
16No
One 36W Linear fittings (suspended or surface mounted), 4000K, fitted with Opal diffuser, 3600 lumens, 100lm/watt, 3 yr warranty similar or equal to Genesis
8
1,936NoNeon Flex Mushroom mould injection connectors with cable length 5m /per set F27FSECX / F27FBEC5X
9
Façade Lights
-187-
LightingBill No. 4ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
646No
Vossloh-Schwabe IP67 150W LED Constant voltage Driver LEDRIVERIP67150
10
2,036NoAluminum mounting clips for flush and mushroom head, width 11mm, length 1m F11AMC
11
8No80A 3p 6kA circuit breaker to be installed in each minsub
12
External Lights
16NoFree standing distribution kiosk with 60A 3p 6kA main breaker with at least 5x20A 1p circuit breaker
13
1,400No16mm2 4-core PVC SWA insulated cu cable + 10mm² BCEW
14
86No
A 8W LED in ground up-lighter with a round stainless steel trim. Remote driver should be installed in a remote mounted waterproof box
15
2,900m
High-density polyethylene (HDPE) flexible 50mmØsleeve piping laid in trench including Joints and 15x90Degree long radius bends for high-density polyethylene(HDPE) Flexible Sleeve Piping
16
80No
One LED Pole Top, Round Area Light, 50W, 6905 lumens, 138 lm/watt, CCT 3000k, Heavy duty die cast aluminium, UV stabilised polyester powder coating, 3 yr warranty similar or equal to Genesis
17
80No
Supply and install Bekaway or similar approved TC-Tel 57W LED light mounted on 5m mounting height galvanised pole for perimeter light
18
35No9W landscape light mounted on 1m high galvanised pole equal or similar to Beka Citrine
19
47No2x4 Single Lever Flash Mounted Switch One Way20
Light Switches
47No2x4 Two Lever Flash Mounted Switch One Way21
-188-
LightingBill No. 4ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
47No2x4 Three Lever Flash Mounted Switch One Way22
22NoUtrasonic sensor switch gor light set @30min23
15No10A Photo cell24
22No10A Timer Switch25
-189-
LightingBill No. 4ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
Lighting
Section No. 6
Bill No. 4
AmountPageNo
ELECTRICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
189
188
187Total Brought Forward from Page No.
-190-
LightingBill No. 4ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 6
BILL NO. 5
LIGHTNING PROTECTION
Allow for complete earthing and lightning protection of the building, including bonding of the reinforcing steel and steel columns. Total cost for the provision of lightning points for the building as indicated on the layout drawings and specific drawings including testing and issuance of certificates thereof. Contractors shall allow for the installation and testing to be performed by approved specialists such as HHK.
PREAMBLES
SUMSoil Resistivity Tests1
General Soil Resistivity Tests for the Buildings
SUM
Complete earth test measurements and provide certificate of compliance for completed lightning protection installation
2
General Testing and Certification for The Buildings
SUMMarked up as Built drawings of lightning protection installation
3
SUM
Total cost for design, supply, install and commission of lightning protection for the buildings based on structural construction drawings including bare cooper earth wire plant earth ring, Earth Spike Complete with Terminations Clamps,Bolts,etc. Bonding Terminations and Connections Between Concrete reinforcing and Trench EarthAluminium Air Conductor Complete with Conductor Guide, Connections to Roof Materials and Connections to trench Earth .
4
Building
-191-
Lightning ProtectionBill No. 5ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SUMTest and Commissioning of lightning protection5
Test and Commissioning
-192-
Lightning ProtectionBill No. 5ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
Lightning Protection
Section No. 6
Bill No. 5
AmountPageNo
ELECTRICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
192
191Total Brought Forward from Page No.
-193-
Lightning ProtectionBill No. 5ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 6
BILL NO. 6
The rates for cable trays shall include for hangers, splices, jointing, drilling; Conduit includes all bends, tee-pieces, joints, locknuts, etc.
WIRING AND CONDUITS
27,700m2.5mm² Bare Copper Earth Wire1
Cabling
27,700m2.5mm2 PVC SWA Cable2
16,460m4mm² Bare Copper Earth Wire3
16,460m4mm2 PVC SWA Cable4
13,100m6mm² Bare Copper Earth Wire5
13,100m6mm2 PVC SWA Cable6
1,000m50mm2 3core PVC SWA Cable7
400m35mm2 4-core PVC insulated cu cable + 16mm² BCEW8
800m70mm2 4-core PVC insulated cu cable + 35mm² BCEW9
1,500m95mm2 4-core PVC insulated cu cable + 50mm² BCEW10
500m150mm2 4-core PVC insulated cu cable + 95mm² BCEW
11
6.0Sets2.5mm2 3Core PVC SWA Cable + 2.5mm² Bare Copper Earth Wire
12
Cable Terminations
-194-
Wiring and ConduitsBill No. 6ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
6.0Sets4mm2 3Core PVC SWA Cable + 4mm² Bare Copper Earth Wire
13
6.0Sets6mm2 3Core PVC SWA Cable + 6mm² Bare Copper Earth Wire
14
5.0Sets25mm2 4-core PVC insulated cu cable + 16mm² BCEW15
1.0Sets35mm2 4-core PVC insulated cu cable + 16mm² BCEW16
4.0Sets35mm2 4-core PVC insulated cu cable + 25mm² BCEW17
2.0Sets50mm2 4-core PVC insulated cu cable + 25mm² BCEW18
1.0Sets70mm2 4-core PVC insulated cu cable + 35mm² BCEW19
3.0Sets95mm2 4-core PVC insulated cu cable + 50mm² BCEW20
3.0Sets120mm2 4-core PVC insulated cu cable + 70mm² BCEW
21
6.0Sets2.5mm2 3Core PVC SWA Cable + 2.5mm² Bare Copper Earth Wire
22
Cable Joints
6.0Sets4mm2 3Core PVC SWA Cable + 4mm² Bare Copper Earth Wire
23
6.0Sets6mm2 3Core PVC SWA Cable + 6mm² Bare Copper Earth Wire
24
1.0Sets35mm2 4-core PVC insulated cu cable + 25mm² BCEW25
5.0Sets25mm2 4-core PVC insulated cu cable + 16mm² BCEW26
2.0Sets35mm2 4-core PVC insulated cu cable + 16mm² BCEW27
1.0Sets35mm2 4-core PVC insulated cu cable + 25mm² BCEW28
3.0Sets50mm2 4-core PVC insulated cu cable + 25mm² BCEW29
3.0Sets95mm2 4-core PVC insulated cu cable + 50mm² BCEW30
-195-
Wiring and ConduitsBill No. 6ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
5.0Sets120mm2 4-core PVC insulated cu cable + 70mm² BCEW
31
5.0Sets120mm2 4-core PVC insulated cu cable + 70mm² BCEW
32
14,100m20mm PVC Conduit Pipe33
Conduits and Accessories
20.0Sets20mm PVC Couplings34
40.0Sets20mm Steel Couplings35
4,300mTwo Compartment P9000 Galvanised Trunking ( Grey)36
Power Skirting and Cable Tray
4,300mSingle Compartment P2000 Galvanised power skirting for comms.
37
300m300mm Heavy Duty Cable Tray38
-196-
Wiring and ConduitsBill No. 6ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
Wiring and Conduits
Section No. 6
Bill No. 6
AmountPageNo
ELECTRICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
196
195
194Total Brought Forward from Page No.
-197-
Wiring and ConduitsBill No. 6ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 6
BILL NO. 7
BACK UP SUPPLY
2No300kVA Volvo Penta TAD1341GE 3Phase Prime Power Silent with Weatherproof Canopy
1
Generators
2No800kVA Volvo Penta TAD1341GE 3Phase Prime Power Silent with Weatherproof Canopy
2
1No
50 kVA Base c/w int batt cab Three phase in single phase out double conversion UPS Equal to Gama Centric or Similar Approved
3
UPS
2No
100 kVA Base c/w int batt cab Three phase in single phase out double conversion UPS Equal to Gama Centric or Similar Approved
4
2No
300 kVA Base c/w int batt cab Three phase in single phase out double conversion UPS Equal to Gama Centric or Similar Approved
5
SUMTest and Commissioning of back up supply6
Test and Commissioning
-198-
Back Up SupplyBill No. 7ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried Forward to Summary of Section No. 6 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 6
BILL NO. 8
BMS
CCTV
49No
NVH-5231 - 2MP Fixed Vandal Proof Dome camera H.265(IMX290+Hi3516D) with IntelliVision Standard VCA (Intelligent Motion / Intrusion / Tampering), 1/2.8" CMOS 2MP@30fps, Quad streaming, D/N(ICR), True WDR, 2D/3DNR, Smart codec with dynamic ROI (Hi-Stream), 3.7mm Lens, 24IR LEDs, Alarm In/Out(1/1), Audio In/Out (1/1), 12VDC/PoE
1
CAMERAS
40No
NUH-64J1 - 4MP MVF IR Bullet camera H.265 (OV4689+Hi3516A) with IntelliVision Professional VCA (Intelligent Motion / Intrusion / Tampering / Line Detector (Counting) / Loitering / Human Detect), 1/3" CMOS 4MP@30fps, Quad streaming, D/N(ICR), True WDR, 2D/3DNR, Smart Focus (P-Iris), Smart codec with dynamic ROI (Hi-Stream), Motorized VariFocal 2.8-12mm Lens, 34IR LEDs, Alarm In/Out(1/1), Audio In/Out (1/1), 12VDC/PoE
2
20No5m high galvanised pole for external cameras3
3,600mCAT-6 UTP multi strand cable (Supplied, Installed and Commisioned).
4
WIRING
1,300No
Making off cable, CAT-6 (RJ-45 + boot) (Supplied, Installed and Commissioned)
5
-199-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
7No
HNR-6400S H.265/264 NVR (server type) 64CH NON POE VERSION Network Video Recorder, H.265 @ 4K Realtime, 2U 19” Server Rack Mountable, 8 SATA Internal HDD, iSCSI Support, Intelligent Multi-Stream management, Management, Various Recording Profiling and Advanced Event Search (Thumbnail/Area/Panoramic), Scheduled backup into HAS-08IE/HAS-16I (iSCSI storage), Emergency Video upload into Cloud Service (RCS, Google Drive, Dropbox)
6
VIDEO RECORDING SYSTEM
5No
2TB 3.5" surveillance HDD, SATA 6Gb/s, 128MB Cache, 4096 Bytes/ sector, Maximum Data Transfer Rate 180MB/s, 3-year Limited Warranty NOTE: Hard Drives to be installedas follows: 1. HNR-6400S (8 units), 2. HNR-6400S (8 units), 3. HVM-80600S (8 Units)
7
2No
6TB 3.5" surveillance HDD, SATA 6Gb/s, 128MB Cache, 4096 Bytes/ sector, Maximum Data Transfer Rate 180MB/s, 3-year Limited Warranty NOTE: Hard Drives to be installed as follows: 1. HNR-6400S (8 units), 2. HNR-6400S (8 units), 3. HVM-80600S (8 Units)
8
16No24" LED Monitor (Upto Full HD Resolution), HDMI Input, 5 Year Warranty
9
MONITORS
4No42" LED Monitor (Upto 4K Resolution), DisplayPort and HDMI input, 5 Year Warranty
10
5No
Dual Display - T5500/Xeon X5650 2.66GHz-6C-12Mb/12GB DDR3/1 x 500GB SATA/DVDRW/2.5GB Quadro 5000/Win7Pro64Bit/3 Year NBD. 12 HD IMAGES OVER DUAL DISPLAY with 2 x 21.5in - U2212HM LED Widescreen Ultrasharp 1920x1080 DVDI-D . Operating system included. Complete with all accessories (Supplied, Installed and Commissioned).
11
COMPUTERS
-200-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
5No
Titanium 2.0 Central Monitoring Software (CMS) IP License-free for Windows OS/ Mac iOS: Remotely monitor Hitron IP cameras or similar approved, NVRs, AHD DVRS, Hybrid DVRs, Compression/ storage devices, etc. Up to 64CH Live view, Playback, Event management Realtime. E-Map Support with event pop-up, Multi-screen layout supports up to 4 monitors with 4K UHD (PC Graphics card required), Instantaneous recording, Playback modes: Calendar & Time Search, Event Search, Export of footage. Includes Titanium Mobile Recommended Hardware Specifications for Operator PC: Intel Core i7-9700 (12MB Cache, up to 4.6GHZ), 8GB - 16GB DDR3 RAM, Minimum 256GB M.2 PCIe x4 SSD (Solid State Drive) , 500GB SATA Hard Drive, DVD-RW, 500 Watt PSU, Gigabit Ethernet RJ45, PCI Express 3.0 compliant with x16 PCI slot, Windows 10 Professional 64 bit, USB Keyboard & Mouse Recommended Graphics card for Four Screen Display: Geforce GPU, 6GB GDDR5 (192-bit), Supportsup to 4 monitor outputs, Max resolution (7680 x 4320 @ 60Hz), 6-pin PCIE power input, PCI Express 3.0 16x Bus Interface, 3 x DisplayPort, 1 x HDMI, 1 x DVI-D, 3 Year warranty
12
SOFTWARE, CONFIGURATION, TRAINING, MAINTENANCE AND MANUALS
SUM Integration and Configuration of the C.C.T.V. System13
SUM
Terminations, Connectors & Labels for all the above mentioned hardware (Supplied, Installed, Tested and Commissioned).
14
SPARES AND LABELLING
SUMSYNTELL ANPR Control Room Server, including 16 lane ANPR Engine
15
ONCE OFF FIXED COST
SUMProject Management and on site end user training16
CONFIGURATION, TRAINING, MAINTENANCE AND MANUAL
-201-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
ACCESS CONTROL
54No
Smart Controler +: Connects up to 4 TBS Biometric devices (RS-485), PSU included, 4 relays, 8 I/O lines, Network ready LAN 10/100Mbps (RJ45), 4 USB 2.0, Embedded Linux OS, Indoor Wallmount (Din-rail incl.)
17
CONTROLL
2No150*180 tunnel size Dual View X-Ray Scanners for Baggage with all accessories and mounting equipment
18
6No3m Boom gate with control motors with card reader and remote control
19
8No
2D + Terminal Heavy Duty Indoor/ Outdoor (Surface-mount), Multispectral sensor, Built-in RFID Reader (Mifare, Classic or Desfire), 5" Touchscreen, pre-configured for Access Control & T/A, Vandal Resistant, IP65 Rated, Liveness detection, Template on Card, User-template capacity 10 000, Transaction storage-capacticy 100 000, PSU including adaptor and clamps, LAN adaptor with RJ45 Plug, RS232 / RS 485, Wiegand, 2 Relay Output
20
BIOMETRIC READERS
24No
2D+ MSP Terminal-Indoor (Surface-mount), Mifare RFIDBuilt-in, Multispectral Sensor, Liveness Detection (Anti-spoofing), for highest accuracy in high-risk/ harsh environments, Access Control and T & A, Vandal resistant, 10 000 Template capacity, 100 000 Transaction capacity, RS232 / RS 485, Wiegand, Relay Output, POE injector with extrernal splitter, LAN Adaptor with RJ45 Plug, Surface-mount adaptor plate.
21
24No
2D+ MSP Terminal-Outdoor (Flush-mount), Mifare RFID Built-in, Multispectral Sensor, Liveness Detection (Anti-spoofing), for highest accuracy in high-risk/ harsh environments, Access Control and T & A, Vandal resistant, 10 000 Template capacity, 100 000 Transaction capacity, RS232 / RS 485, Wiegand, Relay Output, POE injector with extrernal splitter, LAN Adaptor with RJ45 Plug, Surface-mount adaptor plate.
22
-202-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
8No
2D Station-Indoor (wall mount), Mifare RFID Built-in, Access Control and T & A, Vandal resistant, 5 000 Template capacity, 100 000 Transaction capacity, RS232 / RS 485, Wiegand, Relay Output, POE injector with extrernal splitter, LAN Adaptor with RJ45 Plug, Surface-mount
23
28No
Magnetic Lock 300kg Standard Surface Mount Magnetic Lock complete with all brackets and other accessories (Supplied, Installed and Commissioned).
24
MAGNETIC AND ELECTRO-MECHANICAL LOCKS
28No
BREAK GLASS TYPE 1 – ACCESS CONTROL : GREEN over-ride unit (No backbox) (Supplied, Installed and Commissioned).
25
BREAK GLASS UNIT
4NoBREAK GLASS LENSES TYPE 2 – RESETABLE PLASTIC (Supplied, Installed and Commissioned)
26
20NoBREAK GLASS COVERS (Supplied, Installed and Commissioned)
27
10NoBREAKGLASS COVER SEALS (1 pack of four seals) (Supplied, Installed and Commissioned).
28
39No
Door Position Switch Type 1 - Flush Mount complete with all accessories (Supplied, Installed and Commissioned).
29
DOOR POSITION SWITCHES
2,400mMylar cable 0.22mm2 x 8 core(Supplied, Installed and Commissioned).
30
WIRING AND CONNECTORS
2,400mCAT-6 UTP - multi-strand cable (Supplied, Installed and Commissioned)
31
2,400m1.5mm² x 2 core PVC/PVC Cabtyre fire retardant multi strand cable (Supplied, Installed and Commissioned).
32
-203-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1,200NoRJ-45 connectors complete with boot (Supplied, Installed and Commissioned).
33
2NoRead-Only MiFare DesFIRE EV1 Proximity Cards including a card holder and lanyard
34
CARD AND PRINTERS
3NoDye Sublimation card printer (Supplied and Properly Stored).
35
3NoDye Sublimation printer ribbons (Supplied and Properly Stored).
36
1No1.2 X 1.2 m White Backboard for Photos (Supplied, Installed and Commissioned).
37
1No3 MegaPixel Web-Camera with backlight compensation for Photos (Supplied, Installed and Commissioned).
38
1NoSoftware and Card Template Setup for the Client (Supplied, Installed and Commissioned).
39
1No
2D Enrol: Touch-based USB Enrollment device, quality assessment and duplicate verification, captures user fingerprints for Access Control, Time Attendance, civil/ criminal applications
40
COMPUTER AND ENROLLEMENT STATION
1NoRFID Enrollment (including RFID writer)41
2NoCOMPUTER – Front Desk & Card Production Stations. Supplied and installed complete with all accessories.
42
1No
COMPUTER – Control Room Workstation complete with all accessories (Supplied, Installed and Commissioned)
43
SUMBio Admin Rights Manager-Unlimited Zones & Schedules
44
SOFTWARE, CONFIGURATION, TRAINING, MAINTENANCE AND MANUALS
-204-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SUMWeb Based/ Remote Enrolment45
SUMUser Actions & Template Management46
SUMVideo Integration
SUMSystem Configuration47
SUMTraining of the CLIENTS staff48
SUM3 X Full Sets of Operating and Maintenance Manuals for the entire integrated system
49
SUM
Maintenance for the Entire Integrated Security System for the first 12-months of maintenance coinciding with the guarantee / warranty period. TBS CAR
50
6No8 PORT 1000BASE-SX SWITCH as per as general specification (Supplied, Installed and Commissioned).
51
NETWORK EQUIPMENT
6No12 PORT 1000BASE-SX SWITCH as per as general specification (Supplied, Installed and Commissioned).
52
6No
24 PORT 10/100 PoE ETHERNET SWITCH WITH 2 GBIC PORTS as per general specification (Supplied, Installed and Commissioned)
53
1No
Astrophysics XIS100XD 180KV X-Ray machine - Large Tunnel Baggage & Parcel X-Ray Inspection System for DELIVERY AREA
54
METAL DETECTORS & X-RAY MACHINES
1No1000mm Entry Roller Bed55
1No1000mm Exit Roller Bed56
1NoAstrophysics XIS6040 160KV X-Ray machine for RECEPTION AREA
57
1No500mm Entry Roller Bed58
1No500mm Exit Roller Bed59
-205-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1NoAstrophysics WT2000 Multi-Zone Walk Through M/D60
8No47U 19" Rack including all fixing materials (Supplied, Installed and Commissioned).
61
SPLICE BOXES, PATCH PANELS, RACKS AND SPLICES
8No12U 19" Rack including all fixing materials (Supplied, Installed and Commissioned).
62
85No
S-4: Surface mount magnetic contact with tamper switch; length – 58,5 mm, width – 16,5 mm, 15,3 mm, optional pad of 3,3 mm, magnet of dimensions: length – 58,5 mm, width – 14,8 mm and height – 8,3 mm (white)
63
ALARM SYSTEM
6NoB-4M: Gate magnetic contact Medium (in metal casing)64
30NoCobalt Plus: Digital Dual Technology motion detector (microwave anti-masking, BRACKET A included
65
6NoSPW-210 R: Indoor siren, PC-LEXAN case (red)66
18No
INT-SF-SSW: Partition keypad for INTEGRA - White backlighting of keypad, with flap (white backlighting of keypad and display; silver front, silver frame, white back
67
18NoINTEGRA 64 control panel - main board, EN50131 norm GRADE 3 compliant
68
18NoETHM-1 PLUS: TCP/IP communication module for INTEGRA and VERSA control panels (without cable
69
18No
OPU-4P: Plastic box for control panels, expansion modules and GSM modules, dimensions 266 x 286 x 100 mm, (without transformer)
70
18NoTR 60 VA: Transformer 230 V/20 AC, 60 VA for OPU-3 P and OPU-4 P
71
18NoINT-E: Zone expansion module for INTEGRA, VERSA and PERFECTA – 8 zones, tamper
72
-206-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
18No
OPAL GY SET Outdoor dual technology motion detector Grey hermetic enclosure (IP-54), approach area detection (angle bracket and ball-joint bracket included)
73
21NoIntegrum Pro 20: Pack of 20 licences (per license)74
6No42" LED Monitor (Upto 4K Resolution), DisplayPort and HDMI input, 5 Year Warranty
75
6No24" LED Monitor (Upto Full HD Resolution), HDMI Input, 5 Year Warranty
76
6No
Recommended Hardware Specifications for Operator PC: Intel Core i7-9700 (12MB Cache, up to 4.6GHZ), 8GB - 16GB DDR3 RAM, Minimum 256GB M.2 PCIe x4 SSD (Solid State Drive) , 500GB SATA Hard Drive, DVD-RW, 500 Watt PSU, Gigabit Ethernet RJ45, PCI Express 3.0 compliant with x16 PCI slot, Windows 10 Professional 64 bit, USB Keyboard & Mouse Recommended Graphics card for Four Screen Display: Geforce GPU, 6GB GDDR5 (192-bit), Supports up to 4 monitor outputs, Max resolution (7680 x 4320 @ 60Hz), 6-pin PCIE power input, PCI Express 3.0 16x Bus Interface, 3 x DisplayPort, 1 x HDMI, 1 x DVI-D, 3 Year warranty
77
9No
SP-4001R: Outdoor siren with optical (ultra bright LEDs) and acoustical signalling (piezo) – plastic PC LEXAN case, metal shield (red)
78
9NoB-4L: Gate magnetic contact large (in metal cashing)79
2,900mMylar cable 0.22mm2 x 8 core(Supplied, Installed and Commissioned).
80
WIRING AND CONNECTIONS
2,900mCAT-6 UTP - multi-strand cable (Supplied, Installed and Commissioned)
81
2,900m1,5mm² x 2core PVC/PVC Cabtyre fire retardant multi strand cable ( supplied, installed and commissioned)
82
1,400NoRJ-45 connectors complete with boot (Supplied, Installed and Commissioned).
83
-207-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
4,000mSingle mode fiber optic cable with all connectors and accessories
84
4No
Control Room Operators Desk as per the detail drawing inclusive of all fixing materials, brackets and all other accessories required to make this installation complete (Supplied, Installed, Tested and Commissioned).
85
CONTROL ROOM
4No
Control Room Operators Orthopaedic Chair for 12 hour shifts inclusive of all other accessories required to make this installation complete (Supplied, Installed, Tested and Commision
86
5No
Raised Access Floor as per the GENERAL SPECIFICATION inclusive of all brackets and fixing materials and all other accessories to make the installation complete (Supplied, Installed, Tested and Commissioned). {Please note that the contractor should allow for a self levelling epoxy coating on the floor prior to installing the raised access floor}
87
1No
Smalls: Connectors, cable ties, drill bits, grinding disks, consumables and other material necessary to complete the installation as intended.
88
SUMTesting and commissioning of the building management system
89
TESTING AND COMMISIONING
-208-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Collection R
BMS
Section No. 6
Bill No. 8
AmountPageNo
ELECTRICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
208
207
206
205
204
203
202
201
200
199Total Brought Forward from Page No.
-209-
BMSBill No. 8ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried Forward to Summary of Section No. 6 R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
ELECTRICAL INSTALLATION
SECTION SUMMARY - ELECTRICAL INSTALLATION
BillNo
PageNo
Amount
Section No. 6
175Main Supply1
185Low Voltage Supply2
186Socket Outlet3
190Lighting 4
193Lightning Protection5
197Wiring and Conduits6
198Back Up Supply7
209BMS8
-210-
ELECTRICAL INSTALLATIONSection No. 6
Part C2. Pricing Data
Carried to Final Summary R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 7
BILL NO. 1
HVAC INSTALLATION
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
Supply, delivery, installation, commissioning and 12 months maintenance of the following HVAC equipment as shown on the tender drawings.
SUPPLEMENTARY PREAMBLES
LOWER GROUND FLOOR
INDOOR UNITS
1NoHeat Reclaim Fresh Air Unit, flow rate 1000m3/h1
AIR CONDITIONING UNIT:
1NoHeat Reclaim Fresh Air Unit, flow rate 1500m3/h2
2NoInstallation of heat reclaim fresh air unit3
5NoVRV Ceiling cassette units , rated cooling 9kw4
5NoInstallation of VRV Ceiling Cassette5
2NoBranch box: 4 branches6
A/C UNITS ACCESSORIES
4NoRemote Controller7
-211-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
75mPIPE ɸ 9.528
COPPER PIPING COMPLETE WITH ARMAFLEX OR FRK INSULATION WITH ALL ACCESSORIES
75mPIPE ɸ 15.99
40mPVC Drain PIPE ɸ 3210
65mExtra over pipe fittings11
45m200 Dia 12
SUPPLY AIR DUCTING (CIRCULAR DUCTING_INTERNAL INSULATION)
45mØ20013
FLEXI DUCTING
32mØ20014
SUPPLY AIR DUCTING
32mØ25015
32mØ30016
32mØ35017
2NoØ350 to Ø300 , concentric duct taper18
TRANSFORMATION PIECE
1NoØ300 to Ø250, concentric duct taper19
1NoØ200 to Ø250, concentric duct taper20
20No90 Degree, round duct long radius, elbow. Ø20021
10No90 Degree, round duct long radius, elbow. Ø25022
12No90 Degree, round duct long radius, elbow. Ø30023
12No90 Degree, round duct long radius, elbow. Ø35024
-212-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
2NoReturn air Grillie, 200 Dia connect size, and flow rate :208 l/s
25
DIFFUSERS
2NoReturn air Grillie, 200 Dia connect size, and flow rate :278 l/s
26
3Nodia 20027
STOP END
3Nodia 35028
24NoØ20029
SPIGOT
2No600 x 400 mm, All Weather Return Air Grille30
RETURN AIR PLENUM BOX
5NoØ20031
BALANCING DAMPERS
1No
VRV Heat Recovery type: Total Capacity of 22.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
32
VRV OUTDOOR UNITS
1NoInstallation 33
1No
VRV Heat Recovery type: Total Capacity of 28 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
34
1NoInstallation 35
-213-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect
TOILETS
AIR EXTRACTION
1No124l/s @115Pa, Extract Air Fan c/w filters and accessories
36
Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.
5NoAir disc valve, neck size dia 200, Flow rate 35l/s37
2No400 x 400 Door grille 38
1NoInstallation 39
FIRE DAMPER
5NoFire Damper 200 dia 40
Galvanised steel, 120 minute damper
8NoFire Damper 350 dia41
GROUND FLOOR
INDOOR UNITS
3NoHeat reclaim fresh air Unit, flow rate 1500 m3/h42
AIR CONDITIONING UNIT:
3NoInstallation of heat reclaim fresh air unit43
9NoVRV ceiling cassette units , rated cooling 7.1kw44
-214-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
10NoInstallation of VRV ceiling cassette units45
4NoCeiling Ducted Hide Away Unit, HAU-GF-1; 22.4 kW Cooling capacity.
46
4NoInstallation47
1NoVRV Ceiling Ducted Hide Away Unit; 22.4 kW Cooling capacity
48
1NoInstallation 49
2NoWall mounted unit: 2.8 kW Cooling capacity including outdoor units
50
1NoInstallation 51
2NoWall mounted unit; 5.2 kW Cooling capacity including outdoor units
52
1NoInstallation 53
1NoCeiling cassette units , rated cooling 2.8kw. Including outdoor unit.
54
SECURITY ROOM
1NoInstallation 55
3NoBranch box: 4 branches56
A/C UNITS ACCESSORIES
16NoRemote Controller57
212mPIPE ɸ 9.5258
COPPER PIPING COMPLETE WITH ARMAFLEX OR FRK INSULATION WITH ALL ACCESSORIES
187mPIPE ɸ 15.959
77mPVC Drain PIPE ɸ 3260
-215-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
50mPVC PIPE ɸ 15.961
25mPVC PIPE ɸ 15.1062
112mExtra over pipe fittings63
165mØ200 64
SUPPLY AIR DUCTING (CIRCULAR DUCTING_INTERNAL INSULATION)
30mØ300 65
30mØ350 66
30mØ450 67
24m300 x 400mm68
SUPPLY AIR DUCTING (SQUARE DUCTING_INTERNAL INSULATION)
24m400 x 400mm69
165mØ20070
FLEXI DUCTING
50mØ20071
SUPPLY AIR DUCTING
40mØ25072
50mØ30073
50mØ35074
10mØ40075
7NoHAU to ø 350 mm76
TRANSFORMATION PIECE
8NoØ450 to Ø35077
-216-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
10NoØ350 to Ø30078
2NoØ300 to Ø25079
2NoØ350 to Ø300 , concentric duct taper80
1NoØ300 to Ø250, concentric duct taper81
1NoØ200 to Ø250, concentric duct taper82
4No90 Degree, round duct long radius, elbow. Ø20083
4No90 Degree, round duct long radius, elbow. Ø25084
3No90 Degree, round duct long radius, elbow. Ø30085
3No90 Degree, round duct long radius, elbow. Ø35086
8NoSquare Diffuser, 200 Dia connect size, and flow rate :81 l/s
87
DIFFUSERS
24NoSquare Diffuser, 200 Dia connect size, and flow rate :100 l/s
88
2NoReturn air Grillie, 200 Dia connect size, and flow rate :208 l/s
89
2NoReturn air Grillie, 200 Dia connect size, and flow rate :278 l/s
90
3NoØ20091
STOP END
2NoØ25092
5NoØ30093
3NoØ35094
-217-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
56NoØ20095
SPIGOT
2No600 x 400 mm, All Weather Return Air Grille96
RETURN AIR PLENUM BOX
6No1200 x 600 mm Return air grille and box97
37NoØ20098
BALANCING DAMPERS
16NoØ200 BD99
1lotElectrical Works Associated with the above installations100
ELECTRICAL WORKS
SECURITY ROOM
1No4 way blow cassette, 2.8 kW Cooling capacity .101
VRV CASSETTE TYPE INDOOR UNIT
1NoInstallation 102
1NoRemote Controller103
1lotAC Accessories104
1NoCassette Ceiling Unit 5.6 kW Cooling capacity .105
VRV CASSETTE TYPE INDOOR UNIT - CEILING MOUNTED
1NoRemote Controller106
1NoInstallation107
-218-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
44mPIPE ɸ 9.52108
COPPER PIPING COMPLETE WITH ARMAFLEX Complete with Armaflex or FRK Insulation with all Accessories
44mPIPE ɸ 15.9109
44mPVC Drain PIPE ɸ 32110
44mExtra over pipe fittings111
1lotElectrical Works Associated with the above installations112
ELECTRICAL WORKS
1NoBranch box: 6 branches113
BRANCH BOX
2NoBranch box: 8 branches114
2No
VRV Heat Recovery type: Total Capacity of 22.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
115
VRV OUTDOOR UNITS
2NoInstallation 116
2No
VRV Heat Recovery type: Total Capacity of 28 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
117
2NoInstallation 118
2No
VRV Heat Recovery type: Total Capacity of 50 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
119
2NoInstallation 120
-219-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect
TOILETS
13NoAnodized grade aluminium, 400 x 400 Door grille121
AIR TERMINALS
14No35 l/s , Ø150 Disc valve122
AIR EXTRACTION FAN
2No280l/s @115Pa, Extract Air Fan c/w filters and accessories
123
Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.
16NoAir disc valve, neck size dia 200, Flow rate 35l/s124
6No400 x 400 Door grille 125
2NoInstallation 126
2No105 l/s @ 75 E.S.P (EAF -01)127
2No175.7 l/s @ 115 E.S.P (EAF -01)128
1No150 x 150 - 35-40l/s @ 50Pa E.S.P (EF-01)129
Wall Fan, C/W outdoor louvre sized to suite fan, all required accessories to ensure a fully functional installation and suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.
-220-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
FIRST FLOOR
INDOOR UNITS
2NoHeat Reclaim Fresh Air Unit, flow rate 2000m3/hr130
AIR CONDITIONING UNIT:
2NoInstallation of heat reclaim fresh air unit131
10NoVRV Ceiling cassette units, rated cooling 11.2kw132
10NoInstallation of VRV Ceiling Cassette133
6NoCeiling Ducted Hide Away Unit, HAU-GF-1; 22.4 kW Cooling capacity.
134
6NoInstallation135
1NoVRV Ceiling Ducted Hide Away Unit; 9.0 kW Cooling capacity
136
1NoInstallation137
1NoVRV Ceiling Ducted Hide Away Unit; 11.2 kW Cooling capacity
138
1NoInstallation 139
2NoBranch box: 6 branches140
A/C UNITS ACCESSORIES
12NoRemote Controller141
225mPIPE ɸ 9.52142
COPPER PIPING COMPLETE WITH ARMAFLEX OR FRK INSULATION WITH ALL ACCESSORIES
225mPIPE ɸ 15.9143
90mPVC Drain PIPE ɸ 32144
-221-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
50mPVC PIPE ɸ 15.9145
120mExtra over pipe fittings146
165mØ200 147
SUPPLY AIR DUCTING (CIRCULAR DUCTING_INTERNAL INSULATION)
30mØ300 148
30mØ350 149
30mØ450 150
185mØ200151
FLEXI DUCTING
32mØ200152
SUPPLY AIR DUCTING
38mØ250153
38mØ300154
38mØ350155
10NoHAU to ø 350 mm156
TRANSFORMATION PIECE
8NoØ450 to Ø350157
12NoØ350 to Ø300158
4NoØ300 to Ø250159
8NoØ300 to Ø200160
2NoØ350 to Ø300 , concentric duct taper161
1NoØ300 to Ø250, concentric duct taper162
-222-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1NoØ200 to Ø250, concentric duct taper163
4No90 Degree, round duct long radius, elbow. Ø200164
4No90 Degree, round duct long radius, elbow. Ø250165
3No90 Degree, round duct long radius, elbow. Ø300166
3No90 Degree, round duct long radius, elbow. Ø350167
16NoSquare Diffuser, 200 Dia connect size, and flow rate :81 l/s
168
DIFFUSERS
36NoSquare Diffuser, 200 Dia connect size, and flow rate :100 l/s
169
2NoReturn air Grillie, 200 Dia connect size, and flow rate :208 l/s
170
2NoReturn air Grillie, 200 Dia connect size, and flow rate :278 l/s
171
3NoØ200172
STOP END
4NoØ250173
6NoØ300174
3NoØ350175
76NoØ200176
SPIGOT
2No600 x 400 mm, All Weather Return Air Grille177
RETURN AIR PLENUM BOX
10No1200 x 600 mm Return air grille and box178
-223-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
65NoØ200179
BALANCING DAMPERS
36NoØ200 BD180
1lotElectrical Works Associated with the above installations181
ELECTRICAL WORKS
1NoBranch box: 1 branch182
BRANCH BOX
1NoBranch box: 4 branches183
2NoBranch box: 8 branches184
3No
VRV Heat Recovery type: Total Capacity of 50 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
185
VRV OUTDOOR UNITS
3NoInstallation 186
2No
VRV Heat Recovery type: Total Capacity of 56 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
187
2NoInstallation 188
Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect
TOILETS
7NoAnodized grade aluminium, 400 x 400 Door grille189
AIR TERMINALS
-224-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1NoAnodized grade aluminium, 450 x 450 Door grille190
6No35 l/s , Ø150 Disc valve191
AIR EXTRACTION FAN
1No280l/s @115Pa, Extract Air Fan c/w filters and accessories
192
Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.
4NoAir disc valve, neck size dia 200, Flow rate 35l/s193
6No400 x 400 Door grille 194
1NoInstallation 195
1No105 l/s @ 75 E.S.P (EAF -01)196
4No150 x 150 - 35-40l/s @ 50Pa E.S.P (WF1)197
Wall Fan, C/W outdoor louvre sized to suite fan, all required accessories to ensure a fully functional installation and suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.
1,000,000.00ItemProvision Sum for all electrical supply including metering and cabling
198
ELECTRICAL METERING AND CABLING
SECOND FLOOR
INDOOR UNITS
2NoHeat Reclaim Fresh Air Unit, flow rate 2000m3/hr199
AIR CONDITIONING UNIT:
-225-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
2NoInstallation of heat reclaim fresh air unit200
3NoVRV Ceiling cassette units, rated cooling 9kw201
3NoVRV Ceiling cassette units, rated cooling 11.2kw202
6NoInstallation of VRV Ceiling Cassette203
6NoCeiling Ducted Hide Away Unit, HAU-GF-1; 22.4 kW Cooling capacity.
204
6NoInstallation205
1NoVRV Ceiling Ducted Hide Away Unit; 22.4 kW Cooling capacity
206
1NoInstallation 207
2NoBranch Boxes: 4 Branches208
A/C UNITS ACCESSORIES
11NoRemote Controller209
200mPIPE ɸ 9.52210
COPPER PIPING COMPLETE WITH ARMAFLEX OR FRK INSULATION WITH ALL ACCESSORIES
175mPIPE ɸ 15.9211
25mPVC Drain PIPE ɸ 15.9212
40mPVC Drain PIPE ɸ 32213
50mPVC PIPE ɸ 15.9214
25mPIPE ɸ 15.10215
100mExtra over pipe fittings216
-226-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
165mØ200 217
SUPPLY AIR DUCTING (CIRCULAR DUCTING_INTERNAL INSULATION)
30mØ300 218
30mØ350 219
30mØ450 220
165mØ200221
FLEXI DUCTING
40mØ200222
SUPPLY AIR DUCTING
40mØ250223
40mØ300224
40mØ350225
8NoHAU to ø 350 mm226
TRANSFORMATION PIECE
8NoØ450 to Ø350227
10NoØ350 to Ø300228
2NoØ300 to Ø250229
8NoØ300 to Ø200230
2NoØ350 to Ø300 , concentric duct taper231
1NoØ300 to Ø250, concentric duct taper232
1NoØ200 to Ø250, concentric duct taper233
4No90 Degree, round duct long radius, elbow. Ø200234
-227-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
4No90 Degree, round duct long radius, elbow. Ø250235
3No90 Degree, round duct long radius, elbow. Ø300236
3No90 Degree, round duct long radius, elbow. Ø350237
44NoSquare Diffuser, 200 Dia connect size, and flow rate :100 l/s
238
DIFFUSERS
2NoReturn air Grillie, 200 Dia connect size, and flow rate :208 l/s
239
2NoReturn air Grillie, 200 Dia connect size, and flow rate :278 l/s
240
3NoØ200241
STOP END
2NoØ250242
6NoØ300243
3NoØ350244
68NoØ200245
SPIGOT
2No600 x 400 mm, All Weather Return Air Grille246
RETURN AIR PLENUM BOX
8No1200 x 600 mm Return air grille and box247
49NoØ200248
BALANCING DAMPERS
36NoØ200 BD249
-228-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1lotElectrical Works Associated with the above installations250
ELECTRICAL WORKS
1NoBranch box: 4 branches251
BRANCH BOX
2NoBranch box: 8 branches252
2No
VRV Heat Recovery type: Total Capacity of 22.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
253
VRV OUTDOOR UNITS
2NoInstallation 254
1No
VRV Heat Recovery type: Total Capacity of 28 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
255
1NoInstallation 256
1No
VRV Heat Recovery type: Total Capacity of 33.6 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
257
1NoInstallation 258
2No
VRV Heat Recovery type: Total Capacity of 67.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
259
2NoInstallation 260
-229-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect
TOILETS
7NoAnodized grade aluminium, 400 x 400 Door grille261
AIR TERMINALS
6No35 l/s , Ø150 Disc valve262
AIR EXTRACTION FAN
2No124l/s @115Pa, Extract Air Fan c/w filters and accessories
263
Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.
6NoAir disc valve, neck size dia 200, Flow rate 35l/s264
2No400 x 400 Door grille 265
1NoInstallation 266
1No105 l/s @ 75 E.S.P (EAF -01)267
4No150 x 150 - 35-40l/s @ 50Pa E.S.P (WF1)268
Wall Fan, C/W outdoor louver sized to suite fan, all required accessories to ensure a fully functional installation and suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commisioned in position as per specification.
-230-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
FIRE DAMPER
5NoFire Damper 200 dia 269
Galvanised steel, 120 minute damper
8NoFire Damper 350 dia270
BUILDING 8
Indoor Unit: Indoor units each c/w an wired LCD remote controller installed as specified and as indicated in drawing with the following cooling duties
INDOOR UNITS
CCU-01:
1No4 way blow cassette: 5.6 kW Cooling capacity 271
Cassette Type VRV
1NoInstallation 272
1NoRemote controller273
1lotAC Accessories274
12mPIPE ɸ 9.52275
Copper Piping Complete With Armaflex or FRK Insulation with all Accessories
12mPIPE ɸ 15.9276
12mPVC Drain PIPE ɸ 32277
12mExtra over pipe fittings278
1lotElectrical works associated with the above installations279
Electrical work
-231-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
CCU-02:
8No4 way blow cassette: 5.6 kW Cooling capacity 280
Cassette Type VRV
8NoInstallation 281
8NoRemote controller282
1lotAC Accessories283
40mPIPE ɸ 9.52284
Copper Piping Complete With Armaflex or FRK Insulation with all Accessories
40mPIPE ɸ 15.9285
40mPVC Drain PIPE ɸ 32286
40mExtra over pipe fittings287
1lotElectrical works associated with the above installations288
Electrical work
CCU-03:
2No1 way blow cassette: 2.8 kW Cooling capacity 289
Cassette Type VRV
2NoInstallation 290
2NoRemote controller291
1lotAC Accessories292
15mPIPE ɸ 9.52293
Copper Piping Complete With Armaflex or FRK Insulation with all Accessories
15mPIPE ɸ 15.9294
-232-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
15mPVC Drain PIPE ɸ 32295
15mExtra over pipe fittings296
1lotElectrical works associated with the above installations297
Electrical work
CCU-04:
9No1 way blow cassette; 3.6 kW Cooling capacity 298
Cassette Type VRV
9NoInstallation 299
9NoRemote controller300
1lotAC Accessories301
80mPIPE ɸ 9.52302
Copper Piping Complete With Armaflex or FRK Insulation with all Accessories
80mPIPE ɸ 15.9303
80mPVC Drain PIPE ɸ 32304
80mExtra over pipe fittings305
1lotElectrical works associated with the above installations306
Electrical work
-233-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
CCU-05:
1No4 way blow cassette; 9 kW Cooling capacity 307
Cassette Type VRV
1NoInstallation 308
1NoRemote controller309
1lotAC Accessories310
80mPIPE ɸ 9.52311
Copper Piping Complete With Armaflex or FRK Insulation with all Accessories
80mPIPE ɸ 15.9312
80mPVC Drain PIPE ɸ 32313
80mExtra over pipe fittings314
1lotElectrical works associated with the above installations315
Electrical work
CCU-06:
2No1 way blow cassette; 4.5 kW Cooling capacity 316
Cassette Type VRV
2NoInstallation 317
2NoRemote controller318
1lotAC Accessories319
80mPIPE ɸ 9.52320
Copper Piping Complete With Armaflex or FRK Insulation with all Accessories
80mPIPE ɸ 15.9321
-234-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
80mPVC Drain PIPE ɸ 32322
80mExtra over pipe fittings323
1lotElectrical works associated with the above installations324
Electrical work
CCU-07:
1No4 way blow cassette; 4.5 kW Cooling capacity 325
Cassette Type VRV
1NoInstallation 326
1NoRemote controller327
1lotAC Accessories328
10mPIPE ɸ 9.52329
Copper Piping Complete With Armaflex or FRK Insulation with all Accessories
10mPIPE ɸ 15.9330
10mPVC Drain PIPE ɸ 32331
10mExtra over pipe fittings332
1lotElectrical works associated with the above installations333
Electrical work
CCU-08:
1No4 way blow cassette; 4.5 kW Cooling capacity 334
Cassette Type VRV
1NoInstallation 335
1NoRemote controller336
-235-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1lotAC Accessories337
12mPIPE ɸ 9.52338
Copper Piping Complete With Armaflex or FRK Insulation with all Accessories
12mPIPE ɸ 15.9339
12mPVC Drain PIPE ɸ 32340
12mExtra over pipe fittings341
1lotElectrical works associated with the above installations342
Electrical work
VRV OUTDOOR UNITS
2No
VRV Heat Recovery type: Total Capacity of 28 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
343
ODU-01
2NoInstallation 344
1No
VRV Heat Recovery type: Total Capacity of 40 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
345
ODU-02
1NoInstallation 346
1No
VRV Heat Recovery type: Total Capacity of 50.4 kW cooling, heat recovery type outdoor unit complete all accessories including unit fittings, indoor and outdoor pipe branches.
347
ODU-03
1NoInstallation348
-236-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1No4 connectable indoor units349
BRANCH BOX
1No8 connectable indoor units350
1No10 connectable indoor units351
Including all accessories, fittings, installation, etc to ensure a fully functioning system as per the specifications and relevant standards. Colour as per architect
TOILETS
6NoAnodized grade aluminium, 450 x 450 Door grille
AIR TERMINALS
10No35 l/s , Ø150 Disc valve352
AIR EXTRACTION FAN
2No175.7 l/s @ 115 E.S.P (EAF -01)353
Axial flow Fan, C/W intake. discharge cowl, WMS,2x sound attenuators, flexible connections, mounting feet, spring mounts and flanges as specified, suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commissioned in position as per specification.
4No150 x 150 - 35-40l/s @ 50Pa E.S.P (EF-01)354
Wall Fan, C/W outdoor louver sized to suite fan, all required accessories to ensure a fully functional installation and suitable electrical connection wiring (3m long) between isolator and fan terminals, tested, installed and commisioned in position as per specification.
10mØ200355
SUPPLY AIR DUCTING
10mØ300356
-237-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
10mØ350357
10mØ400358
-238-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
228
227
226
225
224
223
222
221
220
219
218
217
216
215
214
213
212
211Total Brought Forward from Page No.
HVAC Installation
Section No. 7
Bill No. 1
AmountPageNo
MECHANICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
-239-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried Forward R
HVAC Installation
Section No. 7
Bill No. 1
AmountPageNo
MECHANICAL INSTALLATION
COLLECTION
Brought Forward R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
238
237
236
235
234
233
232
231
230
229Total Brought Forward from Page No.
-240-
HVAC InstallationBill No. 1MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 7
BILL NO. 2
FIRE PROTECTION INSTALLATION
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
Supply, delivery, installation, commissioning and 12 months maintenance of the following Fire Fighting equipment as shown on the tender drawings:
SUPPLEMENTARY PREAMBLES
FIRE PROTECTION
FIRE HOSE REELS
61No30m pvc fire hose reel c/w a drum, shut off valve 90˚ bend and dia. 7mm aluminium nozzle
1
Supply and install 30m fire hose reel complete with accessories
227mDiameter 25mm Galvanised Mild Steel Pipe2
227mDiameter 32mm Galvanised Mild Steel Pipe3
FIRE EXTINGUISHER
158No
4.5kg of Dry Chemical Powder fire extinguishers c/w
red fire extinguisher cabinet
4
Supply and install portable fire extinguisher complete with wall mounted cabinet and accessories
-241-
Fire Protection InstallationBill No. 2MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
36No890mm Heigh x 590mm Width x 285mm Depth Fire Extinguishers Cabinet.
5
10No5.0kg of Carbon Dioxide fire extinguishers complete with mounting wooden plate
6
FIRE HYDRANT
28NoDia.65 Right angle hydrant 7
Supply and install fire hydrant complete with 65mm dia brass right angle fire hydrants complete with all accessories
FIRE SIGNAGE
230NoStatutory Signage8
Supply and install all statutory signs on chromadek or complete with hangers or support where required.
Supply, deliver, installation, testing, commissioning and handing over in working order and maintenance during guarantee period.
ADDRESSABLE FIRE DETECTION INSTALLATION
5NoComputer workstation complete with all associated peripheral equipment, i5 PC with 15-18' monitor
9
FRONT END EQUIPMENT
5NoMaestro systems software graphics package (Management software)
10
5NoFire Control panel - 3 loop analogue addressable (complete with network card)
11
5NoFire Control panel - Slave Panel12
5NoFire panel standby batteries - 12v 28 a/h13
5NoAllow for a 24 way output board or equivalent to enable interfacing with other services.
14
-242-
Fire Protection InstallationBill No. 2MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
240NoAddressable optical smoke detectors c/w bases15
DETECTION FIELD DEVICES
60NoAddressable rate of rise heat detectors c/w bases16
50NoAddressable interface units17
15NoAddressable line isolators18
42NoManual breakglass units complete with resettable elements and transparent covers.
19
39NoAddressable sounders20
2,770mPH120 1mm 1 pair Fire resistant cable21
1,140mDiameter 25mm steel conduit22
990mDiameter 100mm sleeve for electronics services.23
950mP4000 Data Cable Tray (Truncking)24
1lotInstallation 25
INSTALLATION
-243-
Fire Protection InstallationBill No. 2MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
Fire Protection Installation
Section No. 7
Bill No. 2
AmountPageNo
MECHANICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
243
242
241Total Brought Forward from Page No.
-244-
Fire Protection InstallationBill No. 2MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 7
BILL NO. 3
WET SERVICES INSTALLATION
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
HOT WATER GENERATION:
4No
SANS 1307, Direct solar heating system, 300 litre, 3 kW backup electrical element, 400kPa approved geyser. Complete with solar collector (2000x1000)
1
Supply and installation of domestic geyser installations including shut-off valves, strainers, non-return valves, expansion relief valve, safety valve, drain piping and electrical. And all accessories required to ensure a fully functioning system
40m35 mm ф Copper piping2
WATER RETICULATION PIPING
128m28 mm ф Copper piping3
115m22 mm ф Copper piping4
115m15 mm ф Copper piping5
8No76 mm Bend6
EXTRA OVER COPPER PIPING FOR FITTING.
8No67 mm Bend7
3No54 mm Bend8
-245-
Wet Services InstallationBill No. 3MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
12No42 mm Bend9
48No22 mm Bend10
48No15 mm Bend11
140No22 mm Tee12
96No15 mm Tee13
32No28-15 mm Reducing tee14
40No28-22 mm Reducing tee15
140No22-15 mm Reducing tee16
24No42 mm Straight coupler suitable for male or female connection
17
24No35 mm Straight coupler suitable for male or female connection
18
140No22 mm Straight coupler suitable for male or female connection
19
96No15 mm Straight coupler suitable for male or female connection
20
10No32 mm Shut off valve 21
VALVES TO COPPER PIPING
152No22 mm Shut off valve 22
76No15 mm Shut off valve 23
12No76 mm Non Return Valve24
3No32 mm Non Return Valve25
360,000.00ItemAllow a provisional sum for supply and install complete smart water meters as per the engineer's specification
26
SMART METER
-246-
Wet Services InstallationBill No. 3MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
1lotInstallation 27
INSTALLATION
-247-
Wet Services InstallationBill No. 3MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
Wet Services Installation
Section No. 7
Bill No. 3
AmountPageNo
MECHANICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
247
246
245Total Brought Forward from Page No.
-248-
Wet Services InstallationBill No. 3MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 7
BILL NO. 4
LIFT INSTALLATION
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
The Contractor shall supply, install, and commission according to the drawings .The rates shall include material, labour, all mounting of accessories, including all connection to the point of supply.
SUPPLEMENTARY PREAMBLES
Supply and Installation of Lift - Paraplegic and Passenger lift
4NoSupply and install a new passenger lift 800kg, 3 stops, bi/parting doors and 1 car opening
1
Design, supply, delivery, install and commissioning of the new lift installation according to the relevant SANS specifications and as specified:
1NoSupply and install a new passenger lift 800kg, 4 stops, bi/parting doors and 1 car opening
2
2NoSupply and install a new passenger lift 2500kg, 4 stops, bi/parting doors and 1 car opening
3
7No
Perform all required inspections and test as required by the Occupational Health and Safety Act, No. 85 of 1993, and as prescribed in SABS 1545 and SABS 1543, including issuing of the required certificate.
4
SUMCompilation of three sets of maintenance manual5
-249-
Lift InstallationBill No. 4MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SUMMaintenance during 12 month guarantee period 6
8NoSupply and install new electrical distribution boards 7
8NoSupply and install new lift pit stainless steel sump pump8
5NoTraining9
-250-
Lift InstallationBill No. 4MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Collection R
Lift Installation
Section No. 7
Bill No. 4
AmountPageNo
MECHANICAL INSTALLATION
COLLECTION
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
250
249Total Brought Forward from Page No.
-251-
Lift InstallationBill No. 4MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried Forward to Summary of Section No. 7 R
AmountItemNo
Quantity Rate
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
SECTION NO. 7
BILL NO. 5
GENERAL ITEMS
The contractor is referred to the Model Preambles forTrades (2008 Edition) as issued by the Association ofSouth African Quantity Surveyors before pricing this bill.
PREAMBLES
SUMTraining of personnel1
General Items
24NoO & M manuals with as built drawings2
SUM12 Months maintenance & Guarantee3
SUMProgramming of the works4
SUMWorkshop drawings & Equipment Submissions5
-252-
General ItemsBill No. 5MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried Forward to Summary of Section No. 7 R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
MECHANICAL INSTALLATION
SECTION SUMMARY - MECHANICAL INSTALLATION
BillNo
PageNo
Amount
Section No. 7
240HVAC Installation1
244Fire Protection Installation2
248Wet Services Installation3
251Lift Installation4
252General Items5
-253-
MECHANICAL INSTALLATIONSection No. 7
Part C2. Pricing Data
Carried to Final Summary R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
PageNo
FINAL SUMMARY
SectionNo
Amount
29PRELIMINARIES1
107MAIN BUILDINGS2
140CONCRETE PARKADE3
165EXTERNAL WORKS4
171PROVISIONAL SUMS5
210ELECTRICAL INSTALLATION6
253MECHANICAL INSTALLATION7
RSUB TOTAL
Item
Allow 5% (Five Percent) of the works including preliminaries as Contingency Amount for the unforeseen and the sum provided is under the sole control of the client and upon approval by the Client Representative and deducted in whole or in part.
CONTINGENCY AMOUNT
RSUB TOTAL
9,280,000.00Item
Allow an amount of R 9 280 000.00 (Nine Million Two Hundred and Eighty Thousand Rand) for escalation of prices to be used as directed by the Principal Agent or deducted in whole or in part.
ESCALATIONS (CPAP) PROVISIONAL
RSUB TOTAL
RProvision for Value-Added Tax (VAT) at 15 percent
-254-
Part C2. Pricing Data
Carried Forward R
For Gauteng Growth and Development Agency (GGDA)
At Bonaero Park
Construction of New JMP Buildings
RBrought Forward
PageNo
FINAL SUMMARY
SectionNo
Amount
Note:
Tenderers must submit their tenders on the official form supplied for this purpose.
-255-
Part C2. Pricing Data
Carried to Form of Tender R