39
3 3 17 17 281 281 RP 37.160 Cando Airport Pierce Towner Pierce Towner T158R066 T158R073 Sta 0+00 RP 0.000 Begin Project Sta 2030+74 RP 38.476 End Project 38.476 38.476 H-3-017(037)000/ PM Chip Seal GRAND FORKS GOL DEN VALLEY CASS RI CHL AND RANSOM S A R GE N T DICKEY LA MOURE BARNES K I DD E R LOGAN MCI N T O S H BURLEI GH MORTON GRANT SIOUX ADAMS H ETT I NGE R SLOPE BOWMAN EMMONS OLIVER MERCER STARK BI LL I NGS DUNN MC KENZIE MC LEAN SHERI DAN WELLS EDDY FOSTER GRI GGS STEELE TRAILL DIVIDE WILLIAMS BURKE MOUNTRAI L RENVI LLE WARD MC HENRY BOTTINEAU ROLLETTE TOW NER CAVALIER RAMSEY WALSH PEMBI NA NEL SON BENSON PI ERCE STUTSMAN STATE COUNTY MAP DESIGNER DEVILS LAKE DISTRICT ND DEPARTMENT OF TRANSPORTATION DESIGNER DESIGNER JASON HUNTER Wyatt Hanson 10/22/2020 1 1 H-3-017(037)000 6240 23050 Pierce/Towner ND 17: Jct ND 3 to Jct US 281 PM Chip Seal H-3-017(037)000 DESIGN DATA Traffic Average Daily Current 2019 Pass: 274 Trucks: 76 Total: 350 Preventive Maintenance Christopher K. Beggs 10/22/2020 STATE PROJECT NO. ND PCN NO. SHEET NO. SECTION DEPARTMENT OF TRANSPORTATION NORTH DAKOTA 10/23/2020 jthunter F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\001TS_001_TITLE.dgn 9:41:58 AM JOB # 10 NDDOT DEVILS LAKE DISTRICT of Transportation North Dakota Department document is stored at the on and the original PE- , Registration Number issued and sealed by This document was originally GOVERNING SPECIFICATIONS 10/1/2020 Supplemental Specifications Standard Specifications Department of Transportation by the North Dakota Date Published and Adopted NONE GROSS MILES NET MILES PROJECT NUMBER \ DESCRIPTION

Upload: others

Post on 31-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • 3

    3

    1717

    281

    281

    RP 37.160

    Cando Airport

    Pierce Towner

    Pierce Towner

    T158R066

    T158R073

    Sta 0+00

    RP 0.000

    Begin Project

    Sta 2030+74

    RP 38.476

    End Project

    38.476 38.476H-3-017(037)000/ PM Chip Seal

    GRAND

    FORKS

    GO

    LD

    EN

    VA

    LLE

    Y

    CASS

    RIC

    HLA

    ND

    RANSOM

    SARGENTDICKEY

    LA MOURE

    BARNES

    KIDDER

    LOGAN

    MC IN

    TOSH

    BU

    RLEIG

    H

    MORTON

    GRANT

    SIOUXADAMS

    HETTINGER

    SLOPE

    BOWMAN EM

    MO

    NS

    OLIVER

    MERCER

    STARKBIL

    LIN

    GS

    DUNN

    MC KENZIE

    MC LEAN

    SHERID

    AN

    WELLS

    EDDY

    FOSTER

    GRIG

    GS

    STEELE

    TRAILL

    DIVIDE

    WILLIAMS

    BURKE

    MO

    UNTR

    AIL

    RE

    NVIL

    LE

    WARD

    MC H

    EN

    RY

    BOTTINEAU

    ROLLE

    TTE

    TO

    WNER

    CAVALIER

    RA

    MSEY

    WALSH

    PE

    MBIN

    A

    NELS

    ONBENSONP

    IER

    CE

    STUTSMAN

    STATE COUNTY MAPDESIGNER

    DEVILS LAKE DISTRICT

    ND DEPARTMENT OF TRANSPORTATION

    DESIGNER

    DESIGNER

    JASON HUNTER

    Wyatt Hanson 10/22/2020

    11H-3-017(037)000

    6240

    23050

    Pierce/Towner

    ND 17: Jct ND 3 to Jct US 281

    PM Chip Seal

    H-3-017(037)000

    DESIGN DATA

    Traffic Average Daily

    Current 2019 Pass: 274 Trucks: 76 Total: 350

    Preventive Maintenance

    Christopher K. Beggs

    10/22/2020

    STATE PROJECT NO.

    ND

    PCNNO.

    SHEET

    NO.

    SECTION

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    10/23/2020 jthunter F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\001TS_001_TITLE.dgn9:41:58 AM

    JOB # 10

    NDDOT DEVILS LAKE DISTRICT

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    GOVERNING SPECIFICATIONS

    10/1/2020

    Supplemental Specifications

    Standard Specifications

    Department of Transportation

    by the North Dakota

    Date Published and Adopted

    NONE

    GROSS MILES NET MILES PROJECT NUMBER \ DESCRIPTION

  • STATE PROJECT NO.SECTION

    NO.SHEET

    NO.

    10/20/2020 9:54:13 AM jthunter

    ND 2

    H-3-017(037)000TABLE OF CONTENTS 1

    .. .. ....

    Section Page(s) Description

    PLAN SECTIONS

    1 Title Sheet1

    2 Table of Contents1

    4 Scope of Work1

    6 Notes1-2

    8 Quantities1

    10 Basis of Estimate1

    20 General Details1

    30 Typical Sections1-2

    100 Work Zone Traffic Control1-3

    Number Description

    LIST OF STANDARD DRAWINGS

    NDDOT AbbreviationsD-101-1, 2,3

    NDDOT Utility Company and Organization AbbreviationsD-101-10

    Line StylesD-101-20, 21

    SymbolsD-101-30, 31,32

    Lane Markers (Spotting Tab For Seal Projects Only)D-704-3

    Breakaway Systems For Construction Zone Signs - Perforated TubeD-704-7

    Breakaway Systems For Construction Zone Signs - U-Channel PostD-704-8

    Construction Sign Details - Terminal And Guide SignsD-704-9

    Construction Sign Details - Regulatory SignsD-704-10

    Construction Sign Details - Warning SignsD-704-11, 11A

    Barricade And Channelizing Device DetailsD-704-13

    Construction Sign Punching And Mounting DetailsD-704-14

    Road Closure LayoutsD-704-15

    Terminal And Seal Coat Sign LayoutsD-704-20

    Construction Truck And Temporary Detour LayoutsD-704-22

    Miscellaneous Sign LayoutsD-704-26

    Mobile Operation (Pavement Marking)D-704-27

    Portable Sign Support AssemblyD-704-50

    Pavement Marking Message DetailsD-762-1

    Pavement MarkingD-762-4

    Short-Term Pavement MarkingD-762-11

  • 3

    3

    1717

    281

    281

    RP 37.160

    Cando Airport

    Pierce Towner

    Pierce Towner

    T158R066

    T158R073

    Wolford

    Cando

    Preventative Maintanence Chip Seal

    Sta 0+00

    RP 0.000

    Begin Project

    Sta 2030+74

    RP 38.476

    End Project

    STATE PROJECT NO.

    ND

    NO.

    SHEET

    NO.

    SECTION

    10/23/2020 jthunter F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\004SW_001_Scope.dgn9:46:23 AM

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    8780

    H-3-017(037)000

    4 1

    Scope of Work

    Darin Lindblom

    10/22/2020

  • NOTES

    10/23/2020 9:48:04 AM F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\006NT_001_notes.docm

    STATE PROJECT NO. SECTION

    NO. SHEET

    NO.

    ND H-3-017(037)000 6 1

    This document was originally issued and sealed by

    Darin Lindblom, Registration Number

    PE-8780, on 10/22/2020 and the

    original document is stored at the North Dakota Department of Transportation.

    107-P01 HEIGHT RESTRICTION FOR CONSTRUCITON EQUIPMENT: Between RP 37.000 to RP 37.300, restrict all construction vehicle heights to 17 feet or less due to the Cando Airport. Equipment height will be measured from the centerline of the finished roadway and will include the extended box height of dump trucks and dump trailers.

    401-P01 FOG SEAL: Apply fog seal immediately after performing final brooming. Use CSS1H

    Emulsified Asphalt at a residual rate of 0.05 Gal/SY for fog sealing. 420-P01 SEAL COAT: Seal shoulders before sweeping the excess chips from the adjacent lane. 420-P02 SEAL COAT: The Engineer will collect and test three samples for each lot of material. A

    lot is defined as 100,000 SY @ 24 Lbs/SY of Cover Cater Material CL 41. If the final lot is less than 100,000 SY and greater than 50,000 SY, the Engineer will sample it as a separate lot.

    The Engineer will collect and test each lot with two samples from the stockpile, and one

    sample from the roadway material. Collect and test samples from the stockpile before the job starts. If the average of the three samples does not meet the gradation specified, the Engineer will either reduce the contractor unit price, as specified in Section 420.06, “Basis of Payment; or reject the material. Do not incorporate the additional material if two consecutive lots deviate from the gradation. Restart placement after taking corrective actions and passing a gradation test.

    420-P03 SAND SEAL: Blotter Material CL44 will be used for the sealing of the shoulders. 704-500 PORTABLE RUMBLE STRIPS (PRS): Use PRS made of rubber or engineered

    polymers. Install PRS as part of the temporary traffic control when the following signs are also part

    of the required traffic control set up:

    • “Be Prepared to Stop” (E3-4); and • “Flagger” symbol (W20-7)

    Install PRS that meet the following criteria:

    • Have no adhesives or fasteners required for placement; • Have a manufacture’s speed rating that meets or exceeds the posted speed

    limit; and • Each strip in the array must weigh a minimum of 100 pounds.

    Use individual PRS construction in one of the following manners:

    • A single piece; • Inter locking segments; or • Two pieces hinged at the midpoint.

    An installed array of PRS consists of a minimum of 3 individual strips.

    Move rumble strips with the flagging operation. Do not place rumble strips on horizontal curves.

    The Engineer will count and measure each array as one unit. Include the cost of

    providing, installing, maintaining, and relocating PRS in the unit price bid for “Portable Rumble Strips”.

    704-P01 PORTABLE RUMBLE STRIPS: A quantity of 2 portable rumble strips are provided to

    be used during the duration of the project. Additional quantities are at the contractors expense.

    704-P02 TRAFFIC CONTROL FOR SEAL COATS: Provide traffic control consisting of a

    temporary lane closure, flagging, and a pilot car. Traffic control device quantities are based on a 6 mile limitation and following list:

    1. Section 100 Sheet 3, Portable Rumble Strips, place layout at both ends of the work zone. Flagging stations located within the work zone require sign W20-7-48 only;

    2. Standard D-704-20, Layout H, signing will be required at junctions: 37th Ave NE, 38th Ave NE, 45th Ave NE, 48th Ave NE,52nd Ave NE, 57th Ave NE, 59th Ave NE.

    3. Standard D-704-22, layouts K and L; and Provide additional devices at no cost to the Department. Place flaggers and traffic control devices as shown on Standard D-704-15, layout A at

    the following intersections when the lane closure spans across them: 704-P03 TRAFFIC CONTROL: At the end of each work day, after the final sweeping, and short

    term striping are complete, return the traffic speed to the posted speed limit for the full length of roadway that received the bitumen and cover coat material.

    762-200 PERMANENT WATER BASED PAVEMENT MARKING: Replace the first paragraph of

    762.04 C.2.a “Method of Application” with the following:

    Allow new bituminous treatment to cool to a temperature below 125 °F and cure for a period of 72 hours before applying permanent pavement marking.

  • NOTES

    10/23/2020 9:48:04 AM F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\006NT_001_notes.docm

    STATE PROJECT NO. SECTION

    NO. SHEET

    NO.

    ND H-3-017(037)000 6 2

    This document was originally issued and sealed by

    Darin Lindblom, Registration Number

    PE-8780, on 10/22/2020 and the

    original document is stored at the North Dakota Department of Transportation.

    762-P01 SHORT TERM 4IN LINE – TYPE NR: Before placing short term centerline pavement marking, sweep and remove all excess cover coat material from the entire surface.

    Quantity for two applications of short term centerline pavement marking has been

    included in the estimate of quantities. Additional applications required to accommodate the Contractor’s operation are at the Contractor’s expense.

    • One application for after chip seal is complete; and • One application for after FOG SEAL

  • ESTIMATE OF QUANTITIESSTATE PROJECT NO. SECTIONNO.

    SHEETNO.

    ND 8

    H-3-017(037)000 1

    SPEC CODE ITEM DESCRIPTION UNIT MAINLINE TOTAL ---- ---- ---------------- ---- ------------ -----

    103 0100 CONTRACT BOND L SUM 1 1

    401 0070 FOG SEAL GAL 27,077 27,077

    420 0111 CRS2P EMULSIFIED ASPHALT GAL 263,320 263,320

    420 0126 COVER COAT MATERIAL CL 41 SY 557,298 557,298

    420 0505 SAND SEAL SY 201,973 201,973

    702 0100 MOBILIZATION L SUM 1 1

    704 1000 TRAFFIC CONTROL SIGNS UNIT 3,878 3,878

    704 1048 PORTABLE RUMBLE STRIPS EA 2 2

    762 0103 PVMT MK PAINTED-MESSAGE SF 104 104

    762 0430 SHORT TERM 4IN LINE-TYPE NR LF 170,927 170,927

    762 1104 PVMT MK PAINTED 4IN LINE LF 491,612 491,612

    762 1124 PVMT MK PAINTED 24IN LINE LF 48 48

    ESTIMATE NUMBER: 20972 ESTIMATE TYPE: FINAL FINALIZED: Y RUN DATE: 10/22/2020 TIME: 15:10:50

  • Basis of EstimateSTATE PROJECT NO.

    ND

    NO.

    SHEET

    NO.

    SECTION

    10/23/2020 jthunter F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\010BE_001_BasesEstimate.dgn9:50:00 AM

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    8780

    H-3-017(037)000 10

    1

    Basis of Estimate

    Darin Lindblom

    10/22/2020

  • Hwy `

    Existing R/W

    Hwy `

    (3) Paved Private Drive Approach

    (1) Paved Section Line, County Road, or Street Approach (2) Gravel Section Line, County Road, or Street Approach

    20'

    Approx.

    24'

    Approx.

    100'

    Edge of Pavement

    Hwy `

    Existing R/W

    RadiusEnd

    24'

    Approx.

    100'

    Edge of Pavement

    Edge of Pavement

    Hwy `

    5'

    Edge of Pavement

    20'

    Approx.

    (4) Gravel Private Drive or Field Drive Approach

    5'

    RadiusEnd

    Match Existing RadiusMatch Existing Radius

    Match Existing RadiusMatch Existing Radius

    5'

    Fog Seal @ 0.05 Gal/SY

    Cover Coat Material CL 41 @ 24 Lb/SY

    CRS2P Emulsified Asphalt @ 0.4 Gal/SY

    Cover Coat Material CL 41 @ 24 Lb/SY

    CRS2P Emulsified Asphalt @ 0.4 Gal/SY

    Cover Coat Material CL 41 @ 24 Lb/SY

    CRS2P Emulsified Asphalt @ 0.4 Gal/SYCover Coat Material CL 41 @ 24 Lb/SY

    CRS2P Emulsified Asphalt @ 0.4 Gal/SY

    8780

    20

    1

    STATE PROJECT NO.

    ND

    NO.

    SHEET

    NO.

    SECTION

    10/23/2020 jthunter F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\020GD_001_DApproach_PM_MiR.dgn9:51:28 AM

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    Approach Details

    H-3-017(037)000

    10/22/2020

    Darin Lindblom

  • 2" HBP

    1.5" HBP

    3" HBP

    2" Aggregate Base

    5'12'12'5'

    12" Aggregate Base

    2" HBP

    2.5" HBP

    6" Aggregate Base

    1.2" HBP

    3'12'12'3'

    4.5" HBP

    6'12'12'6'

    Sta 523+78 to Sta 1468+90

    RP 9.920 to RP 27.820

    Sta 0+00 to Sta 465+01

    RP 0.000 to RP 8.807

    Existing Typical

    Sta 465+01 to Sta 523+78

    RP 8.807 to RP 9.920

    Existing Typical

    Sta 1468+90 to Sta 2030+74

    RP 27.820 to RP 38.461

    Existing Typical

    STATE PROJECT NO.

    ND

    NO.

    SHEET

    NO.

    SECTION

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    10/23/2020 jthunter F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\030TP_001_X-sections.dgn9:53:10 AM

    8780

    H-3-017(037)000 30 1

    Existing Typicals

    Darin Lindblom

    10/22/2020

  • 5'12'12'5'

    3'12'12'3'

    6'12'12'6'

    Fog Seal (CSS1H) @ 0.05 Gal/SY

    Cover Coat Material CL 41 @ 24 lbs/SY

    CRS2P Emulsified Asphalt @ 0.40 Gal/SY

    Fog Seal (CSS1H) @ 0.05 Gal/SY

    Cover Coat Material CL 41 @ 24 lbs/SY

    CRS2P Emulsified Asphalt @ 0.40 Gal/SY

    Fog Seal (CSS1H) @ 0.05 Gal/SY

    Cover Coat Material CL 41 @ 24 lbs/SY

    CRS2P Emulsified Asphalt @ 0.40 Gal/SY

    Sand Seal @ 15 lbs/SY

    CRS2P Emulsified Asphalt @ 0.20 Gal/SY

    Sand Seal @ 15 lbs/SY

    CRS2P Emulsified Asphalt @ 0.20 Gal/SY

    Sand Seal @ 15 lbs/SY

    CRS2P Emulsified Asphalt @ 0.20 Gal/SYSand Seal @ 15 lbs/SY

    CRS2P Emulsified Asphalt @ 0.20 Gal/SY

    Sand Seal @ 15 lbs/SY

    CRS2P Emulsified Asphalt @ 0.20 Gal/SY

    Sand Seal @ 15 lbs/SY

    CRS2P Emulsified Asphalt @ 0.20 Gal/SY

    Sta 523+78 to Sta 1468+90

    RP 9.920 to RP 27.820

    Sta 0+00 to Sta 465+01

    RP 0.000 to RP 8.807

    Proposed Typical

    Sta 465+01 to Sta 523+78

    RP 8.807 to RP 9.920

    Proposed Typical

    Sta 1468+90 to Sta 2030+74

    RP 27.820 to RP 38.461

    Proposed Typical

    STATE PROJECT NO.

    ND

    NO.

    SHEET

    NO.

    SECTION

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    10/23/2020 jthunter F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\030TP_002_ProposedX-sections.dgn9:54:38 AM

    8780

    H-3-017(037)000 30 2

    Proposed Typicals

    Darin Lindblom

    10/22/2020

  • SECTION SHEET

    NO. NO.

    100 1

    E5-1-48 48"x48" EXIT GORE 35 48"x48" RIGHT or LEFT SHOULDER CLOSED AHEAD or __ FT or _ MILE

    G20-1-60 60"x24" ROAD WORK NEXT __ MILES 28 48"x48" SURVEY CREW

    G20-1b-60 60"x24" NO WORK IN PROGRESS (Sign and installation only) 18 48"x48" BRIDGE PAINTING AHEAD or __ FT

    G20-2-48 48"x24" END ROAD WORK 26 48"x48" MATERIAL ON ROADWAY

    G20-4-36 36"x18" PILOT CAR FOLLOW ME (Mounted to back of pilot car) 18 48"x48" PAVEMENT BREAKS

    G20-10-108 108"x48" CONTRACTOR SIGN 70 48"x48" RUMBLE STRIPS AHEAD 70

    G20-50a-72 72"x36" ROAD WORK NEXT __ MILES RT & LT ARROWS 8 43 344 48"x48" FRESH OIL LOOSE ROCK 490

    G20-52a-72 72"x24" ROAD WORK NEXT __ MILES RT or LT ARROW 36

    G20-55-96 96"x48" SPEED LIMIT ENFORCED - MINIMUM FEE $80 WHEN WORKERS PRESENT 59

    M1-1-36 36"x36" INTERSTATE ROUTE MARKER (Post and installation only) 10

    M1-4-24 24"x24" U.S. ROUTE MARKER (Post and installation only) 10

    M1-5-24 24"x24" STATE ROUTE MARKER (Post and installation only) 10

    M3-1-24 24"x12" NORTH (Mounted on route marker post) 7

    M3-2-24 24"x12" EAST (Mounted on route marker post) 7

    M3-3-24 24"x12" SOUTH (Mounted on route marker post) 7

    M3-4-24 24"x12" WEST (Mounted on route marker post) 7

    M4-8-24 24"x12" DETOUR (Mounted on route marker post) 7

    M4-9-30 30"x24" DETOUR ARROW RIGHT or LEFT/AHD AND RT or LT 15

    M4-10-48 48"x18" DETOUR (INSIDE ARROW) RIGHT or LEFT (Mounted on barricade) 7

    M5-1-21 21"x15" ADVANCE TURN ARROW RT or LT(Mounted on route marker post) 7

    M5-1-30 30"x21" ADVANCE TURN ARROW RT or LT(Mounted on route marker post) 9

    M6-1-21 21"x15" DIRECTIONAL ARROW RT or LT (Mounted on route marker post) 7

    M6-1-30 30"x21" DIRECTIONAL ARROW RT or LT (Mounted on route marker post) 9

    M6-3-21 21"x15" DIRECTIONAL ARROW UP (Mounted on route marker post) 7

    R1-1-48 48"x48" STOP 4 32 128

    R1-2-60 60"x60" YIELD 29

    R2-1-36 36"x48" SPEED LIMIT __ (Portable only) 4 30 120

    R2-1-48 48"x60" SPEED LIMIT __ 16 39 624

    R2-1aP-24 24"x18" MINIMUM FEE $80 (Mounted on Speed Limit post) 18 10 180 SPECIAL SIGNS

    R3-2-48 48"x48" NO LEFT TURN 35

    R4-1-48 48"x60" DO NOT PASS 16 39 624

    R4-7-48 48"x60" KEEP RIGHT 39

    R5-1-48 48"x48" DO NOT ENTER 35

    R6-1-54 54"x18" ONE WAY RIGHT or LEFT (Mounted on STOP or DO NOT ENTER post) 14

    R7-1-12 12"x18" NO PARKING ANY TIME 11

    R10-6-24 24"x36" STOP HERE ON RED 16

    R11-2-48 48"x30" ROAD CLOSED (Mounted on barricade) 12

    R11-2a-48 48"x30" STREET CLOSED (Mounted on barricade) 12

    R11-3a-60 60"x30" ROAD CLOSED __ MILES AHEAD LOCAL TRAFFIC ONLY (Mtd on barricade) 15

    R11-3c-60 60"x30" STREET CLOSED __ MILES AHEAD LOCAL TRAFFIC ONLY (Mtd on barricade) 15

    R11-4a-60 60"x30" STREET CLOSED TO THRU TRAFFIC (Mounted on barricade) 15

    W1-3-48 48"x48" REVERSE TURN RIGHT or LEFT 35

    W1-4-48 48"x48" REVERSE CURVE RIGHT or LEFT 35

    W1-4b-48 48"x48" TWO LANE REVERSE CURVE RIGHT or LEFT 35

    W1-6-48 48"x24" ONE DIRECTION LARGE ARROW 26

    W3-1-48 48"x48" STOP AHEAD 35

    W3-3-48 48"x48" SIGNAL AHEAD 35 TRAFFIC CONTROL SIGNS TOTAL UNITS

    W3-4-48 48"x48" BE PREPARED TO STOP 2 35 70

    W3-5-48 48"x48" SPEED REDUCTION AHEAD 4 35 140

    W4-2-48 48"x48" LANE ENDS RIGHT or LEFT 35

    W5-1-48 48"x48" ROAD NARROWS 35

    W5-8-48 48"x48" THRU TRAFFIC RIGHT LANE 35

    W5-9-48 48"x48" ROAD WORK TRAFFIC ONLY DOWN & LT or RT ARROW 35

    W6-3-48 48"x48" TWO WAY TRAFFIC 35

    W8-1-48 48"x48" BUMP 35

    W8-3-48 48"x48" PAVEMENT ENDS 35

    W8-7-48 48"x48" LOOSE GRAVEL 35

    W8-11-48 48"x48" UNEVEN LANES 35

    W8-12-48 48"x48" NO CENTER LINE 16 35 560

    W8-17-48 48"x48" SHOULDER DROP-OFF SYMBOL 35

    W8-53-48 48"x48" TRUCKS ENTERING HIGHWAY 35

    W8-54-48 48"x48" TRUCKS ENTERING AHEAD or __ FT or _ MILE 2 35 70

    W8-55-48 48"x48" TRUCKS CROSSING AHEAD or __ FT or _ MILE 2 35 70

    W8-56-48 48"x48" TRUCKS EXITING HIGHWAY 35

    W9-3a-48 48"x48" CENTER LANE CLOSED SYMBOL 35

    W12-2-48 48"x48" LOW CLEARANCE 35

    W13-1P-30 30"x30" __ MPH ADVISORY SPEED PLAQUE (Mounted on warning sign post) 14

    W14-3-64 64"x48" NO PASSING ZONE 28

    W16-2P-30 30"x24" __ FEET PLAQUE (Mounted on warning sign post) 10

    W20-1-48 48"x48" ROAD WORK AHEAD or _FT or _ MILE 4 35 140

    W20-2-48 48"x48" DETOUR AHEAD or __ FT or _ MILE 35

    W20-3-48 48"x48" ROAD or STREET CLOSED AHEAD or __ FT or _ MILE 35

    W20-4-48 48"x48" ONE LANE ROAD AHEAD or __ FT or _ MILE 35

    W20-5-48 48"x48" RIGHT or CENTER or LEFT LANE CLOSED AHEAD or __ FT or _ MILE 35

    W20-7-48 48"x48" FLAGGER 2 35 70

    W20-8-18 18"x18" STOP - SLOW PADDLE Back to Back 2 5 10

    W20-52P-54 54"x12" NEXT __ MILES (Mounted on warning sign post) 14 12 168

    W21-1-48 48"x48" WORKERS 35

    W21-2-48 48"x48" FRESH OIL 35

    W21-3-48 48"x48" ROAD MACHINERY AHEAD or __ FT or _ MILE 35

    W21-5-48 48"x48" SHOULDER WORK 35

    W21-5a-48 48"x48" RIGHT or LEFT SHOULDER CLOSED 35

    UNITS

    SUB

    TOTAL

    This document was

    originally issued

    and sealed by

    Darin Lindblom,

    Registration Number

    PE-8780,

    on 10/22/20 and the

    original document

    is stored at the North Dakota

    Department of Transportation.183504

    Traffic Control Devices List

    35

    NOTE:

    If additional signs are

    required, units will be

    calculated using the formula

    from Section III-18.06 of the

    Design Manual.

    http://www.dot.nd.gov/

    3878

    STATE

    ND

    PROJECT NO.

    35

    H-3-017(037)000

    UNITS

    PER

    AMOUNT

    35

    35

    AMOUNT

    REQUIRED

    SIGN

    SIZE

    W21-5b-48

    14

    DESCRIPTION

    35

    35

    352

    UNITS

    PER

    AMOUNT

    UNITS

    SUB

    TOTAL

    SIGN

    NUMBER

    SIGN

    NUMBER

    SIGN

    SIZEDESCRIPTION

    AMOUNT

    REQUIRED

    W21-50-48

    W21-51-48

    W21-52-48

    W21-53-48

    W21-6-48

    W22-8-48

    EACH

    EACH

    EACH

    EACH

    EACH

    EACH

    EACH

    EACH

    QUANTITY

    2

    704-1072

    704-1080

    704-1081

    704-1085

    704-3501

    SEQUENCING ARROW PANEL - TYPE B

    SF

    LF

    EACH

    EACH

    EACH

    EACH

    EACH

    EACH

    704-1052

    704-1050

    PORTABLE RUMBLE STRIPS

    SEQUENCING ARROW PANEL - TYPE A

    LF

    LF

    SPEC & CODE

    DESCRIPTION

    FLAGGING704-0100 MHR

    704-1000

    SPEC &

    CODEUNIT

    DELINEATOR DRUMS

    TRAFFIC CONES

    PRECAST CONCRETE MED BARRIER - STATE FURNISHED

    RAISED PAVEMENT MARKERS

    SHORT TERM 4IN LINE - TYPE R

    SHORT TERM 4IN LINE - TYPE NR

    704-3510

    762-0200

    762-0420

    762-0430

    STACKABLE VERTICAL PANELS

    VERTICAL PANELS - BACK TO BACK

    704-1070 DELINEATOR

    SEQUENCING ARROW PANEL - TYPE C

    OBLITERATION OF PVMT MK

    PORTABLE PRECAST CONCRETE MED BARRIER

    704-1048

    FLEXIBLE DELINEATORS

    TYPE I BARRICADES

    TYPE III BARRICADES

    EACH

    704-1086

    704-1087

    704-1500

    704-1060

    704-1065

    704-1067 TUBULAR MARKERS

    10/23/2020 9:56 AM F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\100WZ_001_TCDL (2).xlsm VERSION: 7.15.2020

  • ROAD WORK

    NEXT MILES00

    END

    ROAD WORK

    AHEAD

    ROAD

    WORK

    AHEAD

    ROAD

    WORK

    AHEAD

    ROAD

    WORK

    ROAD WORK

    NEXT MILES00

    END

    ROAD WORK

    NEXT MILES

    ROAD WORK

    00

    NEXT MILES00

    ROAD WORK

    SPEED

    55LIMIT

    MINIMUM

    FEE

    $80

    PASS

    NOT

    DO

    FRESH OIL

    LOOSE ROCK

    NEXT MILES00

    SPEED

    55LIMIT

    MINIMUM

    FEE

    $80

    PASS

    NOT

    DO

    FRESH OIL

    LOOSE ROCK

    NEXT MILES00

    SPEEDLIMIT

    55STRIPECENTER

    NO

    STRIPE

    CENTER

    NO

    AHEAD

    ROAD

    WORK

    R2-1-48

    R2-1aP-24

    R4-1-48 W22-8-48

    W20-52P-54

    Sign Sequence 2

    and note 6 for spacing.

    Use Standard D-704-20 Layout H

    Sign Sequence 2

    W20-1-48

    W20-1-48

    G20-1-60

    G20-1-60

    G20-2-48

    G20-2-48

    W20-1-48

    Sign Sequence 2

    R2-1-48

    R2-1aP-24

    R4-1-48 W22-8-48

    W20-52P-54

    Sign Sequence 1

    and note 6 for spacing.

    Use Standard D-704-20 Layout H

    W3-5-48

    G20-52a-72

    G20-52a-72

    W8-12-48 W8-12-48

    Sign Sequence 2

    W20-1-48

    Sign Sequence 2 Sign Sequence 2 Sign Sequence 2

    Sign Sequence 2

    Sign Sequence 2

    STATE PROJECT NO.

    ND

    NO.

    SHEET

    NO.

    SECTION

    10/23/2020 jthunter F:\DVLSLAKE\CONST\DISTRICT DESIGNS\Projects 2020-2021\2021 chip seals\ND 17 - 00 H-3-017(037)000 PCN 23050\Design\100WZ_002_consign.dgn9:58:26 AM

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    8780

    100

    2H-3-017(037)000

    Traffic Control Layout

    Darin Lindblom

    10/22/2020

  • S = Numerical value of speed limit or 85th percentile.

    AHEAD

    ROAD

    WORK

    AHEAD

    RUMBLE

    STRIPS

    SPEEDLIMIT

    XX

    BE

    PREPARED

    TO STOP

    SPEED

    XXLIMIT

    SPEED

    XXLIMIT

    SPEED

    XXLIMIT

    SPEED

    XXLIMIT

    BE

    PREPARED

    TO STOP

    SPEEDLIMIT

    XX

    AHEAD

    RUMBLE

    STRIPS

    AHEAD

    ROAD

    WORK

    MINIMUM

    FEE

    $80

    MINIMUM

    FEE

    $80

    A

    2S Ft

    1/2 C

    1/2 C

    1/2 B

    1/2 B

    1/2 C

    1/2 C

    Flagger

    Portable

    W20-1-48

    A

    2S Ft

    1/2 C

    1/2 C

    1/2 B

    1/2 B

    1/2 C

    1/2 C

    Portable

    W20-7-48

    Portable

    W3-4-48

    AT TEMPORARY ROAD CLOSURE

    PORTABLE RUMBLE STRIPS

    Flagger

    Portable

    W3-4-48

    Portable

    W20-1-48

    Portable

    W20-7-48

    Portable

    W3-5-48

    Portable

    W3-5-48

    Portable

    R2-1-36

    Portable

    R2-1-36

    B2

    12S Ft + A +

    B2

    12S Ft + A +

    10' minimum width

    3/4"

    Min. to 1"

    Max. heig

    ht

    10"

    Min.

    15' C to C

    3' Max.

    Skewing

    Lateral

    Reposition if movement is >3' from original position.

    Reposition if movement is >2' from original position.

    2' Max.

    2' Max.

    10' Min.

    20' Max.

    Reposition if distance between strips is

  • Abn abandoned

    Abut abutment

    Ac acres

    Adj adjusted

    Aggr aggregate

    Ahd ahead

    ARV valve releaseair

    Align alignment

    Al alley

    Alt alternate

    Alum aluminum

    ADA Act Disabilities withAmericans

    A ampere

    & and

    Appr approach

    Approx approximate

    ACP pipe cementasbestos

    Asph asphalt

    AC cementasphalt

    Assmd assumed

    @ at

    Atten attenuation

    ATR recorder trafficautomatic

    Ave Avenue

    Avg average

    ADT traffic dailyaverage

    Az azimuth

    Bk back

    BF faceback

    Bs backsight

    Balc balcony

    WireB wirebarbed

    Barr barricade

    Btry battery

    Brg bearing

    BI inletbeehive

    Beg begin

    BM markbench

    Bkwy bikeway

    Bit bituminous

    Blk block

    FtBd feetboard

    BH holebore

    BS sidesboth

    Bot bottom

    Blvd Boulevard

    Bndry boundary

    BC capbrass

    Brkwy breakaway

    Br bridge

    Bldg building

    BV valvebutterfly

    Byp bypass

    GdrlC guardrailcable

    Calc calculate

    Cd candela

    CIP pipe ironcast

    CB basincatch

    CRS setting rapidcationic

    GdC guardcattle

    C ToC center tocenter

    centerline

    Cm centimeter

    Ch chain

    Chnlk chain-link

    BlkCh blockchannel

    ChCh changechannel

    Chk check

    Chsld chiseled

    Cir circle

    Cl class

    Cl clay

    FCl fillclay

    HvyCl heavyclay

    Clnt clean-out

    Clr clear

    Cl&gr

    Comb. combination

    Coml commercial

    Compr compression

    CADD

    Conc concrete

    Cond conductor

    Const construction

    Cont continuous

    CSB

    Contr contraction

    Contr contractor

    CP

    Coord coordinate

    Cor corner

    Corr corrected

    CAES

    CAP

    CMES

    CMP

    CPVCP

    CSES

    CSP pipe steelcorrugated

    C coulomb

    Co County

    Crse course

    CS

    Ct Court

    Xarm armcross

    Xbuck buckcross

    Xsec sectionscross

    Xing crossing

    Xrd Crossroad

    Crn crown

    CF feetcubic

    M3 metercubic

    M3/s second per meterscubic

    CY yardcubic

    Cy/mi mile per yardscubic

    Culv culvert

    C&G gutter &curb

    CI inletcurb

    CR rampcurb

    CS spiral tocurve

    C cut

    LdDd loaddead

    Defl deflection

    Defm deformed

    D orDeg degree

    Dlnt delineate

    Dlntr delineator

    Depr depression

    Desc description

    Det detail

    DWP panel warningdetectable

    Dtr detour

    diameter

    Dir direction

    Dist distance

    DM materialdisturbed

    DB blockditch

    DG gradeditch

    Dbl double

    Dn down

    Dwg drawing

    Dr drive

    Drwy driveway

    DI inletdrop

    D densitydry

    Ea each

    Esmt easement

    E East

    EB Eastbound

    Elast elastomeric

    EL lockerelectric

    MtrE meterelectric

    Elec electric/al

    EDM meter distanceelectronic

    El orElev elevation

    Ellipt elliptical

    Emb embankment

    Emuls emulsion/emulsified

    ES sectionend

    Engr engineer

    ESS station sensorenvironmental

    Eq equal

    Eq equation

    Evgr evergreen

    Exc excavation

    Exst existing

    Exp expansion

    Expy Expressway

    E curve ofexternal

    Extru extruded

    FOS safety offactor

    F Fahrenheit

    FS sidefar

    F farad

    Fed Federal

    FP pointfeed

    Ft feet/foot

    Fn fence

    PFn postfence

    FO opticfiber

    FB bookfield

    FD drivefield

    F fill

    FAA angularity aggregatefine

    FS sandfine

    FH hydrantfire

    Fl flange

    Flrd flared

    FES section endflared

    BcnF beaconflashing

    FA sample augerflight

    FL lineflow

    Ftg footing

    FM mainforce

    Fs foresight

    Ð

    lack of description, location accuracy or purpose. an unknown characteristic, potentially based on: of existing features. It indicates a feature that has This is a special text character used in the labeling

    CECB concrete erosion control blanket

    C Gr coarse gravel

    coarse sand

    CSFES corrugated steel flared end section

    CSTES corrugated steel traversable end section

    Cl or `

    Dia or |

    corrugated aluminum end section

    corrugated metal end section

    corrugated aluminum pipe

    control point

    corrugated metal pipe

    corrugated poly-vinyl chloride pipe

    corrugated steel end section

    computer aided drafting & design

    clearing & grubbing

    coal slackCo S

    continuous split barrel sample

    clay loamCl Lm

    BG below grade

    DSDS dynamic speed display sign

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    NDDOT ABBREVIATIONS D-101-1

    07-01-14

    2930

    Roger Weigel,

    09/20/18

    09-20-18 General Revisions 04-23-18 General Revisions

  • Fnd found

    Fdn foundation

    Frac fractional

    Frwy freeway

    Frt front

    FF facefront

    DispF dispenserfuel

    FFP pipes fillerfuel

    FLS sensor leakfuel

    Furn furnish/ed

    Gal gallon

    Galv galvanized

    Gar garage

    LGs linegas

    RegG regulator linegas

    GMV valve maingas

    MtrG metergas

    GSV valve servicegas

    GVP pipe ventgas

    GV valvegate

    Ga gauge

    Geod geodetic

    GIS System InformationGeographical

    G giga

    GPS System PositioningGlobal

    Gov government

    Grd graded/grade

    Gr gravel

    Grnd ground

    GWM monitor waterground

    Gdrl guardrail

    Gtr gutter

    PlgH pilingH

    Hdwl headwall

    Ha hectare

    Ht height

    HI instrument ofheight

    Hel helical

    H henry

    Hz hertz

    HDPE polyethylene densityhigh

    HM masthigh

    HP pressurehigh

    HPS sodium pressurehigh

    Hwy highway

    Hor horizontal

    HBP pavement bituminoushot

    Hr hour(s)

    Hyd hydrant

    Ph content ionhydrogen

    Id identification

    " orIn inch

    Incl tubeinclinometer

    IMH manholeinlet

    ID diameterinside

    Inst instrument

    Intchg interchange

    Intmdt intermediate

    Intscn intersection

    Inv invert

    IM monumentiron

    PnI PinIron

    IP Pipeiron

    Jt joint

    J joule

    Jct junction

    K kelvin

    Kn newtonkilo

    Kpa

    Kg kilogram

    Kg/m3

    Km kilometer

    K Kip(s)

    LS

    LSIT

    Ln lane

    Lg large

    Lat latitude

    Lt left

    L

    Lens lenses

    Lvl level

    LB

    Lvlng leveling

    Lht light

    LP

    Ltg lighting

    LF

    Liq liquid

    LL

    L litre

    Lm loam

    Loc location

    LC

    Long. longitude

    Lp loop

    LD

    Lm lumen

    Lum luminaire

    Lx lux

    ML

    MH manhole

    Mkd marked

    Mkr marker

    Mkg marking

    MA armmast

    Matl material

    Max maximum

    MC cornermeander

    Meas measure

    Mdn median

    MD drainmedian

    MC curingmedium

    M mega

    Mer meridian

    M meter

    M/s second permeters

    M curve of ordinatemid

    Mi mile

    MM

    MP

    Ml milliliter

    Mm millimeter

    Mm/hr

    Min minimum

    Misc miscellaneous

    Mon monument

    Mnd mound

    Mtbl mountable

    Mtd mounted

    Mtg mounting

    Mk muck

    Mun municipal

    N nano

    NGS

    NS

    Neop neoprene

    Ntwk network

    N newton

    N North

    NE

    NW

    NB Northbound

    number

    Obsc obscure(d)

    Obsn observation

    Ocpd occupied

    Ocpy occupy

    O/s offset

    OC

    C

    OC

    Orig original

    OD

    OH overhead

    PMT transformer mountedpad

    Pg pages

    Pntd painted

    Pr pair

    Pnl panel

    Pk park

    PK nailParker-Kalon

    Pa pascal

    PSD distance sightpassing

    Pvmt pavement

    Ped pedestal

    Ped pedestrian

    PPP post pushbuttonpedestrian

    Pen. penetration

    Perf perforated

    Per. perimeter

    PL pipeline

    Pl place

    P&P

    PL

    plate

    Pt point

    PCC curve compound ofpoint

    PC curve ofpoint

    PI intersection ofpoint

    PRC curvature reverse ofpoint

    PT tangent ofpoint

    POC curve onpoint

    POT tangent onpoint

    PE polyethylene

    PVC chloridepolyvinyl

    PCC concrete CementPortland

    pounds

    PP

    Preempt preemption

    Prefab prefabricated

    Prep preperation

    Press. pressure

    HMA hot mix asphalt

    MGS Midwest Guardrail System

    Mb mailbox

    P Cap plastic cap

    Pl or Í

    Prfmd or Pref preformed

    National Geodetic Survey

    near side

    millimeters per hour

    mile marker

    mile post

    one dimensional consolidation

    organic content

    on center

    out to outO To O

    outside diameter

    North West

    No. or #

    North East

    office locationOff Loc

    level book

    length of curve

    light pole

    lignite coalLig Co

    kilogram per cubic meter

    kilo pascal

    Land Surveyor (licensed)

    Land Surveyor In Training

    L Sum lump sum

    loop detector

    main line

    M Hr man hour

    liquid limit

    lignite slackLig Sl

    linear foot

    long chord

    plastic limit

    plan & profile

    Lb or #

    power pole

    NDDOT ABBREVIATIONS D-101-2

    07-01-14

    2930

    Roger Weigel,

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    04/23/18

    04-23-18 General Revisions 08-03-15 General Revisions

  • PRV valve reliefpressure

    Prestr prestressed

    Pvt private

    PD driveprivate

    Prod. production/produce

    Prog programmed

    Prop. property

    LnProp lineproperty

    Ppsd proposed

    PB boxpull

    Qty quantity

    Qtr quarter

    R orRad radius

    RR railroad

    Rlwy railway

    Rsd raised

    RTP

    range

    RC

    Rec record

    Rcy recycle

    RPCC

    Ref reference

    RM

    Refl reflectorized

    RCP

    RCPS

    Reinf reinforcement

    Res reservation

    Ret retaining

    Rev reverse

    Rt right

    R/W

    Riv river

    Rd road

    Rdbd bedroad

    Rdwy roadway

    RWIS

    Rk rock

    Rt route

    Salv salvage(d)

    Sd sand

    ClSdy claysandy

    Lm ClSdy loam claysandy

    FlSdy fillsandy

    LmSdy loamsandy

    San line sewersanitary

    Sc scoria

    Sec seconds

    Sec section

    SL linesection

    Sep separation

    Seq sequence

    Serv service

    Sh shale

    Sht sheet

    Shtng sheeting

    Shldr shoulder

    S siemens

    SD

    Sig signal

    Sgl single

    SC

    SS

    Sm small

    S South

    SE

    SW

    SB Southbound

    Sp spaces

    Spcl special

    SP

    G

    Spk spike

    SC

    ST

    SB

    SH

    SV

    Sq square

    SF

    Km2

    M2

    SY

    Stk stake

    Std standard

    N

    SpecsStd

    Sta station

    YdSta yardsstation

    LStm linesteam

    SEC concrete encasedsteel

    SSD distance sightstopping

    SD drainstorm

    St street

    SPP pipe platestructural

    SPPA arch pipe platestructural

    Str structure

    Subd subdivision

    Sub subgrade

    PrepSub preperationsubgrade

    Ss subsoil

    SE superelevation

    SS specificationsupplement

    Supp supplemental

    Surf surfacing

    Surv survey

    Sym symmetrical

    SI

    Tan tangent

    T (semi)tangent

    TS spiral totangent

    Tel telephone

    BTel BoothTelephone

    PTel poletelephone

    Tv television

    Temp temperature

    Temp temporary

    TBM mark benchtemporary

    T tesla

    T sample tubethinwall

    T/mi mile pertons

    Ts topsoil

    T orTwp township

    Traf traffic

    TSCB box control signaltraffic

    Tr trail

    Transf transformer

    TB booktransit

    Trans transition

    TT towertransmission

    Trans transverse

    Trav traverse

    TP pointtraverse

    Trtd treated

    Trmt treatment

    Qc compressiontriaxial

    TERO ordinance rights employmenttribal

    Tpl triple

    TP pointturning

    Typ typical

    Qu strength compressiveunconfined

    Ugrnd underground

    USC&G Survey Geodetic & CoastUS

    USGS Survey GeologicUS

    Util utility

    VG guttervalley

    Vap vapor

    Vert vertical

    VC curvevertical

    VCP pipe clayvitrified

    V volt

    Vol volume

    Wkwy walkway

    W contentwater

    WGV valve gatewater

    WL linewater

    WM mainwater

    WMV valve mainwater

    MtrW meterwater

    WSV valve servicewater

    WW wellwater

    W watt

    Wrng wearing

    Wb weber

    WIM

    W west

    WB westbound

    Wrng wiring

    W/ with

    W/o without

    WC cornerwitness

    WGS

    SA special assembly

    SN sign number

    RAP recycled asphalt pavement

    recycled portland cement concrete

    roadway weather information system

    standard specifications

    systems international

    weigh in motion

    world geodetic system

    SMA stone matrix asphalt

    Rs residence

    SRCP slotted reinforced concrete pipe

    TES traversable end section

    RCB

    RCES

    RCFES reinforced concrete flared end section

    RCTES reinforced concrete traversable end section

    Z zenith

    RP reference point

    Sw or Sdwk sidewalk

    right of way

    reinforced concrete end section

    reinforced concrete box

    rapid curing

    Rge or R

    random traverse point

    reinforced concrete pipe

    reinforced concrete pipe sewer

    R Mkr

    reference monument

    reference marker

    sprinkler head

    split barrel sample

    spiral to tangent

    sprinkler valve

    special provisions

    spiral to curve

    specific gravity

    standard penetration test

    square meter

    square kilometer

    square feet

    square yard

    sight distance

    silt clay

    Si Cl Lm

    Si Cl

    South East

    South West

    silty loam

    silty clay loam

    Si Lm

    slow setting

    slow curing

    NDDOT ABBREVIATIONS D-101-3

    07-01-14

    2930

    Roger Weigel,

    04/23/18

    04-23-18 General Revisions 08-03-15 General Revisions

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

  • 702COM Communications702

    ACCENT CommunicationsAccent

    WUAGASSIZ Incorporated Users WaterAgassiz

    AGC America of Contractors GeneralAssiociated

    PlAll PipelineAlliance

    WU SEASALL Association Users Water SeasonsAll

    PlAMOCO Company PipelineAmoco

    HESSAMRDA Corporation HessAmerada

    AT&T CorporationAT&T

    PAWB Incorporated Energy PawBear

    ELECBAKER ElectricBaker

    ELECBASIN Incorporated Cooperative ElectricBasin

    TELBEK Cooperative CommunicationsBek

    PLBELLE Company Pipeline FourcheBelle

    BLM Management Land ofBureau

    BNSF Railway Fe Santa NorthernBurlington

    BOEING Boeing

    RWDBRNS District Water RuralBarnes

    ELECBURK-DIV Cooperative ElectricBurke-Divide

    WUBURL Users WaterBurleigh

    OneCable OneCable

    SERVCABLE ServicesCable

    ELECCAP Incorporat Cooperative ElectricCapital

    ELEC COCASS Cooperative Electric CountyCass

    RWUCASS Incorporated Users Water RuralCass

    ELECCAV Cooperative Electric RuralCavalier

    CBLCOM Fargo OfCablecom

    PLCENEX PipelineCenex

    DIST WATER PLCENT District Water Line PipeCentral

    ELEC PWRCENT Cooperative Electric PowerCentral

    COE Engineers ofCorps

    TELCONS TelephoneConsolidated

    RESCONT Inc ResourceContinental

    CPR Railway PacificCanadian

    E OD Energy OfDepartment

    CARRDAK Network CarrierDakota

    TEL CENTDAK Telephone CentralDakota

    RWDDAK District Water RuralDakota

    DGC Company GasificationDakota

    NET RDICKEY Networks RuralDickey

    RWUDICKEY Association Users Water RuralDickey

    TELDICKEY TelephoneDickey

    DNRR Railroad NorthernDakota

    PLDOME Company PipelineDome

    DVELEC Cooperative Electric ValleyDakota

    DVMW Western & Valley MissouriDakota,

    ENBRDG Incorporated PipelinesEnbridge

    ENVENTIS TelephoneEnventis

    MNGFALK Company MiningFalkirk

    FHWA Administration HighwayFederal

    WD FKS-TRLG District Water Forks-traillGrand

    TRAN & TRDGETTY Transportation & TradingGetty

    ELEC WGLDN Cooperative Electric WestGolden

    TEL COGRGS Telephone CountyGriggs

    GAS NAT PLNSGT Company Gas Natural PlainsGreat

    TELHALS Company TelephoneHalstad

    IDEA1 Idea1

    TELINT-COMM Company TelephoneInter-Community

    PLKANEB Company PipelineKaneb

    ELECKEM Incorporated Cooperative ElectricKem

    SYS GATHKOCH Incorporated Systems GatheringKoch

    PLLKHD Company PipelineLakehead

    RWULNGDN Incorporated Users Water RuralLangdon

    ELEC R YELLLWR Electric Rural YellowstoneLower

    CONMCKNZ Telcom ConsolidatedMcKenzie

    ELECMCKNZ Cooperative ElectricMcKenzie

    WRDMCKNZ District Resource Water CountyMcKenzie

    MCLEOD USAMcLeod

    ELECMCLN Cooperative ElectricMcLean

    WAT RMCLN-SHRDN Water RuralMcLean-Sheridan

    MDU UtilitiesMontana-dakota

    CABLEMID-CONT CableMid-Continent

    TELMIDSTATE Company TelephoneMidstate

    CABLEMINOT Television CableMinot

    TELMINOT Company TelephoneMinot

    S W WMISS System Water WestMissouri

    PWRMNKOTA PowerMinnkota

    ELECMOR-GRAN-SOU Cooperative ElectricMor-gran-sou

    ELECMOUNT-WILLI Cooperative ElectricMountrail-williams

    TEL LBTYMRE Telephone Liberty &Moore

    MUNICIPAL Sewer And WaterCity

    MUNICIPAL '..................' OfCity

    ELEC CENTN Cooperative Electric CentralNorth

    DIST W VALLN District Water ValleyNorth

    REC & PKSND Recreation And Parks DakotaNorth

    TELND Company Telephone DakotaNorth

    NDDOT Transportation of Department DakotaNorth

    DEPT SCI SOILNDSU Department Science SoilNDSU

    TELNEMONT TelephoneNemont

    ELEC RNODAK Cooperative Electric RuralNodak

    TEL FRMSNOON Company Telephone FarmersNoonan

    NPR Railroad PlainsNorthern

    NSP Power StatesNorthern

    RW PRAIRNTH Association Water Rural PrairieNorthern

    PL BRDRNTHN Pipeline BorderNorthern

    ELEC PLNSNTHN Incorporated Cooperative Electric PlainsNorthern

    REFNTHWSTRN Company RefineryNorthwestern

    COMMNW Cooperation CommunicationNorthwest

    ONEOK gasOneok

    OSHA Administration Health and SafetyOccupational

    PWR TLOTTR Company Power TailOtter

    M E LP Marketing EnergyPrairielands

    COMPOLAR CommunicationsPolar

    ELECPVT ElectricPrivate

    QWEST CommunicationsQwest

    SUPPLY WR&T Association Supply Water T &R

    TEL RIVRED Telephone Rural RiverRed

    TELRESVTN TelephoneReservation

    TELROBRTS Telephone CompanyRoberts

    ELECR-RIDER

    RRVW Railroad Western & Valley RiverRed

    U W ES Incorporated Users Water EastSouth

    CABLESCOTT Dickinson Television CableScott

    ELECSHERDN Cooperative ElectricSheridan

    ELEC VLYSHEYN Cooperative Electric ValleySheyenne

    SKYTECH Incorporated TechnologiesSkyland

    ELECSLOPE Incorporated Cooperative ElectricSlope

    TELCOM RIVSOURIS Telecommunications RiverSouris

    COMM WATST Commission WaterState

    WATER LNSTATE Cooperative Water LineState

    ENGSTER EnergySterling

    RWUSTUT Users Water RuralStutsman

    PRJ PLSW Project PipelineSouthwest

    C MT Communications MountainTurtle

    TCI Dakota North ofTCI

    PL PLNS HGHTESORO Pipeline Plains HighTesoro

    WUTRI-CNTY Incorporated Users WaterTri-County

    RWU COTRL Users Water Rural CountyTraill

    TELUNTD TelephoneUnited

    WUA SOURUPPR Association Users Water SourisUpper

    SPRINTUS SprintU.S.

    CABLE MSLUSAF Cable MissileU.S.A.F.

    USFWS Service Wildlife and FishUS

    COMMUSW Communications WestU.S.

    ELECVRNDRY Cooperative ElectricVerendrye

    TEL RIVW Incorporated Telephone RiverWest

    WEB Association Development Water B. E.W.

    RWAWILLI Association Water RuralWilliams

    PL BASWILSTN Company Pipeline Interstate BasinWilliston

    RWDWLSH District Water Rural WaterWalsh

    TELWOLVRTN TelephoneWolverton

    XLENER EnergyXcel

    YSVR Railroad ValleyYellowstone

    S CENT REG WD

    MISS VALL COMM Missouri Valley Communications

    South Central Regional Water District

    Roughrider Electric Cooperative

    GTR RAMSEY WD Greater Ramsey Water District

    NWRWD Northwest Rural Water District

    2930

    Roger Weigel,

    09/20/18

    NDDOT UTILITY COMPANY AND ORGANIZATION ABBREVIATIONS D-101-10

    07-01-14

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    09-20-18 General Revisions 04-23-18 General Revisions

  • Limits of Const Transition Line

    Bale Check

    Rock Check

    Sight Distance Triangle Line

    Small Hidden Object

    Existing Ground

    Existing Topsoil (Cross Section View)

    Large Hidden Object

    Geotextile Fabric Type D

    Geogrid

    Geotextile Fabric Type R

    Geotextile Fabric Type R1

    Geotextile Fabric Type RR

    Geotextile Fabric Type S

    Floating Silt Curtain

    Centerline Pavement Marking

    Barrier with Centerline Pavement Marking

    Barrier Pavement Marking

    Stripe 4 IN Dotted Extension White

    Stripe 8 IN Dotted Extension White

    Stripe 8 IN Lane Drop

    Wetland Mitigation

    Easement

    Existing Concrete

    Existing Easement

    Existing Aggregate (Cross Section View)

    Existing Curb and Gutter (Cross Section View)

    Tangent Line

    Hidden Object

    Topsoil Profile

    Subgrade, Subcut or Ditch Grade

    Existing Asphalt (Cross Section View)

    Existing Reinforcement Rebar

    Existing State or International Line

    Existing Quarter Section Line

    Existing County

    Existing Section Line

    Existing Township

    Centerline

    Existing Centerline

    Supplemental Contour

    Right of Way

    Existing Right of Way

    Existing Right of Way Railroad

    Failure Line

    Existing Conditions

    Existing Ground (Details)

    Existing Sixteenth Section Line

    Existing Right of Way Not State Owned

    Phantom Object

    Centerline Main

    Excavation Limits

    Existing Government Lot Line

    Existing Adjacent Block Lines

    Existing Adjacent Lot Lines

    Existing Adjacent Property Line

    Existing Adjacent Subdivision Lines

    Subgrade Reinforcement

    Silt Fence

    Tie Bar at Random Spacing

    Fiber Rolls

    Doweled Joint

    Tie Bar 30 Inch 4 Foot Center to Center

    Tie Bar 18 Inch 3 Foot Center to Center

    Depression Contours

    Tree Row

    Sheet Piling

    Existing Wetland Easement USFWS

    Existing Wetland Jurisdictional

    Existing Wetland

    Reservation Boundary

    Existing City Corporate Limits or

    Existing Ground Void (Not Surveyed)

    Dimension Leader

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    Line Styles

    2930

    Roger Weigel,

    09/23/16

    D-101-21

    07-01-14

    Erosion Control

    Environmental

    Right Of Way

    Geotechnical

    StripingCross Sections and Typicals

    Boundary Control

    Pavement Joints

    Countours

    Profile

    Organized by Functional Groups

    Added and Revised Items, 09-23-16

    Bridge Details

  • North Arrow (Half Scale)

    Truck Mounted Attenuator

    Type I Barricade

    Type II Barricade

    Type III Barricade

    Catch Basin

    Cairn or Stone Circle

    Video Detection Camera

    Storm Drain Cap or Stub

    Corrugated Metal End Section 18 Inch

    Corrugated Metal End Section 24 Inch

    Corrugated Metal End Section 30 Inch

    Corrugated Metal End Section 36 Inch

    Corrugated Metal End Section 42 Inch

    Corrugated Metal End Section 48 Inch

    Concrete Foundation

    Ground Connection Conductor

    Neutral Connection Conductor

    Phase 1 Connection Conductor

    Phase 2 Connection Conductor

    Traffic Cone

    Signal Controller

    Pad Mounted Signal Controller

    Alignment Data Point

    Emergency Vehicle Detector

    Attenuation Device

    Diamond Grade Delineator Type A

    Diamond Grade Delineator Type B

    Diamond Grade Delineator Type C

    Diamond Grade Delineator Type D

    Diamond Grade Delineator Type E

    Flexible Delineator

    Flexible Delineator Type A

    Flexible Delineator Type B

    Flexible Delineator Type C

    Flexible Delineator Type D

    Flexible Delineator Type E

    Delineator Type A

    Delineator Type A Reset

    Delineator Type B

    Delineator Type B Reset

    Delineator Type C

    Delineator Type D

    Delineator Type E

    Delineator Drums

    Spot Elevation

    Existing Access Control Arrow

    Existing Artifact

    Existing Flashing Beacon

    Existing Benchmark

    Existing Railroad Battery Box

    Existing Bush or Shrub

    Existing Gas Cap or Stub

    Existing Sanitary Cap or Stub

    Existing Storm Drain Cap or Stub

    Existing Water Cap or Stub

    Existing Sanitary Cleanout

    Existing Concrete Foundation

    Existing Traffic Signal Controller

    Existing Pad Mounted Signal Controller

    Existing Sixteenth Section Corner

    Existing Quarter Section Corner

    Existing Section Corner

    Existing Railroad Crossbuck

    Existing Satellite Dish

    Existing Fuel Dispensers

    Existing Flexible Delineator Type A

    Existing Flexible Delineator Type B

    Existing Flexible Delineator Type C

    Existing Flexible Delineator Type D

    Existing Flexible Delineator Type E

    Existing Delineator Type A

    Existing Delineator Type B

    Existing Delineator Type C

    Existing Delineator Type D

    Existing Delineator Type E

    Existing EFB Misc

    Existing Flashing Beacon

    Existing Pipe Mounted Flasher

    Existing Pad Mounted Feed Point

    Existing Pipe Mounted Feed Point with Pad

    Existing Pole Mounted Feed Point

    Existing Railroad Frog

    Existing Snow Gate 18

    Existing Snow Gate 28

    Existing Snow Gate 40

    Existing Headwall

    Existing Pedestrian Head with Number

    Existing Signal Head

    Existing Sprinkler Head

    Existing Fire Hydrant

    Existing Catch Basin Drop Inlet

    Existing Curb Inlet

    Existing Manhole Inlet

    Existing Junction Box

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    Symbols

    2930

    Roger Weigel,

    D-101-30

    07-01-14

    07/01/14

  • Existing Light Standard

    Existing High Mast Light Standard 10 Luminaire

    Existing High Mast Light Standard 3 Luminaire

    Existing High Mast Light Standard 4 Luminaire

    Existing High Mast Light Standard 5 Luminaire

    Existing High Mast Light Standard 6 Luminaire

    Existing High Mast Light Standard 7 Luminaire

    Existing High Mast Light Standard 8 Luminaire

    Existing High Mast Light Standard 9 Luminaire

    Existing Overhead Sign Structure Load Center

    Existing Luminaire

    Existing Light Standard Luminaire

    Existing Federal Mailbox

    Existing Private Mailbox

    Existing Meander Section Corner

    Existing Meter

    Existing Electrical Manhole

    Existing Gas Manhole

    Existing Sanitary Manhole

    Existing Sanitary Force Main Manhole

    Existing Sanitary Manhole with Valve

    Existing Storm Drain Manhole

    Existing Force Main Storm Drain Manhole

    Existing Force Main Storm Drain Manhole with Valve

    Existing Telephone Manhole

    Existing Manhole with Valve Water

    Existing Water Manhole

    Existing Mile Post Type A

    Existing Mile Post Type B

    Existing Mile Post Type C

    Existing Reference Marker

    Existing RW Marker

    Existing Utility Marker

    Iron Pin R/W Monument

    Existing Object Marker Type I

    Existing Object Marker Type II

    Existing Object Marker Type III

    Existing Electrical Pedestal

    Existing Telephone Pedestal

    Existing Fiber Optic Telephone Pedestal

    Existing TV Pedestal

    Existing Fiber Optic TV Pedestal

    Existing Fuel Filler Pipes

    Existing Traverse PI Aerial Panel

    Existing Pole

    Existing Power Pole

    Existing Power Pole with Transformer

    Existing Telephone Pole

    Existing Wood Pole

    Existing Post

    Existing Pedestrian Push Button Post

    Existing Control Point CP

    Existing Control Point GPS-RTK

    Existing Control Point TRI

    Existing Reference Marker Point NGS

    Existing Pull Box

    Existing Intelligent Transportation Pull Box

    Existing Water Pump

    Existing Slotted Reinforced Concrete Pipe

    Existing RR Profile Spot

    Existing Fuel Leak Sensors

    Existing Highway Sign

    Existing Miscellaneous Spot

    Existing Lighting Standard Pole

    Existing Traffic Signal Standard

    Existing Transformer

    Existing Large Evergreen Tree

    Existing Small Evergreen Tree

    Existing Large Tree

    Existing Small Tree

    Existing Tree Trunk

    Existing Pad Mounted Traffic Signal Control Box

    Existing Undefined Manhole

    Existing Undefined Pull Box

    Existing Undefined Pedestal

    Existing Undefined Valve

    Existing Undefined Pipe Vent

    Existing Gas Valve

    Existing Water Valve

    Existing Fuel Pipe Vent

    Existing Gas Pipe Vent

    Existing Sanitary Pipe Vent

    Existing Storm Drain Pipe Vent

    Existing Water Pipe Vent

    Existing Weather Station

    Existing Ground Water Well Bore Hole

    Existing Windmill or Tower

    Existing Witness Corner

    Flashing Beacon

    Flagger

    Pipe Mounted Flasher

    Sanitary Force Main with Valve

    Iron Monument Found

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    Symbols

    2930

    Roger Weigel,

    D-101-31

    07-01-14

    07/01/14

  • Pad Mounted Feed Point

    Pipe Mounted Feed Point with Pad

    Pole Mounted Feed Point

    Headwall

    Double Headwall with Vegitation Barrier

    Single Headwall with Vegitation Barrier

    Pole Mounted Head

    Sprinkler Head

    Fire Hydrant

    Inlet Type 1

    Inlet Type 2

    Double Inlet Type 2

    Inlet Grate Type 2

    Junction Box

    High Mast Light Standard 10 Luminaire

    High Mast Light Standard 3 Luminaire

    High Mast Light Standard 4 Luminaire

    High Mast Light Standard 5 Luminaire

    High Mast Light Standard 6 Luminaire

    High Mast Light Standard 7 Luminaire

    High Mast Light Standard 8 Luminaire

    High Mast Light Standard 9 Luminaire

    Relocate Light Standard

    Overhead Sign Structure Load Center

    Light Standard 100 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 1000 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 150 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 175 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 200 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 250 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 310 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 35 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 400 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 50 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 70 Watt High Pressure Sodium Vapor Luminaire

    Light Standard 700 Watt High Pressure Sodium Vapor Luminaire

    Manhole

    Manhole 48 Inch

    Sanitary Force Main Manhole

    Sanitary Sewer Manhole

    Storm Drain Manhole

    Storm Drain Manhole with Inlet

    Reset Mile Post

    Mile Post Type A

    Mile Post Type B

    Mile Post Type C

    Right of Way Marker

    Tubular Marker

    Object Marker Type I

    Object Marker Type II

    Object Marker Type III

    Caution Mode Arrow Panel

    Back to Back Vertical Panel Sign

    Double Direction Arrow Panel

    Left Directional Arrow Panel

    Right Directional Arrow Panel

    Sequencing Arrow Panel

    Truck Mounted Arrow Panel

    Power Pole

    Wood Pole

    Pedestrian Push Button Post

    Property Corner

    Pull Box

    Intelligent Transportation Pull Box

    Sanitary Pump

    Storm Drain Pump

    Reinforced Pavement

    Reinforced Concrete End Section 15 Inch

    Reinforced Concrete End Section 18 Inch

    Reinforced Concrete End Section 24 Inch

    Reinforced Concrete End Section 30 Inch

    Reinforced Concrete End Section 36 Inch

    Reinforced Concrete End Section 42 Inch

    Reinforced Concrete End Section 48 Inch

    Reinforced Concrete End Section 54 Inch

    Reset Right of Way Marker

    Reset USGS Marker

    Right of Way Markers

    Riser 30 Inch

    Continuous Split Barrel Sample

    Flight Auger Sample

    Split Barrel Sample

    Thinwall Tube Sample

    Highway Sign

    SNOW GATE 18 FT

    SNOW GATE 28 FT

    SNOW GATE 40 FT

    Standard Penetration Test

    Transformer

    Inclinometer Tube

    Underdrain Cleanout

    Excavation Unit

    Water Valve

    HDWL

    CS

    BF

    AS

    BT

    Incl

    N

    Alignment Monument

    Iron Pin Reference Monument

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

    Symbols

    2930

    Roger Weigel,

    07-01-14

    07/01/14

    D-101-32

  • Marker Body

    Marker Body with Protective Cover

    Cover

    Staple

    0.28"

    1.125"

    0.06"

    1.2

    5"

    1.12

    5"

    2.0"

    Cover material thickness= 0.03"

    4"

    Adhesive

    8. Use adhesive conforming to AASHTO M 237.

    foot, using a .1 degree observation angle and 0 degree entrance angle.

    7. Use retroreflective tape with a minimum reflectance of 1200 candle power per foot-candle per square

    Type W - White body and cover with white reflective tape on one side.

    Type Y - Yellow body and cover with yellow reflective tape on both sides.

    6. Marker types:

    5. Use marker body and cover manufactured from polyurethane material.

    4. Remove markers after permanent pavement marking is installed.

    3. Remove protective covers immediately after seal coat is applied.

    removed manually.

    2. Attach cover to vertical part of marker so traffic does not cause it to detach, but it can be easily

    1. Install lane line markers as shown, prior to beginning the seal coat.

    Notes:

    New Design Engr PE Stamp

    Updated to active voice

    10-03-19

    9-27-17

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally10-3-13

    LANE MARKERS D-704-3(Spotting Tab for Seal Projects only)

    4683

    Kirk J Hoff,

    10/03/19

  • Top Post Receiver Data Table

    A B C D E FSizes (B)

    Square Post

    Perforated Tube

    Slip Base Assembly

    Multi-Directional

    Bolt Retainer for Base Connection

    Ground line

    Ground line

    12"

    25"

    15"

    3"

    4"

    "21

    "87

    "211

    2"

    2"

    "211

    "43

    1"

    "212

    8"

    "1696

    "16155

    "16156

    "43

    60"

    6"

    6" 6"

    3" 3"

    4"

    24"

    1"

    1"

    12"

    6" 6"

    7"

    1"

    1"

    "16115

    12"

    "3293 "32

    93

    "1652

    "833

    "1611

    "16115

    D

    E

    E

    F

    "1652

    "833

    "1611

    "1671

    "3293 "32

    93

    "1696

    C

    A

    A

    B

    A A

    60^

    6" dia.

    6" dia.

    6" dia.

    9" 9"

    60^

    Traffic Flo

    w

    Anchor unit

    Ground line

    Anchor unit

    Post sleeve

    "214

    Traffic Flo

    w

    "1671

    of Posts

    Number

    Gauge

    ness

    Thick-

    Wall

    Gauge

    ness

    Thick-

    Wall

    Base

    Slip Gauge

    Standard

    U.S.

    1

    1

    1

    1

    1

    1

    2

    2

    2

    3 & 4

    3 & 4

    3 & 4

    3 & 4

    3 & 4

    2 12

    12

    12

    12

    12

    12

    12

    12

    12

    12

    10

    10

    10

    12

    12

    12

    12

    10

    No

    No

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    Yes

    0.105

    0.105

    0.105

    0.135

    0.135

    12

    12

    12

    12

    10

    10

    1.702

    2.416

    2.773

    3.432

    3.141

    4.006

    0.129

    0.372

    0.561

    0.605

    0.804

    0.979

    0.380

    0.590

    0.695

    0.841

    0.803

    1.010

    0.172

    0.372

    0.499

    0.590

    0.643

    "3291

    "6491

    "212

    "212

    "1653

    "3213

    "85

    "3225

    "32211

    "64331

    "431

    "871

    "x10 ga.212

    "x10 ga.1632

    "-13 gr. 8 serrated flange nut21

    " U.S.S. steel flat washer21

    " stainless release bushing21

    " U.S.S. steel flat washer21

    " gr. 8 flange bolt43"x22

    1

    "83

    "163

    "83

    washer and lock washer

    " dia. bolt with83

    and lock washer or rivet

    " dia. bolt with washer83

    and lock washer

    " dia. bolt with washer83

    " dia.169

    " dia.212

    " Reprocessed Teflon321Bolt Retainer-

    in.

    of Inertia

    Moment

    2 x 2

    (A)

    Telescoping Perforated Tube

    163 x 216

    32

    21 x 22

    12

    21 x 22

    12

    41 x 24

    12

    21 x 12

    11

    4 2 3in.

    Modulus

    Section

    in.

    Sec. Area

    Cross

    in.

    Size

    Post

    in.

    Size

    Sleeve

    in.

    Base

    Slip

    without

    Size

    Anchor

    412

    212

    412

    412

    1632

    412

    212

    212

    412

    212

    412

    212

    212

    212

    212

    412

    212

    in.

    Thickness

    Wall

    lbs.

    per Foot

    Weight

    2

    2

    412

    212

    2 12 Yes212

    2 12 Yes412

    2 12 12 Yes4122

    12

    2 12

    10

    3

    2

    No

    No

    0.105

    0.785

    Anchor unit

    " teflon bolt retainer321

    4" max.

    4" max.

    Anchor Unit and Post Assembly

    Top Post Receiver

    Bottom Soil Stub

    in.

    Size

    Tube

    Properties of Telescoping Perforated Tube

    60"

    "165R=

    "165R=

    and Post Sleeve Assembly

    Slip Base Anchor Unit

    Multi-Directional

    Plate - ASTM A572 grade 50

    Stabilizing Wing - 7 gauge H.R.P.O. ASTM A1011

    Tube - 3"x3"x7 gauge ASTM A500 grade B tube

    " ASTM A36 structural angle83"x2

    1"x221Angle Receiver - 2

    Plate - ASTM A572 grade 50

    5. Provide more than 7' between the first and fourth posts of a four post sign.

    4. In concrete sidewalk, use same anchor without wings.

    measurement above and below post location and back and ahead of post.

    3. Provide 4" vertical clearance for anchor or breakaway base. Measure the 4"x60"

    2. Use anchor with 43.9 KSI yield strength and 59.3 KSI tensile strength.

    1. Torque slip base bolts as specified by manufacturer.

    Notes:

    post installation)

    anchor plate (one

    Minimum 10 guage

    post installation)

    anchor plate (two

    Minimum 10 guage

    "x10 ga.21"x10 ga. into 216

    3(B) For additional wind load, insert the 2

    (A) Use breakaway base when support is placed in weak soils. Engineer determines if soils are weak.

    New Design Engr PE Stamp

    Updated to active voice

    10-03-19

    9-27-17

    2-28-14

    4683

    BREAKAWAY SYSTEMS FOR CONSTRUCTION ZONE SIGNS D-704-7

    Kirk J Hoff,

    10/03/19

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally

  • Front View Side View

    Anchor unit

    Ground line1"

    "43 1" 4" 1.938" 8.562" .875"

    1"

    .375".375"

    17.125"

    1"

    U-Channel Post

    Retainer strap

    Anchor unit

    4"

    38"

    42"

    Ground line

    38"

    4"

    Retainer Strap Detail

    Sign post

    Sig

    n p

    ost

    Sig

    n p

    ost

    Anchor unit

    Back View

    Sign post

    Ground line

    Sign post

    Ground line

    16" min.

    18" min.

    2" max.

    Alternate A

    Breakaway U-Channel Detail

    Detail A

    (see detail)

    Retainer strap

    See Detail A

    See Alt. A Note 4

    See Alt. A Note 1c

    (see Alt. A Note 1b)

    Retainer strap

    (see Alt. A Note 3)

    and lock washer

    Grade 8 bolt, nut,

    (see Alt. A Note 3)

    and lock washer

    Grade 8 bolt, nut,

    18"

    Note 4

    See Alt. Aanchor unit

    and on back side of

    front side of sign post

    Retainer strap is on

    (60" min.)

    Anchor unit

    (42" min.)

    Anchor unit

    lock washers

    lock nuts and

    2- bolts grade 5,

    lock washers

    lock nuts and

    2- bolts grade 5,

    lock washers

    lock nuts and

    2- bolts grade 5,

    lock washers

    lock nuts and

    2- bolts grade 5,

    (2.5 and 3 lb/ft)

    Alternate C

    Breakaway U-Channel Splice Detail

    (2.5 and 3 lb/ft)

    Alternate B

    Breakaway U-Channel Splice Detail

    Install a maximum of 3 posts within 7'. Install a maximum of 3 posts within 7'.

    Install a maximum of 2 posts within 7'.

    bolts have full contact across the entire width.

    5. Properly nest base post, strap, and sign post. Proper nesting occurs when all flat surfaces of the base post, strap, and sign post at the

    "x2" bolt (this fastens sign post to retainer strap).1654. Complete assembly by tightening

    b) Alternately tighten two connector bolts.

    "x2" bolt, lock washer and nut in bottom of sign post to facilitate alignment of sign post with proper hole in anchor unit.165a) Place 3.

    b) Rotate strap to vertical position.

    a) Drive anchor unit to 4" above ground.2.

    d) Rotate strap 90° to left.

    "x2" bolt, lock washer and nut.165c) Assemble strap to back of anchor unit using

    b) Establish proper assembly by lining up bottom hole of retainer strap with 6th hole from the top of the anchor unit.

    a) Drive anchor unit to within 12" of ground level. 1.

    Alternate A Steps of Installation:

    New Design Engr PE Stamp

    Updated to active voice

    10-03-19

    9-27-17

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally2-28-14

    4683

    BREAKAWAY SYSTEMS FOR CONSTRUCTION ZONE SIGNS D-704-8

    Kirk J Hoff,

    10/03/19

  • 3.15" 29.7" 3.15"

    36"

    4.5"

    9"B

    4.5"

    18"

    New Design Engineer PE Stamp

    Added sign & background color

    10-03-19

    8-17-17

    Background: orange

    Legend: black (non-refl)

    48"

    "216"8

    75

    "83

    "85

    "211R

    24"

    "433

    "433

    "214

    6"C

    6"C

    20""4119

    "4316 18"

    2""212

    Background: orange

    Legend: black (non-refl)

    "4124"16

    324 24"

    "433

    "214

    "433

    6"C

    6"C

    60"

    "211R

    "83

    "85

    19"19"

    G20-1-60

    Background: orange

    Legend: black (non-refl)

    24"

    "433

    "214

    "433

    6"C

    6"C

    60"

    "85

    "83

    "211R

    "161515"16

    1515

    G20-1b-60

    Background: orange

    Legend: black (non-refl)

    G20-50a-72

    36"

    5"

    4"

    5"

    6"C

    72"

    19"19"

    6"C

    4"

    6"C

    33""16715"8

    514

    "16152 "16

    152

    "1671533" "8

    514

    "85

    "87

    "412R

    Background: orange

    Legend: black (non-refl)

    G20-52a-72

    "1671533" "8

    514

    "16152

    19"19"

    "85

    "83

    "211R

    24"

    "214

    3"

    "214

    6"C

    6"C

    72"

    G20-55-96

    Background: orange

    Legend: black (non-refl)

    48"

    "16157

    3"

    "1677

    5"C

    6"C

    "1675

    6"C

    96"

    "411

    "16155

    "163336""8

    1166""16720

    "8740"8

    740

    "161116""16

    927 13"6"

    "161331"16

    1331

    "163245""2

    1255""16714

    "16137"16

    137

    3"R

    "43

    "411

    G20-2-48

    G20-52a-72

    G20-50a-72

    "852

    "415"8

    39

    "21R

    "83

    3"

    3"

    30"

    "213

    "213

    36"

    Background: orange

    Legend: black (non-refl)

    "212

    6"C

    G20-4b-36

    "16514 "8

    711

    "2131"

    "16158

    "16158

    "1616

    "1616

    "21

    "43

    48"

    48"

    1"

    "435

    E5-1-48

    See ARROW DETAILS

    See ARROW DETAILS

    ARROW DETAILS

    "16922"16

    922

    "161314"16

    1314

    3"R

    10"EM

    "435

    "161518

    "217

    "161314"4

    312

    60°

    "43R

    "4113"4

    316

    "211

    "838

    "838

    "214

    14"

    30"

    "43R

    "/ft21

    Taper

    6"C

    6"C

    "212

    "871R

    Background: orange

    Legend: black (non-refl)

    24"

    4"

    5"D

    "83

    "85

    "211R

    12""2111

    8"

    7"

    9"9" See ARROW DETAILS

    M4-9-30

    M4-9(L or R)-30 &

    "1611R

    "1611R

    4"

    4"

    "874

    "817"16

    9

    "213

    "431

    6"4"

    4"

    "8710 "8

    17

    "169

    9"

    "213

    "213

    "215

    Advanced Right or Left

    M4-9(L or R)-30

    Straight

    M4-9-30

    "32315

    "32315

    4"

    4"

    "817"8

    710

    "213

    "169

    "1611R

    Right or Left

    M4-9(L or R)-30

    "431

    E5-1(L or R)-48

    (A)

    or left.

    Arrow may be right or left of the legend to indicate construction to the right (A)

    NOTES:

    See ARROW DETAILS

    Background: orange

    Legend: black (non-refl)

    M4-8-36

    Background: green (orange optional)

    Legend: white

    30"

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally8-13-13

    4683

    CONSTRUCTION SIGN DETAILS D-704-9TERMINAL AND GUIDE SIGNS

    Kirk J Hoff,

    10/03/19

  • Background: white

    Legend: black (non-refl)

    18"18"

    19"19"

    48"

    30"

    "21

    "43

    5"

    4"

    5"

    Background: white

    Legend: black (non-refl)

    R11-2a-48

    Background: white

    Legend: black (non-refl)

    R11-4a-60

    30"

    60"

    "871R

    "2122 "16

    524

    1"3"

    "413

    3"

    "4124"4

    124

    "21

    "43

    "871R

    4"

    "212

    "212

    4"

    6"C

    6"C

    5"C

    8"D

    8"D

    Background: white

    Legend: black (non-refl)

    60"

    1"3"

    "2122 "16

    524

    "43

    "21

    "871R

    3""815

    R11-3c-60

    Background: white

    Legend: black (non-refl)

    30"

    4"

    "833

    "833

    "414

    4"C

    6"C

    5"C

    "8512"8

    53 "871

    "8317

    "8113 3" 10"8" 11"

    "213

    24"

    5"

    5"

    5"D

    5"D

    24"

    4"

    "1618

    "16137

    "83

    "85

    "16139

    "1699

    "211R

    "818

    "818

    18"

    "1653

    "1653

    "1693

    "83

    "85

    24"

    "212

    "212

    "1693

    "211R

    3"D

    2"

    3"D

    2"

    3"D

    R1-50P-24

    R2-1aP-24

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally8-13-13

    D-704-10

    4683

    CONSTRUCTION SIGN DETAILS

    REGULATORY SIGNS

    Kirk J Hoff,New Design Engineer PE Stamp

    Revised sign number

    10-03-19

    8-17-17

    10/03/19

  • 6"C

    6"C

    6"C

    "411

    "43

    48"

    48"

    W8-56-48

    Background: orange

    Legend: black (non-refl)

    "8112"16

    312

    "16151112"

    "871314"

    WORD LETTER SPACING

    AHEAD Standard

    Standard

    Standard

    Standard

    Standard

    200 FT

    350 FT

    500 FT

    1000 FT

    1500 FT

    MILE21

    1 MILE

    * DISTANCE MESSAGES

    "213

    "213 Reduce 40%

    Reduce 40%

    Reduce 50%

    ARROW DETAILS

    Background: orange

    Legend: black (non-refl)

    W5-8-48

    48"

    48"

    "879"8

    79

    "16116"16

    116

    "16111"16

    111

    "16119

    "16119

    "412

    6"D

    6"D

    6"D

    6"D

    "214

    "214

    "214

    W9-3a-48

    48"

    W5-9-48

    Background: orange

    Legend: black (non-refl)

    "1691

    48"6"D

    6"D

    6"D

    6"D

    3"

    3"

    3"

    "8310"8

    310

    3"

    "1617

    6"C

    6"C

    6"C

    "213

    "213

    48"

    48"

    W8-53-48

    Background: orange

    Legend: black (non-refl)

    "16151112"

    "16515"8

    315

    "871314"

    "411

    "43

    "43

    "411

    "43

    "411

    6"C

    6"C

    "213

    "213

    48"

    48"

    W8-54-48

    Background: orange

    Legend: black (non-refl)

    "16151112"

    "16515"8

    315

    "43

    "411

    W8-55-48

    Background: orange

    Legend: black (non-refl)

    7"C

    7"C

    4"

    4"

    "43

    "411

    48"

    48"

    17"17"

    14""161513

    7"C

    6"C

    "1693

    "1693

    DETAILS

    See ARROW

    "161310"16

    1310

    "16116"16

    116

    "8110"8

    110

    "212

    *

    *

    "212

    "213

    "213

    3"R 3"R 3"R

    3"R3"R

    3"R

    "411

    3"R

    "43

    48"

    48"

    W8-9a-48

    Background: orange

    Legend: black (non-refl)

    "8511"8

    511

    "161519"16

    1519

    2"

    7"C

    "16134

    7"D

    "16134

    7"D

    "818

    "818

    48"

    48"

    W9-3a-48

    Background: orange

    Legend: black (non-refl)

    20"

    "8311

    "161313

    "161313

    3"R

    "411

    "43

    "417

    "16134

    "16134

    "417

    "16134

    W5-9-48

    "852

    "83

    "214

    "167R

    "412

    "811

    45°

    "852

    "414"4

    14

    "874

    "874

    "85

    19"

    "858

    "874

    "874

    "85

    "852

    "2110R

    "2110R "16

    13R

    "838

    40.9°

    40.9°

    "413

    "852

    "858

    "1613R

    New Design Engineer PE Stamp

    Revised sign and arrow details

    Updated sign number

    10-03-19

    5-31-18

    8-17-17

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally8-13-13

    D-704-11

    4683

    CONSTRUCTION SIGN DETAILS

    WARNING SIGNS

    Kirk J Hoff,

    10/03/19

  • Background: orange

    Legend: black (non-refl)

    48"

    48"

    15"15"

    "16114"16

    114

    "873

    3"

    6"C

    6"C

    6"C

    3"

    3"

    48"

    W22-8-48

    Background: orange

    Legend: black (non-refl)

    1"

    48"

    7"C

    7"C

    "411

    "43

    "411

    Background: orange

    Legend: black (non-refl)

    48"

    "4116"4

    116

    "4121"4

    121

    7"C

    7"C

    4"

    "43

    "411

    48"

    "214

    W20-51-48

    Background: orange

    Legend: black (non-refl)

    54"

    "16322"16

    322

    12"

    3"

    6"C

    3"

    W20-52P-54

    "83"16

    7

    WORD LETTER SPACING

    AHEAD Standard

    Standard

    Standard

    Standard

    Standard

    200 FT

    350 FT

    500 FT

    1000 FT

    1500 FT

    MILE21

    1 MILE

    6"D

    6"D

    48"

    Background: orange

    Legend: black (non-refl)

    3"

    "16151617"

    "8313"16

    513

    "43

    "411

    48"

    6"

    6"

    * DISTANCE MESSAGES

    6"D

    "873

    W21-50-48

    W21-51-48

    "43

    5"22" "21

    "87183"

    "1633 3"

    "211R

    Reduce 40%

    Reduce 40%

    Reduce 50%

    *

    "16119 "16

    1111

    Background: orange

    Legend: black (non-refl)

    48"

    48"

    "16919"16

    919

    "4114"4

    114

    7"C

    7"C

    5"

    "411

    W21-52-48

    "43

    "411

    "43

    7"C

    4"

    7"C

    4"

    7"C"2

    13

    "161312"16

    1312

    15"15"

    48"

    48"

    Background: orange

    Legend: black (non-refl)

    3"R 3"R 3"R

    3"R

    3"R 3"R

    "4112"4

    112

    W21-53-48

    12"

    18"

    "1654

    "875

    "418

    "16111

    "1612

    W16-7aP-18

    Background: orange

    Legend: black (non-refl)

    "83

    "167

    "211R

    3"

    "1673

    "1673

    "211

    "875

    "21

    "85R

    30°

    W16-7aP-18

    REVISIONS

    DATE CHANGE

    DEPARTMENT OF TRANSPORTATION

    NORTH DAKOTA

    of Transportation

    North Dakota Department

    document is stored at the

    on and the original

    PE- ,

    Registration Number

    issued and sealed by

    This document was originally5-31-18

    D-704-11A

    4683

    CONSTRUCTION SIGN DETAILS

    WARNING SIGNS

    Kirk J Hoff,

    11-01-19

    W16-7aP-18.

    Added details for sign

    11/1/19

  • TUBULAR MARKERVERTICAL PANEL

    28" min

    8" to 12"

    4"

    4"

    TRAFFIC CONE

    2" min

    4" to 6"

    36" min

    18" min

    DELINEATOR DRUM

    6"

    3" to 4"

    28" min

    2"

    4"

    4" to 6"

    More than 36"

    2" to 6"

    3"

    3"2"