sediment treatment in hamburg as part of a …sednet conference dubrovnik 04.04.2019 | röper /...
TRANSCRIPT
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 1
SEDIMENT TREATMENT IN HAMBURG
AS PART OF A CIRCULAR ECONOMY
SedNet Conference Dubrovnik, 04.04.2019
Dr. Henrich Röper, Heinz-Dieter Detzner, HPA
© HPA, Foto Henrich Röper
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 2
01
02
03
A strategic framework for sediment management
A circular economy for sediments?
The „Big Five“
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 3
A strategic framework for sediment management
01
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 4
Influencing Factors
Headwaterdischarge
Flooding
Contaminants
Water quality
Species and habitats
Water temperature
Currents and turbidity
Stormsurgesand wind
Sealevel rise
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 5
Cooperation Innovation
Enhance options
for maintenance and safe
navigation
Maintenance
Improve
sediment quality
Re-use application
after treatment
Remediation
Reduce
sediment quantity
direct beneficial use
River Engineering
Sediment Management Port of Hamburg
A strategic framework for sediment management
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 6
A circular economy forsediments?
02
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 7
Sediment fluxes in 2018 – Port of Hamburg
North SeaTonne E3
1,25 Mio. tTS
Tidal ElbeNeßsand
1,32 Mio. tTSLandtreatment and Disposal
Francop and Feldhofe0,175 Mio. tTS
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 8
Possible options?
Engineering measures in the Elbe estuary
- influencing thesedimentaion dynamic
- coastal protection
- habitat restoration
Sediment quality
acce
pta
nce
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 9
Habitat restoration in shallow waters with sediments from maintenence
© HPA© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 10
Possible options?
Engineering measures in the Elbe estuary
- influencing thesedimentaion dynamic
- coastal protection
- habitat restoration
Sediment quality
acce
pta
nce
Treatment and processingto meet productrequirements
- substitute of rawmaterials
- industrial uses
- costumized production
Economic potential
acce
pte
nce
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 11
Dredged material amounts: Port of Hamburg (2000 – 2018)
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 12
⇒ Sediments are eligible to circular economy thinking
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 13
The „Big Five“
03Beneficial Use Options
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 14
I Sand Dewatering Flumes - Ellerholz
• Operation phasesince 2000
• Annual throughputup to 450,000 m³/a
© HPA
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 15
Dredged Material Treatment Plant - METHA
• Operation phasesince 1993
• Annual throughputup to 550,000 m³/a
© HPA
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 16
Operation Principle of the METHA
Sand
Dewatering
Screen
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 17
DM Treatment - Dewatering Fields Moorburg
• Area size of dewatering fields:about 100 ha
• Field size: 2 - 4 ha
• Throughput capacity:up to 250,000 m³/a
© HPA
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 18
• Filling of dewatering fields
• Remove Supernatant water
• Natural dewatering by sun and wind
• Remove and transport to final use
Operation Principle of the Dewatering Fields
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 19
II DM as sealing material on disposal sites
• Disposal siteFeldhofe
• Capacity7,000,000 m³ DM
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 20
DM as sealing material on disposal sites
DK I DK II
Legend
Planting
Recultivation layer
Drainage layer
HDPE sealing membrane
Dredged Material sealing layer
Gas drainage layer
≥ 170
≥ 30
≥ 40
≥ 40
≥ 170
≥ 30
≥ 40
≥ 40
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 21
III DM as clay substitute in dike construction
METHA-Material (dark) grey)
Natural Marsh Sediment (brown)
• Pilot dike construction using METHA Material below a layer of natural marsh sediment at Ellerholzkanal,Hamburg
• Built in 2004
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 22
III DM as clay substitute in dike construction
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 23
IV Silty and sandy DM in backfilling measures
© HPA
• Area: 8 ha
• 290,000 m³ METHA-Material
• 420,000 ³ Sand
• Target Hight: + 8.00 m
• Built in 2013 - 2016
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 24
IV Silty and sandy DM in backfilling measures
© HPA
Previously installed dredged material
Vertical drainage
Groundwater inflow
into the construction
Groundwater level in
the surrounding site
technically lowered
groundwater level
Pump Pumpsurface structure G
rou
nd
wa
ter
me
asu
rin
g p
oin
t
METHA-Material
Sand
© HPA
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 25
V Silty DM material in the ceramic industry
© HPA
© HPA© HPA
© HPA
© HPA
PilotBrickyardHamburg
LeightweightAggregat Production
SedNet Conference Dubrovnik 04.04.2019 | Röper / Detzner | Folie 26
© HPA-Bildarchiv, Andreas Schmidt-Wiethoff
Dr. Henrich RöperWaterside InfrastructureStrategy and innovationTel.: [email protected]
Hamburg Port AuthorityNeuer Wandrahm 420457 Hamburg
Heinz-Dieter DetznerWaterside InfrastructureLand treatment and disposalTel.: [email protected]