Addendum #8 Project #2358 Jail Expansion, Medical Examiner Building & CTC Crisis Center Addition Public Works Facilities January 31, 2020 Request for Bid See original specification packet for addresses THIS ADDENDUM IS ISSUED TO MODIFY, EXPLAIN OR CORRECT THE ORIGINAL DRAWINGS AND SPECIFICATIONS AND IS HEREBY MADE PART OF THE CONTRACT DOCUMENTS. THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE ADDENDUM RECEIPT SCHEDULE, WHICH WAS INCLUDED IN THE ORIGINAL DOCUMENT PACKAGE. Vendors are required to read entire addendum to determine requirements affecting their contract. Addendum #8 This Addendum is issued to modify, explain, and amend the originally issued Specifications and Drawings dated December 11, 2019, and is hereby made a part of the Bidding Documents. Please acknowledge receipt of this Addendum on Attachment C: RFB Addendum Acknowledgement form. Please hand write on this form an additional check box for #8. Failure to submit this form may result in bidder disqualification. See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST

Upload: others

Post on 14-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

Addendum #8 Project #2358

Jail Expansion, Medical Examiner Building & CTC Crisis Center Addition Public Works Facilities

January 31, 2020 Request for Bid

See original specification packet for addresses THIS ADDENDUM IS ISSUED TO MODIFY, EXPLAIN OR CORRECT THE ORIGINAL DRAWINGS AND SPECIFICATIONS AND IS HEREBY MADE PART OF THE CONTRACT DOCUMENTS. THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE ADDENDUM RECEIPT SCHEDULE, WHICH WAS INCLUDED IN THE ORIGINAL DOCUMENT PACKAGE.

Vendors are required to read entire addendum to determine requirements affecting their contract.

Addendum #8 This Addendum is issued to modify, explain, and amend the originally issued Specifications and Drawings dated December 11, 2019, and is hereby made a part of the Bidding Documents. Please acknowledge receipt of this Addendum on Attachment C: RFB Addendum Acknowledgement form. Please hand write on this form an additional check box for #8. Failure to submit this form may result in bidder disqualification.

See Attached Information

BID DUE DATE 2/04/20 BY 2:00 P.M. CST

Page 2: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 and 180111.01 00 00 00 - 1 Addendum Number 8

© Venture Architects

ADDENDUM NUMBER 8

January 31, 2020

Brown County Project #2358

Issued By:

Venture Architects

212 North 25th Street

Milwaukee, WI 53233

To: Prospective Bidders

This Addendum is issued to modify, explain, and amend the originally issued Specifications and Drawings dated

December 11, 2019, and is hereby made a part of the Bidding Documents. Please acknowledge receipt of this

Addendum in the space provided on the Bid Form. Failure to do so may result in bidder disqualification.

PLEASE INSERT THIS ADDENDUM IN THE PROJECT MANUAL.

ARCHITECTURAL – SPECIFICATIONS – MEDICAL EXAMINER

1. SECTION 08 14 00 – FLUSH WOOD DOORS

a. ADD section in its entirety

2. SECTION 08 16 13 – FIBERGLASS REINFORCED PLASTIC CLAD DOORS

a. ADD section in its entirety

3. SECTION 08 70 00 – FINISH HARDWARE

a. REPLACE all HARDWARE GROUPS with the following groups:

HG1

BUTTS LOCK STOP

HG2 BUTTS ELECTRIC LOCK REX MR199A POWER TRANSFER PT1000 2 FLUSH BOLTS 1555 X 1570 CLOSER 7100/7100EDA/7100DS 2 STOP 2 KICKPLATE 12

2 DOOR POSITION SWITCH MC-4 CARD READER BY OTHERS.

CONNECTION BY DIVISION 26. OPERATIONAL DESCRIPTION: DOOR NORMALLY CLOSED AND LOCKED. FREE EGRESS ALLOWED AT ALL TIMES. REX TO SHUNT DOOR POSITION SWITCH. OUTSIDE ACCESS BY CARD READER, WHICH WILL SHUNT THE ALARM AND UNLOCK OUTSIDE TRIM.

HG3 BUTTS LOCK CLOSER 7100/7100EDA STOP KICKPLATE 12

Page 3: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 and 180111.01 00 00 00 - 2 Addendum Number 8

© Venture Architects

HG4 BUTTS LOCK CLOSER 7100DS KICKPLATE 12

HG5 BUTTS ELECTRIC LOCK REX MR199A POWER TRANSFER PT1000 CLOSER 7100/7100EDA/7100DS STOP KICKPLATE 12

DOOR POSITION SWITCH MC-4 CARD READER BY OTHERS.

CONNECTION BY DIVISION 26. OPERATIONAL DESCRIPTION: DOOR NORMALLY CLOSED AND LOCKED. FREE EGRESS ALLOWED AT ALL TIMES. REX TO SHUNT DOOR POSITION SWITCH. OUTSIDE ACCESS BY CARD READER, WHICH WILL SHUNT THE ALARM AND UNLOCK OUTSIDE TRIM.

HG6 BUTTS PRIVACY WITH INDICATOR MR276 CLOSER 7100/7100EDA (DS AT 115 B/C) STOP KICKPLATE 12

HG7 BUTTS LOCK CLOSER 7100/7100EDA STOP KICKPLATE 12 JAMB SEAL 5050 AUTO DOOR BOTTOM 4447S

HG8 BUTTS ELECTRIC LOCK REX MR199A POWER TRANSFER PT1000 CLOSER 7100/7100EDA/7100DS STOP KICKPLATE 12 JAMB SEAL 5050 AUTO DOOR BOTTOM 7774S

DOOR POSITION SWITCH MC-4 CARD READER BY OTHERS.

CONNECTION BY DIVISION 26. OPERATIONAL DESCRIPTION: DOOR NORMALLY CLOSED AND LOCKED. FREE EGRESS ALLOWED AT ALL TIMES. REX TO SHUNT DOOR POSITION SWITCH. OUTSIDE ACCESS BY CARD READER, WHICH WILL SHUNT THE ALARM AND UNLOCK OUTSIDE TRIM.

HG9 HARDWARE BY DOOR MANUFACTURER

Page 4: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 and 180111.01 00 00 00 - 3 Addendum Number 8

© Venture Architects

HG10 BUTTS ELECTRIC LOCK REX MR200A POWER TRANSFER PT1000 CLOSER 7100/7100EDA/7100DS STOP KICKPLATE 12

DOOR POSITION SWITCH MC-4 CARD READER BY OTHERS.

CONNECTION BY DIVISION 26. OPERATIONAL DESCRIPTION: DOOR NORMALLY CLOSED AND LOCKED. FREE EGRESS ALLOWED AT ALL TIMES. REX TO SHUNT DOOR POSITION SWITCH. OUTSIDE ACCESS BY CARD READER, WHICH WILL SHUNT THE ALARM AND UNLOCK OUTSIDE TRIM.

HG11 HINGE HD2400 ELECTRIC LOCK REX MR199A POWER TRANSFER PT1000 LATCH GUARD MLP111 CLOSER 7100SCS KICKPLATE 12 THRESHOLD 425 JAMB SEAL 160S SWEEP 675

DOOR POSITION SWITCH MC4 CARD READER BY OTHERS.

CONNECTION BY DIVISION 26. OPERATIONAL DESCRIPTION: DOOR NORMALLY CLOSED AND LOCKED. FREE EGRESS ALLOWED AT ALL TIMES. REX TO SHUNT DOOR POSITION SWITCH. OUTSIDE ACCESS BY CARD READER, WHICH WILL SHUNT THE ALARM AND UNLOCK OUTSIDE TRIM.

HG12 BUTTS DEAD BOLT KT116 FLUSH BOLT 1555 X 1570 2 ROLLER LATCHES 1702 2 OVERHEAD HOLDERS 4430 2 DUMMY TRIM MR211

HG13 HINGE HD2400 EXIT DEVICE SS MLR6202R X CYL POWER TRANSFER PT1000 POWER SUPPLY 81440 PULL 1158 CLOSER 7100 X DPDT OVERHEAD STOP 1020 THRESHOLD 425 SWEEP 675

DOOR POSITION SWITCH MC4 CARD READER BY OTHERS.

CONNECTION BY DIVISION 26. OPERATIONAL DESCRIPTION: DOOR NORMALLY CLOSED AND LOCKED. FREE EGRESS ALLOWED AT ALL TIMES. SS TO SHUNT DOOR POSITION SWITCH. OUTSIDE ACCESS BY CARD READER, WHICH WILL SHUNT THE ALARM AND RETRACT LATCHBOLT

Page 5: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 and 180111.01 00 00 00 - 4 Addendum Number 8

© Venture Architects

HG14 HINGE HD2400 EXIT DEVICE SS MLR6202R X CYL POWER TRANSFER PT1000 POWER SUPPLY 81440 PULL 1158 CLOSER 7100 X DPDT OVERHEAD STOP 1020

DOOR POSITION SWITCH MC4 CARD READER BY OTHERS.

CONNECTION BY DIVISION 26. OPERATIONAL DESCRIPTION: DOOR NORMALLY CLOSED AND LOCKED. FREE EGRESS ALLOWED AT ALL TIMES. SS TO SHUNT DOOR POSITION SWITCH. OUTSIDE ACCESS BY CARD READER, WHICH WILL SHUNT THE ALARM AND RETRACT LATCHBOLT

ARCHITECTURAL – SPECIFICATIONS – CTC

1. SECTION 08 14 00 – FLUSH WOOD DOORS

a. ADD section in its entirety

ELECTRICAL – DRAWINGS – CTC

1. SHEET 3-E201 – ENLARGED LIGHTING FLOOR PLANS

a. ADD details as shown on Floor Plan

2. SHEET 3-E401 – ELECTRICAL SHCEDULES AND NOTES

a. ADD details as shown on Sheet

DOCUMENT ATTACHMENTS:

SPECIFICATION ATTCHMENTS – MEDICAL EXAMINER:

SECTION 08 14 00 – Flush Wood Doors

SECTION 08 16 13 – Fiberglass Reinforced Plastic Clad Doors

SPECIFICATION ATTACHMENTS - COMMUNITY TREATMENT CENTER:

SECTION 08 14 00 – Flush Wood Doors

DRAWING ATTACHMENTS – COMMUNITY TREATMENT CENTER:

3-E201, 3-E401

- End of Addendum Number 8 -

Page 6: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 14 00 - 1 Flush Wood Doors

© Venture Architects, LLC

SECTION 08 14 00

FLUSH WOOD DOORS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Solid-core flush wood doors: 1. Wood-veneer faces factory pre-fitting, pre-machining for hardware, detailing, and factory

pre-finishing. 2. Coat Hooks.

1.2 RELATED SECTIONS

A. Section 06 10 00 – Rough Carpentry.

B. Section 06 40 00 – Millwork.

C. Section 08 70 00 – Finish Schedule

1.3 REFERENCE STANDARDS

A. WDMA IS 1A - Window and Door Manufacturers Association (WDMA)

B. AWI – Architectural Woodwork Standards of the Architectural Woodwork Institute (AWI)

C. NFPA 80 - Fire Doors and Windows

D. NFPA 252 - Standard Methods of Fire Tests for Door Assemblies

E. Underwriters' Laboratories - UL 10B (neutral pressure) and UL 10C (positive pressure) - Fire

Tests of Door Assemblies

F. Intertek ITS (Warnock Hersey) - Certification Listings for Fire Doors

G. ASTM E90 - Measurement of Airborne Sound Transmission Loss of Building Partitions

1.4 SUBMITTALS

A. Product Data: Submit door manufacturer's product construction data, hardware attachment performance data, specifications and installation instructions for each type of wood door, including details of core and edge construction, trim for lite openings and similar components.

B. Warranty: Submit sample of manufacturer's door warranty.

C. Shop Drawings: Provide the following information:

1. Door type. 2. Door size. 3. Fire Rating:

a. Neutral pressure - UL 10B/UBC43-2 or 7-2-94.

4. Positive pressure - UL 10C/UBC7-2-97.

Page 7: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 14 00 - 2 Flush Wood Doors

© Venture Architects, LLC

5. Hardware types and locations. 6. Hardware blocking requirements and location. 7. Vision panel or louver cutout size and location.

8. Prefinish system type and approved color(s).

D. Samples:

1. Color samples for factory pre-finishing. Manufacturer shall submit samples of not less than 4" x 6" size of representative veneer or paintable surface, with sample date indicated.

2. Construction samples. Corner sections with door faces, edges, and core representative of the specified door type(s). Corner samples to be not less than 6" x 6".

1.5 QUALITY ASSURANCE

A. Manufacturer: Company specializing in manufacturing products specified in Section with a minimum of five years documented experience. All doors shall be supplied through one Company.

B. Quality Standard: Doors to comply with WDMA I.S. 1-A, Premium Grade.

C. Fire Ratings Compliance: Fire-rated wood doors to comply with NFPA-80 requirements according

to building code standards having local jurisdiction.

D. Label Certification: All doors requiring fire-rating will carry either UL or ITS (Warnock Hersey)

label. Manufacturer's certification labels maybe used for door size variations if approved by AHJ

(Authority Having Jurisdiction).

E. Delivery/Storage/Handling: Store and protect doors in accordance with manufacturer's recommendations and WDMA. Following are general guidelines. For more specific information,

refer to WDMA's Appendix Section "Care and Installation at Job Site." 1. Store doors flat and off the floor on a level surface in a dry, well -ventilated building. Do not

store on edge. Protect doors from dirt, water and abuse.

2. Protect unfinished doors from exposure to light (artificial or natural) after delivery.

3. Do not subject interior doors to extremes in either heat or humidity. HVAC systems shall

be operational and balanced, providing a temperature range of 50 to 90 degrees Fahrenheit and 30% to 50% relative humidity.

4. When handling doors, always lift and carry. Do not drag across other doors or surfaces. Handle with clean hands or gloves.

5. Each door shall be marked on top rail with opening number.

1.6 WARRANTY

A. Doors shall be warranted by the manufacturer to be free of manufacturing defects for the life of the original installation.

B. Warranty shall provide for repair or replacement of the door as originally furnished. Manufacturer

shall elect to repair or replace defective door(s), and will assume reasonable costs associated

with same.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Non-Fire-Rated Flush Doors:

1. Construct using WDMA Five (5) Ply construction, using Hot Press method for laminating door materials. Stiles and rails must be securely bonded to the core and then abrasively

Page 8: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 14 00 - 3 Flush Wood Doors

© Venture Architects, LLC

planed prior to veneering. 2. Core:

a. Particleboard Core (PC-5) to comply with ANSI Stnd. A208.1 LD-2, with screw holding power of 125 lbs., modulus of rupture of 800 psi, modulus of elasticity of 150,000 psi and density of 30-35 lbs. per cubic foot.

b. Structural Composite Lumber Core (SCLC-5): (Full Lite Doors). Engineered hardwood composite. Material shall comply with WDMA minimum performance levels for interior applications with screw holding power of 540 lbs., modulus of rupture of 6,500 psi, modulus of elasticity of 1,300,000 psi and density of 38 lbs. per cubic foot.

3. Crossbands shall be wood-based minimum 1/16-inch thick. Laminate crossbands and face veneers to the core with Type 2 interior use glue using the Hot Press process. Extend crossbands the full width of the door. Minimum properties include internal bond of 100 psi and density of 50 lbs. per cubic foot.

4. Stiles: Hardwood, one piece, laminated or veneered. Constructions with laminated edges

may use structural composite lumber as an inner stile component. a. Matching - Same species as face veneer.

5. Rails: Solid wood, structural composite lumber meeting the minimum requirements of

WDMA.

6. Hardware Blocking: Minimum 5-inch top rail and 5-inch bottom rail for specialized hardware or undercutting flexibility.

7. Reinforce top and/or bottom rails to eliminate the need for through -bolting when installing closers or holders.

Screws must penetrate doors a minimum of 1-1/2" 8. Pair and Set Match:

a. For openings with more than one door, door faces shall be pair or set matched. This includes doors separated by a mullion.

B. Fire-Rated Doors:

1. Construct using WDMA Five (5) Ply construction, using Hot Press method for laminating

door materials. a. Fire Rating Specified: See Door and Frame Schedule. b. Category A Positive Pressure openings shall have all the intumescent required for

compliance contained within the door and require no additional installation of intumescent strips.

c. Positive Pressure Category A 2. Core:

a. Particleboard Core (1/3 hour rated doors only):

Comply with ANSI Stnd. A208.1 LD-2 with screw holding power of 125 lbs.,

modulus of rupture of 800 psi, modulus of elasticity of 150,000 psi and density of 30-

32 lbs. per cubic foot. b) Mineral Core (Rating higher than 1/3 hour):

Non-combustible mineral composite material. 3. Crossbands: Wood-based composites of a minimum thickness of 1/16". Crossbands and

face veneers shall be laminated to the core with Type 2 interior use glue using the Hot Press process. Crossbands must extend the full width of the door. Minimum properties include internal bond 100 psi and density of 50 lbs. per cubic foot.

4. Stiles - Provide manufacturer's standard laminated edge construction with improved screw-holding capability and split resistance. Both inner and outer stiles shall not contain salt treating. a. Matching - Same species as face veneer.

5. Rails - Solid wood or other material contained in manufacturer's fire door approvals.

6. Hardware Blocking: Minimum 5" top rail for specialized hardware and 5" bottom rail for specialized hardware or undercutting flexibility and/or blocking for lockset installation.

7. Reinforce top and/or bottom rails to eliminate the need for through -bolting when installing closers or holders.

Note: Screws must penetrate doors a minimum of 1-1/2"

8. Pair and Set Match:

Page 9: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 14 00 - 4 Flush Wood Doors

© Venture Architects, LLC

For openings with more than one door, door faces shall be pair or set matched. This includes doors separated by a mullion.

2.3 DOOR FABRICATION

A. Factory-prefit and bevel doors (3 degrees ) to suit frame sizes indicated, with 3/16-inch prefit in

width, + 0"/- 1/32", tolerances. Prefit top of door 1/8" +1/16"/-0", and undercut 1/2-inch from top of decorative floor covering. For fire-rated doors comply with NFPA 80 for prefits and undercuts.

B. Factory pre-machine doors for hardware that is not surface applied. Locations and hole patterns to comply with specified hardware requirements as per NFPA 80 standards for doors specified; and to maintain door manufacturer's warranty.

1. Specific locations for hardware will be coordinated between frame and door manufacturers.

2. Specific hardware preps will be per hardware schedule(s) provided. Hardware preps to be neatly and cleanly squared as required per hardware templates.

3. Metal astragals and channels to be supplied where fire -ratings will not allow metal-free

edge(s).

C. Factory Preparation for Light Openings and Louvers - Cut and trim openings through doors to comply with NFPA 80 requirements where indicated; and to maintain door manufacturer's

warranty. 1. Wood beads and wood louvers to be compatible with face veneer. Profiles and installation

per door manufacturer's standard(s).

D. Hat and Coat Hooks: Satin stainless steel. 2-inch x 2-inch Flange. Hook 1-inch W, 6 1⁄2 inches H; projects 3-3⁄16 inches from wall. Concealed wall plate. 1. Bobrick, "No. B-6827 2. Bradley, "Model 9134"

3. American Specialties, "Model 7382-S"

4. A&J Washroom Accessories, "Model UX116-SF" 5. Other manufacturers as approved by Architect.

2.4 FACTORY FINISHING

A. Finish Location: 1. Factory Finishing – All doors to receive a factory finish to meet or exceed WDMA I.S. 1A

TR-6 – Catalyzed Polyurethane.

2. Color tone to be selected by Architect. Submit 12" x 12" sample of proposed finish and receive Architect approval of s ample prior to finishing doors.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Confirm that frames comply with type, size, location and swing requirements and that they are

installed plumb and square.

B. Inspect doors for any damage, manufacturing defects or prefinish inconsistency, e.g. wrong color or poor finish.

C. If frames and doors pass inspections (see A and B above), proceed to installation. Notify

Construction Manager if there are any issues in either frames or doors. Do not proceed with

installation until unsatisfactory conditions have been corrected.

Page 10: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 14 00 - 5 Flush Wood Doors

© Venture Architects, LLC

3.2 INSTALLATION

A. Installation of wood doors to comply with WDMA IS 1A, specific door manufacturer ’s specific instructions, and NFPA 80.

3.3 ADJUSTING AND PROTECTING

A. After installation of door in frame, operate door to ensure that the door swings freely and that all hardware functions correctly. If not, make adjustments as required to provide an operable opening.

B. If required, protect doors following installation from damage that may occur as a result of project

completion.

END OF SECTION

Page 11: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 16 13 - 1 Fiberglass Reinforced Plastic Doors

© Venture Architects, LLC

SECTION 08 16 13

FIBER REINFORCED PLASTIC (FRP) DOORS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Fiberglass reinforced polyester (FRP) clad non-rated doors.

1.2 RELATED SECTIONS

A. Section 08 11 00 – Hollow Metal Doors and Frames: Hollow metal frames.

B. Section 08 70 00 - Door Hardware.

1.3 REFERENCES

A. ASTM International (ASTM): 1. ASTM D256 - Determining the Pendulum Impact Resistance of Notched Specimens of

Plastics. 2. ASTM D543 - Evaluating the Resistance of Plastics to Chemical Reagents. 3. ASTM D570 - Water Absorption of Plastics. 4. ASTM D638 - Tensile Properties of Plastics.

5. ASTM D790 - Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials.

6. ASTM D1308 - Effect of Household Chemicals on Clear and Pigmented Organic Finishes. 7. ASTM D2583 - Indentation Hardness of Rigid Plastics by Means of a Barcol Impressor.

1.4 PERFORMANCE REQUIREMENTS

A. General: Provide door assemblies that have been designed and fabricated to comply with specified performance requirements, as demonstrated by testing manufacturer's corresponding standard systems.

B. Impact Strength, FRP Doors and Panels, Nominal Value, ASTM D256: 15.0 foot-pounds per inch of

notch.

C. Tensile Strength, FRP Doors and Panels, Nominal Value, ASTM D638: 14,000 psi.

D. Flexural Strength, FRP Doors and Panels, Nominal Value, ASTM D790: 21,000 psi.

E. Water Absorption, FRP Doors and Panels, Nominal Value, ASTM D570: 0.20 percent after 24 hours.

F. Indentation Hardness, FRP Doors and Panels, Nominal Value, ASTM D2583: 55.

G. Abrasion Resistance, Face Sheet, Taber Abrasion Test, 25 Cycles at 1,000 Gram Weight with CS-17 Wheel: Maximum of 0.029 average weight loss percentage.

H. Stain Resistance, ASTM D1308: Face sheet unaffected after exposure to red cabbage, tea, and

tomato acid. Stain removed easily with mild abrasive or FRP cleaner when exposed to crayon and crankcase oil.

I. Chemical Resistance, ASTM D543. Excellent rating.

1. Acetic acid, Concentrated.

2. Ammonium Hydroxide, Concentrated.

Page 12: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 16 13 - 2 Fiberglass Reinforced Plastic Doors

© Venture Architects, LLC

3. Citric Acid, 10%. 4. Formaldehyde. 5. Hydrochloric Acid, 10%

6. Sodium hypochlorite, 4 to 6 percent solution.

1.5 SUBMITTALS

A. Comply with General Conditions and Division 01.

B. Product Data: Submit manufacturer's product data, including description of materials, components, and installation.

C. Shop Drawings: Submit manufacturer's shop drawings, including elevations, sections, and details,

indicating dimensions, tolerances, materials, components, and fabrication.

D. Samples: 1. Door: Submit manufacturer's sample of door showing face sheets, core, finish, and vision

lites. 2. Color: Submit manufacturer's samples of standard colors of doors.

E. Test Reports: Submit certified test reports from qualified independent testing agency indicating doors comply with specified performance requirements.

F. Manufacturer's Project References: Submit list of successfully completed projects, including project

name and location, name of architect, and type and quantity of doors manufactured.

G. Maintenance Manual: Submit manufacturer's maintenance and cleaning instructions for doors, including maintenance and operating instructions for hardware.

H. Warranty: Submit manufacturer's standard warranty.

1.6 QUALITY ASSURANCE

A. Manufacturer's Qualifications: 1. Continuously engaged in manufacturing of doors of similar type to that specified, with a

minimum of 25 years successful experience. 2. Door and frame components from same manufacturer. 3. Evidence of a compliant documented quality management system.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Delivery: Deliver materials to site in manufacturer's original, unopened containers and packaging, with labels clearly identifying opening door mark and manufacturer.

B. Storage: Store materials in clean, dry area indoors in accordance with manufacturer's instructions.

C. Handling: Protect materials and finish from damage during handling and installation.

1.8 WARRANTY

A. Warrant doors and factory hardware against failure in materials and workmanship, including excessive deflection, faulty operation, defects in hardware installation, and deterioration of finish or construction in excess of normal weathering.

B. Warranty Period: Ten years.

Page 13: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 16 13 - 3 Fiberglass Reinforced Plastic Doors

© Venture Architects, LLC

PART 2 - PRODUCTS

2.1 MANUFACTURER

A. Doors by the following manufacturers which meet performance requirements of this specification and which provide frame caps frames are also approved: 1. Curries FRP Door System. 2. Other manufacturers as approved by Architect.

2.2 FIBERGLASS REINFORED PLASTIC DOORS

A. Required Rating: See Door and Frame Schedule.

B. Door Opening Size: As indicated on the Drawings.

C. Construction: 1. Door Thickness: 1-7/8 inches at door edge.

2. Stiles and Rails: Stainless steel channel secured with stainless steel screws every 10 inches. 3. Corners: Welded.

D. Face Sheets:

1. Material: Fiberglass Reinforced Plastic. 2. Thickness: 0.120 inch. 3. Surface: Abuse-resistant engineered surface. 4. Color: As selected by Architect from manufacturer's standard colors. 5. Sheet Type: Class A FRP

E. Core: 1. Material: Mineral. 2. Density: Minimum 30 pounds per cubic foot.

3. Perimeter blocking: Minimum 1-1/2 inches wide.

F. Cutouts: 1. Manufacture doors with cutouts for required vision lites. 2. Factory install vision lites.

G. Door Perimeter Channel: Type 304 stainless steel, 3/4 inch by 1-7/8 inches by 0.062 inch.

H. Fasteners: 1. Material: Aluminum, 18-8 stainless steel, or other noncorrosive metal. 2. Compatibility: Compatible with items to be fastened.

3. Exposed Fasteners: Screws with finish matching items to be fastened.

I. Hollow Metal Frames: As specified in Section 08 11 00.

2.3 FABRICATION

A. Sizes and Profiles: Required sizes for door and profile requirements shall be as indicated on the Drawings.

B. Coordination of Fabrication: Field measure before fabrication and show recorded measurements on

shop drawings.

C. Assembly: 1. Complete cutting, fitting, forming, drilling, and grinding of metal before assembly. 2. Remove burrs from cut edges.

D. Fit: 1. Maintain continuity of line and accurate relation of planes and angles.

Page 14: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 16 13 - 4 Fiberglass Reinforced Plastic Doors

© Venture Architects, LLC

2. Secure attachments and support at mechanical joints with hairline fit at contacting members.

2.4 DOOR HARDWARE

A. Hardware shall be fire rated, as specified in Door Schedule.

B. Premachine doors in accordance with templates from specified hardware manufacturers and hardware schedule.

C. Factory install hardware, except field apply gaskets and seals.

D. Hardware Schedule: As specified in Section 08 70 00 – Door Hardware.

E. Finish: As specified in Section 08 70 00 – Door Hardware.

F. Gaskets and Seals supplied by manufacturer: 1. Gaskets: Pemko S88. 2. Smoke Seals: Pemko HSS2000, 1/2-inch wide. 3. Smoke Seals, Pair Doors, Meeting Stile: Pemko S77.

2.5 VISION LITES

A. Vision Lite Kit: Stainless steel.

B. Factory Glazing: 3/16-inch NGP Firelite NT, clear.

C. Size: See Door Types

2.6 ALUMINUM DOOR FRAMING SYSTEMS

A. Insert Framing System:

1. Model: Special-Lite, SL-1030 Series. 2. Insert frame using integral stop fitted with weather stripping. 3. Corner joints of miter design, secure with furnished aluminum clips, and screw into place.

4. Hardware: a. Pre-machine and reinforce insert frame members for hardware in accordance with

manufacturer's standards and hardware schedule. b. Factory install hardware.

5. Anchors: a. Anchors of suitable type to fasten insert framing to existing frame materials.

b. Minimum of 5 anchors on jambs up to 7'-4" height, 3 anchors on headers, and 1 additional anchor for each additional foot of frame.

B. Frame Capping:

1. Special-Lite Model: SL-70. 2. Capping: With insert frame as indicated on the Drawings.

3. Finish: Match framing.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas to receive doors. Notify General Contractor of conditions that would adversely affect installation or subsequent use. Do not proceed with installation until unsatisfactory conditions are corrected.

Page 15: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge

180111.00 08 16 13 - 5 Fiberglass Reinforced Plastic Doors

© Venture Architects, LLC

3.2 PREPARATION

A. Ensure openings to receive frames are plumb, level, square, and in tolerance.

3.3 INSTALLATION

A. Install doors in accordance with manufacturer's instructions.

B. Install hollow metal frames as specified in Section 08 11 00.

C. Install insert framing system and frame capping.

D. Install doors plumb, level, square, true to line, and without warp or rack.

E. Install gaskets and seals to doors in accordance with manufacturer's instructions.

F. Repair minor damages to finish in accordance with manufacturer's instructions and as approved by Architect.

G. Remove and replace damaged components that cannot be successfully repaired as determined by

Architect.

3.4 ADJUSTING

A. Adjust doors, hinges, and locksets for smooth operation without binding.

3.5 CLEANING

A. Clean doors promptly after installation in accordance with manufacturer's instructions.

B. Do not use harsh cleaning materials or methods that would damage finish.

3.6 PROTECTION

A. Protect installed doors to ensure that, except for normal weathering, doors will be without damage or deterioration at time of substantial completion.

END OF SECTION

Page 16: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge
Page 17: See Attached Information BID DUE DATE 2/04/20 BY 2:00 P.M. CST · dead bolt kt116 flush bolt 1555 x 1570 2 roller latches 1702 2 overhead holders 4430 2 dummy trim mr211 hg13 hinge