Select Committee on Economic Development INEP and SWH 14 June 2011. Integrated National Electrification Program (INEP). Historical performance of the programme. Always behind schedule and catching up in the following years. Integrated National Electrification Program (INEP). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Select Committee on

Economic Development

INEP and SWH

14 June 2011

Page 2: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Integrated National Electrification Program (INEP)

Historical performance of the programme

Always behind schedule and catching up in the following years

YearConnections Target

Connections completed to date % Completed

2006/7 76,305 74,253 97%

2007/8 66,875 66,131 99%

2008/9 48,447 46,381 96%

2009/10 76,263 67,002 88%

2010/11 84,235 28,976 34%

Total 352,125 282,743 80%

Page 3: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Integrated National Electrification Program (INEP)

2011/12 performance of the programmeProvince No. planned Project complete

with energy supply> 50% progress

< 50% progress

Construction not started

Eastern Cape 80 35% 28% 11% 26%Free State 16 50% 25% 6% 19%Gauteng 14 71% 21% 7% 0%KwaZulu Natal 79 9% 0% 53% 38%Limpopo 85 60% 6% 8% 26%Mpumalanga 26 35% 15% 4% 46%North West 6 83% 17% 0% 0%Northern Cape 23 39% 13% 22% 26%Western Cape 34 56% 6% 15% 24%Total 363 40% 12% 20% 28%

Page 4: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Some issues for consideration

• Discussed in terms of 1. Rural

2. Urban

3. Informal Settlements

Page 5: Select Committee  on  Economic Development INEP and SWH 14 June 2011

INEP Rural

• 75 % of backlogs• Largely areas in which Eskom is a licensed

distributor• Municipalities (non-licensed and licensed) access

money from DoE, Provincial Governments to implement projects in these Eskom areas of supply

• Hand over infrastructure to Eskom on completion for O&M

Current situation

Page 6: Select Committee  on  Economic Development INEP and SWH 14 June 2011

INEP - Rural

• Non- distributing municipalities do not have electricity departments – completely rely on consultants

• Also many distributing municipalities have vacancy levels of skilled resources exceeding 50% of established posts (ref: EDI Holdings ring-fencing study) – but still stretch themselves to Eskom areas

• Apparently consultants approach municipalities to be appointed for designing and managing implementation of projects

• The design cost is purported to be at risk and the payment is recovered once the project submitted by the municipality is approved; no real risk

– Desperate MMs take the first available “support” they can get – No capacity to review the appropriateness of proposed projects and quality

of work– INEP offices have no capacity either to support municipalities in this regard

Some concerns

Page 7: Select Committee  on  Economic Development INEP and SWH 14 June 2011

INEP - urban

• A fraction of the 25% of backlog• Largely areas in which 177 municipalities are licensed

distributors• DoE does not allow upgrade of existing infrastructure required

for electrification projects• Infill connections– DoE reluctant to fund infill connections – demand for these

connections in existing developments is increasing as more houses are built; contrary to the objective of densification of spatial development patterns to improve urban efficiency.

– Requirement for 80% occupancy of housing developments has also been a delaying factor; also leading to public protests about incomplete houses

Current situation

Page 8: Select Committee  on  Economic Development INEP and SWH 14 June 2011

INEP – Informal settlements

• A significant component of the remaining 25% backlog

• Numbers of informal settlements are increasing with a consequent requirement from political leaders and communities for `regularisation’ (including electrification) of these areas

• Should be a key focus area in the context of the Informal Settlements Upgrading programme

• National target to upgrade informal settlements and provide proper services and land tenure to 400 000 households by 2014.

• DoE currently providing for the electrification of informal settlements.

• Apart from providing the required electrical reticulation, each informal dwelling is also provided with a Pre-paid meter connection and basic connections for electrical fittings.

Current situation

Page 9: Select Committee  on  Economic Development INEP and SWH 14 June 2011

INEP – Informal settlements

• Need for the planning alignment of the Informal Settlement Upgrading Programme with the electrical reticulation programme of the Department of Energy to ensure that electrical grid is available when settlement upgrading projects commence.

• Will require that provincial governments to make their approved Multi Year Housing Development Plans and priority development objectives available to the DoE enable the latter to align its electrification programme accordingly.

Current situation

Page 10: Select Committee  on  Economic Development INEP and SWH 14 June 2011

INEP – Informal settlements

• Agreement required on the removal and recovery of the installed Pre-paid Meters from informal dwellings and the re-installation thereof in the new dwelling units, constructed through the National Housing Programme.

• This initiative will require that the National Housing Programme to be adjusted to include funding for the removal of the existing meters and the re-installation thereof in the new dwellings.

Current situation

Page 11: Select Committee  on  Economic Development INEP and SWH 14 June 2011

INEP - General

• Inequitable funding from DoE– DoE policy to partially fund electrification connections by

municipalities (urban and rural subsidies) but provide the full cost of connections provided by Eskom

– Municipalities are thus required to `top-up’ funding of electrification projects which impacts the overall municipal budget

– The costs have become higher for the remaining difficult areas

– Some municipalities have severe cash shortage problems

• Funding application process– Not aligned with the municipal budgeting process

– Lack of certainty of three-year DoRA allocations

– National Treasury will only release funding to municipalities wef 1 July of each year

Some concerns

Page 12: Select Committee  on  Economic Development INEP and SWH 14 June 2011

INEP - General

• Bulk infrastructure– Some projects may not proceed without the availability of

bulk infrastructure– Frequent cause of delay in electrification projects– Misalignment between Eskom infrastructure and municipal

dev. Plans

• MFMA procurement process– Many municipalities point to the drawn out procurement

process to appoint consultants and purchase the necessary equipment and materials as reasons for the delay in completing electrification projects; balance between ensuring accountability and functionality

Some concerns

Page 13: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Recommendations

• Need some shared capacity to provide technical support to under-capacitated municipalities; capacitate INEP regional offices to play this role

• INEP offices be the points of coordination/ planning alignment between various electrification projects funding agencies

• Provincial Housing Departments must make their approved Multi Year Housing Development Plans and priority development objectives available to the DoE enable the latter to align its electrification programme accordingly

• DoE to allow upgrade of existing infrastructure required for electrification projects

• DoE to fund infill connections

• Requirement for 80% occupancy of housing developments be done away with

Page 14: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Recommendations

• Adjustment of the National Housing Programme to include funding for the removal of the existing meters and the re-installation thereof in the new dwellings

• DoE policy should provide the full cost of connections in areas provided by both Eskom and municipalities

• Eskom to enter into SDAs with municipalities where Eskom is a distributor so as to ensure alignment of expectations

Page 15: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Solar Water Heating programme

• Target of 1 million SWH by 2014 through– Government Departments– Municipalities– Individual and business initiatives incentivized by

rebate systems through Eskom

• Delivered over 115 000 systems under the fiscal and rebate funding schemes since 2009

• Need significant improvement in funding and institutional arrangements to achieve the target of 1 million SWH by 2014

Page 16: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Fiscal funding Scheme

• Almost insignificant in scale• Essentially a welfare intervention aimed at improving the quality of life of

poor households, not about reducing existing demand from the grid;

Municipality Target Actual Delivery mechanism

2010/11 2011/12 Total To date Full subsidy to poor hhs

Mussina 6,000 6,000 Schedule 7 through Eskom

Sol Plaatje 7,837 7,837 2,920 Schedule 7 through EskomEmfuleni 6,000 6,000 Schedule 7 through Eskom

Naledi 7,837 7,837 1,137 Schedule 7 through Eskom

Umsobomvu 6,000 6,000 Schedule 6 direct transfer

Tshwane 15,000 15,000 14,064 Schedule 7 through Eskom

Total 30,674 18,000 48,674 18,121

Page 17: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Rebate funding schemes

• Appears that this has delivered 96,879 of the estimated 115 000 systems under the fiscal and rebate funding schemes since 2009

• This appears a lost opportunity to reduce existing demand from the grid at a time of tight supply conditions

• Delegating this project to one institution, Eskom, and Eskom’s implementation mechanism that does not take advantage of the potential contribution that can be made by municipalities may have been part of the problem.

• Insurance companies still do not replace burst geysers with solar water geysers

• Geyser Heat Pumps not as vigorously pursued/ promoted as much as they should be in cases of relatively new existing geysers

Page 18: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Recommendations

• DoE should devise an implementation strategy that takes advantage of the benefit of numbers and ability to access communities that may be leveraged by working with municipalities; for both the fiscal and the rebate schemes

• DoE discuss with insurance companies possible use of the rebate as a top-up to the insured value of a new geyser to cover price difference between a normal geyser and a solar water geyser.

• More vigorous effort to improve uptake of geyser heat pumps

Page 19: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Conclusion

• SALGA will be seeking to persuade government, on the above recommendations, through the National Electrification Advisory Committee (NEAC)

• The NEAC is non-statutory advisory body, comprising representatives of major stakeholders, as a consultative forum to advise the Minister and the Director General on aspects of the INEP and to assist in guiding the programme.

Page 20: Select Committee  on  Economic Development INEP and SWH 14 June 2011

Thank You