Select solutions to Chapter 11: 11-16 The conceptual problem in applying fixed manufacturing overhead as a product cost is that this procedure treats fixed overhead as though it were a variable cost. Fixed overhead is applied as a product cost by multiplying the fixed overhead rate by the standard allowed amount of the cost driver used to apply fixed overhead. For example, fixed overhead might be applied to Work-in- Process Inventory by multiplying the fixed-overhead rate by the standard allowed machine hours. As the number of standard allowed machine hours increases, the amount of fixed overhead applied increases proportionately. This situation is conceptually unappealing, because fixed overhead, although it is a fixed cost, appears variable in the way that it is applied to work in process. EXERCISE 11-26 (40 MINUTES) 1 . Variable overhead variances: VARIABLE-OVERHEAD SPENDING AND EFFICIENCY VARIANCES Actu al Hour Actu al Rate Actu al Hour Standa rd Rate Standa rd Rate Standa rd Rate Standa rd Allowe d Standa rd Allowe d 50,0 00 hour 50,0 00 hour 40,0 00 hour 40,0 00 hour $19. 20 per $18. 00 per $18. 00 per $18. 00 per $960,000 $900,000 $720,000 $720,000 $60,000 Unfavorable $180,000 Unfavorable Variable-overhead spending variance Variable-overhead efficiency variance No difference x x x x x x x x *Actual variable-overhead rate (AVR) Column (4) is not used to compute the variances. It is included to point out that the flexible-budget amount for variable overhead, FLEXIBLE BUDGET: VARIABLE OVERHEAD ACTUAL VARIABLE OVERHEAD VARIABLE OVERHEAD APPLIED TO WORK-IN-PROCESS (1) (2) (3) (4)

Upload: dinhdiep

Post on 10-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

Select solutions to Chapter 11:

11-16 The conceptual problem in applying fixed manufacturing overhead as a product cost is that this procedure treats fixed overhead as though it were a variable cost. Fixed overhead is applied as a product cost by multiplying the fixed overhead rate by the standard allowed amount of the cost driver used to apply fixed overhead. For example, fixed overhead might be applied to Work-in-Process Inventory by multiplying the fixed-overhead rate by the standard allowed machine hours. As the number of standard allowed machine hours increases, the amount of fixed overhead applied increases proportionately. This situation is conceptually unappealing, because fixed overhead, although it is a fixed cost, appears variable in the way that it is applied to work in process.

EXERCISE 11-26 (40 MINUTES)

1. Variable overhead variances:

VARIABLE-OVERHEAD SPENDING AND EFFICIENCY VARIANCES

Actual Hours (AH)

Actual Rate

(AVR)

Actual Hours (AH)

Standard Rate

(SVR)

Standard Rate

(SVR)

Standard Rate

(SVR)

Standard AllowedHours(SH)

Standard AllowedHours(SH)

50,000hours

50,000hours

40,000hours

40,000hours

$19.20per

hour*

$18.00per

hour

$18.00per

hour

$18.00per

hour

$960,000 $900,000 $720,000 $720,000

$60,000 Unfavorable $180,000 UnfavorableVariable-overheadspending variance

Variable-overheadefficiency variance

No difference

x

x

x

x

x

x

x

x

*Actual variable-overhead rate (AVR)

†Column (4) is not used to compute the variances. It is included to point out that the flexible-budget amount for variable overhead, $720,000, is the amount that will be applied to Work-in-Process Inventory for product-costing purposes.

FLEXIBLE BUDGET:VARIABLE OVERHEAD

ACTUAL VARIABLEOVERHEAD

VARIABLE OVERHEADAPPLIED TO

WORK-IN-PROCESS

(1) (2) (3) (4)†

Page 2: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

EXERCISE 11-26 (CONTINUED)

2. Fixed-overhead variances:

FIXED-OVERHEAD BUDGET AND VOLUME VARIANCES

(1)ACTUAL

FIXEDOVERHEAD

(2)BUDGETED

FIXEDOVERHEAD

(3)FIXED OVERHEAD

APPLIED TOWORK IN PROCESS

StandardStandard Fixed-Allowed OverheadHours Rate40,000hours

$6.00 perhour*

$291,000 $300,000 $240,000

$9,000 Favorable $60,000 Unfavorable†

Fixed-overheadbudget variance

Fixed-overheadvolume variance

*Fixed overhead rate = $6.00 per hour =

† Some accountants would designate a positive volume variance as "unfavorable."

Page 3: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

EXERCISE 11-31 (45 MINUTES)

Budgeted fixed overhead...........................................................................................$ 25,000 Actual fixed overhead ...............................................................................................$ 32,500a

Budgeted production in units................................................................................... 12,500Actual production in units ........................................................................................ 12,000c

Standard machine hours per unit of output............................................................ 4 hoursStandard variable-overhead rate per machine hour............................................... $8.00Actual variable-overhead rate per machine hour.................................................... $9.00b

Actual machine hours per unit of output................................................................. 3d

Variable-overhead spending variance .....................................................................$ 36,000 UVariable-overhead efficiency variance.....................................................................$ 96,000 FFixed-overhead budget variance..............................................................................$ 7,500 UFixed-overhead variance...........................................................................................$ 1,000g U*Total actual overhead.................................................................................................$356,500Total budgeted overhead (flexible budget)..............................................................$409,000e

Total budgeted overhead (static budget).................................................................$425,000f

Total applied overhead..............................................................................................$408,000

*Some accountants would designate a positive fixed-overhead volume variance as unfavorable.

Page 4: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

EXERCISE 11-31 (CONTINUED)

Explanatory Notes:

a. Fixed-overhead budget variance = actual fixed overhead – budgeted fixed overhead$7,500 U = X – $25,000

X = $32,500 = actual fixed overhead

b. Total actual overhead = actual variable overhead + actual fixed overhead$356,500 = X + $32,500

X = $324,000 = actual variable overheadVariable-overhead spending variance = actual variable overhead – (AH SR)

$36,000 U = $324,000 – (AH $8)$8AH = $288,000

AH = 36,000Actual variable-overhead

rate per machine hour =

=

Exercise 11-31 (continued)

c. Fixed-overhead rate =

=

= $.50 per hr.Total standardoverhead rate = standard variable overhead rate + fixed-overhead rate

$8.50 = $8.00 + $.50

Total applied overhead = total standard hours total standard overhead rate$408,000 = X $8.50

X = 48,000 = total standard hrs.

Actual production =

=

d. Actual machine hrs. per unit of output =

Page 5: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

=

e. Total budgeted overhead (flexible budget)= budgeted fixed overhead + (SVR SH)= $25,000 + ($8.00 12,000 units 4 hrs. per unit)= $409,000

Page 6: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

EXERCISE 11-31 (CONTINUED)

f. Total budgeted overhead (static budget)

== ($8.50)(12,500)(4)= $425,000

g. Fixed overhead volume variance= budgeted fixed overhead – applied fixed overhead= $25,000 – ($.50)(12,000 4)= $1,000 U*

* Some accountants would designate a positive volume variance as "unfavorable."PROBLEM 11-45 (45 MINUTES)

Missing amounts for case A:

2. $21.00a per hour

3. $28.50b per hour

6. $294,150c

9. $7,500 Ud

10. $9,000 Fe

11. $(126,000) (Negative)f (The negative sign means that applied fixed overhead exceeded budgeted fixed overhead.)

12. $24,150 underappliedg

13. $135,000 overappliedh

16. 6,000 unitsi

19. $270,000j

20. $756,000k

Explanatory notes for case A:

aBudgeted direct-labor hours= budgeted production standard direct-labor hours per unit

Page 7: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

= 5,000 units 6 hrs. = 30,000 hrs.

Fixed overhead rate =

=

Page 8: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

Problem 11-45 (continued)

bTotal standard overhead rate= variable overhead rate + fixed overhead rate= $7.50 + $21.00 = $28.50

cVariable-overhead spending variance= actual variable overhead – (actual direct-labor hours

standard variable overhead rate)$16,650 U = actual variable overhead – (37,000 $7.50)

Actual variable overhead = $294,150

dVariable-overhead efficiency variance= SVR(AH – SH)= $7.50(37,000 – 36,000)= $7,500 U

eFixed-overhead budget variance= actual fixed overhead – budgeted fixed overhead= $621,000 – $630,000= $9,000 F

fFixed-overhead volume variance= budgeted fixed overhead – applied fixed overhead= $630,000 – (36,000 $21)= $126,000 F

(Some accountants would designate a negative volume variance as “favorable.”)

gUnderapplied variable overhead= actual variable overhead – applied variable overhead= $294,150 – (36,000 $7.50)= $24,150 underapplied

Page 9: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

PROBLEM 11-45 (CONTINUED)

hOverapplied fixed overhead= actual fixed overhead – applied fixed overhead= $621,000 – (36,000 $21)= $135,000 overapplied

iActual production =

=

jApplied variable overhead= SH SVR= 36,000 $7.50= $270,000

kApplied fixed overhead= SH fixed overhead rate= 36,000 $21= $756,000

Page 10: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

PROBLEM 11-47 (60 MINUTES)

1. Standard machine hours per unit = =

= 5 hours per unit

2. Actual cost of direct material per unit =

= $113.87 per unit (rounded)

3. Standard direct-material cost per machine hour =

= $22 per machine hour

4. Standard direct-labor cost per unit =

5. Standard variable-overhead rate per machine hour =

= $20.20 per machine hour

6. First, continue using the high-low method to determine total budgeted fixed overhead as follows:

Total budgeted overhead at 30,000 hours................................................... $1,254,000Total budgeted variable overhead at 30,000 hours (30,000 $20.20)..... 606,000 Total budgeted fixed overhead..................................................................... $ 648,000

The key is to realize that fixed overhead includes not only insurance and depreciation, but also the fixed component of the semivariable-overhead costs (supervision and inspection). (Note that maintenance and supplies are true variable costs.)

Now, we can compute the standard fixed-overhead rate per machine hour, as follows:

Standard fixed-overhead rate per machine hour =

= $21.60 per hourPROBLEM 11-47 (CONTINUED)

7. First, compute actual variable overhead as follows:

Total actual overhead.................................................................................... $1,266,000Total fixed overhead (given)......................................................................... 648,000 Total variable overhead................................................................................. $ 618,000

Page 11: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

Variable-overhead spending variance = Actual variable overhead – (AH SVR)= $618,000 – (32,000 $20.20)= $28,400 Favorable

8. Variable-overhead efficiency variance= (AH SVR) – (SH SVR)= (32,000 $20.20) – (31,000* $20.20) = $20,200 Unfavorable

*Standard allowed machine hours = 6,200 units 5 hours per unit

9. Fixed-overhead budget variance= actual fixed overhead – budgeted fixed overhead= $648,000 – $648,000 = 0

10. Fixed-overhead volume variance= budgeted fixed overhead – applied fixed overhead= $648,000 – (31,000 $21.60) = $21,600 F*

* Some accountants would designate a negative volume variance as "favorable."

Page 12: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

PROBLEM 11-47 (CONTINUED)

11. Flexible budget formula, using the high-low method of cost estimation:

Variable cost per machine hour =

Total budgeted cost at 30,000 hours........................................................... $2,928,000Total variable cost at 30,000 hours (30,000 $76).................................... 2,280,000Fixed overhead cost...................................................................................... $ 648,000

Thus, the flexible budget formula is as follows:

Total production cost = $76X + $648,000

where X = number of machine hours allowed.

Therefore, the total budgeted production cost for 6,050 units is:

($76 30,250*) + $648,000 = $2,947,000

*Standard allowed machine hours = 6,050 units 5 hours per unit

Page 13: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

PROBLEM 11-48 (40 MINUTES)

1. a. Three weaknesses in Albuquerque Wood Crafts, Inc.'s monthly Bookcase Production Performance Report are as follows:

The report is based on a static budget. Management should use a flexible budget that compares the same level of activity, calculating variances between the actual results and the flexible budget. Also, management might consider implementing an activity-based costing system.

Costs over which the supervisors have no control, such as fixed production costs and allocated overhead costs, are included in the report.

The report uses a single plant-wide rate to allocate fixed production costs. Square footage may not drive the fixed production costs, and there may be a more appropriate base such as number of units produced. It may be more appropriate to use different cost drivers for each of the different product lines.

b. Due to Sara McKinley's remarks Steve Clark is likely to:

Feel tense and apprehensive. The timing of McKinley's remarks, immediately before the meeting, without an opportunity for discussion and feedback, will leave Clark feeling tense and probably inattentive throughout the meeting.

Be frustrated and confused by the conflicting signals of the report and what is occurring in his department and in the market. This confusion about the department's results and, consequently, the uncertainty of his job will lead to stress which may negatively affect his performance.

2. a. To improve the monthly performance report, management should:

Use a flexible budget.

Hold supervisors responsible for only those costs over which they have control by using a contribution approach.

Include footnotes to make the report more understandable.

Page 14: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

PROBLEM 11-48 (CONTINUED)

A revised monthly performance report based on a flexible budget is as follows:

ALBUQUERQUE WOOD CRAFTS, INC. BOOKCASE PRODUCTION PERFORMANCE REPORT FOR NOVEMBER

ActualFlexibleBudget Variance

Units......................................................................... 3,000 3,000 Revenue................................................................... $483,000 $495,000a $12,000 U Variable production costs:....................................

Direct material.................................................... $ 69,300 $ 72,000b $ 2,700 F Direct labor......................................................... 54,900 54,000c 900 U Machine time...................................................... 57,600 58,500d 900 F Manufacturing overhead................................... 123,000 126,000 e 3,000 F Total variable costs............................................ $304,800 $310,500 $ 5,700 F

Contribution margin............................................... $178,200 $184,500 $ 6,300 U

a($412,500 budget ÷ 2,500 budgeted units) 3,000 actual unitsb($ 60,000 budget ÷ 2,500 budgeted units) 3,000 actual unitsc($ 45,000 budget ÷ 2,500 budgeted units) 3,000 actual unitsd($ 48,750 budget ÷ 2,500 budgeted units) 3,000 actual unitse($105,000 budget ÷ 2,500 budgeted units) 3,000 actual units

b. Steve Clark should be more motivated by the revised report since it clearly shows that the variable cost variances for his product line were better than Sara McKinley had thought, despite the fact that there is an unfavorable contribution margin variance. Clark is not responsible for the revenue variance which resulted from a decrease in the sales price.

In addition, the separation of costs into controllable and noncontrollable categories allows Clark to devote full effort to those costs which he can influence. Clark will probably exhibit a positive attitude and will continue looking for ways to improve his operation.

Page 15: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

PROBLEM 11-49 (35 MINUTES)

1. Calculation of variances:

Direct-material price variance = PQ(AP – SP)= 15,000($2.20* – $2.00)= $3,000 Unfavorable

*$2.20 = $33,000 15,000

Direct-material quantity variance = SP(AQ – SQ)= $2.00(15,000 – 14,500*)= $1,000 Unfavorable

*14,500 lbs. = 725 20 lbs. per unit

Direct-labor rate variance = AH(AR – SR)= 4,000($18.90* – $18.00)= $3,600 Unfavorable

*$18.90 = $75,600 4,000

Direct-labor efficiency variance = SR(AH – SH)= $18.00(4,000 – 3,625*)= $6,750 Unfavorable

*3,625 hours = 725 units 5 hours per unit

Variable-overhead spending variance= actual variable overhead – (AH SVR)= $5,500 – (4,000)($1.50)= $500 Favorable

Variable-overhead efficiency variance = SVR(AH – SH)= $1.50(4,000 – 3,625)= $562.50 Unfavorable

Page 16: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

PROBLEM 11-49 (CONTINUED)

Fixed-overhead budget variance= actual fixed overhead – budgeted fixed overhead= $13,000 – $12,500*= $500 Unfavorable

*$12,500 = $150,000 (annual) 12 months

Fixed-overhead volume variance = budgeted fixed overhead – applied fixed overhead= $12,500 – $10,875* = $1,625 U†

*$10,875 = 725 units $15.00 per unit

† Some accountants would designate a positive volume variance as "unfavorable."

PROBLEM 11-52 (20 MINUTES)

1. Sales price variance= (Actual sales price – budgeted sales price) actual sales volume= ($48* – $50†) 7,500 = $15,000 Unfavorable

*Actual sales price = $360,000/7,500†Budgeted sales price = $450,000/9,000

2. Sales volume variance= (Actual sales volume – budgeted sales volume) budgeted sales price= (7,500 – 9,000) $50** = $75,000 Unfavorable

**Budgeted sales price = $450,000/9,000

CASE 11-55 (50 MINUTES)

1. New contribution report for February based on a flexible budget:

Flexible Budget* Actual Variance______________________________________

Units (in pounds)……………….. 225,000 225,000 --

Revenue…………………………... $1,800,000 $1,777,500 $ 22,500 U Direct material…………………… 326,250 432,500 106,250 U Direct labor………………………. 189,000 174,000 15,000 F Variable overhead………………. 364,500 375,000 10,500 U Total variable costs…………. $ 879,750 $ 981,500 $101,750 U Contribution margin…………….. $ 920,250 $ 796,000 $124,250 U

Page 17: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

*Each dollar number in the flexible budget column is equal to the static budget number given in the problem multiplied by 1.125 (225,000/200,000). This reflects the increase in the volume of sales from 200,000 units to 225,000 units.

2. The total contribution margin on the flexible budget is $920,250. See requirement (1). Alternatively, multiply the static budget contribution margin of $818,000 by 1.125 (225,000/200,000), as explained in requirement (1).

Page 18: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

CASE 11-55 (CONTINUED)

3. The interpretation of the contribution margin on the flexible budget, $920,250, is as follows: If the unit sales price and unit variable costs had all remained at their budgeted levels, and sales volume increased from 200,000 units to 225,000 units, the contribution margin would have been $920,250.

4. The variance between the flexible budget contribution margin and the actual contribution margin, from requirement (1) is $124,250 U.

This $124,250 unfavorable variance between the flexible budget and actual contribution margin for the chocolate nut supreme cookie product line during April is explained by the following variances:

a. Direct-material price variance:

Type of Material PQ*(AP+ - SP) VarianceCookie mix........................... 2,325,000($.02-$.02).............. $ 0Milk chocolate...................... 1,330,000($.20-$.15).............. 66,500 UAlmonds............................... 240,000($.50-$.50)................. 0 Total............................................................................................. $66,500 U

*PQ = AQ, because all materials were used during the month of purchase.+AP = actual total cost (given) actual quantity

b. Direct-material quantity variance:

Type of Material SP(AQ - SQ*) VarianceCookie mix........................... $.02(2,325,000-2,250,000)..... $ 1,500 UMilk chocolate...................... $.15(1,330,000-1,125,000)..... 30,750 UAlmonds............................... $.50(240,000-225,000)........... 7,500 UTotal............................................................................................. $39,750 U

*SQ = standard ounces of input per pound of cookies actual pounds of cookies produced.

c. Direct-labor rate variance = AH(AR - SR) = 0.

Dividing the total actual labor cost by the actual labor time used, for each type of labor, shows that the actual rate and the standard rate are the same (i.e., AR = SR). Thus, this variance is zero.

Page 19: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

CASE 11-55 (CONTINUED)

d. Direct-labor efficiency variance:

Type of Labor SR*(AH - SH+) VarianceMixing................................... $.24(225,000-225,000)........... $ 0Baking.................................. $.30(400,000-450,000)........... 15,000 FTotal............................................................................................. $15,000 F

*Standard rate per minute = standard rate per hour 60 minutes+Standard minutes per unit (pound) actual units (pounds) produced

e. Variable-overhead spending variance

= actual variable overhead - (AH SVR)

= $375,000 - [(625,000*/60) $32.40]

= $37,500 U

*Total actual minutes of direct labor.

f. Variable-overhead efficiency variance

= SVR(AH - SH*)

= $32.40

= $27,000 F

*SH = (3 minutes per unit, or pound 225,000 units, or pounds) 60 minutes

g. Sales-price variance =

= ($7.90* - $8.00) 225,000

= $22,500 U

*Actual sales price = $1,777,500 225,000 units sold

Page 20: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

CASE 11-55 (CONTINUED)

Summary of variances:

Direct-material price variance.......................................................... $ 66,500 UDirect-material quantity variance..................................................... 39,750 UDirect-labor rate variance................................................................. 0Direct-labor efficiency variance....................................................... 15,000 FVariable-overhead spending variance............................................. 37,500 UVariable-overhead efficiency variance............................................ 27,000 FSales-price variance.......................................................................... 22,500 UTotal.................................................................................................... $124,250 U

5. a. One problem may be that direct labor is not an appropriate cost driver for Colonial Cookies, Inc. because it may not be the activity that drives variable overhead. A good indication of this situation is shown in the variance analysis. The direct-labor efficiency variance is favorable, while the variable-overhead spending variable is unfavorable. Another problem is that baking requires considerably more power than mixing does; this difference could distort product costs.

b. Activity-based costing (ABC) may solve the problems described in requirement 5(a) and therefore is an alternative that management should consider. Since direct labor does not seem to have a direct cause-and-effect relationship with variable overhead, the company should try to identify the activity or activities that drive variable overhead. If the same proportion of these activities is used in all of Colonial’s products, then ABC may not be beneficial. However, if the products require a different mix of these activities, then ABC could be beneficial.

Page 21: Select solutions to Chapter 11: - Middle East Technical …users.metu.edu.tr/mugan/hilton ch 11 select solutions.doc · Web viewIn this situation, misstated standards are affecting

FOCUS ON ETHICS (See page 476 in the text.)In this situation, misstated standards are affecting the accuracy of accounting reports.Cleverly is misusing the standard costing system at Shrood to manage its relationship with the parent company, Gigantic. By overestimating direct-labor hours, too much overhead is routinely applied to products, artificially inflating cost of goods sold (CGS) during the year. This accounting fudge is ‘corrected’ in the fourth quarter of each year by means of a variance adjustment, which serves to instantly reduce CGS and thus boost profits.It is possible that Cleverly and his staff are sufficiently knowledgeable about the real costs of production that the artificial direct-labor hour estimates do not impede their decision making (although this is not certain). However, it is unlikely that the managers at the parent company are in the same position. The information which is being passed to them is distorted, and thus provides a poor basis for managerial decision making. That is, the distorted data may have a negative impact on the business, leading to loss of enterprise value and perhaps jobs. Hence it is unethical for Cleverly to provide this distorted quarterly information to Gigantic, knowing that the company uses the data to make management decisions. A further ethical dilemma occurs because the quarterly numbers from Shrood are provided to analysts and stockholders as a basis on which to judge the financial performance of Gigantic. The management of Gigantic is thus in contravention of its ethical and legal obligations to market regulators, since it is knowingly providing false information to investors.Because of these ethical and legal concerns, it is imperative that Shrood provide accurate information to Gigantic henceforth. Note, however, that this does not necessarily mean that Shrood needs to change its internal cost accounting standards, although it would be preferable to manage according to the most accurate cost numbers available.