Building budget for construction costs
Owner
Project costs for
Building phase
Index 126
Area ( m2 ): . . . . . 4000
Construction costs Kr
Foundation 532 820
Floor 3 229 360
Walls 1 775 530
Ceiling 597 870
GL Frames 1 369 295
Roof panels 1 104 000
Roof boxes 1 824 270
Doors 458 400
Windows 221 400
Bathroom equipment 283 000
Kitchen equipment 100 000
Parking lot 2 199 744
Building services 4 611 680
Electroinstalations 1 495 680
Total construction cost ( old index ) 19 803 049
Total project cost ( new index ) 18 781 463
25 % VAT 4 695 366
Total project cost (Incl. VAT) 23 476 829
Total project cost / m² ( Incl. VAT ) 5 869
Svenstrup Sporthall
Peter Nucker - Svenstrup
Scheme Design
ID Task Name Duration Start Finish
0 Tender Schedule SvenstrupId.
346 days Mon 8/29/11
Mon 12/24/12
1 DESIGN PHASE 90 days Mon 8/29/11 Fri 12/30/1110 TENDER PHASE 65 days Fri 12/30/11 Fri 3/30/1211 Tender documentation
issued 0 days Fri 12/30/11 Fri 12/30/11
12 Project offer period (calculations)
15 days Mon 1/2/12 Fri 1/20/12
13 Stand‐still (break) 10 days Mon 1/23/12 Fri 2/3/1214 Contracting 0 days Fri 2/3/12 Fri 2/3/1215 Offer binding period 30 days Mon 2/6/12 Fri 3/16/1216 Project review 10 days Mon 3/19/12 Fri 3/30/1217 Contracts signed 0 days Fri 3/30/12 Fri 3/30/1218 CONSTRUCTION PHASE 190 days Mon 4/2/12 Fri 12/21/1219 Mobilization
(preparation)5 days Mon 4/2/12 Fri 4/6/12
20 Construction 185 days Mon 4/9/12 Fri 12/21/1221 Plot clearance 10 days Mon 4/9/12 Fri 4/20/1222 Site excavation 10 days Mon 4/23/12 Fri 5/4/1223 Foundation 20 days Mon 5/7/12 Fri 6/1/1224 Pipe system 20 days Mon 5/7/12 Fri 6/1/1225 Floors 20 days Mon 6/4/12 Fri 6/29/1226 Concrete walls 50 days Mon 7/2/12 Fri 9/7/1227 Roof structure 10 days Wed 8/22/12 Tue 9/4/1228 Metal walls 3 days Wed 9/5/12 Fri 9/7/1229 Roof installations 15 days Mon 9/10/12 Fri 9/28/1230 Doors and windows 20 days Mon 10/1/12 Fri 10/26/12
31 Services installations 10 days Mon 10/29/12 Fri 11/9/12
32 Finishes 30 days Mon 11/12/12 Fri 12/21/1233 Handing over 0 days Fri 12/21/12 Fri 12/21/1234 MAINTENANCE PHASE 1 day Mon 12/24/12Mon 12/24/1235 1 year inspection 1 day Mon 12/24/12Mon 12/24/1236 5 year inpection 1 day Mon 12/24/12Mon 12/24/12
12/30
2/3
3/30
12/21
4/17 6/12 8/7 10/2 11/27 1/22 3/18 5/13 7/8 9/2 10/28 12/23 2/17May 1 September 1 January 1 May 1 September 1 January 1
Page 1
Scrutinize Toppics
Case nr.
Page: By:
Case: Svenstrup Sportshall
Doc.nr.:
Area/location/Identifikation: Steel Sandwich Panel
Phase: Brief
Outline proposal Scheme design DD1 DD2
Vetting areas: Steel Sandwich Panel Project material to be investigated: Drawings (21)5.2; (21)5.3; (21)5.5; (27)5.2; (27)5.5; (21)2.1 Other materials (Check lists & references..) Assambly Introduction Results of the vetting Vetting made by: Date:
Reference:
Date: Dec 15th '11
Made by: Henry Pilk Date: Approwed:
Copy:
Notes.:
BPS Quality Assurences 5B
Supervision Plan Tender Control Plan Control Plan
Number Page 1 Case: Svenstrup Sportshall Number . /
rev.:
Contractor/work/subject: Carpenters Ref.: Area/identifikation.. Steel Sandwich Panel
Nr.
Toppic
Method/how
Frequence
Time
Requirement
Requirement to documentation
Who/ Resp.
Carry out
1 Fastening Visual 100% Installation Instructions Photo Project Manager
Carpenter
2 Leveling Mesure 100%
Installation All levelled Report/ Photo Project Manager
Carpenter
3 Air tightness Mesure/ Visual 100%
Finish Air tight Report Project Manager
Carpenter
4 Flashing Visual 100%
Installation/ Finish
Drip flashing fastened
Photo Project Manager
Carpenter
Date Dec 15th,
'11 Made by: Henry Pilk Date:
:
Copy : Notes
BPS Quality Assurence 7
Case no.: Page: by:
Case: Svenstup Sportshal
Doc .no.: archive:
Work/component Steel Sandwichpanel
Construction material/manufaturer
Identification.:
Date Delivery note no.
Type of goods Amounts Received date
Signature Notes
1 Steel Sandwich Panel 100 14.05.2011 2 Steel Sandwich Panel 94 14.05.2011
Date: 18.12.2011 Created by: Henry Pilk Date: Approval by
Copy : Remark:
BPS Quality Assurance Form 9
Unit Scheme
Unit no. SP2E-PIR (typeC) x 9 wrapped Initials TAK / APS
Name: Steel Sandwich Panel Date 06.12.2011
Numbers 42 Revised
Supplier STARKS Printed 18.12.2011
Telephone
Contracter Welder
Case Svenstrup Sporthall
Product name Specification Numbers Units
Plinth flashing EA1B02 11,7 m
Wall Flashing EA1B08 11,7 m
Opening Flashing EA1B15 11,7 m
Fastener L01D 72 pcs
Fastener L03A 180 pcs
Gasket 28 m
Separator 32 m
Self-adhesive gasket 11 m
Separator 8x40 between panel and socle
Steel Sandwich Panel Wall element 1200x3100x120 9 pcs
Renunciation deadline
Delivery form
Off loading
Packaging
Return packaging
Further information
Reference:
Note:
Socle drip – joint between wall and socle
Drip Wall flashing above PVC windows
Flashing for wallopenings
Fixing panels to steel structure
Fixing flashing to panels
Impregnated polyurethane gasket 20x30
sealing of panel finishing and joinery
Self-sticking gasket 4x20 between
panel and frame or frame and column
Self-adhesive polyurethane gasket -
covered with plastic packaging
1 week
Flatbed / Semi-trailer
Mobile crane
Wrapped into plastic;
No
Unit Scheme
Unit no. SP2E-PIR (typeC) x 9 wrapped Initials TAK / APS
Name: Steel Sandwich Panel Date 06.12.2011
Numbers 42 Revised
Supplier STARKS Printed 18.12.2011
Telephone
Contracter Welder
Case Svenstrup Sporthall
Product name Specification Numbers Units
Plinth flashing EA1B02 Socle drip – joint between wall and socle 11,7 m
Wall Flashing EA1B08 Drip Wall flashing above PVC windows 11,7 m
Opening Flashing EA1B15 Flashing for wallopenings 11,7 m
Fastener L01D Fixing panels to steel structure 72 pcs
Fastener L03A Fixing flashing to panels 180 pcs
Gasket Impregnated polyurethane gasket 20x30 28 m
sealing of panel finishing and joinery
Separator Self-sticking gasket 4x20 between 32 m
panel and frame or frame and column
Self-adhesive gasket Self-adhesive polyurethane gasket - 11 m
Separator 8x40 between panel and socle
Steel Sandwich Panel Wall element 1200x3100x120 9 pcs
covered with plastic packaging
Renunciation deadline 1 week
Delivery form Flatbed / Semi-trailer
Off loading Mobile crane
Packaging Wrapped into plastic;
Return packaging No
Further information
Reference:
Note:
DELIVERY PLAN
Plan no.: 1 Initials ATCM
Supplier STARKS Date 06.12.2011
Contact Revised
Telephone Printed 18.12.2011
Contractor Welder
Case Svenstrup Sporthall Period 19 to 27
Unit nr.: Week 19
Week 20
Week 21
Week 22
Week 23
Week 24 Week 25
Week 26
Week 27
SP2E PIR (typeA) 3
SP2E PIR (typeB) 3
SP2E PIR (typeC) 42
SP2E PIR (typeD) 6
SP2E PIR (typeE) 6
SP2E PIR (typeF) 2
SP2E PIR (typeG) 36
SP2E PIR (typeH) 4
SP2E PIR (typeI) 4
SP2E PIR (typeJ) 4
SP2E PIR (typeK) 4
SP2E PIR (typeL) 4
SP2E PIR (typeM) 4
SP2E PIR (typeN) 4
SP2E PIR (typeO) 4
SP2E PIR (typeP) 4
SP2E PIR (typeQ) 4
SP2E PIR (typeR) 4
SP2E PIR (typeS) 4
SP2E PIR (typeT) 48
RENUNCIATION PLAN
Plan no.: 1 Initials ATCM
Supplier STARKS Date 04.05.2006
Contact Revised
Telephone Printed 18.12.2011
Contractor Welder
Case Svenstrup Sporthall Period: week 19 to 21
Renunciation Expected renunciation
Week 19 Week 20 Week 21
Unit nr. Mo Tu We Th Fr Sa So Mo Tu We Th Fr Sa Su Mo Tu We Th Fr Su Su
SP2E PIR (typeA) 3
SP2E PIR (typeB) 3
SP2E PIR (typeC) 42
SP2E PIR (typeD) 6
SP2E PIR (typeE) 6
SP2E PIR (typeF) 2
SP2E PIR (typeG) 36
SP2E PIR (typeH) 4
SP2E PIR (typeI) 4
SP2E PIR (typeJ) 4
SP2E PIR (typeK) 4
SP2E PIR (typeL) 4
SP2E PIR (typeM) 4
SP2E PIR (typeN) 4
SP2E PIR (typeO) 4
SP2E PIR (typeP) 4
SP2E PIR (typeQ) 4
SP2E PIR (typeR) 4
SP2E PIR (typeS) 4
SP2E PIR (typeT) 48
Offloading place Storage area
Offloading method Mobile crane
Retur packaging
Further information Element type H to type S - lifting cross-beam is used.