self inspection report.....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................TRANSCRIPT
![Page 1: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/1.jpg)
Self Inspection Report ( SIR )
TI & MW
Site ID:ZNN713
![Page 2: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/2.jpg)
Site ID: ZNN713
Project Name: STC-USF 6
Subcontractor Name: Al-Samhan
Inspection Date: 2014-12-23
Submission Date: 2014-12-23
Comment:
#` The List Remark
1 Site General
Conditions
2 Antennas
3 Feeders
4 Radio Links
5 BTS
6 Rectifier
7 PCM
8 DDF
9 Documentation
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
STC_ZRS_002_V2.0 2
![Page 3: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/3.jpg)
# Item Picture
or no Severity Result Comment (By Inspector)
1.General site conditions
1 Site Cleaning Y N.S.A
2 Accessibility (ladder, Road, Stoop…...etc) Y N.S.A
3 Material delivered and installed without damages
Y N.S.A
Self-inspection Summary: (by subcontractor)
Subcontractor Sig. & Date:
Notice:
1. Inspection Result: “√” indicate OK. “×” indicate Not Good. "/" indicate N/A. 2. Comment (By Inspector): Inspector must describe clearly the quality problem if the item is not good. 3. Subcontractor must provide photo if it is Yes in the row of picture or no
1- General site conditions :
STC_ZRS_002_V2.0 3
![Page 4: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/4.jpg)
General site conditions photos :
STC_ZRS_002_V2.0 4
![Page 5: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/5.jpg)
General site conditions photos :
STC_ZRS_002_V2.0 5
![Page 6: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/6.jpg)
# Item Picture
or no Severity Result Comment (By Inspector)
2. Antenna
1 Antennas are installed properly and according to the design
Y N.S.A
2 Antennas are securely mounted with no possibility of movement
Y N.S.A
3 Correct antenna, orientation and types on each sector to be connected with ground Y N.S.A
4 Jumper connections to antenna Y N.S.A
5 Connector Isolation Y N.S.A
6 Earthing Kits installed and insulated Y N.S.A
7 Tilting kits installation and antenna mechanical down tilt
Y N.S.A
Self-inspection Summary: (by subcontractor)
Subcontractor Sig. & Date:
Notice:
1. Inspection Result: “√” indicate OK. “×” indicate Not Good. "/" indicate N/A. 2. Comment (By Inspector): Inspector must describe clearly the quality problem if the item is not good. 3. Subcontractor must provide photo if it is Yes in the row of picture or no
2- Antenna:
STC_ZRS_002_V2.0 6
![Page 7: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/7.jpg)
Antenna photos :
STC_ZRS_002_V2.0 7
![Page 8: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/8.jpg)
Antenna photos :
STC_ZRS_002_V2.0 8
![Page 9: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/9.jpg)
Antenna photos :
STC_ZRS_002_V2.0 9
![Page 10: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/10.jpg)
# Item Picture
or no Severity Result Comment (By Inspector)
3. Feeder
1 Feeders are installed properly and according to the design
Y S.A
2 No VSWR alarm appearing in the BTS Y S.A
3 External jumpers are installed & connected to feeders
Y S.A
4 Internal connectors are installed properly & well tighten Y N.S.A
5 External connectors installation and waterproofing Y N.S.A
6 Grounding kits properly installed and insulated Y N.S.A
7 Roxtec Feeder cable entry installed properly & sealed Y N.S.A
8 Feeder is grounded and labeled Y N.S.A
Self-inspection Summary: (by subcontractor)
Subcontractor Sig. & Date:
Notice:
1. Inspection Result: “√” indicate OK. “×” indicate Not Good. "/" indicate N/A. 2. Comment (By Inspector): Inspector must describe clearly the quality problem if the item is not good. 3. Subcontractor must provide photo if it is Yes in the row of picture or no
3- Feeder :
STC_ZRS_002_V2.0 10
![Page 11: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/11.jpg)
Feeder photos :
STC_ZRS_002_V2.0 11
![Page 12: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/12.jpg)
Feeder photos :
STC_ZRS_002_V2.0 12
![Page 13: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/13.jpg)
# Item Picture
or no Severity Result Comment (By Inspector)
4. Radio Link
1 Dish polarization correct according to the transmission design
Y S.A
2 RSL is within the approved range Y S.A
3 Indoor Unit & Outdoor Unit are grounded Y N.S.A
4 Coupler installed properly Y N.S.A
5 Indoor Unit to Outdoor Unit cables properly fixed by calmps , labeled and connected Y N.S.A
6 All connectors tightened properly & soldered Y N.S.A
Self-inspection Summary: (by subcontractor)
Subcontractor Sig. & Date:
Notice:
1. Inspection Result: “√” indicate OK. “×” indicate Not Good. "/" indicate N/A. 2. Comment (By Inspector): Inspector must describe clearly the quality problem if the item is not good. 3. Subcontractor must provide photo if it is Yes in the row of picture or no
4- Radio link:
STC_ZRS_002_V2.0 13
![Page 14: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/14.jpg)
Radio Link photos :
STC_ZRS_002_V2.0 14
![Page 15: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/15.jpg)
![Page 16: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/16.jpg)
![Page 17: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/17.jpg)
![Page 18: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/18.jpg)
![Page 19: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/19.jpg)
![Page 20: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/20.jpg)
![Page 21: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/21.jpg)
# Item Picture
or no Severity Result Comment (By Inspector)
5. BTS
1 DC power cables and/or AC power cables are installed properly and according to the design
Y S.A
2
External alarms cable and connector(s) at BS equipment end (routing connection labeling ...)
Y N.S.A
3 Cabinet(s) grounding cable(s) Y N.S.A
4 Check the alarm appearing on the BTS boards Y N.S.A
5 All the unused slots are covered by dummy Y N.S.A
6 Modules installation (all screws present and tightened) Y N.S.A
Self-inspection Summary: (by subcontractor)
Subcontractor Sig. & Date:
Notice:
1. Inspection Result: “√” indicate OK. “×” indicate Not Good. "/" indicate N/A. 2. Comment (By Inspector): Inspector must describe clearly the quality problem if the item is not good. 3. Subcontractor must provide photo if it is Yes in the row of picture or no
5- BTS (Node-B) :
STC_ZRS_002_V2.0 21
![Page 22: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/22.jpg)
BTS photos :
STC_ZRS_002_V2.0 22
![Page 23: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/23.jpg)
# Item Picture
or no Severity Result Comment (By Inspector)
6. Rectifier
1 Rectifiers are installed properly & fixed well Y S.A
2 AC supply cable is installed properly Y S.A
3 DC power connection in both rectifier and BTS/MW Y N.S.A
4 Circuit breaker at Rectifier as per specification Y S.A
5 External Alarms cable installation Y S.A
6 Cabinet grounding cable(s) installation Y N.S.A
7 Plus (+) busbar grounding cable installation Y S.A
Self-inspection Summary: (by subcontractor)
Subcontractor Sig. & Date:
Notice:
1. Inspection Result: “√” indicate OK. “×” indicate Not Good. "/" indicate N/A. 2. Comment (By Inspector): Inspector must describe clearly the quality problem if the item is not good. 3. Subcontractor must provide photo if it is Yes in the row of picture or no
6- Rectifiers :
STC_ZRS_002_V2.0 23
![Page 24: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/24.jpg)
Rectifier photos :
STC_ZRS_002_V2.0 24
![Page 25: Self Inspection Report TI STC ZNN713](https://reader030.vdocument.in/reader030/viewer/2022020311/577cc1491a28aba71192a199/html5/thumbnails/25.jpg)
# Item Picture
or no Severity Result Comment (By Inspector)
9. Documentation
1 VSWR result Y N.S.A Already submitted to ZTE project team
2 Return loss result for the feeder used in the site Y N.S.A During the pat time we will test them
and record in the pat folder
3 BER for MW ( MW stability 7 days Snap shot ) Y N.S.A We will attached in the pat folder
4 Site Folder Submission Y S.A Already submitted
Self-inspection Summary: (by subcontractor)
Subcontractor Sig. & Date:
Notice:
1. Inspection Result: “√” indicate OK. “×” indicate Not Good. "/" indicate N/A. 2. Comment (By Inspector): Inspector must describe clearly the quality problem if the item is not good. 3. Subcontractor must provide photo if it is Yes in the row of picture or no
9- Documentation :
STC_ZRS_002_V2.0 25