Page 1: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Presentation 01 maart 2016

seminar

LNG, bio-LNG en bio-LPG

Page 2: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Liquefying biogas

Cryogenerator

DigestersLiquefaction

module

Power generationGas treatment /control

module

Page 3: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Development Bio-LNG liquefaction

By Osomo/Jerom van Roosmalen

2nd Demo May 2012Fundraising pilot

1st Pilot Plant Oct 2012- May 2013Prove of concept

2nd Pilot Plant Jan 2015 – Dec 2015Improved concept, Patent validation, Cooperation with Cryonorm

January 20165 ton/day Plant design readyIntegrated and modulair system

Multiple Plants 5 ton/day2017-2020Supply chain of multiple sites25-30 million euros

1st Demo 2011: Does it work?

Page 4: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Biogas test installation AcrresApplication Centre for Renewable RESourcess, Lelystad

Digester

CHPCombined

Heat & Power

Gas treatment3-Stage membrane

LiquefactionStirling cryocooler3-Phase decantor

DigesterCHP

MembraneLNG

ManureOrganic waste

Electrical power

CO2

Heat

RawBiogas

TreatedBiogas

VaporisedBioLNG

TreatedBiogas

BioLNG

CO2

Water

Page 5: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Pilot plant in Lelystad

Page 6: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Cryogenic process

One stage liquifaction

• Very stable• Large variation of gas mixes• Handles peak loads, like high

concentration CO2 or N2• Easy startup, recovery and

process control• Load adjustment 0-100%

3 phase separation

• Post-treatment of LNG• Separates all crystals• LNG at any desirable• pressure or temperature• Under saturated LNG

Page 7: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Process Design

Design principles

• Fluctuating gas flow• Fluctuating gas composition• Integration of gastreatment and

liquifaction• High up-time• Easy start-up and recovery• Continue process flow • (no batch processen)• Reliable quality of LNG• Modular setup

Challanges

• Keep Capex and Opex as low as possible

• Determine allowed bandwidth of impurities and gascomposition

• Robust process line-up• Low energy usage• Low loss of methane• Re-use of CO2• LNG at any temperature or/and

pressure

Page 8: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Research Goals

General

• Make small scale (Bio-)LNG economically feasible

• Design and test a robust totalsystem from raw gas to LNG

• Patent validation• Get insight and grip on

crystallisation and separationof CO2

Technological

• Crystallization effects• CO2 crystal sizes• Sticky or dry• Nucleation

• Determine bandwidth of impurities anduncondesables, like N2

• Push the system to the limits

Page 9: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Results

Constant quality of LNG Specific energy use of 1,2 kWh/kg:

• 0,7 liquefaction• 0,5 gastreatment

Adjustable capacity 0-100% Start-up time <10 min, Steady state in < 1 hour Operational Intelligence of Osisoft Keeps running under extreme conditions, like temporary

overshoot of CO2, H2O, N2 Patent and simulation models are validated

Page 10: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

3D model of 5 MTD

liquefaction plant

PFD of full plant

Page 11: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

www.lngcongres.com

Page 12: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

1.500 Nm3/hr @ 6 barg satellite plant

Norway

Page 13: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Mobile ambient air heated vaporisers

for temporary gas needs or pipe line

interventions

Page 14: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Coldbox for high purity Nitrogen

LIN : 148 kg/hr @ 7 barg

GAN: 1.282 kg/hr @ 7 barg

LNG Coldbox

200 MTD @ 3 barg

Page 15: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

Dual LNG truck loading bay

Page 16: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

LNG/L-CNG fueling

stationPublic station

Scope of supply:

- Concrete pre-fab building with LNG pump skid and control system separated

- LNG dispenser (with filling – and gas return hose)

- Credit card payment system (Tokheim)

- 60 m3 vertical LNG tank (PED certified), 12 bar MAWP

- "saturation on the fly“ enabling saturated LNG supply for various filling pressures.

Page 17: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

L-CNG equipment

500 Nm3 @ 200 barg

Bottle rack capacity

High pressure

Odorizer system

High pressure LNG

piston pump

Submerged

pump skid

Page 18: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

LNG as shipping fuel for inland

water way and short sea vessels

Page 19: seminar LNG, bio-LNG en bio-LPG - · PDF filePresentation 01 maart 2016 seminar LNG, bio-LNG en bio-LPG. Liquefying biogas Cryogenerator ... Cryogenic process One stage liquifaction

LNG bunkering system

LNG bunkering of dual fuel (LNG/MDO) propelled ferries

450 m3/hr bunkering capacity

up to 15 bargFiscal flow metering

750 meter 8” VIP from pump

skid to loading arm

6” loading arm

Fjordline ferry

Risavika Harbor - Norway