COMPANY PROFILECOMPANY PROFILE
September 2015
AMEIL CONSTRUCTORS Limited is a 100% locally owned and operated metal and pressure piping fabricator in Come by Chance, Newfoundland and Labrador. The Company facilities are located close to the following industrial sites which are now sites for Ameil’s products and services: North Atlantic Refining in Come by Chance Newfoundland Transhipment Terminal (IMTT / NTL) in Arnold’s Cove GBS construction facility at Bull Arm, Sunnyside VALE’s nickel refining operation at Long Harbour Husky Energy’s GBS construction site in Argentia
AMEIL has a national shop agreement with the United Brotherhood of Plumbers and Pipefitters of America and Canada which gives the company a unique 100% name call for UA740 tradesmen ensuring only the most senior and qualified pipefitters and welders are used for all products and services. AMEIL has qualified in a comprehensive collection of welding procedures covering all types of piping and structural steel welding including, carbon, stainless, duplex, super duplex and titanium.
AMEIL shop welding equipment is state of the art digital and electronic based and includes Miller welding machines, Vernon cutting machine, manipulators and mobile equipment. AMEIL management process includes a full range of modern digitally-based software to ensure complete tracking and client reporting of product and processes used including Primavera P6; JONAS Construction Management; Welding Coordinator (including Welder Qualification and Weld Specification for up to date tracking and management of welder qualifications, certifications and welding procedures.
AMEIL uses an ISO 9001:2008 registered Quality Management System and a registered COR/PRIME Safety Management System which are easily translated and integrated into specific client requirements for quality and safety reporting; a recent example is the 2013-2014 KKC-HEBRON SC761C project which required integration with KKC’s MIPS and Document Control management systems.
The following Company’s processes and systems are externally audited annually: Certificate of Authorization (Newfoundland Government Services)
• Fabrication / Installation Of Pressure Piping To CSA B51, ASME B31.1, 31.3 & 31.4 Canadian Welding Bureau
• Certified to CSA Standard W47.1, Division 2 ISO 9001:2008 Construction Safety Association of Newfoundland & Labrador
AMEIL has a zero Lost Time Accident since its start in 2006 which it can credit to a comprehensive safety program and proud tradesmen dedicated to providing quality work in as safe and responsible a manner as possible.
LOCATION MAPSLOCATION MAPS
Argentia
(Husky)
0 1 2 3 I I SCALE (km)
CERTIFICATION
• Newfoundland & Labrador Government Services - Certificate Of Authorization
- Shop Fabrication of Pressure Vessels
- Fabrication / Installation Of Pressure Piping To CSA B51, ASME B31.1, 31.3 & 31.4
- Provision of Welding Services
- Repair / Alteration of a Boiler, Pressure Vessel or Piping System
• Letter of Validation - Canadian Welding Bureau
- Certified to CSA Standard W47.1, Division 2
• Certificate Of Registration ISO 9001:2008
- ISO 9001:2008
• Construction Labour Relations Association of Newfoundland & Labrador
- Collective Labour Agreements
• Newfoundland & Labrador Construction Safety Association
- Certificate of Recognition (Letter of Good Standing - COR Program)
Contractor Licence No. JVLQ:?. 0306
Newfgjdland Labrador
~~~~~~~~~~~~~~~-
Service NL
Certificate of Authorization <Tfiis is to certify that
of
1 <Iefi.nery (]Wad", Come iBy Cfiance, :NL
fias impCemented a Quafity Contro{<Program comp{ying with the requirements of <Tfie <BoiCer, <Pressure Vesse{ and Compressed §'as <R.§gufations.
1. Shop Fabrication of Pressure Vessels 2. Shop Fabrication of Pressure Piping to ASME 831.1 3. Shop Fabrication of Pressure Piping to ASME 831.3 4. Shop Fabrication of Pressure Piping to ASME 831.4 5. Installation of Pressure Piping to ASME 831.1 6. Installation of Pressure Piping to ASME B31.3 7. Installation of Pressure Piping to ASME B31.4 8. Provision of Welding Services 9. The Repair or Alteration of a Boiler, Pressure Vessel or Piping System 1 O. The Servicing of Boilers and Pressure Vessels in Preparation for Shutdowns or Inspections
'lfo ""'""'"'""" «not "anifua6k muf 'V'"" Mar 31, 2017 :::] A~-Cfi.ief Inspec o--- ,,,.,
The CWB acknowledges that
Ameil Constructors Limited
40 Alexander Gilbert Street , Come by Chance, NL A0B 1N0 Canada
is certified to CSA Standard W47.1
“Certification of Companies for Fusion Welding of Steel”
in DIVISION 2
for the period January 27, 2015 to February 26, 2016
Company Code: AMEIL1
Scope: Fabrication and erection of structural steel.
The product certification system operated by the Canadian Welding Bureau most closely resembles that described by ISO/IEC Guide 67, Conformity assessment — Fundamentals of product certification, System 6.
Terms and Conditions governing registration and the use of this certificate are defined in the contract between QUASAR and the Holder. Contact the certificate holder for further information related to the scope and boundaries of the registration.
3400E-QMS/2014-09 QUASAR, A Division of the CWB Group, 8260 Park Hill Drive, Milton, Ontario, Canada, L9T 5V7, Tel: 1-800-844-6790 / (905)-542-1312, Fax: (905) 542-1318, Web: www.cwbgroup.org
Certificate of Registration
This is to certify that QUASAR has registered the Quality Management System of:
AMEIL Constructors Limited 40 Alexander Gilbert Street, Come by Chance, NL A0B 1N0
to the Quality System Standard:
ISO 9001:2008
Initial Registration 11 September 2006
Date of Issue 11 September 2015
Date of Expiry 11 September 2018
Certificate Number Q7041
Scope: Mechanical contractor
Registrar
� � � � � � � �
�����������
• Organization Chart
• Project Resources
• Labour & Subcontractors
PROJECT RESOURCES & SUBCONTRACTORS
• Labour & Subcontractors
AMEIL Constructors
Sandra Benson
Administration
AMEIL Constructors
Brian Lomond
Project Manager
AMEIL Constructors
Bob Drake
Production Supervisor
Planning / Scheduling + MIPS
AMEIL Constructors
Jamie Compton
Field Project Manager
IMTT (Whiffen Head)
Ameil Constructors
Trent Walsh
HSE Manager
ISO Coordinator
SubcontractorsSubcontractors
IEAS
Mount Pearl, NL
John Dalley
President
- Non Destructive
Testing
- Dimensional
Control
- Post Weld
Heat Treat
- Coatings
- Insulation
- Electrical
- Instrumentation
- Calibrations
Tech Lift
St. John's, NL
Doug Janes
President
- Heavy Lift
- Transportation
AMEIL Constructors
Paul Ryan
Shop Supervisor
- Fabrication
- Testing
TEAM Industrial
Mount Pearl, NL
Keith Gowan
Manager
EPCO Services
St. John's
Wayne Pretty
President
National Heat Treat
Mount Pearl, NL
Pat Power
Manager
Atlantic Maintenance
System
Cec Cooper
Vice President
Organization Chart
AMEIL Constructors
Come By Chance, NL
AMEIL Constructors
Fred Edwards
President
Ameil Constructors
Gary Inkpen
Quality Manager
Ameil Constructors
Adam Slade
MIPS
AMEIL Constructors
Tor Fosnaes
Document Control + MIPS
AMEIL Constructors
Sharmaine Reid
Work Pack / FRB
Management Team
President & General Manager Fred Edwards
Administration Manager Sandra Benson
Project Manager Brian Lomond
Field Project Manager Jamie Compton
Quality Manager Gary Inkpen
Production Supervisor / Planning Bob Drake
HSE Manager / ISO Coordinator Trent Walsh
Document Control Tor Fosnaes
Work Pack / Fabrication Record Books Sharmaine Reid
MIPS (Welding Database) Adam Slade
Shop Supervisor Paul Ryan
Direct Labour
Manpower
AMEIL Constructors Limited has a National Shop Agreement in
place with the United Association Of Plumbers & Pipefitters
Union. With this agreement, AMEIL has 100% name hire of fully
qualified Pipe Fitters and Welders supplied by the Local UA 740
Union as required.
AMEIL also has an agreement in place with the
CONSTRUCTION LABOUR RELATIONS ASSOCIATIONSOF
NEWFOUNDLAND AND LABRADOR (CLRA) to provide
personnel from other local unions as required.
Computer / Software Resources
Weld Database Welding Coordinator
Planning& Scheduling Primavera P6
Engineering, Draughting & Detailing Acorn Pipe Software, DraftSight (CAD)
CNC Pipe Cutting Win PMP (Vernon Tool)
Document Control DIGIO Jonas (PMS)
Material Management & Logistics Jonas (PMS) & Microsoft Excel
Ameil Constructors Limited - Project Resources
Service: Non-Destructive Testing Service: Coatings
Address: 41 Sagona Avenue Address: Alexander Gilbert Street
Mount Pearl, NL Come By Chance, NL
A1N 4P9 A0B 1N0
Contact: Keith Gowan Contact: Cec Cooper
Phone: 709-745-1818 Phone: 709-726-8177
Fax: 709-745-5401 Fax: 709-722-6268
QA: ISO 9001 Registered QA: Nace Certified
Content: 100% Newfoundland Content: 100% Newfoundland
Service: Post Weld Heat Treatment Service: Electrical & Instrumentation
Address: 109 Clyde Avenue Address: 82 Clyde Avenue
Mount Pearl, NL Mount Pearl, NL
A1N 4R9 A1N 4S2
Contact: Pat Power Contact: John Dalley
Phone: 709-754-0883 Phone: 709-747-0816
Fax: 709-754-1333 Fax: 709-747-0825
QA: ISO 9001 Registered QA: Developing ISO 9001
Content: 100% Newfoundland Quality Procedures In Place
Content: 100% Newfoundland
Service: Dimensional Control
Address: Box 13412 Service: Crane & Transportation Services
St. John’s, NL Address: 37 Tobin's Road
A1B 4B7 St. John’s, NL
Contact: Wayne Pretty A1E 6A3
Phone: 709-753-7100 Contact: Doug Janes
Fax: 709-753-7107 Phone: 709-325-5438
QA: Developing ISO 9001 Fax: 709-237-8977
Quality Procedures In Place Content: 100% Newfoundland
Content: 100% Newfoundland
TechLift
LABOUR & SERVICES
AMEIL Constructors Limited has a National Shop Agreement in place with the United Association Of Plumbers &
Pipefitters Union. With this agreement, AMEIL has 100% name hire of fully qualified Pipe Fitters and Welders
supplied by the Local UA 740 Union.
AMEIL also has an agreement in place with the CONSTRUCTION LABOUR RELATIONS ASSOCIATIONS OF
NEWFOUNDLAND AND LABRADOR (CLRA) to provide personnel from other local unions as required.
TEAM Industrial Services
National Heat Treat
EPCO Services Limited
Atlantic Maintenance
IEAS
SUBCONTRACTOR LIST
Project Planning / Scheduling Tools Used by the Yard / Facility
Ameil Constructors Limited utilizes Jonas Construction Software. This is a Job Cost, Project
Management, Accounting package that ties together all business units to create efficiencies.
At the core of the Jonas solution is the Construction Accounting Software, which consists of five robust
and highly configurable components. Each additional element of the Jonas software is built from this
core accounting software base, making the construction accounting software system extremely stable
and secure while delivering significant reporting flexibility. Seamless integration between every module
maximizes data accuracy and efficiency by eliminating duplicate data entry.
Accounting
Fully GAAP compliant and designed specifically for contractors, the General Ledger (GL) module is both
powerful and easy to use. Open accounting period flexibility allows work in the current period (month,
quarter, year, etc.) while the previous period is still open. Jonas construction accounting software's user-
level security clearly defines who can post transactions to any given period, and multi-company
accounting automatically completes routine inter-company transactions
Payroll
Features of construction payroll software include:
• Current, historical and archived pay history, pay period to pay period
• Multi-union processing and reporting
• "Mini-Personnel" allows for tracking of absences, reminders and personnel notes
Job Cost
The core of the Job Cost system is the Job Cost module, which helps, track five different cost types
(actual, estimated, change order, committed and forecasted final).
Project Management
From one screen, your project managers can access Actual Billing, Actual Cost, RFI, Submittal,
Transmittal , Proposed Change Orders, Actual Change Orders, Purchase Order, and Subcontract
information. All of this information is available with drill down capability.
Document Management (Digio) Fully integrated with the entire Jonas solution, Document Management allows you to electronically
capture, file, organize, retrieve, share, manage and generally control all documents generated from your
Jonas software system and third party applications, such as Microsoft Office (Word, Excel and Outlook)
and Adobe Acrobat (PDF files).
• Description of Facilities
FACILITES & EQUIPMENT
• Main Shop Layout
• Yard Layout
• Equipment Listing
AMEIL Constructors Limited
INFRASTUCTURE
Building & Laydown Areas
� Fabrication Area - 60' X 192' (11,520 sq. ft)
� Heated Warehouse / Shop – 40’ X 104’ (4160 sq. ft)
� Warehouse – 36’ X 87’ (3132 sq. ft)
� Office - 20' X 96' (1920 sq. ft)
� Tool Crib / Lunch Area - 20' X 48' (960 sq. ft)
� Outside Lay Down Area - 2.8 Ha (7 Acres)
� Vernon CNC Cutting Shop – 40’ X 50’ (2000 sq. ft)
� Outside Fabrication Concrete Pad Complete With
Power / Lighting – 50’ X 100’ (5000 sq. ft)
� Two Outside Portable Welding Shelters Wired
For Welding Machines & Lighting - 12’ X 16’ (192 sq. ft)
In addition, Ameil is located adjacent to Atlantic Maintance
Systems (AMS) who provide Ameil with painting and coatings
services. Their shops consist of:
• 4000 square foot paint area
• 4000 square foot blast area
• 2000 square foot outside concrete lay down / wash pad
• 1200 square foot office area
• Temperature, humidity controlled
• High volume / efficient extraction systems
Room
Manager's Office
BoardQA/QCProject
RoomLunch
Common Area
Manager
Admin
Office
Common Area
S/VWC WC OHS
Overhead Door
12' W X 16' H
18' W
X
16' H
Over
hea
d D
oor
12' W X 16' H
Overhead Door
Air Vent System
40 HP Henlex
Lunch Room
Tool Crib KitchenWC WC
New Office Area
12' W X 16' H
Overhead Door
Elect.Room
WC
Drawing Number Sheet
AMEIL ShopRev.
AMEIL Shop Layout
1 OF 1 1Scale
Title
NTS
Hydro Test / Laydown
Pla
te R
ack
Cutt
ing T
able
30P-2
00 (
2" - 3
0")
16P-7
00 (
Med
ium
)
Rot
o-Sta
r (2
" - 6"
)
30P-2
00 (
2" - 3
0")
Rot
o-Sta
r (2
" - 6"
)
16P-7
00 (
Med
ium
)
Rot
o-Sta
r (2
" - 6"
)
12' W
X
16
' H
Overh
ead D
oor
Receiving / Warehouse
Pipe Loading
Cut
Cut / Bevelled
Bev
el S
tati
on
Pipe
Laydown
Dri
ll P
ress
Building Extension (44' X 24')
(12' X 20')
(24' X 30')
Fit / Tack Fit / Tack Fit / Tack
Fit / Tack Fit / Tack
Pipe Rack Pipe Rack
Hydro Test Tank
Plan View
80'
192'
Note: Fabrication Shop Serviced By Two Overhead Cranes (3.2 Tonnes Each)
Compressor Rm
AMEIL Constructors Main Building1
04
' X
40
' (41
60
sq
. ft
)
Sta
inle
ss S
hop
2.8 Ha (7 Arces)Total Land Area
See Attachd - AMEIL Shop Layout
36
' X
87
' (31
32
sq
. ft
)
War
ehou
se
Room
Manager's Office
BoardQA/QCProject
RoomLunch
Common Area
Manager
Admin
Office
Common Area
S/VWC WC OHS
Overhead Door
12' W X 16' H
18' W
X
16
' H
Ove
rhea
d D
oo
r
12' W X 16' H
Overhead Door
Air Vent System
40 HP Henlex
Lunch Room
Tool Crib KitchenWC WC
New Office Area
12' W X 16' H
Overhead Door
Elect.Room
WC
Compressor Rm
14' W X 16' H
Overhead Door
Ov
erhe
ad D
oor
14'
W X
1
6' H
Overhead Crane
3.2 Tonnes
End Prep / Bevel
Pip
e C
utt
ing M
ach
ine
CN
C V
ernon
6 A
xis
And Motorized ConveyorOutside Pipe Loading Rack
Rubb
er C
oat
ed P
ipe
Curv
ed P
ipe
Len
gth
s
Straight Pipe Lengths
45
Scale Drawing No: Sheet
Title
NTS M0277-1Rev.
J-Tubes & Risers
1 OF 1 2
AMEIL Yard Layout
16" A11-9500-02316" B51-9500-012
16" C31-9500-011
16" A11-9625-0118
#57
#55
#56
#33
16" C31-9628-017 #35
16" C31-9625-016 #26
16" C21-9630-019 #40
16" C21-9615-0110 #31
16" C21-9618-0112 #21
16" J-Tubes
3 Stacks @ 2 H
igh X 4
24" J-Tubes
3 Stacks @ 2 H
igh X 3
24" R
isers
1 Stac
k @
2 H
igh
X 3
24 Pieces
18 Pieces
6 Piec
es
Site Trailer
16" J-
Tube
- BR 1
1,000
24" Riser - Bend Radius 3050
1 Sta
ck @
2 H
igh
X 4
8 Pie
ces
16" J
-Tube
- BR 5
5,00
0
1 Sta
ck @
2 H
igh
X 4
8 Pie
ces
24" J-
Tube
- BR 1
1,000
2 Sta
ck @
2 H
igh X
4
16 P
iece
s
24" J
-Tub
e - B
R 55,
000
2 Sta
ck @
2 H
igh X
4
16 P
iece
s
16" J
-Tube
- BR
5,0
00
1 Sta
ck @
1 H
igh
X 2
2 Pie
ces
14 Pieces
10 mm S355 CV1
15 mm S355 CV1
20 mm S355 CV1
20 mm S355 CV2Z
25 mm S355 CV2Z
40 mm S355 CV2Z
7a
1a
1b
1c
1d
2a
2b
3
6
7b
7c
7c
PYEROY Atlantic Services
8
10
9
Item Qty Model
Welding Equipment
250 Amp Welder 9 XMT304
Suitcase 1 2 Suitcase 12R3
Flux Core Welder 1 Powerwave 11153
Rod Oven 2 125 115 Volt
Orbital 1 Adapt-Arc Orbital Welding System
Miller XMT Power Source 1 XMT 350
Hvy Dty Air Treatment Mod 1 43007
16" Guide Assembly 1 66-0356
26"Guide Assembly 1 66-0437
Smoke Eater (Air Cleaner) 6 Smog Hog Porta-Clean
Deisel Welding Machine 1 Air Vantage 500
Lifting Equipment
Overhead Crane 2 P and H SGUS
Forklift Boom 1 WS11200835
Loader Forks 1
Loader Scoop 1 DD111105099
Loader Plow 1 T13110039
Plate Grab 2 6T Capacity 1PU10
2 Led Bridle 1 Wire Assembly Bridle 2"x53'3-1/2"
Pipe Hooks 1 30062013-3
Polyester Round Sling 2 35' round Sling
Spanco 2T Hoist Bracket 1
3T Chain Hoist 1 Bravo 3T Chain Hoist
Pallet Jack 1 FLPS55
Cutting Equipment
Band Saw 1 Hyd-Mech S-20H 13" Cap
Mag Drill 1 19040
Plasma Cutter 1 NH03755
16" Clam Shell 1 324RB
24" Clam Shell 1 624RBL
Air Treatment Module 2 L28-06 KL00
Air Treatment Module 1 L28-06 KL01
OD Tracking Module Kit 1 05-1338
CBM-3 Counterbore Module 1 616RBL
Victaulic Groover 1 VG28GD
Power Drive 1 MULE II
Drill Press 1 TPR-820A
Bevel Master Pipe Lathe 1 221B
ID Tracking Module 1 05-0347
Vernon Cutting Machine 1
Hypotherm Max 200 1 73003
AMEIL ASSET INVENTORY
Page 1 of 2
Item Qty Model
AMEIL ASSET INVENTORY
Testing Equipment
Water Storage Tank 1 ULC-5601 Hydraulic Double Wall
Water Pump 1 Honda GX 120
Generator 1
Test Plug 2 24" Sch 60 Hydro Test Plug
Test Plug 2 24" Sch 40 Hydro Test Plug
Test Plug 2 16" Sch 80 Hydro Test Plug
Air Driven Pump 2 5L-SS-115-BC
Hydraulic Wrench 1 1" Square Drive
Hydraulic Wrench 1 1 1/4" Square Drive
Vehicles
2007 1/2 Ton Truck 1 Ford Ranger
2006 1/2 Ton Truck 1 Ford F-150
1998 1/2 Ton Truck 1 GMC Sierra 1500
2007 Ford F-350 1 Ford F-350
2003 Ford F-350 1 Ford F-350
2009 1/2 Ton Truck 1 Chevy Silverado
2009 3/4 Ton Truck 1 Chevy Silverado
2011 Ford F-350 1 Ford F-350
Transport Truck 1 1998 Freightliner Tractor
Trailer 1 Extendalble Trailer
Car Trailer 1
Caterpillar 1 Cat 420Fit Back Hoe Loader
Forklift 1 C3500
Pipe Stands & Rollers
Black Jack Pipe Stand 20 130 BJS
Pipe Roller 8 HD2-300-RS
Pipe Positioner 2"-30" 2 30P-200
Pipe Positioner 2"-16" 2 16P-700
Foot Swith F/R 4 FS-FR
30" 3-Jaw Welding Gripper 1 T30-100
Serrated Gripper Jaws (set of 3) 1 T30-010
16" Chuck c/w Reverse top jaws 1 16C
Max Jax Pipe Stand 10 781403
2"-6" Weld Positioner 4 Rotor-Star III
Misc.
Torque Pump 1
Rolling Ladder 1 Ladder 10 Step 1580G24
Greenlee 30x48x30 Job Box 1 3048
Greenlee 24x48x24 Job Box 1 2448
Sea Container (40 Feet) 5 ROK/003-KR88
Air Compressor 1
Page 2 of 2
• System Description
QUALITY MANAGEMENT SYSTEM
• List of Procedures
• Sample ITP
QUALITY MANAGEMENT SYSTEM
The Ameil Constructors Limited Quality Management System is registered to ISO 9001:2008 by
Quasar. The QM system is a computer based interactive, online document in which all controlled
documents and records are stored, retrieved from, and saved electronically. Printed documents,
including stamped drawings, received documents and records are scanned and stored in project files.
Project files are used to create project data packages required to satisfy client requirements, regulatory
requirements and Ameil’s internal management and financial systems.
CONSTRUCTION STANDARDS
The following is a list of Ameil’s current certification from recognized industry organizations
(Certificates attached under Certification Section of this document):
• Certificate Of Registration ISO 9001:2008
• Newfoundland Government Services - Certificate Of Authorization
Fabrication / Installation Of Pressure Piping To CSA B51, ASME B31.1, 31.3 & 31.4
Shop Fabrication of Pressure Vessels
Repair / Alteration of A boiler, Pressure Vessel or Piping System
Provision of Welding Services
• Canadian Welding Bureau - Certified to CSA Standard W47.1, Division 2
AMEIL Constructors Limited
QUALITY PROCEDURESIssued: 01.04.08 - Revised: 00.00.00 Page 1
No. PROCEDURE No. PROCEDURE
QP-100 Generation and Control of Inspection and Test Plans QP-604 Stud Welding
QP-101 Generation and Control of Quality Plans QP-605 Locknut Welding
QP-104 Generation and Control of Drawings and Work Orders QP-606 Weld Repair
QP-200 Calibration QP-607 Weld Build Up of Metallic Sections
QP-215 Verification of Weld Rod Ovens QP-608 Numbering & Selection of ASME IX Welding Procedures
QP-218 Weld Consumables
QP-301 Inspection of Piping Systems QP-609 Seal Welding of Threaded Connections
QP-302 Inspection of Welds QP-801 Controlled Bolting - Torqueing
QP-305 Dimensional Control QP-802 High Velocity Flushing Procedure
QP-401 Hydrostatic Pressure Testing for Piping Systems QP-803 Low Velocity Flushing Procedure
QP-402 Pneumatic Pressure Testing for Piping Systems QP-806 Threaded Pipe Assemblies
QP-403 Hydrostatic Pressure Testing for Boilers QP-809 Piping Passivation
QP404 Hydrostatic Pressure Testing for Pressure Vessels QP-811 Controlled Bolting - Tensioning
QP-601 Procurement and Control of Weld Consumables QP-813 Fiberglass Pipe Assembly Using Thermosetting Resin
QP-602 Socket Welding QP-814 Flangeless Lined Pipe Assembly
AMEIL ITP -
Q-002L 1 of 1
Activity No. Activity DescriptionControl Procedure
Reference Responsible PartyDocumentation of Execution
Reference Verifying Documents Ameil C&W WPF EMPC Frequency
Company C&WContractor AMEIL Constructors Ltd.AFC Approved For Construction
H
W
M
R
Hold (Contractor shall notify company 24 hours in advance, before reaching a company required hold point. Contractor shall NOT proceed past hold point unless verified by company representative or waived in writing [email] to proceed, unless notification time has expired.) Company shall notify other participants as required.Witness (Contractor shall notify company 4 hours in advance, before reaching a company required witness point. Contractor shall NOT proceed past witness point unless verified by company representative or waived in writing [email] to proceed, unless notification time has expired.) Company shall notify other participants as required.
Monitor (Contractor shall allow company to monitor on an ongoing basis.)
Review (Contractor shall provide documentation for review as required to company reprsentative.)
1.0 Preliminary Controls (Pre-construction)
2.0 Engineering Activities
3.0 Cutting
5.0 Dimensional Control Items (Internal - AMEIL)
6.0 Certificate of Compliance
Definitions and Abbreviations
4.0 Marking / Labelling
• Safety Policy
OCCUPATIONAL HEALTH & SAFETY
• Occupational Health & Safety Index
• Safe Work Policy
• Safe Work Procedure
• Newfoundland Safety Association
Letter of Good Standing
Occupational Health and Safety Issued: 01.04.08 – Revised:00.00.00
OCCUPATIONAL HEALTH AND SAFETY POLICY Ameil Constructors Limited is committed to accident prevention by demonstrating Occupation-al Health and Safety excellence inside and outside the workplace. Employees have the right to a safe and healthy environment and Ameil provides them with the resources needed to stay acci-dent free. Ameil will continually improve its work environments by eliminating or reducing risk.
Ameil recognizes that Health and Safety success requires commitment, participation and innova-tion by employees and others. It is imperative that everyone demonstrates leadership by acting in a safe manner at all times. Each employee must continuously take precautions to eliminate or minimize risk wherever a hazard or improvement opportunity is identified. Employees are given the opportunity and responsibility to assist in developing health and safety policies, stan-dards, procedures and work plans. Ameil expects all employees to follow correct safety and health practices.
This Occupational Health and Safety Policy is implemented and administered by Ameil through ongoing implementation of its Occupational Health and Safety Program (OHSP). This program, which complies with legislative requirements, sets minimum requirements to be practiced by employees.
It is the policy of the company to establish, maintain and participate in an Occupational Health and Safety Committee at its workplace, regardless of the number of employees on hire. This Committee consists of a manager, a unionized supervisor and a tradesman representative (pre-ferably a shop steward); if no trades’ employees are on hire the Committee will retire until fu-ture jobs require hiring. Management and administration is committed to work with the OHS Committee, using the proscribed forms and schedules outlined in this manual, to ensure lost time accidents and incidents that may lead to losses are reduced as much as possible and em-ployees can enjoy a safe workplace.
As an indicator of personal commitment, I insist Health and Safety excellence is a priority in all aspects of our work lives and business activities.
Fred Edwards President
OCCUPATIONAL HEALTH and SAFETY Issued: 01.04.08 - Revised: 00.00.00 Page 1
OHS SECTION ASSOCIATED FORMS AND PROCEDURESOccupational Health and Safety Objectives Roles and Responsibilities
Program Planning and Implementation1 Risk Management Matrix
Hazard Assessment Checklist (Med. Risk) Hazard Assessment Checklist (High Risk)
Project Start Up Safety Checklist Job Safety Analysis Forms
Job Safety Analysis Log
Safety Training and Communication Employee Orientation2
Pre-Task Hazard Assessments Employee Orientation Evaluation Form Supervisor OHS Program Orientation
Project Safety Meeting Form Safety Inspections Weekly Inspection Form Monthly Inspection Form
Safety Investigations Safety Investigation Report
Records and Statistics Project Safety Files Monthly Safety Performance Report
Monthly Safety Data Report Supervisor’s Safety Performance ReportEmergency Response, Evacuation and First Aid
Disciplinary Action
Work Refusal Process Health and Safety Program DevelopmentModified Work Program Respiratory Protection Program3 Respirator User’s Assessment Form Respirator User’s Fit-Test ReportSafe Work Policies and Instructions Safe Work Procedures
1 14.01.10 – WC 218.01.10 – WC 310.05.05 Program added
OCCUPATIONAL HEALTH and SAFETY Issued: 01.04.08 - Revised: 00.00.00
SAFE WORK POLICIES POLICIES Issue Date
Safety Standards
Personal Protective Equipment 21.05.13
Tools and Equipment 03.04.06
Housekeeping, Storage, and Tool Maintenance 03.04.06
Workplace Hazardous Material Information System - WHMIS 03.04.06
Designated Substances 03.04.06
Asbestos 03.04.06
Fire 03.04.06
Elevated Work - Overhead Protection 03.04.06
Cellular Phones 03.04.06
Fall Protection 05.02.12
Alcohol and Drugs 03.04.06
Isolation Standard – Electrical Work 03.04.06
Isolation Standard – Mechanical work 03.04.06
Work On Or Near Live Electrical Equipment 03.04.06
Confined Spaces 23.01.12
Noise 21.05.13
Material Handling / Body Mechanics 03.04.06
Statement of Policy: The documents listed in this table are official policies of the company and are followed by employees and management to ensure compliance to all safety regulations and to ensure a reduced or eliminated risk to employees. These policies are implemented and authorized by this signed statement.
Fred Edwards, President
SAFE WORK PROCEDURES
Housekeeping RS-1.0 Housekeeping - Scrap Removal RS-1.2 Housekeeping – Workplace Lighting
Elevated Work RS-2.0 Elevated Work - Crane Suspended Work Platforms RS-2.1 Elevated Work - Scaffolds RS-2.2 Elevated Work - Suspended Scaffolds RS-2.3 Elevated Work - Ramps, Runways And Platforms RS-2.4 Elevated Work - Man Lifts RS-2.5 Elevated Work - Ladders
Material Transportation RS-3.0 Transportation Of Dangerous Goods RS-3.1 Loading and Unloading Trucks
Excavations RS-4.0 Excavations
Welding and Cutting RS-5.0 Electric Arc Process - Welding RS-5.1 Electric Arc Process – Welding Restrictions RS-5.2 Welding And Cutting Operations Hazardous Fumes RS-5.3 Welding And Cutting On Containers or Piping Systems RS-5.4 Compressed Gas Welding RS-5.5 Compressed Gas – Cutting RS-5.6 Dismantling Compressed Gas (Welding/Cutting) RS-5.7 Electric Arc Process (Welding) Equipment
Compressed Gases RS-6.0 Compressed Gases RS-6.1 Compressed Gases - Safe Handling RS-6.2 Compressed Gases - Cylinder Storage RS-6.3 Storage And Handling Of Propane RS-6.4 Compressed Gas – Defective Equipment
Forklift Operation RS-7.0 Forklift – Operator Qualifications RS-7.1 Forklift - Operators Daily Checklist RS-7.2 Forklift - Maintenance RS-7.3 Forklift - Propane Fuel (LPG) RS-7.4 Forklift - General Safety Rules
Internal Combustion Engines RS-8.0 Fumes RS-8.1 Ventilation
Hoisting and Rigging RS-9.0 Operating Engineers Qualifications RS-9.1 Operating Engineers Restrictions RS-9.2 Overhead Cranes RS-9.3 Operating Engineers – Equipment Maintenance RS-9.4 Anchorage RS-9.5 Hand Operated Chain Hoist RS-9.6 Chain for Hoisting RS-9.7 Slings and Hitches RS-9.8 Wire Rope Inspection RS-9.9 Nylon Web Slings – Inspection/Maintenance
Temporary Heat RS-10.0 Temporary Heat
Powered Tools and Equipment RS-11.0 Powered Hand Tools – Basic Electrical Safety RS-11.1 Powered Hand Tools – Portable Grinders RS-11.2 Wheel Mounting of Portable Grinder RS-11.3 Powered Hand Tools – Explosive Actuated
Fabrication Pictures
AME IL CONSTRUCTORS LIMITEO
~~IL LIMITED
Lifting / Moving Equipment
� �
Overhead Cranes
•2 – 3.5 tonne overhead cranes •2 – 5 tonne overhead cranes
1
� �
Appendix “D”
Cut & Prep Tools
� �
� �
� �
� �
Appendix “E”
Alignment Tools
59
W H E R E T H E R E ’ S P I P E , T H E R E ’ S M A T H E Y .
Rim Clamps - For TOUGH REFORMING JOBS!
Jackscrews apply pressure on specifi c high points to precisely reform and align the pipe or shells. Ideal for applications that
require 100% weld and grind without releasing clamping pressure to prohibit cracking of partially completed welds.
The clamp can also be used to round the pipe or shell on which it is placed. All surfaces of the Rim Clamp that contact the pipe are made of stainless steel so that this clamp can be used for nuclear and other similar applications.
The 14" to 16" (356mm to 406mm) and larger Rim Clamp closes over the pipe automatically, minimizing risk of injury to the operator.
The Clamp will reform 45,000psi tensile strength pipes up to Schedule 80, with out-of-round conditions up to 2" (51mm).
Clamp Type
Pipe Tensile Strength
Material Pipe Diameter
PSI Mpa 4" - 12" 14" - 24" 32" - 48" 50" - 60" 62" - 72"
STD 45,000 310 X45 1/2" 3/4" 1" 1 1/8" 1 1/4"
Pipe Wall Thickness
All calculations based on a temperature of 72ºF (22ºC).WARNING: Contact Mathey Dearman when pipes are cladded with materials such as Inconel or Titanium. As temperature decreases below 0ºF (-18ºC), the ability of the clamp to reform the pipe wall listed will decrease sharply.
• EXTREMELY ACCURATE fit-up on large diameter pipe or shells.
• Hi-Lo—Handles out-of-round conditions up to 2" (51mm).
• EASY ALIGNMENT AND REFORMING—Pressure can be applied to the high point of the pipe or vessel to reform it to the required shape.
• VERSATILE—The clamp can be used for steel or stainless steel applications.
Clamps With
Muscle
Rim Clamps include:
• Clamp frame
• Required number of jackscrews per pipe and clamp size
• Flip-Up jackbars for mating pipe
• Stabilizer bars
• Level and support device attachment point
• Clamp wrench
• Parts and operating manual
Reformingscrews
Locking hook
hinge point
Lifting chainopen rim clamp
Stabilizing jackbar
Jackbar locking pin
Flip Up jackbar
(Please refer to Commercial Pipe Sizes and Wall Thickness Chart - pg. 87.)
een - i
60
W H E R E T H E R E ’ S P I P E , T H E R E ’ S M A T H E Y .
Mega Rim Clamp—High Tensile Strength Reforming
Please provide us with the following information in order to specify the Mega Rim Clamp for your application.
1. Pipe diameter (inches or millimeters) ________________2. Pipe wall thickness (inches or millimeters) ____________
3. Pipe tensile strength or type material ________________
4. Horizontal or vertical application ____________________
5. Ambient temperature _____________________________
• EXTREME REFORMING CAPABILITY— Reforms high tensile strength pipes.
• Hi-Lo—Can be used on pipe out-of-round condition up to a 2" (51mm) with out-of-round condition.
• VERSATILE—Engineered based on actual customer applications.
MEGA RIM CLAMPPart No.
D711-2632M
The Mega Rim Clamp aligns and reforms high tensile strength X65, X70 and X80 pipes with wall thicknesses
up to 7/8" (22mm) (see chart below for tensile strengths). The clamp reforms pipe out-of-round condition up to 2" (51mm), gaining its strength from heavy-duty oval shaped side plates, latching mechanism, and fl ip-up jackbars for mating pipes.
The hinged fl ip-up jackbars, placed with precision on the clamp, can be rotated away from the primary pipe for insertion of the mating pipe, valve or fi tting to facilitate welding and grinding. The independent pivoting pads of the jackscrews allow for uneven surfaces on the pipe. To avoid risk of contamination, all surfaces of the Mega Rim Clamp that come in contact with the pipe are made of stainless steel.
Clamp Type Pipe Tensile Strength Material Pipe Diameter
PSI Mpa 4" - 12" 14" - 24" 32" - 48" 50" - 60" 62" - 72"
MEGA 45,000 310 X45 1/2" 3/4" 1 1/8" 1 1/4" 1 3/8"
MEGA 65,000 448 X65 7/16" 5/8" 1" 1 1/8" 1 3/8"
MEGA 70,000 482 X70 3/8" 1/2" 7/8" 1" 1 1/4"
MEGA 80,000 551 X80 3/8" 1/2" 3/4" 7/8" 1 1/8"
Pipe Wall Thickness
MEGA RIM CLAMP
The jackbar rotates out of position for alignment, welding and grinding without removal of the clamp.
All calculations based on a temperature of 72ºF (2ºC).
WARNING: Contact Mathey Dearman with pipes cladded with materials such as Inconel or Titanium.As temperature decreases below 0ºF (-18ºC), the ability of the clamp to reform the pipe wall listed will decrease sharply.
61
W H E R E T H E R E ’ S P I P E , T H E R E ’ S M A T H E Y .
Accessories for Rim Clamp and Mega Rim Clamp
Jackbars with jackscrews
Locking hookJackbar latch pin
Main ring
Hinge plate
*Stainless steel
Assembly / Parts Description Rim Clamp Size(in / mm)
Jackbars
DR-300 4 - 14 / 102 - 356
DR-700 14 - 72 / 356 - 1829
Jackscrews
DC-501 4 - 14 / 102 - 356
DR-500 14 - 72 / 356 - 1829
Wrenches
D900-002 3/4" / 19mm 4 - 14 / 102 - 356
D900-003M 7/8" / 22.2mm 14 - 72 / 356 - 1829
Level and Support Device
DA-400S* 4 - 8 / 102 - 203
DB-400S* 4 - 20 / 102 - 508
DC-400 18 - 72 / 457-1829
DC-400S* 18 - 72 / 457 - 1829
Appendix “F”
Automatic Orbital Welder
� �
� �
Appendix “G”
High Pressure Test Plugs
� �