serbca sponsors thank you. commissioning in mississippi why are we doing this, and will it go away?

30
SERBCA SPONSORS THANK YOU

Upload: clement-harvey

Post on 18-Dec-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

SERBCA SPONSORS

THANK YOU

Commissioning In Mississippi

Why Are We Doing This, And Will It Go Away?

Welcome

Col. J.K. Stringer Executive Director

Department Of Finance & Administration State Of Mississippi

Introduction

David Anderson Deputy Executive Director

Department Of Finance & Administration State Of Mississippi

Why Commissioning?

Rick Snowden Director

Bureau Of Building, Grounds, & Real Property Management

State Of Mississippi

First, let’s discuss what it is not.

It is NOT a Silver Bullet !!!!!

Why Commissioning?

Why Commissioning?

It Will Not Eliminate The Need For Good Design

It Will Not Replace The Need For Good Project Management

It Will Not Replace The Need For Quality Construction

Why Commissioning?

Ok, It’s Not A Silver Bullet. What Is It? It Is A Process To …

Quantify And Document Project Goals Provide Means For Measuring Success Or

Failure Provide Tools To The Project Team

Design Supports Project Goals Design Actually Gets Installed Installed Systems Actually Work AND WE HAVE THE PAPERWORK TO PROVE IT!!!!

Why Commission?

So, Why Commission? We always have Commissioned

It has been after the building was occupied It has taken years to complete The design is often never fully implemented It has been very expensive

We propose a better way Commission before the building is occupied Complete during design and construction, not

after Build what is drawn Only pay once

Why Commission?

Glenn Kornbrek Assistant Director

Bureau Of Building, Grounds, & Real Property Management

State Of Mississippi

Why Commissioning?

Three Kinds Of Builders Bob The Builder Bill Bob The Builder Robert Builders, Inc.

Why Commissioning?

It Is Law SB 3007, Laws Of 2008 “AN ACT TO REQUIRE THE DEPARTMENT OF FINANCE

AND ADMINISTRATION TO ADOPT CERTAIN RULES AND REGULATIONS REGARDING ENERGY PERFORMANCE OF STATE-FUNDED BUILDINGS THROUGHOUT THE STATE; TO PROVIDE THAT EACH MAJOR FACILITY CONSTRUCTION PROJECT SHALL BE DESIGNED AND CONSTRUCTED TO EXCEED THE REQUIREMENTS OF THE ENERGY CONSERVATION GUIDES ADOPTED BY THE DEPARTMENT OF FINANCE AND ADMINISTRATION BY AT LEAST 30% UNDER CERTAIN CIRCUMSTANCES; AND FOR RELATED PURPOSES”

Why Commissioning?

Sustainability Policy Site Issues

Avoid developing inappropriate sites Renovation emphasized Minimize heat islands

Water Efficiency Reduce demand water potable water irrigation

systems High efficiency plumbing fixtures

Why Commissioning?

Sustainability Policy, continued Energy Performance

ASHRAE 90.1, 2004 Reduce 30% compared to baseline MUST BE ECONOMICALLY VIABLE Commission Buildings

Product Selection Mississippi products Recycled content Low VOC materials Rapidly renewable materials

Why Commissioning?

What Really Happens? Mechanical And Electrical Engineers

Involved Earlier More Detail On SD and DD Submittals Commons Sense Decisions

What’s In It For Me?

Rod Rabold Vice President

Commissioning Coordinator / Engineer University of NC

What’s In It For Me?

Design Professional

What’s In It For Me?

Lower Risk Owner financed QA support Issues documented earlier Fewer Change Orders

Enhanced Construction Administration Documentation Of Construction Documentation Of Performance

What’s In It For Me?

Johnny Johnson President Evan Johnson & Sons Construction

Company

What’s In It For Me?

Better Design Documents Fewer Unknowns Tighter Bids

Third Party Documentation Of Issues Decision Process Documented Fewer Call Backs

What’s In It For Me?

David Dessert Senior Project Manager Evan Johnson & Sons Construction

Company

What’s In It For Me?

Independent Confirmation Of Mechanical & Electrical Work

Documented Completion Promotes Team Work

What happens when team approach is used What happens when team approach is not

used

What’s In It For Me?

Don Blackston Secretary

Senior Program Manager Clement & Wynn, LLC

Case Studies

Jeff Watson CCP - Immediate Past President

Director Technical Services ARAMARK

Round Table Discussion

Jim Magee, CxA, TBE - PresidentFacility Commissioning Group, Inc.

Rick Snowden

Closing Comments

David Anderson Col. J.K. Stringer

SERBCA SPONSORS

THANK YOU