serving god by serving others - amazon s3campaign... · 2017-04-09 · project building 01....

12

Upload: others

Post on 13-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04
Page 2: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

For nearly 110 years, the people of First Baptist have shined as the light of the

world not only here at the corner of Broward and Federal, but in some of the most

underserved corners of our world. Our rally cry is taken from the words of Jesus in

the book of Matthew, living out our mission to serve God by serving others. It’s been

exciting to see God’s people mobilized in rescuing at risk children, coming alongside

single mothers and widows in need, and simply being generous with their resources

and time.

Culture is advancing so rapidly; the city is growing, and our physical presence in our

neighborhood must be as brilliant as ever! The purpose of SHINE is to renew and

recover some of our aging campus features so we will be visible and engaging to

the thousands of passers-by each day; to restore weathered infrastructure so that

ministry will emanate with clarity and beauty. All for the glory of God.

| You are the light of the world. A city set on a hill cannot be hidden. Nor do people light a lamp and put it under a basket, but on a stand, and it gives light to the whole house. In the same way, let your light SHINE before others, so that they may see your good works and give glory to your Father who is in heaven. Matthew 5:14-16 (ESV)

Page 3: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

Serving God by Serving Others

Page 4: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

re:POSITIONIn our downtown neighborhood by modernizing the EXTERIOR elements of our buildings and grounds.

1

re:NEWThe INTERIOR environments needing the most attention so they will be inviting to all who seek to learn and grow.

2

re:CONNECTTo our community by addressing basic INFRASTRUCTURE and technology needs in a rapidly changing culture.

312projects 24MONTHS 1.5MILLIONDollars All gifts matched in YEAR 1.

Page 5: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

VelocityCenter

NE 1st StreetN

E 3r

d Av

enue C

B

A

Campus Building Designations

D

Broward Blvd.

BUILDING D• Classrooms

• Velocity Center to the South

BUILDING C• Worship Center

• Choir & Orchestra Rooms

• Classrooms

BUILDING A• Staff Offices

• The Terminal (Middle School)

BUILDING B• Treasure Cove & Next

Generation Learning Center (Preschool)

• Club 252 (Elementary)

• Global Grille

• Global Event Center

Page 6: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

SHINE = 12 PROJECTS IN 24 MONTHSProject Building

01. NORTHWEST CORNER FACADE D

02. NORTH ENTRY FACADE D

03. DROP-OFF COVER AT EAST LOBBY C

04. GRASS PARKING AREAS -

05. SOUTH FACADE ON BROWARD A

06. FIRST FLOOR CLASSROOM FINISHES D

07. SECOND FLOOR CLASSROOM FINISHES D

08. WORSHIP CENTER DESIGN CONCEPT C

09. FIRST FLOOR COMMON AREA A

10. ROOFTOP AC UNITS B,C

11. INFRASTRUCTURE & TECHNOLOGY D

12. INFRASTRUCTURE & TECHNOLOGY A

Page 7: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

EXISTING CONDITIONBUILDING D

The corner of

NE 3rd Avenue

and

NE 1st Street

Downtown is becoming a more pedestrian-friendly neighborhood, and these improvements will illustrate the vibrant and attractive nature of the ministry within.

This initiative will add a modern trellis, stone texturing, architectural window features, new shutters, and attractive landscaping.

Page 8: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

EXISTING CONDITIONBUILDING A

Facing

Broward

Boulevard.

Building A is positioned right along Broward Boulevard, and is among our oldest and least attractive structures. Through simple improvements like shade features, brand identifiers, a similar model trellis as is being installed on our northwest corner, and added landscaping, passers-by will know not only who we are but that we are also focused on adding interest to the incredible and expanding downtown community.

Page 9: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

Currently there is no place on campus to drop off or pick up passengers while being protected from the elements in a storm. While this was considered in much earlier versions of our master plan, no structure ever materialized. Through SHINE we will add a simple and elegant porte-cochère along 1st Street on the east side of Building C.

EXISTINGBUILDING CENTRANCE

Facing

NE 1st Street

Page 10: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

browardWe’d like for our dynamic city to see the sense of family

and community here at First Baptist | FTL, so initial

designs have been created to activate the southwest

side of our campus.

sanctuaryFrom carpeting to seating to the functionality and

appearance of the Worship Center stage, our main

gathering space could be enhanced.

technologyOur team has done a remarkable job using older

technology, but advancements must be made in

video and audio.

WHAT COMES NEXT? As a new Lead Pastor on boards, there are several

additional projects under consideration.

Page 11: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04

SHINE is about people.

It’s about sacrificially investing in our neighborhood so that residents will be reached with the light of Jesus. “

Page 12: Serving God by Serving Others - Amazon S3Campaign... · 2017-04-09 · project building 01. northwest corner facade d 02. north entry facade d 03. drop-off cover at east lobby c 04