Willy F. Grimmke, P.E. Kyle M. Vandewater County Superintendent of Public Works Public Works Manager Washington County DPW Washington County DPW 383 Broadway 383 Broadway Fort Edward, NY 12828 Fort Edward, NY 12828 (518) 746-2440 (518) 746-2440 [email protected] [email protected] Synopsis: Washington County DPW began fabricating and installing precast bridge panels with three goals in mind: 1. Reduce the length of bridge closures. 2. Stretch the construction season. 3. Conduct short-span superstructure replacements within the limitations of our maintenance budget. To date the county has completed three separate spans configured as a simple span slab bridge, and transverse panels set on existing beams. This presentation will cover the design and construction of these three spans. About the Presenters: Willy Grimmke is the Superintendent of Public Works for Washington County. He has been with Washington County since 1997. He provides general supervision of the Department and manages the County's Federal Aid projects. Prior to joining the County, Mr. Grimmke managed transportation design and construction projects with a local engineering firm. He has also worked for the Connecticut Department of Transportation. Kyle Vandewater is the Public Works Manager for Washington County. He has been with Washington County since 2001. He provides general supervision for the Solid Waste Division and manages construction performed by county forces in the Highway Division. Mr. Vandewater also has worked as a project manager for Stonebridge Iron and Steel, and the Chazen Companies. SESSION 3.4 Design, Fabrication and Erection Of Precast Concrete Deck Panels

Upload: others

Post on 18-Jan-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Willy F. Grimmke, P.E. Kyle M. Vandewater County Superintendent of Public Works Public Works Manager Washington County DPW Washington County DPW 383 Broadway 383 Broadway Fort Edward, NY 12828 Fort Edward, NY 12828 (518) 746-2440 (518) 746-2440 [email protected] [email protected]

Synopsis:

Washington County DPW began fabricating and installing precast bridge panels with three goals in mind: 1. Reduce the length of bridge closures. 2. Stretch the construction season. 3. Conduct short-span superstructure replacements within the limitations of our maintenance budget. To date the county has completed three separate spans configured as a simple span slab bridge, and transverse panels set on existing beams. This presentation will cover the design and construction of these three spans.

About the Presenters:

Willy Grimmke is the Superintendent of Public Works for Washington County. He has been with Washington County since 1997. He provides general supervision of the Department and manages the County's Federal Aid projects. Prior to joining the County, Mr. Grimmke managed transportation design and construction projects with a local engineering firm. He has also worked for the Connecticut Department of Transportation. Kyle Vandewater is the Public Works Manager for Washington County. He has been with Washington County since 2001. He provides general supervision for the Solid Waste Division and manages construction performed by county forces in the Highway Division. Mr. Vandewater also has worked as a project manager for Stonebridge Iron and Steel, and the Chazen Companies.

SESSION 3.4

Design, Fabrication and Erection Of Precast Concrete Deck Panels

Page 2: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County DPW 1

Design, Fabrication, and Erection of Precast Concrete Deck Panels

Willy F. Grimmke, P.E. SuperintendentKyle M. Vandewater, Deputy Superintendent

Washington County Department of Public Works

27 October 2004

Page 3: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 2

Washington County DPW

Division of HighwaysDivision of Highways60 men staffing 8 maintenance substations.116 County bridges, spans > 20’-0”120 County bridges, spans < 20’-0”

Page 4: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 3

Washington County DPW

285 miles ofCounty highways.

Page 5: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 4

Washington County DPWDivision of Solid WasteDivision of Solid Waste

20 men staffing 5 transfer stations.

Page 6: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 5

Washington County DPW

Engineering DivisionEngineering DivisionStaff of 3 provide surveying and engineering services.

Page 7: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 6

Washington County DPW

Bridge Repair CrewBridge Repair CrewBridge Welder, Carpenter, Flagger.

Page 8: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 7

Washington County DPW

Bridge CrewBridge CrewForeman, 2 Carpenters & 1 Laborer.

Page 9: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 8

Washington County DPW

Emergency BackEmergency Back--up Bridge Crewup Bridge CrewForeman, 2 Carpenters & 1 Laborer.

Page 10: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 9

Washington County DPWBridge Program

Page 11: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 10

Why Precast?PROS

Reduce the length of bridge closures.Stretch the construction season.Address short span construction within our maintenance budget.

CONSLimited by weight.Construction joints.

Page 12: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 11

DesignMaximum panel weight: 12.5 tons.H20 loading.Designed from a maintenance standpoint.Developed spreadsheet model.

Page 13: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 12

DesignREINFORCED CONCRETE SLAB BRIDGE

Exterior panelC206Bridge No.:CR12Road Carried:Town of WhitehallPolitical Unit:

pcf145.00g c = Unit wt. concrete:ft11.75Sc = Clear Span:( = S c + t )ft12.83S = Effective span:ft1.08t = Slab Thickness:

ft30.00Wc = Clear width:( for analysis )ft1.00b = Unit width:psf30.00WS = Wearing Surface:

plf70.00Rail = Railing:psf30.00FOL = Future Overlay:

plf190.99DL = b x t x g c + b (FOL) + b (Rail/W c) x 2 DL = Dead Load:

kip ft3.93MDL = (DL x S 2)/8MDL = Dead Load Moment:

25.00HS = Live Load (HS25):

AASHTO 3.8.2Impact allowance is a fraction of live load stress, and shall not exceed 30% (1.3)Impact:

1 + (50 ft)/(Sc + 125 ft)I = 1.3

(Spans upto and including 50 ft .)900 x SMLL = Live Load Moment:

(Spans 50 ft . to 100 ft .)1000 x (1.3 x S - 20)

kip ft14.43MLL = kip ft18.76MLL(I) = with factored impact:

Page 14: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 17

Casting Photo 3

Page 15: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 18

Panel Loading & ShippingJohn Deere 644 loader.Gradall.

Page 16: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 23

Loading Photo 5

Page 17: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 24

Loading Photo 6

Page 18: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 28

Bridge C89; County Route 74 over Marshall Brook, Village of Greenwich

Existing bridge constructed 1939.Concrete parapet rail system.Erosion/scour issues.Concrete deck in failure.That pesky water main.

Page 19: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 30

Ex photo 2

Page 20: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 1

Ex photo 3

Page 21: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 4

Ex photo 6

Page 22: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 6

Scour repair photo 2

Page 23: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 9

Demolition photo 1

Page 24: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 11

Demolition photo 3

Page 25: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 14

Headwall photo 1

Page 26: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 15

Headwall photo 2

Page 27: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 17

Headwall photo 4

Page 28: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 21

Superstructure photo 4

Page 29: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 23

Superstructure photo 6

Page 30: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 24

Superstructure photo 7

Page 31: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 27

Superstructure photo 10

Page 32: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 29

After

Page 33: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 31

Bridge C37; County Route 16 over Mount Hope Brook, Town of Fort Ann

Original bridge constructed 1930’s.Existing bridge re-constructed 1994.A588 beams with CCA PT wood deck.Premature corrosion of beams.

Page 34: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 32

Ex Conditions photo 1

Page 35: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 34

Ex Conditions photo 3

Page 36: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 35

Detour Bridge photo 1

Page 37: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 38

Detour Bridge photo 4

Page 38: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 41

Detour Bridge photo 7

Page 39: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 42

Beam Prep photo 1

Page 40: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 45

Beam Prep photo 4

Page 41: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 47

Beam Prep photo 6

Page 42: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 51

Superstructure photo 2

Page 43: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 53

Superstructure photo 4

Page 44: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 54

Superstructure photo 5

Page 45: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 58

Superstructure photo 9

Page 46: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 59

Superstructure photo 10

Page 47: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 60

Superstructure photo 11

Page 48: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 62

Superstructure photo 13

Page 49: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 63

Finished Bridge Pictures

Page 50: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 64

Finished Bridge Pictures

Page 51: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 65

Bridge C206; County Route 12 over unnamed stream, Town of Whitehall

Existing bridge re-constructed and widened under the Erwin Plan, 1952.Severe deterioration of abutments and fascia girders.

Page 52: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 66

Exist Conditions photo 1

Page 53: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 69

Ex photo 4

Page 54: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 70

Ex photo 5

Page 55: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 74

Abutment Repairs photo 1

Page 56: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 78

Abutment Repairs photo 5

Page 57: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 80

Abutment Repairs photo 7

Page 58: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 81

Abutment Repairs photo 8

Page 59: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 82

Superstructure photo 1

Page 60: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 86

Superstructure photo 5

Page 61: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 89

After

Page 62: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County Department of Public Works 91

After

Page 63: SESSION 3.4 Design, Fabrication and Erection...Washington County DPW 1 Design, Fabrication, and Erection of Precast Concrete Deck Panels Willy F. Grimmke, P.E. Superintendent Kyle

Washington County DPW 92

Design, Fabrication, and Erection of Precast Concrete Deck Panels

Questions?

Washington County Department of Public Works

27 October 2004