setting up for calibration of pls-3 · written by: steve chan/juanito nocos 5/10/10 a. setting up...

18
1/18 Written By: Steve Chan/Juanito Nocos 5/10/10 PACIFIC LASER SYSTEMS HVL100 Procedures A. Setting Up for Level Calibration of Horizontal Lines, Plumb and Down pg. 2 B. Setting Up for Vertical Line Calibration pg. 4 C. Setting Up for Square Calibration pg. 5 D. Checking Level Line Calibration pg. 6 E. Checking Plumb Up Beam Calibration pg. 8 F. Checking Plumb Down Beam Calibration pg. 9 G. Checking Vertical Line Calibration pg. 10 H. Checking Square Calibration pg. 11 I. Removing Housing from Core pg. 12 J. Adjusting Vertical Line Back to Calibration pg. 13 K. Adjusting Horizontal Line Back to Calibration pg. 14 L. Adjusting Down Beam Back to Calibration pg. 15 M. Adjusting Plumb Beam Back to Calibration pg. 16 N. Adjusting Square Back to Calibration pg. 16 O. Placing Housing Back to Core pg. 17

Upload: others

Post on 23-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

1/18 Written By: Steve Chan/Juanito Nocos 5/10/10

PACIFIC LASER SYSTEMS

HVL100 Procedures

A. Setting Up for Level Calibration of Horizontal Lines, Plumb and Down pg. 2 B. Setting Up for Vertical Line Calibration pg. 4 C. Setting Up for Square Calibration pg. 5 D. Checking Level Line Calibration pg. 6 E. Checking Plumb Up Beam Calibration pg. 8 F. Checking Plumb Down Beam Calibration pg. 9 G. Checking Vertical Line Calibration pg. 10 H. Checking Square Calibration pg. 11 I. Removing Housing from Core pg. 12 J. Adjusting Vertical Line Back to Calibration pg. 13 K. Adjusting Horizontal Line Back to Calibration pg. 14 L. Adjusting Down Beam Back to Calibration pg. 15 M. Adjusting Plumb Beam Back to Calibration pg. 16 N. Adjusting Square Back to Calibration pg. 16 O. Placing Housing Back to Core pg. 17

Page 2: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

2/18 Written By: Steve Chan/Juanito Nocos 5/10/10

A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam

1. Use targets with 1/8” scale to check level. 2. Place target at 60ft away (far field target). If space is limited, place target closer

to the tool. The target needs to be scaled according to the distance from the tool.

3. Place a 2nd target approx. 3ft (1m) away from the tool (near field target). (Fig. A-1)

1st 2nd 60ft 3ft Tool Fig. A-1

4. Use a level platform to set the tool on. (Fig. A-2)

Fig. A-2 5. Place a 6” diameter adjustable mirror above the tool for plumb up calibration

check. (Fig. A-3)

Fig. A-3

6” Dia.

Page 3: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

3/18 Written By: Steve Chan/Juanito Nocos 5/10/10

6. Place an adjustable mirror below the tool for plumb down calibration check. (Fig. A-4)

Fig. A-4

7. Place a target twice the scale of the main beam target for plumb up beam at 60 ft

away from tool. (Fig. A-5)

1/4 in

1/8 in Plumb Target Fig. A-5

8. Place a target with 0.08” scale for down beam at 4.5ft away from tool. (Fig. A-6)

.08”

.04”

Fig. A-6

Page 4: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

4/18 Written By: Steve Chan/Juanito Nocos 5/10/10

B. Setting Up for Vertical Line Calibration 1. On a 20ft high wall, place 1st target 20ft away from tool. Place 2nd target 10ft

above the 1st target. Place 3rd target 20ft above the 1st target. (Fig. B-1, B-2)

3rd

2nd 20ft 10ft 1st

Tool 20ft Fig. B-1

Fig. B-2

2. Align three targets using a plumb bob hanging in front of the targets. (Fig. B-3)

Fig. B-3 3. The scale on 3rd target is 0.058 inches (1.5mm) to be in calibration. 4. The scale on 2nd target is 0.047 inches (1.2mm) to be in calibration. 5. The vertical line is always place at the center of bottom target.

Page 5: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

5/18 Written By: Steve Chan/Juanito Nocos 5/10/10

6. Place a camera in each target and connect to a monitor to easily view the line on the target. (Fig. B-4, B-5)

Fig. B-4 Fig. B-5

C. Setting Up for Square Calibration

1. Use a theodolite mounted to an adjustable height tripod to check the square left

and right beams. (Fig. C-1)

Fig. C-1

2. To setup targets, mark the down reference point of theodolite, mark the level reference point at zero position, and mark another level reference point at 90 degree from zero position. (Fig. C-2)

Fig. C-2

Target 1

Target 2

90°

Theodolite

Page 6: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

6/18 Written By: Steve Chan/Juanito Nocos 5/10/10

D. Checking Level Line Calibration

1. Set tool on the level platform. Center down beam on stage. (Fig. D-1)

Fig. D-1 2. Point one of the horizontal lines to center of the near field target. (Fig. D-2)

Fig. D-2 3. Adjust height of stage until the line is on center of target. (Fig. D-3)

Fig. D-3 4. Rotate and point tool to the far field target. (Fig. D-4)

Near Field

Target

Page 7: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

7/18 Written By: Steve Chan/Juanito Nocos 5/10/10

Fig. D-4 5. Verify if center of beam is 1/8” within the target (± 40 asec). (Fig. D-5)

Fig. D-5 6. Rotate tool until ends of line appear on target. Verify if beams are 1/8” within the target. Intermittently cover one end of line and verify if the lines are overlapping within 40 asec. Fig. D-6 and Fig. D-7

Fig. D-6 Fig. D-7 7. Repeat until all horizontal lines have been checked.

40

40

Far Field

Target

Page 8: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

8/18 Written By: Steve Chan/Juanito Nocos 5/10/10

E. Checking Plumb Up (Intersection of Lines) Calibration

1. Center down beam on stage. (Fig. E-1)

Fig. E-1

2. Adjust mirror until up beam is on center of plumb target. (Fig. E-2) Plumb Up

Mirror Tool Plumb Down

Fig. E-2

3. Rotate tool 180 degrees from initial position while maintaining down beam on

reference target. (Fig. E-3)

Plumb Up Mirror

Tool Plumb Beam

Fig. E-3

4. Verify if up beam is within the ¼” radius of target. Fig. E-4 shows a plumb beam 1/8” inches off from center of target. Since the mirror is adjusted to point the

Page 9: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

9/18 Written By: Steve Chan/Juanito Nocos 5/10/10

beam to the center of target, rotating the tool 180 degrees from initial position will place the beam ¼” away from center of target.

0

1/4 in Tool Fig. E-4 F. Checking Plumb Down Beam Calibration

1. Set tool on a level platform (Fig. F-1). Adjust mirror until down beam is on center of target. (Fig. F-2)

Fig. F-1 Fig. F-2

2. Rotate tool 180 degrees from initial position while maintaining up beam on reference target. (Fig. F-3)

Up Beam

Tool Down Beam Mirror Fig. F-3

Page 10: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

10/18 Written By: Steve Chan/Juanito Nocos 5/10/10

3. Verify if down beam is within the 0.08” radius of target at 4.5ft away. (Fig. F-4)

Fig. F-4

G. Checking Vertical Line Calibration

1. Center down beam on stage. (Fig. G-1)

Fig. G-1 2. Rotate tool until the vertical line is lined up with “Bottom” targets (use as

reference). (Fig. G-2)

Fig. G-2

3. Verify if vertical line straightness is 1/8” within the target. Repeat until all

vertical lines are checked.

TOP

CENTER

BOTTOM

Page 11: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

11/18 Written By: Steve Chan/Juanito Nocos 5/10/10

H. Checking Square Calibration

1. Place tool on a level stage. (Fig. H-1)

Fig. H-1 2. Place the down beam on the down reference mark. (Fig. H-2)

Fig. H-2 3. Rotate tool until center of the vertical line is aligned to reference “0” on target 1.

(Fig. H-3)

Fig. H-3

Target 1

Page 12: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

12/18 Written By: Steve Chan/Juanito Nocos 5/10/10

4. Check the second vertical line if it is within +/- 1/8” from center of the square target. (Fig. H-4)

Fig. H-4 5. Repeat step 1 thru 4 until all squares are checked.

I. Removing Housing from Core

1. Using a T10 Torx screwdriver to remove the three screws that secure the housing.

(Fig. I-1)

Fig. I-1 2. Carefully lift the housing up. (Fig. I-2)

Fig. I-2

Target 2

Page 13: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

13/18 Written By: Steve Chan/Juanito Nocos 5/10/10

3. Turn on the power with horizontal and two vertical lines on. Carefully disconnect the wire connector from the control board and set the housing aside. (Fig. I-3)

(Fig. I-3)

J. Adjusting Vertical Line (Straightness) Back to Calibration

1. Set core on a level stage. Use 1.5mm Hex screwdriver for adjustment. 2. If the vertical line is toward the right side. (Fig. J-1) Adjust the top screw

“clockwise” (tighten) in order to move the line to the left. Note: turn screw slightly since adjustment is very sensitive.

Fig. J-1 3. If the screw is too tight, you will have to slightly loosen (counter clockwise) the

screw that is on the opposite side.

Fig. I-2

Page 14: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

14/18 Written By: Steve Chan/Juanito Nocos 5/10/10

4. Adjust until the line is 1/8” within the target. Repeat the above steps until the remaining vertical lines are within specification.

5. Calibration of square needs to be verified after adjusting vertical line straightness. K. Adjusting Horizontal Line (Level) Back to Calibration

1. Set core on a level stage. Use 1.5mm Hex screwdriver for adjustment. 2. If left side of horizontal line is higher, adjust the center screw clockwise (tighten)

to lower the line and vice versa. If the screw is too tight, you will have to slightly loosen (counter clockwise) the screw on the opposite side. (Fig. K-1) Note: turn screw slightly since adjustment is very sensitive.

Fig. K-1 3. If center portion of the horizontal line is higher in the far field target, slightly loosen the 2 top screws and tighten the 2 bottom screws Fig. K-2.

Page 15: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

15/18 Written By: Steve Chan/Juanito Nocos 5/10/10

4. If center portion of the horizontal line is lower in the far field target, slightly loosen the 2 bottom screws and tighten the 2 tops screws Fig. K-3.

L. Adjusting Down Beam Back to Calibration

1. Set core on a level stage. Use a 1.2mm Hex screwdriver for adjustment. 2. Observe the location of down beam. When down beam is at the lower position

(Fig. L-1), rotate tool back to initial position and turn screw in clockwise direction to bring the beam downward (Fig. L-2). Readjust mirror until beam is at center of target. Rotate tool 180 degree and recheck beam position. Make more adjustment until beam is within specification. Note: turn screw slightly since adjustment is very sensitive.

Fig. L-1

Fig. L-2

Page 16: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

16/18 Written By: Steve Chan/Juanito Nocos 5/10/10

M. Adjusting Plumb Beam Back to Calibration

1. Set core on a level stage. Use 1.5mm Hex screwdriver for adjustment. 2. Plumb adjustment is similar to vertical adjustment. Only make small adjustment

at a time on both vertical lines from opposite ends (ex. V1 and V3 or V2 and V4) (Fig. M-1). Misalignment of the line from two opposite ends will create “double line” (Fig. M-2). Note: turn screw slightly since adjustment is very sensitive.

Fig. M-1 Fig. M-2 N. Adjusting Square Back to Calibration

1. Use 1.5mm Hex screwdriver for adjustment. 2. Vertical line toward the right side angle between LD1 and LD 2 is acute (<

90°) & angle between LD 2 & LD3 is obtuse (>90°). (Fig. N-1)

Fig. N-1

3. Loosen (counter clockwise) LD2 screw and tighten the opposite side of the screw

in order to steer the line back to the left side. (Fig. N-2) Note: turn screw slightly since adjustment is very sensitive.

LD 1

LD 2

< 90°

LD 3

>90°

V1

V3

V2 V4

Double Line

Page 17: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

17/18 Written By: Steve Chan/Juanito Nocos 5/10/10

Fig. N-2

O. Placing Housing Back in Core

1. Install wire connector back on control board. (Fig. O-1)

Fig. O-1 2. Carefully put housing back on the core. (Fig. O-2) Make sure that wires are not

pinched.

Fig. O-2

LD1 LD2

LD2 LD3

Page 18: Setting up for Calibration of PLS-3 · Written By: Steve Chan/Juanito Nocos 5/10/10 A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8”

18/18 Written By: Steve Chan/Juanito Nocos 5/10/10

3. Align the screw holes and install the three screws back onto the housing with a T5 Torx screwdriver. (Fig. O-3)

Fig. O-3